PROCUREMENT PLAN (Mandatory Requirements) Project information: [Bangladesh] [WESTERN ECONOMIC CORRIDOR AND REGIONAL ENHANCEMENT PROGRAM PHASE I PROJECT] [P169880] Project Implementation agency: Roads and Highways Department (RHD) Local Government Engineering Department (LGED) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016 [Revised in November, 2017 and August 2018] (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non- consulting services where international competition is required and for all consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1)Lottery in award of contracts shall not be allowed; 2)Bidders’ qualification[s]/experience requirement[s] shall be mandatory; 3)Bids shall not be rejected based on percentage above or below the estimated cost; 4)Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; 5)The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 6) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 7) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When the Borrower uses other national procurement arrangements (other than national open competitive procurement), such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), such arrangements shall be consistent with the above requirements. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second Hand Goods: Not Applicable. Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) as follows: Goods: Applicable; Works: Not applicable. Hands-on Expanded Implementation Support (HEIS): Not Applicable. Bank’s Procurement Prior Review Thresholds: contracts at or above the thresholds set out in table 1 below are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) Type of High risk Substantial Moderate Low risk procurement risk risk Works (including 5 10 15 20 turnkey, supply & installation of plant and equipment, and PPP) Goods, information 1.5 2 4 6 technology and non-consulting services Consulting 0.5 1 2 4 services: firms Consulting 0.2 0.3 0.4 0.5 services: Individual Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. In addition to the provisions of Table 1 above, and irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: (a) procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulations; (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations; and (e) best and final offer. 3. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract or the package -when the selection document contains more than one lot/slice- , including all taxes and duties payable under the contract. Bid/ Proposal Evaluation Committee: [as per PPSD] Arrangement for CDD: [as per PPSD] Fraud and Corruption (F&C) Checklist: Fraud and Corruption (F&C) checklist, as developed and provided by the Bank, shall be properly filled in during the evaluation and be attached with the evaluation report in case of contracts following national competitive procurement and request for quotations. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: PROCUREMENT Bangladesh : Western Economic Corridor and Regional Enhancement Program PLAN General Information Country: Bangladesh 2020-09-17 Bank’s Approval Date of the Original Procurement Plan: 2022-09-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169880 GPN Date: 2020-07-21 Project Name: Western Economic Corridor and Regional Enhancement Program Loan / Credit No: IDA / 66840 Roads and Highways Department Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned WP-01 (LOT-1,LOT-2 & LOT-3 ) / Construction and Improve ment of Jhenaidah-Jashore H Request for Bids - ighway (N-7) Upgrading National Highway Open - Internationa Single Stage - One E Works (without pr 281,357,270. Pending Imp 2025-10-1 Lot-1: Jhenaidah Bus Stand to IDA / 66840 Corridor and Enhancing Digit Prior Request for Bids 0.00 2022-09-10 2022-09-25 2022-11-20 2023-02-18 2023-05-01 l nvelope equalification) SP 00 lementation 7 Kaliganj Bazar (15.90 km) al Connectivity D Lot-2: Kaliganj Bazar to Mura dgor Bazar (15.80 km) Lot-3: Muradgor Bazar to Jas hore Chaerra Mor (15.78 km) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GP-10 / Procurement of Tele Upgrading National Highway Request for Quota Single Stage - One E Pending Impl phone Equipment for PIU offi IDA / 66840 Corridor and Enhancing Digit Post Limited 3,655.66 0.00 2021-02-21 2021-03-28 2021-09-24 tions nvelope ementation ce al Connectivity Upgrading National Highway GB-07 / Procurement of Com Single Stage - One E IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 52,360.21 50,264.61 Signed 2021-03-18 2021-03-25 2021-03-26 2021-03-25 2021-04-09 2021-04-13 2021-04-24 2021-05-11 2021-05-22 2021-06-03 2021-11-18 puter and Accessories nvelope al Connectivity Upgrading National Highway GP-08 / Procurement of Offic Single Stage - One E IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 9,187.76 7,755.67 Signed 2021-03-18 2021-03-25 2021-03-26 2021-03-25 2021-04-09 2021-04-13 2021-04-24 2021-05-11 2021-05-22 2021-06-03 2021-11-18 e Equipment nvelope al Connectivity Upgrading National Highway GP-09 / Procurement of Furn Single Stage - One E IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 12,751.03 11,720.49 Signed 2021-03-18 2021-03-25 2021-03-26 2021-04-09 2021-05-18 2021-04-24 2021-05-25 2021-05-22 2021-06-01 2021-11-18 iture for the PIU office nvelope al Connectivity Upgrading National Highway GP-08B / Procurement of Offi Single Stage - One E Pending Impl IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 64,838.14 0.00 2021-08-19 2021-08-27 2021-09-10 2021-09-25 2021-10-23 2022-04-21 ce Equipment nvelope ementation al Connectivity Upgrading National Highway GP-09B / Procurement of Fur Single Stage - One E Pending Impl IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 29,947.02 0.00 2021-08-19 2021-08-27 2021-09-10 2021-09-25 2021-10-23 2022-04-21 niture. nvelope ementation al Connectivity Upgrading National Highway GP-07B / Procurement of Co Single Stage - One E Under Imple IDA / 66840 Corridor and Enhancing Digit Post Request for Bids Open - National 56,420.00 0.00 2022-01-10 2022-01-26 2022-01-18 2022-02-01 2022-02-16 2022-03-16 2022-09-12 mputer and Accessories nvelope mentation al Connectivity NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SP07 / Consultancy Services for Design Review of Phase - Project Implementation Sup Quality And Cost- Open - Internationa IDA / 66840 Prior 3,350,000.00 3,874,336.96 Signed 2020-09-20 2020-09-27 2020-10-11 2020-10-12 2020-11-24 2021-05-06 2020-12-22 2021-06-28 2021-01-21 2021-09-23 2021-02-25 2021-11-16 2021-04-01 2022-02-03 2022-04-01 1, 2 and Feasibility Study, De port and Sustainability Based Selection l tail Design of Phase - 3 SP06 / Consultancy Services Project Implementation Sup Quality And Cost- Open - Internationa for Environmental and Social IDA / 66840 Post 1,671,600.00 2,244,206.98 Signed 2020-09-27 2020-10-23 2020-10-18 2020-11-04 2020-12-01 2021-05-17 2020-12-29 2021-06-29 2021-01-28 2021-08-31 2021-03-04 2021-10-21 2021-04-08 2021-12-22 2022-04-08 port and Sustainability Based Selection l Management Upgrading National Highway SP05 / Consultancy Service f Quality And Cost- Open - Internationa IDA / 66840 Corridor and Enhancing Digit Post 634,490.87 464,906.40 Signed 2021-03-01 2021-02-28 2021-03-22 2021-03-04 2021-06-05 2021-06-20 2021-06-26 2021-09-22 2021-08-10 2021-10-24 2021-09-07 2021-10-24 2021-10-12 2022-01-19 2023-12-31 or iNGO Based Selection l al Connectivity SP02 / Consultancy Services Upgrading National Highway Quality And Cost- Open - Internationa for Design of ITS and OFC Sy IDA / 66840 Corridor and Enhancing Digit Prior 1,564,767.51 1,900,755.46 Signed 2021-03-04 2021-03-31 2021-04-03 2021-04-11 2021-06-16 2021-10-11 2021-07-31 2021-12-14 2021-08-30 2022-02-12 2021-10-04 2022-04-13 2021-11-08 2022-05-24 2022-11-08 Based Selection l stem al Connectivity SP04 / Consultancy Services Upgrading National Highway to Assess Progress within Res Quality And Cost- Open - Internationa IDA / 66840 Corridor and Enhancing Digit Post 520,000.00 394,598.77 Signed 2021-03-31 2021-03-29 2021-05-15 2021-05-02 2021-07-19 2021-09-20 2021-09-02 2021-11-02 2021-10-17 2021-11-18 2021-11-21 2022-01-13 2021-12-26 2022-02-27 2023-12-31 ult Monitoring Framework an Based Selection l al Connectivity d Conduct Road User Satisfac tion Survey SP01 / Construction Supervis Upgrading National Highway Quality And Cost- Open - Internationa Under Implement ion and Project Implementati IDA / 66840 Corridor and Enhancing Digit Prior 7,730,000.00 0.00 2021-03-30 2021-07-30 2021-05-14 2021-08-11 2021-08-03 2022-02-06 2021-09-22 2022-04-25 2021-11-21 2022-08-21 2021-12-26 2022-01-30 2023-12-31 Based Selection l ation on Services. al Connectivity Upgrading National Highway SP08 / Consultancy Services Quality And Cost- Open - Internationa Under Implement IDA / 66840 Corridor and Enhancing Digit Post 260,000.00 0.00 2021-04-07 2021-09-15 2021-05-22 2021-10-19 2021-07-12 2022-01-23 2021-08-26 2022-03-07 2021-08-29 2021-10-03 2021-11-07 2023-12-31 for Internal Audit Based Selection l ation al Connectivity INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SP03A / Consultancy Service Upgrading National Highway Individual Consult for Procurement Specialist (N IDA / 66840 Corridor and Enhancing Digit Prior Open 107,169.81 0.00 Canceled 2021-02-03 2021-02-20 2021-03-02 2021-03-23 2021-04-20 2023-12-31 ant Selection ational) al Connectivity SP03B / Consultancy Service Upgrading National Highway Individual Consult Under Implement s for Financial Management S IDA / 66840 Corridor and Enhancing Digit Post Open 107,169.81 0.00 2021-02-03 2021-02-09 2021-03-02 2021-03-23 2021-04-20 2023-12-31 ant Selection ation pecialist (National) al Connectivity SP03C / Consultancy Service Upgrading National Highway Individual Consult s for LA and Resettlement S IDA / 66840 Corridor and Enhancing Digit Post Open 137,311.32 120,636.39 Signed 2021-02-03 2021-02-09 2021-03-02 2021-06-17 2021-03-23 2021-08-03 2021-04-20 2021-10-12 2023-12-31 ant Selection pecialist (National) al Connectivity SP03D / Consultancy Service Upgrading National Highway Individual Consult s for Environmental Specialis IDA / 66840 Corridor and Enhancing Digit Post Open 107,169.81 120,383.85 Signed 2021-02-03 2021-02-09 2021-03-02 2021-06-22 2021-03-23 2021-06-22 2021-04-20 2021-10-12 2023-12-31 ant Selection t (National) al Connectivity SP03 / Consultancy Services Upgrading National Highway Individual Consult for Social Development and P IDA / 66840 Corridor and Enhancing Digit Post Open 105,944.67 109,122.65 Signed 2021-03-04 2021-02-28 2021-04-16 2021-06-17 2021-05-16 2021-06-22 2021-06-02 2021-10-12 2023-12-31 ant Selection ublic Relation Specialist al Connectivity Upgrading National Highway SP03K / Health, Safety and L Individual Consult IDA / 66840 Corridor and Enhancing Digit Post Open 123,425.50 0.00 Canceled 2021-06-21 2021-08-19 2021-08-09 2021-08-30 2021-10-04 2023-12-31 abor Specialist ant Selection al Connectivity Upgrading National Highway SP03L / Gender/GBV Speciali Individual Consult Under Implement IDA / 66840 Corridor and Enhancing Digit Post Open 102,854.60 0.00 2021-08-18 2021-08-19 2021-10-13 2021-11-03 2021-12-08 2024-02-17 st ant Selection ation al Connectivity SP-03A / Consultancy Servic Upgrading National Highway Individual Consult e for Individual Procurement IDA / 66840 Corridor and Enhancing Digit Prior Limited 107,169.81 117,039.86 Signed 2021-10-05 2021-10-12 2021-10-10 2021-10-13 2021-10-31 2021-12-22 2021-12-05 2022-01-31 2023-12-31 ant Selection Specialist (National) al Connectivity SP-03G / Individual Consulta Upgrading National Highway Individual Consult Under Implement ntr ITS Specialist (Internation IDA / 66840 Corridor and Enhancing Digit Post Open 70,866.00 0.00 2022-02-07 2022-03-28 2022-03-06 2022-03-27 2022-04-24 2022-10-21 ant Selection ation al) al Connectivity Upgrading National Highway SP-03P / Covid 19 Response Individual Consult Under Implement IDA / 66840 Corridor and Enhancing Digit Post Open 61,475.00 0.00 2022-03-20 2022-04-12 2022-04-16 2022-05-07 2022-06-04 2023-06-04 Specialist (National) ant Selection ation al Connectivity SP-03K / Procurement for Ind Upgrading National Highway ividual Consultancy Service o Individual Consult Under Implement IDA / 66840 Corridor and Enhancing Digit Post Open 123,426.00 0.00 2022-04-13 2022-04-18 2022-06-01 2022-06-22 2022-07-27 2023-12-31 f Health, Safety and Labor Sp ant Selection ation al Connectivity ecialist (National) SP11 / Engagement of ‘Pro Project Implementation Sup Individual Consult Under Implement curement Expert’ for Fiduciar IDA / 66840 Post Direct 27,690.00 0.00 2022-06-15 2022-08-10 2022-06-29 2022-08-31 2022-07-13 2022-08-10 2025-07-25 port and Sustainability ant Selection ation y Advisory Consultant Panel( FACP) (National) SP12 / Engagement of ‘Finan cial Management Expert’ for Project Implementation Sup Individual Consult Under Implement IDA / 66840 Post Direct 22,000.00 0.00 2022-06-15 2022-08-10 2022-06-29 2022-08-31 2022-07-13 2022-08-10 2025-07-25 Fiduciary Advisory Consultan port and Sustainability ant Selection ation t Panel(FACP) (National) Page 2