Kosovo Competitiveness and Export Readiness Project (P152881) Expenditur Contract Value Procurement Bank Prior Review e Category (USD) Method Civil Works >= 5,000,000 ICB All >/=US$5 million contracts < 5,000,000 NCB <200,000 Shopping NA DC All Goods >= 1,000,000 ICB All >/=US$1,500,000 contracts <1,000,000 NCB <100,000 Shopping NA DC US$50,000 Consultant NA QCBS, QBS, FBS, LCS >/= USD 500,000 for Services and CQS* firms ; >=US$200,000 for IC and >/=all SSS NA SSS NA IC Notes: ICB – International Competitive Bidding NCB – National Competitive Bidding DC – Direct Contracting QCBS – Quality and Cost Based Selection QBS – Quality Based Selection FBS – Fixed Budget Selection LCS – Least Cost Selection *CQS – Selection Based on Consultants’ Qualification below $300,000 depending on the nature of assignment SSS – Single (or Sole) Source Selection IC – Individual Consultant selection procedure NA – Not Applicable PROCUREMENT Kosovo : KOSOVO: COMPETITIVENESS AND EXPORT READINESS PROJECT PLAN General Information Country: Kosovo 2018-06-18 Bank’s Approval Date of the Original Procurement Plan: 2023-09-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152881 GPN Date: 2018-06-11 Project Name: KOSOVO: COMPETITIVENESS AND EXPORT READINESS PROJECT Loan / Credit No: IDA / 60350 Ministry of Trade and Industry Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MTI-1-11-G-SH / IT Equipmen Component 1: Enhancing Bu Request for Quota Single Stage - One E t for PIU Staff and ministry st IDA / 60350 siness Environment and Exp Post Limited 5,597.45 Completed 2018-06-16 2018-06-19 2018-07-06 2018-07-07 2018-08-05 2018-07-25 tions nvelope aff ort Readiness Component 1: Enhancing Bu Request for Quota Single Stage - One E MTI-1-1-10-1-SH / vehicles IDA / 60350 siness Environment and Exp Post Limited 67,120.71 Signed 2019-02-11 2019-02-14 2019-03-04 2019-03-26 2019-06-02 tions nvelope ort Readiness Component 1: Enhancing Bu MTI-1-1-6-ICB / Laboratory a Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Prior Request for Bids 0.00 Canceled 2019-09-03 2019-09-08 2019-10-08 2019-10-28 2019-11-11 2020-02-11 cclimatization system l nvelope ort Readiness Component 1: Enhancing Bu MTI-1-1-7-ICB / Mechanical l Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Post Request for Bids 0.00 Canceled 2019-05-20 2019-05-25 2019-06-24 2019-07-19 2020-06-01 2020-09-01 aboratories equipment l nvelope ort Readiness Component 1: Enhancing Bu MTI-1-1-8-ICB / Electrical lab Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Post Request for Bids 0.00 Canceled 2020-05-06 2020-05-11 2020-06-10 2020-07-05 2020-07-20 2020-09-29 oratories equipment l nvelope ort Readiness Component 1: Enhancing Bu MTI-1-1-9-ICB / Legal metrol Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Post Request for Bids 0.00 Canceled 2020-03-03 2020-03-08 2020-04-07 2020-05-07 2020-06-19 2020-09-21 ogy equipment l nvelope ort Readiness Component 1: Enhancing Bu MTI-1-3-4-ICB / Equipping an Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Prior Request for Bids 0.00 Canceled 2020-03-02 2020-03-07 2020-04-06 2020-05-03 2020-06-07 2022-10-03 d modernizing inspections l nvelope ort Readiness MTI-1-3-2-ICB / E-inspector s Component 1: Enhancing Bu ystem for all inspections and Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Post Request for Bids 0.00 Canceled 2022-01-06 2022-01-11 2022-02-10 2022-03-12 2022-03-27 2022-07-25 upgrade to inspection data m l nvelope ort Readiness anagement and data mining software MTI-1-3-3-ICB / Inspection in teroperability system and up Component 1: Enhancing Bu grading inspection- related d Open - Internationa Single Stage - One E IDA / 60350 siness Environment and Exp Post Request for Bids 0.00 Canceled 2022-02-02 2022-02-07 2022-03-09 2022-04-02 2022-05-03 2022-08-31 atabases in relevant ministri l nvelope ort Readiness es and agencies (data excha nge for risk-based inspection s) MTI-2.1.1.12-G-SH / IT equip Component 2: Project Imple Request for Quota Single Stage - One E Under Imple IDA / 60350 Post Limited 0.00 2021-10-04 2018-07-02 2021-10-20 2023-04-03 ment for PIU staff mentation and Coordination tions nvelope mentation Support NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Enhancing Bu MTI-1-1-2-CQS / Public Awar Consultant Qualifi IDA / 60350 siness Environment and Exp Post Open - National 0.00 Canceled 2020-10-03 2020-10-24 2020-11-17 2020-11-27 2021-01-01 2021-06-30 eness campaign cation Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-4-CQS / NQI Consult Consultant Qualifi IDA / 60350 siness Environment and Exp Post Open - National 0.00 Canceled 2019-10-23 2019-11-13 2019-12-12 2020-01-01 2020-02-05 2020-12-31 ants cation Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-3-CQS / Institutional Consultant Qualifi IDA / 60350 siness Environment and Exp Post Open - National 0.00 Canceled 2019-10-03 2019-10-24 2019-11-17 2019-11-27 2020-01-01 2020-12-31 development consultants. cation Selection ort Readiness MTI-1-1-5-3-CQ / Consultanc Component 1: Enhancing Bu Consultant Qualifi y( Detailed design for Labora IDA / 60350 siness Environment and Exp Post Open - National 55,334.87 Signed 2018-10-10 2019-01-16 2018-10-24 2018-11-05 2019-04-15 2018-11-07 2019-05-07 2018-11-14 2019-05-14 2019-01-13 cation Selection tory acclimatization system) ort Readiness MTI-1-1-CS-QCBS / Support f Component 1: Enhancing Bu Quality And Cost- Open - Internationa or the procurement , accepta IDA / 60350 siness Environment and Exp Prior 0.00 Canceled 2019-06-28 2019-06-20 2019-07-19 2019-09-25 2019-08-17 2019-09-14 2019-09-29 2019-10-06 2019-10-31 2022-09-30 Based Selection l nce and usage of metrology ort Readiness equipment MTI-1-3-1-CQS / Due diligenc e of all inspections, IT, staffin Component 1: Enhancing Bu g, hardware, software, datab Consultant Qualifi IDA / 60350 siness Environment and Exp Post Open - National 0.00 Canceled 2019-11-05 2020-02-20 2019-11-26 2019-12-16 2019-12-26 2020-01-12 2020-07-01 ases for E-inspector and pre cation Selection ort Readiness paring draft Technical specifi cations for E-inspector syste m Page 1 MTI-1-1-1-CS-QCBS / Support Component 1: Enhancing Bu Quality And Cost- Open - Internationa for the procurement, accepta IDA / 60350 siness Environment and Exp Prior 0.00 Canceled 2019-12-16 2019-12-19 2020-01-06 2019-12-23 2020-02-15 2020-03-14 2020-03-28 2020-04-21 2020-05-22 2021-05-22 Based Selection l nce and usage of metrology ort Readiness equipment MTI -1-3-1- CQS / Request fo r:Due diligence of all inspecti Component 1: Enhancing Bu ons, IT, staffing, hardware, so Consultant Qualifi Open - Internationa IDA / 60350 siness Environment and Exp Post 96,391.13 Signed 2020-07-09 2020-07-16 2020-07-24 2020-07-20 2020-08-13 2020-09-25 2020-08-18 2020-10-08 2020-09-02 2020-10-20 2021-04-02 ftware, databases for E-inspe cation Selection l ort Readiness ctor and preparing draft Tech nical specifications for E-insp ector system MTI-1-2-12-CS-CQS / IMPLEM Component 1: Enhancing Bu Consultant Qualifi Open - Internationa ENTING MATCHING GRANTS IDA / 60350 siness Environment and Exp Post 291,285.23 Signed 2020-10-09 2020-10-13 2020-10-30 2020-10-15 2020-12-13 2021-01-26 2021-01-12 2021-04-26 2021-02-16 2021-05-07 2022-10-30 cation Selection l PROGRAM ort Readiness MTI-1-3-2-CS-CQS / Consulta Component 1: Enhancing Bu Consultant Qualifi Open - Internationa ncy for implementation of la IDA / 60350 siness Environment and Exp Post 0.00 Canceled 2021-09-03 2021-09-04 2021-10-04 2021-10-09 2021-10-20 2022-10-20 cation Selection l w and strengthen capacities ort Readiness of inspectorates MTI-1-3-B-CQS / Reforming B Component 1: Enhancing Bu usiness Inspection System - a Consultant Qualifi Pending Impleme IDA / 60350 siness Environment and Exp Post Open - National 0.00 2023-07-07 2023-07-17 2023-07-19 2023-07-20 2023-09-15 2023-10-20 Business Inspection Interoper cation Selection ntation ort Readiness ability data exchange system MT/ CQS /2-1-A / Consulting Component 2: Project Imple Quality Based Sel Pending Impleme Creative Firm for Grant Resul IDA / 60350 mentation and Coordination Post Open - National 0.00 2023-09-15 2023-09-20 2023-09-22 2023-09-23 2023-09-24 2023-09-25 2023-09-27 2023-10-20 ection ntation t – Photography and Video Support INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MTI-2-1-CS-IND / Project Coo Component 2: Project Imple Individual Consult IDA / 60350 Post Open 89,538.75 Signed 2018-07-31 2018-08-14 2018-09-18 2018-05-15 2018-10-09 2018-06-15 2018-11-13 2018-07-21 2022-10-30 rdinator- PCU mentation and Coordination ant Selection Support MTI-2-2-CS-IND / Financial of Component 2: Project Imple Individual Consult IDA / 60350 Post Open 58,069.44 Signed 2018-07-31 2018-08-14 2018-09-18 2018-05-31 2018-10-09 2018-08-01 2018-11-13 2018-07-07 2022-10-30 ficer-PCU mentation and Coordination ant Selection Support MTI-2-3-CS-IND / Procureme Component 2: Project Imple Individual Consult IDA / 60350 Post Open 67,310.40 Completed 2018-07-31 2018-08-14 2018-09-18 2018-03-21 2018-10-09 2018-05-03 2018-11-13 2018-05-09 2022-10-30 2022-11-09 nt officer-PCU mentation and Coordination ant Selection Support MTI-2-4-CS-IND / Matching G Component 2: Project Imple Individual Consult IDA / 60350 Post Open 34,781.49 Terminated 2018-08-01 2018-08-09 2018-08-17 2019-01-15 2018-08-22 2019-01-14 2018-09-25 2019-01-22 2021-08-31 rants program Manager mentation and Coordination ant Selection Support MTI-2-5-CS-IND / Monitoring Component 2: Project Imple Individual Consult IDA / 60350 Post Open 28,652.40 Signed 2018-08-01 2018-08-09 2018-08-17 2018-10-26 2018-08-22 2018-11-15 2018-09-26 2018-11-21 2021-08-31 and evaluation officer mentation and Coordination ant Selection Support MTI-2-6-CS-IND / support an Component 2: Project Imple Individual Consult d outreach officer for Matchin IDA / 60350 mentation and Coordination Post Open 24,559.20 Completed 2018-08-01 2018-08-09 2018-08-17 2018-10-26 2018-08-22 2018-11-15 2018-09-26 2018-11-21 2021-08-31 ant Selection g Grants Program Support MTI-2-7-CS-IND / Administrat Component 2: Project Imple Individual Consult IDA / 60350 Post Open 26,870.17 Signed 2019-01-03 2019-03-11 2019-02-01 2019-03-13 2019-02-11 2019-03-14 2019-03-02 2019-03-20 2022-10-30 ive assistant, support, translo mentation and Coordination ant Selection ter Support MTI-1-1-5-IC / ToR for Suppo Component 1: Enhancing Bu Individual Consult rt for the procurement , acce IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2018-10-12 2018-10-17 2018-10-19 2018-10-24 2018-11-23 ant Selection ptance and usage of metrolo ort Readiness gy equipment Component 1: Enhancing Bu MTI-1-1-5-1-IC / ToR for Publi Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2020-08-13 2020-08-18 2020-08-23 2020-09-20 2020-10-20 c awareness campaign ant Selection ort Readiness MTI-1-1-5-4-IC / TS for Mech Component 1: Enhancing Bu Individual Consult anical laboratories equipmen IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2018-12-07 2018-12-13 2018-12-18 2018-12-25 2019-01-24 ant Selection t ort Readiness Component 1: Enhancing Bu MTI-1-1-5-5-IC / TS for electri Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2019-02-04 2019-02-09 2019-02-12 2019-03-10 2019-04-09 cal laboratories equipment ant Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-5-6-IC / TS for legal Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2019-05-22 2019-05-26 2019-05-29 2019-06-05 2019-07-05 metrology equipment ant Selection ort Readiness MTI-1-1-5-7-IC / TS for E-insp Component 1: Enhancing Bu ector system for all inspectio Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2020-01-15 2020-01-20 2020-01-25 2020-02-20 2020-03-21 ns and upgrade to inspection ant Selection ort Readiness data management and data mining software MTI-1-1-5-8-IC / TS for Inspe ction interoperability system Component 1: Enhancing Bu and upgrading inspection-rel Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2019-09-23 2019-09-28 2019-10-03 2019-10-10 2019-11-09 ated databases in relevant m ant Selection ort Readiness inistries and agencies (data e xchange for risk-based inspe ctions). MTI-1-1-5-9-IC / TS for equip Component 1: Enhancing Bu Individual Consult ping and modernizing inspect IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2019-05-20 2019-05-25 2019-05-29 2019-06-05 2019-07-05 ant Selection ions. ort Readiness Component 1: Enhancing Bu MTI-1-1-5-11-IC / Experts for Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2018-12-11 2018-12-16 2018-12-21 2018-12-28 2022-10-31 metrology agency ant Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-5-12-IC / Experts for Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2018-12-17 2018-12-22 2018-12-25 2019-01-01 2020-12-29 DAK ant Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-5-10-IC / Experts for Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2018-10-26 2018-10-31 2018-11-05 2018-11-12 2022-10-31 department of IT ant Selection ort Readiness Component 1: Enhancing Bu MTI-1-1-5-10-A-IC / IT consul Individual Consult IDA / 60350 siness Environment and Exp Post Limited 15,791.76 Completed 2019-02-27 2019-03-04 2019-03-04 2019-06-10 2019-03-09 2019-06-21 2019-03-15 2019-06-29 2020-03-14 tant ant Selection ort Readiness Page 2 MTI-2-8-CS-IND / Academy s Component 2: Project Imple Individual Consult IDA / 60350 Post Limited 13,336.80 Signed 2019-05-16 2019-03-12 2019-05-21 2019-07-16 2019-05-23 2019-08-26 2019-05-27 2019-09-13 2022-05-27 ector expert-MGP mentation and Coordination ant Selection Support MTI-2-9-CS-IND / Private sect Component 2: Project Imple Individual Consult IDA / 60350 Post Limited 13,336.80 Signed 2019-05-16 2019-03-12 2019-05-21 2019-07-16 2019-05-23 2019-08-26 2019-05-27 2019-09-15 2022-05-27 or expert-MGP mentation and Coordination ant Selection Support MTI-2-10-CS-IND / Internatio Component 2: Project Imple Individual Consult IDA / 60350 Post Limited 26,772.00 Signed 2019-05-16 2019-03-12 2019-05-21 2019-07-16 2019-05-23 2019-09-30 2019-05-27 2019-10-07 2022-05-27 nal expert-MGP mentation and Coordination ant Selection Support MTI-1-1-5-2-IC / ToR for:Due diligence of all inspections, IT Component 1: Enhancing Bu , staffing, hardware, software Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Canceled 2019-06-10 2019-06-15 2019-06-18 2019-06-22 2019-10-10 , databases for E-inspector, a ant Selection ort Readiness nd preparing draft Technical specifications for E-inspector system Component 1: Enhancing Bu MTI-2.11-CS-IND / Lead Asse Individual Consult IDA / 60350 siness Environment and Exp Post Limited 4,562.88 Signed 2019-11-19 2019-10-22 2019-11-24 2019-12-03 2019-11-27 2020-01-23 2019-12-02 2020-02-01 2019-12-10 ssor in ISO/IEC 17020:2012 ant Selection ort Readiness Component 1: Enhancing Bu MTI-2.12-CS-IND / Lead Asse Individual Consult IDA / 60350 siness Environment and Exp Post Limited 6,822.59 Signed 2019-11-18 2019-10-22 2019-11-23 2019-12-03 2019-11-25 2020-01-24 2019-11-30 2020-02-07 2019-12-08 ssor in ISO/IEC 17025:2017 ant Selection ort Readiness MTI-2.13-CS-IND / Technical Component 1: Enhancing Bu Individual Consult Assessor in ISO/IEC 17025:20 IDA / 60350 siness Environment and Exp Post Limited 2,770.32 Signed 2019-11-18 2019-10-22 2019-11-23 2019-12-13 2019-11-26 2020-01-24 2019-12-01 2020-02-04 2019-12-04 ant Selection 17 ort Readiness Component 1: Enhancing Bu MTI-2.14-CS-IND / Thermom Individual Consult IDA / 60350 siness Environment and Exp Post Open 0.00 Canceled 2020-02-06 2020-02-20 2020-02-28 2020-03-01 2020-03-05 2022-10-31 etry Officer ant Selection ort Readiness Component 1: Enhancing Bu MTI-2.15-CS-IC / Time and Fr Individual Consult IDA / 60350 siness Environment and Exp Post Open 0.00 Canceled 2020-02-06 2020-02-20 2020-02-28 2020-03-01 2020-03-05 2022-10-31 equency Officer ant Selection ort Readiness Component 1: Enhancing Bu MTI-2.16-CS-IC / Dimensiona Individual Consult IDA / 60350 siness Environment and Exp Post Open 0.00 Canceled 2020-02-06 2020-02-20 2020-02-28 2020-03-01 2020-03-05 2022-10-31 l metrology officer ant Selection ort Readiness MTI-2-1-2-CS-IND / Monitorin Component 2: Project Imple Individual Consult IDA / 60350 Post Limited 27,620.19 Signed 2020-09-28 2020-08-19 2020-10-03 2020-08-31 2020-10-06 2020-08-31 2020-10-12 2020-09-14 2022-10-31 g and evaluation officer( CER mentation and Coordination ant Selection P) Support MTI-2-1-3-CS-DC / Project co Component 2: Project Imple IDA / 60350 Post Direct Selection Direct 10,886.18 Signed 2020-12-08 2020-12-03 2020-12-08 2020-12-01 2020-12-14 2020-12-13 2021-03-03 2021-06-11 ordinator mentation and Coordination Support Component 1: Enhancing Bu MTI-1-5-10-B-IC / Consultanc Individual Consult Under Implement IDA / 60350 siness Environment and Exp Post Open 0.00 2021-02-24 2021-03-03 2021-03-13 2022-05-15 2021-03-15 2022-08-01 2021-03-31 2022-03-31 y for IT services ant Selection ation ort Readiness MTI-2-3-1-CS-IND / Temporar Component 2: Project Imple Individual Consult Under Implement IDA / 60350 Post Direct - National 0.00 2023-04-05 2022-12-19 2023-04-07 2023-01-03 2023-04-08 2023-01-03 2023-04-10 2023-04-11 y Procurement Specialist mentation and Coordination ant Selection ation Support MTI-2-3-2-CS-IND / Procurem Component 2: Project Imple Individual Consult Under Implement IDA / 60350 Post Open - National 0.00 2023-04-05 2023-02-28 2023-04-08 2023-04-09 2023-04-11 2023-10-31 ent Specialist for CERP PIU mentation and Coordination ant Selection ation Support MTI-2-1-3-1-3-CS-DC / Result Component 2: Project Imple Individual Consult IDA / 60350 Post Open - National 0.00 Canceled 2023-04-05 2023-04-08 2023-04-09 2023-04-11 2023-04-12 s Measurement Expert mentation and Coordination ant Selection Support Component 1: Enhancing Bu MTI-2-1-3-1-CS-DC / Matchin Individual Consult Under Implement IDA / 60350 siness Environment and Exp Post Open - National 0.00 2023-04-05 2020-12-03 2023-04-08 2023-04-09 2023-04-11 2023-04-12 g Grants Manager ant Selection ation ort Readiness MTI-1-3-2-1- IC / Consultanc Component 1: Enhancing Bu y for implementation of law a Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-06-21 2023-06-22 2023-06-28 2023-10-14 nd strengthen capacities of i ant Selection ort Readiness nspectorates - Senior Legal E xpert MTI-1-3-2-2- IC / Consultanc y for implementation of law a Component 1: Enhancing Bu Individual Consult nd strengthen capacities of i IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-05-29 2023-06-21 2023-06-22 2023-06-28 2023-10-30 ant Selection nspectorates - Legal Expert - ort Readiness Coordination of Legislative Pr ocess MTI-1-3-2-3- IC / Consultanc y for implementation of law a Component 1: Enhancing Bu Individual Consult nd strengthen capacities of i IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-05-29 2023-06-21 2023-06-22 2023-06-28 2023-10-30 ant Selection nspectorates - Senior Graphi ort Readiness c Designer - printed Materials and Web Design MTI-1-3-2-4- IC / Consultanc Component 1: Enhancing Bu y for implementation of law a Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-05-29 2023-06-21 2023-06-22 2023-06-28 2023-10-30 nd strengthen capacities of i ant Selection ort Readiness nspectorates - Programer MTI-1-3-2-5- IC / Consultanc Component 1: Enhancing Bu y for implementation of law a Individual Consult IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-05-29 2023-06-21 2023-06-22 2023-06-28 2023-10-30 nd strengthen capacities of i ant Selection ort Readiness nspectorates - Copywriter MTI-1-3-2-6 - IC / Consultanc y for implementation of law a Component 1: Enhancing Bu Individual Consult Pending Impleme nd strengthen capacities of i IDA / 60350 siness Environment and Exp Post Limited 0.00 2023-06-18 2023-06-21 2023-06-22 2023-06-28 2023-10-30 ant Selection ntation nspectorates - International I ort Readiness nspection Reform Expert (RBI ) MTI-1-3-2-7- IC / Consultanc y for implementation of law a Component 1: Enhancing Bu Individual Consult nd strengthen capacities of i IDA / 60350 siness Environment and Exp Post Limited 0.00 Under Review 2023-06-18 2023-05-29 2023-06-21 2023-06-22 2023-06-28 2023-10-30 ant Selection nspectorates - Senior Trainin ort Readiness g and Certification Expert Page 3