PROCUREMENT PLAN (Textual Part) Project information: Lebanon, Greater Beirut Water Supply (P103063) Project Implementation agency: CDR Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Lebanon : LB- GREATER BEIRUT WATER SUPPLY PLAN General Information Country: Lebanon 2019-03-10 Bank’s Approval Date of the Original Procurement Plan: 2023-03-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P103063 GPN Date: Project Name: LB- GREATER BEIRUT WATER SUPPLY Loan / Credit No: IBRD / 79670, IBRD / 88860 Council for Development and Reconstruction Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Bulk Water Su BWW1-A / Tunnel and Transf pply Infrastructure: Tunnels, Open - Internationa Single Stage - One E 196,989,70 IBRD / 79670 Prior Request for Bids Signed 2015-06-01 2015-07-06 er Lines Water Treatment Plant, Tran l nvelope 1.01 smission & Bulk Storage. Component 1: Bulk Water Su BWW1-C / Construction of G pply Infrastructure: Tunnels, Open - Internationa Single Stage - One E Pending Imp 2021-12-0 BWSP - Reservoirs and Trans IBRD / 88860 Prior Request for Bids 0.00 2020-01-15 2020-01-15 2020-04-14 2020-05-12 2020-06-02 Water Treatment Plant, Tran l nvelope lementation 1 mission Lines Contract smission & Bulk Storage. BWW1 SCMU - A / Safety, Ca Component 1: Bulk Water Su re, Maintenance and Urgent pply Infrastructure: Tunnels, 8,951,298.0 2020-05-2 IBRD / 79670 Prior Direct Selection Direct Signed 2019-08-30 2019-12-30 2019-08-30 2019-12-30 2019-11-21 2019-11-21 works Contract for Tunnel an Water Treatment Plant, Tran 9 0 d Transfer Lines smission & Bulk Storage. Component 1: Bulk Water Su BWW1 – A - RTW / Remainin pply Infrastructure: Tunnels, Open - Internationa Single Stage - One E 2022-11-3 IBRD / 79670 Prior Request for Bids 0.00 Canceled 2020-07-21 2020-10-29 2020-08-05 2020-11-25 2020-09-16 2021-03-22 2020-10-05 2022-08-05 2020-11-13 g Tunnel Works Water Treatment Plant, Tran l nvelope 0 smission & Bulk Storage. Component 1: Bulk Water Su BWW1 – A - RPW / Remainin pply Infrastructure: Tunnels, Open - Internationa Single Stage - One E 2022-05-2 IBRD / 79670 Prior Request for Bids 0.00 Signed 2020-07-21 2020-12-11 2020-08-05 2021-04-19 2020-09-16 2021-06-17 2020-10-05 2022-09-15 2020-11-13 2023-03-23 g Pipeline Works Water Treatment Plant, Tran l nvelope 0 smission & Bulk Storage. Request for B Component 1: Bulk Water Su ids - Works ( BWW1 – A - RTW-2 / Remaini pply Infrastructure: Tunnels, Open - Internationa Single Stage - One E Pending Imp 2025-09-1 IBRD / 79670 Prior Request for Bids without preq 0.00 2023-03-27 2023-04-24 2023-06-08 2023-07-06 2023-09-14 ng Tunnel Works - Rebidding Water Treatment Plant, Tran l nvelope lementation 3 ualification) smission & Bulk Storage. SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Bulk Water Su BWC1- A / Construction Supe pply Infrastructure: Tunnels, Quality And Cost- Open - Internationa rvision of Tunnel and Transfe IBRD / 79670 Prior 8,372,006.10 Under Review 2011-09-05 2020-01-10 2011-09-05 2012-10-18 2020-01-22 2013-07-05 2013-07-05 2014-01-24 2020-10-07 2014-06-06 2020-10-09 2015-01-05 2015-01-05 2019-07-30 Water Treatment Plant, Tran Based Selection l r Lines smission & Bulk Storage. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Bulk Water Su pply Infrastructure: Tunnels, Individual Consult BWC1-4 / Project Engineer IBRD / 79670 Prior Direct 228,690.00 Signed 2011-01-04 2011-01-04 2011-01-04 2011-01-04 2011-01-04 2011-03-01 2011-03-01 2011-03-01 2012-01-31 Water Treatment Plant, Tran ant Selection smission & Bulk Storage. Component 1: Bulk Water Su pply Infrastructure: Tunnels, Individual Consult BWC1-4-3 / Financial Officer IBRD / 79670 Post Direct 144,438.70 Signed 2017-03-07 2017-03-07 2017-03-27 2017-03-27 2017-04-17 2017-05-01 2017-05-16 2017-04-01 2018-04-15 Water Treatment Plant, Tran ant Selection smission & Bulk Storage. Component 3: Project Manag BWC1-4-4 / Project Advisor Under Implement IBRD / 79670 ement, Utility Strengthening Post Direct Selection Direct - National 0.00 2023-01-06 2023-01-06 2023-01-10 2023-01-16 2023-11-30 & Overall Coordinator ation and National Studies Page 1