PROCUREMENT PLAN (Project Preparation Advance- PPA) Project information: Ghana, Africa Higher Education Centers of Excellence for Development Impact Project (ACE Impact) P164546 Project Implementation agency: Association of African University (AAU) Date of the Procurement Plan: September 7, 2018 Period covered by this Procurement Plan: October 2018- June 2019 (PPA Period) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: As AAU does not follow Ghana PPDA, when approaching the national market (as specified in the Procurement Plan tables in STEP), Bank’s Procurement Regulations will be followed. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). 1 Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None Recommendations from the Procurement Assessment of AAU (Finalized in June 2018) As part of the preparation of the Project Preparation Advance (PPA), the following recommendations were made as a result of the procurement assessment of AAU, carried out by the World Bank: a. Recruit external consultant/staff who is proficient with much experience - in World Bank procurement rules and procedures, general procurement, donor funded procurement to prosecute all procurement at AAU as well as quality assure and support the procurement at the identified Centers of Excellences; b. Use World Bank standard procurement documents found on the website- www.worldbank.org/procurement for all procurements with the appropriate modification acceptable by the World Bank; c. Prepare a simple Procurement Manual (or a part of a Public Investment Management- PIM) in line with the World Bank Procurement Regulation to guide procurement implementation; d. The Project should immediately prepare the Project Procurement Strategy Document PPSD- with support of the World Bank and prepare a procurement plan covering at least the first 18 months of the project life- to be immediately submitted to the Bank for review and clearance. e. The Procurement Specialist should attend the World Bank monthly procurement clinic, while building the capacity of the entire organization on World Bank procurement procedures. 2 Thresholds for Prior Review, Procurement Approaches and Methods – Good, Works, Non-Consulting Prior ReviewThreshold in (US$'000) ProcurementMethods Thresholds (inUS$'000) Goods, IT and non-consulting Shortlist of National Consultants Works services Consultants SingleSource Engineering Goods, IT Request for Request for &D irect Open Open Open Open & Systems+ Quotation/ Quotation/ Consulting RISK RATING Works Firms Individuals Contract Internationa National or Internationa National or constructio Non Con. National National services l or ICB N CB l or ICB N CB n Serv Shopping Shopping supervision HIGH ≥$5,000 ≥$1,500 ≥$500 ≥$200 ≥$50 ≥15000 <15000 ≤200 ≥3000 <3000 ≤100 <300 ≤500 Services and Consulting Services Post Review: All contracts not subject to prior review shall be subject to post review. I. Summary of the procurement packages for Good, Works and Non-Consulting Services Sr. Contract Estimat Revie Market Selectio Evaluation Procurem Prequ Domesti Expecte Expecte No Description ed Cost w by Approach n Options ent alifica c d date d date (US$) Bank (Open- Method(Most Process tion Prefere of bid/ of (Prior National/ (RFP, Advantage (Single (Yes/ nce proposa Contrac / Limited RFB, ous Bid, stage- No) (Yes/No l t Post) etc.) BAFO, RFQ, DS single ) opening Signatu etc.) Rated envelope re Criteria etc.) etc.) NON-CONSULTING SERVICES 1 Translation 6,000 Post Open- RFQ Most Single No No 10/15/20 10/29/20 services during Internation advantageo stage- 18 18 selection of ACEs al us bid single (PSC meeting) envelope 2 Translation 12,000 Post Open- RFQ Most Single No No 1/7/2019 1/21/201 Services Internation advantageo stage- 9 BootCamp/ al us bid single Project Launch envelope Workshop Total Non- Consulting 18,000 Services 3 II. Threshold Prior Review, Selection Approaches and Methods – Consulting Services - Refer to threshold table above. Note: Consultancy services estimated to cost equivalent to US $ 300,000 and above per contract shall be advertised in the United Nations Development Business (UNDB) online in addition to advertising in national newspaper(s) of wide circulation and/or regional newspaper. Summary of the procurement packages for Consulting Services: Sr. Contract Description Estimat Revie Market Selection Shortlist Expected Expected No ed Cost w by Approach Method ing date of date of (US$) Bank (Open - (QCBS, (Yes/ No) bid/ Contract (Prior/ Internation FBS, LCBS, proposal Signature Post) al/ QBS, CQS, opening National/ DS etc.) etc.) 1 Recruiting ACE Impact Project Open 72,000 Prior INDV Yes 10/15/2018 11/9/2018 Manager International 2 Recruiting ACE Impact M&E Open 18,000 Prior INDV No 10/15/2018 11/04/2018 Officer International 3 Technical assistance towards proposal improvements and Open capacity building before and at 250,000 Prior INDV No International 10/15//2018 11/12/2018 the Boot Camp by several experts (~30 experts). 4 Technical assistance for Open 15,000 Post FIRM/CQS No 4/6/2019 4/20/2018 graduate tracer studies International 5 Recruiting Procurement Open 15,000 Prior INDV No 10/15/2018 10/29/2018 Specialist International 6 Recruiting Safeguards Open 30,000 Prior INDV No 10/9/2018 10/23/2018 Specialist International Total Consultancy Services 400,00 0 4 PROCUREMENT Western and Central Africa : First Africa Higher Education Centers of Excellence for Development Impact Project PLAN General Information Country: Western and Central Africa 2018-10-16 Bank’s Approval Date of the Original Procurement Plan: 2023-09-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164546 GPN Date: 2020-07-27 Project Name: First Africa Higher Education Centers of Excellence for Development Impact Project Loan / Credit No: IDA / 63880, / , IDA / V2380, IDA / D4430, IDA / D4290 ASSOCIATION OF AFRICAN UNIVERSITIES Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-AAU-96092-GO-RFQ / Pur Enhancing National and Regi Request for Quota Single Stage - One E chase of equipment for key p IDA / V2380 onal Level Project Facilitatio Post Open - National 10,000.00 24,225.45 Completed 2019-01-31 2020-07-22 2019-02-24 2020-08-15 2019-03-06 2021-08-16 tions nvelope roject officers (8 computers a n, and Monitoring and Evalu nd a camera) ation GH-AAU-96095-GO-RFQ / Off Enhancing National and Regi ice furniture and equipment f onal Level Project Facilitatio Request for Quota Single Stage - One E IDA / V2380 Post Open - National 3,000.00 865.84 Completed 2019-01-31 2019-02-24 2019-08-21 2019-03-06 2019-10-05 or Project manager (chair, de n, and Monitoring and Evalu tions nvelope sk and cabinet, scanner, prin ation ter) Enhancing National and Regi GH-AAU-163181-GO-RFQ / P Request for Quota Single Stage - One E IDA / D4430 onal Level Project Facilitatio Post Open - National 38,000.00 37,050.00 Completed 2020-03-17 2020-04-06 2020-04-28 2020-05-02 2020-10-25 2020-05-10 urchase of official vehicle tions nvelope n, and Monitoring and Evalu ation GH-AAU-163182-GO-RFQ / P Enhancing National and Regi Request for Quota Single Stage - One E urchase if official vehicle min IDA / D4430 onal Level Project Facilitatio Post Open - National 32,000.00 31,650.00 Completed 2020-03-17 2020-04-06 2020-04-24 2020-05-02 2020-10-21 2020-05-10 tions nvelope ibus for transport of staff and n, and Monitoring and Evalu equipment ation GH-AAU-163183-GO-RFQ / P Enhancing National and Regi urchase of video conferencin onal Level Project Facilitatio Request for Quota Single Stage - One E IDA / D4430 Post Open - National 30,000.00 32,578.87 Completed 2020-03-15 2020-04-30 2020-04-27 2020-07-01 2020-10-24 2021-08-16 g Equipment for the ACE Reg n, and Monitoring and Evalu tions nvelope ional Facilitation Unit (AAU S ation ecretariat) GH-AAU-193339-GO-RFQ / Pr Enhancing National and Regi eparation and printing of co onal Level Project Facilitatio Request for Quota Single Stage - One E IDA / D4290 Post Limited 30,000.00 0.00 Canceled 2020-10-06 2020-12-01 2021-05-30 mmunication materials for th n, and Monitoring and Evalu tions nvelope e ACE Impact Project ation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-AAU-81618-NC-RFQ / Tra Enhancing National and Regi Request for Quota Single Stage - One E nslation services during selec IDA / 63880 onal Level Project Facilitatio Post Limited 6,000.00 6,743.85 Completed 2018-10-20 2018-04-04 2018-11-20 2018-04-28 2018-12-04 2018-05-16 tions nvelope tion of ACEs (PSC meeting) n, and Monitoring and Evalu ation GH-AAU-81622-NC-RFQ / Tra Enhancing National and Regi Request for Quota nslation Services BootCamp/ IDA / 63880 onal Level Project Facilitatio Post 12,000.00 48,000.00 Completed 2020-07-27 2020-09-14 2020-02-15 2020-11-13 2020-03-11 tions Project Launch Workshop n, and Monitoring and Evalu ation GH-AAU-193338-NC-RFQ / A Enhancing National and Regi Request for Quota Single Stage - One E CE Impact Documents Transl IDA / D4290 onal Level Project Facilitatio Post Limited 50,000.00 0.00 Canceled 2020-10-02 2020-11-13 2021-05-12 tions nvelope ation n, and Monitoring and Evalu ation GH-AAU-193340-NC-RFQ / D Enhancing National and Regi evelopment and deployment onal Level Project Facilitatio Request for Quota Single Stage - One E IDA / D4290 Post Limited 10,000.00 0.00 Canceled 2020-10-06 2020-12-01 2021-05-30 of Workshop Support Platfor n, and Monitoring and Evalu tions nvelope ms and Workshop App ation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-AAU-81634-CS-CQS / Tec Enhancing National and Regi Consultant Qualifi Open - Internationa hnical assistance for graduat / onal Level Project Facilitatio Post 15,000.00 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-18 2019-02-22 2019-08-21 cation Selection l e tracer studies n, and Monitoring and Evalu ation Enhancing National and Regi GH-AAU-95506-CS-LCS / Aud Least Cost Selecti IDA / V2380 onal Level Project Facilitatio Post Open - National 10,000.00 0.00 Canceled 2019-02-28 2019-03-21 2019-04-02 2019-05-02 2019-05-12 2019-05-26 2019-06-07 2019-07-07 iting services on n, and Monitoring and Evalu ation Enhancing National and Regi GH-AAU-302219-CS-QCBS / Least Cost Selecti IDA / D4290 onal Level Project Facilitatio Post Open - National 10,000.00 0.00 Canceled 2022-06-30 2022-06-30 2022-07-07 2022-07-21 2022-08-04 2022-08-11 2022-08-25 2022-09-15 2023-03-14 External Auditor for the AAU on n, and Monitoring and Evalu ation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-AAU-81624-CS-INDV / Re Enhancing National and Regi Individual Consult cruiting ACE Impact Project IDA / 63880 onal Level Project Facilitatio Prior Open 72,000.00 312,000.00 Signed 2018-10-15 2019-01-08 2018-11-24 2019-06-10 2018-12-15 2019-07-17 2019-01-19 2019-07-21 2024-01-18 ant Selection Manager n, and Monitoring and Evalu ation Page 1 GH-AAU-81630-CS-INDV / Te Enhancing National and Regi chnical assistance towards pr onal Level Project Facilitatio Individual Consult oposal improvements and ca IDA / 63880 Post Open 250,000.00 0.00 Canceled 2018-10-11 2018-11-01 2018-11-29 2018-12-20 2019-01-24 2019-07-23 n, and Monitoring and Evalu ant Selection pacity building before and at ation the Boot Camp by several ex perts (~30 experts). GH-AAU-81648-CS-INDV / Re Enhancing National and Regi Individual Consult cruiting Procurement Speciali IDA / V2380 onal Level Project Facilitatio Prior Open 15,000.00 84,000.00 Signed 2019-01-25 2019-09-26 2019-03-15 2020-05-01 2019-03-18 2020-05-29 2019-03-26 2020-06-27 2021-03-25 ant Selection st n, and Monitoring and Evalu ation GH-AAU-95505-CS-CDS / Bibl Enhancing National and Regi iometric verification and Disb IDA / V2380 onal Level Project Facilitatio Prior Direct Selection Direct 120,000.00 293,980.00 Signed 2019-01-31 2019-08-26 2019-02-10 2019-10-11 2019-03-17 2019-12-15 2020-03-11 ursement Link Indicator Valid n, and Monitoring and Evalu ation ation GH-AAU-142838-CS-CDS / D Enhancing National and Regi evelopment of Monitoring, Ev IDA / D4430 onal Level Project Facilitatio Post Direct Selection Direct 80,000.00 97,200.00 Signed 2019-10-25 2019-11-19 2019-11-08 2019-12-11 2019-11-28 2020-01-12 2020-05-26 aluation and Learning digital n, and Monitoring and Evalu platform ation GH-AAU-81627-CS-INDV / Re Enhancing National and Regi Individual Consult cruiting ACE Impact M&E Offi IDA / D4290 onal Level Project Facilitatio Prior Open 46,000.00 0.00 Under Review 2019-11-04 2019-11-12 2019-11-24 2019-12-06 2020-01-10 2020-07-08 ant Selection cer n, and Monitoring and Evalu ation GH-AAU-81649-CS-INDV / Re Enhancing National and Regi Individual Consult cruiting Safeguards Specialis IDA / D4290 onal Level Project Facilitatio Prior Open 30,000.00 0.00 Canceled 2019-11-04 2020-04-28 2019-12-01 2020-10-09 2019-12-08 2019-12-29 2020-06-26 ant Selection t n, and Monitoring and Evalu ation GH-AAU-142842-CS-INDV / R Enhancing National and Regi Individual Consult ecruiting sexual harassment IDA / D4430 onal Level Project Facilitatio Prior Open 25,000.00 11,500.00 Completed 2019-11-07 2019-12-16 2019-12-04 2020-01-30 2019-12-16 2020-10-12 2020-01-18 2020-01-30 2020-07-16 2021-01-07 ant Selection policy expert - Anglophone n, and Monitoring and Evalu ation GH-AAU-144807-CS-INDV / R Enhancing National and Regi Individual Consult ecruiting sexual harassment IDA / D4430 onal Level Project Facilitatio Prior Open 25,000.00 3,000.00 Completed 2019-11-08 2019-12-16 2019-12-27 2021-09-26 2020-01-17 2021-10-05 2020-02-21 2021-11-03 2020-08-19 2021-12-07 ant Selection policy expert - Francophone n, and Monitoring and Evalu ation GH-AAU-163184-CS-INDV / R Enhancing National and Regi Individual Consult ecruitment of Sexual Harass IDA / D4430 onal Level Project Facilitatio Prior Open 25,000.00 0.00 Canceled 2020-03-06 2020-03-21 2020-03-26 2020-04-03 2022-03-24 ant Selection ment Expert n, and Monitoring and Evalu ation GH-AAU-181838-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 18,000.00 40,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-10-20 2021-02-28 Expert Alhassan Ndiaye for 3 n, and Monitoring and Evalu Impact Centers (TReCK, CELT ation and CoE_Djibouti) GH-AAU-182071-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 10,000.00 15,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-02 2021-02-28 Expert Benjamin Tchoffo fo n, and Monitoring and Evalu r 1 Impact Center (CEFOGRIS ation ) GH-AAU-182073-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Chux Daniels for 3 Im IDA / D4290 Post Direct Selection Direct 18,000.00 23,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-08 2021-02-28 n, and Monitoring and Evalu pact Centers (RWESCK, STEE ation and CoE_Knust/ KEEP) GH-AAU-182074-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 14,000.00 18,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-03 2021-02-28 Expert Cyrille van Effeterre f n, and Monitoring and Evalu or 2 Impact Centers (CERPP a ation nd CCBAD) GH-AAU-182075-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Dimitris Noukakis for IDA / D4290 Post Direct Selection Direct 18,000.00 20,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-02 2021-02-28 n, and Monitoring and Evalu 3 Impact Centers (ACETEL, A ation CENPEE and ACEITSE) GH-AAU-182076-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 10,000.00 10,000.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-06 2021-02-28 2021-10-31 Expert George Ekosse for 1 I n, and Monitoring and Evalu mpact Center CEMS ation GH-AAU-182078-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 18,000.00 20,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-20 2021-02-28 Expert Gikiri Thuo for 3 Impa n, and Monitoring and Evalu ct Centers (OAU-OAK, CEFOR ation and CAPiC) GH-AAU-182079-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 14,000.00 28,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-10-31 2021-02-28 Expert Janis Tupesis for 2 Im n, and Monitoring and Evalu pact Centers ( ACEMFS and A ation CEDHARS) GH-AAU-182080-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 14,000.00 0.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-08-02 2021-02-28 2020-08-02 Expert Jerome Chennal for 2 I n, and Monitoring and Evalu mpact Centers (CERME and ation DOUNEDON) GH-AAU-182081-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 18,000.00 25,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-08 2021-02-28 Expert Joseph Mutale for 3 Im n, and Monitoring and Evalu pact Centers (RCEES, ACE_SP ation ED and ACE-FUELS) GH-AAU-182082-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 14,000.00 20,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-05 2021-02-28 Expert Luis Mira Silva for 2 I n, and Monitoring and Evalu mpact Centers (WACCI and C ation EFTER) GH-AAU-182083-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 10,000.00 0.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-10-18 2021-02-28 2020-11-02 Expert Madiodio Niasse for 1 n, and Monitoring and Evalu Impact Center (ACECoR) ation GH-AAU-182084-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Mamadou Diallo for IDA / D4290 Post Direct Selection Direct 22,000.00 0.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-02 2021-02-28 2020-11-02 n, and Monitoring and Evalu 4 Impact Centers (CEA-2iE, C ation EA-MEM, C2EA and WACWI SA) GH-AAU-182086-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 14,000.00 17,000.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-07-23 2021-02-28 Expert Nasser Ennih for 2 Im n, and Monitoring and Evalu pact Centers (VALOPRO and ation CEA-AGIR) Page 2 GH-AAU-182088-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Olivier Vandenburg IDA / D4290 Post Direct Selection Direct 18,000.00 0.00 Completed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-02 2021-02-28 2020-11-02 n, and Monitoring and Evalu for 3 Impact Centers (ACEGID ation , CFOREM and CEA-ITECH_MT V) GH-AAU-182089-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 10,000.00 15,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-23 2021-02-28 Expert Oomandra Nath Var n, and Monitoring and Evalu ma for 1 Impact Center (CEA/ ation IEA-MS4SSA) GH-AAU-182091-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Raphael Wahone for IDA / D4290 Post Direct Selection Direct 14,000.00 14,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-07-12 2021-02-28 n, and Monitoring and Evalu 2 Impact Centers (CERSA and ation CDA/ DRYLAND AGRIC) GH-AAU-182092-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 10,000.00 15,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-14 2021-02-28 Expert Sokona Dagnoko for 1 n, and Monitoring and Evalu Impact Center (CEA-AGRISAN ation ) GH-AAU-182093-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Solomon Agbor for 3 I IDA / D4290 Post Direct Selection Direct 18,000.00 25,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-10-12 2021-02-28 n, and Monitoring and Evalu mpact Centers (CERHI, CEA-S ation AMEF and ACE-PUTOR) GH-AAU-182094-CS-CDS / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Expert Xavier Michel for 6 I IDA / D4290 Post Direct Selection Direct 30,000.00 30,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-11-21 2021-02-28 n, and Monitoring and Evalu mpact Centers (ACE-SMIA, E ation NSEA, CEA-MITIC, EMIG, CoE_ Benin and CoE_2iE) GH-AAU-182137-CS-CDS / R ecruitment of Subject Matter Enhancing National and Regi Expert Michelle Niescierenko onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 26,000.00 31,000.00 Signed 2020-06-26 2020-06-29 2020-06-28 2020-07-07 2020-07-15 2020-10-28 2021-02-28 for 5 Impact Centers (WACCB n, and Monitoring and Evalu IP_NCDS, ACENTDFB, WAG ation MC, ACE-PCMT and ACEPHA P) GH-AAU-196981-CS-INDV / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Individual Consult IDA / D4290 Post Direct 10,500.00 20,000.00 Signed 2020-09-29 2020-10-01 2020-10-01 2020-10-21 2020-10-08 2020-10-22 2020-11-12 2020-10-25 2021-02-28 Expert Fadel KEBE for 1Impa n, and Monitoring and Evalu ant Selection ct Center (CERME Togo) ation GH-AAU-196988-CS-INDV / R Enhancing National and Regi ecruitment of Subject Matter onal Level Project Facilitatio Individual Consult Expert Aminata GARBA for 2 IDA / D4290 Post Direct 15,000.00 5,000.00 Signed 2020-09-29 2020-10-01 2020-10-01 2020-10-21 2020-10-08 2020-10-22 2020-11-12 2020-11-12 2021-02-28 n, and Monitoring and Evalu ant Selection Impact Centers ( ACE-SMIA B ation enin and CEA-MITIC Senega l) GH-AAU-229147-CS-CDS / E ngagement of Subject Matter Enhancing National and Regi Expert Dr. Jean-Pierre VANDE onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 5,000.00 8,000.00 Signed 2021-04-13 2021-05-04 2021-04-23 2021-05-12 2021-06-11 2021-07-21 2022-02-28 RVAERE for 2 ACE Impact Ce n, and Monitoring and Evalu ntres (C2EA Abomey Calavi B ation enin and CoE 2iE Burkina Fas o) GH-AAU-229149-CS-CDS / E Enhancing National and Regi ngagement of Subject Matter onal Level Project Facilitatio Expert Dr. Majaliwa Jackson- IDA / D4290 Post Direct Selection Direct 5,000.00 8,000.00 Signed 2021-04-13 2021-05-04 2021-04-23 2021-05-12 2021-06-11 2021-05-25 2022-02-28 n, and Monitoring and Evalu Gilbert for 2 ACE Impact Cent ation ers (RWESCK + WACWISA Gh ana) GH-AAU-229151-CS-CDS / E Enhancing National and Regi ngagement of Subject Matter onal Level Project Facilitatio IDA / D4290 Post Direct Selection Direct 5,000.00 8,000.00 Signed 2021-04-13 2021-05-04 2021-04-23 2021-05-12 2021-06-11 2021-05-25 2022-02-28 Expert Dr. Matthias Wolff for n, and Monitoring and Evalu ACE Impact Centre ACECoR ation Ghana GH-AAU-257342-CS-INDV / D Enhancing National and Regi Individual Consult LI 4.3 Verification Consultanc IDA / D4290 onal Level Project Facilitatio Post Direct 30,000.00 30,000.00 Signed 2021-10-10 2021-10-11 2021-10-18 2021-10-22 2021-10-21 2021-10-22 2021-11-02 2021-11-01 2022-10-31 ant Selection y n, and Monitoring and Evalu ation GH-AAU-333426-CS-INDV / V Enhancing National and Regi Individual Consult Open - Internationa erification Consultancy Assig IDA / D4290 onal Level Project Facilitatio Post 20,000.00 0.00 Signed 2022-12-27 2023-01-13 2023-01-15 2023-03-15 2023-01-22 2023-03-20 2023-02-12 2023-04-04 2023-08-11 ant Selection l nment - DLI 7.6 n, and Monitoring and Evalu ation GH-AAU-381666-CS-CDS / In Enhancing National and Regi Pending Impleme dependent Verification Consu IDA / D4290 onal Level Project Facilitatio Post Direct Selection Direct - National 5,000.00 0.00 2023-09-12 2023-09-18 2023-09-29 2024-03-27 ntation ltancy DLI 7.6 - Abednego C n, and Monitoring and Evalu ORLETEY ation Page 3