Shaanxi Sustainable Towns Development Project Procurement Plan PROCUREMENT PLAN Project information: Country: P.R. China Project name: Shaanxi Sustainable Towns Development Project Project Code: P162623 Project Implementation agency: • Provincial PMO housed with Provincial DRC • Ankang CPMO housed with Ankang City (Hanbin District) Housing and Urban-Rural Development Bureau • Shiquan CPMO housed with Shiquan County Housing and Urban- Rural Development Bureau • Ziyang CPMO housed with Ziyang County Housing and Urban- Rural Development Bureau • Hanzhong CPMO housed with Hanzhong City Development and Reform Commission Yang County-Housing and Urban-Rural Development Bureau • Mian CPMO housed with Mian County Housing and Urban-Rural Development Bureau • Shangluo CPMO housed with Shangluo City (Shangnan County) Housing and Urban-Rural Development Bureau Date of the Procurement Plan: Feb., 2019 Period covered by this Procurement Plan: June 2019-May 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 & August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 1 Shaanxi Sustainable Towns Development Project Procurement Plan A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: a. All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website / electronic portal with free access. b. A minimum of twenty (2) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c. Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d. Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e. Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winner Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f. The winning bidder shall not be required, as a condition of award, to reduce its bid price. No contract negotiation shall be permitted unless agreed in the procurement plan. 2 Shaanxi Sustainable Towns Development Project Procurement Plan g. No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed (except for request for quotation) solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h. The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The procurement documents shall disclose the newspaper and / or the electronic means in which the information on contract award shall be published. j. The contract award notification, according to the consulting selection or procurement method applied, shall identify: (a)name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefor and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. k) The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. l) The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. a. Leased Assets: Not applicable. b. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable: 3 Shaanxi Sustainable Towns Development Project Procurement Plan c. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: “Domestic Preference” is applicable. Works: “Domestic Preference” is not applicable. G. Other Relevant Procurement Information: Prior Review Threshold: Contract Expenditure Value Procurement Prior-Review Category Threshold Method Threshold (USD) (USD) 1. Goods and Non- ≥10,000,000 ICB All Consulting Services <10,000,000 NCB ≥2,000,000 <500,000 Request for Not applicable Quotation None ≥2,000,000 Direct Contracting 2. Works and ≥40,000,000 ICB All Supply and Installation of Plant and Equipment <40,000,000 NCB ≥10,000,000 <500,000 Request for Not applicable Quotation 3. Consulting ≥300,000 QCBS/QBS ≥1,000,000 Services <300,000 CQS N/A Fixed-budget ≥1,000,000 Selection 4 Shaanxi Sustainable Towns Development Project Procurement Plan Contract Expenditure Value Procurement Prior-Review Category Threshold Method Threshold (USD) (USD) Least Cost ≥1,000,000 Selection ≥300,000 Individual consultant ≥1,000,000 Direct Selection (firm) ≥300,000 Direct Selection (individual) 5 Shaanxi Sustainable Towns Development Project Procurement Plan Annex 1 Procurement Plan (2019-2022) Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s (RMB (USD ten ten (Month thousan thousan ) d) d) Laba Cave pump station expansion and reconstruction: pump drainage STDP- capacity is lifted to 14.7m³/s from Dec. 1 HB-CW- 7.2m³/s, 4000m2 reservoir is covered 6280 924 RFB Post 24 2019 01 and replacement of old pumps and reconstruction of the pump house are carried out. Section I of municipal drainage facility engineering in Xiaoxiba area: road engineering of Jinchuan Street (L=1,977 m, W=15 m) and rainwater pipeline; STDP- road engineering of Jinhuan Road (L= Dec. 2 HB-CW- 5418 797 RFB Post 24 174 m, W=15 m) and rainwater pipeline 2019 02 and sewage pipeline; and road engineering of Baiyun Road (L=272 m, W=15 m) and rainwater pipeline and Hanbin sewage pipeline. District Section II of municipal drainage facility engineering in Xiaoxiba area: reconstruction of sewage pipeline in West Outer Ring Road: 675m; road engineering of Xiyuan Road (L=227 m, W=15 m) and rainwater pipeline and sewage pipeline; road engineering of STDP- Jincheng Road (L=255 m, W=15 m) and 3 HB-CW- 7352 1081 RFB Prior Oct. 2022 24 rainwater pipeline and sewage pipeline; 03 road engineering of Jiusheng Road (L= 346 m, W=20 m) and rainwater pipeline and sewage pipeline; and road engineering of Yong'an Road (L=1,037 m, W=20 m) and rainwater pipeline and sewage pipeline; Xiba drainage pumping station engineering: the 6 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s designed pump drainage capacity is 3.32 m³/s. (1) Rehabilitation project of areas prone of water-logging on Yucai Road: New building of rainwater pipeline 1,164 m. (2) Update and reconstruction engineering of infrastructure in Jingning Area: road engineering of Tiyu Road (L= 310 m, W=18 m) and rainwater pipeline and sewage pipeline; road engineering of Jingning Lane (L=375 m, W=5 m) and rainwater pipeline and sewage pipeline; STDP- road engineering of Jiangnan Lane (L= 4 HB-CW- 3593 528 RFB Post Mar. 2020 18 255 m, W=4 m) and rainwater pipeline 04 and sewage pipeline; update and reconstruction engineering of infrastructure in Jingning Community, including road, rainwater and sewage pipeline, lighting, greening, environmental sanitation, fitness equipment and culture engineering. (3) Improvement engineering of human settlement in Luojiazhuang area: Improvement of roads, drainage, square, sanitation, greening, etc. (1) Renovation engineering of infrastructure in Shuangdi area: Improvement of roads, drainage, square, sanitation, greening etc.; (2) Update and reconstruction engineering of infrastructure in Dongguan area: STDP- road engineering of Dabei Street (L= 5 HB-CW- 3898 573 RFB Post Mar. 2021 24 330 m, W=15 m) and rainwater pipeline 05 and sewage pipeline; road engineering of Gulou West Road (L=490 m, W=15 m) and rainwater pipeline and sewage pipeline; road engineering of Gulou East Road (L=513 m, W=15 m) and rainwater pipeline and sewage pipeline; 7 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s and update and reconstruction engineering of nine lanes, including pavement, rainwater and sewage pipeline, lighting and environmental sanitation engineering. Improvement project of Hanjiang riverside slow traffic system: extend and newly build 3 sections with a length of 5.4 km, including roadbed STDP- repair, roadside protection, drainage 6 HB-CW- 1040 153 RFB Post Oct. 2020 12 facilities, pavement, traffic signs and 06 landscape greening, as well as supporting sanitation facilities, rest benches, fitness equipment, sculpture, etc. Reconstruction engineering of the west flood discharge channel of Nanshan: (1) west flood discharge engineering: 415 m 3000*2500 flood discharge pipe culvert (under pressure); (2) flood discharge engineering of Yaowangdian Ditch: 260 m 3000*3000 flood discharge pipe culvert (under pressure); and (3) flood discharge STDP- engineering of Wangyao Ditch: 405 m Dec. 7 HB-CW- 2000*2000 flood discharge pipe culvert 5566 819 RFB Post 24 2019 07 (under pressure). Reconstruction engineering of the east flood discharge channel of Nanshan: east flood discharge channel rechannelling engineering: 48 m 2700*3400 flood discharge pipe culvert (under pressure), 877 m 3500*4000 flood discharge pipe culvert (under pressure) and 219 m (3.5 m+11.5 m)*4.0 m flood discharge open channel. STDP- Civil engineering for a new radar Nov. 8 HB-CW- 1289 190 RFB Post 6 system. 2019 08 8 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s Additional construction of surface water STDP- automatic monitoring stations in the Dec. 9 HB-CW- Hanjiang River Basin (8 sets of 9- 651 96 RFB Post 5 2019 09 parameter automatic monitoring stations). Jiangnan urban area water-logging STDP- monitoring system upgrade project: Dec. 10 500 74 RFB Post 6 HB-G-01 Equipment procurement, software 2020 upgrade. Jiangnan urban area drainage STDP- maintenance equipment procurement 11 400 59 RFB Post Jun.2020 6 HB-G-02 project: Purchase 7 sets of drainage maintenance equipment. Municipal river chief system command room (municipal command room environment construction), municipal river chief system information platform equipment; 13 district- and county- STDP- level river chief system information Dec. 12 1710 251 RFB Prior 10 HB-G-03 centers (Baihe County, Xunyang 2019 County, Pingli County, Zhenping County, Hanbin District, Gaoxin Zone, Yinghu, Shiquan County, Ningshan County, Ziyang County, Langao County, Hengkou District). (1) Municipal river chief system command room (2 large and small UAVs), riverway patrol and monitoring equipment (415 HD monitoring cameras, 29 large and small UAVs), and municipal river chief system STDP- command room patrol equipment (1 13 2732 402 RFB Prior Aug,2020 12 HB-G-04 mobile station for river chief system patrol and maintenance); (2) Patrol equipment of 13 district- or county-level river chief system information centers(13 mobile stations for river chief system patrol and maintenance). 9 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s Prior STDP- C-band dual-polarization Doppler 14 616 91 DC (retroacti Jun. 2019 6 HB-G-05 weather radar and auxiliary equipment. ve) (1) X-band phase-coherent Doppler weather radar and auxiliary equipment; Prior STDP- (2) Vehicle-mounted mobile weather 15 971 143 RFB (retroacti Jun. 2019 6 HB-G-06 station, urban water-logging ve) observation equipment, data center equipment. (1) Ankang City South-to-North Water Diversion Environmental Emergency Command Center Platform, district and county-level (one district and nine counties) software platform; STDP- 16 (2) Additional construction of surface 1727 254 RFB Prior Jun. 2020 6 HB-G-07 water automatic monitoring stations in the Hanjiang River Basin (8 sets of 9- parameter automatic monitoring station monitoring equipment and system integration). Key pollution sources video monitoring equipment, equipment for county and district level environmental emergency command center (monitoring center, large screen and video conference STDP- system), environmental emergency 17 1956 288 RFB Prior Jun. 2020 10 HB-G-08 equipment (emergency site high- definition map transmission UAV transmission system, automatic unmanned surface intelligent monitoring ship and emergency site handling vehicle). Sub-total 45699 6723 2 new emergency refuge squares (Ximen River, Shiliangzi Refuge Square) STDP- Ziyang of 22060m2 in total, with supporting Dec. 1 ZY-CW- 6263.5 921 RFB Post 12 County construction of emergency evacuation 2019 01 passages, disaster prevention and avoidance equipment and greening and 10 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s lighting; Newly-built road: Hanjing Bridge to Caihong Bridge (L=720m, W=16m) Including road pavement, bridge, traffic facilities, rainwater and sewage pipeline, lighting and landscaping Reconstruction of 4 roads: reconstruction of Zifu Road (L=1500m, W=16m), west lane of Qiaogou Road (L=200m, W=6m), Qiaogou Road (L=1200m, W=16m), section from west STDP- lane of Qiaogou Road to Ziyanggang 2 ZY-CW- (L=500m, W=10m), and Jinzhan Road 4311 634 RFB Post Jun. 2020 18 02 of the Railway Station (L=700m, W=10m), including road pavement, traffic facilities, rainwater and sewage pipeline, lighting and landscaping; Reconstruction of flood discharge channel: 764.11m. 2 new emergency refuge squares (North Slope, Dongchengmen Refuge Square) of 2780m2 in total, with STDP- supporting construction of emergency 3 ZY-CW- evacuation passages, disaster 830.8 122 RFB Post Fec. 2020 18 03 prevention and avoidance equipment and greening and lighting; Renovate and newly build mountain town footpath system of 3388m in total Sub-total 11405.3 1677 Flood drainage engineering in Xiangyang Road (L = 1,220 m, W = 24 m), Buzi Road (L = 700 m, W = 12 m), Xianghe Road (L = 95 m, W = 10 m), Shiqua STDP- Jinqiao Road (L = 150 m, W = 10 m), n 1 SQ-CW- 4841 712 RFB Post Jan. 2020 18 Changban Lane (L = 250 m, W = 5 m), County 01 Beitai Lane (L = 250 m, W = 2.5 m), Taoyuan Road (L = 360 m, W = 10 m), and Wenhua North Road (L = 700 m, W = 12 m), including road reconstruction 11 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s and water drainage pipeline; Reconstruction engineering of pedestrian lanes in Dongmenling Road (L = 530 m) and Erliyizu Road (L = 240 m). Drainage project of Bingjiang Avenue STDP- (L= 2500m, W=15m) (including road 2 SQ-CW- 1819 268 RFB Post Apr.2021 15 engineering) and Honghua Avenue 02 (L=250). Comprehensive upgrade and landslide control of 9 streets and lanes (L = 1,242 m) in Laojie Community; STDP- 2 emergency shelters (Chengdong 3 SQ-CW- Square and Honghua Square) with a 1608 236 RFB Post Jan. 2021 12 03 total area of 15,095 m2; 5 community public spaces with a total area of 5,300 m2; and 2 emergency evacuation routes, with length of 0.11 km. STDP- Honghuagou pump station upgrade and Dec. 4 SQ-CW- 1062 156 RFB Post 12 reconstruction project. 2019 04 Sub-total 9330 1372 West Street, Xiaoxi Street, Zhongshan Street, East Street, South Street, North Street and branches and lane of L=6450m, W=1.5~10m; public space reconstruction in vacant land of Town God Temple, Ancient Theatrical Stage and Xijie Community and Weisheng Yangxi STDP- Street Square with an area of 4700m2, an 1 YX-CW- and update of 800 cultural icons and 3835.1 564 RFB Post Jun. 2021 18 County 01 350 traffic signs in old street area; reconstruction of Wenchang Lane, Xianjiang Lane and Zhifang Lane (L=1820, W=3~4.5m); reconstruction of Donger Street, Dongsan Street, Huiguan Street and Qingnian Lane (L=1820, W=6~12m); and reconstruction of Kaiming Square with 12 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s an area of 8700m2 Slow traffic system L=1600m of Wukang Road; reconstruction of the STDP- Stadium with an area of 38000m2; 2 YX-CW- reconstruction of Longquan Road, east 3542.7 521 RFB Post Sep. 2020 12 02 section of Heping Road and south section of Yuanlin Road L=1830m, W=6~16m Reconstruction of linkage section of Nanhuan Road and Hedi Road, Bingjiang Footpath and west section of Wangjiang Road L=2220m, W=6~16m; STDP- reconstruction of Cailun Square with an Dec. 3 YX-CW- area of 20580m2 and new building of 4272.1 628 RFB Post 12 2019 03 Tanghe River Binghe Square with an area of 20672.5m2 and slow traffic system of Heping Road, Tangta Road, Wenming Road, Qingnian Road and Zhuhuan Avenue L=6100m Main drainage pipe of South Ring Road STDP- L=1839m and 2 new flood discharge 4 YX-CW- pumps for the flood discharge pump 3208.0 472 RFB Post Sep. 2020 12 04 station in west section of Wenming Road Sub-total 14858 2185 Civil engineering of Heping Road (L = 2,077 m, W = 30 m), including sewage pipeline L = 2,077 m and rainwater STDP- pipeline L = 2,449m; civil engineering Dec. 1 MX-CW- 7915 1164 RFB Prior 21 of Hanbin Road (L = 1,587 m, W = 50 2020 01 Mianxi m), including sewage pipeline L = an 1,910 m, rainwater pipeline L = 2,406 County m and slow traffic L = 1,513 m; Civil engineering of Wuhou North Road, STDP- Caiyuan Street, Lianmeng Road, 2 MX-CW- Tiandangshan, Jiefang North Road, 4795 705 RFB Post Jun. 2020 18 02 Zhongshan Street, Xinhua Street and Tianyuan Road, including sewage 13 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s pipeline L=2936m and rainwater pipeline L=2972m; civil engineering for slow traffic system of middle section of Jinniu Avenue, west section of Jinniu Avenue, Jiangbin North Road (middle section), Zhanqian Road, Hanhui North Road, north section of Xihan Avenue, north section of Dingjunshan Avenue, Jiangbin South Road, Wuhou South Road and Dingjun Middle Road L=23498m Civil engineering of Jiaqi Road, Renmin Road, Xinxing North Road, Jiefang STDP- South Road, Xinxing South Road and Dec. 3 MX-CW- 3287 483 RFB Post 18 Minzhu Street, including sewage 2020 03 pipeline L=1036m and rainwater pipeline L=3351m; Newly built area of 13,886 m2 and reconstruction area of 104,000 m2 in the Refuge Square, renovation of emergency evacuation channel (Qizhipai Road, Weiwu Road North Road, Heping Road South Extension STDP- Road and Connecting Road), Jinniu 4 MX-CW- 1231 181 RFB Post Jun. 2021 12 Avenue East Section, Jiangbin North 04 Road (Old Town Section), Yanbin Road, Jiangbin North Road (East Section) and slow traffic L = 16,281 m; civil engineering of Jiefang South Road (L = 216 m, W = 30 m), including repair of sidewalk. STDP- Drainage (waterlogging) monitoring 5 325 48 RFQ Post Sep. 2019 MX-G-01 center and emergency rescue facilities Sub-total 17553 2581 Sigou flood discharge channel: L = Shangn STDP- 1,650 m, W = 3 m; Longwangmiao Dec. an 1 SN-CW- Ditch flood discharge channel: L = 581 3977 585 RFB Post 24 2019 County 01 m, W = 1.6 m, new building of Huposhan flood discharge channel H = 14 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s 692 m, W = 2 m Hupo Square: S = 9,113, Dangma Square: S = 1,423 Waterlogging-prone Area in Changxin Road South, transformation of small STDP- streets and lanes of old block in Hupo 2 SN-CW- 3059 450 RFB Post Sep. 2020 24 Area, Waterlogging-prone Area in 02 Changxin Road North; small streets and lanes of old block in Sigou Area Xianhe River Footpath Ring: L = 15 730 m, W = 1.54, footpath of Huanta Slope: STDP- L = 3,032 m, Beihuan Community 3 SN-CW- 7516 1105 RFB Prior May 2021 24 Square: S = 9,585, ground floor; square 03 of the Party School: S = 5,053, two floors underground STDP- West Jiaochang Ditch flood discharge 4 SN-CW- channel: H=1372m, W=3m, and small 1624 239 RFB Post May 2022 24 04 lane of Jiangchang Ditch Sub-total 16176 2379 Upgrade the meteorological disaster monitoring network (update and STDP- 1 construction of 6-element Beidou 505.4 74 RFB Post Sep. 2019 HZ-G-01 automatic weather station, construction of Beidou Center Station); Upgrade the national unattended STDP- station power supply system 2 414.66 61 RFB Post Sep. 2019 HZ-G-02 (generator, UPS, automatic switch Hanzho cabinet, distribution makeshift house); ung Meteorological Disaster Prevention Prior STDP- City 3 Command Center (Dangerous Weather 425.6 63 RFB (retroacti Jun. 2019 HZ-G-03 HD Video Conference Platform); ve) Meteorological Disaster Prevention Command Center (Emergency Warning STDP- Dec. 4 Information Release Platform, 235.14 35 RFQ Post HZ-G-04 2020 Meteorological Data Center Virtual Machine Room); STDP- Vehicle-mounted mobile weather 5 152 22 RFQ Post Sep. 2019 HZ-G-05 station 15 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s Construction of Hanzhong City STDP- Environmental Emergency Dispatch Dec. 6 HZ-CW- 1140 168 RFB Post 9 Center (civil engineering and 2020 01 decoration) Monitoring command center hardware infrastructure in Hanzhong City, command center dispatch STDP- 7 management system, 12369 384.56 57 RFQ Post 2020.12 HZ-G-06 environmental protection hotline and environmental complaint management system, virtualization software. Risk source-aware monitoring equipment, environmental emergency hardware equipment (UAVs, unmanned ships, emergency command vehicles, individual communication equipment, STDP- 8 emergency video terminals, walkie- 3165.44 466 RFB Prior 2020.12 HZ-G-07 talkies, emergency monitoring vehicles), environmental emergency monitoring equipment and environmental emergency supplies and equipment Sub-total 6423 946 Research on regional collaborative 1496 220 strategies and policies Research on 2035 Collaborative STDP- Development Vision Strategy of Town QCBS/ Dec. 1 PPMO- 408 60 Post Zone in the Upper Reaches of Hanjiang QBS 2019 CS-01 River STDP- Action Plan and Research Topics for QCBS/ Dec. 2 PPMO- Climate Change Adaptation in Cities 616 91 Post PPMO QBS 2019 CS-02 and Towns Research Report on Incorporating STDP- Resilient Towns into Spatial Planning Aug. 3 PPMO- 91 13 CQS Post and Land Use Planning (Hanbin District, 2020 CS-03 Ankang City) STDP- Conduct disaster risk evaluation for the Fixed- Dec. 4 PPMO- life channels and key infrastructures, 2 90 13 budget Post 2020 CS-04 items (Shiquan County, Shangnan Selection 16 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s County) Updating and Improving Disaster STDP- Emergency Response Plan and 5 PPMO- Technical Support for Drills (Shiquan 90 13 CQS Post May 2020 CS-05 County, Yangxian County, Mianxian County) Implementation of Town Renewal Needs Assessment Survey, Development of Technical Guidelines STDP- for Town Renewal, Slow Traffic System 6 PPMO- 201 30 CQS Post May 2020 Improvement Plan and Development of CS-06 Potential Apps (Hanbin District, Ankang City, Ziyang County, Shiquan County, Yangxian County, Shangnan County) Project Implementation Support 1836 269 STDP- Dec. 1 PPMO- Project Management Consulting 548 81 QCBS Post 2019 C1-01 STDP- 2 PPMO- Management information system 103 15 CQS Post Oct. 2019 C1-02 STDP- Dec. 3 PPMO- 1 Environmental monitoring expert 60 9 individual Post 2019 C1-03 STDP- Fixed- Post 4 PPMO- Environmental Monitoring Agency 43 6 budget Mar 2020 C1-04 Selection STDP- Post Dec. 5 PPMO- 1 Immigration monitoring expert 103 15 individual 2019 C1-05 STDP- Post 6 PPMO-G- Office equipment 139 20 RFQ Oct. 2019 01 STDP- 1 Consultant expert on thematic Post 7 PPMO- forums and workshops of the regional 20 3 individual May 2020 C1-06 collaborative platform STDP- 1 Consultant expert on rolling Post 8 20 3 individual May 2020 PPMO- investment plan of regional 17 Shaanxi Sustainable Towns Development Project Procurement Plan Project Procure Review Expecte Contra Progr Seri Estimate Estimate County Contrac ment by d Bid ct ess al Contract Description d Cost in d Cost in /Distric t No. Approac Bank(Pri Opening Duratio Statu No. RMB USD t h or/Post) Date n s C1-07 collaborative platform STDP- 1 Consultant expert on knowledge Post 9 PPMO- innovation and management consulting 30 4 individual May 2020 C1-08 of regional collaborative platform STDP- Manpower support of regional Post 10 PPMO- collaborative platform operation- 75 11 individual May 2020 C1-09 1provincial expert STDP- Manpower support of regional 11 PPMO- collaborative platform operation- 68 10 individual Post May 2020 C1-10 1provincial expert STDP- Manpower support of regional 12 PPMO- collaborative platform operation- 1city 68 10 individual Post May 2020 C1-11 expert STDP- Manpower support of regional 13 PPMO- collaborative platform operation- 1city 68 10 individual Post May 2020 C1-12 expert STDP- Manpower support of regional 14 PPMO- collaborative platform operation- 1city 68 10 individual Post May 2020 C1-13 expert STDP- Manpower support of regional 15 PPMO- collaborative platform operation- 1city 68 10 individual Post May 2020 C1-14 expert Sub-total 3332 489 Annex Ⅱ Training and Workshop Serial Contract Estimated Estimated Cost Contract No. No. Description Cost in RMB in USD 1 Training and Inspection 205 30 training Seminar (Preparation for Annual Round Table and Development 2 Forum, Operation and Maintenance of Regional Collaborative 150 22 workshop Platform) 18 Shaanxi Sustainable Towns Development Project Procurement Plan 19 Shaanxi Sustainable Towns Development Project Procurement Plan 20 PROCUREMENT China : Shaanxi Sustainable Towns Development Project PLAN General Information Country: China 2020-01-16 Bank’s Approval Date of the Original Procurement Plan: 2022-07-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162623 GPN Date: 2020-01-14 Project Name: Shaanxi Sustainable Towns Development Project Loan / Credit No: IBRD / 89640 Foreign Debt Management Office, Shaanxi Provincial DRC Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned STDP-ZY-CW-01 / Newly-built road: Hanjing Bridge to Caiho ng Bridge (L=720m, W=16m Single Stage - One E 2021-09-0 ) IBRD / 89640 Urban Regeneration Prior Request for Bids Open - National 5,140,000.00 0.00 Canceled 2020-01-16 2020-01-19 2020-01-17 2020-02-25 2020-03-31 2020-02-27 2020-04-22 2020-03-11 nvelope 2 Including road pavement, bri dge, traffic facilities, rainwat er and sewage pipeline, lighti ng and landscaping STDP-ZY-CW-01* / newly-buil t road:Hanjiang bridge to cai hong bridge(L=720m,w=16 Single Stage - One E 5,358,823.8 2021-03-1 IBRD / 89640 Urban Regeneration Prior Request for Bids Open - National 4,711,400.00 Signed 2020-07-19 2020-10-21 2020-07-22 2020-11-18 2020-08-21 2020-03-31 2020-08-23 2021-03-09 2020-09-11 2020-07-17 m)including road pavement, nvelope 4 0 bridge traffic facilities,rainwa ter and sewage pipeline, ligh tingand landscaping STDP-MX-CW-01 / Civil engin eering of Heping Road (L = 2 ,077 m, W = 30 m), including sewage pipeline L = 2,077 m Single Stage - One E 13,250,000.0 20,990,925. 2022-07-0 and rainwater pipeline L = 2, IBRD / 89640 Urban Regeneration Prior Request for Bids Open - National Terminated 2020-11-21 2020-12-13 2020-11-27 2021-05-10 2020-12-27 2021-06-24 2020-12-30 2021-06-30 2021-01-12 2021-08-18 nvelope 0 84 6 449m; civil engineering of Ha nbin Road (L = 1,587 m, W = 50 m), including sewage pipe line L = 1,910 m, rainwater p ipeline L = 2,40 STDP-SQ-CW-01 / Flood drai nage engineering in Xiangya ng , Xianghe , Jinqiao , Chan gban Lane , Beitai Lane , Tao Single Stage - One E 4,589,922.0 2022-08-0 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 8,000,000.00 Signed 2020-12-22 2020-12-29 2020-12-25 2020-12-28 2021-01-24 2021-03-03 2021-01-27 2021-03-12 2021-02-09 2021-04-02 yuan , and Wenhua North Ro nvelope 7 3 ad , including road reconstru ction and water drainage pip eline;Reconstruction enginee ring of pedestrian lanes in Do ngmenling road STDP-ZY-CW-02 / new emer gency refuge squares (Ximen Single Stage - One E 7,160,996.1 2022-08-0 River, Refuge Square) of 216 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 8,310,000.00 Signed 2020-12-22 2020-12-29 2020-12-25 2020-12-28 2021-01-24 2021-03-03 2021-01-27 2021-03-12 2021-02-09 2021-04-02 nvelope 6 3 00m2 in total: reconstruction of Zifu Road (L=1500m, W=1 6m), STDP-SN-CW-01 / Sigou floo d discharge channel: L =582 Single Stage - One E 4,066,945.2 2022-08-0 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 5,660,000.00 Signed 2020-12-22 2020-12-29 2020-12-25 2020-12-28 2021-01-24 2021-03-03 2021-01-27 2021-03-12 2021-02-09 2021-04-02 m, W = 3 m;Bei huan road: L nvelope 1 3 =998 m, W = 17-20 m STDP-HB-CW-02 / Section I o f municipal drainage facility engineering in Xiaoxiba area: Single Stage - One E 6,557,184.2 2022-08-0 road engineering of Jinchuan, IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 9,500,000.00 Signed 2020-12-22 2020-12-29 2020-12-25 2020-12-28 2021-01-24 2021-03-03 2021-01-27 2021-03-12 2021-02-09 2021-04-02 nvelope 8 3 Jinhuan road and rainwater pi peline; road engineering of B aiyun Road and rainwater pip eline and sewage pipeline. STDP-HB-CW-01 / Laba Cave pump station expansion and reconstruction: pump draina Request for Bids - ge capacity is lifted to 14.7m Single Stage - One E Small Works SPD 5,187,596.9 2022-02-2 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 9,950,000.00 Signed 2021-05-05 2021-05-11 2021-05-10 2021-05-12 2021-06-21 2021-06-24 2021-07-21 2021-06-26 2021-08-25 2021-07-27 ³/s from 7.2m³/s, 4000m2 res nvelope (2 envelope proce 6 1 ervoir is covered and replace ss) ment of old pumps and recon struction of the pump house are carried out. STDP-YX-CW-02 / Slow traffic system in Wukang Road L=1, Request for Bids - 500m; Stadium reconstructio Single Stage - One E Small Works SPD 4,962,439.4 2022-02-2 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 5,640,000.00 Signed 2021-05-05 2021-07-05 2021-05-10 2021-07-13 2021-06-21 2021-08-20 2021-07-21 2021-08-20 2021-08-25 2021-09-18 n 38,110m2; Longquan Road, nvelope (1 envelope proce 9 1 east section of Heping Road ss) and south section of Yuanlin Road L=2,029m, W=4~12m. STDP-HZ-CW-01 / Constructi on of Hanzhong City Environ Request for Bids - mental Emergency Supplies Single Stage - One E Small Works SPD 2,947,775.3 2022-02-2 IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 1,790,000.00 Signed 2021-05-05 2021-08-19 2021-05-10 2021-08-22 2021-06-21 2021-09-27 2021-07-21 2021-09-27 2021-08-25 2021-10-21 Reserve Warehouse (civil en nvelope (1 envelope proce 3 1 gineering and outdoor engin ss) eering in standard constructi on) STDP-HB-CW-03 / Section II of municipal drainage facility National Procure engineering in Xiaoxiba Area: ment Document - Single Stage - One E 4,521,906.1 2022-07-0 road engineering,rainwater p IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 7,470,000.00 Signed 2021-09-14 2021-09-08 2021-09-19 2021-09-22 2021-10-31 2021-10-28 2021-11-30 2021-10-28 2022-01-04 2021-11-30 nvelope 8 3 ipeline and sewage pipeline i ss (Non Bank-SPD n Xiyuan Road; road enginee ) ring, rainwater pipeline and s ewage pipeline in Jincheng R oad; etc National Procure STDP-HB-CW-09 / Additional ment Document - construction of surface water Single Stage - One E 1,174,647.7 2022-08-0 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 1,000,000.00 Signed 2021-10-13 2022-05-18 2021-10-18 2022-05-20 2021-11-29 2022-06-21 2021-12-29 2022-06-21 2022-02-02 2022-07-07 automatic monitoring station nvelope 1 1 ss (Non Bank-SPD s in the Hanjiang River Basin. ) National Procure STDP-SQ-CW-02 / Drainage e ment Document - ngineering in Binjiang Avenu Single Stage - One E 3,896,644.8 2022-07-0 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 4,230,000.00 Signed 2021-09-15 2021-09-08 2021-09-20 2021-09-22 2021-11-01 2021-10-28 2021-12-01 2021-10-28 2022-01-05 2021-11-15 e (L=2,400m, W=16.5m) incl nvelope 8 4 ss (Non Bank-SPD udes road reconstruction eng ) ineering. Page 1 STDP-SN-CW-03 / Huanxian National Procure River footpath: L=6828m, W ment Document - Single Stage - One E 4,279,888.5 2022-08-0 =2, flood discharge channel i IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 5,090,000.00 Signed 2021-10-19 2021-09-29 2021-10-24 2021-10-08 2021-12-05 2021-11-09 2022-01-04 2021-11-09 2022-02-08 2021-11-30 nvelope 2 7 n Hupo Lane: L=834.5m, squ ss (Non Bank-SPD are of the Party School: S=50 ) 53, 1 floor underground STDP-MX-CW-01A / Heping R oad2,098m,main sewage pip e2,099m,main rainwater pipe National Procure 2,101m;Hanjiang Road 1,587 ment Document - Single Stage - One E 20,600,000.0 21,072,213. 2022-02-1 m,main sewage pipe1,265m, IBRD / 89640 Urban Regeneration Prior Request for Bids Open - National 1 Envelope proce Signed 2021-07-23 2021-07-24 2021-07-27 2021-07-28 2021-08-04 2021-08-16 2021-08-18 nvelope 0 55 2 main rainwater pipe1,285m; ss (Non Bank-SPD slow traffic system1,513m, el ) ectric power, telecommunica tions, street lamps, road surf aces, signs and markings, et c. National Procure STDP-HB-CW-10 / Rainwater ment Document - lifting engineering in Xiba Ar Single Stage - One E 3,446,452.8 2022-10-0 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 4,850,000.00 Signed 2021-12-20 2022-04-15 2021-12-25 2022-04-16 2022-02-05 2022-05-27 2022-03-07 2022-06-06 2022-04-11 2022-06-22 ea: a rainwater lifting pump s nvelope 7 8 ss (Non Bank-SPD tation with the design flow of ) Q=5.10m³/s. STDP-HB-CW-04 / regenerati on and reconstruction engine National Procure ering of infrastructure in Jing ment Document - Single Stage - One E Under Imple 2022-10-1 ning Area: road engineering , IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 2,390,000.00 0.00 2021-12-31 2022-06-30 2022-01-05 2022-07-06 2022-02-16 2022-03-18 2022-04-22 nvelope mentation 9 rainwater pipeline and sewag ss (Non Bank-SPD e pipeline ;update and recon ) struction engineering of infra structure in Jingning Commu nity. STDP-SQ-CW-03 / Comprehe nsive upgrade and landslide National Procure control of 9 streets and lanes ment Document - (L=1,242m) in Laojie Commu Single Stage - One E Under Imple 2022-11-1 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 5,220,000.00 0.00 2022-01-25 2022-06-30 2022-01-30 2022-07-06 2022-03-13 2022-04-12 2022-05-17 nity; nvelope mentation 3 ss (Non Bank-SPD 4 community public spaces w ) ith a total area of 23,098m2; Two emergency evacuation t unnels. STDP-YX-CW-01 / West Stree t, Xiaoxi Street, Zhongshan S National Procure treet, East Street, South Stre ment Document - et, North Street and branche Single Stage - One E Under Imple 2023-07-2 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 8,890,000.00 0.00 2021-12-15 2022-07-15 2021-12-18 2022-07-21 2022-01-17 2022-01-20 2022-02-02 s and lane of old streets ;pub nvelope mentation 7 ss (Non Bank-SPD lic space reconstruction with ) an area of 4700m2 ; update cultural icons, facility pieces, and traffic signs in old street area; STDP-MX-CW-03 / Civil engin eering of Jiaqi Road, Renmin National Procure Road, Xinxing North Road, et ment Document - c; renovation of emergency e Single Stage - One E 2,324,881.2 2023-08-1 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 5,790,000.00 Signed 2021-12-31 2022-03-04 2022-01-03 2022-03-03 2022-02-02 2022-05-10 2022-02-05 2022-06-06 2022-02-18 2022-06-22 vacuation channel ;east secti nvelope 5 2 ss (Non Bank-SPD on of Jinniu Avenue, Jiangbin ) North Road (old town section ), Yanbin Road, Jiangbin Nort h Road (east section) and slo w traffic. STDP-SN-CW-04 / West Jiaoc National Procure hang Ditch flood discharge c ment Document - hannel: L=1372m W=3m, a Single Stage - One E Under Imple 2022-11-0 IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 4,480,000.00 0.00 2022-01-20 2022-07-15 2022-01-25 2022-07-21 2022-03-08 2022-04-07 2022-05-12 nd small lane of Jiangchang nvelope mentation 8 ss (Non Bank-SPD Ditch; square of Beihuan Co ) mmunity: S=9585, 1 floor un derground. STDP-YX-CW-03 / Reconstruc tion of linkage section of Sou National Procure th Ring Road and Hedi Road, ment Document - Binjiang footpath ,and Cailun Single Stage - One E Under Imple 2023-10-0 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 3,360,000.00 0.00 2022-02-25 2022-07-15 2022-02-28 2022-07-21 2022-03-30 2022-04-02 2022-04-15 Square with an area of 22,43 nvelope mentation 7 ss (Non Bank-SPD 4m2, slow traffic system;and ) 2 new flood discharge pumps for the flood discharge pump station in west section of We nming Road. National Procure STDP-MX-CW-04 / Renovatio Request for Quota Single Stage - One E ment Document - 2022-10-2 n the refuge Square of 10400 IBRD / 89640 Resilience Strengthening Post Open - National 470,000.00 491,887.75 Signed 2022-03-02 2022-04-27 2022-06-01 tions nvelope 1 Envelope proce 4 0¡ . ss (Non Bank-SPD ) National Procure STDP-YX-CW-04 / Main drain Single Stage - One E ment Document - 3,133,707.0 2023-02-1 age pipe of South Ring Road IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 5,640,000.00 Signed 2022-04-29 2022-04-22 2022-05-04 2022-04-22 2022-06-15 2022-05-27 2022-07-15 2022-06-06 2022-08-19 2022-06-22 nvelope 1 Envelope proce 0 5 L=1,934m. ss (Non Bank-SPD National ) Procure STDP-MX-CW-05 / Newly-buil ment Document - Single Stage - One E Pending Imp 2023-05-1 t Maying emergency shelter IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 896,000.00 0.00 2022-07-22 2022-07-27 2022-09-07 2022-10-07 2022-11-11 nvelope lementation 0 square of 10238.5¡ ss (Non Bank-SPD ) STDP-HB-CW-05 / Renovatio National Procure n engineering of infrastructur ment Document - Single Stage - One E Under Imple 2023-04-1 e in Shuangdi area;regenerat IBRD / 89640 Resilience Strengthening Post Request for Bids Open - National 1 Envelope proce 5,000,000.00 0.00 2022-06-30 2022-06-30 2022-07-05 2022-07-06 2022-08-16 2022-09-15 2022-10-20 nvelope mentation 8 ion and reconstruction engin ss (Non Bank-SPD eering of infrastructure in Do ) ngguan area. STDP-HB-CW-06 / Improvem ent project of Hanjiang rivers National Procure ide slow traffic system: exten ment Document - d and newly build 3 sections Single Stage - One E Under Imple 2023-04-1 IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 1,900,000.00 0.00 2022-06-30 2022-06-30 2022-07-05 2022-07-06 2022-08-16 2022-09-15 2022-10-20 with a length of 5.4 km, inclu nvelope mentation 8 ss (Non Bank-SPD ding roadbed repair, roadsid ) e protection, drainage faciliti es, pavement, traffic signs a nd landscape greening, etc. National Procure STDP-ZY-CW-03 / 3 new eme ment Document - rgency shelter squares Reco Single Stage - One E Pending Imp 2023-04-1 IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 1 Envelope proce 7,400,000.00 0.00 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 nstruction of 2 roads Recons nvelope lementation 8 ss (Non Bank-SPD truction of flood discharge ch ) annel National Procure STDP-HB-CW-08 / Civil engin ment Document - Single Stage - One E Pending Imp 2024-03-0 eering of new radar system ( IBRD / 89640 Urban Regeneration Post Request for Bids Open - National 1 Envelope proce 6,480,000.00 0.00 2022-07-22 2022-07-25 2022-08-24 2022-08-27 2022-09-09 nvelope lementation 2 building of 6.3km fourth-clas ss (Non Bank-SPD s road). ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 STDP-HB-G-06 / (1) X-band p hased Array weather radar a nd auxiliary equipment; Single Stage - One E (2) Vehicle-mounted mobile IBRD / 89640 Urban Regeneration Prior Request for Bids Open - National 2,300,000.00 2,433,668.28 Signed 2020-11-21 2020-12-13 2020-11-27 2020-12-27 2021-03-09 2020-12-30 2021-03-25 2021-01-12 2021-04-16 2021-07-11 nvelope weather station, urban water -logging observation equipm ent, data center equipment. STDP-HB-G-03 / Municipal riv er chief system command ro om (municipal command roo m for environment constructi Single Stage - One E on), municipal river chief syst IBRD / 89640 SSR Collaboration Platform Prior Request for Bids Open - National 4,150,000.00 4,608,544.79 Signed 2021-05-05 2021-05-19 2021-05-10 2021-06-04 2021-06-21 2021-06-30 2021-07-21 2021-08-27 2021-08-25 2021-09-18 2022-02-21 nvelope em informatization platform equipment; 13 district-count y-level river chief system info rmation centers, district-coun ty-level river STDP-HB-G-04 / (1) Municipa l river chief system comman d room , patrol equipment of municipal river chief system Single Stage - One E command room, and riverwa IBRD / 89640 SSR Collaboration Platform Prior Request for Bids Open - National 4,680,000.00 4,606,791.95 Signed 2021-07-08 2022-02-14 2021-07-13 2022-05-15 2021-08-24 2022-06-01 2021-09-23 2022-06-20 2021-10-28 2022-07-05 2022-04-26 nvelope y early warning and broadcas ting system; (2)Patrol equipment of 13 dis trict- or county-level river chi ef system information center s STDP-PPMO-G-01 / Office fac Request for Quota IBRD / 89640 Project Management Post 210,000.00 220,893.55 Signed 2021-06-21 2021-08-16 2021-08-09 2022-02-12 ilities tions STDP-HZ-G-01 / Upgrade the meteorological disaster moni toring network (update and c Single Stage - One E IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 900,000.00 1,018,533.75 Signed 2021-08-11 2021-08-26 2021-08-16 2021-08-26 2021-09-27 2021-09-28 2021-10-27 2021-09-28 2021-12-01 2021-10-21 2022-05-30 onstruction of 6-element Bei nvelope dou automatic weather statio n, construction of Beidou Cen ter Station); STDP-HB-G-02 / Jiangnan urb an area drainage maintenanc Single Stage - One E e equipment procurement pr IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 600,000.00 534,121.59 Signed 2021-12-10 2022-02-11 2021-12-15 2022-02-11 2022-01-26 2022-03-30 2022-02-25 2022-03-30 2022-04-01 2022-06-13 2022-09-28 nvelope oject: Purchase 7 sets of drai nage maintenance equipmen t. STDP-HB-G-07 / (1) Ankang City South-to-North Water Di version Environmental Emerg ency Command Center Platfo Single Stage - One E Under Imple IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 2,580,000.00 0.00 2021-12-31 2022-06-10 2022-01-05 2022-07-07 2022-02-16 2022-03-18 2022-04-22 2022-10-19 rm, district- and county-level nvelope mentation software platform; (2) Additional construction of surface water automatic mon itoring stations in the Hanjian g River Basin. STDP-HB-G-08 / Key pollutio n sources video monitoring e quipment, equipment for cou Single Stage - One E Under Imple IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 2,920,000.00 0.00 2021-12-31 2022-07-27 2022-01-05 2022-07-27 2022-02-16 2022-03-18 2022-04-22 2022-10-19 nty and district level environ nvelope mentation mental emergency command center;environmental emerg ency equipment. STDP-MX-G-01 / One drainag Request for Quota Single Stage - One E e (water-logging) monitoring IBRD / 89640 SSR Collaboration Platform Post Open - National 490,000.00 447,223.27 Signed 2021-12-25 2022-03-03 2022-02-19 2022-06-13 2022-08-18 tions nvelope center and emergency rescu e facilities. STDP-HZ-G-02 / Upgrade the national unattended station Single Stage - One E power supply system (genera IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 620,000.00 641,677.98 Signed 2021-12-31 2022-02-14 2022-01-05 2022-02-14 2022-02-16 2022-03-30 2022-03-18 2022-03-30 2022-04-22 2022-04-28 2022-10-19 nvelope tor, UPS, automatic switch ca binet, distribution makeshift house). STDP-HZ-G-03 / Meteorologi cal Disaster Prevention Com Single Stage - One E IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 720,000.00 667,288.00 Signed 2021-12-31 2022-02-14 2022-01-05 2022-02-14 2022-02-16 2022-03-30 2022-03-18 2022-03-30 2022-04-22 2022-04-28 2022-10-19 mand Center (Dangerous We nvelope ather HD Video Conference P latform); STDP-HZ-G-05 / Vehicle-mou Request for Quota Single Stage - One E IBRD / 89640 SSR Collaboration Platform Post Open - National 230,000.00 241,635.87 Signed 2022-01-05 2022-03-02 2022-04-28 2022-08-29 nted mobile weather station. tions nvelope STDP-HZ-G-04 / Meteorologi cal Disaster Prevention Com mand Center (Emergency Wa Single Stage - One E Under Imple IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 720,000.00 0.00 2021-12-31 2022-02-14 2022-01-05 2022-02-14 2022-02-16 2022-03-18 2022-04-22 2022-10-19 rning Information Release Pla nvelope mentation tform, Meteorological Data C enter Virtual Machine Room); STDP-HB-G-01 / Jiangnan urb an area water-logging monito Single Stage - One E IBRD / 89640 SSR Collaboration Platform Post Request for Bids Open - National 750,000.00 724,969.60 Signed 2022-05-20 2022-05-10 2022-05-25 2022-06-15 2022-07-06 2022-06-14 2022-08-05 2022-06-14 2022-09-09 2022-06-28 2023-03-08 ring system upgrade project: nvelope Equipment procurement, soft ware upgrade. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual STDP-PPMO-C1-01 / Project Quality And Cost- Open - Internationa IBRD / 89640 Project Management Post 810,000.00 641,032.71 Signed 2020-01-15 2020-01-17 2020-02-05 2020-03-25 2020-03-20 2020-05-18 2020-04-17 2020-07-02 2020-05-17 2020-07-07 2020-06-21 2020-07-22 2020-07-26 2020-08-24 2021-07-26 Management Consulting Based Selection l STDP-PPMO-C1-03 / Environ Consultant Qualifi IBRD / 89640 Project Management Post Open - National 250,000.00 259,556.22 Signed 2020-09-15 2020-07-08 2020-10-06 2020-10-08 2020-11-19 2020-08-05 2020-12-19 2020-09-14 2021-01-23 2020-09-28 2021-07-22 mental Monitoring Consultan cation Selection cy STDP-PPMO-C1-05 / Social M Consultant Qualifi IBRD / 89640 Project Management Post Open - National 230,000.00 232,667.73 Signed 2020-09-15 2020-07-08 2020-10-06 2020-10-08 2020-11-19 2020-08-05 2020-12-19 2020-09-14 2021-01-23 2020-09-28 2021-07-22 onitoring Consultant cation Selection Page 3 STDP-PPMO-C1-02 / Manage ment Information System (MI Consultant Qualifi IBRD / 89640 Project Management Post Open - National 150,000.00 145,434.50 Signed 2020-09-15 2020-08-19 2020-10-06 2020-10-08 2020-11-19 2020-09-14 2020-12-19 2020-09-28 2021-01-23 2020-10-19 2021-07-22 S) Development, Operation a cation Selection nd Maintenance Consulting S ervice STDP-PPMO-C1-15 / Preparin g the Three-year Rolling Inve Consultant Qualifi stment Plan of Infrastructure IBRD / 89640 Project Management Post Open - National 290,000.00 298,672.30 Signed 2021-01-17 2021-01-13 2021-02-07 2021-01-20 2021-03-23 2021-02-24 2021-04-22 2021-03-26 2021-05-27 2021-04-02 2025-12-31 cation Selection Southern Shaanxi Hanjiang R iver Eco-economy Zone Colla boration Platform STDP-PPMO-CS-04 / Disaster risk assessment of life chann Consultant Qualifi Under Implement els and key infrastructures (S IBRD / 89640 SSR Collaboration Platform Post Open - National 200,000.00 0.00 2021-12-09 2022-02-15 2021-12-30 2022-06-15 2022-02-12 2022-03-14 2022-04-18 2023-04-13 cation Selection ation hiquan County, Shangnan co unty and Ziyang County) STDP-PPMO-CS-02 / Action Pl an and Research Topics for C Consultant Qualifi Under Implement IBRD / 89640 SSR Collaboration Platform Post Open - National 295,000.00 0.00 2022-01-07 2022-02-14 2022-01-28 2022-06-15 2022-03-13 2022-04-12 2022-05-17 2023-05-12 limate Change Adaptation in cation Selection ation Cities and Towns STDP-PPMO-CS-06 / Town re generation Needs Assessmen t Survey, Development of Te chnical Guidelines for Town r Consultant Qualifi Under Implement egeneration, Slow Traffic Sys IBRD / 89640 SSR Collaboration Platform Post Open - National 295,000.00 0.00 2021-12-20 2022-05-08 2022-01-10 2022-06-15 2022-02-23 2022-03-25 2022-04-29 2023-04-24 cation Selection ation tem Improvement Plan and D evelopment Apps(Hanbin Dis trict, Ziyang County, Shiquan County, Yang County, Mian C ounty Shangnan County) STDP-PPMO-CS-07 / Researc Consultant Qualifi h on Ecological Protection Co IBRD / 89640 SSR Collaboration Platform Post Open - National 250,000.00 162,633.17 Signed 2021-11-10 2021-11-08 2021-12-01 2021-11-11 2022-01-14 2021-12-26 2022-02-13 2022-02-17 2022-03-20 2022-03-02 2023-03-15 cation Selection mpensation Mechanism in So uthern Shaanxi STDP-PPMO-CS-08 / Researc h on Development of Green Consultant Qualifi Recycling High-quality Indust IBRD / 89640 SSR Collaboration Platform Post Open - National 160,000.00 123,839.93 Signed 2021-11-11 2021-11-08 2021-12-02 2021-11-11 2022-01-15 2021-12-26 2022-02-14 2022-02-17 2022-03-21 2022-03-02 2023-03-16 cation Selection rial System and Project Reser ve in Southern Shaanxi durin g the 14th Five-Year Plan STDP-PPMO-CS-01 / Researc h on 2035 Collaborative Dev Quality And Cost- Open - Internationa Under Implement IBRD / 89640 SSR Collaboration Platform Post 630,000.00 0.00 2022-02-15 2022-07-12 2022-03-08 2022-04-21 2022-05-19 2022-06-18 2022-07-23 2022-08-27 2024-02-18 elopment Vision Strategy of Based Selection l ation Town Zone in the Upper Reac hes of Hanjiang River INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4