KINGDOM OF CAMBODIA
              Nation Religion King




 National Committee for Sub-National Democratic
       Development Secretariat (NCDD-S)

     Cambodia Nutrition Project - II P177370
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
                     (ESCP)




                    December 2021




                                                  Confidential
                         ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN


1. The Kingdom of Cambodia (hereinafter the Recipient) will implement the Cambodia Nutrition Project
   II (the Project) with the involvement of the National Committee for Sub-National Democratic
   Development Secretariat (NCDD-S), in collaboration with the Ministry of Health (MOH),
   District/Municipal Administration (DMA) and Commune/Sangkat Administrations. The International
   Development Association, acting as the fund of KfW (Kreditanstalt für Wiederaufbau) (hereafter the
   Bank) have agreed to provide financing for the Project.
2. The Recipient will implement material measures and actions so that the Project is implemented in
   accordance with the Environmental and Social Standards (ESSs). This Environmental and Social
   Commitment Plan (ESCP) sets out a summary of the material measures and actions, any specific
   documents or plans, as well as the timing for each of these.
3. The Recipient will also comply with the provisions of any other E&S documents required under the
   ESF referred to in this ESCP, such as the Environmental and Social Management Plan (ESMP),
   Indigenous Peoples Planning Framework (IPPF), Labor Management Procedures (LMP), and
   Stakeholder Engagement Plan (SEP) and the timelines specified in those E&S documents.
4. The Recipient is responsible for compliance with all requirements of the ESCP even when
   implementation of specific measures and actions is conducted by the Ministry, agency or unit
   referenced in 1 above.
5. Implementation of the material measures and actions set out in this ESCP will be monitored and
   reported to Bank by Recipient as required by the ESCP and the conditions of the legal agreement, and
   the Bank will monitor and assess progress and completion of the material measures and actions
   throughout implementation of the Project.
6. As agreed by the Bank and the Recipient, this ESCP may be revised from time to time during Project
   implementation, to reflect adaptive management of Project, changes and unforeseen circumstances
   or in response to assessment of Project performance conducted under the ESCP itself. In such
   circumstances, the Recipient will agree to the changes with the Bank and will update the ESCP to
   reflect such changes. Agreement on changes to the ESCP will be documented through the exchange
   of letters signed between the Bank and the Recipient. The Recipient will promptly disclose the
   updated ESCP.
7. Where Project changes, unforeseen circumstances, or Project performance result in changes to the
   risks and impacts during Project implementation, the Recipient shall provide additional funds, if
   needed, to implement actions and measures to address such risks and impacts.




                                                                                                     2


                                                                                                     Confidential
MATERIAL MEASURES AND ACTIONS                                                    TIMEFRAME                 RESPONSIBILE
                                                                                                           ENTITY/AUTHORITY
MONITORING AND REPORTING
A      REGULAR REPORTING                                                         Bi-annually               NCDD-S
       Prepare and submit regular environmental and social monitoring
       reports as a section of the semi-annual project reports on the overall
       environmental and social compliance in accordance with the
       requirements of ESCP, ESMP, IPPF, LMP and SEP.
B      INCIDENTS AND ACCIDENTS                                                   Promptly notify the Bank NCDD-S
       Promptly (within 24 hours) notify the Bank of any incident or accident    of the incident or accident
       related to the Project which has, or is likely to have, significant       within 24 hours after
       adverse effects on the environment, the communities and project           learning of the incident or
       workers. Such incident or accident include COVID-19 clusters due to       accident. A report will be
       project activities, workplace accidents, allegations of Sexual            provided within a
       Exploitation and Abuse/Sexual Harassment (SEA/SH), Violence               timeframe acceptable to
       against Children (VAC) and medical malpractices associated with           the Bank as requested.
       project activities. Provide sufficient detail regarding the incident or   Monitor potential risks
       accident, indicating immediate measures taken and / or those that         and relevant procedure(s)
       are planned to be taken to address it. Prepare a report on the            throughout project
       incident or accident and propose any measures to prevent its              implementation
       recurrence.
ESS 1: ASSESSMENT AND MANAGEMENT OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS
1.1.   ORGANIZATIONAL STRUCTURE                                                  One month following       NCDD-S
       Assign one environmental focal point and one social focal point           project effectiveness
       and/or specialists to oversee the overall environmental and social
       management under the project.
1.2    ENVIRONMENTAL AND SOCIAL MANAGEMENT                                       ESMP, LMP, and IPPF to    NCDD-S
                                                                                 be disclosed, consulted

                                                                                                                              3


                                                                                                                              Confidential
MATERIAL MEASURES AND ACTIONS                                                 TIMEFRAME                   RESPONSIBILE
                                                                                                          ENTITY/AUTHORITY
      Adopt and implement the ESMP, LMP and IPPF that have been               and finalized prior to
      prepared for the project in a manner acceptable to the Bank. These      project effectiveness and
      include amongst others: i) implement relevant protocols and             implemented throughout
      procedures to avoid and mitigate risks and measures to enhance          project implementation.
      development opportunities in an inclusive manner; ii) oversee
      potential risks during project implementation, iii) provide technical
      support and facilitation to implementing entities; iv) maintain and
      monitor potential grievances associated under the project; v)
      perform and maintain stakeholder engagement. Update these
      instruments if there are changes in the project’s design, activities
      and/or risks.
ESS 2: LABOR AND WORKING CONDITIONS
2.1   LABOR MANAGEMENT PROCEDURES                                             LMP adopted by project      NCDD-S
      Adopt and implement the LMP that has been developed for the             effectiveness and
      project, particularly on aspects related to Occupational, Health and    implemented throughout
      Safety (OHS) during the COVID-19 pandemic and fair, non-                project implementation
      discriminatory, respectful, and equal treatments in the workplace.
      Maintain and operate a grievance mechanism for project workers as
      established under the LMP consistent with ESS2. Update the LMP if
      there are changes in the project’s design, activities and/or risks.


ESS 3: RESOURCE EFFICIENCY AND POLLUTION PREVENTION AND MANAGEMENT
3.1   E-WASTE MANAGEMENT PLAN                                                 Adopted by project          NCDD-S
      Adopt and implement the project’s Environmental Codes of Practice       effectiveness and
      (ECOP) for e-waste management and disposal as established in the        implemented throughout
      ESMP, to manage disposal of ICT equipment funded by the project.        project implementation


                                                                                                                             4


                                                                                                                             Confidential
MATERIAL MEASURES AND ACTIONS                                                 TIMEFRAME                    RESPONSIBILE
                                                                                                           ENTITY/AUTHORITY

      Coordinate with the Ministry of Health to ensure management of the
      incremental risk of potentially scale-up healthcare waste generation
      under CNP l as result of the promotion-based activities under CNP-ll.



3.2   RESOURCE EFFICIENCY AND POLLUTION PREVENTION AND                        Prior to submission of the   NCDD-S
      MANAGEMENT                                                              procurement documents
      Include provisions for energy efficient equipment in the procurement    of ICT equipment into the
      specifications. Include provisions to full compliance with              World Bank’s STEP
      Environmental Health and Safety Guidelines (EHSGs) in the project’s
      Operational Manual (OM).
ESS 4: COMMUNITY HEALTH AND SAFETY
4.1   MANAGEMENT OF COMMUNTY HEALTH AND SAFETY RISKS                          Adopted by project           NCDD-S
      Adopt and implement measures and actions to assess and manage           effectiveness and
      specific risks to the community associated with project activities,     implemented throughout
      including COVID-19 Infection Prevention Control (IPC) measures,         project implementation
      SEA/SH and VAC risks as established in the ESMP.
ESS 7: INDIGENOUS PEOPLES
7.1   INCLUSIVE ENGAGEMENT AND MEANINGFUL PARTICIPATION                       Adopted by project           NCDD-S
      Adopt and implement relevant provisions in the IPPF for project         effectiveness and
      implementation where there is presence of Indigenous Peoples in         implemented throughout
      line with ESS7 and in a manner acceptable to the Bank. Particular       project implementation
      measures include: i) inclusive stakeholder engagement, participation
      and outreach; ii) provisions of culturally and socially appropriate

                                                                                                                              5


                                                                                                                              Confidential
MATERIAL MEASURES AND ACTIONS                                                       TIMEFRAME                    RESPONSIBILE
                                                                                                                 ENTITY/AUTHORITY
       project activities; iii) inclusive, accessible and safe grievance handling
       mechanisms; and iv) public health measures in times of COVID-19.
ESS 10: STAKEHOLDER ENGAGEMENT AND INFORMATION DISCLOSURE
10.1   STAKEHOLDER ENGAGEMENT IMPLEMENTATION                                        Adopted by project           NCDD-S
       Implement the project’s SEP to ensure inclusive, accessible, socially        effectiveness and
       culturally engagement with key stakeholders including the target             implemented throughout
       community members for the purpose of implementation of activities            project implementation
       under the project. Disclose relevant information to project
       stakeholders in a timely and accessible manner.
10.2   PROJECT GRIEVANCE MECHANISM                                                  Adopted by project           NCDD-S
       Maintain and strengthen the project’s Feedback and Grievance                 effectiveness and
       Redress Mechanism (FGRM) as described in the SEP                             implemented throughout
                                                                                    project implementation
CAPACITY SUPPORT (TRAINING)
CS.1   Provide training and capacity building support to project                    Prior to deployment of       NCDD-S
       implementing entities at both national and sub-national levels,              personnel to the field and
       including Communes/Sangkat Administrations on aspects related to             maintained throughout
       the project’s environmental and social management, including                 project implementation
       among others:
          •   Management of environmental and social risks as established
              in the ESMP
          •   Stakeholder engagement and social inclusion as established in
              the SEP and IPPF
          •   Management of labor-related risks, including OHS as
              established in the LMP


                                                                                                                                    6


                                                                                                                                    Confidential
MATERIAL MEASURES AND ACTIONS                                            TIMEFRAME   RESPONSIBILE
                                                                                     ENTITY/AUTHORITY
        •   Management of community health and safety risks, including
            COVID-19 prevention, SEA/SH and VAC prevention as
            established in the ESMP and SEP
        •   Grievance handling mechanisms and/or processes




                                                                                                        7


                                                                                                        Confidential