The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Skills Strengthening for Industrial Value Enhancement Operation (P156867) SOUTH ASIA | India | Education Global Practice | Requesting Unit: SACIN | Responsible Unit: HSAED IBRD/IDA | Program-for-Results Financing | FY 2017 | Team Leader(s): Shobhana Sosale, Shiro Nakata Seq No: 12 | ARCHIVED on 24-Jun-2022 | ISR51680 | Created by: Shobhana Sosale on 27-May-2022 | Modified by: Shobhana Sosale on 22-Jun- 2022 Program Development Objectives PDO Table Program Development Objective (from Program Appraisal Document) To improve access to quality and market-driven vocational training provided in ITIs and apprenticeships Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory           Implementation Status and Key Decisions The Project Development Objective for the STRIVE operation is to improve access to quality and market-driven vocational training provided in ITIs and apprenticeships. An assessment of the Results Framework, outcome and output indicators, and disbursements achieved indicate good progress towards the achievement of the PDO. Out of seven PDO level indicators, two indicators have already met the final targets, while three indicators are on track. Progress on the remaining two PDO indicators related to ITIs has been impacted due to the closure of the institutions as a result of the COVID-19 pandemic. Implementation progress has accelerated. The project is catching up with the restructured implementation schedule at a substantive pace. Implementation structures and arrangements are well defined and established at the National Project Implementation Unit (NPIU), State Project Implementation Units (SPIUs), Industrial Training Institutes (ITIs) and Industry Cluster (IC) levels. The NPIU’s implementation monitoring at the National, State, ITI and IC levels is satisfactory. Implementation progress is regularly evaluated, and feedback is collected periodically. The problems faced by State-level implementing agencies are being addressed in a timely manner. Further, regular capacity building and knowledge sharing workshops are also being conducted. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P156867 IDA-59650 Effective USD 125.00 124.00 1.00 76.46 47.54 62% 6/24/2022 Page 1 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P156867 IDA-59650 Effective 02-Mar-2017 19-Dec-2017 08-Feb-2018 30-Nov-2022 30-Nov-2022 DLI Disbursement Achievement Disbursed amount in Disbursement % for DLI ID DLI Type Description Coc DLI Amount Status Coc DLI Loan: IDA59650-001 DLI1 Increase in no of Partially 1(a) Regular USD 18,000,000.00 2,000,000.00 11 % Graduates Achieved DLI2 Impr in Indus Partially 1(b) Regular USD 21,000,000.00 15,000,000.00 71 % Training and Emplmt Achieved DLI3 Reduc in ITI Trainer Partially 1(c) Regular USD 20,500,000.00 9,000,000.00 44 % Vac and Trng Achieved DLI4 No of States cond Partially 1(d) Regular USD 18,000,000.00 2,000,000.00 11 % Tracer Stud Achieved DLI5 No of ICs intr Partially 1(e) Regular USD 22,500,000.00 12,700,000.00 56 % Apprnshp Prog Achieved Partially 1(f) Regular DLI6 Inc in Fem Enrlmnt USD 19,000,000.00 16,500,000.00 87 % Achieved EEP 2 Regular Gds,NCS,CS,Trng,Wkshp, USD 5,000,000.00 Fully Achieved 2,558,691.09 51 % IOC Program Action Plan Action Description PMC in place Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 08-Feb-2019 Completed Completion Measurement Award of contract Comments PMC was contracted in May-2018 OM, including ITI PB Grant Agreement Scheme Guidelines, State Performance-Based Funding Scheme Guidelines, Action Description and IAI Grant Mechanism Guidelines, completed Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 30-Apr-2018 Completed Operations Manual approved by the National Steering Committee (NSC) and adopted by the National Project Completion Measurement Implementation Unit (NPIU). The Project’s Operations Manual, including ITI PB Grant Agreement Scheme Guidelines, State Performance-Based Comments Funding Scheme Guidelines, and IAI Grant Mechanism Guidelines, was approved and adopted on January 3, 2019 6/24/2022 Page 2 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Action Description Functional procurement complaint handling and redressal mechanism Source DLI# Responsibility Timing Timing Value Status Other Client Due Date 08-Feb-2019 Completed Completion Measurement Availability on project website and reports generated from the system Comments Action Description First 18 months Procurement Plan updated and submitted to Bank Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 21-Nov-2017 Completed Procurement plan for first 18 months is uploaded on the project website and was also submitted to the World Bank Completion Measurement task team. Comments Action Description Inclusion. All ISPs to include a plan for inclusion of vulnerable groups Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 01-Aug-2018 Completed Completion Measurement ISPs have been received and contain an inclusion plan. Comments Gender. Study to understand the demand- and supply-side constraints for women to enter skills training and Action Description subsequently transition into the labor market Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 08-Feb-2019 Completed Completion Measurement Study completed and shared with the World Bank Comments The study has been completed and shared with the Bank MIS. Develop a system to disaggregate data pertaining to SCs, STs, OBCs, women, minorities, and persons with Action Description disabilities as part of tracer studies for ITI graduates to be implemented by states under the Program Source DLI# Responsibility Timing Timing Value Status Technical Client Recurrent Yearly In Progress 6/24/2022 Page 3 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) ToRs for tracer studies to include requirement for disaggregation of data pertaining to SCs, STs, OBCs, women, Completion Measurement minorities, and persons with disabilities The NIPU has developed a model ToR for Tracer Studies to be conducted by states. States are yet to roll out the Comments ToRs and implement the Tracer Studies. Action Description Robust environmental management system developed and functioning in ITIs Source DLI# Responsibility Timing Timing Value Status Environmental and Social Client Recurrent Continuous Completed Systems Each ITI should have a designated nodal person on environmental and safety management who would be Completion Measurement responsible to undertake following broad environmental management in respective ITI. These include onsite construction management covering the aspects Nodal officers are identified and action plans developed, The remaining activities will remain on-gong till the end of Comments the project Action Description Students aware of and practice good safety norms in ITI Source DLI# Responsibility Timing Timing Value Status Environmental and Social Client Recurrent Continuous Completed Systems Training to staff and students of each ITI on OHS and environment, including hazardous waste, completed. The PB Completion Measurement Grant Agreement to include provisions to ensure that students use safety gear in workshop, are clearly communicated OHS measures, and use Comments Met and continues till the end of the project Action Description Apprenticeship enforce good OHS and waste management standards Source DLI# Responsibility Timing Timing Value Status Environmental and Social Client Recurrent Continuous Completed Systems Grant agreement on IAIs to include provisions to ensure that apprentices are aware of and practice good OHS Completion Measurement measures, and proper waste management systems in place and functional Comments Met and continues till the end of the project Action Description Disclosure of approved Procurement Plans on project website Source DLI# Responsibility Timing Timing Value Status Other Client Recurrent Continuous Delayed 6/24/2022 Page 4 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Completion Measurement Year 2: 20%, Year 4: 40% Comments Action Description Initiate procurement for Independent Verification Firm Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 30-Nov-2017 Completed Completion Measurement IVA onboarded Comments Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Low Low Low Macroeconomic Low Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Moderate Moderate Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Moderate Moderate Moderate Stakeholders Substantial Moderate Moderate Other Substantial Substantial Substantial Overall Moderate Moderate Moderate RiskComments Comments The risk rating for fiduciary aspects continues to be Substantial. Key implementation challenges remain in the areas of funds flow and reporting.  Based on the mapped PFMS with the SNA guidelines will be tested at State level. Key concerns are the availability of sufficient spending limits through the overdraft facility for the SPIUs, the State Societies, ITIs, Industry Clusters (ICs), and the State Apprenticeship Management Cells (SAMCs) required for final utilization. It would be good practice for the NPIU to track that SPIUs and the implementing entities have the required spending limits to achieve the DLIs.  Utilization of Funds. The NPIU has received Utilization Certificates for only about 50 percent of the reported expenditures. Results 6/24/2022 Page 5 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) PDO Indicators by Objectives / Outcomes Results Area 1: Improved Performance of Industrial Training Institutes IN01148594 ►Increase in the number of graduates from ITIs that have signed PB Grant Agreements (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 22.00 20.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 The examination results for the 2019-20 cohort have been declared only by April 30, 2022, and the examination results for the 2020-21 cohort are still in the process of being finalized. However, a majority of Comments these have now been declared. Based on this, the results show 22 percent of graduates. This results indicate that the end-of-project (EOP) target has been surpassed. IN01148596 ►Female enrollment rate in ITIs with signed PB Grant Agreements (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 9.70 18.60 0.00 15.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 As per data from selected ITIs, female enrolment stood at 19.1% in May 2021. Hence, this PDO indicator has been achieved. Actual enrolments as of September 15, 2021 registers are 18.6%, slightly down from the May 2021 figure. Comments This is likely due to dropouts due to the COVID-19 pandemic. Data collection is ongoing as of April 30, 2022. The DLI interim achievement will be reported once the data are available. It is likely that the data will be available by end-June 2022. IN01148597 ►Percentage of graduates from ITIs that have signed PB Grant Agreements who are in gainful employment one year after graduation (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 50.00 0.00 0.00 50.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 As of April 30, 2022, there was no update. This is because it has not been possible for the Project to undertake the tracer study. The results for the 2019-20 cohort have been announced, but the results for the Comments 2020-21 cohort is awaited. The updated timelines will be included in the interim ISR in mid-August 2022. Results Area 2: Increased capacities of State Govts. to support ITIs and Apprenticeship Training IN01148595 ►Number of Participating States that have reduced the vacancies of sanctioned trainers’ posts by at least 20% in government ITIs (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 15.00 15.00 15.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 The end-of-Project (EOP) target was achieved in September 2021. Comments No update as of April 30, 2022. 6/24/2022 Page 6 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Results Area 3: Improved Teaching and Learning IN01148591 ►Number of teachers who have completed pre-employment or in-service distance learning/blended modules (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 5,000.00 20,000.00 20,000.00 20,000.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 By September 15, 2021 the total number of teachers who had received training was 20,000. The end- Project (EOP) target is 20,000. Therefore, the target was achieved then. Comments No further training sessions have been conducted since September 2021. Results Area 4: Improved and Broadened Apprenticeship Training IN01148592 ►Number of ICs that have introduced at least 2 different apprenticeship programs within their participating (member) industries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 7.00 16.00 30.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 By February 2021 it was reported that 4 ICs had initiated at least 2 trades each. This has been successfully verified by IVA. By September 2021, the selection of 11 ICs had been completed. By that time, 3 additional ICs had initiated at least 2 trades as verified by IVA. Data validation was being undertaken for another 6 Comments ICs. A further 9 ICs have achieved the target as on April 9, 2022, and this has been verified. Disbursement against the verified data has been effected. Crosscutting IN01148593 ►Direct Operation beneficiaries; % Female (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0; Female: 0% 409,000, Female 19% 440,521, Female 19% 400000; Female: 12% Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 By September 15, 2021, the number of direct project beneficiaries, 19% of which are female, has reached 409,000. This end-project target of 400,000 had been achieved. By April 30, 2022, the number of direct project beneficiaries is 440,521. This is based on Apprentices enrolled in project ICs as well, Long-term trainees enrolled in project ITIs, Short-term trainees enrolled in ITIs through the PMKVY 3.0 (about 300 hours), Short-term trainees enrolled in ITIs through the SHI scheme Comments (about 300 hours), and any institution from the government or private sector that has participated in training programs that are related to apprenticeships or ITI reform, and have been funded through STRIVE. Data related to Female beneficiaries was being calculated in end-April 2022, and will be reported on or about mid-August 2022. Intermediate Results Indicators by Results Areas Results Area 1: Improved Performance of Industrial Training Institutes IN01148598 6/24/2022 Page 7 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) ►IR Indicator 1.1: Percentage increase in enrollment across ITIs with signed PB Grant Agreement (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.70 1.00 25.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 As reported by the Directorate, enrolment in the current cohort has decreased by 2%. However, with enrolments still ongoing this result is to be re-measured. As of September 15, 2021, the enrolments had increased up to 0.7 percent. The NPIU has reported a 1% increase in on-the-job training (OJT). The pandemic had initially caused a Comments significant decrease in admissions and capacity utilization resulting in the reduction in enrolments by 2%. However, the situation has now improved with the reopening of the ITIs. The current academic year enrolments are picking up, and there has been a 1% increase in enrolment over the baseline. IN01148602 ►IR Indicator 1.2: Percentage of trainees undergoing OJT across ITIs with signed PB Grant Agreements (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.00 22.90 22.90 25.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 While data collection is ongoing, the data currently available with the DGT indicates a 10 percent increase in OJTs, The Directorate is of the view that a 15 percent increase may also be achieved by the end of the academic year. This will be updated once results achieved in confirmed and data is verified by the IVA. Comments By September 15, 2021, there has been a 22.9 percent increase in OJTs, an increase by 12.9 percentage points over the September 2020 level. The end-project target is 25 percent. Data collection ongoing as of the reporting date. Results Area 2: Increased Capacities of State Govts. to support ITIs and Apprenticeship Training IN01148599 ►IR Indicator 4.1: Number of Participating States that have conducted tracer studies (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 4.00 15.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 A pilot tracer study had been conducted in Haryana and the report has been accepted by the NPIU. This result is also verified by the IVA. Due to the COVID-19 pandemic, student performance assessment has Comments been delayed by 1.5 academic years. Commensurately, the tracer studies have also been delayed. Tracer studies have concluded in 4 more States. The reports are awaited. IN01148603 ►IR Indicator 4.2: Percentage of trainees in government ITIs who are from ST populations (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1.35 7.80 7.80 4.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 As reported by the DGT, by Mid-Term Review, the percentage of STs in government ITIs was 7.8 percent Comments (February 2021) thereby exceeding the end-of-Project (EOP) target of 4 percent. Therefore, no additional data has been reported up to April 30, 2022. Per policy and law, ITIs are required to reserve a quota for 6/24/2022 Page 8 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Scheduled Tribes (STs) and Scheduled Castes (SCs). Therefore, ITIs do maintain gender disaggregated data on sub-populations of enrolments. Results Area 3: Improved Teaching and Learning IN01148600 ►IR Indicator 5.1: Number of CTS trades for which ICT-based teaching and learning packages have been developed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 6.00 6.00 4.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 ICT based teaching and learning packages had already been development for 6 CTS trades as of September 15, 2021. This achievement exceeds the end-of-Project (EOP) target that has been set as 4 CTS trades. Based on recent policy level developments at the Ministry of Skills Development and Entrepreneurship (MSDE), the curriculum has been changed, and the trades are in the process of undergoing revisions. Comments The task has now been handed over to the National Instructional Media Institute (NIMI). The Institute is currently In the process of hiring an agency to develop blended teaching and learning (face-to-face and IT-platform based) courses. The policy change has been the result of the COVID-19 pandemic when ITIs had to pivot to remote learning options. IN01148604 ►IR Indicator 5.2: Number of CITS trades upgraded (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 The Directorate had decided to outsource this job and the procurement of a firm for upgrading the selected CITS trades was ongoing in September 2021. However, based on recent policy level developments at the Ministry of Skills Development and Entrepreneurship (MSDE), the curriculum has been changed and the trades are in the process of being revisions. The task has now been handed over to the National Comments Instructional Media Institute (NIMI). The Institute is currently in the process of hiring an agency to develop blended teaching and learning (face-to-face and IT-platform based) courses. The policy change has been the result of the COVID-19 pandemic when ITIs had to pivot to remote learning options. Results Area 4: Improved and Broadened Apprenticeship Training IN01148601 ►IR Indicator 6.1: Number of ICs receiving IAI Grants that have reached a female enrollment of 12% in their respective apprenticeship programs (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 7.00 23.25 10.00 Date 31-Mar-2017 15-Sep-2021 30-Apr-2022 30-Nov-2022 As per data currently available with the Directorate, 4 ICs have reached a female enrolment rate of 58%. This is however yet to be verified by the IVA. Actual Current will be updated once this result is verified. As of September 2021, 7 ICs had reached a female enrolment rate of 58 percent. Data validation is Comments being undertaken for an additional 6 ICs. As of February 2022, female enrolment across 10 industry clusters had reached 23.25% of trainees enrolled in 2021-22. 6/24/2022 Page 9 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Disbursement Linked Indicators DLI_IND_TABLE ►DLI 1 Increase in the number of graduates from ITIs that have signed PB Grant Agreements (Outcome, 18,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) DLI Year/period 4: The selection of 200 ITIs had been completed and Performance Based Grant Agreements (PBGAs) were signed. The number Value 0.00 0.00 of graduates has -- increased by 22% per recent updates from the National Project Implementation Unit (NPIU). The data collection for this DLI is underway. Date 31-Mar-2017 18-Sep-2020 30-Apr-2022 -- Comments ►DLI 2 Improvement in industrial training and employment outcomes for trainees and graduates of ITIs that have signed PB Grant Agreements (Outcome, 21,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) DLI Period year 4 achievement: 28.44 The Director General of Training (DGT) is developing the capacity of the ITIs to improve on-the- job training (OJT) outcomes as a high Value 2%,50% 0.00 -- priority based on the policy push and OJT targets as they continue to be achieved throughout the pandemic. The Year 4 target of 20% was surpassed in January 2022 based on NPIU's project reporting. Date 31-Mar-2017 13-Feb-2019 30-Apr-2022 -- Comments ►DLI 3 Reduction in ITIs’ trainer vacancies and improvements in training of trainers (Outcome, 20,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) Value 0,0 0.00 DLI Period/year 4: 15.0 -- 6/24/2022 Page 10 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) Per September 2021 updates, 7 States had been estimated to have already achieved instructor vacancy reduction targets. This was verified by the IVA and the disbursement claim was approved by the World Bank. As of April 30, 2022, a total of 15 states have reduced instructor vacancy by 15%. Date 31-Mar-2017 13-Feb-2019 30-Apr-2022 -- Comments ►DLI 4 Number of Participating States that have conducted tracer studies (Intermediate Outcome, 18,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) DLI Period/year 4: 5 A pilot tracer study had been conducted in Haryana and the report has been accepted by the NPIU. This marks the achievement of FY 2019- Value 0.00 1.00 20 target. The FY 2020-21 -- target of 5 states was expected to be achieved by December 2021. As of April 30, 2022, a total of 1 (Pilot) and 4 (Project states) have conducted tracer studies. The reports are awaited. Date 31-Mar-2017 14-Aug-2020 30-Apr-2022 -- Comments ►DLI 5 Number of ICs that have introduced at least 2 different apprenticeship programs within their participating (member) industries (Outcome, 22,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) Value 0.00 DLR period 1 (2017-18) DLR Year/period 4: -- for this indicator that states “MSDE has The Operations Manual developed and was developed, approved approved/adopted the and adopted by the Operations Manual for Ministry of Skills the IAI Grant Development and mechanism” has been Entrepreneurship (MSDE). achieved. The selection of 11 ICs was completed and it 6/24/2022 Page 11 of 12 The World Bank Implementation Status & Results Report Skills Strengthening for Industrial Value Enhancement Operation (P156867) was reported that 4 of them had initiated 2 trades each. The minimum threshold target for this DLI is 4 ICs introducing 2 trades each. The IVA has verified the achievement. The findings have been cleared by the World Bank. The actual achievement was 8 ICs introducing 2 trades each. A further 8 ICs (with 2 trades) have claimed achieving the target in March 2022, bringing the total up to 16. Date 31-Mar-2017 13-Feb-2019 13-Feb-2019 -- Comments ►DLI 6 Increase in female enrollment rate in ITIs with PB Grant Agreements and ICs receiving IAI Grants (Outcome, 19,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) FY2021/22 (Year 5) DLI Year/period 3: 18.63% for the 2020-21 ITI cohort, and 23.25% for 10 ICs DLI Year/period 4: Female enrolment targets for ITIs had been verified as achieved for 2019-20 cohort. Data collection for Value 9.7%,0 19.1%,0% -- the 2020-21 cohort was to be initiated in February 2020. The IVA had also verified the female enrolment targets for ICs. The World Bank has approved and disbursed against the DLI claim. The end-of-Project (EOP) target has been surpassed as of April 30, 2022. Date 31-Mar-2017 13-Feb-2019 30-Apr-2022 -- Comments 6/24/2022 Page 12 of 12