Appendix to Annex 3 Procurement Plan I. General 1. Project Information Country : India Borrower : Government of India Project Name : National Hydrology Project Loan Credit No. : 2. Bank’s Approval Date of the Procurement Plan : 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services Thresholds for Method of Procurement for procurement of goods, works and non- consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million Shopping Up to USD 100,000 (INR 6.5 m) Direct Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Procurement of Works: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million Comparison of three quotations / Up to USD 100,000 (INR 6.5 m) Shopping Force Account Must meet the requirements as per Para 3.9 of the Procurement Guidelines, and with prior agreement in PP with the Bank Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: (a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million (b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment. 1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract.. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only. 3. Reference to Procurement Manual The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements. 4. Any Other Special Procurement Arrangements The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions: (a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding. (b)Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises, or enterprises from any given state. (d)Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures. (g)Two or three envelope system will not be used (except when using the e- procurement system assessed and agreed by the Bank). (h)No negotiations are conducted even with the lowest evaluated responsive bidders. 5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Procurement methods of procurement of Consultants' Services (Firms) Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS) Quality Based Selection (QBS) Must meet the requirements as per Para 3..2 to 3.4 of the Consultant Guidelines Selection based on a Fixed Budget Must meet the requirements as per (FBS) Para 3.5 of the Consultant Guidelines, Selection Based on Least Cost Basis Must meet the requirements as per (LCS) Para 3.6 of the Consultant Guidelines, Selection based on Consultant’s Estimated not to exceed USD Qualification (CQ) 300,000, and must meet the requirements as per Para 3.7 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank. Procurement methods for Selection of Individual Consultants (IC) Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V, Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V, Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Consultant Guidelines Prior Review Thresholds: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. 1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines 4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] I. Implementing Agency Capacity Building Activities with Time Schedule No Expected Outcome/Activity Description Estimated Date Duration ASCI training on Procurement Procedures arranged for Executive, Assistant Engineers 1. 2 weeks Continuous who are responsible for Procurement – multiple trainings Contract management training – multiple 2. 2 weeks Continuous trainings Customized training on Procurement Procedures arranged for Executive, Assistant 3. 1 week Continuous Engineers who are responsible for Procurement – multiple trainings PROCUREMENT India : National Hydrology Project PLAN General Information Country: India 2017-11-03 Bank’s Approval Date of the Original Procurement Plan: 2022-09-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152698 GPN Date: 2022-06-17 Project Name: National Hydrology Project Loan / Credit No: IBRD / 87250 Telengana Ground Water Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-TELENGANA GW-23242-C W-RFB / (i)Protection works ( 126) for piezometers drilled under HP-II in Southern Telan Water Resources Monitoring Request for Quota Single Stage - One E 2018-02-2 IBRD / 87250 Post Limited 90,770.00 0.00 Canceled 2017-10-02 2017-12-24 2017-11-26 gana Region and System tions nvelope 4 (ii)Rejuvenation of existing pi ezometers (86) for effective water level measurements in piezometers constructed duri ng HP I & II. IN-TELENGANA GW-23262-C Water Resources Monitoring Request for Quota Single Stage - One E 2018-05-1 W-RFQ / Civil Works for Purpo IBRD / 87250 Post Limited 7,692.00 0.00 Canceled 2018-02-05 2018-03-19 System tions nvelope 8 se Driven Studies IN-TELENGANA GW-24093-C W-RFQ / (i) Protection works ( 98) for Peizometers drilled un der HP-II covering Cluster of Water Resources Monitoring Request for Quota Single Stage - One E 2018-02-2 Eastern Telangana and IBRD / 87250 Post Limited 91,850.00 0.00 Canceled 2017-09-30 2017-12-24 2017-11-25 System tions nvelope 3 (ii) Rejuvenation of existing p iezometers (205) for effectiv e water level measurements in piezometers constructed d uring HP I & II. IN-TELENGANA GW-24096-C W-RFQ / (i) Protection works ( 76) for Peizometers drilled un der HP-II covering Cluster of Water Resources Monitoring Request for Quota Single Stage - One E 2018-02-2 Northern Telangana and IBRD / 87250 Post Limited 67,550.00 0.00 Canceled 2017-09-30 2017-12-24 2017-11-25 System tions nvelope 3 (ii) Rejuvenation of existing p iezometers (135) for effectiv e water level measurements in piezometers constructed d uring HP I & II. NHP-2018-2019-TSGW-3393 83 / Protection works to Piezo Water Resources Monitoring Request for Quota Single Stage - One E 2019-01-0 IBRD / 87250 Post Open - National 78,461.54 70,266.09 Completed 2018-09-15 2018-11-10 2019-06-27 meters of less than 50 m drill System tions nvelope 9 ed under HP-II in Southern Re gion NHP-2018-2019-TSGW-9465 53 / Protection works to Piezo Water Resources Monitoring Request for Quota Single Stage - One E 2019-01-1 IBRD / 87250 Post Open - National 53,846.15 50,521.90 Completed 2018-09-16 2018-11-11 2019-06-27 meters of less than 50 m drill System tions nvelope 0 ed under HP-II in Northern Re gion NHP-2018-2019-TSGW-8340 14 / Protection works to Piezo Water Resources Monitoring Request for Quota Single Stage - One E 2019-01-1 IBRD / 87250 Post Open - National 52,307.69 49,778.55 Completed 2018-09-17 2018-11-12 2020-01-06 meters less than 50m drilled System tions nvelope 1 under HP-II in Eastern Telang ana Region NHP-2018-2019-TSGW-5647 Water Resources Monitoring Request for Quota Single Stage - One E 2019-01-2 46 / Rejuvenation of Existing IBRD / 87250 Post Open - National 84,615.38 73,712.51 Completed 2018-09-29 2018-11-24 2019-06-22 System tions nvelope 3 PZ for effective water level m onitoring NHP-2018-2019-TSGW-7217 Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2019-06-0 19 / Civil works for Purpose D IBRD / 87250 Post Open - National 38,461.54 0.00 2018-10-15 2018-12-10 System tions nvelope lementation 8 riven Studies (Yr1) IN-TELENGANA GW-88377-C W-RFB / Construction of PZs with Protection works to impr Water Resources Monitoring Single Stage - Two E Pending Imp 2019-12-2 IBRD / 87250 Post Request for Bids Open - National 1,230,769.00 0.00 2019-01-21 2019-01-26 2019-03-09 2019-05-22 2019-06-26 ove GW Monitoring Network i System nvelope lementation 3 n the state Piezometers(Medi um 50-100m). (To have 3 PZ s in each GW assessment uni t) NHP-2018-2019-TSGW-4249 62 / Construction of Piezomet ers (50-100 m)with Protectio Water Resources Monitoring Single Stage - Two E Under Imple 2020-04-1 IBRD / 87250 Post Request for Bids Open - National 1,230,769.00 0.00 2019-05-15 2020-02-24 2019-05-20 2019-07-01 2019-09-13 2019-10-18 n works to improve GW Monit System nvelope mentation 5 oring Network in the state. (T o have 3 PZs in each GW ass essment unit) NHP-2018-2019-TSGW-9032 Water Resources Monitoring Single Stage - Two E Pending Imp 2021-09-0 76 / Upgradation of State Dat IBRD / 87250 Post Request for Bids Open - National 230,769.23 0.00 2020-10-08 2020-10-13 2020-11-24 2021-02-06 2021-03-13 System nvelope lementation 9 a Centre at HO & Exhibition C entre NHP-2020-2021-TSGW-1656 51 / Construction of 308 nos Water Resources Monitoring Single Stage - Two E Pending Imp 2021-12-0 Piezometers (Borewells-Lot.I IBRD / 87250 Post Request for Bids Open - National 566,629.66 0.00 2021-03-01 2021-03-06 2021-04-05 2021-05-10 2021-06-05 System nvelope lementation 2 A & Lot.IB) with Protection W orks in Southern Telangana R egion NHP-2021-2022-TSGW-1229 Request for Quota 81 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 1 of Southern Region NHP-2021-2022-TSGW-1279 Request for Quota 74 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 2 of Eastern Region NHP-2021-2022-TSGW-1302 Request for Quota 53 / Rejuvanation of Existing Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-08-2 IBRD / 87250 Post Open - National tions (Non Bank-S 50,769.23 0.00 2021-12-28 2022-02-22 Pz for effective water level m System tions nvelope lementation 1 PD) easurement in Pzs constructe d in Eastern Region Page 1 NHP-2021-2022-TSGW-3264 Request for Quota 42 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 2 of Southern Region NHP-2021-2022-TSGW-3589 Request for Quota 48 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 1 of Eastern Region Request for Quota NHP-2021-2022-TSGW-3924 Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-08-2 IBRD / 87250 Post Open - National tions (Non Bank-S 100,000.00 0.00 2022-01-04 2022-03-01 39 / Upgradation of GW PMU System tions nvelope lementation 8 PD) NHP-2021-2022-TSGW-4373 00 / Rejuvanation of Existing Request for Quota Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-08-1 Pz for effective water level m IBRD / 87250 Post Open - National tions (Non Bank-S 50,769.23 0.00 2021-12-26 2022-02-20 System tions nvelope lementation 9 easurement in Pzs constructe PD) d in Southern Region NHP-2021-2022-TSGW-5209 Request for Quota 77 / Rejuvanation of Existing Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-08-2 IBRD / 87250 Post Open - National tions (Non Bank-S 50,769.23 0.00 2021-12-27 2022-02-21 Pz for effective water level m System tions nvelope lementation 0 PD) easurement in Pzs constructe d in Northern Region NHP-2021-2022-TSGW-6516 Request for Quota 57 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 1 of Northern Region NHP-2021-2022-TSGW-8145 Request for Quota 86 / Protection works for piez Water Resources Monitoring Request for Quota Single Stage - One E Pending Imp 2022-03-1 IBRD / 87250 Post Open - National tions (Non Bank-S 86,538.46 0.00 2021-07-18 2021-09-12 ometers drilled under HP-I & I System tions nvelope lementation 1 PD) I in Part 2 of Northern Region NHP-2021-2022-TSGW-8998 Request for Bids - 46 / Construction of PZs with Water Resources Monitoring Single Stage - Two E Small Works SPD 2022-05-3 Protection works to improve IBRD / 87250 Post Request for Bids Open - National 369,230.77 0.00 Canceled 2021-07-12 2021-07-17 2021-08-18 2021-10-27 2021-12-01 System nvelope (2 envelope proce 0 GW Monitoring Network in th ss) e state under PDS & Inhouse Studies Request for Bids - NHP-2021-2022-TSGW-5675 Water Resources Informatio Single Stage - Two E Small Works SPD Pending Imp 2022-02-1 57 / Upgradation of State Dat IBRD / 87250 Post Request for Bids Open - National 269,230.77 0.00 2021-06-07 2021-06-10 2021-07-05 2021-07-30 2021-08-20 n Systems nvelope (2 envelope proce lementation 6 a , Training cum Information ss) Centre NHP-2019-2020-TSGW-7677 Request for Bids - 85 / Establishment of Region Water Resources Monitoring Single Stage - Two E Small Works SPD Pending Imp 2022-05-1 IBRD / 87250 Post Request for Bids Open - National 318,500.00 0.00 2021-06-21 2021-06-26 2021-07-26 2021-10-08 2021-11-12 al Ground Water Information System nvelope (2 envelope proce lementation 1 Centre in Karimnagar includi ss) ng Infrastructure NHP-2021-2022-TSGW-8569 National Procure 09 / Construction of PZs with ment Document - Water Resources Monitoring Single Stage - Two E Pending Imp 2022-10-0 Protection works to improve IBRD / 87250 Post Request for Bids Open - National 2 Envelope proce 595,384.00 0.00 2021-11-01 2021-11-06 2021-12-18 2022-03-02 2022-04-06 System nvelope lementation 3 GW Monitoring Network in th ss (Non Bank-SPD e state (Lot-IB and GHMC- PD ) S area) NHP-2021-2022-TSGW-2797 Request for Bids - 23 / Construction Of Protectio Water Resources Monitoring Single Stage - Two E Small Works SPD Pending Imp 2022-11-0 IBRD / 87250 Post Request for Bids Open - National 383,561.64 0.00 2022-02-22 2022-02-22 2022-03-24 2022-04-14 2022-05-12 n Works To The Existing Piez System nvelope (2 envelope proce lementation 8 ometers Drilled In Telangana ss) State National Procure NHP-2021-2022-TSGW-7866 ment Document - 80 / Upgradation of State Dat Water Resources Monitoring Single Stage - Two E Pending Imp 2022-11-1 IBRD / 87250 Post Request for Bids Open - National 2 Envelope proce 424,657.53 0.00 2022-02-28 2022-03-02 2022-04-01 2022-04-25 2022-05-17 a Centre at HO & Exhibition C System nvelope lementation 3 ss (Non Bank-SPD entre and GW PMU ) National Procure NHP-2021-2022-TSGW-8569 ment Document - 09_1 / Construction of 257 pi Water Resources Monitoring Single Stage - Two E Pending Imp 2022-11-1 IBRD / 87250 Post Request for Bids Open - National 2 Envelope proce 657,534.25 0.00 2022-02-25 2022-02-27 2022-03-29 2022-04-27 2022-05-20 ezometers (borewells) with p System nvelope lementation 6 ss (Non Bank-SPD rotection works in Telangana ) State (Lot.IB & Lot.V) NHP-2022-2023-TSGW-2638 National Procure 15 / Construction of 89 piezo ment Document - Water Resources Monitoring Single Stage - Two E Pending Imp 2023-02-1 meters with Protection works IBRD / 87250 Post Request for Bids Open - National 2 Envelope proce 308,219.18 0.00 2022-05-15 2022-05-20 2022-06-19 2022-07-18 2022-08-15 System nvelope lementation 1 to improve GW Monitoring Ne ss (Non Bank-SPD twork in GHMC (PD) area ) National Procure NHP-2022-2023-TSGW-4453 ment Document - Water Resources Monitoring Single Stage - Two E Pending Imp 2023-01-2 86 / Protection works for piez IBRD / 87250 Post Request for Bids Open - National 2 Envelope proce 410,958.90 0.00 2022-06-30 2022-06-30 2022-08-01 2022-09-02 2022-09-30 System nvelope lementation 8 ometers drilled under HP-I & I ss (Non Bank-SPD I ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-TELENGANA GW-23217-G Water Resources Monitoring Request for Quota Single Stage - One E O-RFQ / Procurement of Bore IBRD / 87250 Post Limited 76,923.07 0.00 Canceled 2017-09-11 2017-12-23 2017-11-10 2018-01-09 System tions nvelope hole Logging Equipment with AMC Support IN-TELENGANA GW-23260-G O-RFQ / To create resource material (Annual Reports, pa mphlets, Brochure, posters, a Water Resources Operations Request for Quota Single Stage - One E IBRD / 87250 Post Limited 17,538.00 0.00 Canceled 2018-02-03 2018-03-18 2018-04-17 udio visuals, documentaries and Planning System tions nvelope etc.,)on water conservation & management awareness cre ation to water users (IEC) & R esource material for PDS & D SS IN-TELENGANA GW-23278-G O-RFQ / Procurement and Ins Water Resources Monitoring Request for Quota Single Stage - One E IBRD / 87250 Post Limited 12,308.00 0.00 Canceled 2017-12-05 2018-01-10 2018-02-09 tallation of ACs (10) for SDC System tions nvelope and Conference Hall Page 2 IN-TELENGANA GW-24074-G O-RFQ / Basic Field equipmen t for field officers for Strengt hening Manual Observations Water Resources Monitoring Request for Quota Single Stage - One E IBRD / 87250 Post Limited 69,615.00 0.00 Canceled 2017-09-21 2017-12-20 2017-11-16 2017-12-16 - 32units (Each unit Consists System tions nvelope of WL Indicators -2, Geologic al Survey Kits-2, Infiltrometre -1, 100m Mesuring Tapes-5, 50m Measuring Tapes-5, Du mpy Level -1) IN-TELENGANA GW-24071-G O-RFQ / Basic Field equipmen t for field officers for Strengt Water Resources Monitoring Request for Quota Single Stage - One E IBRD / 87250 Post Limited 37,700.00 0.00 Canceled 2017-12-08 2018-01-20 2018-02-20 hening Manual Observations System tions nvelope (98 GPS - 3 Units for Each Dis trict Offices(31Districts) and 5 units for Head Office) IN-TELENGANA GW-24088-G O-DIR / Procurement of IT Eq Water Resources Monitoring Request for Quota Single Stage - One E uipment for Data Centres (De IBRD / 87250 Post Limited 83,385.00 0.00 Canceled 2017-12-09 2017-12-20 2018-01-27 2018-02-26 System tions nvelope sktops, Printers, Laptops, HD Ds, A0 Plotter etc) through G EM IN-TELENGANA GW-37063-G Water Resources Monitoring Single Stage - One E O-RFB / WQ Lab Equpiment U IBRD / 87250 Post Request for Bids Open - National 123,100.00 0.00 Canceled 2017-11-27 2017-12-02 2017-12-23 2018-01-09 2018-02-02 2018-04-04 System nvelope p gradation at Hyderabad an d Karimnagar NHP-2018-2019-TSGW-2616 Water Resources Monitoring Request for Quota Single Stage - One E 29-GO-SH-QU / Basic field eq IBRD / 87250 Post Open - National 92,692.31 160,806.64 Signed 2018-07-28 2018-09-22 2018-11-13 2018-11-21 2018-12-27 System tions nvelope uipment for field officers NHP-2018-2019-TSGW-1278 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 98 / IT Equipment for Data C IBRD / 87250 Post Open - National 4,615.38 0.00 2018-07-16 2018-09-10 2018-11-09 System tions nvelope ementation entres - Communication equi pment (Tabs) NHP-2018-2019-TSGW-9838 Water Resources Monitoring Request for Quota Single Stage - One E 48 / IT Equipment for Data C IBRD / 87250 Post Open - National 52,461.54 34,103.18 Completed 2018-07-16 2018-09-10 2018-09-22 2018-11-09 2018-09-22 System tions nvelope entres - UPS System NHP-2018-2019-TSGW-6640 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 34 / A/Cs 2T for Data Centres IBRD / 87250 Post Open - National 16,000.00 0.00 2018-09-09 2018-11-04 2019-01-03 System tions nvelope ementation and Water Quality Labs NHP-2018-2019-TSGW-9658 Water Resources Monitoring Request for Quota Single Stage - One E 17 / Updation of existing Wat IBRD / 87250 Post Open - National 94,584.62 48,038.19 Signed 2018-08-28 2018-10-23 2019-12-27 2018-12-22 System tions nvelope er Quality Labs at Hyderabad & Karimnagar NHP-2018-2019-TSGW-1672 Water Resources Informatio IBRD / 87250 Post Direct Selection Direct 1,538.46 1,304.08 Completed 2018-07-20 2018-07-25 2018-08-31 2018-08-29 2018-08-31 2019-02-25 2018-09-05 77 / Procurement of SOI Topo n Systems sheets NHP-2018-2019-TSGW-9535 96 / To create resource mate rial (Annual Reports,pamplet Institutional Capacity Enhan Request for Quota Single Stage - One E Pending Impl IBRD / 87250 Post Open - National 7,692.31 0.00 2018-10-27 2018-12-22 2019-02-20 s,Brochure,posters,audiovisu cement tions nvelope ementation als,documentaries etc) on wa ter conservation & managem ent awareness NHP-2018-2019-TSGW-2184 24 / Procurement of equipme Water Resources Operations Request for Quota Single Stage - One E Under Imple nt for Tanks as Source for re IBRD / 87250 Post Open - National 46,153.85 0.00 2018-08-20 2018-10-15 2018-12-14 and Planning System tions nvelope mentation gional Groundwater Recharg e using Managed Aquifer Stor age & Recovery (ASR) NHP-2018-2019-TSGW-5536 Water Resources Monitoring 46 / Software for Data Center IBRD / 87250 Post Direct Selection Direct 30,769.23 34,286.86 Completed 2018-07-25 2018-05-21 2018-07-30 2018-07-11 2018-09-03 2018-09-12 2019-03-02 2018-09-20 System - GIS software NHP-2018-2019-TSGW-3190 Water Resources Monitoring Request for Quota Single Stage - One E Under Imple 70 / Software for Data Center IBRD / 87250 Post Open - National 69,230.77 0.00 2018-08-13 2018-10-08 2018-12-07 System tions nvelope mentation - Other software NHP-2018-2019-TSGW-4486 Water Resources Operations Request for Quota Single Stage - One E Pending Impl IBRD / 87250 Post Open - National 10,984.62 0.00 2018-11-17 2019-01-12 2019-03-28 81 / Resource material for PD and Planning System tions nvelope ementation S & DSS NHP-2018-2019-TSGW-5514 Water Resources Monitoring Request for Quota Single Stage - One E 41 / IT Equipment for Data C IBRD / 87250 Post Open - National 9,307.69 10,881.10 Completed 2018-11-03 2018-12-29 2018-12-01 2019-02-27 2018-12-13 System tions nvelope entres - Printer IN-TELENGANA GW-108349- Water Resources Monitoring GO-DIR / Software for data ce IBRD / 87250 Post Direct Selection Direct 73,470.38 67,093.87 Completed 2019-03-30 2019-03-18 2019-04-04 2019-03-18 2019-05-09 2019-04-15 2019-11-05 2019-04-15 System ntre - surfer software NHP-2019-2020-TSGW-5109 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl IBRD / 87250 Post Open - National 46,030.77 0.00 2019-07-02 2019-08-27 2019-09-26 34 / A/Cs 2T for DDCs (31+3 l System tions nvelope ementation abs) NHP-2019-2020-TSGW-5860 Water Resources Monitoring Single Stage - Two E 66 / Procurement of DWLRs IBRD / 87250 Post Request for Bids Open - National 230,769.23 334,780.53 Signed 2019-09-05 2019-10-31 2019-09-10 2019-10-10 2019-12-28 2019-11-28 2020-04-25 2019-12-19 2020-05-30 2020-03-18 System nvelope with Telemetry NHP-2019-2020-TSGW-3256 Water Resources Monitoring Request for Quota Single Stage - One E IBRD / 87250 Post Open - National 36,925.00 13,856.83 Signed 2019-07-15 2019-09-09 2020-04-20 2019-10-09 73 / Portable Units for WQ Te System tions nvelope st NHP-2019-2020-TSGW-2613 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 04 / IT Equipment for Data C IBRD / 87250 Post Open - National 33,846.15 0.00 2019-12-23 2020-02-11 2020-03-27 System tions nvelope ementation entres - Work Stations for SD C NHP-2019-2020-TSGW-6432 Water Resources Monitoring Request for Quota Single Stage - One E 23 / IT Equipment for Data C IBRD / 87250 Post Open - National 50,769.23 38,789.40 Completed 2019-06-25 2019-08-20 2020-01-02 2019-09-19 2020-02-29 System tions nvelope entres - Data Analysis Syste m (DAS) NHP-2019-2020-TSGW-2115 66 / IT Equipment for Data C Water Resources Monitoring Request for Quota Single Stage - One E Under Imple IBRD / 87250 Post Open - National 25,384.62 0.00 2019-08-07 2019-10-02 2019-11-16 entres - Audio visual equipm System tions nvelope mentation ent for Distance learning NHP-2019-2020-TSGW-8283 Water Resources Monitoring Pending Impl 03 / Softwares for Data Centr IBRD / 87250 Post Direct Selection Direct 76,153.85 0.00 2019-12-03 2019-12-06 2019-12-26 2020-01-25 System ementation es (GIS application softwares ) NHP-2019-2020-TSGW-6534 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 42 / IT Equipment for Data C IBRD / 87250 Post Open - National 10,153.85 0.00 2019-07-20 2019-09-08 2019-10-23 System tions nvelope ementation entres - Printers for SDC Page 3 IN-TELENGANA GW-116685- GO-DIR / Procurement (1 no.) and upgradation (1 no.) of Gr ound Water Modelling Softwa Water Resources Operations IBRD / 87250 Post Direct Selection Direct 10,000.00 9,398.89 Completed 2019-06-10 2019-08-23 2019-06-15 2019-08-23 2019-07-20 2019-09-27 2020-01-16 2019-09-27 re (Visual MODFLOW) and Pr and Planning System ocurement (1 no.) and upgra dation (1 no.) of Geochemical Modelling Software (Aquache m) for Purpose Driven Study IN-TELENGANA GW-116686- GO-DIR / Procurement of Geo logical Modelling Software (R Water Resources Operations ockworks - 1 nos) for Purpose IBRD / 87250 Post Direct Selection Direct 5,500.00 6,216.20 Completed 2019-06-12 2019-08-23 2019-06-17 2019-08-23 2019-07-22 2019-09-27 2020-01-18 2019-09-27 and Planning System Drive Study on Impact of Urb anization on GW Quality & Q uantity and its Management i n GHMC Area, Hyderabad. IN-TELENGANA GW-117255- GO-DIR / Procurement of Gro und Water (fracture zone) Mo Water Resources Operations Pending Impl delling software to simulate IBRD / 87250 Post Direct Selection Direct 3,100.00 0.00 2019-06-12 2019-06-17 2019-07-22 2020-01-18 and Planning System ementation Groundwater Flow in fracture d zone to address local to re gional-scale surface water an d ground water interaction fo r PDS. NHP-2018-2019-TSGW-6194 Water Resources Monitoring Request for Quota Single Stage - One E 08 / IT Equipment for Data C IBRD / 87250 Post Open - National 84,620.00 74,020.65 Completed 2019-06-03 2019-07-29 2019-04-30 2019-09-27 2019-04-30 System tions nvelope entres - computers & laptops IN-TELENGANA GW-156454- GO-RFQ / Procurement of Dat a Retrieval and Analysis Syst Water Resources Informatio Request for Quota Single Stage - One E Pending Impl ems (8 nos) for PDS study o IBRD / 87250 Post Open - National 7,693.00 0.00 2020-02-03 2020-03-01 2020-03-31 n Systems tions nvelope ementation n Impact of urbanisation on GW quality & quantity and its management in GHMC Area, Hyderabad NHP-2020-2021-TSGW-1183 Water Resources Informatio Pending Impl 30 / Upgradation of Data Entr IBRD / 87250 Post Direct Selection Direct 53,846.15 0.00 2020-10-12 2020-10-17 2020-11-21 2021-05-20 n Systems ementation y & Analysis Software NHP-2020-2021-TSGW-1234 Water Resources Informatio Pending Impl 59 / Procurement of SOI Topo IBRD / 87250 Post Direct Selection Direct 1,538.46 0.00 2020-08-31 2020-09-05 2020-10-10 2021-04-08 n Systems ementation sheets(Hard copy and Digital data) NHP-2020-2021-TSGW-1858 Water Resources Monitoring Request for Quota Single Stage - One E Under Imple 30 / IT Equipment for Data C IBRD / 87250 Post Open - National 3,692.31 2,739.72 2020-09-26 2020-11-21 2021-05-20 System tions nvelope mentation entres - hard disk NHP-2020-2021-TSGW-2067 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 69 / IT Equipment for Data C IBRD / 87250 Post Open - National 35,076.92 0.00 2020-09-28 2020-11-23 2021-05-22 System tions nvelope ementation entres - desktop computers/l aptops NHP-2020-2021-TSGW-3615 61 / Sofwares for data centre Water Resources Monitoring Pending Impl IBRD / 87250 Post Direct Selection Direct 7,692.31 0.00 2020-10-12 2020-10-17 2020-11-21 2021-05-20 -procurement of Groundwate System ementation r Application softwares NHP-2020-2021-TSGW-4980 Water Resources Monitoring Pending Impl IBRD / 87250 Post Direct Selection Direct 43,076.92 0.00 2020-08-27 2020-09-01 2020-10-06 2021-04-04 87 / Softwares for Data Centr System ementation es NHP-2020-2021-TSGW-6377 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 07 / IT Equipment for Data C IBRD / 87250 Post Open - National 57,692.31 0.00 2020-09-30 2020-11-25 2021-05-24 System tions nvelope ementation entres - workstations NHP-2020-2021-TSGW-7966 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 46 / IT Equipment for Data C IBRD / 87250 Post Open - National 23,076.92 0.00 2020-10-09 2020-12-04 2021-06-02 System tions nvelope ementation entres - Video Conferencing NHP-2020-2021-TSGW-8091 Water Resources Monitoring Single Stage - Two E Under Imple 75 / Updation of existing wat IBRD / 87250 Post Request for Bids Open - National 138,461.54 0.00 2020-08-24 2020-12-28 2020-08-29 2020-10-10 2020-12-23 2021-01-27 2021-07-26 System nvelope mentation er quality labs at Hyderabad & Karimnagar NHP-2020-2021-TSGW-8788 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 23 / Procurement of Geophys IBRD / 87250 Post Open - National 80,769.23 0.00 2020-08-17 2020-11-12 2021-05-11 System tions nvelope ementation ical equipment and softwares NHP-2021-2022-TSGW-1214 Water Resources Monitoring Pending Impl 39 / Softwares for Data Centr IBRD / 87250 Post Direct Selection Direct 2,307.69 0.00 2021-10-13 2021-10-18 2021-11-22 2022-05-21 System ementation es - upgradation of rockwork s softwares NHP-2021-2022-TSGW-1893 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 32 / IT Equipment for Data C IBRD / 87250 Post Open - National 69,230.77 0.00 2021-11-13 2022-01-08 2022-07-07 System tions nvelope ementation entres - Audio Visual Equipm ent NHP-2021-2022-TSGW-2388 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 27 / Lab Equipment for newly IBRD / 87250 Post Open - National 76,923.08 0.00 2022-01-04 2022-03-01 2022-08-28 System tions nvelope ementation proposed level II lab NHP-2021-2022-TSGW-2506 Water Resources Monitoring Pending Impl 48 / Softwares for Data centr IBRD / 87250 Post Direct Selection Direct 6,153.85 0.00 2021-11-14 2021-11-19 2021-12-24 2022-06-22 System ementation es - aquachem & visual modf low softwares NHP-2021-2022-TSGW-2866 39 / Basic Field equipment fo Water Resources Monitoring Request for Quota Pending Impl IBRD / 87250 Post 30,769.23 0.00 2022-01-04 2022-03-01 2022-08-28 r field officers for Strengtheni System tions ementation ng Manual Observations NHP-2021-2022-TSGW-5740 Water Resources Monitoring Request for Quota Single Stage - One E 33 / Softwares for Data Centr IBRD / 87250 Post Open - National 16,923.08 0.00 Canceled 2021-06-12 2021-08-07 2022-02-03 System tions nvelope es-Ms office for newly procur ed DAS NHP-2021-2022-TSGW-6407 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 14 / IT Equipment for Data C IBRD / 87250 Post Open - National 46,153.85 0.00 2021-12-27 2022-02-21 2022-08-20 System tions nvelope ementation entres - Desktops/workstatio ns NHP-2021-2022-TSGW-6969 47 / Procurement of equipme nt - Borehole video Camera u Water Resources Operations Request for Quota Single Stage - One E Pending Impl IBRD / 87250 Post Open - National 27,692.31 0.00 2021-06-15 2021-08-10 2022-02-06 nder Tanks as source for regi and Planning System tions nvelope ementation onal Groundwater Recharge, using Managed Aquifer Stora ge & Recovery (ASR) Page 4 NHP-2021-2022-TSGW-7018 Water Resources Monitoring Single Stage - Two E Pending Impl 46 / Mobile water quality Tes IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 2021-09-08 2021-09-13 2021-11-08 2022-01-21 2022-02-25 2022-08-24 System nvelope ementation ting laboratory for Groundwa ter department NHP-2021-2022-TSGW-7747 Water Resources Monitoring Single Stage - Two E Pending Impl 04 / Procurement of DWLRs IBRD / 87250 Post Request for Bids Open - National 1,603,846.15 0.00 2021-08-04 2021-08-09 2021-09-06 2021-11-19 2021-12-24 2022-06-22 System nvelope ementation with telemetry NHP-2021-2022-TSGW-6169 82 / Procurement of equipme nt-straddle packers systems Water Resources Operations Pending Impl IBRD / 87250 Post Direct Selection Direct 41,538.46 0.00 2021-06-21 2021-06-26 2021-07-31 2022-01-27 under Tanks as source for re and Planning System ementation gional Groundwater Recharg e, using Managed Aquifer Sto rage & Recovery (ASR) NHP-2020-2021-TSGW-7882 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 64 / IT Equipment for Data C IBRD / 87250 Post Open - National 38,461.54 0.00 2020-09-28 2020-11-23 2021-05-22 System tions nvelope ementation entres - printers NHP-2021-2022-TSGW-8230 Water Resources Monitoring Pending Impl 88 / Softwares for Data Centr IBRD / 87250 Post Direct Selection Direct 25,846.15 0.00 2021-10-26 2021-10-31 2021-11-28 2021-11-28 System ementation es - Upgradataion of Arc GIS Softwares NHP-2021-2022-TSGW-6057 Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl 83 / IT Equipment for Data C IBRD / 87250 Post Open - National 16,923.08 0.00 2022-01-10 2022-02-28 2022-03-30 System tions nvelope ementation entres - Data Analysis Syste m NHP-2022-2023-TSGW-4722 47 / Basic Field equipment fo Water Resources Monitoring Request for Quota Single Stage - One E Pending Impl IBRD / 87250 Post Open - National 28,767.12 0.00 2022-05-28 2022-07-23 2023-01-19 r field officers for Strengtheni System tions nvelope ementation ng Manual Observations NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NHP-2022-2023-TSGW-3373 62 / Determination of Aquifer Parameters by Conducting P Water Resources Monitoring Single Stage - Two E Pending Impl IBRD / 87250 Post Request for Bids Open - National 20,479.45 0.00 2022-08-30 2022-08-30 2022-09-29 2022-11-06 2022-12-11 2023-12-11 umping and Slug Tests on Bo System nvelope ementation re Wells, Analysis and Interpr etation of Test Data in Telan gana State under NHP. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-TELENGANA GW-23248-C S-QCBS / Consultancy Servic es for Study to delineate basi n wise subsurface geometry i Water Resources Operations Quality And Cost- IBRD / 87250 Post Open - National 738,460.00 0.00 Canceled 2018-01-18 2018-02-08 2018-03-24 2018-04-21 2018-05-21 2018-06-25 2018-07-30 2021-07-29 n 3D using existing data and and Planning System Based Selection evaluation of aquifer charact eristics in Telangana region t o develop comprehensive gr ound water Atlas NHP-2018-2019-TSGW-9952 10 / Comprehensive Planing f Water Resources Monitoring Consultant Qualifi Pending Impleme or interiors and Architecture f IBRD / 87250 Post Open - National 31,538.46 0.00 2018-07-23 2018-08-13 2018-09-26 2018-10-26 2018-11-30 2019-01-14 System cation Selection ntation or DDCs, SDC and Training c um Information Centres NHP-2021-2022-TSGW-8239 Water Resources Monitoring Quality And Cost- Pending Impleme IBRD / 87250 Post Open - National 230,769.23 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-16 2021-10-16 2021-11-20 2021-12-25 2022-12-25 90 / Aquifer performance test System Based Selection ntation s INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-TELENGANA GW-36922-C Institutional Capacity Enhan Individual Consult S-CDS / Hiring technical and f IBRD / 87250 Post Limited 11,538.00 0.00 Canceled 2017-12-15 2017-12-20 2017-12-27 2018-01-10 2018-05-10 cement ant Selection inancial experts IN-TELENGANA GW-36911-C S-CDS / Procurement of Servi Water Resources Monitoring Individual Consult ces for Comprehensive Plani IBRD / 87250 Post Limited 31,500.00 0.00 Canceled 2018-01-25 2018-01-30 2018-02-06 2018-02-28 2018-06-28 System ant Selection ng for interiors and Architect ure for DDCs, SDC and Traini ng cum Information Centres NHP-2018-2019-TSGW-4528 Institutional Capacity Enhan Individual Consult Pending Impleme 49 / Hiring Technical & financ IBRD / 87250 Post Open 4,615.38 0.00 2018-08-23 2018-10-11 2018-11-01 2018-12-06 2019-06-04 cement ant Selection ntation ial Experts NHP-2018-2019-TSGW-1901 81 / Consultancy charges for Water Resources Operations PDS study on Impact of Urba IBRD / 87250 Post Direct Selection Direct 30,769.23 28,118.72 Signed 2018-07-16 2018-12-21 2018-07-26 2019-01-04 2018-09-29 2019-01-18 2019-03-28 and Planning System nization on Gw Quality & Qua ntity & its Management in GH MC Area, Hyderabad NHP-2018-2019-TSGW-1615 99 / Consultancy charges for the PDS study on Tanks as S Water Resources Operations Pending Impleme IBRD / 87250 Post Direct Selection Direct 30,769.23 0.00 2018-07-18 2018-07-28 2018-10-01 2019-03-30 ource for regional Groundwat and Planning System ntation er Recharge using Managed Aquifer Storage & Recovery ( ASR) NHP-2018-2019-TSGW-4367 Institutional Capacity Enhan Individual Consult Pending Impleme IBRD / 87250 Post Open 4,615.38 0.00 2018-08-23 2018-10-11 2018-11-01 2018-12-06 2019-06-04 95 / Hiring financial Experts cement ant Selection ntation Page 5 IN-TELENGANA GW-116824- CS-INDV / Comprehensive pla Water Resources Monitoring Individual Consult nning for interiors and archit IBRD / 87250 Post Open 16,155.00 13,088.32 Signed 2019-05-31 2019-07-10 2019-07-05 2019-09-04 2019-07-15 2019-08-05 2019-09-13 2019-10-04 System ant Selection ecture for DDCs, SDC and Tr aining Cum Information Cent re NHP-2020-2021-TSGW-4822 Water Resources Informatio Individual Consult Pending Impleme IBRD / 87250 Post Open 15,384.61 0.00 2020-12-29 2021-02-02 2021-02-23 2021-03-30 2021-09-26 54 / WQ standards & Accredit n Systems ant Selection ntation ation NHP-2021-2022-TSGW-5254 Institutional Capacity Enhan Individual Consult Pending Impleme IBRD / 87250 Post Direct 27,692.31 0.00 2021-08-16 2021-08-26 2021-09-16 2021-10-21 2022-04-19 89 / Hiring of procurement Ex cement ant Selection ntation pert NHP-2021-2022-TSGW-9427 48 / Comprehensive Planing f Water Resources Monitoring Individual Consult Pending Impleme or interiors and Architecture f IBRD / 87250 Post Open 12,307.69 0.00 2021-06-21 2021-08-09 2021-08-30 2021-10-04 2022-04-02 System ant Selection ntation or DDCs, SDC and Training c um Information Centres NHP-2018-2019-TSGW-9545 49 / TOR for Creation and up dating of Central Database a nd uploading of historical dat Water Resources Informatio Pending Impleme a with MIS facility for Realtim IBRD / 87250 Post Direct Selection Direct 18,500.00 0.00 2021-08-08 2021-08-13 2021-09-13 2022-09-08 n Systems ntation e data dissemination includin g web publishing software in cluding development on Sing le Source Selection method u nder NHP, TSGWD NHP-2021-2022-TSGW-7230 63 / Geo referencing of GW n etwork includes (i)capturing oprecise coordinates (X,Yand Water Resources Informatio Pending Impleme Z) of 2886 Observation Wells IBRD / 87250 Post Direct Selection Direct 46,153.85 0.00 2022-01-24 2022-01-28 2022-02-26 2022-08-25 n Systems ntation that are being maintained by GWD by conducting DGPS su rvey, (ii) creation of Digital El evation Model (DEM) for entir e state of Telangana Page 6