The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Ghana Secondary Cities Support Program (P164451) WESTERN AND CENTRAL AFRICA | Ghana | Urban, Resilience and Land Global Practice | Requesting Unit: AWCW1 | Responsible Unit: SAWU1 IBRD/IDA | Program-for-Results Financing | FY 2019 | Team Leader(s): Catherine Lynch, Smile Kwawukume, Su Jung Song Seq No: 9 | ARCHIVED on 11-Oct-2022 | ISR52956 | Created by: Martin Onyach-Olaa on 11-Sep-2022 | Modified by: Martin Onyach-Olaa on 06- Oct-2022 Program Development Objectives PDO Table Program Development Objective (from Program Appraisal Document) to improve urban management and basic urban services in participating municipal assemblies Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Implementation Status and Key Decisions The Ghana Secondary Cities Support Program (P164451), was approved by the World Bank Board on September 25, 2018. The Financing Agreement (FA) signed on December 12, 2018 and the Program declared effective on February 5, 2018. The Program Mid Term Review (MTR) was conducted on March 4, 2022. Out of a total of GHC 330,715,632.00, an amount of GHC 222,190,300.00 (67.18 percent) has been disbursed as of July 31, 2022. Out of 117 UDG sub-project contracts, 61 contracts were completed. Some of the completed sub-projects include 7 urban markets, 11.18 km of stormwater drain, 1 urban bus terminal, 18.83 km of urban roads, 5 km of pedestrian walkway and 2,109 streetlights installation. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P164451 IDA-63190 Effective USD 100.00 100.00 0.00 72.13 24.42 75% Not P164451 IDA-71410 USD 145.00 145.00 0.00 0.00 145.00 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P164451 IDA-63190 Effective 25-Sep-2018 12-Dec-2018 05-Feb-2019 30-Jun-2024 30-Jun-2024 Not P164451 IDA-71410 08-Jun-2022 05-Sep-2022 -- 31-Dec-2025 31-Dec-2025 Effective 10/11/2022 Page 1 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) DLI Disbursement Achievement Disbursed amount in Disbursement % for DLI ID DLI Type Description Coc DLI Amount Status Coc DLI Loan: IDA63190-001 MAs have achieved CSG DLI 1 Regular XDR 2,130,000.00 Fully Achieved 2,130,000.00 100 % MC MAs have scored =/> nat. Partially DLI 2 Regular XDR 23,320,000.00 17,005,973.21 73 % avg. DPAT score Achieved MAs have achieved UPB DLI 3 Regular XDR 29,650,000.00 Fully Achieved 29,649,999.94 100 % Targets MAs have implemented DLI 4 Regular XDR 8,890,000.00 Not Achieved 0.00 AISD Targets RCC have adopted & impl. Partially DLI 5 Regular XDR 2,130,000.00 1,278,000.00 60 % ACSP for MAs Achieved DPAT/APA Results Partially DLI 6 Regular XDR 1,780,000.00 178,000.00 10 % Published by 1st Oct Achieved PF to MAs & Impl. of Partially DLI 7 Regular XDR 1,780,000.00 1,068,000.00 60 % MLGRD/MDAs AWP Achieved RCCs & MAs staff & Impl. Partially DLI 8 Regular XDR 1,420,000.00 710,000.00 50 % of OHLGS ACBP Achieved Loan: IDA71410-001 MAs have achieved CSG 1 Regular USD 3,500,000.00 Not Achieved 0.00 minimum condition MAs have scored => 2 Regular USD 32,372,091.00 Not Achieved 0.00 average DPAT score MAs have achieved urban 3 Regular USD 77,790,746.00 Not Achieved 0.00 performance benc MAs implemented the 4 Regular USD 22,157,163.00 Not Achieved 0.00 AISD Targets RCC adopted their ACSP 5 Regular USD 2,880,000.00 Not Achieved 0.00 for MAs DPAT/APA reslts publishd 6 Regular USD 2,250,000.00 Not Achieved 0.00 Oct 1 each FY Implemt of 7 Regular MLGDRS/MDAs AWSP of USD 2,250,000.00 Not Achieved 0.00 MAs ACBP to support 8 Regular USD 1,800,000.00 Not Achieved 0.00 participating MAs & RCCs Program Action Plan Hiring of a Social Development Specialist at the Program Execution level in addition to the current Environmental Action Description Specialist under the LGCSP. Source DLI# Responsibility Timing Timing Value Status 10/11/2022 Page 2 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Other MLGRD Due Date 31-Jan-2019 Completed Completion Measurement IVA contract. Comments Establishing the E&S Team of MMA with clear terms of reference comprising of (i) Safeguards Focal person; (ii) 2-3 Action Description team members preferably from the Engineering, Health and Social Welfare Units of MMAs Source DLI# Responsibility Timing Timing Value Status Environmental and Social MMA, OHLGS Due Date 31-Dec-2018 Completed Systems Completion Measurement Field verification. Comments Action Description Annual E & S performance review of MAs to validate existence of a functional E & S system and assess compliance. Source DLI# Responsibility Timing Timing Value Status MLGRD, EPA, Environmental and Social Independent Recurrent Continuous In Progress Systems consultants Completion Measurement ToR for the performance review and annual performance review report. Comments Strengthen consultations, information disclosure and grievance redress by developing guidelines on consultations Action Description and stakeholder engagement with support from the World Bank. Source DLI# Responsibility Timing Timing Value Status Other MLGRD, MAs Due Date 31-Dec-2018 Completed Completion Measurement Guidelines on consultations and stakeholders engagement. Comments Action Description Coordination and implementation of gender related activities between the MGCSP, MLGRD, RCCs and the MAs Source DLI# Responsibility Timing Timing Value Status Technical MLGRD, RCC, MAs Recurrent Yearly In Progress (i) The dissemination of the gender strategy in 2022 or 2023 and provision of trainings/workshops for RCCs and MAs Completion Measurement with CSOs and NGOs in 2023-2025. (ii) Gender activities documented in the annual progress report during Year 4- 7(2022-2025) 10/11/2022 Page 3 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Comments Improvement in MA revenue mobilization drive; Building capacity of MA revenue officers for improved IGF Action Description mobilization and collection Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems MoF, OHLGS, RCC Recurrent Continuous In Progress Completion Measurement Increase in IGF Comments Training and capacity building for producing financial reports through GIFMIS; with Regional transaction processing Action Description centers located at RCCs used by participating MAs that have no direct access to GIFMIS Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems CAGD/GIFMIS Recurrent Semi-Annually In Progress Adoption and implementation of annual MLGRD/MDAs technical back-up support plan to support continuous Completion Measurement development of accountants. Comments Enforce follow-up measures and address audit recommendations (internal and external) as per PFM Act 2016, Act 921. Action Description Strengthen internal audit units to effectively report financial improprieties Source DLI# Responsibility Timing Timing Value Status MDAs, OHLGS, Fiduciary Systems Recurrent Continuous In Progress RCC, MAs Completion Measurement Follow-up reports (statement of audit recommendation implementation) Comments Strengthen Audit Committees (ACs) in terms of training and capacity building on reviewing audit reports and following Action Description up on recommendations. Source DLI# Responsibility Timing Timing Value Status MoF, IAA, OHLGS, Fiduciary Systems Recurrent Continuous In Progress RCC, MAs Completion Measurement Adoption and implementation of annual MLGRD/MDAs technical back-up support plan. 10/11/2022 Page 4 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Evidence of AC meetings to review audit recommendations. Comments Continuous M&E of procurement execution and contract performance, and undertake annual procurement Action Description assessment Source DLI# Responsibility Timing Timing Value Status MLGRD, PPA, RCC, Fiduciary Systems Recurrent Continuous In Progress MAs Completion Measurement Procurement and contract performance tracking form Comments Generate and maintain up-to-date records of grievances received, treated, referred to other agencies. Prepare annual Action Description grievance redress report, showing grievances received, proportion handled and cases referred to CHRAJ and other agencies. Source DLI# Responsibility Timing Timing Value Status Environmental and Social CHRAJ, MLGRD, Recurrent Continuous In Progress Systems MAs Annual grievance redress report. Completion Measurement Biannual CHRAJ report. Comments Action Description Develop grievance redress manual/guideline Source DLI# Responsibility Timing Timing Value Status Other MLGRD Due Date 31-Dec-2019 Completed Completion Measurement Grievance redress manual/guideline Comments Develop websites for participating MAs; Ensure publication of key fiscal information on notice boards Action Description Source DLI# Responsibility Timing Timing Value Status Other MLGDRD Recurrent Continuous In Progress 10/11/2022 Page 5 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) (i) POM defines key fiscal information, (ii) MAs’ websites and notice boards with the key fiscal information published, Completion Measurement (iii) document the status of websites and notice boards in annual progress report Comments Action Description All participating MAs appoint Audit committee members in accordance with the PFM Act 2016 Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems MLGDRD, MAs Recurrent Continuous In Progress Completion Measurement Annual Audit Committee report Comments Develop a robust E&S screening mechanism and management framework process using the GOG’s guidelines, and Action Description ensure publication of key E&S documents on Ministry and MA websites. Source DLI# Responsibility Timing Timing Value Status Environmental and Social MLGDRD, EPA, Recurrent Yearly In Progress Systems MAs Screening mechanism manual prepared and submitted to the Bank. E&S instruments disclosed on websites of the Completion Measurement Ministry and MAs. The E&S screening mechanism has been drafted by the client. AF ESSA has been disclosed on the Ministry’s Comments website, RAP disclosure notices are published on the notice boards of the MAs and RCCs, Sexual Exploitation and Abuse (SEA) and Sexual Harassment (SH) response committee at the MA level to Action Description proactively create a safe place for all gender-based violence related issues. Source DLI# Responsibility Timing Timing Value Status Environmental and Social MLGDRD Recurrent Yearly In Progress Systems First Minutes of Committee Meeting including the Committee composition satisfactory to the Bank Completion Measurement Comments SEA/SH committee reports yet to be shared with the Bank. MOU with EPA Training Institute to develop and deliver training modules to MLGRD, EPA staff, RCCs, MMAs and Action Description their E & S consultants: (i) Procurement procedures to manage relevant E&S risks; (ii) ESHS monitoring procedures and reporting Source DLI# Responsibility Timing Timing Value Status 10/11/2022 Page 6 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Environmental and Social MLGDRD, EPA Other Continuous In Progress Systems Completion Measurement Training modules developed and trainings delivered to the associated entities recorded in annual progress report Comments Action Description All Implementing Agencies to use the Ghana e-GP for the procurement under the Program Source DLI# Responsibility Timing Timing Value Status MLGDRD, MAs, Fiduciary Systems Recurrent Continuous In Progress OHLGS Completion Measurement Trained, onboarded and start using e-GP after the AF effectiveness Comments Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Substantial Macroeconomic Substantial Substantial Substantial Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Low Moderate Institutional Capacity for Implementation and Moderate Moderate Moderate Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial Substantial Stakeholders Moderate Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial RiskComments Comments Political and governance and technical design have been downgraded because of the many staff changes that have taken place in the MLGDRD and MAs and some incomplete BoQs for some of the sub-projects at the MAs level. Mitigation measures: For the staff transfer in MAs, the mission agreed with OHLGS to ensure that staff transfers are limited as much as possible to the Program MAs. The following measures will be taken to improve procurement and contract management issues: strengthened and delinking design review process from the design consultants to the MAs, enhanced supervision of supervision consultants by strengthening the oversight role of the MAs as the clients, and more active engagement of MA staff 10/11/2022 Page 7 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Results PDO Indicators by Objectives / Outcomes To improve urban management and basic urban services in participating Municipal Assemblies IN01187336 ►People provided with improved urban infrastructure/services under the GSCSP (Number (Thousand), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 777.00 785.00 2,050.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the cumulative number of direct beneficiaries provided with improved access to Comments infrastructure and services under the Program through Urban Development Grants. The target is set to benefit 40 percent of the population of Program Participating cities. IN01187337 of which female (Number (Thousand), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 401.00 404.00 1,040.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 IN01187338 ►Composite annual average urban performance benchmark percentage score by Progam MAs (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 63.30 63.30 80.00 Date 27-Jun-2018 12-Oct-2021 02-Sep-2022 31-Dec-2023 Average percentage score of institutional performance benchmarks (DLI3) that the participating sub-national Comments entities have achieved Intermediate Results Indicators by Results Areas Results Area 1: Institutional Performance at Program MAs IN01187339 ►Program MAs with Municipal Structure Plans (15 years) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 14.00 14.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the number of participating MAs with Municipal Structure Plans (15 years). IN01187342 ►Program MAs with Municipal Local Plans covering at least 30% of the municipal area (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 10/11/2022 Page 8 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Value 0.00 23.00 23.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs with local plans covering at least 30% of MA’s Comments administrative boundary. IN01187345 ►Program MAs monitoring key municipal services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 21.00 21.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that monitor key municipal services as defined Comments and guided in the POM (linked to DLI 3 performance benchmark). IN01187348 ►MAs that execute at least 80 percent of their O&M budget (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 16.00 16.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that execute at least 80 percent of their O&M Comments budget. IN01187351 ►MAs with improved and up to date Revenue Administration (Computer-based) systems (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 22.00 22.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that have an improved and up to date Revenue Comments Administration (Computer-based) systems, as defined and guided in the POM. IN01187353 ►MAs that satisfy at least 80% of the defined governance capacity criteria (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13.00 13.00 30.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that satisfy at least 80% of the governance Comments capacity criteria, defined in the POM IN01187355 ►MAs that implement at least 80% of the planned gender programs as per the annual action plan (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13.00 13.00 35.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that implement at least 80% of the planned Comments gender programs as per the annual action plan 10/11/2022 Page 9 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) IN01187356 ►MAs that implement climate/disaster urban resilience checklist at planning, designing, construction, and O&M stages (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value to be updated n/a n/a 35.00 Date 13-Mar-2022 13-Mar-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of Program participating MAs that implement climate and disaster urban Comments resilience checklist at planning, designing, construction, and O&M stages, as defined and guided in the POM Results Area 2: Infrstructure delivery IN01187340 ►Cumulative average urban infrastructure delivery percentage by Program MAs (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 44.58 100.00 Date 27-Jun-2018 12-Oct-2021 02-Sep-2022 31-Dec-2025 This is to measure cumulative average delivery rate of UDG infrastructure investments in the Program participating MAs. The indicator will be determined based on actual and cumulative delivery of infrastructure Comments investments against annual delivery targets, the methodology of calculating delivery rate will be specified in the POM and the APA guideline. IN01187343 ►Urban roads built or rehabilitated using UDG (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Set as per accumulated in work Value 0.00 17.31 km 18.83 km plans for Program cities Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the cumulative km of roads rehabilitated/constructed under the Program IN01187346 ►Municipal local economic infrastructure built or rehabilitated using UDG (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Set as per accumulated in work Value 0.00 7.00 9.00 plans for Program cities Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the number of municipal local economic infrastructure built or rehabilitated under the Comments Program IN01187349 ►Drains built or rehabilitated using UDG (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Set as per accumulated in work Value 0.00 10.39 11.19 plans for Program cities 10/11/2022 Page 10 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the km of drains built or rehabilitated under the Program IN01187352 ►Public parks and greenery built or rehabilitated using UDG (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Set as per accumulated in work Value 0.00 0.00 2.00 plans for Program cities Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the cumulative area of green parks constructed/rehabilitated under the Program. IN01187354 ►Satisfaction of beneficiaries with improved access to infrastructure and services supported by the Program (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value to be updated n/a n/a to be determined Date 15-Apr-2022 15-Apr-2022 02-Sep-2022 31-Dec-2025 This is to measure the satisfaction of the beneficiaries with improved access to infrastructure and services supported by the Program. The baseline will and the end target will be established by the 2022 satisfaction survey. The final satisfaction survey in 2025 will measure the success of the indicator. Baseline survey is Comments planned as soon as the Program fund disburse after the effectiveness. The ToR is drafted and the baseline study will be completed within the first half of 2023. Results Area 3: Regional and National Government Support to MAs IN01187341 ►RCCs Annual Capacity Support Plans for MAs implemented (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 86.90 86.90 100.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the percentage implementation of RCCs Annual Capacity Support Plans IN01187344 ►OHLGS Annual Capacity Building Plan implemented (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 100.00 100.00 100.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the percentage implementation of OHLGS Annual Capacity Building Plan IN01187347 ►MLGRD/MDAs approved Annual Workplan implemented (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 10/11/2022 Page 11 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Value 0.00 95.00 95.00 100.00 Date 27-Jun-2018 15-Apr-2022 02-Sep-2022 31-Dec-2025 Comments This is to measure the implementation rate of MLGRD/MDAs approved Annual Workplan IN01187350 ►Improved Intergovernmental Fiscal Transfer System (IGFTS) adopted with timely allocation and publication of UDGs to MAs (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value - Dec 16, 2021 To be updated October 1 of 2024 Date 27-Jun-2018 31-Dec-2021 02-Sep-2022 31-Dec-2024 This is to measure whether improved Intergovernmental Fiscal Transfer System (IGFTS) adopted with Comments timely allocation and publication of UDGs to MAs Disbursement Linked Indicators DLI_IND_TABLE ►DLI 1 Extent to which Participating Municipal Assemblies have achieved Capacity Support Grant (CSG) Minimum Conditions (Output, 7,168,844.00, 42%) Baseline Actual (Previous) Actual (Current) FY 24 Value 0.00 3,000,000.00 3,000,000.00 0.00 Date -- 15-Apr-2022 02-Sep-2022 -- Comments ►DLI 2 Extent to which Participating Municipal Assemblies have scored equal to or above the national average DPAT Score (Intermediate Outcome, 55,953,782.00, 43%) Baseline Actual (Previous) Actual (Current) FY 24 Value 0.00 23,951,000.00 23,951,000.00 35.00 Date -- 15-Apr-2022 02-Sep-2022 -- Comments ►DLI 3 Extent to which Participating Municipal Assemblies have achieved Urban Performance Benchmarks Targets (Intermediate Outcome, 145,446,570.00, 29%) Baseline Actual (Previous) Actual (Current) FY 24 Value 0.00 41,762,000.00 41,762,000.00 80.00 Date -- 15-Apr-2022 02-Sep-2022 -- Comments 10/11/2022 Page 12 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) ►DLI 4 Extent to which Participating Municipal Assemblies have implemented the Annual Infrastructure Service Delivery Target (Intermediate Outcome, 22,157,163.00, 0%) Baseline Actual (Previous) Actual (Current) FY 24 Value 0.00 0.00 0.00 90.00 Date -- 13-Mar-2022 02-Sep-2022 -- Comments ►DLI 5 Regional Coordinating Councils have adopted and implemented their Annual Capacity Support Plans (ACSP) for MAs. (Output, 4,652,166.00, 27%) Baseline Actual (Previous) Actual (Current) FY 24 Value 0.00 1,800,000.00 1,800,000.00 16.00 Date -- 13-Mar-2022 02-Sep-2022 -- Comments ►DLI 6 DPAT/APA Assessments Results Published by October 1 of each FY (Output, 3,105,975.00, 8%) Baseline Actual (Previous) Actual (Current) FY 24 Value - 250,000 250,000 October 1 Date -- 13-Mar-2022 02-Sep-2022 -- Comments ►DLI 7 Timely Allocation and Release of Program Funds to Municipal Assemblies; and Implementation of MLGRD/MDAs Annual Workplan to support Participating MAs (Output, 3,730,965.00, 40%) Baseline Actual (Previous) Actual (Current) FY 24 Value - 1,500,000 1,500,000 Yes Date -- 13-Mar-2022 02-Sep-2022 -- Comments ►DLI 8 Key RCCs and MAs staff have been assigned and OHLGS Annual Capacity Building Plan (ACBP) to support Particpating MAs and RCCs has been implemented (Output, 2,784,536.00, 36%) Baseline Actual (Previous) Actual (Current) FY 24 Value No 1,000,000 1,000,000 Yes Date -- 13-Mar-2022 02-Sep-2022 -- 10/11/2022 Page 13 of 14 The World Bank Implementation Status & Results Report Ghana Secondary Cities Support Program (P164451) Comments 10/11/2022 Page 14 of 14