The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)



Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)

 EAST ASIA AND PACIFIC | China | Environment, Natural Resources & the Blue Economy Global Practice | Requesting Unit: EACCF | Responsible
 Unit: SEAE1
 IBRD/IDA | Program-for-Results Financing | FY 2022 | Team Leader(s): Jian Xie, Liping Jiang

 Seq No: 2 | ARCHIVED on 14-Dec-2022 | ISR54056 | Created by: Xieli Bai on 27-Nov-2022 | Modified by: Xieli Bai on 11-Dec-2022


 Program Development Objectives

  PDO Table
  Program Development Objective (from Program Appraisal Document)
  To strengthen integrated water use efficiency, water pollution control, and ecosystem management, in selected regions of the Yellow River Basin

 Overall Ratings

 Name                                                                              Previous Rating                         Current Rating

 Progress towards achievement of PDO                                               Satisfactory                           Satisfactory
 Overall Implementation Progress (IP)                                              Satisfactory                           Satisfactory


 Implementation Status and Key Decisions

  The Program is not yet effective.



 Data on Financial Performance


 Disbursements (by loan)

 Project       Loan/Credit/TF     Status          Currency        Original    Revised          Cancelled   Disbursed     Undisbursed                % Disbursed

                                  Not
 P172806       IBRD-93540                         USD             380.00         380.00             0.00        0.00           380.00                       0%
                                  Effective


 Key Dates (by loan)

 Project        Loan/Credit/TF        Status      Approval Date       Signing Date        Effectiveness Date     Orig. Closing Date     Rev. Closing Date

                                      Not
 P172806        IBRD-93540                        31-Mar-2022         --                  --                     31-Dec-2027            31-Dec-2027
                                      Effective



 Program Action Plan

                                  Provide regular training for the staff maintaining the town and village sewage treatment facilities focusing on OHS and
  Action Description
                                  other E&S impacts associated with poor O&M

  Source                          DLI#                       Responsibility           Timing                   Timing Value                Status

  Environmental and Social                                   Provincial and/or
                                                                                      Recurrent                Semi-Annually               Not Yet Due
  Systems                                                    municipal PMOs



12/14/2022                                                                                                                        Page 1 of 10
        The World Bank                                                                                 Implementation Status & Results Report
        Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




  Completion Measurement      Semiannual progress reports are submitted to the Bank, including the implementation of related trainings

  Comments                    Program not yet effective



                              Establish monitoring and reporting mechanisms for meaningful public participation and GRM, and strengthen
  Action Description
                              information and documentation management during the Program social risk management

  Source                      DLI#                  Responsibility          Timing                  Timing Value               Status

  Environmental and Social                          Provincial and/or
                                                                            Recurrent               Semi-Annually              Not Yet Due
  Systems                                           municipal PMOs

                              Semi-annual reports are submitted to the Bank, including information of land selection/screening, or approvals,
  Completion Measurement      information disclosure records and public participation, GRM establishment and operation, and support to vulnerable
                              groups

  Comments                    Program not yet effective



                              Prepare and issue guidance note on evaluation criteria and weightings for bid evaluation of contracts where
  Action Description
                              comprehensive scoring method is used

  Source                      DLI#                  Responsibility          Timing                  Timing Value               Status

                                                    BPMO, provincial                                Within six months from
  Fiduciary Systems                                 and/or municipal        Other                   the date of                Not Yet Due
                                                    PMOs                                            effectiveness

  Completion Measurement      Preparation and issuance of guidance on evaluation criteria

  Comments                    Program not yet effective



                              Provide detailed procurement related complaint handling procedures to supplement the general description in SBDs
  Action Description
                              for preparation of procurement documents under the Program.

  Source                      DLI#                  Responsibility          Timing                  Timing Value               Status

                                                    BPMO, provincial                                Within six months from
  Fiduciary Systems                                 and/or municipal        Other                   the date of                Not Yet Due
                                                    PMOs                                            effectiveness

                              Standard language on procurement related complaint handling procedures to be added into issued procurement
  Completion Measurement
                              documents

  Comments                    Program not yet effective



  Action Description          Develop and issue a guideline about the preparation and presentation of Program financial statements

  Source                      DLI#                  Responsibility          Timing                  Timing Value               Status

                                                    BPMO, provincial                                Before the first
  Fiduciary Systems                                 and/or municipal        Other                   Program financial          Not Yet Due
                                                    PMOs                                            statements year end



12/14/2022                                                                                                              Page 2 of 10
            The World Bank                                                                                 Implementation Status & Results Report
            Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




  Completion Measurement           Finalized official guideline provided to the Bank

  Comments                         Program not yet effective



  Action Description               Develop an audit Terms and Reference for the Program financial statements audit

  Source                           DLI#                   Responsibility            Timing             Timing Value                Status

                                                          BPMO, provincial                             Before the first
  Fiduciary Systems                                       and/or municipal          Other              Program financial           Not Yet Due
                                                          PMOs                                         statements audit

  Completion Measurement           TORs shared and approved by the Bank.

  Comments                         Program not yet effective




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                                Rating at Approval            Previous Rating               Current Rating

  Political and Governance                                     Moderate                     Moderate                     Moderate
  Macroeconomic                                                Low                          Low                          Low
  Sector Strategies and Policies                               Substantial                  Substantial                  Substantial
  Technical Design of Project or Program                       Substantial                  Substantial                  Substantial
  Institutional Capacity for Implementation and
                                                               Substantial                  Substantial                  Substantial
  Sustainability
  Fiduciary                                                    Substantial                  Substantial                  Substantial
  Environment and Social                                       Substantial                  Substantial                  Substantial
  Stakeholders                                                 Substantial                  Substantial                  Substantial
  Other                                                        Low                          Low                          Low
  Overall                                                      Substantial                  Substantial                  Substantial




  Results


 PDO Indicators by Objectives / Outcomes


  To improve integrated water use efficiency, water pollution control, and ecosystem management
   IN01222183
    ►1. Agricultural water productivity increased (Text, Custom)

                                          Baseline                    Actual (Previous)        Actual (Current)            End Target



12/14/2022                                                                                                                   Page 3 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)



                                      Henan: 2.06; Shaanxi:                                     Program not yet            Henan: 2.49; Shaanxi:
    Value                                                          Program not yet effective
                                      1.50                                                      effective                  2.20

    Date                              15-Feb-2022                  28-Jun-2022                  06-Dec-2022                31-Dec-2027

                                      Measured as the agricultural output (in metric tons) per unit (thousand cubic meters) of water consumption
    Comments
                                      in demonstration sub-basins.
     IN01222184
     In Henan (Metric ton, Custom Breakdown)

                                     Baseline                    Actual (Previous)             Actual (Current)            End Target

     Value                          2.06                         2.06                          2.06                        2.49

     Date                           15-Feb-2022                  28-Jun-2022                   06-Dec-2022                 31-Dec-2027

     IN01222185
     In Shaanxi (Metric ton, Custom Breakdown)

                                     Baseline                    Actual (Previous)             Actual (Current)            End Target

     Value                          1.50                         1.50                          1.50                        2.20

      Date                          15-Feb-2022                  28-Jun-2022                   06-Dec-2022                 31-Dec-2027
    IN01222191
    ►2. Pollutant loads reduced (Tons/year, Custom)

                                      Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                         0.00                         0.00                       553.61

    Date                              15-Feb-2022                  28-Jun-2022                  06-Dec-2022                31-Dec-2027
                                      Annual pollutant (COD) reduced from point and NPS in the demonstration sub-basins due to Program
                                      activities, including (i) upgrading or building new WWTPs and pipelines; (ii) new rural household
    Comments
                                      connections to decentralized wastewater treatment facilities; and/or (iii) livestock farms equipped with
                                      manure treatment facilities
    IN01222192
    ►3. Reduction of soil erosion per km2 (Tons/year, Custom)

                                      Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                         0.00                         0.00                       480.00

    Date                              15-Feb-2022                  28-Jun-2022                  06-Dec-2022                31-Dec-2027
                                      This indicator highlights the improvement in ecological functions as a result of Program interventions,
                                      reflected in the increase of soil water holding capacity, and the subsequent reduction of soil loss and water
    Comments
                                      runoff, at demonstration sub-basins. The indicator measures accumulated reduction of soil loss intensity
                                      with respect to the baseline year.
    IN01222193
    ►4. Capacity of YRCC to support integrated ecosystem and water resources management of the YRB (Text, Custom)

                                      Baseline                Actual (Previous)                 Actual (Current)           End Target
    Value                             Capacity of YRCC to     Program not yet effective         Program not yet            YRCC issues a
                                      support integrated                                        effective                  technical guideline for
                                      ecosystem and water                                                                  integrated ecosystem
                                      resources management of                                                              and water resources
                                      the YRB not developed                                                                management in the
                                                                                                                           YRB based on
                                                                                                                           consumption based
                                                                                                                           water balance

12/14/2022                                                                                                                   Page 4 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)



                                                                                                                          assessment and
                                                                                                                          modeling

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027
                                      This DLI addresses challenges of institutional strengthening and inter-jurisdictional cooperation by working
                                      at the YRB level, incentivizing upscaling and integration of results from provincial to basin level, and
    Comments                          promoting a paradigm shift in the way water resources are assessed. The three results included in this
                                      indicator will strengthen YRCC's capacity to manage and integrate ecosystem and water resources into
                                      planning and decision-making at the YRB.

 Intermediate Results Indicators by Results Areas



  Improving water use efficiency
    IN01222194
    ►1. Areas with improved agricultural water management (Hectare(Ha), Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target

    Value                             0.00                        0.00                          0.00                       62,000.00

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027

                                      Defined as the areas within the demonstration sub-basins (in hectares) with improved agricultural water
    Comments
                                      management - both through irrigation modernization and improved agronomic practices
    IN01222198
    ►2. Target Value Allocation Plans agreed and implemented in demonstration sub-basins (Text, Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target
                                      Henan: 0 Shaanxi: 0                                       Program not yet            Henan: 3 Shaanxi: 2
    Value                                                         Program not yet effective
                                                                                                effective

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027
                                      Target Values (ET and EC) established and agreed for the demonstration sub-basins; and target values
                                      identified for specific counties within the sub-basins; Allocation Plans prepared and implemented to reduce
                                      total water consumption under the target ET and to reduce pollutant loads under the target EC; Monitoring
    Comments
                                      system in place to measure actual water consumption and pollution load reduction under the Allocation Plan
                                      implementation. Target ET refers to the sustainable limit of water consumption, and target EC refers to the
                                      maximum pollutant load under certain water quality requirement.
    IN01222202
    ►3. Women leadership in WUAs (Percentage, Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target

    Value                             16.00                       16.00                         16.00                      40.00

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027

                                      Percentage of females in executive bodies of WUA (chair/co-chair, or members of the executive
    Comments
                                      committees)


  Improving water quality
    IN01222195
    ►4. Wastewater treatment plants upgraded or built (Number, Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target



12/14/2022                                                                                                                   Page 5 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




    Value                             0.00                        0.00                          0.00                       21.00

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027
                                      This indicator includes both upgraded and newly built WWTPs in demonstration sub-basins. Number of
                                      wastewater treatment plants with effluent discharge standard upgraded from Class 1A; treatment capacity of
    Comments
                                      newly built WWTPs cannot exceed 50,000 tonnes per day. Climate-resilient designs will be incorporated in
                                      constructing or upgrading WWTPs.
    IN01222199
    ►5. Rural households connected to decentralized wastewater treatment facilities (Number, Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target

    Value                             0.00                        0.00                          0.00                       21,612.00

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027

                                      Number of rural households connected to decentralized wastewater treatment facilities in demonstration
    Comments
                                      sub-basins. Installation of decentralized facilities will consider potential climate change impacts.
    IN01222203
    ►6. Medium and large livestock farms equipped with manure treatment facilities (Number, Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target

    Value                             0.00                        0.00                          0.00                       238.00

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027

                                      Number of medium and large livestock farms equipped with operational manure collection and treatment
    Comments
                                      facilities within the demonstration sub-basins


  Improving ecosystem management
    IN01222196
    ►7. Area of ecosystems restored (forests, terracing, wetlands) (Hectare(Ha), Custom)

                                      Baseline                     Actual (Previous)            Actual (Current)           End Target

    Value                             0.00                        0.00                          0.00                       52,583.04

    Date                              15-Feb-2022                 28-Jun-2022                   06-Dec-2022               31-Dec-2027

                                      This indicator measures the areas (in hectares) of forests, terracing, and wetlands restored within
    Comments
                                      demonstration sub-basins
     IN01222201
     Area of forests restored (Hectare(Ha), Custom Breakdown)

                                     Baseline                    Actual (Previous)             Actual (Current)           End Target

     Value                          0.00                         0.00                          0.00                       50,725.00

     Date                           15-Feb-2022                  28-Jun-2022                   06-Dec-2022                31-Dec-2027

     IN01222204
     Area of terracing restored (Hectare(Ha), Custom Breakdown)

                                     Baseline                    Actual (Previous)             Actual (Current)           End Target

     Value                          0.00                         0.00                          0.00                       1,177.04



12/14/2022                                                                                                                   Page 6 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




     Date                           15-Feb-2022                  28-Jun-2022                 06-Dec-2022                 31-Dec-2027

     IN01222206
     Area of wetlands restored (Hectare(Ha), Custom Breakdown)

                                     Baseline                    Actual (Previous)            Actual (Current)           End Target

     Value                          0.00                         0.00                        0.00                        681.00

      Date                          15-Feb-2022                  28-Jun-2022                 06-Dec-2022                 31-Dec-2027
    IN01222207
    ►8. CO2eq reduction by the forests restored through the Program (Metric ton, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                        0.00                         0.00                      182,610.00

    Date                              15-Feb-2022                 28-Jun-2022                  06-Dec-2022               31-Dec-2027

                                      The increase of CO2eq sequestration by the Program is estimated based on the biomass of the increased
    Comments
                                      and rehabilitated forests and other vegetation during program implementation period and its lifetime.


  Strengthening integration of ecosystem and water resources management into strategic planning
    IN01222197
    ►9. Integrated ecosystem and water resources management process developed at the provincial level (Text, Custom)

                                      Baseline                 Actual (Previous)               Actual (Current)          End Target
                                      Integrated ecosystem and
                                      water resources                                          Program not yet
    Value                                                      Program not yet effective                                 N/A
                                      management plans do not                                  effective
                                      exist
    Date                              15-Feb-2022                 28-Jun-2022                  06-Dec-2022               31-Dec-2027
                                      This indicator / DLI provides incentives for multi-sectoral collaboration at different government levels, as
                                      follows: (i) Sanmenxia Municipality in Henan, and Xianyang and Tongchuan Municipalities in Shaanxi, adopt
                                      integrated plans for demonstration sub-basins. The integrated plans need to include a consumption based
                                      water balance analysis, and cover ecosystem management, water resource conservation and water
                                      pollution reduction, considering future climate change impacts and gender; (ii) The Provincial Department of
    Comments
                                      Water Resources (PDWR) in Henan and Shaanxi Provinces each approve one technical guideline on how
                                      to prepare integrated ecosystem and water resources management plans, based on the experience from
                                      the demonstration sub-basins; (iii) The PDWRs in Henan and Shaanxi Provinces each approve a provincial
                                      integrated ecosystem and water resources management plan (for the YRB in Henan and Wei River Basin in
                                      Shaanxi).
    IN01222200
    ►10. Training and capacity building implemented at basin, provincial, municipal and county levels (Number, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                        0.00                         0.00                      4,000.00

    Date                              15-Feb-2022                 28-Jun-2022                  06-Dec-2022               31-Dec-2027
                                      Number of people participating in trainings to build capacity on integrated ecosystem and water resources
                                      management. These trainings include issues of water assessment, landscape management, ecosystem and
    Comments                          water resources integration, pollution control, climate change, gender, and others. The trainings will be
                                      organized by different agencies at the provincial, municipal and county levels, and by YRCC at the basin
                                      level, upon demand.
     IN01222205


12/14/2022                                                                                                                 Page 7 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




     Among which women (Percentage, Custom Supplement)

                                      Baseline                  Actual (Previous)          Actual (Current)            End Target

     Value                            0.00                      0.00                       0.00                        45.00


 Disbursement Linked Indicators
 DLI_IND_TABLE
    ►DLI 1 1a. Areas with improved agricultural water management (Henan) (Output, 55,500,000.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2027
                                                                                                                        0 ha (accumulated:
    Value                        0 ha                          Program not yet effective   Program not yet effective
                                                                                                                        30,000 ha)

    Date                         --                            28-Jun-2022                 06-Dec-2022                  --

    Comments



    ►DLI 2 2a. Pollutant loads reduced (Henan) (Intermediate Outcome, 30,297,300.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2027

    Value                        0.00                          0.00                        0.00                         553.61

    Date                         --                            28-Jun-2022                 06-Dec-2022                  --

    Comments



    ►DLI 3 3a. Area of ecosystems restored (forests, terracing, wetlands) (Henan) (Intermediate Outcome, 74,031,900.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2027
                                                                                                                        Forest: 0 ha (Acc:
                                                                                                                        25328 ha);
                                 Forest: 0 ha;
                                                                                                                        Terracing: 0 ha
    Value                        Terracing: 0 ha;              Program not yet effective   Program not yet effective
                                                                                                                        (Acc: 351 ha);
                                 Wetlands: 0 ha.
                                                                                                                        Wetlands: 0 ha (Acc:
                                                                                                                        219 ha)
    Date                         --                            28-Jun-2022                 06-Dec-2022                  --

    Comments


   ►DLI 4 4.1a Integrated ecosystem and water resources management process developed at the provincial level (Henan) (Intermediate
   Outcome, 26,920,800.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2027
                                 Integrated ecosystem and
                                 water resources
    Value                                                      Program not yet effective   Program not yet effective    N/A
                                 management plans do not
                                 exist




12/14/2022                                                                                                               Page 8 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments



    ►DLI 5 4.2 Capacity of YRCC to support integrated ecosystem and water resources management of the YRB (Outcome, 6,500,000.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)            2027
                                 Capacity of YRCC to
                                 support integrated
    Value                        ecosystem and water           Program not yet effective   Program not yet effective   N/A
                                 resources management of
                                 the YRB not developed
    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments



    ►DLI 6 1b. Areas with improved agricultural water management (Shaanxi) (Output, 33,600,000.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)            2027
                                                                                                                       0 ha (accumulated:
    Value                        0 ha                          Program not yet effective   Program not yet effective
                                                                                                                       32,000 ha)

    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments



    ►DLI 7 2b. Pollutant loads reduced (Shaanxi) (Intermediate Outcome, 59,715,000.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)            2027

    Value                        0.00                          0.00                        0.00                        0.00

    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments



    ►DLI 8 3b. Area of ecosystems restored (forests, terracing, wetlands) (Shaanxi) (Intermediate Outcome, 73,634,014.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)            2027
                                                                                                                       Forest: 0 ha
                                                                                                                       (Accumulated:
                                                                                                                       25397 ha);
    Value                        0 ha                          Program not yet effective   Program not yet effective   Terracing: 0 ha
                                                                                                                       (Acc: 826.04 ha);
                                                                                                                       Wetlands: 0 ha (Acc:
                                                                                                                       462 ha)
    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments


12/14/2022                                                                                                              Page 9 of 10
           The World Bank                                                                                 Implementation Status & Results Report
           Yellow River Basin Ecological Protection and Environmental Pollution Control Program (P172806)




   ►DLI 9 4.1b Integrated ecosystem and water resources management process developed at the provincial level (Shaanxi) (Outcome,
   19,800,986.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)            2027
                                 Integrated ecosystem and
                                 water resources
    Value                                                      Program not yet effective   Program not yet effective   N/A
                                 management plans do not
                                 exist
    Date                         --                            28-Jun-2022                 06-Dec-2022                 --

    Comments




12/14/2022                                                                                                             Page 10 of 10