PROCUREMENT PLAN Project information: Higher Education for Economic Transformation Project P166415 Project Implementation agency: ARU, COSTECH, DUCE, HESLB, MJNUAT,MOCU, MUCE, MUHAS,MUST, MZUMBE, MoEST, OUT, SUA, SUZ, TCU, UDOM, UDSM Date of the Procurement Plan: Sep 28, 2021 Period covered by this Procurement Plan: Oct 2021- Oct 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: When approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. For national open competitive procurement the requirements as per National Procurement Procedure (5.4) of Bank’s Procurement Regulations will apply Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not applicable Other Relevant Procurement Information. None PROCUREMENT Tanzania : Higher Education for Economic Transformation Project PLAN General Information Country: Tanzania 2022-01-11 Bank’s Approval Date of the Original Procurement Plan: 2022-08-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166415 GPN Date: 2021-11-28 Project Name: Higher Education for Economic Transformation Project Loan / Credit No: IDA / 68870 Mkwawa University College of Education (TZ) Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Request for TZ-MUCE-261080-CW-RFQ / Strengthening the Learning Request for Quota Single Stage - One E Quotations ( Pending Imp 2022-09-2 Supply and Installation of Fib IDA / 68870 Environments and Labor Mar Post Open - National 0.00 2022-01-15 2022-03-25 tions nvelope Non Bank-SP lementation 1 er optic to the existing buildi ket Alignment of Priority Pro D) ngs grams GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MUCE-261082-GO-RFQ / Strengthening the Learning Request for Quota Single Stage - One E Pending Impl Supply of equipment to stude IDA / 68870 Environments and Labor Mar Post Open - National 0.00 2022-08-14 2022-10-09 2023-04-07 tions nvelope ementation nts with special needs ket Alignment of Priority Pro grams TZ-MUCE-305993-GO-RFB / Strengthening the Learning Single Stage - One E Pending Impl Supply of laboratory and rese IDA / 68870 Environments and Labor Mar Post Request for Bids Open - National 0.00 2022-08-15 2022-08-20 2022-10-01 2022-10-31 2022-12-05 2023-06-03 nvelope ementation arch equipment ket Alignment of Priority Pro grams TZ-MUCE-261065-GO-RFB / Strengthening the Learning Single Stage - One E Pending Impl Supply of ICT equipment,soft IDA / 68870 Environments and Labor Mar Post Request for Bids Open - National 0.00 2022-08-24 2022-08-29 2022-10-10 2022-11-09 2023-01-21 2023-07-20 nvelope ementation ware,security system and ac ket Alignment of Priority Pro cessories grams NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MUCE-261052-CS-CQS / Strengthening the Learning Consultancy Service for unde Environments and Labor Mar Consultant Qualifi Pending Impleme IDA / 68870 Post Open - National 0.00 2022-02-01 2022-02-22 2022-04-07 2022-05-07 2022-06-20 2022-12-17 rtaking environmental social ket Alignment of Priority Pro cation Selection ntation impact assessment for const grams ruction of buildings TZ-MUCE-259782-CS-QCBS / Consultancy services for desi Strengthening the Learning gn and supervision of the pro Environments and Labor Mar Quality And Cost- Open - Internationa Pending Impleme IDA / 68870 Post 0.00 2022-08-12 2022-09-02 2022-10-16 2022-11-27 2022-12-27 2023-01-31 2023-03-24 2024-03-23 posed construction of four ph ket Alignment of Priority Pro Based Selection l ntation ysical facilities (three acade grams mic buildings and Student,s Hostel) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1