Plan Belgrano WSS Development Project (P125151) PROCUREMENT Argentina : Plan Belgrano Water Supply and Sanitation Services Development Project PLAN General Information Country: Argentina 2017-07-17 Bank’s Approval Date of the Original Procurement Plan: 2022-08-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P125151 GPN Date: Project Name: Plan Belgrano Water Supply and Sanitation Services Development Project Loan / Credit No: / , IBRD / 80320, IBRD / 87310 Ministry of Home Affairs, Public Works and Housing Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-NGII-24-O-LPI / Planta de Tratamiento de Líquidos Cloa Component 1: Water Supply Solicitud de oferta Open - Internationa 64,600,000.0 64,464,034. 2016-01-0 / Previa Firmado 2013-09-17 2013-10-04 2013-11-18 2013-12-09 2014-01-02 2014-04-29 cales del Área Metropolitana and Sanitation Infrastructure s l 0 61 2 Gran Resistencia. AR-NGII-25-O-LPI / Sistema d e Colección en Impulsión Clo Component 1: Water Supply Solicitud de oferta Open - Internationa 76,030,000.0 83,392,069. 2015-12-0 / Previa Firmado 2013-07-24 2013-08-22 2013-10-08 2013-10-31 2013-12-06 2013-12-23 acal del Área Metropolitana, and Sanitation Infrastructure s l 0 36 6 Gran Resistencia. LPI N 02/13 / Obra:Planta de Tratamiento de Líquidos Cloa Component 1: Water Supply Solicitud de oferta Open - Internationa Single Stage - One E 78,300,000.0 78,300,000. En ejecució IBRD / 80320 Previa 2014-04-09 cales del Área Metropolitana and Sanitation Infrastructure s l nvelope 0 00 n Gran Resistencia, Provincia d e Chaco AR-MININTERIOR-31232-CW- RFB / Obra Abastecimiento d e Agua Potable a las Localida Component 1: Water Supply Solicitud de oferta Open - Internationa Single Stage - One E 17,610,714.4 2018-11-1 des de Wichí, El Sauzal, Misió IBRD / 80320 Previa 0.00 Cancelado 2017-10-05 2017-10-05 2017-11-22 2017-12-14 2018-04-12 2019-01-31 2018-05-17 and Sanitation Infrastructure s l nvelope 9 3 n Nueva Pompeya y Fuerte E speranza, Etapa II, Provincia de Chaco.Las obras proyecta das comprenden. AR-MININTERIOR-44442-CW- RFB / Remediación de Lagun Component 1: Water Supply Solicitud de oferta Open - Internationa Single Stage - One E 21,494,148.0 2018-12-1 as de sedimentación en el ár IBRD / 80320 Previa 0.00 Cancelado 2018-02-23 2018-03-05 2018-04-16 2018-05-16 2018-06-20 and Sanitation Infrastructure s l nvelope 0 7 ea Metropolitana de Gran Re sistencia, Provincia de Chaco AR-MININTERIOR-49928-CW- RFB / OBRA: ACUEDUCTO PR ESIDENCIA ROCA - PAMPA DE Component 1: Water Supply Solicitud de oferta Open - Internationa Single Stage - One E 29,298,210.0 2018-12-1 L INDIO Y OTRAS CINCO LOC IBRD / 87310 Previa 0.00 Cancelado 2018-02-20 2018-03-07 2018-04-18 2018-05-18 2018-06-22 and Sanitation Infrastructure s l nvelope 0 9 ALIDADES - 2DA ETAPA - RED ES DE DISTRIBUCIÓN DE AGU A POTABLE, PROVINCIA DEL CHACO AR-MININTERIOR-31232-CW- RFB-2 / Obra Abastecimiento de Agua Potable - Localidade Component 1: Water Supply Solicitud de oferta Open - Internationa Single Stage - One E 24,501,815.2 2023-06-0 IBRD / 80320 Previa 0.00 Cancelado 2020-12-23 2020-12-28 2021-02-14 2021-05-15 2021-06-12 s de Wichí, El Sauzal, Misión and Sanitation Infrastructure s l nvelope 7 2 Nueva Pompeya y Fuerte Esp eranza, Etapa II, Provincia de Chaco AR-MININTERIOR-214622-C W-RFB / Obra Abastecimiento de Agua Potable - Localidade Component 1: Water Supply Solicitud de oferta Single Stage - One E 22,649,474.1 26,604,645. 2023-05-0 IBRD / 80320 Previa Open - National Firmado 2021-01-21 2021-01-28 2021-01-26 2021-01-29 2021-03-09 2021-03-05 2021-04-08 2021-05-11 2021-05-13 2021-07-06 s de Wichí, El Sauzal, Misión and Sanitation Infrastructure s nvelope 9 77 3 Nueva Pompeya y Fuerte Esp eranza, Etapa II, Provincia de Chaco GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-8-B-CP / Compras va Component 1: Water Supply Solicitud de cotiza rias de equipamiento mobilia / Previa Limited - National 45,000.00 0.00 Cancelado 2016-11-09 2016-12-09 2017-01-31 and Sanitation Infrastructure ciones rio de oficina AR-NGII-29-B-CP / Adquisició Component 1: Water Supply Solicitud de cotiza / Posterior Limited - National 21,100.00 0.00 Cancelado 2016-11-04 2016-11-24 2016-12-20 n de artículos de Librería par and Sanitation Infrastructure ciones a la UEP. AR-NGII-51-B-CP / Adquisició Component 1: Water Supply Solicitud de cotiza / Posterior Limited - National 38,000.00 0.00 Cancelado 2016-09-30 2016-11-28 2017-01-27 n de equipos informáticos and Sanitation Infrastructure ciones AR-NGII-9-B-CP / Equipamien Component 1: Water Supply Solicitud de cotiza / Previa Limited - National 25,000.00 0.00 Cancelado 2016-11-09 2016-12-20 2017-02-15 to Informático (Soft y Hardwa and Sanitation Infrastructure ciones re) AR-NGII-46-B-LPI / Adquisició Component 2: Institutional a n, provisión e instalación de Solicitud de oferta Open - Internationa Single Stage - One E IBRD / 80320 nd Operational Development Previa 7,103,449.00 0.00 En ejecución 2018-05-11 2018-05-16 2018-06-27 2018-07-27 2018-08-31 2019-02-27 micromedidores y medidores s l nvelope and Technical Assistance de agua potable.- AR-MININTERIOR-83924-GO- Component 2: Institutional a Solicitud de cotiza Single Stage - One E RFQ / Adquisición de Mobiliar IBRD / 80320 nd Operational Development Posterior Limited 60,000.00 0.00 En ejecución 2018-10-28 2018-10-19 2018-11-13 2019-01-12 ciones nvelope io para oficina DiGePPSE and Technical Assistance AR-MININTERIOR-83927-GO- Component 2: Institutional a Solicitud de cotiza Single Stage - One E RFQ / Adquisición de equipa IBRD / 80320 nd Operational Development Posterior Limited 82,500.00 36,080.46 Firmado 2018-10-31 2018-12-05 2018-11-30 2019-06-10 2019-01-29 ciones nvelope miento informático para ofici and Technical Assistance na DiGePPSE AR-MININTERIOR-87716-GO- Component 2: Institutional a Solicitud de oferta Open - Internationa Single Stage - One E RFB / Adquisición de Equipa IBRD / 80320 nd Operational Development Previa 851,671.20 520,552.62 Firmado 2019-05-13 2019-05-31 2019-06-02 2019-08-05 2019-07-17 2019-08-08 2019-09-15 2020-08-21 2019-11-14 2020-11-19 2020-01-13 s l nvelope miento fijo para Laboratorios and Technical Assistance -I AR-MININTERIOR-112642-GO Component 2: Institutional a Solicitud de oferta Open - Internationa Single Stage - One E -RFB / Adquisición de Equipa IBRD / 80320 nd Operational Development Previa 6,141,000.00 568,128.95 Firmado 2019-05-15 2019-09-02 2019-06-04 2019-11-27 2019-07-19 2019-11-28 2019-09-17 2021-03-23 2019-11-16 2021-06-29 2020-01-15 s l nvelope miento Fijo para los Laborato and Technical Assistance rios- II Page 1 AR-MININTERIOR-44109-GO- Component 2: Institutional a RFB / Adquisición de Medidor Solicitud de oferta Open - Internationa Single Stage - One E IBRD / 80320 nd Operational Development Previa 9,000,000.00 0.00 Cancelado 2018-02-05 2018-02-10 2018-03-24 2018-04-23 2018-05-28 2019-01-23 es de Agua Potable, Kit de Mi s l nvelope and Technical Assistance cro Medición y de Cajas Unifi cadas, con instalación. AR-MININTERIOR-169205-GO -RFB / Adquisición de Draga Component 2: Institutional a para la Obra: Abastecimiento Solicitud de oferta Open - Internationa Single Stage - One E IBRD / 80320 nd Operational Development Previa 2,355,340.41 1,029,011.52 Firmado 2020-07-20 2020-10-21 2020-09-01 2021-01-26 2020-10-16 2021-02-10 2021-01-14 2021-05-10 2021-03-05 2021-09-17 2021-05-04 de Agua Potable en las Locali s l nvelope and Technical Assistance dades de Wichi, El Sauzal, Mi sión Nueva Pompeya y Fuert e Esperanza - Etapa I, Chaco AR-MININTERIOR-225272-GO Component 2: Institutional a Solicitud de cotiza Single Stage - One E -RFQ / Adquisición de Equipa IBRD / 80320 nd Operational Development Posterior Limited 95,000.00 97,051.29 Firmado 2021-03-31 2021-03-17 2021-04-30 2021-05-28 2021-06-29 ciones nvelope miento y Accesorios de Infor and Technical Assistance mática NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-28-S-CP / Servicio d Component 1: Water Supply Solicitud de cotiza / Posterior Limited - National 43,000.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 e limpieza para la oficina de l and Sanitation Infrastructure ciones a UEP. AR-NGII-11-S-CP / Servicio e Component 1: Water Supply Solicitud de cotiza / Posterior Limited - National 12,198.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 xterno de archivo and Sanitation Infrastructure ciones AR-NGII-30-S-CP / Servicio T Component 1: Water Supply Solicitud de cotiza écnico y alquiler de fotocopia / Posterior Limited - National 16,300.00 0.00 Cancelado 2016-11-04 2016-11-30 2017-11-30 and Sanitation Infrastructure ciones dora para la oficina de la UEP . CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-NGII-27-CF-SBCC / Inspec ción para la Obra: Planta de Component 1: Water Supply Selección basada Open - Internationa / Previa 3,211,248.00 2,798,138.22 Firmado 2013-10-04 2013-12-12 2013-12-26 2014-01-13 2014-07-10 2017-02-13 Tratamiento de Líquidos Cloa and Sanitation Infrastructure en calidad y costo l cales del Área Metropolitana Gran Resistencia. AR-NGII-26-CF-SBCC / Inspec ción para la Obra: Sistema d Component 1: Water Supply Selección basada Open - Internationa / Previa 3,500,000.00 3,153,776.19 Firmado 2013-11-22 2014-01-26 2014-03-15 2014-04-15 2014-03-26 2017-05-15 e Colección en Impulsión Clo and Sanitation Infrastructure en calidad y costo l acal del Área Metropolitana, Gran Resistencia. AR-NGII-33-CF-SBMC / Contr Component 1: Water Supply Selección basada atación de los Trabajos de Au / Previa Open - National 10,680.00 19,294.34 Firmado 2013-11-19 2014-03-18 2014-04-25 2014-05-09 2014-12-10 2015-06-30 and Sanitation Infrastructure en el menor costo ditoría Externa, Ejercicio 201 4. Selección basada AR-NGII-53-CF-SCC / 354635 Component 1: Water Supply Open - Internationa / Posterior en calificaciones d 21,321,321.00 0.00 Cancelado 465 and Sanitation Infrastructure l e consultores AR-MININTERIOR-60998-CS- QCBS / CONTRATACIÓN PARA LA ELABORACIÓN DE UN PLA N DIRECTOR DE AGUA Y SAN Component 3: Project Manag Selección basada Open - Internationa IBRD / 80320 Posterior 500,000.00 105,683.40 Firmado 2018-04-26 2016-06-01 2018-05-17 2018-06-30 2016-10-12 2018-07-28 2016-11-10 2018-08-27 2017-01-23 2018-10-01 2017-03-14 2018-11-05 2017-05-12 2019-11-05 EAMIENTO PARA EL AREA ME ement and Supervision en calidad y costo l TROPOLITANA DE PUERTO IG UAZU - PROVINCIA DE MISIO NES - Pedido de Propuestas UEP 8032 - 10/2016 - NGII-4 1-SBCC-CF- AR-MININTERIOR-60999-CS- QCBS / CONTRATACIÓN PARA LA ELABORACIÓN DE PROYE Component 3: Project Manag Selección basada Open - Internationa CTO EJECUTIVO DEL SISTEMA IBRD / 80320 Posterior 750,000.00 0.00 En ejecución 2018-04-26 2016-05-19 2018-05-17 2018-06-30 2016-10-07 2018-07-28 2016-11-14 2018-08-27 2017-01-30 2018-10-01 2017-03-17 2018-11-05 2019-11-05 ement and Supervision en calidad y costo l CLOACAL EN SAN VICENTE - PROVINCIA DE MISIONES - P edido de Propuestas UEP 803 2 - 11/2016 - NGII-42-SBCC- CF- AR-MININTERIOR-61000-CS- QCBS / CONTRATACIÓN PARA LA REVISIÓN, COMPLETAMIE NTO Y ACTUALIZACIÓN DE P Component 3: Project Manag Selección basada Open - Internationa ROYECTO SISTEMA CLOACAL IBRD / 80320 Posterior 700,000.00 61,705.06 Firmado 2018-04-26 2016-06-07 2018-05-17 2018-06-30 2016-09-29 2018-07-28 2016-11-03 2018-08-27 2017-01-16 2018-10-01 2017-03-03 2018-11-05 2017-09-20 2019-11-05 ement and Supervision en calidad y costo l L.N.ALEM - SISTEMA CLOACA L DE ARISTOBULO DEL VALLE - PROVINCIA DE MISIONES - P edido de Propuestas UEP 803 2 - 12/2016 - NGII-43-SBCC-C F- AR-MININTERIOR-31240-CS- QCBS / CONTRATACIÓN DE T RABAJOS PARA LA INSPECCIÓ N DE LA OBRA: ABASTECIMIE Component 1: Water Supply Selección basada Open - Internationa IBRD / 80320 Previa 880,535.70 0.00 Cancelado 2017-10-11 2017-10-20 2017-12-04 2018-01-01 2018-01-31 2018-03-07 2018-04-11 2019-04-11 NTO DE AGUA POTABLE PAR and Sanitation Infrastructure en calidad y costo l A LAS LOCALIDADES DE WIC HÍ, EL SAUZAL, MISIÓN NUEV A POMPEYA Y FUERTE ESPER ANZA - ETAPA II - PROVINCIA DE CHACO AR-MININTERIOR-43779-CS-L CS / Servicio de Auditoría Ext Component 3: Project Manag Selección basada Ejecución pendien IBRD / 80320 Posterior Open - National 80,714.00 0.00 2018-01-12 2018-01-12 2018-01-16 2018-02-20 2018-02-26 2018-03-01 2018-03-05 2020-08-31 erna del Préstamo BIRF 8032 ement and Supervision en el menor costo te -AR y su financiamiento adici onal BIRF 8731-AR AR-MININTERIOR-113147-CS -QCBS / Monitoreo Proactivo Component 3: Project Manag Selección basada IBRD / 80320 Posterior Open - National 185,848.00 0.00 En ejecución 2019-05-08 2019-02-15 2019-05-29 2019-07-12 2019-08-09 2019-09-08 2019-10-13 2019-11-17 2021-11-06 de los PGRs de Prestadores d ement and Supervision en calidad y costo e Agua Potable y Saneamiento AR-MININTERIOR-98095-CS- QCBS / CONTRATACIÓN DE T RABAJOS PARA LA INSPECCIÓ N DE LA OBRA: ABASTECIMIE Component 1: Water Supply Selección basada Open - Internationa IBRD / 80320 Posterior 955,000.00 0.00 Cancelado 2019-02-04 2019-02-09 2019-03-16 2019-04-13 2019-05-13 2019-06-17 2019-07-22 2020-07-21 NTO DE AGUA POTABLE PAR and Sanitation Infrastructure en calidad y costo l A LAS LOCALIDADES DE WIC HÍ, EL SAUZAL, MISIÓN NUEV A POMPEYA Y FUERTE ESPER ANZA - ETAPA II - PROVINCIA DE CHACO Page 2 AR-MININTERIOR-31242-CS- QCBS / CONTRATACIÓN DE L OS TRABAJOS DE INSPECCIÓ Component 1: Water Supply Selección basada Open - Internationa N DE LA OBRA REMEDIACIÓN IBRD / 80320 Previa 1,234,378.21 0.00 Cancelado 2017-10-11 2017-10-20 2017-12-03 2017-12-31 2018-01-30 2018-03-06 2018-04-10 2019-04-10 and Sanitation Infrastructure en calidad y costo l DE LAGUNAS DE SEDIMENTA CIÓN EN EL ÁREA METROPOL ITANA DE GRAN RESISTENCIA , PROVINCIA DE CHACO AR-NGII-50-CI-CD / Contratac ión para la elaboración del m Component 1: Water Supply Adquisición direct / Posterior National 7,000.00 0.00 Cancelado 2016-09-20 2017-02-20 anual operativo, en el marco and Sanitation Infrastructure a del nuevo financiamiento BIR F. AR-NGII-54-CI-CD / Contratac ión de servicios de consultori Component 1: Water Supply Adquisición direct / Posterior National 2,300.00 0.00 Cancelado 2017-04-03 2017-04-28 a para llevar a cabo las tarea and Sanitation Infrastructure a s de traducción pública del n uevo Préstamo BIRF. AR-NGII-49-CI-CD / Contratac ión para la actualización de e Component 1: Water Supply Adquisición direct / Posterior National 3,500.00 0.00 Cancelado 2016-09-30 2016-10-31 studios sociales en el marco and Sanitation Infrastructure a del nuevo financiamiento BIR F. AR-NGII-53-CI-CD / CONSULT ORÍA PARA LA EVALUACIÓN DE PROPUESTAS TÉCNICAS Y Component 1: Water Supply Adquisición direct / Posterior National 2,500.00 0.00 Cancelado 2017-04-03 2017-07-03 DE PRECIO PARA LA ELABOR and Sanitation Infrastructure a ACIÓN DE PROYECTOS EJECU TIVOS DE LAS OBRAS DEL PR OYECTO. AR-MININTERIOR-49932-CS- QCBS / Contratación del Serv icio de Inspección de la Obra: ACUEDUCTO PRESIDENCIA R Component 1: Water Supply Selección basada Open - Internationa IBRD / 87310 Previa 1,171,928.00 0.00 Cancelado 2018-02-28 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-08-05 2018-09-09 2019-09-09 OCA - PAMPA DEL INDIO Y OT and Sanitation Infrastructure en calidad y costo l RAS CINCO LOCALIDADES - 2 DA ETAPA - REDES DE DISTRI BUCIÓN DE AGUA POTABLE, PROVINCIA DEL CHACO. AR-MININTERIOR-31240-CS- QCBS-2 / Contratación de Tra bajos de Inspección de Obra Component 1: Water Supply Selección basada Open - Internationa Abastecimiento de Agua Pota IBRD / 80320 Posterior 880,535.70 625,142.55 Firmado 2020-05-04 2019-03-13 2020-05-13 2020-06-27 2021-05-21 2020-07-25 2021-06-22 2020-08-24 2021-08-18 2020-09-21 2021-06-22 2020-10-21 2021-10-16 2022-10-11 and Sanitation Infrastructure en calidad y costo l ble - Localidades de Wichí, El Sauzal, Misión Nueva Pompe ya y Fuerte Esperanza, Etapa II, Prov. de Chaco AR-MININTERIOR-304729-CS Component 3: Project Manag Selección basada -LCS / Contratación AUDITORI IBRD / 80320 Posterior Open - National 40,552.13 0.00 Bajo Revision 2022-07-18 2022-07-21 2022-07-18 2022-07-22 2022-08-26 2022-09-01 2022-09-04 2022-09-08 2025-03-06 ement and Supervision en el menor costo A Ejercicio 2022 - BIRF 8032 y 8731 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MININTERIOR-44105-CS- CDS / Consultoria para la ela boración de los Planes de Ge Component 3: Project Manag Selección directa IBRD / 80320 Posterior Direct 45,000.00 45,000.00 Firmado 2018-04-26 2018-08-02 2018-05-03 2018-08-17 2018-05-20 2018-12-18 2019-01-30 stión y Resultados de los pre ement and Supervision de consultores stadores de agua y saneamie nto de la región norte de la A rgentina AR-MININTERIOR-87039-CS- CDS / Consultoría externa pa Component 3: Project Manag Selección directa IBRD / 80320 Posterior Direct 34,122.00 0.00 Cancelado 2018-11-23 2018-12-05 2019-01-29 2019-05-29 ra la elaboración de PGR´s: T ement and Supervision de consultores ucumán y Misiones AR-NGII-7-CI-3CV / Plantel Pr Component 2: Institutional a ofesional, Técnico y Administ IBRD / 80320 nd Operational Development Posterior Individual Limited 569,038.00 1,062,585.17 Firmado 2018-12-21 2018-12-21 2016-01-11 2019-01-02 2016-12-30 2020-03-31 rativo de DiGePPSE y DNAPy and Technical Assistance S AR-MININTERIOR-168842-CS Component 2: Institutional a -INDV / Plantel Profesional, T IBRD / 80320 nd Operational Development Posterior Individual Limited 45,000.00 78,984.13 Firmado 2020-04-15 2020-04-01 2020-04-16 2020-03-27 2020-04-17 2020-04-22 2020-04-19 2020-04-23 2020-11-04 écnico y Administrativo DIGE and Technical Assistance PPSE AR-MININTERIOR-121657-CS Component 2: Institutional a -CDS / Programa de Capacita Selección directa IBRD / 80320 nd Operational Development Posterior Direct 108,000.00 0.00 Cancelado 2019-08-15 2019-09-04 2019-10-09 2020-06-05 ción en Regulación de Servici de consultores and Technical Assistance os Públicos de Agua y Sanea miento AR-MININTERIOR-100961-CS Component 2: Institutional a -CDS / Programa de Capacita Selección directa IBRD / 80320 nd Operational Development Posterior Direct 130,000.00 0.00 Cancelado 2019-05-20 2019-06-09 2019-07-14 2020-03-10 ción en Proyecto de Instalaci de consultores and Technical Assistance ones de Ingeniería Sanitaria AR-MININTERIOR-44115-CS-I NDV / Contratación de servici os para el relevamiento de n Component 3: Project Manag ecesidades y definición de Es IBRD / 80320 Posterior Individual Direct 119,000.00 0.00 Cancelado 2018-01-31 2018-02-10 2018-03-03 2018-04-07 2018-09-04 ement and Supervision pecificaciones Técnicas para Macromedición de Prestador es Principales de Agua Potabl e y Saneamiento. AR-MININTERIOR-181526-CS Component 3: Project Manag Ejecución pendien IBRD / 80320 Posterior Individual Limited 6,225.00 0.00 2020-06-23 2020-06-28 2020-06-29 2020-07-09 2021-01-05 -INDV / Analista Económico Fi ement and Supervision te nanciero AR-MININTERIOR-201097-CS -INDV / Especialista Senior - Servicio de consultoría para asesoramiento técnico en la Component 3: Project Manag IBRD / 80320 Posterior Individual Direct 30,000.00 0.00 En ejecución 2020-10-23 2018-02-06 2020-10-27 2020-11-01 2020-11-16 2021-07-14 compra de equipamiento par ement and Supervision a los laboratorios de empres as prestadoras de agua y des agües cloacales de la Región Norte Argentino AR-MININTERIOR-213879-CS Component 3: Project Manag -INDV / Analista en adquisicio IBRD / 80320 Posterior Individual Limited 5,000.00 35,103.24 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 ement and Supervision nes y Contrataciones AR-MININTERIOR-213900-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 3,000.00 27,456.83 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 -INDV / Asistente de Mesa de ement and Supervision Entradas Page 3 AR-MININTERIOR-213902-CS Component 3: Project Manag -INDV / Especialista en Adqui IBRD / 80320 Posterior Individual Limited 5,500.00 18,468.19 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-20 2021-01-18 2021-01-26 2021-04-30 ement and Supervision siciones y Contrataciones AR-MININTERIOR-213903-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 4,500.00 37,120.29 Firmado 2021-01-14 2021-01-15 2021-01-15 2021-01-20 2021-01-16 2021-01-26 2021-01-18 2021-01-26 2021-04-30 -INDV / Analista en Encuadre ement and Supervision Normativo AR-MININTERIOR-221948-CS Component 3: Project Manag -INDV / Especialista en Sopor IBRD / 80320 Posterior Individual Limited 12,000.00 16,862.17 Firmado 2021-02-26 2021-03-04 2021-02-27 2021-03-02 2021-02-28 2021-03-09 2021-03-02 2021-03-09 2021-12-31 ement and Supervision te del Sistema de Gestión de Obras AR-MININTERIOR-221951-CS Component 3: Project Manag -INDV / Staff Operativo de Ap IBRD / 80320 Posterior Individual Limited 12,000.00 35,233.84 Firmado 2021-02-26 2021-03-04 2021-02-27 2021-03-02 2021-02-28 2021-03-09 2021-03-02 2021-03-09 2021-12-31 ement and Supervision oyo de Gestión de Procesos AR-MININTERIOR-226063-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 5,094.00 22,187.09 Firmado 2021-03-23 2021-04-08 2021-03-24 2021-03-31 2021-03-25 2021-04-14 2021-04-01 2021-04-14 2021-12-31 -INDV / Asistente de Mesa de ement and Supervision Entradas AR-MININTERIOR-226064-CS Component 3: Project Manag -INDV / Especialista en Adqui IBRD / 80320 Posterior Individual Limited 11,823.00 41,350.84 Firmado 2021-03-23 2021-04-08 2021-03-24 2021-03-31 2021-03-25 2021-04-15 2021-04-01 2021-04-15 2021-12-31 ement and Supervision siciones y Contrataciones AR-MININTERIOR-226065-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 7,905.00 30,461.29 Firmado 2021-03-23 2021-04-08 2021-03-26 2021-04-13 2021-03-27 2021-04-14 2021-04-01 2021-04-14 2021-12-31 -INDV / Asistente de Encuadr ement and Supervision e Normativo AR-MININTERIOR-226068-CS -INDV / Asistente para la Dire Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 7,373.00 25,930.49 Firmado 2021-03-23 2021-04-08 2021-03-26 2021-03-31 2021-03-27 2021-04-14 2021-04-01 2021-04-14 2021-12-31 cción de Gestión de Proyecto ement and Supervision s Sectoriales y Especiales AR-MININTERIOR-236848-CS -INDV / Especialista Senior en Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 11,000.00 10,282.62 Firmado 2021-05-27 2021-05-27 2021-05-28 2021-06-16 2021-05-29 2021-06-17 2021-06-01 2021-06-17 2021-12-31 el Desarrollo de Metodología ement and Supervision s para Laboratorios de Ensay o AR-MININTERIOR-239911-CS Component 3: Project Manag -INDV / Especialista para el S IBRD / 80320 Posterior Individual Limited 7,819.00 33,614.60 Firmado 2021-06-16 2021-06-16 2021-06-17 2021-06-27 2021-06-18 2021-06-30 2021-06-20 2021-06-30 2022-04-20 ement and Supervision ector de Monitoreo de Contra tos. AR-MININTERIOR-245117-CS Component 3: Project Manag -INDV / ANALISTA ECONÓMIC IBRD / 80320 Posterior Individual Limited 5,531.00 24,788.14 Firmado 2021-07-22 2021-07-22 2021-07-27 2021-07-26 2021-07-28 2021-07-30 2021-08-01 2021-07-30 2022-01-28 ement and Supervision O FINANCIERO AR-MININTERIOR-249429-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 4,723.60 4,625.59 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-24 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 -INDV / Analista Sector Ambi ement and Supervision ental AR-MININTERIOR-249430-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 4,302.20 24,123.89 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-24 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 -INDV / Analista Sector Ambi ement and Supervision ental AR-MININTERIOR-249432-CS Component 3: Project Manag -INDV / Analista Sector Relaci IBRD / 80320 Posterior Individual Limited 4,302.20 11,039.43 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-01 2021-09-01 2021-09-07 2021-12-31 ement and Supervision ones Institucionales AR-MININTERIOR-249433-CS Component 3: Project Manag -INDV / Especialista Sector R IBRD / 80320 Posterior Individual Limited 6,274.60 31,637.67 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-06 2021-09-01 2021-09-06 2021-12-31 ement and Supervision elaciones Institucionales AR-MININTERIOR-249435-CS Component 3: Project Manag -INDV / Analista Sector de Ge IBRD / 80320 Posterior Individual Limited 4,723.60 25,780.70 Firmado 2021-08-23 2021-08-19 2021-08-24 2021-08-25 2021-08-25 2021-09-01 2021-09-01 2021-09-03 2021-12-31 ement and Supervision stión de Consultores Individu ales AR-MININTERIOR-252617-CS Component 3: Project Manag -INDV / Analista para el Secto IBRD / 80320 Posterior Individual Limited 3,000.00 18,262.08 Firmado 2021-09-08 2021-09-08 2021-09-09 2021-09-29 2021-09-10 2021-10-01 2021-09-15 2021-10-05 2021-12-31 ement and Supervision r de Auditoría y Mejora de Pr ocesos AR-MININTERIOR-255923-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 3,800.00 22,689.58 Finalizado 2021-10-01 2021-09-10 2021-10-02 2021-09-29 2021-10-03 2021-10-06 2021-10-04 2021-10-06 2021-12-31 2022-05-23 -INDV / Analista Técnico ement and Supervision AR-MININTERIOR-271701-CS Component 3: Project Manag -INDV / Especialista para el s IBRD / 80320 Posterior Individual Limited 18,916.00 491.40 Firmado 2022-01-03 2022-01-26 2022-01-04 2022-01-04 2022-01-05 2022-01-25 2022-01-07 2022-01-25 2022-12-31 ement and Supervision ector de Presupuesto AR-MININTERIOR-271702-CS Component 3: Project Manag -INDV / Analista para el secto IBRD / 80320 Posterior Individual Limited 17,400.00 16,930.64 Firmado 2022-01-03 2022-01-24 2022-01-04 2022-01-25 2022-01-05 2022-01-25 2022-01-07 2022-01-25 2022-12-31 ement and Supervision r Liquidaciones AR-MININTERIOR-275647-CS -INDV / Consultor Experto en Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 6,603.00 6,502.04 Firmado 2022-01-28 2022-01-27 2022-01-29 2022-01-31 2022-01-30 2022-02-11 2022-02-01 2022-02-11 2022-12-02 Desarrollo de Gestión - Plataf ement and Supervision orma de Gestión de Obras (S GO) AR-MININTERIOR-275648-CS Component 3: Project Manag -INDV / Consultor Experto en IBRD / 80320 Posterior Individual Limited 6,603.00 6,502.04 Firmado 2022-01-28 2022-01-27 2022-01-29 2022-02-01 2022-01-30 2022-02-07 2022-02-01 2022-02-10 2022-12-31 ement and Supervision Gestión de Proyectos AR-MININTERIOR-283438-CS Component 3: Project Manag -INDV / Asesor Integral en Co IBRD / 80320 Posterior Individual Limited 13,737.00 0.00 En ejecución 2022-03-10 2022-03-10 2022-03-11 2022-03-12 2022-03-15 2023-01-13 ement and Supervision mercio Exterior AR-MININTERIOR-283440-CS Component 3: Project Manag -INDV / Especialista en Sopor IBRD / 80320 Posterior Individual Limited 10,127.00 0.00 En ejecución 2022-03-10 2022-03-11 2022-03-12 2022-03-21 2023-01-19 ement and Supervision te del Sistema de Gestión de Obras AR-MININTERIOR-291763-CS Component 3: Project Manag -INDV / Analista para el Secto IBRD / 80320 Posterior Individual Limited 10,657.00 11,001.46 Firmado 2022-04-21 2022-04-21 2022-04-22 2022-04-26 2022-04-23 2022-05-01 2022-05-01 2022-05-04 2023-04-24 ement and Supervision r de Gestión de Procesos AR-MININTERIOR-299381-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 1,408.30 0.00 En ejecución 2022-06-10 2022-06-07 2022-06-11 2022-06-12 2022-06-13 2022-12-31 -INDV / Analista técnico ement and Supervision AR-MININTERIOR-304058-CS Component 3: Project Manag Ejecución pendien IBRD / 80320 Posterior Individual Limited 6,527.14 0.00 2022-07-13 2022-07-14 2022-07-15 2022-08-01 2022-12-31 -INDV / Analista para el Secto ement and Supervision te r Ambiental AR-MININTERIOR-306518-CS Component 3: Project Manag IBRD / 80320 Posterior Individual Limited 5,011.00 0.00 En ejecución 2022-07-27 2022-07-28 2022-07-29 2022-08-16 2023-01-01 -INDV / Asistente Técnico ement and Supervision Page 4 AR-MININTERIOR-306520-CS Component 3: Project Manag Ejecución pendien IBRD / 80320 Posterior Individual Limited 5,889.00 0.00 2022-07-27 2022-07-28 2022-07-29 2022-08-16 2023-01-01 -INDV / Analista Técnico ement and Supervision te AR-MININTERIOR-311153-CS -INDV / Asistente para la Dire Component 3: Project Manag Ejecución pendien IBRD / 80320 Posterior Individual Limited 5,000.00 0.00 2022-08-19 2022-08-22 2022-08-23 2022-09-01 2022-12-31 cción General de Programas ement and Supervision te y Proyectos Sectoriales y Esp eciales Page 5