A. GENERAL PROJECT AND SITE INFORMATION

INSTITUTIONAL AND ADMINISTRATIVE

Country                              Republic of Armenia
                                     Second Community Agricultural Resource Management and
Project Title
                                     Competitiveness Project (CARMAC II)
                                     Construction of veterinary service center in Lori marz, Mets Parni
Subproject Title
                                     community.
Institutional                           Project Team               Project            Local Counterpart
Arrangements                            Leader (WB)              Management            and/or Recipient

(Name and contacts)                   Bekzot Shamsiev        Gagik Khachatryan,         Gagik Paljan
                                                                PIU Director          Head of Mets Parni
                                                                                         Community
Implementation                           Safeguard               Safeguard               Contractor
Arrangements                          Supervision (WB)        Supervision (PIU)
                                                                                     VORDI HRAYR LLC
(Name and contacts)                  Darejan Kapanadze         Sona Tsarukyan
                                                               Alice Savadyan
PROJECT AND SITE DESCRIPTION
Project description                  The veterinary service center (VSC) will provide service to Mets
                                     Parni and nearby located communities. It will provide veterinary
                                     services, counseling, and will serve as a point of sale of
                                     medications, as well as a training facility. Total area of a two-story
                                     structure (basement and 1 floor) will comprise 135 m2, and will
                                     include a meeting room, demonstration room (these two may be
                                     combined) with the area of 30-35 m2, two working rooms with the
                                     area of 10-20 m2, a kitchen, a storage room, and a bathroom/toilet.
                                     The basement will be used as storage.

                                     The following construction activities will be implemented under the
                                     proposed sub-project:
                                         •   Establishment of the construction site and mobilization of
                                             construction works
                                         •   Earth works / excavation, backfilling, leveling
                                         •   Construction works
                                                 ✓    foundation,
                                                 ✓    external walls, internal partition,
                                                 ✓    concrete floors
                                                 ✓    installation of steel doors and windows
                                                 ✓    installation of steel roof
                                         •   Internal renovation works

                                         •   Internal and external water supply and sanitation
                                                 ✓    Internal and external water supply facility
                                                      installation
                                                 ✓    Installation of 1 septic chamber,
                                                 ✓    internal and external power facility construction,
                                                 ✓    solar water heating system installation
                                         •   Landscaping and final restoration of construction site

Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                           2
                                           •   Fencing with metallic fence and illumination of FSC
                                               territory
                                       The works also include arrangements for water and electricity
                                       supply. For connection to the municipal water supply system, an
                                       agreement with technical conditions has been obtained from
                                       Armenian Water and Sewerage Company (AWSC). The municipal
                                       sewerage system does not exist in the area. The flash toilet with 1
                                       concrete septic chamber (length – 2.80 cm width – 1.90 cm,
                                       bottom depth - 20 cm) will be constructed inside of VSC building.
                                       Septic chamber will be regularly cleaned by cesspool truck during
                                       construction as well as during operation of the VSC based on an
                                       agreement to be concluded with AWSC.
                                       The building will be heated with electric heaters.
                                       The design for construction of the VSC in Mets Parni community of
                                       the RA Lori marz was developed by the Kve Nakhagits LLC under
                                       the contract dated on 08.09.2016 (Mets Parni VSC Design)
                                       concluded with APIU.
Project site location                  The VSC will be located in Mets Parni community, Lori marz, at a
                                       distance of about 206 km from the city of Yerevan and 66 km from
                                       Ijevan (marz center) and 2-3 km from state border. The site is at
                                       the altitude of 820 under the sea level. The site allocated for
                                       construction of the VCS belongs to community. There are private
                                       houses and community sport school nearby the plot allocated for
                                       the construction of VSC. Overall duration of construction works is
                                       estimated to be four months, and one month will be required for
                                       preparatory works prior to construction.
Land ownership                         The land plot allocated for the construction of the VSC comprises
                                       0.0705 ha. The land is community / state owned and user rights to
                                       it are granted to the RA Ministry of Agriculture for permanent use
                                       (Certificate No26052016060022, dated 18 May 2016). Certificate
                                       is attached.
Description of geographic, physical,   Project area is located in the Lori marz of Armenia in the
biological, geological, hydrographic   administrative area of Mets Parni community. Main water artery of
and socio-economic context             the area is Debed river, which flows via eastern part of community.
                                       From climatic perspective, the area is located in a moderate
                                       climatic zone. Summers are hot, windy and with optimal humidity,
                                       average temperature in July is 290C, relative humidity is 45-60%
                                       and average speed of the wind is 3.0-6.0 m/sec. Winters are very
                                       cold, windy and humid, average temperatures in January vary
                                       between -15 to -300C, relative humidity is 70% and more, and
                                       average speed of the wind is 5.0-7.0 m/sec. Average annual
                                       precipitation varies within 70-100mm. Natural landscape is dry
                                       mountainous.
Locations and distance for material    Water for construction works will be provided by water cistern
sourcing, especially                   track. External toilet facilities/septic chamber during construction
machinery/aggregates, water,           works will be temporarily installed by the Contractor or will be used
stones
                                       facility of Pharmacy, located nearby. Aggregates and machinery
                                       will be obtained from the licensed providers within the project area.
                                       Contractor may choose to extract equipment himself, in which
                                       case contractor must obtain an extraction license prior to
                                       commencement of extraction. Metallic and PE pipes for water
                                       supply will be purchased from an official supplier.

Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                          3
LEGISLATION
Indentify national and local            Permits required for accomplishing the works envisaged by the
legislation and permits that apply to   project:
project activity
                                        •   Construction license to be possessed by Construction
                                            Contractor,
                                        •   Construction permit to be obtained by the Construction
                                            Contractor from Mets Parni municipality,
                                        •   Certificate of land use rights to be possessed by the Ministry of
                                            Agriculture,
                                        •   Technical Conditions for connection to municipal water supply
                                            to be obtained by Design Company from the AWSC,
                                        •   Permit to connection to municipal electricity supply to be
                                            obtained by Design Company from Electricity Network of
                                            Armenia/ ENA CJSC
                                        •   Written consent for disposal of construction waste to be
                                            obtained by Construction Contractor from the Head of Mets
                                            Parni Community,
                                        •   Agreement for household waste disposal from the VSC during
                                            its operation to be concluded between the VSC administration
                                            and Mets Parni municipality prior to commissioning of the
                                            building,
                                        •   Agreement for servicing of septic chambers during operation
                                            of the VSC to be concluded between the VSC administration
                                            and AWSC.

PUBLIC CONSULTATION
Identify when/where the public          Public consultation meeting was conducted on 15 October 2015 in
consultation took place                 Mets Parni municipality. Minutes of meeting as well as list of
                                        participants are attached.

ATTACHMENTS
   1. Site plan
   2. Certificate of user rights to the land plot
   3. Minutes of public consultation meeting
   4. Construction permit – will be attached
   5. Technical Conditions for water supply connection
   6. Agreement for construction waste disposal
   7. Permit for connection to electricity supply




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                           4
B. SAFEGUARDS INFORMATION


ENVIRONMENTAL/SOCIAL SCREENING

Will the site activity include any of the following?

Activity/Issue                                                Status         Triggered Actions

A. Infrastructure rehabilitation                        [ ] Yes     [x] No   Section C Part A

B. New construction                                     [x] Yes    [ ] No    Section C Part A

C. Individual wastewater treatment system               [ ] Yes     [x] No   Section C Part B

D. Historic building(s) and districts                   [ ] Yes     [x] No   Section C Part C

E. Acquisition of land                                  [ ] Yes     [x] No   Section C Part D

F. Hazardous or toxic materials                         [ ] Yes     [x] No   Section C Part E

G. Impacts on forests and/or protected areas            [ ] Yes     [x] No   Section C Part F

H. Handling/management of medical waste                 [ ] Yes     [x] No   Section C Part G

I. Traffic and Pedestrian Safety                        [ ] Yes     [x] No   Section C Part H




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                 5
C. MITIGATION MEASURES

           ACTIVITY                           PARAMETER                                         MITIGATION MEASURES CHECKLIST
0. General conditions               Notification and Worker Safety          (a) The local authorities, environment inspectorates and community population
                                                                                 have been notified of upcoming activities
                                                                            (b) The public has been notified of the works through appropriate notification in
                                                                                 the media and/or at publicly accessible sites (including the site of the
                                                                                 works)
                                                                            (c) All legally required permits have been acquired for construction and/or
                                                                                 rehabilitation
                                                                            (d) The Contractor formally agrees that all work will be carried out in a safe and
                                                                                 disciplined manner designed to minimize impacts on neighboring residents
                                                                                 and environment.
                                                                            (e) Workers’ PPE will comply with international good practice (hardhats,
                                                                                 as needed masks and safety glasses, harnesses and safety boots).
                                                                            (f) Appropriate signposting of the sites will inform workers of key rules and
                                                                                regulations to follow.
A. General Rehabilitation and /     Air Quality                             (a) The surrounding environment shall be kept free of debris
or Construction Activities                                                  (b) There will be no open burning of construction / waste material at the site
                                                                            (c) There will be no excessive idling of construction vehicles at sites

                                    Noise                                   (a) Construction noise will be limited to day-time hours
                                                                            (b) During operation, the engine covers of generators, air compressors and
                                                                                other powered mechanical equipment shall be closed, and equipment
                                                                                placed as far away from residential areas as possible

                                    Waste management                        (a) Waste collection and disposal pathways and sites will be identified for all
                                                                                major, waste types expected from construction activities.
                                                                            (b) Construction waste will be collected and disposed at the agreed site
                                                                            (c) Whenever feasible the contractor will reuse and recycle appropriate and
                                                                                viable materials (except asbestos)




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                                                                              6
D. MONITORING PLAN

    Activity                     What                        Where                   How                   When                    Why                   Who
                         (is the parameter to be        (is the parameter to    (is the parameter   (define the frequency   (is the parameter to   (is responsible for
                               monitored?)                 be monitored?)      to be monitored?)       or continuous?)         be monitored?)         monitoring?)

                                                                    CONSTRUCTION PHASE

Community          Community has been notified         Mets Parni              Interviews with      First month of          Ensure                 PIU
notification       on upcoming activities              settlement              local residents      construction works      community
                                                                                                                            awareness and
                                                                                                                            consent
                   Clearly established grievance       Mets Parni              Interviews with      Monthly                 Ensure that local      PIU
                   redress mechanism is in place       settlement              municipal                                    community can
                   and accessible for local                                    authorities and                              voice concerns
                   community                                                   local residents                              and ask
                                                                                                                            questions
Legal              All required permits and            Mets Parni              Review of files      Before and during       Comply with legal      PIU
compliance         agreements are acquired             municipality and                             first month of          requirements
                                                       Contractor’s                                 construction works
                                                       administration
Provision of       Personal safety gear is             Construction site       Inspection           monthly                 Prevent trauma         PIU
workers’ health    provided to and used by                                                                                  and casualty
and safety         workers                                                                                                  among workers

Operation of       The surrounding environment is      Construction site       Inspection           monthly visits          Minimize dust          PIU
construction       kept free of debris to minimize                                                  during construction     emission
machinery          dust

                   There is no open burning of         Construction site       Inspection           monthly visits          Prevent air            PIU
                   construction / waste material at                                                 during construction     pollution with
                   the site                                                                                                 hazardous
                                                                                                                            emissions


Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                                                                                 7
                   There is no excessive idling of     Construction site     Inspection       monthly visits        Minimize exhaust    PIU
                   construction vehicles at site                                              during construction

Noise              Construction noise is limited to    Construction site     Inspection       Monthly during        Minimize            PIU
generation         day-time hours                                                             construction          nuisance to local
                                                                                                                    community

Waste              Temporary storage of waste          Construction site     Inspection       Monthly during        Prevent pollution   PIU
generation         within demarcated and fenced                                               construction          of work site and
                   work site, at a designated                                                                       nuisance to local
                   location                                                                                         community
                   Construction waste is regularly     Construction site     Inspection       Monthly during        Prevent             PIU
                   collected and disposed at an                                               construction          environment
                                                       Waste disposal
                   agreed site                                                                                      pollution
                                                       site

Servicing          Construction vehicles and           Construction site     Inspection       Monthly during        Prevent pollution   PIU
machinery          machinery are serviced and                                                 construction          of surface and
                   fueled away from water body or                                                                   ground water
                   at a service center.

Earth works        Separation and stockpiling of       Construction site     Inspection       Monthly during        Ensure              PIU
                   excavated material and topsoil                                             construction          successful
                   for backfilling and site                                                                         reinstatement of
                   reinstatement purposes.                                                                          site

                   Suspension of earth works and       Mets Parni            Review of        In case of chance     Prevent loss of     PIU
                   contacting national authority for   municipality office   communication    finds                 physical cultural
                                                                                                                                        Ministry of
                   cultural heritage preservation in                         and                                    resources
                                                       Construction                                                                     Culture
                   case of chance finds;                                     archaeological
                                                       Contractor’s
                   resumption of works upon                                  reports
                                                       administration
                   formal consent from the
                   authority for preservation of
                   cultural heritage.




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                                                                      8
                                                                    OPERATION PHASE
Maintenance of     Operational waste is collected      VSC                  Inspection   Recurrent   Keep the VSC         Mets Parni
VSC                and timely removed from the         administration                                and its              municipality
                   VSC area.                                                                         surrounding area
                                                                                                     clean and
                                                                                                     comfortable for
                                                                                                     the staff and
                                                                                                     clients
                   Regular maintenance and             VSC                  Inspection   Recurrent   Keep VSC             Mets Parni
                   operational repair works are        administration                                facilities in good   municipality
                   undertaken as required to keep                                                    operational
                   roof, piping and other                                                            condition
                   communications in good
                   technical condition.
                   Septic chambers are cleaned         AWSC, based on       Inspection   Recurrent   Keep VSC             VSC
                   on regular basis                    agreement with                                facilities in good   administration
                                                       VSC                                           operational
                                                       administration                                condition




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                                                                         9
                                                                            Annex 1. Site Map




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan
                                                                                          10
                                              Annex 2. Certificate of user rights to the land plot




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                 11
                                               REPUBLIC OF ARMENIA


                                    CERTIFICATE of STATE REGISTRATION
                                     OF THE RIGHTS TO REAL PROPERTY
                                                   26052016060022
                                                                                             Translated from Armenian


The present Certificate verifies the state registration of the rights to the Real Property which was entered into the Unified
Registration Book of Rights to the Real Property on 18 May 2016, with the following details:


    1.      ENTITY/ENTITIES OF THE REGISTERED RIGHT
    Republic of Armenia


    2.      LOCATION AND NAME OF THE REAL PROPERTY
    Lori Marz, Mets Parni Community, 24 Street 5/2 land plot


    3.      REGISTRATION IS DONE ON THE BASIS OF THE FOLLOWING DOCUMENTS
            Gratuitous Use Contract for Real Property № 3467 of 13.05.2016 and Community Mayor Decision № 38-A of
            26.09.2013



    4.      INFORMATION ON LANDPLOT



    Cadastral code                                                                06 07502970039
    Area (ha)                                                                     0,0705
    Purpose of use                                                                Residential
    Functional purpose or type of land                                            Public Construction
    Type of registered right                                                      Gratuitous use



                                                Additional Comments and Information


Name, surname of Registering Official:           Armine Matoyan

Position:                                        Real Property Cadastre of Lori Territorial Subdivision

/Official Seal/ State Committee of the Real Property Cadastre at the RA Government, Territorial Subdivision issuing
                                                   the Certificate




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                                        12
                   Annex 3. Minutes of Stakeholder Consultation Meeting


A stakeholder consultation meeting on the Environmental Management Plan and Social and
Resettlement Issues was held on September 14, 2016 in Mets Parni Community of Lori Marz.
Information on meeting day and time was posted on information board of Mets Pani Community
Mayor’s Office.
EMP draft version was disclosed on APIU official web page on 01.09.2016, respective link is below
http://www.arspiu.com/131.0.html
On September 14, 2016 Environmental Specialist Alice Savadyan, APIU SA Engineer-constructor
Artush Yeranosyan and Animal Health Component coordinator Sona Tsarukyan and Social Specialist
Emma Mkrtchyan carried out Environmental and Social Public Consultations in Mets Parni
Community of Lori Marz.
S. Tsarukyan presented the main purpose and details of Veterinary Service Center construction project
in Mets Parni Community of Lori Marz under the Second Community Agricultural Resource
Management and Competitiveness Project (CARMACP) and Engineer-constructor A. Yeranosyan
highlighted technical details of construction.

Environmental Management Plan with respective environmental and social impact mitigation
measures was presented and explained in details by APIU Environmental Specialist A. Savadyan
The role of the local community during construction works was emphasized and it has been mentioned
that the information poster with all the necessary contacts will be installed for local community
convenience.
APIU Environmental Specialist A. Savadyan specifically emphasized that civil works will be
implemented on the community owned land, in order not disturb the inhabitants; hence the installation
of safety belts, safety signs and fences is not mandatory and not under strict control in those areas.
However, technical supervisors should keep under control the fulfillment of all the environmental and
social mitigation measures included in EMP, and report the deviations to APIU and administration of
respective Contractor.
It was mentioned that EMP will cover the issue of the transportation and disposal of construction
wastes and excessive soil. It was also noted that prior to commencement of the civil works, the
contractor obtained a written consent from Mets Parni municipality on the disposal of waste. Technical
supervision of the works will be provided on monthly basis and much attention will be paid to the final
restoration of the area.


Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                       13
Some questions regarding the starting date of the construction and the Contractors were raised during
the meeting and the APIU Engineer-constructor A. Yeranosyan responded to all technical questions.
No special questions were received on the EMP and mitigation measures.
E. Mkrtchyan presented potential social risks related to the construction works in the community under
the CARMAC Project II and their elimination and/or mitigation measures. Informing the participants
of the Public Consultations on the main provisions of the CARMAC II Resettlement Policy
Framework Document, E. Mkrtchyan mentioned that for the construction of the Veterinary Service
Center in Mets Parni Community of Lori Marz under the Project, the relevant community owned land
for the VSC construction has been selected by the decision of the Community Meeting, and the land
was later provided to the MoA. No private land will be used as per the Community Administration
Reference on the ownership of lands used under the Project based on the Community cadastral map
survey, and as per the land for VSC construction installed on the Community cadastral map by the
Designing Consulting Company.
The Project grievance redress mechanisms (GRMs) were disclosed in details, explaining that GRMs
are also to ensure that local communities can voice their concerns to the APIU SA, in case they are
unhappy with the performance of works of the contractors or with any other aspect of
construction/operation activities, explaining also the advantages of submitting grievances to the
relevant instances, if any.
No specific questions on social and resettlment issues were raised during the meeting.
The list of participants and respective photos are attached.




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                     14
                                           List of participants




Announcment on public consultation in Mets Parni               Expected area for FSC construction
                    Municipality




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                      15
                                Public consultation meeting in Mets Parni




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                            16
                                                                Annex 4. Construction Permit




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                               17
                                        REPUBLIC OF ARMENIA

                                     CONSTRUCTION PERMIT # 5

05.10.2016


Is given to constructor APIU SI of the RA Ministry of Agriculture,          54b Komitas            s
For implementing construction of watering system in the pastures of Mets Parni community
Gegharkuniki Marz                                                                              z
Facility design documents:
Developed by “QVE NAKHAGITS ” LLC                  8190                                   9
Received         N_1____ positive expertise conclusion provided by «ECOPROJET» LLC, license
15768
Agreed with an authorized body, other interested bodies as prescribed by law Mets Parni Village
Mayor’s Office                                                                       Office
Carry out construction works during
Construction administration register consists of ___ pages and is sealed by Mets Parni Village
Mayor’s Office                                                                  Office




Mayor of Mets Parni Village                            G. Palyan




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                          18
    Annex 5. Technical Conditions for connection to centralized water supply network




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                            19
                                                                                     Translated from Armenian

                              ARMENIAN WATER AND SEWERAGE CJSC


                                          TECHNICAL CONDITIONS

                        for Connection to the Water Supply and Sewerage Systems
                             operated by Armenian Water and Sewerage CJSC

Issued on August 29 2016

Name of the Building and the Location:                  “Veterinary Service Centre”, Land plot 5/2, 24 Str.
                                                        Mets Parni Community, RA Lori marz

Building Owner and Address:                             Mets Parni Community


Water Supply
It is possible to supply water from water main in Mets Parni town at the volume of water 0.1 L/Sec.

It is necessary for that purpose to:
a) build water pipeline according to the plan
b) connect the pipeline built to P 150 mm water pipeline
c) build a manhole with regulating valves at the point of connection (demarcation point)
d) mount water meter box at the demarcation point
e) not to exceed the maximum amount of the water taken /0.1 L/Sec/

Also, the following should be taken into consideration:
a) water supply schedule will be provided, in accordance with the water supply schedule established in the
corresponding district of the residential area
b) water pressure at the connection point is approximately 3,5-4.0 atm. Pressure
c) the installation depth of the pipeline at the connection point is 1.2 m
d) the material of the pipeline at the connection point is steel.

Sewerage

No Connection

Specific Conditions
Implement the works for the connection of the water and sewer pipelines of the building to the existing systems
in the presence of the specialist from “Mets Parni ” subdivision of the Southern territorial branch of the
Company.
In the absence of the technical capacity of the existing systems, the works for the construction of proposed new
water and sewerage systems are carried out at the expense of the owner of the building, in accordance with the
technical specifications issued by “Armenian Water and Sewerage” CJSC.
In case there is a demand for 24-hour water supply, a corresponding capacity water reservoir should be
planned and built.
Plan relevant activities for the protection of the area and the buildings against flooding, in case of overloaded
sewers and system failures.
Failure to comply with the technical specifications and the defined procedures, to use the water as prescribed,
to make the payments for the services provided will result in the suspension of water supply and sewerage
services provision to the subscriber, unless the incompliances are eliminated.
The Technical Specifications are issued for a period of 2 years until August 29, 2018.


“Armenian Water and Sewerage” CJSC         / Operational Director
K. Aghababyan




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                             20
                             Annex 6. Agreement for Construction Waste Disposal




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                            21
                                                                              Translated from Armenian




                 REPUBLIC OF ARMENIA LORI MARZ METS PARNI COMMUNITY



16.05.2016
Phone # (0255) 6 18 97

Address: 377010                                                        To RA Ministry of Agricultural,
Mets Parni Community L. Beki 5                                  Head of APIU Mr. Gagik Khachatryan
Mets Parni.Lori@mta.gov.am



                                               Reference


According to your official letter dated on 14.04.2016, I would like to transfer layout and
Technical Conditions for water supply connection provided from AWSC for construction of
FSC in Mets Parni. At the same time I would like to inform, that sewerage system is not exist
in Community, so please consider the installation of septic chamber for operation of FSC.

Dispose the construction waste and remaining soil, generated during construction of VSC in
RA Lori Marz Mets Parni Community in the community unused land at a distance of 4 km.




Mets Parni Community Mayor:              (signed)      G. Palyan




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                    22
                                Annex 7. Permit for connection to electricity supply




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                            23
                                                                                   Translation from Armenian

                         CONTRACT N 2213511
                                 For
NEW CONSUMER OR CONSUMER RECONSTRUCTING CONSUMPION SYSTEM CONNECTION
                     TO THE ELECTRICITY NETWORK
                                                             17.08.2016

The new Consumer or Constructor or the Consumer reconstructing the consumption system, RA MINISTRY OF
AGRICULTURE, hereinafter “the Client” represented by Mr. Artashes Kirakosyan/ chief of staff as one Party and
“Electric Networks of Armenia” “Kars” Branch, hereinafter “Supplier”, represented by Director G. Farzadan, who
acts as authorized by the Chief Director, as the other Party, hereinafter referred to “the Parties”, conclud ed this
Contract on the following:

                                           1. The object of the Contract
1.1. In accordance with this Contract, the Supplier carries out the works for the Client’s consumption system
connection to the Electricity network and the Client shall provide payment for the connection of its consumption
system to the Electricity Network.
                                         2. The Obligations of the Parties
2.1. The Supplier shall

1) Based on the request submitted by the Client, carry out the works required for the connection of the Client’s
consumption system to the Electricity Network, providing for electricity supply and registration.

Supply electricity from Electricity Post in “Mets Parni ” 60/22 kV “Spandaryan” 10 kV overhead power line of.
Replace Construct Install OM-50 transformer, 10 kV linear isolator and 10 kV circuit breaker scheme. Establish
25 meter 0,22 kV overhead power line and grounding contour. There is no incompliance in the safety zone.
Meters will be installed in the end of line; safety zone is not violated.

2) Complete the connection of the Client’s consumption system to Electricity Network and submit Power Supply
Contract proposal __/__/__ (day, month, year).
2.2. The Client shall

           1) Pay the connection fee for the connection of its consumption system to Electricity Network:
Connection fee: 44,166.67 AMD
VAT: 8,833.33 AMD
Total: 53,000.00 AMD
as it is prescribed in Point 3.
2) Inform the Supplier in written form of any changes, which may affect the terms of the connection or the
payment terms of the connection.
3. Payment procedure
3.1. The Client shall pay 50 % of the payment due for the connection of the consumption system to Electricity
network as advance payment during 5 working days after this Contract is signed.
3.2. The Client shall pay the rest of the payment for connection at least 5 working days prior to the period
defined in sub point 2 of Point 2.1 of this Contract.

4. The Responsibility of the Parties
5. Additional terms
6. Other terms
7. Dispute Resolution
8. Period of Contract and Amendment procedure




Community Agricultural Resource Management and Competitiveness Project II
Environmental Management Plan

                                                                                               24