PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2019-04-11 Bank’s Approval Date of the Original Procurement Plan: 2023-11-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / 62120, IDA / 62150, IDA / 62140 COORDINATING UNIT OF THE WACA PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-WACA CI-107603-CW-RFQ / Travaux de connexion inter Component 4: National Coor Single Stage - One E 2019-06-0 IDA / 62120 A posteriori Demande de prix Open - National 92,000.00 0.00 Annulé 2019-04-07 2019-05-06 net sécurisée et d'installation dination nvelope 5 d'un système de visioconfére nce CI-WACA CI-107601-CW-RFQ / Travaux d'installation de câ Component 2: Strengthening Single Stage - One E 2020-05-0 blage réseaux et système de IDA / 62120 the Policy and Institutional F A posteriori Demande de prix Open - National 70,000.00 59,612.34 Achevé 2020-03-17 2020-04-03 2020-01-16 nvelope 3 sécurité électrique des locau ramework x du siège du projet WACA CI-WACA CI-266714-CW-RFB Demande d'offres Component 3: Strengthening / Construction de l'ouvrage d Open - Internationa Single Stage - One E - DTPM Travaux ( 16,000,000.0 2023-08-0 IDA / 62120 National Physical and Social A priori Appel d'offres 0.00 Annulé 2022-01-10 2022-03-28 2022-03-28 2022-01-15 2022-06-06 2022-07-06 2022-08-10 e protection du cordon sable l nvelope après préqualifica 0 5 Investments ux de Grand-Lahou tion) Demande d'offres CI-WACA CI-272865-CW-RFB - DTPM Travaux ( Component 3: Strengthening / Construction de l'ouvrage d Open - Internationa Single Stage - Two E après préqualifica 54,000,000.0 En cours d'e 2024-02-1 IDA / 62120 National Physical and Social A priori Appel d'offres 0.00 2022-01-31 2022-01-26 2022-03-20 2022-06-20 2022-03-20 2022-12-21 2022-02-05 2022-02-14 2022-05-29 2023-02-28 2022-07-24 2023-09-15 2022-08-28 e protection du cordon sable l nvelope tion) - Application 0 xécution 9 Investments ux de Grand-Lahou. de la disqualificati on de l'entrepren eur CI-WACA CI-368564-CW-RFB Demande d'offres Component 3: Strengthening -23 / Construction de l'ouvra Open - Internationa Single Stage - One E - DTPM Travaux ( 49,144,187.0 En cours d'e 2025-07-1 IDA / 62120 National Physical and Social A priori Appel d'offres 0.00 2023-06-22 2023-07-17 2023-09-07 2023-07-18 2023-09-07 2023-07-18 2023-06-27 2023-07-17 2023-11-16 2023-02-28 2023-12-16 2024-01-20 ge de protection du cordon s l nvelope après préqualifica 0 xamen 3 Investments ableux de Grand-Lahou tion) CI-WACA CI-391061-CW-RFQ Demande de cota -23 / Recrutement d'un prest tions - DTPM Petit Component 4: National Coor Single Stage - One E En attente d 2024-02-1 ataire pour la réalisation des IDA / 62120 A posteriori Demande de prix Limited s travaux (urgenc 100,000.00 0.00 2023-11-21 2023-12-21 dination nvelope 'exécution 9 travaux d'aménagement dan e) - Avec compéti s les locaux du projet WACA tion GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107607-GO-RFB / Acquisition de 02 Pick up do Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 120,000.00 102,901.32 Achevé 2019-04-25 2019-05-25 2019-10-04 2019-07-24 2019-10-12 uble cabine de type 4X4 ave dination nvelope c pare-buffles et covercross s ur la part bailleur CI-WACA CI-107608-GO-RFQ Component 4: National Coor Single Stage - One E / Acquisition de carburant po IDA / 62120 A posteriori Demande de prix Open - National 20,000.00 17,326.60 Achevé 2019-04-09 2019-05-09 2019-07-07 2019-05-30 2019-07-27 dination nvelope ur les véhicules de l'UCP CI-WACA CI-107610-GO-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 50,000.00 54,843.58 Achevé 2019-03-30 2019-11-27 2019-04-29 2019-06-06 2019-05-29 2019-10-19 / Acquisition de matériel infor dination nvelope matique CI-WACA CI-107612-GO-RFQ / Acquisition des fournitures Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 20,000.00 14,005.10 Achevé 2019-04-29 2019-11-27 2019-05-29 2019-06-06 2019-06-13 2019-06-27 et consommables pour le ma dination nvelope tériel informatique CI-WACA CI-107614-GO-RFQ Component 4: National Coor Single Stage - One E / Acquisition de petits matéri IDA / 62120 A posteriori Demande de prix Open - National 10,000.00 6,828.04 Achevé 2019-04-14 2019-05-14 2019-05-09 2019-05-29 2019-05-27 dination nvelope els, fournitures de bureau et documentation CI-WACA CI-107752-GO-RFQ Component 4: National Coor Single Stage - One E / Acquisition du matériel et o IDA / 62120 A posteriori Demande de prix Open - National 16,000.00 8,842.66 Achevé 2019-04-13 2019-05-13 2020-09-16 2019-05-28 2020-09-20 dination nvelope utillage technique CI-WACA CI-107759-GO-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 84,000.00 71,551.00 Achevé 2019-04-07 2019-05-07 2019-05-12 2019-06-06 2019-07-08 / Acquisition de mobilier de b dination nvelope ureau CI-WACA CI-107761-GO-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 40,000.00 0.00 Annulé 2019-05-05 2019-06-04 2019-06-25 / Acquisition de matériel de b dination nvelope ureau CI-WACA CI-110220-GO-RFQ Component 4: National Coor Single Stage - One E / Acquisition et installation d' IDA / 62120 A posteriori Demande de prix Open - National 50,000.00 0.00 Annulé 2019-05-15 2019-06-17 2019-08-16 dination nvelope un groupe électrogène CI-WACA CI-107604-GO-DIR Component 2: Strengthening / Acquisition des données his Passation de marc En attente d' IDA / 62120 the Policy and Institutional F A posteriori Direct 200,000.00 0.00 2019-05-24 2019-05-29 2019-06-16 2019-07-16 toriques des littoraux de l'Afri hé de gré à gré exécution ramework que de l'Ouest avec la sociét é CEREMA CI-WACA CI-164263-NC-DIR / CONTRAT AVEC COMAFRIQU E TECHNOLOGIE POUR LA FO Component 2: Strengthening Passation de marc URNITURE DES LOGICIELS AR IDA / 62120 the Policy and Institutional F A posteriori Direct 31,549.00 28,039.66 Achevé 2020-03-16 2020-05-26 2020-03-21 2020-06-11 2020-04-05 2020-06-22 2020-06-04 2020-07-26 hé de gré à gré CGIS POUR LA MISE EN PLAC ramework E DU GÉOPORTAIL DE L’OBSE RVATOIRE NATIONAL DU LITT ORAL CI-WACA CI-164296-GO-RFQ Component 3: Strengthening Single Stage - One E / ACQUISITION FOURS AMELI IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 10,000.00 0.00 Annulé 2020-06-14 2020-07-21 2020-09-19 nvelope ORES Investments Page 1 CI-WACA CI-164297-GO-RFQ Component 4: National Coor Single Stage - One E / ACQUISITION DE CARBURA IDA / 62120 A posteriori Demande de prix Open - National 40,000.00 17,326.60 Achevé 2020-03-31 2020-05-06 2019-07-10 2020-12-31 2019-08-27 dination nvelope NT POUR LES VÉHICULES DU PROJET CI-WACA CI-164300-GO-RFQ Component 4: National Coor Single Stage - One E / ACQUISITION DE FOURNITU IDA / 62120 A posteriori Demande de prix Open - National 16,000.00 17,180.21 Signé 2020-04-06 2020-05-11 2020-06-08 2020-06-10 2020-06-23 dination nvelope RES ET CONSOMMABLES INF ORMATIQUES CI-WACA CI-164301-GO-RFQ / Acquisition de petits matéri Component 4: National Coor Single Stage - One E els, fournitures de bureau et IDA / 62120 A posteriori Demande de prix Open - National 30,000.00 26,845.62 Achevé 2020-03-30 2020-04-30 2020-06-08 2020-05-30 2020-06-08 dination nvelope documentation (papier, class eur) pour l'UCP et pour les kit s des ateliers CI-WACA CI-164302-GO-RFQ / ACQUISITION DE MATERIEL ET OUTILLAGE TECHNIQUE ( Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 14,000.00 13,176.06 Achevé 2020-04-28 2020-05-30 2019-11-16 2020-06-29 2019-11-16 GPS,Gilets,Rallonges,Multipri dination nvelope ses, Appareils photos,Chauss ures de sécurités, Casques...) CI-WACA CI-164303-GO-RFQ / Acquisition de meubles de r angement, Bureaux, de chais Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 30,000.00 0.00 Annulé 2020-03-29 2020-04-30 2020-05-30 es, chaises visiteurs, au profi dination nvelope t de l'équipe du projet, store, rideau, étiquettage des porte s CI-WACA CI-164305-GO-RFQ Component 4: National Coor Single Stage - One E / Fourniture et installation de IDA / 62120 A posteriori Demande de prix Open - National 3,000.00 2,590.53 Achevé 2020-03-30 2020-05-05 2020-05-31 2020-06-04 2020-05-31 dination nvelope trois (3) splits CI-WACA CI-164298-GO-RFQ / Acquisition de matériel infor Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 30,000.00 25,691.39 Achevé 2020-06-08 2020-07-16 2020-07-14 2020-08-15 2020-07-21 matique pour le personnel en dination nvelope complément de ceux acquis en 2019 CI-WACA CI-173392-GO-RFQ / Acquisition de kits sanitaire Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 20,500.00 1,843,472.18 Signé 2020-06-13 2020-07-28 2020-07-28 2020-08-27 s pour le personnel de l'UCP dination nvelope dans le cadre de la préventio n du COVID-19 CI-WACA CI-193336-GO-DIR / CONTRAT AVEC TOTAL CI P OUR LA FOURNITURE DE CAR Component 3: Strengthening Passation de marc BURANT POUR LES VEHICULE IDA / 62120 National Physical and Social A posteriori Direct 40,000.00 35,772.20 Signé 2020-10-12 2020-10-01 2020-10-22 2020-09-28 2020-11-06 2020-11-26 2020-12-06 hé de gré à gré S DE L'UCP ET DES STRUCTU Investments RES PATENAIRES POUR L'EXE CUTION DES ACTIVITES TECH NIQUES. CI-WACA CI-107606-GO-RFQ Component 3: Strengthening / Acquisition des fours amélio Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 10,000.00 0.00 2020-11-10 2020-11-29 2020-12-29 rés pour le fumage de poisso nvelope exécution Investments n à mettre à disposition des communautés CI-WACA CI-164294-GO-RFB / Fourniture en équipements et logiciels aux structures na Component 2: Strengthening Open - Internationa Single Stage - One E En attente d' tionales de collecte de donné IDA / 62120 the Policy and Institutional F A posteriori Appel d'offres 1,000,000.00 0.00 2020-11-12 2020-11-17 2021-01-01 2021-01-16 2021-02-13 2021-05-14 l nvelope exécution es hydrométéo climatiques ( ramework SODEXAM, ONPC, plateforme nationale RRC, CRO, ANDE, C IAPOL) CI-WACA CI-221912-GO-RFQ -KK-21 / ACQUISITION D'EQUI PEMENT AU PROFIT DES POS Component 3: Strengthening Single Stage - One E En cours d'ex TES DE COMMANDEMENT ET IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 40,000.00 0.00 2021-09-26 2021-12-27 2021-11-21 2022-05-20 nvelope écution DE CONTROLE D'ALERTE ( FO Investments RMATION DES ADMINISTRAT EURS A L'UTILISATION DES E QUIPEMENTS) CI-WACA CI-234851-GO-RFQ Component 4: National Coor Single Stage - One E -KK-21 / FOURNITURE ET CO IDA / 62120 A posteriori Demande de prix Limited 30,000.00 25,361.01 Achevé 2021-06-12 2021-06-04 2021-08-07 2021-07-20 2022-02-03 2021-08-07 dination nvelope NSOMMABLE DE MATERIELS I NFORMATIQUES CI-WACA CI-234854-GO-RFQ -KK-21 / ACQUISITION DE PET Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 20,000.00 11,417.63 Achevé 2021-06-14 2021-06-04 2021-08-09 2021-07-20 2022-02-05 2021-08-16 ITS MATERIELS, FOURNITURE dination nvelope DE BUREAU ET DOCUMENTA TION CI-WACA CI-234912-GO-RFQ KK-21 / Acquérir des kits sani Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 40,000.00 24,928.24 Achevé 2021-06-14 2021-06-02 2021-08-09 2021-07-17 2022-02-05 2021-08-08 taires pour le personnel de l' dination nvelope UCP dans le cadre de la COVI D-19 CI-WACA CI-256941-GO-RFB- BV-21 / ACQUISITION D'ÉQUI PEMENTS POUR LES STRUCT Component 2: Strengthening Open - Internationa Single Stage - One E URES NATIONALES DE COLLE IDA / 62120 the Policy and Institutional F A posteriori Appel d'offres 1,000,000.00 72,314.55 Signé 2021-11-03 2021-11-24 2021-11-08 2021-12-20 2022-02-07 2022-01-19 2022-03-11 2022-02-23 2022-05-29 2022-08-22 l nvelope CTE DE DONNÉES HYDROME ramework TEOCLIMATIQUES (SODEXAM , ONPC, PLATEFORME NATIO NALE RRC, CRO, ANDE, CIAP OL) CI-WACA CI-280727-GO-RFQ Component 4: National Coor Single Stage - One E -BV-22 / ACQUISITION DU MA IDA / 62120 A posteriori Demande de prix Limited 6,000.00 0.00 Achevé 2022-03-24 2022-11-04 2022-04-19 2022-12-17 2022-05-19 dination nvelope TERIEL INFORMATIQUE CI-WACA CI-280736-GO-RFQ -BV-22 / ACQUISITION DES PE Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 10,000.00 0.00 Achevé 2022-04-01 2022-10-19 2022-04-25 2022-12-12 2022-05-25 TITS MATERIELS, FOURNITUR dination nvelope ES DE BUREAU ET DOCUMEN TATION CI-WACA CI-280745-GO-RFQ Component 4: National Coor Single Stage - One E -BV-22 / ACQUISITION DES F IDA / 62120 A posteriori Demande de prix Limited 10,000.00 1,615.75 Achevé 2022-04-06 2022-05-16 2022-04-27 2022-07-04 2022-05-27 2022-08-02 dination nvelope OURNITURES ET MATERIEL T ECHNIQUE CI-WACA CI-280890-GO-RFQ Component 4: National Coor Single Stage - One E -BV-22 / ACQUISITION DU MO IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 Signé 2022-04-01 2022-08-17 2022-04-29 2022-10-15 2022-05-29 dination nvelope BILIER DE BUREAU CI-WACA CI-280919-GO-RFQ Component 4: National Coor Single Stage - One E -BV-22 / ACQUISITION DU MA IDA / 62120 A posteriori Demande de prix Limited 20,000.00 14,304.51 Achevé 2022-04-06 2022-05-10 2022-05-02 2022-06-23 2022-06-01 2022-07-04 dination nvelope TERIEL DE BUREAU Page 2 CI-WACA CI-280732-GO-RFQ -BV-22 / ACQUISITION DES F Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 40,000.00 30,197.30 Achevé 2022-03-29 2022-04-04 2022-04-20 2022-05-16 2022-04-23 2022-06-17 OURNITURES ET CONSOMMA dination nvelope BLES POUR LE MATERIEL INF ORMATIQUE CI-WACA CI-280952-GO-RFQ -BV-22 / ACQUISITION DES KI Component 4: National Coor Single Stage - One E TS SANITAIRES POUR LE PER IDA / 62120 A posteriori Demande de prix Limited 24,000.00 14,593.18 Achevé 2022-04-06 2022-05-10 2022-05-02 2022-06-17 2022-06-01 2022-12-31 dination nvelope SONNEL DE L'UCP DANS LE C ADRE DE LA COVID-19 CI-WACA CI-293237-GO-RFQ -BV22 / Acquisition de matéri els et outillages dans le cadr Component 3: Strengthening Single Stage - One E e de l'appui aux communaut IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 80,000.00 0.00 Achevé 2022-10-11 2022-09-01 2022-11-03 2022-11-23 2022-12-05 2023-07-18 nvelope és pour la réalisation des tra Investments vaux de plantation et réhabili tation des mangroves et pour la création de parc à bois CI-WACA CI-323206-GO-RFB- BV 22 / Acquisition d’équipe Component 2: Strengthening Single Stage - One E ments océanographiques et IDA / 62120 the Policy and Institutional F A posteriori Appel d'offres Open - National 679,480.00 0.00 Annulé 2022-11-16 2022-11-21 2022-12-21 2023-01-05 2023-02-09 2023-08-08 nvelope bathymétriques pour le Cent ramework re de Recherche Océanologiq ue (CRO) CI-WACA CI-341768-GO-RFB- 23 / Acquisition d’équipemen Component 2: Strengthening Single Stage - One E En attente d' ts et de logiciels de collecte IDA / 62120 the Policy and Institutional F A posteriori Appel d'offres Open - National 679,480.00 0.00 2023-02-28 2023-03-06 2023-04-05 2023-04-20 2023-05-25 2023-11-21 nvelope exécution de données hydrométeoclim ramework atiques au Centre de Recher che Océanologique (CRO) CI-WACA CI-343731-GO-RFB- 23 / Acquisition houlographe Component 2: Strengthening Single Stage - One E En attente d' et marégraphe et logiciels au IDA / 62120 the Policy and Institutional F A posteriori Appel d'offres Open - National 700,000.00 0.00 2023-03-22 2023-03-27 2023-04-26 2023-05-11 2023-05-23 2024-05-17 nvelope exécution x structures nationales de col ramework lecte de données océaniques CI-WACA CI-343807-GO-RFQ -23 / Acquisition de matériels et outillages complémentaire Component 3: Strengthening Single Stage - One E En attente d' s dans le cadre de l'appui au IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 40,000.00 0.00 2023-03-29 2023-04-26 2023-05-26 nvelope exécution x communautés pour la créat Investments ion de forêts communautaire s et de la restauration des m angroves CI-WACA CI-343790-GO-RFQ Component 4: National Coor Single Stage - One E En attente d' -23 / Acquisition de deux véh IDA / 62120 A posteriori Demande de prix Limited 120,000.00 0.00 2023-03-24 2023-04-21 2023-04-24 dination nvelope exécution icules pour le projet WACA CI-WACA CI-354396-GO-RFQ Component 2: Strengthening -23 / Acquisition de matériel i Single Stage - One E En cours d'ex IDA / 62120 the Policy and Institutional F A posteriori Demande de prix Limited 70,000.00 0.00 2023-04-26 2023-05-16 2023-05-25 2023-06-19 nformatique au profit du rése nvelope écution ramework au des maires de la zone côti ère CI-WACA CI-354397-GO-RFQ Component 2: Strengthening -23 / Acquisition de mobilier Single Stage - One E IDA / 62120 the Policy and Institutional F A posteriori Demande de prix Limited 20,000.00 0.00 Signé 2023-04-26 2023-05-19 2023-05-25 2023-06-17 2023-06-19 de bureau au profit du résea nvelope ramework u des maires de la zone côtiè re CI-WACA CI-357672-GO-RFQ -23 / Acquisition de matériel i Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 Signé 2023-05-17 2023-06-29 2023-06-14 2023-08-24 2023-06-29 nformatique pour l'Unité de c dination nvelope oordination du projet WACA CI-WACA CI-357679-GO-RFQ -23 / Acquisition de fournitur Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 34,000.00 0.00 Achevé 2023-05-16 2023-05-19 2023-06-09 2023-06-24 2023-06-24 2023-07-22 e et consommable pour le m dination nvelope atériel informatique CI-WACA CI-357686-GO-RFQ Component 4: National Coor Single Stage - One E En cours d'ex IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 2023-05-16 2023-07-10 2023-06-09 2023-06-24 -23 / Acquisition de matériel dination nvelope écution de bureau CI-WACA CI-362362-GO-DIR- 23 / Acquisition d’ équipeme Component 2: Strengthening nts et logiciels des structures Passation de marc En attente d' IDA / 62120 the Policy and Institutional F A posteriori Direct - National 120,000.00 0.00 2023-05-30 2023-06-01 2023-07-03 2023-12-30 nationales de collecte de don hé de gré à gré exécution ramework nées hydrométéoclimatiques complémentaires à la directi on de l’hydrologie CI-WACA CI-362341-GO-RFQ Component 2: Strengthening -23 / Acquisition de FLYBOX e Passation de marc En attente d' IDA / 62120 the Policy and Institutional F A posteriori Direct - National 21,600.00 0.00 2023-07-04 2023-07-06 2023-07-30 2023-08-29 t abonnement internet avec hé de gré à gré exécution ramework Orange Côte d'Ivoire au profi t du réseau des maires CI-WACA CI-368884-GO-RFQ -23 / Acquisition de petits ma Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 10,000.00 0.00 Signé 2023-07-06 2023-09-01 2023-08-04 2023-10-04 2023-09-03 tériels, fournitures de bureau dination nvelope et documentation CI-WACA CI-368888-GO-RFQ Component 4: National Coor Single Stage - One E En attente d' -23 / Acquisition des fournitur IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 2023-07-14 2023-08-11 2023-09-10 dination nvelope exécution es et matériel technique CI-WACA CI-368890-GO-RFQ Component 4: National Coor Single Stage - One E En attente d' -23 / Acquisition de mobilier IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 2023-07-13 2023-08-11 2023-09-10 dination nvelope exécution de bureau au profit du projet WACA CI-WACA CI-391917-GO-RFQ -23 / Acquisition d’un drone e Component 4: National Coor Single Stage - One E En attente d' IDA / 62120 A posteriori Demande de prix Limited 14,000.00 0.00 2023-11-21 2023-12-20 2024-01-19 t un logiciel de traitement d’i dination nvelope exécution mage et de cartographie CI-WACA CI-393256-GO-RFQ Component 3: Strengthening -23 / Acquisition de matériel i Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 66,796.00 0.00 2023-11-29 2023-12-30 2024-02-28 nformatique pour les Activité nvelope exécution Investments s Génératrices de Revenu CI-WACA CI-393258-GO-RFQ Component 3: Strengthening -23 / Acquisition de matériel Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 66,068.00 0.00 2023-11-29 2023-12-30 2024-02-28 audiovisuel pour les Activités nvelope exécution Investments Génératrices de Revenu Page 3 CI-WACA CI-393259-GO-RFQ Component 3: Strengthening -23 / Acquisition de matériel Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 82,746.00 0.00 2023-11-29 2023-12-30 2024-03-29 et outillage agricole pour les nvelope exécution Investments Activités Génératrice de Rev enus CI-WACA CI-393351-GO-RFQ Component 3: Strengthening -23 / Acquisition de matériel Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 67,033.00 0.00 2023-11-29 2023-12-30 2024-03-29 d’élevage et outillage pour le nvelope exécution Investments s Activités Génératrice de Re venu CI-WACA CI-393355-GO-RFB- Component 3: Strengthening 23 / Acquisition de matériel e Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Appel d'offres Open - National 637,250.00 0.00 2023-12-04 2023-12-09 2024-01-08 2024-01-23 2024-02-06 2024-08-04 t outillage technique pour les nvelope exécution Investments Activités Génératrices de Rev enu CI-WACA CI-393353-GO-RFQ Component 3: Strengthening -23 / Acquisition de petit mat Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 194,520.00 0.00 2023-11-29 2023-12-30 2024-03-29 ériel technique pour les Activ nvelope exécution Investments ités Génératrices de Revenu CI-WACA CI-393244-GO-RFQ -23 / Acquisition de matériel Component 3: Strengthening Single Stage - One E En attente d' et mobilier de bureau pour le IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 113,415.00 0.00 2023-12-02 2024-01-04 2024-04-03 nvelope exécution s Activités Génératrices de R Investments evenu et au profit du projet WACA NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107765-NC-RFQ Component 3: Strengthening Single Stage - One E / Production des outils d'app IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 10,000.00 0.00 Annulé 2019-07-16 2019-08-15 2019-09-05 nvelope ui au Dialogue social Investments CI-WACA CI-107791-NC-RFQ / Production des supports de Component 3: Strengthening Single Stage - One E communication et gadgets (B IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 30,000.00 15,784.70 Achevé 2019-04-30 2019-05-30 2019-11-04 2019-06-29 2020-01-04 nvelope ranting de véhicules, flyers, k Investments akemonos, banderoles, tee-s hirt, etc.) CI-WACA CI-107803-NC-RFQ Component 3: Strengthening Single Stage - One E / Confection des panneaux di IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 6,000.00 3,385.98 Achevé 2019-04-28 2019-05-28 2019-11-04 2019-06-27 2020-03-29 nvelope rectionnels et d'enseigne du Investments WACA CI-WACA CI-107814-NC-DIR / Contrat avec AGOSOFT pour l e paramétrage et l'assistanc Component 4: National Coor Passation de marc IDA / 62120 A posteriori Direct 40,000.00 45,087.46 Achevé 2019-04-09 2019-07-03 2019-04-14 2019-08-23 2019-04-28 2019-08-18 2019-05-28 2019-09-15 e du logiciel de comptabilité dination hé de gré à gré TOMPRO et la livraison de TO MARCHE (y compris formatio n CI-WACA CI-107815-NC-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 6,000.00 4,519.75 Achevé 2019-05-12 2019-06-11 2020-05-27 2019-07-11 2020-06-21 / Assurance des véhicules dination nvelope CI-WACA CI-107816-NC-DIR / Component 4: National Coor Passation de marc Contrat d'entretien et de rép IDA / 62120 A posteriori Direct 9,000.00 0.00 Annulé 2019-05-02 2019-05-07 2019-05-22 2019-06-21 dination hé de gré à gré aration des véhicules avec le concessionnaire CI-WACA CI-107817-NC-DIR / Component 4: National Coor Passation de marc Contrat de bail pour la locati IDA / 62120 A posteriori Direct 55,200.00 61,588.71 Achevé 2019-04-01 2019-02-06 2019-04-06 2019-01-22 2019-04-18 2019-02-01 2020-04-12 2019-02-08 dination hé de gré à gré on du siège du projet avec M. FIANKAN CI-WACA CI-108336-NC-RFQ / Service d'entretien, de nett Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 19,200.00 12,926.48 Achevé 2019-05-01 2020-01-07 2019-05-24 2019-06-24 2020-05-18 2020-01-16 oyage, de livraison de fournit dination nvelope ures et produits d'entretien CI-WACA CI-108337-NC-RFQ Component 4: National Coor Single Stage - One E / Couverture Assurance santé IDA / 62120 A posteriori Demande de prix Open - National 100.00 5,671.87 Signé 2019-04-23 2019-05-27 2019-07-22 2020-05-21 dination nvelope du personnel CI-WACA CI-109988-NC-DIR / Convention avec l'OIPR pour l Component 4: National Coor Passation de marc es activités de restauration d IDA / 62120 A posteriori Direct 60,000.00 0.00 Annulé 2019-09-10 2019-09-11 2019-09-26 2020-09-25 dination hé de gré à gré u Parc National d'Azagny et l e Parc National des Iles Ehotil és CI-WACA CI-110226-NC-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 19,200.00 10,557.10 Achevé 2019-04-21 2019-11-27 2019-06-16 2019-05-10 2020-06-15 2020-01-06 / Services de gardiennage dination nvelope CI-WACA CI-110211-NC-RFQ / Installation d'un système d' Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 30,000.00 0.00 Annulé 2019-06-01 2019-06-30 2019-07-30 archivage électronique des d dination nvelope ocuments du projet CI-WACA CI-130047-NC-RFQ / Fourniture et installation d' Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 92,000.00 228,186.03 Signé 2019-09-28 2019-11-23 2020-02-29 2019-12-23 2020-03-05 un système de visioconféren dination nvelope ce pour projet WACA CI-WACA CI-164284-NC-DIR / Contrat avec ATLANTIQUE AS SURANCE POUR LA FOURNIT Component 4: National Coor Passation de marc URE DE SERVICE D’ASSURAN IDA / 62120 A posteriori Direct 23,136.00 11,469.96 Achevé 2020-03-17 2020-04-09 2020-03-22 2020-06-09 2020-04-17 2020-07-27 2020-10-14 2020-07-31 dination hé de gré à gré CE MALADIE ET INDIVIDUELL E ACCIDENT POUR LE PERSO NNEL DU PROJET WACA AU TI TRE DE L’ANNEE 2020 CI-WACA CI-164307-NC-RFQ / Recrutement d'un prestatai Component 3: Strengthening re pour produire les supports Single Stage - One E IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 28,000.00 0.00 Annulé 2020-05-24 2020-07-08 2020-09-06 de sensibilisation (spot audio nvelope Investments visuelle, des contenus audio, PLV, boite à outils, etc.) et Ed ition des documents du MGP CI-WACA CI-130049-NC-RFQ / Services d'entretien des ins Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 10,000.00 7,133.58 Achevé 2020-04-13 2020-06-08 2020-04-06 2020-12-31 2020-04-12 tallations électriques du proj dination nvelope et (Splits, sanitaire et plombe rie) Page 4 CI-WACA CI-164401-NC-DIR / Renouvellement du contrat d Component 4: National Coor Passation de marc IDA / 62120 A posteriori Direct 55,200.00 49,270.97 Achevé 2020-03-16 2019-01-15 2020-03-21 2020-02-03 2020-03-28 2020-02-17 2020-12-03 2020-03-28 e bail pour la location du sièg dination hé de gré à gré e du projet avec M. FIANKAN CI-WACA CI-164476-NC-RFQ / ENTRETIEN ET REPARATION Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 6,000.00 799.58 Achevé 2020-05-12 2020-06-24 2020-07-24 2020-12-31 2020-07-24 DU MATERIEL INFORMATIQUE dination nvelope ET DU MOBILIER DE BUREAU CI-WACA CI-164480-NC-DIR / CONTRAT AVEC CFAO MOTO Component 4: National Coor Passation de marc En attente d' IDA / 62120 A posteriori Direct 20,000.00 0.00 2020-04-29 2020-05-04 2020-05-28 2020-12-31 RS POUR L'ENTRETIEN ET LA dination hé de gré à gré exécution REPARATION DES VEHICULES CI-WACA CI-164504-NC-RFQ Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Open - National 6,000.00 3,547.87 Signé 2020-03-19 2020-04-22 2020-05-18 2020-10-19 2020-05-18 / ASSURANCE DES VEHICULE dination nvelope S CI-WACA CI-164498-NC-DIR / Convention avec l'OIPR pour l Component 3: Strengthening Passation de marc es activités de restauration d IDA / 62120 National Physical and Social A posteriori Direct 400,000.00 358,910.00 Signé 2020-06-08 2020-09-17 2020-06-13 2020-09-04 2020-07-18 2020-10-28 2023-08-16 hé de gré à gré u Parc National d’Azagny et l Investments e Parc National des Iles Ehotil és sur la durée du projet CI-WACA CI-164280-NC-DIR / CONTRAT AVEC EBEN COTE Component 4: National Coor Passation de marc IDA / 62120 A posteriori Direct 25,156.00 22,517.48 Achevé 2020-03-17 2019-11-13 2020-03-22 2019-12-05 2020-04-06 2020-04-09 2020-04-26 2020-04-09 D'IVOIRE POUR L'ENTRETIEN dination hé de gré à gré DES LOCAUX DU PROJET WA CA AU TITRE DE 2020 CI-WACA CI-164278-NC-DIR / CONTRAT AVEC EZITO SECU Component 4: National Coor Passation de marc IDA / 62120 A posteriori Direct 19,695.00 17,210.44 Achevé 2020-06-04 2019-12-12 2020-06-09 2019-11-13 2020-06-24 2020-04-13 2021-03-21 2020-04-13 RITE POUR LE GARDIENNAGE dination hé de gré à gré DES LOCAUX DU PROJET WA CA AU TITRE DE 2020 CI-WACA CI-193342-NC-RFQ / RECRUTEMENT D'UN PREST ATAIRE POUR L'EDITION DES Component 3: Strengthening Single Stage - One E DOCUMENTS DU MGP ( MAN IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 30,000.00 27,135.50 Signé 2020-10-24 2020-11-19 2020-10-18 2020-12-29 nvelope UEL SIMPLIFIE, DEPLIANTS D Investments U MGP, SUPPORT DE FONCTI ONNEMENT DES ORGANES D U MGP) CI-WACA CI-193345-NC-RFQ / RECRUTEMENT D'UN PREST ATAIRE POUR L'ORGANISATI Component 3: Strengthening Single Stage - One E En attente d' ON D'UNE CAMPAGNE DE CO IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 5,000.00 0.00 2020-11-15 2021-01-10 2021-07-09 nvelope exécution MMUNICATION DIGITAL DE S Investments ENSIBILISATION SUR L'IMPOR TANCE DE LA PRESERVATION DU LITTORAL. CI-WACA CI-198606-NC-DIR / Component 3: Strengthening Contrat avec la société AEG Passation de marc IDA / 62120 National Physical and Social A posteriori Direct 17,786.00 19,410.12 Signé 2020-10-22 2020-12-17 2020-10-27 2020-10-09 2020-12-01 2020-12-27 2021-05-30 pour la connexion internet de hé de gré à gré Investments la fibre optique du système d e visioconférence CI-WACA CI-218784-NC-RFQ- KK-21 / Recrutement d'un pr estataire pour la confection d Component 2: Strengthening e stand, kits, supports et gad Single Stage - One E IDA / 62120 the Policy and Institutional F A posteriori Demande de prix Open - National 42,000.00 0.00 Annulé 2021-04-20 2021-06-15 2021-12-12 get dans le cadre des activité nvelope ramework s de la Quinzaine Nationale d e l'Environnement et du Dév eloppement Durable (QNEDD ) et du SARA. CI-WACA CI-218794-NC-DIR- Component 3: Strengthening KK-21 / Maintenance de la pl Passation de marc En attente d' IDA / 62120 National Physical and Social A posteriori Direct 6,000.00 0.00 2021-05-03 2021-05-08 2021-06-12 2021-12-09 ateforme numérique d'enregi hé de gré à gré exécution Investments strement et de suivi des plai ntes CI-WACA CI-218795-NC-RFQ- Component 3: Strengthening Single Stage - One E KK-21 / Production de suppor IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 40,000.00 34,073.95 Signé 2021-06-14 2021-08-09 2021-07-23 2022-02-05 nvelope ts de sensibilisation et de co Investments mmunication CI-WACA CI-218796-NC-RFQ- KK-21 / Recrutement d'un pr Component 3: Strengthening estataire pour l'organisation Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 20,000.00 0.00 2021-03-28 2021-05-23 2021-11-19 d'une campagne de commun nvelope exécution Investments ication digitale de sensibilisat ion sur l'importance de la pré servation du littoral CI-WACA CI-218797-NC-RFQ- Component 3: Strengthening Single Stage - One E KK-21 / Conception et produc IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 12,000.00 4,332.31 Signé 2021-03-28 2021-05-23 2021-07-23 2021-11-19 nvelope tion d'un bulletin d'informatio Investments n sur le WACA CI-WACA CI-221916-NC-RFQ- Component 3: Strengthening Single Stage - One E En attente d' KK-21 / NETTOYAGE DU RESE IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 30,000.00 0.00 2021-05-26 2021-07-21 2022-01-17 nvelope exécution AU PLUVIAL Investments CI-WACA CI-221919-NC-RFQ- Component 3: Strengthening KK-21 / CAMPAGNE DE SENSI Single Stage - One E En attente d' IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 50,000.00 0.00 2021-05-25 2021-07-20 2022-01-16 BILISATION AUX RISQUES ET nvelope exécution Investments A LA GESTION DES DECHETS CI-WACA CI-221921-NC-RFQ- KK-21 / SURVEILLANCE DU R Component 3: Strengthening Single Stage - One E En attente d' ESEAU PLUVIAL DE GRAND-L IDA / 62120 National Physical and Social A posteriori Demande de prix Open - National 10,000.00 0.00 2021-06-30 2021-08-25 2022-02-21 nvelope exécution AHOU ( CONNEXION AU SYST Investments EME D'ALERTE ET AU SIG ) CI-WACA CI-218792-NC-DIR- Component 2: Strengthening KK-21 / Contrat avec COMAF Passation de marc IDA / 62120 the Policy and Institutional F A posteriori Direct 22,000.00 14,396.52 Signé 2021-03-16 2021-07-19 2021-03-21 2021-07-19 2021-04-25 2021-09-16 2021-10-22 RIQUE TECHNOLOGIE pour l'a hé de gré à gré ramework cquisition de la licence ARCG IS CI-WACA CI-221922-NC-DIR- Component 4: National Coor Passation de marc En cours d'ex KK-21 / MAINTENANCE DE L'A IDA / 62120 A posteriori 18,000.00 0.00 2021-05-26 2021-09-08 2021-05-31 2021-09-08 2021-07-05 2022-01-01 dination hé de gré à gré écution PPLICATION DE SUIVI-EVALU ATION RUCHE CI-WACA CI-218805-CW-DIR- KK-21 / Contrat avec le Grou pement R&D pour la prise en Component 4: National Coor Passation de marc En attente d' IDA / 62120 A posteriori Direct 13,400.00 0.00 2021-03-29 2021-04-03 2021-05-08 2021-11-04 charge des frais additifs dus dination hé de gré à gré exécution à l'incidence de la Covid-19 s ur l'étude quantitative des ris ques naturels. Page 5 CI-WACA CI-218790-NC-DIR- Component 2: Strengthening KK-21 / Hébergement et mai Passation de marc IDA / 62120 the Policy and Institutional F A posteriori Direct 6,000.00 5,170.58 Signé 2021-03-16 2021-05-04 2021-03-21 2021-05-04 2021-04-25 2021-07-22 2021-10-22 ntenance du site internet de hé de gré à gré ramework SGIE par Entente Directe ave c le consultant MAP CI-WACA CI-218782-NC-DIR- KK-21 / CONVENTION AVEC L' Component 2: Strengthening Passation de marc URPCI POUR LA DIFFUSION D IDA / 62120 the Policy and Institutional F A posteriori Direct 20,000.00 17,181.00 Signé 2021-04-15 2021-05-19 2021-04-20 2021-07-27 2021-05-25 2021-08-26 2021-11-21 hé de gré à gré ES MESSAGES DE SENSIBILIS ramework ATION A TRAVERS LES RADIO S DE PROXIMITE CI-WACA CI-234840-NC-DIR- KK-21 / ENTRETIEN ET MAINT ENANCE DES LOGICIELS DE C Component 4: National Coor Passation de marc IDA / 62120 A posteriori Direct 10,000.00 8,323.30 Signé 2021-05-27 2021-07-23 2021-06-01 2021-07-23 2021-07-06 2021-08-21 2022-01-02 OMPTABILITE TOM2PRO ; TO dination hé de gré à gré M2PAIE ET DE PASSATION DE S MARCHES TOM2MARCHE A VEC LE CABINET AGOSOFT. CI-WACA CI-234861-NC-DIR- KK-21 / RENOUVELLEMENT D Component 4: National Coor Passation de marc En attente d' IDA / 62120 A posteriori Direct 60,000.00 0.00 2021-05-31 2021-06-05 2021-07-10 2022-01-06 U CONTRAT DE BAIL AU TITR dination hé de gré à gré exécution E DE L'ANNEE 2021 CI-WACA CI-234865-NC-RFQ- KK-21 / ENTRETIEN DES LOC Component 4: National Coor Single Stage - One E En attente d' IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 2021-06-13 2021-08-08 2022-02-04 AUX Y COMPRIS LE MATERIEL dination nvelope exécution ET FOURNITURE D'ENTRETIE N CI-WACA CI-234848-NC-RFQ- Component 4: National Coor Single Stage - One E En attente d' KK-21 / ASSURANCE DU MAT IDA / 62120 A posteriori Demande de prix Limited 6,000.00 0.00 2021-06-14 2021-08-09 2022-02-05 dination nvelope exécution ERIEL ROULANT AU TITRE DE L'ANNEE 2021 CI-WACA CI-234867-NC-RFQ- Component 4: National Coor Single Stage - One E KK-21 / ENTRETIEN ET REPAR IDA / 62120 A posteriori Demande de prix Limited 30,000.00 17,752.63 Achevé 2021-06-14 2021-06-03 2021-08-09 2021-08-08 2022-02-05 2021-09-13 dination nvelope ATION DU MATERIEL INFORM ATIQUE CI-WACA CI-234837-NC-RFQ- KK-21 / CONTRAT AVEC SAHA Component 4: National Coor Passation de marc En attente d' IDA / 62120 A posteriori Direct 40,000.00 0.00 2021-06-03 2021-06-08 2021-07-13 2022-07-13 M POUR L'ASSURANCE DU PE dination hé de gré à gré exécution RSONNEL AU TITRE DE L'AN NEE 2021 CI-WACA CI-234869-NC-RFQ KK 21 / ENTRETIEN ET REPAR Component 4: National Coor Single Stage - One E En attente d' IDA / 62120 A posteriori Demande de prix Limited 20,000.00 0.00 2021-06-15 2021-08-10 2022-02-06 ATION DU MATERIEL ET MOBI dination nvelope exécution LER SAUF INFORMATIQUE CI-WACA CI-234874-NC-RFQ Component 4: National Coor Single Stage - One E KK-21 / FOURNITURE DE SER IDA / 62120 A posteriori Demande de prix Limited 30,000.00 21,895.47 Signé 2021-06-14 2021-08-24 2021-08-09 2021-10-30 2022-02-05 dination nvelope VICE DE GARDIENNAGE CI-WACA CI-221917-NC-RFQ- Component 3: Strengthening Single Stage - One E KK-21 / IMPRESSION DES GUI IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 26,000.00 0.00 Annulé 2021-11-27 2021-11-19 2022-01-22 2022-07-21 nvelope DES D'UTILISATION DES PEST Investments ICIDES CI-WACA CI-235346-NC-RFQ- KK-21 / Entretien et mainten Component 4: National Coor Single Stage - One E En attente d' ance des installations électri IDA / 62120 A posteriori Demande de prix Limited 5,328.00 0.00 2021-11-02 2021-12-28 2022-06-26 dination nvelope exécution ques (climatiseurs, groupe él ectrogène, sanitaire et plomb erie) CI-WACA CI-283866-NC-RFQ- Component 4: National Coor Single Stage - One E BV 22 / Recrutement d'un pr IDA / 62120 A posteriori Demande de prix Limited 20,000.00 0.00 Signé 2022-04-06 2022-06-30 2022-04-27 2022-08-03 2022-05-27 dination nvelope estataire pour la fourniture d e carburant CI-WACA CI-283869-NC-RFQ- Component 4: National Coor Single Stage - One E BV 22 / Recrutement d'un pr IDA / 62120 A posteriori Demande de prix Limited 48,000.00 0.00 Signé 2022-04-06 2021-12-02 2022-04-27 2022-08-06 2022-05-27 dination nvelope estataire pour le service de g ardiennage CI-WACA CI-283871-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Single Stage - One E En attente d' estataire pour l'entretien de IDA / 62120 A posteriori Demande de prix Limited 24,000.00 0.00 2022-04-12 2022-05-03 2022-06-02 dination nvelope exécution s installations électriques, cli matiseurs, sanitaires et plom berie CI-WACA CI-281180-NC-RFQ- BV 22 / Recrutement d’un pr Component 4: National Coor Single Stage - One E estataire pour la prise en cha IDA / 62120 A posteriori Demande de prix Limited 50,000.00 25,344.84 Signé 2022-04-06 2022-04-01 2022-04-27 2022-05-16 2022-05-27 dination nvelope rge de l’assurance maladie d u personnel contractuel de l’ UCP CI-WACA CI-293221-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 74,000.00 48,050.94 Signé 2022-06-14 2022-05-16 2022-07-05 2022-06-24 2022-09-03 estataire pour la fourniture e dination nvelope t l’installation d’équipements de visioconférence CI-WACA CI-293226-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 36,000.00 13,334.65 Signé 2022-06-22 2022-05-16 2022-07-13 2022-07-28 2022-12-10 estataire pour l'entretien et l dination nvelope a réparation du matériel infor matique CI-WACA CI-293228-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Single Stage - One E estataire pour l'entretien et l IDA / 62120 A posteriori Demande de prix Limited 12,000.00 0.00 Signé 2022-06-22 2022-08-16 2022-07-13 2022-09-24 2022-12-20 dination nvelope a réparation du matériel et m obilier sauf informatique CI-WACA CI-293233-NC-DIR- BV22 / Hébergement et main Component 2: Strengthening Passation de marc tenance du site internet de S IDA / 62120 the Policy and Institutional F A posteriori Direct 6,000.00 0.00 Signé 2022-06-21 2022-05-27 2022-06-22 2022-05-30 2022-07-03 2022-09-03 2023-07-03 hé de gré à gré GIE par Entente Directe avec ramework le cabinet MAP APPLICATION BUILDING CI-WACA CI-293235-NC-DIR- BV22 / Renouvellement et m Component 2: Strengthening Passation de marc aintenance de la licence Arc IDA / 62120 the Policy and Institutional F A posteriori Direct 20,000.00 0.00 Signé 2022-06-22 2022-06-01 2022-06-23 2022-06-06 2022-07-04 2022-07-16 2023-07-04 hé de gré à gré Gis par Entente Directe avec ramework COMAFRIQUE TECHNOLOGIE (ESRI) CI-WACA CI-299391-NC-RFQ- BV22 / Recrutement d’un pre Component 2: Strengthening stataire pour l’organisation d' Single Stage - One E IDA / 62120 the Policy and Institutional F A posteriori Demande de prix Limited 32,400.00 22,362.65 Signé 2022-06-23 2022-08-11 2022-07-20 2022-10-16 2022-08-19 une campagne médiatique d nvelope ramework e sensibilisation d’un mois su r le projet WACA et la loi de g estion du littoral Page 6 CI-WACA CI-293241-NC-DIR- Component 3: Strengthening BV22 / Maintenance de la pl Passation de marc IDA / 62120 National Physical and Social A posteriori Direct - National 6,000.00 0.00 Signé 2022-08-30 2022-08-25 2022-08-31 2022-06-07 2022-09-29 2022-09-14 2023-09-29 ateforme numérique d'enregi hé de gré à gré Investments strement et de suivi des plai ntes CI-WACA CI-299392-NC-DIR- Component 2: Strengthening Passation de marc Direct - Internation BV22 / Maintenance du géop IDA / 62120 the Policy and Institutional F A posteriori 10,000.00 0.00 Signé 2022-08-29 2022-05-27 2022-08-30 2022-05-30 2022-09-28 2022-10-04 2023-09-28 hé de gré à gré al ortail du SGIE par Entente Dir ramework ecte CI-WACA CI-320041-NC-DIR- BV 22 / Maintenance annuell Component 4: National Coor Passation de marc e des logiciels TOMATE acqui IDA / 62120 A posteriori Direct - National 10,000.00 0.00 Signé 2022-10-24 2022-07-04 2022-10-26 2022-07-08 2022-11-30 2022-12-17 2023-11-30 dination hé de gré à gré s (TOM2PRO- TOM2PAIE- TO M2MARCHE) par le projet WA CA CI-WACA CI-323208-NC-DIR- Component 4: National Coor Passation de marc Direct - Internation BV 22 / Maintenance de l'app IDA / 62120 A posteriori 6,000.00 0.00 Signé 2022-11-07 2022-10-13 2022-11-09 2022-10-19 2022-12-09 2022-12-01 2023-12-09 dination hé de gré à gré al lication de S&E Ruche CI-WACA CI-334494-NC-RFQ -KT 23 / Recrutement d'un pr Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 50,400.00 0.00 Signé 2023-01-11 2022-12-26 2023-02-08 2023-02-11 2023-12-29 estataire pour assurer le serv dination nvelope ice de gardiennage CI-WACA CI-334495-NC-RFQ- KT 23 / Recrutement d'un pre Component 4: National Coor Single Stage - One E En attente d' stataire pour la fourniture de IDA / 62120 A posteriori Demande de prix Limited 10,000.00 0.00 2023-01-11 2023-02-05 2023-12-29 dination nvelope exécution services d’assurance des deu x (02) véhicules de marque T OYOTA du projet WACA CI-WACA CI-343809-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Single Stage - One E En cours d'ex taire pour l'entretien des inst IDA / 62120 A posteriori Demande de prix Limited 30,000.00 0.00 2023-03-30 2023-04-27 2023-04-27 2024-02-27 dination nvelope écution allations électriques, climatis eurs, sanitaires, plomberies e t groupes électrogènes CI-WACA CI-347582-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Single Stage - One E taire pour la prise en charge IDA / 62120 A posteriori Demande de prix Limited 50,000.00 0.00 Signé 2023-03-28 2023-04-03 2023-04-26 2023-04-29 2024-04-25 dination nvelope de l'assurance maladie du pe rsonnel du projet WACA CI-WACA CI-347847-NC-RFQ- Component 4: National Coor Single Stage - One E En cours d'ex 23 / Recrutement d'un presta IDA / 62120 A posteriori Demande de prix Limited 20,000.00 0.00 2023-03-28 2023-03-28 2023-04-25 2023-05-25 dination nvelope écution taire pour l'acquisition de car burant CI-WACA CI-352520-NC-DIR- 23 / Convention avec la Radi Component 2: Strengthening o Côte d'Ivoire pour la produ Passation de marc En attente d' IDA / 62120 the Policy and Institutional F A posteriori Direct - National 19,456.80 0.00 2023-04-24 2023-04-26 2023-05-19 2024-05-18 ction et la diffusion des mess hé de gré à gré exécution ramework ages d’information et de sen sibilisation sur les activités d u WACA CI-WACA CI-352524-NC-DIR- 23 / Convention la Radio des Component 2: Strengthening Grands Ponts pour la product Passation de marc En attente d' IDA / 62120 the Policy and Institutional F A posteriori Direct - National 8,000.00 0.00 2023-04-17 2023-04-19 2023-05-12 2024-05-11 ion et la diffusion des messa hé de gré à gré exécution ramework ges d’information et de sensi bilisation sur les activités du WACA CI-WACA CI-352527-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Single Stage - One E IDA / 62120 A posteriori Demande de prix Limited 27,000.00 0.00 Signé 2023-04-19 2023-06-13 2023-05-17 2023-07-25 2024-05-16 taire pour l'entretien et la ré dination nvelope paration du matériel informat ique CI-WACA CI-357687-NC-DIR- Component 3: Strengthening 23 / Maintenance de la platef Passation de marc IDA / 62120 National Physical and Social A posteriori Direct - National 6,000.00 0.00 Signé 2023-05-15 2022-12-01 2023-05-17 2022-12-06 2023-06-09 2023-06-08 2023-12-31 orme numérique d'enregistre hé de gré à gré Investments ment et de suivi des plaintes CI-WACA CI-358418-NC-DIR- Component 2: Strengthening Passation de marc 23 / MAINTENANCE DU LOGI IDA / 62120 the Policy and Institutional F A posteriori Direct - National 20,000.00 0.00 Signé 2023-05-11 2023-05-26 2023-05-12 2023-05-31 2023-06-05 2023-06-28 2023-12-31 hé de gré à gré CIEL ARCGIS POUR LE PROJET ramework WACA CI-WACA CI-359450-NC-DIR- Component 2: Strengthening 23 / Maintenance du site int Passation de marc IDA / 62120 the Policy and Institutional F A posteriori Direct - National 6,000.00 0.00 Signé 2023-05-15 2022-12-02 2023-05-16 2022-12-05 2023-06-07 2023-06-08 2023-12-31 ernet du SGIE de l’observatoi hé de gré à gré ramework re national du littoral de COT E D’IVOIRE CI-WACA CI-362325-NC-DIR- 23 / Convention avec l' opéra Component 3: Strengthening teur Orange Money Côte d'Iv Passation de marc En attente d' IDA / 62120 National Physical and Social A posteriori Direct - National 60,000.00 0.00 2023-05-30 2023-06-01 2023-07-08 2024-07-07 oire pour les activités d'AGR hé de gré à gré exécution Investments et de création de forêts com munautaires et restauration des mangroves CI-WACA CI-362843-NC-RFQ- Component 3: Strengthening 23 / Recrutement d'un presta Single Stage - One E En cours d'ex IDA / 62120 National Physical and Social A posteriori Demande de prix Limited 24,000.00 0.00 2023-06-07 2023-05-23 2023-07-05 2023-08-19 taire pour l'impression de gui nvelope écution Investments de d'utilisation des pesticides CI-WACA CI-368894-NC-DIR- 23 / Entretien et maintenanc Component 4: National Coor Passation de marc e des logiciels de comptabilit IDA / 62120 A posteriori Direct - National 10,000.00 0.00 Signé 2023-06-28 2022-12-01 2023-06-30 2022-12-07 2023-07-21 2023-07-11 2023-12-31 dination hé de gré à gré é Tom2Pro et de passation d e marchés Tom2Marché et as sister l'UCP CI-WACA CI-368904-NC-RFQ- 23 / RECRUTEMENT D'UN PR ESTATAIRE POUR LA REALISA Component 4: National Coor Single Stage - One E En attente d' IDA / 62120 A posteriori Demande de prix Limited 24,000.00 0.00 2023-07-12 2023-08-21 2023-09-20 TION DE L'ENTRETIEN ET LA dination nvelope exécution REPARATION DU MATERIEL E T MOBILIER SAUF INFORMATI QUE CI-WACA CI-391926-NC-RFQ- 23 / Recrutement d’un presta Component 4: National Coor Single Stage - One E En attente d' taire pour la mise à jour et la IDA / 62120 A posteriori Demande de prix Limited 36,000.00 0.00 2023-11-21 2023-12-20 2024-04-02 dination nvelope exécution maintenance du système d’a rchivage électronique Page 7 CI-WACA CI-391935-NC-DIR- 23 / Recrutement d’un presta Component 4: National Coor Passation de marc Direct - Internation En attente d' taire pour assurer les frais de IDA / 62120 A posteriori 6,000.00 0.00 2023-11-20 2023-11-21 2023-12-22 2023-12-31 dination hé de gré à gré al exécution redevance de l'application de Suivi Evaluation Ruche CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107811-CS-CQS Component 3: Strengthening Sélection fondée s / Recrutement d'un consultan En cours d'exécut IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 10,000.00 0.00 2019-06-18 2020-04-01 2019-07-03 2019-07-10 2019-07-15 2019-07-27 2019-08-26 t pour la Conception et Héber ion Investments s des consultants gement du site (maintenance ) CI-WACA CI-110148-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening Sélection fondée s pour évaluer les risques pour Open - Internationa IDA / 62150 National Physical and Social A posteriori ur la qualité et le 200,000.00 0.00 Annulé 2019-04-12 2019-06-14 2019-04-27 2019-05-07 2019-05-12 2019-05-17 2019-05-23 2019-06-02 2020-06-01 la zone pilote (inondation côt l Investments coût ière, érosion, système d'alert e précoce de Grand Lahou) CI-WACA CI-110152-CS-CQS / Recrutement d'un cabinet o Component 3: Strengthening Sélection fondée s u ONG pour la réhabilitation IDA / 62150 National Physical and Social A posteriori ur les qualification Open - National 14,945.00 0.00 Annulé 2019-08-05 2019-08-26 2019-09-04 2019-09-14 2019-09-29 2019-11-28 et la plantation de mangrove Investments s des consultants s (les zones concernées sero nt ciblées dans le complexe l agunaire de Grand-Lahou) CI-WACA CI-110158-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening Sélection fondée s Open - Internationa pour la réalisation de l'étude IDA / 62120 National Physical and Social A posteriori ur la qualité et le 350,000.00 564,305.59 Achevé 2019-04-16 2019-06-13 2019-04-23 2020-03-02 2019-04-30 2019-09-28 2019-05-07 2019-01-31 2019-05-08 2019-05-08 2019-05-14 2019-05-08 2019-05-24 2019-11-15 2020-05-23 2020-05-19 l de préfaisabilité de la protect Investments coût ion du cordon sableux de Gra nd Lahou CI-WACA CI-110160-CS-CQS / Recrutement d'un cabinet p Component 3: Strengthening Sélection fondée s our réaliser l'étude d'impact En attente d'exéc IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 25,000.00 0.00 2019-05-08 2019-05-29 2019-06-12 2019-06-19 2019-07-13 2019-09-11 environnemental et social po ution Investments s des consultants ur la réhabilitation et la resta uration des mangroves dans la zone de Grand Lahou CI-WACA CI-110192-CS-QCB S / Recrutement d'un cabinet Component 2: Strengthening Sélection fondée s pour l'élaboration du Plan d' IDA / 62120 the Policy and Institutional F A posteriori ur la qualité et le Open - National 200,000.00 556,146.55 Signé 2019-05-13 2020-03-02 2019-05-28 2020-04-02 2019-07-11 2020-06-30 2019-08-10 2020-09-02 2019-08-20 2020-09-23 2019-09-03 2020-10-15 2019-09-27 2020-12-26 2019-11-26 Aménagement de Gestion du ramework coût Littoral Ivoirien (PAGLI) (duré e de 6 à 9 mois) CI-WACA CI-110046-CS-QCB S / Recrutement d'un cabinet Sélection fondée s Component 4: National Coor d'audit externe du PPA 2018 IDA / 62120 A posteriori ur la qualité et le Open - National 30,000.00 14,114.03 Signé 2019-07-25 2019-09-23 2019-08-09 2019-11-26 2019-09-18 2020-03-17 2019-09-20 2020-04-03 2019-10-05 2020-04-03 2019-10-20 2020-04-22 2019-11-09 2020-06-21 2021-10-29 dination et pour l'exercice septembre coût 2018 à décembre2018 et les exercices 2019 et 2020 CI-WACA CI-125661-CS-QCB S / Evaluer les risques pour la Component 3: Strengthening Sélection fondée s Open - Internationa zone pilote (inondation côtiè IDA / 62120 National Physical and Social A posteriori ur la qualité et le 240,638.00 316,378.47 Achevé 2019-08-23 2018-02-28 2019-08-24 2020-03-17 2019-08-26 2019-11-05 2019-08-27 2019-02-14 2019-08-28 2019-02-13 2019-08-30 2019-03-29 2019-09-01 2019-09-08 2020-06-27 2020-09-13 l re, érosion, systeme d'alerte Investments coût precoce de Grand Lahou) CI-WACA CI-164416-CS-QCB Component 2: Strengthening Sélection fondée s S / Recrutement d'un cabinet IDA / 62120 the Policy and Institutional F A posteriori ur la qualité et le Open - National 112,000.00 728,482.17 Achevé 2020-04-22 2020-06-29 2020-05-13 2020-10-02 2020-05-23 2020-12-18 2020-05-27 2021-03-29 2020-06-26 2021-04-16 2020-07-15 2021-05-11 2020-08-08 2021-10-24 2021-01-31 2021-12-25 pour élaborer l'EESS du PAGL ramework coût I CI-WACA CI-218818-CS-CQS- Component 3: Strengthening Sélection fondée s KK-01 / Recrutement d'un ca IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 300,000.00 257,925.43 Achevé 2021-03-30 2021-03-19 2021-04-20 2021-04-28 2021-06-03 2021-05-28 2021-07-03 2021-07-07 2021-08-07 2021-07-30 2022-02-03 2021-09-20 binet pour la réalisation de l' Investments s des consultants EIES de l'option d'adaptation CI-WACA CI-218827-CS-CQS- KK-21 / Recrutement d'un ca Component 3: Strengthening Sélection fondée s En attente d'exéc binet pour la réalisation de l' IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 300,000.00 0.00 2021-04-28 2021-05-19 2021-07-02 2021-08-01 2021-09-05 2022-03-04 ution EIES de la faisabilité de la sta Investments s des consultants bilisation du littoral de Port-B ouët CI-WACA CI-218828-CS-CQS- KK-21 / Recrutement d'un ca Component 3: Strengthening Sélection fondée s En cours d'exécut binet pour la réalisation de l' IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 80,000.00 0.00 2021-06-03 2021-06-24 2021-08-07 2021-09-06 2021-10-11 2022-04-09 ion évaluation environnementale Investments s des consultants et sociale liée à la mise en œ uvre des AGR CI-WACA CI-221926-CS-QCB S-KK-21 / MISE EN PLACE D'U Component 2: Strengthening Sélection fondée s En attente d'exéc N SYSTEME DE GESTION DUR IDA / 62120 the Policy and Institutional F A posteriori ur la qualité et le Open - National 180,000.00 0.00 2021-09-16 2021-10-07 2021-11-20 2021-12-18 2022-01-17 2022-02-21 2022-03-28 2023-03-28 ution ABLE DES TERRITOIRES: AGE ramework coût NDA 21, GOUVERNANACE, SI G TERRITORIAL CI-WACA CI-164496-CS-QCB S / Recrutement d'un consult ant pour réaliser un (e) const Component 3: Strengthening Sélection fondée s at ou étude d’impact environ IDA / 62120 National Physical and Social A posteriori ur la qualité et le Open - National 40,000.00 0.00 Annulé 2020-05-20 2021-03-01 2020-06-10 2020-07-01 2020-07-05 2020-07-15 2020-08-03 2020-08-27 2020-09-08 nemental et social pour la ré Investments coût habilitation et la plantation d es mangroves dans la zone d e Grand Lahou et à Assinie (îl es éhotilés). CI-WACA CI-223165-CS-CQS / RECRUTEMENT D’UN CONS ULTANT POUR LA REALISATIO Component 3: Strengthening Sélection fondée s N D’UN CONSTAT D'IMPACT E IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 40,000.00 62,714.07 Achevé 2021-03-22 2021-03-22 2021-04-12 2021-04-02 2021-04-22 2021-05-06 2021-04-29 2021-07-07 2021-05-16 2021-08-09 2021-06-20 2021-10-19 NVIRONNEMENTAL ET SOCIA Investments s des consultants L (CIES) DU SOUS-PROJET DE REHABILITATION ET DE PLAN TATION DE MANGROVE DU C OMPLEXE LAGUNAIRE DE GR AND-LAHOU CI-WACA CI-256688-CS-CQS- Component 3: Strengthening Sélection fondée s BV-21 / RECRUTEMENT D'UN IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 100,000.00 72,853.44 Signé 2021-10-21 2021-10-22 2021-11-11 2021-12-25 2022-02-03 2022-01-24 2022-02-24 2022-02-28 2022-04-17 2022-08-27 E STRUCTURE ( ONG ou AUT Investments s des consultants RES) POUR L’EXÉCUTION DES AGR Page 8 CI-WACA CI-218819-CS-CQS- KK-21 / Recrutement d'une O NG pour la réhabilitation, le r Component 3: Strengthening Sélection fondée s En attente d'exéc eboisement des champs de IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 60,000.00 0.00 2021-08-18 2021-09-08 2021-10-22 2021-11-21 2021-12-26 2022-06-24 ution mangrove et la formation de Investments s des consultants s communautés dans les zon es ciblées du complexe lagun aire de Grand-Lahou CI-WACA CI-221936-CS-QBS- KK-21 / PLANTATION DE PAR CS A BOIS, FORMATION A LA GESTION DURABLE DES RESS Component 3: Strengthening Sélection fondée s En attente d'exéc OURCES, IDENTIFICATION ET IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 96,000.00 0.00 2021-10-14 2021-11-04 2021-12-18 2022-01-17 2022-02-21 2022-08-20 ution SECURISATION DES SITES, EL Investments s des consultants ABORATIONS DES TEXTES RE GLMENETAIRES ET REBOISEM ENTS DES SITES EN ESPECE SELECTIONNE CI-WACA CI-164497-CS-CQS / RECRUTEMENT D'UNE ONG POUR LA RÉHABILITATION ET Component 3: Strengthening Sélection fondée s LE REBOISEMENT DES CHAM En attente d'exéc IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 72,000.00 0.00 2021-11-04 2021-11-25 2021-12-05 2021-12-10 2022-01-03 2022-04-03 PS DE MANGROVES ET LA FO ution Investments s des consultants RMATION DES COMMUNAUTÉ S DANS LES ZONES CIBLES DU COMPLEXE LAGUNAIRE D E GRAND-LAHOU CI-WACA CI-218815-CS-CQS- KK-21 / RECRUTEMENT D'UN CONSULTANT POUR L'EVALU ATION ENVIRONNEMENTALE Component 3: Strengthening Sélection fondée s ET SOCIALE (CIES/EIES) DES IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 70,000.00 0.00 Annulé 2021-12-20 2022-01-10 2022-02-23 2022-03-25 2022-04-29 2022-10-26 TRAVAUX DE DEBOUCHAGE Investments s des consultants ET ENTRETIEN DU RESEAU PL UVIAL ET DES TRAVAUX DE C ONSTRUCTION DE L'ENTENN E RELAI AU PROFIT DES COM MUNAUTES DE LA ZONE PILO TE DU PROJET WACA CI-WACA CI-218803-CS-CQS- KK-21 / Recrutement d'un co Component 2: Strengthening Sélection fondée s Open - Internationa nsultant pour la conception e IDA / 62120 the Policy and Institutional F A posteriori ur la qualité et le 200,000.00 0.00 Annulé 2021-12-10 2021-12-31 2022-02-13 2022-03-13 2022-04-12 2022-05-17 2022-06-21 2023-06-21 l t la mise en œuvre d'un syst ramework coût ème d'alerte précoce sur les risques côtiers. CI-WACA CI-264247-CS-CQS Component 2: Strengthening Sélection fondée s / Recrutement d'un cabinet p En cours d'exécut IDA / 62120 the Policy and Institutional F A posteriori ur les qualification Limited 90,000.00 0.00 2021-12-06 2021-12-17 2021-12-20 2022-01-19 2022-02-23 2022-03-16 our le renforcement des capa ion ramework s des consultants cités des membres du CNP et du CoTech CI-WACA CI-256685-CS-QBS- BV-21 / RECRUTEMENT D'UN Component 2: Strengthening Sélection fondée s CABINET POUR l’INTEGRATIO IDA / 62120 the Policy and Institutional F A posteriori ur les qualification Open - National 17,000.00 0.00 Annulé 2021-11-25 2021-12-16 2022-01-29 2022-02-28 2022-04-04 2022-10-01 N DU RÉSEAU DANS LE SYST ramework s des consultants ÈME GEODESIQUE NATIONAL (SECTEUR ABIDJAN - ASSINIE) CI-WACA CI-221929-CS-QCB S-KK-21 / ÉTUDE DE FAISABIL ITÉ DU COMBLEMENT ET MIS Component 3: Strengthening Sélection fondée s E EN SECURITE DES ZONES D IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 60,000.00 0.00 Annulé 2021-11-17 2021-12-08 2022-01-21 2022-02-20 2022-03-27 2022-09-23 E GLISSEMENTS MAJEURS SU Investments s des consultants R GRAND-LAHOU ET DU DÉB OUCHAGE ET ENTRETIEN DU RÉSEAU PLUVIAL DE GRAND- LAHOU/GESTION DES DÉCHE TS CI-WACA CI-266723-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening Sélection fondée s Open - Internationa En cours d'exécut pour l'assistance à la constru IDA / 62120 National Physical and Social A priori ur la qualité et le 3,500,000.00 0.00 2022-01-11 2022-01-04 2022-02-01 2022-02-09 2022-02-15 2022-07-14 2022-04-01 2022-12-01 2022-04-16 2023-02-13 2022-05-21 2022-06-25 2023-06-25 l ion ction de l'option d'daptation Investments coût du cordon sableux de Grand- Lahou. CI-WACA CI-293239-CS-LCS- BV22 / Recrutement d'un cab Component 4: National Coor Sélection au moin En cours d'exécut IDA / 62120 A posteriori Open - National 40,000.00 0.00 2022-06-30 2022-06-27 2022-07-21 2022-09-03 2022-10-01 2022-10-31 2022-12-05 2023-01-09 2024-01-09 inet pour la réalisation de l'a dination dre coût ion udit 2022 et 2023 du projet WACA CI-WACA CI-312257-CS-CQS- BV22 / Recrutement d'un con sultant pour la réalisation de Component 3: Strengthening Sélection fondée s l'étude de faisabilité du comb En cours d'exécut IDA / 62120 National Physical and Social A posteriori ur les qualification Open - National 120,000.00 0.00 2022-09-21 2022-09-14 2022-10-05 2022-10-24 2022-10-28 2022-11-07 2023-02-05 lement et mise en sécurité d ion Investments s des consultants es trois zones du glissement majeur sur grand lahou et du débouchage et entretien du r éseau pluvial de Grand-Laho u CI-WACA CI-323228-CS-CQS- BV 22 / Recrutement d’un co nsultant pour la réalisation d’ un diagnostic complet pour l Component 2: Strengthening Sélection fondée s En cours d'exécut a mise en place d’un systèm IDA / 62120 the Policy and Institutional F A posteriori ur les qualification Limited 200,000.00 0.00 2022-11-22 2022-11-11 2022-12-06 2022-12-27 2023-01-06 2023-04-06 ion e d’alerte précoce sur le litto ramework s des consultants ral ivoirien dans le cadre du Programme d’Investissement Régional de Résilience des Z ones Côtières en Afrique de l’ Oues CI-WACA CI-359459-CS-CQS- 23 / Recrutement d’un consul Component 2: Strengthening Sélection fondée s tant pour l’élaboration du pro En cours d'exécut IDA / 62120 the Policy and Institutional F A posteriori ur les qualification Open - National 100,000.00 0.00 2023-05-18 2023-05-23 2023-06-01 2023-06-07 2023-06-21 2023-06-29 2023-09-27 jet de décret fixant la liste de ion ramework s des consultants s espaces et milieux à préser ver de la zone côtière et les r ègles qui leur sont applicable s CI-WACA CI-393026-CS-CQS- 23 / Recrutement d’un consul Component 3: Strengthening Sélection fondée s En cours d'exame tant pour la réalisation du CI IDA / 62120 National Physical and Social A posteriori ur les qualification Limited 80,000.00 0.00 2023-11-27 2023-11-24 2023-12-11 2024-01-10 2024-02-14 2024-03-30 n ES lié aux modalités de mise Investments s des consultants en œuvre des 5 sites aquacol es CI-WACA CI-393198-CS-CQS- 23 / Recrutement d’une ONG Component 3: Strengthening Sélection fondée s En attente d'exéc pour la mise en œuvre du PA IDA / 62120 National Physical and Social A posteriori ur les qualification Limited 30,000.00 0.00 2023-11-27 2023-12-11 2024-01-10 2024-02-14 2024-07-07 ution R lié aux travaux de stabilisa Investments s des consultants tion du cordon sableux INDIVIDUAL CONSULTANTS Page 9 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-110036-CS-INDV Component 4: National Coor / Recrutement d'un Spécialist IDA / 62120 A posteriori Individuel Open 22,000.00 31,208.40 Achevé 2019-04-17 2019-06-05 2019-05-08 2019-07-17 2019-05-13 2019-07-23 2019-06-02 2019-09-01 2019-11-29 2019-09-01 dination e en Développement instituti onnel CI-WACA CI-110037-CS-INDV Component 4: National Coor / Recrutement d'un Spécialist IDA / 62120 A posteriori Individuel Open 48,000.00 3,120,840.00 Signé 2019-04-22 2019-03-08 2019-05-18 2019-05-02 2019-05-25 2019-05-15 2019-06-09 2019-06-30 2019-12-06 dination e en Gestion du littoral CI-WACA CI-110040-CS-INDV Component 4: National Coor / Recrutement d'un Spécialist IDA / 62120 A posteriori Individuel Open 48,000.00 58,408.94 Signé 2019-04-23 2019-11-13 2019-05-22 2020-02-21 2019-06-01 2020-03-12 2019-06-16 2020-04-02 2019-12-13 2020-04-02 dination e en sauvegarde social CI-WACA CI-110042-CS-INDV Component 4: National Coor IDA / 62120 A posteriori Individuel Open 6,000.00 14,563.92 Achevé 2019-04-16 2019-01-14 2019-04-25 2019-03-20 2019-04-30 2019-05-15 2019-05-07 2019-06-10 2019-11-03 2019-06-25 / Recrutement de deux (02) c dination hauffeurs CI-WACA CI-110045-CS-INDV Component 4: National Coor / Recrutement d'une assistan IDA / 62120 A posteriori Individuel Open 12,000.00 19,752.32 Achevé 2019-04-15 2019-01-18 2019-05-01 2019-02-26 2019-05-08 2019-04-06 2019-05-23 2019-05-27 2019-11-19 2019-06-18 dination te de direction CI-WACA CI-110050-CS-INDV / Recrutement d'un consultan Component 4: National Coor IDA / 62120 A posteriori Individuel Open 35,000.00 56,877.74 Signé 2019-04-29 2020-10-05 2019-05-25 2020-10-27 2019-06-04 2020-12-17 2019-07-02 2021-02-12 2019-12-29 t individuel pour l'évaluation, dination la détermination et le ciblage des AGR CI-WACA CI-110052-CS-INDV / Recrutement d'un cabinet p Component 3: Strengthening our l'étude pour fournir les d IDA / 62120 National Physical and Social A posteriori Individuel Open 52,000.00 46,583.92 Achevé 2019-04-16 2019-06-13 2019-05-01 2018-07-10 2019-05-02 2018-07-16 2019-05-10 2019-01-25 2019-11-06 2019-01-25 onnées socio-économiques d Investments e base de la zone pilote CI-WACA CI-110156-CS-CQS / Recrutement d'un consultan Component 3: Strengthening t individuel pour la réalisatio IDA / 62120 National Physical and Social A posteriori Individuel Open 40,000.00 30,131.71 Achevé 2019-06-25 2019-09-02 2019-07-21 2019-12-05 2019-07-26 2019-11-25 2019-08-30 2020-02-10 2020-02-26 2020-02-11 n de l'étude de faisabilité po Investments ur la réhabilitation et la plant ation de mangroves CI-WACA CI-110172-CS-CDS / Contrat avec le consultant i nternational Jean POMMIER p Component 2: Strengthening Sélection de cons our le transfert de compéten IDA / 62120 the Policy and Institutional F A posteriori ultants par entent Direct 7,000.00 6,297.12 Signé 2019-05-14 2020-02-13 2019-05-24 2020-04-06 2019-06-23 2020-05-06 2019-07-23 ces pour la gestion du géo po ramework e directe rtail du système de gestion d e l'information environnemen tale (SGIE) CI-WACA CI-110178-CS-INDV Component 2: Strengthening / Recrutement d'un consultan IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 7,500.00 0.00 Annulé 2019-05-14 2019-06-09 2019-06-19 2019-07-06 2019-08-05 t national pour l'intégration d ramework es données du SGIE CI-WACA CI-110179-CS-INDV / Recrutement d'un consultan Component 2: Strengthening t national pour la collecte de IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 7,500.00 13,459.13 Signé 2019-05-24 2020-08-03 2019-06-22 2020-09-02 2019-07-02 2020-09-25 2019-07-22 2020-12-24 2019-08-21 s données en vue de l'actuali ramework sation y compris la formation de l'administrateur CI-WACA CI-110184-CS-INDV / Recrutement d'un consultan t individuel pour faire l'état d es lieux des capacités des str Component 2: Strengthening uctures nationales pouvant f IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 20,000.00 17,514.30 Achevé 2019-04-23 2019-09-02 2019-05-17 2019-12-17 2019-05-27 2020-01-16 2019-06-13 2020-02-27 2019-07-13 2020-06-28 ournir des informations hydr ramework oclimatiques en vue du renfo rcement de leurs plateaux te chniques (SODEXAM, ONPC, plateforme nationale RRC, C RO, CI-WACA CI-110202-CS-INDV / Recrutement d'un consultan t pour l'élaboration du projet Component 2: Strengthening de décret et du costing porta IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 20,000.00 16,949.14 Achevé 2019-04-15 2019-06-13 2019-04-30 2018-12-10 2019-05-05 2018-11-29 2019-05-17 2019-01-31 2019-06-16 2019-01-31 nt création, attribution, orga ramework nisation et fonctionnement d e l'Agence Nationale de Gesti on Intégrée du Littoral (ANGI L) CI-WACA CI-130034-CS-INDV / Recrutement d'un consultan Component 4: National Coor t individuel pour le paramétr IDA / 62120 A posteriori Individuel Open 20,000.00 26,064.27 Achevé 2019-09-18 2019-09-24 2019-10-14 2019-12-04 2019-10-24 2019-12-10 2019-11-17 2020-02-02 2019-12-17 2020-02-18 dination age et l'installation d'un syst ème d'archivage électroniqu e des documents du projet CI-WACA CI-110164-CS-CDS / Contrat avec GLOBAL DATA BASE pour la mise en place d Component 2: Strengthening Sélection de cons ’une plateforme de partage d IDA / 62120 the Policy and Institutional F A posteriori ultants par entent Direct 49,095.00 57,938.20 Achevé 2020-03-20 2020-03-26 2020-04-01 2020-04-03 2020-05-05 2020-06-24 2020-11-01 2020-08-23 es données de l’observatoire ramework e directe nationale du littoral de Côte d’Ivoire dans le cadre du Proj et WACA-ResIP CI-WACA CI-164287-CS-CDS / CONTRAT AVEC MADAME M Sélection de cons Component 4: National Coor adame KOFFI Adjoua Olga Ep IDA / 62120 A posteriori ultants par entent Direct 21,600.00 1,629.16 Achevé 2020-03-16 2017-10-10 2020-03-26 2020-03-10 2020-04-15 2020-04-02 2020-12-31 2020-04-02 dination ouse KOUAKOU en qualité d' e directe Assistante en Passation des Marchés du projet WACA CI-WACA CI-164291-CS-CDS Sélection de cons / CONTRAT AVEC MADEMOIS Component 4: National Coor IDA / 62120 A posteriori ultants par entent Direct 18,600.00 1,402.89 Achevé 2020-03-16 2018-08-02 2020-03-26 2020-03-10 2020-04-15 2020-04-02 2020-12-31 2020-04-02 ELLE Djekankou DIOUBATE e dination e directe n qualité d'Assistante Compt able du projet WACA CI-WACA CI-164502-CS-INDV / Recrutement d'un consultan t pour la mise en place du sy stème (permettant aux orga Component 3: Strengthening nes d'enregistrer, de commu IDA / 62120 National Physical and Social A posteriori Individuel Open 10,000.00 14,427.80 Signé 2020-05-28 2020-06-24 2020-06-23 2020-07-15 2020-06-28 2020-09-03 2020-07-13 2020-11-11 2020-08-12 niquer les plaintes automatiq Investments uement à l'UCP et d'avoir l'ét at de traitement de chaque p lainte) et la fourniture des éq uipements associés (tablette s Page 10 CI-WACA CI-164506-CS-CDS / Contrat avec le consultant Component 2: Strengthening Sélection de cons MAP APPLICATION BUILDING IDA / 62120 the Policy and Institutional F A posteriori ultants par entent Direct 6,000.00 5,418.61 Achevé 2020-03-23 2020-03-26 2020-04-02 2020-04-09 2020-04-24 2020-06-21 2021-04-24 2020-07-25 (MAB) pour l'hébergement d ramework e directe e relooking et la maintenanc e du site internet de SGIE CI-WACA CI-164515-CS-CDS / Renouvellement du contrat Sélection de cons Component 1: Strengthening avec OUATTARA Hafsa en qu IDA / 62120 A posteriori ultants par entent Direct 40,800.00 3,048.02 Achevé 2020-09-22 2020-06-15 2020-10-02 2020-07-30 2020-12-06 2020-08-25 2021-09-30 2020-08-25 Regional Integration alité de Spécialiste en dévelo e directe ppement institutionnel du pr ojet WACA CI-WACA CI-164516-CS-CDS Sélection de cons / Contrat avec BONI Aya Mari Component 4: National Coor En cours d'exécut IDA / 62120 A posteriori ultants par entent Direct 55,200.00 0.00 2020-09-20 2019-11-04 2020-09-30 2020-12-04 2021-06-02 e Epouse Mme EBROTTIE en dination ion e directe qualité de Spécialiste en com munication CI-WACA CI-164518-CS-CDS Sélection de cons / Renouvellement du contrat Component 4: National Coor IDA / 62120 A posteriori ultants par entent Direct 22,200.00 1,664.47 Achevé 2020-04-23 2020-04-27 2020-05-03 2020-04-24 2020-06-17 2020-06-28 2020-07-13 2020-06-28 avec AMBEU Assi Anin Rachel dination e directe Epouse OMOKPRA CI-WACA CI-164519-CS-CDS / Renouvellement des contrat Sélection de cons Component 4: National Coor s avec OUATTARA Salifou et IDA / 62120 A posteriori ultants par entent Direct 16,800.00 634.92 Achevé 2020-04-22 2020-06-06 2020-05-02 2020-06-15 2020-06-30 2020-06-28 2021-06-30 2020-06-28 dination GBEGBE Michel en qualité de e directe chauffeurs du projet WACA CI-WACA CI-164520-CS-CDS Sélection de cons Component 4: National Coor En cours d'exécut / Contrat avec KOFFI N'Gbin IDA / 62120 A posteriori ultants par entent Direct 20,400.00 0.00 2020-03-16 2020-01-06 2020-03-18 2020-03-25 2021-03-25 dination ion Denis en qualité de Comptabl e directe e CI-WACA CI-164523-CS-CDS / Contrat avec KOUAKOU He Sélection de cons Component 4: National Coor En cours d'exécut mman Ulrich Thibault en qual IDA / 62120 A posteriori ultants par entent Direct 32,700.00 0.00 2020-03-16 2019-10-01 2020-03-19 2019-09-23 2020-03-27 2021-03-27 dination ion ité de Spécialiste Multimédia e directe et Chargé de l'informatique CI-WACA CI-164530-CS-CDS Sélection de cons / Contrat avec GONGBEÏ Gon Component 4: National Coor En cours d'exécut IDA / 62120 A posteriori ultants par entent Direct 32,700.00 0.00 2020-03-16 2020-11-02 2020-03-26 2020-05-30 2021-05-30 san Mathieu en qualité de Sp dination ion e directe écialiste en Evaluation Enviro nnementale CI-WACA CI-164494-CS-INDV / Recrutement d'un consultan Component 2: Strengthening t national pour la collecte de En cours d'exécut IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 15,000.00 0.00 2020-06-08 2020-07-09 2020-07-12 2020-08-01 2020-09-15 s données en vue de l'actuali ion ramework sation et l’intégration des do nnées dans le nouveau géop ortail CI-WACA CI-177341-CS-CDS / CONTRAT AVEC COSIT POU Sélection de cons Component 4: National Coor R L’EXTENSION ET LA MISE A IDA / 62120 A posteriori ultants par entent Direct 12,850.00 11,659.95 Signé 2020-06-04 2020-06-29 2020-06-14 2020-07-01 2020-07-13 2020-08-06 2020-08-07 dination JOUR DE L'APPLICATION DE S e directe UIVI-EVALUATION RUCHE CI-WACA CI-125428-CS-INDV / Recrutement d'un consultan Component 3: Strengthening En cours d'exécut t individuel pour la formation IDA / 62120 National Physical and Social A posteriori Individuel Open 12,000.00 0.00 2020-10-22 2020-10-26 2020-11-25 2020-12-10 2021-01-08 2021-02-07 ion des membres des Comités d Investments e gestion des plaintes sur leu rs rôles CI-WACA CI-213248-CS-CDS / ETUDE DE FAISABILITE DE L Component 3: Strengthening Sélection de cons 'OPTION D'ADAPTATION CHOI IDA / 62120 National Physical and Social A posteriori ultants par entent Direct 1,500,000.00 1,281,161.52 Achevé 2021-01-28 2021-02-16 2021-02-07 2021-02-15 2021-03-29 2021-05-12 2022-01-23 2021-12-10 SIE POUR LA STABILITE DU C Investments e directe ORDON SABLEUX FDE GRAN D-LAHOU CI-WACA CI-218809-CS-INDV -KK-21 / Recrutement d'un co Component 3: Strengthening nsultant pour l'étude de faisa IDA / 62120 National Physical and Social A posteriori Individuel Open 30,000.00 36,706.67 Signé 2021-07-28 2021-07-09 2021-09-15 2021-09-01 2021-10-06 2021-09-15 2021-11-10 2021-10-09 2022-05-09 bilité pour la mise en place d' Investments une antenne relai téléphoniq ue au profit de 04 villages CI-WACA CI-218823-CS-CQS- KK-21 / Recrutement d'un pr estataire pour la planification Component 3: Strengthening des parcs à bois et la formati IDA / 62120 National Physical and Social A posteriori Individuel Open 30,000.00 34,286.40 Achevé 2021-04-12 2021-08-25 2021-05-31 2021-09-02 2021-06-21 2021-09-14 2021-07-26 2021-11-15 2022-01-22 2021-12-25 on des communautés à la ge Investments stion durable des ressources en bois dans les villages coti ers CI-WACA CI-222298-CS-INDV -KK-21 / REALISATION DE L'E Component 3: Strengthening En attente d'exéc VALUATION ENVIRONNEMEN IDA / 62120 National Physical and Social A posteriori Individuel Open 34,000.00 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2022-04-18 ution TAL ET SOCIAL POUR LA CRE Investments ATION DES PARCS A BOIS CI-WACA CI-218832-CS-CDS- Sélection de cons KK-21 / Renouvellement du c Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori ultants par entent Direct 42,000.00 0.00 2021-03-10 2021-03-20 2021-05-24 2021-11-20 ontrat de la spécialiste en dé dination ution e directe veloppement institutionnelle de l'UCP WACA CI-WACA CI-222306-CS-INDV Component 4: National Coor -KK-21 / BILAN A MI-PARCOU IDA / 62120 A posteriori Individuel Open 50,000.00 70,013.64 Signé 2021-05-17 2021-05-10 2021-07-05 2021-07-28 2021-07-26 2021-08-12 2021-08-30 2021-09-21 2022-02-26 dination RS DU PROJET CI-WACA CI-221931-CS-CDS- Component 3: Strengthening Sélection de cons KK-21 / ASSISTANCE A MAITR En attente d'exéc IDA / 62120 National Physical and Social A posteriori ultants par entent Direct 20,000.00 0.00 2021-03-25 2021-04-04 2021-06-08 2021-12-05 ISE D'OUVRAGE A LA PLANTA ution Investments e directe TION DES MANGROVE CI-WACA CI-222308-CS-CDS- KK-21 / CONVENTION AVEC L' Sélection de cons UIAP POUR LA PRISE EN CHA Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori ultants par entent Direct 709,426.00 0.00 2021-05-18 2021-05-28 2021-08-01 2022-01-28 RGE DU PERSONNEL ET DE C dination ution e directe ERTAINES ACTIVITES DE FON CTIONNEMENT DU PROJET W ACA CI-WACA CI-234828-CS-INDV -KK-21 / Renouvellement du Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori Individuel Open 40,800.00 0.00 2021-05-27 2021-07-15 2021-08-05 2021-09-09 2022-03-08 Chargé de Communication M dination ution ultiMedia et Responsable Info rmatique Page 11 CI-WACA CI-234799-CS-INDV Sélection de cons -KK-21 / RENOUVELLEMENT Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori ultants par entent Direct 22,200.00 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE L'ASSISTAN dination ution e directe CE DE DIRECTION DU PROJET WACA CI-WACA CI-234803-CS-INDV Sélection de cons -KK-21 / RENOUVELLEMENT Component 4: National Coor En cours d'exécut IDA / 62120 A posteriori ultants par entent Direct 21,600.00 0.00 2021-06-07 2021-04-16 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE L'ASSISTAN dination ion e directe TE SPECIALISTE EN PASSATIO N DES MARCHES CI-WACA CI-234805-CS-INDV Sélection de cons Component 4: National Coor En attente d'exéc -KK-21 / RENOUVELLEMNT D IDA / 62120 A posteriori ultants par entent Direct 19,200.00 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 dination ution U CONTRAT DE L'ASSISTANT e directe E COMPTABLE CI-WACA CI-234820-CS-INDV Sélection de cons Component 4: National Coor En attente d'exéc -KK-21 / RENOUVELLEMENT IDA / 62120 A posteriori ultants par entent Direct 16,800.00 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 dination ution DU CONTRAT DES CHAUFFEU e directe RS CI-WACA CI-234832-CS-CDS- Sélection de cons Component 4: National Coor En attente d'exéc KK-21 / CONTRAT AVEC M.KO IDA / 62120 A posteriori ultants par entent Direct 52,800.00 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 dination ution UAKOU Kouassi Lanzaré e directe CI-WACA CI-234831-CS-CDS- Sélection de cons KK-21 / CONTRAT AVEC N'GB Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori ultants par entent Direct 60,000.00 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 EKE AMON SOSTHENE FELIX, dination ution e directe RESPONSABLE ADMINISTRATI F ET FINANCIER CI-WACA CI-234796-CS-INDV Sélection de cons -KK-21 / RENOUVELLEMENT Component 4: National Coor En cours d'exécut IDA / 62140 A posteriori ultants par entent Direct 40,800.00 0.00 2021-06-07 2021-02-03 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE LA SPECIALI dination ion e directe STE EN DEVELOPPEMENT INS TITUTIONNEL CI-WACA CI-234826-CS-CDS- Sélection de cons KK-21 / Contrat avec M. IRO Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori ultants par entent Direct 54,000.00 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 Koulai Marius Vidal, Spécialis dination ution e directe te en Suivi Evaluation CI-WACA CI-239850-CS-QCB S-KK-21 / Recrutement d’un Consultant individuel pour l’é Component 3: Strengthening laboration d’un Plan d’Action IDA / 62120 National Physical and Social A posteriori Individuel Open 80,000.00 64,969.82 Achevé 2021-06-28 2021-07-22 2021-08-02 2021-09-02 2021-08-17 2021-09-22 2021-09-15 2021-10-12 2021-11-14 2021-11-28 de Réinstallation involontaire Investments (PAR) relatif aux travaux de s tabilisation du cordon sableu x et de l’aménagement de l’e mbouchure de Grand-Lahou CI-WACA CI-218798-CS-INDV -KK-21 / Recrutement d'un co nsultant pour l'élaboration du projet de décret fixant les mo Component 2: Strengthening En cours d'exécut dalités de mise en œuvres d IDA / 62120 the Policy and Institutional F A posteriori Individuel Limited 20,000.00 0.00 2021-11-11 2021-10-22 2021-11-16 2021-12-07 2022-01-11 2022-07-10 ion es instruments de protection ramework du littoral (article 7) y compr is le décret fixant la liste des espaces et milieux à préserv er (article 46) CI-WACA CI-260616-CS-INDV Component 4: National Coor En attente d'exéc -BV-21 / RECRUTEMENT DU R IDA / 62120 A posteriori Individuel Open 15,000.00 0.00 2021-12-01 2022-01-19 2022-02-09 2022-03-16 2022-07-14 dination ution ESPONSABLE DES SERVICES COMMUNS CI-WACA CI-260623-CS-INDV -BV-21 / RECRUTEMENT D'UN CONSULTANT POUR L’ÉVALU ATION ET SOCIALE (CIES/EIES Component 3: Strengthening En attente d'exéc ) DES TRAVAUX DE DÉBOUC IDA / 62120 National Physical and Social A posteriori Individuel Open 70,000.00 0.00 2021-12-20 2022-02-07 2022-02-28 2022-04-04 2022-10-01 ution HAGE ET ENTRETIEN DU RÉS Investments EAU PLUVIAL ET DE CONSTR UCTION D'UNE ANTENNE REL AI AU PROFIT DES COMMUNA UTÉS DE LA ZONE PILOTE DU PROJET WACA CI-WACA CI-266708-CS-INDV / Recrutement d'un consultan Component 2: Strengthening t individuel pour l'intégration IDA / 62120 the Policy and Institutional F A posteriori Individuel Limited 17,000.00 11,905.04 Signé 2022-01-05 2021-12-17 2022-01-10 2022-01-14 2022-01-31 2022-06-10 2022-03-07 2022-07-28 2022-09-03 du réseau dans le système g ramework éodésique national (secteur Abidjan-Assinie) CI-WACA CI-309044-CS-INDV Component 3: Strengthening / Recrutement de trois (03) C En cours d'exécut IDA / 62120 National Physical and Social A posteriori Individuel Limited 18,000.00 0.00 2022-08-30 2022-08-25 2022-08-31 2022-09-21 2022-09-29 2022-10-20 onsultants pour la formation ion Investments des acteurs locaux de la filièr e pesticide CI-WACA CI-266710-CS-INDV / Recrutement d'un consultan t individuel pour l'étude de fa Component 3: Strengthening isabilité du comblement et m IDA / 62120 National Physical and Social A posteriori Individuel Limited 60,000.00 0.00 Annulé 2021-12-13 2021-12-17 2021-12-18 2022-01-08 2022-02-12 2022-08-11 ise en sécurité des trois zone Investments s de glissement majeure sur Grand-Lahou et du débaucha ge et entretien du réseau flu vial /gestion des déchets CI-WACA CI-309058-CS-INDV / Recrutement d'un prestatai Component 3: Strengthening re pour la plantation des parc IDA / 62120 National Physical and Social A posteriori Individuel Open - National 100,000.00 0.00 Signé 2022-09-14 2022-09-14 2022-10-07 2023-01-11 2022-10-28 2023-01-26 2022-11-07 2023-03-29 2023-07-05 s à bois et la formation des c Investments ommunautés à la gestion dur able des ressources au profit de 4 villages côtiers CI-WACA CI-319789-CS-CDS- BV 22 / Recrutement d'un ex Component 3: Strengthening Sélection de cons En cours d'exécut pert mangroves pour l'appui IDA / 62120 National Physical and Social A posteriori ultants par entent Direct - National 30,000.00 0.00 2022-10-17 2023-01-31 2022-10-21 2022-11-25 2023-11-25 ion à la réhabilitation et le rebois Investments e directe ement des champs de mangr oves CI-WACA CI-260626-CS-INDV -BV-21 / Recrutement d’un(e) consultant(e) pour la réalisati on d’un diagnostic complet p Component 2: Strengthening our la mise en place d’un sys IDA / 62120 the Policy and Institutional F A posteriori Individuel Open 100,000.00 0.00 Annulé 2022-01-04 2021-12-17 2022-01-31 2022-02-21 2022-03-28 2022-09-24 tème d’alerte précoce sur le l ramework ittoral ivoirien dans le cadre du Programme d’Investissem ent Régional de Résilience de s Zones Côtières en Afrique d e Page 12 CI-WACA CI-325382-CS-CDS- BV 22 / Recrutement d’un co nsultant à l’appui à l’élaborat ion d’un projet de décret port Component 2: Strengthening Sélection de cons ant approbation du Plan d’A IDA / 62120 the Policy and Institutional F A posteriori ultants par entent Direct - National 12,000.00 0.00 Signé 2022-11-17 2023-02-03 2022-11-21 2023-02-06 2022-12-12 2023-03-31 2023-01-11 ménagement et de gestion In ramework e directe tégrée du Littoral (PAGIL) da ns le cadre du Projet d’Invest issement pour la Résilience d es Zones Côtières Ouest-afric aine CI-WACA CI-357703-CS-INDV -23 / Recrutement d’un cons Component 2: Strengthening En cours d'exécut ultant individuel pour l’intégr IDA / 62120 the Policy and Institutional F A posteriori Individuel Open - National 50,000.00 0.00 2023-05-15 2023-05-23 2023-06-09 2023-06-23 2023-07-02 2023-09-30 ion ation du réseau dans le systè ramework me géodésique national du s ecteur Tabou à Abidjan CI-WACA CI-368917-CS-INDV -23 / RECRUTEMENT D'UN CO Component 2: Strengthening NSULTANT POUR LA REALISA En cours d'exécut IDA / 62120 the Policy and Institutional F A posteriori Individuel Open - National 90,000.00 0.00 2023-07-18 2023-08-08 2023-08-08 2023-08-22 2023-08-31 2023-11-29 TION DE L'AGENDA 21 DE LA ion ramework COMMUNE DE GRAND-LAHO U ET DES VILLAGES CÔTIERS CIBLES DU PROJET CI-WACA CI-393215-CS-INDV Component 3: Strengthening -23 / Recrutement d’un cons En attente d'exéc IDA / 62120 National Physical and Social A posteriori Individuel Limited 5,000.00 0.00 2023-11-27 2023-12-02 2023-12-23 2024-01-02 2024-01-12 ultant pour la formation des ution Investments membres de la cellule d’exéc ution du PAR CI-WACA CI-393226-CS-INDV -23 / Recrutement d’un cons Component 4: National Coor En attente d'exéc IDA / 62120 A posteriori Individuel Limited 30,000.00 0.00 2023-12-04 2023-12-09 2023-12-30 2024-01-13 2024-02-17 ultant pour la révision du ma dination ution nuel de procédure CI-WACA CI-391952-CS-INDV -23 / Recrutement d’un cons Component 2: Strengthening En attente d'exéc ultant individuel pour une ét IDA / 62120 the Policy and Institutional F A posteriori Individuel Open - National 40,000.00 0.00 2023-11-27 2023-12-17 2024-01-07 2024-01-17 2024-03-17 ution ude de faisabilité de la mise ramework en place de l'observatoire na tionale CI-WACA CI-392379-CS-CDS- 23 / Recrutement d’un consul Component 3: Strengthening Sélection de cons En attente d'exéc tant pour l’actualisation de l’ IDA / 62120 National Physical and Social A posteriori ultants par entent Direct - National 40,000.00 0.00 2023-11-27 2023-12-03 2024-01-03 2025-01-02 ution EIES approfondie de la constr Investments e directe uction des travaux de stabilis ation CI-WACA CI-393027-CS-CDS- Component 3: Strengthening Sélection de cons En attente d'exéc 23 / Recrutement d’un consul IDA / 62120 National Physical and Social A posteriori ultants par entent Direct - National 10,000.00 0.00 2023-11-27 2023-12-07 2024-02-10 2024-08-08 ution tant pour l’actualisation du P Investments e directe AR Page 13