Democratic Socialist Republic of Sri Lanka Integrated Watershed and Water Resources Management Project PROCUREMENT PLAN FOR WORKS - Repurposing - Date: 27th June 2023 Implementing Agency Irrigation Department Credit/Grant No. : Cr 6621- lk Project Closing Oct-25 Status/Remarks ** Indicate extensions/modifications etc. Descriptio 1 USD = 300.00 Procureme awardin Serial No. Contrac Completion Evaluation Package Method Publish contract ofcontrac Estimated Cost Nationali Initiation Contractor Capacity Signing of contract Prior/Post (Million) selection Name Bank* websites notice in CBO process CBO's No. g t Review of (CBO)/ Stage Contrac n nt of t by of of award ty of Curren t LKR USD Date ** cy Amoun t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 POST POST IWWRMP- Improvements to Kal-aru Main canal from 3+000 to DC Planned 5-Jul-23 19-Jul-23 26-Jul-23 2-Aug-23 26-Jul-23 29-Jan-24 1 RE/WORKS/ID/VAVU/DC/83 4+000 in Kal Aru (CBO) LKR 4.76 0.0159 Actual Scheme Improvements to Kal-aru Main canal from 4+000 to Planned 5-Jul-23 19-Jul-23 26-Jul-23 2-Aug-23 26-Jul-23 29-Jan-24 IWWRMP- DC 2 5+000 in Kal Aru LKR RE/WORKS/ID/VAVU/DC/84 (CBO) 4.80 0.0160 Actual Scheme POST Improvements to RB-01 canal off D-04 canal in LB Main Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- DC 3 Canal at LKR RE/WORKS/ID/VAVU/DC/85 (CBO) 4.96 0.0165 Actual Pavatkulam Scheme POST Improvements to Kiniyama Feeder canal (3+400 to Planned 5-Jul-23 19-Jul-23 26-Jul-23 2-Aug-23 26-Jul-23 29-Jan-24 IWWRMP- DC 4 8+280) at Kiniyama LKR RE/WORKS/ID/KURU/DC/86 (CBO) 4.21 0.0140 Actual Scheme POST POST IWWRMP- Improvements to Kiniyama Feeder canal (0+000 to DC Planned 5-Jul-23 19-Jul-23 26-Jul-23 2-Aug-23 26-Jul-23 29-Jan-24 5 RE/WORKS/ID/KURU/DC/87 3+400) at Kiniyama (CBO) LKR 4.27 0.0142 Actual Scheme Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- Improvements to renavation at Palukadawala Feeder 6 FA LKR RE/WORKS/ID/KURU/FA/06 Canal regulator gates 3.20 0.0107 Actual POST IWWRMP- DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 7 RE/WORKS/ID/KURU/DC/88 Improvements to RBMC in Meddeketiya scheme (CBO) LKR 4.69 0.0156 Actual POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- DC 8 Improvements to FC-28 LB off RBMC in Magalla Scheme LKR RE/WORKS/ID/KURU/DC/89 (CBO) 4.55 0.0152 Actual POST POST IWWRMP- DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 9 RE/WORKS/ID/KURU/DC/90 Improvements to LB off RBMC at Hulugalla Tank (CBO) LKR 2.60 0.0087 Actual Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- Improvements to Mahananneriya tank bund at 0+500 DC 10 Actual LKR RE/WORKS/ID/KURU/DC/91 vehicle crossing (CBO) 2.18 0.0073 POST IWWRMP- DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 RE/WORKS/ID/KALU/DC/92 Improvements to Pattiya eliya ela 0+000 to 2+500 in (CBO) 11 LKR Bolgoda scheme 2.43 0.0081 Actual POST POST IWWRMP- Construction of reugulator across Kilaviweli drainage DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 12 RE/WORKS/ID/AMP/DC/93 channel in (CBO) LKR 3.19 0.0106 Actual Koddandamadu Planned 6-Jul-23 20-Jul-23 27-Jul-23 3-Aug-23 27-Jul-23 30-Jan-24 IWWRMP- DC 13 Rehabilitation of C- 15 Canal in Block J unit Actual LKR RE/WORKS/ID/AMP/DC/94 (CBO) 4.98 0.0166 POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 Construction of Offtake in U/S of Wannammadu regulator IWWRMP- DC 14 in Upper LKR RE/WORKS/ID/AMP/DC/95 (CBO) 1.10 0.0037 Kurunakanji Unit Actual POST Improvements to canal from 0+000 to 0+140 in RBMC in Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- DC 15 Kapiriggama LKR RE/WORKS/ID/ANU/DC/96 (CBO) 4.63 0.0154 Actual Scheme POST IWWRMP- DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 16 Improvements to D canal at LBMC in Kedewa Scheme LKR RE/WORKS/ID/ANU/DC/97 (CBO) 4.09 0.0136 Actual POST Rehabilitation of leakage through D 10 Turnout structure at Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- DC 17 8+500km in LKR RE/WORKS/ID/ANU/DC/98 (CBO) 3.95 0.0132 Actual UMC Padaviya Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 ST IWWRMP- DC 18 Improvement to RB sluice structure at Mahawewalkadawala Scheme 0 21 0 0007 LKR O 18 RE/WORKS/ID/ANU/DC/99 Improvement to RB sluice structure at (CBO) Actual LKR POST PO Mahawewalkadawala Scheme 0.21 0.0007 Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- DC 19 Improvement of Handrail in Illukwewa anicut LKR RE/WORKS/ID/ANU/DC/100 (CBO) 1.20 0.0040 Actual POST IWWRMP- DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 20 Gravelling & pot hole filling on the tank bund LKR RE/WORKS/ID/MONA/DC/101 (CBO) 1.02 0.0034 Actual POST POST POST POST POST IWWRMP- Demolishing and Reconstruction of Box culvert at 0+214 in DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 21 RE/WORKS/ID/MONA/DC/102 Yudagnawa (CBO) Actual LKR 1.14 0.0038 DC 1 canal Yudaganawa IWWRMP- Demolishing and Reconstruction of Drop structure with DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 22 RE/WORKS/ID/MONA/DC/103 Diversion canal at 2+271 in Main canal Pelwaththa Anicut (CBO) Actual LKR 2.26 0.0075 scheme IWWRMP- Construction of Box culvert at 0+300 in LBMC in DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 23 RE/WORKS/ID/MONA/DC/104 Pelwaththa anicut scheme (CBO) 1.09 LKR 0.0036 Actual IWWRMP- Fixing of steel gate for the regulator in Athurugiriya mada DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 24 RE/WORKS/ID/COL/DC/105 ela at 0+096 km in Hettigeoya Scheme (CBO) 0.52 LKR 0.0017 Actual IWWRMP- Repairs to 2 bay regulators in Bandarawela ela at 0+015 DC Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 25 RE/WORKS/ID/COL/DC/106 km in (CBO) LKR 0.93 0.0031 Actual Hettigeoya Scheme POST IWWRMP- DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 26 RE/WORKS/ID/COL/DC/107 Repairs to regulator in Ambagahawela ela at 1+976 km (CBO) LKR 0.31 0.0010 Actual POST IWWRMP- DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 Reconstruction to damaged turn out structures in 27 RE/WORKS/ID/PUT/DC/108 (CBO) LKR Inginimitiya LBMC 2.10 0.0070 Actual POST IWWRMP- DC Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 Reconstruction to damaged turn out structures in 28 RE/WORKS/ID/PUT/DC/109 (CBO) LKR Inginimitiya RBMC 2.59 0.0086 Actual POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- DC 29 Construction of D2 canal anicut in Krawita scheme LKR RE/WORKS/ID/PUT/DC/110 (CBO) 2.80 0.0093 Actual POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- Construction of inlet structure & Improvements of DC 30 Actual LKR RE/WORKS/ID/TRINCO/DC/111 Kallarippu channel from stn.0+000 to stn.0+500 (CBO) 4.30 0.0143 POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- Improvements of Kallarippu canal from stn.0+500 to stn DC 31 Actual LKR RE/WORKS/ID/TRINCO/DC/112 2+000 (CBO) 4.65 0.0155 POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- Improvements of 91 Yaya Pansala channel in Vendrasan DC 32 LKR RE/WORKS/ID/TRINCO/DC/113 scheme (CBO) 3.60 0.0120 Actual POST Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- DC 33 Improvements of D7 sub channel in Vendarasan scheme LKR RE/WORKS/ID/TRINCO/DC/114 (CBO) 4.96 0.0165 Actual POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- DC 34 Improvements of FCC D6/D7 in Vendrasan scheme LKR RE/WORKS/ID/TRINCO/DC/115 (CBO) 4.32 0.0144 Actual POST Contraction of gated regulator at "Akkara 800 Yaya" Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 10-Feb-24 IWWRMP- DC 35 drainage canal of LKR RE/WORKS/ID/TRINCO/DC/116 (CBO) 4.98 0.0166 Actual D3 canal at Vendrasan scheme POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- DC 36 Improvements to D27A Canal in Minipe Scheme LKR RE/WORKS/ID/KAN/DC/117 (CBO) 3.70 0.0123 Actual POST Strengthing of Both Upstream side of Syphon at 11+346 in Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- DC 37 Minipe Main LKR RE/WORKS/ID/KAN/DC/118 (CBO) 2.14 0.0071 Actual Canal st Stage I POST Construction of FTO structure along FC 19 off Murapola Ela Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- DC 38 in LKR RE/WORKS/ID/KAN/DC/119 (CBO) 2.98 0.0099 Actual Murapola Ela Scheme POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- Improvements to D 34 Canal from 0+620 km to 0+737 km DC 39 LKR RE/WORKS/ID/KAN/DC/120 in Stage II (CBO) 4.09 0.0136 Actual Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 Improvements of Bandara Amuna Main Canal from 0+000 O ST IWWRMP- to 0+160 0f DC 40 2 09 0 0070 LKR 40 RE/WORKS/ID/KEG/DC/121 Bandara Amuna Scheme (CBO) Actual LKR POST PO 2.09 0.0070 Improvements to Kehelpath Amuna Main Canal from 0+623 Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- DC 41 to 0+663 in LKR RE/WORKS/ID/KEG/DC/122 (CBO) 3.50 0.0117 Actual Kehelpath Amuna Scheme POST Improvements of FC canal from 0+000 to 0+212 in Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- DC 42 Molligoda area in LKR RE/WORKS/ID/KEG/DC/123 (CBO) 4.86 0.0162 Actual Bandara Amuna Scheme POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 IWWRMP- Improvemeats to Ruppayaya canal in Athirahapitiya DC 43 LKR RE/WORKS/ID/MATALE/DC/124 scheme (CBO) 0.77 0.0026 Actual POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb-24 IWWRMP- Improvemeats to D6A & D6 canal in Hattota Amuna DC 44 LKR RE/WORKS/ID/MATALE/DC/125 scheme (CBO) 4.67 0.0156 Actual POST Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan-24 Improvements to Main canal form 0+003 to 0+075 in IWWRMP- DC 45 Mahanikakatuwa LKR RE/WORKS/ID/MATALE/DC/126 (CBO) 3.62 0.0121 Scheme Actual POST Improvements of RB-2 canal in Radagalpotha scheme in Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- DC 46 Minipe LKR RE/WORKS/ID/MATALE/DC/127 (CBO) 2.69 0.0090 Actual Division POST Improvements to Welamitiyawa D canal from 0+997 to Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- DC 47 1+050 in LKR RE/WORKS/ID/MATALE/DC/128 (CBO) 3.71 0.0124 Actual Wemedilla scheme POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- Construction of turnout structures in Athirahpitiya DC 48 LKR RE/WORKS/ID/MATALE/DC/129 Ihalawela yaya canal in Athirahpitiya Scheme (CBO) 2.13 0.0071 Actual POST Construction of drop structures in FC-01, FC-03, FC-05 and Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 10-Feb-24 IWWRMP- DC 49 FC-05A at LKR RE/WORKS/ID/MATALE/DC/130 (CBO) 4.43 0.0148 Actual RBMC in Mahagonawewa scheme POST Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 10-Feb-24 IWWRMP- DC 50 Improvements to D2 Canal in Makulethenna Scheme LKR RE/WORKS/ID/MATALE/DC/131 (CBO) 1.87 0.0062 Actual POST Improvements to Karaughawewa Main Canal in Stage IV in Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- DC 51 Minipe LKR RE/WORKS/ID/MATALE/DC/132 (CBO) 3.61 0.0120 Actual Division 158.39 0.5280 FA - Force Acccount Democratic Socialist Republic of Sri Lanka Integrated Watershed and Water Resources Management Project PROCUREMENT PLAN FOR WORKS - Repurposing - Date: 27th June 2023 Implementing Agency Nothern Provincial Council - Irrigation Department Credit/Grant No. : Cr 6621- lk Project Closing Oct-25 Status/Remarks ** Indicate extensions/modifications etc. 1 USD = 300.0000 Descriptio Contracto Procureme award notice awardin Serial No. Contrac Completion (Nationali Evaluation Estimated Cost Package Method r CBO)/ ofcontrac Name Initiation in website Signing of contract Capacity (Million) Prior/Post contract Bank* selection Publish CBO process of CBO's Review No. g t Contrac ty of n nt by of Stage t t of s of Curren LKR USD Date Amoun ** cy t (LKR) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 POST IWWRMP- Improvement of Mulli mirusuvil FP Bund of Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 2-Dec-23 DC 1 RE/WORKS/NPC/JAFFNA/DC/ Vadamarachchi LKR (CBO) 4.76 0.0159 25 Lagoon Actual POST IWWRMP- Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 5-Dec-23 DC 2 RE/WORKS/NPC/JAFFNA/DC/ Improvement of Vernan SWE Bund LKR (CBO) 4.76 0.0159 26 Actual POST Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb-24 IWWRMP- DC 3 RE/WORKS/NPC/JAFFNA/DC/ Improvement of Chappaddiyan FP Bund Package 1 LKR (CBO) 4.76 0.0159 Actual 27 POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 IWWRMP- DC 4 RE/WORKS/NPC/JAFFNA/DC/ Improvement of Chappaddiyan FP Bund Package 2 LKR (CBO) 4.76 0.0159 Actual 28 POST IWWRMP- Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb-24 DC 5 RE/WORKS/NPC/JAFFNA/DC/ Improvement of Chappaddiyan FP Bund Package 3 Actual LKR (CBO) 4.76 0.0159 29 POST IWWRMP- Improvement of kantharoodai to Alankulai drainage Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 12-Dec-23 DC 6 RE/WORKS/NPC/JAFFNA/DC/ at Actual LKR (CBO) 4.79 0.0160 30 Valukaiyaru scheme POST IWWRMP- Improvement of Alankulai inlet and outlet drainages Planned 18-Jul-23 1-Aug-23 8-Aug-23 15-Aug-23 8-Aug-23 13-Dec-23 DC 7 RE/WORKS/NPC/JAFFNA/DC/ at LKR (CBO) 4.76 0.0159 Actual 31 Valukaiyaru scheme POST Renovation of FC1, FC4, FC14 Canal & Structures, Main Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 5-Nov-23 IWWRMP- Canal Farm DC 8 RE/WORKS/NPC/VAVU/DC/ Actual LKR Road and Clearing of Spill tail Canal at Kalmadu Irrigation (CBO) 4.75 0.0158 32 Scheme POST IWWRMP- Renovation of LB/Link & Kovil Farm Road, Desilting of Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 5-Nov-23 DC 9 RE/WORKS/NPC/VAVU/DC/ LB/FC3 & Actual LKR (CBO) 4.76 0.0159 33 Improvements of Tank Bund at Malikai Irrigation Scheme POST Planned 11-Jul-23 25-Jul-23 1-Aug-23 8-Aug-23 1-Aug-23 5-Jan-24 IWWRMP- DC 10 Improvements to D canal in LB at Vavunikulam LKR RE/WORKS/NPC/MUL/DC/34 (CBO) 5.00 0.0167 Actual POST Planned 11-Jul-23 25-Jul-23 1-Aug-23 8-Aug-23 1-Aug-23 5-Jan-24 IWWRMP- DC 11 Improvements to RB Main Canal in Vavunikulam Actual LKR RE/WORKS/NPC/MUL/DC/35 (CBO) 5.00 0.0167 POST Planned 13-Jul-23 27-Jul-23 3-Aug-23 10-Aug-23 3-Aug-23 7-Jan-24 IWWRMP- Improvements to RB Main Canal Road in Thunukkai, DC 12 Actual LKR RE/WORKS/NPC/MUL/DC/36 Vavunikulam (CBO) 5.00 0.0167 POST Planned 13-Jul-23 27-Jul-23 3-Aug-23 10-Aug-23 3-Aug-23 7-Jan-24 IWWRMP- DC 13 Improvements to D canal Road in LB Vavunikulam Actual LKR RE/WORKS/NPC/MUL/DC/37 (CBO) 5.00 0.0167 Status/Remarks Descriptio Contracto Procureme award notice awardin Serial No. Contrac Completion (Nationali Evaluation Estimated Cost Package Method r CBO)/ ofcontrac Initiation Name in website Signing of contract Capacity (Million) Prior/Post selection contract Bank* Publish CBO process of CBO's Review No. g t ty Contrac of of n nt by Stage t of t of s Curren LKR USD Date Amoun ** cy t (LKR) POST Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 11-Jan-24 IWWRMP- Improvement to Canal Farm structure and farm Road at DC 14 LKR RE/WORKS/NPC/MUL/DC/38 Udayarkaddu Tank. (CBO) 5.00 0.0167 Actual 67.87 0.2262 Democratic Socialist Republic of Sri Lanka Integrated Watershed and Water Resources Management Project PROCUREMENT PLAN FOR WORKS - Repurposing - Date: 27th June 2023 Implementing Agency Eastern Provincial Council - Irrigation Department Credit/Grant No. : Cr 6621- lk Project Closing Oct-25 Descriptio Contracto Procureme award notice awardin Serial No. Contrac Completion (Nationali Evaluation Estimated Cost Package Method r CBO)/ ofcontrac Name Initiation in website Signing of contract Capacity (Million) Prior/Post contract Bank* selection Publish CBO process of CBO's Review No. g t Contrac ty of n nt by of Stage t of s of Curren LKR USD Date Amoun cy t (LKR) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 POST IWWRMP- Improvement to LB Main Channel from Saliyapura Anicut Planned 7-Jul-23 21-Jul-23 28-Jul-23 4-Aug-23 28-Jul-23 31-Jan- DC 1 RE/WORKS/EPC/TRINCO/DC/ of LKR (CBO) 4.75 0.0158 7 Paravipanchan Tank Actual POST IWWRMP- Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb- DC 2 RE/WORKS/EPC/TRINCO/DC/ Improvement to Main Channel of Galmetiyawa Tank LKR (CBO) 4.75 0.0158 8 Actual POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb- IWWRMP- Improvements to RB Main channel of Andan kulam DC 3 RE/WORKS/EPC/TRINCO/DC/ LKR Scheme (CBO) 4.75 0.0158 Actual 9 POST Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb- IWWRMP- Improvement to D3 Channel off RB Main Channel of DC 4 RE/WORKS/EPC/TRINCO/DC/ Mahakalampathu LKR (CBO) 4.75 0.0158 Actual 10 Scheme POST IWWRMP- Planned 13-Jul-23 27-Jul-23 3-Aug-23 10-Aug-23 3-Aug-23 6-Feb- DC 5 RE/WORKS/EPC/TRINCO/DC/ Improvements to RB Main Channel of Pulikandiya Scheme Actual LKR (CBO) 4.75 0.0158 11 POST IWWRMP- Improvements to Tank Bund including Rip-Rap Protection Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 10-Feb- DC 6 RE/WORKS/EPC/TRINCO/DC/ of Actual LKR (CBO) 4.75 0.0158 12 Ullaikulam Tank Scheme POST IWWRMP- Improvements of LB main channel from 0+213m to Planned 19-Jul-23 2-Aug-23 9-Aug-23 16-Aug-23 9-Aug-23 12-Feb- DC 7 RE/WORKS/EPC/TRINCO/DC/ 0+339m in Actual LKR (CBO) 4.75 0.0158 13 Periyakulam Irrigation Scheme POST IWWRMP- Planned 19-Jul-23 2-Aug-23 9-Aug-23 16-Aug-23 9-Aug-23 12-Feb- Improvements of RB Main Channel of Ethabendiwewa DC 8 RE/WORKS/EPC/TRINCO/DC/ Actual LKR Tank (CBO) 4.75 0.0158 14 POST Planned 10-Jul-23 24-Jul-23 31-Jul-23 7-Aug-23 31-Jul-23 3-Feb- IWWRMP- Improvement to Spill - 01 (0+000m to 0+041m), Spill way DC 9 Actual LKR RE/WORKS/EPC/BATI/DC/15 and Channel at Kirimichchodai Tank (CBO) 4.75 0.0158 POST Improvement of Branch Channels of RB Main Channel and Planned 12-Jul-23 26-Jul-23 2-Aug-23 9-Aug-23 2-Aug-23 5-Feb- IWWRMP- DC 10 Spill way Actual LKR RE/WORKS/EPC/BATI/DC/16 (CBO) 4.75 0.0158 Including necessary structure of Mathurankerny Tank POST Improvement to Tank Bund (0+413 km-0+580 km), Spill Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb- IWWRMP- DC 11 and Channel at Actual LKR RE/WORKS/EPC/BATI/DC/17 (CBO) 4.75 0.0158 Palayadiodai Tank POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb- IWWRMP- Improvements to Kaluthavalai Periyakulam and Lift DC 12 Actual LKR RE/WORKS/EPC/BATI/DC/18 Irrigation channel (CBO) 3.80 0.0127 POST Planned 14-Jul-23 28-Jul-23 4-Aug-23 11-Aug-23 4-Aug-23 7-Feb- IWWRMP- Improvements to inlet channel at Kovil Porathivu DC 13 Actual LKR RE/WORKS/EPC/BATI/DC/19 Periyakulam (CBO) 3.80 0.0127 POST Planned 17-Jul-23 31-Jul-23 7-Aug-23 14-Aug-23 7-Aug-23 10-Feb- Improvements to channel system in Nedunchenai kandam IWWRMP- DC 14 at LKR RE/WORKS/EPC/BATI/DC/20 (CBO) 2.85 0.0095 Adachchakal scheme Actual POST Construction of hume pipe culvert including gated Planned 19-Jul-23 2-Aug-23 9-Aug-23 16-Aug-23 9-Aug-23 12-Feb- IWWRMP- arrangements and improvements to channel in DC 15 Actual LKR RE/WORKS/EPC/BATI/DC/21 Muthalaimadu Kandam at Pulugunnawai (CBO) 1.90 0.0063 Scheme 16 4 28 0 0143 Planned 21-Jul-23 4-Aug-23 11-Aug-23 18-Aug-23 11-Aug-23 14-Feb- Improvements to RB-3 Main channel at Kankaniyarkulam IWWRMP- at DC T 16 RE/WORKS/EPC/BATI/DC/22 Pulugunawai Scheme (CBO) Actual LKR POST PO 4.28 0.0143 Improvements to Agricultural Access Road in Planned 21-Jul-23 4-Aug-23 11-Aug-23 18-Aug-23 11-Aug-23 14-Feb-24 IWWRMP- DC 17 Periyakalapoddamadu Actual LKR RE/WORKS/EPC/BATI/DC/23 (CBO) 4.75 0.0158 Mel kandam at Adachchakal Scheme POST Planned 25-Jul-23 8-Aug-23 15-Aug-23 22-Aug-23 15-Aug-23 18-Feb-24 IWWRMP- Improvements to Channel system in Periyakalapoddamadu DC 18 Actual LKR RE/WORKS/EPC/BATI/DC/24 kilal kandam at Adachchakal Scheme (CBO) 4.75 0.0158 ** Indicate extensions/modifications etc. 1 USD = 300.0000 LKR PROCUREMENT Sri Lanka : Sri Lanka Integrated Watershed and Water Resources Management Project PLAN General Information Country: Sri Lanka 2019-06-28 Bank’s Approval Date of the Original Procurement Plan: 2023-10-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166865 GPN Date: 2020-07-28 Project Name: Sri Lanka Integrated Watershed and Water Resources Management Project Loan / Credit No: / , IDA / 66210, IDA / 66190 Ministry of Mahaweli Development and Environment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LK-MOMDE-117185-CW-RFQ Component 4: Project Manag Request for Quota Single Stage - One E 2019-11-1 / Refurbishment of PMU offic / Post Limited 45,311.47 38,887.42 Completed 2019-06-26 2019-06-18 2019-08-14 2019-09-09 ement tions nvelope 2 e (IWWRMP/PP/WORKS/01) LK-MOMDE-123620-CW-RFB / Improvements to Unnichcha Component 2: Infrastructure Single Stage - One E 2021-03-1 i LB main channel from stn 0 / Post Request for Bids Open - National 923,033.71 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 Improvements nvelope 8 +000 to stn 13+725 (IWWRM P-2/WORKS/ID/OCBN/04-1) LK-MOMDE-124032-CW-RFB / Improvements to Unnichcha Component 2: Infrastructure Single Stage - One E 2021-03-0 i RB main channel from stn 0 / Post Request for Bids Open - National 906,741.57 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 Improvements nvelope 1 +000 to stn 4+950 ( IWWRM P-2/WORKS/ID/OCBN/04-2 ) LK-MOMDE-124217-CW-RFB / Improvements to Unnichcha Component 2: Infrastructure Single Stage - One E 2021-03-0 i RB main channel from stn 4 / Post Request for Bids Open - National 887,640.45 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 Improvements nvelope 1 +950 to stn 10+000 ( IWWR MP-2/WORKS/ID/OCBN/04-3 ) LK-MOMDE-124409-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-03-0 / Rehabilititation of Panama T / Post Request for Bids Open - National 342,696.63 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 Improvements nvelope 5 ank ( IWWRMP-2/WORKS/ID/ OCBN/07 ) LK-MOMDE-124659-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-03-2 / Rehabilititation of Peramad / Post Request for Bids Open - National 898,876.40 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 Improvements nvelope 9 uwa Scheme ( IWWRMP-2/W ORKS/ID/OCBN/17 ) LK-MOMDE-124666-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-03-2 / Improvements Viyadikulam / Post Request for Bids Open - National 950,185.39 0.00 Canceled 2019-12-20 2020-01-03 2020-01-24 2020-02-23 2020-03-29 Improvements nvelope 9 Spill ( IWWRMP-2/WORKS/ID/ OCBN/18-2 ) LK-MOMDE-124667-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-05-0 / Rehabilititation of Abakolaw / Post Request for Bids Open - National 325,505.62 0.00 Canceled 2020-01-24 2020-02-07 2020-02-28 2020-03-29 2020-05-03 Improvements nvelope 3 ewa Tank ( IWWRMP-2/WORK S/ID/OCBN/19 ) LK-MOMDE-124683-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-03-0 / Rehabilititation of Karawita / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2019-11-25 2019-12-09 2019-12-30 2020-01-29 2020-03-04 Improvements nvelope 4 tank ( IWWRMP-2/WORKS/ID/ OCBN/20 ) LK-MOMDE-125489-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-04-0 / Rehabilititation of Madiyaw / Post Request for Bids Open - National 464,775.28 0.00 Canceled 2019-12-23 2020-01-06 2020-01-27 2020-02-26 2020-04-01 Improvements nvelope 1 a Tank ( IWWRMP-2/WORKS/I D/OCBN/23 ) LK-MOMDE-125508-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-04-0 / Rehabilititation of Mannank / Post Request for Bids Open - National 280,898.88 0.00 Canceled 2019-12-27 2020-01-10 2020-01-31 2020-03-01 2020-04-05 Improvements nvelope 5 atiya Tank ( IWWRMP-2/WOR KS/ID/OCBN/27 ) LK-MOMDE-125511-CW-RFB / Rehabilititation of Main Can Component 2: Infrastructure Single Stage - One E 2021-03-1 / Post Request for Bids Open - National 347,780.90 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 al of Kimbulawana Oya Sche Improvements nvelope 8 me (LBMC) ( IWWRMP-2/WOR KS/ID/OCBN/28-1 ) LK-MOMDE-125513-CW-RFB / Rehabilititation of Main Can Component 2: Infrastructure Single Stage - One E 2021-03-0 / Post Request for Bids Open - National 262,859.69 0.00 Canceled 2019-12-09 2019-12-10 2019-12-31 2020-01-30 2020-03-05 al of Kimbulawana Oya Sche Improvements nvelope 5 me (RBMC) ( IWWRMP-2/WO RKS/ID/OCBN/28-2) LK-MOMDE-125515-CW-RFB Component 2: Infrastructure Single Stage - One E 2021-03-1 / Rehabilititation of Maha And / Post Request for Bids Open - National 896,067.42 0.00 Canceled 2019-12-09 2019-12-23 2020-01-13 2020-02-12 2020-03-18 Improvements nvelope 8 ara Wewa ( IWWRMP-2/WOR KS/ID/OCBN/29 ) LK-MOMDE-125834-CW-RFB / Improvement of Spillway Ta Component 2: Infrastructure Single Stage - One E 2021-03-0 / Post Request for Bids Open - National 369,101.12 0.00 Canceled 2019-11-26 2019-12-10 2019-12-31 2020-01-30 2020-03-05 il Canal of Kotmale Dam ( IW Improvements nvelope 5 WRMP-2/WORKS/MASL/OCBN /101 ) LK-MOMDE-125839-CW-RFB / Repairs to gates of irrigatio Component 2: Infrastructure Single Stage - One E 2021-09-1 n structures in Kalawewa Left / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2019-12-06 2019-12-20 2020-01-10 2020-02-09 2020-03-15 Improvements nvelope 6 Bank main canal (IWWRMP-2 /WORKS/MASL//OCBN/105) LK-MOMDE-125846-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2020-11-1 nkaddu RB Canal - Muthuiyan / Post Request for Bids Open - National 365,168.54 0.00 Canceled 2019-11-15 2019-11-29 2019-12-20 2020-01-19 2020-02-23 Improvements nvelope 9 kaddu Division - Package 01 (RB/Track 03) ( IWWRMP-2/W ORKS/NPC/OCBN/200-1 ) LK-MOMDE-125994-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2020-11-2 nkaddu LB Canal - Muthuiyan / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 Improvements nvelope 0 kaddu Division - (LB/Track 02 ) ( IWWRMP-2/WORKS/NPC/O CBN/200-6 ) LK-MOMDE-125995-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2021-02-1 nkaddu LB Canal - Muthuiyan / Post Request for Bids Open - National 196,629.21 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 Improvements nvelope 8 kaddu Division - (LB/Track 04 ) ( IWWRMP-2/WORKS/NPC/O CBN/200-7 ) Page 1 LK-MOMDE-126158-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2021-10-2 nkaddu LB Canal - Muthuiyan / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 Improvements nvelope 5 kaddu Division - (LB/Track 01 ) (IWWRMP-2/WORKS/NPC/OC BN/200-9) LK-MOMDE-126330-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2021-04-2 nkaddu RB Canal - Muthuiyan / Post Request for Bids Open - National 674,157.30 0.00 Canceled 2020-04-17 2020-05-01 2020-05-22 2020-06-21 2020-07-26 Improvements nvelope 2 kaddu Division - (RB/Track 04 ) ( IWWRMP-2/WORKS/NPC/O CBN/200-10 ) LK-MOMDE-126332-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2021-05-2 nkaddu LB Canal - Muthuiyan / Post Request for Bids Open - National 561,797.75 0.00 Canceled 2020-05-17 2020-05-31 2020-06-21 2020-07-21 2020-08-25 Improvements nvelope 2 kaddu Division - (LB/Track 03 ) ( IWWRMP-2/WORKS/NPC/O CBN/200-11) LK-MOMDE-126333-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2021-05-2 nkaddu RB Canal - Muthuiyan / Post Request for Bids Open - National 146,067.42 0.00 Canceled 2020-05-15 2020-05-29 2020-06-19 2020-07-19 2020-08-23 Improvements nvelope 0 kaddu Division - (RB/Track 08 ) (IWWRMP-2/WORKS/NPC/OC BN/200-12) LK-MOMDE-126337-CW-RFB / Improvements of Muthuiyan Component 2: Infrastructure Single Stage - One E 2021-05-2 kaddu RB Main Canal - Muthu / Post Request for Bids Open - National 84,269.66 0.00 Canceled 2020-05-20 2020-06-03 2020-06-24 2020-07-24 2020-08-28 Improvements nvelope 5 iyankaddu Division ( IWWRM P-2/WORKS/NPC/OCBN/200-1 3) LK-MOMDE-126338-CW-RFB / Improvements of Muthuiyan Component 2: Infrastructure Single Stage - One E 2021-07-2 kaddu LB Main Canal - Muthu / Post Request for Bids Open - National 84,269.66 0.00 Canceled 2020-07-20 2020-08-03 2020-08-24 2020-09-23 2020-10-28 Improvements nvelope 5 iyankaddu Division ( IWWRM P-2/WORKS/NPC/OCBN/200-1 4) LK-MOMDE-126345-CW-RFB / Rehabilitation of Kalmadu S Component 2: Infrastructure Single Stage - One E 2020-11-2 / Post Request for Bids Open - National 1,404,494.38 0.00 Canceled 2019-11-18 2019-12-02 2019-12-23 2020-01-22 2020-02-26 cheme Headworks ( IWWRMP Improvements nvelope 2 -2/WORKS/NPC/OCBN/201-1 ) LK-MOMDE-126347-CW-RFB / Rehabilitation of channel to Component 2: Infrastructure Single Stage - One E 2022-08-2 kandawalai under RB cannel / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2021-08-23 2021-09-06 2021-09-27 2021-10-27 2021-12-01 Improvements nvelope 8 under Kalmadu Scheme ( IW WRMP-2/WORKS/NPC/OCBN/2 01-2 ) LK-MOMDE-126353-CW-RFB / Rehabilitation of channel to Component 2: Infrastructure Single Stage - One E 2021-10-2 Puliyampokkanai under RB c / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 Improvements nvelope 5 annel under Kalmadu Schem e ( IWWRMP-2/WORKS/NPC/O CBN/201-3 ) LK-MOMDE-126367-CW-RFB / Improvements of Spill & spil Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 337,078.65 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 ltail under Kalmadu Scheme ( Improvements nvelope 1 IWWRMP-2/WORKS/NPC/OCB N/201-5 ) LK-MOMDE-126371-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One E 2021-02-1 kulam channel to kannagipur / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2020-02-14 2020-02-28 2020-03-20 2020-04-19 2020-05-24 Improvements nvelope 8 am under LB cannel ( IWWR MP-2/WORKS/NPC/OCBN/202- 1) LK-MOMDE-126376-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One E 2021-10-2 kulam channel to Akkarayan / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 Improvements nvelope 1 under LB cannel & lift irrigati on ( IWWRMP-2/WORKS/NPC/ OCBN/202-2 ) LK-MOMDE-126378-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One E 2021-10-0 / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 kulam RB cannel ( IWWRMP-2 Improvements nvelope 3 /WORKS/NPC/OCBN/202-3 ) LK-MOMDE-126387-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 449,438.20 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 kulam spill & spilltail channel Improvements nvelope 1 ( IWWRMP-2/WORKS/NPC/OC BN/202-5 ) LK-MOMDE-126390-CW-RFB / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One E 2021-10-0 / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 under Piramanthalaru Sche Improvements nvelope 3 me ( IWWRMP-2/WORKS/NPC/ OCBN/203-1 ) LK-MOMDE-126391-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2020-11-2 m under Piramanthalaru Irrig / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2019-11-18 2019-12-02 2019-12-23 2020-01-22 2020-02-26 Improvements nvelope 2 ation Scheme (phase 01) (IW WRMP-2/WORKS/NPC/OCBN/2 03-2) LK-MOMDE-126392-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2021-09-2 m under Piramanthalaru Irrig / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2020-09-21 2020-10-05 2020-10-26 2020-11-25 2020-12-30 Improvements nvelope 6 ation Scheme (phase 02) ( I WWRMP-2/WORKS/NPC/OCB N/203-3 ) LK-MOMDE-126396-CW-RFB / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 196,629.21 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 under Kanagambikai Irrigatio Improvements nvelope 1 n Scheme (IWWRMP-2/WOR KS/NPC/OCBN/204-1) LK-MOMDE-126400-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2020-11-2 / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 m under Kanagambikai Sche Improvements nvelope 6 me ( IWWRMP-2/WORKS/NPC /OCBN/204-2 ) LK-MOMDE-126410-CW-RFB / Rehabilitation of Head work Component 2: Infrastructure Single Stage - One E 2020-12-2 / Post Request for Bids Open - National 421,348.31 0.00 Canceled 2019-12-19 2020-01-02 2020-01-23 2020-02-22 2020-03-28 s of Kudamuruddy Tank ( IW Improvements nvelope 3 WRMP-2/WORKS/NPC/OCBN/2 06-1) Page 2 LK-MOMDE-126412-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2021-10-0 m under Kudamuruddy Tank / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 Improvements nvelope 3 Irrigation Scheme ( IWWRMP- 2/WORKS/NPC/OCBN/206-2) LK-MOMDE-126413-CW-RFB / Rehabilitation of Head work Component 2: Infrastructure Single Stage - One E 2020-12-2 / Post Request for Bids Open - National 1,123,595.51 0.00 Canceled 2019-12-16 2019-12-30 2020-01-20 2020-02-19 2020-03-25 s of Kariyalai Nagapaduwan Improvements nvelope 0 Tank ( IWWRMP-2/WORKS/NP C/OCBN/207-1 ) LK-MOMDE-126416-CW-RFB / Rehabilitation of LB cannel Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 365,168.54 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 under Kariyalai Nagapaduwa Improvements nvelope 5 n Tank (IWWRMP-2/WORKS/N PC/OCBN/207-2) LK-MOMDE-126417-CW-RFB / Rehabilitation of RB cannel Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 308,988.76 0.00 Canceled 2020-10-20 2020-11-03 2020-11-24 2020-12-24 2021-01-28 under Kariyalai Nagapaduwa Improvements nvelope 5 n Tank ( IWWRMP-2/WORKS/ NPC/OCBN/207-3 ) LK-MOMDE-126418-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2021-10-0 m under Vaneri kulam Irrigati / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-09-28 2020-10-12 2020-11-02 2020-12-02 2021-01-06 Improvements nvelope 3 on Scheme ( IWWRMP-2/WOR KS/NPC/OCBN/208-1 ) LK-MOMDE-126420-CW-RFB / Rehabilitation of Head work Component 2: Infrastructure Single Stage - One E 2021-10-2 / Post Request for Bids Open - National 224,719.10 0.00 Canceled 2020-10-16 2020-10-30 2020-11-20 2020-12-20 2021-01-24 s of Vaneri kulam ( IWWRMP- Improvements nvelope 1 2/WORKS/NPC/OCBN/208-2 ) LK-MOMDE-126422-CW-RFB / Rehabilitation of Dowstrea Component 2: Infrastructure Single Stage - One E 2020-11-2 m infrastructure in Periyapan / Post Request for Bids Open - National 112,359.55 0.00 Canceled 2019-11-22 2019-12-06 2019-12-27 2020-01-26 2020-03-01 Improvements nvelope 6 divirichan Kulam ( IWWRMP- 2/WORKS/NPC/OCBN/209 ) LK-MOMDE-126382-CW-RFB / Rehabilitation of akkarayan Component 2: Infrastructure Single Stage - One E 2022-07-2 / Post Request for Bids Open - National 842,696.63 0.00 Canceled 2021-07-16 2021-07-30 2021-08-20 2021-09-19 2021-10-24 kulam Headworks ( IWWRMP- Improvements nvelope 1 2/WORKS/NPC/OCBN/202-4 ) LK-MOMDE-163016-CW-RFB / Reconstruction of Muthuiya Component 2: Infrastructure Single Stage - One E 2022-02-2 nkaddu LB Canal - Muthuiyan / Post Request for Bids Open - National 589,887.64 0.00 Canceled 2021-02-16 2021-03-02 2021-03-23 2021-04-22 2021-05-27 Improvements nvelope 1 kaddu Division - (LB/Track 01 ) (IWWRMP-2/WORKS/NPC/OC BN/200-9) LK-MOMDE-126361-CW-RFB / Rehabilitation of channel to Component 2: Infrastructure Single Stage - One E 2022-01-1 kalmadu nagar under LB can / Post Request for Bids Open - National 393,258.43 0.00 Canceled 2021-01-10 2021-01-24 2021-02-14 2021-03-16 2021-04-20 Improvements nvelope 5 nel under Kalmadu Scheme ( IWWRMP-2/WORKS/NPC/OCB N/201-4 ) LK-MOMDE-224661-CW-RFB / Rehabilitation of Muththuiya Component 2: Infrastructure Single Stage - One E 2022-07-1 nkaddu RB Canal - Muththuiy IDA / 66210 Post Request for Bids Open - National 365,168.54 495,097.40 Signed 2021-03-15 2021-03-15 2021-07-13 2021-09-29 2021-08-10 2021-10-29 2021-09-09 2021-11-17 2021-10-14 2021-12-29 Improvements nvelope 1 ankaddu Division - (RB/Track 03) (IWWRMP-2/WORKS/NPC/ OCBN/200-1) LK-MOMDE-125854-CW-RFB / Rehabilitation of Muthuiyan Component 2: Infrastructure Single Stage - One E 2022-11-1 kaddu RB Canal - Muthuiyank IDA / 66210 Post Request for Bids Open - National 617,977.53 630,858.08 Signed 2019-11-15 2019-11-15 2021-08-12 2021-09-29 2021-09-09 2021-10-29 2021-10-09 2021-11-17 2021-11-13 2021-12-26 Improvements nvelope 3 addu Division - (RB/Track 05) ( IWWRMP-2/WORKS/NPC/OC BN/200-3 ) LK-MOMDE-125855-CW-RFB / Rehabilitation of Muthuiyan Component 2: Infrastructure Single Stage - One E 2023-05-0 kaddu RB Canal - Muthuiyank IDA / 66210 Post Request for Bids Open - National 634,831.46 718,142.02 Signed 2020-01-20 2020-01-20 2021-08-11 2021-10-07 2021-09-08 2021-11-05 2021-10-08 2021-11-12 2021-11-12 2022-01-10 Improvements nvelope 6 addu Division - (RB/Track 01) ( IWWRMP-2/WORKS/NPC/OC BN/200-4) LK-MOMDE-125856-CW-RFB / Rehabilitation of Muthuiyan Component 2: Infrastructure Single Stage - One E 2022-08-1 kaddu RB Canal - Muthuiyank IDA / 66210 Post Request for Bids Open - National 831,460.67 842,331.64 Signed 2020-01-20 2020-01-20 2021-08-19 2021-10-07 2021-09-16 2021-11-05 2021-10-16 2021-11-12 2021-11-20 2022-02-12 Improvements nvelope 7 addu Division - (RB/Track 02) ( IWWRMP-2/WORKS/NPC/OC BN/200-5) LK-MOMDE-163045-CW-RFB / Rehabilitation of Kalmadu S Component 2: Infrastructure Single Stage - One E 2,577,071.6 2023-11-1 IDA / 66210 Post Request for Bids Open - National 1,619,101.12 Signed 2020-11-18 2020-11-18 2021-08-16 2021-10-07 2021-09-13 2021-11-11 2021-10-13 2021-11-17 2021-11-17 2021-12-30 cheme Headworks (IWWRMP- Improvements nvelope 2 7 2/WORKS/NPC/OCBN/201-1) LK-MOMDE-163038-CW-RFB / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2022-08-1 m under Piramanthalaru Irrig IDA / 66210 Post Request for Bids Open - National 139,213.48 150,556.82 Signed 2020-11-18 2020-11-18 2021-08-16 2021-10-07 2021-09-13 2021-12-05 2021-10-13 2021-11-17 2021-11-17 2022-01-07 Improvements nvelope 4 ation Scheme (phase 01) (IW WRMP-2/WORKS/NPC/OCBN/2 03-2) LK-MOMDE-124412-CW-RFB / Rehabilitation of tank bund Component 2: Infrastructure Single Stage - One E 2024-01-0 (1.5 km) including Rip Rap an IDA / 66210 Post Request for Bids Open - National 337,640.45 237,807.17 Signed 2019-12-02 2019-12-03 2021-10-04 2021-07-15 2021-11-01 2021-07-29 2021-12-01 2021-08-11 2022-01-05 2022-01-03 Improvements nvelope 5 d sluice of Mahalindawewa T ank ( IWWRMP-2/WORKS/ID/ OCBN/06) LK-MOMDE-125529-CW-RFB Request for Bids - / Improvements to Walawa R Component 2: Infrastructure Single Stage - One E Works (without pr 2,482,005.7 2024-01-3 B 41 km Main Canal from 0+ IDA / 66210 Post Request for Bids Open - National 2,302,251.70 Terminated 2019-11-22 2020-01-21 2021-05-03 2021-06-27 2021-05-31 2021-08-17 2021-06-30 2021-10-27 2021-08-04 2021-12-28 Improvements nvelope equalification) SP 8 1 000 km to 17+400 km ( IWW D RMP-2/WORKS/MASL/OCBN/1 00-1) LK-MOMDE-125831-CW-RFB / Improvements to Walawa R Request for Bids - B 41 km Main Canal from 23 Component 2: Infrastructure Single Stage - One E Works (without pr 2,825,799.7 2024-03-0 IDA / 66210 Post Request for Bids Open - National 2,444,167.62 Terminated 2019-11-22 2019-12-20 2021-06-02 2021-06-27 2021-06-30 2021-08-17 2021-07-30 2021-10-27 2021-09-03 2021-12-28 +400 km to 33+420 km and Improvements nvelope equalification) SP 4 1 34+640km to 40+910 km ( I D WWRMP-2/WORKS/MASL/OCB N/100-2 ) LK-MOMDE-125832-CW-RFB Request for Bids - / Hydro Mechanical works of Component 2: Infrastructure Single Stage - One E Works (without pr 2023-03-2 IDA / 66210 Post Request for Bids Open - National 332,261.49 325,986.56 Signed 2019-11-29 2019-12-20 2021-06-09 2021-06-27 2021-07-07 2021-08-10 2021-08-06 2021-09-23 2021-09-10 2022-01-03 Walawa RB Main Canal ( IWW Improvements nvelope equalification) SP 4 RMP-2/WORKS/MASL/OCBN/1 D 00-3 ) Page 3 LK-MOMDE-125833-CW-RFB Request for Bids - / Ecological Improvements an Component 2: Infrastructure Single Stage - One E Works (without pr 2023-03-2 d Marking Reservation along IDA / 66210 Post Request for Bids Open - National 422,232.84 376,090.19 Signed 2019-11-29 2019-12-17 2021-06-09 2021-06-27 2021-07-07 2021-08-10 2021-08-06 2021-09-08 2021-09-10 2021-12-10 Improvements nvelope equalification) SP 4 Walawa RB Main Canal ( IWW D RMP-2/WORKS/MASL/OCBN/1 00-4 ) LK-MOMDE-125835-CW-RFB National Procure / Installation of Automated G ment Document - eodetic Survey Systems in K Component 2: Infrastructure Single Stage - Two E 2022-11-2 IDA / 66210 Prior Request for Bids Open - National 2 Envelope proce 1,623,595.51 0.00 Canceled 2019-11-19 2021-07-09 2021-08-06 2021-11-23 otmale & Randenigala Dams Improvements nvelope 3 ss (Non Bank-SPD for Dam Movement Monitorin ) g ( IWWRMP-2/WORKS/MASL/ /OCBN/102 ) National Procure LK-MOMDE-125836-CW-RFB ment Document - / Supply and Installation of G Component 2: Infrastructure Single Stage - Two E 2022-12-0 IDA / 66210 Prior Request for Bids Open - National 2 Envelope proce 2,000,000.00 0.00 Canceled 2019-12-03 2021-07-23 2021-08-20 2021-12-07 antry Crane for Polgolla Barr Improvements nvelope 7 ss (Non Bank-SPD age ( IWWRMP-2/WORKS/MA ) SL//OCBN/103 ) National Procure LK-MOMDE-125838-CW-RFB ment Document - / Supply and Installation of G Component 2: Infrastructure Single Stage - Two E 2022-11-2 IDA / 66210 Prior Request for Bids Open - National 2 Envelope proce 1,185,393.26 0.00 Canceled 2019-12-03 2021-07-12 2021-08-09 2021-11-26 antry Crane for Udawalawe D Improvements nvelope 6 ss (Non Bank-SPD am ( IWWRMP-2/WORKS/MAS ) L//OCBN/104 ) LK-MOMDE-163036-CW-RFB National Procure / Repairs to gates of irrigatio ment Document - Component 2: Infrastructure Single Stage - One E 2023-04-2 n structures in Kalawewa Left IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 449,438.20 427,739.47 Signed 2020-07-06 2020-07-16 2021-07-16 2021-09-13 2021-08-13 2021-10-12 2021-09-12 2021-12-13 2021-10-17 2022-02-15 Improvements nvelope 0 Bank main canal (IWWRMP-2/ ss (Non Bank-SPD WORKS/MASL//OCBN/105) ) National Procure LK-MOMDE-163046-CW-RFB ment Document - / Rehabilitation of Downstrea Component 2: Infrastructure Single Stage - One E 2022-10-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 224,719.10 225,969.75 Signed 2020-09-21 2020-09-21 2021-07-19 2021-10-07 2021-08-16 2021-11-05 2021-09-15 2021-11-17 2021-10-20 2021-12-31 m under Kanagambikai Sche Improvements nvelope 0 ss (Non Bank-SPD me (IWWRMP-2/WORKS/NPC/ ) OCBN/204) LK-MOMDE-125488-CW-RFB Request for Bids - / Rehabilitation of Haththota Component 2: Infrastructure Single Stage - One E Works (without pr 2023-03-0 IDA / 66210 Post Request for Bids Open - National 341,337.08 257,360.61 Terminated 2019-12-23 2019-12-26 2021-12-03 2021-07-15 2021-12-31 2021-07-29 2022-01-30 2021-09-13 2022-03-06 2021-11-14 Anicut Scheme (1st to 5th K Improvements nvelope equalification) SP 6 m canal) ( IWWRMP-2/WORK D S/ID/OCBN/16-1) LK-MOMDE-234772-CW-RFB Request for Bids - / Rehabilititation of Haththot Component 2: Infrastructure Single Stage - One E Works (without pr 2023-01-2 IDA / 66210 Post Request for Bids Open - National 314,971.91 122,969.66 Terminated 2021-07-01 2021-07-01 2021-10-28 2021-07-15 2021-11-25 2021-07-29 2021-12-25 2021-09-07 2022-01-29 2021-11-14 a Anicut Scheme (6th to 10th Improvements nvelope equalification) SP 9 Km canal) (IWWRMP-2/WORK D S/ID/OCBN/16-2) National Procure LK-MOMDE-241092-CW-RFB ment Document - / Supply installation of Gantr Component 2: Infrastructure Single Stage - Two E 2022-11-2 IDA / 66210 Post Request for Bids Open - National 2 Envelope proce 2,000,000.00 0.00 Signed 2021-06-27 2021-06-28 2021-07-16 2021-07-11 2021-08-27 2021-08-24 2021-10-24 2022-01-25 2021-11-28 2022-11-24 y Crane mechanism for Polgo Improvements nvelope 8 ss (Non Bank-SPD lla Barrage (IWWRMP-2/WOR ) KS/MASL/OCBN/103) LK-MOMDE-241083-CW-RFB National Procure / Installation of Automated G ment Document - eodetic Survey Systems in K Component 2: Infrastructure Single Stage - Two E 2022-11-2 IDA / 66210 Post Request for Bids Open - National 2 Envelope proce 1,623,595.51 0.00 Terminated 2021-06-25 2021-06-28 2021-07-15 2021-07-11 2021-08-26 2021-09-03 2021-10-23 2022-03-29 2021-11-27 2023-02-03 otmale & Randenigala Dams Improvements nvelope 7 ss (Non Bank-SPD for Dam Movement Monitorin ) g (IWWRMP-2/WORKS/MASL/ OCBN/102) National Procure LK-MOMDE-241095-CW-RFB ment Document - / Supply and Installation of G Component 2: Infrastructure Single Stage - Two E 2022-11-2 IDA / 66210 Post Request for Bids Open - National 2 Envelope proce 1,185,393.26 0.00 Signed 2021-06-25 2021-06-27 2021-07-15 2021-07-11 2021-08-26 2021-08-24 2021-10-23 2022-01-25 2021-11-27 2022-11-24 antry Crane for Udawalawe D Improvements nvelope 7 ss (Non Bank-SPD am (IWWRMP-2/WORKS/MAS ) L/OCBN/104) National Procure LK-MOMDE-123597-CW-RFB ment Document - / Improvement to Bathalagod Component 2: Infrastructure Single Stage - One E 2022-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 179,606.74 0.00 Canceled 2021-06-27 2021-07-20 2021-08-17 2021-09-16 2021-10-21 a main CHL road from 0+000 Improvements nvelope 8 ss (Non Bank-SPD to 2+100 km ( IWWRMP-2/W ) ORKS/ID/OCBN/01-4 ) LK-MOMDE-123572-CW-RFB National Procure / Improvements to Bathalago ment Document - Component 2: Infrastructure Single Stage - One E 2022-10-1 da Anicut & Anicut inlet CHL IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 411,123.60 353,143.92 Terminated 2019-11-15 2019-11-15 2021-07-08 2021-07-15 2021-08-07 2021-07-29 2021-09-06 2021-10-09 2021-10-11 2021-11-23 Improvements nvelope 1 road from CH0 to 3+775 (IW ss (Non Bank-SPD WRMP-2/WORKS/ID/OCBN/01- ) 1) National Procure LK-MOMDE-123606-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2023-12-2 / Rehabilitation of Dewahuwa IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 568,854.87 0.00 Signed 2019-11-19 2022-03-28 2021-09-22 2022-04-21 2021-10-20 2022-06-03 2021-11-19 2023-01-31 2021-12-24 2023-04-07 Improvements nvelope 4 Scheme ( IWWRMP-2/WORKS ss (Non Bank-SPD /ID/OCBN/03 ) ) National Procure LK-MOMDE-125496-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2022-11-1 / Rehabilitation of Arawatta t IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 230,492.13 213,054.90 Signed 2019-12-27 2021-08-20 2021-08-09 2021-08-31 2021-09-06 2021-10-12 2021-10-06 2021-10-21 2021-11-10 2022-01-31 Improvements nvelope 0 ank bund ( IWWRMP-2/WORK ss (Non Bank-SPD S/ID/OCBN/18) ) National Procure LK-MOMDE-123594-CW-RFB ment Document - / Improvement to Bathalagod Component 2: Infrastructure Single Stage - One E 2022-10-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 190,769.66 157,638.22 Terminated 2019-11-15 2019-11-18 2021-10-21 2021-08-10 2021-11-18 2021-07-29 2021-12-18 2021-08-31 2022-01-22 2021-11-14 a main bund road ch from 0 t Improvements nvelope 9 ss (Non Bank-SPD o 1+525 ( IWWRMP-2/WORKS ) /ID/OCBN/01-2 ) LK-MOMDE-123600-CW-RFB Request for Bids - / Rehabilitation of D1, D2, D4 Component 2: Infrastructure Single Stage - One E Works (without pr 2022-10-2 IDA / 66210 Post Request for Bids Open - National 321,657.30 0.00 Canceled 2019-11-19 2021-08-20 2021-07-26 2021-08-31 2021-08-23 2021-09-22 2021-10-27 canals in Bathalagoda Schem Improvements nvelope equalification) SP 7 e ( IWWRMP-2/WORKS/ID/OC D BN/02-1) National Procure LK-MOMDE-123602-CW-RFB ment Document - / Rehabilitation of D5, D7, D7 Component 2: Infrastructure Single Stage - One E 2022-11-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 231,629.21 0.00 Canceled 2019-11-19 2021-08-20 2021-07-29 2021-08-31 2021-08-28 2021-09-27 2021-11-01 RB canals in Bathalagoda Sc Improvements nvelope 1 ss (Non Bank-SPD heme ( IWWRMP-2/WORKS/ID ) /OCBN/02-2 ) LK-MOMDE-225755-CW-RFB National Procure / Improvement to Bund (1 km ment Document - ), rip rap Protection, Instrume Component 2: Infrastructure Single Stage - One E 2024-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 3,132,932.58 0.00 Canceled 2021-06-30 2022-04-26 2022-05-26 2022-06-25 2022-07-30 ntation and Toe filter & drain Improvements nvelope 9 ss (Non Bank-SPD of Senanayaka Samudraya R ) eservoir (IWWRMP-2/WORKS/ ID/OCBN/20) LK-MOMDE-302734-CW-RFB National Procure / Providing rip-rap protection ment Document - Component 2: Infrastructure Single Stage - One E 2024-12-0 to Senanayaka Samudraya B IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 1,660,000.00 0.00 Signed 2022-07-18 2022-07-22 2022-08-31 2022-08-14 2022-09-30 2022-09-06 2022-10-30 2022-10-21 2022-12-04 2023-02-18 Improvements nvelope 3 und & Improvement to Bund ss (Non Bank-SPD Road (IWWRMP-2/WORKS/ID/ ) OCBN/20-1) National Procure LK-MOMDE-124591-CW-RFB ment Document - / Rehabilitation of Tank Bund, Component 2: Infrastructure Single Stage - One E Under Imple 2022-12-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 205,500.00 0.00 2019-11-14 2023-05-16 2021-09-20 2023-05-30 2021-10-18 2023-06-23 2021-11-17 2023-08-25 2021-12-22 Sluice and Spillway in Nagad Improvements nvelope mentation 2 ss (Non Bank-SPD eepa tank( IWWRMP-2/WORK ) S/ID/OCBN/07) Page 4 LK-MOMDE-124595-CW-RFB National Procure / Improvements to Akathimur ment Document - Component 2: Infrastructure Single Stage - One E 2022-11-2 ippu tank bund from 0+000 t IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 865,000.00 0.00 Signed 2019-12-02 2022-11-04 2021-08-23 2023-01-02 2021-09-20 2023-01-25 2021-10-20 2023-03-30 2021-11-24 2023-07-28 Improvements nvelope 4 o 6+450 of Akathimurippu Sc ss (Non Bank-SPD heme ( IWWRMP-2/WORKS/ID ) /OCBN/11) LK-MOMDE-125494-CW-RFB National Procure / Improvements to Muhathan ment Document - Component 2: Infrastructure Single Stage - One E 2024-01-0 kulam Main Canal from 0+00 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 367,000.00 0.00 Signed 2022-09-15 2022-11-09 2022-10-06 2022-12-05 2022-11-05 2022-12-30 2022-12-05 2023-03-16 2023-01-09 2023-07-11 Improvements nvelope 9 0 to 4+400 of Muhathankula ss (Non Bank-SPD m Scheme( IWWRMP-2/WOR ) KS/ID/OCBN/17) National Procure LK-MOMDE-302519-CW-RFB ment Document - / Rehabilitation of D1, D2, D4 Component 2: Infrastructure Single Stage - One E 2024-02-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 188,000.00 0.00 Signed 2022-09-26 2022-11-09 2022-11-09 2022-12-05 2022-12-09 2022-12-30 2023-01-18 2023-02-02 2023-02-22 2023-05-10 canals in Bathalagoda Schem Improvements nvelope 2 ss (Non Bank-SPD e (Retender) (IWWRMP-2/WO ) RKS/ID/OCBN/02-1) LK-MOMDE-302531-CW-RFB National Procure / Rehabilitation of D5, D7 and ment Document - Component 2: Infrastructure Single Stage - One E 2024-02-2 D7 RB canals in Bathalagoda IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 134,000.00 0.00 Signed 2022-09-26 2022-11-09 2022-11-09 2022-12-05 2022-12-09 2022-12-30 2023-01-18 2023-02-07 2023-02-22 2023-05-22 Improvements nvelope 2 Scheme (Retender) (IWWRMP ss (Non Bank-SPD -2/WORKS/ID/OCBN/02-2) ) LK-MOMDE-124649-CW-RFB / Improvements to Mavilaru Component 2: Infrastructure Single Stage - One E 2023-03-0 IDA / 66210 Post Request for Bids Open - National 412,247.19 0.00 Canceled 2020-02-06 2021-12-01 2021-12-29 2022-01-28 2022-03-04 Headworks (RB) ( IWWRMP-2/ Improvements nvelope 4 WORKS/ID/OCBN/13-2 ) LK-MOMDE-124671-CW-RFB / Improvements of Access ro Component 2: Infrastructure Single Stage - One E 2023-04-1 ad of Vahanery tank form Stn IDA / 66210 Post Request for Bids Open - National 775,000.00 0.00 Canceled 2019-12-27 2022-01-11 2022-02-08 2022-03-10 2022-04-14 Improvements nvelope 4 0+000 to 7+683 (Santhiyar r oad) ( IWWRMP-2/WORKS/ID/ OCBN/09-2 ) National Procure LK-MOMDE-123596-CW-RFB ment Document - / Improvement to Bathalagod Component 2: Infrastructure Single Stage - One E 2022-10-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 103,988.76 0.00 Canceled 2019-11-15 2021-07-08 2021-08-07 2021-09-06 2021-10-11 a Anicut (Mechanical works) ( Improvements nvelope 1 ss (Non Bank-SPD IWWRMP-2/WORKS/ID/OCBN/ ) 01-3 ) LK-MOMDE-367174-CW-RFB National Procure / Establishment of Provincial ment Document - Component 1: Watershed an Single Stage - One E Pending Imp 2025-07-1 Groundwater Management u IDA / 66190 Post Request for Bids Open - National 1 Envelope proce 90,277.00 0.00 2024-03-18 2024-04-17 2024-05-15 2024-06-12 2024-07-17 d Water Resources Planning nvelope lementation 7 nit at Jaffna region (IWWRMP- ss (Non Bank-SPD 1/WORKS/PMU/WRB/NCB/1) ) LK-MOMDE-367175-CW-RFQ / Expansion of regional office Request for Quota s for establishment of Provin Component 1: Watershed an Request for Quota Single Stage - One E 2025-06-2 IDA / 66190 Post Limited tions (Non Bank-S 50,000.00 0.00 Canceled 2023-10-20 2024-01-05 cial Groundwater Manageme d Water Resources Planning tions nvelope 8 PD) nt units at regional scale (IW WRMP-1/WORKS/PMU/WRB/N S/2) LK-MOMDE-367176-CW-RFQ / Implementing of MAR as pil Request for Quota Component 1: Watershed an Request for Quota Single Stage - One E Pending Imp 2025-07-0 ot studies at identified sites t IDA / 66190 Post Limited tions (Non Bank-S 16,670.00 0.00 2024-04-21 2024-07-07 d Water Resources Planning tions nvelope lementation 7 hrough an appropriate struct PD) ure (IWWRMP-1/WORKS/PMU/ WRB/NS/3) National Procure LK-MOMDE-124596-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-07-2 / Rehabilitation of Pavatkula IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 874,719.10 0.00 2024-03-11 2024-04-24 2024-05-22 2024-06-21 2024-07-26 Improvements nvelope lementation 6 m Tank ( IWWRMP-2/WORKS/ ss (Non Bank-SPD ID/OCBN/12 ) ) LK-MOMDE-124660-CW-RFB National Procure / Improvements to RB Main c ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-1 anal from 0+000Km to 1+46 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 676,471.91 0.00 2024-03-28 2024-05-11 2024-06-08 2024-07-08 2024-08-12 Improvements nvelope lementation 2 5Km of Viyadikulam Scheme ss (Non Bank-SPD ( IWWRMP-2/WORKS/ID/OCB ) N/15) LK-MOMDE-305818-CW-RFB National Procure / Improvements to Bathalago ment Document - Component 2: Infrastructure Single Stage - One E 2025-06-2 da Anicut & Anicut inlet CHL IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 204,000.00 0.00 Canceled 2024-01-31 2024-03-15 2024-04-14 2024-05-24 2024-06-28 Improvements nvelope 8 road from CH0 to 3+775 (Ret ss (Non Bank-SPD ender) (IWWRMP-2/WORKS/I ) D/OCBN/01-1) LK-MOMDE-305823-CW-RFB National Procure / Improvement to Bathalagod ment Document - Component 2: Infrastructure Single Stage - One E 2025-06-2 a main bund road ch from 0 t IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 95,000.00 0.00 Canceled 2024-01-31 2024-03-15 2024-04-14 2024-05-24 2024-06-28 Improvements nvelope 8 o 1+525 (Retender)(IWWRMP ss (Non Bank-SPD -2/WORKS/ID/OCBN/01-2) ) National Procure LK-MOMDE-124408-CW-RFB ment Document - / Improvements to (22 km) B Component 2: Infrastructure Single Stage - One E 2025-05-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 815,235.96 0.00 Canceled 2023-07-07 2023-08-20 2023-09-19 2023-10-29 2023-12-03 ranch canal and structures of Improvements nvelope 6 ss (Non Bank-SPD Illukuchenal Unit ( IWWRMP-2 ) /WORKS/ID/OCBN/05 ) National Procure LK-MOMDE-124592-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2024-12-1 / Rehabilititation of Wadamu IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 369,932.58 0.00 Canceled 2023-07-17 2023-08-30 2023-09-29 2023-11-08 2023-12-13 Improvements nvelope 2 nai Tank ( IWWRMP-2/WORKS ss (Non Bank-SPD /ID/OCBN/08 ) ) National Procure LK-MOMDE-124593-CW-RFB ment Document - / Rehabilitation of Vahanery Component 2: Infrastructure Single Stage - One E 2025-01-3 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 551,604.19 0.00 Canceled 2023-09-04 2023-10-18 2023-11-17 2023-12-27 2024-01-31 Tank bund from Stn 0+000 t Improvements nvelope 0 ss (Non Bank-SPD o Stn 2+100 ( IWWRMP-2/WO ) RKS/ID/OCBN/09-1 ) National Procure LK-MOMDE-124594-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2025-03-2 / Rehabilitation of HaliEla Tan IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 422,191.01 0.00 Canceled 2023-10-25 2023-12-08 2024-01-07 2024-02-16 2024-03-22 Improvements nvelope 2 k ( IWWRMP-2/WORKS/ID/OC ss (Non Bank-SPD BN/10) ) National Procure LK-MOMDE-124642-CW-RFB ment Document - / Rehabilitation of Mavilaru L Component 2: Infrastructure Single Stage - One E 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 614,000.00 0.00 Canceled 2023-08-22 2023-10-05 2023-11-04 2023-12-14 2024-01-18 B Bund from 0+130 to 2+73 Improvements nvelope 7 ss (Non Bank-SPD 0 ( IWWRMP-2/WORKS/ID/OC ) BN/13-1) National Procure LK-MOMDE-124655-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2025-04-1 / Rehabilitation of Peramadu IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 595,505.62 0.00 Canceled 2023-11-13 2023-12-27 2024-01-26 2024-03-06 2024-04-10 Improvements nvelope 0 Tank ( IWWRMP-2/WORKS/ID/ ss (Non Bank-SPD OCBN/14) ) National Procure LK-MOMDE-125506-CW-RFB ment Document - Component 2: Infrastructure Single Stage - One E 2024-12-2 / Rehabilitation of Waduwaw IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 352,808.99 0.00 Canceled 2023-07-25 2023-09-07 2023-10-07 2023-11-16 2023-12-21 Improvements nvelope 0 ala Scheme ( IWWRMP-2/WO ss (Non Bank-SPD RKS/ID/OCBN/19 ) ) Page 5 National Procure LK-MOMDE-302735-CW-RFB ment Document - / Instrumentation facility to S Component 2: Infrastructure Single Stage - One E 2026-02-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 355,000.00 0.00 Canceled 2023-09-14 2023-10-28 2023-11-27 2024-01-06 2024-02-10 enanayake Samudra bund (I Improvements nvelope 9 ss (Non Bank-SPD WWRMP-2/WORKS/ID/OCBN/2 ) 0-2) LK-MOMDE-163031-CW-RFB National Procure / Improvement of Spillway Ta ment Document - Component 2: Infrastructure Single Stage - One E 2025-01-2 il Canal and removing rock b IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 842,696.63 0.00 Canceled 2023-08-31 2023-10-14 2023-11-13 2023-12-23 2024-01-27 Improvements nvelope 6 oulders in Kotmale Dam ( IW ss (Non Bank-SPD WRMP-2/WORKS/MASL/OCBN ) /101 ) LK-MOMDE-125851-CW-RFB National Procure / Rehabilitation of Muthuiyan ment Document - Component 2: Infrastructure Single Stage - One E 2024-11-2 kaddu RB Canal - Muthuiyank IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 325,842.70 0.00 Canceled 2023-06-26 2023-08-09 2023-09-08 2023-10-18 2023-11-22 Improvements nvelope 1 addu Division - (RB/Track 07) ss (Non Bank-SPD ( IWWRMP-2/WORKS/NPC/OC ) BN/200-2 ) LK-MOMDE-126155-CW-RFB National Procure / Rehabilitation of Muththuiya ment Document - Component 2: Infrastructure Single Stage - One E 2024-10-2 nkaddu RB Canal - Muththuiy IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 464,831.46 0.00 Canceled 2023-06-01 2023-07-15 2023-08-14 2023-09-23 2023-10-28 Improvements nvelope 7 ankaddu Division - (RB/Track ss (Non Bank-SPD 06) (IWWRMP-2/WORKS/NPC/ ) OCBN/200-6) LK-MOMDE-163023-CW-RFB National Procure / Rehabilitation of Muthuiyan ment Document - Component 2: Infrastructure Single Stage - One E 2025-02-2 kaddu LB Canal - Muthuiyank IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 589,887.64 0.00 Canceled 2023-10-02 2023-11-15 2023-12-15 2024-01-24 2024-02-28 Improvements nvelope 7 addu Division - (LB/Track 03) ss (Non Bank-SPD ( IWWRMP-2/WORKS/NPC/OC ) BN/200-7) National Procure LK-MOMDE-163041-CW-RFB ment Document - / Improvements of Spill & spil Component 2: Infrastructure Single Stage - One E 2025-01-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 291,011.24 0.00 Canceled 2023-08-08 2023-09-21 2023-10-21 2023-11-30 2024-01-04 l tail under Kalmadu Scheme Improvements nvelope 3 ss (Non Bank-SPD ( IWWRMP-2/WORKS/NPC/OC ) BN/201-2 ) National Procure LK-MOMDE-228195-CW-RFB ment Document - / Rehabilitation on Akkarayan Component 2: Infrastructure Single Stage - One E 2025-05-3 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 842,696.63 0.00 Canceled 2023-07-11 2023-08-24 2023-09-23 2023-11-02 2023-12-07 kulam Headworks (IWWRMP- Improvements nvelope 0 ss (Non Bank-SPD 2/WORKS/NPC/OCBN/202 ) National Procure LK-MOMDE-163026-CW-RFB ment Document - / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One E 2025-01-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 327,865.17 0.00 Canceled 2023-08-08 2023-09-21 2023-10-21 2023-11-30 2024-01-04 under Piramanthalaru Schem Improvements nvelope 3 ss (Non Bank-SPD e (IWWRMP-2/WORKS/NPC/O ) CBN/203-1) National Procure LK-MOMDE-126401-CW-RFB ment Document - / Rehabilitation of Head work Component 2: Infrastructure Single Stage - One E 2025-04-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 1,500,000.00 0.00 Canceled 2023-11-20 2024-01-03 2024-02-02 2024-03-13 2024-04-17 s in Periyamdu Tank ( IWWR Improvements nvelope 7 ss (Non Bank-SPD MP-2/WORKS/NPC/OCBN/205 ) ) National Procure LK-MOMDE-163044-CW-RFB ment Document - / Rehabilitation of Head work Component 2: Infrastructure Single Stage - One E 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 510,000.00 0.00 Canceled 2023-08-24 2023-10-07 2023-11-06 2023-12-16 2024-01-20 s of Kudamuruddy Tank ( IW Improvements nvelope 9 ss (Non Bank-SPD WRMP-2/WORKS/NPC/OCBN/2 ) 06) LK-MOMDE-163054-CW-RFB / Improvements to canal Syst Component 2: Infrastructure Single Stage - One E 2024-03-1 em (18km) inculuding structu IDA / 66210 Post Request for Bids Open - National 561,797.75 0.00 Canceled 2021-05-20 2021-12-16 2022-01-13 2022-02-12 2022-03-19 Improvements nvelope 8 res of Puluganawai-Kankaniy ar scheme (IWWRMP-2/WORK S/EPC/OCBN/303) LK-MOMDE-163055-CW-RFB National Procure / Improvements of tank bund ment Document - (1.5km), including Rip Rap an Component 2: Infrastructure Single Stage - One E 2024-11-3 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 168,539.33 0.00 Canceled 2023-07-05 2023-08-18 2023-09-17 2023-10-27 2023-12-01 d Sluice Structure to Pulugan Improvements nvelope 0 ss (Non Bank-SPD awai-Kankaniyar scheme (IW ) WRMP-2/WORKS/EPC/OCBN/3 05) LK-MOMDE-163066-CW-RFB National Procure / Immediate improvement of ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-12-1 upper phephary of Polgolla D IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 786,516.85 0.00 2024-08-12 2024-09-11 2024-10-09 2024-11-08 2024-12-13 Improvements nvelope lementation 3 am - Phase I (IWWRMP-2/WO ss (Non Bank-SPD RKS/MASL/OCBN/106-1) ) LK-MOMDE-163051-CW-RFB National Procure / Rehabilitation of Tank Bund ment Document - Component 2: Infrastructure Single Stage - One E Under Imple 2024-11-2 including Rip-Rap and both Sl IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 416,700.00 0.00 2023-07-28 2023-08-31 2023-08-27 2023-09-09 2023-09-24 2023-09-27 2023-10-24 2023-11-28 Improvements nvelope mentation 7 uice to Meiyankal Tank (IWW ss (Non Bank-SPD RMP-2/WORKS/EPC/OCBN/30 ) 0) National Procure LK-MOMDE-321760-CW-RFB ment Document - / Improvements to Spill struc Component 2: Infrastructure Single Stage - One E Under Imple 2024-12-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 361,200.00 0.00 2023-07-28 2023-08-31 2023-08-27 2023-09-09 2023-09-26 2023-09-27 2023-11-05 2023-12-10 ture of Meiyankal Tank ( IWW Improvements nvelope mentation 9 ss (Non Bank-SPD RMP-2/WORKS/EPC/OCBN/30 ) 8) LK-MOMDE-305825-CW-RFB National Procure / Improvements to Canal (6th ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-03-2 - 10th km) system including IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 279,000.00 0.00 2023-11-10 2023-12-10 2024-01-09 2024-02-18 2024-03-24 Improvements nvelope lementation 4 structures of Haththota Anicu ss (Non Bank-SPD t Scheme (Retender) (IWWR ) MP-2/WORKS/ID/OCBN/16-2) LK-MOMDE-321755-CW-RFB National Procure / Improvements to Channel S ment Document - Component 2: Infrastructure Single Stage - One E Under Imple 2024-12-1 ystem (12km) including struc IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 275,000.00 0.00 2023-07-31 2023-08-31 2023-08-30 2023-09-09 2023-09-29 2023-09-27 2023-11-08 2023-12-13 Improvements nvelope mentation 2 tures to Adachchakal Schem ss (Non Bank-SPD e ( IWWRMP-2/WORKS/EPC/ ) OCBN/307 ) LK-MOMDE-321748-CW-RFB National Procure / Rehabilitation of Tank Bund ment Document - Component 2: Infrastructure Single Stage - One E Under Imple 2024-12-1 (1.0 km) including rip-rap, spi IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 166,700.00 0.00 2023-07-31 2023-08-31 2023-08-30 2023-09-09 2023-09-29 2023-09-27 2023-11-08 2023-12-13 Improvements nvelope mentation 2 ll and sluice of Adachchakal T ss (Non Bank-SPD ank (IWWRMP-2/WORKS/EPC/ ) OCBN/306) LK-MOMDE-321765-CW-RFB National Procure / Improvements to LB & RB M ment Document - Component 2: Infrastructure Single Stage - One E Under Imple 2024-12-0 ain and "D" Channel includin IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 125,000.00 0.00 2023-07-28 2023-08-31 2023-08-27 2023-09-09 2023-09-26 2023-09-27 2023-11-05 2023-12-10 Improvements nvelope mentation 9 g structures of Meiyankal Sch ss (Non Bank-SPD eme (IWWRMP-2/WORKS/EPC ) /OCBN/309) LK-MOMDE-305824-CW-RFB National Procure / Improvements to Canal (1st ment Document - Component 2: Infrastructure Single Stage - One E Under Imple 2024-11-2 - 5th km) system including st IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 198,900.00 0.00 2023-07-14 2023-06-21 2023-08-13 2023-07-23 2023-09-12 2023-10-22 2023-11-26 Improvements nvelope mentation 5 ructures of Haththota Anicut ss (Non Bank-SPD Scheme (Retender) (IWWRMP ) -2/WORKS/ID/OCBN/16-1) Page 6 LK-MOMDE-370946-CW-RFB National Procure / Desilting, removing aquatic ment Document - plants and construction of M Component 2: Infrastructure Single Stage - One E Under Imple 2024-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 83,500.00 0.00 2023-09-01 2023-08-30 2023-10-15 2023-10-13 2023-11-14 2023-10-11 2023-12-24 2024-01-28 ud sluice in Pallegama tank i Improvements nvelope mentation 6 ss (Non Bank-SPD n Nuwaragala Block (IWWRM ) P-RE/WORKS/MASL/POL/NCB/ 01) National Procure LK-MOMDE-378031-CW-RFB ment Document - / Improvement to Kurankupa Component 2: Infrastructure Single Stage - One E Pending Imp 2024-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 81,000.00 0.00 2023-09-22 2023-10-13 2023-11-22 2023-12-22 2024-01-26 nchan tank in Kinniya DS divi Improvements nvelope lementation 4 ss (Non Bank-SPD sion (IWWRMP-RE/WORKS/EP ) C/TRINCO/NCB/01) LK-MOMDE-378049-CW-RFB National Procure / Improvements to Walawa R ment Document - B 41 km Main Canal from 0+ Component 2: Infrastructure Single Stage - One E Under Imple 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 938,500.00 0.00 2023-09-14 2023-09-18 2023-09-28 2023-10-13 2023-10-28 2023-12-07 2024-01-11 000 km to 8+250 km (Packa Improvements nvelope mentation 0 ss (Non Bank-SPD ge 01) – (Retender) (IWWRM ) P-2/WORKS/MASL/OCBN/107 - 1) LK-MOMDE-378051-CW-RFB National Procure / Improvements to Walawa R ment Document - B 41 km Main Canal from 8+ Component 2: Infrastructure Single Stage - One E Under Imple 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 812,500.00 0.00 2023-09-14 2023-09-18 2023-09-28 2023-10-13 2023-10-28 2023-12-07 2024-01-11 250 km to 17+400 km (Pack Improvements nvelope mentation 0 ss (Non Bank-SPD age 02) – (Retender) (IWWR ) MP-2/WORKS/MASL/OCBN/10 7 - 2) LK-MOMDE-378055-CW-RFB National Procure / Improvements to Walawa R ment Document - B 41 km Main Canal from 23 Component 2: Infrastructure Single Stage - One E Under Imple 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 587,500.00 0.00 2023-09-14 2023-09-18 2023-09-28 2023-10-13 2023-10-28 2023-12-07 2024-01-11 +400 km to 30+005 km (Pac Improvements nvelope mentation 0 ss (Non Bank-SPD kage 03) – (Retender) (IWW ) RMP-2/WORKS/MASL/OCBN/1 07 - 3) LK-MOMDE-378056-CW-RFB National Procure / Improvements to Walawa R ment Document - B 41 km Main Canal from 30 Component 2: Infrastructure Single Stage - One E Under Imple 2025-01-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 787,000.00 0.00 2023-09-14 2023-09-18 2023-09-28 2023-10-13 2023-10-28 2023-12-07 2024-01-11 +005 km to 41+600 km (Pac Improvements nvelope mentation 0 ss (Non Bank-SPD kage 04) – (Retender) (IWW ) RMP-2/WORKS/MASL/OCBN/1 07 - 4) LK-MOMDE-378264-CW-DIR / Installation of gates and repa Component 2: Infrastructure Other (with field f Pending Imp 2024-04-2 ir hoisting arrangements in T IDA / 66210 Post Direct Selection Direct - National 28,000.00 0.00 2023-09-15 2023-09-20 2023-10-30 Improvements or explanation) lementation 7 himbiri amuna in Minneriya s cheme (IWWRMP-RE/WORKS/ ID/POL/FA/1) LK-MOMDE-378542-CW-DIR / Installation of steel gates and Component 2: Infrastructure Other (with field f Pending Imp 2024-04-2 repair hoisting arrangements IDA / 66210 Post Direct Selection Direct - National 8,300.00 0.00 2023-09-15 2023-09-20 2023-10-30 Improvements or explanation) lementation 7 in Ruban amuna in Minneriya scheme (IWWRMP-RE/WORKS /ID/POL/FA/2) LK-MOMDE-378545-CW-DIR / Improvements of hoisting arr Component 2: Infrastructure Other (with field f Pending Imp 2024-05-0 angement and installation of IDA / 66210 Post Direct Selection Direct - National 3,500.00 0.00 2023-09-19 2023-09-24 2023-11-03 Improvements or explanation) lementation 1 Gangodawewa in Minneriya s cheme (IWWRMP-RE/WORKS/ ID/POL/FA/3) LK-MOMDE-378547-CW-DIR / Installation of gates and repa Component 2: Infrastructure Other (with field f Pending Imp 2024-05-0 ir hoisting arrangement in we IDA / 66210 Post Direct Selection Direct - National 7,000.00 0.00 2023-09-19 2023-09-24 2023-11-03 Improvements or explanation) lementation 1 liela spill in Minneriya schem e (IWWRMP-RE/WORKS/ID/PO L/FA/4) LK-MOMDE-378549-CW-DIR / Improvements of Door 07 ca Component 2: Infrastructure Other (with field f Pending Imp 2024-05-0 IDA / 66210 Post Direct Selection Direct - National 22,500.00 0.00 2023-09-21 2023-09-26 2023-11-05 nal spill in Minneriya scheme Improvements or explanation) lementation 3 (IWWRMP-RE/WORKS/ID/POL/ FA/5) LK-MOMDE-378550-CW-DIR / Improvements to renovation Component 2: Infrastructure Other (with field f Pending Imp 2024-05-0 at Palukadawala Feeder Cana IDA / 66210 Post Direct Selection Direct - National 9,000.00 0.00 2023-09-21 2023-09-26 2023-11-05 Improvements or explanation) lementation 3 l regulator gates (IWWRMP-R E/WORKS/ID/KURU/FA/06) LK-MOMDE-388629-CW-RFQ / Improvements to Ethandam Request for Quota Component 2: Infrastructure Request for Quota Single Stage - One E Pending Imp 2024-08-1 urippu Tank Bund in Kuchcha IDA / 66210 Post Limited tions (Non Bank-S 32,300.00 0.00 2023-11-20 2024-02-14 Improvements tions nvelope lementation 2 veli Division (IWWRMP-RE/W PD) ORKS/EPC/TRINCO/NCB/02) LK-MOMDE-388823-CW-RFB National Procure / Expansion of regional office ment Document - s for establishment of Provin Component 1: Watershed an Single Stage - One E Pending Imp 2025-02-0 IDA / 66190 Post Request for Bids Open - National 1 Envelope proce 61,200.00 0.00 2023-10-30 2023-11-20 2023-12-11 2024-01-05 2024-02-09 cial Groundwater Manageme d Water Resources Planning nvelope lementation 8 ss (Non Bank-SPD nt units at regional scale (IW ) WRMP-1/WORKS/PMU/WRB/N CB/4) National Procure LK-MOMDE-163064-CW-RFB ment Document - / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 416,000.00 0.00 2024-03-29 2024-04-28 2024-05-28 2024-07-07 2024-08-11 at Nithakaikulam Tank (IWW Improvements nvelope lementation 1 ss (Non Bank-SPD RMP-2/WORKS/NPC/OCBN/20 ) 8) National Procure LK-MOMDE-225762-CW-RFB ment Document - / Rehabilitation of Headworks Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-1 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 417,000.00 0.00 2024-03-29 2024-04-28 2024-05-28 2024-07-07 2024-08-11 at Maruthankulam Tank (IW Improvements nvelope lementation 1 ss (Non Bank-SPD WRMP-2/WORKS/NPC/OCBN/2 ) 09) National Procure LK-MOMDE-317179-CW-RFB ment Document - / Rehabilitation of Welimarut Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 167,000.00 0.00 2024-03-25 2024-04-24 2024-05-24 2024-07-03 2024-08-07 hamadu Tank Headworks (IW Improvements nvelope lementation 7 ss (Non Bank-SPD WRMP-2/WORKS/NPC/OCBN/2 ) 10) LK-MOMDE-163059-CW-RFB National Procure / Rehabilitation of Head work ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-0 s and Downstream infrastruc IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 253,000.00 0.00 2024-03-25 2024-04-24 2024-05-24 2024-07-03 2024-08-07 Improvements nvelope lementation 7 ture of Kariyalai Nagapaduwa ss (Non Bank-SPD n Tank (IWWRMP-2/WORKS/N ) PC/OCBN/207) National Procure LK-MOMDE-124090-CW-RFB ment Document - / Improvements to LB Main C Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 334,000.00 0.00 2024-03-22 2024-04-21 2024-05-21 2024-06-30 2024-08-04 anal of Huruluwewa Major Sc Improvements nvelope lementation 4 ss (Non Bank-SPD heme ( IWWRMP-2/WORKS/ID ) /OCBN/04-1) Page 7 National Procure LK-MOMDE-124402-CW-RFB ment Document - / Improvements to Huruluwe Component 2: Infrastructure Single Stage - One E Pending Imp 2025-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 170,400.00 0.00 2024-03-22 2024-04-21 2024-05-21 2024-06-20 2024-07-25 wa Right Bank Main Canal (R Improvements nvelope lementation 5 ss (Non Bank-SPD B) (IWWRMP-2/WORKS/ID/OC ) BN/04-2) LK-MOMDE-321768-CW-RFB National Procure / Improvement of tank bund ( ment Document - Component 2: Infrastructure Single Stage - One E Pending Imp 2025-09-2 0.4 km) including Rip Rap Pr IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 569,500.00 0.00 2023-11-20 2023-12-20 2024-01-19 2024-02-28 2024-04-03 Improvements nvelope lementation 5 otection and spill of Paravipa ss (Non Bank-SPD nchanTank ( IWWRMP-2/WOR ) KS/EPC/OCBN/310 ) National Procure LK-MOMDE-163052-CW-RFB ment Document - / Rehabilitation of Chadayant Component 2: Infrastructure Single Stage - One E Pending Imp 2025-07-2 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 259,000.00 0.00 2024-03-25 2024-04-24 2024-05-22 2024-06-21 2024-07-26 halawa Tank (IWWRMP-2/WO Improvements nvelope lementation 6 ss (Non Bank-SPD RKS/EPC/OCBN/301) ) National Procure LK-MOMDE-163053-CW-RFB ment Document - / Rehabilitation of Saliyapura Component 2: Infrastructure Single Stage - One E Pending Imp 2025-08-0 IDA / 66210 Post Request for Bids Open - National 1 Envelope proce 65,000.00 0.00 2024-04-01 2024-05-01 2024-05-29 2024-06-28 2024-08-02 anicut of Paravipanchan Sche Improvements nvelope lementation 2 ss (Non Bank-SPD me (IWWRMP-2/WORKS/EPC/ ) OCBN/302) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-117380-GO-DIR / Procurement of Relevant Dat a and Maps for preparation o Component 1: Watershed an / Post Direct Selection Direct 15,151.52 0.00 Canceled 2019-08-05 2019-08-13 2019-09-17 2020-01-15 f GIS maps including specific d Water Resources Planning geographic locations/sub-wat ersheds (IWWRMP/PP/GOODS /01) LK-MOMDE-123586-GO-RFB Component 2: Infrastructure Single Stage - One E / Procurement of Crew Cabs ( / Post Request for Bids Open - National 475,000.00 0.00 Canceled 2020-06-09 2020-06-23 2020-08-04 2020-09-03 2020-10-08 2021-04-06 Improvements nvelope IWWRMP-2/GOODS/PMU/OCB N/3 ) LK-MOMDE-124216-GO-DIR / Purchasing of GIS Maps and Component 1: Watershed an / Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-01-27 2020-02-10 2020-03-21 2020-09-17 Satellite Images ( IWWRMP-1/ d Water Resources Planning GOODS/PMU/OCBN/6 ) LK-MOMDE-123574-GO-RFB / Procurement of clay groutin Component 2: Infrastructure Single Stage - One E IDA / 66210 Post Request for Bids Open - National 675,000.00 543,120.43 Signed 2022-01-24 2022-02-24 2022-02-07 2022-03-07 2022-03-07 2022-04-06 2022-04-06 2022-05-17 2022-05-11 2022-07-14 2023-03-07 g machines ( IWWRMP-2/GO Improvements nvelope ODS/PMU/OCBN/1 ) LK-MOMDE-273765-GO-RFQ Component 2: Infrastructure Request for Quota Single Stage - One E / Procurement and Supply of IDA / 66210 Post Limited 13,250.00 10,217.89 Signed 2022-02-16 2022-03-16 2022-04-16 2022-04-21 2022-05-16 Improvements tions nvelope Laptops for PMU LK-MOMDE-273774-GO-RFQ / Procurement of Multifunctio Component 2: Infrastructure Request for Quota Single Stage - One E IDA / 66210 Post Limited 13,250.00 10,300.28 Signed 2022-03-01 2022-03-16 2022-05-13 2022-05-09 2022-06-12 nal Color Printer with binding Improvements tions nvelope Facility and Scanner for PMU LK-MOMDE-273776-GO-RFQ Component 2: Infrastructure Request for Quota Single Stage - One E / Procurement and Supply of IDA / 66210 Post Limited 5,300.00 2,000.00 Signed 2022-03-01 2022-05-05 2022-05-13 2022-06-09 2022-06-12 Improvements tions nvelope Server UPS for PMU LK-MOMDE-317333-GO-RFQ Component 2: Infrastructure Request for Quota Single Stage - One E / Procurement and Supply of IDA / 66210 Post Limited 42,000.00 0.00 Signed 2022-11-01 2022-11-10 2023-01-03 2023-02-25 2023-02-02 Improvements tions nvelope Computer and Accessories fo r ID LK-MOMDE-367154-GO-RFB / Procurement and supply of Component 1: Watershed an Single Stage - One E Pending Impl IDA / 66190 Post Request for Bids Open - National 90,300.00 0.00 2024-01-17 2024-02-16 2024-03-15 2024-04-14 2024-05-19 2024-11-15 Test pumping unit with supp d Water Resources Planning nvelope ementation orting accessories (IWWRMP- 1/GOODS/WRB/NCB//25) LK-MOMDE-367164-GO-RFQ / Procurement and supply of Component 1: Watershed an Request for Quota Single Stage - One E Pending Impl Chemicals for the analysis ac IDA / 66190 Post Limited 25,000.00 0.00 2024-04-24 2024-07-03 2024-08-02 d Water Resources Planning tions nvelope ementation tivities - Package 2 ( IWWRM P-1/GOODS/WRB/NS/28) LK-MOMDE-303520-GO-RFB Component 2: Infrastructure Single Stage - One E / Procurement of Reservoir S IDA / 66210 Post Request for Bids Open - National 417,000.00 0.00 Canceled 2022-10-14 2022-10-28 2022-11-27 2022-12-27 2023-01-31 2024-01-31 Improvements nvelope pillways Bridge under side In spection Machine LK-MOMDE-124212-GO-RFB / Procurement of computer a Component 1: Watershed an Single Stage - One E Pending Impl IDA / 66210 Post Request for Bids Open - National 106,000.00 0.00 2024-01-23 2024-02-06 2024-03-05 2024-04-04 2024-05-09 2024-09-06 nd accessories-1 ( IWWRMP-2 d Water Resources Planning nvelope ementation /GOODS/PMU/OCBN/4 ) LK-MOMDE-282437-GO-DIR / Procurement and Supply of s pare parts for repairing and Component 1: Watershed an Direct - Internation Pending Impl IDA / 66190 Post Direct Selection 806,000.00 0.00 2023-07-17 2023-07-31 2023-09-04 2024-03-02 maintenance of automated in d Water Resources Planning al ementation struments of HMIS stations (I WWRMP-1/GOODS/PMU/OCBI /19) LK-MOMDE-124219-GO-RFB Component 1: Watershed an Single Stage - One E Pending Impl / Procurement of Office Equip IDA / 66210 Post Request for Bids Open - National 30,000.00 0.00 2024-08-20 2024-09-09 2024-10-07 2024-11-06 2024-12-11 2025-04-10 d Water Resources Planning nvelope ementation ments-1 ( IWWRMP-2/GOODS /PMU/OCBN/7 ) LK-MOMDE-124214-GO-RFB Component 2: Infrastructure Single Stage - One E Pending Impl / Procurement of Photocopy IDA / 66210 Post Request for Bids Open - National 30,000.00 0.00 2024-08-20 2024-09-03 2024-10-01 2024-10-31 2024-12-05 2025-04-04 Improvements nvelope ementation Machines-1 ( IWWRMP-2/GOO DS/PMU/OCBN/5 ) LK-MOMDE-302803-GO-RFQ / Procurement and Supply of spare parts for repairing and Component 1: Watershed an Request for Quota Single Stage - One E Pending Impl IDA / 66190 Post Open - National 2,000.00 0.00 2024-05-08 2024-07-30 2025-01-26 maintenance of automated in d Water Resources Planning tions nvelope ementation struments of HMIS stations of MASL (National) (IWWRMP-1/ GOODS/PMU/NS/22) LK-MOMDE-284455-GO-RFB / Procurement and Supply of Component 2: Infrastructure Single Stage - One E Pending Impl IDA / 66210 Post Request for Bids Open - National 285,400.00 0.00 2024-08-15 2024-08-20 2024-09-19 2024-10-19 2024-11-23 2025-05-22 High Pressure water pumps (I Improvements nvelope ementation WWRMP-2/GOODS/PMU/OCB N/13) Page 8 LK-MOMDE-367150-GO-RFB / Procurement and Supply of Component 1: Watershed an Single Stage - One E Pending Impl IDA / 66190 Post Request for Bids Open - National 61,200.00 0.00 2023-10-31 2023-11-30 2023-12-28 2024-01-27 2024-03-02 2024-08-29 Scientific Equipment for WRB d Water Resources Planning nvelope ementation (IWWRMP-1/GOODS/WRB/NC B/24) LK-MOMDE-367160-GO-RFQ / Procurement and Supply of Component 1: Watershed an Request for Quota Single Stage - One E Pending Impl IDA / 66190 Post Limited 37,500.00 0.00 2023-12-01 2024-02-09 2024-06-08 Material for well drilling (IWW d Water Resources Planning tions nvelope ementation RMP-1/GOODS/WRB/NS/26) LK-MOMDE-367163-GO-RFQ / Procurement and supply of Component 1: Watershed an Request for Quota Single Stage - One E Pending Impl Chemicals for the analysis ac IDA / 66190 Post Limited 19,500.00 0.00 2023-12-03 2024-02-11 2024-03-12 d Water Resources Planning tions nvelope ementation tivities - Package 1 (IWWRMP -1/GOODS/WRB/NS/27) LK-MOMDE-367167-GO-RFQ / Procurement and Supply of Component 1: Watershed an Request for Quota Single Stage - One E Pending Impl IDA / 66190 Post Limited 16,130.00 0.00 2023-11-22 2024-01-31 2024-04-30 Server and Laptops for WRB ( d Water Resources Planning tions nvelope ementation IWWRMP-1/GOODS/WRB/NS/ 29) LK-MOMDE-367332-GO-RFQ / Procurement and Supply of Component 2: Infrastructure Request for Quota Single Stage - One E Pending Impl IDA / 66210 Post Limited 1,400.00 0.00 2024-01-01 2024-02-26 2024-03-27 Computer accessories (UPS) f Improvements tions nvelope ementation or ID (Retender) (IWWRMP-2/ GOODS/PMU/NS/30) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-282432-NC-RFQ / Hiring Service provider for M Component 1: Watershed an Request for Quota Single Stage - One E aintenance and Service for H IDA / 66190 Post Limited 14,000.00 0.00 Canceled 2022-03-14 2022-05-16 2025-05-15 d Water Resources Planning tions nvelope MIS Server & Related Equipm ent at Data Center of ID (IW WRMP-1/NC/PMU/S/1) LK-MOMDE-302793-NC-RFQ / Hiring Service provider for M Component 1: Watershed an Request for Quota Single Stage - One E aintenance and Service for H IDA / 66190 Post Open - National 7,400.00 0.00 Signed 2022-10-24 2022-11-14 2023-01-27 2023-02-03 2026-01-26 d Water Resources Planning tions nvelope MIS Server & Related Equipm ent at Data Center of ID (IW WRMP-1/NC/PMU/S/1) LK-MOMDE-157171-NC-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Conducting Asset verification IDA / 66210 Post Limited 2,808.99 0.00 Canceled 2023-07-18 2023-09-05 2023-10-05 ement tions nvelope and Valuation for the PMU-IW WRMP Assets LK-MOMDE-367296-NC-RFQ / Hiring Service provider for Pr Component 2: Infrastructure Request for Quota Single Stage - One E Under Imple eparation of Video document IDA / 66210 Post Limited 14,500.00 0.00 2023-07-05 2023-08-02 2023-09-13 2023-10-02 2024-01-11 Improvements tions nvelope mentation ary for IWWRM Project - Phas e I (IWWRMP-2/NC/PMU/S/4) LK-MOMDE-302794-NC-RFQ / Geotechnical Investigations f Component 1: Watershed an Request for Quota Single Stage - One E or proposed locations of eart IDA / 66190 Post Limited 2,600.00 0.00 Canceled 2023-11-03 2024-02-04 2024-08-02 d Water Resources Planning tions nvelope h retaining structures around Polgolla reservoir periphery (I WWRMP-1/NC/PMU/S/2) LK-MOMDE-302797-NC-RFQ / Re-establishment of boundari Component 1: Watershed an Request for Quota Single Stage - One E es in acquired lands by MASL IDA / 66190 Post Limited 6,350.00 0.00 Signed 2023-07-28 2023-05-16 2023-10-29 2023-09-01 2024-04-26 d Water Resources Planning tions nvelope for the purposes of Polgolla R eservoir (IWWRMP-1/NC/PMU/ S/3) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-116917-CS-INDV / Consultancy services for Pre Component 3: Multi-sector Consultant Qualifi / Post Limited 9,090.91 0.00 Canceled 2019-07-25 2019-08-08 2019-09-07 2019-10-12 2020-04-09 paration of TOR for River Bas Water Resources Planning cation Selection in Management Plan (IWWRM P/PP/CONS/30) LK-MOMDE-120102-CS-QCBS / Consultancy service to finali Component 1: Watershed an Quality And Cost- ze the Bid documents for irri / Post Open - National 12,121.21 0.00 Canceled 2019-09-16 2019-10-07 2019-11-20 2019-12-18 2020-01-17 2020-02-21 2020-03-27 2021-03-27 d Water Resources Planning Based Selection gation dam rehabilitation of Component 1 (IWWRMP/PP/C ONS/35) LK-MOMDE-121715-CS-CQS / Consultancy Service for prep Component 1: Watershed an Consultant Qualifi aration of Watershed Manage / Post Open - National 15,151.52 0.00 Canceled 2019-07-17 2019-08-07 2019-09-20 2019-10-20 2019-11-24 2020-05-22 d Water Resources Planning cation Selection ment plans for selected area (IWWRMP/PP/CONS/36) LK-MOMDE-121716-CS-CQS / Consultancy services for pre Component 2: Infrastructure Consultant Qualifi / Post Open - National 30,303.03 0.00 Canceled 2019-09-15 2019-10-06 2019-11-19 2019-12-19 2020-01-23 2020-07-21 paration of Risk Assesment (I Improvements cation Selection WWRMP/PP/CONS/37) LK-MOMDE-125891-CS-QCBS / Consultancy service for pre paration of Watershed mana gement plan for seven select Component 1: Watershed an Quality And Cost- Open - Internationa / Post 1,348,314.61 0.00 Canceled 2019-12-05 2019-12-26 2020-02-08 2020-03-07 2020-04-06 2020-05-11 2020-06-15 2021-06-15 ed divisions -Nuwara Eliya, B d Water Resources Planning Based Selection l adulla, Walapnae & Kandy (D elthota, Haguranketha and P ahatha Hewaheta) (IWWRMP- 1/CS/QCBS/1) LK-MOMDE-125993-CS-QCBS / Consultancy Service for stu dy and recommendation for back erosion of Rantambe da Component 2: Infrastructure Quality And Cost- Open - Internationa m spillway tail canal ,LB erosi / Post 786,516.85 0.00 Canceled 2019-11-25 2019-12-16 2020-01-29 2020-02-26 2020-03-27 2020-05-01 2020-06-05 2021-06-05 Improvements Based Selection l on of Victoria dam spillway ta il canal, Back Analysis for Vic toria dam and Kotmale Dam grouting gallery inspection (I WWRMP-2/CS/QCBS/7) Page 9 LK-MOMDE-126757-CS-QCBS / Development of Basin Mana Component 1: Watershed an Quality And Cost- gement plan for Walawa & M / Post Open - National 421,348.31 0.00 Canceled 2020-05-25 2020-06-15 2020-07-29 2020-08-26 2020-09-25 2020-10-30 2020-12-04 2021-12-04 d Water Resources Planning Based Selection a Oya including the stakehol der workshops (IWWRMP-1/C S/QCBS/5) LK-MOMDE-126759-CS-QCBS / Consultancy service for Exp Component 1: Watershed an Quality And Cost- ansion and enhancement of / Post Open - National 561,797.75 0.00 Canceled 2020-10-29 2020-11-19 2021-01-02 2021-01-30 2021-03-01 2021-04-05 2021-05-10 2023-05-10 d Water Resources Planning Based Selection WMS/MASL bulk water allocat ion model (IWWRMP-1/CS/QC BS/6) LK-MOMDE-138818-CS-CQS / Consultancy on improving re servoir capacity by dredging Component 1: Watershed an Consultant Qualifi / Post Open - National 112,359.55 0.00 Canceled 2020-04-01 2020-04-22 2020-06-05 2020-07-05 2020-08-09 2021-08-09 sand deposits - medium and d Water Resources Planning cation Selection minor irrigation tanks within the watershed (IWWRMP-1/C S/CQS/2) LK-MOMDE-138828-CS-CQS / Establishment of policy and i Component 2: Infrastructure Consultant Qualifi nstitutional arrangements for / Post Open - National 112,359.55 0.00 Canceled 2020-04-14 2020-05-05 2020-06-18 2020-07-18 2020-08-22 2021-08-22 Improvements cation Selection dam safety, and water resour ces management (IWWRMP-2 /CS/CQS/15) LK-MOMDE-138831-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 25,280.90 0.00 Canceled 2020-12-16 2021-01-06 2021-02-19 2021-03-21 2021-04-25 2022-04-25 Improvements cation Selection nd Environmental social scre ening report for rehabiliate d ams & canals cluster VII (IW WRMP-2/CS/CQS/18) LK-MOMDE-138832-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 25,280.90 0.00 Canceled 2019-12-13 2020-01-03 2020-02-16 2020-03-17 2020-04-21 2021-04-21 Improvements cation Selection nd Environmental social scre ening report for rehabilitate dams & canals cluster VIII (I WWRMP-2/CS/CQS/19) LK-MOMDE-138824-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 56,179.78 0.00 Canceled 2020-09-09 2020-09-30 2020-11-13 2020-12-13 2021-01-17 2021-07-16 Improvements cation Selection nd Environmental social scre ening report for rehabilitate dams & canals cluster IV ( IW WRMP-2/CS/CQS/11) LK-MOMDE-138829-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 11,235.96 0.00 Canceled 2020-02-17 2020-03-09 2020-04-22 2020-05-22 2020-06-26 2021-06-26 Improvements cation Selection nd Environmental social scre ening report for rehabiliate d ams & canals cluster V (IWW RMP-2/CS/CQS/16) LK-MOMDE-138830-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 22,471.91 0.00 Canceled 2019-12-09 2019-12-30 2020-02-12 2020-03-13 2020-04-17 2021-04-17 Improvements cation Selection nd Environmental social scre ening report for rehabilitate dams & canals cluster VI (IW WRMP-2/CS/CQS/17) LK-MOMDE-138822-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 56,179.78 0.00 Canceled 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-07-07 2021-01-03 Improvements cation Selection nd Environmental social scre ening report for rehabilitate dams & canals cluster II (IW WRMP-2/CS/CQS/9) LK-MOMDE-138835-CS-CQS / Feasibility study tocheck the Component 2: Infrastructure Consultant Qualifi possibility of diverson of Kalu / Post Open - National 280,898.88 0.00 Canceled 2020-09-28 2020-10-19 2020-12-02 2021-01-01 2021-02-05 2022-02-05 Improvements cation Selection ganga Water to the CKD area (IWWRMP-2/CS/CQS/22) LK-MOMDE-138823-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Framework a / Post Open - National 56,179.78 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-04 2021-01-08 2021-07-07 Improvements cation Selection nd Environmental social scre ening report for rehabilitate dams & canals cluster III ( IW WRMP-2/CS/CQS/10) LK-MOMDE-138836-CS-CQS / Preparation of guidline for s Component 2: Infrastructure Consultant Qualifi / Post Open - National 11,235.96 0.00 Canceled 2020-07-30 2020-08-20 2020-10-03 2020-11-02 2020-12-07 2021-12-07 ustainable Dam safety and H Improvements cation Selection ydraulic Assets ( IWWRMP-2/ CS/CQS/23 ) LK-MOMDE-138838-CS-CQS / Component 2: Infrastructure Consultant Qualifi / Post Open - National 280,898.88 0.00 Canceled 2020-11-01 2020-11-22 2021-01-05 2021-02-04 2021-03-11 2022-03-11 Risk assessment for all identi Improvements cation Selection fied dams LK-MOMDE-162965-CS-QCBS / Consultancy service for pre Component 1: Watershed an Quality And Cost- paration of Mahaweli Upper / Post Open - National 280,898.88 0.00 Canceled 2020-10-29 2020-11-19 2021-01-02 2021-01-30 2021-03-01 2021-04-05 2021-05-10 2022-05-10 d Water Resources Planning Based Selection Watershed management inte rvention plan for cluster II (I WWRMP-1/CS/QCBS/2) LK-MOMDE-138837-CS-CQS / preparation of O & M Manual Component 2: Infrastructure Consultant Qualifi / Post Open - National 280,898.88 0.00 Canceled 2021-12-01 2021-12-22 2022-02-04 2022-03-06 2022-04-10 2023-04-10 s and Emergency Action plan Improvements cation Selection s for selected dams ( IWWRM P-2/CS/CQS/24 ) LK-MOMDE-162967-CS-QCBS / Consultancy service for pre Component 1: Watershed an Quality And Cost- paration of Mahaweli Upper / Post Open - National 224,719.10 0.00 Canceled 2021-02-01 2021-02-22 2021-04-07 2021-05-05 2021-06-04 2021-07-09 2021-08-13 2022-08-13 d Water Resources Planning Based Selection Watershed management inte rvention plan for cluster III (I WWRMP-1/CS/QCBS/3) Page 10 LK-MOMDE-162968-CS-QCBS / Consultancy Service develo pment of best practices for w Component 1: Watershed an Quality And Cost- / Post Open - National 56,179.78 0.00 Canceled 2020-09-29 2020-10-20 2020-12-03 2020-12-31 2021-01-30 2021-03-06 2021-04-10 2021-10-07 ater management using nati d Water Resources Planning Based Selection ve , herbal, economical impo rtant species (IWWRMP-1/CS/ QCBS/4) LK-MOMDE-138839-CS-CQS / Consultancy Service for Deve Component 4: Project Manag Consultant Qualifi / Post Open - National 14,044.94 0.00 Canceled 2020-10-15 2020-11-05 2020-12-19 2021-01-18 2021-02-22 2021-05-23 lopment for Project Website ( ement cation Selection IWWRMP-4/CS/CQS/26) LK-MOMDE-162972-CS-QCBS / Consultancy service for dev Component 1: Watershed an Quality And Cost- elopment for integrated desi / Post Open - National 56,179.78 0.00 Canceled 2020-09-29 2020-10-20 2020-12-03 2020-12-31 2021-01-30 2021-03-06 2021-04-10 2022-04-10 d Water Resources Planning Based Selection gn proposal for upper periph ary of Polgolla reservoir (IW WRMP-1/CS/QCBS/5) LK-MOMDE-162975-CS-CQS / Consultancy service for Expa Component 1: Watershed an Consultant Qualifi Open - Internationa / Post 561,795.75 0.00 Canceled 2020-11-02 2020-11-23 2021-02-06 2021-03-08 2021-04-19 2022-04-19 nsion and enhancement of W d Water Resources Planning cation Selection l MS/MASL bulk water allocatio n model LK-MOMDE-162977-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Plan and Env IDA / 66210 Post Open - National 84,269.00 0.00 Signed 2021-06-30 2021-08-23 2021-07-26 2021-09-07 2021-09-08 2022-03-02 2021-10-08 2022-05-19 2021-11-12 2022-06-28 2022-05-11 Improvements cation Selection ironmental and Social Screen ing report for rehabilitate da ms & canals in NPC (IWWRMP -2/CS/CQS/7) LK-MOMDE-138821-CS-CQS / Consultancy service for Prep aration of Environmental Soci Component 2: Infrastructure Consultant Qualifi al Management Plan and Env IDA / 66210 Post Open - National 56,179.78 0.00 Signed 2021-06-30 2021-08-23 2021-07-20 2021-09-07 2021-09-02 2022-03-02 2021-10-02 2022-05-19 2021-11-06 2022-06-28 2022-05-05 Improvements cation Selection ironmental and Social Screen ing report for rehabilitate da ms & canals in EPC (IWWRMP -2/CS/CQS/8) LK-MOMDE-138825-CS-CQS / Consultancy Service for prep aration of Livelihood Support Component 2: Infrastructure Consultant Qualifi IDA / 66210 Post Open - National 56,179.78 0.00 Signed 2021-09-23 2022-04-04 2021-10-14 2022-05-23 2021-11-27 2022-08-10 2021-12-27 2023-05-24 2022-01-31 2023-06-13 2022-07-30 Assistance Plan (LSA) for the Improvements cation Selection period of Cultivation forgo of selected dams (IWWRMP-2/C S/CQS/9) LK-MOMDE-138826-CS-CQS / Consultancy Service for inspe ction, identification of defect Component 2: Infrastructure Consultant Qualifi IDA / 66210 Post Open - National 84,269.66 0.00 Signed 2021-07-28 2022-03-04 2021-08-18 2022-03-24 2021-10-01 2022-06-22 2021-10-31 2022-12-22 2021-12-05 2022-12-31 2022-06-03 s and repair works of syphon Improvements cation Selection e from 3+950 km to 4+330 k m of walawa RB main canal (I WWRMP-2/CS/CQS/10) LK-MOMDE-138834-CS-CQS / Feasibility Study for Construc tion of Poonery Tank and Bar Component 2: Infrastructure Consultant Qualifi IDA / 66210 Post Open - National 252,808.99 0.00 Canceled 2022-02-01 2022-08-09 2022-02-22 2022-04-07 2022-05-07 2022-06-11 2023-06-11 rages including Investigation, Improvements cation Selection Detailed Design, BD preparat ion, EIA and Social assessme nt (IWWRMP-2/CS/CQS/13) LK-MOMDE-121717-CS-CQS / Component 4: Project Manag Consultant Qualifi Preparation of Management I IDA / 66210 Post Open - National 12,121.21 0.00 Signed 2022-02-01 2022-02-11 2022-02-15 2022-03-13 2022-04-07 2022-08-10 2022-05-07 2022-10-21 2022-06-11 2022-12-31 2022-12-08 ement cation Selection nformation System (IWWRMP /PP/CONS/15) LK-MOMDE-162963-CS-QCBS / Consultancy service for pre Component 1: Watershed an Quality And Cost- paration of Implementation s IDA / 66190 Post Open - National 955,056.18 0.00 Canceled 2021-08-18 2021-10-28 2021-12-11 2022-01-10 2022-02-09 2022-03-02 2022-04-06 2023-04-06 d Water Resources Planning Based Selection upport Upper Mahaweli Wate rshed management plan (IW WRMP-1/CS/QCBS/1) LK-MOMDE-240803-CS-QCBS / Consultancy for Dams Portf olio Risk Assessment and Pre Component 2: Infrastructure Quality And Cost- Under Implement paration of Operation and Ma IDA / 66210 Post Open - National 505,617.98 0.00 2022-08-22 2022-08-23 2022-09-16 2022-09-16 2022-10-30 2022-12-02 2022-11-29 2023-02-02 2022-12-29 2023-04-18 2023-01-19 2023-02-23 2024-02-23 Improvements Based Selection ation intenance (O&M) Plan and E mergency Preparedness Plan (EPP) for all identified dams ( IWWRMP-2/CS/QCBS/16) LK-MOMDE-315784-CS-CQS / Component 4: Project Manag Consultant Qualifi Consultancy Service for Deve IDA / 66210 Post Open - National 13,250.00 0.00 Signed 2022-09-26 2022-10-03 2022-10-17 2022-10-25 2022-11-21 2022-12-30 2022-12-21 2023-02-01 2023-01-25 2023-03-09 2023-04-25 ement cation Selection lopment for Project Website LK-MOMDE-138820-CS-CQS / Development of Groundwate Component 1: Watershed an Consultant Qualifi r Data & Information System IDA / 66190 Post Open - National 56,179.78 0.00 Canceled 2022-04-14 2022-06-22 2022-08-19 2022-10-18 2022-11-22 2023-11-22 d Water Resources Planning cation Selection for WRB covering entire coun try (IWWRMP-1/CS/CQS/4) LK-MOMDE-330742-CS-QCBS / Consultancy Services of De velopment of Groundwater M anagement Plans for Malwat Component 1: Watershed an Quality And Cost- Under Implement hoya, Deduru Oya, Kumbukk IDA / 66210 Post Open - National 70,000.00 0.00 2022-12-12 2022-12-15 2023-01-02 2023-02-15 2023-02-14 2023-03-15 2023-03-29 2023-04-14 2023-05-19 2023-06-23 2024-06-22 d Water Resources Planning Based Selection ation an Oya, MathuruOya, Mee Oy a, Maa Oya, Kelani basin and Jaffna Peninsula (WRB) by co nsidering the real-time data on water quality, quantity, et c. LK-MOMDE-118622-CS-QCBS / Consultancy Service for Fea Component 2: Infrastructure Quality And Cost- Open - Internationa Under Implement sibility Study on Stability Ass IDA / 66210 Post 280,000.00 0.00 2023-03-21 2023-03-17 2023-04-04 2023-05-02 2023-05-18 2023-09-14 2023-06-15 2023-07-15 2023-08-19 2023-09-23 2024-09-22 Improvements Based Selection l ation essment of Senanayake Sam udraya Headworks ( IWWRMP -2/CS/QCBS/6 ) LK-MOMDE-138819-CS-CQS / Development Groundwater M anagement plans for Malwat hoya, Deduru Oya, Kumbukk Component 1: Watershed an Consultant Qualifi an Oya, MathuruOya, Mee Oy IDA / 66190 Post Open - National 140,449.44 0.00 Canceled 2021-08-19 2022-02-07 2021-09-09 2022-07-29 2021-11-06 2022-01-05 2022-02-09 2023-02-09 d Water Resources Planning cation Selection a, Maa Oya, Kelani basin and Jaffna Peninsula (WRB) by co nsidering the real-time data on water quality, quantity, et c.(IWWRMP-1/CS/CQS/3) Page 11 LK-MOMDE-138827-CS-CQS / Consultancy service for desig Component 2: Infrastructure Consultant Qualifi IDA / 66210 Post Open - National 28,089.89 0.00 Canceled 2021-08-13 2022-03-04 2021-09-03 2022-03-24 2021-10-17 2021-11-16 2021-12-21 2022-06-19 n of Bridge at 4+000 km of w Improvements cation Selection alawa RB main canal (IWWR MP-2/CS/CQS/11) LK-MOMDE-118633-CS-QCBS / Consultancy Services for De veloping a suitable Back anal ysis for Victoria dam to study Component 2: Infrastructure Quality And Cost- Open - Internationa IDA / 66210 Post 417,000.00 0.00 Canceled 2023-08-02 2023-10-03 2023-11-16 2023-12-14 2024-01-13 2024-02-17 2024-03-23 2025-03-23 the AAR and its impacts on t Improvements Based Selection l he safety of Victoria dam for FSL and HFL including necess ary testing and surveys and portfolio risk assessment for all the dams LK-MOMDE-240780-CS-CQS / Consultancy service for devel Component 1: Watershed an Consultant Qualifi Pending Impleme opment for integrated design IDA / 66190 Post Open - National 44,943.82 0.00 2024-07-16 2024-08-15 2024-10-12 2024-12-11 2025-01-15 2025-07-14 d Water Resources Planning cation Selection ntation proposal for upper periphary of Polgolla reservoir (IWWRM P-1/CS/CQS/2) LK-MOMDE-367169-CS-LCS / Consultancy service for Desi Component 1: Watershed an Least Cost Selecti Pending Impleme gn and Construction Supervis IDA / 66190 Post Open - National 20,900.00 0.00 2023-11-27 2023-12-18 2024-01-31 2024-02-28 2024-03-29 2024-05-03 2024-06-07 2025-08-31 d Water Resources Planning on ntation ion for establishment of Jaffn a regional office (IWWRMP-1/ CS/LCS/30) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOMDE-113221-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult sessment for Rehabilitation o / Post Limited 9,090.91 9,340.87 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-28 2019-06-07 2019-06-03 2019-06-17 2019-06-08 2019-08-16 Improvements ant Selection f Elahara scheme, Haththota scheme and Arawatta Tank (IWWRMP/PP/CONS/01) LK-MOMDE-113250-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult sessment for Rehabilitation o / Post Limited 12,121.21 3,593.15 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-28 2019-06-07 2019-06-02 2019-06-15 2019-06-15 2019-08-14 Improvements ant Selection f Hali Ela Tank, Akathimuripu Tank, Madiyawa Tank and W aduwala Scheme (IWWRMP/P P/CONS/02) LK-MOMDE-113252-CS-INDV / Consultancy services for Aq Component 2: Infrastructure Individual Consult / Post Limited 6,060.61 0.00 Signed 2019-05-30 2019-05-08 2019-06-02 2019-04-10 2019-06-07 2019-05-24 2019-06-17 2019-06-12 2019-08-16 uatic Survey Improvements ant Selection (IWWRMP/PP/CONS/03) LK-MOMDE-116871-CS-INDV / Consultancy service for Pre paration of Operation manual for river basin planning and Component 2: Infrastructure Individual Consult management, customized to / Post Limited 24,242.42 0.00 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-03 2019-06-07 2019-05-27 2019-06-17 2019-06-11 2019-08-16 Improvements ant Selection the selected river basins (Wa lawa including the Walawa R B preparation of ESMP, Kalaw ewa and Mahalindawewa) (IWWRMP/PP/CONS/06) LK-MOMDE-116883-CS-INDV / Consultancy for Preparation Component 1: Watershed an Individual Consult / Post Limited 12,121.21 8,274.72 Signed 2019-08-01 2019-07-01 2019-08-06 2019-05-03 2019-08-27 2019-07-09 2019-10-01 2019-07-23 2020-03-29 of guideline for Sustainable d Water Resources Planning ant Selection Watershed Management (IW WRMP/PP/CONS/08) LK-MOMDE-116900-CS-INDV Component 4: Project Manag Individual Consult / Short-term assignment for P / Post Limited 3,030.30 0.00 Canceled 2019-05-30 2019-05-08 2019-06-04 2019-06-18 2019-07-09 2020-01-05 ement ant Selection ersonal Assistant (IWWRMP/P P/CONS/17) LK-MOMDE-116901-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult / Post Limited 12,121.21 2,756.51 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-09 2019-06-07 2019-05-27 2019-06-17 2019-06-05 2019-08-16 sesment for Rehabilitation of Improvements ant Selection Muththuiyankaddu irrigation scheme (IWWRMP/PP/CONS/1 8) LK-MOMDE-116906-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult / Post Limited 12,121.21 1,875.18 Signed 2019-05-30 2019-05-08 2019-06-04 2019-04-09 2019-06-09 2019-05-27 2019-06-19 2019-06-09 2019-08-18 sesment for Rehabilitation of Improvements ant Selection Dewahuwa tank & scheme a nd Baththalagoda Anicut & s cheme (IWWRMP/PP/CONS/2 2) LK-MOMDE-116907-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult sessment for Rehabilitation o / Post Limited 21,212.12 9,340.87 Signed 2019-05-30 2019-05-08 2019-06-02 2019-04-09 2019-06-07 2019-04-10 2019-06-17 2019-06-09 2019-08-16 Improvements ant Selection f Huruluwewa irrigation sche me, Karawita Tank & Ambak olawewa Tank (IWWRMP/PP/C ONS/23) LK-MOMDE-116909-CS-INDV / Consultancy services for En vironmental Social Impact As sesment for Rehabilitation of Component 2: Infrastructure Individual Consult / Post Limited 24,242.42 14,236.74 Signed 2019-05-30 2019-05-08 2019-06-04 2019-05-28 2019-06-11 2019-05-28 2019-06-25 2019-06-09 2019-09-23 Vahanery Dam, Panama Tan Improvements ant Selection k, Unnichchai scheme, Naga deepa Tank, Illukuchenal & S enanayake Samudraya Reser voir (IWWRMP/PP/CONS/24) LK-MOMDE-116910-CS-INDV / Consultancy services for En vironmental Social Impact As sesment for Rehabilitation of Component 2: Infrastructure Individual Consult / Post Limited 24,242.42 13,898.79 Signed 2019-05-30 2019-05-08 2019-06-04 2019-04-09 2019-06-11 2019-05-28 2019-06-25 2019-06-05 2019-09-23 Pavatkulam Tank, Muhathank Improvements ant Selection ulam Scheme, Viyadhikulam irrigation scheme, Peramadu Tank & Scheme and Mavilaru Headworks (IWWRMP/PP/CON S/25) Page 12 LK-MOMDE-116911-CS-INDV / Consultancy service for pre Component 2: Infrastructure Individual Consult paration of Livelihood Suppor / Post Limited 18,181.82 0.00 Canceled 2019-07-09 2019-07-14 2019-08-04 2019-09-08 2020-03-06 Improvements ant Selection t Assistance Plan (LSA) - Wal awa (IWWRMP/PP/CONS/26) LK-MOMDE-116912-CS-INDV / Consultancy services for En vironmental Social Impact As Component 2: Infrastructure Individual Consult / Post Limited 9,090.91 3,736.75 Signed 2019-05-30 2019-05-08 2019-06-04 2019-05-15 2019-06-11 2019-05-24 2019-06-25 2019-06-26 2019-08-24 sesment for Rehabilitation of Improvements ant Selection Kothmale Dam & irrigation sc heme (IWWRMP/PP/CONS/27) LK-MOMDE-116914-CS-INDV / Individual Consultancy servi ces to prepare mechanical sp Component 2: Infrastructure Individual Consult ecification, Estimation & Bid / Post Limited 9,090.91 11,032.96 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-23 2019-06-07 2019-05-28 2019-06-17 2019-06-12 2020-06-16 Improvements ant Selection documents for Gantry crane Polgolla, Udawalawe and Gat e Automation for Bowatenna (IWWRMP/PP/CONS/28) LK-MOMDE-116896-CS-INDV / Short-term assignment for P Component 4: Project Manag Individual Consult / Post Limited 3,030.30 0.00 Signed 2019-05-30 2019-05-08 2019-06-02 2019-06-03 2019-06-07 2019-06-03 2019-06-17 2019-06-26 2019-12-14 rocurement Assistant (IWWR ement ant Selection MP/PP/CONS/16) LK-MOMDE-116904-CS-INDV / Consultancy services for En vironmental Social Impact As sesment for Rehabilitation of Component 2: Infrastructure Individual Consult / Post Limited 27,272.27 8,299.72 Signed 2019-05-30 2019-05-08 2019-06-02 2019-05-23 2019-06-07 2019-05-24 2019-06-17 2019-06-11 2019-08-16 Piramanthalaru Kulam irrigati Improvements ant Selection on scheme, Kanagambikaikul am irrigation scheme and Kal madu tank irrigation scheme (IWWRMP/PP/CONS/21) LK-MOMDE-121767-CS-INDV / Individual consultancy servi ces for preparation and revie Component 2: Infrastructure Individual Consult wing the RFP of study & reco / Post Open 60,000.00 0.00 Canceled 2019-07-28 2019-09-15 2019-10-06 2019-11-10 2020-05-08 Improvements ant Selection mmendation for selected MA SL Dams (Rantambe, Victoria , Kothmale) (IWWRMP/PP/CO NS/32) LK-MOMDE-121782-CS-INDV / Consultancy for Preparation Component 2: Infrastructure Individual Consult of guideline for sustainable / Post Limited 12,121.21 0.00 Canceled 2019-09-18 2019-09-23 2019-10-14 2019-11-18 2020-05-16 Improvements ant Selection Dam safety and Hydraulic As sert (IWWRMP/PP/CONS/07) LK-MOMDE-138929-CS-INDV / Consultancy services for Pre Component 2: Infrastructure Individual Consult / Post Limited 8,426.97 0.00 Canceled 2020-05-29 2020-06-03 2020-06-24 2020-07-29 2021-07-29 paration of TOR for River Bas Improvements ant Selection in Management Plan (IWWRM P-2/CS/IC/20) LK-MOMDE-118665-CS-INDV / Training program on Procur Component 4: Project Manag Individual Consult / Post Limited 6,060.61 0.00 Canceled 2020-11-15 2020-11-20 2020-12-11 2021-01-15 2021-01-22 ement (Evaluation of Consult ement ant Selection ancy, Goods and Works) (IW WRMP/PP/CONS/41) LK-MOMDE-162970-CS-INDV / Consultancy service for Pre paration of Environmental So cial Management Framework Component 2: Infrastructure Individual Consult IDA / 66210 Post Limited 11,235.96 3,069.72 Signed 2021-08-13 2021-09-15 2021-08-18 2021-10-04 2021-09-09 2022-04-05 2021-10-14 2022-04-17 2022-01-12 2022-12-28 and Environmental social scr Improvements ant Selection eening report for Rehabilitati on of Wadamunai tank & Lun ugamwehera Reservoir (IWW RMP-2/CS/IND/12) LK-MOMDE-282411-CS-INDV / Consultancy service for Pre Component 2: Infrastructure Individual Consult paration of TOR for Senenaya IDA / 66210 Post Limited 5,500.00 0.00 Signed 2022-04-24 2022-04-25 2022-04-29 2022-07-11 2022-05-20 2022-09-20 2022-06-10 2022-10-21 2022-08-09 Improvements ant Selection ka Samudraya feasibility stu dy (IWWRMP-2/CS/IND/19) LK-MOMDE-282414-CS-INDV / Consultancy service for pre paration of Initial Environme Component 2: Infrastructure Individual Consult IDA / 66210 Post Limited 7,950.00 4,904.12 Signed 2022-04-25 2022-04-25 2022-04-30 2022-05-23 2022-05-21 2022-07-25 2022-06-11 2022-10-01 2022-09-09 nt Examination (IEE) Report Improvements ant Selection for Improvements to Mavilar u Headworks (LB & RB) (IWW RMP-2/CS/IND/20) LK-MOMDE-302749-CS-CDS / Consultancy service for Prep Component 1: Watershed an aration of Implementation Su IDA / 66190 Post Direct Selection Direct - National 564,000.00 0.00 Signed 2022-09-21 2022-11-11 2022-10-19 2022-12-30 2022-12-23 2023-08-02 2024-12-22 d Water Resources Planning pport Upper Mahaweli Water shed Management Plan (IWW RMP-1/CS/DIR/1) LK-MOMDE-116903-CS-INDV / Consultancy services for En vironmental Social Impact As sesment for Rehabilitation of Component 2: Infrastructure Individual Consult / Post Limited 27,272.73 0.00 Canceled 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2020-04-27 Akkarayankulam irrigation sc Improvements ant Selection heme, Kudamuruthy Tank an d Vannerikulam headworks & irrigation scheme (IWWRMP/P P/CONS/20) LK-MOMDE-116902-CS-INDV / Consultancy services for En vironmental Social Impact As sesment for Rehabilitation of Component 2: Infrastructure Individual Consult / Post Limited 24,242.42 0.00 Canceled 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2019-12-29 Periyamadu Tank and Kariyal Improvements ant Selection ai Nagarpaduwan Tank & irri gation scheme and Periyapa ndivirichchan scheme (IWWR MP/PP/CONS/19) LK-MOMDE-318527-CS-INDV / Hiring Individual Consultant Component 2: Infrastructure Individual Consult ( Eng. E.M.S.Bandara - Electr IDA / 66210 Post Direct - National 5,840.00 0.00 Canceled 2022-10-31 2022-12-08 2022-11-10 2022-11-24 2022-12-29 2023-06-27 Improvements ant Selection ical and Mechanical) to estab lish Dam Safety Review Pane l (DSRP) LK-MOMDE-318538-CS-INDV / Hiring Individual Consultant ( Prof. Nimal Seneviratne - Component 2: Infrastructure Individual Consult IDA / 66210 Post Direct - National 5,840.00 0.00 Signed 2022-10-20 2022-12-08 2022-10-30 2023-03-31 2022-11-13 2023-04-03 2022-12-18 2023-04-25 2023-06-16 Engineering Geology / Geote Improvements ant Selection chnical Engineering) to estab lish Dam Safety Review Pane l (DSRP) Page 13 LK-MOMDE-318539-CS-INDV / Hiring Individual Consultant ( Dr.H.A.Dharmagunawardha Component 2: Infrastructure Individual Consult IDA / 66210 Post Direct - National 5,840.00 0.00 Signed 2022-10-20 2022-12-08 2022-10-30 2023-02-13 2022-11-13 2023-03-22 2022-12-18 2023-04-11 2023-06-16 ne - Engineering Geology / G Improvements ant Selection eotechnical Engineering ) to Establish Dam Safety Review Panel (DSRP) LK-MOMDE-318535-CS-INDV / Hiring Individual Consultant Component 2: Infrastructure Individual Consult ( Eng.T.D Wickramarathna - IDA / 66210 Post Direct - National 5,840.00 0.00 Signed 2022-10-25 2022-12-08 2022-11-04 2023-02-13 2022-11-18 2023-03-22 2022-12-23 2023-04-04 2023-06-21 Improvements ant Selection Hydrology ) to establish Da m Safety Review Panel (DSR P) LK-MOMDE-318532-CS-INDV / Hiring Individual Consultant Component 2: Infrastructure Individual Consult ( Eng.Chandani Hema Deven IDA / 66210 Post Direct - National 5,840.00 0.00 Canceled 2022-10-27 2022-12-08 2022-11-06 2022-11-20 2022-12-25 2023-06-23 Improvements ant Selection dra - Dam Design) to Establi sh Dam Safety Review Panel (DSRP) LK-MOMDE-318531-CS-INDV / Hiring Individual Consultant ( Eng.S.W.Ediriweera - Dam Component 2: Infrastructure Individual Consult IDA / 66210 Post Direct - National 5,840.00 0.00 Canceled 2022-10-27 2022-12-08 2022-11-06 2022-11-20 2022-12-25 2023-06-23 Instrumentation and Monitori Improvements ant Selection ng Equipment ) to establish Dam Safety Review Panel (D SRP) LK-MOMDE-318533-CS-INDV / Hiring Individual Consultant (Eng.Badra Kamaladasa - D Component 2: Infrastructure Individual Consult IDA / 66210 Post Direct - National 5,840.00 0.00 Canceled 2022-10-25 2022-12-08 2022-11-04 2022-11-18 2022-12-23 2023-06-21 am Construction, Quality Ass Improvements ant Selection urance and Management) to Establish Dam Safety Review Panel (DSRP) LK-MOMDE-318537-CS-INDV / Hiring Individual Consultant Component 2: Infrastructure Individual Consult ( Prof. K.P.P. Pathirana - D IDA / 66210 Post Direct - National 5,840.00 0.00 Signed 2022-10-24 2022-12-08 2022-11-03 2023-02-13 2022-11-17 2023-03-22 2022-12-22 2023-04-21 2023-06-20 Improvements ant Selection am Design ) to Establish Da m Safety Review Panel (DSR P) LK-MOMDE-184063-CS-INDV Component 4: Project Manag Individual Consult / Short-term assignment for P IDA / 66190 Post Limited 2,500.00 0.00 Canceled 2020-07-15 2020-07-15 2020-07-18 2020-07-15 2020-08-01 2020-09-05 2021-03-04 ement ant Selection ersonal Assistant (IWWRMP/P P/CONS/17) LK-MOMDE-282420-CS-INDV / Consultancy service for Pre pare TOR for the Consultancy Component 2: Infrastructure Individual Consult Open - Internationa Pending Impleme IDA / 66210 Post 11,000.00 0.00 2024-01-26 2024-04-25 2024-05-09 2024-05-30 2024-08-28 Service for the Evaluation an Improvements ant Selection l ntation d Recommendation of Kothm ale, Victoria & Rantambe Res ervoirs (IWWRMP-2/CS/IND/1 8) LK-MOMDE-388372-CS-INDV / Hiring Individual Consultant Component 4: Project Manag Individual Consult Pending Impleme IDA / 66210 Post Limited 12,903.23 0.00 2023-10-23 2023-10-28 2023-11-06 2023-11-27 2024-02-05 to prepare Mid Term Review ement ant Selection ntation (MTR) Report for IWWRMP (I WWRMP-2/CS/IND/32) LK-MOMDE-378558-CS-INDV / Consultancy Service for Bio Component 2: Infrastructure Individual Consult Pending Impleme IDA / 66210 Post Limited 9,500.00 0.00 2023-10-30 2023-11-06 2023-11-20 2023-12-18 2024-03-17 diversity Surveys for selected Improvements ant Selection ntation Tanks (IWWRMP-2/CS/IND/31 ) LK-MOMDE-321293-CS-CDS / Consultancy service for Expa Component 1: Watershed an Direct - Internation Pending Impleme nsion of Vista DSS software p IDA / 66190 Post Direct Selection 695,000.00 0.00 2024-01-22 2024-02-26 2024-05-01 2025-07-25 d Water Resources Planning al ntation ackage and capacity Develop ment ( IWWRMP-1/CS/DIR/29 ) Page 14