Summarized Procurement Plan I. GENERAL Project information: Borrower: CCARDESA Project Name: Agricultural Productivity Program for Southern Africa Project ID No: P164486 Grant No.: Project Implementing Agency: CCARDESA Bank’s approval Date of the Procurement Plan: February 13, 2019 Date of General Procurement Notice: Period covered by this procurement plan: February 13, 2019 to September 2020 II. Goods and Works and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Thresholds for Procurement Methods and Prior Review Goods, Works and Non- Consulting Services Procurement Approaches and Methods (US$ Prior millions) Review Category Open Open Request for (US$ millions) International National Quotation (RfQ) Works ≥ 15 ≥7 < 0.2 ≤ 0.2 Goods, IT, and non- ≥6 ≥1 < 0.1 ≤ 0.1 consulting services 2. Reference to (if any) Project Operational/Procurement Manual: The Procurement Plan also forms part of the Project Implementation Manual approved on May 2019. 1 3. Procurement Packages with Methods and Time Schedule Procurement of Goods & Non-consulting Services Summary 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB NIL NIL NIL NIL NIL (Works) Summary of the NCB NIL NIL NIL NIL NIL (Works) Summary of the ICB NIL NIL No NIL No major goods (Goods) Summary of the NCB NIL NIL NIL NIL NIL (Goods) Summary of the RfQ 0.03 6 No Post Request for (Goods & Non- Quotations Consulting Services) Summary of the DC 0.2million 2 No Post (Non-consulting services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines: Selection and Employment of Consultants: Thresholds for Consultants Selection Methods and Prior Review Thresholds for Consultants Selection Methods and Prior Review for Consulting Services Category Prior Short List of National Consultants (US$ million) 2 Review Consulting Engineering and (US$ Services Construction Supervision millions) Consultants (Firms) ≥4 ≤ 0.3 ≤ 0.3 Individual Consultants ≥ 0.5 NA. NA. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines: Selection and Employment of Consultants. 3. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. 4. Any Other Special Selection Arrangements: N/A 5. Consultancy Assignments with Selection Methods and Time Procurement of Consulting Services Summary 1 2 3 4 5 6 Ref. No. Description of Estimated Package Review Comments Assignment Cost s by Bank (Prior / US$ million Post) Summary of NIL NIL NIL NIL contracts through CQS 3 Summary of 0.2 million 26 Post Individual Consultants (mostly contracts through peer reviewers) IC 4 PROCUREMENT Eastern and Southern Africa : Agricultural Productivity Program for Southern Africa - Angola & Lesotho PLAN General Information Country: Eastern and Southern Africa 2020-08-27 Bank’s Approval Date of the Original Procurement Plan: 2023-12-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164486 GPN Date: Project Name: Agricultural Productivity Program for Southern Africa - Angola & Lesotho Loan / Credit No: IBRD / 89170 Agronomic Research Institute Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Solicitação de Ofe AO-IIA-188294-CW-RFP / Ref Strengthening the Institution rtas - Pequenas O urbishment of the PIU Office Solicitação de Ofe Single Stage - One E 2023-11-0 IBRD / 89170 al and Enabling Environment Posterior Open - National bras Documento 200,000.00 0.00 Cancelado 2023-01-17 2023-01-22 2023-03-05 2023-04-04 2023-05-09 and three premises in Chiang rtas nvelope 5 for Technology Adoption Padrão de Aquisiç a - Huambo ão (DPA) - proces so de 1 envelope Solicitação de Ofe APPSA/W-001 / Construction Strengthening the Institution rtas - Obras (sem Works of the Cassava Region Solicitação de Ofe Open - Internationa Single Stage - One E 2023-11-2 IBRD / 89170 al and Enabling Environment Posterior prequalificação) D 5,000,000.00 0.00 Assinado 2023-03-10 2023-04-19 2023-03-15 2023-04-25 2023-04-26 2023-06-27 2023-04-27 2023-07-21 2023-06-01 2023-09-26 al Leadership Center in Mala rtas l nvelope 8 for Technology Adoption ocumento Padrão nje. de aquisição (DPA ) Solicitação de Ofe APPSA/W-006 / Rehabilitatio Strengthening the Institution rtas - Pequenas O Em fase de I Solicitação de Ofe Single Stage - One E 2023-12-1 n of the Malanje Agricultural IBRD / 89170 al and Enabling Environment Posterior Open - National bras Documento 200,000.00 0.00 mplementa 2023-02-28 2023-04-24 2023-03-05 2023-05-03 2023-04-16 2023-06-27 2023-05-16 2023-09-21 2023-06-20 rtas nvelope 7 Experimental Station for Technology Adoption Padrão de Aquisiç ção ão (DPA) - proces so de 1 envelope Solicitação de Ofe APPSA/W-010 / Rehabilitatio rtas - Pequenas O Strengthening the Institution Em fase de I n of three (3) Buildings of the Solicitação de Ofe Single Stage - One E bras Documento 2023-12-2 IBRD / 89170 al and Enabling Environment Posterior Open - National 400,000.00 0.00 mplementa 2023-03-06 2023-04-25 2023-03-11 2023-05-03 2023-04-22 2023-05-22 2023-06-26 Chianga (Huambo) and Buildi rtas nvelope Padrão de Aquisiç 3 for Technology Adoption ção ng in Largo Cussy ão (DPA) - proces so de 1 envelope APPSA/W-007 / Rehabilitatio Strengthening the Institution Em fase de I n of the Tissue Culture Labor Solicitação de Cot Single Stage - One E Outro (campo par 2023-12-2 IBRD / 89170 al and Enabling Environment Posterior Limited 50,000.00 0.00 mplementa 2023-05-03 2023-04-28 2023-06-28 atory at the Mazozo Agricultu ações nvelope a explicação) 5 for Technology Adoption ção ral Experimental Station APPSA/W-008 / Construction Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-10-3 of a Warehouse at the Tomb IBRD / 89170 al and Enabling Environment Posterior Limited 15,000.00 0.00 Cancelado 2023-03-08 2023-05-03 ações nvelope a explicação) 0 oco Agricultural Experimental for Technology Adoption Field (Zaire) APPSA/W-009 / Construction Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-12-2 of a Warehouse at the Ceilun IBRD / 89170 al and Enabling Environment Posterior Limited 15,000.00 0.00 Cancelado 2023-05-05 2023-06-30 ações nvelope a explicação) 7 ga Agricultural Experimental for Technology Adoption Field (Bié) APPSA/W-005 / Fencing at th Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-10-2 e Agricultural Experimental S IBRD / 89170 al and Enabling Environment Posterior Limited 70,000.00 0.00 Cancelado 2023-03-01 2023-05-30 2023-04-26 ações nvelope a explicação) 3 tations of Namibe for Technology Adoption APPSA/W-003 / Fencing at th Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-10-2 e Agricultural Experimental S IBRD / 89170 al and Enabling Environment Posterior Limited 70,000.00 0.00 Cancelado 2023-03-04 2023-05-30 2023-04-29 ações nvelope a explicação) 6 tations of Chianga (Huambo) for Technology Adoption APPSA/W-004 / Fencing at th Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-12-2 e Agricultural Experimental S IBRD / 89170 al and Enabling Environment Posterior Limited 40,000.00 0.00 Cancelado 2023-05-01 2023-06-26 ações nvelope a explicação) 3 tations of Mazozo (Luanda) for Technology Adoption APPSA/W-002 / Fencing at th Strengthening the Institution Solicitação de Cot Single Stage - One E Outro (campo par 2023-10-1 e Agricultural Experimental S IBRD / 89170 al and Enabling Environment Posterior Limited 100,000.00 0.00 Cancelado 2023-02-25 2023-05-30 2023-04-22 ações nvelope a explicação) 9 tations of Malanje for Technology Adoption GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-188196-GO-RFQ / Offi Technology Generation and Solicitação de Cot Single Stage - One E ce supplies for R&D projects IBRD / 89170 Posterior Limited 30,000.00 0.00 Cancelado 2020-10-11 2020-12-06 2021-06-04 Dissemination ações nvelope and PIU office AO-IIA-193891-GO-RFQ / Pur Strengthening the Institution chase ot three vehicles stati Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 120,000.00 174,219.91 Concluído 2020-11-08 2021-02-19 2021-01-03 2021-04-14 2021-07-02 2021-11-13 on wagon 13 seats for Experi ações nvelope for Technology Adoption mental Fields of Luso, Ceilun ga and Zaire AO-IIA-193765-GO-RFB / Pur Strengthening the Institution Solicitação de Ofe Single Stage - One E chase of tractors and implem IBRD / 89170 al and Enabling Environment Posterior Open - National 400,000.00 0.00 Cancelado 2021-01-10 2021-01-15 2021-02-26 2021-03-28 2021-05-02 2021-10-29 rtas nvelope ents for Malanje and Huambo for Technology Adoption (Chianga) AO-IIA-188275-GO-RFQ / Thr Strengthening the Institution Solicitação de Cot Single Stage - One E ee sets video conference equ IBRD / 89170 al and Enabling Environment Posterior Limited 30,000.00 0.00 Cancelado 2020-11-08 2021-01-03 2021-07-02 ações nvelope ipment for Technology Adoption AO-IIA-221338-GO-RFQ / Veh Project management, monit Solicitação de Cot Single Stage - One E icles to Support the monitori IBRD / 89170 oring and evaluation, and re Posterior Limited 200,000.00 281,067.85 Concluído 2021-03-09 2021-06-11 2021-05-04 2021-10-14 2021-10-31 2022-03-14 ações nvelope ng Missions gional coordination Strengthening the Institution AO-IIA-187417-GO-RFB / Pur Solicitação de Ofe Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Open - National 880,000.00 0.00 Cancelado 2020-09-21 2020-09-26 2020-11-07 2020-12-07 2021-01-11 2021-07-10 chase of vehicles rtas nvelope for Technology Adoption Strengthening the Institution AO-IIA-188183-GO-RFQ / Pur Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 15,000.00 0.00 Cancelado 2021-05-09 2021-07-04 2021-12-31 chase of 10 motorbikes ações nvelope for Technology Adoption Strengthening the Institution APPSA/G-013 / Procurement IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 25,000.00 81,865.99 Assinado 2022-01-10 2022-01-26 2022-01-15 2022-01-31 2022-02-19 2022-02-22 2022-08-18 of Motorbikes for Technology Adoption Strengthening the Institution APPSA/G-014 / Procurement IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 500,000.00 535,515.88 Assinado 2022-01-10 2021-12-10 2022-01-15 2022-02-07 2022-02-19 2022-03-18 2022-08-18 Tractors and Implements for Technology Adoption Page 1 APPSA/G-015 / Procurement Strengthening the Institution of Vehicles for PIU, IIA Resear IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 750,000.00 804,217.70 Assinado 2022-01-11 2022-01-05 2022-01-16 2022-02-07 2022-02-20 2022-03-09 2022-08-19 ch Programmes and Stations for Technology Adoption Project management, monit APPSA/G-016 / License Softw IBRD / 89170 oring and evaluation, and re Posterior Aquisição Direta Direct 30,000.00 16,459.31 Assinado 2022-01-16 2022-01-26 2022-01-21 2022-01-26 2022-02-25 2022-02-05 2022-08-24 are Accounting TOMPRO gional coordination APPSA/G-017 / IT Equipment Strengthening the Institution Solicitação de Ofe Single Stage - One E for UIP and Subprojects Supp IBRD / 89170 al and Enabling Environment Posterior Open - National 300,000.00 0.00 Assinado 2022-05-31 2022-05-26 2022-06-05 2022-05-27 2022-07-17 2022-07-08 2022-08-16 2023-04-10 2022-09-20 2023-08-10 2023-03-19 rtas nvelope ort for Technology Adoption AO-IIA-188210-GO-RFQ / Lab oratory supplies (essencial e Technology Generation and Solicitação de Cot Single Stage - One E IBRD / 89170 Posterior Limited 70,000.00 0.00 Cancelado 2021-01-15 2021-03-12 2021-09-08 quipment, reagens and other Dissemination ações nvelope lab consumables) APPSA/G-021 / Procurement Strengthening the Institution Solicitação de Ofe Single Stage - One E of 6 Vehicles to Intensify the IBRD / 89170 al and Enabling Environment Posterior Open - National 500,000.00 0.00 Assinado 2022-06-26 2022-07-18 2022-07-01 2022-07-27 2022-08-12 2022-08-31 2022-09-11 2022-09-05 2022-10-16 2022-10-03 2023-04-14 rtas nvelope Activities of the Research Su for Technology Adoption b-projects Fields APPSA/G-022 / Procurement Strengthening the Institution Solicitação de Cot Single Stage - One E of 15 Motorbikes and Access IBRD / 89170 al and Enabling Environment Posterior Open - National 150,000.00 0.00 Assinado 2022-07-19 2022-06-23 2022-09-13 2022-08-03 2023-03-12 ações nvelope ories for Technology Adoption Strengthening the Institution APPSA/G-025 / Procurement Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 80,000.00 0.00 Assinado 2022-08-01 2022-08-25 2022-09-26 2022-10-13 2023-03-25 1 Vehicle for Supporting UIP ações nvelope for Technology Adoption Strengthening the Institution APPSA/G-023 / Procurement Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Open - National 150,000.00 0.00 Assinado 2022-09-10 2022-10-13 2022-09-14 2023-04-11 of 3 Tractors ações nvelope for Technology Adoption AO-IIA-187401-GO-RFQ / Pur Technology Generation and Solicitação de Ofe Single Stage - One E IBRD / 89170 Posterior Open - National 120,000.00 0.00 Cancelado 2021-01-18 2021-01-23 2021-03-06 2021-04-05 2021-05-10 2021-11-06 chase of IT equipments for R Dissemination rtas nvelope &D Projects APPSA/G-032 / Procurement Technology Generation and Solicitação de Cot Open - Internationa Single Stage - One E IBRD / 89170 Posterior 100,000.00 0.00 Cancelado 2022-12-10 2023-04-01 2023-02-04 2023-08-03 of Laboratorial Reagents Dissemination ações l nvelope Strengthening the Institution APPSA/G-018 / Procurement Solicitação de Ofe Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Open - National 250,000.00 0.00 Cancelado 2023-01-15 2023-03-20 2023-01-20 2023-04-07 2023-03-03 2023-05-12 2023-04-02 2023-05-31 2023-05-07 2023-11-03 of Tractors and Implements I rtas nvelope for Technology Adoption APPSA/G-034 / Procurement Strengthening the Institution Solicitação de Cot Single Stage - One E of Reagents, Equipment and IBRD / 89170 al and Enabling Environment Posterior Limited 120,000.00 0.00 Cancelado 2022-11-05 2022-12-15 2023-06-13 ações nvelope other Laboratorial Consumab for Technology Adoption les I APPSA/G-033 / Procurement Strengthening the Institution Solicitação de Cot Single Stage - One E Implementaç of Irrigation System for Agric IBRD / 89170 al and Enabling Environment Posterior Limited 120,000.00 0.00 2023-01-22 2023-03-03 2023-08-30 ações nvelope ão Pendente ultural Experimental Stations for Technology Adoption I APPSA/G-020 / Procurement Technology Generation and Solicitação de Cot Open - Internationa Single Stage - One E of Laboratory Equipment and IBRD / 89170 Posterior 150,000.00 0.00 Cancelado 2023-03-05 2023-04-01 2023-04-30 2023-10-27 Dissemination ações l nvelope Consumables APPSA/G-26 / Lightning prot Strengthening the Institution ection equipment for UIP offi Solicitação de Cot Single Stage - One E IBRD / 89170 al and Enabling Environment Posterior Limited 80,000.00 0.00 Cancelado 2023-01-02 2023-02-27 2023-08-26 ces and Chianga Agricultural ações nvelope for Technology Adoption Experiment Station - Huambo AO-IIA-193893-GO-RFQ / Pro Strengthening the Institution Solicitação de Ofe Single Stage - One E Implementaç curement of Irrigation Syste IBRD / 89170 al and Enabling Environment Posterior Open - National 260,000.00 0.00 2023-06-30 2023-07-05 2023-08-16 2023-09-15 2023-10-20 2024-04-17 rtas nvelope ão Pendente m for Agricultural Experimen for Technology Adoption tal Stations APPSA/G-043 / Procurement Technology Generation and Solicitação de Cot Single Stage - One E IBRD / 89170 Posterior Limited 100,000.00 0.00 Assinado 2023-07-01 2023-06-28 2023-08-26 2023-08-10 2024-02-22 of Fertilizer for Agricultural C Dissemination ações nvelope ampaign APPSA/G-042 / Automatic W Technology Generation and Solicitação de Cot Single Stage - One E Em fase de I IBRD / 89170 Posterior Limited 120,000.00 0.00 2023-07-04 2023-11-07 2023-08-29 2024-02-25 eather Stations Dissemination ações nvelope mplementaç ão APPSA/G-045 / Procurement Technology Generation and Direct - Internation 4 vehicles for High-Level Inte IBRD / 89170 Posterior Aquisição Direta 200,000.00 0.00 Assinado 2023-06-29 2023-06-28 2023-07-04 2023-07-10 2023-08-08 2023-07-14 2024-02-04 Dissemination al r-Ministerial missions to verif y Project Actions APPSA/G-044 / Procurement of 17 Generators for the Cass Technology Generation and Direct - Internation IBRD / 89170 Posterior Aquisição Direta 220,000.00 0.00 Assinado 2023-06-29 2023-07-07 2023-07-04 2023-07-10 2023-08-08 2023-07-19 2024-02-04 ava Regional Leadership Cen Dissemination al ter and Agricultural Experime ntal Stations APPSA/G-041 / Procurement Em fase de I Technology Generation and Solicitação de Cot Single Stage - One E of Solar Energy Equipment fo IBRD / 89170 Posterior Limited 115,000.00 0.00 mplementaç 2023-07-04 2023-08-31 2023-08-29 2024-02-25 Dissemination ações nvelope r Subproject ão APPSA/G-019 / Procurement Strengthening the Institution Solicitação de Cot Single Stage - One E of 10 Freezers for the Conser IBRD / 89170 al and Enabling Environment Posterior Open - National 100,000.00 0.00 Cancelado 2023-08-05 2023-09-30 2024-03-28 ações nvelope vation of Genetic Agricultural for Technology Adoption Material AO-IIA-187641-GO-RFB / Pro Strengthening the Institution curement of Equipment and Solicitação de Ofe Single Stage - One E Implementaç IBRD / 89170 al and Enabling Environment Posterior Open - National 400,000.00 0.00 2023-10-30 2023-11-04 2023-12-16 2024-01-15 2024-02-19 2024-08-17 Furniture for the Cassava Re rtas nvelope ão Pendente for Technology Adoption gional Leadership Center APPSA/G-027 / Procurement of 2 Refrigeration Chambers f Strengthening the Institution Em fase de I Solicitação de Cot Single Stage - One E or Legume Seeds for the Agri IBRD / 89170 al and Enabling Environment Posterior Limited 110,000.00 0.00 mplementaç 2023-10-03 2023-11-16 2023-11-28 2024-05-26 ações nvelope cultural Experimental Station for Technology Adoption ão s of Mazozo and Chianga APPSA/G-054 / Procurement of 500,000 polyethylene Bag Technology Generation and Solicitação de Cot Single Stage - One E Implementaç IBRD / 89170 Posterior Limited 95,000.00 0.00 2023-09-27 2023-11-22 2024-05-20 s for the Production of fruit tr Dissemination ações nvelope ão Pendente ees for Subprojects AO-IIA-188898-GO-RFQ / Aut Technology Generation and Solicitação de Cot Single Stage - One E omatic Weather Stations for IBRD / 89170 Posterior Limited 97,000.00 0.00 Cancelado 2021-01-17 2021-03-14 2021-09-10 Dissemination ações nvelope Research and Field Stations APPSA/G-053 / Procurement Technology Generation and Solicitação de Ofe Single Stage - One E Implementaç of 15 Greenhouses for Subpr IBRD / 89170 Posterior Open - National 225,000.00 0.00 2023-12-18 2023-12-23 2024-02-03 2024-03-04 2024-04-08 2024-10-05 Dissemination rtas nvelope ão Pendente ojects and CRdL Page 2 APPSA/G-055 / Procurement Technology Generation and Solicitação de Ofe Open - Internationa Single Stage - One E Implementaç of Laboratory Reagents for s IBRD / 89170 Posterior 350,000.00 0.00 2023-12-18 2023-12-23 2024-02-03 2024-03-04 2024-04-08 2024-10-05 Dissemination rtas l nvelope ão Pendente ubprojects and CRdL APPSA/G-056 / Procurement Technology Generation and Solicitação de Ofe Open - Internationa Single Stage - One E Implementaç of Laboratory Equipments for IBRD / 89170 Posterior 450,000.00 0.00 2023-12-18 2023-12-23 2024-02-03 2024-03-04 2024-04-08 2024-10-05 Dissemination rtas l nvelope ão Pendente subprojects and CRdL APPSA/G-049 / Procurement Technology Generation and Solicitação de Ofe Single Stage - One E Implementaç of Implements for Tractors 9 IBRD / 89170 Posterior Open - National 770,000.00 0.00 2023-12-18 2023-12-23 2024-02-03 2024-03-04 2024-04-08 2024-10-05 Dissemination rtas nvelope ão Pendente 5HP and 145HP APPSA/G-051 / Procurement Technology Generation and Solicitação de Cot Single Stage - One E Implementaç IBRD / 89170 Posterior Limited 100,000.00 0.00 2023-12-19 2024-02-13 2024-08-11 of Differents Seeds for Subpr Dissemination ações nvelope ão Pendente ojects APPSA/G-052 / Procurement Technology Generation and Solicitação de Cot Single Stage - One E Implementaç IBRD / 89170 Posterior Limited 100,000.00 0.00 2023-12-05 2024-01-30 2024-07-28 of Pesticides for subprojects Dissemination ações nvelope ão Pendente APPSA/G-050 / Procurement Technology Generation and Solicitação de Cot Single Stage - One E Implementaç IBRD / 89170 Posterior Limited 20,000.00 0.00 2023-12-16 2024-02-10 2024-08-08 of Office Furniture for Subpro Dissemination ações nvelope ão Pendente jects NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual APPSA/S-002 / Repair Servic Strengthening the Institution Solicitação de Ofe Single Stage - One E es and Supply of Parts of Tra IBRD / 89170 al and Enabling Environment Posterior Open - National 300,000.00 0.00 Cancelado 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 2023-04-18 rtas nvelope ctors for Experimental Agricu for Technology Adoption ltural Stations APPSA/S-001 / Repair Servic Strengthening the Institution e and Supply of Parts for IIA IBRD / 89170 al and Enabling Environment Posterior Aquisição Direta Direct 300,000.00 0.00 Cancelado 2022-05-26 2022-05-27 2022-05-31 2022-07-05 2023-01-01 Vehicles Within the scope of for Technology Adoption APPSA APPSA/S-003 / Website Desi Strengthening the Institution Solicitação de Cot Single Stage - One E gn, Development and Manag IBRD / 89170 al and Enabling Environment Posterior Open - National 20,000.00 0.00 Cancelado 2022-06-05 2022-07-31 2023-01-27 ações nvelope ement Services for the IIA an for Technology Adoption d APPSA CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-259173-CS-QCBS / Pr Strengthening the Institution Seleção Baseada oject Design and Supervision Open - Internationa IBRD / 89170 al and Enabling Environment Posterior na Qualidade e Cu 540,000.00 0.00 Assinado 2021-10-29 2022-01-21 2021-11-19 2022-04-18 2022-01-02 2022-06-13 2022-01-30 2022-07-22 2022-03-01 2022-06-29 2022-04-05 2022-08-16 2022-05-10 2022-10-06 2023-05-10 of the Supervision of the Cas l for Technology Adoption sto sava Regional Leadership Ce nter AO-IIA-267731-CS-QCBS / As Project management, monit Seleção Baseada sessment the Agriculture Res IBRD / 89170 oring and evaluation, and re Posterior na Qualidade e Cu Open - National 180,000.00 99,929.00 Assinado 2021-12-19 2022-01-10 2022-01-09 2022-01-20 2022-02-22 2022-04-14 2022-03-22 2022-05-30 2022-04-21 2022-06-03 2022-05-26 2022-06-06 2022-06-30 2022-08-03 2023-06-30 earch Baseline gional coordination sto Project management, monit APPSA/C-028 / External Audi Seleção Baseada Open - Internationa IBRD / 89170 oring and evaluation, and re Posterior 200,000.00 0.00 Assinado 2022-01-13 2022-02-02 2022-02-03 2022-03-04 2022-03-19 2022-07-15 2022-04-16 2022-08-31 2022-05-16 2022-11-10 2022-06-20 2022-12-05 2022-07-25 2023-05-27 2023-01-21 t no Menor Custo l gional coordination AO-IIA-188277-CS-INDV / Ra pid rual survey for assement of conditions to stregthen the Seleção Baseada Technology Generation and the basic seed and vegetativ IBRD / 89170 Posterior nas Qualificações Limited 60,000.00 0.00 Cancelado 2022-09-01 2022-09-15 2022-10-15 2022-11-19 2023-05-18 Dissemination e propagation materials fram dos Consultores ework under coordination of Chianga Research Station in the Central Plateau of Angola APPSA/C-023 / Consultancy f or the Development of Enviro Strengthening the Institution Seleção Baseada nmental Impact Studies for t IBRD / 89170 al and Enabling Environment Posterior nas Qualificações Open - National 100,000.00 0.00 Cancelado 2022-06-20 2022-06-16 2022-07-11 2022-08-04 2022-09-03 2022-10-08 2023-04-06 he Construction Work of the for Technology Adoption dos Consultores Cassava Regional Leadership Center - Malanje INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-IIA-187655-CS-INDV / Re Project management, monit cruitment of Procurement Sp IBRD / 89170 oring and evaluation, and re Prévia Individual Open 84,000.00 0.00 Cancelado 2020-09-01 2021-01-15 2020-10-20 2021-07-16 2020-11-10 2020-12-15 2021-06-13 ecialist gional coordination AO-IIA-187660-CS-INDV / Re Project management, monit cruitment of safeguards spec IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 0.00 Cancelado 2020-09-01 2020-10-09 2020-10-20 2021-07-01 2020-11-10 2021-07-09 2020-12-15 2021-06-13 ialist gional coordination AO-IIA-187659-CS-INDV / Re Project management, monit cruitment of communication IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 86,205.35 Assinado 2020-09-01 2021-02-12 2020-10-20 2021-09-30 2020-11-10 2021-10-01 2020-12-15 2021-11-01 2021-06-13 and information specialst gional coordination AO-IIA-187657-CS-INDV / Re Project management, monit cruitment of monitoring and IBRD / 89170 oring and evaluation, and re Posterior Individual Open 84,000.00 111,873.80 Assinado 2020-09-01 2020-10-09 2020-10-20 2021-04-28 2020-11-10 2021-05-24 2020-12-15 2021-06-21 2021-06-13 evaluation specialist gional coordination AO-IIA-187647-CS-INDV / Re Project management, monit cruitment of the project coor IBRD / 89170 oring and evaluation, and re Posterior Individual Open 96,000.00 0.00 Cancelado 2020-09-01 2020-09-17 2020-10-20 2020-11-10 2020-12-15 2021-06-13 dinator gional coordination Project management, monit AO-IIA-221339-CS-INDV / So IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,500.00 97,039.57 Assinado 2021-03-10 2021-09-21 2021-04-28 2021-11-08 2021-05-19 2021-11-09 2021-06-23 2021-11-27 2021-12-20 cial Safeguards Specialist gional coordination Project management, monit AO-IIA-187662-CS-INDV / Re IBRD / 89170 oring and evaluation, and re Posterior Individual Open 36,000.00 0.00 Cancelado 2020-09-01 2020-10-09 2020-10-20 2020-11-10 2020-12-15 2021-06-13 cruitment of an accountant gional coordination Page 3 AO-IIA-187652-CS-INDV / Re Project management, monit cruitment of financial manag IBRD / 89170 oring and evaluation, and re Posterior Individual Open 84,000.00 0.00 Cancelado 2020-09-01 2020-10-09 2020-10-20 2020-11-10 2020-12-15 2021-06-13 er gional coordination AO-IIA-239079-CS-INDV / Fin Project management, monit ancial Management Specialis IBRD / 89170 oring and evaluation, and re Posterior Individual Open 140,000.00 150,376.47 Assinado 2021-07-22 2021-07-27 2021-09-09 2021-09-27 2021-09-30 2021-09-29 2021-11-04 2021-10-22 2022-05-03 t gional coordination Project management, monit AO-IIA-239084-CS-INDV / Ac IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 64,954.01 Assinado 2021-07-22 2021-07-27 2021-09-09 2021-10-14 2021-09-30 2021-10-20 2021-11-04 2021-11-08 2022-05-03 countant gional coordination Project management, monit AO-IIA-252339-CS-INDV / IT IBRD / 89170 oring and evaluation, and re Posterior Individual Open 45,000.00 33,285.56 Assinado 2021-09-13 2021-10-05 2021-11-01 2022-02-08 2021-11-22 2022-03-24 2021-12-27 2022-04-30 2022-06-25 Specialist gional coordination Project management, monit AO-IIA-252343-CS-INDV / Infr IBRD / 89170 oring and evaluation, and re Posterior Individual Limited 74,000.00 34,485.56 Assinado 2021-09-13 2021-10-21 2021-09-18 2022-01-14 2021-10-09 2022-03-24 2021-11-13 2022-04-30 2022-05-12 astructure Specialist gional coordination AO-IIA-252344-CS-INDV / En Project management, monit vironmental Safeguards Spec IBRD / 89170 oring and evaluation, and re Posterior Individual Open 74,000.00 98,039.57 Em Análise 2021-09-13 2021-09-29 2021-11-01 2021-07-01 2021-11-22 2021-10-19 2021-12-27 2021-10-24 2022-06-25 ialist gional coordination AO-IIA-244838-CS-INDV / Fin Project management, monit ancial Management Consulta IBRD / 89170 oring and evaluation, and re Posterior Individual Direct 60,000.00 0.00 Cancelado 2021-07-23 2021-07-22 2021-08-02 2021-08-03 2021-08-23 2021-09-27 2022-03-26 nt gional coordination AO-IIA-252345-CS-INDV / Co nsultancy for Water Resource Strengthening the Institution s Assessment, Irrigation Cap IBRD / 89170 al and Enabling Environment Posterior Individual Limited 60,000.00 0.00 Cancelado 2021-09-27 2021-10-05 2021-10-02 2022-03-24 2021-10-23 2021-11-27 2022-05-26 acity Review and Water Man for Technology Adoption agement Systems Proposals Project management, monit AO-IIA-254446-CS-INDV / Pro IBRD / 89170 oring and evaluation, and re Prévia Individual Open 176,000.00 156,793.58 Assinado 2021-09-23 2021-10-12 2021-11-11 2021-12-02 2021-12-02 2021-12-08 2022-01-06 2021-12-23 2022-07-05 curement Specialist gional coordination AO-IIA-218571-CS-INDV / Stu Strengthening the Institution dies on small scale irrigation IBRD / 89170 al and Enabling Environment Posterior Individual Open 30,000.00 0.00 Cancelado 2022-03-14 2022-05-02 2022-05-23 2022-06-27 2022-12-24 schemes in Central Plateau o for Technology Adoption f Angola AO-IIA-188476-CS-INDV / Re Strengthening the Institution cruitment of a consultant for IBRD / 89170 al and Enabling Environment Posterior Individual Limited 20,000.00 0.00 Cancelado 2020-11-02 2020-11-06 2020-11-27 2021-01-01 2021-06-30 budget preparation and supe for Technology Adoption rvision of rehabilitation works in Chianga RS Project management, monit AO-IIA-221336-CS-INDV / Pro IBRD / 89170 oring and evaluation, and re Posterior Individual Open 100,000.00 0.00 Cancelado 2022-03-31 2022-05-19 2022-06-09 2022-07-14 2023-01-10 ject Manager gional coordination Project management, monit APPSA/C-029 / Procurement IBRD / 89170 oring and evaluation, and re Prévia Individual Open 72,000.00 0.00 Cancelado 2022-01-14 2022-02-24 2022-03-04 2022-03-25 2022-04-29 2022-10-26 Assistant gional coordination Project management, monit APPSA/C-030 / Financial Assi IBRD / 89170 oring and evaluation, and re Posterior Individual Open 72,000.00 0.00 Assinado 2022-01-14 2022-02-02 2022-03-04 2022-07-25 2022-03-25 2022-09-20 2022-04-29 2022-10-03 2022-10-26 stant gional coordination AO-IIA-193690-CS-INDV / Ass Strengthening the Institution essment the agriculture rese IBRD / 89170 al and Enabling Environment Posterior Individual Open 50,000.00 0.00 Cancelado 2020-11-03 2021-07-12 2020-12-22 2021-01-12 2021-02-16 2021-08-15 ardh baseline for Technology Adoption AO-IIA-188286-CS-INDV / Ass Strengthening the Institution ess and design the IIA resear IBRD / 89170 al and Enabling Environment Posterior Individual Open 45,000.00 0.00 Cancelado 2022-06-30 2022-08-18 2022-09-08 2022-10-13 2023-04-11 ch network investment for Technology Adoption APPSA/C-032 / Consultant fo Project management, monit r Supporting the Installation, IBRD / 89170 oring and evaluation, and re Posterior Individual Open 80,000.00 0.00 Assinado 2022-05-13 2022-05-16 2022-07-01 2023-01-20 2022-07-22 2023-04-28 2022-08-26 2023-06-07 2023-02-22 Operation and, Management gional coordination of DHIS2 Project management, monit APPSA/C-022 / Monitoring an IBRD / 89170 oring and evaluation, and re Posterior Individual Open 120,000.00 0.00 Assinado 2022-06-13 2022-06-03 2022-08-01 2022-10-04 2022-08-22 2022-10-31 2022-09-26 2022-11-20 2023-03-25 d Evaluation Specialist gional coordination AO-IIA-188291-CS-INDV / Stu Strengthening the Institution dies on cassava value chain i IBRD / 89170 al and Enabling Environment Posterior Individual Open 30,000.00 0.00 Cancelado 2022-07-19 2022-09-06 2022-09-27 2022-11-01 2023-04-30 n Angola for Technology Adoption Project management, monit AO-IIA-221337-CS-INDV / Ca IBRD / 89170 oring and evaluation, and re Posterior Individual Open 80,000.00 0.00 Cancelado 2022-05-31 2022-07-19 2022-08-09 2022-09-13 2023-03-12 ssava Consultant Specialist gional coordination Project management, monit APPSA/C-025 / Procurement Em fase de Imple IBRD / 89170 oring and evaluation, and re Prévia Individual Open - National 30,000.00 0.00 2022-11-03 2023-02-06 2022-12-22 2023-01-12 2023-02-16 2023-08-15 Assistant mentação gional coordination Project management, monit APPSA/IC-20 / Financial Man IBRD / 89170 oring and evaluation, and re Posterior Individual Open - National 140,000.00 0.00 Assinado 2023-05-02 2023-05-02 2023-06-20 2023-10-24 2023-07-11 2023-11-09 2023-08-15 2024-02-11 agement Specialist I gional coordination Project management, monit APPSA/C-027 / Internal Audit IBRD / 89170 oring and evaluation, and re Posterior Individual Open 70,000.00 0.00 Cancelado 2022-01-12 2022-04-19 2022-03-02 2022-03-23 2022-04-27 2022-10-24 gional coordination APPSA/C-020 / Cassava Spec Technology Generation and Em fase de Imple ialist for Support to Subproje IBRD / 89170 Posterior Individual Limited 65,000.00 0.00 2023-09-08 2023-09-23 2023-09-13 2023-11-14 2023-10-04 2023-11-08 2024-05-06 Dissemination mentação cts Within the Scope of the C RdL Project management, monit APPSA/C-031 / Social Safegu Em fase de Imple IBRD / 89170 oring and evaluation, and re Posterior Individual Open - National 75,000.00 0.00 2023-10-16 2023-11-07 2023-12-04 2023-12-25 2024-01-29 2024-07-27 ards Specialist II mentação gional coordination APPSA/C-033 / Information, Project management, monit Communication, and Knowle IBRD / 89170 oring and evaluation, and re Posterior Individual Open - National 75,000.00 0.00 Em Análise 2023-10-16 2023-11-07 2023-12-04 2023-12-25 2024-01-29 2024-07-27 dge Management Specialist gional coordination Page 4