FOR OFFICIAL USE ONLY Report No: PAD00001 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT [and/or] INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED [LOAN/CREDIT/GRANT/GUARANTEE] IN THE AMOUNT OF [US$ / EUR / SDR YY] MILLION (EQUIVALENT TO [US$XX] MILLION) TO ILLER BANKASI ANONIM SIRKETI (ILBANK) FOR THE IPF REGULAR PROJECT FOR ICR (P500152) 23-Sept-2022 EUROPE AND CENTRAL ASIA Note to Task Team: 1. Modify amounts above and provide equivalent in US$ if applicable. 2. For RVP/CD CLEARANCE DATE, enter the same date as on MOP. 3. For projects with financing to be approved by the Board, delete one of the following boxes, based on the PAD Guidance section on disclosure. For RVP-approved projects, delete both boxes at RVP approval. The Box should be aligned to the bottom of the page (insert blank lines to lower the box). Delete this note when finalizing the document. This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. OR This document is being made publicly available prior to Board consideration. This does not imply a presumed outcome. This document may be updated following Board consideration and the updated document will be made publicly available in accordance with the Bank’s policy on Access to Information. Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT Note to Task Team: Fill in information on country, fiscal year and currency equivalents. This information, plus abbreviations and acronyms and the management / TTL information should fit on one page. Delete this note when finalizing the document. TURKIYE (EUROPE AND CENTRAL ASIA) GOVERNMENT FISCAL YEAR July, 1 – June, 30 CURRENCY EQUIVALENTS (Exchange Rate Effective as of date) Currency Unit US$1.00 ABBREVIATIONS AND ACRONYMS Note to Task Team: Add to / amend the table below (examples given for illustration). Delete this note when For Official Use Only finalizing the document. CPF Country Partnership Framework MTEF Medium-Term Expenditure Framework GDP Gross Domestic Product MOF Ministry of Finance GNP Gross National Product PER Public Expenditure Review IBRD International Bank for Reconstruction SDR Special Drawing Rights and Development IDA International Development Association SCD Systematic Country Diagnostic IFC International Finance Corporation WB World Bank IMF International Monetary Fund WBG World Bank Group LDP Letter of Development Policy Regional Vice President: Anna M. Bjerde Country Director: Auguste Tano Kouame Regional Director: Practice Manager: Task Team Leader (s): Sunil Ignatius Leo, Adriana Tull Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT TURKIYE (EUROPE AND CENTRAL ASIA) IPF Regular Project for ICR (P500152) TABLE OF CONTENTS STRATEGIC CONTEXT ..........................................................................................................................7 A. COUNTRY CONTEXT ......................................................................................................................... 7 B. SECTORAL AND INSTITUTIONAL CONTEXT ...................................................................................... 7 C. RELEVANCE TO HIGHER LEVEL OBJECTIVES ..................................................................................... 7 PROJECT DESCRIPTION .......................................................................................................................7 D. PROJECT DEVELOPMENT OBJECTIVE ............................................................................................... 8 E. PROJECT COMPONENTS .................................................................................................................. 8 F. PROJECT BENEFICIARIES .................................................................................................................. 8 G. RESULTS CHAIN ................................................................................................................................ 8 H. RATIONALE FOR BANK INVOLVEMENT AND ROLE OF PARTNERS ................................................... 8 For Official Use Only I. LESSONS LEARNED AND REFLECTED IN THE PROJECT DESIGN ........................................................ 8 IMPLEMENTATION ARRANGEMENTS ..................................................................................................8 J. INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENTS ............................................................ 8 K. RESULTS MONITORING AND EVALUATION ARRANGEMENTS ......................................................... 9 L. SUSTAINABILITY ............................................................................................................................... 9 PROJECT APPRAISAL SUMMARY .........................................................................................................9 M. TECHNICAL, ECONOMIC AND FINANCIAL ANALYSIS (IF APPLICABLE) ............................................. 9 N. FIDUCIARY ........................................................................................................................................ 9 O. LEGAL OPERATIONAL POLICIES ........................................................................................................ 9 P. ENVIRONMENTAL AND SOCIAL ....................................................................................................... 9 GRIEVANCE REDRESS SERVICES ........................................................................................................ 10 KEY RISKS ....................................................................................................................................... 10 RESULTS FRAMEWORK AND MONITORING ....................................................................................... 11 INDICATIVE TERMS AND CONDITIONS FOR THE GUARANTEE (When Applicable) ............................... 22 ANNEX 1: IMPLEMENTATION ARRANGEMENTS AND SUPPORT PLAN ................................................. 23 Optional Annexes - (Delete annexes that are not applicable) Teams may add additional annexes if needed. Possible annexes could include: Sept 23, 2022 Page 1 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT • Sector or Specific Project Design Analysis • Economic and Financing Analysis • Procurement • Safeguards • Performance-Based Condition (PBC) Disbursement and Verification Protocol (for IPF with PBCs) • Assessment of Financial Sector and Financial Intermediaries (for Financial Intermediary Loans) • Draft Term Sheets (Guarantees) • Team List • Maps • Other For Official Use Only Sept 23, 2022 Page 2 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT Note to Task Team: The following sections are system generated and can only be edited online in the Portal. Delete this note when finalizing the document. @#&OPS~Doctype~OPS^dynamics@padbasicinformation#doctemplate PRODUCT INFORMATION Operation Name Operation Acronym IPF Regular Project for ICR Municipal SIP Operation ID Product P500152 Investment Project Financing (IPF) Environmental and Social Risk Classification Moderate Borrower/Recipient Implementing Agency ILLER BANKASI ANONIM SIRKETI (ILBANK) ILLER BANKASI ANONIM SIRKETI (ILBANK) For Official Use Only DEVELOPMENT OBJECTIVE The Project Development Objective (PDO) is to improve host and refugee communities access to safely managed water supply, sanitation and solid waste services in selected municipalities affected by the influx of Syrians Under Temporary Protection in Turkey. COMPONENTS Component Name Component Cost (USD) Component 1 1,000.00 ACCOUNTABILITY Who is the primary beneficiary of this operation? Beneficiary country/countries (borrower, recipient) Country or Group of Countries Turkiye Geographical Identifier Republic of Turkiye Region Requesting Unit EUROPE AND CENTRAL ASIA ECCTR Bank/IFC Collaboration Joint Level/Type of Collaboration Yes Joint Project – involving co financing with IFC (loan, equity, budget, other) or staffing Implementing Unit Sept 23, 2022 Page 1 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT Responsible Unit (e.g. EECG1) Practice Area (Lead) ITSOP Contributing Practice Areas Agriculture and Food @#&OPS~Doctype~OPS^dynamics@padprocessing#doctemplate PROCESSING Is this a Small Grant operation? Is this an Urgent Need or Capacity Constraint operation? No No Expected Approval Date Expected Closing Date 20-Oct-2022 25-Oct-2022 FINANCING & IMPLEMENTATION MODALITIES Situations of Urgent Need of Assistance or Capacity Constraints [✓] Fragile State(s) [✓] Fragile within a non-fragile Country For Official Use Only [ ] Small State(s) [ ] Conflict [ ] Responding to Natural or Man-made Disaster Other Situations [✓] Financial Intermediaries (FI) [ ] Series of Projects (SOP) [ ] Performance-Based Conditions (PBCs) [ ] Contingent Emergency Response Component (CERC) [ ] Alternative Procurement Arrangements (APA) [ ] Hands-on Expanded Implementation Support (HEIS) @#&OPS~Doctype~OPS^dynamics@padfinancingsummary#doctemplate Sept 23, 2022 Page 2 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT FINANCING SUMMARY (US$, Millions) COSTS Total Operation Cost 296.76 Project Cost 148.80 Other Costs 147.96 FINANCING Total Financing 148.80 International Bank for Reconstruction and Development (IBRD) 148.80 Financing Gap 147.96 @#&OPS~Doctype~OPS^dynamics@projectidaresource#doctemplate @#&OPS~Doctype~OPS^dynamics@paddisbursementprojection#doctemplate For Official Use Only EXPECTED DISBURSEMENTS (US$, Millions) @#&OPS~Doctype~OPS^dynamics@padclimatechange#doctemplate CLIMATE CHANGE AND DISASTER SCREENING For all operations (IDA and IBRD) has the project been screened for short-term and long-term climate change and disaster risks? Yes, it has been screened and the results are discussed in the Appraisal Document Have potential resilience-enhancing measures (where risks exist) been identified in the appraisal Document? Yes dontremove @#&OPS~Doctype~OPS^dynamics@padrisk#doctemplate Sept 23, 2022 Page 3 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT SYSTEMATIC OPERATIONS RISK- RATING TOOL (SORT) Risk Category Rating Political and Governance ⚫ High Macroeconomic ⚫ Substantial Sector Strategies and Policies ⚫ Moderate Technical Design of Project or Program ⚫ Low Institutional Capacity for Implementation and Sustainability ⚫ Substantial Fiduciary ⚫ Moderate Environment and Social ⚫ Moderate Stakeholders ⚫ High Other ⚫ Moderate Overall Risk ⚫ Substantial For Official Use Only @#&OPS~Doctype~OPS^dynamics@padcompliance#doctemplate Sept 23, 2022 Page 4 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT COMPLIANCE Policy Does the operation depart from the CPF in content or in other significant respects? Yes Does the operation require any waivers of Bank policies? Yes Have these been approved by Bank management? Yes Is approval for any policy waiver sought from the Board? Yes Environmental and Social Standards Relevance Given its Context at the Time of Appraisal E & S Standards Relevance For Official Use Only ESS 1: Assessment and Management of Environmental and Social Risks and Relevant Impacts ESS 10: Stakeholder Engagement and Information Disclosure Relevant ESS 2: Labor and Working Conditions Relevant ESS 3: Resource Efficiency and Pollution Prevention and Management Relevant ESS 4: Community Health and Safety Relevant ESS 5: Land Acquisition, Restrictions on Land Use and Involuntary Resettlement Relevant ESS 6: Biodiversity Conservation and Sustainable Management of Living Natural Relevant Resources ESS 7: Indigenous Peoples/Sub-Saharan African Historically Underserved Not Currently Relevant Traditional Local Communities ESS 8: Cultural Heritage Relevant ESS 9: Financial Intermediaries Relevant NOTE: For further information regarding the World Bank’s due diligence assessment of the Project’s potential environmental and social risks and impacts, please refer to the Project’s Appraisal Environmental and Social Review Summary (ESRS). @#&OPS~Doctype~OPS^dynamics@padlegalcovenants#doctemplate Sept 23, 2022 Page 5 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT LEGAL COVENANTS Sections and Description Legal Covenants 1 @#&OPS~Doctype~OPS^dynamics@padconditions#doctemplate CONDITIONS Type Name Description Financing Source Approval Condition 1 Approval required IBRD/IDA Note to Task Team: End of system generated content, document is editable from here. Delete this note when finalizing the document. For Official Use Only Sept 23, 2022 Page 6 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT IBRD (and/or) IDA PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN/CREDIT/GRANT TO TURKIYE (EUROPE AND CENTRAL ASIA) STRATEGIC CONTEXT Note to Task Team: Bank Guidance on Preparing the PAD for IPF. Delete this note when finalizing the document Note to Task Team: Formatting instructions for this document. A. Header 1. [All sub-sections must have a continuous paragraph numbering for the entire main text or for each annex per institutional standard.] (a) This is the sub-para numbering for this level. This is the sub-para numbering for this level. This is the sub- para numbering for this level. (i) This is the sub-para numbering for this level. This is the sub-para numbering for this level. (ii) This is the sub-para numbering for this level. This is the sub-para numbering for this level. For Official Use Only (iii) This is the sub-para numbering for this level. This is the sub-para numbering for this level. Delete this note when finalizing the document. A. COUNTRY CONTEXT Country Text B. SECTORAL AND INSTITUTIONAL CONTEXT C. RELEVANCE TO HIGHER LEVEL OBJECTIVES PROJECT DESCRIPTION Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document Page 7 Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT A. PROJECT DEVELOPMENT OBJECTIVE (i) PDO Statement Note to Task Team: The PDO has been pre-populated from the datasheet for the first time for your convenience. Keep it up to date whenever it is changed in the datasheet. Delete this note when finalizing the document. Proposed Development Objective The Project Development Objective (PDO) is to improve host and refugee communities access to safely managed water supply, sanitation and solid waste services in selected municipalities affected by the influx of Syrians Under Temporary Protection in Turkey. (ii) PDO Level Indicators For Official Use Only B. PROJECT COMPONENTS C. PROJECT BENEFICIARIES D. RESULTS CHAIN E. RATIONALE FOR BANK INVOLVEMENT AND ROLE OF PARTNERS F. LESSONS LEARNED AND REFLECTED IN THE PROJECT DESIGN IMPLEMENTATION ARRANGEMENTS A. INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENTS Page 8 Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document B. RESULTS MONITORING AND EVALUATION ARRANGEMENTS C. SUSTAINABILITY PROJECT APPRAISAL SUMMARY Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document A. TECHNICAL, ECONOMIC AND FINANCIAL ANALYSIS (IF APPLICABLE) For Official Use Only B. FIDUCIARY (i) Financial Management (ii) Procurement C. LEGAL OPERATIONAL POLICIES Policies Triggered Projects on International Waterways OP/BP 7.50 Yes Projects in Disputed Areas OP/BP 7.60 Yes D. ENVIRONMENTAL AND SOCIAL Page 9 Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT Note to Task Team: This summary section is downloaded from the PAD data sheet and is editable. It should match the text provided by E&S specialist. If it is revised after the initial download the task team must manually update the summary in this section. Delete this note when finalizing the document. Screening of Environmental and Social Risks and Impacts GRIEVANCE REDRESS SERVICES Note to Task Team: Inclusion of the following text is mandatory in all IPF PADs. No additional text should be added in this section. Delete this note when finalizing the document. Grievance Redress. Communities and individuals who believe that they are adversely affected by a project supported by the World Bank may submit complaints to existing project-level grievance mechanisms or the Bank’s Grievance Redress Service (GRS). The GRS ensures that complaints received are promptly reviewed in order to address project- For Official Use Only related concerns. Project affected communities and individuals may submit their complaint to the Bank’s independent Accountability Mechanism (AM). The AM houses the Inspection Panel, which determines whether harm occurred, or could occur, as a result of Bank non-compliance with its policies and procedures, and the Dispute Resolution Service, which provides communities and borrowers with the opportunity to address complaints through dispute resolution. Complaints may be submitted to the AM at any time after concerns have been brought directly to the attention of Bank Management and after Management has been given an opportunity to respond. For information on how to submit complaints to the Bank’s Grievance Redress Service (GRS), visit http://www.worldbank.org/GRS. For information on how to submit complaints to the Bank’s Accountability Mechanism, visit https://accountability.worldbank.org. KEY RISKS Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document Page 10 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT RESULTS FRAMEWORK AND MONITORING Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document Note to Task Team: The following sections are system generated and can only be edited online in the Portal. Delete this note when finalizing the document. @#&OPS~Doctype~OPS^dynamics@padannexresultframework#doctemplate PDO Indicators by PDO Outcomes PDO Outcome To Improve host and refugee communities access to environmental infrastructure services Indicator Name Farmers reached with agricultural assets or services Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Climate Change Baseline & Targets Value FY Baseline 100 2027 End Target 10000 2030 This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Description of Indicator Bank project support. "Agriculture" or "Agricultural" includes: crops, livestock, capture fisheries, aquaculture, agroforestry, Page 11 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-sanitary and food safety services, agricultural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of an agriculture-related business (disaggregated by men and women) targeted by the project. SubIndicator Name Farmers reached with agricultural assets or services - Female Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Baseline & Targets Value FY Baseline 200 End Target 200000 Description of Indicator No description provided Intermediate Indicators by Components Component Component 1 Indicator Name Fisheries management plans implemented Page 12 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Citizen Engagement Baseline & Targets Value FY Baseline 150 2024 End Target 300 2025 This indicator measures the number of fisheries management plans that have been implemented through operations supported by the World Bank. This indicator relates to the actual application and enforcement of measures to control fishing Description of Indicator in a determined geographic area. Fishing units accessing the fisheries are identifiable (registered, marked, possibly licensed), and management measures (such as gear and spatial or period restrictions) are applied and enforced (as demonstrated by a minimum rate of control of the target fleet each year, and prosecution of identified delinquents). Indicator Name People provided with access to improved water sources Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Climate Change Baseline & Targets Value FY Baseline 150 2023 End Target 500 2024 Page 13 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT This indicator measures the cumulative number of people who benefited from improved water supply services that have been Description of Indicator constructed through operations supported by the World Bank. SubIndicator Name People provided with access to improved water sources - Female (RMS requirement) Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Baseline & Targets Value FY Baseline 100 End Target 500 This indicator measures the cumulative number of people who benefited from improved water supply services that have been Description of Indicator constructed through operations supported by the World Bank. SubIndicator Name People provided with access to improved water sources - rural Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Baseline & Targets Value FY Baseline 200 End Target 600 Page 14 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Description of Indicator No description provided SubIndicator Name People provided with access to improved water sources - urban Comments on how indicator relates to No Comments entered operation design Type Corporate Indicator Unit of Measure Number Is this indicator flagged as PBC? No Cross-Cutting Themes Baseline & Targets Value FY Baseline 400 End Target 800 Description of Indicator No description provided Performance-based Conditions (PBC) Timeline Type Bank Financial Year Period Period Definition Timeline Period 1 Period 2 Period 3 Page 15 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Note to Task Team: End of system generated content, document is editable from here. Delete this note when finalizing the document. Page 16 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Monitoring & Evaluation Plan: PDO Indicators Note to Task Team: PDO Outcome name, Indicator Name and Description in following section are system generated and can only be edited online in the Operations Portal. M&E information such as Frequency, Data Source, Methodology and Responsibility for Data collection can be updated in this document. Delete this note when finalizing the document PDO Outcome To Improve host and refugee communities access to environmental infrastructure services Indicator Name Farmers reached with agricultural assets or services Description Frequency Data source Methodology for Data Collection Responsibility for Data Collection SubIndicator Name Farmers reached with agricultural assets or services - Female Description Frequency Data source Methodology for Data Collection Page 17 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Responsibility for Data Collection Monitoring & Evaluation Plan: Intermediate Results Indicators Note to Task Team: Component name, Indicator Name and Description in following section are system generated and can only be edited online in the Operations Portal. M&E information such as Frequency, Data Source, Methodology and Responsibility for Data collection can be updated in this document. Delete this note when finalizing the document Component Component 1 Indicator Name Fisheries management plans implemented Description Frequency Data source Methodology for Data Collection Responsibility for Data Collection Indicator Name People provided with access to improved water sources Description Frequency Data source Page 18 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Methodology for Data Collection Responsibility for Data Collection SubIndicator Name People provided with access to improved water sources - Female (RMS requirement) Description Frequency Data source Methodology for Data Collection Responsibility for Data Collection SubIndicator Name People provided with access to improved water sources - rural Description Frequency Data source Methodology for Data Collection Responsibility for Data Collection SubIndicator Name People provided with access to improved water sources - urban Description Frequency Page 19 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Data source Methodology for Data Collection Responsibility for Data Collection Page 20 Sept 23, 2022 The World Bank IPF Regular Project for ICR(P500152) PROJECT APPRAISAL DOCUMENT Verification Protocol Table: Performance-Based Conditions Note to Task Team: Indicator Name and Description in following section are system generated and can only be edited online in the Operations Portal. Verification protocol information such as Formula, Data Source/Agency, Verification Entity and Procedure can be updated in this document. Delete this note when finalizing the document Page 21 Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT INDICATIVE TERMS AND CONDITIONS FOR THE GUARANTEE (When Applicable) Note to Task Team: Click here for guidance on preparing the PAD. Delete this note when finalizing the document Note to Task Team: In the case of the Guarantee, present a term sheet summarizing the terms and conditions of the proposed Guarantee. Delete this note when finalizing the document. Page 22 Sept 23, 2022 The World Bank IPF Regular Project for ICR (P500152) PROJECT APPRAISAL DOCUMENT ANNEX 1: IMPLEMENTATION ARRANGEMENTS AND SUPPORT PLAN Beneficiary country/countries (borrower, recipient) Turkiye Operation Name IPF Regular Project for ICR Note to Task Team: 1. [All sub-sections must have a continuous paragraph numbering for the entire main text or for each annex per institutional standard.] (a) This is the sub-para numbering for this level. (i) This is the sub-para numbering for this level. This is the sub-para numbering for this level. Delete this note when finalizing the document. Page 23 Sept 23, 2022