PROCUREMENT PLAN Project information: Colombia Sustainable Low Carbon Development In Orinoquía Region Project P160680 Project Implementation agency: Ministerio de Agricultura y Desarrollo Rural -MADR- Date of the Procurement Plan: 02/06/2019 Period covered by this Procurement Plan: 02/06/2019 – 12/31/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Sustainable Low-Carbon Development in Orinoquia region Project PLAN General Information Country: Colombia 2019-02-13 Bank’s Approval Date of the Original Procurement Plan: 2023-03-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160680 GPN Date: 2019-02-13 Project Name: Sustainable Low-Carbon Development in Orinoquia region Project Loan / Credit No: TF / A6377, TF / A6376 Ministerio de Agricultura y Desarrollo Rural Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual A Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Process S Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Contract Comple Description Component Review Type Method Document Typ Amount (U mount (U and Recommendatio Signed Contract o. h cess (Y/N) isk tatus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes tion e S$) S$) n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-149145-GO-RFQ / Adquirir Equipos de computo Project Coordination, Manag , cámara, software licenciad Solicitud de cotiza Single Stage - One TF / A6377 ement, Monitoring and Eval Posterior Open - National 25,000.00 20,492.96 Finalizado 2020-02-23 2020-04-19 2020-02-18 2020-06-03 2020-05-25 o , ayudas tecnologicas audi ciones Envelope uation ovisulaes y de telecomunica cion para apoyar la gestión d el Proyecto Fondo biocarbon o. CO-MADR-177410-GO-RFQ / Adquirir Equipos de cómputo Definition of Emission Reduc Solicitud de cotiza Single Stage - One , software licenciado y acces TF / A6377 tion Program and Monitoring Posterior Open - National 61,200.00 0.00 Cancelado 2020-06-20 2020-08-15 2020-10-14 ciones Envelope orios para apoyar la gestión , Reporting and Verification del Proyecto Fondo biocarbo no CO-MADR-205824-GO-RFB / Adquirir Equipos de cómputo Definition of Emission Reduc Solicitud de ofert Single Stage - One , software licenciado y acces TF / A6376 tion Program and Monitoring Posterior Open - National 231,158.77 148,408.08 Firmado 2020-11-27 2020-12-29 2020-12-02 2021-02-08 2021-01-13 2021-02-18 2021-02-12 2021-04-09 2021-03-19 2021-06-18 2021-09-15 as Envelope orios para apoyar la gestión , Reporting and Verification del Proyecto Fondo biocarbo no CO-MADR-222435-GO-RFQ / Adquisición de equipos acce Project Coordination, Manag Solicitud de cotiza Single Stage - One sorios para la operación del TF / A6376 ement, Monitoring and Eval Posterior Open - National 36,084.00 0.00 Cancelado 2021-03-20 2021-05-15 2021-11-11 ciones Envelope Proyecto Biocarbono Orinoqu uation ia y la Dirección de Innovaci ón CO-MADR-261844-GO-RFQ / Project Coordination, Manag Adquisición de equipos de co Solicitud de cotiza Single Stage - One TF / A6376 ement, Monitoring and Eval Posterior Open - National 36,082.00 31,078.46 Firmado 2021-11-17 2022-01-12 2022-03-24 2022-07-11 mputo y telecomunicaciones ciones Envelope uation para el proyecto BIOCARBON O NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-125771-NC-RFQ / SUMINISTRO DE TIQUETES A ÉREOS AL PROYECTO: DESA Project Coordination, Manag RROLLO SOSTENIBLE BAJO E Solicitud de cotiza Single Stage - One TF / A6377 ement, Monitoring and Eval Posterior Open - National 20,000.00 17,788.20 Firmado 2019-09-05 2019-10-09 2019-10-15 2020-10-08 N CARBONO EN LA REGIÓN ciones Envelope uation DE LA ORINOQUIA, ASÍ COM O LA PRESTACIÓN DE SERVI CIOS DE AGENCIA DE VIAJES -AÑO 1 -COMPONENTE 4 CO-MADR-132942-NC-RFQ / Project Coordination, Manag Solicitud de cotiza Single Stage - One Taller de socializacion y arra TF / A6377 ement, Monitoring and Eval Posterior Open - National 4,000.00 0.00 Cancelado 2019-09-05 2019-09-20 2019-09-30 ciones Envelope nque Fondo Biocarbono Se uation ptiembre 2019 CO-MADR-163819-NC-RFQ / Prestar los servicios logístico s (alimentación, salón y ayu Project Coordination, Manag das audiovisuales) para los a Solicitud de cotiza Single Stage - One TF / A6377 ement, Monitoring and Eval Posterior Open 8,000.00 0.00 Cancelado 2020-03-09 2020-03-21 2020-04-20 sistentes a la primera Mesa ciones Envelope uation Técnica Intercomponentes p ara el proyecto, “DESARROL LO SOSTENIBLE BAJO EN CA RBONO EN LA REGIÓN DE LA ORINOQUIA” CO-MADR-197658-NC-RFB / Implementar la actualización catastral con enfoque multip Integrated Land- Use Planni Adquisición direct ropósito para el municipio de TF / A6377 ng and Improved Governanc Posterior Direct 1,500,000.00 1,180,395.29 Firmado 2020-11-06 2020-11-20 2020-11-11 2020-11-20 2020-12-08 2021-01-28 2021-12-08 a Arauquita, en el departamen e for Deforestation Control to de Arauca, en el marco de l Proyecto Desarrollo Sosteni ble Bajo en Carbono para la Orinoquia. CO-MADR-201158-NC-RFB / Inventario Forestal de la regi Definition of Emission Reduc Solicitud de ofert Single Stage - One ón de la Orinoquía, dentro d TF / A6376 tion Program and Monitoring Posterior Open - National 941,000.00 0.00 Cancelado 2020-11-17 2020-11-19 2020-11-22 2020-11-21 2021-01-03 2021-02-02 2021-03-09 2021-09-05 as Envelope el Componente 3: Preparació , Reporting and Verification n del Programa de Reducció n de Emisiones y del MRV CO-MADR-211404-NC-RFB / Elaborar el inventario foresta l de la región Orinoquia sigui endo los parámetros estable Definition of Emission Reduc Solicitud de ofert Single Stage - One cidos en el Documento Marc TF / A6376 tion Program and Monitoring Posterior Open - National 941,000.00 764,771.05 Firmado 2020-12-28 2020-12-28 2021-01-02 2021-01-04 2021-01-19 2021-02-03 2021-01-19 2021-03-10 2021-04-05 2021-09-06 as Envelope o Rector, el marco estadístic , Reporting and Verification o y geoestadístico, los proce dimientos, metodologías y pr otocolos técnicos definidos p or el IDEAM para la impleme CO-MADR-218458-NC-RFB / Prestar servicios como Oper Integrated Land- Use Planni Solicitud de ofert Single Stage - One ador logístico para la puesta TF / A6376 ng and Improved Governanc Posterior Open - National 194,750.00 0.00 Firmado 2021-04-22 2021-04-14 2021-04-27 2021-06-08 2021-05-18 2021-07-08 2021-06-03 2021-08-12 2021-07-27 2022-02-08 as Envelope en marcha de las diferentes e for Deforestation Control actividades y estrategias del proyecto BIOCARBONO CO-MADR-218263-NC-RFB / Formular un plan de ordena Integrated Land- Use Planni miento social de la propieda Solicitud de ofert Single Stage - One TF / A6376 ng and Improved Governanc Posterior Open - National 300,000.00 0.00 Cancelado 2021-02-22 2021-02-27 2021-04-10 2021-05-10 2021-06-14 2021-12-11 d rural en un municipio priori as Envelope e for Deforestation Control zado por el Proyecto, con ba se en los lineamientos de la ANT CO-MADR-218264-NC-RFB / Integrated Land- Use Planni Formular dos (2) planes de o Solicitud de ofert Single Stage - One TF / A6376 ng and Improved Governanc Posterior Open - National 300,000.00 0.00 Cancelado 2021-02-22 2021-02-27 2021-04-10 2021-05-10 2021-06-14 2021-12-11 rdenación forestal, con base as Envelope e for Deforestation Control en los lineamientos de las Co rporaciones y MADS CO-MADR-231937-NC-DIR / Suministro de tiquetes aéreo Integrated Land- Use Planni Adquisición direct s de pasajeros en rutas nacio TF / A6376 ng and Improved Governanc Posterior Direct 45,714.00 41,656.00 Firmado 2021-04-30 2021-04-30 2021-05-05 2021-05-24 2021-06-09 2021-07-09 2021-12-06 a nales o internacionales para e for Deforestation Control el desarrollo del Proyecto BI OCARBONO - ORINOQUIA CO-MADR-222433-NC-RFQ / Prestar el servicio de diseño e impresión de afiches, follet os, cartillas, u otras publicaci Project Coordination, Manag Solicitud de cotiza Single Stage - One ones a demanda, impresas o TF / A6376 ement, Monitoring and Eval Posterior Open - National 30,312.00 0.00 Cancelado 2021-03-20 2021-05-15 2021-11-11 ciones Envelope digitales, hacer las respectiv uation as gestiones para la adquisic ión del ISBN para las publica ciones que lo requieran, reali zar la producción Page 1 CO-MADR-218245-NC-RFB / Establecer factores de emisi Definition of Emission Reduc Solicitud de ofert Single Stage - One ón para los usos del suelo di TF / A6376 tion Program and Monitoring Posterior Open - National 1,070,000.00 0.00 Cancelado 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 2022-06-20 as Envelope stintos a bosque y los cambi , Reporting and Verification os de uso del suelo de la Ori noquia CO-MADR-224155-NC-RFQ / Prestar sus servicios profesio nales con autonomía técnica Project Coordination, Manag y administrativa, para la gra Solicitud de cotiza Single Stage - One TF / A6376 ement, Monitoring and Eval Posterior Open - National 18,187.00 0.00 Cancelado 2021-11-14 2022-01-09 2022-05-09 bación, edición, animación y ciones Envelope uation entrega de videos y fotografí as para el Proyecto Desarroll o Sostenible bajo en carbono en la región de la Orinoquia Definition of Emission Reduc CO-MADR-283510-NC-RFB / Solicitud de ofert Single Stage - One TF / A6376 tion Program and Monitoring Posterior Open - National 668,035.00 0.00 En ejecución 2022-03-30 2022-05-19 2022-04-04 2022-05-16 2022-06-28 2022-06-15 2022-08-29 2022-07-20 2023-05-16 Inventario No Bosque as Envelope , Reporting and Verification CO-MADR-313815-NC-RFQ / Adquirir créditos de servicios de nube pública, licencias de Power BI incluyendo servicio Integrated Land- Use Planni Solicitud de cotiza Single Stage - One s de soporte especializado p TF / A6376 ng and Improved Governanc Posterior Open - National 83,410.00 0.00 En ejecución 2022-10-22 2022-12-17 2023-08-14 ciones Envelope ara desarrollar procesos de g e for Deforestation Control estión de información para la implementación de la Infraes tructura de Datos Espaciales de la Orinoquía CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Expression of Interes Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) t (US$) t Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-172824-CS-QCBS / “Elaborar los lineamientos y criterios técnicos estableci dos en la Ley 1776 "por la cu Integrated Land- Use Planni Selección basada al se crean y se desarrollan l TF / A6377 ng and Improved Governanc Posterior Open - National 72,750.00 69,472.22 Firmado 2020-05-08 2020-06-08 2020-05-22 2020-07-05 2020-10-09 2020-07-19 2020-11-27 2020-07-24 2021-01-25 2020-08-13 2021-01-15 2020-09-10 2021-04-27 2021-01-08 en calidad y costo as zonas de interés de desar e for Deforestation Control rollo rural, económico y soci al, ZIDRES"; definiendo las c ondiciones de presentación, evaluación elegibilidad, CO-MADR-182002-CS-QBS / “Consultoría para la gestión Sustainable Land- Use Mana Selección basada Open - Internationa de agroecosistemas ganader TF / A6377 Previa 1,000,000.00 1,330,912.34 Firmado 2020-06-30 2020-07-30 2020-07-21 2020-08-12 2020-08-19 2020-12-23 2020-09-03 2021-02-09 2020-09-13 2021-03-23 2020-09-23 2021-08-24 2020-10-21 2021-09-29 2021-12-15 gement en calidad l os sostenibles bajos en carb ono en paisajes priorizados d e la Orinoquia” CO-MADR-183810-CS-QCBS / “Apoyar la estructuración d Sustainable Land- Use Mana Selección basada TF / A6377 Posterior Open - National 181,667.00 163,459.11 Firmado 2020-07-13 2020-07-16 2020-07-28 2020-09-26 2020-10-05 2020-10-11 2020-11-20 2020-10-21 2020-12-23 2020-11-15 2020-12-23 2020-12-20 2021-03-23 2021-09-16 e programas y proyectos de gement en calidad y costo Pagos por Servicios Ambient ales CO-MADR-196095-CS-QBS / Consultoría para identificar, validar y socializar modelos productivos sostenibles bajo Sustainable Land- Use Mana Selección basada Open - Internationa TF / A6377 Posterior 600,000.00 368,742.33 Firmado 2020-09-30 2020-10-09 2020-10-21 2020-10-30 2020-11-19 2020-12-10 2021-01-03 2021-01-12 2021-01-18 2021-01-29 2021-02-02 2021-01-29 2021-03-02 2021-04-29 2022-03-02 s en carbono para el cultivo gement en calidad l de arroz en Arauca (Arauca), Paz de Ariporo (Casanare), Vi llavicencio, Puerto López y P uerto Gaitán (Meta). CO-MADR-197663-CS-CQS / Identificar, documentar, anal izar y validar los factores de emisión para plantaciones fo Definition of Emission Reduc Selección basada restales de Colombia y en pa TF / A6377 tion Program and Monitoring Posterior en calificaciones Open - National 74,538.00 58,176.38 Firmado 2020-10-09 2020-10-09 2020-10-13 2020-12-16 2020-12-27 2021-01-25 2021-01-01 2021-03-23 2021-01-25 2021-05-25 2021-07-24 rticular de la región Orinoqui , Reporting and Verification de consultores a, como insumo del sistema nacional de MRV para AFOLU y a través de un ejercicio co ncertado entre las entidad CO-MADR-178416-CS-QCBS / Actualizar el inventario de Definition of Emission Reduc Gases Efecto Invernadero (G Selección basada TF / A6377 tion Program and Monitoring Posterior Open - National 85,000.00 0.00 Cancelado 2020-06-12 2020-06-10 2020-06-26 2020-08-09 2020-08-23 2020-08-28 2020-09-17 2020-10-15 2020-12-14 EI) de la región de la Orinoqu en calidad y costo , Reporting and Verification ía con variables representati vas (proxy) a escala municip al. CO-MADR-194714-CS-QCBS / Inventario Forestal de la re Definition of Emission Reduc Selección basada Open - Internationa gión de la Orinoquía, dentro TF / A6377 tion Program and Monitoring Posterior 941,000.00 0.00 Cancelado 2020-09-24 2020-09-23 2020-10-14 2020-09-25 2020-12-13 2020-12-27 2021-01-01 2021-02-05 2021-03-06 2022-03-06 en calidad y costo l del Componente 3: Preparaci , Reporting and Verification ón del Programa de Reducci ón de Emisiones y del MRV CO-MADR-201847-CS-QCBS / Caracterizar, validar y socia lizar sistemas agroforestales (SAF) bajos en carbono para Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 383,000.00 0.00 Cancelado 2020-11-09 2021-06-11 2020-11-30 2021-01-13 2021-02-10 2021-03-12 2021-04-16 2021-05-21 2022-05-21 el cultivo de cacao en las su gement en calidad y costo bregiones del Sarare (Arauca ) y la cuenca alta y media de l río Ariari (Meta), en la Orino quia colombiana CO-MADR-204779-CS-LCS / Realizar la auditoria externa al proyecto Desarrollo Soste Project Coordination, Manag Selección basada nible Bajo en Carbono para l TF / A6376 ement, Monitoring and Eval Posterior Open - National 37,651.00 7,615.24 Finalizado 2020-11-27 2021-01-28 2020-12-18 2021-01-31 2021-02-04 2021-02-28 2021-03-04 2021-03-30 2021-04-07 2021-05-04 2021-04-06 2021-06-08 2021-06-04 2021-12-05 2021-10-13 en el menor costo a Orinoquia , para el periodo uation comprendido entre el 1 de ju nio del 2019 y hasta el 31 de diciembre de 2020 CO-MADR-218250-CS-LCS / Definition of Emission Reduc Diseñar el Plan de financiaci Selección basada TF / A6376 tion Program and Monitoring Posterior Open - National 80,000.00 0.00 Cancelado 2021-02-19 2021-03-12 2021-04-25 2021-05-23 2021-06-22 2021-07-27 2021-08-31 2022-02-27 ón para la implementación d en el menor costo , Reporting and Verification e las acciones e intervencion es previstas del ERPD CO-MADR-218252-CS-LCS / I mplementar las salvaguarda s establecidas a nivel nacion Definition of Emission Reduc Selección basada al, con las comunidades de l TF / A6376 tion Program and Monitoring Posterior Open - National 75,000.00 0.00 Cancelado 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 en el menor costo a región, y desarrollar los re , Reporting and Verification portes de dichas actividades de acuerdo con los lineamie ntos nacionales (MGAS, PPI, MP) CO-MADR-218269-CS-QCBS / Desarrollo de un modelo de negocios para la consolidaci ón de la producción de aceit Sustainable Land- Use Mana Selección basada e de palma sostenible en pai TF / A6376 Posterior Open - National 300,000.00 0.00 Cancelado 2021-03-15 2021-04-05 2021-05-19 2021-06-16 2021-07-16 2021-08-20 2021-09-24 2022-09-24 gement en calidad y costo sajes palmeros priorizados a partir de la realización de an álisis costo - beneficio de me jores prácticas bajas en carb ono y el diseño de herrami CO-MADR-218270-CS-CQS / Identificar especies vegetale Selección basada s, desarrollar protocolos y fo Sustainable Land- Use Mana TF / A6376 Posterior en calificaciones Open - National 150,000.00 0.00 Cancelado 2021-04-30 2021-10-26 2021-05-21 2021-07-04 2021-08-03 2021-09-07 2022-03-06 rtalecer capacidades para pr gement de consultores ocesos de reconversión, rest auración y fomento de SAF e n paisajes priorizados CO-MADR-218271-CS-QCBS Sustainable Land- Use Mana Selección basada / Definir e implementar mes TF / A6376 Posterior Open - National 300,000.00 0.00 En ejecución 2021-03-01 2021-11-05 2021-03-22 2021-05-05 2021-11-12 2021-06-02 2021-12-16 2021-07-02 2022-02-25 2021-08-06 2022-08-31 2021-09-10 2022-09-10 gement en calidad y costo as técnicas agroclimáticas e n la Orinoquia CO-MADR-199060-CS-QCBS / Diseñar, apoyar y hacer rec omendaciones a la impleme Integrated Land- Use Planni ntación de acciones dirigidas Selección basada Open - Internationa TF / A6376 ng and Improved Governanc Posterior 550,000.00 0.00 Cancelado 2020-10-20 2020-11-12 2020-11-03 2020-12-20 2020-12-28 2021-01-05 2021-01-21 2021-02-14 2022-02-14 a la reducción de la deforest en calidad y costo l e for Deforestation Control ación, la promoción de la leg alidad de la cadena forestal y la conservación de los bos ques en la región de la Orino quia Page 2 CO-MADR-218256-CS-QCBS Integrated Land- Use Planni Selección basada / Actualizar y socializar el M TF / A6376 ng and Improved Governanc Posterior Open - National 200,000.00 0.00 Cancelado 2021-05-31 2021-06-21 2021-08-04 2021-09-01 2021-10-01 2021-11-05 2021-12-10 2022-12-10 en calidad y costo OTRO con el gobierno region e for Deforestation Control al actual CO-MADR-233553-CS-QCBS / Preparar un plan de financi ación y un plan de distribuci Definition of Emission Reduc Selección basada ón de beneficios para el Prog TF / A6376 tion Program and Monitoring Posterior Open - National 160,000.00 137,118.44 Firmado 2021-05-10 2021-05-27 2021-05-31 2021-07-14 2021-10-15 2021-08-11 2021-11-16 2021-09-10 2022-01-24 2021-10-15 2022-02-14 2021-11-19 2022-03-22 2022-03-19 en calidad y costo rama de Reducción de Emisi , Reporting and Verification ones de la región de la Orino quia en Colombia, a partir de una evaluación de costos y b eneficios CO-MADR-218457-CS-QCBS / Diseñar e implementar un programa de formación de fo rmadores en planificación te Integrated Land- Use Planni Selección basada rritorial enfocado a bajo carb TF / A6376 ng and Improved Governanc Posterior Open - National 392,440.00 0.00 Cancelado 2021-08-02 2021-08-23 2021-10-06 2021-11-03 2021-12-03 2022-01-07 2022-02-11 2022-11-08 en calidad y costo ono, hacedores de política, o e for Deforestation Control rganizaciones, EPSEAS y de más temas relacionados con los componentes 1 y 2 del Pr oyecto BIOCARBONO CO-MADR-218257-CS-CQS / Realizar acompañamiento té Integrated Land- Use Planni Selección basada cnico y jurídico para la adopc TF / A6376 ng and Improved Governanc Posterior en calificaciones Open - National 120,000.00 0.00 Cancelado 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 ión de las determinantes am e for Deforestation Control de consultores bientales regionales en las c orporaciones (CORPORINOQ UIA y CORMACARENA) CO-MADR-218259-CS-CQS / Implementar en los POT de l Integrated Land- Use Planni Selección basada os municipios priorizados del TF / A6376 ng and Improved Governanc Posterior en calificaciones Open - National 150,000.00 0.00 Cancelado 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 Vichada, acciones de gestión e for Deforestation Control de consultores de cambio climático basado en EEP CO-MADR-240660-CS-QCBS / Incorporar la gestión del ca mbio climático en las determ Integrated Land- Use Planni Selección basada inantes ambientales (CORPO TF / A6376 ng and Improved Governanc Posterior Open - National 270,000.00 0.00 En ejecución 2021-07-12 2022-01-20 2021-08-02 2021-09-15 2022-03-23 2021-10-13 2022-04-28 2021-11-12 2022-07-06 2021-12-17 2022-08-31 2022-01-21 2023-01-21 en calidad y costo RINOQUIA - CORMACARENA) e for Deforestation Control y desarrollar un piloto a esca la local a través del modelo de estructura ecológica princ ipal CO-MADR-218273-CS-QCBS / Diseñar la estrategia de ge stión del conocimiento para Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 80,000.00 0.00 Cancelado 2021-04-30 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-11-09 el desarrollo regional bajo en gement en calidad y costo carbono de la Orinoquia y la consolidación de circuitos co rtos bajos en carbono CO-MADR-218251-CS-LCS / Definition of Emission Reduc Selección basada Construir propuestas de artic TF / A6376 tion Program and Monitoring Posterior Open - National 60,000.00 0.00 Cancelado 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 en el menor costo ulación en áreas de traslape , Reporting and Verification CO-MADR-218253-CS-LCS / Definition of Emission Reduc Diseñar el Plan de distribució Selección basada TF / A6376 tion Program and Monitoring Posterior Open - National 80,000.00 0.00 Cancelado 2021-03-26 2021-04-16 2021-05-30 2021-06-27 2021-07-27 2021-08-31 2021-10-05 2022-04-03 n de beneficios del Programa en el menor costo , Reporting and Verification de Reducción de Emisiones d e la Orinoquia CO-MADR-218254-CS-CQS / Realizar el proceso de mejor Definition of Emission Reduc Selección basada amiento de información y de TF / A6376 tion Program and Monitoring Posterior en calificaciones Open - National 60,000.00 0.00 Cancelado 2021-02-26 2021-03-19 2021-05-02 2021-06-01 2021-07-06 2022-01-02 los sistemas de información , Reporting and Verification de consultores relacionados con tierras fore stales (SNIF) CO-MADR-218275-CS-QCBS / Ajustar los instrumentos de financiamiento e incentivos f Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 200,000.00 0.00 Cancelado 2021-08-16 2021-09-06 2021-10-20 2021-11-17 2021-12-17 2022-01-21 2022-02-25 2023-02-25 orestales y de bosques de co gement en calidad y costo nservación y evaluar y/o dise ñar instrumentos regulatorio s CO-MADR-243539-CS-QCBS Integrated Land- Use Planni / Diseñar y validar una meto Selección basada TF / A6376 ng and Improved Governanc Posterior Open - National 100,000.00 59,199.45 Firmado 2021-08-16 2021-09-29 2021-09-06 2021-10-20 2022-01-11 2021-11-17 2022-02-11 2021-12-17 2022-05-10 2022-01-21 2022-07-29 2022-02-25 2022-09-09 2022-08-24 dología para la valoración ec en calidad y costo e for Deforestation Control onómica de predios con atrib utos ambientales CO-MADR-201848-CS-QCBS / Caracterizar, validar y socia lizar modelos de producción Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 200,000.00 0.00 Cancelado 2021-08-16 2021-09-06 2021-10-20 2021-11-17 2021-12-17 2022-01-21 2022-02-25 2023-02-25 - conservación para el cultiv gement en calidad y costo o de marañón bajo en carbo no a escala de paisaje en la altillanura colombiana CO-MADR-218246-CS-QCBS Definition of Emission Reduc / Generar factores de emisió Selección basada TF / A6376 tion Program and Monitoring Posterior Open - National 353,000.00 0.00 Cancelado 2021-02-26 2021-04-27 2021-03-19 2021-05-02 2021-05-30 2021-06-29 2021-08-03 2021-09-07 2022-09-07 n Tir2 para arroz de secano en calidad y costo , Reporting and Verification y ganadería de cría en la reg ión de la Orinoquía CO-MADR-259587-CS-CQS / Ajustar los instrumentos de f Selección basada inanciamiento e incentivos f Sustainable Land- Use Mana TF / A6376 Posterior en calificaciones Open - National 250,000.00 228,482.43 Firmado 2021-11-05 2021-12-20 2021-11-26 2022-01-09 2022-03-09 2022-02-08 2022-05-10 2022-03-15 2022-08-23 2023-03-15 orestales y de bosques de co gement de consultores nservación y evaluar y/o dise ñar instrumentos regulatorio s (Forestal comercial) CO-MADR-218266-CS-QCBS / Construir el plan de acción para la implementación de la Integrated Land- Use Planni estrategia integral de control Selección basada TF / A6376 ng and Improved Governanc Posterior Open - National 150,000.00 0.00 En ejecución 2021-11-15 2022-02-24 2021-12-06 2022-01-19 2022-05-02 2022-02-16 2022-05-31 2022-03-18 2022-07-22 2022-04-22 2022-08-22 2022-05-27 2023-05-27 de la deforestación y propue en calidad y costo e for Deforestation Control sta de fortalecimiento de ca pacidades e involucramiento de actores, con énfasis en la s autoridades ambientales y municipales CO-MADR-222428-CS-QCBS / Prestar sus servicios como central de medios o agencia de medios para el diseño, ej Project Coordination, Manag Selección basada ecución y seguimiento de un TF / A6376 ement, Monitoring and Eval Posterior Open - National 87,853.00 0.00 Cancelado 2021-12-06 2021-12-27 2022-02-09 2022-03-09 2022-04-08 2022-05-13 2022-06-17 2022-12-14 en el menor costo plan de medios que acompa uation ñe la estrategia de comunica ciones y participación del Pr oyecto Desarrollo Sostenible bajo en carbono en la región de l CO-MADR-222430-CS-LCS / Diseñar un Protocolo con guí as de actuación en situacion es de riesgo, crisis comunica Project Coordination, Manag Selección basada tiva y reputacional, socializar TF / A6376 ement, Monitoring and Eval Posterior Open - National 18,826.00 0.00 Cancelado 2021-12-13 2022-01-03 2022-02-16 2022-03-16 2022-04-15 2022-05-20 2022-06-24 2022-10-22 en el menor costo lo y capacitar a los voceros uation del Proyecto Desarrollo Sost enible bajo en carbono en la región de la Orinoquia, en ac uerdo con lo establecid CO-MADR-222431-CS-CQS / Prestar servicios de monitore o de medios de comunicació Project Coordination, Manag Selección basada n nacionales, regionales y m TF / A6376 ement, Monitoring and Eval Posterior en calificaciones Limited 10,609.00 0.00 Cancelado 2021-12-13 2021-12-27 2022-01-26 2022-03-02 2022-12-31 unicipales (prensa escrita, ra uation de consultores dio, televisión, internet y red es sociales) en temas de inte rés del proyecto Biocarbono Orinoquia CO-MADR-263396-CS-CQS / Crear condiciones habilitante Selección basada s para el desarrollo de agroe Sustainable Land- Use Mana TF / A6376 Posterior en calificaciones Open - National 250,000.00 0.00 En ejecución 2021-11-22 2022-03-11 2021-12-13 2022-01-26 2022-04-25 2022-02-25 2022-07-21 2022-04-01 2023-04-01 cosistemas sostenibles bajos gement de consultores en carbono para el cultivo de l marañón en la altillanura co lombiana CO-MADR-269695-CS-QCBS / Formular una estrategia pa ra el escalamiento de sistem Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 549,080.00 0.00 En ejecución 2022-01-14 2022-01-13 2022-02-04 2022-03-20 2022-02-28 2022-04-17 2022-04-04 2022-05-17 2022-04-21 2022-06-21 2022-04-21 2022-07-26 2023-07-26 as agroforestales (SAF) bajos gement en calidad y costo en carbono para el cultivo de l cacao en núcleos productiv os de Arauca y del Meta Page 3 CO-MADR-280413-CS-QCBS / Consultoría para la Formula ción del Plan de Ordenación Integrated Land- Use Planni Forestal (POF) de la subzona Selección basada TF / A6376 ng and Improved Governanc Posterior Open - National 400,000.00 0.00 En ejecución 2022-02-28 2022-03-01 2022-03-21 2022-05-04 2022-06-01 2022-07-01 2022-08-05 2022-09-09 2023-09-09 hidrográfica del río Bita en el en calidad y costo e for Deforestation Control departamento del Vichada, j urisdicción de la Corporación Autónoma Regional de la Ori noquia (CORPORINOQUIA) CO-MADR-283505-CS-QCBS / Estructurar proyectos de fo Integrated Land- Use Planni Selección basada restería comunitaria, bajo el TF / A6376 ng and Improved Governanc Posterior Open - National 900,000.00 0.00 En ejecución 2022-03-30 2022-06-06 2022-04-20 2022-06-03 2022-05-17 2022-07-01 2022-06-22 2022-07-31 2022-09-06 2022-09-04 2022-10-13 2022-10-09 2023-10-09 en calidad y costo enfoque de los clústeres fore e for Deforestation Control stales para la región de la Or inoquia CO-MADR-283506-CS-QCBS / Realizar un pilotaje para el desarrollo de acuerdos cero Integrated Land- Use Planni deforestación en zonas estra Selección basada TF / A6376 ng and Improved Governanc Posterior Open - National 120,000.00 0.00 Cancelado 2022-03-30 2022-04-20 2022-06-03 2022-07-01 2022-07-31 2022-09-04 2022-10-09 2023-10-09 tégicas de la Orinoquia para en calidad y costo e for Deforestation Control la reducción de la deforestac ión y el fomento de la produ cción sostenible de cadenas priorizadas por el proyecto CO-MADR-283509-CS-CQS / Estrategia para impulsar la c Selección basada ontribución de la cadena de l Sustainable Land- Use Mana TF / A6376 Posterior en calificaciones Open - National 100,000.00 0.00 Cancelado 2022-06-22 2022-07-13 2022-08-26 2022-09-25 2022-10-30 2023-04-28 a palma a la reducción de ga gement de consultores ses efecto invernadero en el marco del Programa de Redu cción de Emisiones PRE CO-MADR-291071-CS-QCBS / Estrategia producción mate rial vegetal nativo direcciona Sustainable Land- Use Mana Selección basada TF / A6376 Posterior Open - National 150,000.00 0.00 En ejecución 2022-05-02 2022-11-30 2022-05-23 2022-07-06 2022-08-03 2022-09-02 2022-10-07 2022-11-11 2024-01-05 do a la restauración de paisa gement en calidad y costo je productivos y SAF bajos e n carbono en paisajes de la Orinoquia INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Identifie Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference d/Selected Consultan Signed Contract Contract Completion o. h unt (US$) t (US$) tract t Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-MADR-99638-CS-INDV / Project Coordination, Manag Profesional de adquisiciones TF / A6377 ement, Monitoring and Eval Posterior Individual Open 24,500.00 55,379.34 Finalizado 2019-02-11 2019-02-26 2019-02-21 2019-04-10 2019-02-22 2019-04-19 2019-03-01 2019-06-04 2020-03-01 2020-02-20 para la UIP del proyecto uation CO-MADR-99663-CS-INDV / Project Coordination, Manag Profesional financiero para e TF / A6377 ement, Monitoring and Eval Posterior Individual Open 24,500.00 79,748.06 Firmado 2019-02-11 2019-02-26 2019-02-19 2019-04-10 2019-02-20 2019-04-19 2019-03-01 2019-06-04 2019-08-28 l apoyo en la UIP uation CO-MADR-99665-CS-INDV / Project Coordination, Manag TF / A6377 Posterior Individual Open 45,000.00 79,276.45 Finalizado 2019-02-11 2019-02-13 2019-02-19 2019-04-10 2019-02-22 2019-04-19 2019-03-01 2019-06-04 2019-08-28 2020-04-07 Coordinador general para la ement, Monitoring and Eval UPI uation CO-MADR-99654-CS-INDV / Asistente administrativo y op Project Coordination, Manag erativo para apoyar al IDEAM TF / A6377 ement, Monitoring and Eval Posterior Individual Open 48,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 en la coordinación de las acc uation iones de gestión del program a CO-MADR-99650-CS-INDV / Seis consultores que obteng Project Coordination, Manag an los insumos para la elabo TF / A6377 ement, Monitoring and Eval Posterior Individual Open 210,000.00 0.00 Cancelado 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2019-11-30 ración del ER-Programa desd uation e las instituciones gubernam entales (MADS, MADR, UPRA, DNP, FINAGRO, PRICCO) CO-MADR-107364-CS-INDV / Project Coordination, Manag Apoyo Administrativo a la Un TF / A6377 ement, Monitoring and Eval Posterior Individual Open 17,000.00 52,197.85 Finalizado 2019-04-05 2019-06-25 2019-04-19 2019-08-06 2019-04-23 2019-09-02 2019-05-01 2019-09-12 2019-12-31 2021-12-31 idad de Implementación del uation proyecto CO-MADR-107357-CS-INDV / Project Coordination, Manag Líder Especialista en Planific TF / A6377 ement, Monitoring and Eval Posterior Individual Open 23,900.00 71,015.17 Firmado 2019-04-05 2019-06-18 2019-04-22 2019-08-13 2019-04-25 2019-09-13 2019-05-01 2019-10-25 2019-12-31 ación y Políticas Públicas en l uation a Unidad de Implementación del Proyecto CO-MADR-107358-CS-INDV / Project Coordination, Manag Líder Especialista en Monitor TF / A6377 ement, Monitoring and Eval Posterior Individual Open 28,120.00 77,730.73 Firmado 2019-04-05 2019-06-18 2019-04-22 2019-08-02 2019-04-25 2019-08-28 2019-05-01 2019-10-25 2019-12-31 eo de la Unidad de Impleme uation ntación del Proyecto MADR CO-MADR-107362-CS-INDV / Project Coordination, Manag Asesor de Comunicaciones y TF / A6377 ement, Monitoring and Eval Posterior Individual Open 23,900.00 45,256.30 Finalizado 2019-04-05 2019-06-25 2019-04-22 2019-08-09 2019-04-25 2019-08-02 2019-05-01 2019-09-12 2019-12-31 2020-04-07 Participación de la Unidad de uation Implementación del Proyecto MADR CO-MADR-107363-CS-INDV / Líder Especialista en Desarro Project Coordination, Manag llo Rural de Bajas Emisiones TF / A6377 ement, Monitoring and Eval Posterior Individual Open 28,000.00 77,121.93 Firmado 2019-04-05 2019-06-18 2019-04-22 2019-08-02 2019-04-25 2019-08-28 2019-05-01 2019-10-25 2019-12-31 de la Unidad de Implementa uation ción del proyecto MADR CO-MADR-132927-CS-INDV / Project Coordination, Manag Apoyo Departamental Arauc TF / A6377 ement, Monitoring and Eval Posterior Individual Open 10,833.00 47,908.82 Firmado 2019-09-05 2019-08-01 2019-09-05 2019-09-05 2019-09-05 2019-10-18 2019-09-12 2019-11-15 2019-12-31 a - Primer (1)año uation CO-MADR-132931-CS-INDV / Project Coordination, Manag Apoyo Departamental Casan TF / A6377 ement, Monitoring and Eval Posterior Individual Open 10,833.00 48,320.94 Firmado 2019-09-05 2019-08-01 2019-09-05 2019-10-18 2019-09-05 2019-10-17 2019-09-12 2019-11-25 2019-12-31 are (1) primer año uation CO-MADR-132935-CS-INDV / Project Coordination, Manag Apoyo Departamental Meta TF / A6377 ement, Monitoring and Eval Posterior Individual Open 10,833.00 48,997.23 Firmado 2019-09-05 2019-08-01 2019-09-05 2019-10-08 2019-09-05 2019-10-18 2019-09-12 2019-11-15 2019-12-31 - Primer (1)año uation CO-MADR-132937-CS-INDV / Project Coordination, Manag Apoyo Departamental Vicha TF / A6377 ement, Monitoring and Eval Posterior Individual Open 10,833.00 25,176.86 Firmado 2019-09-05 2019-08-01 2019-09-05 2019-09-05 2019-09-05 2019-09-05 2019-09-12 2019-12-02 2019-12-31 da - Primer (1) año uation CO-MADR-153426-CS-CDS / Prestar sus servicios profesio nales con autonomía técnica apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Direct 34,320.00 44,887.56 Firmado 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-10 2021-03-13 el Instituto de Hidrología, Me , Reporting and Verification teorología y Estudios Ambien tales IDEAM, como profesion al experto en los análisis esp aciales y estructuración de CO-MADR-143405-CS-INDV / Project Coordination, Manag TF / A6377 Posterior Individual Open 28,000.00 41,902.77 Firmado 2019-10-29 2019-10-30 2019-11-06 2020-01-28 2019-11-27 2020-02-04 2020-02-18 2020-03-03 2020-08-16 Especialista en comunicació ement, Monitoring and Eval n Digital uation CO-MADR-143406-CS-INDV / Project Coordination, Manag Profesional en medios e Ide TF / A6377 ement, Monitoring and Eval Posterior Individual Open 2,000.00 1,484.04 Firmado 2019-10-29 2019-10-30 2019-11-06 2020-01-31 2019-11-26 2020-02-07 2020-02-24 2020-03-03 2020-05-08 ntidad Grafica uation CO-MADR-148038-CS-INDV / Gestor Técnico, para la impl ementación y seguimiento té cnico del componente 1 del Integrated Land- Use Planni Proyecto: Desarrollo Sosteni TF / A6377 ng and Improved Governanc Posterior Individual Open 34,000.00 25,368.42 Finalizado 2020-02-24 2020-03-12 2020-03-21 2020-05-29 2020-03-26 2020-04-23 2020-04-09 2020-05-01 2021-04-09 2020-05-01 ble bajo en carbono en la re e for Deforestation Control gión de la Orinoquia, específi camente apoyando el desarr ollo de la arquitecturafuncio nal y de componentes del sis tema Page 4 CO-MADR-153424-CS-CDS / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Direct 34,320.00 45,020.23 Firmado 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 el Instituto de Hidrología, Me , Reporting and Verification teorología y Estudios Ambien tales IDEAM, como profesion al agropecuario para la carac terización y seguimiento de CO-MADR-132919-CS-INDV / Project Coordination, Manag TF / A6377 Posterior Individual Open 12,500.00 57,141.44 Firmado 2019-09-05 2019-08-01 2019-09-05 2019-09-30 2019-09-05 2019-09-30 2019-09-12 2019-11-26 2020-07-26 Especialista Sector privado ement, Monitoring and Eval - año 1 uation CO-MADR-153423-CS-CDS / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Direct 34,320.00 45,154.83 Firmado 2020-02-06 2020-02-11 2020-02-27 2020-04-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 el Instituto de Hidrología, Me , Reporting and Verification teorología y Estudios Ambien tales IDEAM, como profesion al experto en análisis espaci ales para la recopilación, CO-MADR-153429-CS-CDS / Prestar sus servicios profesio nales con autonomía técnica apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Direct 31,680.00 36,105.46 Firmado 2020-02-06 2020-02-11 2020-02-27 2020-06-08 2020-03-03 2020-06-08 2020-03-13 2020-07-15 2021-03-13 el Instituto de Hidrología, Me , Reporting and Verification teorología y Estudios Ambien tales IDEAM, liderando la art iculación de los procesos de Monitoreo Comunitario Par CO-MADR-132940-CS-INDV / Project Coordination, Manag TF / A6377 Posterior Individual Open 38,000.00 55,531.53 Firmado 2020-09-06 2020-01-08 2020-09-06 2020-02-07 2020-09-06 2020-03-03 2020-09-13 2020-03-06 2021-01-01 Coordinador Regional - Prim ement, Monitoring and Eval er (1) año uation CO-MADR-153428-CS-CDS / Prestar sus servicios profesio nales con autonomía técnica apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Direct 37,180.00 48,917.74 Firmado 2020-02-06 2020-02-11 2020-02-27 2020-02-13 2020-03-03 2020-02-13 2020-03-13 2020-03-06 2021-03-13 el Instituto de Hidrología, Me , Reporting and Verification teorología y Estudios Ambien tales IDEAM, asesorando est adísticamente los procesos n ecesarios para el levantamie n Integrated Land- Use Planni CO-MADR-142886-CS-INDV / TF / A6377 ng and Improved Governanc Posterior Individual Open 34,000.00 47,973.58 Firmado 2020-02-20 2019-12-05 2020-03-16 2020-02-18 2020-03-21 2020-03-16 2020-04-06 2020-03-17 2021-04-06 GESTOR TECNICO DNP e for Deforestation Control Integrated Land- Use Planni CO-MADR-146069-CS-INDV / TF / A6377 ng and Improved Governanc Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-27 2020-03-26 2020-07-25 PROFESIONAL ZIDRES 4 e for Deforestation Control Integrated Land- Use Planni CO-MADR-146065-CS-INDV / TF / A6377 ng and Improved Governanc Posterior Individual Open 6,000.00 4,526.46 Firmado 2020-02-27 2019-12-05 2020-02-28 2020-02-27 2020-02-28 2020-02-27 2020-03-09 2020-03-25 2020-07-07 PROFESIONAL ZIDRES 1 e for Deforestation Control Integrated Land- Use Planni CO-MADR-146066-CS-INDV / TF / A6377 ng and Improved Governanc Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-23 2020-03-26 2020-07-21 PROFESIONAL ZIDRES 2 e for Deforestation Control Integrated Land- Use Planni CO-MADR-146068-CS-INDV / TF / A6377 ng and Improved Governanc Posterior Individual Open 6,000.00 4,476.78 Firmado 2020-02-20 2019-12-05 2020-03-06 2020-02-27 2020-03-14 2020-02-27 2020-03-27 2020-03-26 2020-07-25 PROFESIONAL ZIDRES 3 e for Deforestation Control CO-MADR-159519-CS-INDV / Prestar sus servicios profesio nales como consultor SOCIAL de salvaguardas con autono Definition of Emission Reduc mía técnica y administrativa, TF / A6377 tion Program and Monitoring Posterior Individual Open 34,000.00 25,121.58 Finalizado 2020-02-20 2020-02-13 2020-03-25 2020-03-09 2020-03-30 2020-04-11 2020-04-10 2020-04-02 2021-04-10 2020-07-28 apoyando a la Unidad Imple , Reporting and Verification mentadora del Proyecto, UIP, al Ministerio de Agricultura y Desarrollo Rural, bajo la orie ntación del Ministerio de CO-MADR-159520-CS-INDV / Prestar sus servicios profesio nales como consultor AMBIE NTAL de salvaguardas con a Definition of Emission Reduc utonomía técnica y administr TF / A6377 tion Program and Monitoring Posterior Individual Open 34,000.00 46,261.99 Firmado 2020-02-20 2020-02-13 2020-03-25 2020-03-09 2020-03-30 2020-03-11 2020-04-15 2020-04-02 2021-04-15 ativa, apoyando a la Unidad I , Reporting and Verification mplementadora del Proyecto UIP: Desarrollo sostenible baj o en carbono en la región de la Orinoquia, al Ministerio de CO-MADR-159522-CS-INDV / Prestar sus servicios profesio nales, con autonomía técnic a y administrativa, apoyando Project Coordination, Manag a la Dirección de Innovación, TF / A6377 ement, Monitoring and Eval Posterior Individual Open 34,000.00 31,046.40 Rescindido 2020-02-20 2020-03-04 2020-03-25 2020-06-23 2020-03-30 2020-06-23 2020-04-14 2022-09-08 2021-04-14 Desarrollo Tecnológico y Prot uation ección Sanitaria del Ministeri o de Agricultura y Desarrollo Rural, en la realización de lo s procesos de adqui CO-MADR-151449-CS-INDV / Definition of Emission Reduc Profesional Programador se TF / A6377 tion Program and Monitoring Posterior Individual Open 26,667.00 0.00 Cancelado 2020-01-13 2020-01-13 2020-01-13 2020-02-17 2021-02-17 nior , Reporting and Verification CO-MADR-99651-CS-INDV / Un consultor para implement Project Coordination, Manag ar una plataforma de gestión TF / A6377 ement, Monitoring and Eval Posterior Individual Open 35,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 del conocimiento y experien uation cias en el diseño e implemen tación de ER-Program CO-MADR-99659-CS-INDV / Líder técnico especialista en Project Coordination, Manag uso y cambios de uso del su TF / A6377 ement, Monitoring and Eval Posterior Individual Open 72,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 elo de apoyo al IDEAM en la uation estimación y el reporte de e misiones y remociones de G EI para el sector AFOLU CO-MADR-151447-CS-INDV / Definition of Emission Reduc Profesional Interprete 1 (juni TF / A6377 tion Program and Monitoring Posterior Individual Open 20,000.00 0.00 Cancelado 2020-01-17 2020-01-17 2020-01-17 2020-02-21 2020-11-04 or) , Reporting and Verification CO-MADR-151444-CS-INDV / Profesional experto tematico para fortalecer capacidades Definition of Emission Reduc del ideam en analisis de cam TF / A6377 tion Program and Monitoring Posterior Individual Direct 26,667.00 0.00 Cancelado 2020-01-10 2020-01-20 2020-02-10 2020-03-16 2021-03-16 bio de uso del suelo , en las , Reporting and Verification cateforias claves a ser inclui das en la estimacion de liena base , escenario de referenci a y los reportes del PRE CO-MADR-99656-CS-INDV / Dos analistas de datos que f Project Coordination, Manag ortalezcan las capacidades d TF / A6377 ement, Monitoring and Eval Posterior Individual Open 96,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 el IDEAM de estimación y re uation porte de emisiones y remoci ones de GEI para el sector A FOLU CO-MADR-99653-CS-INDV / Consultor senior para la cons Project Coordination, Manag olidación coordinada del ER- TF / A6377 ement, Monitoring and Eval Posterior Individual Open 100,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 Program a partir de insumos uation técnicos específicos generad os. CO-MADR-99657-CS-INDV / Líder técnico especialista en Project Coordination, Manag Actividades agrícolas que for TF / A6377 ement, Monitoring and Eval Posterior Individual Open 72,000.00 0.00 Cancelado 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 talezca las capacidades del I uation DEAM de estimación y report e, de emisiones y remocione s de GEI para el sector AFOL U Page 5 CO-MADR-157971-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa, apoyando a Sustainable Land- Use Mana la Dirección de Innovación, D TF / A6377 Posterior Individual Open 50,000.00 0.00 Cancelado 2020-02-06 2020-03-11 2020-03-18 2020-04-01 2020-11-02 gement esarrollo Tecnológico y Prote cción Sanitaria del Ministerio de Agricultura y Desarrollo R ural como profesional de apo yo para la formulación CO-MADR-162169-CS-INDV / Sustainable Land- Use Mana TF / A6377 Posterior Individual Open 19,500.00 32,470.39 Firmado 2020-02-28 2020-02-19 2020-03-23 2020-04-16 2020-03-23 2020-04-21 2020-04-10 2020-06-02 2020-08-08 Profesional Pdeas meta gement CO-MADR-158772-CS-INDV / Sustainable Land- Use Mana TF / A6377 Posterior Individual Open 19,500.00 32,470.39 Firmado 2020-02-28 2020-02-29 2020-03-23 2020-04-16 2020-03-23 2020-04-16 2020-04-10 2020-06-02 2020-08-08 Profesional P DEAs vichada gement CO-MADR-162170-CS-INDV / Sustainable Land- Use Mana TF / A6377 Posterior Individual Open 19,500.00 14,549.54 Firmado 2020-02-28 2020-03-19 2020-03-23 2020-04-17 2020-03-23 2020-04-23 2020-04-10 2020-06-02 2020-08-08 Profesional P DEAs Casanar gement e CO-MADR-162171-CS-INDV / Sustainable Land- Use Mana TF / A6377 Posterior Individual Open 19,500.00 32,470.39 Firmado 2020-02-28 2020-02-19 2020-03-23 2020-04-21 2020-03-23 2020-04-21 2020-04-10 2020-06-02 2020-08-08 Profesional P DEAS ARAUCA gement CO-MADR-143404-CS-INDV / Definition of Emission Reduc Apoyo Administrativo - IDEA TF / A6377 tion Program and Monitoring Posterior Individual Open 11,000.00 25,445.05 Firmado 2019-10-29 2019-11-29 2019-11-05 2020-04-25 2020-02-14 2020-01-31 2020-02-19 2020-02-17 2020-08-17 M - Primer año , Reporting and Verification CO-MADR-156564-CS-INDV / Definition of Emission Reduc profesional ambiental-salvag TF / A6377 tion Program and Monitoring Posterior Individual Open 34,000.00 0.00 Cancelado 2020-02-20 2020-03-30 2020-04-20 2020-04-30 2021-04-30 uardas , Reporting and Verification CO-MADR-156563-CS-INDV / Definition of Emission Reduc profesional social -salvaguar TF / A6377 tion Program and Monitoring Posterior Individual Open 34,000.00 0.00 Cancelado 2020-02-20 2020-03-30 2020-04-20 2020-04-30 2021-04-30 das , Reporting and Verification CO-MADR-163818-CS-INDV / Prestar sus servicios profesio nales como coordinador del proceso del estimación y rep Definition of Emission Reduc Selección directa orte de emisiones y remocio TF / A6377 tion Program and Monitoring Posterior Direct 46,000.00 45,112.50 Firmado 2020-04-14 2020-04-16 2020-04-24 2020-04-20 2020-05-16 2020-06-03 2021-05-16 de consultores nes de GI para AFOLU en la , Reporting and Verification Orinoquía, en las categorías relacionadas con actividades agrícolas y su inclusión en el MRV del proyecto CO-MADR-163817-CS-INDV / Prestar sus servicios profesio nales, como coordinador del Definition of Emission Reduc proceso de estimación y rep Selección directa TF / A6377 tion Program and Monitoring Posterior Direct 46,000.00 27,353.81 Firmado 2020-04-14 2020-04-16 2020-04-24 2020-04-20 2020-05-16 2020-06-03 2021-05-16 orte de emisiones y remocio de consultores , Reporting and Verification nes de GEI para el sector AF OLU de la región de la Orino quía, en las categorías relaci onadas con uso y cambios d e uso de la tierra CO-MADR-168115-CS-INDV / Project Coordination, Manag TF / A6377 Posterior Individual Open 70,000.00 124,136.18 Firmado 2020-04-15 2020-04-21 2020-05-06 2020-05-13 2020-05-11 2020-05-13 2020-05-21 2020-06-12 2020-12-31 Coordinador General del Pro ement, Monitoring and Eval yecto uation CO-MADR-149179-CS-INDV / Project Coordination, Manag Profesional de Comunicación TF / A6377 ement, Monitoring and Eval Posterior Individual Open 18,750.00 0.00 Cancelado 2020-02-11 2020-03-31 2020-03-31 2020-05-05 2020-12-25 e intercambio de informació uation n de los resultados del proye cto CO-MADR-172096-CS-INDV / Definition of Emission Reduc Consultor modelamiento del TF / A6377 tion Program and Monitoring Posterior Individual Open 21,243.00 21,626.94 Firmado 2020-05-04 2020-05-06 2020-05-28 2020-07-10 2020-06-02 2020-07-17 2020-06-17 2020-08-20 2021-06-17 riesgo SMByC , Reporting and Verification CO-MADR-172097-CS-INDV / Definition of Emission Reduc Experto encargado de la coo TF / A6377 tion Program and Monitoring Posterior Individual Open 22,449.00 32,232.00 Finalizado 2020-05-04 2020-10-07 2020-05-28 2020-10-28 2020-06-02 2020-10-30 2020-06-17 2021-01-04 2021-06-17 2021-07-31 rdinación para elaboración d , Reporting and Verification el ERPD para la Orinoquia CO-MADR-172098-CS-INDV / Definition of Emission Reduc Intérpretes de imágenes sat TF / A6377 tion Program and Monitoring Posterior Individual Open 48,000.00 19,476.72 Finalizado 2020-05-04 2020-05-06 2020-05-28 2020-07-16 2020-06-02 2020-07-17 2020-06-17 2020-08-20 2021-06-17 2021-05-20 elitales para el Cubo de dato , Reporting and Verification s de IDEAM (x2) CO-MADR-172808-CS-CDS / Consultor junior en suelos ge stionados : Prestar sus servic ios profesionales apoyando a Definition of Emission Reduc la Subdirección del IDEAM, e TF / A6377 tion Program and Monitoring Posterior Individual Direct 26,000.00 30,527.90 Firmado 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 n el proceso de incorporació , Reporting and Verification n de las metodologías paraa estimación de las emisiones asociadas a los suelos gestio nados en el sector AFOLU CO-MADR-172107-CS-CDS / Definition of Emission Reduc Líder temático del Cubo de d TF / A6377 tion Program and Monitoring Posterior Individual Direct 35,200.00 37,572.80 Firmado 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 atos de IDEAM , Reporting and Verification CO-MADR-172800-CS-CDS / Consultor junior para el sect or de uso y cambio de uso d e la tierra: Hidrología, Meteo Definition of Emission Reduc rología y Estudios Ambiental TF / A6377 tion Program and Monitoring Posterior Individual Direct 26,000.00 32,876.20 Firmado 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 es IDEAM, en el proceso de e , Reporting and Verification stimación y reporte de emisi ones y remociones de GEI pa ra el sector AFOLU de la regi ón de la Orinoquía, en las c CO-MADR-172806-CS-CDS / Consultor temático en ganad ería: Prestar sus servicios pr ofesionales apoyando a la Su Definition of Emission Reduc bdirección de Estudios Ambi TF / A6377 tion Program and Monitoring Posterior Individual Direct 26,000.00 30,527.90 Firmado 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 entales del Instituto de Hidro , Reporting and Verification logía, Meteorología y Estudio s Ambientales IDEAM, en el p roceso de ajuste de las meto dologías para la estimación CO-MADR-172796-CS-CDS / Consultor junior en actividad es agrícolas: Prestar sus serv icios profesionales apoyando Definition of Emission Reduc a la Subdirección de Estudio TF / A6377 tion Program and Monitoring Posterior Individual Direct 26,000.00 32,876.20 Firmado 2020-06-02 2020-06-02 2020-06-12 2020-06-03 2020-06-17 2020-06-03 2020-07-11 2020-07-15 2021-07-11 s Ambientales del Instituto d , Reporting and Verification e Hidrología, Meteorología y Estudios Ambientales IDEAM, en el proceso de estimación y reporte de emisiones y CO-MADR-178996-CS-INDV / Integrated Land- Use Planni Apoyo Administrativo Cartas TF / A6377 ng and Improved Governanc Posterior Individual Open 4,970.00 10,564.23 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-10-09 2020-07-09 2020-10-13 2020-08-06 2020-11-11 2021-01-03 del paisaje UIP-UPRA e for Deforestation Control CO-MADR-178997-CS-INDV / Integrated Land- Use Planni Profesional en análisis de sis TF / A6377 ng and Improved Governanc Posterior Individual Open 10,833.00 24,918.73 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-08-19 2020-08-06 2020-09-17 2021-01-03 temas productivos agrícolas e for Deforestation Control del paisaje agropecuario CO-MADR-178999-CS-INDV / Integrated Land- Use Planni Profesional en análisis ambie TF / A6377 ng and Improved Governanc Posterior Individual Open 12,008.00 23,519.47 Finalizado 2020-06-10 2020-06-12 2020-07-04 2020-08-05 2020-07-09 2020-08-06 2020-07-24 2020-09-28 2020-12-21 2021-02-28 ntal y Ecológico del paisaje a e for Deforestation Control gropecuario CO-MADR-179001-CS-INDV / Integrated Land- Use Planni Profesional en comunicación TF / A6377 ng and Improved Governanc Posterior Individual Open 10,833.00 23,461.89 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-08-05 2020-08-06 2020-11-03 2021-01-03 social para el desarrollo del e for Deforestation Control paisaje agropecuario CO-MADR-179002-CS-INDV / Integrated Land- Use Planni Profesional en análisis econó TF / A6377 ng and Improved Governanc Posterior Individual Open 12,008.00 29,122.91 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-08-03 2020-07-09 2020-08-19 2020-08-06 2020-09-17 2021-01-03 mico del paisaje agropecuari e for Deforestation Control o CO-MADR-179003-CS-INDV / Integrated Land- Use Planni Profesional en Ordenamiento TF / A6377 ng and Improved Governanc Posterior Individual Open 14,355.00 11,258.91 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-07-27 2020-07-09 2020-07-28 2020-08-06 2020-09-17 2021-01-03 territorial y prospectiva e for Deforestation Control Page 6 CO-MADR-179004-CS-INDV / Integrated Land- Use Planni Profesional en análisis de sis TF / A6377 ng and Improved Governanc Posterior Individual Open 10,833.00 24,692.98 Firmado 2020-06-10 2020-06-12 2020-07-04 2020-07-29 2020-07-09 2020-07-29 2020-08-06 2020-09-28 2021-01-03 temas productivos pecuarios e for Deforestation Control del paisaje agropecuario CO-MADR-181730-CS-INDV / Gestor Técnico gestión de la Integrated Land- Use Planni información apoyando al De TF / A6377 ng and Improved Governanc Posterior Individual Direct 34,000.00 0.00 Cancelado 2020-06-24 2020-06-29 2020-07-04 2020-07-19 2021-07-19 partamento Nacional de Plan e for Deforestation Control eación, DNP para la impleme ntación y seguimiento técnic o del componente 1 CO-MADR-181986-CS-INDV / Definition of Emission Reduc Consultor técnico de cambio TF / A6377 tion Program and Monitoring Posterior Individual Open 32,728.00 28,674.00 Firmado 2020-06-25 2020-06-26 2020-07-24 2020-08-26 2020-07-29 2020-08-26 2020-08-20 2020-09-29 2021-08-20 climático para el MADS , Reporting and Verification Definition of Emission Reduc CO-MADR-181989-CS-INDV / TF / A6377 tion Program and Monitoring Posterior Individual Open 32,728.00 35,606.14 Firmado 2020-06-25 2020-06-26 2020-07-24 2020-08-26 2020-07-29 2020-09-02 2020-08-20 2020-09-28 2021-08-20 Asesor jurídico y legal , Reporting and Verification CO-MADR-182723-CS-INDV / Gestor Técnico gestión de la Integrated Land- Use Planni información apoyando al De TF / A6377 ng and Improved Governanc Posterior Individual Direct 34,000.00 41,126.07 Firmado 2020-06-30 2020-03-12 2020-07-10 2020-05-29 2020-07-15 2020-05-29 2020-08-04 2020-07-15 2021-08-04 partamento Nacional de Plan e for Deforestation Control eación, DNP para la impleme ntación y seguimiento técnic o del componente 1 CO-MADR-182724-CS-INDV / Integrated Land- Use Planni Profesional experto en desar TF / A6377 ng and Improved Governanc Posterior Individual Open 13,388.00 26,658.52 Firmado 2020-07-03 2020-07-16 2020-08-01 2020-09-21 2020-08-06 2020-09-24 2020-08-30 2020-12-17 2021-01-27 rollo sostenible bajo en carb e for Deforestation Control ono CO-MADR-184009-CS-INDV / Integrated Land- Use Planni Profesional ecología del pais TF / A6377 ng and Improved Governanc Posterior Individual Direct 13,388.33 35,168.98 Firmado 2020-07-15 2020-07-16 2020-07-25 2020-08-14 2020-07-30 2020-08-19 2020-08-23 2020-09-03 2021-01-20 aje y sensoramiento remoto e for Deforestation Control CO-MADR-190104-CS-CDS / Actualización de los inventar ios de GEI con proxys para lo Definition of Emission Reduc Selección directa s 59 municipios de la región TF / A6377 tion Program and Monitoring Posterior Direct 85,000.00 84,982.67 Firmado 2020-08-24 2020-08-25 2020-09-24 2020-09-28 2020-10-28 2021-02-01 2020-12-27 de consultores de la Orinoquía, dentro del C , Reporting and Verification omponente 3: Preparación d el Programa de Reducción d e Emisiones y del MRV CO-MADR-190915-CS-INDV / Prestar sus servicios profesio nales como consultor SOCIAL de salvaguardas con autono Definition of Emission Reduc mía técnica apoyando a la U TF / A6377 tion Program and Monitoring Posterior Individual Direct 34,000.00 34,811.85 Firmado 2020-08-27 2020-08-31 2020-08-29 2020-08-27 2020-09-03 2020-08-27 2020-10-01 2020-09-28 2021-10-01 nidad Implementadora del Pr , Reporting and Verification oyecto, UIP, al Ministerio de Agricultura y Desarrollo Rura l, bajo la orientación del Mini sterio de Ambiente y Desarr CO-MADR-194082-CS-INDV / Prestar sus servicios profesio nales en la realización de lo s procesos de adquisiciones Project Coordination, Manag y contrataciones que se requ TF / A6377 ement, Monitoring and Eval Posterior Individual Direct 47,287.00 50,851.48 Firmado 2020-09-17 2020-09-18 2020-09-21 2020-09-16 2020-09-23 2020-09-16 2020-10-12 2020-10-16 2021-10-12 ieran, de acuerdo con lo esta uation blecido en el Acuerdo Legal, el Manual Operativo del Proy ecto, el Plan de Adquisicione s y las Regulaciones de CO-MADR-197661-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6377 tion Program and Monitoring Posterior Individual Open 21,825.00 0.00 Cancelado 2020-10-21 2020-11-17 2020-11-20 2020-11-30 2020-11-20 2020-12-09 2021-12-09 IDEAM como profesional exp , Reporting and Verification erto para realizar la descarg a y procesamiento de imáge nes, interpretación digital, v alidación, reporte y ajustes n CO-MADR-199053-CS-INDV / Prestar sus servicios profesio nales apoyando a la Secretar ia técnica del Nodo Regional Integrated Land- Use Planni de Cambio Climático de la Or TF / A6376 ng and Improved Governanc Posterior Individual Open 28,991.00 27,892.92 Firmado 2020-10-14 2020-12-29 2020-11-14 2021-01-19 2020-11-16 2021-04-10 2020-12-05 2021-05-04 2021-12-05 inoquia – NORECCO (CORMA e for Deforestation Control CARENA), como consultor de apoyo para orientar, implem entar y hacer seguimiento a la estrategia de Fortalecimie nto d CO-MADR-199054-CS-INDV / consultor de apoyo técnico p ara la implementación y seg Integrated Land- Use Planni uimiento de medidas de cam TF / A6376 ng and Improved Governanc Posterior Individual Open 100,905.00 85,326.92 Firmado 2020-10-14 2021-01-18 2020-11-14 2021-01-21 2020-11-16 2021-04-12 2020-12-05 2021-05-07 2021-12-05 bio climático territoriales, co e for Deforestation Control n un enfoque al ordenamient o territorial y el fomento de un desarrollo sostenible bajo en carbono (4) CO-MADR-199055-CS-INDV / facilitador para preparar el d iseño metodológico, realizar Integrated Land- Use Planni la moderación, desarrollar, a TF / A6376 ng and Improved Governanc Posterior Individual Open 25,226.00 21,480.47 Firmado 2020-10-14 2020-12-29 2020-11-14 2021-02-08 2020-11-16 2021-04-06 2020-12-05 2021-05-07 2021-12-05 nalizar, documentar y sistem e for Deforestation Control atizar los espacios de partici pación y para la socio constr ucción del conocimiento CO-MADR-199058-CS-INDV / consultor de apoyo técnico p ara la implementación y seg Integrated Land- Use Planni uimiento de medidas de cam TF / A6376 ng and Improved Governanc Posterior Individual Open 25,226.00 21,480.47 Firmado 2020-10-14 2020-12-29 2020-11-14 2021-02-08 2020-11-16 2021-04-08 2020-12-05 2021-05-07 2021-12-05 bio climático en el ordenami e for Deforestation Control ento territorial, en el cumpli miento de los PIGCCT y com o enlace de NORECCO en juri sdicción de CORPORINOQUIA , CO-MADR-199069-CS-INDV / Prestar sus servicios como el Profesional en análisis socio- Integrated Land- Use Planni cultural del paisaje agropecu TF / A6376 ng and Improved Governanc Posterior Individual Direct 10,197.00 21,444.87 Firmado 2020-10-09 2020-10-16 2020-10-17 2020-10-13 2020-10-20 2020-10-19 2020-11-08 2020-11-11 2021-04-07 ario, para desarrollar el com e for Deforestation Control ponente socio-cultural de la f ormulación de las Cartas del paisaje agropecuario. CO-MADR-197659-CS-INDV / Consultor Temático forestal quien prestara sus servicios Definition of Emission Reduc profesionales en el análisis d TF / A6377 tion Program and Monitoring Posterior Individual Open 25,462.00 0.00 Cancelado 2020-10-09 2020-10-16 2020-11-12 2020-11-12 2020-12-01 2021-12-01 e bases de datos de activida , Reporting and Verification d alfanuméricos y geográfico s requeridos para la estimaci ón y el reporte de emisiones y remociones de GEI del sect or AFOLU CO-MADR-201159-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica Project Coordination, Manag y administrativa, apoyando a TF / A6376 ement, Monitoring and Eval Posterior Individual Direct 34,781.00 32,009.76 Firmado 2020-10-22 2020-11-03 2020-11-01 2020-10-22 2020-11-22 2020-11-25 2020-12-27 2020-11-25 2021-06-25 la UIP y a la Dirección de Inn uation ovación, Desarrollo Tecnológ ico y Protección Sanitaria de l MADR como Asesor (a) de C omunicaciones y Participacio n CO-MADR-200275-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica Definition of Emission Reduc , como ingeniero de sistema TF / A6376 tion Program and Monitoring Posterior Individual Direct 30,121.00 27,234.24 Firmado 2020-11-03 2020-11-03 2020-11-09 2020-11-04 2020-11-12 2020-11-04 2020-12-01 2020-12-01 2021-12-01 s generando los desarrollos t , Reporting and Verification ecnológicos necesarios para la captura, almacenamiento, procesamiento, análisis y div ulgación de la información d el IFN Page 7 CO-MADR-200277-CS-INDV / Profesional de Calidad Opera ción estadística Inventario F orestal Nacional, para la impl Definition of Emission Reduc ementación de las operacion TF / A6376 tion Program and Monitoring Posterior Individual Direct 30,121.00 26,402.88 Firmado 2020-11-03 2020-11-03 2020-11-09 2020-11-03 2020-11-12 2020-11-03 2020-12-01 2020-12-01 2021-12-01 es estadísticas de USO DE L , Reporting and Verification OS RECURSOS FORESTALES- URFN, y de INVENTARIO FOR ESTAL NACIONAL-IFN, y de lo s procesos para la interopera bilidad CO-MADR-179000-CS-INDV / Integrated Land- Use Planni Profesional en análisis socio- TF / A6377 ng and Improved Governanc Posterior Individual Open 10,833.00 0.00 Cancelado 2020-06-10 2020-08-20 2020-07-04 2020-07-09 2020-08-06 2021-01-03 cultural del paisaje agropecu e for Deforestation Control ario CO-MADR-99660-CS-INDV / Líder técnico de apoyo para Project Coordination, Manag la estimación y el reporte de TF / A6377 ement, Monitoring and Eval Posterior Individual Open 78,000.00 0.00 Cancelado 2019-04-25 2019-05-14 2019-05-21 2019-06-02 2019-11-29 emisiones y remociones de uation GEI para el sector AFOLU CO-MADR-200276-CS-INDV / Prestar sus servicios profesio nales como consultor expert o coordinando la caracteriza Definition of Emission Reduc ción de las causas y agentes TF / A6376 tion Program and Monitoring Posterior Individual Direct 37,021.00 33,143.39 Firmado 2020-11-19 2020-11-20 2020-11-25 2020-11-03 2020-11-28 2020-12-17 2020-12-17 2020-12-17 2021-12-17 de la transformación del bos , Reporting and Verification que y sus emisiones asociad as, los procesos de modelaci ón y el monitoreo comunitari o participativo CO-MADR-201844-CS-INDV / Prestar sus servicios profesio nales apoyando a la Subdire cción de Estudios Ambiental Definition of Emission Reduc es del Instituto de Hidrología TF / A6376 tion Program and Monitoring Posterior Individual Direct 25,462.00 23,102.52 Firmado 2020-11-19 2020-11-20 2020-11-29 2020-11-20 2020-12-20 2020-11-20 2021-01-24 2020-12-16 2021-07-23 , Meteorología y Estudios Am , Reporting and Verification bientales IDEAM, en el proc eso de incorporación y gener ación de propuesta metodoló gica y seguimiento de accion es CO-MADR-178998-CS-INDV / Integrated Land- Use Planni Profesional en análisis socio- TF / A6377 ng and Improved Governanc Posterior Individual Open 10,833.00 0.00 Cancelado 2020-06-10 2020-08-20 2020-07-04 2020-07-09 2020-08-06 2021-01-03 cultural del paisaje agropecu e for Deforestation Control ario CO-MADR-205823-CS-CDS / Prestar sus servicios como el Profesional en análisis socioc Integrated Land- Use Planni ultural del paisaje agropecua TF / A6376 ng and Improved Governanc Posterior Individual Direct 10,833.00 18,312.01 Firmado 2020-11-27 2020-11-23 2020-12-07 2020-11-23 2020-12-28 2020-11-23 2021-02-01 2021-01-15 2021-07-31 rio, para desarrollar el comp e for Deforestation Control onente sociocultural de la for mulación de las Cartas del p aisaje agropecuario CO-MADR-208056-CS-INDV / Prestar sus servicios profesio nales apoyando a la Subdire cción de Estudios Ambiental Definition of Emission Reduc es del Instituto de Hidrología TF / A6376 tion Program and Monitoring Posterior Individual Limited 25,462.00 23,599.80 Firmado 2020-12-10 2020-12-07 2020-12-15 2020-12-15 2021-01-05 2021-01-21 2021-02-09 2021-02-19 2021-08-08 , Meteorología y Estudios Am , Reporting and Verification bientales IDEAM, en el anális is de bases de datos de activ idad alfanuméricos y geográf icos requeridos para la est CO-MADR-209804-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del p Integrated Land- Use Planni aisaje agropecuario, para ap TF / A6377 ng and Improved Governanc Posterior Individual Direct 26,107.00 24,198.22 Finalizado 2020-12-22 2020-12-16 2021-01-01 2020-12-16 2021-01-22 2020-12-17 2021-02-26 2021-01-15 2022-02-26 2021-10-04 oyar la coordinación de la for e for Deforestation Control mulación de la Carta del pais aje agropecuario, brindado e l enfoque de ordenamiento t erritorial en todo el pr CO-MADR-197660-CS-INDV / Prestar servicios profesional Definition of Emission Reduc es para el el control de calid TF / A6377 tion Program and Monitoring Posterior Individual Open 164,000.00 0.00 Cancelado 2020-10-12 2020-11-20 2020-11-11 2020-11-11 2020-11-30 2021-11-30 ad de datos de campo del in , Reporting and Verification ventario forestal de la Orino quia (x5) CO-MADR-211405-CS-INDV / Apoyar al especialista de ad quisiciones en la realización de los procesos de adquisici Project Coordination, Manag ones y contrataciones que s TF / A6376 ement, Monitoring and Eval Posterior Individual Direct 23,576.00 21,110.86 Firmado 2021-02-08 2021-02-05 2021-02-18 2021-02-05 2021-03-11 2021-02-09 2021-04-15 2021-02-15 2021-10-12 e requieran, de acuerdo con uation lo establecido en el Acuerdo Legal, el Manual Operativo d el Proyecto, el Plan de Adqui siciones y las Regulaciones CO-MADR-215613-CS-INDV / Apoyar al especialista financi ero del Proyecto BIOCARBON Project Coordination, Manag O en la gestión financiera d TF / A6376 ement, Monitoring and Eval Posterior Individual Direct 23,576.00 21,110.86 Firmado 2021-02-08 2021-02-05 2021-02-18 2021-02-05 2021-03-11 2021-02-05 2021-04-15 2021-02-15 2021-10-12 el proyecto, de acuerdo con l uation o establecido en el Acuerdo Legal, el Manual Operativo d el Proyecto y el Plan de Adqu isiciones CO-MADR-217660-CS-INDV / Prestar sus servicios persona les apoyando a la Unidad de Implementación del Proyecto Definition of Emission Reduc (UIP) en la implementación d TF / A6376 tion Program and Monitoring Posterior Individual Limited 2,000.00 1,665.34 Firmado 2021-02-15 2021-02-03 2021-02-20 2021-03-01 2021-03-13 2021-03-08 2021-04-17 2021-04-14 2021-10-14 e los procesos de gestión de , Reporting and Verification conocimiento a partir de la i nformación sobre las práctic as bajas en carbono para las cadenas priorizadas y las p CO-MADR-217665-CS-INDV / Apoyar a la Subdirección de Ecosistemas e Información A mbiental del Instituto de Hid Definition of Emission Reduc rología, Meteorología y Estud TF / A6376 tion Program and Monitoring Posterior Individual Open 50,832.00 21,088.35 Firmado 2021-02-22 2021-02-16 2021-04-12 2021-03-15 2021-05-03 2021-04-30 2021-06-07 2021-05-21 2021-12-04 ios Ambientales IDEAM, en la , Reporting and Verification verificación de las actividade s que adelanten las brigadas en campo para el levantamie nto de los conglomerados, d CO-MADR-217669-CS-INDV / Realizar el análisis de inform ación a través de SIG para el Definition of Emission Reduc soporte al marco geoestadíst TF / A6376 tion Program and Monitoring Posterior Individual Limited 54,000.00 16,402.05 Firmado 2021-02-22 2021-02-16 2021-02-27 2021-03-03 2021-03-20 2021-05-04 2021-04-24 2021-05-21 2021-10-21 ico como apoyo a la operació , Reporting and Verification n en campo y la generación de cartografía relacionada c on la implementación del IFN en la región de la Orinoquia CO-MADR-217672-CS-INDV / Apoyar los procesos de capa citación en los procedimient os metodológicos del IFN, el Definition of Emission Reduc análisis de la información, el TF / A6376 tion Program and Monitoring Posterior Individual Open 24,161.00 18,050.20 Firmado 2021-02-22 2021-02-16 2021-04-12 2021-03-15 2021-05-03 2021-07-14 2021-06-07 2021-07-29 2021-12-04 seguimiento a las actividade , Reporting and Verification s de campo y al aseguramie nto, control de calidad y críti ca de los procesos de superv isión propios del IFN CO-MADR-217673-CS-INDV / Consultor desarrollador para Definition of Emission Reduc consolidar la nueva platafor TF / A6376 tion Program and Monitoring Posterior Individual Open 18,826.00 0.00 Cancelado 2021-02-22 2021-03-15 2021-04-12 2021-05-03 2021-06-07 2021-12-04 ma informática que permite l , Reporting and Verification a captura y administración d e datos del Inventario Forest al Nacional - IFN CO-MADR-218247-CS-INDV / Fortalecer las capacidades d e la Dirección de Cambio Cli Definition of Emission Reduc mático y Gestión del Riesgo TF / A6376 tion Program and Monitoring Posterior Individual Limited 36,000.00 0.00 Cancelado 2021-03-12 2021-03-17 2021-04-07 2021-05-12 2021-11-08 (DCCGR) del MADS para la fo , Reporting and Verification rmulación, cuantificación, re porte y registro de iniciativas de mitigación de GEI Page 8 CO-MADR-218248-CS-INDV / Realizar el diseño, validación Definition of Emission Reduc metodológica e implementac TF / A6376 tion Program and Monitoring Posterior Individual Limited 35,000.00 18,224.50 Firmado 2021-02-15 2021-04-05 2021-02-20 2021-04-27 2021-03-13 2021-06-01 2021-04-17 2021-07-01 2021-10-14 ión del sistema de monitoreo , Reporting and Verification , reporte y verificación del se ctor AFOLU e n la Orinoquia CO-MADR-218249-CS-INDV / Definition of Emission Reduc Realizar la identificación de TF / A6376 tion Program and Monitoring Posterior Individual Limited 35,000.00 15,957.00 Firmado 2021-02-15 2021-04-05 2021-02-20 2021-04-22 2021-03-13 2021-06-17 2021-04-17 2021-07-08 2021-10-14 Beneficios No carbono del E , Reporting and Verification RPD CO-MADR-218255-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Subdirección Definition of Emission Reduc de Estudios Ambientales del TF / A6376 tion Program and Monitoring Posterior Individual Limited 30,191.00 0.00 Cancelado 2021-02-19 2021-02-24 2021-03-17 2021-04-21 2021-10-18 Instituto de Hidrología, Mete , Reporting and Verification orología y Estudios Ambienta les IDEAM, en el diseño y vali dación metodológica del sist ema de monitoreo, reporte CO-MADR-199085-CS-INDV / Diseñar la estrategia de inter operabilidad para recopilar y Integrated Land- Use Planni procesar información espaci TF / A6376 ng and Improved Governanc Posterior Individual Open 33,886.00 0.00 Cancelado 2021-02-22 2021-03-25 2021-03-27 2021-04-15 2022-04-15 al y geográfica del área de in e for Deforestation Control tervención del Proyecto Bioc arbono y entidades beneficia rias CO-MADR-218260-CS-INDV / Apoyar la recopilación y proc Integrated Land- Use Planni esamiento de información es TF / A6376 ng and Improved Governanc Posterior Individual Open 23,340.00 0.00 Cancelado 2021-02-25 2021-04-15 2021-05-06 2021-06-10 2021-12-07 pacial y geográfica del área e for Deforestation Control de intervención del Proyecto Biocarbono, y Minagricultur a CO-MADR-201950-CS-INDV / Apoyar la formulación, imple mentación y seguimiento de Sustainable Land- Use Mana estrategias asociadas al fort TF / A6376 Posterior Individual Open 36,000.00 0.00 Cancelado 2021-02-22 2021-03-23 2021-04-02 2021-05-07 2022-05-07 gement alecimiento institucional de l as mesas de ganadería soste nible de la Orinoquia y su de sarrollo sostenible bajo en ca rbono CO-MADR-201953-CS-INDV / Apoyar el fortalecimiento de las mesas de ganadería sost Sustainable Land- Use Mana enible departamentales de l TF / A6376 Posterior Individual Open 94,000.00 53,382.42 Firmado 2021-02-22 2021-03-25 2021-03-23 2021-03-29 2021-04-02 2021-06-18 2021-05-07 2021-07-06 2022-05-07 gement a Orinoquia (Meta, Casanare, Arauca y Vichada) y el desar rollo regional sostenible bajo en carbono CO-MADR-218459-CS-INDV / Fortalecer la institucionalida d regional del SNIA (Sistema Sustainable Land- Use Mana s Territoriales Innovación, m TF / A6376 Posterior Individual Limited 25,000.00 22,049.00 Firmado 2021-03-01 2021-02-24 2021-03-06 2021-05-18 2021-03-27 2021-07-06 2021-05-01 2021-07-08 2021-10-28 gement esas departamentales de C& T, innovación, actualización PECTIA, C&T regalías, superv isión apoyos profesionales P DEA) CO-MADR-218460-CS-INDV / Apoyo para la puesta en mar Sustainable Land- Use Mana cha y el seguimiento del PIG TF / A6376 Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-03-01 2021-03-06 2021-03-27 2021-05-01 2021-10-28 gement CC sector agropecuario / ND C 2020 por parte del MADR CO-MADR-218461-CS-INDV / Apoyo seguimiento y supervi Sustainable Land- Use Mana TF / A6376 Posterior Individual Limited 25,000.00 22,709.45 Firmado 2021-03-01 2021-02-24 2021-03-06 2021-03-02 2021-03-27 2021-04-13 2021-05-01 2021-04-21 2021-10-28 sión del proyecto BIOCARBO gement NO ORINOQUIA por parte de la DIDTPS CO-MADR-222427-CS-INDV / Project Coordination, Manag Prestar servicios profesional TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 6,903.00 7,300.16 Firmado 2021-03-29 2021-05-26 2021-04-03 2021-05-31 2021-04-24 2021-07-01 2021-05-29 2021-07-14 2021-11-25 es como apoyo administrativ uation o regional CO-MADR-223832-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa, apoyando a Project Coordination, Manag la Dirección de Innovación, D TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 21,964.00 0.00 Cancelado 2021-03-15 2021-03-17 2021-03-20 2021-04-12 2021-04-10 2021-05-15 2021-11-11 esarrollo Tecnológico y Prote uation cción Sanitaria del Ministerio de Agricultura y Desarrollo R ural, como apoyo departame ntal del Proyecto Biocar CO-MADR-223836-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa, apoyando a Sustainable Land- Use Mana la Dirección de Innovación, D TF / A6376 Posterior Individual Limited 20,803.00 17,768.89 Firmado 2021-03-15 2021-03-10 2021-03-20 2021-03-12 2021-04-10 2021-04-27 2021-05-15 2021-05-12 2021-11-11 gement esarrollo Tecnológico y Prote cción Sanitaria del Ministerio de Agricultura y Desarrollo R ural como profesional de apo yo para la formulación CO-MADR-222434-CS-INDV / Realizar el análisis del cambi o de uso del suelo en las cat egorías clave a ser incluidas Definition of Emission Reduc en la estimación de línea bas TF / A6376 tion Program and Monitoring Posterior Individual Direct 3,187.00 0.00 Cancelado 2021-03-15 2021-03-09 2021-03-25 2021-04-15 2021-05-20 2021-11-16 e, escenario de referencia y l , Reporting and Verification os reportes del programa de reducción de emisiones cons iderando usos forestales, agr ícolas y otros tipos de CO-MADR-224148-CS-INDV / Realizar el análisis del cambi o de uso del suelo en las cat egorías clave a ser incluidas Definition of Emission Reduc en la estimación de línea bas TF / A6376 tion Program and Monitoring Posterior Individual Direct 13,179.00 10,934.70 Firmado 2021-03-15 2021-03-10 2021-03-25 2021-03-12 2021-04-15 2021-04-07 2021-05-20 2021-04-07 2021-11-16 e, escenario de referencia y l , Reporting and Verification os reportes del programa de reducción de emisiones cons iderando usos forestales, agr ícolas y otros tipos de CO-MADR-228016-CS-INDV / Análisis del cambio de uso d el suelo en las categorías cla ve a ser incluidas en la estim Definition of Emission Reduc ación de línea base, escenari TF / A6376 tion Program and Monitoring Posterior Individual Direct 19,906.00 18,745.20 Firmado 2021-04-12 2021-04-15 2021-04-22 2021-04-22 2021-04-27 2021-05-03 2021-06-01 2021-05-18 2021-11-28 o de referencia y los reporte , Reporting and Verification s del programa de reducción de emisiones considerando u sos forestales, agrícolas y ot ros tipos de cobertura v CO-MADR-230636-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa para apoyar Sustainable Land- Use Mana a la Unidad Implementadora TF / A6376 Posterior Individual Direct 36,000.00 32,804.10 Firmado 2021-04-23 2021-04-26 2021-05-03 2021-04-22 2021-05-24 2021-05-07 2021-06-28 2021-05-10 2021-12-25 gement del Proyecto Biocarbono UIP en la formulación y seguimie nto de iniciativas relacionad as con la validación de mode los productivos sostenibles CO-MADR-218262-CS-INDV / Apoyar la recopilación y proc Integrated Land- Use Planni esamiento de información es TF / A6376 ng and Improved Governanc Posterior Individual Open 23,340.00 0.00 Cancelado 2021-02-25 2021-04-15 2021-05-06 2021-06-10 2021-12-07 pacial y geográfica del área e for Deforestation Control de intervención para la regió n CO-MADR-218267-CS-INDV / Integrated Land- Use Planni Asesorar la implementación TF / A6376 ng and Improved Governanc Posterior Individual Open 31,000.00 0.00 Cancelado 2021-03-15 2021-05-03 2021-05-24 2021-06-28 2021-12-25 de estrategia de gobernanza e for Deforestation Control y control de la deforestación Page 9 CO-MADR-218268-CS-INDV / Integrated Land- Use Planni Apoyar la Implementación d TF / A6376 ng and Improved Governanc Posterior Individual Open 24,371.00 0.00 Cancelado 2021-04-15 2021-06-03 2021-06-24 2021-07-29 2022-01-25 e la estrategia de control a l e for Deforestation Control a deforestación (uno por foc o de deforestación) CO-MADR-231537-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa apoyando al Integrated Land- Use Planni Ministerio de Agricultura y D TF / A6376 ng and Improved Governanc Posterior Individual Limited 33,886.00 22,216.32 Firmado 2021-04-30 2021-05-04 2021-05-05 2021-06-02 2021-05-26 2021-09-17 2021-06-30 2021-09-27 2021-12-27 esarrollo Rural (Min agricultu e for Deforestation Control ra) y a la Unidad Implementa dora del Proyecto Biocarbon o en la gestión y procesamie nto de la información espa CO-MADR-231548-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa apoyando al Integrated Land- Use Planni Ministerio de Agricultura y D TF / A6376 ng and Improved Governanc Posterior Individual Limited 23,340.00 31,878.00 Firmado 2021-04-30 2021-05-04 2021-05-05 2021-06-02 2021-05-26 2021-10-05 2021-06-30 2021-10-11 2021-12-27 esarrollo Rural (Minagricultur e for Deforestation Control a) y la Unidad Implementado ra del Proyecto Biocarbono U IP como gestor para el desa rrollo la estrategia de fo CO-MADR-230654-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa apoyando al Integrated Land- Use Planni Ministerio de Agricultura y D TF / A6376 ng and Improved Governanc Posterior Individual Limited 42,000.00 14,757.68 Firmado 2021-04-26 2021-05-04 2021-05-01 2021-07-28 2021-05-22 2021-12-27 2021-06-26 2022-02-18 2021-12-23 esarrollo Rural (Min agricultu e for Deforestation Control ra) desde CORPORINOQUIA y o CORMACARENA como apoy o técnico para la implementa ción del Sistema de Informac ión CO-MADR-230658-CS-INDV / Prestar sus servicios como G estor técnico de gobernanza y control a la deforestación, Integrated Land- Use Planni desde la Dirección de Bosqu TF / A6376 ng and Improved Governanc Posterior Individual Limited 31,000.00 18,657.36 Firmado 2021-04-30 2021-05-04 2021-05-05 2021-06-09 2021-05-26 2021-07-14 2021-06-30 2021-07-30 2021-12-27 es, Biodiversidad y Servicios e for Deforestation Control Ecosistémicos del Ministerio de Ambiente y Desarrollo So stenible, para la formulación, seguimiento y cumplimient CO-MADR-230661-CS-INDV / Apoyar a la Dirección de Bos ques, Biodiversidad y Servici os Ecosistémicos del Minister Integrated Land- Use Planni io de Ambiente y Desarrollo TF / A6376 ng and Improved Governanc Posterior Individual Limited 37,371.00 29,850.24 Firmado 2021-04-30 2021-05-04 2021-05-05 2021-08-27 2021-05-26 2022-01-21 2021-06-30 2022-03-04 2021-12-27 Sostenible, a la Unidad imple e for Deforestation Control mentadora del Proyecto, y a los respectivos Departament os en la planeación, progra mación, ejecución, monitore o CO-MADR-231771-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa a la Direcció Sustainable Land- Use Mana n de Innovación, Desarrollo T TF / A6376 Posterior Individual Limited 10,971.00 10,212.48 Firmado 2021-04-30 2021-05-05 2021-05-05 2021-05-07 2021-05-26 2021-06-02 2021-06-30 2021-06-08 2021-12-27 gement ecnológico y Protección Sani taria del Ministerio de Agricu ltura y Desarrollo Rural com o apoyo operativo para el se guimiento del Proyecto B CO-MADR-232603-CS-INDV / Prestar sus servicios profesio nales apoyando a la Unidad I mplementadora del Proyecto Definition of Emission Reduc UIP, para la construcción del TF / A6376 tion Program and Monitoring Posterior Individual Open 22,857.00 0.00 Cancelado 2021-05-07 2021-05-04 2021-06-25 2021-07-16 2021-08-20 2022-02-16 Marco de Gestión Ambiental , Reporting and Verification y Social del Programa de Re ducción de Emisiones para la Orinoquia, de acuerdo con lo s lineamientos de la Iniciati CO-MADR-232604-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Dirección de Definition of Emission Reduc Cambio Climático y Gestión TF / A6376 tion Program and Monitoring Posterior Individual Open 22,286.00 0.00 Cancelado 2021-05-07 2021-05-31 2021-06-25 2021-07-16 2021-08-20 2022-02-16 del Riesgo del Ministerio de , Reporting and Verification Ambiente y Desarrollo Soste nible (MADS), en el seguimie nto de las acciones y política s de reducción a la deforest CO-MADR-232605-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa para apoyar Sustainable Land- Use Mana al MADR – Dirección de Inno TF / A6376 Posterior Individual Limited 24,286.00 23,180.52 Firmado 2021-05-07 2021-07-28 2021-05-12 2022-02-28 2021-06-02 2022-06-14 2021-07-07 2022-06-29 2022-01-03 gement vación, Desarrollo Tecnológi co y Protección Sanitaria en el desarrollo de agroecosiste mas ganaderos sostenibles b ajos en carbono en la Orinoq CO-MADR-234657-CS-INDV / Prestar sus servicios profesio Integrated Land- Use Planni nales como Gestor Senior pa TF / A6376 ng and Improved Governanc Posterior Individual Direct 24,000.00 22,991.64 Firmado 2021-05-19 2021-05-22 2021-05-22 2021-05-26 2021-05-25 2021-05-26 2021-06-04 2021-06-01 2021-12-31 ra el seguimiento y monitore e for Deforestation Control o del proyecto Desarrollo So stenible Bajo en Carbono en la Región de la Orinoquia CO-MADR-235332-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa apoyando al Integrated Land- Use Planni Ministerio de Agricultura y D TF / A6376 ng and Improved Governanc Posterior Individual Limited 10,293.00 5,642.81 Firmado 2021-05-24 2021-05-28 2021-05-29 2021-06-15 2021-06-19 2021-08-31 2021-07-24 2021-09-01 2022-01-20 esarrollo Rural (Min agricultu e for Deforestation Control ra) y específicamente a la U nidad de Planificación Rural Agropecuaria (UPRA) y a la U nidad Implementadora del CO-MADR-234498-CS-INDV / Prestar sus servicios como el Profesional en Ordenamiento territorial y prospectiva del p Integrated Land- Use Planni aisaje agropecuario, para ap TF / A6376 ng and Improved Governanc Posterior Individual Direct 13,535.00 14,402.39 Firmado 2021-05-21 2021-05-22 2021-05-31 2021-05-12 2021-06-21 2021-06-03 2021-07-26 2021-06-21 2022-01-22 oyar la coordinación de la for e for Deforestation Control mulación de la Carta del pais aje agropecuario, brindado e l enfoque de ordenamiento t erritorial en todo el pr CO-MADR-237680-CS-INDV / Definition of Emission Reduc Profesional análisis distribuci TF / A6376 tion Program and Monitoring Posterior Individual Limited 12,641.00 11,701.65 Firmado 2021-06-04 2021-07-14 2021-06-09 2021-07-23 2021-06-30 2021-09-17 2021-08-04 2021-10-01 2022-01-31 ón de la propiedad en la Orin , Reporting and Verification oquia CO-MADR-237682-CS-INDV / Definition of Emission Reduc Prestar servicios como Profe TF / A6376 tion Program and Monitoring Posterior Individual Limited 12,641.00 11,701.65 Firmado 2021-06-04 2021-07-14 2021-06-09 2021-07-23 2021-06-30 2021-09-27 2021-08-04 2021-10-11 2022-01-31 sional para el diagnóstico de , Reporting and Verification la tenencia de la tierra en la Orinoquía CO-MADR-237683-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica y administrativa, apoyando a Project Coordination, Manag la Dirección de Innovación, D TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 20,000.00 18,174.80 Firmado 2021-06-04 2021-06-11 2021-06-09 2021-06-24 2021-06-30 2021-08-04 2021-08-04 2021-08-06 2022-01-31 esarrollo Tecnológico y Prote uation cción Sanitaria del Ministerio de Agricultura y Desarrollo R ural, como apoyo departame ntal del Proyecto Biocar CO-MADR-240007-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Dirección de Definition of Emission Reduc Cambio Climático y Gestión TF / A6376 tion Program and Monitoring Posterior Individual Limited 24,474.00 20,362.68 Firmado 2021-06-18 2021-06-16 2021-06-23 2021-06-17 2021-07-14 2021-09-02 2021-08-18 2021-09-13 2022-08-18 del Riesgo del Ministerio de , Reporting and Verification Ambiente y Desarrollo Soste nible (MADS), en el seguimie nto de las acciones y política s de reducción a la deforest Page 10 CO-MADR-240822-CS-INDV / Integrated Land- Use Planni Coordinador infraestructura TF / A6376 ng and Improved Governanc Posterior Individual Limited 39,663.00 33,713.01 Firmado 2021-06-28 2021-11-19 2021-07-03 2022-01-21 2021-07-24 2022-03-28 2021-08-28 2022-04-21 2022-08-28 de datos MADR-UPRA e for Deforestation Control Definition of Emission Reduc CO-MADR-240877-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Direct 13,714.00 12,530.88 Firmado 2021-06-22 2021-06-23 2021-07-02 2021-06-24 2021-07-23 2021-06-24 2021-08-27 2021-08-02 2022-02-23 Consultor mapas biomasa , Reporting and Verification CO-MADR-218462-CS-INDV / Apoyo encadenamientos pro Sustainable Land- Use Mana TF / A6376 Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-03-01 2021-03-06 2021-03-27 2021-05-01 2021-10-28 ductivos y circuitos cortos ba gement jos en carbono & negocios v erdes CO-MADR-218276-CS-INDV / Evaluar y consolidar propues Sustainable Land- Use Mana TF / A6376 Posterior Individual Open 55,000.00 0.00 Cancelado 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2022-02-09 ta de turismo sostenible aso gement ciado al sector AFOLU CO-MADR-218241-CS-INDV / Prestar sus servicios profesio nales como intérprete junior Definition of Emission Reduc 1 para análisis de cambio de TF / A6376 tion Program and Monitoring Posterior Individual Limited 11,000.00 0.00 Cancelado 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-10-14 uso del suelo en el cubo de d , Reporting and Verification atos del Sistema de Monitore o de Bosques y Carbono (SM ByC) del IDEAM CO-MADR-218242-CS-INDV / Consultor individual par el a nálisis de incertidumbre de d Definition of Emission Reduc atos de actividad en el grupo TF / A6376 tion Program and Monitoring Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 de Procesamiento Digital de , Reporting and Verification Imágenes del Sistema de Mo nitoreo de Bosques y Carbon o (SMByC) del IDEAM CO-MADR-218243-CS-INDV / Consultor desarrollador para análisis de cambio de uso de Definition of Emission Reduc l suelo en el grupo de Proces TF / A6376 tion Program and Monitoring Posterior Individual Limited 28,000.00 0.00 Cancelado 2021-02-26 2021-03-03 2021-03-24 2021-04-28 2021-10-25 amiento Digital de Imágenes , Reporting and Verification del Sistema de Monitoreo de Bosques y Carbono (SMByC) del IDEAM CO-MADR-241138-CS-INDV / Integrated Land- Use Planni Profesional apoyo cambio cli TF / A6376 ng and Improved Governanc Posterior Individual Limited 25,227.00 20,895.96 Firmado 2021-06-28 2021-06-29 2021-07-03 2021-07-01 2021-07-24 2021-07-30 2021-08-28 2021-08-09 2022-08-28 matico- NORECCO - Vichada e for Deforestation Control CO-MADR-241139-CS-INDV / Sustainable Land- Use Mana TF / A6376 Posterior Individual Limited 21,415.00 17,960.67 Firmado 2021-06-28 2021-06-29 2021-07-03 2021-07-07 2021-07-24 2021-08-26 2021-08-28 2021-08-26 2022-05-25 Apoyo MGS Vichada gement CO-MADR-242940-CS-INDV / Integrated Land- Use Planni Profesional Analista de infor TF / A6376 ng and Improved Governanc Posterior Individual Limited 6,611.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2021-12-14 mación infraestructura de da e for Deforestation Control tos CO-MADR-242941-CS-INDV / Integrated Land- Use Planni Líder monitoreo cultivos infr TF / A6376 ng and Improved Governanc Posterior Individual Limited 35,451.00 25,812.77 Firmado 2021-07-16 2021-11-19 2021-07-21 2022-01-21 2021-08-11 2022-05-09 2021-09-15 2022-05-12 2022-08-11 aestructura de datos e for Deforestation Control CO-MADR-242942-CS-INDV / Integrated Land- Use Planni Analista software calidad infr TF / A6376 ng and Improved Governanc Posterior Individual Limited 13,222.00 0.00 En ejecución 2021-07-16 2021-11-19 2021-07-21 2021-08-11 2021-09-15 2022-03-14 aestructura de datos e for Deforestation Control CO-MADR-242944-CS-INDV / Integrated Land- Use Planni Apoyo técnico SIG monitoreo TF / A6376 ng and Improved Governanc Posterior Individual Limited 14,875.00 0.00 En ejecución 2021-07-16 2022-11-25 2021-07-21 2022-03-24 2021-08-11 2021-09-15 2022-03-14 cultivos infraestructura de d e for Deforestation Control atos CO-MADR-242945-CS-INDV / Integrated Land- Use Planni Arquitecto solución infraestr TF / A6376 ng and Improved Governanc Posterior Individual Limited 20,714.00 18,720.49 Firmado 2021-07-16 2021-11-19 2021-07-21 2022-05-19 2021-08-11 2022-08-29 2021-09-15 2022-09-21 2022-05-13 uctura de datos e for Deforestation Control CO-MADR-242946-CS-INDV / Integrated Land- Use Planni Desarrollador servicios web i TF / A6376 ng and Improved Governanc Posterior Individual Limited 6,611.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2021-12-14 nteroperabilidad infraestruct e for Deforestation Control ura de datos CO-MADR-242947-CS-INDV / Integrated Land- Use Planni Desarrollador software funci TF / A6376 ng and Improved Governanc Posterior Individual Limited 15,536.00 0.00 En ejecución 2021-07-16 2021-11-19 2021-07-21 2021-08-11 2021-09-15 2022-03-14 onalidad UPRA e for Deforestation Control CO-MADR-242948-CS-INDV / Integrated Land- Use Planni Desarrollador software table TF / A6376 ng and Improved Governanc Posterior Individual Limited 15,536.00 0.00 En ejecución 2021-07-16 2021-11-19 2021-07-21 2021-08-11 2021-09-15 2022-03-14 ro infraestructura de datos e for Deforestation Control CO-MADR-242949-CS-INDV / Integrated Land- Use Planni Diseñador gráfico infraestruc TF / A6376 ng and Improved Governanc Posterior Individual Limited 10,357.00 0.00 En ejecución 2021-07-16 2021-11-19 2021-07-21 2021-08-11 2021-09-15 2022-05-13 tura de datos e for Deforestation Control CO-MADR-242950-CS-INDV / Integrated Land- Use Planni Profesional estandarización TF / A6376 ng and Improved Governanc Posterior Individual Limited 6,611.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2021-12-14 de la información infraestruc e for Deforestation Control tura de datos CO-MADR-242951-CS-INDV / Integrated Land- Use Planni Gestion del conocimiento, us TF / A6376 ng and Improved Governanc Posterior Individual Limited 22,036.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2022-07-12 o y apropiación infraestructu e for Deforestation Control ra de datos CO-MADR-242952-CS-INDV / Integrated Land- Use Planni Profesional en pruebas de ca TF / A6376 ng and Improved Governanc Posterior Individual Limited 5,288.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2021-12-14 lidad servicios web infraestr e for Deforestation Control uctura de datos Definition of Emission Reduc CO-MADR-242953-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Limited 25,000.00 0.00 Cancelado 2021-07-16 2021-07-21 2021-08-11 2021-09-15 2022-03-14 Profesional tipificación , Reporting and Verification CO-MADR-242986-CS-INDV / Integrated Land- Use Planni Profesional ciencia política re TF / A6376 ng and Improved Governanc Posterior Individual Limited 14,875.00 11,993.72 Firmado 2021-07-16 2021-08-24 2021-07-21 2021-09-09 2021-08-11 2022-01-21 2021-09-15 2022-02-03 2022-03-14 gularización de la propiedad e for Deforestation Control CO-MADR-242987-CS-INDV / Integrated Land- Use Planni Jurídico estrategia regulariza TF / A6376 ng and Improved Governanc Posterior Individual Limited 13,883.00 11,193.73 Firmado 2021-07-16 2021-08-24 2021-07-21 2021-09-09 2021-08-11 2021-11-17 2021-09-15 2022-02-07 2022-03-14 ción de la propiedad e for Deforestation Control Definition of Emission Reduc CO-MADR-242996-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 25,416.00 21,136.95 Firmado 2021-07-16 2021-07-19 2021-09-03 2021-08-05 2021-09-24 2021-10-12 2021-10-29 2021-10-20 2022-04-27 Supervisor local IFN , Reporting and Verification CO-MADR-242999-CS-INDV / Implementar las salvaguarda s establecidas a nivel nacion Definition of Emission Reduc al, con las comunidades de l TF / A6376 tion Program and Monitoring Posterior Individual Open 25,102.00 0.00 Cancelado 2021-07-16 2021-09-03 2021-09-24 2021-10-29 2022-04-27 a región, y desarrollar los re , Reporting and Verification portes de dichas actividades de acuerdo con los lineamie ntos nacionales (MGAS, PPI, MP) CO-MADR-243540-CS-INDV / Definition of Emission Reduc Ingeniero de sistemas AFOL TF / A6376 tion Program and Monitoring Posterior Individual Limited 15,000.00 0.00 Cancelado 2021-08-02 2021-08-02 2021-08-07 2021-08-28 2021-10-02 2022-03-31 U , Reporting and Verification Definition of Emission Reduc CO-MADR-243541-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 25,157.00 20,160.80 Firmado 2021-07-31 2021-07-19 2021-09-18 2021-07-22 2021-10-09 2021-10-15 2021-11-13 2021-11-02 2022-07-11 Consultor MGAS , Reporting and Verification CO-MADR-243542-CS-INDV / Definition of Emission Reduc Profesional intérprete de imá TF / A6376 tion Program and Monitoring Posterior Individual Direct 15,061.00 12,462.72 Firmado 2021-07-16 2021-07-19 2021-07-26 2021-07-21 2021-08-16 2021-07-21 2021-09-20 2021-08-17 2022-01-18 genes cubo de datos IDEAM , Reporting and Verification Definition of Emission Reduc CO-MADR-244991-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Limited 47,066.00 39,672.00 Firmado 2021-07-30 2021-07-30 2021-08-04 2021-08-02 2021-08-25 2021-09-13 2021-09-29 2021-09-20 2022-09-29 Escritor principal ERPD , Reporting and Verification CO-MADR-245000-CS-INDV / Integrated Land- Use Planni Profesional distribución y ten TF / A6376 ng and Improved Governanc Posterior Individual Limited 12,727.00 10,064.56 Firmado 2021-08-16 2021-08-25 2021-08-21 2021-09-21 2021-09-11 2022-04-07 2021-10-16 2022-06-07 2022-04-14 encia de la tierra e for Deforestation Control Page 11 CO-MADR-245002-CS-INDV / Integrated Land- Use Planni Profesional con Experticia en TF / A6376 ng and Improved Governanc Posterior Individual Limited 12,727.00 10,760.16 Firmado 2021-08-16 2021-08-25 2021-08-21 2021-11-19 2021-09-11 2022-02-17 2021-10-16 2022-02-21 2022-04-14 Ordenamiento Social de La P e for Deforestation Control ropiedad Rural CO-MADR-248589-CS-INDV / Sustainable Land- Use Mana Apoyos técnicos y administr TF / A6376 Posterior Individual Limited 64,007.00 54,033.48 Firmado 2021-09-10 2021-09-02 2021-09-15 2021-10-21 2021-10-06 2022-05-25 2021-11-10 2022-06-08 2022-11-10 gement ativos componente 2 CO-MADR-243001-CS-INDV / Definition of Emission Reduc Prestar servicios personales TF / A6376 tion Program and Monitoring Posterior Individual Open 3,822.00 0.00 Cancelado 2021-07-16 2021-09-10 2021-09-03 2021-09-24 2021-10-29 2022-04-27 apoyando el desarrollo de la , Reporting and Verification nueva plataforma del IFN CO-MADR-253208-CS-INDV / Sustainable Land- Use Mana Apoyo Mesas Ganadería Sost TF / A6376 Posterior Individual Limited 14,990.00 0.00 Cancelado 2021-09-20 2021-10-01 2021-09-25 2021-10-20 2021-10-16 2021-11-20 2022-06-18 gement enible Arauca CO-MADR-254109-CS-INDV / Definition of Emission Reduc Ingeniero de sistemas AFOL TF / A6376 tion Program and Monitoring Posterior Individual Open 15,000.00 11,993.40 Firmado 2021-09-27 2021-09-24 2021-11-15 2021-09-30 2021-12-06 2022-01-20 2022-01-10 2022-02-03 2022-07-09 U , Reporting and Verification Definition of Emission Reduc CO-MADR-257398-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 11,860.00 0.00 Cancelado 2021-10-15 2021-10-15 2021-12-03 2021-12-24 2022-01-28 2022-07-27 Intérprete imágenes IDEAM , Reporting and Verification CO-MADR-259592-CS-INDV / Apoyo Administrativo para lo s proyectos: regularización d Sustainable Land- Use Mana e la tenencia de la tierra y m TF / A6376 Posterior Individual Open 12,378.00 5,869.38 Firmado 2021-11-05 2021-11-16 2021-12-24 2022-01-06 2022-01-14 2022-05-27 2022-02-18 2022-06-07 2023-02-18 gement apas de precios comerciales de la tierra rural de la Orinoq uia, con estrategias coordina das UIP-UPRA CO-MADR-261839-CS-CDS / Definition of Emission Reduc Generar factores de emisión Selección directa TF / A6376 tion Program and Monitoring Posterior Direct 524,246.00 281,823.75 Firmado 2021-11-10 2021-11-15 2021-11-20 2021-09-20 2022-01-24 2022-05-05 2023-01-24 Tier2 para arroz de secano y de consultores , Reporting and Verification ganadería de cría en la regió n de la Orinoquía CO-MADR-263307-CS-INDV / Integrated Land- Use Planni Apoyo temático SIG monitor TF / A6376 ng and Improved Governanc Posterior Individual Limited 28,482.00 20,628.84 Firmado 2021-11-22 2021-11-26 2021-11-27 2022-03-24 2021-12-18 2022-07-05 2022-01-22 2022-07-12 2022-12-18 eo cultivos infraestructura d e for Deforestation Control e datos CO-MADR-263308-CS-INDV / Integrated Land- Use Planni Apoyo SIG especialista monit TF / A6376 ng and Improved Governanc Posterior Individual Limited 24,482.00 20,628.84 Firmado 2021-11-22 2021-11-26 2021-11-27 2022-03-24 2021-12-18 2022-07-12 2022-01-22 2022-07-13 2022-12-18 oreo cultivos 2 e for Deforestation Control CO-MADR-263309-CS-INDV / Integrated Land- Use Planni Apoyo SIG especialista monit TF / A6376 ng and Improved Governanc Posterior Individual Limited 28,482.00 20,785.88 Firmado 2021-11-22 2021-11-26 2021-11-27 2022-03-24 2021-12-18 2022-08-11 2022-01-22 2022-08-26 2022-12-18 oreo cultivos e for Deforestation Control CO-MADR-263310-CS-INDV / Integrated Land- Use Planni Apoyo SIG especialista monit TF / A6376 ng and Improved Governanc Posterior Individual Limited 28,482.00 20,813.11 Firmado 2021-11-22 2021-11-26 2021-11-27 2022-03-24 2021-12-18 2022-07-16 2022-01-22 2022-07-21 2022-12-18 oreo cultivos e for Deforestation Control Integrated Land- Use Planni CO-MADR-263311-CS-INDV / TF / A6376 ng and Improved Governanc Posterior Individual Limited 20,714.00 0.00 En ejecución 2021-11-22 2021-11-26 2021-11-27 2022-08-16 2021-12-18 2022-01-22 2022-09-19 Cientifico de Datos ID e for Deforestation Control Integrated Land- Use Planni CO-MADR-263312-CS-INDV / TF / A6376 ng and Improved Governanc Posterior Individual Limited 20,714.00 0.00 En ejecución 2021-11-22 2021-11-26 2021-11-27 2022-08-16 2021-12-18 2022-01-22 2022-09-19 Cientifico de Datos 2 ID e for Deforestation Control CO-MADR-263313-CS-INDV / Integrated Land- Use Planni Administrador Base de datos TF / A6376 ng and Improved Governanc Posterior Individual Limited 20,714.00 0.00 En ejecución 2021-11-22 2021-11-26 2021-11-27 2021-12-18 2022-01-22 2022-09-19 ID e for Deforestation Control Integrated Land- Use Planni CO-MADR-263314-CS-INDV / TF / A6376 ng and Improved Governanc Posterior Individual Limited 17,629.00 0.00 En ejecución 2021-11-22 2021-11-26 2021-11-27 2021-12-18 2022-01-22 2022-09-19 Analista información ID e for Deforestation Control Integrated Land- Use Planni CO-MADR-263315-CS-INDV / TF / A6376 ng and Improved Governanc Posterior Individual Limited 28,482.00 20,256.68 Firmado 2021-11-22 2021-11-26 2021-11-27 2022-02-23 2021-12-18 2022-05-09 2022-01-22 2022-05-18 2022-12-18 gestión conocimiento ID e for Deforestation Control CO-MADR-261426-CS-INDV / Definition of Emission Reduc Consultor Contabilidad RENA TF / A6376 tion Program and Monitoring Posterior Individual Limited 15,000.00 10,052.68 Firmado 2021-12-03 2021-12-14 2021-12-08 2022-01-11 2021-12-29 2022-05-06 2022-02-02 2022-05-19 2022-09-30 RE , Reporting and Verification CO-MADR-272057-CS-INDV / Definition of Emission Reduc Consultor cooperación intern TF / A6376 tion Program and Monitoring Posterior Individual Limited 28,238.00 0.00 Cancelado 2022-01-17 2022-01-22 2022-02-12 2022-03-19 2023-03-19 acional - IDEAM , Reporting and Verification CO-MADR-272060-CS-INDV / Integrated Land- Use Planni Apoyo administrativo infraes TF / A6376 ng and Improved Governanc Posterior Individual Limited 13,178.00 9,595.74 Firmado 2022-01-24 2022-01-12 2022-01-29 2022-02-01 2022-02-19 2022-05-10 2022-03-26 2022-05-18 2023-03-26 tructura de datos espaciales e for Deforestation Control CO-MADR-257698-CS-INDV / Sustainable Land- Use Mana Consultores apoyo precios c TF / A6376 Posterior Individual Limited 104,119.00 0.00 Cancelado 2021-10-18 2021-10-23 2021-11-13 2021-12-18 2022-06-16 gement omerciales de la tierra CO-MADR-273600-CS-INDV / Especialista para la recolecci ón, tratamiento y análisis de Sustainable Land- Use Mana información requerida para l TF / A6376 Posterior Individual Open 89,245.00 64,985.10 Firmado 2022-01-31 2022-01-31 2022-03-21 2022-02-01 2022-04-11 2022-03-17 2022-05-16 2022-06-01 2022-11-12 gement a elaboración de los mapas de precios comerciales de la tierra rural de la Orinoquia, a escala 1:100.000 CO-MADR-273601-CS-INDV / Especialista para la recolecci ón, tratamiento y análisis de información requerida para l Sustainable Land- Use Mana a elaboración de los mapas TF / A6376 Posterior Individual Open 14,874.00 10,830.85 Firmado 2022-01-31 2022-01-31 2022-03-21 2022-02-01 2022-04-11 2022-05-07 2022-05-16 2022-06-01 2022-11-12 gement de precios comerciales de la tierra rural de la Orinoquia, a escala 1:100.000, con énfasi s en el Departamento del Me ta, en el marco del Proy CO-MADR-272059-CS-INDV / Integrated Land- Use Planni Apoyo técnico control defore TF / A6376 ng and Improved Governanc Posterior Individual Limited 19,767.00 0.00 Cancelado 2022-01-24 2022-01-29 2022-02-19 2022-03-26 2022-11-21 stacion Meta e for Deforestation Control CO-MADR-273611-CS-INDV / Apoyar a la Dirección de Bos ques, Biodiversidad y Servici Integrated Land- Use Planni os Ecosistémicos del Minister TF / A6376 ng and Improved Governanc Posterior Individual Open 19,767.00 0.00 En ejecución 2022-01-31 2022-08-11 2022-03-21 2022-04-11 2022-05-16 2023-01-11 io de Ambiente y Desarrollo e for Deforestation Control Sostenible, a la Unidad imple mentadora del Proyecto, y al Departamento del Meta CO-MADR-273655-CS-INDV / Prestar servicios profesional es en el área de cooperación Definition of Emission Reduc y asuntos internacionales de TF / A6376 tion Program and Monitoring Posterior Individual Limited 28,238.00 20,449.80 Firmado 2022-01-31 2022-02-11 2022-02-05 2022-03-22 2022-02-26 2022-05-10 2022-04-02 2022-05-12 2023-04-02 la dirección general del Instit , Reporting and Verification uto de Hidrología, Meteorolo gía y Estudios Ambientales-I DEAM CO-MADR-273775-CS-INDV / Prestar sus servicios apoyan do a la Unidad de Implement ación del Proyecto en los pro Definition of Emission Reduc cesos de gestión de conocim TF / A6376 tion Program and Monitoring Posterior Individual Direct 9,695.00 8,235.47 Firmado 2022-01-27 2022-01-31 2022-02-06 2022-02-03 2022-02-27 2022-02-03 2022-04-03 2022-02-05 2023-02-27 iento sobre las prácticas baj , Reporting and Verification as en carbono para las cade nas priorizadas y las propues tas de acciones y/o medidas de mitigación para el PRE Page 12 CO-MADR-273777-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando al IDEAM, coordi Definition of Emission Reduc nando la caracterización de l TF / A6376 tion Program and Monitoring Posterior Individual Direct 35,734.00 30,353.92 Firmado 2022-01-27 2022-01-31 2022-02-06 2022-01-12 2022-02-27 2022-02-16 2022-04-03 2022-02-17 2023-01-28 as causas y agentes de la tra , Reporting and Verification nsformación del bosque y su s emisiones asociadas, los pr ocesos de modelación y el m onitoreo comunitario particip a CO-MADR-273783-CS-INDV / Prestar sus servicios profesio nales apoyando a la Subdire cción de Estudios Ambiental Definition of Emission Reduc es del IDEAM, en el proceso TF / A6376 tion Program and Monitoring Posterior Individual Direct 25,440.00 21,609.71 Firmado 2022-01-27 2022-01-31 2022-02-06 2022-01-12 2022-02-27 2022-02-22 2022-04-03 2022-02-23 2023-02-27 de implementación de meto , Reporting and Verification dología y seguimiento de acc iones para la estimación de carbono en categorías No bo sque asociadas a los suelos gesti CO-MADR-242943-CS-INDV / Integrated Land- Use Planni Apoyo gestión proyectos infr TF / A6376 ng and Improved Governanc Posterior Individual Limited 9,255.00 0.00 Cancelado 2021-07-16 2021-11-19 2021-07-21 2021-08-11 2021-09-15 2022-09-15 aestructura de datos e for Deforestation Control CO-MADR-276193-CS-INDV / Prestar sus servicios profesio nales como Especialista Amb iental del Proyecto “Desarrol Definition of Emission Reduc lo sostenible bajo en carbon TF / A6376 tion Program and Monitoring Posterior Individual Limited 32,436.00 26,138.16 Firmado 2022-02-07 2022-02-01 2022-02-12 2022-02-02 2022-03-05 2022-03-02 2022-04-09 2022-03-22 2022-11-30 o en la región de la Orinoqui , Reporting and Verification a”, con autonomía técnica y bajo la orientación de la Unid ad Implementadora del Proy ecto (UIP) y las entidades CO-MADR-279192-CS-INDV / Definition of Emission Reduc Consultor actividades agrícol TF / A6376 tion Program and Monitoring Posterior Individual Limited 16,943.00 0.00 Cancelado 2022-02-21 2022-02-16 2022-02-26 2022-03-19 2022-04-23 2023-01-18 as y forestales AFOLU , Reporting and Verification CO-MADR-279195-CS-INDV / Definition of Emission Reduc Profesional Calidad Operació TF / A6376 tion Program and Monitoring Posterior Individual Open 16,316.00 11,815.44 Firmado 2022-03-01 2022-03-01 2022-04-19 2022-03-15 2022-05-10 2022-05-09 2022-06-14 2022-05-18 2023-02-09 n Estadística IFN , Reporting and Verification CO-MADR-279205-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica Project Coordination, Manag y administrativa, como Apoy TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 22,569.00 16,346.91 Firmado 2022-02-21 2022-02-21 2022-02-26 2022-03-28 2022-03-19 2022-06-06 2022-04-23 2022-06-22 2022-11-30 o Administrativo a la UIP del uation Proyecto: Desarrollo Sosteni ble bajo en carbono en la re gión de la Orinoquia CO-MADR-280423-CS-CDS / Auditoria de los Recursos Ad ministrados durante el perio Project Coordination, Manag do comprendido entre el 01 Selección directa TF / A6376 ement, Monitoring and Eval Posterior Direct 9,774.00 10,036.71 Firmado 2022-02-28 2022-02-24 2022-03-10 2022-03-03 2022-05-14 2022-05-05 2022-09-11 de enero y el 31 de diciembr de consultores uation e del 2021 por el MADR bajo el proyecto Desarrollo Soste nible bajo en carbono en la r egión de la Orinoquia Definition of Emission Reduc CO-MADR-283512-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 20,394.00 14,229.43 Firmado 2022-03-28 2022-05-19 2022-05-16 2022-06-13 2022-06-06 2022-07-21 2022-07-11 2022-07-25 2023-01-07 Consultor SIG RENARE , Reporting and Verification CO-MADR-283513-CS-INDV / Profesional de apoyo para la Definition of Emission Reduc implementación de la estrat TF / A6376 tion Program and Monitoring Posterior Individual Limited 21,964.00 0.00 En ejecución 2022-03-28 2022-06-29 2022-04-02 2022-04-23 2022-05-28 2022-11-30 egia del sector privado regio , Reporting and Verification nal en el marco de las activi dades del componente 3 del Proyecto Biocarbono Orinoqu ia Definition of Emission Reduc CO-MADR-283515-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 20,081.00 0.00 Cancelado 2022-03-28 2022-05-19 2022-05-16 2022-06-06 2022-07-11 2023-03-08 Desarrollador IFN , Reporting and Verification CO-MADR-283604-CS-INDV / Definition of Emission Reduc Consultor para costo de opor TF / A6376 tion Program and Monitoring Posterior Individual Limited 25,101.00 0.00 Cancelado 2022-03-28 2022-04-02 2022-04-23 2022-05-28 2022-06-21 tunidad , Reporting and Verification CO-MADR-283610-CS-INDV / Prestar servicios profesional Project Coordination, Manag es como Coordinador Region TF / A6376 ement, Monitoring and Eval Posterior Individual Open 41,416.00 0.00 En ejecución 2022-03-31 2022-03-23 2022-05-19 2022-06-09 2022-07-14 2023-07-14 al de la Unidad Implementad uation ora del proyecto de Desarroll o Sostenible Bajo en Carbon o en la región de la Orinoqui a CO-MADR-283612-CS-INDV / Apoyar a la UIP en la implem entación del sistema de mon Project Coordination, Manag itoreo y seguimiento, media TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 26,356.00 0.00 En ejecución 2022-03-31 2022-06-22 2022-04-05 2022-04-26 2022-05-31 2023-05-31 nte la implementación de ba uation ses de datos, la realización d e análisis y reportes para la analítica y demás módulos d el portal de gestión del cono cimimiento CO-MADR-283613-CS-INDV / Prestar sus servicios profesio Project Coordination, Manag nales como Asesor de Comu TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 75,302.00 54,112.80 Firmado 2022-03-31 2022-04-22 2022-04-05 2022-05-10 2022-04-26 2022-07-08 2022-05-31 2022-07-28 2023-05-31 nicaciones y Participación de uation l Proyecto BIOCARBONO ORI NOQUIA CO-MADR-283614-CS-INDV / Prestar sus servicios profesio Project Coordination, Manag nales como Especialista en C TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 25,885.00 21,725.76 Firmado 2022-03-31 2022-04-22 2022-04-05 2022-05-10 2022-04-26 2022-07-14 2022-05-31 2022-07-28 2023-05-31 omunicación Digital del PRO uation YECTO BIOCARBONO ORINO QUIA CO-MADR-286393-CS-INDV / Definition of Emission Reduc Profesional intérprete degra TF / A6376 tion Program and Monitoring Posterior Individual Open 34,451.00 0.00 En ejecución 2022-03-31 2022-06-06 2022-05-19 2022-06-09 2022-07-14 2023-04-10 dacion forestal IDEAM x 2 , Reporting and Verification CO-MADR-286507-CS-INDV / Definition of Emission Reduc Consultor actividades agrícol TF / A6376 tion Program and Monitoring Posterior Individual Open 16,943.00 11,857.86 Firmado 2022-03-31 2022-03-25 2022-05-19 2022-05-13 2022-06-09 2022-07-14 2022-07-14 2022-08-01 2023-04-10 as y forestales- AFOLU , Reporting and Verification CO-MADR-286845-CS-INDV / Integrated Land- Use Planni Profesional apoyo cambio cli TF / A6376 ng and Improved Governanc Posterior Individual Open 16,818.00 7,356.27 Firmado 2022-04-01 2022-05-19 2022-05-20 2022-05-20 2022-06-10 2022-07-22 2022-07-15 2022-08-09 2022-12-31 mático NORECCO -Arauca e for Deforestation Control CO-MADR-272061-CS-INDV / Integrated Land- Use Planni Apoyo técnico SIG Corporino TF / A6376 ng and Improved Governanc Posterior Individual Limited 17,571.00 12,704.16 Firmado 2022-05-02 2022-06-21 2022-05-07 2022-07-12 2022-05-28 2022-08-10 2022-07-02 2022-09-05 2023-01-28 quia e for Deforestation Control CO-MADR-283611-CS-INDV / Apoyar a la UIP en la implem entación del sistema de mon Project Coordination, Manag itoreo y seguimiento, media TF / A6376 ement, Monitoring and Eval Posterior Individual Limited 26,356.00 0.00 En ejecución 2022-05-16 2022-06-22 2022-05-21 2022-06-11 2022-07-16 2023-07-16 nte el análisis de documento uation s técnicos y la consolidación de información para las etap as de generación y transfere ncia de conocimiento CO-MADR-283511-CS-INDV / Realizar el proceso de mejor Definition of Emission Reduc amiento de información y de TF / A6376 tion Program and Monitoring Posterior Individual Open 59,614.00 0.00 Cancelado 2022-03-31 2022-05-19 2022-06-09 2022-07-14 2023-07-14 los sistemas de información , Reporting and Verification relacionados con tierras fore stales (SNIF) Definition of Emission Reduc CO-MADR-296237-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open 20,081.00 0.00 Cancelado 2022-06-01 2022-07-07 2022-07-20 2022-08-10 2022-09-14 2023-05-12 Apoyo jurídico SNIF , Reporting and Verification CO-MADR-296238-CS-INDV / Definition of Emission Reduc Contratación de 2 consultore TF / A6376 tion Program and Monitoring Posterior Individual Open 21,963.00 0.00 En ejecución 2022-06-01 2022-07-26 2022-07-20 2022-08-10 2022-09-14 2023-04-12 s para apoyar la consolidació , Reporting and Verification n de la información técnica S NIF Page 13 Integrated Land- Use Planni CO-MADR-283507-CS-INDV / TF / A6376 ng and Improved Governanc Posterior Individual Limited 32,004.00 0.00 Cancelado 2022-03-30 2022-04-04 2022-04-25 2022-05-30 2023-05-30 Gestor técnico tierras ANT e for Deforestation Control CO-MADR-283508-CS-INDV / Prestar servicios profesional Integrated Land- Use Planni es como apoyo técnico al D TF / A6376 ng and Improved Governanc Posterior Individual Limited 13,178.00 0.00 Cancelado 2022-03-30 2022-04-04 2022-04-25 2022-05-30 2022-11-26 NP en los temas relacionado e for Deforestation Control s con el catastro multipropós ito CO-MADR-294021-CS-INDV / Prestar sus servicios profesio nales en el liderazgo y articu Definition of Emission Reduc lación de los procesos de Mo TF / A6376 tion Program and Monitoring Posterior Individual Open 22,480.00 21,671.52 Firmado 2022-06-06 2022-06-10 2022-07-25 2022-06-13 2022-08-15 2022-08-10 2022-09-19 2022-09-05 2023-01-21 nitoreo Comunitario Particip , Reporting and Verification ativo con el Sistema de Moni toreo Reporte y Verificación de Colombia CO-MADR-296240-CS-INDV / Definition of Emission Reduc Consultor consolidación map TF / A6376 tion Program and Monitoring Posterior Individual Direct 15,859.00 11,453.90 Firmado 2022-06-06 2022-05-31 2022-06-16 2022-06-06 2022-07-07 2022-06-06 2022-08-11 2022-06-21 2023-02-07 as biomasa , Reporting and Verification CO-MADR-296232-CS-INDV / Definition of Emission Reduc Lider Tecnico Reglamentacio TF / A6376 tion Program and Monitoring Posterior Individual Direct 19,444.00 16,079.00 Firmado 2022-07-11 2022-06-15 2022-07-21 2022-06-21 2022-08-11 2022-06-22 2022-09-15 2022-07-15 2023-04-13 n SNIF , Reporting and Verification CO-MADR-299368-CS-INDV / Consultor para el análisis de incertidumbre de datos de a Definition of Emission Reduc ctividad en el grupo de Proce TF / A6376 tion Program and Monitoring Posterior Individual Direct 18,000.00 14,726.45 Firmado 2022-07-11 2022-06-15 2022-07-21 2022-06-15 2022-08-11 2022-06-15 2022-09-15 2022-06-17 2023-06-12 samiento Digital de Imágene , Reporting and Verification s del Sistema de Monitoreo d e Bosques y Carbono (SMBy C) del IDEAM CO-MADR-300821-CS-INDV / Prestar sus servicios profesio nales con autonomía técnica , apoyando a la Unidad Imple Definition of Emission Reduc mentadora del Proyecto (UIP TF / A6376 tion Program and Monitoring Posterior Individual Direct 4,097.00 3,351.63 Firmado 2022-07-15 2022-06-28 2022-07-25 2022-07-05 2022-08-15 2022-07-05 2022-09-19 2022-07-05 2022-11-18 ) Desarrollo Sostenible Bajo , Reporting and Verification en Carbono para la Orinoqui a y en articulación con la UP RA, en la consolidación del d ocumento final para el anális CO-MADR-300822-CS-INDV / Integrated Land- Use Planni Editor de contenidos ordena TF / A6376 ng and Improved Governanc Posterior Individual Limited 14,889.00 0.00 En ejecución 2022-08-01 2022-09-12 2022-08-06 2022-08-27 2022-10-01 2023-05-29 miento territorial e for Deforestation Control CO-MADR-306669-CS-INDV / Integrated Land- Use Planni Profesional Apoyo al pacto p TF / A6376 ng and Improved Governanc Posterior Individual Limited 15,789.00 0.00 En ejecución 2022-08-31 2022-09-14 2022-09-05 2022-09-26 2022-10-31 2023-06-28 or la madera en el Departam e for Deforestation Control ento del Meta CO-MADR-306673-CS-INDV / Integrated Land- Use Planni Profesional de apoyo, Contro TF / A6376 ng and Improved Governanc Posterior Individual Limited 11,842.00 0.00 En ejecución 2022-08-31 2022-09-05 2022-09-05 2022-09-26 2022-10-31 2023-04-29 l y vigilancia madera legal e for Deforestation Control CO-MADR-307390-CS-INDV / Integrated Land- Use Planni Apoyo control deforestación TF / A6376 ng and Improved Governanc Posterior Individual Open - National 16,579.00 0.00 En ejecución 2022-08-31 2022-08-04 2022-10-19 2022-11-09 2022-12-14 2023-09-10 Arauca e for Deforestation Control CO-MADR-312208-CS-INDV / Definition of Emission Reduc Profesional intérprete de imá TF / A6376 tion Program and Monitoring Posterior Individual Open - National 22,105.00 0.00 En ejecución 2022-09-30 2022-09-09 2022-11-18 2022-12-09 2023-01-13 2023-11-30 genes IDEAM , Reporting and Verification Definition of Emission Reduc CO-MADR-319077-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open - National 6,579.00 0.00 En ejecución 2022-10-17 2022-10-11 2022-12-05 2022-12-26 2023-01-30 2023-07-29 Abogado SNIF , Reporting and Verification CO-MADR-320857-CS-CDS / Fortalecer la extensión de m ejores prácticas bajas en car Sustainable Land- Use Mana Selección directa TF / A6376 Posterior Direct - National 526,316.00 0.00 Cancelado 2022-11-30 2022-11-22 2022-12-10 2023-02-13 2024-02-13 bono en la cadena de la pal gement de consultores ma de aceite en la Orinoquia y desarrollo de casos de neg ocios sostenibles CO-MADR-328169-CS-CDS / Fortalecer capacidades para la extensión de buenas práct Sustainable Land- Use Mana Selección directa icas sostenibles bajas en car TF / A6376 Posterior Direct - National 416,667.00 0.00 En ejecución 2022-12-05 2022-11-24 2022-12-15 2023-02-18 2024-02-18 gement de consultores bono en la cadena de la pal ma de aceite en la Orinoquia y promover el desarrollo de casos de negocios sostenible s Definition of Emission Reduc CO-MADR-328172-CS-INDV / TF / A6376 tion Program and Monitoring Posterior Individual Open - National 27,500.00 0.00 Cancelado 2022-12-12 2023-01-30 2023-02-20 2023-03-27 2023-11-30 Consultor RENARE - ERPA , Reporting and Verification CO-MADR-337588-CS-INDV / Apoyar a la UIP en los proce sos de gestión de conocimie Definition of Emission Reduc nto sobre las prácticas bajas TF / A6376 tion Program and Monitoring Posterior Individual Direct - National 10,293.00 0.00 En ejecución 2023-01-27 2023-01-24 2023-02-06 2023-01-24 2023-02-27 2023-01-24 2023-04-03 2023-11-30 en carbono para las cadenas , Reporting and Verification priorizadas y las propuestas de acciones y/o medidas de mitigación CO-MADR-340849-CS-INDV / Integrated Land- Use Planni Consultor de Apoyo Gestión I TF / A6376 ng and Improved Governanc Posterior Individual Limited 15,556.00 0.00 En ejecución 2023-02-20 2023-02-20 2023-02-25 2023-02-22 2023-03-18 2023-04-22 2023-12-29 nformación Dirección Bosqu e for Deforestation Control es CO-MADR-340852-CS-INDV / Integrated Land- Use Planni Consultor gestor técnico de t TF / A6376 ng and Improved Governanc Posterior Individual Limited 21,111.00 0.00 En ejecución 2023-02-20 2023-02-23 2023-02-25 2023-03-18 2023-04-22 2023-12-29 ierras e for Deforestation Control CO-MADR-338216-CS-INDV / Consultor para finalizar el Do cumento del Programa de Re Definition of Emission Reduc ducción de Emisiones para la TF / A6376 tion Program and Monitoring Posterior Individual Direct - National 31,111.00 0.00 En ejecución 2023-02-27 2023-02-20 2023-03-09 2023-02-21 2023-03-30 2023-02-21 2023-05-04 2023-12-29 Orinoquía, registrarlo en REN , Reporting and Verification ARE y apoyar las Negociacio nes del Acuerdo de Compra de Reducción de Emisiones CO-MADR-343187-CS-INDV / Definition of Emission Reduc Ejecución pendie Consultor técnico de salvagu TF / A6376 tion Program and Monitoring Posterior Individual Open - National 12,444.00 0.00 2023-03-06 2023-04-24 2023-05-15 2023-06-19 2024-02-14 nte ardas Minambiente , Reporting and Verification CO-MADR-343190-CS-INDV / Definition of Emission Reduc Ejecución pendie Consultor jurídico de salvagu TF / A6376 tion Program and Monitoring Posterior Individual Open - National 12,444.00 0.00 2023-03-06 2023-04-24 2023-05-15 2023-06-19 2024-02-14 nte ardas Minambiente , Reporting and Verification CO-MADR-344169-CS-INDV / Definition of Emission Reduc Consultor forestal Dirección TF / A6376 tion Program and Monitoring Posterior Individual Open - National 15,556.00 0.00 En ejecución 2023-03-06 2023-02-23 2023-04-24 2023-05-15 2023-06-19 2023-11-30 de Cambio Climático y Gesti , Reporting and Verification ón del Riesgo en MinAmbient e CO-MADR-344173-CS-INDV / Definition of Emission Reduc Experto reglamentación mer TF / A6376 tion Program and Monitoring Posterior Individual Limited 18,667.00 0.00 En ejecución 2023-03-13 2023-03-09 2023-03-18 2023-04-08 2023-05-13 2023-11-09 cados de carbono , Reporting and Verification CO-MADR-346101-CS-INDV / Integrated Land- Use Planni PROFESIONAL GESTION DEL TF / A6376 ng and Improved Governanc Posterior Individual Limited 9,169.00 0.00 En ejecución 2023-03-17 2023-03-02 2023-03-22 2023-04-12 2023-05-17 2023-10-14 CONOCIMIENTO IDE e for Deforestation Control CO-MADR-351907-CS-CDS / Project Coordination, Manag Selección directa Ejecución pendie TF / A6376 Posterior Direct - National 10,333.00 0.00 2023-04-03 2023-04-13 2023-06-17 2023-10-15 Auditoria al proyecto vigenci ement, Monitoring and Eval de consultores nte a 2022 uation Page 14