PROCUREMENT PLAN (Textual Part) Project information: Nepal- Strategic Road Connectivity and Trade Improvement Project (P170409) Project Implementation agency: Department of Roads Date of the Procurement Plan: 2020/03/16 Period covered by this Procurement Plan: 2020/03/16 – 2021/09/15 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used with applicable caveats as follows. National Procurement Procedures: These procedures are applicable for the procurement of goods, works and non-consulting services only. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nepal’s Public Procurement Act, 2007, as amended by Amendment 2073 (2016) – (1st Amendment) and the Public Procurement Regulation, 2007, as amended by Amendment 2076 (2019) – (9th Amendment), such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1) Model bidding documents, including contract conditions agreed with the Bank (as amended from time to time), shall be used. Bidding documents shall be made available, by mail or in person, or through e-GP portal to all who are willing to pay the required fee. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids / request for proposals document shall require that Bidders / Proposers submitting Bids / Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Qualification criteria (in case pre-qualifications were not carried out) shall be stated in the bidding documents for all contracts, irrespective of the value, and if a registration process is required, a foreign firm declared as the lowest evaluated bidder shall be given a reasonable opportunity to register, without let or hindrance. 5) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. 6) Performance security should be an amount of five (5) to ten (10) percent of the contract price and shall not be increased merely based on comparison of the bid price of awarded bidders with the pre-bid cost estimate. 7) If a contract is terminated because of fundamental breach of contract by the contractor, the amount to be recovered from the contractor representing the employer’s additional costs for completing the contract shall be provisioned as agreed with the Bank in model bidding documents. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Nepal : Nepal Strategic Road Connectivity and Trade Improvement Project PLAN General Information Country: Nepal 2020-03-26 Bank’s Approval Date of the Original Procurement Plan: 2022-09-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170409 GPN Date: 2020-06-01 Project Name: Nepal Strategic Road Connectivity and Trade Improvement Project Loan / Credit No: IDA / 66730, / Department of Roads Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-W-NNM-ICB-1 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E 10,876,546. 2029-01-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids Signed 2020-03-30 2020-05-18 2020-07-14 2021-07-29 2020-08-11 2021-09-22 2020-04-15 2020-10-21 2020-10-10 2021-11-25 2020-11-09 2022-03-12 2021-01-16 2022-04-12 mprovement l nvelope 30 6 Bridges [CH: 0+000 Km to C H: 12+260 Km, Tribhuban Hi ghway] SRCTIP-DOR-W-NNM-ICB-2 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E 43,987,346. 2029-01-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids Signed 2020-03-30 2020-05-18 2020-07-14 2021-07-29 2020-08-11 2021-09-22 2020-04-15 2020-10-21 2020-10-10 2021-11-25 2020-11-09 2022-03-12 2021-01-16 2022-04-27 mprovement l nvelope 00 6 Bridges [CH: 0+000 Km to C H: 43+540 Km, Prithivi High way] SRCTIP-DOR-W-NNM-ICB-3 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E Under Imple 2029-03-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids 0.00 2020-05-31 2021-03-06 2020-09-14 2022-04-12 2020-10-12 2022-05-05 2020-06-16 2021-03-23 2020-12-11 2022-07-04 2021-01-10 2022-09-21 2021-03-19 mprovement l nvelope mentation 9 Bridges [CH: 43+542 Km to CH: 82+403 Km, Prithivi High way] SRCTIP-DOR-WPM-RDBKT-NC B-01 / Periodic Maintenance Single Stage - Two E 1,140,739.7 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National Signed 2021-01-24 2021-03-05 2021-01-25 2021-03-05 2021-02-25 2021-04-08 2021-04-06 2021-05-07 2021-05-05 2021-05-27 of Khawa-Lamidanda Road, N nvelope 5 9 H34-011,Bhaktapur Division, DOR SRCTIP-DOR-WPM-RDBRT-N CB-02 / Periodic Maintenance of Mawa-Harichamod NH01- Single Stage - Two E 2022-08-0 006, Budhi Khola-Itahari NH0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 779,881.01 Signed 2021-01-24 2021-03-16 2021-01-25 2021-03-16 2021-02-25 2021-04-18 2021-04-10 2021-06-20 2021-05-09 2021-07-20 nvelope 2 1-008, Itahari-Sakhawa Gach hi NH01-009, Base Camp - B hedetar NH08-007,Biratnaga r Division, DOR SRCTIP-DOR-WPM-RDCHN-N CB-03 / Periodic Maintenance of Banke-Nawalpur NH01-02 Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 862,667.17 Signed 2021-01-24 2021-04-16 2021-01-25 2021-04-20 2021-02-25 2021-05-17 2021-04-10 2021-06-25 2021-05-09 2021-07-11 4, Nawalpur-Bagmati NH01-0 nvelope 2 25, Bagmati-Chandranigahap ur NH01-026,Chandranigaha pur Division, DOR SRCTIP-DOR-WPM-RDCHR-N CB-04 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 901,985.77 Signed 2021-01-24 2021-03-01 2021-01-25 2021-03-01 2021-02-25 2021-04-04 2021-04-10 2021-04-25 2021-05-09 2021-05-10 of Dolalghat - Chautara NH3 nvelope 2 1-001,Charikot Division, DOR SRCTIP-DOR-WPM-RDDNG-N CB-05 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 654,835.57 Signed 2021-01-24 2021-03-07 2021-01-25 2021-03-07 2021-02-25 2021-04-08 2021-04-10 2021-05-24 2021-05-09 2021-06-17 of Lamahi-Ameliya, NH01-05 nvelope 2 7,Dang Division, DOR SRCTIP-DOR-WPM-RDDSB-N CB-06 / Periodic Maintenance Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 978,900.31 Signed 2021-01-24 2021-03-08 2021-01-25 2021-03-16 2021-02-25 2021-04-09 2021-04-06 2021-05-16 2021-05-05 2021-06-30 of Khurkot - Barkhe Khola, N nvelope 9 H13-005,DhuliKel Bardibas R oad SRCTIP-DOR-WPM-RDKTM-N CB-07 / Periodic Maintenance of Bansbari-Budhanilkantha Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 998,979.53 Signed 2021-01-24 2021-03-03 2021-01-25 2021-03-03 2021-02-25 2021-04-04 2021-04-06 2021-05-20 2021-05-05 2021-06-14 F02503, Tinkune-Koteshwar nvelope 9 NH34-002, Koteshwar-Manoh ara bridge NH34-003,Kathma ndu Division, DoR SRCTIP-DOR-WPM-RDMHN-N CB-08 / Periodic Maintenance of Sukhad Choraha-Atariya N Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 810,057.38 Signed 2021-01-24 2021-04-13 2021-01-25 2021-04-20 2021-02-25 2021-05-20 2021-04-06 2021-06-22 2021-05-05 2021-07-04 H01-066, Atariya-Mohana Riv nvelope 9 er NH01-067, Mohana River- Daiji NH01-068,Mahendranag ar Division, DOR SRCTIP-DOR-WPM-RDNPL-NC B-09 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 666,130.11 Signed 2021-01-24 2021-03-16 2021-01-25 2021-03-16 2021-02-25 2021-04-16 2021-04-10 2021-05-24 2021-05-09 2021-06-16 of Khairi Khola-Kohalpur NH0 nvelope 2 1-060,Nepalgunj Division, DO R SRCTIP-DOR-WPM-RDSRK-N CB-11 / Periodic Maintenance of Kalakhola Gaun (DB) - Sai Single Stage - Two E 2022-08-0 n NH58-012, Sain - Tilepata IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 934,336.45 Signed 2021-01-24 2021-03-30 2021-01-25 2021-03-30 2021-02-25 2021-04-30 2021-04-10 2021-08-05 2021-05-09 2021-09-08 nvelope 2 NH58-013, Gurase (DB) - Chu pra (NH03) NH60-002, Dailek h - Pallo Kalimati NH60-003, Surkhet Division, DOR SRCTIP-DOR-WPM-RDPKR-NC B-10 / Periodic Maintenance of Bindebasini-Yamdi bridge F04202, Waling-Syangja NH4 Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 Canceled 2021-01-24 2021-03-03 2021-01-25 2021-03-03 2021-02-25 2021-04-04 2021-04-10 2021-05-09 7-010, Syangja-Kubinde NH4 nvelope 2 7-011, Syangja-Kubinde NH4 7-011, Pokhara municipality boundary-Prithvichok NH47-0 13, Pokhara Division, DOR SRCTIP-DOR-WPM-RDPKR-NC B-10-RE / Periodic Maintenan National Proc ce of Bindebasini-Yamdi brid urement Doc ge F04202, Waling-Syangja N Single Stage - Two E ument - 2 En 1,151,413.2 2023-02-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National Signed 2021-08-20 2021-08-24 2021-08-21 2021-08-24 2021-09-21 2021-09-24 2021-11-04 2022-01-04 2021-12-03 2022-02-08 H47-010, Syangja-Kubinde N nvelope velope proce 1 6 H47-011, Syangja-Kubinde N ss (Non Bank H47-011, Pokhara municipalit -SPD) y boundary-Prithvichok NH47 -013, Pokhara Division, DOR Page 1 SRCTIP-DOR-WPM-RDBHT-N CB-12 / Periodic Maintenance National Proc of Lothar-Tikauli (km 457.78 urement Doc 0 to km 461.780) of Mahendr Single Stage - Two E ument - 2 En Pending Imp 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2021-12-15 2021-12-16 2022-01-16 2022-03-01 2022-03-30 a Highway (NH01_034), Nara nvelope velope proce lementation 0 yanghat-Aanptari (km 30.450 ss (Non Bank to km 32.900) of Narayangha -SPD) t - Mugling Highway (NH044_ 02), Bharatpur Division DOR. SRCTIP-DOR-WPM-RDBRT-N CB-13 / Periodic Maintenance National Proc of Duhabi (KRM)-Inarwa (km urement Doc 0.000 to km 8.000 of F054_0 Single Stage - Two E ument - 2 En Under Imple 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2021-12-15 2021-12-29 2021-12-16 2021-12-29 2022-01-16 2022-01-30 2022-03-01 2022-02-18 2022-03-30 1), Bardanga-Urlabari (MRM) nvelope velope proce mentation 0 (km 0.000 to km 19.35 of F0 ss (Non Bank 60-01), Mawa-Harichamod (k -SPD) m 54.750 to km 63.450 of N H01-006), Biratnagar Divisio n, DoR. SRCTIP-DOR-WPM-RDBTW-N CB-14 / Periodic Maintenance National Proc of Sunwal-Parasi-Maheshpur urement Doc (km 0.000 to km 8.950 of F0 Single Stage - Two E ument - 2 En Under Imple 2023-03-3 09_01,_02), Belhaiya-Siddhar IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2021-12-15 2022-01-01 2021-12-16 2022-01-01 2022-01-16 2022-03-01 2022-03-30 nvelope velope proce mentation 0 thanagar, Butwal Municipalit ss (Non Bank y Boundry - Rajmarga Chaura -SPD) ha (km 0.750 to km 4.800, k m 22.110 to km24.040 of N H47_001,_003), Butwal Divisi on, DOR. SRCTIP-DOR-WPM-RDHRK-N CB-15 / Periodic Maintenance National Proc of Hilepani-Harkapur (km 46 urement Doc 6.34 to 473.34 of NH03_017) Single Stage - Two E ument - 2 En 1,130,787.1 2023-03-3 , Hilepani-Okhaldhunga (km IDA / 66730 Institutional Strengthening Post Request for Bids Open - National Signed 2021-12-15 2021-12-20 2021-12-16 2021-12-20 2022-01-16 2022-01-21 2022-03-01 2022-02-13 2022-03-30 2022-02-24 nvelope velope proce 6 0 102.13 to 116.33 of NH20_00 ss (Non Bank 6), Okhaldhunga-Mudhebisan -SPD) a-Salleri (km 137.330 to 195. 04 of of NH20_007 and 008), Harkapur Division DoR. SRCTIP-DOR-WPM-RDLHN-N National Proc CB-16 / Periodic Maintenance urement Doc of Koshi Barrage- Bhardaha ( Single Stage - Two E ument - 2 En Under Imple 2023-03-3 km 134.93 to km140.950 of IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2021-12-15 2021-12-26 2021-12-16 2021-12-26 2022-01-16 2022-03-01 2022-03-30 nvelope velope proce mentation 0 NH01_012), Bhardaha-Rupan ss (Non Bank i (km 161.74-km171.740 of N -SPD) H01_013), Lahan Division DO R. National Proc SRCTIP-DOR-WPM-RDPLP-NC urement Doc B-17 / Periodic Maintenance Single Stage - Two E ument - 2 En 2023-03-3 of Kadambas-Banstari (km 3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 405,483.86 Signed 2021-12-15 2022-02-03 2021-12-16 2022-02-02 2022-01-16 2022-03-06 2022-03-01 2022-04-25 2022-03-30 2022-05-18 nvelope velope proce 0 5.200 to km 55.590 of NH47_ ss (Non Bank 005), Palpa Division, DOR. -SPD) SRCTIP-DOR-WPM-RDSRK-N CB-18 / Periodic Maintenance National Proc of Harre-Chhinchu (km 74.0 urement Doc 00 to 80.600 of NH58_007), Single Stage - Two E ument - 2 En 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 Canceled 2021-12-15 2022-01-04 2021-12-16 2022-01-04 2022-01-16 2022-02-04 2022-03-01 2022-03-30 Bangesimal-Baddichaur (km1 nvelope velope proce 0 12.990 to km140.100 of NH5 ss (Non Bank 8_010), Kalakholagaun-Sain ( -SPD) km 165.990-174.990 of NH 5 8_012), Surkhet Division, DO R. SRCTIP-DOR-WPM-RDBHT-N National Proc CB-19 / Periodic Maintenance urement Doc of Lothar-Tikauli (km 438.55 Single Stage - Two E ument - 2 En Under Imple 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-07-22 2022-07-22 2022-07-24 2022-08-22 2022-09-16 2022-10-23 0-440.000, km 442.800-444. nvelope velope proce mentation 0 800, km 457.200-458.750)of ss (Non Bank Mahendra Highway Link NH0 -SPD) 1-034), Bharatpur Division D OR SRCTIP-DOR-WPM-RDDSB-N National Proc CB-21 / Periodic Maintenance urement Doc of Barkhe Khola-Dhulikhel(k Single Stage - Two E ument - 2 En Under Imple 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-09-14 2022-07-22 2022-09-28 2022-08-22 2022-09-16 2022-10-23 m 149.000-156.000 of BP Hig nvelope velope proce mentation 0 hway link NH13-006),Dhulikh ss (Non Bank el Bardibas Road Project, DO -SPD) R National Proc SRCTIP-DOR-WPM-RDDMK-N urement Doc CB-22 / Periodic Maintenance Single Stage - Two E ument - 2 En Under Imple 2023-06-2 of Gauradaha-Dipu-Gaurigan IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-07-22 2022-07-22 2022-08-02 2022-08-22 2022-09-16 2022-10-23 nvelope velope proce mentation 0 j (km 10.560-21.960 of link F ss (Non Bank 002-02),Damak Division, DO -SPD) R SRCTIP-DOR-WPM-RDHTD-N CB-23 / Periodic Maintenance National Proc of Sirsiya Border-Junction of urement Doc Old Alignment(km 0.000 -1.3 Single Stage - Two E ument - 2 En Under Imple 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-07-22 2022-07-22 2022-08-22 2022-09-16 2022-10-23 30 of link H02-01 Tribhuvan nvelope velope proce mentation 0 Rajpath Old),Ratamate-Hetau ss (Non Bank nda (km391.360-396.700 of -SPD) link NH01-031 Tribhuvan Raj path) Hetaunda Division, DO R SRCTIP-DOR-WPM-RDKTM-N CB-24 / Periodic Maintenance National Proc of Kalanki-Balkhu link NH39- urement Doc 011(km 18.95-21.95), Manoh Single Stage - Two E ument - 2 En Under Imple 2023-06-2 ara-Koteshwar link NH39-001 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-08-26 2022-07-22 2022-08-25 2022-08-22 2022-09-16 2022-10-23 nvelope velope proce mentation 0 (0.000-1.000),Lainchaur-Ring ss (Non Bank road-Balaju Bypass link F021- -SPD) 02 (km 4.38-5.34), Lainchaur -Maharajgunj, link F025-01(k m 0.00 to 1.00), Sankhu-Laps iphedi-Bhot SRCTIP-DOR-WPM-RDLTP-NC B-25 / Periodic Maintenance National Proc of Balkhu-Ekantakuna (KTM R urement Doc ing Road) link NH39-012 (km Single Stage - Two E ument - 2 En Under Imple 2023-06-2 21.95-23.95), Ekantakuna-Ku IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-08-26 2022-07-22 2022-08-25 2022-08-22 2022-09-16 2022-10-23 nvelope velope proce mentation 0 santi-Satdobato link NH39-01 ss (Non Bank 3 ( km 23.95-25.95), Satdoba -SPD) to-Gwarko link NH39-014 ( k m 25.95-27.45), Gwarko-Ma nohara (Balkumari), link NH3 9-015 (km 27.45 SRCTIP-DOR-WPM-RDNPL-NC B-26 / Periodic Maintenance National Proc of Man River-Bhuregaun link urement Doc NH01-062 ( km 842.91-869.4 Single Stage - Two E ument - 2 En Under Imple 2023-06-2 , 875-878.04 ), Bhuregaun-Ka IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-07-19 2022-07-25 2022-07-22 2022-07-28 2022-08-22 2022-09-16 2022-10-23 nvelope velope proce mentation 0 rnali NH01-063 (km 878.04-9 ss (Non Bank 00.75), of Mahendra Highway -SPD) , Kohalpur-Deurali link NH58- 005 (kn 22.24-42.91),Deurali -Harre link NH58-006 ( km 45 .3-68.85) of Page 2 SRCTIP-DOR-WPM-RDSRK-N CB-18-2 / Periodic Maintenan National Proc ce of Harre-Chhinchu(km 74. urement Doc 000 to 80.600 of NH58_007), Single Stage - Two E ument - 2 En 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 Canceled 2022-03-10 2022-04-01 2022-03-11 2022-04-04 2022-04-11 2022-05-25 2022-06-23 Bangesimal-Baddichaur(km1 nvelope velope proce 3 12.990 to km140.100 of NH5 ss (Non Bank 8_010), Kalakholagaun-Sain( -SPD) km 165.990-174.990 of NH 5 8_012), Surkhet Division, DO R SRCTIP-DOR-WPM-RDSRK-N CB-18-3 / Periodic Maintenan National Proc ce of Harre-Chhinchu(km 74. urement Doc 000 to 80.600 of NH58_007), Single Stage - Two E ument - 2 En 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 Canceled 2022-07-19 2022-07-22 2022-07-22 2022-07-24 2022-08-22 2022-09-16 2022-10-23 Bangesimal-Baddichaur(km1 nvelope velope proce 0 12.990 to km140.100 of NH5 ss (Non Bank 8_010), Kalakholagaun-Sain( -SPD) km 165.990-174.990 of NH 5 8_012),Surkhet Division, DOR . SRCTIP-DOR-WPM-RDBTW-N CB-20 / Periodic Maintenance National Proc of Bamaha Khola-Kothi River urement Doc ( km 598.21-614.45, link NH0 Single Stage - Two E ument - 2 En 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 Canceled 2022-07-19 2022-07-25 2022-07-22 2022-08-22 2022-09-16 2022-10-23 1-048, of Mahendra Highway) nvelope velope proce 0 , Ramgram-Lumbini (km 532. ss (Non Bank 240-538.88, km 539.88-555. -SPD) 19, of Postal Highway Link N H05-026),Butwal Division DO R SRCTIP-DOR-WPM-RDBTW-N National Proc CB-20-2 / Periodic Maintenan urement Doc ce of Parasi-Bhairahawa road Single Stage - Two E ument - 2 En Pending Imp 2023-09-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 0.00 2022-09-30 2022-10-03 2022-11-03 2022-11-28 2023-01-04 (KM 532.240 to KM 555.19) o nvelope velope proce lementation 1 f NH05_026, and Bamaha Kh ss (Non Bank ola-Kothi River road (KM 598. -SPD) 21 to KM 615.45) of NH01-04 8 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-NCS-17 / Procur ement of Non- Consulting Ser Single Stage - One E Under Imple IDA / 66730 Trade Facilitation Post Request for Bids Open - National 0.00 2021-10-06 2021-10-31 2021-10-11 2021-11-19 2021-11-25 2021-12-20 2021-12-25 2022-01-29 2025-01-13 vices For GBV Service Provid nvelope mentation er under SRCTIP in NNM Roa d SRCTIP-DOR-NCS-18 / Procur ement of Non- Consulting Ser Single Stage - One E Pending Impl IDA / 66730 Trade Facilitation Post Request for Bids Open - National 0.00 2021-11-01 2021-11-08 2021-12-23 2022-02-06 2022-03-13 2025-02-25 vices For Training Service Pro nvelope ementation vider under SRCTIP in NNM R oad CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-CS-NNM-QCBS- 1 / Procurement of Consultin g Service for Construction Su Regional Road Connectivity I Quality And Cost- Open - Internationa IDA / 66730 Prior 4,840,361.52 Signed 2020-04-08 2020-06-29 2020-04-18 2020-10-09 2020-07-01 2021-04-30 2020-08-30 2021-07-15 2020-10-09 2021-10-29 2020-11-24 2022-03-09 2020-12-20 2022-04-07 2028-12-20 pervision of Improvement/Wi mprovement Based Selection l dening of Nagdhunga - Naubi se - Mugling Road and Bridge s SRCTIP-DOR-CS-KDP-QCBS-2 / Detailed engineering Desig Regional Road Connectivity I Quality And Cost- Open - Internationa n of Upgradation of Kamala- IDA / 66730 Prior 1,865,504.59 Signed 2020-03-27 2020-04-21 2020-04-06 2020-06-18 2020-06-19 2021-01-26 2020-08-18 2021-03-23 2020-09-22 2021-06-25 2020-11-14 2021-08-12 2021-01-05 2021-09-15 2022-01-05 mprovement Based Selection l Dhalkebar- Pathlaiya Section of Mahendra Highway and as sociated Bridges SRCTIP-DOR-CS-KDP-QCBS-3 / Environmental Social Impac Regional Road Connectivity I Quality And Cost- IDA / 66730 Post Open - National 367,695.91 Signed 2020-03-27 2020-03-19 2020-04-06 2020-06-11 2020-06-20 2021-02-15 2020-07-20 2021-04-01 2020-09-18 2021-09-13 2020-11-02 2021-09-30 2021-01-01 2021-12-01 2022-01-01 t Assessment (ESIA), RAP and mprovement Based Selection VCDP of Kamala-Dhalkebar-P athlaiya SRCTIP-DOR-PMC-CS-QCBS-6 Regional Road Connectivity I Quality And Cost- / Program Management Cons IDA / 66730 Prior Open - National 809,493.63 Signed 2020-04-09 2020-08-13 2020-04-30 2020-11-09 2020-07-13 2021-04-26 2020-08-17 2021-07-28 2020-10-01 2021-11-12 2020-11-12 2022-01-03 2020-12-31 2022-02-13 2025-12-31 mprovement Based Selection ultant for Periodic Maintenan ce SRCTIP-DOR-CS-CQS-7 / Proc urement of Consulting Servic Consultant Qualifi / Institutional Strengthening Post Open - National 0.00 Canceled 2020-06-05 2020-07-17 2020-06-12 2020-07-26 2020-09-09 2020-10-21 2021-01-19 e for the Detail Design of Trai cation Selection ning Center of Department of Roads at Gajuri SRCTIP-DOR-CS-QCBS-7 / Pr ocurement of Consulting Ser Quality And Cost- vice for Detailed Design and IDA / 66730 Institutional Strengthening Post Open - National 26,434.15 Signed 2020-07-27 2020-07-28 2020-08-03 2020-08-11 2020-09-16 2021-01-29 2020-10-14 2021-02-28 2020-11-13 2021-04-19 2020-12-18 2021-04-29 2021-01-29 2021-06-10 2024-01-29 Based Selection Technical Support Consultant for Research and Training Ce ntre at Gajuri SRCTIP-DOR-CS-QCBS- 11 / Consulting Service to carry o Regional Road Connectivity I Quality And Cost- Under Implement IDA / 66730 Post Open - National 0.00 2020-12-24 2020-12-22 2020-12-29 2020-12-25 2021-02-26 2021-04-16 2021-03-28 2021-07-06 2021-04-27 2021-07-28 2021-06-01 2021-08-18 2021-07-13 2027-04-13 ut Road User Satisfaction Sur mprovement Based Selection ation vey and Preparation of Neces sary Reports SRCTIP-MOPIT-CS-QCBS-19 / Procurement of Consultancy Regional Road Connectivity I Quality And Cost- Open - Internationa Services of Project Managem IDA / 66730 Prior 0.00 Under Review 2021-08-11 2021-08-24 2021-08-21 2021-08-30 2021-11-04 2022-04-19 2022-01-03 2022-07-08 2022-02-07 2022-04-01 2022-05-23 2025-05-07 mprovement Based Selection l ent Consultants (PMC) for Ro ad Safety Management (MOP IT) under SRCTIP SRCTIP-DOR-CS-QCBS-28 / T Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement ransaction Advisory Services IDA / 66730 Post 0.00 2022-07-07 2022-07-08 2022-08-06 2022-08-23 2022-09-19 2022-10-31 2022-11-30 2023-01-04 2023-02-08 2025-07-27 mprovement Based Selection l ation under SRCTIP Page 3 SRCTIP-DOR-RAMS-CS-QCBS -29 / Project Management Co Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement IDA / 66730 Prior 0.00 2022-07-13 2022-07-21 2022-07-28 2022-07-25 2022-09-11 2022-10-23 2022-11-22 2022-12-27 2023-02-09 2028-02-08 nsultant for Road Asset Mana mprovement Based Selection l ation gement System development SRCTIP-DOR-TESP-CS-QCBS- 30 / Procurement Training an Regional Road Connectivity I Quality And Cost- Pending Impleme IDA / 66730 Post Open - National 0.00 2022-09-26 2022-10-17 2022-11-30 2022-12-28 2023-01-27 2023-03-03 2023-04-07 2024-10-06 d Employment Service Provid mprovement Based Selection ntation er under SRCTIP INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-NNM-CS-IND-4 / Regional Road Connectivity I Individual Consult Procurement Evaluation Pane / Prior Open 0.00 Canceled 2020-04-07 2020-04-29 2020-05-04 2020-05-25 2020-05-31 2021-05-31 mprovement ant Selection l Expert - 1 SRCTIP-DOR-NNM-CS-IND-5 / Regional Road Connectivity I Individual Consult / Prior Open 0.00 Canceled 2020-04-07 2020-04-30 2020-05-04 2020-05-25 2020-05-31 2021-05-31 Procurement Panel Expert - 2 mprovement ant Selection SRCTIP-DOR-NNM-CS-IND- 4 / Procurement of Individual C Regional Road Connectivity I Individual Consult IDA / 66730 Prior Open 98,281.75 Signed 2020-07-16 2020-07-21 2020-09-19 2021-01-08 2020-09-28 2021-02-23 2020-10-29 2021-03-10 2021-10-29 onsultant; Procurement Eval mprovement ant Selection uation Panel Expert-1 SRCTIP-DOR-NNM-CS-IND- 5 / Procurement of Individual C Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Prior Open 0.00 2020-07-16 2020-07-21 2020-09-19 2020-09-28 2020-10-29 2021-10-29 onsultant; Procurement Eval mprovement ant Selection ation uation Panel Expert - 2; SRCTIP-DOR-S-IND-8 / Procur ement of Individual Consulta Individual Consult nt (Technical Advisor for Roa IDA / 66730 Institutional Strengthening Post Limited 30,218.02 Signed 2020-08-10 2020-08-10 2020-08-13 2020-09-11 2020-09-03 2020-11-26 2020-09-22 2020-12-10 2021-09-22 ant Selection d Asset and Road Maintenan ce Management Specialist) SRCTIP-DOR-CS-IND-9 / Proc urement of Individual Consult Regional Road Connectivity I Individual Consult IDA / 66730 Post Open 0.00 Canceled 2020-11-05 2020-11-02 2020-12-22 2021-01-12 2021-02-05 2024-07-19 ant; Occupational Health and mprovement ant Selection Safety Specialist [OHSS] SRCTIP-DOR-CS-IND-10 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Post Open 0.00 Canceled 2020-11-05 2020-11-02 2020-12-22 2021-01-12 2021-02-05 2024-07-19 mprovement ant Selection ltant; Gender Specialist [GS] SRCTIP-DOR-CS-IND - 10 / Pr Regional Road Connectivity I Individual Consult Under Implement ocurement of Individual Cons IDA / 66730 Post Open 0.00 2021-01-25 2021-01-29 2021-03-03 2021-03-24 2021-04-28 2026-04-28 mprovement ant Selection ation ultant; Gender Specialist [GS ] SRCTIP-MOPIT-CS-IND-12 / C onsulting Service of Individua Individual Consult Under Implement IDA / 66730 Institutional Strengthening Post Limited 0.00 2021-02-17 2021-03-07 2021-02-22 2021-03-15 2021-03-28 2024-03-27 l Consultant [TECHNICAL ADV ant Selection ation ISOR (ROAD SAFETY)] SRCTIP-DOR-CS-IND-13 / Pro curement of Individual Consu Individual Consult IDA / 66730 Institutional Strengthening Post Open 16,237.14 Signed 2021-04-05 2021-04-08 2021-05-10 2021-09-21 2021-05-20 2021-10-03 2021-06-10 2021-10-31 2024-06-09 ltant ; Financial Management ant Selection Consultant (FMC) SRCTIP-DOTM-CS-IND-14 / T echnical Advisor for Road Tra Individual Consult Under Implement IDA / 66730 Institutional Strengthening Post Open 0.00 2021-04-16 2021-04-21 2021-05-27 2021-05-31 2021-06-18 2023-06-18 nsport Safety Activities under ant Selection ation DOTM and NRSC SRCTIP-DOR-CS-IND-15 / Soc ial Development Advisor (SD Individual Consult A) for Planning and Impleme IDA / 66730 Institutional Strengthening Post Open 31,369.90 Signed 2021-04-25 2021-04-21 2021-06-15 2021-12-23 2021-06-19 2022-01-06 2021-07-07 2022-01-31 2023-07-07 ant Selection ntation of Social Safeguard A ctivities as Capacity Enhance ment of GESU, DoR SRCTIP-DOR-CS-IND-16 / Env ironmental Advisor (EA) for Pl Individual Consult anning and Implementation o IDA / 66730 Institutional Strengthening Post Open 31,392.56 Signed 2021-04-25 2021-04-21 2021-06-15 2021-11-24 2021-06-19 2021-12-14 2021-07-07 2022-02-13 2023-07-07 ant Selection f Environmental Safeguard A ctivities as Capacity Enhance ment of GESU, DoR SRCTIP-DOR-CS-IND-20 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Prior Direct 9,754.33 Signed 2021-07-27 2021-07-28 2021-07-31 2021-07-29 2021-08-03 2021-08-06 2021-08-09 2021-08-08 2022-01-06 mprovement ant Selection ltant; Procurement Specialist [PS] SRCTIP-DOR-CS-IND-21 / Ge Individual Consult otechnical Engineering Exper IDA / 66730 Institutional Strengthening Post Open 44,544.16 Signed 2021-07-29 2021-08-02 2021-09-16 2021-11-01 2021-10-07 2021-11-02 2021-11-11 2021-11-28 2022-05-10 ant Selection t (GEE) at DOR-GESU SRCTIP-DOR-CS-IND - 9 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult IDA / 66730 Post Open 0.00 Canceled 2021-01-25 2021-01-29 2021-03-03 2021-03-24 2021-04-28 2026-04-28 ltant; Occupational Health an mprovement ant Selection d Safety Specialist [OHSS] SRCTIP-DOR-CS-IND - 9-2 / P rocurement of Individual Con Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Post Open 0.00 2021-08-11 2021-08-11 2021-10-02 2021-10-23 2021-11-20 2026-11-20 sultant; Occupational Health mprovement ant Selection ation and Safety Specialist [OHSS] SRCTIP-DOR-CS-IND-22 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult IDA / 66730 Prior Open 103,211.78 Signed 2021-10-26 2021-10-31 2021-11-20 2021-12-28 2021-11-22 2022-01-03 2021-12-08 2022-01-24 2027-07-15 ltant : Procurement and Cont mprovement ant Selection ract Management Specialist SRCTIP-DOR-CS-IND-23 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Post Open 0.00 2021-10-25 2021-10-31 2021-11-19 2021-11-22 2021-12-12 2027-07-15 ltant ; Social Development Ex mprovement ant Selection ation pert/ Consultant SRCTIP-DOR-CS-IND-24 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Post Open 69,591.15 Signed 2021-10-25 2021-10-31 2021-11-19 2022-01-10 2021-11-24 2022-01-24 2021-12-13 2022-02-07 2027-07-15 mprovement ant Selection ltant ; Environmental Safegu ard Consultant Page 4 SRCTIP-DOR-S-IND-25 / Proc urement of Individual Consult Individual Consult ant: Technical Advisor for Ro IDA / 66730 Institutional Strengthening Post Limited 57,566.54 Signed 2021-11-19 2021-11-21 2021-11-24 2021-12-09 2021-12-15 2022-01-13 2022-01-19 2022-01-31 2024-01-19 ant Selection ad Asset and Road Maintena nce Management Specialist ( National). SRCTIP-DOR-CS-IND-25 / Pro curement of Individual Engin Regional Road Connectivity I Individual Consult IDA / 66730 Post Limited 58,000.48 Signed 2022-01-04 2022-01-06 2022-01-04 2021-12-09 2022-01-06 2022-01-13 2022-01-17 2022-01-31 2022-06-16 eer for Slope Assessment W mprovement ant Selection orks in Nagdhunaga- Naubise -Mugling Road SRCTIP-DOR-CS-IND-26 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult Under Implement ltant : Junior Engineer for Slo IDA / 66730 Post Limited 0.00 2022-01-04 2022-01-06 2022-01-05 2022-01-06 2022-01-17 2022-06-16 mprovement ant Selection ation pe Assessment Works in Na gdhunaga- Naubise-Mugling Road SRCTIP-MOPIT-CS-IND-27 / C ONSULTANCY SERVICES OF R Individual Consult IDA / 66730 Institutional Strengthening Post Limited 0.00 Canceled 2022-03-13 2022-03-22 2022-03-18 2022-04-08 2022-05-13 2023-05-13 OAD SAFETY ENGINEER FOR ant Selection THE NATIONAL ROAD SAFETY COUNCIL SRCTIP-MOPIT-CS-IND-27-2 / Individual Consult Under Implement ROAD SAFETY SUPPORT ENGI IDA / 66730 Institutional Strengthening Post Limited 0.00 2022-04-07 2022-04-15 2022-04-12 2022-05-03 2022-06-07 2023-06-07 ant Selection ation NEER FOR NATIONAL ROAD S AFETY COUNCIL Page 5