The World Bank                                                                                    Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)



Inclusive Housing Finance Program (P150993)

 MIDDLE EAST AND NORTH AFRICA | Egypt, Arab Republic of | Finance, Competitiveness and Innovation Global Practice | Requesting Unit:
 MNC03 | Responsible Unit: EMNF1
 IBRD/IDA | Program-for-Results Financing | FY 2015 | Team Leader(s): Laila Ashraf AbdelKader Ahmed, Alia Eldidi, Aun Ali Rahman

 Seq No: 13 | ARCHIVED on 11-Apr-2022 | ISR50730 | Created by: Alia Eldidi on 21-Mar-2022 | Modified by: Alia Eldidi on 05-Apr-2022


 Program Development Objectives

  PDO Table
  Program Development Objective (from Program Appraisal Document)
  The objective of the Program is to improve the affordability of formal housing for low-income households in the Arab Republic of Egypt and to
  strengthen the SHMFF's capacity to design policies and coordinate programs in the social housing sector.




 Overall Ratings

 Name                                                                        Previous Rating                          Current Rating

 Progress towards achievement of PDO                                         Moderately Satisfactory                 Moderately Satisfactory
 Overall Implementation Progress (IP)                                        Moderately Satisfactory                 Moderately Satisfactory


 Implementation Status and Key Decisions

  The highlights of the implementation support mission that took place in February - March 2022 are as follows:

  Progress towards achievement of the PDO and overall implementation progress remain moderately satisfactory. The issues identified
  during previous missions are continuously being addressed by the Egyptian Government. The Inclusive Housing Finance Program is on track to
  meet its development objective. The Program for Results (PforR) is contributing to improving the affordability of formal housing for low-income
  households in Egypt and to the strengthening of the Social Housing and Mortgage Finance Fund's (SHMFF) capacity to design policies and
  coordinate programs in the social housing sector. The delivery of demand-side subsidies for ownership is progressing with over 400,000
  households benefiting from the Program since its inception, despite the crisis posed by the COVID-19 pandemic and related office closures. The
  majority of program beneficiaries belong to the bottom 40 percent of the country’s population. The Program continues to have a profound impact on
  gender with 22 percent of beneficiaries being women. It also continues serving beneficiaries with informal revenues. Institutional strengthening and
  capacity building indicators have progressed well. SHMFF continues strengthening its internal capacity in order to fulfill its mandate effectively,
  particularly in the areas of IT, M&E, and internal audit.



 Data on Financial Performance


 Disbursements (by loan)

 Project        Loan/Credit/TF    Status      Currency       Original    Revised     Cancelled      Disbursed      Undisbursed              % Disbursed


 P150993        IBRD-84980        Effective   USD             500.00      500.00           0.00         409.63            90.37                     82%

 P150993        IBRD-90330        Effective   USD             500.00      500.00           0.00         134.25           365.75                     27%


 Key Dates (by loan)



4/11/2022                                                                                                                    Page 1 of 21
            The World Bank                                                                              Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




 Project         Loan/Credit/TF    Status      Approval Date    Signing Date   Effectiveness Date    Orig. Closing Date    Rev. Closing Date

 P150993         IBRD-84980        Effective   05-May-2015      10-Jun-2015    11-Nov-2015           30-Jun-2020           30-Apr-2022
 P150993         IBRD-90330        Effective   20-Mar-2020      05-Jul-2020    27-Oct-2020           31-Dec-2024           31-Dec-2024


 DLI Disbursement

                                                                                    Achievement      Disbursed amount in    Disbursement % for
 DLI ID       DLI Type      Description                   Coc        DLI Amount
                                                                                    Status           Coc                    DLI

 Loan: IBRD84980-001

                              DLR#1.1 INT. AUDIT
  001         Regular         (OWNERSHP AND               USD       15,000,000.00   Fully Achieved        15,000,000.00                  100 %
                              RENTAL
                              DLR#1.2 INT. AUD
  002         Regular         ESTABLISH. AND              USD       10,000,000.00   Fully Achieved        10,000,000.00                  100 %
                              OPERATIN
                              DLR#2.1 M&E UNIT
  003         Regular         ESTABLISH. AND              USD       10,000,000.00   Fully Achieved        10,000,000.00                  100 %
                              FUNCTION
                              DLR#2.2 M&E INFORM.
  004         Regular                                     USD       15,000,000.00   Fully Achieved        15,000,000.00                  100 %
                              MULTI YEAR PL., ANNU
                              DLR#3 ACCOUNTABILITY
  005         Regular                              USD              50,000,000.00   Fully Achieved        50,000,000.00                  100 %
                              AND TRANSPARENCY
                              DLR#4.1 MECHANIZM
  006         Regular                             USD               20,000,000.00   Fully Achieved        20,000,000.00                  100 %
                              MONITOR ESTABLISHED
                              DLR#4.2 PERC.
  007         Regular         OWNERSHIP                   USD       10,000,000.00   Fully Achieved        10,000,000.00                  100 %
                              EXC.50%,UP TO 65
                              DLR#4.3 PERC.
                                                                                    Partially
  008         Regular         OWNERSHIP                   USD       10,000,000.00                          9,997,300.00                  100 %
                                                                                    Achieved
                              EXC.50%,UP TO 75
                              DLR#4.4 PERC.
  009         Regular         OWNERSHIP EXC.              USD       10,000,000.00   Fully Achieved        10,000,000.00                  100 %
                              50%,UP TO 8
                              DLR#5 NO OF 725T
                                                                                    Partially
  010         Regular         HOUSEHOLDS RCV              USD      225,000,000.00                        106,769,373.52                  47 %
                                                                                    Achieved
                              SUBSIDIE
                              DLR#6 NO OF NEW
                                                                                    Partially
  011         Regular         HOUSEHO. PARTICIP.          USD       48,750,000.00                          1,127,333.78                  2.3 %
                                                                                    Achieved
                              102T
                              DLR#7 PERC. OF 20%
  012         Regular         OF DEMAND SIDE              USD       25,000,000.00   Fully Achieved        25,000,000.00                  100 %
                              SUBSID
                              DLR#8 UP TO 250T
                                                                                    Partially
  013         Regular         DEMAND SIDE                 USD       50,000,000.00                            483,200.00                  1%
                                                                                    Achieved
                              SUBSIDIES

 Loan: IBRD90330-001




4/11/2022                                                                                                             Page 2 of 21
            The World Bank                                                                        Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                            DLR#1.1 - An Internal
  1.1         Regular                                     USD             0.01   Not Achieved                 0.00
                            Audit function
                            DLR#1.2 - An Internal
  1.2         Regular                                     USD             0.01   Not Achieved                 0.00
                            Audit function est
                            DLR#2.1 - M&E unit has
  2.1         Regular                                     USD             0.01   Not Achieved                 0.00
                            been established
                            DLR#2.2 - M&E unit has
  2.2         Regular                                     USD             0.01   Not Achieved                 0.00
                            maintained functi
                            DLR#3 - Accountability
  3           Regular                                     USD             0.01   Not Achieved                 0.00
                            and Transparency
                            DLR#3.1 - Operational and
  3.1         Regular                                 USD         6,000,000.00   Not Achieved                 0.00
                            Staffed MU
                            DLR#4.1 - SHMFF
  4.1         Regular                                     USD             0.01   Not Achieved                 0.00
                            established in FY16
                            DLR#4.2 - % ownership
  4.2         Regular                                     USD             0.01   Not Achieved                 0.00
                            housing FY 17
                            DLR#4.3 - % ownership
  4.3         Regular                                     USD             0.01   Not Achieved                 0.00
                            housing FY 18
                            DLR#4.4 - % ownership
  4.4         Regular                                     USD             0.01   Not Achieved                 0.00
                            housing FY 19
                            DLR#5 - up to 950k
  5           Regular                                     USD   250,000,000.00   Not Achieved                 0.00
                            households
                            DLR#6 - up to 102,400
  6           Regular                                     USD    11,500,000.00   Not Achieved                 0.00
                            households
                            DLR#6.1 - Operational
  6.1         Regular                                     USD     8,000,000.00   Not Achieved                 0.00
                            Staffed RU
                            DLR#6.2 - Development &
  6.2         Regular                                     USD    10,250,000.00   Not Achieved                 0.00
                            Implementation
                            DLR#7 - 20% of each
  7           Regular                                     USD             0.01   Not Achieved                 0.00
                            Fiscal year

  8           Regular       DLR#8 - up to 250,000         USD             0.01   Not Achieved                 0.00

  8.1         Regular       DLR#8.1- Adoption of PPP USD         17,000,000.00   Fully Achieved     17,000,000.00                 100 %

                            DLR#8.2- Public tender
  8.2         Regular                                     USD    17,000,000.00   Not Achieved                 0.00
                            process
                            DLR#8.3- Effective launch
  8.3         Regular                                     USD    50,000,000.00   Not Achieved                 0.00
                            PPP
                            DLR#9 - Development of
  9           Regular                                     USD    50,000,000.00   Not Achieved                 0.00
                            Mechanism
                            DLR#10.1 - Adoption of
  10.1        Regular                                     USD    25,000,000.00   Not Achieved                 0.00
                            Real Estate
                            DLR#10.2 - Adoption of
  10.2        Regular                                     USD    25,000,000.00   Not Achieved                 0.00
                            Regulations
                            DLR#11.1 - SHMFF
  11.1        Regular                                     USD     4,000,000.00   Not Achieved                 0.00
                            operational




4/11/2022                                                                                                       Page 3 of 21
            The World Bank                                                                                   Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                            DLR#11.2 - 250k Social
  11.2        Regular                                     USD         10,000,000.00      Not Achieved                     0.00
                            Housing buit
                            DLR#12.1 - Carrying out a
  12.1        Regular                                     USD          7,500,000.00      Not Achieved                     0.00
                            review
                            DLR#12.2 - Pilot
  12.2        Regular                                     USD          7,499,999.89      Not Achieved                     0.00
                            delegation

 Program Action Plan

                                 Multi-institutional governance structure established and functioning to facilitate coordination across Government
  Action Description
                                 entities (Advisory Committee)

  Source                         DLI#                   Responsibility          Timing                  Timing Value               Status

                                                        Client                  Due Date                30-Jun-2015                Completed

  Completion Measurement

  Comments



                                 Establishment and functioning of a housing monitoring and evaluation system and an M&E unit within SHMFF, and
  Action Description
                                 the preparation of the Multi-Year Plan and Annual Targets informed by the M&E system

  Source                         DLI#                   Responsibility          Timing                  Timing Value               Status

  Technical                      DLI 2                  Client                  Recurrent               Yearly                     Completed

  Completion Measurement         Establishment of M&E unit

  Comments



                                 Establishment by SHMFF of a functioning mechanism to monitor occupancy and vacancy of housing units by
  Action Description
                                 households receiving demand–side housing subsidy

  Source                         DLI#                   Responsibility          Timing                  Timing Value               Status

  Technical                      DLI 3                  Client                  Due Date                30-Jun-2016                Completed

  Completion Measurement         Establishment by SHMFF of a functioning mechanism to monitor occupancy and vacancy

  Comments



  Action Description             Full staffing of SHMFF based on agreed organizational structure and staff skills

  Source                         DLI#                   Responsibility          Timing                  Timing Value               Status

  Technical                                             Client                  Due Date                31-Jan-2016                Completed

  Completion Measurement         Establishment by SHMFF of a functioning mechanism to monitor occupancy and vacancy

  Comments



4/11/2022                                                                                                                   Page 4 of 21
            The World Bank                                                                                   Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




  Action Description             Integrate housing location criteria and requirement to collect physical coordinates into housing program guidelines

  Source                         DLI#                   Responsibility           Timing                 Timing Value               Status

                                                        Client                   Due Date               30-Jun-2017                Completed

  Completion Measurement

  Comments



  Action Description             Monitoring and enforcement of location criteria for housing programs

  Source                         DLI#                   Responsibility           Timing                 Timing Value               Status

                                                        Client                   Due Date               30-Jun-2016                Completed

  Completion Measurement

  Comments



  Action Description             The annual audited financial statements of the Program are issued on a timely basis and made public.

  Source                         DLI#                   Responsibility           Timing                 Timing Value               Status

                                                        Client                   Recurrent              Yearly                     Completed

  Completion Measurement

  Comments



                                 The SHMFF needs to establish robust integrated grievance redress mechanism and link it to the local level grievance
  Action Description             redress system. SHMFF will also need to design and implement an improved mechanism for disseminating
                                 information.

  Source                         DLI#                   Responsibility           Timing                 Timing Value               Status

  Environmental and Social
                                                        Both                     Due Date               30-Jun-2016                Completed
  Systems

  Completion Measurement         establish robust integrated grievance redress mechanism

  Comments



  Action Description             Establishment of unified beneficiary database

  Source                         DLI#                   Responsibility           Timing                 Timing Value               Status




4/11/2022                                                                                                                   Page 5 of 21
            The World Bank                                                                                 Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                                                        Client                   Due Date             30-Jun-2016                Completed

  Completion Measurement

  Comments



                                 The operational and financial management arrangements for the rental subsidy should be laid out in regulation and
  Action Description
                                 detailed in a Procedures Manual, consistent with SHMFF's Manual when applicable.

  Source                         DLI#                   Responsibility           Timing               Timing Value               Status

  Technical                                             Client                   Due Date             30-Sep-2020                Delayed

  Completion Measurement         Adoption of operations manual for rental unit

  Comments



                                 SHMFF programs should be integrated with the State budget, using the national budget classifications and chart of
  Action Description
                                 accounts.

  Source                         DLI#                   Responsibility           Timing               Timing Value               Status

  Fiduciary Systems                                     Client                   Due Date             01-Jan-2016                Completed

  Completion Measurement         SHMFF programs integrated with the State budget,

  Comments



                                 For the new rental subsidy programs, beneficiary enrollment, monitoring, and payment databases should be
  Action Description
                                 integrated in the program’s management information system (MIS)

  Source                         DLI#                   Responsibility           Timing               Timing Value               Status

  Technical                                             Client                   Due Date             30-Sep-2020                Delayed

  Completion Measurement         rental program integrated into MIS

  Comments



                                 Establishment and operation of an internal audit function within SHMFFproviding assurance service for the ownership
  Action Description
                                 and rental programs affiliated with the SHMFF.

  Source                         DLI#                   Responsibility           Timing               Timing Value               Status

  Technical                                             Client                   Due Date             31-Dec-2016                Completed

  Completion Measurement         Establishment and operation of an internal audit function

  Comments



4/11/2022                                                                                                                 Page 6 of 21
            The World Bank                                                                                    Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                                 The SHMFF and its sub-programs should be subject to periodic and timely reporting on budget execution, using the
  Action Description             GFMIS or an accounting system that can seamlessly feed information into the GFMIS. The financial reports should be
                                 publicly available.

  Source                         DLI#                   Responsibility           Timing                  Timing Value                Status

  Fiduciary Systems                                     Client                   Due Date                30-Jun-2016                 Completed

                                 The SHF and GSMFF programs were integrated with the State budget, using the national budget classifications and
  Completion Measurement
                                 chart of accounts

  Comments



                                 Ensure that beneficiaries use safe buildings through Including building validity certificate among required application
  Action Description
                                 documents

  Source                         DLI#                   Responsibility           Timing                  Timing Value                Status

  Fiduciary Systems                                     Client                   Recurrent               Continuous                  In Progress

  Completion Measurement         Ongoing according to the requirements of the national system

  Comments



                                 Guidelines and training provided to SHMFF staff and other stakeholders about addressing occupational safety related
  Action Description
                                 to construction activities and handling of building chemicals and construction wastes

  Source                         DLI#                   Responsibility           Timing                  Timing Value                Status

  Environmental and Social
                                                        Both                     Due Date                30-Sep-2020                 In Progress
  Systems

  Completion Measurement         Planned to be done on a systematic manner after the establishment of the SHMFF including an Environment Unit.

                                 In progress. During the mission, the Environment Unit developed the Operation Manual, which included a training
  Comments
                                 plan for the unit staff on relevant topics including occupational health and safety in construction.



                                 Deliver training and capacity building to the SHMFF and other relevant stakeholders on issues related to land
  Action Description
                                 acquisition, involuntary resettlement

  Source                         DLI#                   Responsibility           Timing                  Timing Value                Status

  Environmental and Social
                                                        Both                     Due Date                30-Jul-2021                 In Progress
  Systems

  Completion Measurement         Training delivered

  Comments




4/11/2022                                                                                                                     Page 7 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)



                                 Strengthening the institutional Setup through developing comprehensive ToRs for the social team to be hired, and
  Action Description
                                 hiring social officers

  Source                         DLI#                  Responsibility           Timing                 Timing Value               Status

  Environmental and Social
                                                       Both                     Due Date               30-Sep-2020                Completed
  Systems

  Completion Measurement         TORs developed

  Comments



  Action Description             Designing and implementing consultation, communication and reaching out plans

  Source                         DLI#                  Responsibility           Timing                 Timing Value               Status

  Environmental and Social
                                                       SHMFF                    Due Date               15-Jan-2021                In Progress
  Systems

  Completion Measurement         Designing and implementing consultation, communication and reaching out plans completed

  Comments



  Action Description             Establishing robust integrated grievance redress mechanism and link it to the local level grievance redress system

  Source                         DLI#                  Responsibility           Timing                 Timing Value               Status

                                                       Both                     Due Date               31-Mar-2016                Completed

  Completion Measurement

  Comments



  Action Description             Adoption of an Operations Manual (OM) for the Environment Unit provided to the Bank for No Objection.

  Source                         DLI#                  Responsibility           Timing                 Timing Value               Status

  Environmental and Social
                                                       SHMFF                    Due Date               31-Dec-2020                Completed
  Systems

  Completion Measurement         Adoption of operations manual environment unit

  Comments



                                 The institutional set-up of the SHMFF Environment Unit should be strengthened by being staffed with minimum
  Action Description
                                 technical staff which includes a senior environmental specialist and a senior Health and Safety Specialist

  Source                         DLI#                  Responsibility           Timing                 Timing Value               Status

  Environmental and Social
                                                       SHMFF                    Recurrent              Semi-Annually              Completed
  Systems


4/11/2022                                                                                                                  Page 8 of 21
            The World Bank                                                                                     Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




  Completion Measurement         The two specialists are hired

  Comments                       Completed. The unit manager was hired as well as five environmental and health and safety specialists.



                                 Improve transparency of SHMFF by disclosing actual costs of construction, main contractors, procurement
  Action Description
                                 processes, the maintenance and facility management activities in the Program projects

  Source                         DLI#                   Responsibility           Timing                 Timing Value                Status

  Fiduciary Systems                                     SHMFF                    Recurrent              Yearly                      Not Yet Due

                                 Disclosure of Improve transparency of actual costs of construction, main contractors, procurement processes, the
  Completion Measurement
                                 maintenance and facility management activities in the Program projects in annual report.

  Comments



                                 Ensure that SHMFF continue their gender inclusion policies, which include the prioritization of female applicants with
  Action Description             children and implementation of joint ownership contracts, while monitoring the progress of the 24% female ownership
                                 target

  Source                         DLI#                   Responsibility           Timing                 Timing Value                Status

  Environmental and Social
                                                        SHMFF                    Recurrent              Yearly                      In Progress
  Systems

  Completion Measurement         SHMFF includes in its eligibility criteria system higher ponderation for women headed households

  Comments



                                 Conduct dissemination and communication campaigns targeted to women headed households to encourage increase
  Action Description
                                 participation in the program

  Source                         DLI#                   Responsibility           Timing                 Timing Value                Status

  Environmental and Social
                                                        SHMFF                    Recurrent              Yearly                      In Progress
  Systems

  Completion Measurement         Communication campaign completed

  Comments




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                             Rating at Approval               Previous Rating               Current Rating

  Political and Governance                                  --                               Moderate                     Moderate



4/11/2022                                                                                                                    Page 9 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




  Macroeconomic                                           --                             Substantial                   Substantial
  Sector Strategies and Policies                          --                             Substantial                   Substantial
  Technical Design of Project or Program                  Substantial                   Substantial                   Substantial
  Institutional Capacity for Implementation and
                                                          --                             Substantial                   Substantial
  Sustainability
  Fiduciary                                               Substantial                   Substantial                   Substantial
  Environment and Social                                  Moderate                      Moderate                      Moderate
  Stakeholders                                            --                             Substantial                   Substantial
  Other                                                   Substantial                   --                             --
  Overall                                                 Substantial                   Substantial                   Substantial




  Results


 PDO Indicators by Objectives / Outcomes


  PDO
   IN01119009
    ►1.1 Number of targeted households accessing ownership and rental housing units with support from the Program (Number, Custom)

                                      Baseline                  Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                      373,022.00                    401,769.00                1,052,400.00

    Date                              01-Apr-2015               31-Jul-2021                   02-Mar-2022              31-Dec-2024

    Comments
     IN01119010
     1.2 female-headed households as a percentage of benefeciaries (Percentage, Custom Supplement)

                                     Baseline                  Actual (Previous)           Actual (Current)            End Target

      Value                          0.00                      22.13                       22.27                       24.00
    IN01119126
    ►2. Percentage of Program beneficiaries in bottom 20% of the income distribution (Percentage, Custom)

                                      Baseline                  Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                      50.46                         48.80                     50.00

    Date                              01-Apr-2015               31-Jul-2021                   02-Mar-2022              31-Dec-2024

    Comments
    IN01119127
    ►3. Percentage of income spent on housing costs by Program beneficiaries (Percentage, Custom)

                                      Baseline                  Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                      42.56                         41.50                     30.00




4/11/2022                                                                                                                Page 10 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




    Date                              01-Apr-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments
    IN01119128
    ►4. Establishment of a housing M&E system functioning and informing the Multi-Year Plan and Annual Targets (Yes/No, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             No                         Yes                          Yes                       Yes

    Date                              01-Apr-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

   Comments
   IN01119129
   ►5. Development, adoption and implementation of an alternative system that progressively phases out the interest rate subsidy (Yes/No,
   Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             No                         No                           No                        Yes

    Date                              31-May-2019                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments


 Intermediate Results Indicators by Results Areas



  Strengthening Governance and Institutional Set-up of Housing Sector
    IN01119130
    ►1.1. Completed executive by-laws, organizational structure, financing model, fiduciary arrangements, operating systems for the SHMFF
   (Yes/No, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             No                         Yes                          Yes                       Yes

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments
    IN01119135
    ►1.2. SHMFF fully staffed as per organizational plan (Yes/No, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             No                         Yes                          Yes                       Yes

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

   Comments
   IN01119140
   ►1.3. Internal audit function providing assurance services for the ownership and rental programs affiliated with the SHMFF established and
   operating (Yes/No, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             No                         Yes                          Yes                       Yes


4/11/2022                                                                                                                Page 11 of 21
            The World Bank                                                                                   Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024

    Comments
    IN01119148
    ►1.4. Adequate staffing of social officers per organizational plan (Yes/No, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             No                          Yes                          Yes                       Yes

    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024

   Comments
   IN01119151
   ►1.5. Number of capacity building and training workshops conducted for the hired social workers at the Central and Governorate level.
   (Number, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                        86.00                        86.00                     27.00

    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024

    Comments



  Enhancing Transparency and Accountability of Social Housing Programs
   IN01119131
    ►2.1. Mechanism to monitor occupancy of housing post-subsidy established and functioning as per DLI definition (Yes/No, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             No                          Yes                          Yes                       Yes

    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024

    Comments
    IN01119138
    ►2.2. Percentage of rental housing units occupied by targeted beneficiaries at least 1 year after lease (Percentage, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                        93.77                        95.50                     75.00

    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024

   Comments
   IN01119142
   ►2.3. Percentage of ownership housing units occupied by low-income households after at least 1 year of receiving subsidies under the AMP
   (Percentage, Custom)

                                      Baseline                    Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                        93.77                        95.50                     85.00

    Date                              10-Aug-2015                 31-Jul-2021                  02-Mar-2022               31-Dec-2024




4/11/2022                                                                                                                 Page 12 of 21
            The World Bank                                                                                Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




    Comments
    IN01119147
    ►2.4. Establish a unified social programs and beneficiary databases (Yes/No, Custom)

                                      Baseline                  Actual (Previous)            Actual (Current)         End Target

    Value                             No                        Yes                         Yes                       Yes

    Date                              10-Aug-2015               31-Jul-2021                 02-Mar-2022               31-Dec-2024

    Comments
    IN01119150
    ►2.5. Establishment of a functioning accountability and transparency mechanism in SHMFF as per DLI definition (Yes/No, Custom)

                                      Baseline                  Actual (Previous)            Actual (Current)         End Target

    Value                             No                        Yes                         Yes                       Yes

    Date                              10-Aug-2015               31-Jul-2021                 02-Mar-2022               31-Dec-2024

    Comments
    IN01119152
    ►2.6. Average time required to resolve complaints in AMP (Days, Custom)

                                      Baseline                  Actual (Previous)            Actual (Current)         End Target

    Value                             60.00                     20.00                       20.00                     20.00

    Date                              10-Aug-2015               31-Jul-2021                 02-Mar-2022               31-Dec-2024

    Comments
    IN01119153
    ►2.7. Percentage of resolved complaints received by SHMFFF and Governorate housing offices (Percentage, Custom)

                                      Baseline                  Actual (Previous)            Actual (Current)         End Target

    Value                             0.00                      92.85                       92.40                     90.00

    Date                              10-Aug-2015               31-Jul-2021                 02-Mar-2022               31-Dec-2024

    Comments
    IN01119154
    ►2.8. Annual published reports on complaints and how issues were resolved, including resolution rates (Yes/No, Custom)

                                      Baseline                  Actual (Previous)            Actual (Current)         End Target

    Value                             No                        Yes                         Yes                       Yes

    Date                              10-Aug-2015               31-Jul-2021                 02-Mar-2022               31-Dec-2024

    Comments



  Improving Access to Affordable Housing
    IN01119134


4/11/2022                                                                                                              Page 13 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




    ►3.1. Number of households receiving demand side home ownership subsidies for new units under the AMP (Number, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                       370,648.00                   399,393.00                950,000.00

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments

     IN01119136
     3.1.1. Female- headed households as percentage of beneficiaries (Percentage, Custom Supplement)

                                     Baseline                   Actual (Previous)            Actual (Current)          End Target

      Value                         0.00                        22.13                       22.27                      24.00
    IN01119143
    ►3.2. Number of households participating in rental subsidy programs (Number, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                       2,374.00                     2,376.00                  102,400.00

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments

     IN01119145
     3.2.1. Female-headed households as percentage of beneficiaries (Percentage, Custom Supplement)

                                     Baseline                   Actual (Previous)            Actual (Current)          End Target

      Value                         0.00                        0.00                        0.00                       20.00
    IN01119149
    ►3.3. Number of previously vacant units occupied 1 year after inclusion into the Program (Number, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                       65,104.00                    96,380.00                 30,000.00

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments



  Promoting Well Located Social Housing
    IN01119133
    ►4.1. Percent of demand-side subsidies supporting the purchase or rental of housing units within a 60 minute travel time to an employment
   center (Percentage, Custom)

                                      Baseline                   Actual (Previous)            Actual (Current)          End Target

    Value                             0.00                       100.00                       100.00                    50.00

    Date                              10-Aug-2015                31-Jul-2021                  02-Mar-2022              31-Dec-2024

    Comments
    IN01119139


4/11/2022                                                                                                                Page 14 of 21
            The World Bank                                                                                 Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)



   ►4.2. Percent of demand-side subsidies supporting the purchase or rental of housing units within a 45 minute travel time to an employment
   center (Percentage, Custom)

                                      Baseline                    Actual (Previous)          Actual (Current)          End Target

    Value                             0.00                        100.00                     100.00                    50.00

    Date                              10-Aug-2015                 31-Jul-2021                02-Mar-2022              31-Dec-2024

   Comments
   IN01119144
   ►4.3. Percent of demand-side subsidies supporting the purchase or rental of housing units within a 30 minute travel time to an employment
   center (Percentage, Custom)

                                      Baseline                    Actual (Previous)          Actual (Current)          End Target

    Value                             0.00                        100.00                     100.00                    15.00

    Date                              10-Aug-2015                 31-Jul-2021                02-Mar-2022              31-Dec-2024

   Comments
   IN01119146
   ►4.4. Percentage of land made available for SHMFF developments that complies with location and service criteria stated in Law
   (Percentage, Custom)

                                      Baseline                    Actual (Previous)          Actual (Current)          End Target

    Value                             0.00                        100.00                     100.00                    100.00

    Date                              10-Aug-2015                 31-Jul-2021                02-Mar-2022              31-Dec-2024

    Comments



  Promoting Private Sector Participation in Low-Income Housing
    IN01119132
    ►5.1. Number of demand-side subsidies supporting the purchase or rental of housing units developed by the private sector (Number,
   Custom)

                                      Baseline                    Actual (Previous)          Actual (Current)          End Target

    Value                             0.00                        2,549.00                   2,554.00                  250,000.00

    Date                              10-Aug-2015                 31-Jul-2021                02-Mar-2022              31-Dec-2024

    Comments
    IN01119137
    ►5.2. PPP guidelines publicly disseminated (Yes/No, Custom)

                                      Baseline                    Actual (Previous)          Actual (Current)          End Target

    Value                             No                          Yes                        Yes                       Yes

    Date                              10-Aug-2015                 31-Jul-2021                02-Mar-2022              31-Dec-2024

   Comments
   IN01119141
   ►5.3. Percentage of demand side subsidy supporting the purchase or rental of housing units developed by private sector (Percentage,
   Custom)



4/11/2022                                                                                                               Page 15 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                                       Baseline                  Actual (Previous)            Actual (Current)           End Target

    Value                              0.00                      0.68                         0.64                       43.00

    Date                               10-Aug-2015               31-Jul-2021                  02-Mar-2022                31-Dec-2024

    Comments


 Disbursement Linked Indicators
 DLI_IND_TABLE
    ►DLI 1 Establishment and operation of an internal audit function within SHMFF providing assurance service for the ownership and rental
   programs affiliated with the SHMFF (Process, 25.00, 60%)


                                  Baseline                     Actual (Previous)           Actual (Current)               2024

    Value                         No                           Yes                         Yes                            Yes

    Date                          01-Apr-2014                  31-Jul-2021                 02-Mar-2022                   --

    Comments


    ►DLI 2 Establishment and functioning of a housing monitoring and evaluation system and an M&E unit within SHMFF, and the preparation of
    the Multi-Year Plan and Annual Targets informed by the M&E system (Process, 25.00, 20%)


                                  Baseline                     Actual (Previous)           Actual (Current)               2024

    Value                         No                           Yes                         Yes                            Yes

    Date                          01-Apr-2014                  31-Jul-2021                 02-Mar-2022                   --

    Comments


    ►DLI 3 The establishment and functioning of an accountability and transparency mechanism within SHMFF for implementing the Program
    (Process, 50.00, 40%)


                                  Baseline                     Actual (Previous)           Actual (Current)               2024

    Value                         No                           Yes                         Yes                            Yes

    Date                          01-Apr-2014                  31-Jul-2021                 02-Mar-2022                   --

    Comments
      IN01119158
      DLI 3.1 DLI 3.1: Establishment of an operational and properly staffed Claims Management Unit (Output, 6.00, 0%)

      Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                     Actual (Previous)           Actual (Current)               2024

     Value                        No                           Yes                         Yes                           Yes



4/11/2022                                                                                                                Page 16 of 21
            The World Bank                                                                                     Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




     Date                         --                             31-Jul-2021                  02-Mar-2022                    --

     Comments


   ►DLI 4 Establishment by SHMFF of a functioning mechanism to monitor occupancy and vacancy of housing units by households receiving
   demand–side housing subsidy (Process, 50.00, 40%)


                                  Baseline                       Actual (Previous)             Actual (Current)              2024

    Value                         No                             Yes                           Yes                           Yes

    Date                          01-Apr-2014                    31-Jul-2021                  02-Mar-2022                    --

    Comments


   ►DLI 5 Number of households receiving demand-side homeownership subsidies for new housing units in each Fiscal Year during Program
   implementation under the AMP (Outcome, 475.00, 3%)


                                  Baseline                       Actual (Previous)             Actual (Current)              2024

    Value                         0.00                           370,648.00                    399.00                        950.00

    Date                          01-Apr-2014                    31-Jul-2021                  02-Mar-2022                    --

    Comments


   ►DLI 6 Number of new households participating in rental subsidy programs in each Fiscal Year during Program implementation (Outcome,
   60.25, 1%)


                                  Baseline                       Actual (Previous)             Actual (Current)              2024

    Value                         0.00                           1.95                          2.30                          102.40

    Date                          01-Apr-2014                    31-Aug-2020                  02-Mar-2022                    --

    Comments
     IN01119162
     DLI 6.1 DLI 6.1: Establishment of a functioning rental unit and a digital platform within SHMFF linking private landlords and eligible
     tenants (Output, 8.00, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                       Actual (Previous)             Actual (Current)              2024

     Value                        No                             No                            No                           Yes

     Date                         --                             31-Jul-2021                  02-Mar-2022                    --

     Comments

     IN01119163




4/11/2022                                                                                                                    Page 17 of 21
            The World Bank                                                                                   Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)



     DLI 6.2 DLI 6.2: Implementation of a rental incentive package including a rental risk insurance product, and direct subsidies for tenants
     (Output, 10.25, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                      Actual (Previous)             Actual (Current)              2024

     Value                        No                            No                            No                           Yes

     Date                         --                            31-Jul-2021                  02-Mar-2022                   --

     Comments


   ►DLI 7 Percentage of demand-side subsidies provided supporting the purchase or rental of housing units located within a commute of 60
   minutes or less to an employment center (Outcome, 25.00, 20%)


                                  Baseline                      Actual (Previous)             Actual (Current)              2024

    Value                         0.00                          100.00                        100.00                        50.00

    Date                          01-Apr-2014                   31-Jul-2021                  02-Mar-2022                   --

    Comments


   ►DLI 8 Number of demand-side subsidies provided supporting the purchase or rental of housing units developed by private sector entities in
   each Fiscal Year (Output, 50.00, 1%)


                                  Baseline                      Actual (Previous)             Actual (Current)              2024

    Value                         0.00                          2,549.00                      2.50                          250.00

    Date                          01-Apr-2014                   31-Jul-2021                  02-Mar-2022                   --

    Comments
     IN01119166
     DLI 8.1 DLI 8.1: Development and implementation of new PPP guidelines addressing key bottlenecks expressed by private sector
     (Output, 17.00, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                      Actual (Previous)             Actual (Current)              2024

     Value                        No                            Yes                           Yes                          Yes

     Date                         --                            31-Jul-2021                  02-Mar-2022                   --

     Comments

     IN01119167
     DLI 8.2 DLI 8.2: Call for proposals under new PPP guidelines (Output, 17.00, 0%)

     Unit of Measure: Yes/No
     Indicator Type:


4/11/2022                                                                                                                  Page 18 of 21
            The World Bank                                                                                   Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




                                  Baseline                      Actual (Previous)             Actual (Current)            2024

     Value                        No                            No                            No                          Yes

     Date                         --                            31-Jul-2021                  02-Mar-2022                  --

     Comments

     IN01119168
     DLI 8.3 DLI 8.3: Roll out and implementation of three PPP pilots representing 10,000 units (Output, 50.00, 0%)

     Unit of Measure: Number (Thousand)
     Indicator Type:


                                  Baseline                      Actual (Previous)             Actual (Current)            2024

     Value                        0.00                          0.00                          0.00                        10.00

     Date                         --                            31-Jul-2021                  02-Mar-2022                  --

     Comments


   ►DLI 9 Development, adoption and implementation of an alternative system that progressively phases out the interest rate subsidy (Output,
   50.00, 0%)


                                  Baseline                      Actual (Previous)             Actual (Current)            2024

    Value                         No                            No                            No                          Yes

    Date                          --                            31-Jul-2021                  02-Mar-2022                  --

    Comments



    ►DLI 10 Adoption of legislation regulating real estate profession and installment sales (Output, 50.00, 0%)


                                  Baseline                      Actual (Previous)             Actual (Current)            2024

    Value                         No                            No                            No                          Yes

    Date                          --                            31-Jul-2021                  02-Mar-2022                  --

    Comments
     IN01119171
     DLI 10.1 DLR 10.1: Adoption of a real estate developers law (including, implementing regulations; and related regulatory authority) in form
     and substance satisfactory to the Bank (Output, 25.00, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                      Actual (Previous)             Actual (Current)            2024

     Value                        No                            No                            No                          Yes


4/11/2022                                                                                                                 Page 19 of 21
            The World Bank                                                                                Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)




     Date                         --                          31-Jul-2021                  02-Mar-2022                  --

     Comments

     IN01119172
     DLI 10.2 DLR 10.2: Adoption of regulations on installments sales post construction including supervisory regime, in form and substance
     satisfactory to the Bank (Output, 25.00, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                     Actual (Previous)           Actual (Current)             2024

     Value                        No                          No                           No                           Yes

     Date                         --                          31-Jul-2021                  02-Mar-2022                  --

     Comments



    ►DLI 11 Operationalization of SHMFF Environment Unit (Output, 4.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2024

    Value                         No                          Yes                          Yes                          Yes

    Date                          --                          31-Jul-2021                  02-Mar-2022                  --

    Comments
     IN01119174
     DLI 11.1 DLI 11.1: Number of housing units with green GPRS certification from the National Building Research Center as per the
     Operations Manual (Output, 10.00, 0%)
     Unit of Measure: Number (Thousand)
     Indicator Type:


                                  Baseline                     Actual (Previous)           Actual (Current)             2024

     Value                        0.00                        0.00                         0.00                         25.00

     Date                         --                          31-Jul-2021                  02-Mar-2022                  --

     Comments



    ►DLI 12 Improve the efficiency of the subsidy application and issuance process (Output, 15.00, 0%)


                                  Baseline                     Actual (Previous)           Actual (Current)             2024

    Value                         No                          No                           No                           Yes

    Date                          --                          31-Jul-2021                  02-Mar-2022                  --

    Comments
     IN01119176


4/11/2022                                                                                                               Page 20 of 21
            The World Bank                                                                                  Implementation Status & Results Report
            Inclusive Housing Finance Program (P150993)



     DLI 12.1 DLR 12.1 Carrying out of a review and streamlining of procedures and screening processes of application, analysis and
     provision of the subsidy and implementation of recommendations (Output, 7.50, 0%)
     Unit of Measure: Yes/No
     Indicator Type:


                                  Baseline                    Actual (Previous)            Actual (Current)              2024

     Value                        No                          No                           No                           Yes

     Date                         --                          31-Jul-2021                 02-Mar-2022                    --

     Comments

     IN01119177
     DLI 12.2 DLR 12.2: Pilot delegation of underwriting procedures to selected banks (Output, 7.50, 0%)

     Unit of Measure: Number (Thousand)
     Indicator Type:


                                  Baseline                    Actual (Previous)            Actual (Current)              2024

     Value                        0.00                        0.00                         0.00                         5.00

     Date                         --                          31-Jul-2021                 02-Mar-2022                    --

     Comments




4/11/2022                                                                                                                Page 21 of 21