Procurement Plan is under preparation. PROCUREMENT Kyrgyz Republic : Climate Resilient Water Services Project PLAN General Information Country: Kyrgyz Republic 2022-12-28 Bank’s Approval Date of the Original Procurement Plan: 2023-12-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173734 GPN Date: 2023-01-31 Project Name: Climate Resilient Water Services Project Loan / Credit No: IDA / 70810 Department for Development of Drinking Water Supply and Wastewater Disposal Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Request for B IDA-CRWSP-CW-RFB-10 / Re ids - Small W habilitation of WS, sanitation Infrastructure Investments a Single Stage - One E Pending Imp 2026-04-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 2024-12-20 2024-12-25 2025-02-05 2025-03-07 2025-04-11 and hygiene (WASH) facilities nd Service Improvements nvelope lementation 1 nvelope proc in social institutions of subpr ess) ojects Request for B IDA-CRWSP-CW-RFB-11 / Re ids - Small W habilitation of water supply a Infrastructure Investments a Open - Internationa Single Stage - One E 2025-04-1 IDA / 70810 Prior Request for Bids orks SPD (1 e 0.00 Canceled 2023-12-22 2023-12-27 2024-02-07 2024-03-08 2024-04-12 nd sanitation system in Kyzyl nd Service Improvements l nvelope 2 nvelope proc -Suu sub-project (Kyzyl-Suu) ess) Request for B IDA-CRWSP-CW-RFB-14 / Re ids - Small W habilitation of water supply s Infrastructure Investments a Single Stage - Two E 2025-03-1 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 Signed 2023-04-10 2023-04-26 2023-04-15 2023-04-26 2023-05-27 2023-05-26 2023-08-09 2023-06-22 2023-09-13 2023-07-21 ystem in Kyzyl-Suu sub-proje nd Service Improvements nvelope 4 nvelope proc ct (3 Lots) 1st Stage ess) Request for B IDA-CRWSP-CW-RFB-15 / Re ids - Small W habilitation of water supply s Infrastructure Investments a Single Stage - Two E Under Imple 2025-04-1 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2023-05-10 2023-12-11 2023-05-15 2023-12-11 2023-06-26 2023-09-08 2023-10-13 ystem in Kyzyl-Suu sub-proje nd Service Improvements nvelope mentation 3 nvelope proc ct (2 Lots) 2nd Stage ess) IDA-CRWSP-CW-RFB-1 / Reh Request for B abilitation of water supply an ids - Small W d sanitation system in Ak-Tur Infrastructure Investments a Single Stage - One E 2026-01-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2024-09-20 2024-09-25 2024-11-06 2024-12-06 2025-01-10 pak sub-project (Otukchu, Ky nd Service Improvements nvelope 0 nvelope proc zyl-Korgon, Tokoi, Chogorok, ess) Ak-Turpak, Kalacha, Chon-Ka ra) Request for B IDA-CRWSP-CW-RFB-2 / Reh ids - Small W abilitation of water supply an Infrastructure Investments a Single Stage - One E 2024-11-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 d sanitation system in Sovets nd Service Improvements nvelope 3 nvelope proc koe sub-project (Sovetskoe) ess) IDA-CRWSP-CW-RFB-3 / Reh Request for B abilitation of water supply an ids - Small W Infrastructure Investments a Single Stage - One E 2026-01-1 d sanitation system in Katra IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2024-09-20 2024-09-25 2024-11-06 2024-12-06 2025-01-10 nd Service Improvements nvelope 0 n sub-project (Jany-Turmush nvelope proc (Baul)) and Kulundu sub-proj ess) ect (Bulak-Bashy) 2 lots Request for B IDA-CRWSP-CW-RFB-4 / Reh ids - Small W abilitation of water supply an Infrastructure Investments a Single Stage - One E 2024-11-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 d sanitation system in Katra nd Service Improvements nvelope 3 nvelope proc n Sub-project (Katran) ess) Request for B IDA-CRWSP-CW-RFB-5 / Reh ids - Small W abilitation of water supply an Infrastructure Investments a Single Stage - One E 2024-11-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 d sanitation system in Toguz- nd Service Improvements nvelope 3 nvelope proc y sub-project (Aibiyke (Mada ess) niyat)) IDA-CRWSP-CW-RFB-6 / Reh Request for B abilitation of water supply an ids - Small W Infrastructure Investments a Single Stage - One E 2026-01-1 d sanitation system Dara sub IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2024-09-20 2024-09-25 2024-11-06 2024-12-06 2025-01-10 nd Service Improvements nvelope 0 -project (Kayindy, Kan, Sary- nvelope proc Talaa, Chek, Jany-Jer) and Su ess) u-Bashy sub-project (Apkan) IDA-CRWSP-CW-RFB-7 / Reh Request for B abilitation of water supply an ids - Small W Infrastructure Investments a Single Stage - One E 2026-01-1 d sanitation system in Toguz- IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2024-09-20 2024-09-25 2024-11-06 2024-12-06 2025-01-10 nd Service Improvements nvelope 0 Bulak sub-project (Sabyrov ( nvelope proc 50 let Kirgizii) and Margun su ess) b-project (Margun) 2 Lots IDA-CRWSP-CW-RFB-8 / Reh Request for B abilitation of water supply an ids - Small W d sanitation system in Tort-G Infrastructure Investments a Single Stage - One E 2024-11-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 ul sub-project (Ak-Otok, Ak-T nd Service Improvements nvelope 3 nvelope proc urpak, Zar-Tash, Chon-Gara, ess) Chon-Talaa) and Suu-Bashy s ub-project (Boz-Adyr) IDA-CRWSP-CW-RFB-9 / Reh Request for B abilitation of water supply an ids - Small W Infrastructure Investments a Single Stage - One E 2024-11-1 d sanitation system in Kara-B IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 nd Service Improvements nvelope 3 ulak sub-project (Kara-Bulak) nvelope proc and Suu-Bashy sub-project (A ess) igul-Tash) Request for B IDA-CRWSP-CW-RFB-12 / Re ids - Small W habilitation of water supply a Infrastructure Investments a Open - Internationa Single Stage - One E 2025-04-1 IDA / 70810 Prior Request for Bids orks SPD (1 e 0.00 Canceled 2023-12-22 2023-12-27 2024-02-07 2024-03-08 2024-04-12 nd sanitation system in Kun- nd Service Improvements l nvelope 2 nvelope proc Chygysh sub-project (Bokonb ess) aeva) Request for B IDA-CRWSP-CW-RFB-13 / Re ids - Small W habilitation of water supply a Infrastructure Investments a Single Stage - One E 2025-04-1 IDA / 70810 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2023-12-22 2023-12-27 2024-02-07 2024-03-08 2024-04-12 nd sanitation system in Ton s nd Service Improvements nvelope 2 nvelope proc ub-project (Kadzhi-Sai) ess) Request for B IDA-CRWSP-CW-RFB-16 / Co ids - Small W Infrastructure Investments a Open - Internationa Single Stage - Two E 2027-05-0 nstruction of sanitation syste IDA / 70810 Prior Request for Bids orks SPD (2 e 0.00 Canceled 2025-06-02 2025-06-07 2025-07-19 2025-10-01 2025-11-05 nd Service Improvements l nvelope 7 m in Kyzyl-Suu sub-project nvelope proc ess) Request for B IDA-CRWSP-CW-RFB-3-3 / Re ids - Small W habilitation of water supply s Infrastructure Investments a Single Stage - Two E Pending Imp 2025-10-0 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2023-10-30 2023-11-04 2023-12-16 2024-02-28 2024-04-10 ystem in Toguz-Bulak sub-pr nd Service Improvements nvelope lementation 7 nvelope proc oject (Sabyrov (50 years of K ess) yrgyzstan) Request for B IDA-CRWSP-CW-RFB-7-7 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 nd Service Improvements nvelope lementation 2 ystem in Suu-Bashy sub-proj nvelope proc ect (Aigul-Tash) ess) Page 1 Request for B IDA-CRWSP-CW-RFB-17-17 / ids - Small W Rehabilitation of water suppl Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-09 2024-10-14 2024-11-25 2025-02-07 2025-03-21 y system Dara sub-project (K nd Service Improvements nvelope lementation 7 nvelope proc ayindy, Kan, Sary-Talaa) ess) Request for B IDA-CRWSP-CW-RFB-5-5 / Re ids - Small W habilitation of water supply s Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 ystem in Toguz-Bulak sub-pr nd Service Improvements nvelope lementation 2 nvelope proc oject (Aibiyke (Madaniyat)) ess) Request for B IDA-CRWSP-CW-RFB-8-8 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 nd Service Improvements nvelope lementation 2 ystem in Kara-Bulak sub-proj nvelope proc ect (Kara-Bulak) ess) Request for B IDA-CRWSP-CW-RFB-18-18 / ids - Small W Rehabilitation of water suppl Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-02-01 2024-02-06 2024-03-19 2024-06-01 2024-07-13 y system in Kun-Chygysh sub nd Service Improvements nvelope lementation 9 nvelope proc -project (Bokonbaeva) ess) Request for B IDA-CRWSP-CW-RFB-6-6 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 nd Service Improvements nvelope lementation 2 ystem in Margun sub-project nvelope proc (Margun) ess) Request for B IDA-CRWSP-CW-RFB-1-1 / Re ids - Small W habilitation of water supply s Infrastructure Investments a Single Stage - Two E Pending Imp 2025-10-0 IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2023-10-29 2023-11-03 2023-12-15 2024-02-27 2024-04-09 ystem in Baul sub-project (Ja nd Service Improvements nvelope lementation 6 nvelope proc ny-Turmush (Baul)) ess) Request for B IDA-CRWSP-CW-RFB-4-4 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 nd Service Improvements nvelope lementation 2 ystem in Katran Sub-project nvelope proc (Katran) ess) Request for B IDA-CRWSP-CW-RFB-11-11 / ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 Rehabilitation of water suppl IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-09 2024-10-14 2024-11-25 2025-02-07 2025-03-21 nd Service Improvements nvelope lementation 7 y system in Suu-Bashy sub-p nvelope proc roject (Apkan) ess) Request for B IDA-CRWSP-CW-RFB-12-12 / ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 Rehabilitation of water suppl IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-09 2024-10-14 2024-11-25 2025-02-07 2025-03-21 nd Service Improvements nvelope lementation 7 y system in Boz-Adyr sub-pro nvelope proc ject ess) IDA-CRWSP-CW-RFB-13-13 / Request for B Rehabilitation of water suppl ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 y system in Tort-Gul sub-proj IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-09 2024-10-14 2024-11-25 2025-02-07 2025-03-21 nd Service Improvements nvelope lementation 7 ect (Ak-Otok, Ak-Turpak, Zar- nvelope proc Tash, Chon-Gara, Chon-Talaa ess) ) Request for B IDA-CRWSP-CW-RFB-2-2 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2025-10-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2023-10-29 2023-11-03 2023-12-15 2024-02-27 2024-04-09 nd Service Improvements nvelope lementation 6 ystem in Kulundu sub-project nvelope proc (Bulak-Bashy) ess) IDA-CRWSP-CW-RFB-16-16 / Request for B Rehabilitation of water suppl ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 y system in Ak-Turpak sub-pr IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-09 2024-10-14 2024-11-25 2025-02-07 2025-03-21 nd Service Improvements nvelope lementation 7 oject (Otukchu, Kyzyl-Korgon nvelope proc , Tokoi, Chogorok, Ak-Turpak, ess) Kalacha, Chon-Kara) Request for B IDA-CRWSP-CW-RFB-10-10 / ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-09-1 Rehabilitation of water suppl IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-10-10 2024-10-15 2024-11-26 2025-02-08 2025-03-22 nd Service Improvements nvelope lementation 8 y system Dara sub-project (C nvelope proc hek, Jany-Jer) ess) Request for B IDA-CRWSP-CW-RFB-19-19 / ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-1 Rehabilitation of water suppl IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-02-02 2024-02-07 2024-03-20 2024-06-02 2024-07-14 nd Service Improvements nvelope lementation 0 y system in Ton sub-project ( nvelope proc Kadzhi-Sai) ess) Request for B IDA-CRWSP-CW-RFB-9-9 / Re ids - Small W Infrastructure Investments a Single Stage - Two E Pending Imp 2026-01-0 habilitation of water supply s IDA / 70810 Post Request for Bids Open - National orks SPD (2 e 0.00 2024-01-25 2024-01-30 2024-03-12 2024-05-25 2024-07-06 nd Service Improvements nvelope lementation 2 ystem in Sovetskoe sub-proje nvelope proc ct (Sovetskoe) ess) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-CRWSP-G-RFB-2 / Suppl Infrastructure Investments a Open - Internationa Single Stage - One E Pending Impl IDA / 70810 Post Request for Bids 0.00 2025-03-02 2025-03-07 2025-04-18 2025-05-18 2025-06-22 2025-12-19 y of water meters nd Service Improvements l nvelope ementation IDA-CRWSP-G-RFB-1 / Purch Institutional Strengthening f ase offfice furnuture and equ or Climate Resilient Service Open - Internationa Single Stage - One E IDA / 70810 Post Request for Bids 0.00 Canceled 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 2024-05-12 ipment for billing system of b Delivery, Water Resources M l nvelope eneficiaries anagement and Dam Manag ement IDA-CRWSP-G-RFB-5 / Purch Institutional Strengthening f ase of laboratory equipment or Climate Resilient Service Single Stage - One E Pending Impl IDA / 70810 Post Request for Bids Open - National 0.00 2025-08-03 2025-08-08 2025-09-19 2025-10-19 2025-11-23 2026-05-22 for the target WSS enterprise Delivery, Water Resources M nvelope ementation s for the analysis of drinking anagement and Dam Manag water quality ement IDA-CRWSP-G-RFQ-4 / Purch Institutional Strengthening f ase of office furniture and eq or Climate Resilient Service Request for Quota Single Stage - One E Pending Impl IDA / 70810 Post Open - National 0.00 2025-10-15 2025-12-10 2026-06-08 uipment for the beneficiary b Delivery, Water Resources M tions nvelope ementation illing system (Phase 2) anagement and Dam Manag ement IDA-CRWSP-G-RFQ-3 / Purch Institutional Strengthening f ase of office furniture and eq or Climate Resilient Service Request for Quota Single Stage - One E Pending Impl IDA / 70810 Post Open - National 0.00 2024-10-15 2024-12-10 2025-06-08 uipment for the beneficiary b Delivery, Water Resources M tions nvelope ementation illing system (Phase 1) anagement and Dam Manag ement Institutional Strengthening f IDA-CRWSP-G-RFQ-6 / Purch or Climate Resilient Service Request for Quota Single Stage - One E Pending Impl IDA / 70810 Post Open - National 0.00 2023-06-06 2023-08-01 2024-01-28 ase auto DDWSWD Delivery, Water Resources M tions nvelope ementation anagement and Dam Manag ement NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-CRWSP-QCBS-1 / Prepar Infrastructure Investments a Quality And Cost- Open - Internationa ation of detailed designs for IDA / 70810 Post 0.00 Canceled 2023-02-15 2023-03-08 2023-04-21 2023-05-19 2023-06-18 2023-07-23 2023-08-27 2024-08-26 nd Service Improvements Based Selection l 11 sub-projects in Batken obl ast IDA-CRWSP-QCBS-2 / Prepar Infrastructure Investments a Quality And Cost- Open - Internationa Pending Impleme ation of detailed designs for IDA / 70810 Post 0.00 2023-03-17 2023-04-07 2023-05-21 2023-06-18 2023-07-18 2023-08-22 2023-09-26 2024-09-25 nd Service Improvements Based Selection l ntation 3 sub-projects in Issyk-Kul ob last IDA-CRWSP-QCBS-3 / Selecti Infrastructure Investments a Quality And Cost- Open - Internationa Pending Impleme on of the Construction Super IDA / 70810 Prior 0.00 2023-08-18 2023-09-08 2023-10-22 2023-11-19 2023-12-19 2024-01-23 2024-02-27 2025-02-26 nd Service Improvements Based Selection l ntation vision Company Infrastructure Investments a Least Cost Selecti Open - Internationa IDA-CRWSP-LCS-1 / Audit IDA / 70810 Post 0.00 Signed 2023-06-16 2023-04-02 2023-07-07 2023-08-20 2023-05-05 2023-09-17 2023-06-19 2023-10-17 2023-06-27 2023-11-21 2023-07-17 2023-12-26 2023-08-17 2026-12-31 nd Service Improvements on l IDA-CRWSP-СQS-2023-1 / Pr eparation of detailed designs Infrastructure Investments a Consultant Qualifi IDA / 70810 Post Open - National 0.00 Signed 2023-04-10 2023-05-19 2023-05-01 2023-06-05 2023-06-14 2023-07-13 2023-07-14 2023-08-09 2023-08-18 2023-09-01 2024-02-16 for 6 WSS sub-projects in Bat nd Service Improvements cation Selection ken oblast (1 Phase) Institutional Strengthening f IDA-CRWSP-QCBS-4 / Selecti or Climate Resilient Service Quality And Cost- Open - Internationa on of a Instituional Developm IDA / 70810 Post 0.00 Canceled 2023-08-18 2023-09-08 2023-10-22 2023-11-19 2023-12-19 2024-01-23 2024-02-27 2025-02-26 Delivery, Water Resources M Based Selection l ent Consultant anagement and Dam Manag ement IDA-CRWSP-СOMP2-CQS-202 Institutional Strengthening f 3-1 / Consultant on the devel or Climate Resilient Service Consultant Qualifi Pending Impleme IDA / 70810 Post Open - National 0.00 2024-01-15 2024-02-05 2024-03-20 2024-04-19 2024-05-24 2025-01-05 opment of by-laws in the fiel Delivery, Water Resources M cation Selection ntation d of WSS anagement and Dam Manag ement IDA-CRWSP-СOMP2-CQS-202 Institutional Strengthening f 3-2 / Consultant on the devel or Climate Resilient Service opment of the National Progr Consultant Qualifi Under Implement IDA / 70810 Delivery, Water Resources M Post Open - National 0.00 2023-09-01 2023-07-27 2023-09-22 2023-11-05 2023-12-05 2024-01-09 2025-06-30 am for the Development of t cation Selection ation anagement and Dam Manag he WSS Sector and support f ement or the institutional capacity d evelopment of the DDWSWD IDA-CRWSP-CQS-1 / Baseline Project Management, M&E a Consultant Qualifi IDA / 70810 Post Open - National 0.00 Signed 2023-06-02 2023-07-03 2023-06-23 2023-08-06 2023-08-24 2023-09-05 2023-09-15 2023-10-10 2023-10-02 2024-04-07 Survey nd Professional Developmen cation Selection t IDA-CRWSP-CQS-2 / Impact Project Management, M&E a Consultant Qualifi Pending Impleme IDA / 70810 Post Open - National 0.00 2026-09-15 2026-10-06 2026-11-19 2026-12-19 2027-01-23 2027-07-22 Assestment nd Professional Developmen cation Selection ntation t IDA-CRWSP-СOMP2-CQS-202 Institutional Strengthening f 3-3 / Consultant for capacity or Climate Resilient Service Consultant Qualifi Under Implement building of WSS enterprises a IDA / 70810 Delivery, Water Resources M Post Open - National 0.00 2023-09-01 2023-09-15 2023-09-22 2023-11-05 2023-12-05 2024-01-09 2026-12-31 cation Selection ation nd support in improving their anagement and Dam Manag financial management ement IDA-CRWSP-СQS-2023-2 / Pr eparation of detailed designs Infrastructure Investments a Consultant Qualifi Under Implement IDA / 70810 Post Open - National 0.00 2023-05-22 2023-09-06 2023-06-12 2023-09-14 2023-07-26 2023-08-25 2023-09-29 2024-06-30 for 6 WSS sub-projects in Bat nd Service Improvements cation Selection ation ken oblast (2 Phase) IDA-CRWSP-СQS-2024-3 / Te chnical Supervision of Civil W Infrastructure Investments a Consultant Qualifi Pending Impleme IDA / 70810 Post Open - National 0.00 2024-02-05 2024-02-26 2024-04-10 2024-05-10 2024-06-14 2026-06-14 orks for Construction of Wate nd Service Improvements cation Selection ntation r Supply Systems in Batken o blast (1 phase) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-CRWSP-IC-2022-1 / Sele Institutional Strengthening f ction of consultant for produc or Climate Resilient Service Individual Consult e a due diligence note on the IDA / 70810 Delivery, Water Resources M Post Open - National 0.00 Signed 2022-12-15 2022-12-01 2023-02-02 2022-11-15 2023-02-23 2022-11-21 2023-03-30 2022-12-25 2023-05-29 ant Selection security and conflict risk asse anagement and Dam Manag ssment in the Batken Region ement of the Kyrgyz Republic IDA-CRWSP-DS-2023-1 / Revi ew of previously prepared de Infrastructure Investments a tailed design estimates of Ky IDA / 70810 Post Direct Selection Direct - National 0.00 Signed 2023-02-03 2023-02-28 2023-02-20 2023-03-13 2023-03-20 2023-03-23 2023-06-18 nd Service Improvements zyl-Suu sub-project Issyk-Kul oblast, including author's sup ervision IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 6 / Consultant on the develop or Climate Resilient Service Individual Consult IDA / 70810 Post Open - National 0.00 Canceled 2023-07-03 2023-07-27 2023-08-21 2023-09-11 2023-10-16 2027-10-15 ment and implementation of Delivery, Water Resources M ant Selection the DDWSWD's communicati anagement and Dam Manag on strategy ement IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 5 / Consultant for developme or Climate Resilient Service Individual Consult Open - Internationa Pending Impleme nt of an energy efficiency im IDA / 70810 Delivery, Water Resources M Post 0.00 2024-07-01 2024-08-19 2024-09-09 2024-10-14 2025-10-14 ant Selection l ntation provement plan for priority anagement and Dam Manag WSS enterprises (internation ement al) Institutional Strengthening f IDA-CRWSP-СOMP2-IC-2023- or Climate Resilient Service Individual Consult 7 / Consultant on sanitation d IDA / 70810 Post Open - National 0.00 Canceled 2023-07-02 2023-07-27 2023-08-20 2023-09-10 2023-10-15 2028-12-31 Delivery, Water Resources M ant Selection evelopment anagement and Dam Manag ement IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 8 / Regional Specialist on inst or Climate Resilient Service Individual Consult IDA / 70810 Post Open - National 0.00 Signed 2023-06-01 2023-06-13 2023-07-20 2023-07-28 2023-08-10 2023-07-31 2023-09-14 2023-08-01 2026-07-10 itutional development in Zhe Delivery, Water Resources M ant Selection ti-Oguz district anagement and Dam Manag ement IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 9 / Regional Specialist on inst or Climate Resilient Service Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2025-02-03 2023-06-13 2025-03-24 2025-04-14 2025-05-19 2028-03-14 itutional development in Ton Delivery, Water Resources M ant Selection ation district anagement and Dam Manag ement Page 3 IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 10 / Regional Specialist on in or Climate Resilient Service Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2024-01-15 2023-06-13 2024-03-04 2024-03-25 2024-04-29 2027-02-28 stitutional development in Le Delivery, Water Resources M ant Selection ation ylek district anagement and Dam Manag ement IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 11 / Regional Specialist on in or Climate Resilient Service Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2024-03-01 2023-06-13 2024-04-19 2024-05-10 2024-06-14 2027-04-15 stitutional development in B Delivery, Water Resources M ant Selection ation atken distirct anagement and Dam Manag ement IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 12 / Regional Specialist on in or Climate Resilient Service Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2025-01-15 2023-06-13 2025-03-05 2025-03-26 2025-04-30 2028-02-29 stitutional development in Ka Delivery, Water Resources M ant Selection ation damjay district anagement and Dam Manag ement IDA-CRWSP-СOMP2-IC-2023- 4 / Consultant on automation Institutional Strengthening f of DDWSWD activities and im or Climate Resilient Service Individual Consult Pending Impleme plementation of the billing sy IDA / 70810 Delivery, Water Resources M Post Open - National 0.00 2023-07-16 2023-09-03 2023-09-24 2023-10-29 2026-08-31 ant Selection ntation stem for 8 target subprojects anagement and Dam Manag (Bokonbaev, Kaji-Say, Dara, ement Tort-Kul, Ak-Turpak, Apkan, B aul, Kulundu) IDA-CRWSP-СOMP2-IC-2023- 13 / Consultant on automatio Institutional Strengthening f n of DDWSWD activities and i or Climate Resilient Service Individual Consult Pending Impleme mplementation of the billing IDA / 70810 Delivery, Water Resources M Post Open - National 0.00 2023-09-17 2023-11-05 2023-11-26 2023-12-31 2026-12-30 ant Selection ntation system for 7 target subprojec anagement and Dam Manag ts (Kyzyl-Suu, Katran, Aibike, ement Margun, Suu-Bashy, Kara-Bul ak, Sovetskoe) IDA-CRWSP-IC-2023-1 / Seni Infrastructure Investments a Individual Consult or technical supervision cons IDA / 70810 Post Open - National 0.00 Signed 2023-07-15 2023-07-13 2023-09-02 2023-10-03 2023-09-23 2023-10-04 2023-10-28 2023-10-05 2025-04-25 nd Service Improvements ant Selection ultant for Kyzyl-Suu subproje ct IDA-CRWSP-IC-2023-2 / Tech Infrastructure Investments a Individual Consult nical supervision consultant f IDA / 70810 Post Open - National 0.00 Signed 2023-07-17 2023-07-13 2023-09-04 2023-10-03 2023-09-25 2023-10-04 2023-10-30 2023-10-05 2025-04-27 nd Service Improvements ant Selection or Kyzyl-Suu subproject IDA-CRWSP-СOMP2-IC-2023- Institutional Strengthening f 6-1 / Consultant on the devel or Climate Resilient Service Individual Consult IDA / 70810 Post Open - National 0.00 Signed 2023-09-08 2023-09-06 2023-10-27 2023-10-19 2023-11-17 2023-10-20 2023-12-22 2023-11-01 2024-05-16 opment and implementation Delivery, Water Resources M ant Selection of the DDWSWD's communic anagement and Dam Manag ation strategy ement Institutional Strengthening f IDA-CRWSP-СOMP2-IC-2023- or Climate Resilient Service Individual Consult 7-1 / Consultant on sanitation IDA / 70810 Post Open - National 0.00 Signed 2023-09-08 2023-09-06 2023-10-27 2023-10-19 2023-11-17 2023-10-20 2023-12-22 2023-10-23 2028-12-20 Delivery, Water Resources M ant Selection development anagement and Dam Manag ement IDA-CRWSP-IC-2023-3 / Sele ction of environmental consu Infrastructure Investments a Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2023-09-15 2023-09-06 2023-11-03 2023-11-24 2023-12-29 2028-06-27 ltant for WSS subprojects in nd Service Improvements ant Selection ation Batken and Issyk-Kul oblasts IDA-CRWSP-IC-2023-4 / Sele ction of hydrogeologist for W Infrastructure Investments a Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2023-09-15 2023-09-06 2023-11-03 2023-11-24 2023-12-29 2028-06-27 SS subprojects in Batken and nd Service Improvements ant Selection ation Issyk-Kul oblasts IDA-CRWSP-IC-2023-5 / Sele Infrastructure Investments a Individual Consult Under Implement ction of surveyor for WSS sub IDA / 70810 Post Open - National 0.00 2023-09-15 2023-09-06 2023-11-03 2023-11-24 2023-12-29 2028-06-27 nd Service Improvements ant Selection ation projects in Batken and Issyk- Kul oblasts IDA-CRWSP-IC-2023-6 / Sele ction of electrical engineer fo Infrastructure Investments a Individual Consult Under Implement IDA / 70810 Post Open - National 0.00 2023-09-15 2023-09-06 2023-11-03 2023-11-24 2023-12-29 2028-06-27 r WSS subprojects in Batken nd Service Improvements ant Selection ation and Issyk-Kul oblasts IDA-CRWSP-IC-2 / Internatio Infrastructure Investments a Individual Consult Open - Internationa Under Implement IDA / 70810 Post 0.00 2023-12-15 2023-12-07 2024-02-02 2024-02-23 2024-03-29 2025-03-29 nal Process Engineer nd Service Improvements ant Selection l ation IDA-CRWSP-DS-2023-4 / Revi ew of previously prepared de Infrastructure Investments a Pending Impleme tailed design estimates of Ba IDA / 70810 Post Direct Selection Direct - National 0.00 2024-02-01 2024-02-11 2024-03-03 2024-06-01 nd Service Improvements ntation ul sub-project (Jany-Turmush (Baul)) Batken oblast IDA-CRWSP-DS-2023-5 / Revi ew of previously prepared de Infrastructure Investments a Pending Impleme tailed design estimates of To IDA / 70810 Post Direct Selection Direct - National 0.00 2024-02-01 2024-02-11 2024-03-03 2024-06-01 nd Service Improvements ntation guz-Bulak sub-project (Sabyr ov (50 let Kirgizii) Batken obl ast IDA-CRWSP-DS-2023-3 / Revi ew of previously prepared de Infrastructure Investments a Pending Impleme IDA / 70810 Post Direct Selection Direct - National 0.00 2024-02-01 2024-02-11 2024-03-03 2024-03-12 tailed design estimates of Ka nd Service Improvements ntation dzhi-Sai sub-project Issyk-Kul oblast IDA-CRWSP-DS-2023-6 / Mon itoring of water analysis for r Infrastructure Investments a IDA / 70810 Post Direct Selection Direct - National 0.00 Under Review 2024-02-01 2023-12-07 2024-02-11 2024-03-03 2024-07-01 adiation of the Kadzhi Say, B nd Service Improvements okonbaevo and Kyzyl-Suu su bprojects IDA-CRWSP-DS-2023-2 / Revi ew of previously prepared de Infrastructure Investments a Under Implement IDA / 70810 Post Direct Selection Direct - National 0.00 2023-12-04 2023-11-01 2023-12-14 2024-01-04 2024-01-13 tailed design estimates of Bo nd Service Improvements ation konbaeva sub-project Issyk-K ul oblast IDA-CRWSP-CS-2024-1 / Envi ronmental Consultant for the preparation of the Environm Project Management, M&E a ental and Social Managemen Individual Consult Pending Impleme IDA / 70810 nd Professional Developmen Post Limited 0.00 2023-12-13 2023-12-18 2023-12-20 2024-01-08 2024-02-12 t Framework (ESMF), Environ ant Selection ntation t mental and Social Commitme nt Plan (ESCP) for the new up coming project “Unified acce ss to the water supply and sa nitation” IDA-CRWSP-CS-2024-2 / Soci al Development Consultant f or the preparation of the Sta Project Management, M&E a keholder Engagement Plan (S Individual Consult Pending Impleme IDA / 70810 nd Professional Developmen Post Limited 0.00 2023-12-13 2023-12-18 2023-12-20 2024-01-08 2024-02-12 EP), Labor Management Proc ant Selection ntation t edures (LMP), Resettlement a ction plan (RAP), Code of Co nduct, as well as contribute t o ESMF for the new upcomin g project Page 4 Page 5