PROCUREMENT PLAN (Textual Part)
Project information:
      Country: Bolivia
      Project name: Bolivia Urban Resilience Project
      P-number: P165861
Project Implementation Agencies: Municipality of Santa Cruz
(GAMSC) and Municipality of La Paz (GAMLP)
Date of the Procurement Plan: September 09, 2021
Period covered by this Procurement Plan: 18 months


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers”, dated July 2016, revised November 2017 and August 2018”
(“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges
in Procurement (STEP) system will be used to prepare, clear and update
Procurement Plans and conduct all procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the country’s own
procurement procedures acceptable for the Bank by the may be used.
    When the Borrower uses its own national open competitive procurement
    arrangements, such arrangements shall be subject to paragraph 5.4 of
    the Procurement Regulations and the following conditions.


    a. open advertising of the procurement opportunity at the national level;
    b. the procurement is open to eligible firms from any country;
    c. the request for bids/request for proposals document shall require that
    Bidders/Proposers submitting Bids/Proposals present a signed acceptance
    at the time of bidding, to be incorporated in any resulting contracts,
    confirming application of, and compliance with, the Bank’s Anti-
    Corruption Guidelines, including without limitation the Bank’s right to
    sanction and the Bank’s inspection and audit rights;
    d. contracts with an appropriate allocation of responsibilities, risks, and
    liabilities;
    e. publication of contract award information;
    f. rights for the Bank to review procurement documentation and activities;
    g. an effective complaints mechanism; and
    h. maintenance of records of the Procurement Process.

    When other national procurement arrangements other than national open
    competitive procurement arrangements are applied by the Borrower,
    such arrangements shall be subject to paragraph 5.5 of the Procurement
    Regulations.



Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan tables. Not Applicable.
Procurement of Second Hand Goods as specified under paragraph 5.11 of
the Procurement Regulations: Not Applicable.
Domestic preference as specified under paragraph 5.51 of the Procurement
Regulations (Goods and Works): Not Applicable.
Hands-on Expanded Implementation Support (HEIS) as specified under
paragraphs 3.10 and 3.11 of the Procurement Regulations may be Applicable.
Other Relevant Procurement Information.
Procurement activities will be undertaken by GAMSC for Part 1 and 3.1; and
by the GAMLP for Parts 2 and 3.2.
Procurement of Goods, Works and Non-Consulting Services. According the
Project Procurement Strategy for Development (PPSD), the open
international competitive bidding approach should be applied when the
Procurement Plan establishes it, while for small contracts the open national
competitive bidding approach is supported by the availability of bidders in
the local market. For Works and Gods the Borrower is able to specify detailed
requirements to which bidders respond by offering bids; the Request for Bids
or the Request for Quotations would be the selection methods for these
contracts.


Procurement of Consulting Services. Technical Assistance, designs,
supervision services, and other studies: Considering that these will be small
and medium magnitude contracts, the suitable market approach would be an
open competition in the international or national market or direct market
approach, while the Quality-Cost- Based Selection or Direct Selection (when
a sole firm with needed capabilities is identified and justified) would be the
selection methods.
 Project implementation support personnel. Individuals contracted to support
project implementation (project staff), other than individual consulting
positions identified in the Legal Agreement, may be selected by the Borrower
according to their personnel hiring procedures for such activities, as
reviewed and found acceptable by the Bank and described in the POMs.
Individual consultants. Individual consultants will be selected for an
assignment for which: (i) a team of experts is not required; (ii) no additional
office support is required; and (iii) the experience and qualifications of the
individual are of paramount requirement. The evaluation shall be based on
the relevant qualifications and experience of the individual consultant in
accordance with provision of paragraphs 7.34 to 7.39 of the Procurement
Regulations.
PROCUREMENT
                Bolivia : Bolivia Urban Resilience
PLAN
General Information
Country:           Bolivia                                                                             2021-12-07
                                                  Bank’s Approval Date of the Original Procurement Plan:
                                                                                                       2022-12-22
                                                  Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:        P165861                        GPN Date:                                            2021-08-12
Project Name:      Bolivia Urban Resilience
Loan / Credit No:  IDA / 65160
                   Municipal Autonomous Government of La Paz
Executing Agency(ies):

WORKS
Activity Reference No. /                                                                                                                                                            Procureme Actual Am                                                                                                                                                                  Bid Evaluation Report
                             Loan / Credit N                                                                         Market Approac Procurement Pro Prequalification High SEA/SH Ri                     Process St Draft Pre-qualification Prequalification Evalu          Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /                                                  Contract Complet
       Description                                    Component                   Review Type       Method                                                                          nt Docume ount (US$                                                                                                                                                                  and Recommendation           Signed Contract
                                    o.                                                                                      h             cess           (Y/N)             sk                              atus         Documents               ation Report                ent / Justification Notice / Invitation                  s Issued        Opening / Minutes                                                           ion
                                                                                                                                                                                      nt Type     )                                                                                                                                                                            for Award
                                                                                                                                                                                                                    Planned     Actual      Planned      Actual            Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual        Planned      Actual   Planned     Actual

 BO-GAMLP-256261-CW-RFB /                                                                                                                                                              National Proc
CONSTRUCCIÓN OBRAS HIDR                                                                                                                                                                urement Doc
                                               Resilient Infrastructure, Slop
ÁULICAS DE REGULACIÓN PA                                                                        Solicitud de oferta                   Single Stage - One E                             ument - 1 En                                                                                                                                                                                                                       2023-07-0
                            IDA / 65160        e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00   Cancelado                                                2022-04-01                2022-04-06                                     2022-05-06                2022-05-27            2022-06-27
RA LA CUENCA DEL RÍO ORK                                                                        s                                     nvelope                                          velope proce                                                                                                                                                                                                                           6
                                               pgrading in La Paz
OJAHUIRA DISTRITO 13 (Inclu                                                                                                                                                            ss (Non Bank
ye Salvaguardas Ambientales                                                                                                                                                            -SPD)
y Sociales)

 BO-GAMLP-256214-CW-RFB /
                                                                                                                                                                                       National Proc
CONSTRUCCIÓN DE DOBLE E
                                                                                                                                                                                       urement Doc
MBOVEDADO RÍO COTAHUM                          Resilient Infrastructure, Slop
                                                                                                Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2023-02-1
A AGUAS ABAJO AVENIDA FR IDA / 65160           e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2022-01-17                2022-01-24                                     2022-02-23                2022-03-16            2022-04-18
                                                                                                s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    3
ANCISCO BEDREGAL, SECTO                        pgrading in La Paz
                                                                                                                                                                                       ss (Non Bank
R SUR, DISTRITO 21 (Incluye
                                                                                                                                                                                       -SPD)
Salvaguardas Ambientales y
Sociales)

 BO-GAMLP-256260-CW-RFB /
                                                                                                                                                                                       National Proc
CONSTRUCCIÓN OBRAS DE E
                                                                                                                                                                                       urement Doc
STABILIZACIÓN AV LIBERTAD                      Resilient Infrastructure, Slop
                                                                                                Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2023-06-2
SECTOR PTE. LIBERTAD, ZON IDA / 65160          e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2022-02-21                2022-03-02                                     2022-04-01                2022-04-22            2022-05-23
                                                                                                s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    1
AS INMACULADA CONCEPCIÓ                        pgrading in La Paz
                                                                                                                                                                                       ss (Non Bank
N, 14 DE SEPTIEMBRE (Incluy
                                                                                                                                                                                       -SPD)
e Salvaguardas Ambientales
y Sociales)
                                                                                                                                                                                       National Proc
 BO-GAMLP-256252-CW-RFB /
                                                                                                                                                                                       urement Doc
CONSTRUCCIÓN DE OBRAS C                        Resilient Infrastructure, Slop
                                                                                                Solicitud de oferta                   Single Stage - One E                             ument - 1 En               En ejecució                                                                                                                                                                                             2023-08-2
IVILES PARA LA INTERVENCIÓ IDA / 65160         e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2021-12-17   2021-12-31   2021-12-22   2022-02-02                        2022-01-24   2022-02-14   2022-02-14            2022-03-18
                                                                                                s                                     nvelope                                          velope proce               n                                                                                                                                                                                                           3
N INTEGRAL DEL BARRIO 3 D                      pgrading in La Paz
                                                                                                                                                                                       ss (Non Bank
E MAYO, ZONA 3 DE MAYO
                                                                                                                                                                                       -SPD)

                                                                                                                                                                                       National Proc
 BO-GAMLP-256262-CW-RFB /
                                                                                                                                                                                       urement Doc
CONSTRUCCIÓN DE OBRAS C                        Resilient Infrastructure, Slop
                                                                                                Solicitud de oferta                   Single Stage - One E                             ument - 1 En               En ejecució                                                                                                                                                                                             2023-08-2
IVILES PARA LA INTERVENCIÓ IDA / 65160         e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2021-12-17   2021-12-31   2021-12-22   2022-02-02                        2022-01-24   2022-02-14   2022-02-14            2022-03-18
                                                                                                s                                     nvelope                                          velope proce               n                                                                                                                                                                                                           1
N INTEGRAL DEL BARRIO ALT                      pgrading in La Paz
                                                                                                                                                                                       ss (Non Bank
O LAS DELICIAS, ZONA ALTO
                                                                                                                                                                                       -SPD)
LAS DELICIAS D-2

 BO-GAMLP-256264-CW-RFB /                                                                                                                                                              National Proc
CONSTRUCCIÓN DE OBRAS C                                                                                                                                                                urement Doc
                                               Resilient Infrastructure, Slop
IVILES PARA LA INTERVENCIÓ                                                                      Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2023-10-1
                           IDA / 65160         e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2022-02-14                2022-02-21                                     2022-03-23                2022-04-13            2022-05-13
N INTEGRAL DEL BARRIO UR                                                                        s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    6
                                               pgrading in La Paz
BANIZACIÓN SAN JOSE DE C                                                                                                                                                               ss (Non Bank
ONDORINI, ZONA SAN JOSE C                                                                                                                                                              -SPD)
ONDORINI
                                                                                                                                                                                       National Proc
 BO-GAMLP-256268-CW-RFB /
                                                                                                                                                                                       urement Doc
CONSTRUCCIÓN DE OBRAS C                        Resilient Infrastructure, Slop
                                                                                                Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2023-10-1
IVILES PARA LA INTERVENCIÓ IDA / 65160         e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2022-02-14                2022-02-21                                     2022-03-23                2022-04-13            2022-05-13
                                                                                                s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    6
N INTEGRAL DEL BARRIO ALT                      pgrading in La Paz
                                                                                                                                                                                       ss (Non Bank
O TEJAR KOA KOA, ZONA KO
                                                                                                                                                                                       -SPD)
A KOA

 BO-GAMLP-326506-CW-RFB /                                                                                                                                                              National Proc
CONSTRUCCIÓN OBRAS HIDR                                                                                                                                                                urement Doc
                                               Resilient Infrastructure, Slop
ÁULICAS DE REGULACIÓN PA                                                                        Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2024-07-1
                            IDA / 65160        e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2022-11-14                2022-11-18                                     2022-12-21                2023-01-11            2023-02-13
RA LA CUENCA DEL RÍO ORC                                                                        s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    1
                                               pgrading in La Paz
KOJAHUIRA DISTRITO 13 (Incl                                                                                                                                                            ss (Non Bank
uye Salvaguardas Ambiental                                                                                                                                                             -SPD)
es y Sociales)

 BO-GAMLP-328497-CW-RFQ
                                                                                                                                                                                       Request for
/ CONSTRUCCIÓN OBRAS DE                        Resilient Infrastructure, Slop
                                                                                                Solicitud de cotiza                   Single Stage - One E                             Quotations (               Ejecución p                                                                                                                                                                                             2024-07-2
ESTABILIZACIÓN AV LIBERTA    IDA / 65160       e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                                                      2022-12-27                                                                                     2023-02-17
                                                                                                ciones                                nvelope                                          Non Bank-SP                endiente                                                                                                                                                                                                    2
D SECTOR PTE. LIBERTAD, Z                      pgrading in La Paz
                                                                                                                                                                                       D)
ONAS INMACULADA CONCEP
CIÓN, 14 DE SEPTIEMBRE

 BO-GAMLP-256258-CW-RFB /                                                                                                                                                              National Proc
CONSTRUCCIÓN OBRAS HIDR                                                                                                                                                                urement Doc
                                               Resilient Infrastructure, Slop
ÁULICAS DE REGULACIÓN PA                                                                        Solicitud de oferta                   Single Stage - One E                             ument - 1 En               Ejecución p                                                                                                                                                                                             2024-07-0
                             IDA / 65160       e Stabilization, and Urban U     Posterior                           Open - National                                                                        0.00                                                            2023-03-31                2023-04-05                                     2023-05-05                2023-05-26            2023-06-26
RA LA CUENCA DEL RÍO IRPA                                                                       s                                     nvelope                                          velope proce               endiente                                                                                                                                                                                                    4
                                               pgrading in La Paz
VI DISTRITO 18 (Incluye Salv                                                                                                                                                           ss (Non Bank
aguardas Ambientales y Soci                                                                                                                                                            -SPD)
ales)



GOODS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                       Bid Evaluation Report
                             Loan / Credit N                                                                         Market Approac Procurement Pro Prequalification Actual Amount     Process St Draft Pre-qualification Prequalification Evalu     Draft Bidding Docum Specific Procurement        Bidding Documents a Proposal Submission /
       Description                                    Component                   Review Type       Method                                                                                                                                                                                                                                     and Recommendation               Signed Contract     Contract Completion
                                    o.                                                                                      h             cess           (Y/N)           (US$)            atus         Documents              ation Report            ent / Justification Notice / Invitation              s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                     for Award
                                                                                                                                                                                                       Planned      Actual        Planned   Actual   Planned      Actual   Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual            Planned      Actual   Planned      Actual
BO-GAMLP-256253-GO-RFQ /
                                                                                                Solicitud de cotiza                   Single Stage - One E                             Ejecución pe
ADQUISICIÓN DE EQUIPAMIE IDA / 65160           Project Management               Posterior                           Open - National                                             0.00                                                                                       2022-03-11                                                                                         2022-05-03            2022-08-16
                                                                                                ciones                                nvelope                                          ndiente
NTO DE COMPUTADORAS PA
RA EL PRUB

BO-GAMLP-256254-GO-RFQ /
                                                                                                Solicitud de cotiza                   Single Stage - One E                             Ejecución pe
ADQUISICIÓN DE MOBILIARIO IDA / 65160          Project Management               Posterior                           Open - National                                             0.00                                                                                       2022-03-11                                                                                         2022-05-03            2022-08-16
                                                                                                ciones                                nvelope                                          ndiente
DE OFICINA PARA EL PRUB



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                       Bid Evaluation Report
                             Loan / Credit N                                                                         Market Approac Procurement Pro Prequalification Actual Amount     Process St Draft Pre-qualification Prequalification Evalu     Draft Bidding Docum Specific Procurement        Bidding Documents a Proposal Submission /
       Description                                    Component                   Review Type       Method                                                                                                                                                                                                                                     and Recommendation               Signed Contract     Contract Completion
                                    o.                                                                                      h             cess           (Y/N)           (US$)            atus         Documents              ation Report            ent / Justification Notice / Invitation              s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                     for Award
                                                                                                                                                                                                       Planned      Actual        Planned   Actual   Planned      Actual   Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual            Planned      Actual   Planned      Actual
 BO-GAMLP-256286-NC-DIR /                                                                       Adquisición direct
                          IDA / 65160          Project Management               Posterior                            Direct                                                     0.00   Cancelado                                                     2022-03-15            2022-03-21                                                                                         2022-04-07            2024-06-05
ALQUILER DE OFICINAS PARA                                                                       a
EL PRUB


CONSULTING FIRMS




                                                                                                                                                                                                                         Page 1
Activity Reference No. /                                                                                                                                                                                                                                                                                                                           Combined Evaluation
                            Loan / Credit N                                                                         Market Approac      Contract Type   Actual Amount                                                  Expression of Interest Short List and Draft R Request for Proposals Opening of Technical              Evaluation of Technic
       Description                                   Component                   Review Type        Method                                                               Process Status      Terms of Reference                                                                                                                                    Report and Draft Neg     Signed Contract     Contract Completion
                                   o.                                                                                      h                                (US$)                                                             Notice          equest for Proposals        as Issued         Proposals / Minutes                   al Proposal
                                                                                                                                                                                                                                                                                                                                                      otiated Contract
                                                                                                                                                                                             Planned       Actual       Planned        Actual      Planned       Actual      Planned       Actual      Planned      Actual   Planned      Actual    Planned     Actual    Planned      Actual   Planned      Actual
 BO-GAMLP-267625-CS-QCBS
/ SUPERVISIÓN CONSTRUCCI
                                              Resilient Infrastructure, Slop
ÓN DE DOBLE EMBOVEDADO                                                                         Selección basada
                          IDA / 65160         e Stabilization, and Urban U     Posterior                            Open - National                               0.00   En ejecución        2021-12-20   2021-12-29   2021-12-27     2021-12-30   2022-02-09                                          2022-03-11            2022-04-05           2022-04-21              2022-05-23            2023-03-29
RÍO COTAHUMA AGUAS ABAJ                                                                        en calidad y costo
                                              pgrading in La Paz
O AVENIDA FRANCISCO BEDR
EGAL, SECTOR SUR, DISTRIT
O 21

 BO-GAMLP-267746-CS-QCBS
/ SUPERVISIÓN CONSTRUCCI
                                              Resilient Infrastructure, Slop
ÓN OBRAS DE ESTABILIZACI                                                                       Selección basada
                          IDA / 65160         e Stabilization, and Urban U     Posterior                            Open - National                               0.00   En ejecución        2021-12-20   2021-12-29   2021-12-27     2021-12-30   2022-02-09                                          2022-03-11            2022-04-05           2022-04-21              2022-05-23            2023-07-03
ÓN AV LIBERTAD SECTOR PT                                                                       en calidad y costo
                                              pgrading in La Paz
E. LIBERTAD, ZONAS INMACU
LADA CONCEPCIÓN, 14 DE S
EPTIEMBRE

 BO-GAMLP-302678-CS-QCBS
/ SUPERVISIÓN CONSTRUCCI                      Resilient Infrastructure, Slop
                                                                                               Selección basada
ÓN OBRAS HIDRÁULICAS DE IDA / 65160           e Stabilization, and Urban U     Posterior                            Open - National                               0.00   En ejecución        2022-06-30   2022-09-07   2022-08-15                  2022-09-26                                          2022-10-26            2022-11-20           2022-12-05              2023-01-04            2024-06-16
                                                                                               en calidad y costo
REGULACIÓN PARA LA CUEN                       pgrading in La Paz
CA DEL RÍO ORCKOJAHUIRA,
DISTRITO 13



INDIVIDUAL CONSULTANTS
Activity Reference No. /    Loan / Credit N                                                                         Market Approac                      Actual Amount                                                  Invitation to Identifie Draft Negotiated Cont
                                                     Component                   Review Type       Method                               Contract Type                    Process Status      Teams of Reference                                                                Signed Contract         Contract Completion
       Description                 o.                                                                                      h                                (US$)                                                      d/Selected Consultant            ract
                                                                                                                                                                                             Planned       Actual       Planned       Actual    Planned      Actual          Planned       Actual      Planned      Actual

BO-GAMLP-256277-CS-CDS /
                            IDA / 65160       Project Management               Posterior       Individual           Direct                                   15,841.05   Firmado             2021-12-17   2022-01-13   2022-01-03     2022-01-04   2022-01-03   2022-01-06   2022-01-07   2022-01-14   2024-03-07
RESPONSABLE FINANCIERO


BO-GAMLP-256272-CS-CDS /
                            IDA / 65160       Project Management               Posterior       Individual           Direct                                   15,886.70   Firmado             2021-12-17   2021-12-23   2022-01-03     2022-01-04   2022-01-03   2022-01-06   2022-01-07   2022-01-13   2024-03-07
RESPONSABLE DE ADQUISICI
ONES

BO-GAMLP-256273-CS-CDS /
CONTRATACIÓN DE ENCARG      IDA / 65160       Project Management               Posterior       Individual           Direct                                   11,650.47   Firmado             2021-12-17   2021-12-23   2022-01-03     2022-01-04   2022-01-03   2022-01-06   2022-01-07   2022-01-13   2024-03-07
ADO DE ADQUISICIONES


 BO-GAMLP-256282-CS-INDV
                            IDA / 65160       Project Management               Posterior       Individual           Open                                          0.00   En ejecución        2022-02-21   2022-10-17   2022-03-14                  2022-03-14                2022-04-14                2023-12-11
/ CONTRATACIÓN DE FISCAL
TÉCNICO

 BO-GAMLP-256284-CS-INDV
                                                                                                                                                                         Ejecución pendien
/ CONTRATACIÓN DE FISCAL    IDA / 65160       Project Management               Posterior       Individual           Open                                          0.00                       2022-02-21                2022-03-14                  2022-03-14                2022-04-14                2023-12-11
                                                                                                                                                                         te
AMBIENTAL


 BO-GAMLP-260607-CS-INDV
                         IDA / 65160          Project Management               Posterior       Individual           Direct                                        0.00   En ejecución        2021-12-17   2022-07-15   2022-01-03     2022-07-21   2022-01-03   2022-07-28   2022-01-07                2024-03-07
/ CONTRATACIÓN DE ASESOR
A LEGAL

 BO-GAMLP-330830-CS-INDV
/ CONTRATACIÓN PROFESION IDA / 65160          Project Management               Previa          Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-04                2023-01-06                2024-12-31
AL ADQUISICIONES I PARA EL
PIR

 BO-GAMLP-330833-CS-INDV
/ CONTRATACIÓN PROFESION IDA / 65160          Project Management               Previa          Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-04                2023-01-06                2024-12-31
AL ADQUISICIONES II PARA E
L PIR

 BO-GAMLP-330838-CS-INDV
/ CONTRATACIÓN DE ASESOR IDA / 65160          Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-04                2023-01-06                2025-05-30
LEGAL I PARA EL PIR


 BO-GAMLP-330845-CS-INDV
/ ESPECIALISTA EN ADQUISICI IDA / 65160       Project Management               Previa          Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2024-12-31
ONES PARA EL PIR


 BO-GAMLP-330960-CS-INDV
/ ESPECIALISTA EN PLANIFICA
                            IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
CIÓN, SEGUIMIENTO Y CONT
ROL PARA EL PIR


 BO-GAMLP-330964-CS-INDV
/ CONTRATACIÓN DE FISCAL    IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
TÉCNICO I PARA EL PIR


 BO-GAMLP-330965-CS-INDV
/ CONTRATACIÓN PROFESION IDA / 65160          Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
AL FINANCIERO PARA EL PIR


 BO-GAMLP-330966-CS-INDV
/ CONTRATACIÓN PROFESION IDA / 65160          Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
AL ADMINISTRATIVO PARA EL
PIR

 BO-GAMLP-330969-CS-INDV
                                                                                                                                                                         Ejecución pendien
/ CONTRATACIÓN DE FISCAL    IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00                       2022-12-16                2023-01-03                  2023-01-03                2023-01-06                2025-07-31
                                                                                                                                                                         te
AMBIENTAL I PARA EL PIR


 BO-GAMLP-330972-CS-INDV
/ ESPECIALISTA ADMINISTRAT IDA / 65160        Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
IVO FINANCIERO PARA EL PIR


 BO-GAMLP-330974-CS-INDV
/ ESPECIALISTA TÉCNICO AM IDA / 65160         Project Management               Posterior       Individual           Direct - National                             0.00   En ejecución        2022-12-16   2022-12-22   2023-01-03                  2023-01-03                2023-01-06                2025-07-31
BIENTAL Y SOCIAL PARA EL PI
R

 BO-GAMLP-330976-CS-INDV
                                                                                                                                                                         Ejecución pendien
/ CONTRATACIÓN DE CONCE     IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00                       2022-12-16                2023-01-03                  2023-01-03                2023-01-06                2025-07-31
                                                                                                                                                                         te
RTADOR SOCIAL PARA EL PIR


 BO-GAMLP-331310-CS-INDV
/ CONTRATACIÓN DE FISCAL    IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00   Cancelado           2022-12-16                2023-01-03                  2023-01-03                2023-01-06                2025-07-31
TÉCNO II PARA EL PIR


 BO-GAMLP-333309-CS-INDV
                                                                                                                                                                         Ejecución pendien
/ CONTRATACIÓN DE FISCAL    IDA / 65160       Project Management               Posterior       Individual           Direct - National                             0.00                       2022-12-23                2023-01-03                  2023-01-03                2023-01-06                2025-07-31
                                                                                                                                                                         te
TÉCNICO II PARA EL PIR




                                                                                                                                                                                                                             Page 2