PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coasta Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2018-10-04 Bank’s Approval Date of the Original Procurement Plan: 2022-09-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coasta Areas Resilience Investment Project Loan / Credit No: IDA / D2880, IDA / 62150, IDA / D2860 Ministry of Environment and Sustainable Development Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74186-CW-RFQ / Component 3: Strengthening Single Stage - One E 2019-07-0 2019-11 Mise en place d'une clôture g IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,168.67 Achevé 2018-11-10 2019-11-08 2019-01-05 2019-11-13 nvelope 4 -30 rillagée autour de la marre à Investments Spartines MR-MEDD-74202-CW-RFQ / T Component 3: Strengthening ravaux d'entretien des couloi Single Stage - One E 2019-08-2 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-12-30 2019-02-24 rs de pare-feux du Typha au nvelope 3 Investments niveau de Diawling MR-MEDD-74205-CW-RFB / C Component 4: National Coor Single Stage - Two E 2019-08-0 onstruction des sièges de l'O IDA / D2880 A posteriori Appel d'offres Open - National 0.00 Annulé 2018-09-03 2018-09-08 2018-10-20 2019-01-02 2019-02-06 dination nvelope 5 bservatoire et de l'UGP MR-MEDD-75955-CW-RFB / C Component 3: Strengthening Single Stage - One E 2019-08-2 olmatage des brèches du litt IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 Annulé 2018-11-05 2018-11-10 2018-12-22 2019-01-21 2019-02-25 nvelope 4 oral de NKTT Investments MR-MEDD-75986-CW-RFQ / T Component 3: Strengthening Single Stage - One E En attente d 2019-05-3 ravaux pour la fixation des d IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-06 2018-12-01 nvelope 'exécution 0 unes au niveau de Chami Investments MR-MEDD-76006-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2019-07-1 Restauration des éco-systèm IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-11-20 2019-01-15 nvelope 'exécution 4 es du Parc National d'Awleiga Investments tt (PNA) MR-MEDD-115356-CW-RFQ / Réalisation de clôture grillag Component 3: Strengthening Single Stage - One E 2019-07-2 2019-07 ée autour du périmètre de 15 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,467.31 Achevé 2019-05-25 2019-06-13 2019-06-10 2019-06-21 nvelope 0 -22 ha de fixation mécanique et Investments biologique du cordon dunaire de Nouakchott MR-MEDD-115655-CW-RFQ / Component 3: Strengthening Single Stage - One E 2019-08-1 2019-09 Fixation de 15 ha de dunes d IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,984.27 Achevé 2019-06-01 2019-06-12 2019-06-11 2019-06-28 nvelope 0 -16 u littoral de Nouakchott Investments MR-MEDD-115657-CW-RFQ / Component 3: Strengthening Travaux d'entretien de couloi Single Stage - One E 2019-07-1 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 27,601.13 Signé 2019-05-30 2021-05-19 2019-06-12 2021-05-28 rs de pare-feus pour la resta nvelope 2 Investments uration des mangroves au ni veau de Diawling MR-MEDD-115659-CW-RFQ / Component 3: Strengthening Single Stage - One E 2019-07-2 2019-08 Réalisation de pépinières de IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 34,921.07 Achevé 2019-06-08 2019-07-19 2019-06-21 2019-08-01 nvelope 1 -29 mangroves au Diawling Investments MR-MEDD-124501-CW-RFQ / Component 3: Strengthening mise en place d'une cloture Single Stage - One E 2020-04-1 2019-08 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 8,464.35 Achevé 2019-08-26 2019-07-25 2019-10-21 2019-08-02 de protectionsur les 2 ha de nvelope 8 -29 Investments dunes fixées au PND MR-MEDD-124500-GO-RFQ / Component 3: Strengthening mise en place de clotures po Single Stage - One E En attente d 2020-04-1 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2019-09-07 2019-10-19 ur abriter les pépinières de m nvelope 'exécution 6 Investments angroves au PND MR-MEDD-129309-CW-RFQ / Component 3: Strengthening Clôture grillagée pour la prot Single Stage - One E 2020-04-3 2019-10 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 36,983.98 Achevé 2019-09-07 2019-09-13 2019-11-02 2019-09-17 ection d'une fixation de dune nvelope 0 -23 Investments s de 15 ha du littoral de Nou akchott MR-MEDD-137084-CW-RFQ / Component 1: Strengthening Single Stage - One E 2019-11-1 2020-05 Mise en place de couloirs de IDA / D2880 A posteriori Demande de prix Limited 28,650.24 Achevé 2019-10-06 2020-03-13 2019-10-16 2020-03-06 Regional Integration nvelope 5 -13 pare-feux de Typha au nivea u du Diawling MR-MEDD-137891-CW-DIR / Component 3: Strengthening Renforcement de la résilienc Passation de marc 2020-01-0 IDA / D2880 National Physical and Social A posteriori Direct 0.00 Annulé 2019-10-02 2019-10-04 2019-10-04 e des communautés et des é hé de gré à gré 2 Investments cosystèmes de Ndiago. MR-MEDD-156359-CW-RFQ / Mise en place d'une clôture g Component 3: Strengthening Single Stage - One E En attente d 2020-04-1 rillagée autour de la marre à IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-02-10 2020-03-05 nvelope 'exécution 9 Spartine à la Baie de l'Etoile Investments de Nouadhibou (phase II) MR-MEDD-170442-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-11-0 2020-01 Construction de Loges des ag IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 24,963.37 Achevé 2020-05-13 2019-09-19 2020-07-08 2019-09-27 nvelope 5 -13 ents de surveillance Investments MR-MEDD-170443-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-11-0 Travaux de fixation des dune IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 37,972.83 Signé 2020-06-13 2019-04-01 2020-08-08 2019-04-16 nvelope 6 s au diawling Investments MR-MEDD-170445-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2020-10-1 Clôture grillagée fixation du IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-05-14 2020-07-09 nvelope 'exécution 7 nes au Diawling Investments MR-MEDD-170447-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-02-1 2020-04 Travaux de coupe de typha a IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 33,708.59 Achevé 2020-06-24 2020-03-05 2020-08-19 2020-03-23 nvelope 5 -24 u Parc National du Diawling Investments Page 1 MR-MEDD-170449-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-10-0 2020-06 Mise en place de pépinière d IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 29,996.09 Achevé 2020-06-24 2020-03-10 2020-08-19 2020-03-25 nvelope 3 -08 e mangroves au Diawling Investments MR-MEDD-170453-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-11-1 2020-07 clôture pour protéger les pla IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 24,131.97 Achevé 2020-06-13 2020-06-05 2020-08-08 2020-06-23 nvelope 6 -20 ntations de mangroves au Di Investments awling Component 3: Strengthening MR-MEDD-170456-CW-RFQ / Single Stage - One E 2020-11-0 2020-08 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 14,446.54 Achevé 2020-07-16 2020-07-10 2020-09-10 2020-07-24 Plantation de mangroves nvelope 9 -10 Investments MR-MEDD-170457-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-10-0 2021-07 Travaux d’entretien des coul IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 22,783.70 Achevé 2020-05-15 2021-07-08 2020-07-10 2021-07-29 nvelope 8 -29 oirs et de coupe de Typha dé Investments jà réalisés MR-MEDD-178901-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-07-2 2020-07 Entretien des claies et du reb IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 16,815.78 Achevé 2020-06-15 2020-06-23 2020-06-28 2020-07-10 nvelope 8 -23 oisement (au niveau du PND) Investments MR-MEDD-200677-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-02-2 Construction d’un poste de s IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 34,654.84 Signé 2020-11-15 2020-10-26 2021-01-10 2020-12-07 nvelope 4 urveillance au PND Investments MR-MEDD-200725-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-04-1 2020-12 Mise en place d’une pépinièr IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 16,021.62 Achevé 2020-11-22 2020-10-26 2021-01-17 2020-11-11 nvelope 7 -07 e d’Acacias Investments MR-MEDD-200729-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-05-1 2020-04 Entretien des travaux et coul IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 30,347.33 Achevé 2020-12-21 2020-05-13 2021-02-15 2020-04-06 nvelope 6 -06 oirs déjà réalisés Investments MR-MEDD-200730-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-04-2 2020-12 Entretien de 15 ha coupés en IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 18,441.49 Achevé 2020-11-25 2020-10-23 2021-01-20 2020-11-11 nvelope 0 -17 2020 Investments MR-MEDD-200733-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2021-05-2 Coupe de 50 ha de Typha da IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2020-12-26 2021-02-20 nvelope 'exécution 1 ns le bassin de BELL Investments MR-MEDD-225606-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2021-06-3 Entretien des sites de pépini IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2021-03-27 2021-05-16 nvelope 'exécution 0 ères mangroves Investments MR-MEDD-225608-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-06-0 2021-04 Clôture de plantations de ma IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 57,763.54 Achevé 2021-04-03 2021-03-26 2021-05-09 2021-04-01 nvelope 8 -13 ngroves Investments MR-MEDD-225609-CW-RFQ / Component 3: Strengthening Single Stage - One E 2021-06-0 2020-08 Reboisement des zones de m IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 15,365.45 Achevé 2021-04-10 2021-06-10 2021-05-30 2020-07-24 nvelope 2 -10 angroves Investments MR-MEDD-170569-CW-RFB / Component 3: Strengthening Open - Internationa Single Stage - One E 2022-01-2 Travaux pour le colmatage d IDA / D2880 National Physical and Social A posteriori Appel d'offres 0.00 Annulé 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 l nvelope 9 es brèches Investments MR-MEDD-170571-CW-RFB / Travaux pour la réalisation d Component 3: Strengthening Single Stage - One E 2021-09-0 e passages de franchissemen IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 Annulé 2020-11-16 2020-11-21 2021-01-02 2021-02-01 2021-03-08 nvelope 4 t du cordon dunaire et équip Investments ement des passages piétons MR-MEDD-75953-CW-RFQ / Component 3: Strengthening Single Stage - One E 2019-08-1 Mise en place de de bacs à fl IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-12-17 2019-02-11 nvelope 0 eurs pour la sécurisation du li Investments ttoral MR-MEDD-74188-CW-RFQ / Component 3: Strengthening Single Stage - One E 2019-07-1 Aménagement du site de l'éc IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-20 2019-01-15 nvelope 4 o-loge Investments MR-MEDD-75993-CW-RFQ / T ravaux de restauration des p Component 3: Strengthening Single Stage - One E 2019-07-2 aysages des carrières de coq IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-12-05 2019-01-30 nvelope 9 uillages en frange continenta Investments le du cordon dunaire du littor al MR-MEDD-74189-CW-RFQ / T Component 3: Strengthening Single Stage - One E 2019-10-0 ravaux de construction de l'é IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2019-02-09 2019-04-06 nvelope 3 co-loge Investments MR-MEDD-82725-CW-RFQ / Component 2: Strengthening mise en place d'une pépinièr Single Stage - One E 2019-06-2 IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2018-10-27 2018-12-22 e pour les besoins de la fixati nvelope 0 ramework on des dunes du littoral MR-MEDD-200772-CW-RFB / Component 3: Strengthening Single Stage - One E 2022-04-2 Travaux de construction du si IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 Annulé 2020-12-30 2021-01-04 2021-02-15 2021-03-17 2021-04-21 nvelope 1 ège de l'Observatoire Nation Investments al du Littoral MR-MEDD-170440-CW-RFQ / Component 3: Strengthening Single Stage - One E 2020-09-1 Confection et mise en place IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2020-05-26 2020-07-21 nvelope 9 de bacs pour la sécurisation Investments du littoral MR-MEDD-75951-CW-RFQ / T Component 3: Strengthening Single Stage - One E 2019-09-0 ravaux pour passages de piét IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2019-01-15 2019-03-12 nvelope 8 ons sur le cordon dunaire de Investments NKTT Request for MR-MEDD-232482-CW-RFQ / Component 3: Strengthening Single Stage - One E Quotations ( En attente d 2021-12-1 Entretenir les claies de fixati IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2021-07-17 2021-09-11 nvelope Non Bank-SP 'exécution 0 ons des dunes et les bacs de Investments D) protection MR-MEDD-232486-CW-RFQ / Request for Component 3: Strengthening Faire une clôture grillagée au Single Stage - One E Quotations ( 2021-12-0 2021-07 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 37,285.56 Achevé 2021-07-10 2021-06-22 2021-09-04 2021-06-29 tour des sites fixés (fixation b nvelope Non Bank-SP 3 -30 Investments iologique) du cordon dunaire D) Request for MR-MEDD-232488-CW-RFQ / Component 3: Strengthening Single Stage - One E Quotations ( 2021-10-2 Reboisement de 10000 plant IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 24,081.68 Signé 2021-06-27 2021-07-29 2021-08-22 2021-08-06 nvelope Non Bank-SP 1 s d’Acacia tortilles au PND Investments D) Page 2 Request for B MR-MEDD-232508-CW-RFB / Component 3: Strengthening ids - Works ( Single Stage - One E 2023-03-0 Réaliser les travaux de colma IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National without preq 337,223.98 Signé 2021-11-15 2021-06-28 2021-11-20 2022-01-01 2021-07-30 2022-01-31 2021-08-17 2022-03-07 2021-10-22 nvelope 7 tage des 3 brèches (9, 13 et Investments ualification) 16) SPD MR-MEDD-232510-CW-RFB / Request for B Réaliser les travaux pour le p Component 3: Strengthening ids - Small W Single Stage - One E En attente d 2023-03-0 assage de franchissement du IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National orks SPD (1 e 0.00 2021-11-15 2021-11-20 2022-01-01 2022-01-31 2022-03-07 nvelope 'exécution 7 cordon dunaire et équipemen Investments nvelope proc t pour le passage piéton ess) MR-MEDD-232489-CW-RFQ / Request for Component 3: Strengthening Entretenir les travaux, les co Single Stage - One E Quotations ( 2021-12-1 IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 18,689.53 Signé 2021-07-19 2021-07-08 2021-09-13 2021-07-14 uloirs de pare-feu, les claies nvelope Non Bank-SP 2 Investments et le reboisement réalisés en D) 2020 au PND National Proc MR-MEDD-232511-CW-RFB / urement Doc Component 3: Strengthening Réhabiliter les bacs existants Single Stage - One E ument - 1 En En attente d 2023-01-0 IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 2021-09-16 2021-09-21 2021-11-02 2021-12-02 2022-01-06 et faire l'extension pour la sé nvelope velope proce 'exécution 3 Investments curisation du cordon dunaire ss (Non Bank du littoral -SPD) MR-MEDD-75980-CW-RFQ / T Component 3: Strengthening Single Stage - One E 2019-06-1 ravaux de fixation de dunes IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-10-20 2018-12-15 nvelope 3 du littoral de NKTT sur un pre Investments mier site pilote National Proc MR-MEDD-232506-CW-RFB / Component 2: Strengthening urement Doc Single Stage - One E 2023-02-0 Construire le siège de l'obser IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National ument - 1 En 0.00 Annulé 2021-10-15 2021-10-20 2021-12-01 2021-12-31 2022-02-04 nvelope 1 vatoire du littoral ramework velope proce ss (Non Bank -SPD) Request for MR-MEDD-262950-CW-RFQ / Component 3: Strengthening Single Stage - One E Quotations ( 2022-03-0 Travaux de fixation des dune IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 39,933.80 Signé 2021-11-27 2021-11-17 2022-01-16 2021-12-14 nvelope Non Bank-SP 2 s du Parc National de Diawlin Investments D) g (Année 2021) Request for MR-MEDD-315487-CW-RFQ / Component 3: Strengthening Quotations - Mise en place des couloirs d Single Stage - One E En attente d 2023-07-0 IDA / D2880 National Physical and Social A posteriori Demande de prix Open - National Small Works 0.00 2022-11-08 2023-01-03 e pares feux dans le typha a nvelope 'exécution 2 Investments (Emergency) u PND (2km) SPD -Compet itive Request for B MR-MEDD-315492-CW-RFB / Component 3: Strengthening ids - Works ( Single Stage - One E En attente d 2023-06-1 Réalisation des travaux pour IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National without preq 0.00 2022-10-25 2022-10-30 2022-12-11 2023-01-10 2023-02-14 nvelope 'exécution 4 la fixation des dunes du littor Investments ualification) al SPD Request for MR-MEDD-232485-CW-RFQ / Component 3: Strengthening Single Stage - One E Quotations ( 2021-11-1 Réaliser les travaux de fixati IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2021-06-27 2021-08-16 nvelope Non Bank-SP 4 on des dunes Investments D) MR-MEDD-170567-CW-RFB / Component 2: Strengthening Open - Internationa Single Stage - One E 2022-05-0 IDA / D2880 A posteriori Appel d'offres 0.00 Annulé 2021-01-04 2021-01-19 2021-03-02 2021-04-01 2021-05-06 Travaux de fixation de dunes the Policy and Institutional F l nvelope 3 du littoral ramework MR-MEDD-170572-CW-RFB / Component 3: Strengthening Travaux de réhabilitation et e 2021-05-2 IDA / D2880 National Physical and Social A posteriori Appel d'offres Open - National 0.00 Annulé 2020-08-10 2020-09-09 2020-10-09 2020-10-29 2020-11-28 xtension de la digue Nord du 7 Investments Parc National du Diawling (P ND) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74169-GO-RFQ / A Component 2: Strengthening cquisition d'équipements de Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 1,680.00 Achevé 2018-10-06 2019-07-22 2018-12-01 2019-07-25 2019-05-30 2019-08-30 bureaux au profit de l'Autorit nvelope ramework é de la Zone franche de NDB MR-MEDD-74201-GO-RFQ / A Component 3: Strengthening cquisition de matériel pour la Single Stage - One E IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-12-01 2019-01-26 2019-07-25 surveillance des investissem nvelope Investments ents physiques pour Diawling MR-MEDD-74203-GO-RFQ / A Component 3: Strengthening cquisition d'équipement pour Single Stage - One E En attente d' IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2018-10-06 2018-12-01 2019-05-30 l'observatoire ornithologique nvelope exécution Investments au niveau de Diawling MR-MEDD-74204-GO-RFB / A Component 4: National Coor Single Stage - One E IDA / D2880 A posteriori Appel d'offres Open - National 91,573.20 Signé 2018-08-30 2018-12-27 2018-09-04 2018-10-16 2019-02-07 2018-11-15 2019-02-20 2018-12-20 2020-06-20 2019-06-18 chat de véhicule dination nvelope MR-MEDD-75977-GO-RFQ / A Component 2: Strengthening cquisition d'équipements de Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2018-10-30 2018-12-25 2019-06-23 surveillance et de secourism nvelope ramework e au profit de la Direction de la Protection Civile MR-MEDD-75990-GO-RFQ / Component 3: Strengthening Single Stage - One E Mise en place de pépinières IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-10 2019-01-05 2019-07-04 nvelope de mangroves à Nouamghar Investments MR-MEDD-75995-GO-RFQ / A Component 2: Strengthening cquisition d'équipements pou Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2018-12-10 2019-02-04 2019-08-03 r le réseau des Parlementaire nvelope exécution ramework s et élus locaux de l'environn ement MR-MEDD-75997-GO-RFQ / A Component 2: Strengthening Single Stage - One E En attente d' cquisition de matériel pour la IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2018-12-04 2019-01-29 2019-07-28 nvelope exécution coordination du Master Gaed ramework MR-MEDD-75998-GO-RFQ / A Component 2: Strengthening cquisition d'équipements pou Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2018-11-04 2018-12-30 2019-06-28 r l'opérationnalisation de la b nvelope exécution ramework ase de données du MEED MR-MEDD-76001-GO-RFQ / A Component 2: Strengthening cquisition d'équipements pou Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 26,828.15 Achevé 2018-11-04 2020-08-17 2018-12-30 2020-10-01 2019-06-28 2021-01-13 r le laboratoire des études en nvelope ramework vironnementales et de géogr aphie (LEERG) MR-MEDD-76866-GO-RFQ / A Component 3: Strengthening Single Stage - One E En attente d' cquisition de matériel pour le IDA / D2880 National Physical and Social A posteriori Demande de prix Open - National 0.00 2018-10-15 2018-12-10 2019-06-08 nvelope exécution s AGR Investments Page 3 MR-MEDD-124789-GO-RFQ / impression de cartes de distri Component 3: Strengthening Single Stage - One E butions des formations de m IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 16,666.67 Achevé 2019-08-26 2019-12-09 2019-10-21 2019-12-17 2020-04-18 2020-01-13 nvelope angroves du BAS DELTA DU F Investments LEUVE SENEGAL rive droite. MR-MEDD-170370-GO-RFQ / Component 2: Strengthening Équipements au profit des D Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2020-05-15 2020-07-10 2020-08-09 élégations Régionales de l'En nvelope exécution ramework vironnement (littoral) MR-MEDD-170397-GO-RFQ / Component 2: Strengthening Acquisition d'équipement de Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2020-08-25 2020-10-20 2020-12-04 bureau au profit de l'autorité nvelope exécution ramework de la zone franche MR-MEDD-170462-GO-RFQ / Component 2: Strengthening Single Stage - One E Acquisition d'équipements au IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 34,879.93 Achevé 2020-08-23 2020-08-24 2020-10-18 2020-09-08 2021-04-16 2020-09-14 nvelope profit de la DAPL/MEDD ramework MR-MEDD-172830-GO-DIR / l Component 4: National Coor Passation de marc IDA / D2880 A posteriori Direct 9,469.23 Signé 2020-08-10 2021-08-06 2020-08-15 2021-07-28 2020-09-19 2021-07-28 2020-09-28 ogiciel gestion suivi-évaluatio dination hé de gré à gré n (RUCH) MR-MEDD-200669-GO-RFQ / Acquisition d’équipements a Component 2: Strengthening Single Stage - One E En attente d' u profit de la Délégation Gé IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2020-11-10 2021-01-05 2021-02-19 nvelope exécution nérale de la Sécurité Civile et ramework de la Gestion des Crises au M IDEC MR-MEDD-200671-GO-RFQ / Component 2: Strengthening Single Stage - One E En attente d' Acquisition d’équipements a IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2020-11-10 2021-01-05 2021-02-19 nvelope exécution u profit de l’ONM ramework MR-MEDD-200683-GO-RFQ / Component 2: Strengthening Single Stage - One E Acquisition de matériel optiq IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 35,730.93 Achevé 2020-11-28 2020-10-26 2021-01-23 2020-11-11 2021-03-09 2020-12-15 nvelope ue pour l’Observatoire du PN ramework D MR-MEDD-200687-GO-RFQ / Component 2: Strengthening Single Stage - One E En attente d' Acquisition d’un Drone équip IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2020-11-28 2021-01-23 2026-01-01 nvelope exécution é au profit du PND ramework MR-MEDD-221606-GO-RFQ / Acquisition de deux zodiacs é Component 3: Strengthening Single Stage - One E quipés de tous ses accessoir IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 9,675.19 Signé 2021-02-28 2021-03-04 2021-03-21 2021-03-08 2021-04-20 2021-03-16 nvelope es, gonflables, avec moteur à Investments bord capable de transporter 5 personnes MR-MEDD-221613-GO-RFQ / Component 3: Strengthening Single Stage - One E Acquisition de deux drones é IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 8,016.59 Achevé 2021-02-28 2021-03-04 2021-03-21 2021-03-08 2021-04-11 2021-03-16 nvelope quipés au profit du PND Investments MR-MEDD-225619-GO-RFQ / Component 2: Strengthening Single Stage - One E Equipement de la salle de ré IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 350,844.75 Achevé 2021-04-04 2021-02-01 2021-05-24 2021-02-12 2021-07-08 2021-03-15 nvelope union du MEDD ramework MR-MEDD-172827-GO-RFB / Component 2: Strengthening Acquisition d'équipements de Open - Internationa Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres 0.00 Annulé 2020-08-18 2020-08-23 2020-10-04 2020-11-03 2020-12-08 2021-06-06 surveillance et de secourism l nvelope ramework e au profit de la Direction de la Protection Civile MR-MEDD-200771-GO-RFB / Acquisition d'une ambulance Component 2: Strengthening Single Stage - One E équipée au Profit de la Délég IDA / 62150 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 Annulé 2020-11-30 2020-12-05 2021-01-16 2021-02-15 2021-03-22 2021-03-26 nvelope ation Générale de la sécurité ramework Civile et de la Gestion des cr ises au MIDEC MR-MEDD-200663-GO-RFQ / Component 2: Strengthening Single Stage - One E Acquisition d’équipements a IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2020-11-04 2020-12-30 2021-02-13 nvelope u profit de la Police Environn ramework ementale MR-MEDD-75959-GO-RFQ / A Component 2: Strengthening cquisition d'équipements pou Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2018-12-10 2019-02-04 2019-08-03 r l'observatoire national du lit nvelope ramework toral mauritanien MR-MEDD-170405-GO-RFQ / Component 2: Strengthening Single Stage - One E Acquisition de matériel pour l IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2020-06-16 2020-08-11 2020-09-25 nvelope a coordination du Master GA ramework ED MR-MEDD-75978-GO-RFQ / A Component 2: Strengthening Single Stage - One E cquisition d'équipements au IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2018-10-20 2018-12-15 2019-06-13 nvelope profit de l'ONM ramework MR-MEDD-75988-GO-RFQ / A Component 3: Strengthening Single Stage - One E cquisition d'équipements pou IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-20 2019-01-15 2019-07-14 nvelope r la fixation des dunes au niv Investments eau de Chami MR-MEDD-74196-GO-RFQ / A Component 3: Strengthening Single Stage - One E chat de plants pour la fixatio IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-25 2019-01-20 2019-07-19 nvelope n biologique du cordon dunai Investments re de Diawling MR-MEDD-200674-GO-RFQ / Component 2: Strengthening Acquisition d’équipements a Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2020-11-15 2021-01-10 2021-07-09 u profit du Port Autonome de nvelope ramework Nouakchott, dit Port de l’Amit ié (PAN – PA) MR-MEDD-74193-GO-RFQ / A Component 3: Strengthening cquisition d'équipements et d Single Stage - One E IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-10-13 2018-12-08 2019-06-06 e matériels de protection du nvelope Investments cordon dunaire de Diawling MR-MEDD-75979-GO-RFQ / A Component 2: Strengthening Single Stage - One E cquisition d'équipements pou IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2018-11-20 2019-01-15 2019-07-14 nvelope r l'opérationnalisation du pla ramework n POLMAR MR-MEDD-75952-GO-RFQ / E Component 3: Strengthening quipements pour passages d Single Stage - One E IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2019-01-20 2019-03-17 2019-09-13 e franchissement du cordon nvelope Investments dunaire de NKTT Page 4 MR-MEDD-200694-GO-RFQ / Component 2: Strengthening Acquisition de stations de me Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2020-11-28 2021-01-23 2021-03-09 sures topographiques et de G nvelope ramework PS différentiels au profit de la DPREM MR-MEDD-170352-GO-RFQ / Component 2: Strengthening Single Stage - One E Équipement du centre de doc IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 Annulé 2020-07-01 2020-08-26 2020-10-10 nvelope umentation électronique de l ramework a CNOEZA MR-MEDD-232476-GO-RFQ / Acquisition des équipements Component 2: Strengthening Single Stage - One E pour les Délégations Régiona IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 35,818.73 Achevé 2021-06-20 2021-07-05 2021-08-09 2021-07-08 2021-08-12 2021-09-01 nvelope les de l'Environnement (NDB, ramework INCHIRI, NKTT NORD ET TRA RZA) MR-MEDD-238152-CW-RFQ / Component 2: Strengthening panneaux de signalisation su Single Stage - One E IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 19,304.00 Achevé 2021-08-15 2021-05-17 2021-10-10 2021-05-24 2022-04-08 2021-05-24 r les principaux sites du proje nvelope ramework t au niveau du littoral de Nouakch ott MR-MEDD-232502-GO-RFB / Acquisition de 7 véhicules au Component 2: Strengthening Single Stage - One E profit des Délégations Région IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 Annulé 2021-07-20 2021-07-25 2021-09-05 2021-10-05 2021-11-09 2022-03-09 nvelope ales de l'environnement : ND ramework B, INCHIRI, NKTT ET TRARZA, et du Cabinet du MEDD MR-MEDD-249413-GO-RFB / Component 2: Strengthening Acquisition d'une station mét Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 2021-10-12 2021-10-17 2021-11-28 2021-12-28 2022-02-01 2022-06-01 éorologique au profit de l'Offi nvelope exécution ramework ce National de la Météorologi e MR-MEDD-249415-GO-RFQ / Component 3: Strengthening Acquisition d'un groupe élect Single Stage - One E IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 37,313.33 Signé 2021-10-23 2021-09-01 2021-12-18 2021-09-22 2022-03-18 rogène pour la base de vie d nvelope Investments u Parc National de Diawling ( PND) MR-MEDD-249410-GO-DIR / Acquisition de 7 véhicules au Component 2: Strengthening Passation de marc profit des Délégations Région IDA / D2880 the Policy and Institutional F A posteriori Direct 195,982.29 Signé 2021-09-22 2021-11-04 2021-09-27 2021-09-09 2021-11-01 2021-11-16 2021-12-16 hé de gré à gré ales de l'environnement : ND ramework B, INCHIRI, NKTT ET TRARZA, et du Cabinet du MEDD MR-MEDD-267607-GO-RFQ / Component 2: Strengthening Acquisition des équipements Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2022-01-22 2022-03-19 2022-05-18 pour la Direction Régionale d nvelope exécution ramework e l'Environnement et du Dév eloppement Durable MR-MEDD-249412-GO-RFB / Component 2: Strengthening Single Stage - One E En attente d' Acquisition des équipements IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 2022-10-10 2022-10-15 2022-11-26 2022-12-26 2023-01-30 2023-04-30 nvelope exécution pour la police environnement ramework ale MR-MEDD-315478-GO-RFQ / Acquisition des moyens de m Component 3: Strengthening Single Stage - One E En attente d' obilité ( 4 quads et 4 VTT) po IDA / D2880 National Physical and Social A posteriori Demande de prix Open - National 0.00 2022-10-22 2022-12-17 2022-12-18 nvelope exécution ur le bureau de surveillance Investments du littoral (Nouakchott) MR-MEDD-315482-GO-RFB / Component 2: Strengthening Acquisition de cinq (05) lod Single Stage - One E En attente d' IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 2022-10-17 2022-10-22 2022-12-03 2023-01-02 2023-02-06 2023-06-06 ges équipées au profit du bur nvelope exécution ramework eau de Surveillance du littora l de Nouakchott MR-MEDD-315486-GO-RFB / Acquisition de matériels info rmatiques et de mobiliers de Component 2: Strengthening Single Stage - One E En attente d' bureau en deux lots distincts IDA / D2880 the Policy and Institutional F A posteriori Appel d'offres Open - National 0.00 2022-10-17 2022-10-22 2022-12-03 2023-01-02 2023-02-06 2023-05-07 nvelope exécution pour deux délégations région ramework ales de l'Environnement : (D REDD NCHIRI et TRARZA), et le MEDD MR-MEDD-315580-GO-RFQ / Acquisition d'équipements d Component 2: Strengthening Single Stage - One E En attente d' e GPS, appareils photos, jum IDA / D2880 the Policy and Institutional F A posteriori Demande de prix Limited 0.00 2022-11-19 2023-01-14 2023-03-15 nvelope exécution elles, matraques, bottes de s ramework écurité pour le Bureau de Sur veillance du littoral MR-MEDD-317823-GO-RFQ / Achat de mobilier et matériel Component 4: National Coor Single Stage - One E En attente d' IDA / D2880 A posteriori Demande de prix Limited 0.00 2022-10-15 2022-12-10 2023-01-24 de bureau pour l'Unité de Ge dination nvelope exécution stion du Projet WACA-MR NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74195-NC-RFQ / C Component 3: Strengthening ollecte et transport sur sites Single Stage - One E IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 Annulé 2018-11-13 2019-04-02 2019-01-08 2019-07-07 de matériaux de fixation méc nvelope Investments anique de dunes au niveau d e Diawling MR-MEDD-170490-NC-RFQ / Component 4: National Coor Single Stage - One E IDA / D2880 A posteriori Demande de prix Limited 18,116.74 Signé 2020-05-15 2020-03-05 2020-07-10 2020-03-11 2021-07-07 Maintenance et suivi informa dination nvelope tique MR-MEDD-200678-NC-RFQ / Component 2: Strengthening Single Stage - One E IDA / D2880 A posteriori Demande de prix Limited 0.00 Annulé 2020-11-28 2021-01-23 2021-03-09 Nettoyage de 35 villages au the Policy and Institutional F nvelope PND ramework MR-MEDD-232496-NC-RFQ / Component 3: Strengthening Single Stage - One E Recruter une ONG facilitatric IDA / D2880 National Physical and Social A posteriori Demande de prix Open - National 0.00 Annulé 2021-07-28 2021-10-22 2022-10-19 nvelope e du MGP Investments MR-MEDD-170472-NC-DIR / Component 3: Strengthening Passation de marc Opérationnalisation du méca IDA / D2880 National Physical and Social A posteriori Direct 0.00 Annulé 2020-06-23 2020-07-08 2020-08-12 2021-02-08 hé de gré à gré nisme de gestion de plaintes Investments (MGP) MR-MEDD-315579-CS-INDV / Component 3: Strengthening La traduction, multiplication Single Stage - One E En attente d' IDA / D2880 National Physical and Social A posteriori Demande de prix Limited 0.00 2022-10-22 2022-12-11 2023-01-10 et mise à disposition des outi nvelope exécution Investments ls (référentiel et fiches) en ar abe et français Page 5 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74182-CS-QCBS / Component 2: Strengthening Sélection fondée s Elaboration de la directive d' IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 aménagement du littoral de ramework s des consultants NDB MR-MEDD-74184-CS-QCBS / Component 2: Strengthening Sélection fondée s Etude sur le classement de la IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 38,055.67 Signé 2018-09-20 2018-10-08 2018-10-11 2018-11-24 2018-10-16 2018-12-24 2019-10-19 2019-01-28 2018-10-20 2019-07-27 Baie de l'Etoile de NDB ramework s des consultants MR-MEDD-74207-CS-QCBS / Analyse du rapport EIE du pr Component 2: Strengthening Sélection fondée s ojet Ahmeyin/Guembeul pour IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 la production de gaz offshore ramework s des consultants en Mauritanie et au Sénégal MR-MEDD-75957-CS-QCBS / Component 2: Strengthening Sélection fondée s Evaluation des risques liés au IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 x inondations de la ville de N ramework s des consultants KTT MR-MEDD-75958-CS-QCBS / Component 2: Strengthening Sélection fondée s Elaboration de la directive d' IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-28 2018-10-19 2018-12-02 2019-01-01 2019-02-05 2019-08-04 aménagement du littoral de ramework s des consultants NKTT MR-MEDD-75960-CS-QCBS / Component 2: Strengthening Sélection fondée s Elaboration d'une stratégie d IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-21 2018-10-12 2018-11-25 2018-12-25 2019-01-29 2019-07-28 e gestion intégrée du littoral ramework s des consultants mauritanien MR-MEDD-75970-CS-QCBS / Component 2: Strengthening Sélection fondée s Evaluation du capital sédime IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2018-09-20 2018-10-11 2018-11-24 2018-12-24 2019-01-28 2019-07-27 ntologique de la ville de NKT ramework s des consultants T MR-MEDD-115364-CS-CQS / Component 3: Strengthening Sélection fondée s Etude de faisabilité pour la ré IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 Annulé 2019-05-27 2020-04-27 2019-06-03 2019-06-07 2019-06-14 2019-07-24 habilitation et l'extension de Investments s des consultants la digue de protection au niv eau du Diawling MR-MEDD-115676-CS-CQS / Component 3: Strengthening Sélection fondée s Etude technique pour le colm IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 39,243.19 Achevé 2018-06-15 2018-06-15 2018-06-29 2018-08-01 2018-07-13 2018-08-02 2018-08-10 2018-08-02 2018-09-24 2018-09-19 atage des brèches du littoral Investments s des consultants de Nouakchott MR-MEDD-117326-CS-QCBS / recrutement d'un cabinet d Sélection fondée s Component 4: National Coor En attente d'exéc 'audit pour audit extezrne du IDA / D2880 A posteriori ur la qualité et le Open - National 0.00 2019-05-29 2019-05-31 2019-06-08 2019-06-11 2019-06-14 2019-06-20 2019-06-23 2019-07-13 dination ution projet pour les années coût 2018 2019 2020 et 2021. MR-MEDD-124791-CS-INDV / etude sur la mise en place du système Waves pour le littor Component 2: Strengthening Sélection fondée s al et l'espace maritime : eval Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur la qualité et le 0.00 Annulé 2019-09-12 2019-10-03 2019-11-16 2019-12-14 2020-01-13 2020-02-17 2020-03-23 2021-03-23 uation des ecosystèmes phys l ramework coût iqueset monetaire pour la sel ection des comptes du capital natur el côtier . MR-MEDD-135519-CS-QCBS Component 2: Strengthening Sélection fondée s / Etude environnementale str Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur la qualité et le 0.00 Annulé 2019-10-04 2019-10-06 2019-10-09 2019-10-14 2019-10-29 2019-11-03 2019-11-13 2019-12-13 atégique pour l'exploitation d l ramework coût u sable noir sur le littoral ma uritanien MR-MEDD-157694-CS-CQS / Component 2: Strengthening Sélection fondée s Etude environnementale stra Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 171,889.76 Signé 2020-02-11 2020-02-06 2020-02-26 2020-04-10 2020-04-07 2020-05-10 2020-08-05 2020-06-14 2020-08-14 2020-12-11 tégique pour l'exploitation du l ramework s des consultants sable noir sur le littoral mauri tanien MR-MEDD-170561-CS-CQS / Component 2: Strengthening Sélection fondée s Élaboration des directives d’ Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2020-05-11 2020-10-19 2020-06-01 2021-02-03 2020-07-15 2020-08-14 2020-09-18 2020-12-17 aménagement du littoral de l ramework s des consultants Nouakchott de Nouadhibou MR-MEDD-170480-CS-INDV / Action pilote de recherche (in Component 3: Strengthening Sélection fondée s En attente d'exéc troduction de plantes aquatiq IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 0.00 2020-07-15 2020-08-05 2020-09-18 2020-10-18 2020-11-22 2021-01-21 ution ues, atténuation du PH de l’e Investments s des consultants au,…) de la mare de Riyad MR-MEDD-170427-CS-CQS / Component 2: Strengthening Sélection fondée s Open - Internationa Etude impact environnement IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2020-10-12 2020-08-03 2020-10-27 2020-12-10 2021-01-09 2021-02-13 2021-05-04 l al et social ( colmatage de br ramework s des consultants èches ) MR-MEDD-182813-CS-CQS / Réalisation de l'étude sur la c Component 3: Strengthening Sélection fondée s Open - Internationa En attente d'exéc aractérisation des déchets ur IDA / D2880 National Physical and Social A posteriori ur les qualification 0.00 2020-09-23 2020-10-14 2020-11-27 2020-12-27 2021-01-31 2021-03-17 l ution bains à Nouadhibou et propo Investments s des consultants sition d'un système de gestio n approprié MR-MEDD-200765-CS-CQS / accompagnement de l'UGP e Sélection fondée s t des structures beneficiaires Component 4: National Coor IDA / D2880 A posteriori ur les qualification Limited 39,845.23 Signé 2020-05-04 2021-05-24 2020-05-18 2020-06-10 2020-06-17 2021-06-22 2020-07-22 2020-07-03 2021-01-18 dans la mise en oeuvre des a dination s des consultants ctivitesd investissement(iden tification des sites screening environnemental reporting...) MR-MEDD-182699-CS-CQS / accompagnement de l'UGP e Component 2: Strengthening Sélection fondée s t des structures beneficiaires IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Limited 0.00 Annulé 2020-07-01 2020-07-15 2020-08-14 2020-09-18 2020-12-17 dans la mise en oeuvre des a ramework s des consultants ctivitesd investissement(iden tification des sites screening environnemental reporting...) MR-MEDD-228916-CS-CQS / Recrutement d'un cabinet po Component 3: Strengthening Sélection fondée s En cours d'exécut ur le choix d’un site d’Enfoui IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2021-04-06 2021-06-17 2021-04-20 2021-05-20 2021-06-24 2021-12-21 ion ssement Technique et de trai Investments s des consultants tement des ordures ménagèr es à Nouakchott Page 6 MR-MEDD-170566-CS-CQS / Étude pour la détermination Component 2: Strengthening Sélection fondée s du trait de côte du littoral ma IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-04-21 uritanien par images satellita ramework s des consultants ires avec quelques relevés d u terrain par GNSS de N’Diag o au Cap blanc MR-MEDD-170564-CS-CQS / Component 2: Strengthening Sélection fondée s Etude pour l’évaluation des ri Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-10-20 sques liés aux inondations de l ramework s des consultants Nouakchott et Nouadhibou MR-MEDD-192591-CS-CQS / Component 2: Strengthening Sélection fondée s Open - Internationa Etude de la bathymétrie et d IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2020-09-15 2020-09-30 2020-10-15 2020-10-30 2020-12-04 2021-06-02 l e l'hydrométrie au PNBA ramework s des consultants MR-MEDD-76863-CS-QBS / él Component 2: Strengthening aboration de plans de dévelo Sélection fondée s IDA / D2880 the Policy and Institutional F A posteriori Open - National 0.00 Annulé 2018-09-26 2018-10-17 2018-11-30 2018-12-28 2019-01-27 2019-02-26 2019-04-02 2020-04-01 ppement communaux pour T ur la qualité ramework evragh Zeine ,sebkha et Elmi na MR-MEDD-76873-CS-QCBS / Component 2: Strengthening Sélection fondée s Open - Internationa Etude sur les pressions et enj IDA / D2880 the Policy and Institutional F A posteriori ur la qualité et le 0.00 Annulé 2018-10-08 2018-10-29 2018-12-12 2019-01-09 2019-02-08 2019-03-15 2019-04-19 2020-04-18 l eux exercés sur l'espace vital ramework coût du PNBA MR-MEDD-170392-CS-INDV / Component 2: Strengthening Sélection fondée s Open - Internationa Etude de faisabilité sur la dél IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2020-05-20 2020-05-20 2020-06-10 2020-07-24 2020-08-23 2020-09-27 2020-12-26 l ocalisation du site d'orpaillag ramework s des consultants e de Chami MR-MEDD-170573-CS-CQS / Component 3: Strengthening Sélection fondée s Open - Internationa Activités de renforcement de IDA / D2880 National Physical and Social A posteriori ur les qualification 0.00 Annulé 2020-05-11 2020-07-06 2020-06-01 2020-07-15 2020-08-14 2020-09-18 2021-09-15 l la résilience des populations Investments s des consultants de N’Diago MR-MEDD-232494-CS-CQS / Élaborer une enquête statisti que sur le nombre de ménag Sélection fondée s Component 4: National Coor En attente d'exéc es situés sur le littoral ayant IDA / D2880 A posteriori ur les qualification Open - National 0.00 2021-08-10 2021-08-31 2021-10-14 2021-11-13 2021-12-12 2022-03-12 dination ution accès à des activités de subs s des consultants tances améliorées et sur le s core du niveau de satisfactio n des populations du littoral MR-MEDD-232505-CS-CQS / Recrutement d’un Cabinet po ur Faire une modélisation de Component 2: Strengthening Sélection fondée s la dynamique du littoral au ni Open - Internationa En cours d'exécut IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 2021-10-14 2021-08-13 2021-11-04 2021-12-18 2022-01-17 2022-02-21 2022-08-20 veau du Port de N'Diago pour l ion ramework s des consultants mieux comprendre la problé matique actuelle de l’érosion constatée et les mesures à p rendre MR-MEDD-232481-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’un bureau de IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 39,629.82 Signé 2021-06-21 2021-06-21 2021-07-12 2021-08-25 2021-09-07 2021-09-24 2021-09-07 2021-10-29 2021-09-22 2022-04-27 contrôle et de suivi des trava Investments s des consultants ux de colmatage des 3 brèch es (9, 13 et 16) MR-MEDD-200679-CS-INDV / Component 2: Strengthening Sélection fondée s Recrutement d'un formateur IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2020-12-17 2021-01-07 2021-02-20 2021-03-22 2021-04-26 2021-05-26 pour la formation des institu ramework s des consultants teurs en éducation environne mentale au PND MR-MEDD-239559-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d'un consultent IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 41,182.86 Signé 2021-08-05 2021-06-08 2021-08-26 2021-10-09 2021-08-04 2021-11-08 2021-08-09 2021-12-13 2021-08-09 2022-06-11 pour élaborer le dossier tech Investments s des consultants nique pour la fixation de dun e de littoral. MR-MEDD-246147-CS-CQS / Recrutement d’ ONGs pour a ssurer la formation des ONG Component 3: Strengthening Sélection fondée s En cours d'exécut porteuses de Projet et le suiv IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2021-08-09 2021-09-01 2021-08-23 2021-09-07 2021-10-06 2021-12-05 ion i des Projets Investments s des consultants dans les communes littorales de Nktt: Sebkha ,ElMina et Te vraghZeine. MR-MEDD-249823-CS-CQS / Recrutement d'un Bureau d'é Sélection fondée s Component 4: National Coor tude pour le contrôle et le sui IDA / D2880 A posteriori ur les qualification Open - National 35,802.72 Signé 2021-09-27 2021-10-01 2021-10-18 2021-12-01 2021-11-22 2021-12-31 2021-11-22 2022-02-04 2021-12-06 2023-02-01 dination vi des travaux de la construc s des consultants tion du siège de l'Observatoi re du Littoral Mauritanien MR-MEDD-74256-CS-CQS / E Component 3: Strengthening Sélection fondée s tude pour le franchissement IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 Annulé 2018-10-08 2018-10-22 2018-11-21 2018-12-26 2019-06-24 du cordon dunaire de NKTT Investments s des consultants MR-MEDD-232512-CS-CQS / Élaborer une étude de faisabi Component 2: Strengthening Sélection fondée s lité (technique et financière) Open - Internationa IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2021-07-20 2021-08-10 2021-09-23 2021-10-23 2021-11-27 2022-05-26 pour la construction d'un Cen l ramework s des consultants tre d'Enfouissement Techniq ue des déchets solides urbai ns de Nouakchott MR-MEDD-234406-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 Annulé 2021-07-15 2021-07-29 2021-08-28 2021-10-02 2021-12-31 r le suivi de Projets Sociaux e Investments s des consultants t AGR dans la Communes d’E l Mina MR-MEDD-234410-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 Annulé 2021-06-15 2021-06-29 2021-07-29 2021-09-02 2021-11-01 r le suivi de Projets Sociaux e Investments s des consultants t AGR dans la Communes de Tevragh Zeina MR-MEDD-232514-CS-CQS / Recrutement d’un bureau po ur Mener les études prioritair es nécessaires pour (i) suivre Component 2: Strengthening Sélection fondée s Open - Internationa l’impact du changement clim IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-01-21 l atique sur le littoral, (ii) faire ramework s des consultants une analyse historique de l’é volution du trait de côte et (ii i) fournir les données essenti elles aux évalu MR-MEDD-232480-CS-CQS / Recrutement d’un Cabinet po Component 2: Strengthening Sélection fondée s ur réaliser un état des connai IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Limited 0.00 Annulé 2021-06-14 2021-06-28 2021-07-13 2021-08-17 2021-11-15 ssances et des données disp ramework s des consultants onibles sur le système côtier (situation de référence Page 7 MR-MEDD-232513-CS-CQS / Recrutement d’un bureau po Component 2: Strengthening Sélection fondée s ur Elaborer une EIES pour la IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2021-09-15 2021-10-06 2021-11-19 2021-12-19 2022-01-23 2022-07-22 construction d'un Centre d'E ramework s des consultants nfouissement Technique des déchets de la ville de Nouakc hott MR-MEDD-211477-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d'un cabinet po IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 0.00 Annulé 2021-02-05 2021-02-26 2021-04-11 2021-05-11 2021-06-15 2021-08-14 ur le Suivi des travaux de la Investments s des consultants Digue Nord MR-MEDD-234411-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 Annulé 2021-07-15 2021-07-29 2021-08-28 2021-10-02 2021-12-01 r le suivi de Projets Sociaux e Investments s des consultants t AGR dans la Communes de Sebkha MR-MEDD-267101-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’un Consultant Open - Internationa En cours d'exame IDA / D2880 National Physical and Social A posteriori ur les qualification 0.00 2021-12-15 2021-12-13 2021-12-30 2022-01-28 2022-02-12 2022-03-19 2022-06-17 (cabinet) pour l’élaboration d l n Investments s des consultants ’un avant-Projet de loi relatif au littoral MR-MEDD-267604-CS-LCS / Component 4: National Coor Sélection au moin Open - Internationa En cours d'exécut Recrutement d'un cabinet d' IDA / D2880 A posteriori 0.00 2021-12-20 2021-12-12 2022-01-10 2022-02-23 2022-03-23 2022-04-22 2022-05-27 2022-06-11 2024-11-27 dination dre coût l ion audit pour les exercices 2021 -2022-2023 MR-MEDD-267605-CS-QCBS / Recrutement d'un cabinet p Component 3: Strengthening Sélection fondée s Open - Internationa En attente d'exéc our l'élaboration des Directiv IDA / D2880 National Physical and Social A posteriori ur la qualité et le 0.00 2022-10-10 2022-10-31 2022-12-14 2023-01-11 2023-02-10 2023-03-17 2023-04-21 2023-10-18 l ution es d'Aménagements Littoral Investments coût es de Nouakchott et Nouadhi bou MR-MEDD-315488-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’un Cabinet po En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 0.00 2022-10-24 2022-11-14 2022-12-28 2023-01-27 2023-03-03 2023-06-01 ur l'étude technique de colm ution Investments s des consultants atage des 6 brèches MR-MEDD-315489-CS-CQS / Recrutement d’un Cabinet po Component 3: Strengthening Sélection fondée s En attente d'exéc ur l'étude d’impact environne IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 0.00 2022-10-17 2022-11-07 2022-12-21 2023-01-20 2023-02-24 2023-08-23 ution mentale et sociale (EIES) du Investments s des consultants colmatage des 6 brèches MR-MEDD-259720-CS-QCBS / Recrutement d’un cabinet p Component 3: Strengthening Sélection fondée s Open - Internationa our l’élaboration du Plan Nati IDA / D2880 National Physical and Social A posteriori ur la qualité et le 0.00 Annulé 2021-12-06 2021-11-04 2021-12-27 2021-11-15 2022-02-09 2022-03-09 2022-04-08 2022-05-13 2022-06-17 2022-12-14 l onal de Gestion des Déchets Investments coût Solides en Mauritanie MR-MEDD-315547-CS-CQS / Recrutement d’un Cabinet po Sélection fondée s Component 4: National Coor En attente d'exéc ur la révision du Manuel des IDA / D2880 A posteriori ur les qualification Open - National 0.00 2022-09-28 2022-10-19 2022-12-02 2023-01-01 2023-02-05 2023-05-06 dination ution Procédures Administratifs, Fi s des consultants nanciers, de Passation des M archés MR-MEDD-315554-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2022-11-07 2022-11-21 2022-12-21 2023-01-25 2023-04-25 r le Suivi des SPS/AGRs pour ution Investments s des consultants la commune de Nouadhibou MR-MEDD-315556-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2022-10-17 2022-10-31 2022-11-30 2023-01-04 2023-04-04 r le Suivi des SPS/AGRs pour ution Investments s des consultants la commune de Chami MR-MEDD-315559-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2022-10-10 2022-10-24 2022-11-23 2022-12-28 2023-03-28 r le Suivi des SPS/AGRs pour ution Investments s des consultants la commune de Keurmecen MR-MEDD-315568-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2022-09-26 2022-10-10 2022-11-09 2022-12-08 2023-03-08 r le Suivi des SPS/AGRs pour ution Investments s des consultants la commune de Tiguinte MR-MEDD-315570-CS-CQS / Component 3: Strengthening Sélection fondée s Recrutement d’une ONG pou En attente d'exéc IDA / D2880 National Physical and Social A posteriori ur les qualification Limited 0.00 2022-10-03 2022-10-17 2022-11-16 2022-12-15 2023-03-15 r le Suivi des SPS/AGRs pour ution Investments s des consultants la commune de Benichab MR-MEDD-232504-CS-CQS / Recrutement d’un cabinet po Component 2: Strengthening Sélection fondée s Open - Internationa ur réaliser un audit environn IDA / D2880 the Policy and Institutional F A posteriori ur les qualification 0.00 Annulé 2021-09-15 2021-08-11 2021-10-06 2021-09-21 2021-11-19 2021-12-19 2022-01-23 2022-07-22 l emental des usines de farine ramework s des consultants de poisson le long du littoral MR-MEDD-249756-CS-CQS / Recrutement d'un bureau d'é Component 2: Strengthening Sélection fondée s tude pour l'élaboration d'un c IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2021-10-13 2021-08-27 2021-11-03 2021-12-17 2022-01-16 2022-02-20 2022-04-21 ahier des charges environne ramework s des consultants mentales des usines d'orpaill ages MR-MEDD-267614-CS-CQS / Recrutement d’ une ONG pou Component 2: Strengthening Sélection fondée s r assurer la formation des ON IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Limited 0.00 Annulé 2022-01-10 2022-01-24 2022-02-23 2022-03-30 2022-06-28 G porteuses de Projet et le su ramework s des consultants ivi des Projets dans la Comm une Littorale de Nouadhinou MR-MEDD-249750-CS-CQS / Recrutement d'une ONG char gée de la mise en œuvre du Component 2: Strengthening Sélection fondée s programme de sensibilisation IDA / D2880 the Policy and Institutional F A posteriori ur les qualification Open - National 0.00 Annulé 2021-09-15 2021-10-06 2021-11-19 2021-12-19 2022-01-23 2022-04-23 sur les risques liés à l’utilisati ramework s des consultants on des produits chimiques da ns l’extraction artisanale de l ’or pour le Wilaya Nouadhibo u MR-MEDD-232491-CS-CQS / Component 3: Strengthening Sélection fondée s Recruter un bureau pour ass IDA / D2880 National Physical and Social A posteriori ur les qualification Open - National 0.00 Annulé 2021-07-13 2021-08-03 2021-09-16 2021-10-16 2021-11-14 2022-02-12 urer le contrôle et le suivi de Investments s des consultants s travaux de la digue Page 8 MR-MEDD-315491-CS-QCBS / Recrutement d’un cabinet p Component 2: Strengthening Sélection fondée s our élaborer une étude de fai Open - Internationa En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori ur la qualité et le 0.00 2022-10-24 2022-11-14 2022-12-28 2023-01-25 2023-02-24 2023-03-31 2023-05-05 2023-09-02 sabilité pour la construction l ution ramework coût d'un Centre d'Enfouissement Technique des déchets solide s urbains de Nouakchott INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MR-MEDD-74127-CS-INDV / Diagnostic et évaluation de l Component 2: Strengthening En cours d'exécut a capacité de tous les organi IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2018-08-17 2019-03-28 2018-08-22 2018-09-12 2018-10-17 2019-04-15 ion smes concernés avec l'OLM (i ramework nclus consultations, séminair es, ateliers) MR-MEDD-74130-CS-INDV / Component 2: Strengthening Elaboration des plans de résil IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 13,532.13 Signé 2018-08-20 2018-10-17 2018-08-25 2019-10-18 2018-09-15 2018-10-19 2018-10-20 2019-03-28 2019-04-18 ience de N'Diago ramework MR-MEDD-74133-CS-INDV / I dentification des actions prio Component 2: Strengthening En attente d'exéc ritaires de l'antenne national IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2018-10-10 2018-10-15 2018-11-05 2018-12-10 2019-06-08 ution e de la MOLOA (inclus consul ramework tations, ateliers, séminaires) MR-MEDD-74135-CS-INDV / Component 3: Strengthening Elaboration de textes juridiqu IDA / D2880 National Physical and Social A posteriori Individuel Limited 14,000.00 Achevé 2018-11-02 2019-02-05 2018-11-07 2019-02-02 2018-11-28 2019-01-02 2019-02-25 2019-07-01 2020-02-10 es relatifs aux principes pollu Investments eur-payeurs MR-MEDD-74137-CS-INDV / Conception et mise en place d'une plateforme de gestion Component 2: Strengthening environnementale relative à l IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2018-09-03 2018-09-08 2018-09-29 2018-11-03 2019-05-02 'évaluation des activités et le ramework suivi de leurs impacts enviro nnementaux sur le littoral m auritanien MR-MEDD-74141-CS-INDV / Component 2: Strengthening Analyse du cadre foncier rela IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 28,445.10 Signé 2018-10-15 2020-12-16 2018-10-20 2021-04-06 2018-11-10 2021-04-07 2018-12-15 2021-04-08 2019-06-13 tif au littoral (inclus consultat ramework ions, séminaires, ateliers) MR-MEDD-74152-CS-INDV / Component 2: Strengthening En attente d'exéc Elaboration de guide des act IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2018-11-01 2018-11-06 2018-11-27 2019-01-01 2019-06-30 ution eurs et des métiers du littora ramework l mauritanien MR-MEDD-74153-CS-INDV / Component 2: Strengthening Revue et amendement du sy IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 36,000.00 Signé 2018-10-01 2020-02-11 2018-10-06 2020-05-30 2018-10-27 2020-06-02 2018-12-01 2020-06-30 2019-05-30 stème des études d'impact e ramework nvironnemental en Mauritani e MR-MEDD-74164-CS-INDV / Component 2: Strengthening Recrutement d'un assistant t En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2018-09-13 2018-11-01 2018-11-22 2018-12-27 2019-06-25 echnique au profit de l'Autori ution ramework té de la Zone franche de NDB MR-MEDD-74175-CS-INDV / Component 2: Strengthening Etat des lieux de l'environne IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 23,548.85 Signé 2018-11-01 2018-12-20 2018-11-06 2018-12-04 2018-11-27 2018-12-12 2019-01-01 2018-12-17 2019-06-30 ment au niveau de la Zone fr ramework anche de NDB MR-MEDD-74194-CS-INDV / Component 3: Strengthening En cours d'exécut Etudes de faisabilité des trav IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-10-01 2018-11-24 2018-10-06 2018-10-27 2018-12-01 2019-05-30 ion aux de fixation du cordon du Investments naire de Diawling MR-MEDD-74199-CS-INDV / Component 3: Strengthening Recrutement d'un consultant IDA / D2880 National Physical and Social A posteriori Individuel Limited 9,240.00 Achevé 2018-11-05 2019-03-28 2018-11-10 2019-03-28 2018-12-01 2019-01-05 2019-03-28 2019-07-04 2019-04-02 pour le suivi et le contrôle de Investments s travaux du cordon dunaire de Diawling MR-MEDD-74200-CS-INDV / Component 3: Strengthening Elaboration d'une carte d'occ IDA / D2880 National Physical and Social A posteriori Individuel Limited 17,280.00 Achevé 2018-11-15 2019-03-28 2018-11-20 2019-03-28 2018-12-11 2019-01-15 2019-03-28 2019-07-14 2019-05-15 upation des éco-systèmes de Investments mangroves MR-MEDD-75945-CS-INDV / Component 3: Strengthening En cours d'exécut Etude pour le franchissement IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2018-10-01 2019-02-12 2018-10-06 2018-10-27 2018-12-01 2019-05-30 ion du cordon dunaire de NKTT Investments MR-MEDD-75972-CS-INDV / Component 2: Strengthening Conception et mise en place IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 13,545.94 Signé 2018-11-05 2019-03-20 2018-11-10 2019-03-28 2018-12-01 2019-03-28 2019-01-05 2019-03-28 2019-07-04 d'un site web pour l'OLM ramework MR-MEDD-76422-CS-INDV / Component 4: National Coor En cours d'exécut IDA / D2880 A posteriori Individuel Limited 0.00 2018-09-12 2018-09-17 2018-10-08 2018-11-12 2019-05-11 Recrutement d'un auditeur in dination ion terne MR-MEDD-76867-CS-INDV / Component 3: Strengthening Mise à jour du SIG de la Régi IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 on de Nouakchott Investments MR-MEDD-76868-CS-INDV / Component 3: Strengthening Adaptation du fonds d'Investi IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-12-04 2019-01-22 2019-02-12 2019-03-19 2019-09-15 ssement communal (région d Investments e NKTT) MR-MEDD-82701-CS-INDV / r ecrutement d'un consultant n Component 2: Strengthening En attente d'exéc ational pour l'appui à l'étude IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2018-10-29 2018-11-03 2018-11-24 2018-12-29 2019-06-27 ution de faisabilité du projet WACA ramework -CCA en Mauritanie MR-MEDD-82704-CS-INDV / r Component 2: Strengthening En attente d'exéc éalisation d'un documentaire IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2018-10-19 2018-10-24 2018-11-14 2018-12-19 2019-06-17 ution sur la baie de l'étoile ramework MR-MEDD-82731-CS-INDV / Component 4: National Coor En attente d'exéc IDA / D2880 A posteriori Individuel Limited 0.00 2018-11-19 2018-11-24 2018-12-15 2019-01-03 2019-07-02 Maintenance et suivi informa dination ution tique Page 9 MR-MEDD-82737-CS-INDV / accompagnement de l'UGP e Component 3: Strengthening t des structures beneficiaires IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2018-11-15 2018-11-20 2018-12-11 2019-01-15 2019-07-14 dans la mise en oeuvre des a Investments ctivitesd investissement(iden tification des sites screening environnemental reporting...) MR-MEDD-76859-CS-NPO / M Component 3: Strengthening ise en place d'un système de IDA / D2880 National Physical and Social A posteriori Individuel Limited 33,664.91 Signé 2018-11-01 2019-09-02 2018-11-06 2019-10-02 2018-11-27 2019-10-02 2019-01-01 2019-10-02 2019-06-30 Gestion de plaintes Investments MR-MEDD-76166-CS-INDV / Component 2: Strengthening Recrutement d'un Responsab IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 9,600.00 Signé 2018-09-05 2019-03-18 2018-09-10 2018-07-26 2018-10-01 2018-11-05 2019-07-31 2019-05-04 le de Suivi-Evaluation ramework MR-MEDD-76167-CS-INDV / Component 2: Strengthening En attente d'exéc Recrutement d'un Spécialiste IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2018-09-05 2018-10-24 2018-11-14 2018-12-19 2019-06-17 ution en communication ramework MR-MEDD-76173-CS-INDV / Component 2: Strengthening Recrutement en Développem IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 9,600.00 Signé 2018-09-05 2019-07-25 2018-10-24 2019-07-25 2018-11-14 2018-12-19 2019-08-01 2019-06-17 ent Institutionnel ramework MR-MEDD-76168-CS-INDV / Component 2: Strengthening Recrutement d'un Spécialiste En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 en Développement Social, sa ution ramework uvegarde sociale et genre MR-MEDD-76158-CS-INDV / Component 2: Strengthening Recrutement Coordinateur d IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 4,320.00 Signé 2018-08-29 2017-09-28 2018-09-03 2017-09-28 2018-09-24 2017-09-28 2018-10-29 2020-01-02 2019-04-27 u Projet WACA ramework MR-MEDD-76160-CS-INDV / Component 2: Strengthening Recrutement d'un Coordinate IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 3,520.00 Signé 2018-08-29 2018-02-01 2018-09-03 2018-02-01 2018-09-24 2018-10-29 2018-05-02 2019-04-27 ur-Adjoint juriste pour le Proj ramework et WACA MR-MEDD-76162-CS-INDV / Component 2: Strengthening Recrutement d'un Responsab IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 1,600.00 Signé 2018-08-29 2018-06-28 2018-09-03 2018-06-28 2018-09-24 2018-10-29 2018-08-02 2019-04-27 le de Passation des Marchés ramework MR-MEDD-115334-CS-INDV / Elaboration des TDR de l'étu Component 2: Strengthening En cours d'exécut de de détermination du trait IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2019-05-30 2019-10-01 2019-06-12 2019-06-14 2019-06-18 2019-07-08 ion de côte du Littoral mauritani ramework en par GNSS de N'Diago au C ap blanc MR-MEDD-115272-CS-INDV / Component 2: Strengthening Etude pour l'élaboration d'un IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 23,826.67 Achevé 2019-05-30 2019-06-07 2019-06-13 2019-06-13 2019-06-15 2019-06-18 2019-06-21 2019-06-27 2019-08-05 2019-09-05 e stratégie et d'un plan de co ramework mmunication pour le Projet MR-MEDD-115327-CS-INDV / Component 3: Strengthening L'élaboration d'une étude d'i IDA / D2880 National Physical and Social A posteriori Individuel Open 21,493.34 Achevé 2019-05-30 2019-06-12 2019-06-11 2019-06-13 2019-06-13 2019-06-17 2019-06-27 2019-07-27 2019-09-05 dentification de sous-projets Investments dans les communes littorales MR-MEDD-115350-CS-INDV / Elaboration de cahier de pres Component 3: Strengthening criptions techniques pour le c IDA / D2880 National Physical and Social A posteriori Individuel Open 7,466.67 Signé 2019-05-30 2019-10-02 2019-06-12 2019-06-13 2019-06-17 2019-06-18 2019-06-20 2019-06-27 2019-07-16 olmatage des brèches du cor Investments don dunaire de Nouakchott MR-MEDD-115371-CS-CDS / Component 2: Strengthening Etat des lieux du foncier du li IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 24,773.34 Achevé 2019-05-30 2019-10-01 2019-06-11 2019-09-05 2019-06-13 2019-09-05 2019-06-17 2019-09-09 2019-08-16 2019-11-21 ttoral de N'Diago et de la Zon ramework e Franche de Nouadhibou MR-MEDD-124792-CS-INDV / Inventaire des textes juridiqu Component 2: Strengthening es relatifs à la gestion des zo IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2019-08-21 2019-08-26 2019-09-16 2019-10-21 2020-04-18 nes côtières et marines et ra ramework tifications des protocoles de l a convention d'Abidjan. MR-MEDD-74150-CS-INDV / Component 2: Strengthening Analyse et révision de l'ordon IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2019-10-22 2019-11-15 2019-11-20 2019-11-30 2020-01-09 nance relative au littoral et él ramework aboration des textes d'applic ation MR-MEDD-149021-CS-INDV / Recrutement d'un consultant pour une mission d'assistanc Component 1: Strengthening En attente d'exéc e pour la saisie, sur le STEP, IDA / D2880 A posteriori Individuel Limited 0.00 2019-12-09 2019-12-11 2019-12-13 2019-12-17 2020-01-01 Regional Integration ution de l’ensemble des marchés p assés par les Projets PGDP et WACA/Mauritanie au cours d e l’exercice 2019. MR-MEDD-170446-CS-INDV / Component 3: Strengthening En cours d'exécut suivi des travaux de fixation IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 2020-05-29 2020-06-24 2020-06-13 2020-07-04 2020-08-08 2020-09-22 ion des dunes au Diawling Investments MR-MEDD-170469-CS-INDV / Elaboration de l’étude d’impa Component 3: Strengthening ct environnemental ou de no IDA / D2880 National Physical and Social A posteriori Individuel Open 28,914.58 Signé 2020-07-06 2020-11-11 2020-08-24 2021-05-26 2020-09-14 2021-05-26 2020-10-19 2021-06-10 2021-04-17 tice d’impact environnement Investments al pour l’extension de la digu e Nord du PND MR-MEDD-170488-CS-INDV / Component 4: National Coor Spécialiste en sauvegarde e IDA / D2880 A posteriori Individuel Open 14,250.17 Signé 2020-06-22 2020-05-20 2020-08-10 2020-08-04 2020-08-31 2020-08-04 2020-10-05 2020-11-02 2021-01-03 dination nvironnementalement MR-MEDD-170410-CS-INDV / Component 2: Strengthening IDA / D2880 A posteriori Individuel Open 0.00 Annulé 2020-08-17 2021-08-05 2020-10-05 2020-10-26 2020-11-30 2021-01-29 Révision de l'ordonnance du l the Policy and Institutional F ittoral ramework MR-MEDD-170431-CS-INDV / Component 3: Strengthening Élaboration APS, APD et DAO IDA / D2880 National Physical and Social A posteriori Individuel Open 28,721.26 Signé 2020-10-13 2020-09-10 2020-12-01 2021-06-01 2020-12-22 2021-06-02 2021-01-26 2021-06-16 2021-04-26 pour passage de franchissem Investments ent du cordon dunaire MR-MEDD-170466-CS-INDV / Component 3: Strengthening Elaboration des études (APS, IDA / D2880 National Physical and Social A posteriori Individuel Open 26,669.01 Signé 2020-07-20 2020-05-08 2020-09-07 2020-06-02 2020-09-28 2020-06-02 2020-11-02 2020-06-24 2021-05-01 APD, DAO) de l’extension de l Investments a digue Nord du PND Page 10 MR-MEDD-170408-CS-INDV / Component 2: Strengthening IDA / D2880 A posteriori Individuel Open 31,898.11 Signé 2020-05-11 2020-06-23 2020-06-29 2020-08-24 2020-07-20 2020-09-02 2020-08-24 2020-09-17 2020-10-08 Analyse de l'ordonnance du l the Policy and Institutional F ittoral ramework MR-MEDD-170478-CS-INDV / Component 3: Strengthening Elaboration du Plan de gestio IDA / D2880 National Physical and Social A posteriori Individuel Open 27,409.48 Signé 2020-08-17 2021-05-24 2020-10-05 2021-05-17 2020-10-26 2021-05-24 2020-11-30 2021-06-10 2021-05-29 n et d’exploitation de la mare Investments de Riyad MR-MEDD-170476-CS-INDV / Réalisation de l’étude sur la c Component 3: Strengthening aractérisation des déchets ur IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2020-08-10 2020-06-03 2020-09-28 2020-10-19 2020-11-23 2021-01-22 bains à NDB et proposition d’ Investments un système de gestion appro prié MR-MEDD-183319-CS-CDS / Component 3: Strengthening Sélection de cons Complément à l'étude relativ En attente d'exéc IDA / D2880 National Physical and Social A posteriori ultants par entent Direct 0.00 2020-07-08 2020-07-18 2020-07-28 2020-08-04 e à l'identification de sous-pr ution Investments e directe ojets sociaux dans les comm unes littorales MR-MEDD-192575-CS-INDV / Component 3: Strengthening Etude impact environnemen IDA / D2880 National Physical and Social A posteriori Individuel Limited 37,558.58 Signé 2020-09-21 2020-09-22 2020-09-26 2020-11-05 2020-10-11 2020-10-22 2020-11-15 2020-11-10 2020-12-30 tal et social (colmatage de br Investments èches) MR-MEDD-170422-CS-INDV / Component 2: Strengthening Etude de la bathymétrie et d IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-08-18 2020-09-05 2020-10-06 2020-10-27 2020-12-01 2021-03-01 e l'hydrométrie au PNBA ramework MR-MEDD-200735-CS-INDV / Component 2: Strengthening Recrutement d’un Expert d’a En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 2020-12-25 2020-12-30 2021-01-20 2021-02-24 2021-04-10 ppui pour la restauration et l ution ramework a valorisation des Mangroves et du Sporobolus MR-MEDD-200747-CS-INDV / Component 2: Strengthening Recrutement d'un Expert Inte IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 23,197.94 Signé 2020-12-15 2020-11-24 2021-02-02 2021-04-19 2021-02-23 2021-09-14 2021-03-30 2021-09-29 2021-07-28 rnational en gestion du Littor ramework al pour un appui à la DPREM MR-MEDD-200770-CS-CDS / Sélection de cons Recrutement d’un Consultant Component 4: National Coor En attente d'exéc IDA / D2880 A posteriori ultants par entent Direct 0.00 2020-09-15 2020-09-25 2020-10-20 2020-12-04 pour la formation sur STEP a dination ution e directe vec une assistance pour STE P MR-MEDD-203246-CS-INDV / Component 4: National Coor IDA / D2880 A posteriori Individuel Limited 43,744.69 Signé 2020-09-10 2020-04-23 2020-09-15 2020-10-19 2020-10-06 2020-10-23 2020-11-10 2020-11-16 2021-05-09 Recrutement d’un Coordinat dination eur Adjoint MR-MEDD-207334-CS-INDV / Component 3: Strengthening Etude de faisabilité de la rest IDA / D2880 National Physical and Social A posteriori Individuel Limited 23,474.11 Signé 2020-12-04 2020-12-14 2020-12-09 2021-03-05 2020-12-19 2021-03-09 2021-01-14 2021-03-23 2021-02-13 auration et de la valorisation Investments de mangroves au PND MR-MEDD-209747-CS-INDV / Recrutement de consultant ( e) individuel (le) pour la réali Component 2: Strengthening sation d’une Notice d’Impact IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 18,710.25 Signé 2020-12-22 2020-12-23 2020-12-27 2020-01-20 2021-01-17 2021-01-29 2021-02-21 2021-03-16 2021-04-22 Environnemental et Social (N ramework IES) pour la construction du b âtiment devant abriter l’Obs ervatoire du Littoral mauritan ien (OLM). MR-MEDD-211476-CS-INDV / Component 4: National Coor Recrutement d'un Chef com IDA / D2880 A posteriori Individuel Open 0.00 Annulé 2021-01-15 2021-03-05 2021-03-26 2021-04-30 2022-04-27 dination ptable pour le Projet WACA - Mauritanie Component 3: Strengthening MR-MEDD-217842-CS-INDV / IDA / D2880 National Physical and Social A posteriori Individuel Direct 1,380.83 Signé 2021-02-09 2021-02-15 2021-02-11 2021-02-24 2021-02-16 2021-02-25 2021-02-20 2021-02-01 2021-05-21 Comptable du PGDP Investments MR-MEDD-217844-CS-INDV / Component 3: Strengthening En cours d'exécut Conseiller technique du Coor IDA / D2880 National Physical and Social A posteriori Individuel Direct 0.00 2021-02-09 2021-02-15 2021-02-11 2021-01-28 2021-02-13 2021-02-01 2021-02-16 2021-05-17 ion dinateur du PGDP Investments Component 3: Strengthening MR-MEDD-217850-CS-INDV / IDA / D2880 National Physical and Social A posteriori Individuel Direct 2,560.06 Signé 2021-02-09 2021-02-15 2021-02-11 2021-01-31 2021-02-14 2021-02-02 2021-02-19 2021-02-02 2021-05-20 Expert SIG du PGDP Investments MR-MEDD-218369-CS-INDV / Component 4: National Coor Recrutement de l'Expert en s IDA / D2880 A posteriori Individuel Direct 2,375.03 Signé 2021-02-15 2021-05-23 2021-02-17 2021-02-15 2021-02-20 2021-02-01 2021-02-24 2021-02-01 2022-02-24 dination uivi/évaluation MR-MEDD-218371-CS-INDV / Component 4: National Coor IDA / D2880 A posteriori Individuel Direct 2,375.03 Signé 2021-02-15 2021-05-23 2021-02-17 2021-02-26 2021-02-19 2021-02-01 2021-02-23 2021-02-01 2022-02-23 Recrutement de l'Auditeur In dination terne MR-MEDD-218374-CS-INDV / Component 4: National Coor Recrutement du Spécialiste d IDA / D2880 A posteriori Individuel Direct 0.00 Annulé 2021-02-15 2021-05-24 2021-02-17 2021-02-19 2021-02-23 2022-02-23 dination e Passation des Marchés MR-MEDD-218375-CS-INDV / Component 4: National Coor Recrutement de l'assistant e IDA / D2880 A posteriori Individuel Direct 853.35 Signé 2021-02-15 2021-02-15 2021-02-17 2021-02-16 2021-02-19 2021-02-26 2021-02-23 2021-02-01 2022-02-23 dination n passation de marchés MR-MEDD-218377-CS-INDV / Recrutement du spécialiste e Component 4: National Coor IDA / D2880 A posteriori Individuel Direct 2,375.03 Signé 2021-02-15 2021-02-15 2021-02-17 2021-02-25 2021-02-19 2021-02-26 2021-02-23 2021-02-01 2022-02-23 n Sauvegarde Sociale, Sociét dination é Civile et Genre MR-MEDD-218381-CS-INDV / Component 4: National Coor Recrutement d'un Spécialiste IDA / D2880 A posteriori Individuel Direct 2,375.03 Signé 2021-02-15 2021-05-24 2021-02-17 2021-02-01 2021-02-19 2021-06-10 2021-02-23 2021-02-01 2022-02-23 dination en Communication MR-MEDD-218382-CS-INDV / Component 4: National Coor En cours d'exécut Recrutement de Coordinateu IDA / D2880 A posteriori Individuel Direct 0.00 2021-02-15 2021-02-15 2021-02-17 2021-02-19 2021-02-23 2022-02-23 dination ion r (ce) du Projet MR-MEDD-219143-CS-INDV / Component 4: National Coor Recrutement d'un comptable IDA / D2880 A posteriori Individuel Limited 20,016.68 Signé 2021-02-11 2021-03-19 2021-02-16 2021-02-25 2021-03-09 2021-02-01 2021-04-13 2021-02-01 2021-10-10 dination en chef pour l'UGP MR-MEDD-225611-CS-INDV / Recrutement d'un Consultant Component 4: National Coor Individuel pour le dérouleme IDA / D2880 A posteriori Individuel Direct 9,941.98 Signé 2021-03-22 2021-03-23 2021-04-01 2021-03-18 2021-04-22 2021-03-18 2021-05-21 2021-03-22 2021-06-20 dination nt sur STEP des activités du P rojet PGDP pour les exercice s 2019,2018 et 2017. Page 11 MR-MEDD-200742-CS-INDV / Component 2: Strengthening Recrutement d’un consultant IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-12-25 2020-12-30 2021-01-20 2021-02-24 2021-04-25 pour compléter l’étude sur la ramework Baie de l’Etoile MR-MEDD-74185-CS-INDV / Component 2: Strengthening Actualisation du plan d'amén IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2018-09-20 2018-11-08 2018-11-29 2019-01-03 2019-07-02 agement et de gestion de la ramework Baie de l'Etoile de NDB MR-MEDD-200710-CS-INDV / Component 2: Strengthening Recrutement d’un Consultant IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-11-23 2020-11-28 2020-12-19 2021-01-23 2021-03-24 pour compléter le guide des ramework acteurs et métiers du littoral MR-MEDD-170414-CS-INDV / Component 2: Strengthening Élaboration du décret portant IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-05-11 2020-05-16 2020-06-06 2020-07-11 2020-10-09 modalités du fonctionnement ramework de l'observatoire du littoral MR-MEDD-170415-CS-INDV / Component 2: Strengthening Révision du décret portant cr IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-05-18 2020-05-23 2020-06-13 2020-07-18 2020-09-01 éation du conseil consultatif ramework du littoral MR-MEDD-74187-CS-INDV / Component 3: Strengthening Etude relative à la mise en pl IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-09-18 2018-11-06 2018-11-27 2019-01-01 2019-06-30 ace de l'éco-loge Investments MR-MEDD-170403-CS-INDV / Component 2: Strengthening Élaboration du Plan de Gestio IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-05-25 2020-07-13 2020-08-03 2020-09-07 2020-11-06 n Environnementale et Social ramework e de la Zone Franche de Nou adhibou MR-MEDD-74191-CS-INDV / Component 2: Strengthening Elaboration d'une carte de po IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2018-11-13 2018-11-18 2018-12-09 2019-01-13 2019-07-12 tentialités de la Zone franche ramework de NDB MR-MEDD-170401-CS-INDV / Component 2: Strengthening Élaboration d'une carte de po IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-08-25 2020-10-13 2020-11-03 2020-12-08 2021-06-06 tentialités pour la zone Franc ramework he de NDB MR-MEDD-170174-CS-INDV / Recrutement d'une assistanc Component 2: Strengthening e technique pour l'intégratio IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2020-12-27 n de la dimension résilience ramework climatique dans l'ensemble d es stratégies du littoral MR-MEDD-74190-CS-INDV / Component 3: Strengthening Elaboration d'un plan de gest IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2018-09-19 2018-11-07 2018-11-28 2019-01-02 2019-07-01 ion environnementale et soci Investments ale du site de l'éco-loge MR-MEDD-170425-CS-INDV / Etude sur l'état des lieux et l Component 2: Strengthening e mapping des bases de don IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-07-20 2020-09-07 2020-09-28 2020-11-02 2021-05-01 nées et systèmes géographi ramework ques des zones côtières de l a Mauritanie MR-MEDD-74174-CS-INDV / Component 2: Strengthening Actualisation du schéma opé IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2018-12-03 2018-12-08 2018-12-29 2019-02-02 2019-08-01 rationnel de la Zone franche ramework de NDB MR-MEDD-200714-CS-INDV / Recrutement d’un Consultant pour l’élaboration du décret Component 3: Strengthening portant modalités du fonctio IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-02-05 nnement de l’Observatoire d Investments u Littoral et la révision du dé cret portant création du Cons eil Consultatif du Littoral MR-MEDD-124785-CS-INDV / etude sur l'état des lieux et l Component 2: Strengthening e mapping des bases de don IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2019-08-05 2019-08-10 2019-08-15 2019-09-12 2019-10-12 nees et SIG des zones côtière ramework s et arides de la mauritanie. MR-MEDD-74154-CS-INDV / Rédaction des termes de réfé Component 2: Strengthening rence de l'étude relative aux IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2018-10-03 2018-10-08 2018-10-29 2018-12-03 2019-06-01 plans de résilience de N'Diag ramework o (inclus consultations, atelie rs, séminaires) MR-MEDD-137101-CS-INDV / Component 3: Strengthening sélection d'un consultant pou IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2019-10-08 2019-10-13 2019-10-20 2019-10-23 2019-12-22 r préparer le dossier relatif a Investments ux fixations des dunes du litt oral MR-MEDD-200737-CS-INDV / Component 2: Strengthening Recrutement d’un consultant IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-12-24 2020-12-29 2021-01-19 2021-02-23 2021-04-24 pour adapter le guide de bon ramework nes pratiques /pestes et pesti cides MR-MEDD-74192-CS-INDV / Component 3: Strengthening Evaluation des risques d'inon IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2018-12-17 2018-12-22 2019-01-12 2019-02-16 2019-08-15 dations pour la ville de NBD Investments MR-MEDD-170396-CS-INDV / Component 2: Strengthening Etat de lieu de la pollution m IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-09-15 2020-11-03 2020-11-24 2020-12-29 2021-06-27 étallique dans le milieu littor ramework al de la baie du Lévrier MR-MEDD-158682-CS-INDV / Component 2: Strengthening étude de faisabilité de la dél IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-02-13 2020-04-02 2020-04-23 2020-05-28 2020-11-24 ocalisation du Centre de trait ramework ement de l'or de Chami MR-MEDD-74172-CS-INDV / Component 2: Strengthening Analyse du schéma opération IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-01-29 2020-02-10 2020-03-18 2020-04-08 2020-05-13 2020-07-12 nel de la Zone franche de ND ramework B Page 12 MR-MEDD-82696-CS-INDV / r Component 2: Strengthening ecrutement d'un consultant p IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2018-10-31 2018-11-20 2018-11-05 2018-11-26 2018-12-31 2019-06-29 our appuyer la cellule Chang ramework ement Climatique MR-MEDD-170400-CS-INDV / Etude pour réaliser un état d Component 2: Strengthening es lieux des capacités des usi IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-07-15 2020-08-18 2020-09-02 2020-09-23 2020-10-28 2021-01-26 nes de production de farine d ramework e poisson d'Elbountiya en ma tière de gestion environneme ntale MR-MEDD-157985-CS-INDV / Component 2: Strengthening Etude de faisabilité de la dél IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2020-02-10 2020-02-19 2020-02-15 2020-02-26 2020-03-11 2020-04-10 ocalisation du centre de trait ramework ement de l'or à Chami MR-MEDD-232477-CS-INDV / Component 4: National Coor En attente d'exéc Recrutement d’un spécialiste IDA / D2880 A posteriori Individuel Open 0.00 2021-05-25 2021-07-13 2021-08-03 2021-09-07 2022-09-04 dination ution en développement institution nel MR-MEDD-232478-CS-INDV / Component 2: Strengthening Recrutement d’un juriste en IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 49,709.88 Signé 2021-06-15 2021-07-19 2021-06-20 2021-08-06 2021-07-11 2021-08-16 2021-08-15 2021-09-01 2022-02-11 appui au MEDD ramework MR-MEDD-232495-CS-INDV / Component 4: National Coor Recrutement d’un Consultant IDA / D2880 A posteriori Individuel Open 3,997.78 Signé 2021-08-10 2021-06-21 2021-09-28 2021-09-09 2021-10-19 2021-09-09 2021-11-17 2021-09-06 2022-02-15 dination pour l’évaluation à mi-parcou rs MR-MEDD-232498-CS-INDV / Component 2: Strengthening Un Consultant Individuel pou En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2021-07-20 2021-09-07 2021-09-28 2021-11-02 2022-01-31 r Définir les objectifs, le cadr ution ramework e et le contenu de l’Observat oire du Littoral MR-MEDD-236658-CS-INDV / Recrutement du Spécialiste d Component 4: National Coor IDA / D2880 A posteriori Individuel Open 27,174.73 Signé 2021-06-04 2021-06-02 2021-07-23 2021-08-11 2021-08-13 2021-08-04 2021-09-17 2021-08-16 2022-09-14 e Passation des Marchés du P dination rojet WACA-Mauritanie MR-MEDD-200718-CS-INDV / Component 3: Strengthening Recrutement d’un Consultant IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2020-11-30 2021-06-10 2020-12-05 2020-12-26 2021-01-30 2021-03-31 pour l’élaboration du dossier Investments technique pour la fixation de s dunes du Littoral MR-MEDD-249821-CS-INDV / RECRUTEMENT D’UN CONSU Component 2: Strengthening LTANT INTERNATIONAL INDIV IDA / D2880 the Policy and Institutional F A posteriori Individuel Direct 25,000.00 Signé 2021-09-15 2021-10-21 2021-09-25 2021-11-10 2021-10-16 2021-11-12 2021-11-20 2021-11-15 2022-01-04 IDUEL POUR L’ELABORATION ramework D’UNE LOI SUR L’EVALUATIO N D’IMPACT ENVIRONNEMEN TAL EN MAURITANIE MR-MEDD-249825-CS-INDV / Recrutement d'un Consultant Component 2: Strengthening Individuel pour l'élaboration En cours d'exame IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 2021-09-15 2021-11-03 2021-11-03 2021-11-24 2021-12-29 2022-03-29 d'une Notice d'Impact et Envi n ramework ronnementale Sociale pour l' addiction de l'eau potable du Parc National de Diawling (P ND) MR-MEDD-170430-CS-INDV / Component 3: Strengthening Etude pour la préparation du IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2020-06-22 2020-08-10 2020-08-31 2020-10-05 2021-01-03 dossier technique pour la fixa Investments tion des dunes MR-MEDD-232492-CS-INDV / Component 3: Strengthening Élaborer un plan genre pour l IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2021-07-20 2021-09-07 2021-09-28 2021-10-27 2022-01-25 e projet Investments MR-MEDD-232493-CS-INDV / Component 3: Strengthening faire une évaluation environn IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2021-07-19 2021-09-06 2021-09-27 2021-11-01 2022-01-30 ementale et sociale des sous Investments projets sociaux MR-MEDD-232497-CS-INDV / Evaluer les besoins (études, Component 3: Strengthening données à acquérir) et défini IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2021-09-14 2021-09-19 2021-10-10 2021-11-14 2022-01-13 r les indicateurs de suivi pour Investments une meilleure compréhensio n de l’évolution du littoral MR-MEDD-170486-CS-INDV / Expert en système de gestio Component 3: Strengthening n de l'information environne IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2020-06-15 2020-08-18 2020-08-04 2020-08-25 2020-09-29 2020-12-28 mentale pour le littoral (Syst Investments ème de données et d'informa tion) MR-MEDD-170484-CS-INDV / Component 3: Strengthening Expert Côtier (gestion intégr IDA / D2880 National Physical and Social A posteriori Individuel Open 0.00 Annulé 2020-05-15 2020-07-09 2020-07-03 2020-07-24 2020-08-28 2021-08-25 ée des zones costières ) Investments MR-MEDD-170420-CS-INDV / Component 2: Strengthening Révision du décret portant cr IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2020-06-08 2020-07-27 2020-08-17 2020-09-21 2020-11-05 éation du FIE ramework MR-MEDD-129310-CS-CQS / Component 3: Strengthening Sélection de cons Opérationalisation et Mise en IDA / D2880 National Physical and Social A posteriori ultants par entent Direct 0.00 Annulé 2019-09-24 2019-10-01 2019-09-27 2019-10-02 2020-03-30 place d'un système de gestio Investments e directe n de plaintes pour le Projet W ACA MR-MEDD-76164-CS-INDV / Component 2: Strengthening Recrutement d'un Comptable IDA / D2880 the Policy and Institutional F A posteriori Individuel Open 0.00 Annulé 2018-08-31 2018-10-19 2018-11-09 2018-12-14 2019-06-12 pour le Projet ramework MR-MEDD-267098-CS-INDV / Recrutement d'un responsabl Component 4: National Coor En cours d'exécut IDA / D2880 A posteriori Individuel Open 0.00 2021-12-15 2021-12-11 2022-01-04 2022-01-25 2022-02-09 2022-08-08 e Administratif et Financier dination ion pour le Projet WACA-MR MR-MEDD-315538-CS-INDV / Recrutement d’un consultant Component 3: Strengthening En attente d'exéc individuel pour faire le contrô IDA / D2880 National Physical and Social A posteriori Individuel Open - National 0.00 2022-10-24 2022-12-12 2023-01-02 2023-02-06 2023-06-06 ution le et le suivi des travaux de fi Investments xation des dunes du littoral Page 13 MR-MEDD-267611-CS-INDV / Recrutement d'un Consultant Individuel pour réaliser l'étud Component 2: Strengthening e sur l'état de lieux, Diagnost IDA / D2880 the Policy and Institutional F A posteriori Individuel Limited 0.00 Annulé 2022-01-24 2022-01-29 2022-02-19 2022-03-26 2023-06-24 ic des études existantes sur l ramework es dynamiques et évolutions du littoral dans le Secteur Tr ansfrontalier Sénégalo-Maurit anien MR-MEDD-315544-CS-INDV / Recrutement d’un consultant Component 3: Strengthening En attente d'exéc individuel pour suivre le trait IDA / D2880 National Physical and Social A posteriori Individuel Open - National 0.00 2022-10-18 2022-12-06 2022-12-27 2023-01-31 2023-05-01 ution de côtes dans le secteur tran Investments sfrontalier Mauritanie-Sénéga l MR-MEDD-315577-CS-INDV / Component 3: Strengthening Recrutement d’un consultant En attente d'exéc IDA / D2880 National Physical and Social A posteriori Individuel Open - National 0.00 2022-10-20 2022-12-08 2022-12-29 2023-01-27 2023-03-28 individuel pour L’élaboration ution Investments du plan d’engagement des p arties prenantes MR-MEDD-315583-CS-INDV / Component 4: National Coor En attente d'exéc Recrutement d’un Consultant IDA / D2880 A posteriori Individuel Open - National 0.00 2022-10-24 2022-12-12 2023-01-02 2023-02-06 2023-03-23 dination ution Individuel pour le Site Web d u Projet MR-MEDD-232484-CS-INDV / Component 3: Strengthening Un Consultant Individuel pou IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2021-06-28 2021-07-03 2021-07-24 2021-08-28 2022-02-24 r assurer le suivi des travaux Investments de franchissement et de cons truction de bacs MR-MEDD-232483-CS-INDV / Recrutement d’un consultant Component 3: Strengthening Individuel pour Faire le contr IDA / D2880 National Physical and Social A posteriori Individuel Limited 0.00 Annulé 2021-07-14 2021-07-19 2021-08-09 2021-09-13 2021-12-12 ôle et le suivi des travaux de Investments fixation des dunes du littoral MR-MEDD-315490-CS-INDV / Recrutement d’un consultant Component 2: Strengthening Open - Internationa En attente d'exéc individuel pour l’étude sur l' IDA / D2880 the Policy and Institutional F A posteriori Individuel 0.00 2022-10-17 2022-12-05 2022-12-26 2023-01-30 2023-03-31 l ution organisation et le fonctionne ramework ment de l'Observatoire du Lit toral MR-MEDD-315582-CS-INDV / Component 2: Strengthening Un expert juriste en appui à l En attente d'exéc IDA / D2880 the Policy and Institutional F A posteriori Individuel Open - National 0.00 2022-11-14 2023-01-02 2023-01-23 2023-02-27 2023-06-27 a Direction Réglementaire et ution ramework des Accords Multilatéraux (DI RAM) Page 14