CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM CORAL TRIANGLE INITIATIVE (COREMAP – CTI) LOAN NO. 8336-ID Procurement Plan Version No.: 1 Date: August 31, 2018 I. General Information 1. Project information: a. Country: Indonesia b. Recipient: Ministry of Finance (MOF) c. Project Name: Coral Reef Rehabilitation and Management Program – Coral Triangle Initiative (Coremap – CTI) d. Project Implementing Agency (PIA): Indonesian Institute of Science (LIPI) 2. Bank’s No Objection Date of the Procurement Plan: a. Version 1: July 10, 2017 3. Date of General Procurement Notice: January 8, 2015 4. Period covered by this procurement plan: July 10, 2017 to December 31, 2020 II. Types of Contract, Bank’s Review Requirements and Applied Methods A. Works, Goods and Non-consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procureme Ref. Bank’s Review Procurement Method nt Method No. Requirement Threshold 1 International Competitive ≥ Each contract equal Bidding (Works) $25,000,000 to or above $15,000,000 equivalent shall be subject to Bank’s prior review. All other contracts subject to post review. 2 National Competitive < Each contract equal Bidding (Works) $25,000,000 to or above $15,000,000 equivalent shall be subject to Bank’s prior review. All other contracts subject to post 3. International Competitive ≥ $2,000,000 review. Each contract equal Bidding (Goods/IT System) to or above $4,000,000 equivalent shall be subject to Bank’s prior review. All other contracts subject to post 4. International Competitive ≥ review. Each contract equal Bidding (Non-consulting $10,000,000 to or above Services) $4,000,000 equivalent shall be subject to Bank’s prior review. All other contracts subject to post 5. National Competitive < $2,000,000 No prior review review. Bidding (Goods/IT System) (only post review). 6. National Competitive < Each contract equal Bidding (Non-consulting $10,000,000 to or above Services) $4,000,000 equivalent shall be subject to Bank’s prior review. All other contracts subject to post 7. Shopping (Goods/IT < $ 100,000 review. No prior review System) (only post review). 8. Shopping (Small Works and < $ 200,000 No prior review Non-consulting Services) (only post review). 9. Direct Contracting (Small No Each contract equal Works, Goods and Non- procurement to or above consulting Services) method $4,000,000 threshold. equivalent shall be Subject to subject to Bank’s prior review. All justification other contracts for Direct subject to post Contracting review. as per para. 3.6 of the Justification for Procurement proposed use of Guidelines Direct Contracting method in any contract, regardless of value, shall be sent for the Bank’s 1. Pre-qualification: Not applicable. prior approval as part of the procurement plan. 2. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable. 3. Reference to (if any) Project Operational/Procurement Manual: Not Applicable 4. Any Other Special Procurement Arrangements: (i) PIU may use its own forms of contract for goods/non-consulting services procured under shopping method, which have been reviewed and found acceptable by the Bank; (ii) The Bank may review technical aspects of procurement documents and other non-procurement matters (technical specifications, environmental documents, cost estimate, etc.) related to the procurement activity in questioned, if needed. 5. Summary of the Procurement Packages planned after project effectiveness (including those that are subject to retroactive financing and advance procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packag Domesti Revie Comment No. on ed es c w s Cost Prefere by (US$ nce Bank million) (yes/no) (Prior / Post) 1. Summary 12.16 8 No Post of the NCB (Works) 2. Summary 4.39 8 No Post of the NCB (Goods/IT Systems) 3. Summary 0.20 1 No Post of the NCB (Non- consulting Services) 4. Summary 0.09 1 No Post of the Shopping (Small Works) 4. Summary 0.86 14 No Post of the Shopping 1 2 3 4 5 6 7 Ref. Descripti Estimat Packag Domesti Revie Comment No. on ed es c w s Cost Prefere by (US$ nce Bank million) (yes/no) (Prior / Post) (Goods) 5. Summary 0.10 1 No Post of the Shopping (Non- consulting Services) 7. Summary [to be [to be No Post of the updated updated Direct , if any] , if any] Contractin g (Goods/IT systems, Non- Consulting Services and Small Works) B. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to prior review by Bank as stated in Appendix 1 to the Guidelines for Selection and Employment of Consultants: Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement 1. QCBS (Firms) Applied to all Each contract equal to estimated value. No or above $2,000,000 threshold. equivalent shall be subject to Bank’s prior review. All other contracts subject to post review. (Prior review from technical perspective of only the draft TOR and draft cost estimate). Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement 2. CQS (Firms) Only for estimated No prior review (only contract value < $ post review). 300,000 as per paragraph 3.7 of the 3. Single Source Consultant No selection Guidelines. method Each contract equal to Selection of threshold. Subject to or above $2,000,000 Firms justification for Singe equivalent shall be Source Selection of subject to Bank’s prior firms as per para. 3.9 review. All other and 3.10 of the contracts subject to Consultant Guidelines. post review. (Prior review from technical perspective of only the draft TOR, Justification for use of Single Source Selection method and draft cost estimate, shall be sent for the Bank’s prior 4. Competitive No threshold. approval No as part prior review of the (only Selection of review), plan). procurement post unless Individual contract is equal to or Consultants above $400,000. (comparison of at least 3 CVs) (Prior review from technical perspective of only the draft TOR 5. Single Source No Threshold. and No draft prior cost (only review Selection of estimate). post review), unless Individual Subject to justification contract is equal to or Consultants for single source of above $400,000. individuals as per para. 5.4 of the (Prior review from Consultant Guidelines technical perspective of only the draft TOR, Justification for use of Single Source Selection method together with CV of the recommended candidate and draft cost estimate, shall be sent for the Bank’s 2. Shortlist comprising entirely of national consultants prior approval : Short as part of the procurement list of consultants for services (firms), estimated to cost less than $ 400,000 equivalent per contract, may comprise plan). entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Consultants may be hired under Indefinite Delivery Contract (IDCs) or Price Agreement as per paragraph 4.5 of the Consultant Guidelines. 4. Summary of Consultancy Assignments with Selection Methods and Time Schedule after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref Descripti Type of Estimat Packag Revie Commen . on of Assignme ed es/Posit w ts No. Assignme nts Cost ions by nts (US$ Bank million) (Prior / Post) 1. Summary Time- 0.80 1 Post of number Based of contracts that will be let under QCBS 2. Summary (Time- [to be [to be Post Time of number Based updated updated, based: 10 of /Lump- , if any] if any] contracts contracts Sum) (USD 0.40 that will million); be let Lumpsum under (6 other contracts methods (USD 0.38 (QBS, FBS, million) LCS and CQS) 3. Summary Time- 0.004 1 Post of number Based of contracts that will be let under single- source selection 1 2 3 4 5 6 7 Ref Descripti Type of Estimat Packag Revie Commen . on of Assignme ed es/Posit w ts No. Assignme nts Cost ions by nts (US$ Bank million) (Prior / Post) 3. Summary Time- 0.24 8 Post of number Based of individual consultant contracts that will be let under competitiv e selection 4. Summary (Time- [to be [to be Post of number Based updated updated, of /Lump- , if any] if any] individual Sum) consultant contracts that will be let under single- source selection PROCUREMENT Indonesia : Coral Reel Rehabilitation and Management Program -Coral Triangle Initiative (COREMAP-CTI) PLAN General Information Country: Indonesia Bank’s Approval Date of the Original Procurement Plan: 2018-09-07 2021-11-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P127813 GPN Date: Project Name: Coral Reel Rehabilitation and Management Program -Coral Triangle Initiative (COREMAP-CTI) Loan / Credit No: IBRD / 83360 Research Center for Oceanography - Indonesia Institute of Sciences Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Pending CW-1 / Renovation of Strengthening Sustainable Single Stage - One 2018-05- IBRD / 83360 Post Request for Bids Open - National 753,175.00 0.00 Implementat 2017-08-31 2017-09-05 2017-09-26 2017-10-10 2017-11-29 MarBEST Raden Saleh campus Marine-based Economy Envelope 27 ion CW-2 / Renovation of Under Strengthening Sustainable Single Stage - One 2019-11- MarBEST Pulau Pari Field IBRD / 83360 Post Request for Bids Open - National 2,110,000.00 0.00 Implementat 2018-08-31 2018-08-31 2018-09-10 2018-10-01 2018-10-15 2018-11-08 Marine-based Economy Envelope 08 Station ion Pending CW-3 / Renovation of UPTs. Strengthening Sustainable Single Stage - One 2019-02- IBRD / 83360 Post Request for Bids Open - National 2,400,000.00 0.00 Implementat 2018-03-06 2018-03-11 2018-04-22 2018-05-01 2018-05-23 Lombok Marine-based Economy Envelope 01 ion Under CW-4 / Renovation of Strengthening Sustainable Single Stage - One 2018-10- IBRD / 83360 Post Request for Bids Open - National 365,000.00 0.00 Implementat 2018-03-12 2018-03-20 2018-03-19 2018-04-09 2018-05-11 2018-04-23 2018-05-18 2018-05-14 UPTs.Tual Marine-based Economy Envelope 11 ion CW-5 / Renovation of UPT. Strengthening Sustainable Single Stage - One 2019-11- IBRD / 83360 Post Request for Bids Open - National 240,000.00 0.00 Canceled 2019-04-24 2019-05-01 2019-05-22 2019-06-05 2019-06-29 Bitung Marine-based Economy Envelope 26 Under CW-7 / Renovation of UPTs. Strengthening Sustainable Single Stage - One 2018-12- IBRD / 83360 Post Request for Bids Open - National 195,000.00 0.00 Implementat 2018-03-08 2018-04-15 2018-03-13 2018-04-24 2018-05-24 2018-06-28 Ternate Marine-based Economy Envelope 25 ion CW-1A / Building Boundary Pending Strengthening Sustainable Request for Single Stage - One 2019-03- Wall and Parking Areas of IBRD / 83360 Post Open - National 96,000.00 0.00 Implementat 2018-07-28 2018-09-22 Marine-based Economy Quotations Envelope 21 MarBEST Raden Saleh campus ion CW-5A / Building Retaining Strengthening Sustainable Single Stage - One 2019-05- Wall and Renovation of UPTs. IBRD / 83360 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2018-07-23 2018-07-28 2018-09-08 2018-10-08 2018-11-12 Marine-based Economy Envelope 11 Bitung (2019) CW-9 / The procurement of Pending Mechanical Electrical and Strengthening Sustainable Request for Single Stage - One 2019-08- IBRD / 83360 Post Open - National 35,000.00 0.00 Implementat 2019-04-27 2019-06-01 Interior Related Works for Marine-based Economy Quotations Envelope 30 ion Raden Saleh Institutional Strengthening Pending CW-5B / Building Renovation Single Stage - One 2020-01- IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 485,000.00 0.00 Implementat 2019-05-21 2019-05-26 2019-06-16 2019-06-30 2019-07-28 of UPTs. Bitung Envelope 24 Management ion CW-8 / Building Ancol Pending Strengthening Sustainable Single Stage - One 2019-06- National Data Repository IBRD / 83360 Post Request for Bids Open - National 5,700,000.00 0.00 Implementat 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2018-12-21 Marine-based Economy Envelope 19 Campus ion GD-C4 / Procurement of Gate Institutional Strengthening Request for Pending Request for Single Stage - One 2021-07- Works for BBIL Lombok IBRD / 83360 for Decentralized Coral Reef Post Open - National Quotations (Non 3,230.00 0.00 Implementat 2021-07-13 2021-07-16 Quotations Envelope 29 Building Management Bank-SPD) ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD-1B / Procurement of equipment for Tempat Uji Strengthening Sustainable Single Stage - One IBRD / 83360 Post Request for Bids Open - National 120,000.00 0.00 Canceled 2019-03-01 2019-03-08 2019-03-29 2019-04-05 2019-04-29 2019-05-29 Kompetensi (TUK) assessment Marine-based Economy Envelope centers in 2019 GD-6A / Procurement of Under Strengthening Sustainable Single Stage - One Laboratorium Equipment for IBRD / 83360 Post Request for Bids Open - National 1,800,000.00 0.00 Implementati 2019-05-06 2020-11-03 2019-05-13 2019-06-03 2019-06-10 2019-07-04 2019-12-31 Marine-based Economy Envelope Ancol Campus on GD-8 / Procurement Office Pending Equipment (furniture) for Strengthening Sustainable Single Stage - One IBRD / 83360 Post Request for Bids Open - National 400,000.00 0.00 Implementati 2019-05-06 2019-05-13 2019-06-03 2019-06-10 2019-07-04 2019-08-03 Pulau Pari MarBest Field Marine-based Economy Envelope on Station Pending GD-13 / Equipment for UPT Strengthening Sustainable Single Stage - One IBRD / 83360 Post Request for Bids Open - National 380,000.00 0.00 Implementati 2019-07-01 2019-07-15 2019-08-05 2019-08-12 2019-09-05 2019-10-05 Lombok Marine-based Economy Envelope on GD-17 / Procurement of Pending Strengthening Sustainable Single Stage - One Office Equipment for Ancol IBRD / 83360 Post Request for Bids Open - National 1,000,000.00 0.00 Implementati 2019-07-01 2019-07-08 2019-07-29 2019-08-05 2019-08-29 2019-09-28 Marine-based Economy Envelope Campus on GD-7B / Procurement of Air Pending Strengthening Sustainable Request for Single Stage - One Condition including IBRD / 83360 Post Open - National 45,000.00 0.00 Implementati 2018-03-30 2018-04-21 2018-06-20 Marine-based Economy Quotations Envelope Installation for Raden Saleh on GD-9A / IT equipment for Pending Strengthening Sustainable Request for Single Stage - One sub-national data nodes in IBRD / 83360 Post Open - National 100,000.00 0.00 Implementati 2018-09-22 2018-10-14 2018-12-13 Marine-based Economy Quotations Envelope 2018 on GD-11 / IT Equipment for Pending Strengthening Sustainable Request for Single Stage - One Research Monitoring and IBRD / 83360 Post Open - National 7,600.00 0.00 Implementati 2018-04-07 2018-06-02 2018-11-29 Marine-based Economy Quotations Envelope CRMIS (2017) on Page 1 Pending Strengthening Sustainable Request for Single Stage - One GD-12 / Coffee table book IBRD / 83360 Post Open - National 100,000.00 0.00 Implementati 2020-01-08 2020-01-30 2020-03-30 Marine-based Economy Quotations Envelope on Pending GD-14 / Equipment for UPT Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 50,000.00 0.00 Implementati 2018-11-08 2018-12-02 2019-01-31 Bitung Marine-based Economy Quotations Envelope on Pending GD-15 / Equipment for UPT Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 50,000.00 0.00 Implementati 2018-09-22 2018-10-14 2018-12-13 Tual Marine-based Economy Quotations Envelope on Pending GD-16 / Equipment for UPT Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 40,000.00 0.00 Implementati 2018-09-22 2018-10-14 2018-12-13 Ternate Marine-based Economy Quotations Envelope on Pending GD-18 / Procurement of Data Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 90,000.00 0.00 Implementati 2018-09-22 2018-10-14 2018-12-13 Logger (2018) Marine-based Economy Quotations Envelope on Pending GD-19 / Procure Office Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 30,000.00 0.00 Implementati 2018-04-05 2018-04-27 2018-06-26 Equipment for PMO Marine-based Economy Quotations Envelope on GD-20 / Procurement of Pending Strengthening Sustainable Request for Single Stage - One Rubber Boats for RV Baruna IBRD / 83360 Post Open - National 100,000.00 0.00 Implementati 2018-02-14 2018-03-08 2018-05-07 Marine-based Economy Quotations Envelope Jaya VIII on Pending GD-21 / Procurement of Wire Strengthening Sustainable Request for Single Stage - One IBRD / 83360 Post Open - National 100,000.00 0.00 Implementati 2018-02-14 2018-03-08 2018-05-07 Rope for RV Baruna Jaya VIII Marine-based Economy Quotations Envelope on GD-10 / Laboratorium Pending Strengthening Sustainable Single Stage - One Equipment for Research IBRD / 83360 Post Request for Bids Open - National 165,000.00 0.00 Implementati 2017-06-03 2017-06-08 2017-07-20 2017-08-19 2017-09-23 2017-11-29 Marine-based Economy Envelope Agenda on GD-10A / Laboratorium Pending Strengthening Sustainable Request for Single Stage - One Equipment for Research IBRD / 83360 Post Open - National 11,100.00 0.00 Implementati 2017-07-20 2017-09-14 2017-10-27 Marine-based Economy Quotations Envelope Agenda on GD-22 / Procurement of Institutional Strengthening Pending Diving Equipment for Tempat Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 60,000.00 0.00 Implementati 2018-09-24 2018-10-18 2018-12-17 Uji Kompetensi (TUK) Quotations Envelope Management on assessment centers in 2018 GD-23 / Procurement of IT Institutional Strengthening Pending Equipment for Tempat Uji Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 80,000.00 0.00 Implementati 2018-09-24 2018-10-18 2018-12-17 Kompetensi (TUK) assessment Quotations Envelope Management on centers in 2018 GD-7A / Procurement of Pending Strengthening Sustainable Single Stage - One office equipment (furniture) IBRD / 83360 Post Request for Bids Open - National 365,000.00 0.00 Implementati 2019-01-31 2019-02-07 2019-02-28 2019-03-07 2019-03-31 2019-04-30 Marine-based Economy Envelope for Raden Saleh on GD-9B / IT equipment for Pending Strengthening Sustainable Single Stage - One sub-national data nodes in IBRD / 83360 Post Request for Bids Open - National 75,000.00 0.00 Implementati 2019-05-06 2019-05-13 2019-05-27 2019-06-03 2019-06-27 2019-08-26 Marine-based Economy Envelope 2019 on Development of Eco-system Pending GD-24 / Printed the book of Request for Single Stage - One IBRD / 83360 Based Resources Post Open - National 14,000.00 0.00 Implementati 2019-07-13 2019-08-24 2019-10-23 Nusa Manggala Ekspedition Quotations Envelope Management on Pending GD-19A / Procurement Office Project Management and Request for Single Stage - One IBRD / 83360 Post Open - National 12,500.00 0.00 Implementati 2019-06-01 2019-07-06 2019-09-04 Equipment for PMO 2019 Coordination, and Learning Quotations Envelope on GD-1D / Procurement of Institutional Strengthening Pending equipment for 3 Assessment Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 45,000.00 0.00 Implementati 2020-04-11 2020-05-23 2020-07-22 Centers/Tempat Uji Quotations Envelope Management on Kompetensi (TUK) in 2020 Institutional Strengthening Pending GD-18A / Procurement of Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 50,000.00 0.00 Implementati 2019-06-02 2019-07-14 2019-10-12 Data Lodger in 2 sites in 2019 Quotations Envelope Management on GD-18B / Procurement of Institutional Strengthening Pending Request for Single Stage - One Data Lodger for 2 sites in IBRD / 83360 for Decentralized Coral Reef Post Open - National 50,000.00 0.00 Implementati 2020-04-19 2020-05-31 2020-08-29 Quotations Envelope 2020 Management on GD-1C / Procurement of Institutional Strengthening Pending equipment for Tempat Uji Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 65,000.00 0.00 Implementati 2019-06-08 2019-07-20 2019-09-18 Kompetensi (TUK) assessment Quotations Envelope Management on centers in 2019 PMO-GD-B7 / Procurement Institutional Strengthening Pending Single Stage - One of Laboratory Furniture for IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 112,000.00 0.00 Implementati 2021-06-02 2021-06-07 2021-07-07 2021-07-21 2021-08-07 2021-10-06 Envelope Lombok Management on PMO-GD-B8 / Procurement Institutional Strengthening Pending Single Stage - One of Office Furniture for Ancol IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 167,500.00 0.00 Implementati 2021-06-16 2021-06-21 2021-07-21 2021-08-04 2021-09-01 2021-12-30 Envelope Building Management on PMO-GD-B9 / Procurement Institutional Strengthening Pending Single Stage - One of Laboratory Interior for IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 945,000.00 0.00 Implementati 2021-06-02 2021-06-07 2021-07-07 2021-07-21 2021-08-18 2021-12-16 Envelope Ancol Building Management on PMO-GD-B11 / Procurement Institutional Strengthening Pending Single Stage - One of Research Equipment for IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 586,000.00 0.00 Implementati 2021-06-02 2021-06-07 2021-07-07 2021-07-21 2021-08-18 2021-12-16 Envelope Oceanography Ancol Management on PMO-GD-C2 / Office Institutional Strengthening Pending Request for Single Stage - One electronic equipment for IBRD / 83360 for Decentralized Coral Reef Post Open - National 8,000.00 0.00 Implementati 2021-06-07 2021-07-07 2021-08-06 Quotations Envelope Ancol Building Management on GD-D1 / E-Purchasing Institutional Strengthening Pending Micropipet Multichannel for IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 1,591.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2022-04-09 BBIL Lombok Management on Page 2 Institutional Strengthening Pending GD-D2 / E-Purchasing Elisa IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 7,125.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 Washer for BBIL Lombok Management on GD-D3 / E-Purchasing Institutional Strengthening Pending Instrument Cabinet for BBIL IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 6,304.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 Lombok Management on Institutional Strengthening Pending GD-D4 / E-Purchasing Table IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 979.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 and Locker for BBIL Lombok Management on Institutional Strengthening Pending GD-D5 / E-Purchasing UPS IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 6,039.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 for BBIL Lombok Management on Institutional Strengthening Pending GD-D10 / Procurement of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 4,008.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 Backdrop dan Sticker Sunblast Management on Institutional Strengthening Pending GD-D6 / E-Purchasing digital IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 5,304.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 whiteboard for BBIL Lombok Management on Institutional Strengthening Pending GD-D7 / E-Purchasing Smart IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 1,061.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 TV Management on Institutional Strengthening Pending GD-D8 / E-Purchasing UV IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 3,334.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 Sterilizier for BBIL Lombok Management on GD-D13 / Procurement of Institutional Strengthening Pending Furniture and Dormitory IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 14,178.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-10-14 Equipment for BBIL Lombok Management on Institutional Strengthening Pending GD-D9 / E-Purchasing paper IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 473.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 shredder for BBIL Lombok Management on GD-D14 / Procurement of Institutional Strengthening Pending Request for Single Stage - One Laboratory Furnitures for BBIL IBRD / 83360 for Decentralized Coral Reef Post Open - National 69,170.00 0.00 Implementati 2021-09-06 2021-11-01 2021-12-31 Quotations Envelope Lombok Management on GD-D16 / Procurement of Institutional Strengthening Pending Single Stage - One Tanks and Aquariums for BBIL IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 108,461.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 2022-02-10 Envelope Lombok Management on GD-E6 / Procurement of Data Institutional Strengthening Pending Single Stage - One Processing Device and IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 197,341.00 0.00 Implementati 2021-09-01 2021-09-06 2021-09-27 2021-10-07 2021-10-21 2021-12-05 Envelope communication for RCO Ancol Management on GD-E1 / E-Purchasing Institutional Strengthening Pending Mikroskop Fluorescence for IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 12,727.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-30 RCO Ancol Management on Institutional Strengthening Pending GD-E2 / E-Purchasing IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 7,133.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2022-04-09 Camera Mikroskop Management on GD-E3 / E-Purchasing Institutional Strengthening Pending Biosafety Cabinet for RCO IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 5,649.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-25 Ancol Management on GD-E5 / E-Purchasing Institutional Strengthening Pending Storage Cabinet and Utilities IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 6,100.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-04 2021-11-03 for RCO Ancol Management on Institutional Strengthening Pending GD-E4 / E-Purchasing UPS IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 1,361.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-25 3KVA for RCO Ancol Management on Institutional Strengthening Pending GD-E9 / E-Purchasing Smart IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 12,607.00 0.00 Implementati 2021-09-01 2021-09-06 2021-10-11 2021-11-10 TV fo RCO Ancol Management on GD-1E / Procurement of Institutional Strengthening Pending equipment for 3 Assessment Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 146,800.00 0.00 Implementati 2021-09-06 2021-10-18 2021-12-17 Centers/Tempat Uji Quotations Envelope Management on Kompetensi (TUK) in 2021 GD-B13 / Procurement of IT Institutional Strengthening Pending Single Stage - One Equipment for 2 Sub National IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 16,700.00 0.00 Implementati 2021-09-01 2021-09-06 2021-09-20 2021-10-04 2021-10-25 2021-12-24 Envelope Data Nodes in 2021 Management on GD-D11 / Procurement of Institutional Strengthening Pending Request for Single Stage - One Office Curtain for BBIL IBRD / 83360 for Decentralized Coral Reef Post Open - National 13,951.00 0.00 Implementati 2021-11-10 2021-12-15 2022-01-14 Quotations Envelope Lombok Office Management on PMO-GD-B5 / Procurement Institutional Strengthening Pending Single Stage - One of Marine Laboratory IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 588,000.00 0.00 Implementati 2021-06-02 2021-06-12 2021-07-12 2021-07-26 2021-08-12 2022-02-08 Envelope Equipment for Deep Sea Management on (Ambon) GD-C5 / Cable Installation Institutional Strengthening Pending from LVMDP Panel Box to SDP IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 2,200.00 0.00 Implementati 2021-02-16 2021-02-17 2021-02-19 2021-02-24 Panel Box Lombok Management on GD-C3 / Procurement of Institutional Strengthening Pending Request for Single Stage - One Computer Supporting Data IBRD / 83360 for Decentralized Coral Reef Post Open - National 5,315.00 0.00 Implementati 2021-04-16 2021-04-27 2021-04-30 Quotations Envelope Processing for RCO Management on Institutional Strengthening Pending GD-B2 / E-purchasing of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 3,240.00 0.00 Implementati 2021-05-17 2021-05-19 2021-05-24 2021-07-12 Office Furniture for Lombok 1 Management on Page 3 GD-D18 / Procurement of Institutional Strengthening Pending Request for Single Stage - One BBIL Laboratory Supporting IBRD / 83360 for Decentralized Coral Reef Post Open - National 6,350.00 0.00 Implementati 2021-07-26 2021-08-02 2021-08-16 Quotations Envelope Equipment Management on Institutional Strengthening Pending GD-E10 / Procurement of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 2,622.00 0.00 Implementati 2021-10-01 2021-10-06 2021-10-15 2021-11-01 Imaging Software Management on Institutional Strengthening Pending GD-B3 / E-purchasing of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 5,704.00 0.00 Implementati 2021-06-01 2021-06-06 2021-06-21 2021-08-02 Office Furniture for Lombok 2 Management on Institutional Strengthening Pending GD-B1 / E-purchasing of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 32,610.00 0.00 Implementati 2021-06-10 2021-06-15 2021-06-29 2021-07-28 Office Furniture for Lombok 3 Management on PMO-GD-B12 / Procurement Institutional Strengthening Pending of Gas Installation Network for IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 64,200.00 0.00 Implementati 2021-11-07 2021-11-12 2021-12-03 2022-03-03 Ancol Laboratory Building Management on PMO-GD-B4 / Procurement Institutional Strengthening Pending of Real Time Data Logger for IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 53,850.00 0.00 Implementati 2021-11-07 2021-11-12 2021-12-03 2022-04-02 Lombok Management on GD-D15 / Procurement of Institutional Strengthening Pending Single Stage - One Laboratory Equipment for BBIL IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 691,284.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2021-12-08 2021-12-22 2022-02-05 Envelope Lombok Management on Institutional Strengthening Pending GD-D12 / Procurement of Request for Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Open - National 13,955.00 0.00 Implementati 2021-11-10 2021-12-15 2022-01-14 CCTV and Sound System Quotations Envelope Management on PMO-GD-B6 / Procurement Institutional Strengthening Pending of Generating Set and Tank IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 49,590.00 0.00 Implementati 2021-11-07 2021-11-12 2021-12-03 2022-01-17 for Lombok Management on GD-E11 / Procurement of Institutional Strengthening Pending Single Stage - One Oceanography Laboratory and IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 1,975,000.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2021-12-08 2021-12-22 2022-05-21 Envelope Research Equipment Management on GD-G4 / Procurement of Institutional Strengthening Pending Interior and Exterior for Pari Single Stage - One IBRD / 83360 for Decentralized Coral Reef Post Request for Bids Open - National 741,300.00 0.00 Implementati 2021-11-09 2021-11-14 2021-11-26 2021-12-03 2021-12-17 2022-04-16 Island Station and Interior of Envelope Management on OR Kebumian Room Institutional Strengthening Pending GD-B12 / Procurement of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 307,800.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2022-01-15 Fume Hood Equipment Management on Institutional Strengthening Pending GD-B14 / Procurement of IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 21,000.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2022-01-15 Coldroom for Ancol Office Management on GD-B15 / Procurement of Institutional Strengthening Pending Arm Hood dan Ventilated IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 49,200.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2022-01-30 Cabinet Management on GD-B16 / Procurement of Institutional Strengthening Pending Laboratory Chemical Air IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 105,000.00 0.00 Implementati 2021-11-05 2021-11-10 2021-12-01 2022-03-01 Purification System for Ancol Management on Office GD-D17 / Procurement of Institutional Strengthening Pending Biosafety Cabinet for BBIL IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 8,900.00 0.00 Implementati 2021-11-07 2021-11-12 2021-12-03 2022-01-17 Lombok Management on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending NC-2 / Movie Making for Strengthening Sustainable Single Stage - One IBRD / 83360 Post Request for Bids Open - National 200,000.00 0.00 Implementati 2019-07-08 2019-07-15 2019-08-05 2019-08-12 2019-09-02 2020-09-01 Coremap Legacy Marine-based Economy Envelope on Development of Eco-system Pending NC-3 / Film Documentary for Request for Single Stage - One IBRD / 83360 Based Resources Post Open - National 100,000.00 0.00 Implementati 2018-09-07 2018-09-30 2018-12-29 Nusa Manggala Expedition Quotations Envelope Management on NC-4 / Dissemination of the Development of Eco-system Pending Request for Single Stage - One Nusa Manggala Expedition IBRD / 83360 Based Resources Post Open - National 35,000.00 0.00 Implementati 2019-08-07 2019-09-04 2019-09-11 Quotations Envelope Results Management on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant CS-17 / Construction Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 5,000.00 0.00 2018-02-01 2018-02-22 2018-03-08 2018-03-28 2018-04-01 2018-12-03 Supervision Ternate Marine-based Economy Implementation Selection CS-13 / Supervision Consultant Strengthening Sustainable Pending Consultant for Renovation IBRD / 83360 Post Qualification Open - National 10,000.00 0.00 2018-02-01 2018-02-22 2018-03-08 2018-04-07 2018-04-24 2018-12-03 Marine-based Economy Implementation Tual Selection CS-14 / Supervision Consultant Strengthening Sustainable Pending Consultant for Renovation IBRD / 83360 Post Qualification Open - National 10,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 Marine-based Economy Implementation Bitung Selection Page 4 CS-12 / Supervision Consultant Strengthening Sustainable Pending Consultant for Renovation IBRD / 83360 Post Qualification Open - National 25,000.00 0.00 2018-03-29 2018-04-19 2018-06-02 2018-07-02 2018-08-06 2019-02-02 Marine-based Economy Implementation Lombok Selection CS-6 / Supervision Consultant Strengthening Sustainable Pending consultant for Renovation IBRD / 83360 Post Qualification Open - National 25,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2019-03-01 Marine-based Economy Implementation Pulau Pari Selection Consultant CS-15 / Construction Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 120,000.00 0.00 2018-09-30 2018-10-21 2018-10-31 2018-11-07 2018-11-13 2020-03-24 Management for Ancol Marine-based Economy Implementation Selection Consultant CS-18 / Interior Design for Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 15,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 Raden Saleh Marine-based Economy Implementation Selection Consultant CS-16 / Detail Engginering Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 120,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-09-28 Design and UKL/UPL Ancol Marine-based Economy Implementation Selection Consultant CS-1 / Independent Project Management and Pending IBRD / 83360 Post Qualification Open - National 100,000.00 0.00 2021-06-03 2021-06-24 2021-07-04 2021-07-11 2021-07-17 2021-10-15 evaluation consultant Coordination, and Learning Implementation Selection CS-4 / Consultant for Master Consultant Plan of Renovation, Detail and Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 94,600.00 0.00 2018-03-29 2018-04-19 2018-06-02 2018-07-02 2018-08-06 2019-02-02 Engginering Design for Marine-based Economy Implementation Selection Renovation Pulau Pari CS-5 / Consultant for Master Consultant Plan of Renovation, Detail and Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 91,000.00 0.00 2018-03-29 2018-04-19 2018-06-02 2018-07-02 2018-08-06 2019-02-02 Engginering Design for Marine-based Economy Implementation Selection Renovation Lombok CS-14A / Supervision Consultant Strengthening Sustainable Pending Consultant for Renovation IBRD / 83360 Post Qualification Open - National 10,000.00 0.00 2019-03-01 2019-03-22 2019-04-01 2019-04-08 2019-04-14 2019-11-26 Marine-based Economy Implementation Bitung (2019) Selection CS-3 / Supervising Consultant Strengthening Sustainable Pending Consultant for Renovation IBRD / 83360 Post Qualification Open - National 23,000.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2018-04-17 Marine-based Economy Implementation Raden Saleh Selection Consultant CS-8 / Detail Engginering Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 61,000.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2018-04-07 Design for Renovation Bitung Marine-based Economy Implementation Selection Consultant CS-11 / Detail Engginering Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 6,400.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2018-04-07 Design for Renovation Ternate Marine-based Economy Implementation Selection Consultant CS-9 / Detail Engginering Strengthening Sustainable Pending IBRD / 83360 Post Qualification Open - National 6,900.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2018-04-07 Design for Renovation Tual Marine-based Economy Implementation Selection CS-2 / PMO Consultant Project Management and Quality And Cost- (Campaign + IT, Business IBRD / 83360 Post Open - International 800,000.00 0.00 Canceled 2018-08-31 2018-10-01 2018-10-19 2018-10-22 2018-11-19 2018-12-10 2018-12-31 2019-01-21 2020-12-31 Coordination, and Learning Based Selection Plan) 24 monts CS-2A / Project Management Consultant for Project Management Office (PMO) Project Management and Quality And Cost- Under Coral Reef Rehabilitation and IBRD / 83360 Post Open - International 650,000.00 0.00 2019-04-05 2019-04-26 2019-05-24 2019-05-06 2019-05-27 2019-06-03 2019-06-17 2019-07-04 2020-12-31 Coordination, and Learning Based Selection Implementation Management Program (COREMAP) - Coral Triangle Initiative (CTI) CS-16A / The Consultant Consultant Strengthening Sustainable Pending Services of Interior Design for IBRD / 83360 Post Qualification Open - National 50,000.00 0.00 2020-03-02 2020-03-16 2020-04-13 2020-04-27 2020-05-18 2020-08-16 Marine-based Economy Implementation Ancol Building Selection CS-20 / The Consultant Services for Environment Impact Assessment (EIA) Institutional Strengthening Consultant Pending Documents for the overall site IBRD / 83360 for Decentralized Coral Reef Post Qualification Open - National 40,000.00 0.00 2019-08-18 2019-09-01 2019-10-06 2019-10-13 2019-10-21 2020-01-19 Implementation of Research Center for Management Selection Oceanography (RCO) LIPI Building in Ancol, Jakarta CS-21 / Consultant Services for Detailed Engineering Institutional Strengthening Consultant Design (DED) for the IBRD / 83360 for Decentralized Coral Reef Post Qualification Open - National 300,000.00 0.00 Canceled 2019-08-11 2019-08-25 2019-09-15 2019-09-22 2019-10-06 2020-03-04 Intellectual Property and Management Selection Biodiversity Data Center Building CS-22 / Consultant Services for Detailed Engineering Design (DED) for the Institutional Strengthening Quality And Cost- Pending Intellectual Property and IBRD / 83360 for Decentralized Coral Reef Post Open - National 300,000.00 0.00 2019-11-04 2019-11-06 2019-11-27 2019-12-18 2019-12-25 2020-01-08 2020-01-29 2020-04-28 Based Selection Implementation Biodiversity Data Center Management Building and LIPI Laboratorium Buildings INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual IC-2A / IT consultant for Project Management and Pending IBRD / 83360 Post Consultant Open 20,409.00 0.00 2017-08-09 2017-08-28 2017-08-28 2017-09-04 2018-09-04 upgrade of CRMIS Coordination, and Learning Implementation Selection Individual IC-12 / Develop On Line Project Management and Pending IBRD / 83360 Post Consultant Open 30,000.00 0.00 2018-02-01 2018-03-22 2018-04-12 2018-04-30 2019-12-02 Application for LSP Coordination, and Learning Implementation Selection Page 5 Individual IC-4A / Individual consultan Strengthening Sustainable Pending IBRD / 83360 Post Consultant Open 5,500.00 0.00 2018-09-14 2018-10-01 2018-10-04 2018-10-10 2019-02-28 for Procurement (2018) Marine-based Economy Implementation Selection Individual IC-4 / Individual consultan Project Management and Pending IBRD / 83360 Post Consultant Open 15,703.00 0.00 2017-06-02 2017-07-21 2017-08-11 2017-09-15 2017-12-31 for Procurement Coordination, and Learning Implementation Selection Individual IC-3 / Individual consultan Project Management and Pending IBRD / 83360 Post Consultant Open 85,234.00 0.00 2017-06-02 2017-07-21 2017-08-11 2017-09-15 2020-12-31 for Finance Management Coordination, and Learning Implementation Selection Individual IC-2B / IT consultant for Web Project Management and Pending IBRD / 83360 Post Consultant Open 20,452.00 0.00 2017-05-02 2017-06-20 2017-07-11 2017-08-15 2017-12-31 Programmer Coordination, and Learning Implementation Selection IC-1 / Individual Consultant Individual Sistem Kompetensi Kerja (SKK) Project Management and Pending IBRD / 83360 Post Consultant Open 41,535.00 0.00 2017-05-02 2017-06-20 2017-07-11 2017-08-15 2017-12-31 for Lembaga Sertifikasi Profesi Coordination, and Learning Implementation Selection (LSP) 2017 Individual IC-13 / Individual consultant Project Management and Pending IBRD / 83360 Post Consultant Open 25,000.00 0.00 2018-09-14 2018-10-01 2018-10-04 2018-10-10 2019-02-28 for Reporting Specialist (2018) Coordination, and Learning Implementation Selection CS-19 / Re-design the Strengthening Sustainable Pending Detailed Engineering Design IBRD / 83360 Post Direct Selection Direct 23,000.00 0.00 2018-10-22 2018-11-01 2018-12-03 2018-12-31 Marine-based Economy Implementation (DED) for Lombok Building GD-G5 / Supervision Institutional Strengthening Consultant for Interior and Pending IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 6,650.00 0.00 2021-11-14 2021-11-24 2021-12-17 2022-04-16 Exterior Pari Island Station Implementation Management and Interior of OR Kebumian Room GD-A8 / Consultant Services Institutional Strengthening of Interior and Exterior for Pending IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 6,464.00 0.00 2021-07-22 2021-08-01 2021-10-05 2021-11-19 Pari Island Station and Interior Implementation Management of OR Kebumian Room Institutional Strengthening PMO-GD-C1 / Interior Design Pending IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 7,000.00 0.00 2021-05-20 2021-05-27 2021-06-18 2021-07-18 for Ancol Building Implementation Management CS-3A / Supervising Consultant for Building Institutional Strengthening Pending crumbling perimeter wall and IBRD / 83360 for Decentralized Coral Reef Post Direct Selection Direct 4,000.00 0.00 2021-11-12 2021-11-22 2021-12-13 2022-03-13 Implementation parking areas of MarBEST Management Raden Saleh Campus Page 6