The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) EAST ASIA AND PACIFIC | China | Environment, Natural Resources & the Blue Economy Global Practice | Requesting Unit: EACCF | Responsible Unit: SEAE1 IBRD/IDA | Program-for-Results Financing | FY 2022 | Team Leader(s): Jian Xie, Liping Jiang Seq No: 2 | ARCHIVED on 14-Dec-2022 | ISR54056 | Created by: Xieli Bai on 27-Nov-2022 | Modified by: Xieli Bai on 11-Dec-2022 Program Development Objectives PDO Table Program Development Objective (from Program Appraisal Document) To strengthen integrated water use efficiency, water pollution control, and ecosystem management, in selected regions of the Yellow River Basin Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Implementation Status and Key Decisions The Program is not yet effective. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed Not P172806 IBRD-93540 USD 380.00 380.00 0.00 0.00 380.00 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Not P172806 IBRD-93540 31-Mar-2022 -- -- 31-Dec-2027 31-Dec-2027 Effective Program Action Plan Provide regular training for the staff maintaining the town and village sewage treatment facilities focusing on OHS and Action Description other E&S impacts associated with poor O&M Source DLI# Responsibility Timing Timing Value Status Environmental and Social Provincial and/or Recurrent Semi-Annually Not Yet Due Systems municipal PMOs 12/14/2022 Page 1 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Completion Measurement Semiannual progress reports are submitted to the Bank, including the implementation of related trainings Comments Program not yet effective Establish monitoring and reporting mechanisms for meaningful public participation and GRM, and strengthen Action Description information and documentation management during the Program social risk management Source DLI# Responsibility Timing Timing Value Status Environmental and Social Provincial and/or Recurrent Semi-Annually Not Yet Due Systems municipal PMOs Semi-annual reports are submitted to the Bank, including information of land selection/screening, or approvals, Completion Measurement information disclosure records and public participation, GRM establishment and operation, and support to vulnerable groups Comments Program not yet effective Prepare and issue guidance note on evaluation criteria and weightings for bid evaluation of contracts where Action Description comprehensive scoring method is used Source DLI# Responsibility Timing Timing Value Status BPMO, provincial Within six months from Fiduciary Systems and/or municipal Other the date of Not Yet Due PMOs effectiveness Completion Measurement Preparation and issuance of guidance on evaluation criteria Comments Program not yet effective Provide detailed procurement related complaint handling procedures to supplement the general description in SBDs Action Description for preparation of procurement documents under the Program. Source DLI# Responsibility Timing Timing Value Status BPMO, provincial Within six months from Fiduciary Systems and/or municipal Other the date of Not Yet Due PMOs effectiveness Standard language on procurement related complaint handling procedures to be added into issued procurement Completion Measurement documents Comments Program not yet effective Action Description Develop and issue a guideline about the preparation and presentation of Program financial statements Source DLI# Responsibility Timing Timing Value Status BPMO, provincial Before the first Fiduciary Systems and/or municipal Other Program financial Not Yet Due PMOs statements year end 12/14/2022 Page 2 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Completion Measurement Finalized official guideline provided to the Bank Comments Program not yet effective Action Description Develop an audit Terms and Reference for the Program financial statements audit Source DLI# Responsibility Timing Timing Value Status BPMO, provincial Before the first Fiduciary Systems and/or municipal Other Program financial Not Yet Due PMOs statements audit Completion Measurement TORs shared and approved by the Bank. Comments Program not yet effective Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Low Low Low Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial Substantial Stakeholders Substantial Substantial Substantial Other Low Low Low Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes To improve integrated water use efficiency, water pollution control, and ecosystem management IN01222183 ►1. Agricultural water productivity increased (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 12/14/2022 Page 3 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Henan: 2.06; Shaanxi: Program not yet Henan: 2.49; Shaanxi: Value Program not yet effective 1.50 effective 2.20 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Measured as the agricultural output (in metric tons) per unit (thousand cubic meters) of water consumption Comments in demonstration sub-basins. IN01222184 In Henan (Metric ton, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 2.06 2.06 2.06 2.49 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 IN01222185 In Shaanxi (Metric ton, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 1.50 1.50 1.50 2.20 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 IN01222191 ►2. Pollutant loads reduced (Tons/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 553.61 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Annual pollutant (COD) reduced from point and NPS in the demonstration sub-basins due to Program activities, including (i) upgrading or building new WWTPs and pipelines; (ii) new rural household Comments connections to decentralized wastewater treatment facilities; and/or (iii) livestock farms equipped with manure treatment facilities IN01222192 ►3. Reduction of soil erosion per km2 (Tons/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 480.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 This indicator highlights the improvement in ecological functions as a result of Program interventions, reflected in the increase of soil water holding capacity, and the subsequent reduction of soil loss and water Comments runoff, at demonstration sub-basins. The indicator measures accumulated reduction of soil loss intensity with respect to the baseline year. IN01222193 ►4. Capacity of YRCC to support integrated ecosystem and water resources management of the YRB (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value Capacity of YRCC to Program not yet effective Program not yet YRCC issues a support integrated effective technical guideline for ecosystem and water integrated ecosystem resources management of and water resources the YRB not developed management in the YRB based on consumption based water balance 12/14/2022 Page 4 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) assessment and modeling Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 This DLI addresses challenges of institutional strengthening and inter-jurisdictional cooperation by working at the YRB level, incentivizing upscaling and integration of results from provincial to basin level, and Comments promoting a paradigm shift in the way water resources are assessed. The three results included in this indicator will strengthen YRCC's capacity to manage and integrate ecosystem and water resources into planning and decision-making at the YRB. Intermediate Results Indicators by Results Areas Improving water use efficiency IN01222194 ►1. Areas with improved agricultural water management (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 62,000.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Defined as the areas within the demonstration sub-basins (in hectares) with improved agricultural water Comments management - both through irrigation modernization and improved agronomic practices IN01222198 ►2. Target Value Allocation Plans agreed and implemented in demonstration sub-basins (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Henan: 0 Shaanxi: 0 Program not yet Henan: 3 Shaanxi: 2 Value Program not yet effective effective Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Target Values (ET and EC) established and agreed for the demonstration sub-basins; and target values identified for specific counties within the sub-basins; Allocation Plans prepared and implemented to reduce total water consumption under the target ET and to reduce pollutant loads under the target EC; Monitoring Comments system in place to measure actual water consumption and pollution load reduction under the Allocation Plan implementation. Target ET refers to the sustainable limit of water consumption, and target EC refers to the maximum pollutant load under certain water quality requirement. IN01222202 ►3. Women leadership in WUAs (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 16.00 16.00 16.00 40.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Percentage of females in executive bodies of WUA (chair/co-chair, or members of the executive Comments committees) Improving water quality IN01222195 ►4. Wastewater treatment plants upgraded or built (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 12/14/2022 Page 5 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Value 0.00 0.00 0.00 21.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 This indicator includes both upgraded and newly built WWTPs in demonstration sub-basins. Number of wastewater treatment plants with effluent discharge standard upgraded from Class 1A; treatment capacity of Comments newly built WWTPs cannot exceed 50,000 tonnes per day. Climate-resilient designs will be incorporated in constructing or upgrading WWTPs. IN01222199 ►5. Rural households connected to decentralized wastewater treatment facilities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 21,612.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Number of rural households connected to decentralized wastewater treatment facilities in demonstration Comments sub-basins. Installation of decentralized facilities will consider potential climate change impacts. IN01222203 ►6. Medium and large livestock farms equipped with manure treatment facilities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 238.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Number of medium and large livestock farms equipped with operational manure collection and treatment Comments facilities within the demonstration sub-basins Improving ecosystem management IN01222196 ►7. Area of ecosystems restored (forests, terracing, wetlands) (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 52,583.04 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 This indicator measures the areas (in hectares) of forests, terracing, and wetlands restored within Comments demonstration sub-basins IN01222201 Area of forests restored (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50,725.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 IN01222204 Area of terracing restored (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,177.04 12/14/2022 Page 6 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 IN01222206 Area of wetlands restored (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 681.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 IN01222207 ►8. CO2eq reduction by the forests restored through the Program (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 182,610.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 The increase of CO2eq sequestration by the Program is estimated based on the biomass of the increased Comments and rehabilitated forests and other vegetation during program implementation period and its lifetime. Strengthening integration of ecosystem and water resources management into strategic planning IN01222197 ►9. Integrated ecosystem and water resources management process developed at the provincial level (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Integrated ecosystem and water resources Program not yet Value Program not yet effective N/A management plans do not effective exist Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 This indicator / DLI provides incentives for multi-sectoral collaboration at different government levels, as follows: (i) Sanmenxia Municipality in Henan, and Xianyang and Tongchuan Municipalities in Shaanxi, adopt integrated plans for demonstration sub-basins. The integrated plans need to include a consumption based water balance analysis, and cover ecosystem management, water resource conservation and water pollution reduction, considering future climate change impacts and gender; (ii) The Provincial Department of Comments Water Resources (PDWR) in Henan and Shaanxi Provinces each approve one technical guideline on how to prepare integrated ecosystem and water resources management plans, based on the experience from the demonstration sub-basins; (iii) The PDWRs in Henan and Shaanxi Provinces each approve a provincial integrated ecosystem and water resources management plan (for the YRB in Henan and Wei River Basin in Shaanxi). IN01222200 ►10. Training and capacity building implemented at basin, provincial, municipal and county levels (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4,000.00 Date 15-Feb-2022 28-Jun-2022 06-Dec-2022 31-Dec-2027 Number of people participating in trainings to build capacity on integrated ecosystem and water resources management. These trainings include issues of water assessment, landscape management, ecosystem and Comments water resources integration, pollution control, climate change, gender, and others. The trainings will be organized by different agencies at the provincial, municipal and county levels, and by YRCC at the basin level, upon demand. IN01222205 12/14/2022 Page 7 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Among which women (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 45.00 Disbursement Linked Indicators DLI_IND_TABLE ►DLI 1 1a. Areas with improved agricultural water management (Henan) (Output, 55,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 0 ha (accumulated: Value 0 ha Program not yet effective Program not yet effective 30,000 ha) Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 2 2a. Pollutant loads reduced (Henan) (Intermediate Outcome, 30,297,300.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Value 0.00 0.00 0.00 553.61 Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 3 3a. Area of ecosystems restored (forests, terracing, wetlands) (Henan) (Intermediate Outcome, 74,031,900.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Forest: 0 ha (Acc: 25328 ha); Forest: 0 ha; Terracing: 0 ha Value Terracing: 0 ha; Program not yet effective Program not yet effective (Acc: 351 ha); Wetlands: 0 ha. Wetlands: 0 ha (Acc: 219 ha) Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 4 4.1a Integrated ecosystem and water resources management process developed at the provincial level (Henan) (Intermediate Outcome, 26,920,800.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Integrated ecosystem and water resources Value Program not yet effective Program not yet effective N/A management plans do not exist 12/14/2022 Page 8 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 5 4.2 Capacity of YRCC to support integrated ecosystem and water resources management of the YRB (Outcome, 6,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Capacity of YRCC to support integrated Value ecosystem and water Program not yet effective Program not yet effective N/A resources management of the YRB not developed Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 6 1b. Areas with improved agricultural water management (Shaanxi) (Output, 33,600,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 0 ha (accumulated: Value 0 ha Program not yet effective Program not yet effective 32,000 ha) Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 7 2b. Pollutant loads reduced (Shaanxi) (Intermediate Outcome, 59,715,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Value 0.00 0.00 0.00 0.00 Date -- 28-Jun-2022 06-Dec-2022 -- Comments ►DLI 8 3b. Area of ecosystems restored (forests, terracing, wetlands) (Shaanxi) (Intermediate Outcome, 73,634,014.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Forest: 0 ha (Accumulated: 25397 ha); Value 0 ha Program not yet effective Program not yet effective Terracing: 0 ha (Acc: 826.04 ha); Wetlands: 0 ha (Acc: 462 ha) Date -- 28-Jun-2022 06-Dec-2022 -- Comments 12/14/2022 Page 9 of 10 The World Bank Implementation Status & Results Report Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806) ►DLI 9 4.1b Integrated ecosystem and water resources management process developed at the provincial level (Shaanxi) (Outcome, 19,800,986.00, 0%) Baseline Actual (Previous) Actual (Current) 2027 Integrated ecosystem and water resources Value Program not yet effective Program not yet effective N/A management plans do not exist Date -- 28-Jun-2022 06-Dec-2022 -- Comments 12/14/2022 Page 10 of 10