NATIONAL WATER RESOURCES MANAGEMENT PROJECT – PHASE 1 1. Procurement for the NWRMP-1 would be carried out in accordance with the World Bank’s "Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Procurement Guidelines); "Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Consultant Guidelines); and the provisions stipulated in the Financing Agreement. The World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credit and Grants dated October 15, 2006 and revised on January 2011, would also apply. Procurement Implementation and Arrangements 2. Procurement Arrangements: The implementation responsibility of the NWRMP-1 will lie with the DWRLI through the PIU. The main activities to be procured under the NWRMP-1 will include procurement of a digital information exchange system between DWRLI central, regional and district offices; development and implementation of a WIS; and procurement of IT hardware and software at the district irrigation offices. TA will include an assessment and strengthening of 481 WUAs; strengthening of WUA Supports Units to provide better training to WUAs; and strengthening around 29 FWUAs. 3. Shortlists composed entirely of national consultants. Short lists of consultants for services estimated to cost less than U$100,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The Bank's Standard Request for Proposal Document would be used as a base for all procurement of consultancy services to be procured under the NWRMP-1. Some of the PIU staff hired under previous projects (2OIP and WMIP would continue working for implementation of the NWRMP-1). One International consultant for basin planning and management hired under WMIP will also continue to work under NWRMP-1 as this is a natural continuation of a previous assignment. 4. Training: Training program will focus on strengthening capacity of DWRLI to use new digital information exchange system and WIS; strengthening of 481 WUAs as well WUA Supports Units and around 29 FWUAs. Training and study tours will be carried out in accordance with the training plan prepared annually and submitted to IDA for review and no-objection prior to implementation. Substantial revisions during the year will also be submitted to IDA. 5. Operating Costs: The grant will finance incremental operating costs. Operating costs will cover vehicle maintenance for PIU, fuel, utility and communication costs, translation costs, travel expenses, bank charges, office supplies, advertisement costs, printing, mail, as well as other reasonable expenditures directly associated with the implementation of the NWRMP-1. Such costs would be financed by the NWRMP-1 as per an annual budget approved by the Bank and incurred using the implementing agency’s administrative procedures. Operating cost will not include salaries of civil servants. 6. Advance Procurement: In view of short implementation period of the project, all new procurement activities will be advanced as feasible as possible in line with the agreed procurement plan. 7. Procurement Supervision and Ex-post Review: Routine procurement reviews and supervision will be provided by the procurement analyst based in the country office. In addition, two supervision missions are expected to take place per year during which ex-post reviews will be conducted for the contracts that are not subject to Bank prior review on a sample basis (20 percent in terms of number of contracts). One ex-post review report will be prepared per fiscal year, including findings of physical inspections for not less than 10 percent of the contracts awarded during the review period. 8. Procurement Thresholds and Methods of Procurement: The following methods of procurement shall be used for procurement under the NWRMP-1. It has been agreed that if a particular invitation for bid comprises of several packages, lots or slices, and invited in the same invitation for bid, then the aggregate value of the whole package determines the applicable threshold amount for procurement and also for the review by the Bank. The National Competitive Bidding (NCB) conditions will be part of Financing Agreement. 9. Procurement plan. For each contract to be financed by the Bank, the different procurement methods or consultant selection methods, the need for prequalification, estimated costs, prior review requirements, and time frame are agreed between the Government and the Bank project team in the Procurement Plan. A procurement plan has been developed covering the above procurement activities and will be agreed during negotiations. Thereafter, the plan will be updated periodically, at least once per year, and each update will be subject to the Bank’s prior review. The initial procurement plan plus the subsequent updates will be published on the Bank’s external web site in line with the requirements of Bank Guidelines. PROCUREMENT Kyrgyz Republic : NATIONAL WATER RESOURCES MANAGEMENT PROJECT PLAN General Information Country: Kyrgyz Republic 2018-04-13 Bank’s Approval Date of the Original Procurement Plan: 2023-12-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144336 GPN Date: 2020-10-01 Project Name: NATIONAL WATER RESOURCES MANAGEMENT PROJECT Loan / Credit No: TF / 16315, TF / B1013 The Water Resources Service under the Ministry of Agriculture of the Kyrgyz Republic Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/G/S/C.2/05 / Device Strengthening national wate Request for Quota Open - Internationa for measuring water flow rat TF / 16315 Prior 72,235.35 Completed 2016-03-26 2016-06-19 r management capacity tions l e in the canals NWRMP/G/ICB/C.1/01 / Procu rement of IT equipment and Strengthening national wate Open - Internationa Single Stage - One E TF / 16315 Prior Request for Bids 431,245.39 Completed 2016-05-25 2016-07-24 2017-05-08 Office equipment with preins r management capacity l nvelope talled MS Office and Providin g Trainings NWRMP/G/S/C3/04 / Office fu Improving irrigation manage Request for Quota Single Stage - One E rniture and computer or educ TF / 16315 ment by Water Users Associ Post Open - National 13,755.91 Completed 2018-08-10 2018-09-20 2018-08-16 2018-11-05 2018-10-16 tions nvelope ational equipment for WUA O ations SUs and RSUs NWRMP/G/S/C3/05 / Publicati Improving irrigation manage Request for Quota Single Stage - One E TF / 16315 Post Open - National 11,520.22 Completed 2019-04-04 2019-05-11 2019-05-19 2019-06-09 2019-06-30 ons_Issue of the journal "Vest ment by Water Users Associ tions nvelope nik AVP" ations NWRMP/G/S/C4/08 / Video co Request for Quota Single Stage - One E TF / 16315 Project Management Post Open - National 66,854.92 Completed 2019-08-05 2019-08-23 2019-09-06 2019-08-29 2019-09-12 nference equipment tions nvelope NWRMP/G/S/C1/12 / server r Strengthening national wate Request for Quota Single Stage - One E Under Imple TF / 16315 Post Open - National 0.00 2019-03-18 2019-05-02 2019-06-02 oom equipment r management capacity tions nvelope mentation NWRMP/G/S/C3/01-1 / Produ ction of special clothes (vests Improving irrigation manage Request for Quota Single Stage - One E , T-shirts, caps) and other inf TF / 16315 ment by Water Users Associ Post Open - National 9,686.76 Completed 2020-06-21 2020-07-29 2018-08-16 2020-08-15 2018-10-09 tions nvelope ormation materials (backpac ations ks, mugs, pens) with the logo NWRMP-AF/C1/G/RFQ/01 / C Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 9,957.08 Completed 2020-07-01 2020-08-12 2021-09-17 2020-10-11 2021-10-02 omputer equipment r management capacity tions nvelope NWRMP-AF/C1-1/G/RFQ/02 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 74,955.62 Completed 2020-07-01 2020-08-12 2021-07-11 2020-10-11 2021-07-16 Vehicles for permit officers r management capacity tions nvelope NWRMP-AF/C1-2/G/RFQ/06 / providing additional equipme Strengthening national wate Request for Quota Single Stage - One E nt for server rooms (Air con TF / 16315 Post Open - National 80,386.46 Completed 2021-07-22 2021-09-09 2022-04-21 2021-11-08 2022-08-16 r management capacity tions nvelope ditioning, alarm, sensors, co mmunication equipment) NWRMP-AF/C4/G/RFQ/01 / In Irrigation and Drainage Man Request for Quota Single Stage - One E Pending Impl ventories and digital mapas f TF / 16315 Post Open - National 0.00 2020-08-22 2020-10-20 2021-02-17 agement tions nvelope ementation or 30 off-farm I&D systems NWRMP-AF/C4/G/RFB/02 / In Irrigation and Drainage Man Single Stage - One E Pending Impl TF / 16315 Post Request for Bids Open - National 0.00 2020-05-15 2020-06-05 2020-07-05 2020-07-19 2020-08-12 2020-12-10 ventories and digital maps fo agement nvelope ementation r 101 WUAs NWRMP-AF/C4/G/RFB/04 / Co Irrigation and Drainage Man Open - Internationa Single Stage - One E TF / 16315 Post Request for Bids 0.00 Canceled 2021-03-31 2021-09-08 2021-04-05 2021-09-10 2021-05-17 2021-10-22 2021-06-16 2021-07-21 2022-01-17 mputer equipment agement l nvelope NWRMP-AF/C4/G/RFB/04/RT1 Irrigation and Drainage Man Open - Internationa Single Stage - One E TF / 16315 Post Request for Bids 127,474.00 Completed 2021-12-13 2021-12-17 2021-12-17 2021-12-20 2022-01-28 2022-02-01 2022-03-29 2022-02-25 2022-04-26 2022-04-09 2022-07-25 2022-07-26 / Computer equipment agement l nvelope NWRMP/G/S/C1/05 / providin g additional equipment for s Strengthening national wate Request for Quota Single Stage - One E erver rooms in north region ( TF / 16315 Post Open - National 0.00 Canceled 2018-08-10 2018-09-20 2018-12-20 r management capacity tions nvelope Air conditioning, alarm, sens ors, communication equipme nt) NWRMP/G/S/C1/10 / providin g additional equipment for s Strengthening national wate Request for Quota Single Stage - One E erver rooms in south region ( TF / 16315 Post Open - National 0.00 Canceled 2018-08-10 2018-09-20 2018-12-20 r management capacity tions nvelope Air conditioning, alarm, sens ors, communication equipme nt) NWRMP/G/S/C1/06 / Instalati Strengthening national wate Request for Quota Single Stage - One E on of digital network in the s TF / 16315 Post Open - National 0.00 Canceled 2018-08-29 2018-09-21 2018-10-15 2019-01-11 r management capacity tions nvelope outh region (installation of DI N) NWRMP/G/S/C1/06-1 / Instal Strengthening national wate Request for Quota Single Stage - One E ation of digital network in the TF / 16315 Post Open - National 0.00 Canceled 2018-08-29 2018-09-21 2018-10-15 2019-01-11 r management capacity tions nvelope north region (installation of D IN) NWRMP/C3/G/S/03 / Purchas Improving irrigation manage e of 50 computers and multif Request for Quota Single Stage - One E TF / 16315 ment by Water Users Associ Post Open - National 0.00 Canceled 2018-08-28 2018-10-12 2018-11-12 unction printers for 40 RVKs, tions nvelope ations 7 OVKs and 3 AHEs NWRMP-AF/C4/G/RFB/01 / Co Irrigation and Drainage Man Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 mputer equipment agement tions nvelope NWRMP-AF/C1/G/RFQ/07 / Pr Strengthening national wate Request for Quota Single Stage - One E Pending Impl TF / B1013 Post Open - National 0.00 2023-05-01 2023-06-17 2023-08-01 ocurement of video clips for r management capacity tions nvelope ementation MNRETS Page 1 NWRMP-AF/C1/G/RFQ/08 / Eq uipment for the development Strengthening national wate Request for Quota Single Stage - One E Under Imple TF / B1013 Post Open - National 0.00 2023-05-15 2023-05-15 2023-06-30 2023-08-14 of a permit system for the us r management capacity tions nvelope mentation e of surface water resources NWRMP-AF/C1/G/RFQ/02 / Pu Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-08-10 2020-09-21 2020-11-20 blication r management capacity tions nvelope NWRMP-AF/C1-1/G/RFQ/01 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 IT equipment and VPN r management capacity tions nvelope NWRMP-AF/C1-1/G/RFQ/03 / Strengthening national wate Request for Quota Single Stage - One E Computers, software, printer TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 r management capacity tions nvelope s for permitting NWRMP-AF/C1-1/G/RFQ/04 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 Communication campaign r management capacity tions nvelope NWRMP-AF/C1-1/G/RFQ/05 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 Remote sensing software, ha r management capacity tions nvelope rdware, data NWRMP-AF/C1-2/G/RFQ/01 / Strengthening national wate Request for Quota Single Stage - One E Monitoring equipement (wate TF / 16315 Post Open - National 0.00 Canceled 2020-06-25 2020-08-06 2020-10-05 r management capacity tions nvelope r quality, goundwater and gla ciers) NWRMP-AF/C1-2/G/RFQ/02 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-07-01 2020-08-12 2020-10-11 Hydrological modeling softwa r management capacity tions nvelope re NWRMP-AF/C1-2/G/RFQ/03 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2020-09-18 2020-10-30 2020-12-29 Publication of the 5 RBMP's r management capacity tions nvelope NWRMP-AF/C1-2/G/RFQ/04 / Strengthening national wate Request for Quota Single Stage - One E TF / 16315 Post Open - National 0.00 Canceled 2021-07-26 2021-09-09 2021-11-08 Water Atlas of Kyrgyzstan r management capacity tions nvelope NWRMP-AF/C1-2/G/RFQ/05 / Strengthening national wate Request for Quota Single Stage - One E Remote Sensing Software, H TF / 16315 Post Open - National 0.00 Canceled 2021-07-25 2021-09-08 2021-11-07 r management capacity tions nvelope ardware, Data NWRMP-AF/C4/G/RFB/05 / Te Irrigation and Drainage Man Single Stage - One E chnical equipment of the trai TF / B1013 Post Request for Bids Open - National 0.00 Canceled 2023-03-13 2023-07-14 2023-03-15 2023-07-17 2023-04-19 2023-08-16 2023-05-09 2023-08-17 2023-06-20 2023-10-18 agement nvelope ning room of the Water Servi ce NWRMP-AF/C1/G/RFB/03 / Im provement and implementati Strengthening national wate Open - Internationa Single Stage - One E TF / B1013 Post Request for Bids 0.00 Canceled 2023-07-31 2023-08-17 2023-08-02 2023-08-18 2023-09-13 2023-09-28 2023-09-27 2023-10-11 2023-11-08 2024-04-26 on of the Unified Water Infor r management capacity l nvelope mation System for MNRETS NWRMP-AF/C1/G/RFB/01 / Cr Strengthening national wate Single Stage - One E Pending Impl eation of the State Water Ad TF / B1013 Post Request for Bids Open - National 0.00 2023-08-20 2023-08-23 2023-09-20 2023-10-04 2023-10-28 2024-01-26 r management capacity nvelope ementation ministration and Basin Admin istrations NWRMP-AF/C4/G/RFB/05-2 / Technical equipment of the tr Irrigation and Drainage Man Single Stage - One E Under Imple TF / B1013 Post Request for Bids Open - National 0.00 2023-09-03 2023-09-05 2023-09-05 2023-09-26 2023-10-12 2023-10-03 2023-10-22 2023-12-21 aining room of the Water Ser agement nvelope mentation vice (Lot#1 - Lot #5) NWRMP-AF/C1/G/RFB/04 / Se rver equipment for the Impro Strengthening national wate Single Stage - Two E Under Imple vement and implementation TF / B1013 Post Request for Bids Open - National 0.00 2023-11-10 2023-11-11 2023-11-12 2023-11-26 2023-11-30 2023-12-13 2023-10-12 2024-01-02 2024-04-01 r management capacity nvelope mentation of the Unified Water Informat ion System for MNRETS NWRMP-AF/C4/G/RFQ/05 / Ai Irrigation and Drainage Man Request for Quota Single Stage - One E Pending Impl TF / B1013 Post Open - National 0.00 2023-12-19 2024-01-08 2024-02-07 r condition for water resourc agement tions nvelope ementation e center WRS NWRMP-AF/C1/G/RFB/02 / Se Strengthening national wate Open - Internationa Single Stage - One E Pending Impl nsors for water protection, m TF / B1013 Post Request for Bids 0.00 2023-12-20 2023-12-23 2024-01-15 2024-01-25 2024-02-22 2024-03-28 r management capacity l nvelope ementation onitoring and control system MPRTEN NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP-AF/C4/G/RFB/03 / In Irrigation and Drainage Man Open - Internationa Single Stage - One E ventories and digital maps fo TF / 16315 Post Request for Bids 184,912.00 Signed 2021-03-31 2021-06-16 2021-04-05 2021-06-16 2021-05-17 2021-07-28 2021-06-16 2021-08-24 2021-07-21 2021-09-14 2022-01-17 agement l nvelope r 101 WUAs and 30 off-farm I &D systems NWRMP-AF/NC1/G/DS/01 / Lo gistical company for the orga Strengthening national wate Direct - Internation Pending Impl nization of overseas tour to s TF / B1013 Post Direct Selection 0.00 2023-11-11 2023-11-14 2023-12-08 2024-02-29 r management capacity al ementation tudy international experience in irrigation water managem ent (Spain/Portugal) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/CS/QBS/C.1/01 / Pla nning, designing and implem Strengthening national wate Consultant Qualifi Open - Internationa entation supervision of a Nati TF / 16315 Prior 247,789.00 Completed 2015-04-13 2015-04-21 2016-02-10 r management capacity cation Selection l onal Water Information Syste m for the Kyrgyz Republic NWRMP/C4/TR/CQS/04 / Stre ngthening the relationship wi Consultant Qualifi TF / 16315 Project Management Post Open - National 28,295.49 Completed 2018-08-03 2018-08-10 2018-08-10 2018-09-07 2018-10-16 2018-09-14 2018-10-18 2018-10-01 2018-10-27 2018-12-31 2018-12-14 th universities to integrate th cation Selection e experience of the NWRMP- 1 into university courses NWRMP-AF/TR/C1-1/02 / Trai nings capacity building and t Strengthening national wate Consultant Qualifi Open - Internationa Pending Impleme TF / 16315 Post 0.00 2022-03-02 2022-03-23 2022-05-06 2022-06-05 2022-07-10 2022-12-31 raining for river basin plans; r management capacity cation Selection l ntation permits; water accounting Page 2 NWRMP-AF/CS/C1-1/QCBS/0 Strengthening national wate Quality And Cost- Open - Internationa TF / 16315 Post 0.00 Canceled 2020-06-19 2021-10-18 2020-07-10 2020-08-21 2020-09-04 2020-09-18 2020-10-05 2020-10-22 2023-02-08 1 / WIS Service r management capacity Based Selection l NWRMP-AF/CS/C1-1/QCBS/0 1-1 / Development and imple Strengthening national wate Quality And Cost- Open - Internationa TF / 16315 Post 0.00 Signed 2021-12-22 2022-02-09 2022-01-05 2022-02-17 2022-02-02 2022-04-01 2022-03-04 2022-05-26 2022-03-24 2022-06-28 2022-04-29 2022-07-28 2022-06-03 2022-10-16 2022-10-21 mentation of the information r management capacity Based Selection l system "Unified Water Inform ation System" NWRMP-AF/CS/C5/LCS/01 / P Least Cost Selecti Open - Internationa TF / 16315 Project Management Post 0.00 Canceled 2020-06-26 2020-11-20 2020-07-17 2020-07-29 2020-08-03 2020-08-10 2020-09-14 2020-10-15 2022-12-31 roject audit on l NWRMP-AF/CS/C1-1/CQS/02 Strengthening national wate Consultant Qualifi / TA for water resources fee, TF / 16315 Post Open - National 0.00 Canceled 2020-06-13 2020-07-04 2020-08-08 2020-08-15 2020-09-18 2021-01-16 r management capacity cation Selection permits and billing NWRMP-AF/CS/C1-1/CQS/01 Strengthening national wate Consultant Qualifi / Inventory of existing permit TF / 16315 Post Open - National 0.00 Canceled 2020-07-10 2020-07-31 2020-08-28 2020-09-11 2020-10-15 2021-02-12 r management capacity cation Selection s, water abstractions & waste water discharge NWRMP-AF/CS/C1-2/CQS/01 Strengthening national wate Consultant Qualifi / Review of all existing water TF / 16315 Post Open 0.00 Canceled 2020-05-14 2020-06-04 2020-07-02 2020-07-29 2020-08-12 2020-11-10 r management capacity cation Selection monitoring systems (quantity & quality) NWRMP-AF/CS/C1-2/CQS/02 Strengthening national wate Quality And Cost- TF / 16315 Post Open 0.00 Canceled 2020-05-18 2020-06-01 2020-06-18 2020-06-28 2020-07-08 2020-07-20 2020-08-12 2022-12-31 / Feasability studies r management capacity Based Selection NWRMP-AF/CS/C1-2/CQS/03 Strengthening national wate Consultant Qualifi / Inventory of transboundary TF / 16315 Post Open 0.00 Canceled 2020-05-20 2020-06-10 2020-07-06 2020-07-30 2020-08-12 2020-12-10 r management capacity cation Selection water management objects NWRMP-AF/CS/C.1-2/CQS/05 Strengthening national wate Consultant Qualifi / Modernization of the syste TF / B1013 Post Open - National 0.00 Canceled 2023-03-20 2023-04-03 2023-05-17 2023-05-22 2023-05-30 2024-03-31 r management capacity cation Selection m of water protection, monit oring and control NWRMP-AF/CS/C.1-2/CQS/04 / Implementation of a Unified Strengthening national wate Consultant Qualifi TF / B1013 Post Open - National 0.00 Canceled 2023-06-17 2024-02-27 Information System for groun r management capacity cation Selection dwater accounting, quality a nd mapping NWRMP-AF/CS/C.1_2/CQS/04 / Development of the softwar Strengthening national wate Consultant Qualifi Under Implement e for Improvement and imple TF / B1013 Post Open - National 0.00 2023-11-13 2023-11-17 2023-11-27 2023-12-18 2023-12-23 2024-01-06 2024-03-30 r management capacity cation Selection ation mentation of the Unified Wat er Information System for MN RETS INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/CS/IC/C.4/01 / Intern Strengthening national wate Individual Consult ational Team Leader for Nati TF / 16315 Prior Open 371,333.33 Completed 2015-08-21 2015-09-27 2018-01-07 r management capacity ant Selection onal Water Resource Manage ment Project NWRMP/CS/IC/C.3/02 / Chief Strengthening national wate Individual Consult Advisor Component 3 - Intern TF / 16315 Prior Open 186,540.80 Completed 2015-08-26 2015-09-27 2019-07-06 r management capacity ant Selection ational Water Users Associati on Specialist CANCELLED1 / PIU DEPUTY Strengthening national wate TF / 16315 Prior Direct Selection Direct 13,443.67 Terminated 2015-04-30 DIRECTOR r management capacity NWRMP/CS/SSS/C.2/01 / Nati onal Consultant Component Strengthening national wate 2 - Maintenance, Operation a TF / 16315 Prior Direct Selection Direct 22,872.73 Completed 2015-12-09 2020-01-07 r management capacity nd Management of off-farm Ir rigation & Drainage systems NWRMP/CS/IC/C.4/03_1 / WIS Strengthening national wate Individual Consult TF / 16315 Prior Open 26,426.62 Completed 2015-12-11 2015-12-23 2020-01-07 Coordinator r management capacity ant Selection NWRMP/CS/IC/C.1/01 / Chief Strengthening national wate Individual Consult Advisor Component 1 - Intern TF / 16315 Prior Open 149,897.78 Completed 2016-04-18 2016-04-21 2019-01-12 r management capacity ant Selection ational Water Policy & Institu tional expert NWRMP/CS/SSS/C.3/03 / INT Strengthening national wate ERNATIONAL AGRICULTURE A TF / 16315 Prior Direct Selection Direct 119,830.00 Completed 2016-12-11 2018-07-10 r management capacity ND WATER SECTOR ECONOM IST AND M&E CANCELLED 2 / Database Ma Strengthening national wate Individual Consult TF / 16315 Prior Open 18,934.77 Terminated 2015-07-06 2015-06-30 nagement Specialist r management capacity ant Selection NWRMP/CS/IC/C.4/03 / WIS C Strengthening national wate Individual Consult TF / 16315 Prior Open 8,310.08 Completed 2015-07-06 2015-07-11 2020-01-12 oordinator r management capacity ant Selection NWRMP/CS/IC/C.2/01 / Chief Advisor Component 2 - Intern Improving irrigation service Individual Consult ational off-farm Irrigation & D TF / 16315 delivery to Water Users Asso Prior Open 242,681.00 Completed 2015-08-21 2015-10-01 2019-01-12 ant Selection rainage Management, Operat ciations ion and Maintenance (MOM) expert NWRMP/CS/IC/C.4/22 / Procu Strengthening national wate Individual Consult TF / 16315 Prior Open 13,672.50 Completed 2015-09-28 2015-10-08 2017-09-10 rement Specialist r management capacity ant Selection NWRMP/CS/IC/C.4/21 / Procu Strengthening national wate Individual Consult TF / 16315 Prior Open 11,954.87 Completed 2015-09-28 2015-10-08 2016-09-11 rement Specialist r management capacity ant Selection NWRMP/CS/SSS/C.4/01 / Con Strengthening national wate TF / 16315 Prior Direct Selection Direct 27,733.00 Completed 2016-01-11 2017-06-10 tract for audit services r management capacity NWRMP/CS/SSS/C.3/06 / ON- FARM IRRIGATION SYSTEM M Strengthening national wate TF / 16315 Prior Direct Selection Direct 10,784.33 Completed 2016-01-31 2019-07-10 ANAGEMENT, OPERATION AN r management capacity D MAINTENANCE SPECIALIST NWRMP/CS/SSS/C.3/06-1 / A Strengthening national wate TF / 16315 Prior Direct Selection Direct 10,784.33 Completed 2016-01-31 2019-07-10 SSETS MANAGEMENT SPECIA r management capacity LIST Page 3 NWRMP/CS/IC/C.4/06 / Infor Strengthening national wate Individual Consult mation Technology and Local TF / 16315 Prior Open 20,616.39 Completed 2016-02-21 2016-03-05 2018-08-10 r management capacity ant Selection Area Network Specialist (IT/L AN Specialist) NWRMP/CS/IC/C.1/05/1-1 / N ational Water Resources Man Strengthening national wate TF / 16315 Prior Direct Selection Direct 7,155.46 Completed 2016-10-09 2020-01-12 agement & River Basin Mana r management capacity gement expert (River Basin A dvisor) NWRMP/CS/SSS/C.1/13 / NAT Strengthening national wate IONAL WATER OBJECTS AND TF / 16315 Prior Direct Selection Direct 4,502.96 Completed 2016-10-22 2017-04-10 r management capacity WATER SCHEMES CODING EX PERT NWRMP/CS/IC/C.1/03 / Intern Strengthening national wate Individual Consult ational Water Resources Man TF / 16315 Prior Open 99,647.11 Completed 2016-04-18 2016-04-25 2019-01-12 r management capacity ant Selection agement & River Basin Mana gement expert NWRMP/CS/IC/C.3/05 / Intern ational On-farm Irrigation an Strengthening national wate Individual Consult d Drainage (I&D) Manageme TF / 16315 Prior Open 174,403.67 Completed 2016-09-13 2016-09-29 2017-02-25 r management capacity ant Selection nt, Operation & Maintenance (MOM) and Asset Manageme nt Expert NWRMP/CS/IC/C.1/05/1 / NAT IONAL WATER RESOURCES M Strengthening national wate TF / 16315 Prior Direct Selection Direct 5,399.86 Completed 2016-10-10 2020-01-12 ANAGEMENT AND RIVER BASI r management capacity N MANAGEMENT EXPERT (riv er basin modeling) NWRMP/CS/IC/C.1/04 / Intern Strengthening national wate Individual Consult TF / 16315 Prior Open 38,998.55 Completed 2016-07-26 2016-08-06 2018-06-28 ational Environmental expert r management capacity ant Selection NWRMP/CS/SSS/C.1/12 / Inte Strengthening national wate TF / 16315 Prior Direct Selection Direct 56,395.00 Completed 2016-10-30 2019-01-12 rnational Water Law Expert r management capacity NWRMP/CS/SSS/C.2/20 / INT Strengthening national wate TF / 16315 Prior Direct Selection Direct 126,173.33 Completed 2016-10-29 2017-10-19 ERNATIONAL TRAINING EXPE r management capacity RT NWRMP/CS/IC/C.4/08 / GIS S Strengthening national wate Individual Consult TF / 16315 Prior Open 17,297.13 Completed 2016-06-03 2016-06-11 2020-01-12 PECIALIST r management capacity ant Selection NWRMP/CS/SSS/C.2/19 / INT Strengthening national wate ERNATIONAL IRRIGATION SH TF / 16315 Prior Direct Selection Direct 26,810.00 Completed 2016-10-09 2017-09-15 r management capacity EDULING SPECIALIST NWRMP/CS/IC/C4 / Hiring Kyr Individual Consult TF / 16315 Project Management Post Open 2,276.29 Completed 2018-08-02 2018-08-10 2018-08-31 2018-09-05 2018-09-05 2018-09-06 2018-09-10 2018-09-25 2018-12-31 2019-01-24 gyz language translator remi ant Selection nder NWRMP/CS/IC/C1/8 / internat Strengthening national wate Individual Consult TF / 16315 Post Open 27,007.00 Completed 2018-08-03 2018-10-24 2018-08-31 2018-12-17 2018-09-04 2019-01-07 2018-09-18 2019-01-22 2018-12-31 2019-07-07 ional river basin planning spe r management capacity ant Selection cialist NWRMP/CS/IC/C1/8-1 / natio Strengthening national wate Individual Consult TF / 16315 Post Open 2,889.64 Completed 2018-08-03 2018-08-10 2018-08-29 2018-09-06 2018-09-03 2018-09-06 2018-09-11 2018-09-14 2018-12-31 2019-01-04 nal GIS specialist r management capacity ant Selection NWRMP/CS/IC/C2/15-1 / Nati Improving irrigation service Individual Consult TF / 16315 Post Open 2,735.52 Completed 2018-08-03 2018-08-10 2018-08-31 2018-09-07 2018-09-05 2018-09-10 2018-09-17 2018-09-20 2018-12-31 2019-01-04 onal Design Engineer delivery to Water Users Asso ant Selection ciations NWRMP/CS/IC/C1/07 / Local Strengthening national wate Individual Consult TF / 16315 Post Open 4,623.42 Completed 2018-08-03 2018-08-10 2018-08-28 2017-05-11 2018-09-03 2017-05-11 2018-09-17 2017-05-18 2018-12-31 2017-11-26 Environmental Expert r management capacity ant Selection NWRMP/CS/IC/C1/8-2 / Intern Strengthening national wate Individual Consult TF / 16315 Post Open 33,506.66 Completed 2018-08-20 2018-09-04 2018-09-19 2018-12-17 2018-09-26 2019-01-08 2018-10-15 2019-01-23 2018-12-31 2019-07-07 ational expert on basin plann r management capacity ant Selection ing NWRMP/CS/IC/C4/06 / Inform Individual Consult ation Technology and Local A TF / 16315 Project Management Post Open 9,246.83 Completed 2018-08-03 2015-09-22 2018-08-27 2016-02-18 2018-08-30 2016-02-18 2018-09-13 2016-03-03 2018-12-31 2018-08-08 ant Selection rea Network Specialist (IT/LA N Specialist) NWRMP/CS/IC/C1/06-2 / Loca Strengthening national wate Individual Consult l specialist on Water Code an TF / 16315 Post Open 6,765.60 Completed 2018-09-14 2019-02-27 2018-10-09 2017-09-26 2018-10-16 2017-09-27 2018-11-02 2017-10-07 2018-12-31 2018-07-06 r management capacity ant Selection d WUA Law amendments NWRMP/CS/IC/C1/7 / Nationa Strengthening national wate Individual Consult l Consultant on preparation o TF / 16315 Post Limited 2,136.02 Completed 2018-10-17 2018-10-10 2018-10-19 2018-10-19 2018-10-22 2018-10-22 2018-10-26 2018-10-31 2018-12-31 2019-01-10 r management capacity ant Selection f the meeting of the National Water Council NWRMP/CS/CQS/C3/07-1 / In Improving irrigation manage ventory, development of ass TF / 16315 ment by Water Users Associ Post Direct Selection Direct 99,469.38 Completed 2018-08-15 2018-10-24 2018-08-31 2018-09-21 2019-02-14 2018-12-31 2019-09-02 et management plans and pr ations eparation of digital maps of WUAs. NWRMP/CS/IC/C1/8-3 / Intern Strengthening national wate Individual Consult TF / 16315 Post Open 28,815.56 Completed 2018-11-15 2019-01-21 2018-12-14 2019-04-01 2018-12-21 2019-04-05 2019-01-11 2019-04-23 2019-06-29 2019-07-14 ational expert on basin plann r management capacity ant Selection ing NWRMP/CS/IC/C1/03 / IT engi Strengthening national wate Individual Consult TF / 16315 Post Open 2,435.00 Completed 2019-02-11 2019-02-27 2019-03-11 2019-03-25 2019-03-18 2019-03-26 2019-04-04 2019-04-09 2019-06-30 2019-07-14 neer (junior specialist) and GI r management capacity ant Selection S NWRMP/CS/IC/C4/11-8 / Tran Individual Consult TF / 16315 Project Management Post Open 2,875.09 Completed 2019-02-11 2019-02-27 2019-03-05 2019-02-27 2019-03-08 2019-02-27 2019-03-19 2019-03-06 2019-06-30 2019-07-06 slator ant Selection NWRMP/CS/IC/C1/7-1 / Natio Strengthening national wate Individual Consult nal Consultant on preparatio TF / 16315 Post Limited 3,992.72 Completed 2019-02-11 2019-01-16 2019-02-12 2019-02-15 2019-02-26 2019-02-15 2019-03-15 2019-02-19 2019-06-30 2019-07-05 r management capacity ant Selection n of the meeting of the Natio nal Water Council NWRMP/CS/IC/C4/07 / Datab Individual Consult TF / 16315 Project Management Post Open 7,564.47 Completed 2015-04-14 2015-04-14 2015-06-12 2015-05-29 2015-06-12 2015-06-10 2015-07-01 2015-07-04 2019-06-30 2020-01-19 ase Management Specialist ant Selection NWRMP/CS/IC/C4/21-1 / Proc Individual Consult TF / 16315 Project Management Post Open 11,073.83 Completed 2017-01-27 2018-01-15 2017-02-28 2017-03-13 2017-03-07 2017-03-17 2017-03-29 2017-04-01 2019-06-30 2019-09-07 urement specialist ant Selection NWRMP-AF/CS/C1/04 / Natio Strengthening national wate TF / 16315 Post Direct Selection Direct 19,541.66 Completed 2020-05-14 2020-06-19 2020-05-28 2020-06-17 2020-06-15 2020-07-03 2021-12-31 2022-07-04 nal WRM & RBM expert r management capacity NWRMP-AF/CS/C4/IC/04 / Int Irrigation and Drainage Man Under Implement TF / 16315 Post Direct Selection Direct 0.00 2020-05-14 2021-04-13 2020-05-28 2020-06-15 2022-12-31 ernational MOM specialist agement ation NWRMP-AF/CS/C4/IC/05 / Agr Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 22,908.94 Signed 2020-05-11 2020-06-19 2020-05-18 2020-06-17 2020-06-15 2020-07-03 2022-12-31 icultural economist agement Page 4 NWRMP-AF/CS/C1-2/IC/05 / Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-05-14 2020-06-19 2020-06-04 2020-06-07 2020-06-15 2022-12-31 WRM & RBM expert r management capacity ant Selection NWRMP-AF/CS/C1-2/IC/10 / H Strengthening national wate Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 ydrological modeling expert r management capacity ant Selection ntation NWRMP-AF/CS/C1-2/IC/11 / F Strengthening national wate Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 loodrisk management expert r management capacity ant Selection ntation NWRMP-AF/CS/C1-2/IC/12 / D Strengthening national wate Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 am expert r management capacity ant Selection ntation NWRMP-AF/CS/C1-2/IC/13 / C Strengthening national wate Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 osting expert/engineer r management capacity ant Selection ntation NWRMP-AF/CS/C4/IC/06 / Irri Irrigation and Drainage Man Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-08 2020-07-09 2020-07-23 2020-08-12 2022-12-31 gation agronomy specialist agement ant Selection ntation NWRMP-AF/CS/C4/IC/07 / WR Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 17,485.58 Completed 2020-05-20 2020-07-20 2020-06-01 2020-09-01 2020-06-15 2020-09-05 2022-12-31 2022-07-04 M specialist agement NWRMP-AF/CS/C4/IC/08 / I& Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 24,945.91 Signed 2020-05-20 2020-07-20 2020-05-27 2020-09-01 2020-06-15 2020-09-05 2022-12-31 D infrastructure specialist agement NWRMP-AF/CS/C4/IC/09 / GIS Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 23,357.91 Signed 2020-05-20 2020-06-19 2020-05-29 2020-06-17 2020-06-15 2020-07-12 2022-12-31 specialist agement NWRMP-AF/CS/C4/IC/10 / Fin Irrigation and Drainage Man Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-29 2020-07-31 2020-08-12 2021-12-31 ancial Specialist agement ant Selection ntation NWRMP-AF/CS/C4/IC/11 / WU Irrigation and Drainage Man Individual Consult TF / 16315 Post Open 11,516.50 Completed 2020-06-10 2021-04-06 2020-07-22 2021-05-18 2020-07-29 2021-05-25 2020-08-12 2021-06-14 2021-12-31 2022-07-13 A specialist/Engineer agement ant Selection NWRMP-AF/CS/C4/IC/14 / MO Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 25,048.88 Signed 2020-05-20 2020-07-20 2020-06-01 2020-09-01 2020-06-15 2020-09-07 2021-12-31 M specialist agement NWRMP-AF/CS/C4/IC/15 / Irri Irrigation and Drainage Man TF / 16315 Post Direct Selection Direct 25,048.87 Signed 2020-05-20 2020-07-20 2020-06-03 2020-09-01 2020-06-15 2020-09-07 2021-12-31 gation Engineer agement NWRMP-AF/CS/C4/IC/03 / Irri Irrigation and Drainage Man Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-15 2020-07-22 2020-08-12 2021-12-31 gation Engineer (Costing) agement ant Selection ntation NWRMP-AF/CS/C4/IC/12 / Int Irrigation and Drainage Man Individual Consult Pending Impleme TF / 16315 Post Open 0.00 2020-06-10 2020-07-15 2020-07-22 2020-08-12 2021-12-31 ernational agricultural econo agement ant Selection ntation mist NWRMP-AF/CS/C1/03 / Natio Strengthening national wate TF / 16315 Post Direct Selection Direct 20,282.01 Signed 2020-06-03 2020-06-19 2020-06-09 2020-06-25 2020-06-15 2020-07-15 2023-01-23 nal legal expert r management capacity NWRMP-AF/CS/C1-2/DS/05 / Strengthening national wate TF / 16315 Post Direct Selection Direct 5,914.98 Completed 2020-06-29 2020-06-19 2020-06-29 2020-06-29 2020-06-30 2020-07-06 2022-06-30 2021-03-17 WRM & RBM expert r management capacity NWRMP-AF/CS/C4/IC/01 / Nat Strengthening national wate Individual Consult ional Institutional Reform Spe TF / 16315 Post Open 3,106.51 Terminated 2020-06-10 2020-07-24 2020-07-22 2021-05-18 2020-07-29 2021-05-18 2020-08-12 2021-06-07 2023-01-29 r management capacity ant Selection cialist NWRMP AF NWRMP-AF/CS/C5/DS/01 / Pr TF / 16315 Project Management Post Direct Selection Direct 21,900.00 Signed 2020-09-21 2020-09-29 2020-10-05 2020-11-20 2020-11-12 2021-01-10 2023-01-19 oject audit NWRMP-AF/CS/C.1-2/IC/05-1 Strengthening national wate Individual Consult TF / 16315 Post Open 11,555.77 Signed 2021-03-29 2021-03-29 2021-05-17 2021-09-06 2021-06-07 2021-09-15 2021-07-12 2021-09-29 2022-06-30 / WRM & RBM expert r management capacity ant Selection NWRMP-AF/CS/C4/IC/02 / Int Strengthening national wate Individual Consult ernational Institutional devel TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 r management capacity ant Selection opment/WUO specialist NWRMP-AF/CS/C4/IC/13 / En Irrigation and Drainage Man Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 vironmental specialist agement ant Selection NWRMP-AF/CS/C.2/IC/02 / Int Strengthening national wate ernational Institutional devel TF / B1013 Post Direct Selection Direct 74,344.44 Signed 2021-06-18 2021-08-16 2021-06-28 2021-08-27 2021-07-23 2021-09-07 2023-01-07 r management capacity opment/WUO specialist NWRMP-AF/CS/C4/IC/ 13 / Ad Strengthening national wate visor to finalize the National TF / B1013 Post Direct Selection Direct 10,072.07 Completed 2021-06-18 2021-06-25 2021-06-28 2021-07-23 2021-07-22 2021-07-30 2022-01-18 2022-07-04 r management capacity Water Strategy (NWS). NWRMP-AF-WSFCRP/CS/C1/D Strengthening national wate Individual Consult TF / B1013 Post Direct 7,605.36 Completed 2021-10-22 2021-10-27 2021-10-22 2021-10-26 2021-10-27 2021-10-26 2021-10-28 2021-11-09 2022-04-11 2022-05-03 S/1 / Economist r management capacity ant Selection NWRMP-AF-WSFCRP/CS/C1/D Strengthening national wate Individual Consult TF / B1013 Post Direct 8,623.48 Completed 2021-10-28 2021-11-30 2021-10-31 2021-11-01 2021-11-01 2021-11-01 2021-11-01 2021-11-06 2022-04-15 2022-04-23 S/2 / Senior Design Engineer r management capacity ant Selection NWRMP-AF-WSFCRP/CS/C1/D Strengthening national wate Individual Consult TF / B1013 Post Direct 8,623.48 Completed 2021-10-28 2021-10-29 2021-10-31 2021-11-01 2021-11-01 2021-11-01 2021-11-01 2021-11-06 2022-04-15 2022-04-23 S/3 / Design Engineer r management capacity ant Selection NWRMP-AF-WSFCRP/CS/C1/D Strengthening national wate Individual Consult TF / B1013 Post Direct 2,593.53 Completed 2021-10-28 2021-10-29 2021-10-31 2021-11-01 2021-11-01 2021-11-01 2021-11-01 2021-11-06 2022-04-15 2022-04-23 S/4 / Estimator Engineer r management capacity ant Selection NWRMP-AF-WSFCRP/CS/C1/D Strengthening national wate Individual Consult TF / B1013 Post Direct 8,624.00 Completed 2021-10-28 2021-10-29 2021-10-31 2021-11-01 2021-11-01 2021-11-01 2021-11-01 2021-11-06 2022-04-15 2022-04-23 S/5 / Dam Specialist r management capacity ant Selection NWRMP/CS/IC/C1/10 / Negoti Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2018-08-20 2018-09-19 2018-09-26 2018-10-15 2018-12-31 ation processes international r management capacity ant Selection expert NWRMP/CS/IC/C1/9 / Negotia Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2018-08-20 2018-09-19 2018-09-26 2018-10-15 2018-12-31 tion processess specialist r management capacity ant Selection NWRMP-AF/CS/C1/05 / Natio Strengthening national wate Individual Consult TF / 16315 Post Limited 5,410.92 Signed 2022-08-01 2022-08-02 2022-08-06 2022-08-03 2022-08-06 2022-08-03 2022-08-13 2022-08-08 2022-11-11 nal Legal Adviser r management capacity ant Selection NWRMP-AF/CS/C1/06 / Natio Strengthening national wate Individual Consult nal consultant on the permitt TF / 16315 Post Limited 5,419.91 Signed 2022-08-01 2022-08-02 2022-08-06 2022-08-03 2022-08-06 2022-08-03 2022-08-13 2022-08-08 2022-11-11 r management capacity ant Selection ing system for the use of surf ace waters Page 5 NWRMP-AF/CS/C1/08 / Local Strengthening national wate Individual Consult Under Implement National Coordinator for Wat TF / B1013 Post Open - National 0.00 2023-03-10 2023-03-10 2023-04-12 2023-03-31 2023-04-19 2023-04-14 2023-05-03 2024-03-31 r management capacity ant Selection ation er Resources Management a nd Legal act. NWRMP-AF/CS/C1/09 / Local Strengthening national wate Individual Consult Under Implement Water Protection and Water TF / B1013 Post Open - National 0.00 2023-03-10 2023-03-10 2023-03-30 2023-03-31 2023-03-30 2023-04-17 2023-04-14 2024-03-31 r management capacity ant Selection ation Quality Consultant NWRMP-AF/CS/C1/10 / Local Strengthening national wate Individual Consult Under Implement TF / B1013 Post Open - National 0.00 2023-03-10 2023-03-10 2023-04-12 2023-03-31 2023-04-12 2023-04-14 2023-04-14 2024-03-31 Economic Consultant r management capacity ant Selection ation NWRMP-AF/CS/C1/11 / Local Consultant for development Strengthening national wate Individual Consult TF / B1013 Post Open - National 0.00 Signed 2023-03-10 2023-03-10 2023-04-12 2023-03-31 2023-04-13 2023-04-14 2023-04-28 2023-04-19 2024-03-31 and technical support water i r management capacity ant Selection nformation system NWRMP-AF/CS/C1/12 / Consu Strengthening national wate Individual Consult Under Implement TF / B1013 Post Open - National 0.00 2023-03-10 2023-03-10 2023-04-12 2023-03-31 2023-04-13 2023-04-14 2023-04-28 2024-03-31 ltant on the permit system fo r management capacity ant Selection ation r water use NWRMP-AF/CS/C1/01 / Intern Strengthening national wate Individual Consult ational Capacity building and TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 r management capacity ant Selection institutional development ex pert NWRMP-AF/CS/C1/02 / Natio Strengthening national wate Individual Consult nal Capacity building and ins TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 r management capacity ant Selection titutional development exper t NWRMP-AF/CS/C1-1/IC/01 / R Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-15 2020-07-29 2020-08-12 2021-12-31 emote Sensing Expert r management capacity ant Selection NWRMP-AF/CS/C1-1/IC/02 / I Strengthening national wate Individual Consult nternational specialist for Per TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2022-12-31 r management capacity ant Selection mit system design, advice, s oftware, procecures NWRMP-AF/CS/C1-1/IC/04 / N Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2022-12-31 ational Groundwater speciali r management capacity ant Selection st NWRMP-AF/CS/C1-2/IC/01 / I Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 nternational WRM & RBM exp r management capacity ant Selection ert NWRMP-AF/CS/C1-2/IC/03 / I Strengthening national wate Individual Consult nternational Hydrological mo TF / 16315 Post 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 r management capacity ant Selection deling expert NWRMP-AF/CS/C1-2/IC/04 / I Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 nternational Environmental e r management capacity ant Selection xpert NWRMP-AF/CS/C1-2/IC/08 / P Strengthening national wate Individual Consult TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 otable and wastewater exper r management capacity ant Selection t NWRMP-AF/CS/C1-2/IC/09 / E Strengthening national wate Individual Consult nvironmental and water reso TF / 16315 Post Open 0.00 Canceled 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 r management capacity ant Selection urces monitoring expert NWRMP-AF/CS/C1/07 / Intern Strengthening national wate Individual Consult Open - Internationa TF / 16315 Post 0.00 Canceled 2022-08-01 2022-08-02 2022-08-30 2022-09-01 2022-09-17 2022-12-16 ational legal consultant r management capacity ant Selection l NWRMP-AF/CS/C1/15 / Short- Strengthening national wate term consultant for GIS, Rem TF / B1013 Post Direct Selection Direct - National 0.00 Signed 2023-03-02 2023-03-17 2023-03-05 2023-03-22 2023-03-08 2023-04-01 2023-03-09 r management capacity ote Sensing, and Basin Mana gement NWRMP-AF/CS/C1/14 / Short- term consultant on the sectio Strengthening national wate Under Implement TF / B1013 Post Direct Selection Direct - National 0.00 2023-03-02 2023-03-17 2023-03-05 2023-03-09 2023-06-07 n "Hydrological regime and g r management capacity ation eo-ecological assessment of basins" NWRMP-AF/CS/C4/IC/16 / Sh ort-term consultant for water Irrigation and Drainage Man Under Implement TF / B1013 Post Direct Selection Direct - National 0.00 2023-03-02 2023-03-17 2023-03-08 2023-03-17 2023-03-11 2023-06-09 policy preparation in the irrig agement ation ation and drainage sector NWRMP-AF/CS/C1/13 / Intern Strengthening national wate Individual Consult Open - Internationa TF / B1013 Post 0.00 Canceled 2023-05-24 2023-07-05 2023-07-12 2023-07-27 2024-03-31 ational Consultant (IT speciali r management capacity ant Selection l st) NWRMP-AF/SSS/C1/02 / Loca Strengthening national wate Pending Impleme TF / B1013 Post Direct Selection Direct - National 0.00 2023-12-18 2023-12-26 2024-01-08 2024-03-31 l Consultant to preparation IC r management capacity ntation R Page 6