Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Africa Environmental Health and Pollution Management Program (P167788) WESTERN AND CENTRAL AFRICA | Western and Central Africa | Environment, Natural Resources & the Blue Economy Global Practice | Global Environment Project | Investment Project Financing | FY 2021 | Seq No: 7 | ARCHIVED on 27-Dec-2023 | ISR59388 | Implementing Agencies: Direction de l’Environnement et des Etablissements Classés - DEEC, Environmental Protection Agency (EPA), National Environmental Management Authority (Ministry of Environment and Forestry), Republic of Ghana, Republic of Kenya, Republic of Senegal, Republic of Zambia, The National Environmental Management Council (NEMC), United Republic of Tanzania, Zambia Environmental Management Agency Key Dates Key Project Dates Bank Approval Date: 27-Jul-2020 Effectiveness Date: 14-Aug-2020 Planned Mid Term Review Date: 15-May-2023 Actual Mid-Term Review Date: 29-May-2023 Original Closing Date: 31-Jul-2025 Revised Closing Date: 31-Jul-2025 pdoTable Project Development Objective (PDO) Project Development Objective (from Project Appraisal Document) To reduce exposure to mercury and uPOPs pollution at pilot sites and strengthen the institutional capacity to manage and regulate mercury use in artisanal small-scale gold mining (ASGM) and e-waste in selected countries in Africa Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Institutional Strengthening, Knowledge and Capacity Building:(Cost $8.00 M) Policy Dialogue and Regulatory Enhancements:(Cost $8.68 M) Demonstrating Application of Technological Tools and Economic Approaches:(Cost $19.36 M) Program Implementation and Coordination:(Cost $1.85 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The ISM finds that the Client's commitment to the project with the implementing entities, Government authorities and key stakeholders was good overall. However, some delays delays in procurement and low disbursement rates in the Kenya and Zambia country projects need to be improved to move implementation at a sustained pace to achieve the development objectives by closing date. An action plan was agreed with the respective PIUs to address these implementation challenges. 12/27/2023 Page 1 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) The quality and timeliness of procurement and disbursement activities have been delayed in some countries (Kenya and Zambia) for various reasons. But most countries are picking up the pace of implementation. The respective Bank teams will continue to organize monthly technical missions to accelerate implementation and address challenges in implementation in all five participating countries. Most countries (notably Senegal, Ghana, Tanzania and Zambia) produced quality outputs on Components 1 and 2 and started the necessary preparatory work for component 3 on demonstrations in pilot sites. After the regional meeting, held in Kenya, Most countries are starting to accelerate the pace of implementation and the Bank team is providing hands-on implementation support. Actions - the team will be working with respective PIUs on 1. Improving the procurement processes, particularly contract management. This is essential for quality and timely delivery of deliverables and progress of the project. 2. merging procurement items as much as possible to minimize transactions and consecutive delays. 3. updating implementation plans with quarterly disbursement projections for the remainder of the project period for closer monitoring and follow up 4. The selection of demonstration sites such that all necessary infrastructure and equipment can be procured for selected sites, and demonstration activities can be initiated. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial Substantial Stakeholders Substantial Substantial Substantial Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Institutional strengthening, knowledge and capacity building IN01384253 ►Knowledge products on mercury and uPOPs management designed and disseminated (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 12/27/2023 Page 2 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) The indicator is an indirect measurement of the strengthened capacity through improved knowledge Comments: resources and collaboration for environmental risk management related to e-waste and mercury. The knowledge products developed and consulted shall be reported and submitted to the relevant ministries. IN01384254 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384256 Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384258 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384260 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384263 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 2.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384264 ►Stakeholder outreach events completed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 40.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator covers the required stakeholder outreach events, promoting the project objectives, activities Comments: and results, at the regional, national and local level. It measures the number of outreach events conducted within the framework of the projects. IN01384267 Tanzania (Number, Custom Breakdown) 12/27/2023 Page 3 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384269 Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384270 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384272 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384274 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 8.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384276 ►Policy interventions on mercury and e-waste management (including uPOPs emissions) designed and consulted (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator is an indirect measurement of the strengthened capacity through improved policy Comments: instruments and legal framework for environmental risk management related to e-waste and mercury. The policies designed and consulted shall be reported and submitted to the relevant ministries. IN01384279 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384280 12/27/2023 Page 4 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384281 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384282 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384283 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 2.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 Demonstration pilots, awareness raising on cleaner technologies for management of mercury and waste IN01384252 ►Piloting of best environmental practices and cleaner technologies to help countries meet their Stockholm and Minamata Convention obligations completed and evaluated (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the number of demonstration pilots established, functioning and evaluated. The progress in preparation and implementation is provided through annual progress review reports. Following Comments: the completion of each pilot project implementation a ‘Demonstration pilot evaluation report’ shall be delivered. The final evaluation report shall be disseminated, by the participating countries as well as the regional platform, to concerned stakeholders and interested parties. IN01384255 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384257 Ghana (Number, Custom Breakdown) 12/27/2023 Page 5 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384259 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384261 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384262 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384265 ►Mercury use in ASGM reduced at pilot sites (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the reduction of mercury use in ASGM reduced at pilot sites and/or the exposure to uPOPs pollution from open burning of hazardous waste including e-waste reduced at pilot sites, as Comments: compared to a baseline conducted at the pilot sites. The progress shall be reported in the progress reports. Following the completion of each pilot project implementation a ‘Demonstration pilot evaluation report’ shall be delivered, incl. an assessment of the clean technology impact. IN01384266 Tanzania (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384268 Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 12/27/2023 Page 6 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384271 ►Exposure to uPOPs pollution from open burning of hazardous waste including e-waste reduced at pilot sites (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the reduction of the exposure to uPOPs pollution from open burning of hazardous waste including e-waste reduced at pilot sites, as compared to a baseline conducted at the pilot sites. The Comments: progress shall be reported in the progress reports. Following the completion of each pilot project implementation a ‘Demonstration pilot evaluation report’ shall be delivered, incl. an assessment of the clean technology impact. IN01384273 Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384275 Zambia (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384277 Kenya (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384278 Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 Overall Comments PDO All countries made significant progress on Component 1 - Knowledge management, capacity building and institutional strengthening, and moderate progress on policy and regulatory reforms but most countries have been delayed on the implementation of Component 3 on Demonstration pilots due to the challenges on identifying sites, securing land and agreeing on the appropriate technologies to be procured and tested. Intermediate Results Indicators by Components 12/27/2023 Page 7 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Institutional strengthening, knowledge and capacity building IN01384284 ►E-waste management and mercury use benchmarked in participating countries (volume/Mt) through the regional platform (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the progress in developing environmental monitoring protocols. The indicator shall Comments: be assessed upon delivery or annually through the progress reports. IN01384289 Tanzania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384290 Ghana (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384293 Zambia (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384296 Kenya (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384299 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384303 ►Trained inspection officers (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 12/27/2023 Page 8 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Value 0.00 0.00 0.00 110.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures number of participants in project learning events for improved management of e- waste and/or mercury, incl. events arranged by the regional knowledge platform. The indicator is Comments: measured by the participation of the inspection officers as reported in the progress reports. The participants are disaggregated by gender. IN01384304 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384306 Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384309 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384311 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384313 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384314 Tanzania: % female participants (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 IN01384315 Ghana: % female participants (Percentage, Custom Supplement) 12/27/2023 Page 9 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 IN01384316 Zambia: % female participants (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 IN01384317 Kenya: % female participants (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 IN01384318 Senegal: % female participants (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 IN01384319 ►Communities involved in planning, implementation and evaluation of demonstration pilots (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator ensures the participation and inclusion of communities affected by the project. The communities shall be involved in the project development throughout the planning, implementation and Comments: evaluation of the demonstration pilots. The indicator is measured by the participation of the citizens and/or communities as reported in the progress reports. IN01384320 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384321 Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384322 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 12/27/2023 Page 10 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384323 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384324 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 2.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 Policy Dialogue and Regulatory Enhancements IN01384285 ►Guidelines and checklists for stakeholders and workers developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the progress in developing guidelines and checklists for project stakeholders and Comments: workers. The indicator shall be assessed upon delivery or annually through the progress reports. IN01384288 Tanzania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384291 Ghana (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384294 Zambia (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384297 Kenya (Yes/No, Custom Breakdown) 12/27/2023 Page 11 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384300 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384302 ►Stakeholder communication strategy developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator ensures the development of the stakeholder communication strategy. The indicator Comments: contributes to the required stakeholder outreach objectives, activities and results. The indicator is reported through the submission of the communication strategy and/or in the annual progress report. IN01384305 Tanzania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384307 Ghana (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384308 Zambia (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384310 Kenya (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 12/27/2023 Page 12 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) IN01384312 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 Demonstration pilots, awareness raising on cleaner technologies for management of mercury and waste IN01384286 ►Training events for relevant stakeholders conducted (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator measures the number of training events conducted with the participation of stakeholders, Comments: government officials and/or communities. IN01384287 Tanzania (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384292 Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384295 Zambia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384298 Kenya (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384301 Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target 12/27/2023 Page 13 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Value 0.00 2.00 2.00 2.00 Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 IN01384325 ►Private sector in selected pilot project sites engaged (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 The indicator ensures the engagement of the private sector in the pilot projects. The project shall promote the private sector participation in the project development throughout the planning, implementation and Comments: evaluation of the demonstration pilots. The indicator is measured by the active participation of the private sector as reported in the progress reports. IN01384326 Tanzania (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384327 Ghana (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384328 Zambia (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384329 Kenya (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 26-Oct-2020 26-Oct-2020 23-Apr-2025 IN01384330 Senegal (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Nov-2019 01-Dec-2022 01-Dec-2022 23-Apr-2025 12/27/2023 Page 14 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P167788 TF-B3246 Effective USD 8.26 8.26 0.00 1.89 6.37 23% P167788 TF-B3310 Effective USD 7.34 7.34 0.00 5.48 1.86 75% P167788 TF-B3321 Effective USD 8.72 8.72 0.00 3.51 5.20 40% P167788 TF-B3322 Effective USD 8.07 8.07 0.00 1.59 6.49 20% P167788 TF-B3323 Effective USD 5.50 5.50 0.00 2.53 2.98 46% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P167788 TF-B3246 Effective 27-Jul-2020 07-Sep-2020 07-Sep-2020 31-Jul-2025 31-Jul-2025 P167788 TF-B3310 Effective 09-Jul-2020 19-Oct-2020 19-Oct-2020 31-Jul-2025 31-Jul-2025 P167788 TF-B3321 Effective 30-Jun-2020 18-Aug-2020 18-Aug-2020 31-Jul-2025 31-Jul-2025 P167788 TF-B3322 Effective 30-Jun-2020 14-Aug-2020 14-Aug-2020 31-Jul-2025 31-Jul-2025 P167788 TF-B3323 Effective 27-Jul-2020 10-Aug-2020 18-Dec-2020 31-Jul-2025 31-Jul-2025 Cumulative Disbursements 12/27/2023 Page 15 of 16 Public Disclosure Copy The World Bank Implementation Status & Results Report Africa Environmental Health and Pollution Management Program (P167788) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/27/2023 Page 16 of 16