PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Project name: Bolivia Urban Resilience Project P-number: P165861 Project Implementation Agencies: Municipality of Santa Cruz (GAMSC) and Municipality of La Paz (GAMLP) Date of the Procurement Plan: September 09, 2021 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”, dated July 2016, revised November 2017 and August 2018” (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures acceptable for the Bank by the may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations may be Applicable. Other Relevant Procurement Information. Procurement activities will be undertaken by GAMSC for Part 1 and 3.1; and by the GAMLP for Parts 2 and 3.2. Procurement of Goods, Works and Non-Consulting Services. According the Project Procurement Strategy for Development (PPSD), the open international competitive bidding approach should be applied when the Procurement Plan establishes it, while for small contracts the open national competitive bidding approach is supported by the availability of bidders in the local market. For Works and Gods the Borrower is able to specify detailed requirements to which bidders respond by offering bids; the Request for Bids or the Request for Quotations would be the selection methods for these contracts. Procurement of Consulting Services. Technical Assistance, designs, supervision services, and other studies: Considering that these will be small and medium magnitude contracts, the suitable market approach would be an open competition in the international or national market or direct market approach, while the Quality-Cost- Based Selection or Direct Selection (when a sole firm with needed capabilities is identified and justified) would be the selection methods. Project implementation support personnel. Individuals contracted to support project implementation (project staff), other than individual consulting positions identified in the Legal Agreement, may be selected by the Borrower according to their personnel hiring procedures for such activities, as reviewed and found acceptable by the Bank and described in the POMs. Individual consultants. Individual consultants will be selected for an assignment for which: (i) a team of experts is not required; (ii) no additional office support is required; and (iii) the experience and qualifications of the individual are of paramount requirement. The evaluation shall be based on the relevant qualifications and experience of the individual consultant in accordance with provision of paragraphs 7.34 to 7.39 of the Procurement Regulations. PROCUREMENT Bolivia : Bolivia Urban Resilience PLAN General Information Country: Bolivia 2021-12-07 Bank’s Approval Date of the Original Procurement Plan: 2022-12-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165861 GPN Date: 2021-08-12 Project Name: Bolivia Urban Resilience Loan / Credit No: IDA / 65160 Municipal Autonomous Government of La Paz Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-GAMLP-256261-CW-RFB / National Proc CONSTRUCCIÓN OBRAS HIDR urement Doc Resilient Infrastructure, Slop ÁULICAS DE REGULACIÓN PA Solicitud de oferta Single Stage - One E ument - 1 En 2023-07-0 IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 Cancelado 2022-04-01 2022-04-06 2022-05-06 2022-05-27 2022-06-27 RA LA CUENCA DEL RÍO ORK s nvelope velope proce 6 pgrading in La Paz OJAHUIRA DISTRITO 13 (Inclu ss (Non Bank ye Salvaguardas Ambientales -SPD) y Sociales) BO-GAMLP-256214-CW-RFB / National Proc CONSTRUCCIÓN DE DOBLE E urement Doc MBOVEDADO RÍO COTAHUM Resilient Infrastructure, Slop Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2023-02-1 A AGUAS ABAJO AVENIDA FR IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-01-17 2022-01-24 2022-02-23 2022-03-16 2022-04-18 s nvelope velope proce endiente 3 ANCISCO BEDREGAL, SECTO pgrading in La Paz ss (Non Bank R SUR, DISTRITO 21 (Incluye -SPD) Salvaguardas Ambientales y Sociales) BO-GAMLP-256260-CW-RFB / National Proc CONSTRUCCIÓN OBRAS DE E urement Doc STABILIZACIÓN AV LIBERTAD Resilient Infrastructure, Slop Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2023-06-2 SECTOR PTE. LIBERTAD, ZON IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-02-21 2022-03-02 2022-04-01 2022-04-22 2022-05-23 s nvelope velope proce endiente 1 AS INMACULADA CONCEPCIÓ pgrading in La Paz ss (Non Bank N, 14 DE SEPTIEMBRE (Incluy -SPD) e Salvaguardas Ambientales y Sociales) National Proc BO-GAMLP-256252-CW-RFB / urement Doc CONSTRUCCIÓN DE OBRAS C Resilient Infrastructure, Slop Solicitud de oferta Single Stage - One E ument - 1 En En ejecució 2023-08-2 IVILES PARA LA INTERVENCIÓ IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2021-12-17 2021-12-31 2021-12-22 2022-02-02 2022-01-24 2022-02-14 2022-02-14 2022-03-18 s nvelope velope proce n 3 N INTEGRAL DEL BARRIO 3 D pgrading in La Paz ss (Non Bank E MAYO, ZONA 3 DE MAYO -SPD) National Proc BO-GAMLP-256262-CW-RFB / urement Doc CONSTRUCCIÓN DE OBRAS C Resilient Infrastructure, Slop Solicitud de oferta Single Stage - One E ument - 1 En En ejecució 2023-08-2 IVILES PARA LA INTERVENCIÓ IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2021-12-17 2021-12-31 2021-12-22 2022-02-02 2022-01-24 2022-02-14 2022-02-14 2022-03-18 s nvelope velope proce n 1 N INTEGRAL DEL BARRIO ALT pgrading in La Paz ss (Non Bank O LAS DELICIAS, ZONA ALTO -SPD) LAS DELICIAS D-2 BO-GAMLP-256264-CW-RFB / National Proc CONSTRUCCIÓN DE OBRAS C urement Doc Resilient Infrastructure, Slop IVILES PARA LA INTERVENCIÓ Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2023-10-1 IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-02-14 2022-02-21 2022-03-23 2022-04-13 2022-05-13 N INTEGRAL DEL BARRIO UR s nvelope velope proce endiente 6 pgrading in La Paz BANIZACIÓN SAN JOSE DE C ss (Non Bank ONDORINI, ZONA SAN JOSE C -SPD) ONDORINI National Proc BO-GAMLP-256268-CW-RFB / urement Doc CONSTRUCCIÓN DE OBRAS C Resilient Infrastructure, Slop Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2023-10-1 IVILES PARA LA INTERVENCIÓ IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-02-14 2022-02-21 2022-03-23 2022-04-13 2022-05-13 s nvelope velope proce endiente 6 N INTEGRAL DEL BARRIO ALT pgrading in La Paz ss (Non Bank O TEJAR KOA KOA, ZONA KO -SPD) A KOA BO-GAMLP-326506-CW-RFB / National Proc CONSTRUCCIÓN OBRAS HIDR urement Doc Resilient Infrastructure, Slop ÁULICAS DE REGULACIÓN PA Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2024-07-1 IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-11-14 2022-11-18 2022-12-21 2023-01-11 2023-02-13 RA LA CUENCA DEL RÍO ORC s nvelope velope proce endiente 1 pgrading in La Paz KOJAHUIRA DISTRITO 13 (Incl ss (Non Bank uye Salvaguardas Ambiental -SPD) es y Sociales) BO-GAMLP-328497-CW-RFQ Request for / CONSTRUCCIÓN OBRAS DE Resilient Infrastructure, Slop Solicitud de cotiza Single Stage - One E Quotations ( Ejecución p 2024-07-2 ESTABILIZACIÓN AV LIBERTA IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2022-12-27 2023-02-17 ciones nvelope Non Bank-SP endiente 2 D SECTOR PTE. LIBERTAD, Z pgrading in La Paz D) ONAS INMACULADA CONCEP CIÓN, 14 DE SEPTIEMBRE BO-GAMLP-256258-CW-RFB / National Proc CONSTRUCCIÓN OBRAS HIDR urement Doc Resilient Infrastructure, Slop ÁULICAS DE REGULACIÓN PA Solicitud de oferta Single Stage - One E ument - 1 En Ejecución p 2024-07-0 IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 2023-03-31 2023-04-05 2023-05-05 2023-05-26 2023-06-26 RA LA CUENCA DEL RÍO IRPA s nvelope velope proce endiente 4 pgrading in La Paz VI DISTRITO 18 (Incluye Salv ss (Non Bank aguardas Ambientales y Soci -SPD) ales) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-GAMLP-256253-GO-RFQ / Solicitud de cotiza Single Stage - One E Ejecución pe ADQUISICIÓN DE EQUIPAMIE IDA / 65160 Project Management Posterior Open - National 0.00 2022-03-11 2022-05-03 2022-08-16 ciones nvelope ndiente NTO DE COMPUTADORAS PA RA EL PRUB BO-GAMLP-256254-GO-RFQ / Solicitud de cotiza Single Stage - One E Ejecución pe ADQUISICIÓN DE MOBILIARIO IDA / 65160 Project Management Posterior Open - National 0.00 2022-03-11 2022-05-03 2022-08-16 ciones nvelope ndiente DE OFICINA PARA EL PRUB NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-GAMLP-256286-NC-DIR / Adquisición direct IDA / 65160 Project Management Posterior Direct 0.00 Cancelado 2022-03-15 2022-03-21 2022-04-07 2024-06-05 ALQUILER DE OFICINAS PARA a EL PRUB CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-GAMLP-267625-CS-QCBS / SUPERVISIÓN CONSTRUCCI Resilient Infrastructure, Slop ÓN DE DOBLE EMBOVEDADO Selección basada IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 En ejecución 2021-12-20 2021-12-29 2021-12-27 2021-12-30 2022-02-09 2022-03-11 2022-04-05 2022-04-21 2022-05-23 2023-03-29 RÍO COTAHUMA AGUAS ABAJ en calidad y costo pgrading in La Paz O AVENIDA FRANCISCO BEDR EGAL, SECTOR SUR, DISTRIT O 21 BO-GAMLP-267746-CS-QCBS / SUPERVISIÓN CONSTRUCCI Resilient Infrastructure, Slop ÓN OBRAS DE ESTABILIZACI Selección basada IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 En ejecución 2021-12-20 2021-12-29 2021-12-27 2021-12-30 2022-02-09 2022-03-11 2022-04-05 2022-04-21 2022-05-23 2023-07-03 ÓN AV LIBERTAD SECTOR PT en calidad y costo pgrading in La Paz E. LIBERTAD, ZONAS INMACU LADA CONCEPCIÓN, 14 DE S EPTIEMBRE BO-GAMLP-302678-CS-QCBS / SUPERVISIÓN CONSTRUCCI Resilient Infrastructure, Slop Selección basada ÓN OBRAS HIDRÁULICAS DE IDA / 65160 e Stabilization, and Urban U Posterior Open - National 0.00 En ejecución 2022-06-30 2022-09-07 2022-08-15 2022-09-26 2022-10-26 2022-11-20 2022-12-05 2023-01-04 2024-06-16 en calidad y costo REGULACIÓN PARA LA CUEN pgrading in La Paz CA DEL RÍO ORCKOJAHUIRA, DISTRITO 13 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-GAMLP-256277-CS-CDS / IDA / 65160 Project Management Posterior Individual Direct 15,841.05 Firmado 2021-12-17 2022-01-13 2022-01-03 2022-01-04 2022-01-03 2022-01-06 2022-01-07 2022-01-14 2024-03-07 RESPONSABLE FINANCIERO BO-GAMLP-256272-CS-CDS / IDA / 65160 Project Management Posterior Individual Direct 15,886.70 Firmado 2021-12-17 2021-12-23 2022-01-03 2022-01-04 2022-01-03 2022-01-06 2022-01-07 2022-01-13 2024-03-07 RESPONSABLE DE ADQUISICI ONES BO-GAMLP-256273-CS-CDS / CONTRATACIÓN DE ENCARG IDA / 65160 Project Management Posterior Individual Direct 11,650.47 Firmado 2021-12-17 2021-12-23 2022-01-03 2022-01-04 2022-01-03 2022-01-06 2022-01-07 2022-01-13 2024-03-07 ADO DE ADQUISICIONES BO-GAMLP-256282-CS-INDV IDA / 65160 Project Management Posterior Individual Open 0.00 En ejecución 2022-02-21 2022-10-17 2022-03-14 2022-03-14 2022-04-14 2023-12-11 / CONTRATACIÓN DE FISCAL TÉCNICO BO-GAMLP-256284-CS-INDV Ejecución pendien / CONTRATACIÓN DE FISCAL IDA / 65160 Project Management Posterior Individual Open 0.00 2022-02-21 2022-03-14 2022-03-14 2022-04-14 2023-12-11 te AMBIENTAL BO-GAMLP-260607-CS-INDV IDA / 65160 Project Management Posterior Individual Direct 0.00 En ejecución 2021-12-17 2022-07-15 2022-01-03 2022-07-21 2022-01-03 2022-07-28 2022-01-07 2024-03-07 / CONTRATACIÓN DE ASESOR A LEGAL BO-GAMLP-330830-CS-INDV / CONTRATACIÓN PROFESION IDA / 65160 Project Management Previa Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-04 2023-01-06 2024-12-31 AL ADQUISICIONES I PARA EL PIR BO-GAMLP-330833-CS-INDV / CONTRATACIÓN PROFESION IDA / 65160 Project Management Previa Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-04 2023-01-06 2024-12-31 AL ADQUISICIONES II PARA E L PIR BO-GAMLP-330838-CS-INDV / CONTRATACIÓN DE ASESOR IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-04 2023-01-06 2025-05-30 LEGAL I PARA EL PIR BO-GAMLP-330845-CS-INDV / ESPECIALISTA EN ADQUISICI IDA / 65160 Project Management Previa Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2024-12-31 ONES PARA EL PIR BO-GAMLP-330960-CS-INDV / ESPECIALISTA EN PLANIFICA IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 CIÓN, SEGUIMIENTO Y CONT ROL PARA EL PIR BO-GAMLP-330964-CS-INDV / CONTRATACIÓN DE FISCAL IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 TÉCNICO I PARA EL PIR BO-GAMLP-330965-CS-INDV / CONTRATACIÓN PROFESION IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 AL FINANCIERO PARA EL PIR BO-GAMLP-330966-CS-INDV / CONTRATACIÓN PROFESION IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 AL ADMINISTRATIVO PARA EL PIR BO-GAMLP-330969-CS-INDV Ejecución pendien / CONTRATACIÓN DE FISCAL IDA / 65160 Project Management Posterior Individual Direct - National 0.00 2022-12-16 2023-01-03 2023-01-03 2023-01-06 2025-07-31 te AMBIENTAL I PARA EL PIR BO-GAMLP-330972-CS-INDV / ESPECIALISTA ADMINISTRAT IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 IVO FINANCIERO PARA EL PIR BO-GAMLP-330974-CS-INDV / ESPECIALISTA TÉCNICO AM IDA / 65160 Project Management Posterior Individual Direct - National 0.00 En ejecución 2022-12-16 2022-12-22 2023-01-03 2023-01-03 2023-01-06 2025-07-31 BIENTAL Y SOCIAL PARA EL PI R BO-GAMLP-330976-CS-INDV Ejecución pendien / CONTRATACIÓN DE CONCE IDA / 65160 Project Management Posterior Individual Direct - National 0.00 2022-12-16 2023-01-03 2023-01-03 2023-01-06 2025-07-31 te RTADOR SOCIAL PARA EL PIR BO-GAMLP-331310-CS-INDV / CONTRATACIÓN DE FISCAL IDA / 65160 Project Management Posterior Individual Direct - National 0.00 Cancelado 2022-12-16 2023-01-03 2023-01-03 2023-01-06 2025-07-31 TÉCNO II PARA EL PIR BO-GAMLP-333309-CS-INDV Ejecución pendien / CONTRATACIÓN DE FISCAL IDA / 65160 Project Management Posterior Individual Direct - National 0.00 2022-12-23 2023-01-03 2023-01-03 2023-01-06 2025-07-31 te TÉCNICO II PARA EL PIR Page 2