Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: negotiations Oct 2020. 2. Date of General Procurement Notice: to be published in June 2021. 3. Period covered by this procurement plan: The procurement period of project covered from Dec 2020 to Jun 2022, no procurements have commenced as yet. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement for Moderate Risk Projects: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$ 4 million All 2. NCB (Goods) US$ 4 million All 3. ICB (Works) US$ 15 million All 4. NCB (Works) US$ 15 million All 5. (Non-Consultant Services) US$ 4 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: All procurement details are provided in the PPSD and additional information shall be updated in PPSD as and when needed. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness The main contracts identified so far for the three implementing entities are provided in the annex below. There would be some works contracts of landfill sites at the upper limit of NCB, however these would be designed in the first 12-16 months of project implementation. Some consultancies are beyond the national firms thresholds, goods are small. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 m 2. Single Source (Firms) Above US $ 2 m Justification alongwith identification of SSS in procurement plan 3. Individual Above US$ 400, 000 In addition the selection of procurement staff 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the OPCS guidance. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: There are a number of activities for consultancy contracts. The procurement activity table is annexed which indicted the identified activities. Procurement Activities Estimate Bank Market S.N Categor Selection Evaluation Description d Cost in Oversigh Approac O y Methods Method: (US$) t h Individual Consultants Individual Procurement & Selection Open REoI Contract Moderat Based on 1 180,077 Post Competiti Advertisem management e qualification ve ent specialist and experience Individual Assistant Selection Procurement & Open REoI Moderat Based on 2 Contract 118,270 Post Competiti Advertisem e qualification management ve ent and specialist experience Individual Selection Open REoI Project Manager Moderat Based on 3 200,083 Post Competiti Advertisem (Engineering) e qualification ve ent and experience Individual Selection Open REoI Senior Solid Waste Moderat Based on 4 200,083 Post Competiti Advertisem Engineer e qualification ve ent and experience Individual Selection Open REoI Deputy PM Moderat Based on 5 160,065 Post Competiti Advertisem (Engineer) e qualification ve ent and experience Individual Selection Open REoI Moderat Based on 6 Quantity Surveyor 120,048 Post Competiti Advertisem e qualification ve ent and experience Individual Selection Open REoI PPP & Transaction Moderat Based on 7 200,083 Post Competiti Advertisem Advisory Specialist e qualification ve ent and experience Individual Selection Open REoI IT & Networking Moderat Based on 8 200,083 Post Competiti Advertisem Specialists e qualification ve ent and experience Individual Selection Senior Open REoI Moderat Based on 9 Environmental 160,065 Post Competiti Advertisem e qualification Specialist ve ent and experience Individual Selection Open REoI Health and Safety Moderat Based on 10 160,065 Post Competiti Advertisem Specialist e qualification ve ent and experience Individual Social Safeguards Selection Open REoI & Stakeholder Moderat Based on 11 160,065 Post Competiti Advertisem Engagement e qualification ve ent Specialist and experience Individual Selection Open REoI Resettlement Moderat Based on 12 160,065 Post Competiti Advertisem Specialist e qualification ve ent and experience Individual Selection Monitoring and Open REoI Moderat Based on 13 Evaluation 120,048 Post Competiti Advertisem e qualification Specialist ve ent and experience Individual Selection Open REoI Communications Moderat Based on 14 160,065 Post Competiti Advertisem specialist e qualification ve ent and experience Individual Selection Open REoI Finance and admin Moderat Based on 15 315,363 Post Competiti Advertisem Staff e qualification ve ent and experience Individual Selection Open REoI Office Support Staff Moderat Based on 16 295,672 Post Competiti Advertisem (skilled/unskilled) e qualification ve ent and experience GOODS Purchase of Single Stage necessary SW Open One Envelope related equipment Moderat 1 3,567,182 Post Competiti RFB with / machinery e ve Qualifying /vehicles for waste Criteria collection Single Stage Acquisition of light Open One Envelope Moderat 2 equipment (bins/ 1,432,818 Post Competiti RFB with e containers) ve Qualifying Criteria Rehabilitation of Single Stage waste collection Open One Envelope Moderat 3 and transport 3,000,000 Post Competiti RFB with e equipment of KMC, ve Qualifying DMC and SSWMB Criteria IT Equipment for PIU Computer Equipment (Laser Printers, Heavy Up to US $ duty Photo copier 100,000 Moderat Request for 4 machine Laptops, 49,453 Post RFQ Lowest Bid e Quotation Cartridges, Internet (Shopping Network, ) Software’s, Multimedia Equipment, Cameras etc.) Up to US $ Power Generator 100,000 Moderat Request for 5 for PIU (50 – 75 25,000 Post RFQ Lowest Bid e Quotation KVA) (Shopping ) Up to US $ Office Appliances, 100,000 Machinery and Moderat Request for 6 16,855 Post RFQ Lowest Bid Communication e Quotation (Shopping System for PIU ) Up to US $ 100,000 Office Furniture Moderat Request for 7 91,891 Post RFQ Lowest Bid and Fixture for PIU e Quotation (Shopping ) Up to US $ 100,000 Office Vehicles for Moderat Request for 8 95,125 Post RFQ Lowest Bid PIU (Cars) e Quotation (Shopping ) Up to US $ 100,000 Office Vehicles for Moderat Request for 9 77,289 Post RFQ Lowest Bid PIU (pick up) e Quotation (Shopping ) Up to US $ Upgradation, 100,000 Renovation and Moderat Request for 10 100,000 Post RFQ Lowest Bid Redesigning for e Quotation (Shopping Office ) Consulting Firms Consultancy for the Quality design and Open Best Moderat Cost Based 1 supervision of the 600,000 Post competitio evaluated e Selection new landfill cell at n proposal (QCBS) Jam Chakro Consultancy for the Open Consultants preparation ESIA Moderat Most qualified 2 200,000 Post competitio Qualificatio and RP at Jam e firm n n (CQS) Chakro Consultancy for the Quality design and Open Best Moderat Cost Based 3 supervision of the 600,000 Post competitio evaluated e Selection dumping site at n proposal (QCBS) Dhabeji Consultancy for the Open Consultants Moderat Most qualified 4 preparation ESIA 200,000 Post competitio Qualificatio e firm and RP at Dhabeji n n (CQS) Consultancy for the design and Open Consultants Moderat Most qualified 4 supervision of the 250,000 Post competitio Qualificatio e firm new Transfer n n (CQS) Stations Consultancy for the Open Consultants preparation ESIA Moderat Most qualified 5 300,000 Post competitio Qualificatio and RP for the New e firm n n (CQS) Transfer Stations Consultancy for the preparation of tender documents Open Consultants Moderat Most qualified 6 for the 150,000 Post competitio Qualificatio e firm procurement of n n (CQS) equipment and condition survey Consultancy for the mapping and design of the Open Consultants Katchra kundies, Moderat Most qualified 7 150,000 Post competitio Qualificatio preparation of e firm n n (CQS) tender documents, and supervision on construction works Consultancy for the Open Consultants preparation ESMP Moderat Most qualified 8 50,000 Post competitio Qualificatio and RP for the e firm n n (CQS) Katchra Kundies Consultancy for implementation of communication & Open Consultants Moderat Most qualified 9 community 1,000,000 Post competitio Qualificatio e firm outreach activities n n (CQS) during monsoon 2020* Consultancy for the monitoring of Environmental and Open Consultants Social Impact Moderat Most qualified 10 350,000 Post competitio Qualificatio Assessments, e firm n n (CQS) Environmental and Social Management Plans Consultancy for Quality Cost Monitoring Gender Request for Moderat NCB up to Based 11 Impacts and 150,000 Post Proposal e $ 0.5 M Selection Developing Gender (RFP) (QCBS) Inclusion Plans Consultancy for the Quality Cost Request for implementation Moderat NCB up to Based 12 400,000 Post Proposal and monitoring of e $ 0.5 M Selection (RFP) Resettlement Plans (QCBS) Works Cleaning of Waste from Nullahs* ( Works already awarded for the Year 2020 – 2021) Desilting of Nala And Transportation of Desilted Material Direct to Designated Moderat Request for Single Stage 1 2,000,000 Post Contractin Dump Sites at e BID (RFB) One Envelope g Karachi (District Central Package-1) Desilting of Nala And Transportation of Desilted Material Direct to Designated Moderat Request for Single Stage 2 Post Contractin Dump Sites at e BID (RFB) One Envelope g Karachi (District West Package-2) Desilting of Nala And Transportation of Desilted Material to Designated Direct Moderat Request for Single Stage 3 Dump Sites at Post Contractin e BID (RFB) One Envelope Karachi g (District South Package-3 – Part - 1) Desilting of Nala And Transportation of Desilted Material to Designated Direct Moderat Request for Single Stage 4 Dump Sites at Post Contractin e BID (RFB) One Envelope Karachi g (District South Package-3 – Part - 2) Desilting of Nala And Transportation of Desilted Material Direct to Designated Moderat Request for Single Stage 5 Post Contractin Dump Sites at e BID (RFB) One Envelope g Karachi (District East Package-4) Desilting of Nala And Transportation of Desilted Material Direct to Designated Moderat Request for Single Stage 6 Post Contractin Dump Sites at e BID (RFB) One Envelope g Karachi (District Malir & Korangi Package-5) Desilting of Nala And Transportation of Desilted Material to Designated Direct Moderat Request for Single Stage 7 Dump Sites at Post Contractin e BID (RFB) One Envelope Karachi g (Nallahs of various Districts Package- 6) Cleaning of Waste from Nullahs (for Moderat Open - Request for Single Stage 8 6,000,000 Post the year 2021 - e national BID (RFB) One Envelope 2022) Temporary storage and dewatering Direct Moderat Request for Single Stage 9 facility for waste 2,000,000 Post Contractin e BID (RFB) One Envelope cleared from g nullahs Improvement and Construction of Open - Moderat 19,000,00 Request for Single Stage 10 sanitary Prior internatio e 0 BID (RFB) Two Envelope engineered landfill nal site at Jam Chakro Retrofitting of Existing and Moderat Open - Request for Single Stage 11 1,850,000 Post Construction of e national BID (RFB) One Envelope New Kachra Kundis PROCUREMENT Pakistan : Solid Waste Emergency and Efficiency Project PLAN General Information Country: Pakistan 2021-06-10 Bank’s Approval Date of the Original Procurement Plan: 2023-12-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173021 GPN Date: 2021-11-05 Project Name: Solid Waste Emergency and Efficiency Project Loan / Credit No: IBRD / 91770 PIU Sindh Solid Waste Management Board Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-PIU SSWMB-233617-CW- Request for Quota Project Management and Im Request for Quota Single Stage - One E 2021-11-0 RFQ / Upgradation, Renovati IBRD / 91770 Post Limited tions (Non Bank-S 95,000.00 88,899.10 Signed 2021-06-16 2021-03-15 2021-08-11 2021-04-26 plementation Support tions nvelope 9 on and Redesigning for PIU S PD) WEEP Office. PK-PIU SSWMB-259664-CW- Request for Quota Project Management and Im Request for Quota Single Stage - One E 2022-05-0 RFQ / Extension of Solid Wast IBRD / 91770 Post Limited tions (Non Bank-S 98,000.00 72,481.24 Signed 2021-11-07 2021-12-13 2022-01-02 2022-02-07 plementation Support tions nvelope 2 e Management Board office. PD) PK-PIU SSWMB-375272-CW- RFB / Construction of Modern Garbage Transfer Stations (P Development of SWM Backb Open - Internationa Single Stage - Two E Other (with field f 28,000,000.0 Under Revie 2025-05-0 ackage 1) IBRD / 91770 Prior Request for Bids 0.00 2023-09-25 2023-10-06 2023-09-30 2023-10-10 2023-11-14 2023-11-27 2024-01-07 2024-02-05 one Infrastructure l nvelope or explanation) 0 w 6 using Two Lots (Namely: Lot1 - GTS Sharafi Goth & GTS Din ga Moor and, Lot2- GTS Imtia z & GTS Gutter Bagicha) PK-PIU SSWMB-399273-CW- RFB / Construction of Sanitar Immediate Emergency Resp Open - Internationa Single Stage - Two E Other (with field f 45,000,000.0 Pending Imp 2025-12-3 IBRD / 91770 Prior Request for Bids 0.00 2023-12-20 2023-12-22 2024-02-05 2024-03-26 2024-04-30 y Engineered Landfill Site at J onse Interventions l nvelope or explanation) 0 lementation 0 am Chakro Karachi. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PIU SSWMB-233624-GO-R FQ / Procurement of IT Equip ment for PIU SWEEP Computer Equipment (Laser IBRD / 91770 Project Management and Im Request for Quota Single Stage - One E Post Limited 75,000.00 62,835.09 Signed 2021-06-05 2021-07-05 2021-07-31 2021-08-21 2021-10-29 Printers, Heavy-duty Photo c plementation Support tions nvelope opier machine Laptops, Cartr idges, Internet Network, Soft ware’s, Multimedia Equipmen t, Cameras etc.) PK-PIU SSWMB-233634-GO-R FQ / Procurement of Power G Project Management and Im Request for Quota Single Stage - One E Pending Impl IBRD / 91770 Post Limited 25,000.00 0.00 2021-06-05 2021-07-31 2021-09-29 enerator for PIU for SWEEP plementation Support tions nvelope ementation (50 – 75 KVA) PK-PIU SSWMB-237157-GO-R Project Management and Im Request for Quota Single Stage - One E FQ / Procurement of Office V IBRD / 91770 Post Limited 100,000.00 0.00 Completed 2021-06-19 2021-07-19 2021-08-14 2021-08-30 2021-11-12 2022-01-25 plementation Support tions nvelope ehicles for PIU (Cars) PK-PIU SSWMB-233630-GO-R FQ / Procurement of Office A Project Management and Im Request for Quota Single Stage - One E IBRD / 91770 Post Limited 50,000.00 38,905.23 Signed 2021-06-19 2021-04-05 2021-08-14 2021-05-16 2021-10-13 ppliances, Machinery and Co plementation Support tions nvelope mmunication System for PIU PK-PIU SSWMB-233622-GO-R Project Management and Im Request for Quota Single Stage - One E FQ / Procurement of Office Fu IBRD / 91770 Post Limited 95,000.00 78,089.76 Signed 2021-06-16 2021-03-15 2021-08-11 2021-04-26 2021-11-09 plementation Support tions nvelope rniture and Fixture for PIU S WEEP PK-PIU SSWMB-237160-GO-R Project Management and Im Request for Quota Single Stage - One E Pending Impl FQ / Procurement of Office V IBRD / 91770 Post Limited 80,000.00 0.00 2021-06-20 2021-08-15 2021-11-13 plementation Support tions nvelope ementation ehicles for PIU (Pick up) PK-PIU SSWMB-259671-GO-R FQ / Procurement of Office Fu Project Management and Im Request for Quota Single Stage - One E rniture and Fixture for Solid IBRD / 91770 Post Limited 98,000.00 73,738.82 Signed 2021-11-20 2021-12-13 2022-01-15 2022-02-07 2022-03-16 plementation Support tions nvelope Waste Management Board Of fice for Extended Portion. PK-PIU SSWMB-259673-GO-R FQ / Procurement of Office A Project Management and Im Request for Quota Single Stage - One E ppliances and Machinery for IBRD / 91770 Post Limited 70,000.00 0.00 Signed 2021-11-20 2022-02-28 2022-01-15 2022-04-11 2022-03-16 plementation Support tions nvelope Sindh Solid Waste Managem ent Board extended Portion PK-PIU SSWMB-286546-GO-R Project Management and Im Request for Quota Single Stage - One E FQ / Procurement of Motor Bi IBRD / 91770 Post Limited 5,000.00 0.00 Signed 2022-04-04 2022-08-25 2022-05-30 2022-10-09 2022-07-29 plementation Support tions nvelope kes for PIU SWEEP Office PK-PIU SSWMB-360565-GO-R Project Management and Im Request for Quota Single Stage - One E Pending Impl FQ / Procurement of IT Equip IBRD / 91770 Post Limited 70,000.00 0.00 2023-05-16 2023-07-11 2023-10-09 plementation Support tions nvelope ementation ment For PIU SWEEP NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PIU SSWMB-335280-NC-R FQ / Hiring of a Third Party E Development of SWM Backb Request for Quota Single Stage - One E Pending Impl nvironmental Testing Firm Fo IBRD / 91770 Post Limited 90,000.00 0.00 2023-01-16 2023-03-13 2023-09-09 one Infrastructure tions nvelope ementation r Landfill Site Jamchakro & 6 Garbage Transfer Stations Page 1 PK-PIU SSWMB-357581-NC-R Project Management and Im Request for Quota Single Stage - One E Pending Impl FQ / Hiring of 4*4 Vehicles on IBRD / 91770 Post Limited 80,000.00 0.00 2023-04-28 2023-06-05 2025-06-30 plementation Support tions nvelope ementation a Rental basis CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-PIU SSWMB-239054-CS-C QS / Consultancy for the prep aration of tender documents Development of SWM Backb Consultant Qualifi Pending Impleme IBRD / 91770 Post Open - National 100,000.00 0.00 2021-06-14 2021-07-05 2021-08-18 2021-09-17 2021-10-22 2022-04-20 for the procurement of equip one Infrastructure cation Selection ntation ment and Asset verification a nd assessment, condition sur vey for overhauling & repair. PK-PIU SSWMB-239056-CS-C QS / Consultancy for the map Development of SWM Backb Consultant Qualifi Pending Impleme ping and design of the Katchr IBRD / 91770 Post Open - National 150,000.00 0.00 2021-06-14 2021-07-05 2021-08-18 2021-09-17 2021-10-22 2022-04-20 one Infrastructure cation Selection ntation a kundies, preparation of ten der documents, and supervisi on on construction works PK-PIU SSWMB-235480-CS-Q CBS / Consultancy for the pre Development of SWM Backb Consultant Qualifi paration of ESIA, ESMP and R IBRD / 91770 Post Limited 300,000.00 0.00 Canceled 2021-06-02 2021-06-16 2021-07-16 2021-08-20 2022-08-20 one Infrastructure cation Selection P at Jam Chakro, Dhabeji, Kat chra Kundies and Garbage Tr ansfer Stations. PK-PIU SSWMB-235479-CS-Q CBS / Consultancy Services f or conducting the feasibility s tudy, preliminary design, det Development of SWM Backb Quality And Cost- Open - Internationa IBRD / 91770 Prior 1,500,000.00 1,151,188.90 Signed 2021-06-14 2021-11-01 2021-07-05 2021-11-03 2021-08-18 2022-02-23 2021-09-15 2022-04-07 2021-10-15 2022-05-30 2021-11-19 2022-07-14 2021-12-24 2022-08-23 2023-12-24 ailed design and preparation one Infrastructure Based Selection l of bidding documents and co nstruction supervision for the construction of a new landfill cell and six transfer stations i n Karachi PK-PIU SSWMB-235491-CS-Q CBS / Consultancy for imple Development of SWM Backb Quality And Cost- Open - Internationa Pending Impleme IBRD / 91770 Prior 1,000,000.00 0.00 2021-06-15 2021-07-06 2021-08-19 2021-09-16 2021-10-16 2021-11-20 2021-12-25 2022-12-25 mentation of communication one Infrastructure Based Selection l ntation & community outreach activi ties. PK-PIU SSWMB-252069-CS-C QS / Consultancy for the prep Development of SWM Backb Consultant Qualifi aration of ESIA, ESMP and RP IBRD / 91770 Post Limited 300,000.00 0.00 Canceled 2021-09-10 2021-09-24 2021-10-24 2021-11-28 2022-11-28 one Infrastructure cation Selection at Jam Chakro, Dhabeji, Katc hra Kundies and Garbage Tra nsfer Stations. PK-PIU SSWMB-254939-CS-C QS / Consultancy Services for Conducting Environmental a nd Social Impact Assessment Project Management and Im Consultant Qualifi IBRD / 91770 Post Open - National 300,000.00 233,094.55 Signed 2021-09-28 2021-12-14 2021-10-19 2021-12-21 2021-12-02 2022-03-09 2022-01-01 2022-04-01 2022-02-05 2022-04-30 2023-02-05 & Preparing Environmental a plementation Support cation Selection nd Social Management Plan f or the Construction of a New Landfill Cell and Six Transfer Stations in Karachi PK-PIU SSWMB-278080-CS-C QS / CONSULTANCY SERVICE S FOR FEASIBILITY STUDY, IN CLUDING TECHNO-ECONOMI Development of SWM Backb Consultant Qualifi C STUDY, PREPARATION OF P IBRD / 91770 Post Limited 100,000.00 0.00 Signed 2022-02-14 2022-02-18 2022-02-28 2022-03-17 2022-03-30 2022-04-01 2022-05-04 2022-04-22 2022-10-31 one Infrastructure cation Selection RELIMINARY DESIGN, COST E STIMATION, BIDDING DOCUM ENT FOR THE INTEGRATED IN DUSTRIAL SOLID WASTE SYS TEM PROJECT KARACHI PK-PIU SSWMB-278093-CS-C QS / CONSULTANCY SERVICE S FOR TECHNO-ECONOMIC F EASIBILITY STUDY, INCLUDIN Development of SWM Backb Consultant Qualifi IBRD / 91770 Post Limited 100,000.00 0.00 Signed 2022-02-14 2022-02-18 2022-02-28 2022-03-17 2022-03-30 2022-04-01 2022-05-04 2022-04-22 2022-10-31 G PREPARATION OF PRELIMIN one Infrastructure cation Selection ARY DESIGN, COST ESTIMATI ON, BIDDING DOCUMENT FO R MEDICAL HAZARDOUS WA STE MANAGEMENT KARACHI. PK-PIU SSWMB-386725-CS-C QS / Consultancy Services Fo r Hiring of Legal Firm For Rev Project Management and Im Consultant Qualifi Under Implement IBRD / 91770 Post Open - National 50,000.00 0.00 2023-10-16 2023-10-17 2023-11-06 2023-10-18 2023-12-20 2024-01-19 2024-02-23 2024-08-21 iew and Drafting of Legal and plementation Support cation Selection ation Regulatory Framework for th e Sindh Solid Waste Manage ment Board INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2