The World Bank                                                                                    Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)


 EAST ASIA AND PACIFIC | China | Agriculture and Food Global Practice | Requesting Unit: EACCF | Responsible Unit: SEAAG
 IBRD/IDA | Program-for-Results Financing | FY 2022 | Team Leader(s): Ladisy Komba Chengula, Wendao Cao


 Seq No: 1 | ARCHIVED on 06-Jul-2022 | ISR51183 | Created by: Yunqing Tian on 24-Apr-2022 | Modified by: Ladisy Komba Chengula on 29-Jun-
 2022


 Program Development Objectives

  PDO Table
  Program Development Objective (from Program Appraisal Document)
  The Program Development Objective (PDO) is to enhance environmentally sustainable agricultural and rural infrastructure development in
  selected areas of Guangxi and Guizhou.

 Overall Ratings

 Name                                                                        Previous Rating                         Current Rating

 Progress towards achievement of PDO                                         --                                      Satisfactory
 Overall Implementation Progress (IP)                                        --                                      Satisfactory


 Implementation Status and Key Decisions

  This is the first ISR for the Green Agricultural and Rural Revitalization Program-Phase I. The program was approved by the Executive Directors of
  the Board of the Bank on March 31, 2022.
  The government is working on the internal procedures for signing. It is expected the project could be signed in July 2022.



 Data on Financial Performance


 Disbursements (by loan)

 Project       Loan/Credit/TF     Status       Currency        Original   Revised        Cancelled   Disbursed     Undisbursed             % Disbursed

                                  Not
 P177590       IBRD-93570                      USD             170.00      170.00             0.00        0.00           170.00                       0%
                                  Effective

                                  Not
 P177590       IBRD-93580                      USD             150.00      150.00             0.00        0.00           150.00                       0%
                                  Effective


 Key Dates (by loan)

 Project        Loan/Credit/TF     Status      Approval Date       Signing Date     Effectiveness Date     Orig. Closing Date     Rev. Closing Date

                                   Not
 P177590        IBRD-93570                     31-Mar-2022         --               --                     30-Jun-2028            30-Jun-2028
                                   Effective
                                   Not
 P177590        IBRD-93580                     31-Mar-2022         --               --                     30-Jun-2028            30-Jun-2028
                                   Effective



 Program Action Plan



7/6/2022                                                                                                                    Page 1 of 13
           The World Bank                                                                                         Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



                                  1. Issue an official notification that no contract will be awarded to either a firm or an individual appearing on either the
  Action Description
                                  World Bank’s debarred list or under temporary suspension list.

  Source                          DLI#                    Responsibility           Timing                    Timing Value                Status

                                                                                                             No later than loan
  Fiduciary Systems                                       RPMO/PPMO                Other                                                 Not Yet Due
                                                                                                             effectiveness

  Completion Measurement          Provincial/Regional official notifications to counties are issued and copies are shared with the World Bank

  Comments



                                  2. Regularly inform the World Bank of any credible and material allegations of fraud and/or corruption regarding the
  Action Description
                                  PforR’s activities as part of the overall PforR’s reporting requirements.

  Source                          DLI#                    Responsibility           Timing                    Timing Value                Status

  Fiduciary Systems                                       RPMO/PPMO                Recurrent                 Semi-Annually               Not Yet Due

  Completion Measurement          Reflected in the PforR’s quarterly/annual progress reports

  Comments



                                  3. Guangxi and Guizhou to Issue updated policies related to funds integration and budget performance evaluation
  Action Description              measures that increase the discretion of the county governments to utilize funds in line with their development plans
                                  and priorities.

  Source                          DLI#                    Responsibility           Timing                    Timing Value                Status

                                                          RPMO/PPMO and
  Fiduciary Systems                                       relevant government      Due Date                  31-Dec-2022                 Not Yet Due
                                                          agency

                                  Document is issued by the relevant government agencies and shared with the World Bank.
  Completion Measurement


  Comments



                                  4. Implement measures to improve rural solid waste transfer stations by enhancing leachate and odour management
  Action Description
                                  facilities and providing PPE, sanitation and resting facilities for workers.

  Source                          DLI#                    Responsibility           Timing                    Timing Value                Status

  Environmental and Social        DLI 8                   PHURDD, county
                                                                                   Recurrent                 Continuous                  Not Yet Due
  Systems                                                 HURDBs

                                  RPMO/PPMO submit transfer stations’ completion acceptance reports as well as semi-annual progress reports to the
  Completion Measurement
                                  World Bank, to provide information about completion and operation of the relevant facilities.

  Comments




7/6/2022                                                                                                                          Page 2 of 13
            The World Bank                                                                                         Implementation Status & Results Report
            Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



                                   5. Undertake measures to ensure availability of adequate operations and maintenance (O&M) funding for the
  Action Description
                                   wastewater treatment facilities.

  Source                           DLI#                   Responsibility            Timing                  Timing Value                  Status

  Environmental and Social         DLI 8                  PEEDs, county
                                                                                    Recurrent               Continuous                    Not Yet Due
  Systems                                                 EEBs

                                   RPMO/PPMO submit O&M funding arrangement documents as well as semi-annual progress reports to the Bank, to
  Completion Measurement
                                   provide information about O&M funding arrangement

  Comments



                                   6. Prepare and implement detailed training and capacity building plans: (a) GA skills training plan; (b) training plan for
  Action Description               the O&M of the rural solid waste and wastewater facilities; and (c) capacity building plans supporting the achievement
                                   of DLIs.

  Source                           DLI#                   Responsibility            Timing                  Timing Value                  Status

                                                          RPMO/PPMO and
  Other                                                                             Recurrent               Yearly                        Not Yet Due
                                                          CPMOs

                                   The training and capacity building plans are prepared by PMOs and cleared by the Bank. Records of the people
  Completion Measurement
                                   trained in various skills are kept in the MIS.

  Comments




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                                Rating at Approval                Previous Rating               Current Rating

  Political and Governance                                     Low                              --                            Low
  Macroeconomic                                                Low                              --                            Low
  Sector Strategies and Policies                               Low                              --                            Low
  Technical Design of Project or Program                       Moderate                         --                            Moderate
  Institutional Capacity for Implementation and
                                                               Substantial                      --                            Substantial
  Sustainability
  Fiduciary                                                    Substantial                      --                            Substantial
  Environment and Social                                       Substantial                      --                            Moderate
  Stakeholders                                                 Low                              --                            Low
  Other                                                        --                                --                            --
  Overall                                                      Substantial                      --                            Substantial


  RiskComments




7/6/2022                                                                                                                            Page 3 of 13
           The World Bank                                                                                      Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



  Comments
  This is an initial ISR for the GARR I following its Board approval on March 31, 2022. Implementation has not yet started because the LA and PAs
  have not been signed; and the GARR I is not effective.




  Results


 PDO Indicators by Objectives / Outcomes


  To enhance environmentally sustainable agricultural and rural infrastructure development
   IN01133280
   ►1. Nutrient load reduction (Ammonia-Nitrogen (NH3N), Total Phosphorus (TP)) achieved under the PforR in program counties (Tons/year,
   Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                        --                            0.00                      34,787.00

    Date                               01-Jul-2021                 --                            15-Jun-2022               30-Jun-2028

                                       Cumulative quantities of the annual reduction of nutrient loads (NH3N, TP) achieved due to fertilizer use
    Comments
                                       reduction and increase in efficiency in selected value chains (e.g., rice, fruits and vegetables).
    IN01133291
    ►2. Chemical Oxygen Demand (COD) pollution load reduction achieved under the PforR in program counties (Tons/year, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                        --                            0.00                      226,667.00

    Date                               01-Jul-2021                 --                            15-Jun-2022               30-Jun-2028
                                       Cumulative quantities of the annual reduction of pollution load (COD) achieved due to the improved
    Comments                           management of livestock and poultry manure and wastewater treatment in demonstration villages in
                                       program counties.
    IN01133292
    ►3. Greenhouse gas (GHG) emissions reduction achieved under the PforR in the program counties (Metric tons/year, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                        --                            0.00                      2,260,000.00

    Date                               01-Jul-2021                 --                            15-Jun-2022               30-Jun-2028

                                    This indicator measures the reduction in metric tons of GHG emissions from the activity of chemical fertilizer
   Comments
                                    reduction, manure management, plastic recycled, and solid waste incineration
   IN01133293
   ►4. Beneficiaries reached with assets or public services (disaggregated by gender and ethnic minority) under the PforR in program counties
   (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                        --                            0.00                      6,790,971.00

    Date                               01-Jul-2021                 --                            15-Jun-2022               30-Jun-2028
                                       Number of the people in program counties who directly derive benefits (disaggregated by gender and ethnic
    Comments                           minority) from program intervention (i.e., IT-based systems, green value chain development, wastewater
                                       and solid waste treatment and other public services etc.).
     IN01133294
     (a) female (Number, Custom Supplement)


7/6/2022                                                                                                                     Page 4 of 13
           The World Bank                                                                                       Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




                                     Baseline                      Actual (Previous)             Actual (Current)           End Target

     Value                           0.00                         --                             0.00                       3,270,095.00

     IN01133295
     (b) ethnic minority (Number, Custom Supplement)

                                     Baseline                      Actual (Previous)             Actual (Current)           End Target

     Value                           0.00                         --                             0.00                       3,354,744.00


 Intermediate Results Indicators by Results Areas



  Results Area 1: Strengthening institutional capacity for governance
   IN01133297
    ►1. Development and use of a comprehensive IT-based M&E system for rural infrastructure and public services (Number, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       27.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028
                                       Establishment of an IT-based system that enables provinces to expand the scope of IT-based rural
                                       infrastructure (or assets) management system to include wastewater and solid waste activities. The IT-
    Comments                           based system will enable county governments to monitor and evaluate investments, O&M of facilities, and
                                       whether the rural infrastructure meet the provincial environmental standards. IT-based systems will also be
                                       used for decision-making support/tool and to improve transparency and accountability.
   IN01133301
   ►2. Development and use of an IT-based system for green agricultural program-based budgeting and expenditure reporting (Number,
   Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       27.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028
                                       Establishment of an IT-based program-based budgeting plans and expenditure reporting system that adopts
                                       RRS plan expenditure classification. The platform would enable county governments to consolidate or pool
    Comments
                                       fiscal resources from various earmarked budgets to finance priority sub-programs and track expenditures
                                       under the RRS plan. This will show the contribution of PforR to green agricultural development.
   IN01133303
   ►3. Number of agro-products certified and/or registered in the PforR counties as either green, organic or GI using the approved
   regional/provincial regulations, standards and guidelines (Number, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       255.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028
                                       This indicator measures both number of product certificates and the number of geographical indication (GI)
                                       registered by using the approved regional/provincial regulations, standards and guidelines.. Product
    Comments
                                       certification is defined as agri-products certified as organic and green according to national standards set by
                                       MARA. Geographical indication (GI) certificates are done according to national standards.
    IN01133306
    ►4. Number of program counties have adopted the evidence-based 15th rural revitalization five-year plan (Number, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)           End Target


7/6/2022                                                                                                                       Page 5 of 13
           The World Bank                                                                                        Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




    Value                              0.00                         --                             0.00                       27.00

    Date                               01-Jul-2021                  --                             15-Jun-2022                30-Jun-2028
                                       This indicator focuses on tracking the impact of the M&E system of rural revitalization program on the
    Comments                           development of rural revitalization strategy. It is measured by the number of counties that have adopted the
                                       15th rural revitalization five-year plan using the information collected through the M&E system.


  Results Area 2 - Greening selected agricultural value chains
   IN01133298
   ►Tonnes of chemical fertilizer reduced due to the adoption of green technologies and sustainable practices in selected crop production
   systems in the Program Counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         --                             0.00                       137,376.00

    Date                               01-Jul-2021                  --                             15-Jun-2022                30-Jun-2028

    Comments
    IN01133300
    ►5. Quantity of organic fertilizer used in the program counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         --                             0.00                       5,455,113.00

    Date                               01-Jul-2021                  --                             15-Jun-2022                30-Jun-2028

                                       Cumulative quantities of organic fertilizer used by farmers in various crop production systems as a
    Comments
                                       replacement for the chemical fertilizers.
    IN01133304
    ►6. Quantity of formula fertilizer used in the program counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         --                             0.00                       450,411.00

    Date                               01-Jul-2021                  --                             15-Jun-2022                30-Jun-2028

                                       Cumulative quantities of formula fertilizers used by farmers in various crop production systems as
    Comments
                                       substitutes to chemical fertilizers.
    IN01133307
    ►7. Area under fertigation in program counties (Hectare(Ha), Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         --                             0.00                       22,597.00

    Date                               01-Jul-2021                  --                             15-Jun-2022                30-Jun-2028
                                       Cumulative number of hectares (ha) under fertigation practices. Fertigation is the injection of fertilizers, used
    Comments                           for soil nutrients amendments, water amendments and other water soluble products into an irrigation
                                       system. Fertigation is related to chemigation, the injection of chemicals into an irrigation system
    IN01133309
    ►8. Area under green manure in the program counites (Hectare(Ha), Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target




7/6/2022                                                                                                                        Page 6 of 13
           The World Bank                                                                                       Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




    Value                              0.00                        --                             0.00                      81,199.00

    Date                               01-Jul-2021                 --                             15-Jun-2022               30-Jun-2028

                                      Cumulative number of hectares under green manure (nitrogen fixing crops), including vetch (genus Vicia),
   Comments
                                      which will be incorporated into the soil to increase organic matter and nutrients and improve soil structure.
   IN01133311
   ►9. Beneficiaries who have been trained in the green agricultural technologies and practices (farmers, input suppliers, enterprises/agri-
   businesses, extension staff), disaggregated by gender) (Number, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)          End Target

    Value                              0.00                        --                             0.00                      66,680.00

    Date                               01-Jul-2021                 --                             15-Jun-2022               30-Jun-2028

                                       Cumulative number of people (farmers, input suppliers, enterprises/agri-businesses, extension staff) trained
    Comments
                                       in green agricultural technologies and practices disaggregated by gender/ethnic minority
     IN01133312
     Of which female (Number, Custom Supplement)

                                     Baseline                     Actual (Previous)              Actual (Current)           End Target

     Value                          0.00                       --                          0.00                         10,521.00
   IN01133314
   ►10. Beneficiaries who have adopted green agricultural technologies and practices (farmers, input suppliers, enterprises/agri-businesses,
   extension staff), disaggregated by gender) (Percentage, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)          End Target

    Value                              30.00                       --                             0.00                      80.00

    Date                               01-Jul-2021                 --                             15-Jun-2022               30-Jun-2028

                                       Percentage of the people who have been trained and have adopted green agricultural technologies and
    Comments
                                       practices.
     IN01133315
     Of which female (Percentage, Custom Supplement)

                                     Baseline                     Actual (Previous)              Actual (Current)           End Target

      Value                          30.00                        --                             0.00                       80.00
    IN01133316
    ►Tons of livestock and poultry manure treated and recycled in the PforR counties (Tons/year, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)          End Target

    Value                              0.00                        --                             0.00                      20,343,528.00

    Date                               01-Jul-2021                 --                             15-Jun-2022               30-Jun-2028

    Comments
    IN01133317
    ►11. Manure treated by large farms in the program counties (Tons/year, Custom)

                                       Baseline                        Actual (Previous)          Actual (Current)          End Target

    Value                              0.00                        --                             0.00                      6,666,670.00




7/6/2022                                                                                                                      Page 7 of 13
           The World Bank                                                                                       Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028

                                    Cumulative quantity (tons) of livestock and poultry manure that are collected, treated and recycled by large
   Comments
                                    farms into organic fertilizer, biogas/energy generation, and irrigation water in the program counties.
   IN01133318
   ►12. Manure treated at centralized and small-scale manure treatment facilities constructed for small and medium scale farms in the program
   counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       13,676,858.00

    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028
                                       Cumulative quantity (tons) of livestock and poultry manure that are collected, treated and recycled by
    Comments                           centralized and small-scale manure treatment facilities for small and medium scale farms in program
                                       counties
    IN01133319
    ►13. Centralized manure treatment facilities constructed for small and medium scale farms in the program counties (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       156.00

    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028
                                       Cumulative number of centralized manure treatment facilities newly constructed for small and medium scale
                                       farms in the program counties. Small and medium-scale animal farms are defined as less than 500 head of
    Comments
                                       pigs, less than 2,000 egg chickens (Layers), less than 10,000 meat chicken (Broilers), and/or less than 30
                                       head of cattle.
    IN01133320
    ►14. Manure treatment facilities constructed for small scale farms in the program counties (Guizhou) (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       2,558.00

    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028

                                       Cumulative number of small scale manure treatment facilities newly constructed for small and medium scale
    Comments
                                       farms in the program counties in Guizhou.
    IN01133321
    ►Tons of agricultural plastics recovered and recycled in the PforR counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       37,869.00

    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028

    Comments
    IN01133322
    ►15. Quantity of agricultural plastic film recovered and recycled in the program counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       35,427.00

    Date                               01-Jul-2021                  --                            15-Jun-2022                30-Jun-2028

                                       Cumulative quantity (tons) of agricultural plastic mulch film (dry weight of plastic wastes) recovered, treated
    Comments
                                       and recycled in the program counties.

7/6/2022                                                                                                                       Page 8 of 13
           The World Bank                                                                                       Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



   IN01133323
   ►16. Quantity of agricultural chemical (fertilizer, pesticide, fungicide) packaging materials recycled in the program counties in program
   counties (Tons/year, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       2,442.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028

                                       Cumulative number (tons) of agricultural chemical (fertilizer, pesticide, fungicide) packaging materials
    Comments
                                       recovered, treated and recycled in the program counties


  Results Area 3 - Increasing access to solid waste and wastewater services
   IN01133296
    ►Number of spatial Integrated Village Development Plans (IVDPs) approved by the relevant PforR counties’ authorities (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       336.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028

   Comments
   IN01133299
   ►17. Counties implementing the approved guidelines for wastewater and solid waste management in rural villages in the program counties
   (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       27.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028

                                       Development of guidelines for wastewater and solid waste management in rural villages by
    Comments
                                       provincial/regional government and approved and used in program counties
    IN01133302
    ►18. Beneficiaries trained in O&M of rural villages wastewater and solid waste management systems in program counties (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       49,311.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028

                                        Cumulative number of people trained in O&M of rural villages wastewater and solid waste management
   Comments
                                        systems in the program counties
   IN01133305
   ►Number of demonstration villages with newly constructed or rehabilitated climate resilient wastewater treatment facilities and established
   solid waste collection, sorting and transfer systems (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                         --                            0.00                       112.00

    Date                               01-Jul-2021                  --                            15-Jun-2022               30-Jun-2028

   Comments
   IN01133308
   ►19. Percentage of rural domestic wastewater facilities in demonstration villages meeting effluent discharge standards (Percentage,
   Custom)


7/6/2022                                                                                                                       Page 9 of 13
           The World Bank                                                                                       Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




                                         Baseline                      Actual (Previous)          Actual (Current)          End Target

    Value                                0.00                          --                         0.00                      80.00

    Date                                 01-Jul-2021                   --                         15-Jun-2022               30-Jun-2028

                                     Percentage of wastewater properly treated and managed per the rural wastewater management guideline in
    Comments
                                     the pilot villages.
    IN01133310
    ►20. Percentage of rural domestic solid waste and agricultural plastic film in demonstration villages that is collected, sorted and transferred
    (Percentage, Custom)

                                         Baseline                      Actual (Previous)          Actual (Current)          End Target

    Value                                0.00                          --                         0.00                      70.00

    Date                                 01-Jul-2021                   --                         15-Jun-2022               30-Jun-2028

                                    Percentage of rural solid waste and agricultural plastic waste collected, sorted and treated according to the
    Comments
                                    per the rural solid waste management guideline in the pilot villages.
    IN01133313
    ►21. Percentage of newly created and upgraded jobs held by women in the transformation of agricultural value chain and in the rural waste
    management and environmental rehabilitation (Percentage, Custom)

                                         Baseline                      Actual (Previous)          Actual (Current)          End Target

    Value                                0.00                          --                         0.00                      50.00

    Date                                 01-Jul-2021                   --                         15-Jun-2022               30-Jun-2028
                                         The indicator will be calculated as the percentage of women or female employees in entities that receive the
    Comments                             Program support in the transformation of production, processing, packaging, marketing and sales of green
                                         agricultural products and in the newly constructed rural wastewater management facilities.

 Disbursement Linked Indicators
 DLI_IND_TABLE
    ►DLI 1 DLI1: Development and use of a comprehensive IT-based M&E system for rural infrastructure, public services and profile of rural
   villages (Guizhou) (Output, 6,800,000.00, 0%)


                                  Baseline                         Actual (Previous)            Actual (Current)             2027

    Value                         0.00                            --                            0.00                         0.00

    Date                          --                              --                            15-Jun-2022                  --

    Comments


    ►DLI 2 DLI1: Development and use of a comprehensive M&E system for the implementation of the Rural Revitalization Program (Guangxi)
    (Output, 5,984,991.25, 0%)


                                  Baseline                         Actual (Previous)            Actual (Current)             2027

    Value                         0.00                            --                            0.00                         0.00

    Date                          --                              --                            15-Jun-2022                  --

    Comments




7/6/2022                                                                                                                     Page 10 of 13
           The World Bank                                                                                   Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)



   ►DLI 3 DLI2: Development and use of an IT-based system for green agricultural program-based budgeting and expenditure reporting
   (Guizhou) (Output, 11,900,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        0.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 4 DLI2: Development and use of an IT-based system for green agricultural program-based budgeting and expenditure reporting
   (Guangxi) (Output, 10,473,750.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        0.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 5 DLI3: Adoption of regulations, standards and guidelines on GAP and number of products produced in the Program Counties that are
   certified and/or registered as either green, organic or GI (Guizhou) (Output, 6,800,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        28.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 6 DLI3: Adoption of regulations, standards and guidelines on GAP and number of products produced in the Program Counties that are
   certified and/or registered as either green, organic or GI (Guangxi) (Output, 5,985,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        23.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 7 DLI4: Tonnes of chemical fertilizer reduced due to the adoption of green technologies and sustainable practices in selected crop
   production systems in the Program counties (Guizhou) (Output, 25,500,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        29,956.00

    Date                          --                            --                           15-Jun-2022                 --



7/6/2022                                                                                                                 Page 11 of 13
           The World Bank                                                                                   Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




    Comments


   ►DLI 8 DLI4: Tonnes of chemical fertilizer reduced due to the adoption of green technologies and sustainable practices in selected crop
   production systems in the Program counties (Guangxi) (Output, 2.24, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        16,467.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 9 DLI5: Percentage increase of treated and recycled livestock and poultry manure from large scale and small scale farms in the
   Program Counties (Guizhou) (Output, 30,600,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         82.00                         --                           0.00                        5.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 10 DLI5: Percentage increase of treated and recycled livestock and poultry manure from large scale and small scale farms in the
   Program Counties (Guangxi) (Output, 26,932,500.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         85.00                         --                           0.00                        5.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 11 DLI6: Percentage increase of recovered and recycled agricultural plastics in the Program Counties (Guizhou) (Output,
   18,700,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         79.00                         --                           0.00                        1.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 12 DLI6: Percentage increase of recovered and recycled agricultural plastics in the Program Counties (Guangxi) (Output,
   16,458,750.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027




7/6/2022                                                                                                                 Page 12 of 13
           The World Bank                                                                                   Implementation Status & Results Report
           Green Agricultural and Rural Revitalization Program for Results - Phase I (P177590)




    Value                         82.00                         --                           0.00                        1.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 13 DLI7: Number of Integrated Village Development Plans (IVDPs) approved by Program Counties (Guizhou) (Output, 13,600,000.00,
   0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        35.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 14 DLI7: Number of Integrated Village Development Plans (IVDPs) approved by Program Counties (Guangxi)) (Output, 11,969,880.00,
   0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        20.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 15 DLI8: Number of demonstration villages with newly constructed or rehabilitated existing climate resilient wastewater treatment and
   solid waste collection, sorting and transfer systems (Guizhou)) (Output, 56,100,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        15.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments


   ►DLI 16 DLI8: Number of demonstration villages with newly constructed or rehabilitated existing climate resilient wastewater treatment and
   solid waste collection, sorting and transfer systems (Guangxi)) (Output, 4.93, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)            2027

    Value                         0.00                          --                           0.00                        10.00

    Date                          --                            --                           15-Jun-2022                 --

    Comments




7/6/2022                                                                                                                 Page 13 of 13