Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) West Africa Coasta Areas Resilience Investment Project (P162337) AFRICA WEST | Western Africa | Environment, Natural Resources & the Blue Economy Global Practice | IBRD/IDA | Investment Project Financing | FY 2018 | Seq No: 7 | ARCHIVED on 17-Mar-2022 | ISR49929 | Implementing Agencies: Sao Tome and Principe - Ministry of Infrastructures and Natural Resources, Mauritania - Ministry of Environment and Sustainable Development, Benin - Ministry of Living Environment and Sustainable Development, Sao Tome and Principe - Ministry of Planning, Finance and Blue Economy, Togo - Ministry of Environment and Forestry Resources, Cote d'Ivoire - Ministry of Environment and Sustainable Development, Benin - Ministry of Economy and Finance, Togo - Ministry of Economy and Finance, Senegal - Ministry of Environment and Sustainable Development, Mauritania - Ministry of Economic Affairs and Promotion of Productive Sectors, Senegal - Ministry of Finance, Cote d'Ivoire - Ministry of Economy and Finances, West Africa Economic and Monetary Union, International Union for Conservation of Nature Key Dates Key Project Dates Bank Approval Date: 09-Apr-2018 Effectiveness Date: 20-Jul-2018 Planned Mid Term Review Date: 08-Jul-2022 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2023 Revised Closing Date: 31-Dec-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) To strengthen the resilience of targeted communities and areas in coastal Western Africa. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Strengthening Regional Integration:(Cost $12.00 M) Component 2: Strengthening the Policy and Institutional Framework:(Cost $40.77 M) Component 3: Strengthening National Physical and Social Investments:(Cost $192.40 M) Component 4: National Coordination:(Cost $18.53 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions Project Implementation arrangements are operational. Since the last ISR, the Bank team and the Regional Implementation Support Unit (RISU) had country-specific implementation support missions for each of the six countries, as well as one with the regional entities. Despite the COVID situations, hybrid and/or in-person missions were conducted. An operational reporting and support mechanisms with the regional institutions is in 3/17/2022 Page 1 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) effect including a regional steering committee attended by the six engaged countries and networks of specialists from the six countries. For instance, the 7th regional steering committee took place in November 2021. Progress reports with performance indicators are compiled every six months based on national progress report from each country. Safeguards progress reports are prepared and consolidated every three months. The organizational effectiveness of Project Implementation Units is supported with capacity building by RISU and the Bank team as needed. Staff turn- over is still being experienced in some PIUs, but solutions and re-adjustments are done as follow up to implementation support missions. Regional Integration is showing progress: The arrangement with IUCN managing a Regional Implementation Support Unit (RISU) and with WAEMU managing a Regional Management Unit are being implemented with already observed improvement related to implementation times. The arrangement is ensuring effective regional coordination and integration across country activities. Nevertheless, increased coordination, preparation and speed for the financial transfers as well as audit reports and financial management are still needed on financial management aspects. Also, the achievement of concrete results in the coming months is essential to confirm the effectiveness of regional integration for building coastal resilience. WAEMU is planning the organization of a Regional Minister’s Meeting in February 2022 with the objective to; (i) validate the 2020 State of the West African Coast, (ii) validate practical arrangements for setting-up the Regional Observatory of the West African Coast (ORLOA) and; (iii) adopt draft regulations for the incorporation of the Abidjan Convention Protocols in WAEMU legal corpus. The Regional Partnership for Coastal and Marine Conservation in West Africa (PRCM) will organize a Regional Forum in March 2022, in collaboration with the regional institutions and networks. The RISU staffing was enhanced by the recruitment of a social development/gender specialist. Civil works and social sub-projects have advanced. Despite some significant delays in the preparation of the final coastal engineering designs, the Project is progressively moving to the construction stage. Contracts for civil works for coastal protection has advanced with several signed, and major progress on coastal rehabilitation work is to be expected in 2022 and 2023. In Benin and Togo, the firm in charge of works for the transboundary coastal protection works has been recruited and Environmental and Social Impact assessment and Resettlement Action Plan have been validated and published. In Mauritania, the company for the civil work for the colmatage of three breches in Nouakchott, to protect against the risk of submersion of the capital, has been recruited. In São Tome & Principe, the works for safer expansion areas have been completed in one of the areas (Santa Catarina). For Cote d’Ivoire (Grand Lahou) and Senegal (Corniches de Dakar and Ile de Gorée), the project design documents have been validated and next step is the finalization of Environmental and social studies. Social sub-projects are implemented in all six countries. A mid-term review is planned for 2022 allowing for adjustments in project implementation approaches and management. Response to the COVID-19 situation. To respond to the COVID-19 situation, contingencies plans to respond to COVID-19 situation are still in place within the PIUs. Technical studies continued, as most is desk top work and can be done remotely, and consultations with targeted communities, especially for social sub-projects have been limited to more but smaller groups and will remain as such until the situation is back to normal. In the meantime, the World Bank team and regional partners continue to provide implementation support through regular virtual meetings and missions. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Moderate Moderate Environment and Social High High High Stakeholders High Moderate Moderate Other -- Substantial Substantial Overall High Substantial Substantial Results 3/17/2022 Page 2 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) PDO Indicators by Objectives / Outcomes To strengthen the resilience of targeted communities and areas in coastal Western Africa IN01090367 ►Households in targeted coastal areas with less exposure to erosion due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4,028.00 4,028.00 17,188.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090368 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,652.00 3,652.00 4,100.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090369 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,711.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090370 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4,879.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090371 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 50.00 50.00 400.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090372 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,500.00 Date 14-Dec-2017 30-Jun-2020 31-Jan-2022 31-Dec-2023 IN01090373 Togo (Number, Custom Breakdown) 3/17/2022 Page 3 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 326.00 326.00 4,598.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090374 ►Households in targeted coastal areas with less exposure to flooding due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,947.00 3,947.00 53,888.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090375 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,652.00 3,652.00 1,600.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090376 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5,925.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090377 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 41,581.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090378 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 70.00 70.00 816.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090379 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 900.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090380 Togo (Number, Custom Breakdown) 3/17/2022 Page 4 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 225.00 225.00 3,066.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090381 ►Households in targeted coastal areas with less exposure to pollution due to the project (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,321.00 1,321.00 12,277.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090382 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6,900.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090383 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090384 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090385 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 71.00 71.00 306.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090386 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090387 Togo (Number, Custom Breakdown) 3/17/2022 Page 5 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,535.00 2,535.00 5,071.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 IN01090388 ►Share of target beneficiaries with rating ‘Satisfied’ or above on project interventions (disaggregated by country, sex) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 72.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090389 Benin (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 65.00 Date 14-Dec-2017 30-Jun-2020 31-Jan-2022 31-Dec-2023 IN01090390 Côte d’Ivoire (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090391 Mauritania (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090392 São Tomé and Príncipe (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090393 Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090394 Togo (Percentage, Custom Breakdown) 3/17/2022 Page 6 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 14-Dec-2017 20-Jun-2018 31-Jan-2022 31-Dec-2023 IN01090395 ►Regional integration score (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 6.00 6.00 16.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 31-Dec-2023 Overall Comments PDO The indicators on exposure reductions will significantly improve after the conclusion of the major protection works. The progress reported so far is thanks to small-scale (São Tome and Principe), or emergency works (Benin and Togo), which provided needed support for part of the beneficiaries, but the major contributions to those indicators will come from the completion of main contract works. The first survey of satisfied beneficiaries is performed as part of the Mid-term review process, so the first values will be uploaded in the next ISR. Intermediate Results Indicators by Components Component 2: Strengthening the Policy and Institutional Framework IN01090396 ►Countries that timely submit datasets to the Regional Coastal Observatory (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090398 ►Countries with national Multi-Sector Investment Plans updated to integrate regional environmental considerations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 Date 14-Dec-2017 30-Jun-2020 31-Jan-2022 29-Dec-2023 IN01090400 ►Score on policy instruments and legal framework (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.50 2.50 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090402 Benin (Number, Custom Breakdown) 3/17/2022 Page 7 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 5.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090404 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.25 0.25 5.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090406 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 14-Dec-2017 06-Sep-2021 31-Jan-2022 06-Jul-2023 IN01090408 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.50 0.50 4.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090411 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090413 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.75 0.75 5.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090415 ►Inter-Ministerial Coastal Zone established and operational (disaggregated by country) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090417 Benin (Yes/No, Custom Breakdown) 3/17/2022 Page 8 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090419 Côte d’Ivoire (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090421 Mauritania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090423 São Tomé and Príncipe (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090425 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090427 Togo (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090429 ►National Early Warning System operational (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090430 Benin (Yes/No, Custom Breakdown) 3/17/2022 Page 9 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Baseline Actual (Previous) Actual (Current) End Target Value No No No No Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090432 Côte d’Ivoire (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090435 Mauritania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090437 São Tomé and Príncipe (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090438 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090441 Togo (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 Component 3: Strengthening National Physical and Social Investments IN01090397 ►Targeted coastal area with flooding control measures (disaggregated by country) (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5,234.23 5,245.35 26,353.00 3/17/2022 Page 10 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090399 Benin (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5,200.00 5,200.00 400.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090401 Côte d’Ivoire (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12,000.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090403 Mauritania (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12,590.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090405 São Tomé and Príncipe (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.23 4.23 250.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090407 Senegal (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090409 Togo (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 30.00 41.12 1,035.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090410 ►Shoreline with targeted coastal erosion control measures (disaggregated by country) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.70 4.88 114.30 3/17/2022 Page 11 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090412 Benin (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.70 0.70 23.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090414 Côte d’Ivoire (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 13.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090416 Mauritania (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 51.50 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090418 São Tomé and Príncipe (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 7.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090420 Senegal (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.80 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090422 Togo (Kilometers, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 18.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090424 ►Sites/zones with pollution control measures (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 5.00 16.00 3/17/2022 Page 12 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090426 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090428 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090431 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090433 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 3.00 10.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090434 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090436 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 5.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090439 ►Critical assets protected (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 3/17/2022 Page 13 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090440 ►Natural ecosystems conserved and/or restored (disaggregated by country) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 10.00 10.00 42.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090442 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 8.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090443 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 11.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090444 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 3.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090445 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 11.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090446 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090447 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 7.00 7.00 8.00 3/17/2022 Page 14 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090448 ►Coastal households with access to improved livelihood activities (disaggregated by country and by sex) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,524.00 2,421.00 56,500.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090449 Benin (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,270.00 1,270.00 300.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090450 Côte d’Ivoire (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,200.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090451 Mauritania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 44,000.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090452 São Tomé and Príncipe (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 60.00 939.00 4,500.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 IN01090453 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 182.00 182.00 500.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090454 Togo (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 30.00 30.00 5,000.00 3/17/2022 Page 15 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 06-Jul-2023 IN01090455 ►Local level planning committees in coastal resilience with female representation of 40% or more (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 23.00 Date 14-Dec-2017 30-Jun-2021 31-Jan-2022 29-Dec-2023 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P162337 IDA-62120 Effective USD 30.00 30.00 0.00 7.73 19.31 29% P162337 IDA-62130 Effective USD 30.00 30.00 0.00 3.70 23.73 14% P162337 IDA-62140 Effective USD 30.00 30.00 0.00 5.95 20.83 22% P162337 IDA-62150 Effective USD 30.00 30.00 0.00 3.98 23.43 15% P162337 IDA-69150 Effective USD 6.00 6.00 0.00 0.00 5.66 0% P162337 IDA-69160 Effective USD 12.00 12.00 0.00 0.00 11.32 0% P162337 IDA-D2860 Effective USD 15.00 15.00 0.00 5.12 9.36 35% P162337 IDA-D2870 Effective USD 15.00 15.00 0.00 2.16 12.08 15% P162337 IDA-D2880 Effective USD 20.00 20.00 0.00 7.66 11.67 40% P162337 IDA-D2890 Effective USD 8.00 8.00 0.00 4.52 3.18 59% P162337 IDA-D2900 Effective USD 12.00 12.00 0.00 5.09 6.50 44% P162337 IDA-D8460 Effective USD 6.00 6.00 0.00 0.00 5.88 0% P162337 IDA-D8470 Effective USD 12.00 12.00 0.00 0.00 11.75 0% P162337 TF-A7130 Effective USD 7.53 7.53 0.00 2.17 5.37 29% P162337 TF-A7131 Effective USD 11.57 11.57 0.00 3.33 8.24 29% 3/17/2022 Page 16 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) P162337 TF-A7132 Effective USD 1.15 1.15 0.00 0.16 0.99 14% P162337 TF-B4205 Effective USD 6.00 6.00 0.00 0.82 5.18 14% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P162337 IDA-62120 Effective 09-Apr-2018 21-Apr-2018 14-Sep-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62130 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62140 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-62150 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-69150 Effective 18-Jun-2021 23-Aug-2021 20-Dec-2021 31-Dec-2023 31-Dec-2023 P162337 IDA-69160 Effective 18-Jun-2021 14-Sep-2021 20-Dec-2021 31-Dec-2023 31-Dec-2023 P162337 IDA-D2860 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2870 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2880 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2890 Effective 09-Apr-2018 21-Apr-2018 31-Jul-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D2900 Effective 09-Apr-2018 21-Apr-2018 30-Nov-2018 31-Dec-2023 31-Dec-2023 P162337 IDA-D8460 Effective 18-Jun-2021 23-Aug-2021 20-Dec-2021 31-Dec-2023 31-Dec-2023 P162337 IDA-D8470 Effective 18-Jun-2021 14-Sep-2021 20-Dec-2021 31-Dec-2023 31-Dec-2023 P162337 TF-A7130 Effective 09-Apr-2018 21-Apr-2018 20-Jul-2018 30-Apr-2023 30-Apr-2023 P162337 TF-A7131 Effective 09-Apr-2018 21-Apr-2018 17-Aug-2018 31-Dec-2023 31-Dec-2023 P162337 TF-A7132 Effective 09-Apr-2018 21-Apr-2018 31-Jul-2018 31-Oct-2023 31-Oct-2023 P162337 TF-B4205 Effective 13-Jan-2021 13-Jan-2021 13-Jan-2021 31-Dec-2023 31-Dec-2023 Cumulative Disbursements 3/17/2022 Page 17 of 18 Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Coasta Areas Resilience Investment Project (P162337) Restructuring History Level 2 Approved on 09-Sep-2020 Related Project(s) P162337-West Africa Coasta Areas Resilience Investment Project ,P163945-Investments towards Resilient Management of GCLME ,P168908- Additional grant for West Africa Coastal Area Resilience Investment Project ,P169292-West Africa Coastal Areas Resilience Investment Project AF GCF Togo ,P176313-West Africa Coastal Areas Resilience Investment Project AF BN-TG 3/17/2022 Page 18 of 18