P128534 Safety Nets Project Procurement Plan June 1st 2017 I. General 1. Bank’s approval Date of the procurement Plan: February 5, 2013 (initial): Revision 12 of Updated Procurement Plan, April 20, 2017 2. Date of General Procurement Notice: Nov 24, 2014 3. Period covered by this procurement plan: The procurement period of project covered from year November 2016 to March 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. NCB (Goods) Above or equal US$ 10 million 2. NCB (Works) Above or equal US$ 10 million 3. NCB (Non-Consultant Above or equal Services) US$ 2 million 4. Individual (Goods) Above or equal Justification to be US$ 10 million included in the PP 5. Individual (Non Consultant Above or equal Justification to be Services) US$ 2 million included in the PP 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for the Safety Nets Project issued on January 2014 by Project Coordination Unit. 1 5. Any Other Special Procurement Arrangements: Not Applicable 6. Summary of the Procurement Packages planned during the 18 months of the current Procurement Plan-November 2016 to March 2018 (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) 1 Summary 0 0 No No of the ICB (Works) 2 Summary 0 0 No No of the ICB (Goods) 3 Summary 0 0 No No of the NCB (Works) 4 Summary 1.5 18 No Post of the NCB (Goods) 5 Summary 0.74 2 No Prior of the NCB (Non- Consultant Services) 6 Summary 0.51 16 No Post of the NCB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above or equal US$ 1 million 2 2 Competitive Methods Above or equal (Individual) US$ 0.3 million 3 Single Source (Firms) Above or equal Justification to be US$ 1 million included in the PP 4 Single Source (Individual) Above or equal Justification to be US$ 0.3 million included in the PP 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million 1 Summary 1.7 8 Prior LCS; SSS; of number CQS; of Individual contracts ; that will be let under other methods 2 Summary 2 72 Post SSS; of number CQS; of Individual contracts that will be let under other methods 3 4 PROCUREMENT Cameroon : Cameroon Social Safety Nets PLAN General Information Country: Cameroon 2017-02-14 Bank’s Approval Date of the Original Procurement Plan: 2022-10-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P128534 GPN Date: Project Name: Cameroon Social Safety Nets Loan / Credit No: IDA / 52240, IDA / 62230, IDA / D2980 UNITE DE GESTION DU PROJET FILETS SOCIAUX Executing Agency(ies): WORKS Activity Reference No. Procurement Estimated Actual A Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio High SEA/SH Process Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Contract Compl / Description Component Review Type Method Document Ty Amount ( mount ( rt and Recommenda Signed Contract No. ch ocess n (Y/N) Risk Status n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes etion pe US$) US$) tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d CM-UGP-PFS-26069-CW-R Laying the Foundations of Demande de pri Single Stage - On 2018-04-0 2018-08-2 2018-04-2 2018-10-0 2018-05- FQ / Aménagement des bu IDA / 52240 a Safety Net System and A posteriori Limited 8,300.00 7,209.40 Achevé x e Envelope 1 9 4 5 15 reaux de l'antenne régiona Supporting Project Manag le du Nord ouest ement GOODS Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Estimated A Actual Amoun Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) mount (US$) t (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-UGP-PFS-5831-GO-RF Laying the Foundations of B / fourniture du matériel i a Safety Net System and Single Stage - On 2017-01-2 2017-02-0 2017-01-2 2017-03-1 2017-01-2 2017-04-1 2017-02-1 2017-05-1 2017-04-1 2017-11-1 2017-05-0 IDA / 52240 A posteriori Appel d'offres Open - National 253,000.00 243,616.43 Achevé nformatique, de téléphoni Supporting Project Manag e Envelope 4 1 9 2 4 1 0 6 7 2 8 e, et d'équipement de bur ement eau (en 3 lots distincts) CM-UGP-PFS-6172-GO-RF Q / Fourniture du matériel Public Works Program Pilo Demande de pri Single Stage - On 2017-02-1 2017-02-1 2017-04-1 2017-03-1 2017-05-1 2017-04-1 de la phase 3 des THIMO d IDA / 52240 A posteriori Limited 188,000.00 159,198.65 Achevé t x e Envelope 8 0 5 0 5 4 ans 2 communes de la rég ion de l'Extrême Nord et 2 communes de la région de l'EST CM-UGP-PFS-6231-GO-RF Q / Fourniture des boîtes à pharmacie de la phase 3 d Public Works Program Pilo Demande de pri Single Stage - On 2017-02-2 2017-03-0 2017-04-1 2017-04-0 2017-05-0 2017-04-1 IDA / 52240 A posteriori Limited 29,000.00 31,172.51 Achevé es THIMO pour 2 commun t x e Envelope 0 3 7 7 1 4 es de la région de l'Extrêm e Nord et 2 communes de la région de l'Est CM-UGP-PFS-6307-GO-RF Laying the Foundations of Demande de pri Single Stage - On 2017-03-2 2017-05-1 2018-05-1 Q / Fourniture des fournitu IDA / 52240 a Safety Net System and A posteriori Limited 60,000.00 0.00 Annulé x e Envelope 0 5 0 res de bureau au Projet Fil Supporting Project Manag ets Sociaux ement CM-UGP-PFS-7392-GO-RF Laying the Foundations of Single Stage - On 2017-05-3 2016-12-1 2017-06-0 2017-07-1 2017-08-1 2017-09-2 2017-10-2 Q / Fourniture des consom IDA / 52240 a Safety Net System and A posteriori Appel d'offres Open - National 130,000.00 0.00 Annulé e Envelope 1 2 5 7 6 0 0 mables informatiques Supporting Project Manag ement CM-UGP-PFS-16931-GO-R Laying the Foundations of FQ / fourniture des pièces a Safety Net System and Demande de pri Single Stage - On 2017-06-1 2017-08-1 2017-07-1 2017-08-2 2017-08-1 IDA / 52240 A posteriori Open - National 37,500.00 32,502.70 Achevé de rechange pour véhicule Supporting Project Manag x e Envelope 9 4 7 8 7 s et motos du Projet Filets ement Sociaux CM-UGP-PFS-23000-GO-R FQ / fourniture des boites à pharmacie pour la phase Public Works Program Pilo Demande de pri Single Stage - On 2017-08-1 2017-09-0 2017-10-1 2017-10-1 2018-04-1 2017-10-2 IDA / 52240 A posteriori Limited 25,100.00 21,014.35 Achevé 4 des THIMO dans 2 comm t x e Envelope 5 4 3 6 1 4 unes de la région de l'Ada maoua et 1 commune de l a région du Nord CM-UGP-PFS-25708-GO-R Laying the Foundations of Demande de pri Single Stage - On 2017-11-0 2018-03-2 2017-12-1 2018-04-0 2018-01-0 2018-04-1 FQ / Fourniture du mobilier IDA / 52240 a Safety Net System and A posteriori Limited 8,300.00 6,813.69 Achevé x e Envelope 9 2 2 6 2 2 de bureau de l'antenne du Supporting Project Manag Nord-Ouest ement CM-UGP-PFS-25990-GO-R FQ / Fourniture des boites Public Works Program Pilo Demande de pri Single Stage - On 2017-10-1 2018-03-0 2017-11-1 2018-04-0 2017-12-0 2018-04-1 à pharmacie de la phase 5 IDA / 52240 A posteriori Limited 25,100.00 20,966.02 Achevé t x e Envelope 2 1 0 3 1 3 des THIMO pour 2 commu nes de la région de l'Est et 2 communes de la région du Nord ouest CM-UGP-PFS-26037-GO-R Laying the Foundations of FQ / Fourniture des autoc a Safety Net System and Demande de pri Single Stage - On 2017-09-2 2018-06-1 2017-10-1 2018-07-0 2017-10-3 2018-07-1 IDA / 52240 A posteriori Limited 2,000.00 2,081.57 Achevé ollants pour voitures et mo Supporting Project Manag x e Envelope 7 1 6 5 0 9 tos au Projet Filets Sociaux ement CM-UGP-PFS-23003-GO-R FQ / Fourniture du matérie Public Works Program Pilo Demande de pri Single Stage - On 2017-09-1 2017-09-0 2017-10-0 2017-10-1 2017-10-2 2017-11-2 l et des matériaux de trav IDA / 52240 A posteriori Limited 100,000.00 90,128.08 Achevé t x e Envelope 1 4 3 6 4 2 ail pour la phase 4 des THI MO dans 2 communes de l a région de l'Adamaoua CM-UGP-PFS-25561-GO-R Laying the Foundations of FB / Fourniture du matériel a Safety Net System and Single Stage - On 2017-09-0 2017-04-2 2017-09-0 2017-09-0 2017-06-2 2017-09-0 2017-07-0 2017-09-0 2017-08-3 2017-10-0 IDA / 52240 A posteriori Appel d'offres Open - National 162,000.00 143,614.65 Signé roulant autos et motos au Supporting Project Manag e Envelope 1 8 1 1 9 1 7 8 1 8 projet Filets Sociaux en de ement ux lots distincts CM-UGP-PFS-25477-GO-R Cash Transfer Program wi Demande de pri Single Stage - On 2017-10-0 2017-11-1 2017-11-0 2017-12-2 2017-11-2 2018-01-2 FQ / Fourniture des seaux IDA / 52240 th Accompanying Measur A posteriori Limited 38,000.00 26,101.20 Achevé x e Envelope 9 3 6 0 7 4 au Projet Filets Sociaux es to Boost Household Pro ductivity CM-UGP-PFS-25475-GO-R FQ / Fourniture du matérie Public Works Program Pilo Demande de pri Single Stage - On 2017-09-0 2017-09-0 2017-09-2 2017-11-1 2017-10-1 2017-11-2 l et des matériaux de trav IDA / 52240 A posteriori Limited 61,000.00 50,255.93 Achevé t x e Envelope 2 4 4 4 5 3 ail pour la phase 4 des THI MO dans la région du nord , commune de Touboro CM-UGP-PFS-47595-GO-R FQ / Fourniture du matérie Public Works Program Pilo Demande de pri Single Stage - On 2018-06-1 2018-08-3 2018-07-3 2018-09-2 2018-08-2 2018-10-1 l de la phase 6 des THIMO IDA / 52240 A posteriori Limited 80,275.00 65,428.39 Achevé t x e Envelope 8 1 0 7 9 8 du Projet Filets Sociaux da ns les communes de Dem bo et Bashéo, région du N ord CM-UGP-PFS-47606-GO-R FB / Fourniture et paramét Cash Transfer Program wi rage d'un progiciel de gest th Accompanying Measur Single Stage - On 2018-06-2 2018-06-2 2018-07-2 2018-08-1 2018-09-1 2019-03-1 ion intégré pour la planific IDA / 52240 A posteriori Appel d'offres Open - National 167,500.00 0.00 Annulé es to Boost Household Pro e Envelope 1 6 7 7 4 3 ation, la programmation, l ductivity a budgétisation, le suivi év aluation et la production d es rapports et indicateurs CM-UGP-PFS-47608-GO-R Cash Transfer Program wi Demande de pri Single Stage - On 2018-03-2 2018-05-0 2018-05-2 FQ / Fourniture des logiciel IDA / 52240 th Accompanying Measur A posteriori Limited 48,400.00 0.00 Annulé x e Envelope 7 8 9 s informatiques au projet es to Boost Household Pro Filets Sociaux ductivity CM-UGP-PFS-16933-GO-R Cash Transfer Program wi FQ / Fourniture des seaux, th Accompanying Measur Demande de pri Single Stage - On 2017-06-2 2017-08-1 2017-09-1 IDA / 52240 A posteriori Open - National 193,700.00 0.00 Annulé Tee shirt, casquettes auto es to Boost Household Pro x e Envelope 0 5 4 collants pour véhicules est ductivity ampillés Projet Filets Socia ux CM-UGP-PFS-25989-GO-R FQ / Fourniture du matérie Public Works Program Pilo Demande de pri Single Stage - On 2018-04-0 2018-03-0 2018-05-0 2018-04-0 2018-06-0 2018-04-2 l et des matériaux de trav IDA / 52240 A posteriori Limited 80,275.00 72,952.92 Achevé t x e Envelope 6 1 5 3 4 0 ail pour la phase 5 des THI MO dans 2 communes de l a région du Nord ouest (O ku et Ako) CM-UGP-PFS-25987-GO-R FQ / Fourniture du matérie l et des matériaux de trav Public Works Program Pilo Demande de pri Single Stage - On 2018-04-0 2018-03-0 2018-05-0 2018-04-0 2018-06-0 2018-04-2 IDA / 52240 A posteriori Limited 80,275.00 65,815.47 Achevé ail pour la phase 5 des THI t x e Envelope 6 1 5 3 4 4 MO dans 2 communes de l a région de l'EST (Bétaré O YA et Batouri) CM-UGP-PFS-25491-GO-R Laying the Foundations of Demande de pri Single Stage - On 2018-04-1 2018-05-2 2019-05-2 FQ / Fourniture du matérie IDA / 52240 a Safety Net System and A posteriori Limited 30,000.00 0.00 Annulé x e Envelope 9 4 4 l de pause café au Projet F Supporting Project Manag ilets Sociaux ement CM-UGP-PFS-47578-GO-R Cash Transfer Program wi Demande de pri Single Stage - On 2018-06-0 2019-01-2 2018-07-1 2019-03-0 2018-08-0 2019-03-2 FQ / Fourniture des pneus IDA / 52240 th Accompanying Measur A posteriori Limited 28,400.00 24,340.71 Achevé x e Envelope 4 4 6 4 6 8 de recharge pour des auto es to Boost Household Pro s et motos du Projet ductivity CM-UGP-PFS-25476-GO-R Cash Transfer Program wi FQ / Fourniture des tee-shi th Accompanying Measur Demande de pri Single Stage - On 2017-12-0 2018-01-2 2017-12-2 2018-03-0 2018-01-1 2018-03-2 IDA / 52240 A posteriori Limited 99,000.00 68,943.69 Achevé rts et casquettes estampill es to Boost Household Pro x e Envelope 2 4 6 1 6 9 és au Projet Filets Sociaux ductivity CM-UGP-PFS-25488-GO-R Laying the Foundations of Demande de pri Single Stage - On 2018-01-0 2018-03-2 2018-02-1 2018-05-2 2019-02-1 2018-12-2 FQ / fourniture des encres IDA / 52240 a Safety Net System and A posteriori Limited 100,000.00 83,622.13 Achevé x e Envelope 3 9 0 2 0 0 pour imprimantes et photo Supporting Project Manag copieurs ement CM-UGP-PFS-25487-GO-R Laying the Foundations of Demande de pri Single Stage - On 2017-09-1 2017-10-1 2018-10-1 FQ / Fourniture des fournit IDA / 52240 a Safety Net System and A posteriori Limited 60,000.00 0.00 Annulé x e Envelope 6 1 1 ures de bureau au Projet Fi Supporting Project Manag lets sociaux ement CM-UGP-PFS-67485-GO-R Laying the Foundations of FQ / Fourniture du matérie a Safety Net System and Demande de pri Single Stage - On 2018-07-1 2018-07-0 2018-08-1 2018-07-3 2018-09-0 2018-08-0 IDA / 52240 A posteriori Limited 8,250.00 6,993.13 Achevé l informatique et de burea Supporting Project Manag x e Envelope 5 5 9 0 2 6 utique de l'antenne région ement ale du projet du Nord Oues t CM-UGP-PFS-67490-GO-R Laying the Foundations of Demande de pri Single Stage - On 2018-07-1 2018-07-0 2018-08-1 2018-07-2 2019-08-1 2018-08-2 FQ / Fourniture des polices IDA / 52240 a Safety Net System and A posteriori Limited 8,250.00 3,525.35 Achevé x e Envelope 0 2 4 5 4 9 d'assurance aux 40 premi Supporting Project Manag ères motos du projet ement CM-UGP-PFS-47597-GO-R FQ / Fourniture des boîtes Public Works Program Pilo Demande de pri Single Stage - On 2018-09-0 2018-08-2 2018-09-3 2018-09-1 2018-10-0 2018-09-1 IDA / 52240 A posteriori Limited 8,360.00 7,383.31 Achevé à pharmacie de la phase 6 t x e Envelope 9 9 0 4 7 9 des THIMO du Projet Filets Sociaux CM-UGP-PFS-75801-GO-R Cash Transfer Program wi Demande de pri Single Stage - On 2018-09-1 2018-10-0 2018-10-1 2018-10-2 2018-10-1 2018-10-3 FQ / Fourniture du matérie IDA / 52240 th Accompanying Measur A posteriori Limited 8,360.00 7,144.10 Achevé x e Envelope 5 1 0 4 7 1 l pour les crèches tempora es to Boost Household Pro ires au PFS ductivity CM-UGP-PFS-130190-GO- RFQ / Fourniture des licenc Laying the Foundations of es pour la plateforme tom a Safety Net System and Demande de pri Single Stage - On 2019-10-1 2019-09-3 2019-12-1 2019-11-1 2020-06-1 2020-03-0 IDA / 62230 A posteriori Limited 34,000.00 29,607.05 Achevé ate ( Licence Multiprojet, Supporting Project Manag x e Envelope 0 0 3 8 0 5 Monosite et Multiposte To ement m2pro, Tom2monitoring, T om2paie et Tom2marché) CM-UGP-PFS-121205-GO- Laying the Foundations of Demande de pri Single Stage - On 2019-10-0 2019-09-3 2019-11-2 2019-11-1 2020-03-2 2020-06-1 RFB / Fourniture des conso IDA / 52240 a Safety Net System and A posteriori Limited 80,000.00 62,547.39 Achevé x e Envelope 5 0 3 8 2 2 mmables informatiques au Supporting Project Manag Projet Filets Sociaux ement CM-UGP-PFS-121383-GO- Laying the Foundations of RFQ / Acquisition des fourn a Safety Net System and Demande de pri Single Stage - On 2019-10-1 2019-09-3 2019-12-1 2019-11-1 2020-04-1 2020-06-1 IDA / 62230 A posteriori Limited 40,000.00 26,447.17 Achevé itures de bureaux et des p Supporting Project Manag x e Envelope 4 0 6 8 4 2 roduits d'entretien de bure ement au en deux lots distincts CM-UGP-PFS-120445-GO- UN / FOURNITURE DE 756 Laying the Foundations of Passation de ma TABLETTES BIOMETRIQUE a Safety Net System and rchés auprès de 2019-11-3 2019-07-3 2019-12-1 2019-06-0 2020-02-0 2019-11-1 2020-08-2 2021-10-1 S MOBILES et 756 BATTER IDA / 62230 A posteriori Direct 660,808.00 660,808.00 Achevé Supporting Project Manag s agences de l'O 0 1 4 7 2 3 0 9 IE EXTERNES TYPES POWE ement NU RBANK ET 756 SACS PHO TOVOLTAÏQUES en deux tr anches de 400 et 356 chac une CM-UGP-PFS-171977-GO- RFB / Fourniture du matéri Public Works Program Pilo Single Stage - On 2020-06-3 2020-06-1 2020-07-0 2020-08-1 2020-07-2 2020-09-1 2020-08-1 2020-10-2 2020-09-2 2020-11-1 2021-02-1 el THIMO de la phase 7 d IDA / D2980 A posteriori Appel d'offres Open - National 267,580.00 187,352.13 Achevé t e Envelope 0 7 5 6 8 5 4 0 1 0 6 es Travaux à Haute Intensi té de Main d'œuvre en 4 lo ts distincts CM-UGP-PFS-172000-GO- RFQ / Fourniture des boîte Public Works Program Pilo Demande de pri Single Stage - On 2020-06-2 2020-08-1 2020-08-2 2020-09-2 2020-09-0 2020-12-1 IDA / D2980 A posteriori Limited 41,800.00 29,602.75 Achevé s à pharmacie de la phase t x e Envelope 0 4 6 9 9 7 7 des THIMO en 3 lots disti ncts CM-UGP-PFS-172036-GO- Laying the Foundations of Demande de pri Single Stage - On 2020-06-2 2020-08-1 2020-08-1 2020-09-2 2020-09-0 2021-08-1 RFQ / Fourniture de 50 mi IDA / 62230 a Safety Net System and A posteriori Limited 37,500.00 23,591.16 Achevé x e Envelope 0 4 9 9 2 9 ni groupes électrogènes a Supporting Project Manag u Projet Filets Sociaux ement CM-UGP-PFS-172065-GO- Laying the Foundations of RFB / Fourniture des conso a Safety Net System and Single Stage - On 2020-12-1 2021-01-0 2020-12-2 2021-10-1 2021-02-0 2021-02-1 2021-03-0 2021-02-1 2021-04-1 2021-05-0 2022-04-1 IDA / 52240 A posteriori Appel d'offres Open - National 160,000.00 62,330.61 Signé mmables informatiques à l Supporting Project Manag e Envelope 5 8 5 5 5 0 7 6 1 4 1 'unité de Gestion du Projet ement Filets Sociaux CM-UGP-PFS-172042-GO- Laying the Foundations of Demande de pri Single Stage - On 2021-01-0 2021-03-1 2021-07-0 2021-04-0 RFB / Fourniture de 4 véhi IDA / 62230 a Safety Net System and A posteriori Open - National 200,000.00 155,468.00 Signé x e Envelope 6 0 5 9 cules pick up double cabin Supporting Project Manag e au Projet Filets Sociaux ement Page 1 CM-UGP-PFS-172008-GO- RFQ / Fourniture et équipe Public Works Program Pilo Demande de pri Single Stage - On 2020-05-2 2020-07-2 2020-08-0 IDA / D2980 A posteriori Limited 50,000.00 0.00 Annulé ment du matériel de crèch t x e Envelope 0 6 9 e de la Phase 7 des THIMO en 3 lots CM-UGP-PFS-213727-GO- RFQ / Fourniture des boîte s à pharmacie des phases Public Works Program Pilo Demande de pri Single Stage - On 2021-05-0 2021-04-0 2021-06-3 2021-05-2 2021-07-3 2021-08-1 IDA / 62230 A posteriori Limited 50,160.00 39,218.32 Achevé 8 et 9 des Travaux à Haut t x e Envelope 5 8 0 8 0 9 e intensité de main d'œuvr e du Projet Filets Sociaux e n deux 2 lots distincts CM-UGP-PFS-205171-GO- Cash Transfer Program wi RFQ / Recrutement du pre th Accompanying Measur Demande de pri Single Stage - On 2021-05-0 2021-09-2 2021-06-3 2021-11-1 2021-07-1 2022-01-2 IDA / D2980 A posteriori Limited 15,251.00 11,916.61 Achevé stataire pour la fourniture es to Boost Household Pro x e Envelope 5 7 0 8 4 0 des lecteurs MP3 et des ba ductivity ffles CM-UGP-PFS-217839-GO- Laying the Foundations of Demande de pri Single Stage - On 2021-02-2 2021-02-1 2021-04-1 2021-03-0 2021-04-2 2021-06-0 RFQ / Fourniture de deux p IDA / 62230 a Safety Net System and A posteriori Limited 8,380.00 7,603.68 Achevé x e Envelope 7 2 0 5 4 8 hotocopieurs en Urgence a Supporting Project Manag u Projet Filets Sociaux ement CM-UGP-PFS-211488-GO- RFB / Fourniture du Matéri Public Works Program Pilo Single Stage - On 2021-02-1 2021-02-1 2021-02-1 2021-03-2 2021-03-2 2021-04-2 2021-04-0 2021-06-0 2021-05-0 2021-07-0 2021-11-2 el des phases 8 et 9 des Tr IDA / 62230 A posteriori Appel d'offres Open - National 321,096.00 194,297.34 Achevé t e Envelope 0 6 5 9 3 8 1 2 4 2 9 avaux à Haute Intensité de Main d'Œuvre (THIMO) en 4 lots distincts CM-UGP-PFS-222852-GO- Laying the Foundations of RFB / Acquisition des fourn a Safety Net System and Single Stage - On 2021-04-1 2021-06-1 2021-04-2 2021-06-0 2021-07-0 2021-06-1 2021-07-2 2021-07-2 2021-08-1 2022-07-2 IDA / 62230 A posteriori Appel d'offres Open - National 269,944.00 94,736.43 Signé itures de bureaux et des p Supporting Project Manag e Envelope 5 1 0 4 9 9 9 4 9 4 roduits d'entretien de bure ement au en deux lots distincts CM-UGP-PFS-233101-GO- RFB / Fourniture du matéri Public Works Program Pilo Single Stage - On En cours d' 2021-06-3 2022-01-1 2021-07-0 2021-08-1 2022-02-2 2021-09-1 2022-03-2 2021-10-2 2021-11-2 el de la phase 10 des Trav IDA / 62230 A posteriori Appel d'offres Open - National 227,443.00 0.00 t e Envelope exécution 0 7 7 8 2 7 8 2 1 aux à Haute Intensité de M ain d'œuvre du Projet Filet s Sociaux en 2 lots distinct s CM-UGP-PFS-241556-GO- Cash Transfer Program wi RFQ / Fourniture du matéri th Accompanying Measur Demande de pri Single Stage - On 2021-08-0 2021-09-0 2021-09-0 2021-09-2 2021-09-1 2022-01-2 el des crèches temporaire IDA / 62230 A posteriori Limited 8,384.00 6,085.59 Achevé es to Boost Household Pro x e Envelope 4 1 4 2 8 0 s des phases 8 et 9 des Tr ductivity avaux à Haute Intensité de Main d'œuvre (THIMO) CM-UGP-PFS-233093-GO- RFQ / Fourniture des boîte s à pharmacie de phase 1 Public Works Program Pilo Demande de pri Single Stage - On En cours d' 2021-08-3 2022-01-1 2021-10-2 2021-11-2 0 des Travaux à Haute int IDA / 62230 A posteriori Limited 35,530.00 0.00 t x e Envelope exécution 0 9 5 4 ensité de main d'œuvre du Projet Filets Sociaux dans les régions de l’Extrême N ord, du Nord et de l’Adam aoua CM-UGP-PFS-241685-GO- RFB / Fourniture du matéri el de travail de la phase 1 Public Works Program Pilo Single Stage - On 2021-08-3 2021-09-0 2021-10-1 2021-11-1 2021-12-2 2022-02-0 0 des Travaux à Haute int IDA / 62230 A posteriori Appel d'offres Open - National 227,443.00 0.00 Annulé t e Envelope 0 4 6 5 0 3 ensité de main d'œuvre (T HIMO) dans les régions de l'Adamaoua, du Nord et de l'Extrême Nord en 3 lots di stincts CM-UGP-PFS-239622-GO- Laying the Foundations of RFQ / Fourniture d'un scan a Safety Net System and Demande de pri Single Stage - On 2021-08-1 2021-09-2 2021-09-2 2021-11-1 2021-10-1 2022-01-2 ner et d'un copieur en pro IDA / 62230 A posteriori Limited 19,500.00 16,033.71 Achevé Supporting Project Manag x e Envelope 7 7 8 8 2 0 cédure d'urgence pour la p ement assation des marchés du P rojet Filets Sociaux CM-UGP-PFS-170601-GO- Laying the Foundations of RFB / Fourniture du matéri a Safety Net System and Single Stage - On 2021-10-0 2021-11-3 2021-10-1 2021-11-2 2022-01-2 2021-12-2 2022-03-2 2022-02-0 2022-04-2 2022-03-2 el informatique, du matéri IDA / 62230 A posteriori Appel d'offres Open - National 480,040.00 332,079.34 Signé Supporting Project Manag e Envelope 1 0 5 9 1 9 5 8 9 5 el de téléphonie et des log ement iciels informatiques au Pr ojet Filets Sociaux en 3 lot s distincts CM-UGP-PFS-281266-GO- Laying the Foundations of Single Stage - On En cours d' 2022-03-3 2022-08-2 2022-04-0 2022-05-1 2022-05-2 2022-06-1 2022-12-1 RFB / Fourniture des conso IDA / 52240 a Safety Net System and A posteriori Appel d'offres Open - National 193,750.00 0.00 e Envelope exécution 0 6 9 4 9 7 4 mmables informatiques au Supporting Project Manag Projet Filets Sociaux ement CM-UGP-PFS-281268-GO- Laying the Foundations of RFB / Acquisition des fourn a Safety Net System and Demande de pri Single Stage - On En attente 2022-04-1 2022-06-0 2022-12-0 IDA / 62230 A posteriori Limited 74,580.00 0.00 itures de bureau et des pr Supporting Project Manag x e Envelope d'exécution 3 8 5 oduits d'entretien pour le ement Projet Filets Sociaux CM-UGP-PFS-281269-GO- Laying the Foundations of RFQ / Fourniture des sacs a Safety Net System and Demande de pri Single Stage - On 2022-04-0 2022-05-1 2022-06-0 IDA / D2980 A posteriori Limited 44,400.00 0.00 Annulé pour les équipes de terrain Supporting Project Manag x e Envelope 5 7 7 dans le cadre de l'accomp ement agnement des bénéficiaire s CM-UGP-PFS-172043-GO- RFB / Fourniture du matéri Cash Transfer Program wi el productif pour les sancti th Accompanying Measur Single Stage - On En cours d' 2022-04-0 2022-07-0 2022-04-1 2022-07-1 2022-05-2 2022-06-2 2022-07-2 2022-08-2 IDA / 62230 A posteriori Appel d'offres Open - National 235,840.00 0.00 ons positives des cycles 3, es to Boost Household Pro e Envelope exécution 1 8 1 5 3 2 7 6 4, 5, G1, G2, G3 des Trans ductivity ferts Monétaires Ordinaire s du Projet Filets Sociaux en 6 lots distincts CM-UGP-PFS-25491-GO-R Laying the Foundations of Demande de pri Single Stage - On En cours d' 2022-04-1 2022-08-1 2022-05-2 2022-11-1 FQ-2 / Fourniture du néces IDA / 62230 a Safety Net System and A posteriori Limited 15,000.00 0.00 x e Envelope exécution 5 9 0 6 saire de pause café au pro Supporting Project Manag jet Filets Sociaux ement CM-UGP-PFS-232884-GO- Laying the Foundations of RFQ / Fourniture du 2150 k a Safety Net System and Demande de pri Single Stage - On 2021-08-1 2021-10-1 2021-11-0 its de formation et de trav IDA / D2980 A posteriori Limited 43,000.00 0.00 Annulé Supporting Project Manag x e Envelope 3 5 5 ail, pour les équipes de ter ement rain dans le cadre de l'acc ompagnement des bénéfic iaires CM-UGP-PFS-172069-GO- Laying the Foundations of RFQ / Fourniture du mobili a Safety Net System and Demande de pri Single Stage - On 2021-01-2 2021-03-0 2021-03-1 IDA / 62230 A posteriori Limited 14,820.00 0.00 Annulé er de bureau et d’un coffre Supporting Project Manag x e Envelope 0 1 5 -fort pour l’Unité de Gestio ement n du Projet Filets Sociaux CM-UGP-PFS-172070-GO- Laying the Foundations of RFQ / Fourniture des Pneu a Safety Net System and Demande de pri Single Stage - On 2021-11-0 2021-12-2 2022-01-0 IDA / 62230 A posteriori Limited 28,386.00 0.00 Annulé s et pièces de rechange de Supporting Project Manag x e Envelope 4 3 6 s véhicules du Projet Filets ement Sociaux CM-UGP-PFS-233020-GO- Laying the Foundations of RFQ / Fourniture et installa a Safety Net System and Demande de pri Single Stage - On 2021-06-2 2021-08-2 2021-09-2 IDA / 62230 A posteriori Limited 27,600.00 0.00 Annulé tion du dispositif de vidéoc Supporting Project Manag x e Envelope 5 1 0 onférence avec abonneme ement nt Zoom et webex CM-UGP-PFS-307727-GO- Laying the Foundations of RFQ / Fourniture et installa a Safety Net System and Demande de pri Single Stage - On En attente 2022-09-0 2022-10-1 2022-11-0 IDA / 62230 A posteriori Limited 24,000.00 0.00 tion du matériel de vidéo c Supporting Project Manag x e Envelope d'exécution 5 7 7 onférence au Projet Filets ement Sociaux CM-UGP-PFS-320353-GO- RFQ / Fourniture et installa Laying the Foundations of tion d'un Groupe électrogè a Safety Net System and Demande de pri Single Stage - On En attente 2022-10-2 2022-12-1 2022-12-2 IDA / 62230 A posteriori Limited 60,000.00 0.00 ne d'au moins 100 KVA av Supporting Project Manag x e Envelope d'exécution 9 0 4 ec Inverseur automatique ement d'au moins 160 A au site d e l'Unité de Gestion du Pro jet Filets Sociaux NON CONSULTING SERVICES Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Estimated A Actual Amoun Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) mount (US$) t (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-UGP-PFS-6232-NC-RF Q / Recrutement des agen Public Works Program Pilo Demande de pri Single Stage - On 2017-02-1 2017-02-1 2017-04-1 2017-04-2 2017-12-0 IDA / 52240 A posteriori Limited 60,000.00 61,263.97 Signé ces de paiement pour les t x e Envelope 5 0 2 4 8 phases 3 et 4 des THIMO e n lots CM-UGP-PFS-6233-NC-RF Q / Recrutement des agen ces de paiement pour le p Cash Transfer Program wi aiement de 19500 ménag th Accompanying Measur Demande de pri Single Stage - On 2017-03-0 2017-05-0 2019-04-2 es bénéficiaires du cycle 2 IDA / 52240 A priori Limited 351,000.00 0.00 Annulé es to Boost Household Pro x e Envelope 7 5 5 des transferts monétaires ductivity dont 7500 dans la région d e l'Extrême Nord, 5500 da ns les régions du Nord et d e l'Adamaoua, et 6500 dan s les régions de l'Est, du N CM-UGP-PFS-6315-NC-RF ord Cash Transfer Program wi Demande de pri Single Stage - On 2017-02-2 2017-04-2 2017-04-2 2017-05-2 2017-05-0 2017-06-1 Q / Impression des docum IDA / 52240 th Accompanying Measur A posteriori Limited 70,000.00 22,001.63 Achevé x e Envelope 5 1 2 6 6 9 ents du Projet es to Boost Household Pro ductivity CM-UGP-PFS-6306-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-03-0 2017-03-0 2017-04-2 2017-06-0 2018-04-2 2018-06-0 Q / fourniture des polices d IDA / 52240 a Safety Net System and A posteriori Limited 123,900.00 58,410.90 Achevé x e Envelope 3 6 8 7 3 8 'assurance maladie Supporting Project Manag ement CM-UGP-PFS-7385-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-03-0 2017-03-0 2017-04-2 2017-06-1 2018-04-2 2018-06-1 Q / Fourniture des polices IDA / 52240 a Safety Net System and A posteriori Limited 31,100.00 18,329.45 Achevé x e Envelope 3 6 8 5 3 4 d'assurance automobile Supporting Project Manag ement CM-UGP-PFS-14464-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-06-1 2018-07-1 2017-06-1 2018-07-2 2018-06-1 Q / Renouvellement du co IDA / 52240 a Safety Net System and A posteriori Limited 8,250.00 3,553.09 Signé x e Envelope 3 7 9 5 4 ntrat d'assurance des 40 Supporting Project Manag motos en circulation ement CM-UGP-PFS-25608-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-0 2017-10-3 2018-10-3 Q / Maintenance Autos UG IDA / 52240 a Safety Net System and A posteriori Limited 8,300.00 0.00 Annulé x e Envelope 4 1 1 P pour 1 an Supporting Project Manag ement CM-UGP-PFS-25616-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-0 2017-11-0 2018-11-0 Q / Maintenance matériel IDA / 52240 a Safety Net System and A posteriori Limited 8,300.00 0.00 Annulé x e Envelope 7 7 7 bureautique et informatiqu Supporting Project Manag e UGP pour 1 an ement CM-UGP-PFS-25623-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-1 2017-11-0 2018-11-0 Q / Maintenance froid et cli IDA / 52240 a Safety Net System and A posteriori Limited 8,300.00 0.00 Annulé x e Envelope 1 9 9 matisation UGP pour 1 an Supporting Project Manag ement CM-UGP-PFS-25711-NC-RF Laying the Foundations of Q / Fourniture du service d a Safety Net System and Demande de pri Single Stage - On 2017-12-0 2018-04-2 2018-01-0 2018-07-1 2019-01-0 IDA / 52240 A posteriori Limited 6,000.00 8,986.03 Signé e gardiennage pour l'ante Supporting Project Manag x e Envelope 9 0 9 0 9 nne régionale du Nord Oue ement st CM-UGP-PFS-25729-NC-RF Laying the Foundations of Q / Fourniture des systèm a Safety Net System and Demande de pri Single Stage - On 2017-10-1 2018-02-2 2017-11-1 2018-03-1 2017-12-1 2018-07-0 IDA / 52240 A posteriori Limited 4,000.00 1,315.18 Achevé es de sécurité et de GPS e Supporting Project Manag x e Envelope 5 0 5 2 5 2 t du service de tracking po ement ur les autos CM-UGP-PFS-25892-NC-RF Laying the Foundations of Q / Confection et la pose d a Safety Net System and Demande de pri Single Stage - On 2017-09-3 2017-11-1 2018-02-0 2017-12-0 2018-04-0 IDA / 52240 A posteriori Open - National 4,000.00 7,636.09 Achevé es plaques signalétiques ( Supporting Project Manag x e Envelope 0 0 8 1 9 7 plaques directionnelles ement + 3 panneaux) CM-UGP-PFS-25980-NC-RF Laying the Foundations of Q / Avenant au contrat de l a Safety Net System and Demande de pri Single Stage - On 2017-09-1 2016-09-2 2017-09-2 2016-10-3 2018-09-2 IDA / 52240 A posteriori Limited 6,000.00 14,850.36 Signé 'agence de gardiennage d Supporting Project Manag x e Envelope 1 6 3 1 3 e l'antenne régionale du N ement ord CM-UGP-PFS-25981-NC-RF Laying the Foundations of Q / Avenant au contrat de l a Safety Net System and Demande de pri Single Stage - On 2017-09-1 2016-06-2 2017-09-2 2016-07-2 2018-09-2 IDA / 52240 A posteriori Limited 5,000.00 16,374.35 Signé 'agence de gardiennage d Supporting Project Manag x e Envelope 1 4 3 8 3 e l'antenne régionale de l' ement Extrême Nord CM-UGP-PFS-25983-NC-RF Laying the Foundations of Q / Avenant au contrat d'a a Safety Net System and Demande de pri Single Stage - On 2017-09-1 2017-10-1 2017-10-1 2017-12-2 2018-08-1 2018-06-0 ssurance du personnel en IDA / 52240 A posteriori Limited 39,000.00 24,386.04 Achevé Supporting Project Manag x e Envelope 5 9 6 0 2 8 vu de la prise en compte d ement u personnel nouvellement recruté CM-UGP-PFS-30748-NC-DI R / recrutement d'une age Cash Transfer Program wi Passation de ma nce de paiement chargée th Accompanying Measur 2017-10-0 2018-01-0 2017-10-0 2017-11-2 2017-11-1 2018-02-1 2018-11-1 2019-07-2 IDA / 52240 A posteriori rché de gré à gr Direct 36,000.00 30,643.76 Achevé d'assurer les transferts mo es to Boost Household Pro 4 4 9 7 6 3 6 4 é nétaires des bénéficiaires ductivity de la phase 2 des transfert s monétaires d'urgence du Projet Filets Sociaux CM-UGP-PFS-37510-NC-RF Q / avenant Lettre de Marc hé N°009/LM/MINEPAT/CTS Passation de ma /PFS/UGP/CAPM/2017 du 2 Public Works Program Pilo 2017-12-1 2018-01-0 2017-12-2 2018-01-0 2018-01-1 2018-02-1 2018-05-1 IDA / 52240 A posteriori rché de gré à gr Direct 6,000.00 22,354.79 Signé 6 mai 2017 de l'agence de t 8 4 5 8 5 3 5 é paiement pour la réalisatio n des paiements des 600 0 bénéficiaires des THIMO 5 dont 3000 dans le Nord- Ouest et 3000 dans l'Est Page 2 CM-UGP-PFS-37511-NC-RF Laying the Foundations of Q / Avenant au contrat d'a Passation de ma a Safety Net System and 2017-12-1 2017-12-2 2017-12-2 2017-12-2 2018-01-0 2018-02-1 2018-07-0 ssurance véhicule LETTRE IDA / 52240 A posteriori rché de gré à gr Direct 4,000.00 1,207.48 Signé Supporting Project Manag 8 2 3 2 9 3 8 DE MARCHE N°011/LM/MIN é ement EPAT/CTS/PFS/UGP/CAPM/2 017 DU 08 JUIN 2017 CM-UGP-PFS-25853-NC-DI R / Avenant au contrat de l 'agence de paiement char gée des transferts monetai Public Works Program Pilo Demande de pri Single Stage - On 2017-09-2 2018-01-0 2017-11-2 2018-02-1 2018-05-1 IDA / 52240 A posteriori Limited 23,400.00 22,232.85 Signé res du cycle 2 à l'Est, le No t x e Envelope 5 8 0 3 9 rd ouest, Douala et Yaoun dé pour la phase 5 des T HIMO dont 3000 dans la ré gion de l'Est et 3000 dans la région du Nord Ouest CM-UGP-PFS-47580-NC-RF Cash Transfer Program wi Demande de pri Single Stage - On 2018-03-3 2018-06-1 2018-05-2 2018-08-2 2019-05-2 Q / Fourniture de polices d' IDA / 52240 th Accompanying Measur A posteriori Limited 28,000.00 14,785.79 Signé x e Envelope 1 1 6 2 6 assurance autos au projet es to Boost Household Pro Filets Sociaux ductivity CM-UGP-PFS-47582-NC-RF Cash Transfer Program wi Q / Confection et pause de th Accompanying Measur Demande de pri Single Stage - On 2018-04-3 2018-08-2 2018-06-1 2018-09-1 2018-07-1 2018-11-2 IDA / 52240 A posteriori Limited 8,250.00 7,009.83 Achevé s plaques signalétiques de es to Boost Household Pro x e Envelope 0 3 1 2 1 3 s réalisations du Projet File ductivity ts Sociaux dans les comm unes CM-UGP-PFS-47593-NC-RF Q / Agence de paiement c Cash Transfer Program wi hargée d'assurer le paiem th Accompanying Measur Demande de pri Single Stage - On 2018-05-2 2018-07-1 2019-07-1 IDA / 52240 A posteriori Limited 19,170.00 0.00 Annulé ent des 3000 bénéficiaires es to Boost Household Pro x e Envelope 3 8 8 de la phase 3 des transfert ductivity s monétaires d'urgence du du Projet Filets Sociaux d ans le Nord Ouest CM-UGP-PFS-47602-NC-DI R / Avenant au contrat de l 'agence de paiement char gée d'assurer les paiemen Passation de ma Public Works Program Pilo 2018-06-2 2018-06-2 2018-07-2 2018-07-3 2018-09-1 2019-01-2 2019-02-2 t des transfert monétaires IDA / 52240 A posteriori rché de gré à gr Direct 11,700.00 10,227.50 Achevé t 1 6 0 1 2 7 6 du cycle 2 dans le Nord et é l'Adamaoua pour les paie ments de 3000 bénéficiair e de la phase 6 des THIMO dans la région du Nord, co mmunes de Dembo et Bas CM-UGP-PFS-25707-NC-RF héo Laying the Foundations of Demande de pri Single Stage - On 2017-10-0 2017-11-0 2018-11-0 Q / Maintenance froid et cli IDA / 52240 a Safety Net System and A posteriori Limited 5,000.00 0.00 Annulé x e Envelope 9 7 7 matisation EN et NO pour Supporting Project Manag 1 an ement CM-UGP-PFS-25610-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-0 2017-10-3 2018-10-3 Q / Maintenance des Autos IDA / 52240 a Safety Net System and A posteriori Limited 5,000.00 0.00 Annulé x e Envelope 4 1 1 et Motos de l'Extrême-Nor Supporting Project Manag d ement CM-UGP-PFS-25612-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-09-0 2017-09-3 2018-09-3 Q / Maintenance des Autos IDA / 52240 a Safety Net System and A posteriori Limited 5,000.00 0.00 Annulé x e Envelope 3 0 0 et Motos du Projet du Nord Supporting Project Manag ement CM-UGP-PFS-25618-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-0 2017-11-0 2018-11-0 Q / Maintenance matériel IDA / 52240 a Safety Net System and A posteriori Limited 5,000.00 0.00 Annulé x e Envelope 7 3 3 bureautique et informatiqu Supporting Project Manag e EN et NO pour 1 an ement CM-UGP-PFS-47255-NC-RF Cash Transfer Program wi Q / Production et multiplic th Accompanying Measur Demande de pri Single Stage - On 2018-03-1 2018-02-2 2018-04-1 2018-03-0 2018-04-2 2018-03-1 IDA / 52240 A posteriori Limited 7,567.00 7,132.71 Achevé ation des documents des P es to Boost Household Pro x e Envelope 6 3 0 8 4 2 ratiques familiales essenti ductivity elles CM-UGP-PFS-26101-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2017-10-1 2017-11-1 2018-11-1 Q / Maintenance des Autos IDA / 52240 a Safety Net System and A posteriori Limited 5,000.00 0.00 Annulé x e Envelope 1 3 3 et Motos du Nord-Ouest Supporting Project Manag ement CM-UGP-PFS-6311-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2018-04-0 2018-03-0 2018-05-1 2018-03-2 2019-05-0 2018-08-2 Q / Fourniture de police d' IDA / 52240 a Safety Net System and A posteriori Limited 8,250.00 3,228.19 Achevé x e Envelope 6 2 1 6 6 8 assurance pour 20 motos Supporting Project Manag ement CM-UGP-PFS-26060-NC-RF Laying the Foundations of Demande de pri Single Stage - On 2018-05-0 2018-03-0 2018-06-0 2018-03-2 2018-06-2 2018-03-2 Q / Fourniture des Systèm IDA / 52240 a Safety Net System and A posteriori Limited 8,500.00 1,867.92 Achevé x e Envelope 1 5 1 6 2 9 es de sécurité pour les mo Supporting Project Manag tos du projet (20) ement CM-UGP-PFS-37512-NC-RF Q / Avenant N°2 au contra Cash Transfer Program wi t d'assurance du personne Passation de ma th Accompanying Measur 2018-03-3 2018-03-1 2018-04-0 2018-03-2 2018-05-0 2018-04-2 2018-10-3 l pour la prise en compte d IDA / 52240 A posteriori rché de gré à gr Direct 30,000.00 34,099.31 Signé es to Boost Household Pro 0 9 6 2 4 4 1 es relais communautaires é ductivity recrutés dans le cadre de l a sensibilisation sur les pr atiques familiales essentie lles CM-UGP-PFS-47572-NC-RF Cash Transfer Program wi Demande de pri Single Stage - On 2018-05-0 2018-06-1 2018-07-0 2018-10-0 2019-07-0 B / Fourniture des polices IDA / 52240 th Accompanying Measur A posteriori Limited 130,000.00 127,074.00 Signé x e Envelope 7 1 2 5 2 d'assurance au personnel es to Boost Household Pro du Projet Filets Sociaux ductivity CM-UGP-PFS-72576-NC-RF Q / Multiplication de certai ns documents pour la colle Laying the Foundations of cte des données sur les PF a Safety Net System and Demande de pri Single Stage - On 2018-09-1 2018-09-0 2018-10-2 2018-09-2 2018-11-1 2018-10-0 E de la phase pilote pour u IDA / 52240 A posteriori Limited 8,250.00 7,116.25 Achevé Supporting Project Manag x e Envelope 6 5 8 7 1 1 ne période de 6 mois et de ement s questionnaires et autres documents pour la collect e des données dans le ca dre de la première évaluat ion interne du Projet CM-UGP-PFS-92192-NC-RF Cash Transfer Program wi Q / Multiplication de certai th Accompanying Measur Demande de pri Single Stage - On 2019-01-1 2019-01-1 2019-02-2 2019-02-0 2020-02-2 IDA / 52240 A posteriori Limited 6,500.00 5,551.26 Signé ns documents de collecte es to Boost Household Pro x e Envelope 5 7 6 4 6 de données des PFE pour ductivity une période d'un an MOF-CM-UGP-PFS-6233-N Cash Transfer Program wi C-RFQ / Recrutement des th Accompanying Measur Demande de pri Single Stage - On 2017-02-2 2017-03-0 2017-05-0 2017-05-2 2019-10-2 agences de paiement pour IDA / 52240 A posteriori Limited 351,000.00 142,058.17 Signé es to Boost Household Pro x e Envelope 7 8 1 6 8 le paiement de 19500 men ductivity ages beneficiaires du cycl e 2 des transferts monetai res en 3 lots CM-UGP-PFS-121194-NC-R Laying the Foundations of FQ / Fourniture des polices a Safety Net System and Demande de pri Single Stage - On 2019-09-1 2019-09-0 2019-11-0 2020-11-0 IDA / 62230 A posteriori Limited 28,000.00 0.00 Annulé d'assurance pour les autos Supporting Project Manag x e Envelope 0 6 5 4 du Projet Filets Sociaux ement CM-UGP-PFS-121367-NC-R FB / FOURNITURE D’UNE P Laying the Foundations of OLICE D'ASSURANCE MALA a Safety Net System and Single Stage - On 2019-08-3 2019-10-0 2019-09-1 2019-10-2 2019-11-1 2019-11-2 2019-12-2 2019-12-2 2020-12-2 IDA / 62230 A posteriori Appel d'offres Open - National 164,000.00 0.00 Annulé DIE POUR UN AN EN FAVE Supporting Project Manag e Envelope 0 9 4 6 3 5 7 3 2 UR DU PERSONNEL DU PR ement OJET FILETS SOCIAUX ET L EURS FAMILLES (2019-20 20) CM-UGP-PFS-152342-NC-R Laying the Foundations of FQ / FOURNITURE DES POL a Safety Net System and Demande de pri Single Stage - On 2020-02-1 2020-04-1 2020-07-2 2021-04-1 IDA / 62230 A posteriori Open - National 28,000.00 9,512.73 Signé ICES D'ASSURANCE POUR Supporting Project Manag x e Envelope 0 4 0 4 SIX (06) VEHICULES DU PR ement OJET FILETS SOCIAUX CM-UGP-PFS-143130-NC-R FQ / Recrutement d'une ag ence de paiement pour le Public Works Program Pilo Demande de pri Single Stage - On En cours d' 2020-07-1 2020-08-2 2020-09-2 2021-03-1 transfert des paiements a IDA / D2980 A posteriori Limited 13,500.00 0.00 t x e Envelope exécution 0 0 0 9 ux 3000 bénéficiaires de la phase 7 des Travaux à Haute Intensité de Main d' œuvre dans la commune d e Mokolo CM-UGP-PFS-172111-NC-R Laying the Foundations of FB / Fourniture d'une polic a Safety Net System and Single Stage - On 2020-06-0 2020-06-2 2020-06-1 2020-07-2 2020-07-3 2020-08-2 2020-09-0 2020-10-0 2020-10-1 2021-10-0 e d'assurance maladie pou IDA / 62230 A posteriori Appel d'offres Open - National 164,000.00 412,976.85 Signé Supporting Project Manag e Envelope 1 5 6 8 0 7 1 1 6 1 r un an en faveur du pers ement onnel du Projet Filets Socia ux et leur famille CM-UGP-PFS-175637-NC- DIR / Agence de paiement des 6000 bénéficiaires du Cash Transfer Program wi Cycle 3 des transferts Mon Passation de ma th Accompanying Measur 2020-06-3 2018-05-0 2020-07-0 2020-08-1 2020-08-2 2020-09-1 2022-09-0 étaires Ordinaires, des 200 IDA / D2980 A posteriori rché de gré à gr Direct 165,240.00 109,603.08 Signé es to Boost Household Pro 0 1 5 4 3 1 2 0 de la phase 3 des Trans é ductivity ferts Monétaires d’Urgenc e et des 3000 de la phas e 7 des THIMO dans les R égions de l’Adamaoua et d e l’Est en 3 lots distinct CM-UGP-PFS-175721-NC- DIR / Agence de paiement des bénéficiaires du Cycle Cash Transfer Program wi Passation de ma 3 des transferts Monétaire th Accompanying Measur 2020-06-3 2018-05-0 2020-07-0 2020-08-1 2020-08-2 2020-09-1 2022-09-0 IDA / 62230 A posteriori rché de gré à gr Direct 237,960.00 115,704.37 Signé s Ordinaires, de la phase es to Boost Household Pro 0 1 5 4 3 1 2 é 3 des Transferts Monétaire ductivity s d’Urgence, de la phase 7 des Travaux à Haute Int ensité de Main d'œuvre, R égions de l’Extrême Nord CM-UGP-PFS-175722-NC- et du Nord DIR / Agence de Paiement des bénéficiaires du cycle Cash Transfer Program wi 3 des Transferts Monétaire Passation de ma th Accompanying Measur 2020-06-3 2018-05-0 2020-07-0 2020-08-1 2020-08-2 2020-09-1 2022-09-0 s Ordinaires dans la Régio IDA / 62230 A posteriori rché de gré à gr Direct 129,600.00 94,082.84 Signé es to Boost Household Pro 0 1 5 4 3 1 2 n du Sud, Communes d'Eb é ductivity olawa 2 (1000), Meyomess ala (1000) Ma’an (1000) et dans les ville de Douala et yaoundé communes de D ouala 5 (1500),Yaoundé 3 CM-UGP-PFS-175723-NC- (1500), DIR / Agence de Paiement Cash Transfer Program wi des bénéficiaires de la pha Passation de ma th Accompanying Measur 2020-06-3 2020-07-0 2020-08-2 2022-09-0 se 3 des Transferts Monét IDA / 62230 A posteriori rché de gré à gr Direct 16,200.00 0.00 Annulé es to Boost Household Pro 0 5 3 2 aires d’Urgence dans la Ré é ductivity gion du Sud-Ouest, Comm unes de Limbe1 (500), Li mbe 2 (500) Limbe 3 (500) CM-UGP-PFS-175725-NC- DIR / Agence de Paiement Cash Transfer Program wi des bénéficiaires de la pha Passation de ma th Accompanying Measur 2020-06-3 2020-07-0 2020-08-2 2022-09-0 se 3 des Transferts Monét IDA / 62230 A posteriori rché de gré à gr Direct 21,600.00 0.00 Annulé es to Boost Household Pro 0 5 3 2 aires d’Urgence dans la Ré é ductivity gion du Nord-Ouest, Com munes de Bamenda 1 (50 0), Bamenda 2 (500) Bam enda 3 (1000) CM-UGP-PFS-172073-NC-R Laying the Foundations of Single Stage - On En cours d' 2020-07-3 2020-07-2 2020-08-0 2020-09-1 2020-08-2 2020-10-1 2020-11-1 2021-11-1 FB / Impression et reprogr IDA / 62230 a Safety Net System and A posteriori Appel d'offres Open - National 260,942.64 0.00 e Envelope exécution 0 0 4 5 5 5 9 9 aphie des documents pour Supporting Project Manag le Projet Filets Sociaux ement CM-UGP-PFS-206581-NC-R Laying the Foundations of Demande de pri Single Stage - On 2021-03-0 2021-04-2 2022-04-2 FQ / Entretien des motos d IDA / 62230 a Safety Net System and A posteriori Limited 40,000.00 0.00 Annulé x e Envelope 3 8 8 u projet Filets Sociaux Supporting Project Manag ement CM-UGP-PFS-206582-NC-R Laying the Foundations of Demande de pri 2021-03-0 2021-06-1 2021-04-2 2021-07-0 2022-04-2 FQ / Entretien des véhicule IDA / 62230 a Safety Net System and A posteriori 22,000.00 7,099.06 Signé x 3 1 8 2 8 s du Projet Filets Sociaux Supporting Project Manag ement CM-UGP-PFS-172015-NC-R FQ / Recrutement des age Public Works Program Pilo Demande de pri Single Stage - On 2020-07-0 2020-09-0 2021-09-0 IDA / D2980 A posteriori Limited 45,000.00 0.00 Annulé nces de paiement pour la t x e Envelope 5 9 9 phase 7 des THIMO en 3 lo ts distincts CM-UGP-PFS-143140-NC-R FQ / Recrutement d'une ag ence de paiement pour le paiement des bénéficiaires Public Works Program Pilo Demande de pri Single Stage - On 2020-07-1 2020-09-2 2021-03-2 de la phase 7 des Travau IDA / D2980 A posteriori Limited 22,500.00 0.00 Annulé t x e Envelope 0 6 5 x à Haute Intensité de Mai n d'œuvre du PFS dont 1 000 dans la commune de Dir région de l'Adamaoua et 4000 dans la commun e deTouboro, région du No CM-UGP-PFS-143142-NC-R rd FQ / Recrutement d'une ag ence de paiement pour le paiement des bénéficiaire Public Works Program Pilo Demande de pri Single Stage - On 2020-07-1 2020-09-2 2021-03-1 s de la phase 7 des Trava IDA / D2980 A posteriori Limited 9,000.00 0.00 Annulé t x e Envelope 0 0 9 ux à Haute Intensité de Ma in d'œuvre du PFS dans la région de l'Est dont 1000 d ans la commune de Ngour a, et 1000 dans la comm une de Mandjou CM-UGP-PFS-220415-NC-R Laying the Foundations of FQ / Fourniture de service a Safety Net System and Demande de pri Single Stage - On 2021-04-0 2021-04-0 2021-05-0 2021-05-2 2022-05-0 IDA / 62230 A posteriori Limited 8,640.00 5,620.72 Signé de gardiennage au bureau Supporting Project Manag x e Envelope 4 8 5 5 5 de l'Unité de Gestion du Pr ement ojet Filets Sociaux CM-UGP-PFS-232595-NC-R Laying the Foundations of FQ / Fourniture de service a Safety Net System and Demande de pri Single Stage - On 2021-06-3 2021-07-1 2021-07-3 2021-09-1 2022-07-3 IDA / 62230 A posteriori Limited 5,760.00 3,664.63 Signé de gardiennage au bureau Supporting Project Manag x e Envelope 0 2 1 6 1 de l'Antenne régionale du ement projet du Sud CM-UGP-PFS-232598-NC-R Laying the Foundations of FQ / Fourniture de service a Safety Net System and Demande de pri Single Stage - On 2021-07-1 2021-07-1 2021-08-1 2021-09-1 2022-08-1 IDA / D2980 A posteriori Limited 5,760.00 3,664.63 Signé de gardiennage au bureau Supporting Project Manag x e Envelope 0 2 0 6 0 de l'Antenne régionale du ement projet de l'Est Page 3 CM-UGP-PFS-232599-NC-R Laying the Foundations of FQ / Fourniture de service a Safety Net System and Demande de pri Single Stage - On 2021-07-1 2021-07-1 2021-08-1 2021-09-1 2022-08-1 IDA / D2980 A posteriori Limited 5,760.00 3,664.63 Signé de gardiennage au bureau Supporting Project Manag x e Envelope 0 2 0 6 0 de l'Antenne régionale du ement projet de l'Adamaoua CM-UGP-PFS-232878-NC-R Laying the Foundations of Demande de pri Single Stage - On 2021-06-3 2021-06-2 2021-08-2 2021-08-1 2022-08-2 FQ / Fourniture d'une polic IDA / 62230 a Safety Net System and A posteriori Limited 18,400.00 6,361.56 Signé x e Envelope 0 4 7 8 7 e d'assurance pour les 6 v Supporting Project Manag éhicules du projet ement CM-UGP-PFS-257346-NC- DIR / Recrutement par Ent Cash Transfer Program wi ente Directe d'une Agence Passation de ma th Accompanying Measur 2021-10-2 2021-10-1 2021-11-0 2021-12-0 2021-12-2 2021-12-2 2023-12-2 de Paiement pour assurer IDA / 62230 A posteriori rché de gré à gr Direct 48,600.00 20,592.90 Signé es to Boost Household Pro 9 0 3 9 2 7 2 les paiements des bénéfici é ductivity aires de la phase 4 des Tra nsferts Monétaires d’Urge nce du Projet Filets Sociau x CM-UGP-PFS-172112-NC-R Laying the Foundations of FQ / Fourniture d'une polic a Safety Net System and Demande de pri Single Stage - On En attente 2022-03-3 2022-05-3 2023-05-3 IDA / 62230 A posteriori Limited 12,000.00 0.00 e d'assurance pour 60 mot Supporting Project Manag x e Envelope d'exécution 0 1 1 os du Projet Filets Sociaux ement CM-UGP-PFS-285043-NC-R Cash Transfer Program wi FQ / Fourniture des service th Accompanying Measur Demande de pri Single Stage - On En cours d' 2022-04-2 2022-08-0 2022-06-1 2022-12-1 IDA / 62230 A posteriori Limited 49,727.00 0.00 s d'impression et de repro es to Boost Household Pro x e Envelope exécution 3 8 8 5 graphie des documents du ductivity Projet CM-UGP-PFS-172057-NC-R Laying the Foundations of Demande de pri Single Stage - On 2021-04-0 2021-05-2 2021-11-2 FQ / Confection et pause d IDA / 62230 a Safety Net System and A posteriori Limited 24,000.00 0.00 Annulé x e Envelope 9 8 4 es plaques signalitiques d Supporting Project Manag u Projet Filets Sociaux ement CM-UGP-PFS-206863-NC-R Laying the Foundations of FQ / Maintenance du maté a Safety Net System and Demande de pri Single Stage - On 2021-04-2 2021-06-1 2022-06-1 IDA / 62230 A posteriori Limited 8,250.00 0.00 Annulé riel et logiciels informatiqu Supporting Project Manag x e Envelope 0 5 5 e du Projet Filets Sociaux ement CM-UGP-PFS-233113-NC-R FQ / Agences de paiement de la phase 10 des Trava Public Works Program Pilo Demande de pri Single Stage - On 2022-04-0 2022-06-2 2022-12-1 IDA / 62230 A posteriori Limited 38,250.00 0.00 Annulé ux à Haute Intensité de Ma t x e Envelope 9 0 7 in d'Œuvre dans les régio ns de l'Adamaoua, du Nor d et de l'extrême Nord en deux lots distincts CM-UGP-PFS-232601-NC-R Laying the Foundations of FQ / Fourniture des systèm a Safety Net System and Demande de pri Single Stage - On En attente 2022-04-1 2022-05-1 2023-03-0 IDA / 62230 A posteriori Limited 10,800.00 0.00 es de sécurité et de GPS e Supporting Project Manag x e Envelope d'exécution 0 1 7 t du service de tracking po ement ur les autos du projet CM-UGP-PFS-285486-NC- DIR / Recrutement par Ent ente Directe de l’agence Cash Transfer Program wi de paiement CAMCCUL po Passation de ma th Accompanying Measur 2022-03-3 2022-03-3 2022-04-0 2022-04-1 2022-05-2 2022-04-2 2023-05-2 ur le paiement des frais de IDA / D2980 A posteriori rché de gré à gr Direct 2,974.00 2,354.56 Signé es to Boost Household Pro 0 0 4 4 3 2 3 transport des relais comm é ductivity unautaires chargés d’appu yer le projet dans la mise en œuvre de la phase pilot e de l’expérimentation de l ’accompagnement plus CM-UGP-PFS-291086-NC- DIR / Recrutement des age nces de paiement chargée s d'effectuer les paiement Passation de ma Public Works Program Pilo En cours d' 2022-05-0 2022-05-0 2022-05-1 2022-05-1 2022-06-2 2022-12-2 s des bénéficiaires de la p IDA / 62230 A posteriori rché de gré à gr Direct 38,250.00 0.00 t exécution 2 2 2 1 3 0 hase 10 des Travaux à Ha é ute Intensité de Main d'œu vre du Projet Filets Sociau x dans les régions de l'Extr ême Nord et du Nord et da ns la région de l'Adamaou aCM-UGP-PFS-315954-NC-R Laying the Foundations of Demande de pri Single Stage - On En cours d' 2022-09-2 2022-10-2 2022-12-1 FQ / Entretien et réparatio IDA / 62230 a Safety Net System and A posteriori Limited 40,000.00 0.00 x e Envelope exécution 2 7 1 n des véhicules du projet Supporting Project Manag ement CONSULTING FIRMS Activity Reference No. Short List and Draft Combined Evaluatio Loan / Credit Market Approa Contract Type Estimated Am Actual Amou Process Statu Expression of Intere Request for Proposal Opening of Technica Evaluation of Techn / Description Component Review Type Method Terms of Reference Request for Proposal n Report and Draft N Signed Contract Contract Completion No. ch ount (US$) nt (US$) s st Notice s as Issued l Proposals / Minutes ical Proposal s egotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-UGP-PFS-6358-CS-CQ S / ONG pour THIMO: 7000 bénéficiaires dans 2 comm Sélection fondé unes de l'Extrême Nord, 2 Public Works Program Pilo e sur les qualific 2016-10-0 2017-02-2 2017-04-1 2017-02-2 2017-05-1 2017-03-0 2017-06-1 2018-03-2 2017-12-1 2018-04-1 IDA / 52240 A posteriori Open - National 429,190.00 367,605.09 Achevé 2017-02-07 communes de l'Est pour la t ations des cons 7 8 3 2 3 3 7 3 4 0 phase 3 et 6000 bénéficiai ultants res: 2 communes Adamao ua, 1 commune Nord pour la phase 4 en 2017 (1 ON G par région) CM-UGP-PFS-54735-CS-C Cash Transfer Program wi Sélection fondé QS / Consultant pour le dé th Accompanying Measur e sur les qualific 2018-06-1 2018-06-2 2018-10-2 2018-08-0 2019-01-2 2018-09-0 2019-03-2 2018-10-0 2019-04-1 2019-04-0 veloppement d'un progicie IDA / 52240 A posteriori Open - National 167,500.00 135,528.54 Signé 2018-05-30 es to Boost Household Pro ations des cons 1 0 6 3 3 2 2 7 5 5 l de gestion intégré pour le ductivity ultants système d'information du Projet Filets Sociaux CM-UGP-PFS-172238-CS-Q Laying the Foundations of CBS / Recrutement d'un ca Sélection fondé a Safety Net System and En cours d'exéc 2020-08-2 2020-09-1 2020-11-0 2020-11-2 2020-12-2 2021-02-0 2021-03-1 2022-03-1 binet pour l'audit externe IDA / 62230 A posteriori e sur la qualité Open - National 36,000.00 0.00 2020-08-28 Supporting Project Manag ution 5 8 1 9 9 5 2 2 du Projet Filets Sociaux, fi et le coût ement nancement additionnel , e xercices 2019-2020 (18 m ois) , 2021 CM-UGP-PFS-175920-CS-C QS / Recrutement d'une O NG pour la mise en œuvre Sélection fondé des activités de la Phase 8 Public Works Program Pilo e sur les qualific 2021-01-2 2021-03-0 2021-04-0 2021-05-0 2021-11-0 des THIMO dans les régio IDA / 62230 A posteriori Open - National 89,678.22 0.00 Annulé 2020-12-30 t ations des cons 0 5 4 9 5 ns du Nord Ouest, Commu ultants ne de Santa (2000 bénéfici aires) et du Sud-Ouest, Co mmunes de Buéa (1000 b énéficiaires) et de Limbé II (1500 bénéficiaires) CM-UGP-PFS-206866-CS-C QS / Recrutement d'une O NG chargée d'accompagne Sélection fondé r le Projet Filets Sociaux d Public Works Program Pilo e sur les qualific En cours d'exéc 2020-12-1 2021-02-2 2021-04-0 2021-05-0 2021-06-0 2021-12-0 ans la mise en œuvre de l IDA / 62230 A posteriori Open - National 165,070.00 0.00 2021-01-30 t ations des cons ution 1 0 5 5 9 6 a phase 8 des THIMO dans ultants la région de l'Adamaoua ( Communes de Nganha et Nyambaka) et dans la régi on du Centre (Communes de Lembe Yezoum) CM-UGP-PFS-206867-CS-C QS / Recrutement d'une O NG chargée d'accompagne Sélection fondé r le Projet Filets Sociaux d Public Works Program Pilo e sur les qualific En cours d'exéc 2020-11-0 2021-02-2 2021-04-0 2021-03-1 2021-05-0 2021-06-0 2021-12-0 ans la mise en œuvre de l IDA / 62230 A posteriori Open - National 231,098.00 0.00 2021-01-30 t ations des cons ution 5 0 5 5 5 9 6 a phase 9 des THIMO dans ultants les régions de l'Adamaoua (Commune de Meiganga), de l'Est (Commune de Ken tzou), et du Sud (Commun es de Sangmelima et d'Eb CM-UGP-PFS-206928-CS-C olowa 1) Cash Transfer Program wi Sélection fondé QS / Recrutement de la fir th Accompanying Measur e sur les qualific En cours d'exéc 2021-01-1 2021-02-0 2021-03-1 2021-03-2 2021-04-1 2021-05-2 2022-05-2 me d'appui à la mise en œ IDA / D2980 A posteriori Open - National 160,000.00 0.00 2021-01-11 es to Boost Household Pro ations des cons ution 2 1 7 4 6 1 1 uvre des interventions dan ductivity ultants s le cadre de l'étude quant itative sur les VBG CM-UGP-PFS-232639-CS-C QS / recrutement d'une O Sélection fondé NG chargée d'accompagne Public Works Program Pilo e sur les qualific En cours d'exéc 2021-09-1 2021-08-2 2021-10-0 2021-11-1 2021-11-0 2021-11-2 2021-12-0 2022-06-0 r le projet dans la réalisati IDA / 62230 A posteriori Open - National 148,563.00 0.00 2021-07-30 t ations des cons ution 5 0 3 5 2 9 7 5 on de la phase 10 des tra ultants vaux à haute Intensité de Main d'Œuvre (THIMO) dan s la région de l'Extrême No rd CM-UGP-PFS-232640-CS-C QS / Recrutement de l'ON Sélection fondé G chargée d'accompagner Public Works Program Pilo e sur les qualific En cours d'exéc 2021-09-1 2021-08-2 2021-10-0 2021-11-1 2021-11-0 2021-11-2 2021-12-0 2022-06-0 le projet dans la réalisatio IDA / 62230 A posteriori Open - National 132,056.00 0.00 2021-07-30 t ations des cons ution 5 0 3 5 2 9 7 5 n de la phase 10 des Trav ultants aux à Haute Intensité de main d'Œuvre (THIMO) da ns les régions du Nord et d e l'Adamaoua INDIVIDUAL CONSULTANTS Activity Reference No. Invitation to Identifie Loan / Credit Market Approa Contract Type Estimated Am Actual Amou Process Statu Draft Negotiated Co / Description Component Review Type Method Terms of Reference d/Selected Consulta Signed Contract Contract Completion No. ch ount (US$) nt (US$) s ntract nt Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-UGP-PFS-6328-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2016-12-2 2017-03-2 2017-04-1 2017-05-1 2017-05-2 2017-01-1 2017-06-1 IDA / 52240 A posteriori Individuel Open 12,950.00 10,372.40 Signé 2017-02-06 ge et l'enregistrement à Bl es to Boost Household Pro 0 7 7 9 2 9 6 angoua du cycle 2 des tra ductivity nsferts monetaires CM-UGP-PFS-6334-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-03-2 2017-04-1 2017-01-1 2017-05-2 2017-01-1 2017-06-1 2018-01-0 IDA / 52240 A posteriori Individuel Open 12,950.00 10,368.36 Achevé 2017-02-06 ge et l'enregistrement à G es to Boost Household Pro 5 7 7 3 2 9 6 8 oulfey du cycle 2 des trans ductivity ferts monetaires CM-UGP-PFS-6337-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-03-2 2017-04-1 2017-06-1 2017-05-2 2017-01-1 2017-06-2 IDA / 52240 A posteriori Individuel Open 15,500.00 12,422.62 Signé 2017-02-06 ge et l'enregistrement à M es to Boost Household Pro 5 7 7 3 2 9 1 akari du cycle 2 des transf ductivity erts monetaires CM-UGP-PFS-6339-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-03-2 2017-04-1 2017-05-1 2017-05-2 2017-01-1 2017-06-1 2017-07-1 IDA / 52240 A posteriori Individuel Open 12,500.00 10,372.40 Achevé 2017-02-06 ge et l'enregistrement à G es to Boost Household Pro 7 7 7 9 2 9 6 4 OBO du cycle 2 des transf ductivity erts monetaires CM-UGP-PFS-6340-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-03-2 2017-04-1 2017-05-1 2017-05-2 2017-01-1 2017-06-1 IDA / 52240 A posteriori Individuel Open 12,500.00 10,379.07 Signé 2017-02-06 ge et l'enregistrement à B es to Boost Household Pro 5 7 7 6 2 9 6 OURRHA du cycle 2 des tr ductivity ansferts monetaires CM-UGP-PFS-6341-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-03-2 2017-04-1 2017-05-1 2017-05-2 2017-01-1 2017-06-1 IDA / 52240 A posteriori Individuel Open 12,500.00 10,379.07 Signé 2017-02-06 ge et l'enregistrement à K es to Boost Household Pro 5 7 7 6 2 9 6 oza du cycle 2 des transfer ductivity ts monetaires CM-UGP-PFS-6342-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-1 2017-05-1 2017-02-2 2017-01-1 2017-03-2 IDA / 52240 A posteriori Individuel Open 12,500.00 10,372.40 Signé 2017-02-06 ge et l'enregistrement à M es to Boost Household Pro 6 3 4 8 4 9 1 ogodé du cycle 2 des trans ductivity ferts monetaires CM-UGP-PFS-6344-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-1 2017-05-1 2017-02-2 2017-01-2 2017-03-2 IDA / 52240 A posteriori Individuel Open 15,500.00 11,613.54 Signé 2017-02-06 ge et l'enregistrement à B es to Boost Household Pro 5 3 4 7 4 6 6 anyo du cycle 2 des transf ductivity erts monetaires CM-UGP-PFS-6346-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-2 2017-02-1 2017-02-1 2017-06-2 2017-02-2 2017-01-1 2017-03-2 IDA / 52240 A posteriori Individuel Open 12,500.00 10,381.76 Signé 2017-02-06 ge et l'enregistrement à T es to Boost Household Pro 9 3 4 8 4 9 1 cheboa du cycle 2 des tran ductivity sferts monetaires CM-UGP-PFS-6347-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-1 2017-02-2 2017-01-2 2017-03-2 IDA / 52240 A posteriori Individuel Open 12,500.00 9,829.76 Signé 2017-02-06 ge et l'enregistrement à M es to Boost Household Pro 5 3 4 4 6 1 ayo Oulo du cycle 2 des tr ductivity ansferts monetaires CM-UGP-PFS-6348-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-2 2017-02-2 2017-05-2 2017-02-2 2017-01-2 2017-03-2 2017-09-1 IDA / 52240 A posteriori Individuel Open 12,500.00 9,707.50 Achevé 2017-02-06 ge et l'enregistrement à R es to Boost Household Pro 6 4 6 4 8 6 5 8 ey Bouba du cycle 2 des tr ductivity ansferts monetaires CM-UGP-PFS-6349-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-2 2017-02-0 2017-02-1 2017-05-2 2017-02-1 2017-01-2 2017-03-0 IDA / 52240 A posteriori Individuel Open 12,500.00 9,716.26 Signé 2017-02-06 ge et l'enregistrement à T es to Boost Household Pro 2 9 0 6 2 6 9 ouboro du cycle 2 des tran ductivity sferts monetaires CM-UGP-PFS-6350-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2016-12-2 2017-02-1 2017-02-2 2017-03-0 2017-03-1 2017-03-2 2017-09-2 IDA / 52240 A posteriori Individuel Open 12,500.00 11,772.77 Achevé 2017-02-06 ge et l'enregistrement à K es to Boost Household Pro 0 8 8 4 4 9 7 ette du cycle 2 des transfe ductivity rts monetaires CM-UGP-PFS-6351-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-2 2017-05-1 2017-03-0 2017-03-1 2017-03-2 IDA / 52240 A posteriori Individuel Open 12,500.00 9,713.75 Signé 2017-02-06 ge et l'enregistrement à B es to Boost Household Pro 5 8 8 7 4 4 9 elo du cycle 2 des transfer ductivity ts monetaires Page 4 CM-UGP-PFS-6352-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-2 2017-05-1 2017-03-0 2017-03-1 2017-03-2 IDA / 52240 A posteriori Individuel Open 12,500.00 9,703.73 Signé 2017-02-06 ge et l'enregistrement à M es to Boost Household Pro 5 8 8 6 4 4 9 enchum Valley du cycle 2 ductivity des transferts monetaires CM-UGP-PFS-6353-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2016-12-2 2017-02-1 2017-02-2 2017-02-2 2017-03-1 2017-03-0 2017-03-1 2017-03-2 2017-08-0 IDA / 52240 A posteriori Individuel Open 15,500.00 9,020.07 Achevé 2017-02-06 ge et l'enregistrement à D es to Boost Household Pro 0 8 3 8 0 4 4 9 1 ouala 3 du cycle 2 des tra ductivity nsferts monetaires CM-UGP-PFS-6354-CS-IND Cash Transfer Program wi V / Consultant pour le cibla th Accompanying Measur 2017-05-1 2017-02-1 2017-02-2 2017-05-2 2017-03-0 2017-03-1 2017-03-2 IDA / 52240 A posteriori Individuel Open 15,500.00 9,264.24 Signé 2017-02-06 ge et l'enregistrement à Y es to Boost Household Pro 7 8 8 4 4 4 9 aoundé du cycle 2 des tra ductivity nsferts monetaires CM-UGP-PFS-6355-CS-IND V / Consultant chargé d'a méliorer les modules du v Cash Transfer Program wi olet économique notamme th Accompanying Measur 2016-12-1 2017-02-2 2017-02-0 2017-03-0 2017-03-2 2017-03-1 2017-03-2 2017-04-1 2018-09-2 nt formation en AGR ( agri IDA / 52240 A posteriori Individuel Open 26,260.00 22,361.04 Achevé 2017-02-10 es to Boost Household Pro 5 5 9 2 1 2 1 7 4 culture, petit commerce, g ductivity estion de l'argent, élevage ) et former les bénéficiaire s dans ces modules à l'Ext rême Nord dans le cadre d e la phase 2 du cycle 1 CM-UGP-PFS-6356-CS-IND V / Consultant chargé d'a méliorer les modules du v Cash Transfer Program wi olet économique : formati th Accompanying Measur 2016-12-1 2017-02-2 2017-02-0 2017-03-0 2017-03-2 2017-03-1 2017-03-2 2017-04-1 2018-09-2 on en AGR ( agriculture,pe IDA / 52240 A posteriori Individuel Open 28,460.00 24,278.93 Achevé 2017-02-10 es to Boost Household Pro 5 5 9 2 1 2 1 7 1 tit commerce, gestion de l' ductivity argent, élevage) et former les bénéficiaires dans ces modules dans le Nord et l' Adamaoua dans le cadre d e la phase 2 du cycle 1 CM-UGP-PFS-6357-CS-IND V / Consultant chargé d'a méliorer les modules du v Cash Transfer Program wi olet économique : formati th Accompanying Measur 2016-12-1 2017-02-2 2017-02-0 2017-03-0 2017-03-2 2017-03-1 2017-03-2 2017-04-1 2018-10-2 on en AGR ( agriculture,pe IDA / 52240 A posteriori Individuel Open 31,400.00 26,919.25 Achevé 2017-02-10 es to Boost Household Pro 5 5 9 2 1 2 1 7 5 tit commerce, gestion de l' ductivity argent, élevage) et former les bénéficiaires dans ces modules dans le Nord O, E st, Dla, Ydé dans le cadre de la phase 2 du cycle 1 CM-UGP-PFS-6421-CS-IND Public Works Program Pilo 2017-07-1 2017-04-0 2017-03-2 2017-04-2 2017-06-0 2017-11-2 V / Expert environnementa IDA / 52240 A priori Individuel Open 63,840.00 0.00 Annulé 2017-02-17 t 3 7 9 8 2 9 l et social du PFS Laying the Foundations of CM-UGP-PFS-6423-CS-IND 2017-07-1 2017-03-2 2017-05-0 2017-04-1 2017-05-2 2017-06-2 IDA / 52240 a Safety Net System and A priori Individuel Open 1,920.00 0.00 Annulé 2017-02-07 V / Assistant Comptable 3 8 9 8 3 8 Supporting Project Manag ement Laying the Foundations of CM-UGP-PFS-6424-CS-IND 2017-07-1 2017-03-2 2017-03-2 2017-04-1 2017-05-2 2017-06-2 IDA / 52240 a Safety Net System and A priori Individuel Open 1,920.00 0.00 Annulé 2017-02-07 V / Assistant SPM 3 8 1 8 3 8 Supporting Project Manag ement CM-UGP-PFS-6327-CS-CD Cash Transfer Program wi Sélection de co S / protocole d'accord ave th Accompanying Measur 2017-02-1 2017-03-0 2017-09-2 IDA / 52240 A priori nsultants par en Direct 900,000.00 0.00 Annulé 2017-02-06 c l'INS pour le dénombrem es to Boost Household Pro 6 3 9 tente directe ent et l'enquête PMT du cy ductivity cle 2 CM-UGP-PFS-14406-CS-IN Cash Transfer Program wi DV / Opérateur Terrain co th Accompanying Measur 2017-06-2 2017-06-0 2017-10-2 2017-06-1 2017-10-2 2017-06-2 2017-10-3 2019-06-2 IDA / 52240 A posteriori Individuel Open 12,960.00 7,006.15 Signé 2017-05-19 mmune Mayo Moskota (Ex es to Boost Household Pro 6 4 3 1 7 1 1 1 trême Nord) pour les trans ductivity ferts monetaires d'urgenc e CM-UGP-PFS-14407-CS-IN Laying the Foundations of 2015-01-0 2017-05-0 2017-05-0 2017-05-1 2017-06-1 2017-05-1 2017-06-0 2019-05-1 DV / Renouvellement du c IDA / 52240 a Safety Net System and A posteriori Individuel Open 24,000.00 81,097.42 Signé 2017-05-08 9 9 5 0 3 0 9 0 ontrat de l'Assistante du C Supporting Project Manag oordonnateur du Projet ement CM-UGP-PFS-14409-CS-IN Laying the Foundations of DV / Renouvellement du c a Safety Net System and 2015-01-0 2017-05-0 2017-05-0 2017-05-0 2017-06-1 2017-05-0 2017-06-0 2019-05-0 IDA / 52240 A posteriori Individuel Open 19,200.00 44,266.70 Signé 2017-05-05 ontrat de la Secrétaire de Supporting Project Manag 9 6 5 7 4 7 9 7 l'Unité de Gestion du Proje ement t CM-UGP-PFS-14410-CS-IN Laying the Foundations of 2015-01-0 2017-05-0 2017-05-0 2017-05-0 2017-06-0 2017-05-0 2017-06-0 2019-05-0 DV / Renouvellement con IDA / 52240 a Safety Net System and A posteriori Individuel Open 16,800.00 38,438.87 Signé 2017-05-05 9 6 5 7 9 7 9 7 trat Chauffeur 1 de l'Unité Supporting Project Manag de Gestion du Projet ement CM-UGP-PFS-14411-CS-IN Laying the Foundations of 2015-06-0 2017-05-0 2015-05-0 2017-05-0 2017-06-0 2017-05-0 2017-06-0 2019-05-0 DV / Renouvellement contr IDA / 52240 a Safety Net System and A posteriori Individuel Open 16,800.00 38,438.87 Signé 2017-05-05 9 6 5 7 9 7 9 7 at Chauffeur 2 Unité de G Supporting Project Manag estion du Projet ement CM-UGP-PFS-14412-CS-IN Laying the Foundations of DV / Renouvellement du c a Safety Net System and 2015-01-0 2017-05-0 2017-05-0 2017-05-0 2017-05-3 2017-05-0 2017-06-0 2019-05-0 IDA / 52240 A posteriori Individuel Open 16,800.00 32,191.68 Signé 2017-05-05 ontrat de l'Agent de liaison Supporting Project Manag 9 6 5 7 1 7 9 7 de l'Unité de Gestion du Pr ement ojet CM-UGP-PFS-14463-CS-IN Laying the Foundations of 2017-06-1 2017-06-1 2017-06-1 2019-06-1 DV / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori Individuel Open 12,960.00 0.00 Annulé 2017-06-09 2 3 5 5 e l'operateur de terrain de Supporting Project Manag Yaoundé 7 ement CM-UGP-PFS-14460-CS-IN Laying the Foundations of DV / Avenant au contrat d a Safety Net System and 2017-06-1 2017-06-1 2017-06-1 2017-12-1 IDA / 52240 A posteriori Individuel Open 3,240.00 0.00 Annulé 2017-06-09 e l'opératrice de terrain de Supporting Project Manag 2 3 5 2 la commune de Douala 2 ement CM-UGP-PFS-14490-CS-IN Laying the Foundations of 2017-06-2 2017-06-2 2017-06-2 2019-06-2 DV / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori Individuel Open 16,800.00 0.00 Annulé 2017-06-15 3 5 9 9 e Technicienne de surface Supporting Project Manag de l'UGP ement CM-UGP-PFS-14454-CS-IN Laying the Foundations of 2017-10-2 2017-06-1 2017-06-1 2015-06-1 2017-06-1 2015-06-1 2019-06-1 DV / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori Individuel Open 19,200.00 34,575.36 Résilié 2017-06-09 7 2 3 5 5 7 5 u point focal de la ville de Supporting Project Manag Douala ement CM-UGP-PFS-16811-CS-IN Laying the Foundations of DV / renouvellement de co a Safety Net System and 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2019-06-0 IDA / 52240 A posteriori Individuel Direct 12,960.00 25,629.07 Signé 2017-06-09 ntrat opérateur de terrain Supporting Project Manag 1 7 2 9 3 9 3 1 commune de MOKOLO ement CM-UGP-PFS-16814-CS-IN Laying the Foundations of 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2019-06-0 DV / renouvellement contr IDA / 52240 a Safety Net System and A posteriori Individuel Direct 12,960.00 23,513.04 Signé 2017-06-09 2 7 3 9 4 9 4 at opérateur de terrain 2 c Supporting Project Manag ommune de MOKOLO ement CM-UGP-PFS-16821-CS-IN Laying the Foundations of DV / Renouvellement de c a Safety Net System and 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2019-06-0 IDA / 52240 A posteriori Individuel Direct 12,960.00 23,513.04 Signé 2017-06-09 ontrat de l'opérateur de te Supporting Project Manag 2 7 3 9 5 9 5 rrain de la commune de M ement AGA CM-UGP-PFS-16823-CS-IN Laying the Foundations of DV / Renouvellement du c a Safety Net System and 2022-01-1 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2017-06-1 2017-06-0 2017-12-0 IDA / 52240 A posteriori Individuel Direct 3,240.00 14,966.57 Signé 2017-06-09 ontrat de l'opérateur de t Supporting Project Manag 1 0 7 1 9 2 9 9 errain de la commune de ement Kar Hay CM-UGP-PFS-16925-CS-IN Laying the Foundations of 2017-06-1 2017-06-1 2017-06-2 2019-06-1 DV / Avenant au contrat d IDA / 52240 a Safety Net System and A priori Individuel Open 63,840.00 0.00 Annulé 2017-06-12 5 9 1 1 u SPM du Projet Supporting Project Manag ement CM-UGP-PFS-14451-CS-IN Laying the Foundations of 2017-07-1 2017-06-1 2017-06-1 2017-06-1 2019-06-1 DV / Renouvellement du c IDA / 52240 a Safety Net System and A priori Individuel Open 46,000.00 0.00 Annulé 2017-06-09 9 0 4 5 5 ontrat Comptable Supporting Project Manag ement CM-UGP-PFS-14446-CS-IN Laying the Foundations of DV / Renouvellement du c a Safety Net System and 2017-07-1 2017-06-0 2017-06-1 2017-06-1 2019-06-1 IDA / 52240 A priori Individuel Open 63,840.00 0.00 Annulé 2017-06-09 ontrat de l'Expert Informat Supporting Project Manag 9 9 0 5 5 ique et Responsable SIG d ement u Projet CM-UGP-PFS-14452-CS-IN Laying the Foundations of 2017-06-1 2017-06-1 2017-06-1 2017-06-1 2019-06-1 DV / Renouvellement du c IDA / 52240 a Safety Net System and A priori Individuel Direct 38,400.00 0.00 Annulé 2017-06-09 2 3 3 5 5 ontrat du Responsable Ré Supporting Project Manag gional Extrême Nord ement CM-UGP-PFS-25501-CS-IN Laying the Foundations of DV / Recrutement du resp a Safety Net System and 2017-08-1 2017-09-2 2017-10-2 2017-10-0 2017-11-0 2017-10-1 2017-11-0 2018-10-1 IDA / 52240 A posteriori Individuel Open 19,200.00 47,854.03 Signé 2017-08-31 onsable régional du Nord o Supporting Project Manag 7 6 5 3 6 3 3 3 uest du projet Filets Socia ement ux CM-UGP-PFS-25504-CS-IN Laying the Foundations of DV / Consultant chargé de a Safety Net System and 2017-09-0 2017-09-2 2017-10-0 2017-10-0 2017-11-0 2017-10-1 2017-11-0 2018-04-1 IDA / 52240 A posteriori Individuel Open 21,500.00 80,692.20 Signé 2017-09-01 la Conception et l' appui à Supporting Project Manag 6 9 2 6 3 6 3 9 la mise en œuvre du plan ement de communication CM-UGP-PFS-25520-CS-IN DV / Recrutement de 4 co nsultants pour le ciblage d Laying the Foundations of es bénéficiaires de la phas a Safety Net System and 2017-10-0 2017-10-1 2017-12-0 2017-10-1 2017-12-1 2017-10-2 2017-12-1 2017-11-1 2018-09-1 e 2 des transferts monetai IDA / 52240 A posteriori Individuel Open 36,400.00 30,128.36 Achevé 2017-09-07 Supporting Project Manag 5 2 5 9 1 7 2 6 7 res d'urgence dans les dép ement artement du Logone et Ch ari (Communes de Blango ua, Goulfey, Makari) et da ns le département du May o Tsanaga(commune de M CM-UGP-PFS-25782-CS-IN ayo Moskota Laying the Foundations of DV / Avenant N°01 au con a Safety Net System and 2014-10-1 2017-09-0 2017-06-1 2017-09-1 2017-06-1 2017-09-1 2017-08-1 2018-09-1 IDA / 52240 A posteriori Individuel Open 38,095.25 233,063.21 Signé 2017-09-06 trat de l'Expert informatiq Supporting Project Manag 0 9 3 0 5 1 7 1 ue et responsable SIG UGP ement CM-UGP-PFS-25786-CS-IN Laying the Foundations of DV / Avenant N°02 au con a Safety Net System and 2013-05-2 2017-09-0 2017-06-1 2017-09-1 2017-06-2 2017-09-1 2017-08-1 2018-09-1 IDA / 52240 A posteriori Individuel Open 38,095.25 129,515.08 Signé 2017-09-06 trat du Spécialiste en pass Supporting Project Manag 9 9 9 0 2 1 7 1 ation des Marchés de l'UG ement P CM-UGP-PFS-25787-CS-IN Laying the Foundations of 2014-10-1 2017-09-0 2017-06-1 2017-09-1 2017-06-1 2017-09-1 2017-08-1 2018-09-1 DV / Avenant N°1 au contr IDA / 52240 a Safety Net System and A posteriori Individuel Open 35,555.57 167,336.95 Signé 2017-09-06 4 9 3 0 5 1 7 1 at du Comptable de l'UGP Supporting Project Manag ement CM-UGP-PFS-25794-CS-IN Laying the Foundations of DV / Avenant N°1 au contr a Safety Net System and 2015-04-1 2017-09-0 2017-06-1 2017-09-1 2017-06-1 2017-09-1 2017-08-1 2018-09-1 IDA / 52240 A posteriori Individuel Open 19,200.00 138,374.99 Signé 2017-09-06 at du Responsable régiona Supporting Project Manag 4 9 3 0 6 1 7 1 l du Projet Filets Sociaux d ement ans l'Extrême Nord CM-UGP-PFS-25517-CS-IN DV / Consultant chargé de Cash Transfer Program wi la sensibilisation des bénéf th Accompanying Measur 2017-09-0 2017-10-1 2017-10-2 2017-10-1 2017-11-0 2017-10-2 2017-11-0 2018-02-2 IDA / 52240 A posteriori Individuel Open 58,180.00 43,182.70 Signé 2017-09-07 iciaires du Cycle 2 (i) à l'E es to Boost Household Pro 6 2 5 9 1 7 1 4 xtrême Nord, (ii) au Nord e ductivity t à l'Adamaoua, (iii) à l'Est, au Nord-ouest, à Douala et à Yaoundé CM-UGP-PFS-6326-CS-CD Cash Transfer Program wi Sélection de co 2017-09-0 2017-08-3 2017-09-1 2017-09-2 2018-05-1 S / Protocole d'accord avec IDA / 52240 th Accompanying Measur A priori nsultants par en Direct 500,000.00 391,776.36 Signé 2017-08-31 5 1 6 8 4 l'INS pour la réalisation de es to Boost Household Pro tente directe l'enquête de base ductivity CM-UGP-PFS-25509-CS-IN Cash Transfer Program wi DV / Recrutement de 34 re th Accompanying Measur 2017-10-1 2017-12-3 2017-11-2 2018-01-0 2017-11-2 2018-01-1 2017-12-0 2019-01-1 2019-05-3 lais communautaires dans IDA / 52240 A posteriori Individuel Open 40,800.00 49,307.71 Signé 2017-11-30 es to Boost Household Pro 3 0 0 6 4 4 7 4 1 la commune de Koza, dép ductivity artement du Mayo Tsanag a, Région de l'Extrême Nor d CM-UGP-PFS-25508-CS-IN Cash Transfer Program wi DV / Recrutement de 34 re th Accompanying Measur 2017-10-1 2018-01-2 2017-11-2 2018-02-0 2017-11-2 2018-02-1 2017-12-0 2019-02-1 lais communautaires dans IDA / 52240 A posteriori Individuel Open 40,800.00 46,287.84 Signé 2017-12-30 es to Boost Household Pro 3 9 4 3 7 1 5 1 la commune de Bourrha, d ductivity épartement du Mayo Tsan aga, Région de l'Extrême Nord CM-UGP-PFS-25512-CS-IN Cash Transfer Program wi DV / Recrutement de 34 re th Accompanying Measur 2017-10-1 2017-12-3 2017-11-0 2018-01-0 2017-11-2 2018-01-1 2017-12-0 2019-01-1 lais communautaires dans IDA / 52240 A posteriori Individuel Open 40,800.00 69,189.81 Signé 2017-11-30 es to Boost Household Pro 3 0 8 6 2 4 5 4 la commune de Mogode, d ductivity épartement du Mayo Tsan aga, Région de l'Extrême Nord CM-UGP-PFS-25515-CS-IN Cash Transfer Program wi DV / Recrutement de 34 re th Accompanying Measur 2017-10-1 2018-01-0 2017-11-2 2018-01-0 2017-11-2 2018-01-1 2017-12-0 2019-01-1 lais communautaires dans IDA / 52240 A posteriori Individuel Open 40,800.00 50,528.89 Signé 2017-11-30 es to Boost Household Pro 3 2 4 9 8 7 5 7 la commune de Mayo-Oulo ductivity , département du Mayo Lo uti, Région du Nord CM-UGP-PFS-25516-CS-IN Cash Transfer Program wi DV / Recrutement de 34 re th Accompanying Measur 2017-10-1 2018-01-0 2017-12-0 2018-01-1 2017-12-0 2018-01-1 2017-12-0 2019-01-1 lais communautaires dans IDA / 52240 A posteriori Individuel Open 40,800.00 68,555.87 Signé 2017-11-30 es to Boost Household Pro 3 4 4 1 4 9 5 9 la commune de Tcheboa, ductivity département de la Bénoué , Région du Nord CM-UGP-PFS-37431-CS-IN Laying the Foundations of 2018-01-1 2018-01-2 2018-02-2 2018-01-2 2018-03-0 2018-01-2 2018-03-0 2019-01-2 DV / Chauffeur de l'antenn IDA / 52240 a Safety Net System and A posteriori Individuel Open 6,840.00 10,274.36 Signé 2017-12-27 1 0 8 2 6 9 6 9 e régionale du Projet du N Supporting Project Manag ord- Ouest ement CM-UGP-PFS-37432-CS-IN Laying the Foundations of 2018-01-1 2018-01-2 2018-02-2 2018-01-2 2018-03-0 2018-02-0 2018-03-0 2019-02-0 DV / Secrétaire de l'antenn IDA / 52240 a Safety Net System and A posteriori Individuel Open 9,600.00 15,722.34 Signé 2017-12-28 1 3 8 8 6 4 6 4 e régionale du Projet du N Supporting Project Manag ord Ouest ement Page 5 CM-UGP-PFS-37434-CS-IN Laying the Foundations of 2018-01-1 2017-12-2 2018-02-2 2017-12-2 2018-03-2 2017-12-2 2018-03-2 2018-12-2 DV / Point focal du Projet d IDA / 52240 a Safety Net System and A posteriori Individuel Open 9,600.00 14,584.42 Signé 2017-11-30 1 2 8 6 9 8 9 8 e la ville de Douala Supporting Project Manag ement CM-UGP-PFS-25972-CS-C QS / Avenant au contrat N °001/MINEPAT/CTS/PFS/CA PM/2017 du 23 mars 2017 Sélection de co Public Works Program Pilo 2017-12-2 2017-12-2 2017-12-2 2018-01-1 2018-02-1 2018-07-1 2019-05-2 de l'ONG chargée de la mi IDA / 52240 A posteriori nsultants par en Direct 99,042.50 93,748.34 Achevé 2017-12-18 t 1 5 2 8 3 7 2 se en œuvre des THIMO 3 tente directe dans l'Extrême Nord avec 4000 bénéficiaires pour la mise en œuvre des THIMO 5 avec 3000 bénéficiaires dans la région du Nord-ou CM-UGP-PFS-25907-CS-C est QS / Avenant au contrat N °002/MINEPAT/CTS/PFS/CA PM/2017 du 23 mars 2017 Sélection de co Public Works Program Pilo 2017-12-2 2017-12-2 2017-12-2 2018-01-1 2018-02-1 2018-07-1 2018-07-2 de l'ONG chargée de la mi IDA / 52240 A posteriori nsultants par en Direct 99,042.50 92,937.44 Achevé 2017-12-18 t 1 5 2 8 3 7 7 se en œuvre des THIMO 3 tente directe dans la région de l'Est av ec 3000 bénéficiaires pour la mise en œuvre des THI MO 5 avec 3000 bénéficiai res dans la région de l'Est CM-UGP-PFS-47367-CS-IN DV / Consultant individuel Public Works Program Pilo 2018-04-0 2018-04-1 2018-04-2 2018-05-2 IDA / 52240 A posteriori Individuel Limited 8,250.00 0.00 Annulé 2018-03-30 chargé d'actualiser la cart t 4 8 8 8 e des THIMO du Projet File ts Sociaux CM-UGP-PFS-47368-CS-IN DV / Consultants individuel Cash Transfer Program wi s (3) chargés du ciblage d th Accompanying Measur 2018-05-0 2018-05-2 2018-06-0 2018-07-1 IDA / 52240 A posteriori Individuel Open 20,256.00 0.00 Annulé 2018-04-06 es bénéficiaires de la phas es to Boost Household Pro 9 3 2 7 e 3 des transferts monéta ductivity ires d'urgence dans la rég ion du Nord Ouest CM-UGP-PFS-47363-CS-IN DV / Consultants individuel Cash Transfer Program wi s (03) chargés de complét th Accompanying Measur 2018-02-0 2018-04-1 2018-04-0 2018-04-2 2018-04-1 2018-05-1 2018-04-1 2019-05-1 er et d'améliorer les manu IDA / 52240 A posteriori Individuel Open 63,040.00 87,765.09 Signé 2018-03-09 es to Boost Household Pro 2 4 6 8 3 2 8 2 els de formation et de for ductivity mer les bénéficiaires sur le s AGR pour le cycle 2 des t ransferts monétaires du Pr ojet Filets CM-UGP-PFS-47362-CS-IN Cash Transfer Program wi DV / Consultant individuel th Accompanying Measur 2018-05-1 2018-04-1 2018-05-2 2018-04-2 2018-06-0 2018-04-3 2018-06-0 2019-04-3 IDA / 52240 A posteriori Individuel Open 8,250.00 7,158.24 Signé 2018-03-15 chargé de la traduction de es to Boost Household Pro 5 7 3 4 1 0 1 0 s documents du projet en ductivity anglais CM-UGP-PFS-25526-CS-IN Laying the Foundations of DV / Consultant chargé de a Safety Net System and 2018-10-3 2017-10-1 2017-10-1 2017-10-2 2018-10-2 IDA / 52240 A posteriori Individuel Open 12,000.00 0.00 Annulé 2017-09-15 l'accompagnement en TO Supporting Project Manag 0 1 6 4 4 M2PRO, TOM2PAIE, TOM2 ement MONITORING et TOM2MAR CHE CM-UGP-PFS-25881-CS-IN Laying the Foundations of 2018-08-0 2018-05-1 2018-09-1 2018-05-2 2018-09-1 2018-06-1 2018-09-1 2018-12-1 2019-02-1 DV / Consultant chargé du IDA / 52240 a Safety Net System and A posteriori Individuel Open 8,250.00 7,201.62 Achevé 2018-04-17 8 3 0 0 2 7 3 4 5 développement du site WE Supporting Project Manag B ement CM-UGP-PFS-16899-CS-IN Laying the Foundations of 2014-10-1 2017-10-1 2017-10-1 2017-09-0 2017-10-2 2017-11-0 2019-10-1 DV / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori Individuel Open 76,190.00 71.57 Signé 2017-10-02 4 3 8 8 3 1 3 e l'auditeur interne Supporting Project Manag ement CM-UGP-PFS-47928-CS-IN Cash Transfer Program wi 2018-06-2 2018-05-3 2018-11-1 2018-06-1 2018-11-2 2018-07-0 2019-01-0 2019-07-0 DV / Assistant au suivi éva IDA / 52240 th Accompanying Measur A posteriori Individuel Open 12,000.00 10,966.15 Signé 2018-04-20 2 0 2 3 0 4 3 4 luation es to Boost Household Pro ductivity CM-UGP-PFS-47923-CS-IN Cash Transfer Program wi 2018-03-2 2018-05-0 2018-10-0 2018-05-2 2018-10-1 2018-06-1 2018-10-1 2019-06-1 DV / Recrutement d'un Sp IDA / 52240 th Accompanying Measur A posteriori Individuel Open 12,000.00 26,092.28 Signé 2018-04-04 6 7 1 1 0 8 1 8 écialiste en Passation des es to Boost Household Pro Marché Assistant ductivity CM-UGP-PFS-54610-CS-IN Cash Transfer Program wi DV / consultant individuel th Accompanying Measur 2018-03-2 2018-04-2 2018-05-1 2018-06-1 2018-12-1 pour l'assistance à la migr IDA / 52240 A posteriori Individuel Limited 8,250.00 0.00 Annulé 2018-04-16 es to Boost Household Pro 6 1 2 6 3 ation comptable vers le no ductivity uveau référentiel comptab le SYSCOHADA révisé CM-UGP-PFS-54615-CS-IN Cash Transfer Program wi DV / consultant pour assist th Accompanying Measur 2018-10-3 2018-04-2 2018-11-1 2018-05-1 2018-12-0 2018-06-2 2018-12-0 2019-06-2 IDA / 52240 A posteriori Individuel Limited 8,250.00 10,408.76 Signé 2018-04-20 er l'UGP à l'utilisation opti es to Boost Household Pro 0 5 9 6 6 0 7 0 male des logiciels TOM2P ductivity RO, TOM2PAIE et TOM2M ARCHE CM-UGP-PFS-54616-CS-IN DV / Consultant pour la co Cash Transfer Program wi nception du masque de sai th Accompanying Measur 2018-08-0 2018-04-3 2018-08-1 2018-05-2 2018-09-1 2018-06-2 2018-09-1 2018-12-2 IDA / 52240 A posteriori Individuel Limited 8,250.00 7,097.50 Signé 2018-04-25 sie, la supervision de la sai es to Boost Household Pro 7 0 4 1 0 5 1 2 sie et l'analyse des donné ductivity es de la première évaluati on interne du Projet IDA CM-UGP-PFS-47366-CS-IN Cash Transfer Program wi DV / Consultant individuel th Accompanying Measur 2018-05-0 2018-05-1 2018-05-2 2018-06-2 chargé d'actualiser la cart IDA / 52240 A posteriori Individuel Limited 8,250.00 0.00 Annulé 2018-04-30 es to Boost Household Pro 5 9 9 8 e de pauvreté pour les tra ductivity nsferts monétaires du Proj et Filets Sociaux CM-UGP-PFS-47370-CS-IN Cash Transfer Program wi Sélection de co DV / Avenant au contrat d th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 3,600.00 3,181.63 Signé 2018-04-20 u point focal du Projet dan es to Boost Household Pro 1 7 8 3 8 0 tente directe s le Département du Mber ductivity é, région de l'Adamaoua CM-UGP-PFS-25974-CS-C Sélection de co QS / Contrat ONG pour la p Public Works Program Pilo 2018-07-0 2018-06-0 2018-07-2 2018-07-3 2018-09-1 2019-01-2 2019-02-0 IDA / 52240 A posteriori nsultants par en Direct 99,042.50 85,366.88 Achevé 2018-05-30 hase 6 des THIMO pour 30 t 2 9 0 0 9 6 9 tente directe 00 bénéficiaires dans 2 co mmunes de la région du Nord CM-UGP-PFS-47376-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain de th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,169.08 Signé 2018-04-24 la commune de la commu es to Boost Household Pro 1 8 8 4 8 1 tente directe ne de la commune de kai ductivity kai département du Mayo Danay, région de l'extrêm e Nord CM-UGP-PFS-47377-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opérateur de terrain de IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 la commune de Méri, dépa tente directe ductivity rtement du Diamaré, régio n de l'Extrême Nord CM-UGP-PFS-47378-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opérateur de terrain de IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 la commune de Ndoukoula tente directe ductivity , département du Diamaré , région de l'Extrême Nord CM-UGP-PFS-47379-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opérateur de terrain de IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,169.08 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 la commune de Guider, dé tente directe ductivity partement du Mayo Louti, région du Nord CM-UGP-PFS-47430-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opérateur de terrain de IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 la commune de Lagdo, dé tente directe ductivity partement de la Bénoué, r égion du Nord CM-UGP-PFS-47431-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain N° th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 1 de la commune de Bibe es to Boost Household Pro 1 8 8 4 8 1 tente directe mi (ADAMOU Bienvenu), d ductivity épartement de la Bénoué, région du Nord CM-UGP-PFS-47432-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain N° th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 2 de la commune de Bibe es to Boost Household Pro 1 8 8 4 8 1 tente directe mi (GOUDOUM GRANA Die ductivity unedort), département de la Bénoué, région du Nord CM-UGP-PFS-47433-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain de th Accompanying Measur 2018-02-2 2018-04-2 2018-01-2 2018-04-2 2018-02-2 2019-04-2 IDA / 52240 A posteriori nsultants par en Direct 8,100.00 8,495.18 Signé 2018-04-18 la commune de Kar Hay p es to Boost Household Pro 3 2 3 8 8 8 tente directe our la commune de Makar ductivity y dans le département du Logone et Chari, région de l'Extrême Nord CM-UGP-PFS-47434-CS-IN Cash Transfer Program wi Sélection de co DV / Avenant au contrat d th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2019-12-3 IDA / 52240 A posteriori nsultants par en Direct 16,800.00 15,497.59 Signé 2018-04-24 e la secrétaire de l'antenn es to Boost Household Pro 1 8 8 4 8 0 tente directe e régionale de l'Extrême N ductivity ord CM-UGP-PFS-47435-CS-IN Cash Transfer Program wi 2018-03-1 2018-07-0 2018-03-1 2018-07-0 2018-03-2 2018-07-0 2019-12-1 DV / Avenant au contrat d IDA / 52240 th Accompanying Measur A posteriori Individuel Direct 11,340.00 7,980.91 Signé 2018-03-05 2 2 7 4 5 4 5 u chauffeur de l'antenne r es to Boost Household Pro égionale du Nord ductivity CM-UGP-PFS-47369-CS-IN Cash Transfer Program wi Sélection de co DV / Avenant au contrat d th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-11-0 IDA / 52240 A posteriori nsultants par en Direct 3,600.00 3,188.07 Signé 2018-04-25 u point focal du départem es to Boost Household Pro 1 9 8 5 8 1 tente directe ent du Diamaré dans la ré ductivity gion de l'Extrême Nord CM-UGP-PFS-47371-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain N° th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 1 de la commune de DIR ( es to Boost Household Pro 1 8 8 4 8 1 tente directe HEBGASSO Jean Baptiste) ductivity département du Mbéré, ré gion de l'Adamaoua CM-UGP-PFS-47372-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opérateur de terrain N° IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 2 de la Commune de Dir ( tente directe ductivity HOULAO Pierre) départem ent du Mbéré, région de l' Adamoua CM-UGP-PFS-47375-CS-IN DV / Avenant au contrat d Cash Transfer Program wi Sélection de co e l'opérateur de terrain N° th Accompanying Measur 2018-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 2 de la commune de BOG es to Boost Household Pro 1 8 8 4 8 1 tente directe O( Wanie Bernard) départe ductivity ment du Diamaré, région d e l'Extrême Nord CM-UGP-PFS-47373-CS-IN Cash Transfer Program wi DV / Avenant au contrat d Sélection de co th Accompanying Measur 2016-01-1 2018-04-2 2018-02-2 2018-05-0 2018-02-2 2018-10-3 e l'opératrice de terrain N° IDA / 52240 A posteriori nsultants par en Direct 2,430.00 2,147.60 Signé 2018-04-24 es to Boost Household Pro 1 8 8 4 8 1 1 de la commune de BOG tente directe ductivity O, département du Diamar é, région de l'Extrême Nor d CM-UGP-PFS-59671-CS-C Cash Transfer Program wi Sélection de co 2016-01-1 2018-05-1 2018-05-3 2018-05-1 2018-05-3 2018-11-1 DS / Opérateur de terrain IDA / 52240 th Accompanying Measur A posteriori nsultants par en Direct 3,240.00 2,391.05 Signé 2018-04-30 1 0 0 9 1 5 de la commune de Douala es to Boost Household Pro tente directe 4 ductivity CM-UGP-PFS-59673-CS-IN Cash Transfer Program wi DV / Recrutement du Resp th Accompanying Measur 2018-06-1 2018-06-0 2018-10-1 2018-06-1 2018-11-1 2018-06-2 2018-12-0 2019-06-2 IDA / 52240 A posteriori Individuel Open 19,200.00 16,630.56 Signé 2018-05-04 onsable régional de l'ante es to Boost Household Pro 2 6 0 3 6 2 3 2 nne du Nord du Projet Filet ductivity s Sociaux CM-UGP-PFS-59789-CS-C DS / Audit financier et com ptable des comptes du Pro Cash Transfer Program wi Sélection de co jet de Remise à niveau des th Accompanying Measur 2018-04-2 2018-04-3 2018-03-2 2018-05-1 2018-07-3 2020-05-1 IDA / 52240 A posteriori nsultants par en Direct 54,000.00 46,581.42 Signé 2018-04-26 Réseaux de Transport d'El es to Boost Household Pro 0 0 3 4 1 3 tente directe ectricité et Réforme du Se ductivity cteur (PRRTERS): exercice s 2017-2018 - 2019 et du Projet Filets Sociaux (PFS) : exercices 2017-2018 CM-UGP-PFS-67474-CS-C Laying the Foundations of DS / Avenant au contrat d Sélection de co a Safety Net System and 2015-12-3 2018-07-0 2018-05-0 2018-07-0 2018-05-0 2019-01-0 e l'opérateur de terrain de IDA / 52240 A posteriori nsultants par en Direct 3,240.00 2,831.73 Signé 2018-06-29 Supporting Project Manag 0 3 2 9 8 5 la commune de Yaoundé 1 tente directe ement er NGO SICK ELEANOR RH OLY épouse KAM CM-UGP-PFS-67475-CS-C DS / Avenant au contrat d Laying the Foundations of Sélection de co e l'opérateur de terrain de a Safety Net System and 2015-12-3 2018-07-0 2018-05-0 2018-07-0 2018-05-0 2019-01-0 IDA / 52240 A posteriori nsultants par en Direct 3,240.00 2,831.73 Signé 2018-06-29 la commune de Funfong, d Supporting Project Manag 0 3 2 9 8 5 tente directe épartement du Boyo régio ement n du Nord Ouest AGHA-AH EVARISTUS ALANJI CM-UGP-PFS-67477-CS-C DS / Avenant au contrat d Laying the Foundations of Sélection de co e l'opérateur de terrain de a Safety Net System and 2015-12-3 2018-07-0 2018-05-0 2018-07-0 2018-05-0 2019-01-0 IDA / 52240 A posteriori nsultants par en Direct 3,240.00 2,831.73 Signé 2018-06-29 la commune de Balikumba Supporting Project Manag 0 3 2 9 8 5 tente directe t département du Ngo Ket ement ungja région du Nord Oues t TAJIPUKU ALPHONSE TAM IGHANG Page 6 CM-UGP-PFS-67478-CS-C DS / avenant au contrat de Laying the Foundations of Sélection de co l'opérateur de terrain N1 d a Safety Net System and 2015-12-3 2018-07-0 2018-05-0 2018-07-0 2018-05-0 2019-01-0 IDA / 52240 A posteriori nsultants par en Direct 3,240.00 2,831.73 Signé 2018-06-29 e la commune de Messam Supporting Project Manag 0 3 2 9 8 5 tente directe ena département du Haut ement Nyong région de l'Est TSAL A MVOGO BERNARD JEAN CM-UGP-PFS-67479-CS-C Laying the Foundations of Sélection de co DS / Avenant au contrat d a Safety Net System and 2015-12-3 2018-07-0 2015-05-0 2018-07-0 2018-05-0 2019-01-0 IDA / 52240 A posteriori nsultants par en Direct 4,800.00 4,195.15 Signé 2018-06-29 u point focal du départem Supporting Project Manag 0 3 4 9 8 5 tente directe ent du Haut Nyong région ement de l'Est MBILLA Pierre Vale ry CM-UGP-PFS-67481-CS-C Laying the Foundations of DS / avenant au contrat de Sélection de co a Safety Net System and 2015-12-3 2018-07-0 2018-06-2 2018-07-1 2018-06-2 2018-11-0 l'opérateur de terrain N°2 IDA / 52240 A posteriori nsultants par en Direct 2,160.00 1,887.82 Signé 2018-07-02 Supporting Project Manag 0 6 5 2 9 9 de la commune de Messa tente directe ement mena ESSOMBA YANNICK ALBERT NGUEM CM-UGP-PFS-67482-CS-C Laying the Foundations of DS / Avenant au contrat d Sélection de co a Safety Net System and 2015-12-3 2018-07-0 2018-05-1 2018-07-0 2018-05-1 2018-08-0 2018-06-3 e l'opérateur de terrain N° IDA / 52240 A posteriori nsultants par en Direct 540.00 471.95 Achevé 2018-06-29 Supporting Project Manag 0 3 0 8 5 7 0 2 de la commune de Lagd tente directe ement o, département de la Béno ué, région du Nord SIRINA ELVIS CM-UGP-PFS-67517-CS-IN Laying the Foundations of Sélection de co 2018-07-0 2018-07-1 2019-07-1 DV / Responsable Administ IDA / 52240 a Safety Net System and A posteriori nsultants par en Direct 38,095,248.00 0.00 Annulé 2018-06-29 4 1 1 ratif et Financier du Projet Supporting Project Manag tente directe ement CM-UGP-PFS-72586-CS-IN Laying the Foundations of 2018-09-1 2018-09-0 2018-09-1 2018-09-2 2018-09-1 2018-10-2 2018-09-1 2019-10-2 DV / Recrutement d'un op IDA / 52240 a Safety Net System and A posteriori Individuel Direct 5,940.00 5,136.94 Signé 2018-08-23 3 2 4 3 7 8 7 8 érateur de terrain pour la Supporting Project Manag commune de Koza ement CM-UGP-PFS-81429-CS-IN DV / consultants national s Laying the Foundations of énior chargé d'appuyer la a Safety Net System and 2018-10-0 2018-10-2 2018-11-2 2018-11-1 2018-11-2 2018-12-2 2018-11-3 2019-03-2 2019-09-0 Banque mondiale et le Proj IDA / 52240 A posteriori Individuel Limited 24,600.00 21,307.91 Achevé 2018-10-18 Supporting Project Manag 5 5 6 5 8 0 0 0 4 et Filets Sociaux dans la pr ement éparation d'une évaluation qualitative sur les Violence s Basées sur le Genre (VB G) au Cameroun CM-UGP-PFS-83718-CS-IN Laying the Foundations of 2018-10-2 2018-12-3 2019-03-1 2019-01-2 2019-03-1 2019-02-2 2019-04-0 2021-02-2 DV / Responsable Administ IDA / 52240 a Safety Net System and A posteriori Individuel Open 38,096.00 125,993.93 Signé 2018-11-11 2 0 3 0 8 4 1 3 ratif et Financier du Projet Supporting Project Manag Filets Sociaux ement CM-UGP-PFS-83719-CS-IN Laying the Foundations of 2018-10-2 2018-12-3 2019-02-1 2019-01-2 2019-03-0 2019-02-2 2019-03-1 2020-02-2 DV / Expert en sauvegarde IDA / 52240 a Safety Net System and A posteriori Individuel Open 38,095.00 25,544.73 Signé 2018-11-11 4 0 9 0 4 4 5 4 s sociales du Projet Filets S Supporting Project Manag ociaux ement CM-UGP-PFS-83720-CS-IN Laying the Foundations of DV / coach du responsable a Safety Net System and 2018-11-0 2019-01-0 2019-03-0 2019-01-2 2019-03-1 2019-03-0 2019-04-1 2019-08-3 IDA / 52240 A posteriori Individuel Open 38,095.00 19,480.26 Résilié 2018-11-18 des activités d'accompagn Supporting Project Manag 1 6 7 7 1 3 7 0 ement du Projet Filets Soci ement aux CM-UGP-PFS-83722-CS-IN Laying the Foundations of 2018-11-0 2019-01-0 2019-02-1 2019-01-2 2019-02-2 2019-03-0 2019-02-2 2020-03-0 DV / Assistant en Gestion IDA / 52240 a Safety Net System and A posteriori Individuel Open 14,400.00 10,329.66 Signé 2018-11-18 1 6 8 7 0 3 0 2 des Ressources Humaines Supporting Project Manag et du matériel ement CM-UGP-PFS-83723-CS-IN Laying the Foundations of DV / Assistant au Respons a Safety Net System and 2018-11-1 2019-01-0 2019-03-0 2019-01-2 2019-03-0 2019-03-0 2019-03-0 2020-03-0 IDA / 52240 A posteriori Individuel Open 14,400.00 9,119.51 Signé 2018-11-18 able du Systeme d'Informa Supporting Project Manag 3 6 1 7 6 3 6 2 tion ement du Projet Filets Sociaux MOF-CM-UGP-PFS-14460- Laying the Foundations of Sélection de co CS-CDS / Avenant au contr a Safety Net System and 2017-06-1 2017-06-0 2017-06-1 2017-06-1 2017-12-1 IDA / 52240 A posteriori nsultants par en Direct 3,240.00 2,785.30 Signé 2017-06-09 at de l'opératrice de terrai Supporting Project Manag 3 9 6 7 3 tente directe n de la commune de Doual ement a2 MOF-UGP-PFS-14463-CS-C Laying the Foundations of Sélection de co 2017-06-1 2017-06-0 2017-06-2 2017-06-1 2019-06-2 DS / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori nsultants par en Direct 12,960.00 25,147.34 Signé 2017-01-12 2 9 3 5 3 e l'operateur de terrain de Supporting Project Manag tente directe Yaoundé 7 ement MOF-UGP-PFS-14490-CS-C Laying the Foundations of Sélection de co 2015-01-1 2017-06-2 2017-06-2 2017-07-0 2017-07-0 2019-07-0 DS / Avenant au contrat d IDA / 52240 a Safety Net System and A posteriori nsultants par en Direct 16,800.00 14,442.29 Signé 2017-06-15 3 3 3 2 3 2 e Technicienne de surface Supporting Project Manag tente directe de l'UGP ement MOF-CM-UGP-PFS-6421-C Laying the Foundations of 2017-02-1 2017-04-0 2017-05-1 2017-04-2 2017-05-1 2017-06-0 2017-06-0 2019-06-0 S-INDV / Expert environne IDA / 52240 a Safety Net System and A posteriori Individuel Open 63,840.00 110,857.53 Signé 2017-02-17 0 7 7 8 8 2 9 2 mental et social du PFS Supporting Project Manag ement MOF-CM-UGP-PFS-6423-C Laying the Foundations of 2017-01-1 2017-03-2 2017-05-1 2017-04-1 2017-05-1 2017-05-2 2017-06-1 2018-05-2 2018-06-1 S-INDV / Assistant Compta IDA / 52240 a Safety Net System and A posteriori Individuel Open 9,600.00 27,305.89 Signé 2017-02-07 1 8 7 8 7 3 3 3 3 ble Supporting Project Manag ement Laying the Foundations of MOF-CM-UGP-PFS-6424-C 2017-01-1 2017-03-2 2017-04-1 2017-04-1 2017-04-2 2017-05-2 2017-05-1 2018-05-2 IDA / 52240 a Safety Net System and A posteriori Individuel Open 9,600.00 6,156.07 Résilié 2017-02-07 S-INDV / Assistant SPM 1 8 2 8 1 3 0 3 Supporting Project Manag ement CM-UGP-PFS-108883-CS-I Laying the Foundations of 2019-03-2 2019-06-1 2019-08-0 2019-07-0 2019-08-1 2019-08-0 2019-09-0 2020-08-0 2020-08-3 NDV / Auditeur interne du IDA / 52240 a Safety Net System and A posteriori Individuel Open 45,714.00 29,878.57 Achevé 2019-04-19 4 6 8 7 3 4 9 3 1 Projet Filets Sociaux Supporting Project Manag ement CM-UGP-PFS-111619-CS-C Cash Transfer Program wi DS / Avenant N°01 au cont Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-12-0 rat de l'Opérateur de Terra IDA / 52240 A posteriori nsultants par en Direct 2,160.00 1,832.99 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 5 in 1 de la Commune de Ba tente directe ductivity nyo, Département du May o Banyo, Région de l'Adam aoua CM-UGP-PFS-111629-CS-C Cash Transfer Program wi DS / Avenant Contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-12-0 Opérateur de Terrain 2 de IDA / 52240 A posteriori nsultants par en Direct 2,160.00 1,845.59 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 5 la Commune de Banyo, Dé tente directe ductivity partement du Mayo Banyo , Région de l'Adamaoua CM-UGP-PFS-111638-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 2,898.00 2,459.26 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 8 6 Commune de Bélo, Départ tente directe ductivity ement du Boyo, Région du Nord-Ouest CM-UGP-PFS-111640-CS-C Cash Transfer Program wi Sélection de co DS / Avenant au contrat d th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 2,898.00 32,024.07 Signé 2019-05-22 e l'Opérateur de Terrain 1 es to Boost Household Pro 2 1 4 5 8 6 tente directe de Douala IIIe, Ville de Dou ductivity ala CM-UGP-PFS-111642-CS-C Cash Transfer Program wi Sélection de co DS / Avenant de l'Opérate th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 2,898.00 32,052.15 Signé 2019-05-22 ur de Terrain 2 de la Com es to Boost Household Pro 2 1 4 5 8 6 tente directe mune de Douala IIIe, Ville ductivity de Douala CM-UGP-PFS-111643-CS-C Cash Transfer Program wi Sélection de co DS / Avenant de l'Opérate th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 2,898.00 15,181.83 Signé 2019-05-22 ur de Terrain 1 de la Com es to Boost Household Pro 2 1 4 5 8 6 tente directe mune de Ketté, Départem ductivity ent de la Kadey, Région de l'Est CM-UGP-PFS-111658-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 Opérateur de Terrain 2 de IDA / 52240 A posteriori nsultants par en Direct 2,898.00 15,181.83 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 8 6 la Commune de Ketté, Dép tente directe ductivity artement de la Kadey, Rég ion de l'Est CM-UGP-PFS-111662-CS-C Cash Transfer Program wi Sélection de co DS / Avenant contrat de l' th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 2,898.00 32,052.15 Signé 2019-05-22 Opératrice de Terrain 1 de es to Boost Household Pro 2 1 4 5 8 6 tente directe la Commune de Yaoundé II ductivity e, Ville de Yaoundé CM-UGP-PFS-111664-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 1,620.00 1,374.74 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 Commune de Blangoua, D tente directe ductivity épartement du Logone et Chari, Région de l'Extrême -Nord CM-UGP-PFS-111670-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 1,620.00 1,374.74 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 Commune de Bourha, Dép tente directe ductivity artement du Mayo Tsanag a, Région de l'Extrême-Nor d CM-UGP-PFS-111678-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 1,620.00 1,374.74 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 Commune de Gobo, Dépar tente directe ductivity tement du Mayo Danay, R égion de l'Extrême-Nord CM-UGP-PFS-111681-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 1,620.00 1,374.74 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 Commune de Goulfey, Dép tente directe ductivity artement du Logone et Ch ari, Région de l'Extrême-N ord CM-UGP-PFS-111685-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 1,620.00 1,374.74 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 Commune de Koza, Départ tente directe ductivity ement du Mayo Tsanaga, Région de l'Extrême-Nord CM-UGP-PFS-111688-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 4,860.00 4,124.22 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 Commune de Makari, Dép tente directe ductivity artement du Logone et Ch ari, Région de l'Extrême-N ord CM-UGP-PFS-111691-CS-C Cash Transfer Program wi DS / Avenant de l'Opérate Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 ur de Terrain de la Commu IDA / 52240 A posteriori nsultants par en Direct 4,860.00 4,124.22 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 ne de Mogodé, Départeme tente directe ductivity nt du Mayo Tsanaga, Régi on de l'Extrême-Nord CM-UGP-PFS-111692-CS-C Cash Transfer Program wi DS / Avenant contrat de l' Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-12-0 Opérateur de Terrain de la IDA / 52240 A posteriori nsultants par en Direct 2,160.00 1,832.99 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 5 Commune de Mayo Oulo, tente directe ductivity Département du Mayo Lou ti, Région du Nord CM-UGP-PFS-111696-CS-C Cash Transfer Program wi DS / Avenant de l'Opérate Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 ur de Terrain de la Commu IDA / 52240 A posteriori nsultants par en Direct 4,860.00 4,124.22 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 ne de Rey Bouba, Départe tente directe ductivity ment du Mayo Rey, Région du Nord CM-UGP-PFS-111698-CS-C Cash Transfer Program wi DS / Avenant de l'Opérate Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 ur de Terrain de la Commu IDA / 52240 A posteriori nsultants par en Direct 4,898.00 4,124.22 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 ne de Tchéboa, Départem tente directe ductivity ent de la Bénoué, Région du Nord CM-UGP-PFS-111699-CS-C Cash Transfer Program wi DS / Avenant de l'Opérate Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-12-0 ur de Terrain 1 de la Com IDA / 52240 A posteriori nsultants par en Direct 2,160.00 1,832.99 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 5 mune de Touboro, Départe tente directe ductivity ment du Mayo Rey, Région du Nord CM-UGP-PFS-111725-CS-C Cash Transfer Program wi Sélection de co DS / Avenant contrat Point th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 4,293.00 22,491.60 Signé 2019-05-22 Focal du Projet Filets Socia es to Boost Household Pro 2 1 4 5 8 6 tente directe ux dans le Département d ductivity e la Kadey, Région de l'Est CM-UGP-PFS-111726-CS-C Cash Transfer Program wi DS / Avenant contrat Point Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 Focal du Projet Filets Socia IDA / 52240 A posteriori nsultants par en Direct 7,200.00 6,109.96 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 ux dans le Département d tente directe ductivity u Logone et Chari, Région de l'Extrême-Nord CM-UGP-PFS-111727-CS-C Cash Transfer Program wi DS / Avenant contrat Point Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-12-0 Focal du Projet Filets Socia IDA / 52240 A posteriori nsultants par en Direct 3,200.00 2,715.54 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 5 ux dans le Département d tente directe ductivity u Mayo Banyo, Région de l 'Adamaoua CM-UGP-PFS-111735-CS-C Cash Transfer Program wi DS / Avenant contrat Point Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2019-11-0 Focal du Projet Filets Socia IDA / 52240 A posteriori nsultants par en Direct 2,400.00 2,036.65 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 4 ux dans le Département d tente directe ductivity u Mayo Danay, Région de l 'Extrême-Nord CM-UGP-PFS-111737-CS-C Cash Transfer Program wi DS / Avenant contrat Point Sélection de co th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-2 2020-05-0 Focal du Projet Filets Socia IDA / 52240 A posteriori nsultants par en Direct 7,200.00 6,109.96 Signé 2019-05-22 es to Boost Household Pro 2 1 4 5 0 6 ux dans le Département M tente directe ductivity ayo Tsanaga, Région de l'E xtrême-Nord Page 7 CM-UGP-PFS-111739-CS-C Cash Transfer Program wi Sélection de co DS / Avenant contrat Point th Accompanying Measur 2017-01-1 2019-06-0 2019-03-1 2019-08-0 2019-03-1 2020-01-1 IDA / 52240 A posteriori nsultants par en Direct 4,293.00 47,484.67 Signé 2019-05-22 Focal du Projet Filets Socia es to Boost Household Pro 2 1 4 5 8 6 tente directe ux dans la Ville de Yaound ductivity é CM-UGP-PFS-121795-CS-C DS / Consultant chargé de Laying the Foundations of Sélection de co l'élaboration de la méthod a Safety Net System and 2019-07-1 2019-12-1 2019-10-2 2020-02-1 2020-01-0 2020-03-1 IDA / 62230 A posteriori nsultants par en Direct 28,000.00 23,174.93 Signé 2019-11-30 ologie de choix et d’opérat Supporting Project Manag 2 9 9 3 9 4 tente directe ionnalisation du choix des ement communes bénéficiaires d u Projet Filets Sociaux CM-UGP-PFS-141188-CS-I Laying the Foundations of NDV / Recrutement d'un p a Safety Net System and 2020-02-0 2020-02-2 2020-03-3 2022-03-3 oint Focal dans la ville d IDA / 62230 A posteriori Individuel Open 19,200.00 0.00 Annulé 2019-12-10 Supporting Project Manag 4 5 1 1 e Douala, région du littoral ement pour la phase 3 des Trans ferts Monétaires ordinaires CM-UGP-PFS-141191-CS-I Laying the Foundations of NDV / Recrutement d'un P a Safety Net System and 2020-02-0 2020-02-2 2020-03-3 2022-03-3 oint Focal dans la ville de IDA / 62230 A posteriori Individuel Open 19,200.00 0.00 Annulé 2019-12-10 Supporting Project Manag 4 5 1 1 Yaoundé pour la cycle 3 ement des Transferts Monétaires ordinaires CM-UGP-PFS-141758-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-01-2 2020-02-1 2020-03-2 2020-10-1 es 1000 bénéficiaires de la IDA / D2980 A posteriori Individuel Open 7,560.00 0.00 2019-11-29 Supporting Project Manag men 5 4 4 0 6 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Waza, départem ent du Logone et Chari, ré gion de l'Extrême-Nord CM-UGP-PFS-143558-CS-I NDV / Recrutement de l'e Laying the Foundations of nquêteur Chercheur N°1 d a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-11-2 2020-06-0 2020-04-2 e l'équipe septentrionale d IDA / 62230 A posteriori Individuel Limited 5,394.00 7,761.40 Achevé 2019-11-29 Supporting Project Manag 7 0 5 3 6 7 7 6 1 ans le cadre de la préparat ement ion d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143560-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°2 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-0 2020-06-0 2020-04-2 l'équipe septentrionale da IDA / 62230 A posteriori Individuel Limited 5,394.00 7,761.40 Achevé 2019-11-29 Supporting Project Manag 7 0 6 3 6 7 6 6 0 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143562-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°3 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-1 2020-06-0 2020-04-2 l'équipe septentrionale da IDA / 62230 A posteriori Individuel Limited 5,394.00 7,761.40 Achevé 2019-11-29 Supporting Project Manag 7 0 6 3 6 7 6 6 0 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143563-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°4 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-11-2 2020-06-0 2020-03-0 l'équipe septentrionale da IDA / 62230 A posteriori Individuel Limited 5,394.00 7,719.29 Achevé 2019-11-29 Supporting Project Manag 7 0 6 3 6 7 7 6 4 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143564-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°1 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-0 2020-06-0 2020-04-2 l'équipe Adamaoua-Est da IDA / 62230 A posteriori Individuel Limited 4,902.00 7,200.12 Achevé 2019-11-29 Supporting Project Manag 7 0 5 3 6 7 6 6 3 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143565-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°2 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-0 2020-06-0 2020-02-2 l'équipe Adamaoua-Est da IDA / 62230 A posteriori Individuel Limited 4,902.00 7,200.12 Achevé 2019-11-29 Supporting Project Manag 7 0 5 3 6 7 6 6 5 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143567-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°3 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-1 2020-06-0 2020-04-2 l'équipe Adamaoua-Est da IDA / 62230 A posteriori Individuel Limited 4,902.00 7,200.12 Achevé 2019-11-29 Supporting Project Manag 7 0 5 3 6 7 3 6 0 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-143568-CS-I NDV / Recrutement de l'en Laying the Foundations of quêteur Chercheur N°4 de a Safety Net System and 2019-09-2 2019-12-2 2019-11-2 2020-01-0 2019-11-2 2020-02-0 2019-12-0 2020-06-0 2020-04-2 l'équipe Adamaoua-Est da IDA / 62230 A posteriori Individuel Limited 4,394.00 7,200.12 Achevé 2019-11-29 Supporting Project Manag 7 0 5 3 6 7 6 6 0 ns le cadre de la préparati ement on d'une évaluation qualit ative sur les Violences Bas ées sur le Genre (VBG) au Cameroun CM-UGP-PFS-152346-CS-I NDV / RECRUTEMENT DU C Laying the Foundations of ONSULTANT CHARGE D’IN a Safety Net System and 2020-01-2 2020-02-0 2020-01-2 2020-02-2 2020-02-0 2020-04-0 2020-02-2 2020-07-0 STALLER ET DE PARAMETR IDA / 62230 A posteriori Individuel Limited 7,500.00 6,007.08 Signé 2020-01-31 Supporting Project Manag 2 7 2 8 5 4 1 3 ER LES LOGICIELS TOM2PR ement O, TOM2MARCHE ET TOM2 PAIE D’UNE PART ET D’AU TRE PART DE RENFORCER LES CAPACITES DE L’UGP CM-UGP-PFS-142945-CS-C DS / Recrutement d'une O Sélection de co NG pour la mise en œuvre Public Works Program Pilo En cours d'exa 2019-10-1 2020-02-2 2020-05-0 2020-12-3 IDA / D2980 A posteriori nsultants par en Direct 99,042.00 0.00 2020-02-10 des activités de la Phase 7 t men 5 9 4 0 tente directe des THIMO dans la région de l'Extrême Nord, commu ne de Mokolo CM-UGP-PFS-142946-CS-C DS / Recrutement d'une O Sélection de co Public Works Program Pilo En cours d'exa 2020-02-2 2020-02-2 2020-05-0 2020-12-3 NG pour la mise en œuvre IDA / D2980 A posteriori nsultants par en Direct 132,056.00 0.00 2020-02-10 t men 8 9 4 0 des activités de la Phase 7 tente directe des THIMO dans la région du Nord , commune de To uboro CM-UGP-PFS-142944-CS-C DS / Recrutement d'une O NG pour la mise en œuvre Sélection de co Public Works Program Pilo En cours d'exéc 2019-10-1 2020-02-2 2020-05-0 2020-12-3 des activités de la Phase 7 IDA / D2980 A posteriori nsultants par en Direct 99,042.00 0.00 2020-02-10 t ution 6 9 4 0 des THIMO dans les régio tente directe ns de l'Adamaoua (commu ne de Dir) et de l'Est (Com munes de Ngoura et de M andjou) CM-UGP-PFS-141791-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-04-1 es 2000 bénéficiaires du c IDA / D2980 A posteriori Individuel Open 10,400.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Garoua Boulaï , d épartement du Lom et Djé rem, région de l'Est CM-UGP-PFS-141143-CS-I NDV / Recrutement de l' O pérateur de Terrain N°1 d Laying the Foundations of u Projet Filets Sociaux de l a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 a Commune de Logone Bir Supporting Project Manag men 0 5 5 0 0 ni, département du Logon ement e et Chari, région de l'Extr ême Nord pour le cycle 3 d es Transferts Monétaires O rdinaires CM-UGP-PFS-141192-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2019-10-1 2020-08-2 2020-04-1 2020-09-1 2020-04-1 2020-10-2 2020-05-1 2021-05-1 es 1000 bénéficiaires de la IDA / D2980 A posteriori Individuel Open 7,560.00 10,955.52 Signé 2020-06-30 Supporting Project Manag 6 5 1 5 5 0 3 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Fotokol, départe ment du Logone et Chari, r égion de l'Extrême-Nord CM-UGP-PFS-141091-CS-I Laying the Foundations of NDV / Recrutement d'un R a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 esponsable Régional dans IDA / D2980 A posteriori Individuel Open 38,400.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 la Région de l'Est pour la ement cycle 3 des Transferts Mon étaires ordinaires CM-UGP-PFS-141718-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain I de la C a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 ommune de Meiganga, dé Supporting Project Manag men 0 5 5 0 0 partement du Mbéré, régio ement n de l'Adamaoua pour le c ycle 3 des Transferts Moné taires Ordinaires CM-UGP-PFS-141717-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 de l a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 a Commune de Logone Bir IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 ni, département du Logon ement e et Chari, région de l'Extr ême Nord pour le cycle 3 d es Transferts Monétaires O rdinaires CM-UGP-PFS-141793-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 es 3000 bénéficiaires du c IDA / D2980 A posteriori Individuel Open 12,950.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 0 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Touboro, départe ment du Mayo-Rey, région du Nord CM-UGP-PFS-141162-CS-I NDV / Recrutement d'un O Laying the Foundations of pérateur de Terrain dans l a Safety Net System and En cours d'exéc 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 a Commune de Meyomess IDA / 62230 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag ution 0 5 5 0 0 ala, Département du Dja e ement t Lobo, région du Sud pour le cycle 3 des Transferts M onétaires Ordinaires CM-UGP-PFS-141731-CS-I NDV / Recrutement de l'Op érateur de Terrain N°2 du Laying the Foundations of Projet Filets Sociaux dans a Safety Net System and 2019-10-1 2020-08-2 2020-05-1 2020-09-1 2020-05-1 2020-10-2 2020-06-0 2022-10-2 IDA / 62230 A posteriori Individuel Open 12,960.00 11,666.27 Signé 2020-06-30 la Commune de Moulvoud Supporting Project Manag 0 5 7 5 9 0 9 0 aye , département du May ement o Kani, région de l'Extrêm e- Nord pour le cycle 3 des Transferts Monétaires Ordi naires CM-UGP-PFS-141171-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-10-2 s la Commune de Fotokol, IDA / D2980 A posteriori Individuel Open 6,480.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 département du Logone et ement Chari, région de l'Extrême Nord pour la phase 3 des T ransferts Monétaires d'Urg ence CM-UGP-PFS-141780-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 2000 bénéficiaires du c IDA / D2980 A posteriori Individuel Open 10,400.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Meiganga , dépar tement du Mbéré, région d e l'Adamaoua CM-UGP-PFS-141196-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 2000 bénéficiaires du c IDA / 62230 A posteriori Individuel Open 10,400.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Madringrin , dép artement du Mayo-Rey, ré gion du Nord CM-UGP-PFS-141170-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-10-2 s la Commune de Waza, d IDA / D2980 A posteriori Individuel Open 6,480.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 épartement du Logone et ement Chari, région de l'Extrême Nord pour la phase 3 des T ransferts Monétaires d'Urg ence CM-UGP-PFS-141801-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1000 bénéficiaires du c IDA / 62230 A posteriori Individuel Open 6,320.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Ma'an , départe ment de la Valée du Ntem, région du Sud Page 8 CM-UGP-PFS-141167-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2019-10-1 2020-08-2 2020-05-2 2020-09-1 2020-05-2 2020-10-2 2020-06-1 2021-10-2 IDA / D2980 A posteriori Individuel Open 6,480.00 0.00 Signé 2020-06-30 s la Commune de Meigang Supporting Project Manag 0 5 6 5 8 0 1 0 a, département du Mbéré, ement région de l'Adamaoua pou r la phase 3 des Transferts Monétaires d'Urgence CM-UGP-PFS-141168-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-10-2 IDA / D2980 A posteriori Individuel Open 6,480.00 0.00 2020-06-30 s la Commune de Ngaoui, Supporting Project Manag men 0 5 5 0 0 département du Mbéré, ré ement gion de l'Adamaoua pour l a phase 3 des Transferts M onétaires d'Urgence CM-UGP-PFS-141160-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°1 de a Safety Net System and 2019-10-1 2020-08-2 2020-04-1 2020-09-1 2020-04-1 2020-10-2 2020-05-1 2022-10-2 la la Commune de Madingr IDA / 62230 A posteriori Individuel Open 12,960.00 11,502.26 Signé 2020-06-30 Supporting Project Manag 0 5 1 5 6 0 3 0 ing , département du May ement o Rey, région du Nord pour le cycle 3 des Transferts M onetaires Ordinaires CM-UGP-PFS-141755-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exéc 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1000 bénéficiaires de la IDA / D2980 A posteriori Individuel Open 7,560.00 0.00 2020-06-30 Supporting Project Manag ution 5 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Ngaoui, départe ment du Mbéré, région de l'Adamaoua CM-UGP-PFS-141794-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2019-10-1 2020-08-2 2020-03-1 2020-09-1 2020-03-1 2020-10-2 2020-04-1 2021-05-1 es 1000 bénéficiaires du c IDA / 62230 A posteriori Individuel Open 6,320.00 7,329.97 Signé 2020-06-30 Supporting Project Manag 6 5 6 5 9 0 7 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune d' Ebolowa II, départ ement de la Mvila, région du Sud CM-UGP-PFS-141184-CS-I Laying the Foundations of NDV / Recrutement d'un P a Safety Net System and En cours d'exéc 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 oint Focal dans le départ IDA / D2980 A posteriori Individuel Open 19,200.00 0.00 2020-06-30 Supporting Project Manag ution 0 5 5 0 0 ement du Mayo Rey, régio ement n du Nord pour la cycle 3 des Transferts Monétaires ordinaires CM-UGP-PFS-141145-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°1 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet Filets Sociaux dans IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 la Commune de Bétaré Oy ement a, département du Lom et Djérem, région de l'Est po ur le cycle 3 des Transfert s Monétaires Ordinaires CM-UGP-PFS-141787-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1500 bénéficiaires du c IDA / D2980 A posteriori Individuel Open 7,850.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Logone Birni, dép artement du Logone et Ch ari, région de l'Extrême-No CM-UGP-PFS-141812-CS-I rd NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 IDA / 62230 A posteriori Individuel Open 7,850.00 0.00 2020-06-30 es 1500 bénéficiaires du c Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Yaoundé III , Ville de Yaoundé CM-UGP-PFS-141727-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet Filets Sociaux dans IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 la Commune de Bétaré Oy ement a, département du Lom et Djérem, région de l'Est po ur le cycle 3 des Transfert s Monétaires Ordinaires CM-UGP-PFS-141164-CS-I NDV / Recrutement d'un O Laying the Foundations of pérateur de Terrain dans l a Safety Net System and En cours d'exéc 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 a Commune de Ma'am, Dé IDA / 62230 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag ution 0 5 5 0 0 partement de la Vallée du ement Ntem, région du Sud pour le cycle 3 des Transferts M onétaires Ordinaires CM-UGP-PFS-141800-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1000 bénéficiaires du c IDA / 62230 A posteriori Individuel Open 6,320.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Meyomessala, dé partement du Dja et Lobo, région du Sud CM-UGP-PFS-141159-CS-I NDV / Recrutement de l'Op érateur de Terrain N°1 du Laying the Foundations of Projet Filets Sociaux dans a Safety Net System and 2019-10-1 2020-08-2 2020-05-0 2020-09-1 2020-05-1 2020-10-2 2020-06-0 2022-10-2 IDA / 62230 A posteriori Individuel Open 12,960.00 0.00 Signé 2020-06-30 la Commune de Moulvoud Supporting Project Manag 0 5 9 5 2 0 9 0 aye , département du May ement o Kani, région de l'Extrêm e- Nord pour le cycle 3 des Transferts Monétaires Ordi naires CM-UGP-PFS-141097-CS-I Laying the Foundations of NDV / Recrutement d'un R a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 esponsable Régional dans IDA / 62230 A posteriori Individuel Open 38,400.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 la Région du SUD pour la ement cycle 3 des Transferts Mon étaires ordinaires CM-UGP-PFS-141163-CS-I NDV / Recrutement d'un O Laying the Foundations of pérateur de Terrain dans l a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 IDA / 62230 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 a Commune d'Ebolowa II, Supporting Project Manag men 0 5 5 0 0 département de la Mvila, r ement égion du Sud pour le cycle 3 des Transferts Monétaire s Ordinaires CM-UGP-PFS-141141-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°1 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet Filets Sociaux de la IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 Commune de Meiganga, d ement épartement du Mbéré, régi on de l'Adamaoua pour le cycle 3 des Transferts Mon étaires Ordinaires CM-UGP-PFS-141161-CS-I NDV / Recrutement de 3 O Laying the Foundations of pérateurs de Terrain dans a Safety Net System and En cours d'exéc 2019-10-1 2020-08-2 2020-04-2 2020-09-1 2020-04-3 2020-10-2 2022-10-2 IDA / D2980 A posteriori Individuel Open 38,880.00 0.00 2020-06-30 la Commune de Touboro, Supporting Project Manag ution 0 5 4 5 0 0 0 département du Mayo-Rey ement , région du Nord pour le cy cle 3 des Transferts Monét aires Ordinaires CM-UGP-PFS-141735-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 de a Safety Net System and 2019-10-1 2020-08-2 2020-04-1 2020-09-1 2020-04-1 2020-10-2 2020-05-1 2022-10-2 la la Commune de Madingr IDA / 62230 A posteriori Individuel Open 12,960.00 11,567.97 Signé 2020-06-30 Supporting Project Manag 0 5 1 5 7 0 3 0 ing , département du May ement o Rey, région du Nord pour le cycle 3 des Transferts M onetaires Ordinaires CM-UGP-PFS-141155-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°1 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet filets sociaux dans l IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 a Commune de Garoua-Bo ement ulaï, département du Lom et Djérem, région de l'Est pour le cycle 3 des Transfe rts Monétaires Ordinaires CM-UGP-PFS-141785-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 2000 bénéficiaires du c IDA / 62230 A posteriori Individuel Open 10,400.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Moulvoudaye , d épartement du Mayo Kani, région de l'Extrême-Nord CM-UGP-PFS-141183-CS-I NDV / Recrutement d'un P Laying the Foundations of oint Focal dans le départ a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 IDA / D2980 A posteriori Individuel Open 19,200.00 0.00 2020-06-30 ement du Logone et Chari, Supporting Project Manag men 0 5 5 0 0 région de l'Extrême Nord p ement our la cycle 3 des Transfer ts Monétaires ordinaires CM-UGP-PFS-141804-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 IDA / 62230 A posteriori Individuel Open 7,850.00 0.00 2020-06-30 es1500 bénéficiaires du cy Supporting Project Manag men 5 5 5 0 8 cle 3 des TMO du Projet Fil ement ets Sociaux dans la comm une de Douala V , Ville de Douala CM-UGP-PFS-141187-CS-I NDV / Recrutement d'un P Laying the Foundations of oint Focal dans le départ a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 IDA / 62230 A posteriori Individuel Open 19,200.00 0.00 2020-06-30 ement du Mayo Kani, régio Supporting Project Manag men 0 5 5 0 0 n de l'Extrême Nord pour l ement a cycle 3 des Transferts M onétaires ordinaires CM-UGP-PFS-141084-CS-I Laying the Foundations of NDV / Recrutement d'un R a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 esponsable Régional dans IDA / D2980 A posteriori Individuel Open 38,400.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 la Région de l'Adamaoua ement pour la cycle 3 des Transf erts Monétaires ordinaires CM-UGP-PFS-141729-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet filets sociaux dans l IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 a Commune de Garoua-Bo ement ulaï, département du Lom et Djérem, région de l'Est pour le cycle 3 des Transfe rts Monétaires Ordinaires CM-UGP-PFS-141725-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 du a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2022-10-2 Projet Filets Sociaux de la IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2020-06-30 Supporting Project Manag men 0 5 5 0 0 Commune de Meiganga, d ement épartement du Mbéré, régi on de l'Adamaoua pour le cycle 3 des Transferts Mon étaires Ordinaires CM-UGP-PFS-141193-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 2000 bénéficiaires du c IDA / D2980 A posteriori Individuel Open 10,400.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 ycle 3 des TMO du Projet F ement ilets Sociaux dans la com mune de Bétaré Oya , dép artement du Lom et Djére m, région de l'Est CM-UGP-PFS-172114-CS-I Laying the Foundations of En cours d'exéc 2020-10-2 2020-07-1 2020-12-1 2020-08-0 2020-09-1 2021-09-1 NDV / Recrutement d'un A IDA / 62230 a Safety Net System and A posteriori Individuel Open 14,400.00 0.00 2020-05-25 ution 8 6 7 6 0 0 ssistant SPM Supporting Project Manag ement CM-UGP-PFS-172210-CS-I Laying the Foundations of NDV / Recrutement d'un c a Safety Net System and En cours d'exéc 2020-06-2 2020-08-1 2020-09-0 2020-10-0 2021-10-0 onsultant pour la traductio IDA / 62230 A posteriori Individuel Open 41,122.00 0.00 2020-06-22 Supporting Project Manag ution 9 3 3 8 8 n des documents du Projet ement Filets Sociaux en Anglais/ Français CM-UGP-PFS-141752-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and En cours d'exa 2019-10-1 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1000 bénéficiaires de la IDA / D2980 A posteriori Individuel Open 7,560.00 0.00 2020-06-30 Supporting Project Manag men 5 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Meiganga, départ ement du Mbéré, région d e l'Adamaoua CM-UGP-PFS-176264-CS-I NDV / Recrutement par En tente Directe d'un Consult Laying the Foundations of ant pour le ciblage des 20 a Safety Net System and 2020-06-3 2020-06-2 2020-07-2 2020-07-1 2020-07-2 2020-08-1 2020-08-2 2021-02-1 IDA / D2980 A posteriori Individuel Direct 10,400.00 7,273.30 Signé 2020-06-10 00 bénéficiaires du cycle 3 Supporting Project Manag 0 0 7 1 9 5 6 1 des TMO du Projet Filets S ement ociaux dans la commune d e Meiganga , département du Mbéré, Région de l'Ada maoua CM-UGP-PFS-141174-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 s la Commune de Bamend IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 0 a II, département de MEZA ement M, région du Nord-Ouest p our la phase 3 des Transfe rts Monétaires d'Urgence Page 9 CM-UGP-PFS-141763-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 500 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 4,920.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Bamenda II , dép artement de la Mezam, ré gion du Nord-Ouest CM-UGP-PFS-141771-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 500 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 4,920.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Limbé III, départe ment du Fako, région du S ud-Ouest CM-UGP-PFS-141765-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 1000 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 7,560.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Bamenda III , dép artement de la Mezam, ré gion du Nord-Ouest CM-UGP-PFS-141178-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 s la Commune de Limbé I, Supporting Project Manag 5 5 0 0 département de Fako, régi ement on du Sud-Ouest pour la p hase 3 des Transferts Mon étaires d'Urgence CM-UGP-PFS-141179-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 s la Commune de Limbé II, Supporting Project Manag 5 5 0 0 département de Fako, régi ement on du Sud-Ouest pour la p hase 3 des Transferts Mon étaires d'Urgence CM-UGP-PFS-141769-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 500 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 4,920.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Limbé II, départe ment du Fako, région du S ud-Ouest CM-UGP-PFS-141197-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 500 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 4,920.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Bamenda I, dépa rtement de la Mezam, régi on du Nord-Ouest CM-UGP-PFS-141173-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 s la Commune de Bamend IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 0 a I, département de MEZA ement M, région du Nord-Ouest p our la phase 3 des Transfe rts Monétaires d'Urgence CM-UGP-PFS-141180-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 s la Commune de Limbé III Supporting Project Manag 5 5 0 0 , département de Fako, ré ement gion du Sud-Ouest pour la phase 3 des Transferts Mo nétaires d'Urgence CM-UGP-PFS-141176-CS-I NDV / Recrutement d'un Laying the Foundations of Opérateur de Terrain dan a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-10-2 s la Commune de Bamend IDA / 62230 A posteriori Individuel Open 6,480.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 0 a III, département de MEZ ement AM, région du Nord-Ouest pour la phase 3 des Transf erts Monétaires d'Urgence CM-UGP-PFS-141767-CS-I NDV / Recrutement d'un C Laying the Foundations of onsultant pour le ciblage d a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2021-05-1 es 500 bénéficiaires de la IDA / 62230 A posteriori Individuel Open 4,920.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 8 Phase 3 des TMU du Projet ement Filets Sociaux dans la com mune de Limbé I , départe ment du Fako, région du S ud-Ouest CM-UGP-PFS-172022-CS-C Cash Transfer Program wi DS / Convention avec l’INS Sélection de co th Accompanying Measur 2020-08-1 2020-09-2 2020-08-2 2020-11-1 2020-09-2 2021-05-1 pour l’enquête PMT du Cyc IDA / 62230 A posteriori nsultants par en Direct 937,708.53 828,613.11 Signé 2020-09-15 es to Boost Household Pro 9 7 6 1 9 0 le 3 et du Cycle G1 des tr tente directe ductivity ansferts Monétaires Ordin aires du Projet Filets Socia ux; CM-UGP-PFS-200965-CS-I Laying the Foundations of En cours d'exa 2020-10-1 2021-02-0 2021-02-1 2021-03-0 2023-03-0 NDV / Recrutement d'un C IDA / 62230 a Safety Net System and A posteriori Individuel Open 63,983.20 0.00 2020-11-30 men 9 6 1 5 5 omptable pour le Projet Fil Supporting Project Manag ets Sociaux ement CM-UGP-PFS-172276-CS-I Laying the Foundations of NDV / Consultant pour la c a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2020-11-1 IDA / 62230 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2020-08-20 onception d'une affiche d Supporting Project Manag 5 5 0 9 e communication et de se ement nsibilisation sur le MGP CM-UGP-PFS-141118-CS-I Laying the Foundations of NDV / Recrutement de la S a Safety Net System and 2021-04-0 2021-03-1 2021-04-0 2021-05-1 2023-05-1 IDA / 62230 A posteriori Individuel Open 17,203.00 0.00 Annulé 2021-01-20 ecrétaire de l'antenne régi Supporting Project Manag 4 7 7 2 2 onale du Sud-Ouest du Pro ement jet Filets Sociaux CM-UGP-PFS-141133-CS-I Laying the Foundations of NDV / Recrutement de la S a Safety Net System and 2021-04-0 2021-03-1 2021-08-0 2021-04-0 2021-08-1 2021-05-1 2021-08-2 2023-05-1 IDA / D2980 A posteriori Individuel Open 17,203.00 7,371.70 Signé 2021-01-20 ecrétaire de l'antenne régi Supporting Project Manag 4 7 9 7 2 2 7 2 onale de l'Adamaoua du Pr ement ojet Filets Sociaux CM-UGP-PFS-141134-CS-I Laying the Foundations of NDV / Recrutement du Cha a Safety Net System and 2021-01-2 2021-03-1 2021-08-1 2021-04-0 2021-08-2 2021-05-1 2021-09-0 2023-05-1 IDA / D2980 A posteriori Individuel Open 11,612.00 5,027.99 Signé 2021-01-20 uffeur de l'antenne région Supporting Project Manag 9 7 9 7 3 2 6 2 ale de l'Adamaoua du Proj ement et Filets Sociaux CM-UGP-PFS-141124-CS-I Laying the Foundations of NDV / Recrutement de la S a Safety Net System and 2021-04-0 2021-03-1 2021-08-0 2021-04-0 2021-08-1 2021-05-1 2021-08-2 2023-05-1 IDA / 62230 A posteriori Individuel Open 17,203.00 7,315.73 Signé 2021-01-20 ecrétaire de l'antenne régi Supporting Project Manag 4 7 9 7 2 2 7 2 onale Sud du Projet Filets ement Sociaux CM-UGP-PFS-141129-CS-I Laying the Foundations of NDV / Recrutement du Cha a Safety Net System and 2021-01-2 2021-03-1 2021-08-0 2021-04-0 2021-08-1 2021-05-1 2021-08-2 2023-05-1 IDA / 62230 A posteriori Individuel Open 11,612.00 5,027.99 Signé 2021-01-20 uffeur de l'antenne région Supporting Project Manag 9 7 9 7 2 2 7 2 ale Sud du Projet Filets So ement ciaux CM-UGP-PFS-141131-CS-I Laying the Foundations of NDV / Recrutement du Cha a Safety Net System and 2021-01-2 2021-03-1 2021-08-0 2021-04-0 2021-08-1 2021-05-1 2021-08-2 2023-05-1 IDA / D2980 A posteriori Individuel Open 11,612.00 4,938.12 Signé 2021-01-20 uffeur de l'antenne région Supporting Project Manag 9 7 9 7 2 2 7 2 ale de l'Est du Projet Filets ement Sociaux CM-UGP-PFS-141123-CS-I Laying the Foundations of NDV / Recrutement du Cha a Safety Net System and 2021-03-1 2021-04-0 2021-05-1 2023-05-1 IDA / 62230 A posteriori Individuel Open 12,960.00 0.00 Annulé 2021-01-20 uffeur de l'antenne région Supporting Project Manag 7 7 2 2 ale du Sud-Ouest du Projet ement Filets Sociaux CM-UGP-PFS-172280-CS-I Laying the Foundations of NDV / Consultant pour la p a Safety Net System and 2021-02-1 2021-03-0 2021-04-0 2021-10-0 IDA / 62230 A posteriori Individuel Open 30,000.00 0.00 Annulé 2020-12-21 roduction des séries radio Supporting Project Manag 1 4 8 5 phoniques pour la préventi ement on des VBG CM-UGP-PFS-203028-CS-I Cash Transfer Program wi NDV / recrutement d’un co th Accompanying Measur En cours d'exéc 2020-11-3 2020-12-0 2020-12-0 2020-12-2 2021-01-3 2021-02-1 nsultant individuel chargé IDA / 62230 A posteriori Individuel Limited 3,000.00 0.00 2020-11-30 es to Boost Household Pro ution 0 5 7 6 0 4 de traduire en images le c ductivity ontrat moral du Projet Filet s Sociaux CM-UGP-PFS-141130-CS-I Laying the Foundations of NDV / Recrutement de la S a Safety Net System and 2021-04-0 2021-03-1 2021-08-0 2021-04-0 2021-08-1 2021-05-1 2021-08-2 2023-05-1 IDA / D2980 A posteriori Individuel Open 17,203.00 7,263.41 Signé 2021-01-20 ecrétaire de l'antenne régi Supporting Project Manag 4 7 9 7 2 2 7 2 onale de l'Est du Projet Fil ement ets Sociaux CM-UGP-PFS-187235-CS-I Laying the Foundations of NDV / Recrutement du cha a Safety Net System and 2021-01-2 2021-03-1 2021-04-0 2021-05-1 2023-05-1 IDA / 62230 A posteriori Individuel Open 11,612.00 0.00 Annulé 2021-01-20 uffeur de l'antenne région Supporting Project Manag 9 7 7 2 2 ale du Sud ouest du Projet ement Filets Sociaux CM-UGP-PFS-172253-CS-I NDV / Recrutement d’un C Laying the Foundations of onsultant pour une évaluat a Safety Net System and En cours d'exa 2020-11-3 2020-12-0 2020-12-2 2021-01-3 2021-07-2 ion sociale et une consulta IDA / 62230 A posteriori Individuel Limited 10,950.00 0.00 2020-11-30 Supporting Project Manag men 0 5 6 0 9 tion des populations '4B' e ement n vue de l'élaboration d'un Plan d'action Peuple Autoc htone (PPA) (IDA National) CM-UGP-PFS-203162-CS-C Laying the Foundations of Sélection de co En cours d'exéc 2020-12-1 2020-07-2 2020-09-2 2022-09-2 DS / Spécialiste en Passati IDA / 62230 a Safety Net System and A posteriori nsultants par en Direct 90,541.00 0.00 2020-07-15 ution 0 5 8 8 on des Marchés Supporting Project Manag tente directe ement CM-UGP-PFS-203164-CS-C Laying the Foundations of Sélection de co 2020-09-0 2020-11-0 2022-11-0 DS / Responsable Régional IDA / 62230 a Safety Net System and A posteriori nsultants par en Direct 39,787.00 0.00 Annulé 2020-08-26 5 9 9 du Projet Filets Sociaux da Supporting Project Manag tente directe ns le Nord-Ouest ement Laying the Foundations of Sélection de co CM-UGP-PFS-203161-CS-C En cours d'exéc 2019-03-2 2020-09-2 2020-12-0 2022-12-0 IDA / 62230 a Safety Net System and A posteriori nsultants par en Direct 64,890.00 0.00 2020-09-18 DS / Auditeur Interne ution 4 8 2 2 Supporting Project Manag tente directe ement CM-UGP-PFS-205157-CS-I Cash Transfer Program wi NDV / Recrutement du con th Accompanying Measur 2021-01-0 2021-01-2 2021-03-0 2021-05-3 sultant pour la production IDA / D2980 A posteriori Individuel Limited 14,447.00 0.00 Annulé 2020-12-30 es to Boost Household Pro 4 5 1 0 de 5 séries radiophoniques ductivity en 5 langues (français, ara be, Fufuldé, Arabe et Koto) CM-UGP-PFS-205176-CS-I Cash Transfer Program wi NDV / Recrutement du con th Accompanying Measur En cours d'exa 2020-12-0 2021-01-0 2021-01-2 2021-03-0 2021-03-3 IDA / D2980 A posteriori Individuel Limited 8,127.00 0.00 2020-12-30 sultant pour la production es to Boost Household Pro men 8 4 5 1 1 des images pour la formati ductivity on des couples CM-UGP-PFS-205281-CS-I NDV / Recrutement de l'op Laying the Foundations of érateur de terrain N°1 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 IDA / D2980 A posteriori Individuel Open 12,960.00 7,420.88 Signé 2021-03-15 a Commune de Ngaoui dé Supporting Project Manag 5 0 6 1 2 5 5 5 partement du Mbere régio ement n de l'Adamaoua pour le c ycle 4 des Transferts Moné taires ordinaires CM-UGP-PFS-205285-CS-I NDV / Recrutement de l'op Laying the Foundations of érateur de Terrain N°2 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-1 2021-07-0 2021-07-0 2023-07-0 a Commune de Ngaoui, dé IDA / D2980 A posteriori Individuel Open 12,960.00 7,394.20 Signé 2021-03-15 Supporting Project Manag 5 0 6 1 6 5 5 5 partement du Mbéré, Régi ement on de l'Adamaoua dans le cadre du cycle 4 des Trans ferts Monétaires Ordinaire s du Projet filets Sociaux CM-UGP-PFS-205286-CS-I NDV / Recrutement de l'op Laying the Foundations of érateur de Terrain N°2 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 a Commune de Njohong, d IDA / D2980 A posteriori Individuel Open 12,960.00 0.01 Signé 2021-03-15 Supporting Project Manag 5 0 6 1 2 5 5 5 épartement du Mbéré, Rég ement ion de l'Adamaoua dans le cadre du cycle 4 des Trans ferts Monétaires Ordinaire s du Projet filets Sociaux CM-UGP-PFS-205287-CS-I NDV / Recrutement de l'op Laying the Foundations of érateur de Terrain N°1 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 a Commune de Njohong, d IDA / D2980 A posteriori Individuel Open 12,960.00 7,392.74 Signé 2021-03-15 Supporting Project Manag 5 0 6 1 2 5 5 5 épartement du Mbéré, Rég ement ion de l'Adamaoua dans le cadre du cycle 4 des Trans ferts Monétaires Ordinaire s du Projet filets Sociaux CM-UGP-PFS-205288-CS-I NDV / Recrutement de l'Op érateur de Terrain N°1 de l Laying the Foundations of a Commune de Mandjou, a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 IDA / D2980 A posteriori Individuel Open 12,960.00 7,420.88 Signé 2021-03-15 Département du Lom et Dj Supporting Project Manag 5 0 5 1 1 5 5 5 erem, Région de l'Est dans ement le cadre du cycle 4 des Tra nsferts Monétaires Ordinai res du Projet filets Sociaux CM-UGP-PFS-205290-CS-I NDV / Recrutement de l'Op érateur de Terrain N°2 de l Laying the Foundations of a Commune de Mandjou, a Safety Net System and En cours d'exéc 2021-05-1 2021-05-3 2021-07-0 2023-07-0 IDA / D2980 A posteriori Individuel Open 12,960.00 0.00 2021-03-15 Département du Lom et Dj Supporting Project Manag ution 0 1 5 5 erem, Région de l'Est dans ement le cadre du cycle 4 des Tra nsferts Monétaires Ordinai res du Projet filets Sociaux Page 10 CM-UGP-PFS-205291-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°1 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 a Commune de Kentzou, D IDA / D2980 A posteriori Individuel Open 12,960.00 7,705.38 Signé 2021-03-15 Supporting Project Manag 5 0 5 1 1 5 5 5 épartement de la Kadey, R ement égion de l'Est dans le cadr e du cycle 4 des Transferts Monétaires Ordinaires du P rojet Filets Sociaux CM-UGP-PFS-205292-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain N°2 de l a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2023-07-0 a Commune de Kentzou, D IDA / D2980 A posteriori Individuel Open 12,960.00 7,705.38 Signé 2021-03-15 Supporting Project Manag 5 0 5 1 1 5 5 5 épartement de la Kadey, R ement égion de l'Est dans le cadr e du cycle 4 des Transferts Monétaires Ordinaires du P rojet Filets Sociaux CM-UGP-PFS-205294-CS-I NDV / Recrutement de l'Op érateur de Terrain N°1 de l Laying the Foundations of a Commune de Makary Dé a Safety Net System and 2021-02-0 2021-05-0 2021-06-1 2021-05-2 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / D2980 A posteriori Individuel Open 12,960.00 7,795.05 Signé 2021-03-15 partement du Logone et C Supporting Project Manag 5 3 6 4 2 8 5 8 hari, Région de l'Extrême ement Nord dans le cadre du cycl e 4 des Transferts Monétai res Ordinaires du Projet Fil ets Sociaux CM-UGP-PFS-205297-CS-I NDV / Recrutement de l'Op érateur de Terrain N°2 de l Laying the Foundations of a Commune de Makary Dé a Safety Net System and 2021-02-0 2021-05-0 2021-06-1 2021-05-2 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / D2980 A posteriori Individuel Open 12,960.00 7,795.05 Signé 2021-03-15 partement du Logone et C Supporting Project Manag 5 3 6 4 2 8 5 8 hari, Région de l'Extrême ement Nord dans le cadre du cycl e 4 des Transferts Monétai res Ordinaires du Projet Fil ets Sociaux CM-UGP-PFS-205298-CS-I NDV / Recrutement de l'Op érateur de Terrain N°1 de l Laying the Foundations of a Commune de Tokomber a Safety Net System and 2021-02-0 2021-05-0 2021-06-1 2021-05-2 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / 62230 A posteriori Individuel Open 12,960.00 7,359.01 Signé 2021-03-15 é Département du Mayo S Supporting Project Manag 5 3 6 4 2 8 5 8 ava, Région de l'Extrême ement Nord dans le cadre du cycl e 4 des Transferts Monétai res Ordinaires du Projet Fil ets Sociaux CM-UGP-PFS-205301-CS-I NDV / Recrutement de l'Op érateur de Terrain N°2 de l Laying the Foundations of a Commune de Tokomber a Safety Net System and 2021-02-0 2021-05-0 2021-06-1 2021-05-2 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / 62230 A posteriori Individuel Open 12,960.00 7,354.20 Signé 2021-03-15 é Département du Mayo S Supporting Project Manag 5 3 6 4 2 8 5 8 ava, Région de l'Extrême ement Nord dans le cadre du cycl e 4 des Transferts Monétai res Ordinaires du Projet Fil ets Sociaux CM-UGP-PFS-141107-CS-I Laying the Foundations of NDV / Recrutement d'un R a Safety Net System and 2020-08-2 2020-09-1 2020-10-2 2022-10-2 esponsable Régional dans IDA / 62230 A posteriori Individuel Open 38,400.00 0.00 Annulé 2020-06-30 Supporting Project Manag 5 5 0 0 la Région du SUD-OUEST p ement our la cycle 3 des Transfe rts Monétaires ordinaires CM-UGP-PFS-212970-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 mmune de Mbé Départem IDA / 62230 A posteriori Individuel Open 12,960.00 7,541.99 Signé 2021-03-31 Supporting Project Manag 5 9 6 9 2 4 5 4 ent de la VINA, Région de l ement 'Adamaoua dans le cadre du cycle 4 des Transferts Monétaires Ordinaires du P rojet Filets Sociaux CM-UGP-PFS-212971-CS-I NDV / Recrutement de l'Op érateur de Terrain de la C Laying the Foundations of ommune de Bankim Dépar a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 IDA / 62230 A posteriori Individuel Open 12,960.00 7,523.13 Signé 2021-03-31 tement du Mayo- Banyo, R Supporting Project Manag 5 9 6 9 2 4 5 4 égion de l'Adamaoua dans ement le cadre du cycle 4 des Tra nsferts Monétaires Ordinai res du Projet Filets Sociaux CM-UGP-PFS-212972-CS-I NDV / Recrutement de l'Op érateur de Terrain de la C Laying the Foundations of ommune de Mayo Darlé D a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 IDA / 62230 A posteriori Individuel Open 12,960.00 7,555.74 Signé 2021-03-31 épartement du Mayo- Ban Supporting Project Manag 5 9 6 9 2 4 5 4 yo, Région de l'Adamaoua ement dans le cadre du cycle 4 d es Transferts Monétaires O rdinaires du Projet Filets S ociaux CM-UGP-PFS-212973-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Mindif Départ IDA / 62230 A posteriori Individuel Open 12,960.00 7,359.01 Signé 2021-03-31 Supporting Project Manag 5 9 6 9 2 4 5 4 ement du Mayo- Kani, Régi ement on de l'Extrême Nord dans le cadre du cycle 4 des Tra nsferts Monétaires Ordinai res du Projet Filets Sociaux CM-UGP-PFS-212974-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Djoum Départ IDA / 62230 A posteriori Individuel Open 12,960.00 7,705.38 Signé 2021-03-31 Supporting Project Manag 5 9 6 9 2 4 5 4 ement du Dja et Lobo Régi ement on du Sud dans le cadre d u cycle 4 des Transferts M onétaires Ordinaires du Pr ojet Filets Sociaux CM-UGP-PFS-212976-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Meyomessala IDA / 62230 A posteriori Individuel Open 12,960.00 7,359.01 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 Département du Dja et Lo ement bo, Région du Sud dans le cadre du cycle 4 des Trans ferts Monétaires Ordinaire s du Projet Filets Sociaux CM-UGP-PFS-212977-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Douala 2ème IDA / 62230 A posteriori Individuel Open 12,960.00 7,423.12 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 Ville de Douala dans le ca ement dre du cycle 4 des Transfe rts Monétaires Ordinaires du Projet Filets Sociaux CM-UGP-PFS-212978-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 IDA / 62230 A posteriori Individuel Open 12,960.00 7,423.12 Signé 2021-03-31 ommune de Yaoundé 7 Vill Supporting Project Manag 5 9 5 9 1 4 5 4 e de Yaoundé dans le cadr ement e du cycle 4 des Transferts Monétaires Ordinaires du P rojet Filets Sociaux CM-UGP-PFS-212979-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Mora, Départe IDA / D2980 A posteriori Individuel Open 12,960.00 7,394.20 Signé 2021-03-31 Supporting Project Manag 5 9 6 9 2 4 5 4 ment du Mayo Sava, Régio ement n de l'Extrême Nord dans l e cadre du cycle 5 des Tra nsferts Monétaires Ordinai res du Projet Filets Sociaux CM-UGP-PFS-212980-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Ouli, Départe IDA / D2980 A posteriori Individuel Open 12,960.00 7,394.20 Signé 2021-03-31 Supporting Project Manag 5 9 6 9 2 4 5 4 ment de la Kadey, Région ement de l'Est dans le cadre du c ycle 5 des Transferts Moné taires Ordinaires du Projet Filets Sociaux CM-UGP-PFS-212981-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la C a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 ommune de Batouri, Dépa IDA / D2980 A posteriori Individuel Open 12,960.00 7,414.95 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 rtement de la Kadey, Régi ement on de l'Est dans le cadre d u cycle 5 des Transferts M onétaires Ordinaires du Pr ojet Filets Sociaux CM-UGP-PFS-212982-CS-I NDV / Recrutement de l'Op érateur de Terrain de la C Laying the Foundations of ommune de Gari -Gombo, a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 IDA / D2980 A posteriori Individuel Open 12,960.00 7,394.20 Signé 2021-03-31 Département de la Boumb Supporting Project Manag 5 9 5 9 1 4 5 4 a et Ngoko, Région de l'Est ement dans le cadre du cycle 5 d es Transferts Monétaires O rdinaires du Projet Filets S ociaux CM-UGP-PFS-212983-CS-I NDV / Recrutement de l'Op érateur de Terrain de la C Laying the Foundations of ommune de Salapoumbe, a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2023-07-1 IDA / D2980 A posteriori Individuel Open 12,960.00 7,414.95 Signé 2021-03-31 Département de la Boumb Supporting Project Manag 5 9 5 9 1 4 5 4 a et Ngoko, Région de l'Est ement dans le cadre du cycle 5 d es Transferts Monétaires O rdinaires du Projet Filets S ociaux CM-UGP-PFS-213101-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-07-1 IDA / 62230 A posteriori Individuel Open 6,480.00 5,027.99 Signé 2021-03-31 mmune de Douala IV, Vill Supporting Project Manag 5 9 1 9 4 4 1 4 e de Douala dans le cadre ement de la phase 4 des Transfer ts Monétaires d'urgence d u Projet Filets Sociaux CM-UGP-PFS-213102-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-07-1 mmune de Yaoundé III, Vil IDA / 62230 A posteriori Individuel Open 6,480.00 5,007.03 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 4 le de Yaoundé dans le cad ement re de la phase 4 des Trans ferts Monétaires d'urgence du Projet Filets Sociaux CM-UGP-PFS-213103-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-07-1 mmune de Babadjou, Dép IDA / 62230 A posteriori Individuel Open 6,480.00 4,975.89 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 artement du Bamboutos, R ement égion de l'Ouest dans le ca dre de la phase 4 des Tran sferts Monétaires d'urgenc e du Projet Filets Sociaux CM-UGP-PFS-213104-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-07-1 mmune de Batcham, Dép IDA / 62230 A posteriori Individuel Open 6,480.00 4,975.89 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 artement du Bamboutos, R ement égion de l'Ouest dans le ca dre de la phase 4 des Tran sferts Monétaires d'urgenc e du Projet Filets Sociaux CM-UGP-PFS-213105-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-07-1 mmune de Galim, Départ IDA / 62230 A posteriori Individuel Open 6,480.00 4,975.89 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 ement du Bamboutos, Rég ement ion de l'Ouest dans le cadr e de la phase 4 des Transf erts Monétaires d'urgence du Projet Filets Sociaux CM-UGP-PFS-213106-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-07-1 mmune de foumban, Dép IDA / 62230 A posteriori Individuel Open 6,480.00 4,975.89 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 5 4 artement du Noun, Région ement de l'Ouest dans le cadre d e la phase 4 des Transfert s Monétaires d'urgence du Projet Filets Sociaux CM-UGP-PFS-213107-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-07-1 mmune de Touboro , Dép IDA / D2980 A posteriori Individuel Open 6,480.00 4,943.30 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 4 artement du Mayo Rey, Ré ement gion du Nord dans le cadre de la phase 4 des Transfer ts Monétaires d'urgence d u Projet Filets Sociaux CM-UGP-PFS-213108-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-07-1 mmune de kette, Départe IDA / D2980 A posteriori Individuel Open 6,480.00 4,943.30 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 4 ment de la Kadey, Région ement de l'Est dans le cadre de la phase 4 des Transferts Mo nétaires d'urgence du Proj et Filets Sociaux CM-UGP-PFS-213110-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-07-1 mmune de NGOURA, Dép IDA / D2980 A posteriori Individuel Open 6,480.00 5,196.70 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 4 artement du Lom et Djere ement m, Région de l'Est dans le cadre de la phase 4 des Tr ansferts Monétaires d'urge nce du Projet Filets Sociau x Page 11 CM-UGP-PFS-213111-CS-I NDV / Recrutement de l'Op Laying the Foundations of érateur de Terrain de la Co a Safety Net System and En cours d'exéc 2021-03-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2022-07-1 mmune de Garoua , Dépa IDA / D2980 A posteriori Individuel Open 6,480.00 0.00 2021-03-31 Supporting Project Manag ution 1 9 6 9 2 4 4 rtement du Lom et Djerem ement , Région de l'Est dans le c adre de la phase 4 des Tra nsferts Monétaires d'urgen ce du Projet Filets Sociaux CM-UGP-PFS-213113-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / D2980 A posteriori Individuel Open 10,400.00 6,722.39 Signé 2021-03-31 Supporting Project Manag 5 9 4 9 1 4 5 9 ansferts Monétaires Ordin ement aires du Projet Filets Socia ux dans la Commune de N gaoui département du Mb ere région de l'Adamaoua (2000 ménages bénéficiair CM-UGP-PFS-213114-CS-I es) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / D2980 A posteriori Individuel Open 10,400.00 5,443.85 Signé 2021-03-31 Supporting Project Manag 5 9 4 9 1 4 5 9 ansferts Monétaires Ordin ement aires du Projet Filets Socia ux dans la Commune de N johong département du M bere région de l'Adamaou a (2000 ménages bénéfici CM-UGP-PFS-213115-CS-I aires) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,300.00 3,805.13 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet Filets Socia ux dans la Commune de Mbe département de la Vi na, région de l'Adamaoua (1000 ménages bénéficiair CM-UGP-PFS-213116-CS-I es) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,320.00 3,805.13 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Bankim, départ ement du Mayo Banyo régi on de l'Adamaoua (1000 ménages bénéficiaires) CM-UGP-PFS-213117-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,320.00 3,805.13 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Mayo Darle, dé partement du Mayo Banyo région de l'Adamaoua (10 00 ménages bénéficiaires) CM-UGP-PFS-213118-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / D2980 A posteriori Individuel Open 10,400.00 6,745.03 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Manjou, départ ement du Lom et Djerem r égion de l'Est (2000 ména ges bénéficiaires) CM-UGP-PFS-213119-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / D2980 A posteriori Individuel Open 10,400.00 6,722.39 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Kenzou, départ ement de la Kadey région de l'Est (2000 ménages bé néficiaires) CM-UGP-PFS-213120-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / D2980 A posteriori Individuel Open 7,850.00 3,849.41 Signé 2021-03-31 Supporting Project Manag 5 9 4 9 1 4 9 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Makary, départ ement du Logone et Chari région de l'Extrême Nord ( 1500 ménages bénéficiair CM-UGP-PFS-213121-CS-I es) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and En cours d'exéc 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 10,400.00 0.00 2021-03-31 Supporting Project Manag ution 5 9 5 9 2 4 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Tokombere, dé partement du Mayo Sava r égion de l'Extrême Nord (2 000 ménages bénéficiaires )CM-UGP-PFS-213122-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-07-3 2021-07-1 2021-08-1 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,320.00 3,631.70 Signé 2021-03-31 Supporting Project Manag 5 9 4 9 0 4 1 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Mindif, départe ment du Mayo Kani région de l'Extrême Nord (1000 ménages bénéficiaires) CM-UGP-PFS-213123-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,320.00 3,805.13 Signé 2021-03-31 Supporting Project Manag 5 9 8 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Djoum, départe ment du Dja et Lobo régio n du Sud (1000 ménages b énéficiaires) CM-UGP-PFS-213124-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-07-2 2021-06-0 2021-07-3 2021-07-1 2021-07-3 2022-02-0 éficiaires du cycle 4 des Tr IDA / 62230 A posteriori Individuel Open 6,320.00 3,849.41 Signé 2021-03-31 Supporting Project Manag 5 9 8 9 0 4 0 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Meyo Messala, département du Dja et Lob o région du Sud (1000 mé nages bénéficiaires) CM-UGP-PFS-213125-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 IDA / 62230 A posteriori Individuel Open 6,320.00 3,849.41 Signé 2021-03-31 éficiaires du cycle 4 des Tr Supporting Project Manag 5 9 8 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Douala 2ème, Ville de Douala (1000 mén ages bénéficiaires) CM-UGP-PFS-213126-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-07-1 2021-06-0 2021-07-2 2021-07-1 2021-07-2 2022-02-0 IDA / 62230 A posteriori Individuel Open 6,320.00 3,715.13 Signé 2021-03-31 éficiaires du cycle 4 des Tr Supporting Project Manag 5 9 9 9 1 4 1 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Yaoundé 7, Vill e de Yaoundé (1000 ména ges bénéficiaires) CM-UGP-PFS-213127-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires du cycle 5 des Tr IDA / D2980 A posteriori Individuel Open 6,320.00 8,179.99 Signé 2021-03-31 Supporting Project Manag 5 9 5 9 1 4 9 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Mora , Départe ment du Mayo Sava Régio n de l'Extrême Nord (100 0 ménages bénéficiaires) CM-UGP-PFS-213129-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 IDA / D2980 A posteriori Individuel Open 6,320.00 3,631.70 Signé 2021-03-31 éficiaires du cycle 5 des Tr Supporting Project Manag 5 9 7 9 2 4 5 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Ouli, Départem ent de la Kadey de l'Est (1 000 ménages bénéficiaires )CM-UGP-PFS-213135-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 IDA / D2980 A posteriori Individuel Open 6,320.00 3,870.43 Signé 2021-03-31 éficiaires du cycle 5 des Tr Supporting Project Manag 5 9 7 9 1 4 9 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Batouri, Départ ement de la Kadey de l'Est (1000 ménages bénéficiai CM-UGP-PFS-213136-CS-I res) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and En cours d'exéc 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2022-02-0 éficiaires du cycle 5 des Tr IDA / D2980 A posteriori Individuel Open 6,320.00 0.00 2021-03-31 Supporting Project Manag ution 5 9 7 9 2 4 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Gari Gombo, D épartement de la Boumba et Ngoko, Région de l'Est (1000 ménages bénéficiair CM-UGP-PFS-213137-CS-I es) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and En cours d'exéc 2021-02-0 2021-05-1 2021-06-0 2021-07-1 2022-02-0 éficiaires du cycle 5 des Tr IDA / D2980 A posteriori Individuel Open 6,320.00 0.00 2021-03-31 Supporting Project Manag ution 5 9 9 4 9 ansferts Monétaires Ordin ement aires du Projet dans la Co mmune de Salapoumbe, D épartement de la Boumba et Ngoko, Région de l'Est (1000 ménages bénéficiair CM-UGP-PFS-213138-CS-I es) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 éficiaires de la phase 4 de IDA / D2980 A posteriori Individuel Open 7,560.00 5.68 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 7 4 2 9 s Transferts Monétaires d' ement urgence du PFS dans la Co mmune de Garoua boulaï, Département du Lom et Dj erem, Région de l'Est (10 00 ménages bénéficiaires) CM-UGP-PFS-213139-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 éficiaires de la phase 4 de IDA / D2980 A posteriori Individuel Open 7,560.00 5,542.81 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 9 s Transferts Monétaires d' ement urgence du PFS dans la Co mmune de Ngoura, Départ ement du Lom et Djerem, Région de l'Est (1000 mé nages bénéficiaires) CM-UGP-PFS-213140-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 éficiaires de la phase 4 de IDA / D2980 A posteriori Individuel Open 7,560.00 5,567.66 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Kette, Dépar tement de la Kadey, Régio n de l'Est (1000 ménages bénéficiaires) CM-UGP-PFS-213142-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 éficiaires de la phase 4 de IDA / D2980 A posteriori Individuel Open 7,650.00 5,620.22 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 7 4 2 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Touboro, Dé partement du Mayo Rey, R égion du Nord (1000 mén ages bénéficiaires) CM-UGP-PFS-213143-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 éficiaires de la phase 4 de IDA / 62230 A posteriori Individuel Open 7,560.00 5,527.07 Signé 2021-03-31 Supporting Project Manag 5 9 1 9 4 4 1 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Foumban, D épartement du Noun, Régi on de l'Ouest (1000 ména ges bénéficiaires) Page 12 CM-UGP-PFS-213144-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires de la phase 4 de IDA / 62230 A posteriori Individuel Open 4,920.00 3,593.71 Signé 2021-03-31 Supporting Project Manag 5 9 7 9 1 4 5 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Galim, Dépa rtement du Bamboutos, Ré gion de l'Ouest (500 mén ages bénéficiaires) CM-UGP-PFS-213145-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires de la phase 4 de IDA / 62230 A posteriori Individuel Open 4,920.00 3,584.50 Signé 2021-03-31 Supporting Project Manag 5 9 7 9 1 4 5 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Batcham, Dé partement du Bamboutos, Région de l'Ouest (500 m énages bénéficiaires) CM-UGP-PFS-213146-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-1 2021-06-0 2021-06-2 2021-07-1 2021-07-0 2022-02-0 éficiaires de la phase 4 de IDA / 62230 A posteriori Individuel Open 4,920.00 3,593.71 Signé 2021-03-31 Supporting Project Manag 5 9 7 9 1 4 5 9 s Transferts Monétaires d' ement urgence du Projet dans la Commune de Babadjou, D épartement du Bamboutos , Région de l'Ouest (500 ménages bénéficiaires) CM-UGP-PFS-213147-CS-I NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 IDA / 62230 A posteriori Individuel Open 7,560.00 5,535.12 Signé 2021-03-31 éficiaires de la phase 4 de Supporting Project Manag 5 9 1 9 4 4 1 9 s Transferts Monétaires d' ement urgence du Projet Filets So ciaux dans la Commune d e Douala IV, Ville de Doual a (1000 ménages bénéfici CM-UGP-PFS-213148-CS-I aires) NDV / Consultant pour le ciblage des villages et mé Laying the Foundations of nages potentiellement bén a Safety Net System and 2021-02-0 2021-05-1 2021-06-0 2021-06-0 2021-06-0 2021-07-1 2021-06-2 2022-02-0 IDA / 62230 A posteriori Individuel Open 7,560.00 5,635.54 Signé 2021-03-31 éficiaires de la phase 4 de Supporting Project Manag 5 9 1 9 4 4 1 9 s Transferts Monétaires d' ement urgence du Projet Filets So ciaux dans la Commune d e Yaoundé III, Ville de Yao undé (1000 ménages béné CM-UGP-PFS-203027-CS-I ficiaires) Laying the Foundations of NDV / Consultant pour la p a Safety Net System and En cours d'exéc 2021-04-0 2021-04-2 2021-05-3 2021-11-2 IDA / 62230 A posteriori Individuel Limited 30,000.00 0.00 2021-03-31 roduction des séries radio Supporting Project Manag ution 5 6 1 7 phoniques pour la préventi ement on des VBG CM-UGP-PFS-217843-CS-I Laying the Foundations of NDV / Recrutement du cha a Safety Net System and En cours d'exa 2021-05-2 2021-02-2 2021-03-2 2021-04-2 2023-04-2 IDA / 62230 A posteriori Individuel Limited 16,800.00 0.00 2021-02-22 uffeur N° 3 de l'Unité de G Supporting Project Manag men 5 7 0 4 4 estion du Projet Filets Soci ement aux CM-UGP-PFS-218220-CS-I NDV / Recrutement du poi Laying the Foundations of nt focal du département d a Safety Net System and 2021-02-1 2021-04-2 2021-06-1 2021-05-1 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / D2980 A posteriori Individuel Open 19,200.00 10,959.84 Signé 2021-03-02 u Mbéré, région de l'Adam Supporting Project Manag 7 7 6 8 2 2 5 2 aoua dans le cadre des Cy ement cles 4 et 5 des Transferts Monétaire Ordinaire CM-UGP-PFS-218223-CS-I NDV / Recrutement du poi Laying the Foundations of nt focal du département d a Safety Net System and 2021-02-1 2021-04-2 2021-06-1 2021-05-1 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / 62230 A posteriori Individuel Open 19,200.00 11,185.42 Signé 2021-03-02 u Mayo Banyo, région de l' Supporting Project Manag 7 7 6 8 2 2 5 2 Adamaoua dans le cadre d ement es Cycles 4 et 5 des Transf erts Monétaire Ordinaire CM-UGP-PFS-218225-CS-I NDV / Recrutement du poi Laying the Foundations of nt focal du département d a Safety Net System and 2021-02-1 2021-04-2 2021-06-1 2021-05-1 2021-06-2 2021-06-2 2021-07-0 2023-06-2 IDA / D2980 A posteriori Individuel Open 19,200.00 11,100.38 Signé 2021-03-02 e la Boumba et Ngoko, rég Supporting Project Manag 7 7 6 8 2 2 5 2 ion de l'Est dans le cadre d ement es Cycles 4 et 5 des Transf erts Monétaire Ordinaire CM-UGP-PFS-218226-CS-I Laying the Foundations of NDV / Recrutement du poi a Safety Net System and 2021-02-1 2021-04-2 2021-06-1 2021-05-1 2021-06-2 2021-06-2 2021-07-0 2023-06-2 nt focal du département d IDA / D2980 A posteriori Individuel Open 19,200.00 11,100.38 Signé 2021-03-02 Supporting Project Manag 7 7 5 8 1 2 5 2 e la Kadey, région de l'Est ement dans le cadre des Cycles 4 et 5 des Transferts Monéta ire Ordinaire CM-UGP-PFS-220028-CS-C DS / RECRUTEMENT DU CO NSULTANT CHARGE DE L'E Cash Transfer Program wi Sélection de co NQUETE DE BASE POUR L' th Accompanying Measur En cours d'exéc 2021-02-1 2021-03-2 2021-05-2 2022-01-2 IDA / D2980 A posteriori nsultants par en Direct 499,337.00 0.00 2021-03-15 EVALUATION D'IMPACT DE es to Boost Household Pro ution 8 5 9 4 tente directe S MESURES D'ACCOMPAG ductivity NEMENT DU PROJET FILET S SOCIAUX AUPRES DES P OPULATIONS HOTES ET DE S REFUGIES AU CAMEROU NCM-UGP-PFS-227924-CS-I Laying the Foundations of En cours d'exéc 2021-04-2 2021-06-1 2021-07-0 2021-08-1 2022-08-1 NDV / Recrutement d'un a IDA / 62230 a Safety Net System and A posteriori Individuel Open 9,600.00 0.00 2021-04-30 ution 3 8 9 3 3 ssistant comptable au Proj Supporting Project Manag et Filets Sociaux ement CM-UGP-PFS-232625-CS-I Laying the Foundations of NDV / recrutement d'un te a Safety Net System and En cours d'exa 2021-05-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / D2980 A posteriori Individuel Limited 1,920.00 0.00 2021-06-25 chnicien de surface pour l' Supporting Project Manag men 5 0 1 5 5 antenne régionale du pro ement jet de l'extrême Nord CM-UGP-PFS-232631-CS-I Laying the Foundations of NDV / recrutement d'un Te a Safety Net System and En cours d'exa 2021-05-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / D2980 A posteriori Individuel Limited 1,920.00 0.00 2021-06-25 chnicien de surface pour l' Supporting Project Manag men 5 0 1 5 5 antenne Régionale du proj ement et du Nord CM-UGP-PFS-232634-CS-I Laying the Foundations of NDV / recrutement d'un te a Safety Net System and En cours d'exa 2021-05-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / D2980 A posteriori Individuel Limited 1,920.00 0.00 2021-06-25 chnicien de surface pour l' Supporting Project Manag men 5 0 1 5 5 antenne régionale du pro ement jet de l'Est CM-UGP-PFS-232635-CS-I Laying the Foundations of NDV / recrutement d'un te a Safety Net System and En cours d'exa 2021-05-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / D2980 A posteriori Individuel Limited 1,920.00 0.00 2021-06-25 chnicien de surface pour l' Supporting Project Manag men 5 0 1 5 5 antenne régionale du pro ement jet de l'Adamaoua CM-UGP-PFS-232636-CS-I Laying the Foundations of NDV / recrutement d'un te a Safety Net System and En cours d'exa 2021-05-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / 62230 A posteriori Individuel Limited 1,920.00 0.00 2021-06-25 chnicien de surface pour l' Supporting Project Manag men 5 0 1 5 5 antenne régionale du pro ement jet du sud CM-UGP-PFS-232637-CS-I Laying the Foundations of NDV / recrutement d'un de a Safety Net System and En cours d'exa 2021-06-2 2021-06-3 2021-07-2 2021-08-2 2022-08-2 IDA / 62230 A posteriori Individuel Limited 7,000.00 0.00 2021-06-25 uxième technicien de surf Supporting Project Manag men 5 0 1 5 5 ace pour l'Unité de Gestio ement n du Projet CM-UGP-PFS-234703-CS-C DS / Convention de parten ariat avec l'Institut Nation Cash Transfer Program wi al de la Statistique (INS) p Sélection de co th Accompanying Measur En cours d'exéc 2021-06-0 2021-06-1 2021-06-0 2021-07-3 2022-03-2 our la réalisation de l’enqu IDA / 62230 A priori nsultants par en Direct 1,200,000.00 0.00 2021-05-31 es to Boost Household Pro ution 6 5 7 0 7 ête Proxy Means Test (PMT tente directe ductivity ) dans les communes béné ficiaires du programme de transferts monétaires ordi naires du cycle 4 et du cyc le 5 du PFS CM-UGP-PFS-239536-CS-I Laying the Foundations of En cours d'exéc 2021-10-1 2021-08-1 2022-04-2 2021-09-0 2022-04-2 2021-10-1 2023-01-1 NDV / Recrutement d'un a IDA / 62230 a Safety Net System and A posteriori Individuel Open 18,000.00 0.00 2021-06-30 ution 2 8 7 8 8 3 3 ssistant du Responsable Supporting Project Manag Administratif et Financier ement CM-UGP-PFS-239633-CS-I Laying the Foundations of En cours d'exéc 2021-06-1 2021-07-1 2021-06-2 2021-07-3 2021-06-2 2021-09-0 2023-03-0 NDV / Recrutement d'un a IDA / 62230 a Safety Net System and A posteriori Individuel Direct 22,857.00 0.00 2021-06-30 ution 8 0 8 1 9 4 8 ssistant au Spécialiste en Supporting Project Manag Passation des Marchés ement CM-UGP-PFS-249781-CS-I NDV / Recrutement du con Laying the Foundations of sultant chargé de l'Elabora a Safety Net System and En cours d'exéc 2021-09-1 2021-10-0 2021-09-1 2021-10-2 2021-12-0 2022-01-3 tion du Cadre de gestion e IDA / 62230 A posteriori Individuel Limited 18,000.00 0.00 2021-09-29 Supporting Project Manag ution 3 6 6 7 1 0 nvironnementale et social ement e (CGES), avec évaluation des risques de sécurité, et les risques de Violence Ba sée sur le Genre (VBG) CM-UGP-PFS-249790-CS-I Laying the Foundations of NDV / Recrutement du con a Safety Net System and 2021-09-1 2021-10-0 2021-09-1 2021-10-2 2021-10-0 2021-12-0 2021-10-2 2022-01-3 2022-03-2 IDA / 62230 A posteriori Individuel Limited 9,030.00 7,570.82 Achevé 2021-09-29 sultant chargé de l'Elabor Supporting Project Manag 3 6 6 7 1 1 0 0 2 ation du Plan de Gestion d ement e la Main d’Œuvre (PGMO) CM-UGP-PFS-249794-CS-I NDV / Recrutement d'un c Laying the Foundations of onsultant chargé de l'élab a Safety Net System and 2021-09-1 2021-10-0 2021-09-1 2021-10-2 2021-10-0 2021-12-0 2021-10-2 2022-01-3 2022-02-1 IDA / 62230 A posteriori Individuel Limited 9,030.00 6,736.15 Achevé 2021-09-29 oration du Plan de Mobilisa Supporting Project Manag 3 6 6 7 1 1 0 0 5 tion des Parties Prenantes ement (PMPP) qui intégrera un m écanisme de gestion des p laintes. CM-UGP-PFS-255951-CS-I NDV / Recrutement d'un c onsultant individuel pour l’ Laying the Foundations of élaboration de la Stratégie a Safety Net System and En cours d'exéc 2021-10-1 2021-10-2 2021-10-2 2021-11-1 2021-11-0 2021-12-2 2022-01-1 de Passation de Marchés p IDA / 62230 A posteriori Individuel Limited 15,000.00 0.00 2021-10-20 Supporting Project Manag ution 4 7 5 7 5 2 6 our promouvoir le Dévelop ement pement (PPSD : Project Pro curement Strategy for Dev elopment) du Projet Filets Sociaux adaptatif et d’Incl usion Economique CM-UGP-PFS-303170-CS-I NDV / Recrutement du con sultant national chargé d’a Laying the Foundations of ppuyer l’UGP dans la prép a Safety Net System and En cours d'exéc 2022-07-1 2022-08-2 2022-09-0 2022-10-1 2023-02-1 IDA / D2980 A posteriori Individuel Open - National 10,640.00 0.00 2022-07-21 aration de la mise en œuvr Supporting Project Manag ution 5 3 6 0 1 e du Programme d’inclusio ement n économique des jeunes dans le cadre du Projet Fil ets Sociaux Adaptatifs et I nclusion Économique CM-UGP-PFS-304021-CS-I NDV / Recrutement du con Laying the Foundations of sultant national chargé d’a a Safety Net System and En cours d'exéc 2022-07-1 2022-08-2 2022-09-0 2022-10-1 2023-02-1 ppuyer l’UGP dans la prép IDA / D2980 A posteriori Individuel Open - National 10,640.00 0.00 2022-07-21 Supporting Project Manag ution 5 3 6 0 1 aration de la mise en œuvr ement e du Concours de plans d’ affaires dans le cadre du Projet Filets Sociaux Adapt atifs et Inclusion Économiq CM-UGP-PFS-304023-CS-I ue NDV / Recrutement du con Laying the Foundations of sultant national chargé d’a a Safety Net System and En cours d'exéc 2022-07-1 2022-08-2 2022-09-0 2022-10-1 2023-02-1 ppuyer l’UGP dans la prép IDA / D2980 A posteriori Individuel Open - National 10,640.00 0.00 2022-07-21 Supporting Project Manag ution 5 3 6 0 1 aration de la mise en œuvr ement e du Dispositif de paiemen t numérique du Projet File ts Sociaux Adaptatifs et In clusion Économique CM-UGP-PFS-315983-CS-I NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-2 2022-11-1 2022-12-2 IDA / D2980 A posteriori Individuel Open - National 12,100.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 5 9 0 5 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion économique dans la région de l'Adama CM-UGP-PFS-315993-CS-I oua. NDV / Recrutement du con sultant national N°1 charg Laying the Foundations of é de conduire la cartograp a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-2 2022-11-1 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 12,100.00 0.00 2022-09-19 hie des infrastructures de l Supporting Project Manag men 6 5 9 0 5 ’écosystème du dispositif ement de paiement numérique d u Projet Filets Sociaux Ada ptatifs et Inclusion économ ique dans la région du Cen CM-UGP-PFS-316003-CS-I tre NDV / Recrutement du con sultant national N° 2 charg Laying the Foundations of é de conduire la cartograp a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-2 2022-11-1 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 12,100.00 0.00 2022-09-19 hie des infrastructures de l Supporting Project Manag men 6 5 9 0 5 ’écosystème du dispositif ement de paiement numérique d u Projet Filets Sociaux Ada ptatifs et Inclusion Écono mique dans la région du C CM-UGP-PFS-316007-CS-I entre NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exéc 2022-09-0 2022-10-1 2022-10-2 2022-11-1 2022-12-2 IDA / D2980 A posteriori Individuel Open - National 11,900.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag ution 6 5 9 0 5 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région de l'Est Page 13 CM-UGP-PFS-316012-CS-I NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-2 2022-11-1 2022-12-2 IDA / D2980 A posteriori Individuel Open - National 12,300.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 5 9 0 5 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région de l'Extrêm eCM-UGP-PFS-316022-CS-I Nord NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-1 2022-11-0 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 11,900.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 3 8 6 1 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région du Littoral CM-UGP-PFS-316024-CS-I NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-1 2022-11-0 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 11,900.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 3 8 6 1 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région du Nord CM-UGP-PFS-316027-CS-I NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-2 2022-11-0 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 12,700.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 3 0 8 3 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région de l'Ouest CM-UGP-PFS-316030-CS-I NDV / Recrutement du con sultant national chargé de Laying the Foundations of conduire la cartographie d a Safety Net System and En cours d'exa 2022-09-0 2022-10-1 2022-10-1 2022-11-0 2022-12-2 IDA / 62230 A posteriori Individuel Open - National 11,900.00 0.00 2022-09-19 es infrastructures de l’éco Supporting Project Manag men 6 3 8 6 1 système du dispositif de p ement aiement numérique du Pro jet Filets Sociaux Adaptatif s et Inclusion Économique dans la région du Sud. Page 14