The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) Benin - Stormwater Management and Urban Resilience Project (P167359) WESTERN AND CENTRAL AFRICA | Benin | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 8 | ARCHIVED on 15-Dec-2022 | ISR53421 | Implementing Agencies: Government of Benin, Ministère du Cadre de Vie Key Dates Key Project Dates Bank Approval Date: 23-May-2019 Effectiveness Date: 03-Feb-2020 Planned Mid Term Review Date: 03-Apr-2023 Actual Mid-Term Review Date: Original Closing Date: 30-Sep-2025 Revised Closing Date: 30-Sep-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed Project Development Objective is to reduce flood risks in selected areas of Cotonou and strengthen urban resilience management and capacity at the city level. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Stormwater drainage investment and community engagement for flood risk reduction and climate change adaptation:(Cost $93.80 M) Component 2: Strengthening urban resilience management and capacity:(Cost $1.75 M) Component 3: Project management, monitoring and evaluation:(Cost $4.45 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Project is in second half of Year 3 of implementation with contractors in place since December 2021 and in 2 of the 3 project areas of intervention (basins Pa3 and Y) and civil works are underway. All implementation and operational mechanisms are fully established and all safeguards instruments are being implemented (and updated wherever necessary). RAPs in sections of Basin Pa3 and Y where works are underway, were fully implemented before the works could start. The bidding process for the works in the third and final basin AAc is expected to be initiated before the end of 2022, and works can start once the evaluation of the performance of the operation and maintenance mechanism for the stormwater drainage system in Cotonou is satisfactorily assessed (evaluation report expected in December 2022). The Société de Gestion des Déchets et de Salubrité (SGDS) was designated to play a major role in that operation and maintenance mechanism, providing services to the Municipality of Cotonou. The NGO in charge of identifying 12/15/2022 Page 1 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) community level subprojects in areas of intervention has started its work and is expected to help identify 10 subprojects within the next 6 months. Activities under the capacity building component are underway. The project is in parallel financing with 5 other donors (AfDB, BOAD, EIB, AFD, BIsD) sharing the same Manual of operations, and covering 31 additional basins, all supporting the Government flaghip Programme d'Assainissement Pluvial de Cotonou (PAPC). Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Low Low Macroeconomic Moderate Low Low Sector Strategies and Policies High Moderate Moderate Technical Design of Project or Program High Moderate Moderate Institutional Capacity for Implementation and High Moderate Moderate Sustainability Fiduciary Substantial Moderate Moderate Environment and Social High Substantial Substantial Stakeholders Substantial Low Low Other -- Low -- Overall High Moderate Moderate Results PDO Indicators by Objectives / Outcomes To reduce flood risks in selected areas of Cotonou IN01202341 ►Cotonou residents in selected areas benefiting from decreased risk of recurring flooding (number) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 168,000.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 IN01202343 ►Area of flood-prone zones under integrated flood risk management approaches (ha) (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target 12/15/2022 Page 2 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) Value 0.00 0.00 0.00 35.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 To strengthen urban resilience management and capacity at the city level IN01202342 ►Designated entity and/or entities have the financial and technical capacities to execute O&M of city-wide drainage infrastructure on a regular basis (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 The results of the O&M performance evaluation are expected in December 2022 - January 2023 and will confirm whether the designated entity (SGDS) and the Municipality of Cotonou have the financial and Comments: technical capacities to execute the O&M of the drainage infrastructure on a daily basis. IN01202344 ►Constructed and/or rehabilitated drainage infrastructure cleaned semi-annually (percentage) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Overall Comments PDO The project started with some delays because of the 5 months it took to be signed, another 4 months to become effective. There were some heavy lifting work to prepare before the bidding process for the first DAO could be initiated. Civil works started therefore with some delays and results are not showing yet, but works sites are very active, and indicators will start changing this FY. Intermediate Results Indicators by Components Component 1:Stormwater drainage investment and community engagement for flood risk reduction and CCA IN01202346 ►Length of drainage work rehabilitated and constructed (primary and secondary networks) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 5.65 25.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 The unit of measurement is corrected to kilometers (km) Comments: IN01202348 ►Additional retention capacity due to rehabilitated storage areas (Cubic Meter(m3), Custom) 12/15/2022 Page 3 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 400,000.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 IN01202350 ►O&M mechanism is functional (including financing mechanism) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No Yes Yes Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 The results of the O&M performance evaluation are expected in September/October 2022 and will Comments: determine whether the O&M mechanism is functional or not. IN01202352 ►Community equipment for flood risk reduction validated, implemented and integrated into municipality assets (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Identification of community projects has started with support from social facilitation NGO. Comments: IN01202353 ►Waste collection rate in the drainage infrastructure provided by the project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 95.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 IN01202354 ►Lenght of roads paved with concrete interlock blocs (km) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 IN01202355 ►People reached by the information, education and communication strategy (IEC-resilience, climate change and waste management) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 381.00 3,219.00 25,000.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 IN01202356 12/15/2022 Page 4 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) ►Women being members of the community committees for flood control (percentage) IEC action plan progress reports, surveys, audio-visual recording, meeting documents (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Set up of community committees for flood control is being initiated with support from social facilitation Comments: NGO. IN01202357 ►Activities to be designed alleviate disproportionate flood impacts on women and most vulnerable (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Component 2: Strengthening urban resilience management and capacity IN01202345 ►Modular data sharing platform for rainwater management and urban resilience operational and managed by the designated entity under the Ministry of sustainable and Territorial Development (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Procurement process is on-going. Services are expected to start in August/September 2022. Comments: IN01202347 ►Hydrological flood modeling managed by the designated entity under the Ministry of Sustainable and Territorial Development (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Procurement process is on-going. Services are expected to start in August/September 2022. Comments: IN01202349 ►Key stakeholders (including females) trained on flood risk management, urban climate change resilience and territorial planning (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 300.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Component 3: Project Management, Monitoring and Evaluation 12/15/2022 Page 5 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) IN01202351 ►Grievances registered related to delivery of Program benefits that are addressed (percentage) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 100.00 100.00 80.00 Date 11-Apr-2019 01-Apr-2022 28-Oct-2022 30-Sep-2025 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P167359 IDA-64300 Effective USD 100.00 100.00 0.00 25.06 69.75 26% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P167359 IDA-64300 Effective 23-May-2019 07-Oct-2019 03-Feb-2020 30-Sep-2025 30-Sep-2025 Cumulative Disbursements 12/15/2022 Page 6 of 7 The World Bank Implementation Status & Results Report Benin - Stormwater Management and Urban Resilience Project (P167359) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/15/2022 Page 7 of 7