Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulations. Other Conditions: 1. Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other Model Procurement Documents agreed with the Bank) shall be used. 3. Request for Bids (Open-National), if allowed in the Procurement Plan, will be carried out under the Bank’s Procurement Regulations following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and The Public Procurement Rules 2008, as amended in August 2009) using standard/model bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. PROCUREMENT Bangladesh : Rural Electrification and Renewable Energy Development II (RERED II) Project PLAN General Information Country: Bangladesh 2017-07-28 Bank’s Approval Date of the Original Procurement Plan: 2022-10-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P131263 GPN Date: Project Name: Rural Electrification and Renewable Energy Development II (RERED II) Project Loan / Credit No: IDA / 51580, IDA / 55140, TF / 15034, IDA / 62020 Infrastructure Development Company Limited Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned W-01 UNDER REREDII-AFII / Single Stage - One E Pending Imp 2021-03-0 Civil Work Construction of th IDA / 62020 Sector Technical Assistance Post Request for Bids Open - National 4,000,000.00 0.00 2019-06-13 2019-06-16 2019-07-16 2019-08-15 2019-09-12 nvelope lementation 5 e New Office Building of IDC OL W-01 UNDER REREDP-II AF / Single Stage - One E 2020-05-1 Shore Piling work of the New IDA / 55140 Sector Technical Assistance Post Request for Bids Open - National 551,250.00 401,298.26 Terminated 2019-08-01 2019-10-07 2019-08-06 2021-02-07 2019-09-17 2019-10-28 2019-10-17 2019-12-01 2019-11-21 2020-01-02 nvelope 9 Office Building of IDCOL GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-16 UNDER GPOBA-II FOR R EREDPII / Procurement of 1,0 Request for Quota Single Stage - One E 00 Pcs of Construction Manu IDA / 51580 Household Energy Post Limited 1,200.00 619.86 Completed 2017-10-18 2017-09-21 2017-10-25 2017-09-26 2017-11-06 2017-10-08 tions nvelope als under IDCOL Biogas progr am (Package No.: G-16 under GPOBAII) G-08 UNDER REREDP-II AF / Procurement of 2 Pcs of Onli Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 2,565.00 2,127.79 Completed 2017-10-31 2017-10-24 2017-11-09 2017-10-31 2017-11-16 2017-11-28 ne Energy Meters under IDC tions nvelope OL Other RE program G-09-REREDII-AF AND G-57- Single Stage - One E REREDII / Procurement of 22 IDA / 51580 Access to Electricity Post Request for Bids Open - National 55,000.00 46,716.39 Completed 2017-11-28 2017-12-19 2017-11-29 2017-12-21 2017-12-20 2018-01-11 2018-01-19 2018-02-04 2018-02-04 2018-03-01 2018-03-06 2018-04-04 nvelope units of Motorcycles for IDCO L G-18 UNDER GPOBA-II FOR R Request for Quota Single Stage - One E EREDPII / Procurement of 6 u IDA / 51580 Household Energy Post Limited 75.00 0.00 Canceled 2017-12-29 2018-01-08 2018-01-23 tions nvelope nits of toolkit for IDCOL Bio-g as Program G-56 UNDER REREDP-II / Prin Single Stage - One E ting and Supply of 100,000 P IDA / 51580 Household Energy Post Request for Bids Open - National 25,000.00 22,809.43 Completed 2017-11-28 2017-11-29 2017-12-21 2017-12-20 2018-01-11 2018-01-19 2018-01-31 2018-02-04 2018-02-25 2018-03-06 2018-03-20 nvelope cs Calendar for IDCOL ICS Pr ogram. G-11 UNDER REREDP-II AF / Procurement of 10 units of C Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 6,282.01 5,911.85 Completed 2018-01-10 2018-01-28 2018-01-21 2018-02-04 2018-01-28 2018-02-08 PU and 13 units of monitor fo tions nvelope r IDCOL HO and RE office G-19 UNDER GPOBA-II / Sup Request for Quota Single Stage - One E ply of Biogas stoves for IDCO IDA / 51580 Household Energy Post Limited 28,750.00 25,032.78 Completed 2018-05-24 2018-05-27 2018-05-31 2018-06-03 2018-06-30 2018-06-28 tions nvelope L Biogas & Bio-fertilizer Progr am. G-20 UNDER GPOBA-II / Sup Request for Quota Single Stage - One E ply of equipment for the Tec IDA / 51580 Household Energy Post Open - National 8,250.00 7,782.60 Completed 2018-06-05 2018-06-13 2018-06-14 2018-06-25 2018-06-28 tions nvelope hnical Monitoring Facility of I DCOL. G-21 UNDER GPOBA-II / Sup ply and fixation of furniture, f Request for Quota Single Stage - One E IDA / 51580 Household Energy Post Limited 36,880.00 25,588.37 Terminated 2018-07-12 2018-06-14 2018-07-19 2018-06-21 2018-07-26 ixture and equipment for IDC tions nvelope OL (17th floor-North). G-22 UNDER GPOBA-II / Sup Request for Quota Single Stage - One E ply of refrigerator for the Tec IDA / 51580 Household Energy Post Limited 1,880.00 990.77 Completed 2018-07-12 2018-05-24 2018-07-20 2018-06-03 2018-07-27 2018-06-06 tions nvelope hnical Monitoring Facilty of I DCOL G-05 UNDER USAID / Procure ment of 30 unit IP Phones, 10 Request for Quota Single Stage - One E TF / 15034 Access to Electricity Post Limited 2,812.00 2,602.48 Completed 2018-09-24 2018-09-25 2018-10-02 2018-10-01 2018-10-09 2018-10-04 unit network switch and 1 bo tions nvelope x CAT6 UTP cable for new reg ional offices of IDCOL G-06 UNDER USAID / Procure Request for Quota Single Stage - One E ment of 5 unit of LASER print TF / 15034 Access to Electricity Post Limited 4,687.00 3,006.91 Completed 2018-09-24 2018-09-25 2018-10-03 2018-09-30 2018-10-10 2018-09-30 tions nvelope ers for new regional offices o f IDCOL G-13 UNDER REREDII-AF / Su Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 5,250.00 3,433.07 Completed 2018-07-12 2018-07-12 2018-07-19 2018-07-19 2018-07-26 2018-07-25 pply of 3 unit of laser printer tions nvelope s for IDCOL G-14 UNDER REREDII-AF / Su Request for Quota Single Stage - One E pply of Batteries for Online U IDA / 55140 Access to Electricity Post Limited 5,750.00 4,985.58 Completed 2018-07-12 2018-07-26 2018-07-19 2018-08-02 2018-07-26 2018-08-11 tions nvelope PS and IPS of IDCOL G-09 UNDER REREDII-AFII / S upply of furniture, fixture and Single Stage - One E Pending Impl IDA / 55140 Sector Technical Assistance Post Request for Bids Open - National 1,262,500.00 0.00 2020-08-24 2020-08-29 2020-09-26 2020-10-26 2020-11-23 2021-05-22 office equipment for the new nvelope ementation office building of IDCOL G-15 UNDER REREDII-AF / Su Request for Quota Single Stage - One E pply and installation of Docu IDA / 55140 Access to Electricity Post Limited 6,875.00 5,545.59 Completed 2018-11-01 2018-11-09 2018-10-23 2018-11-16 2018-11-07 tions nvelope Dex server for IDCOL G-24 UNDER GPOBA-II / Sup Request for Quota Single Stage - One E ply of furniture, fixture and of IDA / 51580 Access to Electricity Post Limited 6,125.00 5,736.87 Completed 2018-11-01 2018-05-08 2018-11-11 2018-05-17 2018-11-18 2018-05-27 tions nvelope fice equipment in IDCOL Dha ka RO G-16 UNDER REREDP-II AF / Single Stage - One E Supply of thirty (30) units De IDA / 55140 Access to Electricity Post Request for Bids Open - National 18,750.00 19,016.42 Completed 2018-12-09 2019-01-10 2018-12-10 2019-01-09 2019-01-24 2019-02-04 2019-02-11 2019-03-07 2019-02-26 2019-03-22 2019-03-07 nvelope sktop Computer for IDCOL e mployees Page 1 G-06 UNDER REREDP-II AFII / Single Stage - One E Supply of Equipment (Phase- IDA / 62020 Access to Electricity Post Request for Bids Open - National 220,000.00 102,954.20 Completed 2018-12-09 2019-11-26 2018-12-10 2019-01-09 2019-12-10 2019-02-10 2020-02-18 2019-03-17 2020-06-15 2019-05-16 2021-01-11 nvelope 02) for IDCOL Technical Moni toring Facilities G-17 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply of two (02) units PoE IDA / 55140 Access to Electricity Post Limited 2,375.00 1,786.53 Completed 2018-12-10 2018-12-13 2018-12-19 2018-12-23 2018-12-26 2018-12-27 tions nvelope Switch & two (02) units Laser Printer for IDCOL G-23 UNDER GPOBA-II / Sup Request for Quota Single Stage - One E IDA / 51580 Household Energy Post Limited 875.00 643.70 Completed 2018-07-12 2018-06-05 2018-07-19 2018-06-14 2018-07-26 2018-06-24 ply of rechargeable table fan tions nvelope s for IDCOL. G-10 UNDER REREDP-II AF II / Framework Agreement for S Single Stage - One E IDA / 62020 Access to Electricity Post Request for Bids Open - National 71,822.63 0.00 Canceled 2018-12-26 2018-12-27 2019-01-17 2019-02-17 2019-03-19 2020-03-18 upply of Toners and Mainten nvelope ance Kit for printers of IDCOL G-11 UNDER REREDP-II AF II Single Stage - One E / Framework Agreement for S IDA / 62020 Access to Electricity Post Request for Bids Open - National 14,908.25 0.00 Canceled 2018-12-26 2018-12-27 2019-01-17 2019-02-17 2019-03-19 2020-03-18 nvelope upply of Stationary for IDCOL G-12 UNDER REREDII-AF-II / Supply of 190 units of Micros Request for Quota Single Stage - One E oft Exchange Online Plan-1 ( IDA / 62020 Access to Electricity Post Limited 10,000.00 8,410.98 Completed 2019-01-15 2019-01-13 2019-01-21 2019-01-21 2019-01-29 2019-01-31 tions nvelope EOP-1) & Office 365 Enterpris e E1 subscription license for I DCOL G-18 UNDER REREDP-II AF / Selection of Firm for Printing Request for Quota Single Stage - One E IDA / 55140 Household Energy Post Limited 1,062.50 0.00 Canceled 2019-04-04 2019-04-10 2019-04-30 Leaflet & Manuals for IDCOL tions nvelope Biogas & Bio-fertilizer progra m G-12 UNDER REREDP-II AF-II Single Stage - One E / Printing and Supply of 240, IDA / 62020 Household Energy Post Request for Bids Open - National 60,000.00 50,768.69 Completed 2019-03-04 2019-03-20 2019-03-09 2019-03-31 2019-04-04 2019-04-09 2019-04-21 2019-05-14 2019-05-19 2019-06-13 2019-06-10 nvelope 000 pcs of Calender for IDCO L ICS Program G-19 UNDER REREDP-II AF / Supply of Arsenic Kit for testi Request for Quota Single Stage - One E ng the arsenic level in potent IDA / 55140 Access to Electricity Post Limited 2,812.50 2,464.07 Completed 2019-03-26 2019-03-28 2019-04-21 2019-04-07 2019-05-02 2019-04-21 tions nvelope ial Solar Irrigation Pump Proj ect sites by IDCOL inspectors G-13 UNDER REREDP-II AF-II / Supply of thirty paper licens e of MS Office 2019 (standar Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 28,750.00 21,726.40 Completed 2019-03-29 2019-04-04 2019-04-18 2019-04-16 2019-04-30 2019-07-21 d), thirty paper license of Wi tions nvelope ndows 10 pro and Security fir ewall with UTM for 300 users of IDCOL HO & RE office G-14 UNDER REREDP-II AF-II / Supply of 120 SFT Roller Bli Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 6,125.00 2,860.00 Completed 2019-04-02 2019-04-02 2019-04-11 2019-04-10 2019-04-18 2019-04-18 nds Fabrics & 22 pcs Executi tions nvelope ve Chair for IDCOL HO 17 Flo or G-20 UNDER REREDP-II AF / Supply of 30 television and 3 0 refrigerators for disseminat IDA / 55140 Access to Electricity Post Direct Selection Direct 18,750.00 0.00 Canceled 2019-04-01 2019-04-02 2019-04-07 2019-04-11 ion in different solar mini-gri d project sites for demonstra tion of energy efficient applia nces G-15 UNDER REREDP-II AF-II Request for Quota Single Stage - One E / Supply of Attendance Devic IDA / 62020 Access to Electricity Post Limited 7,437.50 5,163.34 Completed 2019-05-05 2019-05-06 2019-05-13 2019-05-27 2019-05-20 2019-06-27 tions nvelope e for IDCOL Regional Offices G-21 UNDER REREDP-II AF / Supply of 02 units Hard Disk IDA / 55140 Access to Electricity Post Direct Selection Direct 875.00 862.91 Completed 2019-05-29 2019-02-25 2019-05-30 2019-02-26 2019-06-09 2019-03-03 2019-06-11 2019-03-07 for IBA system X3650 M4 Ser ver G-16 UNDER REREDP II AF II Request for Quota Single Stage - One E / Supply of 01 unit 6KVA onli IDA / 62020 Access to Electricity Post Limited 4,375.00 2,907.70 Completed 2019-06-09 2019-06-17 2019-06-20 2019-06-27 2019-06-30 2019-07-07 tions nvelope ne UPS for server room of ID COL Dhaka RO G-17 UNDER RERED-II-AF-II / Request for Quota Single Stage - One E Printing and Supply of Biogas IDA / 62020 Household Energy Post Limited 6,875.00 3,473.42 Completed 2019-06-24 2019-06-18 2019-07-02 2019-07-15 2019-07-09 2019-09-04 tions nvelope Manuals for IDCOL G-18 UNDER REREDP-II AFII / Single Stage - One E Supply of 20 Motorcycles for IDA / 62020 Access to Electricity Post Request for Bids Open - National 45,000.00 0.00 Canceled 2019-08-29 2019-09-03 2019-09-24 2019-11-07 2019-11-28 2019-12-29 nvelope new regional managers G-19 UNDER REREDP-II AFII / Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 2,406.25 1,609.76 Completed 2019-08-22 2019-08-19 2019-09-02 2019-08-26 2019-09-09 2019-08-29 Supply of 35 units IP Phones tions nvelope G-20 UNDER REREDP-II AFII / Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 9,225.00 6,720.92 Completed 2019-08-04 2019-10-13 2019-08-19 2019-10-17 2019-08-26 2019-10-31 Supply of 41 units IPS Batter tions nvelope y G-21 UNDER REREDP-II AFII / Request for Quota Single Stage - One E Supply of 254 units of mobile IDA / 62020 Access to Electricity Post Limited 41,275.00 0.00 Canceled 2019-08-05 2019-08-27 2019-09-03 tions nvelope phones for field staffs G-22 UNDER REREDP-II AFII / Request for Quota Single Stage - One E Supply of 7 units Laptops for IDA / 62020 Access to Electricity Post Limited 6,125.00 5,671.33 Completed 2019-08-08 2019-08-22 2019-08-24 2019-08-28 2019-08-31 2019-08-31 tions nvelope IDCOL HO employees G-23 UNDER REREDP-II AFII / Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 1,875.00 1,400.44 Completed 2019-08-19 2019-09-29 2019-08-27 2019-10-06 2019-09-03 2019-10-10 Supply of 25 units IP Camera tions nvelope G-24 UNDER REREDP-II AFII / Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 312.50 0.00 Canceled 2019-08-26 2019-09-03 2019-09-10 Supply of 10 pcs Analog Hydr tions nvelope ometer G-25 UNDER REREDP-II AFII / Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 6,250.00 0.00 Canceled 2019-09-09 2019-09-17 2019-09-24 Supply of 2 pcs Digital Batter tions nvelope y Tester G-22 UNDER REREDP-II / Sup Request for Quota Single Stage - One E ply of 40 units Tablet for tech IDA / 62020 Access to Electricity Post Limited 7,500.00 0.00 Canceled 2019-10-03 2019-10-14 2019-10-21 tions nvelope nical inspectors G-23 UNDER REREDP-II AF / Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 10,275.00 0.00 Canceled 2019-09-02 2019-09-10 2019-09-18 Supply of 137 units Multimet tions nvelope er Page 2 G-24 UNDER REREDP-II AF / Supply of 05 units Printers, 1 Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 16,500.00 12,689.43 Completed 2019-08-04 2019-08-25 2019-08-19 2019-09-01 2019-08-29 2019-09-03 unit Photocopier Machine an tions nvelope d 03 units Projectors G-25 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply of 01 unit attendance IDA / 55140 Access to Electricity Post Limited 875.00 706.40 Completed 2019-08-04 2019-08-05 2019-08-08 2019-08-21 2019-08-18 2019-08-31 tions nvelope device for IDCOL office space G-28 UNDER REREDP-II AF / Single Stage - One E Selection of firm for Supply & IDA / 55140 Access to Electricity Post Request for Bids Open - National 60,625.00 47,843.34 Completed 2019-10-24 2019-11-26 2019-10-29 2019-11-19 2019-12-18 2019-12-19 2020-02-18 2020-01-23 2020-06-17 2020-02-22 2020-10-11 nvelope Installation of VRF AC G-26 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply of 07 (seven) units La IDA / 55140 Access to Electricity Post Limited 4,500.00 4,220.95 Completed 2019-10-03 2018-07-31 2019-10-09 2018-08-02 2019-10-16 2018-08-06 tions nvelope ptop for IDCOL officials G-27 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply and Installation of 03 IDA / 55140 Access to Electricity Post Limited 4,250.00 2,942.91 Completed 2019-10-03 2018-07-31 2019-10-09 2018-08-05 2019-10-16 2018-08-08 tions nvelope units IPS with Batteries for ID COL G-29 UNDER REREDP II AF / Supply of nine units 2KVA IPS Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 7,875.00 7,058.20 Completed 2019-11-28 2020-02-19 2019-12-05 2020-03-01 2019-12-15 2020-03-10 with maintenance-free batter tions nvelope y for new IDCOL Regional Offi ces G-26 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Printing of 30,000 pcs New IDA / 62020 Household Energy Post Limited 6,125.00 6,619.67 Completed 2019-12-12 2019-12-08 2019-12-20 2019-12-12 2019-12-27 2019-12-29 tions nvelope Year Calendars for IDCOL Bio gas Program G-27 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Printing of 200,000 pcs of le IDA / 62020 Household Energy Post Limited 3,750.00 4,033.26 Completed 2019-12-16 2019-12-23 2019-12-24 2019-12-29 2020-01-03 2020-01-09 tions nvelope aflets for IDCOL Biogas Progr am G-28 UNDER REREDP-II-AF-II Request for Quota Single Stage - One E / Printing and Supply of 5000 IDA / 62020 Access to Electricity Post Limited 1,875.00 0.00 Canceled 2020-03-02 2020-03-09 2020-03-16 tions nvelope Pcs of Brochures for SIP G-29 UNDER REREDII-AFII / S upply and Installation of 1 un IDA / 62020 Access to Electricity Post Direct Selection Direct 288.00 0.00 Canceled 2020-03-05 2020-03-08 2020-03-11 2020-03-18 it of Attendance Device for ID COL G-30 UNDER REREDII-AFII / P Single Stage - One E rinting & Supply of 300000 P IDA / 62020 Household Energy Post Request for Bids Open - National 75,000.00 0.00 Canceled 2020-03-08 2020-03-08 2020-03-22 2020-04-21 2020-05-26 2020-06-25 nvelope cs of Calendars for IDCOL ICS Program G-31 UNDER REREDII-AFII / P Single Stage - One E rinting and Supply of Books o IDA / 62020 Household Energy Post Request for Bids Open - National 31,250.00 0.00 Canceled 2020-04-15 2020-04-16 2020-05-07 2020-06-06 2020-07-11 2020-08-20 nvelope n R&D Activities of Renewabl e Energy of IDCOL G-30 UNDER REREDII-AF / Su Request for Quota Single Stage - One E IDA / 55140 Access to Electricity Post Limited 9,125.00 7,573.94 Completed 2020-08-17 2020-08-18 2020-08-22 2020-08-26 2020-08-27 2020-09-02 pply of 10 units of Laptop for tions nvelope IDCOL G-32 UNDER REREDP-II AF-II Request for Quota Single Stage - One E / Supply of Video Conferencin IDA / 62020 Access to Electricity Post Limited 10,000.00 0.00 Canceled 2020-09-06 2020-11-01 2020-12-01 tions nvelope g Equipment G-33 UNDER REREDP-II AF II Single Stage - One E / Supply of 2,790 pcs signage IDA / 62020 Household Energy Post Request for Bids Open - National 89,063.00 97,449.34 Signed 2020-09-27 2020-10-04 2020-10-04 2021-09-13 2020-10-18 2020-10-25 2020-11-17 2021-01-11 2020-12-22 2021-02-28 2021-06-20 nvelope for IDCOL ICS Program (3 Lot s) G-34 UNDER REREDP-II AF II Single Stage - One E Pending Impl / Printing of 300,000 pcs Cale IDA / 62020 Household Energy Post Request for Bids Open - National 62,500.00 0.00 2020-09-27 2020-10-04 2020-10-18 2020-11-17 2020-12-22 2021-01-06 nvelope ementation ndars for IDCOL ICS Program G-35 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Supply of 2,500 pcs cap for IDA / 62020 Household Energy Post Limited 2,344.00 0.00 Canceled 2020-10-06 2020-10-18 2020-11-02 tions nvelope IDCOL ICS Program G-36 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Supply of 750 pcs bag for ID IDA / 62020 Household Energy Post Limited 7,031.00 4,342.72 Completed 2020-10-09 2021-02-15 2020-10-21 2021-02-25 2020-11-05 2021-02-28 tions nvelope COL ICS Program G-37 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Supply of 2,500 pcs T-shirt f IDA / 62020 Household Energy Post Limited 7,813.00 4,021.16 Completed 2020-10-23 2020-12-27 2020-11-03 2021-01-11 2020-12-03 2021-02-09 tions nvelope or IDCOL ICS Program G-39 UNDER REREDP-II AF II Single Stage - One E IDA / 62020 Access to Electricity Post Request for Bids Open - National 64,375.00 0.00 Canceled 2020-11-18 2020-11-23 2020-12-07 2021-01-06 2021-02-10 2021-03-12 / Supply of 93 units Desktop nvelope Computer G-31 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply of 40 units IP phones IDA / 55140 Access to Electricity Post Limited 11,125.00 0.00 Canceled 2020-10-06 2020-10-20 2020-11-04 tions nvelope & 7 units switch G-32 UNDER REREDP-II AF / Request for Quota Single Stage - One E Supply of 2 units projector & IDA / 55140 Access to Electricity Post Limited 9,000.00 3,939.73 Completed 2020-11-23 2021-03-23 2020-12-06 2021-03-29 2020-12-21 2021-04-04 tions nvelope 7 units scanner G-41 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Access to Electricity Post Limited 10,500.00 0.00 2020-11-06 2020-11-19 2020-12-04 / Supply of 200 units MS Exc tions nvelope ementation hange online G-33 UNDER REREDP-II AF / Request for Quota Single Stage - One E Pending Impl IDA / 55140 Access to Electricity Post Limited 20,000.00 0.00 2020-10-11 2020-10-24 2020-11-23 Supply of 2 units server tions nvelope ementation G-44 UNDER REREDP-II AF-II Request for Quota Single Stage - One E / Supply of 180 units MS EOP- IDA / 62020 Access to Electricity Post Limited 10,625.00 8,576.57 Completed 2021-02-01 2020-01-09 2021-02-07 2020-01-15 2021-02-22 2020-01-28 tions nvelope 1 License and 10 units MS Of fice 365 E-1 G-45 UNDER REREDII-AFII / P Request for Quota Single Stage - One E rinting and Supply of Books o IDA / 62020 Household Energy Post Open - National 12,500.00 3,009.97 Completed 2021-06-10 2021-06-19 2021-08-26 2021-07-01 2021-11-03 tions nvelope n R&D Activities of Renewabl e Energy of IDCOL G-46 UNDER REREDP-II AF-II / Supply of 6KVA online UPS, Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 5,750.00 5,387.36 Completed 2021-08-23 2021-09-15 2021-09-16 2021-09-20 2021-09-26 2021-09-23 battery, cabinet, installation tions nvelope with all related accessories Page 3 G-47 UNDER REREDP-II AF-II Request for Quota Single Stage - One E Pending Impl / Supply of 20 Desktop PC for IDA / 62020 Access to Electricity Post Open - National 15,125.00 0.00 2021-09-06 2021-10-05 2021-10-20 tions nvelope ementation IDCOL HO & RE G-48 UNDER REREDP-II AF-II Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 10,000.00 7,114.88 Completed 2021-08-27 2021-08-29 2021-09-11 2021-09-07 2021-09-18 2021-09-21 / Supply of 07 printers for ID tions nvelope COL G-49 UNDER REREDP-II AF-II Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 15,000.00 9,337.49 Completed 2021-08-31 2021-08-29 2021-09-27 2021-09-07 2021-10-27 2021-09-08 / Supply of 02 units photocop tions nvelope ier machine G-50 UNDER REREDP-II AF II Request for Quota Single Stage - One E IDA / 62020 Household Energy Post Limited 5,500.00 3,860.66 Completed 2021-10-08 2021-10-14 2021-10-18 2021-10-19 2021-11-17 2021-10-24 / Supply of Kaspersky Antivir tions nvelope us Licenses G-38 UNDER REREDP-II AF II Single Stage - One E Under Imple / Supply of Leaflets and User IDA / 62020 Household Energy Post Request for Bids Open - National 72,500.00 0.00 2020-11-05 2022-04-13 2020-11-10 2022-09-01 2020-12-22 2022-05-09 2021-01-21 2022-07-26 2021-02-25 2021-03-27 nvelope mentation Manuals for IDCOL ICS Progra m G-51 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Supply of umbrellas for IDC IDA / 62020 Household Energy Post Limited 11,250.00 7,059.03 Completed 2021-11-05 2021-12-12 2021-11-17 2022-01-06 2021-12-02 2022-01-31 tions nvelope OL ICS Program G-52 UNDER REREDP-II AF II Single Stage - One E Under Imple / Supply of Mic with Amplifier IDA / 62020 Household Energy Post Request for Bids Open - National 40,500.00 0.00 2021-11-01 2022-04-13 2021-11-06 2022-05-10 2021-11-20 2021-12-20 2022-01-13 2022-02-12 nvelope mentation for IDCOL ICS Program G-53 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl / Supply of Laptop for IDCOL IDA / 62020 Access to Electricity Post Limited 3,000.00 0.00 2021-12-06 2021-12-26 2022-01-10 tions nvelope ementation Regional Offices G-54 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Access to Electricity Post Limited 5,250.00 0.00 2021-10-31 2021-11-18 2021-11-25 / Supply of attendance devic tions nvelope ementation es for IDCOL G-42 UNDER REREDP-II AF II Request for Quota Single Stage - One E IDA / 62020 Access to Electricity Post Limited 5,400.00 3,181.69 Completed 2020-11-30 2021-12-22 2020-12-13 2022-01-06 2020-12-28 2022-01-12 / Supply of MS Office 365 lice tions nvelope nses G-40 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Access to Electricity Post Limited 48,750.00 0.00 2020-11-09 2020-11-22 2020-12-07 / Supply of Windows 11 for ID tions nvelope ementation COL G-43 UNDER REREDP-II AF II / Lot 1: Supply of 01 unit MS Request for Quota Single Stage - One E Pending Impl windows server 2019 standar IDA / 62020 Household Energy Post Limited 36,250.00 0.00 2020-11-16 2020-11-29 2020-12-14 tions nvelope ementation d Lot 2: Supply of 02 units MS SQL Server 2019 enterprise G-55 UNDER REREDP-II AF-II Request for Quota Single Stage - One E IDA / 62020 Household Energy Post Limited 8,200.00 5,969.68 Completed 2021-12-12 2022-01-26 2022-01-02 2022-02-08 2022-01-17 2022-02-27 / Supply of batteries for IPS tions nvelope G-56 UNDER REREDP-II AF II Request for Quota Single Stage - One E / Supply of PoE Switch for ID IDA / 62020 Household Energy Post Limited 1,500.00 1,290.71 Completed 2021-12-12 2021-12-26 2021-12-27 2022-01-06 2022-01-11 2022-01-24 tions nvelope COL Regional Offices G-57 UNDER REREDP-II AF II / Supply of 210 users MS 365 Request for Quota Single Stage - One E Business Basic, 10 users Offi IDA / 62020 Household Energy Post Limited 8,750.00 6,562.49 Completed 2022-01-16 2022-01-12 2022-01-28 2022-01-20 2022-02-04 2022-01-24 tions nvelope ce 365 EI & 10 users license of Exchange Online Archiving for IDCOL HO, RE & RO G-58 UNDER REREDP-II AF II / Supply of 6KVA Online UPS i Request for Quota Single Stage - One E Under Imple IDA / 62020 Access to Electricity Post Limited 4,375.00 0.00 2022-04-15 2022-05-08 2022-05-03 2022-06-02 ncluding battery for IDCOL D tions nvelope mentation haka Regional Office G-59 UNDER REREDP-II AF II Request for Quota Single Stage - One E Under Imple / Procurement of 02 (two) uni IDA / 62020 Household Energy Post Limited 13,000.00 0.00 2022-07-23 2022-08-03 2022-08-04 2023-01-31 tions nvelope mentation ts of 6KVA online ups with Ba ttery G-60 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Household Energy Post Limited 5,500.00 0.00 2022-08-26 2022-09-10 2023-03-09 / Supply of 10 (ten) units CIS tions nvelope ementation CO IP Phone G-61 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Household Energy Post Limited 350.00 0.00 2022-08-29 2022-09-18 2023-03-17 / Supply of IP Camera tions nvelope ementation G-62 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl / Supply of Physical server wi IDA / 62020 Household Energy Post Limited 16,250.00 0.00 2022-09-02 2022-09-16 2023-03-15 tions nvelope ementation th Windows Server 2022 Sta ndard G-63 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Household Energy Post Limited 6,000.00 0.00 2022-10-11 2022-10-23 2022-10-31 / Renewal of Antivirus Licens tions nvelope ementation e 2022-23 G-64 UNDER REREDP-II AF II Request for Quota Single Stage - One E Pending Impl IDA / 62020 Household Energy Post Limited 4,500.00 0.00 2022-11-05 2022-12-02 2023-05-31 / Procurement of Monitor tions nvelope ementation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NS-03 UNDER REREDPII-AF / Selection of Firm for Battery IDA / 55140 Access to Electricity Post Direct Selection Direct 20,000.00 38,145.18 Signed 2018-02-22 2018-01-10 2018-02-27 2018-01-16 2018-03-22 2018-02-01 2018-12-31 Testing under IDCOL Other R E Program (Package No.: NS- 03 under REREDPII-AF) NS-05 UNDER REREDII-AFII / Selection of Firm for Collectin g Power Quality Data of Tran IDA / 62020 Access to Electricity Post Direct Selection Direct 5,000.00 4,768.15 Completed 2018-11-05 2018-11-05 2018-11-08 2018-11-08 2018-11-16 2018-12-04 2018-12-11 2019-01-03 smission Line of Two Power P lants of SEBL SMG Project-2 NS-06 UNDER REREDPII-AFII / Selection of Firm for providi IDA / 62020 Access to Electricity Post Direct Selection Direct 57,500.00 0.00 Canceled 2018-11-08 2018-11-12 2018-11-27 2019-11-27 ng Billboard Display Service t o promote IDCOL Programs a nd Projects CONSULTING FIRMS Page 4 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-16 UNDER RERED-II-AF-II / Selection of firm for developi Consultant Qualifi ng the communication strate IDA / 62020 Household Energy Post Open - National 43,750.00 26,442.51 Completed 2018-06-24 2018-06-04 2018-07-09 2018-07-20 2018-08-16 2018-07-27 2018-10-24 2018-08-06 2018-11-19 2018-11-04 2019-10-28 cation Selection gy for IDCOL ICS program (pr ocurement method: CQS with Limited Market approach) S-06 UNDER USAID / Audit s ervices for solar Irrigation Pu Consultant Qualifi TF / 15034 Access to Electricity Post Open - National 50,000.00 44,992.22 Completed 2018-10-31 2018-10-07 2018-11-14 2021-10-05 2018-12-13 2019-01-03 2018-12-18 2019-01-31 2018-12-20 2019-02-10 2019-04-30 2022-03-16 mp (SIP) and solar Mini-Grid ( cation Selection SMG) sponsors of IDCOL S-21 UNDER REREDII-AFII / C onsulting firm for the interior Consultant Qualifi Pending Impleme IDA / 62020 Sector Technical Assistance Post Open - National 125,000.00 0.00 2020-04-05 2020-04-26 2020-06-14 2020-07-09 2020-07-29 2021-01-25 design and supervision of de cation Selection ntation coration of new office buildin g of IDCOL S-20 UNDER REREDII-AFII / A consulting firm for Architectu Consultant Qualifi IDA / 62020 Sector Technical Assistance Post Open - National 250,000.00 335,869.54 Signed 2018-11-20 2018-08-31 2018-12-10 2018-12-17 2019-01-09 2019-01-16 2019-05-15 2019-02-16 2019-06-24 2021-05-13 ral and Structural design and cation Selection work supervision of IDCOL's new office building S-24 UNDER REREDP-II AFII / Quality And Cost- Pending Impleme Selection of a firm for designi IDA / 62020 Access to Electricity Post Open - National 25,000.00 0.00 2019-10-01 2019-10-22 2019-11-26 2019-12-24 2020-01-08 2020-01-26 2020-03-01 2020-05-31 Based Selection ntation ng process flow automation o f IDCOL S-29 UNDER REREDP-II AF II Quality And Cost- / Selection of consultant for p IDA / 62020 Household Energy Post Open - National 250,000.00 0.00 Canceled 2021-12-15 2021-12-22 2022-01-05 2022-02-18 2022-03-18 2022-04-17 2022-05-22 2022-06-26 2024-06-25 Based Selection romoting IDCOL ICS Program S-31 UNDER REREDP-II AF II Quality And Cost- Open - Internationa Pending Impleme / Selection of Consultant for IDA / 62020 Household Energy Post 500,000.00 0.00 2022-10-11 2022-10-16 2022-12-25 2023-01-22 2023-02-21 2023-03-28 2023-05-02 2023-12-31 Based Selection l ntation promoting IDCOL ICS Progra m S-32 UNDER REREDP-II AF II / Selection of consultant for fi Quality And Cost- Pending Impleme IDA / 62020 Household Energy Post Open - National 250,000.00 0.00 2022-10-12 2022-11-02 2022-12-16 2023-01-13 2023-02-12 2023-03-19 2023-04-23 2023-12-31 eld-level sales campaign und Based Selection ntation er IDCOL ICS Program INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDCOL S-13 / Technical Cons ultant for Biogas Based Capti IDA / 51580 Access to Electricity Prior Direct Selection Direct 0.00 155,946.05 Canceled ve Plant - Draft Negotiated C ontract S-11 UNDER GPOBA-II FOR R EREDPII / Selection of Individ Individual Consult ual Consultant for developme IDA / 51580 Household Energy Post Open 2,560.00 2,248.94 Completed 2017-12-10 2018-01-22 2018-01-04 2018-02-05 2018-01-11 2018-02-07 2018-01-28 2018-02-11 2018-02-27 2018-09-04 ant Selection nt of PO Module software und er IDCOL Biogas program S-09 UNDER GPOBA-II FOR R EREDPII / Selection of Individ ual Consultant for Developm Individual Consult IDA / 51580 Access to Electricity Post Open 24,400.00 23,840.74 Completed 2017-11-30 2018-01-23 2017-12-18 2018-02-28 2017-12-25 2018-03-01 2018-01-17 2018-03-05 2018-06-16 2018-09-27 ent and Publication of Press ant Selection News about IDCOL Programs & Project (Package No.: S-09 under GPOBA-II) S-12 UNDER GPOBA-II / Sele ction of Individual Consultant for the Design of Low-cost Bri Individual Consult IDA / 51580 Household Energy Post Open 11,000.00 10,768.00 Completed 2018-02-20 2018-02-18 2018-03-05 2018-02-19 2018-03-12 2018-03-08 2018-04-03 2018-03-11 2018-04-23 2018-04-20 ck-cement Based Biogas Plan ant Selection t under IDCOL Biogas & Bio-f ertilizer Program (Package N o.: S-12 under GPOBA-II) S-24 UNDER REREDPII-AF / S election of firm for conductin g impact assessment of solar IDA / 55140 Access to Electricity Post Direct Selection Direct 108,000.00 126,115.99 Completed 2018-02-22 2018-02-25 2017-10-30 2018-03-10 2018-02-22 2018-12-31 2019-11-24 irrigation, solar mini-grid and ICS Projects of IDCOL (Packa ge No.: S-24 under REREDPII- AF) S-13 UNDER GPOBA-II / Sele ction of Individual Consultant Individual Consult for development of 'Construc IDA / 51580 Household Energy Post Open 3,500.00 3,046.31 Completed 2018-03-01 2018-04-08 2018-03-09 2018-04-15 2018-03-14 2018-04-26 2018-03-22 2018-04-26 2018-05-06 2018-06-27 ant Selection tion Manual' and 'User Manu al' under IDCOL Biogas & Bio -fertilizer Program. S-14 UNDER GPOBA-II / Sele ction of Individual Consultant for the development of onlin Individual Consult IDA / 51580 Household Energy Post Direct 1,400.00 1,218.52 Completed 2018-04-05 2018-03-12 2018-04-10 2018-04-10 2018-04-20 2018-04-22 2018-05-08 2018-04-22 2018-11-04 2018-10-21 e-based PO Data Entry Softw ant Selection are for larger plants under ID COL Biogas & Bio-fertilizer pr ogram. S-17 UNDER RERED-II-AF-II / Selection of individual consul Individual Consult tant for development of a soc IDA / 62020 Household Energy Post Limited 4,380.00 3,814.52 Terminated 2018-10-08 2018-10-04 2018-10-23 2018-10-10 2018-10-28 2018-10-17 2018-11-05 2018-10-24 2019-01-19 ant Selection iocultural program to promot e woodlot plantation under I DCOL ICS Program. S-18 UNDER RERED-II-AF-II / Selection of Individual Consul Individual Consult tant for the Development of IDA / 62020 Household Energy Post Limited 5,625.00 5,483.37 Completed 2018-10-15 2018-10-15 2018-10-30 2018-10-25 2018-11-04 2018-10-28 2018-11-08 2018-11-12 2019-02-06 2019-08-04 ant Selection Mobile Application Based Ins pection system under IDCOL ICS Program. S-22 UNDER REREDP-II AF / Selection of Technical Consul Individual Consult IDA / 55140 Access to Electricity Post Limited 6,250.00 0.00 Canceled 2018-01-15 2018-01-20 2018-02-10 2018-02-25 2018-05-26 tant under IDCOL Biomass pr ant Selection ogram (under Renewable En ergy Project) Page 5 S-19 UNDER REREDII-AFII / Fi rm for arranging a design co mpetition to select a firm for IDA / 62020 Sector Technical Assistance Post Direct Selection Direct 37,500.00 7,004.44 Completed 2018-10-31 2018-05-15 2018-11-06 2018-05-15 2018-11-20 2018-05-15 2019-11-20 2018-12-20 architectural and structural d esign work of new office buil ding of IDCOL S-26 UNDER REREDP-II AF / Selection of Individual Consul Individual Consult IDA / 55140 Household Energy Post Limited 937.50 882.92 Completed 2019-01-14 2018-12-10 2019-01-16 2019-01-27 2019-01-20 2019-02-04 2019-01-23 2019-02-07 2019-03-30 2019-02-27 tant for Designing Leaflet & ant Selection Manuals for IDCOL Biogas & Bio-fertilizer program S-22 UNDER REREDP-II AF-II Individual Consult / Individual Consultant to dev IDA / 62020 Household Energy Post Direct 56,250.00 58,364.55 Signed 2019-03-04 2019-04-07 2019-03-11 2019-05-05 2019-03-25 2019-05-22 2019-03-31 2019-05-30 2020-02-29 ant Selection elop domestic and commerci al stoves S-23 UNDER REREDP-II AF-II IDA / 62020 Household Energy Post Direct Selection Direct 312.50 294.31 Completed 2019-03-05 2019-03-17 2019-03-08 2019-03-14 2019-03-21 2019-03-20 2019-03-31 2019-03-31 / Design of Biogas Manual S-27 UNDER REREDP-II AF / Selection of Individual Consul tant for developing mobile ap Individual Consult plication for inspection of Sol IDA / 55140 Access to Electricity Post Limited 12,500.00 0.00 Canceled 2019-09-01 2019-09-05 2019-09-08 2019-09-12 2019-10-13 ant Selection ar Irrigation & Solar-Minigrid with web service and option f or integrating other project-r elated inspection templates S-25 UNDER REREDP-II AFII / Selection of Firm to measure personal exposure to Househ IDA / 62020 Household Energy Post Direct Selection Direct 220,502.00 220,477.00 Signed 2019-10-06 2020-07-02 2019-10-16 2020-07-13 2019-11-12 2020-07-14 2020-05-10 old Air Pollution (HAP) and st ove usage patterns associate d with transition to ICS under IDCOL ICS Program S-26 UNDER REREDII-AFII / S election of Consultant for Do IDA / 62020 Household Energy Post Direct Selection Direct 15,000.00 13,573.32 Completed 2020-03-15 2020-02-04 2020-03-19 2020-02-05 2020-04-14 2020-06-21 2020-07-13 2020-11-05 cumenting R&D Activities on Renewable Energy of IDCOL S-27 UNDER REREDP-II AF II / Developing a web-based sof Individual Consult tware for online enlistment of IDA / 62020 Access to Electricity Post Limited 15,000.00 0.00 Canceled 2020-09-23 2020-09-24 2020-09-29 2020-10-06 2021-04-04 ant Selection solar products under IDCOL r enewable energy programs S-28 UNDER REREDP-II AF II / Selection of consultant for I Individual Consult IDA / 62020 Household Energy Post Limited 5,625.00 5,071.73 Signed 2020-10-22 2021-03-07 2020-10-29 2021-03-01 2020-11-08 2021-03-15 2020-12-13 2021-03-24 2021-06-11 DCOL ICS program inspection ant Selection app improvement S-30 UNDER REREDP-II AF II Individual Consult Under Implement / Selection of consultant for a IDA / 62020 Household Energy Post Limited 10,000.00 0.00 2022-07-24 2022-10-10 2022-07-29 2022-08-19 2022-09-23 2023-09-23 ant Selection ation chieving gender targets unde r ICS Program S-33 UNDER REREDP-II AF II / Selection of an Individual C Individual Consult Pending Impleme IDA / 62020 Access to Electricity Post Limited 3,000.00 0.00 2022-10-12 2022-10-17 2022-10-24 2022-11-05 2023-05-04 onsultant to inspect the upda ant Selection ntation ted technical standard for SIP projects Page 6