Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : PFM-MDF Financed Strengthening Public Financial Management Project Loan Credit No. : P 162196 2. Bank’s Approval Date of the Procurement Plan : March 2019 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contract above NCB ( Goods) > USD 30,000 and up to USD 100,000 USD 200,000 Shopping (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above USD 300,000 NCB (Works) > 50,000 and up to USD 1.5 million Shopping (Works) Up to USD 50,000 ICB (Non- > 200,000 USD All contract above Consulting USD 100,000 Services) NCB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Procurement Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above USD Based Selection 70,000 for Consultant (b) Quality Based No threshold Firms Selection (c) Selection Made No threshold All contracts above USD Under a Fixed Budget 50,000 for Individual (d) Least Cost Selection No threshold Consultants. (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Consultant Selection of firms Guidelines Para 3.9 (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT PLAN General Information Country: Bhutan 2018-04-10 Bank’s Approval Date of the Original Procurement Plan: 2022-05-05 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162196 GPN Date: Project Name: PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT Loan / Credit No: TF / A5549 Department of Revenue and Custom Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-DRC-GST-53742-GO-RFQ Strengthening Budget Execu Request for Quota Single Stage - One E / Automatic document scann TF / A5549 tion and Oversight Capacitie Post Open - National 306.88 Completed 2018-03-20 2018-04-24 2018-04-03 2018-10-21 2018-05-03 tions nvelope er with document feeder. s BT-DRC-GST-53750-GO-RFQ Strengthening Budget Execu Request for Quota Single Stage - One E TF / A5549 Post Open - National 392.93 Completed 2018-03-20 2018-05-14 2018-04-03 2018-11-10 2018-05-03 / Multi function network print tion and Oversight Capacitie tions nvelope er s BT-DRC-GST-53754-GO-RFQ Strengthening Budget Execu Request for Quota Single Stage - One E / Light weight portable projec TF / A5549 tion and Oversight Capacitie Post Open - National 685.47 Completed 2018-03-20 2018-04-30 2018-04-03 2018-10-27 2018-05-03 tions nvelope tor, pointer and screen s BT-DRC-GST-53778-GO-RFQ Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 1,707.16 Completed 2018-03-18 2018-05-13 2018-06-18 2018-11-09 2018-07-18 / Purchasing ten number of la d Institutional Framework tions nvelope ptops BT-DRC-GST-53025-GO-RFQ / Procurement of 11 numbers Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 17,314.16 Completed 2018-04-21 2018-06-16 2018-05-31 2018-07-31 2018-06-30 of 65 inch TV ( Part of Video d Institutional Framework tions nvelope Conference equipment BT-DRC-GST-66249-GO-RFQ / one number of High end WI FI-Access Point for GST Proje Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 843.12 Completed 2018-06-20 2018-07-16 2018-01-05 2019-07-16 2018-02-04 ct Office (To be used for GST d Institutional Framework tions nvelope Project Office where all the u sers and video conferencing equipment will be connected. ) BT-DRC-GST-79629-GO-RFQ / Procurement of high end pr ojectors with build-in operati Strengthening Budget Execu Request for Quota Single Stage - One E ng system(Microsoft Window TF / A5549 tion and Oversight Capacitie Post Open - National 2,751.49 Completed 2018-12-04 2019-01-09 2019-05-16 2020-01-09 2019-06-21 tions nvelope s 10) and In-Built Interactive s screen Feature, digital writin g pen, wireless keyboard and mouse. BT-DRC-GST-79637-GO-RFQ Strengthening Budget Execu Request for Quota Single Stage - One E / Procurement of photo copy/ TF / A5549 tion and Oversight Capacitie Post Open - National 1,462.93 Completed 2018-12-05 2019-01-30 2019-05-16 2019-03-31 2019-07-31 tions nvelope printer machine for GST Proje s ct Office. BT-DRC-GST-79633-GO-RFQ / Procurement of 7 numbers Strengthening PFM Legal an Request for Quota Single Stage - One E of laptops (for new officials jo TF / A5549 Post Open - National 1,170.29 Completed 2018-12-08 2019-01-14 2019-05-16 2019-03-15 2019-07-31 d Institutional Framework tions nvelope ining GST Project Office and 8 for the representatives fro m regional offices). BT-DRC-GST-57741-GO-RFQ / Procurement of 10 numbers Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 15,143.78 Completed 2018-04-28 2018-06-23 2018-05-31 2018-08-07 2018-06-30 of Webcam (part of video con d Institutional Framework tions nvelope ferencing equipment) BT-DRC-GST-79639-GO-RFQ Strengthening PFM Legal an Request for Quota Single Stage - One E / Procurement of Document S TF / A5549 Post Open - National 0.00 Canceled 2018-11-28 2019-01-23 2020-01-23 d Institutional Framework tions nvelope hredder Machine for GST Proj ect Office. BT-DRC-GST-53744-GO-RFQ Strengthening Budget Execu Request for Quota Single Stage - One E / Photo copy machine with do TF / A5549 tion and Oversight Capacitie Post Open - National 0.00 Canceled 2018-03-20 2018-05-07 2018-11-03 tions nvelope cument feeder s BT-DRC-GST-150883-GO-DIR / Purchase of 20 numbers lap Strengthening PFM Legal an TF / A5549 Post Direct Selection Direct 1,053.96 Completed 2019-12-18 2019-12-24 2019-12-18 2019-09-12 2020-01-06 2019-12-24 2020-07-20 2020-01-17 top for GST project office, De d Institutional Framework partment of Revenue and Cu stoms, MoF. BT-DRC-GST-154699-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Procurement of server for TF / A5549 Post Limited 4,959.14 Completed 2020-02-03 2020-03-13 2020-02-28 2020-04-03 2020-03-30 2020-09-10 d Institutional Framework tions nvelope GST project BT-DRC-GST-154702-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Procurement of four num TF / A5549 Post Limited 1,187.57 Signed 2020-02-02 2020-06-08 2020-02-17 2020-10-12 2020-03-17 d Institutional Framework tions nvelope bers of projector for GST proj ect office BT-DRC-GST-154703-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Supply of four number mi TF / A5549 Post Limited 0.00 Canceled 2020-01-28 2020-02-14 2020-03-15 d Institutional Framework tions nvelope crophone and sound system BT-DRC-GST-154705-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Document shredder for G TF / A5549 Post Limited 324.71 Completed 2020-01-31 2020-03-13 2020-03-13 2020-04-03 2020-04-11 2020-06-18 d Institutional Framework tions nvelope ST project office BT-DRC-GST-154707-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Pending Impl TF / A5549 Post Limited 0.00 2020-01-21 2020-01-21 2020-01-21 Q / Procurement of photocop d Institutional Framework tions nvelope ementation y machine BT-DRC-GST-164334-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Purchase of flash drive 25 TF / A5549 Post Limited 191.85 Completed 2020-03-25 2020-05-14 2020-04-10 2020-06-02 2020-04-30 2020-10-05 d Institutional Framework tions nvelope 00 numbers for Taxpayer Ou treach Program Page 1 BT-DRC-GST-164343-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Purchase of 2000 folders TF / A5549 Post Limited 24,569.43 Completed 2020-03-25 2020-05-14 2020-04-10 2020-06-02 2020-04-30 2020-09-16 d Institutional Framework tions nvelope for Taxpayer Outreach Progr am BT-DRC-GST-164340-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple Q / Purchase of 850 advocac TF / A5549 Post Limited 0.00 2020-04-10 2020-06-08 2020-04-20 2020-05-31 d Institutional Framework tions nvelope mentation y bags for Taxpayer Outreac h Program BT-DRC-GST-164341-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / printing of 2780 numbers TF / A5549 Post Limited 920.00 Completed 2020-04-10 2020-05-14 2020-04-20 2020-06-02 2020-05-31 2020-11-30 d Institutional Framework tions nvelope of brochures for Taxpayer Ou treach Program BT-DRC-GST-164337-NC-RFP / Procurement of Audio and V Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Limited 0.00 Canceled 2020-04-10 2020-04-20 2020-05-31 ideo film for dissemination of d Institutional Framework tions nvelope outreach program.. BT-DRC-GST-164332-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Purchase of 2500 pens fo TF / A5549 Post Limited 0.00 Canceled 2020-03-25 2020-04-10 2020-04-30 d Institutional Framework tions nvelope r Taxpayer Outreach Progra m BT-DRC-GST-199546-GO-DIR / Procurement of 2500 numb Strengthening PFM Legal an TF / A5549 Post Direct Selection Direct 3,050.75 Signed 2020-10-14 2020-10-14 2020-10-14 2020-05-25 2020-10-14 2020-06-03 2020-10-14 ers of pen as taxpayer outrea d Institutional Framework ch program materials BT-DRC-GST-205488-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple Q / Purchase of 3 numbers of TF / A5549 Post Open - National 0.00 2020-11-23 2020-12-24 2021-02-22 d Institutional Framework tions nvelope mentation technical laptop BT-DRC-GST-215075-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Purchase of a wireless Ac TF / A5549 Post Open - National 0.00 Canceled 2021-02-01 2021-03-12 2021-06-10 d Institutional Framework tions nvelope cess Point for GST project offi ce BT-DRC-GST-215076-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple Q / Procurement of 5 number TF / A5549 Post Open - National 0.00 2021-02-01 2021-03-11 2021-06-09 d Institutional Framework tions nvelope mentation s of sound System for GST pr oject office BT-DRC-GST-215077-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Procurement of 3 number TF / A5549 Post Open - National 29,710.08 Completed 2021-02-01 2021-03-11 2021-03-19 2021-06-09 2021-04-19 d Institutional Framework tions nvelope s of Server for GST project of fice BT-DRC-GST-215078-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Pending Impl Q / Purchase of 10 numbers TF / A5549 Post Open - National 0.00 2021-02-01 2021-03-11 2021-06-09 d Institutional Framework tions nvelope ementation of general laptop for GST proj ect office BT-DRC-GST-215669-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple Q / Procurement of 25 numb TF / A5549 Post Open - National 0.00 2021-01-28 2021-03-03 2021-06-01 d Institutional Framework tions nvelope mentation ers of Metal roll-up banner st and BT-DRC-GST-215671-GO-RF Q / Procurement of 2500 nu Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple mbers of Bhutan Integrated T TF / A5549 Post Open - National 1,271.31 2021-01-28 2021-03-03 2021-06-01 d Institutional Framework tions nvelope mentation axation System (BITS) Broch ures for GST Project office BT-DRC-GST-215672-GO-RF Q / Procurement of 1000 nu Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 11,307.98 2021-01-28 2021-03-03 2021-06-01 mbers of Fabric Folder as a t d Institutional Framework tions nvelope mentation ax payer outreach program material BT-DRC-GST-215674-GO-RF Q / Procurement of 2000 nu Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 1,980.57 2021-01-28 2021-03-03 2021-06-01 mbers of Pen as a tax payer d Institutional Framework tions nvelope mentation outreach program material BT-DRC-GST-215675-GO-RF Q / Procurement of 2000 nu Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 6,129.06 2021-01-28 2021-03-03 2021-06-01 mbers of Notepad as a Tax p d Institutional Framework tions nvelope mentation ayer outreach program mate rial BT-DRC-GST-239002-GO-DIR Strengthening PFM Legal an Pending Impl TF / A5549 Post Direct Selection Direct 0.00 2021-06-11 2021-06-11 2021-06-21 2021-07-24 / Procurement of VMware Sof d Institutional Framework ementation tware BT-DRC-GST-252675-GO-RF Q / Procurement of 3 numbe Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 0.00 2021-10-08 2021-10-10 2021-12-03 2022-06-01 rs of "All in one technical co d Institutional Framework tions nvelope mentation mputer screen" for GST Proj ect office and DRC BT-DRC-GST-252685-GO-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple Q / Procurement of 3 number TF / A5549 Post Open - National 0.00 2021-10-08 2021-10-10 2021-12-03 2022-06-01 d Institutional Framework tions nvelope mentation s of technical laptops for GST Project Office BT-DRC-GST-252687-GO-RF Q / Purchase of 9 numbers of Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 0.00 2021-10-08 2021-10-10 2021-12-03 2022-06-01 Touch floor stand LCD displa d Institutional Framework tions nvelope mentation y penal as part of taxpayer o utreach materials BT-DRC-GST-252689-GO-RF Q / Procurement of 3 number Strengthening PFM Legal an Request for Quota Single Stage - One E Under Imple TF / A5549 Post Open - National 0.00 2021-10-08 2021-10-10 2021-12-03 2022-06-01 s of Automatic document sca d Institutional Framework tions nvelope mentation nner for GST Project Office a nd Regional Offices NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-DRC-GST-215665-NC-RF Strengthening PFM Legal an Request for Quota Single Stage - One E Q / Procurement of website f TF / A5549 Post Open - National 4,668.10 Signed 2021-01-28 2021-03-03 2021-05-28 2021-06-01 d Institutional Framework tions nvelope or GST project office BT-DRC-GST-215667-NC-RF Q / Procurement of 5 units of Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 3,267.67 Signed 2021-01-28 2021-03-03 2021-05-28 2021-06-01 advertisement videos -audio d Institutional Framework tions nvelope visual as a tax payer outreac h program. BT-DRC-GST-215668-NC-RF Strengthening PFM Legal an Request for Quota Single Stage - One E TF / A5549 Post Open - National 633.53 Signed 2021-01-28 2021-03-03 2021-05-28 2021-06-01 Q / Procurement of GST them d Institutional Framework tions nvelope e song Page 2 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-DRC-GST-57695-CS-CDS / Hiring of Consultant for traini Strengthening PFM Legal an TF / A5549 Post Direct Selection Direct 6,320.00 Completed 2018-04-11 2018-04-09 2018-04-15 2018-03-14 2018-04-27 2018-04-12 2019-06-30 2019-06-13 ng and hand holding on Micr d Institutional Framework o Simulation Model BT-DRC-GST-76986-CS-CDS / Hiring of long term IT consult Strengthening PFM Legal an Individual Consult ant on need basis. Anticipate TF / A5549 Post Open 77,000.00 Terminated 2018-10-01 2018-10-22 2018-10-25 2018-12-28 2018-11-15 2019-01-07 2018-12-20 2019-01-17 2020-02-01 d Institutional Framework ant Selection d assistance of four times wit hin one year of initial contrac t. BT-DRC-GST-91632-CS-INDV / Hiring of consultant for tran Strengthening PFM Legal an Individual Consult TF / A5549 Post Open 2,893.73 Completed 2018-12-19 2019-01-18 2019-01-13 2019-02-20 2019-01-15 2019-02-26 2019-02-07 2019-04-12 2019-06-07 2019-08-06 slation of draft GST law and r d Institutional Framework ant Selection egulations from English to Dz ongkha BT-DRC-GST-150512-CS-IND V / Hiring of long term IT con Strengthening PFM Legal an Individual Consult sultant on need basis spread TF / A5549 Prior Open 77,750.00 Signed 2020-01-17 2020-04-27 2020-02-28 2020-07-03 2020-03-13 2020-10-15 2020-04-09 2020-10-23 2021-04-09 d Institutional Framework ant Selection over a period of one year whi ch is subject to renewal base d on his performance. BT-DRC-GST-293490-CS-IND V / Hiring of Individual Consul Strengthening PFM Legal an Individual Consult Pending Impleme tant as Administrative Officer TF / A5549 Post Limited 0.00 2022-05-30 2022-06-03 2022-06-04 2022-06-10 2022-12-31 d Institutional Framework ant Selection ntation to provide logistics/administr ative support for the GST Proj ect Office Page 3