The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Strengthening Disaster Risk Management Project (P166302) EUROPE AND CENTRAL ASIA | Romania | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 11 | ARCHIVED on 22-Feb-2023 | ISR55017 | Implementing Agencies: Ministry of Internal Affairs - Department of Emergency Situations and General Inspectorate for Emerg, Romania (through its Ministry of Public Finance) Key Dates Key Project Dates Bank Approval Date: 24-Jul-2018 Effectiveness Date: 20-Dec-2018 Planned Mid Term Review Date: 16-Feb-2022 Actual Mid-Term Review Date: 23-May-2022 Original Closing Date: 31-Dec-2024 Revised Closing Date: 30-Nov-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to enhance the resilience of critical disaster and emergency response infrastructure and to strengthen the Borrower’s institutional capacities in disaster risk reduction and climate change adaptation. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Improving Resilience of Disaster and Emergency Response Infrastructure:(Cost $52.62 M) Enhancing Institutional Capacity for Risk Reduction Investment Planning:(Cost $5.02 M) Project Management:(Cost $2.84 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The Project aims to enhance the resilience of critical disaster and emergency response facilities and to strengthen institutional capacities for investment planning for disaster risk reduction and climate change adaptation. The Project became Effective on 20 December 2018, and implementation of key activities under Components 1 and 2 are underway. Construction works are underway at fire stations in Carei, Mizil, Tecuci, Obor and Calarasi and designs are being prepared for fire stations in Slobozia, Vaslui, Focsani, Pitesti and Botoșani. The Project's objectives remain valid and highly relevant, and the Government continues to support activities to reach the objectives of the Project. 2/22/2023 Page 1 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Moderate Moderate Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Low Low Technical Design of Project or Program Low Low Low Institutional Capacity for Implementation and Moderate Moderate Moderate Sustainability Fiduciary Substantial Moderate Moderate Environment and Social Moderate Moderate Moderate Stakeholders Low Low Low Other -- Low -- Overall Moderate Moderate Moderate Results PDO Indicators by Objectives / Outcomes Enhance the resilience of critical disaster and emergency response facilities IN01252069 ►Number of disaster and emergency response facilities that are upgraded to be resilient (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 25.00 Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252171 ►Number of rescue personnel, emergency and disaster management staff, volunteers and administrative staff with access to disaster resilient buildings (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,000.00 Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252173 ►Number of project beneficiaries in areas covered by resilient emergency and disaster response facilities (Number (Thousand), Custom) Baseline Actual (Previous) Actual (Current) End Target 2/22/2023 Page 2 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Value 0.00 0.00 0.00 3,000.00 Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 Strengthen institutional capacities in investment planning for disaster risk reduction IN01252070 ►Enhanced Ro-Risk assessment supports enhanced risk reduction planning in other ministries (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Procurement of Ro-Risk data is being Procurement of services services for this used by at least two Ro-Risk Assessment for this activity is Value activity is expected to ministries for disaster (2018 version) expected to be launched be launched in early risk management by October 2022. 2024. decision making. Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252172 ►MOIA, through DES and GIES, has strengthened institutional capacity for risk reduction investment planning (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target GIES is systematically GIES has started a collecting data on The final version of the process to collect data The final version of the emergency and damage and loss on vulnerable buildings damage and loss disaster response assessment and has a prioritization assessment methodology assets and their Value methodology is now method for assessing is expected to be potential vulnerability expected to be which buildings should completed by October to disasters, and has completed by the end be strengthened for 28, 2022. developed a plan for of February 2023. greater resilience. future resilience actions. Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 Intermediate Results Indicators by Components C1.Improving resilience of Disaster and Emergency Response Facilities IN01252174 ►Number of technical designs completed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5.00 5.00 35.00 Date 02-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252177 ►Number of newly constructed emergency and response buildings with resilient structures and systems (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 2/22/2023 Page 3 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252180 ►Number of emergency and response buildings retrofitted to improve structural resilience (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 15.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252181 ►Number of communities reached out to via informative meetings and trainings (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252182 ►Number of direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,000.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252183 Female Project Beneficiaries (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 200.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 C2. Enhancing Institutional Capacity for Risk Reduction Investment Planning IN01252175 ►Number of reports on the impacts of disasters and climate change in Romania (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2023 IN01252178 ►Public Awareness Campaigns (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 26.00 26.00 10.00 2/22/2023 Page 4 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Date 01-Jul-2019 31-Aug-2022 17-Feb-2023 31-Dec-2024 C3. Project Management IN01252176 ►Institutional capacity in engineering, procurement and contract management is in place (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 IN01252179 ►Percentage of grievances responded to in the stipulated time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 100.00 100.00 100.00 Date 01-Jul-2018 31-Aug-2022 17-Feb-2023 31-Dec-2024 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P166302 IBRD-88920 Effective USD 60.48 60.48 0.00 8.99 50.18 15% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P166302 IBRD-88920 Effective 24-Jul-2018 01-Aug-2018 20-Dec-2018 31-Dec-2024 30-Nov-2025 Cumulative Disbursements 2/22/2023 Page 5 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Restructuring History Level 2 Approved on 05-Dec-2022 ,Level 2 Approved on 11-Jan-2023 Related Project(s) P180531-Additional Financing - Romania Strengthening Disaster Risk Management Project 2/22/2023 Page 6 of 6