Initial Procurement Plan for the Project Prior/post review Procurement Procurement by the Bank Reference method type Description of contract package Component 1 Infrastructure Investments and Asset Management Sub-component 1.1 Reliable and Safe Railway Infrastructure 1.1.1 Track rehabilitation (heavy maintenance) 111A Design for rehabilitation of railway sections in tunnels Vracar and Dedinje CS QCBS Post Lot1: Rehabilitation works on railway in tunnels Vracar and Dedinje 111B Lot2: Rehabilitation works on railway section Pancevacki most - Pancevo W RFB Prior glavna 111C Supervision CS QCBS Prior 1.1.2 Stage 2 of construction of main railway station - Belgrade Centre (Prokop) 112A Revision of design for main railway station - Belgrade Centre (Prokop) CS DS Prior 112B Construction works with arrangement and equipping of the interior W RFB Prior 112C Supervision CS QCBS Prior 1.1.3 Railway Level crossings (RLC) Lot1: Design, civil works, provision, installation and commissioning of RLC, I group Lot2: Design, civil works, provision, installation and commissioning of RLC, II group S&G& 113A RFB Prior Lot3: Design, civil works, provision, installation and commissioning of RLC, III W group Lot4: Design, civil works, provision, installation and commissioning of RLC, IV group 113B Services for technical control of designs CS QCBS Post 113C Supervision CS QCBS Prior 1.1.4 Measurement stations Prior/post review Procurement Procurement by the Bank Reference 114A Design for 4 measurement stations CS CQS Post method type 114B Civil works, installation and commissioning Description of contract package W RFB Post 114C Supervision CS CQS Post Sub-Component 1.2 Technical Documentation 121A Design for connecting the Belgrade Center railway station with the highway CS QCBS Post Design for reconstruction and modernization of Pancevo - Vrsac - border with 122A CS QCBS Prior Romania railway line Sub-Component 1.3 Asset Management 1.3.1 Life Cycle Cost 131A Technical advisor to support full integration and implementation of LCC CS QCBS Post 1.3.2 Reliability, Availability, Maintainability, and Safety system (Railway RAMS) 132A Railway construction investment and mitigation measures CS CQS Post Feasibility study including the best practice in implementing a RAMS 132B CS QCBS Prior harmonized with the existing systems with initial investments Component 2 Institutional Strengthening and Project Management Sub-Component 2.1 Sectoral Governance 2.1.1 Railway Directorate Procurement of basic resources for the realization of competencies 211A G RFQ Post (company car) 211B Technical assistance to the Railway Directorate CS QCBS Post 2.1.2 Institutional Support Technical support to the railway companies (legal gap analysis, functional 212A CS QCBS Prior analysis, establishment of statement of requirements) 2.1.3 ICT Business support systems Technical assistance to support introduction of business process support 213A CS QCBS Post systems, financial reporting systems, and document management systems 213B Provision and installation of IT equipment G RFB Prior 213C Provision and installation of data register for RD G RFB Post 213D Document management systems for railway companies NCS RFB Post Sub-Component 2.2 Human capital Prior/post review Procurement Procurement by the Bank Reference Human Capital Analysis and HR Strategy with change management plan - method 221A Technical assistance to strengthen human resources (IZS, Serbia Cargo and CS QCBS Prior type Serbia Voz) Description of contract package 221B Implementation of retraining program and trainings CS QCBS Prior 221C Implementation of modern HR systems and tools G RFB Post 221D PhD program fund creation CS CQS Post Sub-Component 2.3 Project management and capacity building 2.3.1 PIU staff 231A Head of PIU CS n/a Prior 231B Assistant for procurement and financial activities (full-time) CS IC Post 231C Environmental and safeguard specialist (part-time, throughout the project) CS IC Post 231D Railway specialist (full-time) CS IC Post 231E Civil Engineer with railway expertise (full-time) CS IC Post 231F Human development specialist (full-time over 3 years) CS IC Post 231G Transport planner (part-time, throughout the project) CS IC Post 231H Railway ITC specialist (full-time, throughout the project) CS IC Post 231I Transport economist (full time over 3 years) CS IC Post 231J Business support management system specialist (full time over 4 years) CS IC Post 231K Public communications and citizen engagement specialist (full-time) CS IC Post 231L M&E Specialist (part-time, throughout the project) CS IC/DS Prior 2.3.2 PITs staff 232A Railway investment specialist (IZS) (full-time, over 4 years) CS IC Post 232B Rail asset management specialist (IZS) (full-time, over 4 years) CS IC Post 232C Specialist in railways management (IZS) (full-time, over 4 years) CS IC Post 2.3.3 Office equipment for PIU and PITs staff 233A IT Equipment for PIU and PITs staff G RFQ Post 233B Furniture and consumables for PIU and PITs staff office G RFQ Post 233C Vehicles for maintenance (six vehicles) G RFB Post 2.4 Training/Workshop TR n/a n/a 2.5 Operating costs 2.6 Citizen engagement and communication plan Component 3 Railway Modernization Enablers Sub-Component 3.1 ITS and SMS Prior/post review Procurement Procurement by the Bank Reference 3.1.1 Intelligent railway systems method type Technical advisor to support development of implementation plan for 311A Description of contract package CS QCBS Post intelligent railway systems Implementation of pilot-project (design, provision, installation and 311B TBD TBD Prior commissioning of the equipment) 311C Supervision CS CQS Post 3.1.2 Safety Management System (SMS) 312A Technical advisor to develop SMS action plan and railway resilience plan CS QCBS Post 312B Technical advisory for railway network resilience analysis and plans CS QCBS Post 312C Implementation of selected SMS interventions CS QCBS Post Investments in monitoring (bridges, tunnels, landslides stability, etc.) and 312D TBD TBD Prior safety equipment (against COVID and other emergencies) 312E Investments in infrastructure (maintenance, repair works) W RFB Post 312F Supervision CS CQS Post Sub-Component 3.2 Integrated Territorial Development Study on integration of new passenger and cargo services with existing and 321A CS QCBS Post future urban transport 321B Pilot projects in local municipalities G&W RFB Prior Sub-Component 3.3 Market share Technical assistance to assess the ownership alternatives for Serbia Cargo, 331A CS QCBS Post roadmap for implementation of selected approach 331B Market potentials and strategy for attracting more users G RFB Post Contingencies Front-end Fee TOTAL: PROCUREMENT Serbia : Serbia Railway Sector Modernization PLAN General Information Country: Serbia 2021-06-28 Bank’s Approval Date of the Original Procurement Plan: 2022-09-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170868 GPN Date: 2021-06-25 Project Name: Serbia Railway Sector Modernization Loan / Credit No: IBRD / 92210 Central Fiduciary Unit Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-SRSM-RFB-G-21-02 / Pro Infrastructure Investments a Open - Internationa Single Stage - One E curement of maintenance m IBRD / 92210 Post Request for Bids 1,446,267.67 Signed 2021-07-19 2021-07-27 2021-07-26 2021-08-24 2021-10-24 2021-10-08 2021-11-23 2021-12-06 2021-12-28 2022-02-10 2023-02-21 nd Asset Management l nvelope achinery for Serbian Railway Infrastructure SER-SRSM-RFQ-G-22-31 / IT Institutional Strengthening a Request for Quota Single Stage - One E Pending Impl IBRD / 92210 Post Open - National 0.00 2022-02-05 2022-04-23 2022-07-22 Equipment for PIU and PITs st nd Project Management tions nvelope ementation aff SER-SRSM-G-RFQ-22-33 / Fu Institutional Strengthening a Request for Quota Single Stage - One E Pending Impl rniture and consumables for IBRD / 92210 Post Open - National 0.00 2022-02-19 2022-05-07 2022-08-05 nd Project Management tions nvelope ementation PIU and PITs staff office SER-SRSM-RFQ-G-22-32 / Ve Institutional Strengthening a Request for Quota Single Stage - One E Pending Impl IBRD / 92210 Post Open - National 0.00 2022-10-05 2022-11-30 2023-08-31 hicles for Railway directorate nd Project Management tions nvelope ementation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-SRSM-QCBS-CS-21-01 / Railway Modernization Enabl Quality And Cost- Open - Internationa Under Implement Restructuring of Serbia Cargo IBRD / 92210 Post 0.00 2021-06-14 2021-07-12 2021-07-05 2021-08-11 2021-08-18 2022-06-13 2021-09-15 2022-08-22 2021-10-15 2021-11-19 2021-12-20 2022-10-16 ers Based Selection l ation Serbia Railway Sector Moder nization Project SER-AUDIT-QCBS-CS-21-07-S RSM / “Serbia Railway Sector Modernization Project” (SRS M), for the years part of 2021 Institutional Strengthening a Quality And Cost- IBRD / 92210 Post Open - National 62,749.44 Signed 2021-09-30 2021-10-01 2021-09-30 2021-10-04 2021-10-25 2021-11-05 2021-12-06 2021-11-22 2022-02-11 2021-12-20 2022-02-28 2022-01-17 2022-04-04 2027-04-30 and 2022-first period, 2023-s nd Project Management Based Selection econd period, 2024-third peri od, 2025-fourth period, and 2 026 (Closing date December 31, 2026, plus 4 months)-fift h period SER-SRSM-CQ-CS-21-19 / De Infrastructure Investments a Consultant Qualifi sign and Supervision of four IBRD / 92210 Post Open - National 0.00 Canceled 2021-12-20 2022-01-10 2022-02-23 2022-03-25 2022-04-29 2024-04-29 nd Asset Management cation Selection measurement stations SER-SRSM-QCBS-CS-21-20 / Design for connecting the Bel Infrastructure Investments a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Post 0.00 2021-12-20 2022-01-10 2022-03-11 2022-04-25 2022-05-25 2022-06-29 2022-08-03 2023-08-03 grade Center railway station nd Asset Management Based Selection l ntation with the highway SER-SRSM-QCBS-CS-21-21 / Design for reconstruction an Infrastructure Investments a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Prior 0.00 2021-12-20 2022-01-10 2022-02-12 2022-03-29 2022-04-28 2022-06-02 2022-07-07 2023-07-07 d modernization of Pancevo - nd Asset Management Based Selection l ntation Vrsac - border with Romania railway line SER-SRSM-CQ-CS-21-23 / Pr eliminary Design, Supervisio n (FIDIC Engineer) and Techn Infrastructure Investments a Consultant Qualifi IBRD / 92210 Post Open - National 0.00 Canceled 2021-12-20 2022-04-12 2022-01-10 2022-03-11 2022-04-10 2022-05-15 2024-05-14 ical Control of Design of Cons nd Asset Management cation Selection truction Permit for constructi on of Bogojevo station bypas s SER-SRSM-CQ-CS-21-24 / IT Institutional Strengthening a Consultant Qualifi Pending Impleme IBRD / 92210 Post Open - National 0.00 2021-12-20 2022-01-10 2022-03-11 2022-04-10 2022-05-15 2022-09-12 Audit nd Project Management cation Selection ntation SER-SRSM-CQ-CS-21-26 / TA Railway Modernization Enabl Consultant Qualifi Under Implement for disputes analysis of Serbi IBRD / 92210 Post Open - National 0.00 2021-12-27 2022-06-22 2022-01-17 2022-03-18 2022-08-26 2022-05-02 2022-06-06 2022-12-03 ers cation Selection ation an Railway Companies SER-SRSM-QCBS-CS-21-27 / Preliminary Design, Supervisi on (FIDIC Engineer) and Tech nical Control of Design for Co Institutional Strengthening a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Prior 0.00 2021-12-27 2022-01-17 2022-03-18 2022-05-02 2022-06-01 2022-07-06 2022-08-10 2026-12-17 nstruction Permit for rehabilit nd Project Management Based Selection l ntation ation of lines in tunnels Dedi nje, Vezni, Stadion and Vrača r and section Pančevački mo st - Pančevo Glavna SER-SRSM-QCBS-CS-22-28 / Supervision (FIDIC Engineer) Institutional Strengthening a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Prior 0.00 2022-01-10 2022-01-31 2022-04-01 2022-05-16 2022-06-15 2022-07-20 2022-08-24 2026-10-02 and Technical Control of Desi nd Project Management Based Selection l ntation gns for Construction Permit o f RLCs Page 1 SER-SRSM-QCBS-CS-22-29 / Technical support to the rail Institutional Strengthening a Quality And Cost- Open - Internationa Pending Impleme way companies (legal gap an IBRD / 92210 Post 0.00 2022-01-24 2022-02-14 2022-04-15 2022-05-30 2022-06-29 2022-08-03 2022-09-07 2023-09-07 nd Project Management Based Selection l ntation alysis, functional analysis, es tablishment of statement of r equirements) SER-SRSM-QCBS-CS-22-30 / Human Capital Analysis and HR Strategy with change ma Institutional Strengthening a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Prior 0.00 2022-01-24 2022-02-14 2022-04-15 2022-05-30 2022-06-29 2022-08-03 2022-09-07 2023-09-07 nagement plan - Technical as nd Project Management Based Selection l ntation sistance to strengthen huma n resources (IZS, Serbia Carg o and Serbia Voz) SER-SRSM-QCBS-CS-22-34 / Technical assistance to supp ort introduction of business Institutional Strengthening a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Post 0.00 2022-03-01 2022-03-22 2022-06-05 2022-07-05 2022-08-04 2022-09-08 2022-10-13 2023-10-13 process support systems, fin nd Project Management Based Selection l ntation ancial reporting systems, an d document management sy stems SER-SRSM-QCBS-CS-21-25 / Study on rail market potentia ls and possibilities for attracti Railway Modernization Enabl Quality And Cost- Open - Internationa Under Implement IBRD / 92210 Post 0.00 2022-05-30 2022-06-14 2022-06-20 2022-06-29 2022-08-18 2022-09-15 2022-10-02 2022-11-01 2022-11-29 2023-01-03 2024-07-03 ng more users with special e ers Based Selection l ation mphasis on integration with existing and future urban tra nsport SER-SRSM-QCBS-CS-21-22 / Technical Advisory for the pr eparation of Technical Specifi cations for the Procurement Infrastructure Investments a Quality And Cost- Open - Internationa Under Implement and Implementation of a Rail IBRD / 92210 Prior 0.00 2022-07-06 2022-07-07 2022-07-27 2022-08-05 2022-08-29 2022-09-28 2022-10-28 2022-11-25 2022-12-30 2025-11-30 nd Asset Management Based Selection l ation Infrastructure Asset Manage ment System Implementatio n (RI-AMS) and the state-of-t he-art analysis of the environ ment for its implementation SER-SRSM-QCBS-CS-21-19-2 / Technical Design Review an Infrastructure Investments a Quality And Cost- Open - Internationa Pending Impleme IBRD / 92210 Post 0.00 2022-07-14 2022-08-04 2022-09-17 2022-11-01 2022-12-01 2022-12-22 2023-01-13 2023-11-15 d Site Supervision on installa nd Asset Management Based Selection l ntation tion of measurement stations SER-SRSM-QCBS-CS-21-23-2 / Preparation of the technical documentation, technical des Infrastructure Investments a Quality And Cost- Open - Internationa Under Implement IBRD / 92210 Post 0.00 2022-08-05 2022-08-08 2022-09-04 2022-09-05 2022-10-18 2022-11-29 2022-12-29 2023-01-26 2023-02-23 2024-10-31 ign review and site supervisi nd Asset Management Based Selection l ation on of works for construction of the connection line (triangl e) in the Bogojevo rail junctio n INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-SRSM-IC-CS-21-04 / Civi Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 0.00 Canceled 2021-07-12 2021-08-19 2021-08-23 2021-10-19 2021-09-13 2021-10-18 2026-12-31 l Engineer with railway exper nd Project Management ant Selection tise SER-SRSM-IC-CS-21-05 / Tra Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 139,858.33 Signed 2021-07-12 2021-08-19 2021-08-30 2021-10-19 2021-09-20 2021-10-22 2021-10-25 2021-10-27 2026-09-30 nsport planner and policy nd Project Management ant Selection SER-SRSM-IC-CS-21-06 / Rail Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 0.00 Canceled 2021-07-12 2021-12-15 2021-09-06 2022-07-15 2021-09-27 2022-08-31 2021-11-01 2026-12-31 way ITC specialist nd Project Management ant Selection SER-SRSM-IC-CS-21-07 / Tra Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 0.00 Canceled 2021-07-12 2021-07-26 2021-09-06 2021-11-12 2021-09-27 2021-11-01 2024-10-16 nsport economist nd Project Management ant Selection SER-SRSM-IC-CS-21-08 / Pub Institutional Strengthening a Individual Consult lic communications, social an IBRD / 92210 Post Open 29,073.94 Terminated 2021-07-26 2021-08-19 2021-09-20 2021-10-19 2021-10-11 2021-10-22 2021-11-15 2021-10-27 2026-12-31 nd Project Management ant Selection d citizen engagement special ist SER-SRSM-IC-CS-21-09 / M& Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 139,424.96 Signed 2021-07-26 2021-12-15 2021-09-01 2022-03-31 2021-09-22 2022-05-10 2021-10-27 2022-05-20 2026-12-31 E Specialist nd Project Management ant Selection SER-SRSM-IC-CS-21-03 / Juni Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 119,634.64 Signed 2021-07-19 2021-07-26 2021-09-13 2021-10-29 2021-10-04 2021-11-08 2021-11-08 2021-11-09 2027-01-07 or Railway Specialist nd Project Management ant Selection SER-SRSM-IC-CS-21-10 / Occ Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 60,653.76 Signed 2021-12-06 2021-12-15 2022-01-31 2022-03-22 2022-02-21 2022-03-25 2022-03-28 2022-03-28 2026-12-31 upational, Health and Safety nd Project Management ant Selection Specialist SER-SRSM-DS-CS-21-11 / He Institutional Strengthening a IBRD / 92210 Post Direct Selection Direct 28,177.76 Signed 2021-12-06 2021-12-05 2021-12-16 2021-12-29 2022-02-19 2022-01-05 2026-12-31 ad of PIU nd Project Management SER-SRSM-DS-CS-21-12 / En Institutional Strengthening a IBRD / 92210 Post Direct Selection Direct 141,533.60 Signed 2021-12-06 2021-12-05 2021-12-16 2022-01-17 2022-02-19 2022-01-19 2026-12-31 vironmental and Social Speci nd Project Management alist SER-SRSM-IC-CS-21-14 / Hu Institutional Strengthening a Individual Consult Under Implement IBRD / 92210 Post Open 0.00 2021-12-06 2021-12-15 2022-01-24 2022-03-31 2022-02-14 2022-03-21 2025-03-05 man Development Specialist nd Project Management ant Selection ation SER-SRSM-IC-CS-21-15 / Busi Institutional Strengthening a Individual Consult Under Implement ness support management s IBRD / 92210 Post Open 0.00 2021-12-06 2021-12-15 2022-01-24 2022-02-14 2022-03-21 2025-03-05 nd Project Management ant Selection ation ystem specialist SER-SRSM-IC-CS-21-17 / Dep Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 0.00 Canceled 2021-12-20 2022-02-07 2022-02-28 2022-04-04 2023-04-04 uty Head of PIU for LIID Proje nd Project Management ant Selection ct SER-SRSM-DS-CS-21-18 / Re Infrastructure Investments a Under Implement vision of design for main rail IBRD / 92210 Post Direct Selection Direct 0.00 2021-12-13 2022-02-08 2021-12-23 2022-05-13 2022-02-26 2022-06-26 nd Asset Management ation way station - Belgrade Centr e (Prokop) SER-SRSM-IC-CS-21-11-2 / H Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 198,498.22 Signed 2022-01-28 2022-02-02 2022-02-17 2022-03-17 2022-02-24 2022-03-22 2022-03-10 2022-03-28 2026-12-31 ead of PIU nd Project Management ant Selection SER-SRSM-IC-CS-21-04-2 / Ci Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 136,840.21 Signed 2022-01-25 2022-01-19 2022-03-15 2022-04-21 2022-03-29 2022-05-30 2022-04-12 2022-06-08 2026-12-31 vil Engineer with Railway Exp nd Project Management ant Selection ertise SER-SRSM-IC-CS-21-07-2 / Tr Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 118,230.84 Signed 2022-02-23 2022-02-22 2022-04-04 2022-03-31 2022-04-18 2022-04-14 2022-05-02 2022-04-18 2025-05-02 ansport Economist nd Project Management ant Selection Page 2 SER-SRSM-IC-CS-22-35 / Ad Institutional Strengthening a Individual Consult IBRD / 92210 Post Open 68,164.89 Signed 2022-05-30 2022-06-14 2022-07-18 2022-08-08 2022-08-01 2022-08-17 2022-08-11 2022-08-18 2026-12-31 ministrative Assistant nd Project Management ant Selection SER-SRSM-IC-CS-22-36 / Soci Institutional Strengthening a Individual Consult Under Implement IBRD / 92210 Post Open - National 0.00 2022-09-26 2022-09-20 2022-11-07 2022-11-14 2022-11-24 2026-12-31 al and Citizen Engagement S nd Project Management ant Selection ation pecialist Page 3