PROCUREMENT PLAN (Textual Part) Project information: [country]Central African Republic CAR Powering Enterprise Growth and Entrepreneurship (P176274) [Project name] [P- number] Project Implementation agency: [insert legal name]AGIR PIU Date of the Procurement Plan: [insert date]2/24/2022 Period covered by this Procurement Plan: [insert from – to period] 2/24/2022-2/24/2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation],Procurement law dated June 2008 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable.” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable.” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Not Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Central African Republic : CAR Investment and Business Competitiveness for Employment PLAN General Information Country: Central African Republic 2022-02-24 Bank’s Approval Date of the Original Procurement Plan: 2022-10-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P176274 GPN Date: Project Name: CAR Investment and Business Competitiveness for Employment Loan / Credit No: / , IDA / V4130 AGIR Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1 / ACQUISITION DE MATERI Component 1: Investment R Passation de marc En attente d' ELS INFORMATIQUES ET DU S / A posteriori Direct 50,000.00 0.00 2022-01-28 2022-02-02 2022-03-09 2022-09-05 eforms and Facilitation hé de gré à gré exécution YSTEME D'INFORMATION DU PROJET (TOMPRO) 11 / Paramétrage du logiciel Component 1: Investment R Passation de marc En attente d' IDA / V4130 A posteriori Direct 10,000.00 0.00 2022-08-30 2022-09-04 2022-10-09 2023-04-07 Tom pro eforms and Facilitation hé de gré à gré exécution NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 3 / Consultant pour Etude de la mise en place ou le renforc Sélection fondée s ement d’un mécanisme perm Component 1: Investment R Open - Internationa En attente d'exéc / A posteriori ur les qualification 100,000.00 0.00 2022-01-10 2022-01-31 2022-03-16 2022-04-15 2022-05-20 2022-11-16 ettant aux PME de profiter de eforms and Facilitation l ution s des consultants s opportunités de marchés q u’offrent les grandes entrepri ses 12 / Service d'une firme pou r les études sur les organism Sélection fondée s Component 1: Investment R Open - Internationa En attente d'exéc es publics qui soutiennent le IDA / V4130 A posteriori ur les qualification 300,000.00 0.00 2022-09-22 2022-10-13 2022-11-26 2022-12-26 2023-01-30 2023-07-29 eforms and Facilitation l ution secteur privé et un plan d'act s des consultants ion des réformes du schéma de ces organismes 18 / Réalisation des études a Sélection fondée s rchitecturales pour la réhabili Component 1: Investment R En attente d'exéc IDA / V4130 A posteriori ur les qualification Open - National 50,000.00 0.00 2022-12-21 2023-01-11 2023-02-24 2023-03-26 2023-04-30 2023-10-27 tation d'un bâtiment abritant eforms and Facilitation ution s des consultants la coordination du projet PICE E INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 6 / Elaboration des documen ts de Sauvegardes environne Sélection de cons Component 1: Investment R mentales et Sociales : Plan d IDA / V4130 A posteriori ultants par entent Direct 60,000.00 61,050.40 Signé 2022-02-25 2022-02-25 2022-03-07 2022-03-03 2022-05-11 2022-03-07 2022-11-07 eforms and Facilitation e Gestion Environnementale e directe et Sociale Générique (PGESG ) 7 / Elaboration des documen Sélection de cons ts de Sauvegardes environne Component 1: Investment R IDA / V4130 A posteriori ultants par entent Direct 40,000.00 19,129.53 Signé 2022-02-25 2022-02-25 2022-03-07 2022-03-03 2022-05-11 2022-03-07 2022-11-07 mentales et Sociales : Plan d eforms and Facilitation e directe e Gestion de la Main d’Œuvre (PGMO) 9 / Elaboration du manuel de Component 1: Investment R / A posteriori Individuel Limited 20,000.00 0.00 Annulé 2022-02-25 2022-04-25 2022-03-02 2022-03-23 2022-04-27 2022-10-24 procédures du Projet eforms and Facilitation Sélection de cons 2 / Elaboration du Manuel d' Component 1: Investment R IDA / V4130 A posteriori ultants par entent Direct 40,000.00 34,375.80 Signé 2022-06-30 2022-05-31 2022-07-10 2022-06-01 2022-09-13 2022-06-08 2023-03-12 exécution du projet (MEP) eforms and Facilitation e directe 13 / Service d'une firme RH Sélection de cons Component 1: Investment R En cours d'exécut pour le recrutement du Staff IDA / V4130 A posteriori ultants par entent Direct 150,000.00 0.00 2022-07-20 2022-06-07 2022-07-30 2022-06-09 2022-10-03 2023-04-01 eforms and Facilitation ion de la coordination PICEE e directe 14 / Service d'un Consultant Individuel pour mener une ét Component 1: Investment R En attente d'exéc ude d'évaluation du marché IDA / V4130 A posteriori Individuel Open 50,000.00 0.00 2022-09-22 2022-11-10 2022-12-01 2023-01-05 2023-07-04 eforms and Facilitation ution des filières porteuse d'emploi pour la formation professionn elle. 15 / Service d'un Consultant pour l'élaboration d'un méca Component 1: Investment R En attente d'exéc nisme de sélection des appre IDA / V4130 A posteriori Individuel Open 50,000.00 0.00 2022-08-25 2022-10-13 2022-11-03 2022-12-08 2023-06-06 eforms and Facilitation ution ntis pour la mise en relation avec les entreprises et leurs f ormations. 4 / Réalisation des études ar Sélection de cons chitecturales pour la réhabilit Component 1: Investment R IDA / V4130 A posteriori ultants par entent Direct 50,000.00 0.00 Annulé 2022-08-16 2022-08-26 2022-10-30 2023-04-28 ation d'un bâtiment destiné à eforms and Facilitation e directe abriter l'équipe du CAPMEA Page 1 5 / Réalisation des études ar Sélection de cons chitecturales pour la réhabilit Component 1: Investment R IDA / V4130 A posteriori ultants par entent Direct 50,000.00 0.00 Annulé 2022-08-24 2022-09-03 2022-11-07 2023-05-06 ation du bâtiment servant de eforms and Facilitation e directe bureau au CMCAA 10 / Réalisation des études a Sélection de cons rchitecturales pour la réhabili Component 1: Investment R IDA / V4130 A posteriori ultants par entent Direct 50,000.00 0.00 Annulé 2022-10-10 2022-10-20 2022-12-24 2023-06-22 tation d'un bâtiment abritant eforms and Facilitation e directe la coordination du projet PICE E Page 2