PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Brazil : SABESP - IMPROVING WATER SERVICE ACCESS AND SECURITY IN THE METROPOLITAN REGION OF SÃO PAULO PROJECT PLAN General Information Country: Brazil 2018-11-13 Bank’s Approval Date of the Original Procurement Plan: 2023-09-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165695 GPN Date: Project Name: SABESP - IMPROVING WATER SERVICE ACCESS AND SECURITY IN THE METROPOLITAN REGION OF SÃO PAULO PROJECT Loan / Credit No: IBRD / 89160, / Company of Water and Sewage of the State of São Paulo Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SABESP-86308-CW-RFB / SES Itapecerica da Serra Reduce pollution loads to sc Implantação de Redes coleto Solicitação de Ofe Single Stage - One E 8,995,802.8 2021-05-1 IBRD / 89160 arce water resources in the Posterior Open - National Assinado 2020-06-30 2019-05-10 2020-07-30 2021-03-24 2020-09-10 2021-05-02 2020-10-10 2021-06-28 2020-11-14 2021-09-13 ras de Esgoto, Ligações de E rtas nvelope 5 3 Guarapiranga Water Basin sgoto, E.E.E, Linhas de recalq ue e Coletores troncos Secun dários BR-SABESP-86329-CW-RFB / Expand access to water serv Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2021-04-1 m áreas de alta vulnerabilida / Prévia Open - National 0.00 Cancelado 2020-06-30 2020-07-05 2020-08-16 2020-09-15 2020-10-20 d increase system resilience rtas nvelope 8 de social - UGRs Santana, Fr in the MRSP eguesia, Extremo Norte e Piri tuba BR-SABESP-86323-CW-RFB / Expand access to water serv Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2020-10-0 m áreas de alta vulnerabilida / Posterior Open - National 0.00 Cancelado 2019-12-20 2019-12-25 2020-02-05 2020-03-06 2020-04-10 d increase system resilience rtas nvelope 7 de social - UGRs Moóca, Jardi in the MRSP ns, Alto Tietê, Santana e Freg uesia BR-SABESP-86317-CW-RFB / Regularização de ligações e Expand access to water serv m áreas de alta vulnerabilida ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2020-04-1 / Posterior Open - National 0.00 Cancelado 2019-06-30 2019-07-05 2019-08-16 2019-09-15 2019-10-20 de social - UGRs Interlagos, G d increase system resilience rtas nvelope 7 uarapiranga, Santo Amaro, Bi in the MRSP llings, Butantã, Cotia, Osasco e Tietê BR-SABESP-86318-CW-RFB / Reduce pollution loads to sc Implantação de Coletor Tronc Solicitação de Ofe Single Stage - One E 3,483,739.6 2021-06-1 IBRD / 89160 arce water resources in the Posterior Open - National Assinado 2020-08-30 2021-05-28 2020-09-04 2021-08-20 2020-10-16 2021-09-27 2020-11-15 2021-11-03 2020-12-20 2021-12-25 o (Guavirituba) e Linha de Re rtas nvelope 1 8 Guarapiranga Water Basin calque (Talamanca) BR-SABESP-154205-CW-RFP Expand access to water serv Solicitação de Ofe Single Stage - One E 2021-05-1 / Manutenção das barragens: IBRD / 89160 ices, reduce water losses, an Posterior Open - National 0.00 Cancelado 2020-07-31 2021-03-24 2020-08-05 2021-03-24 2020-09-16 2021-05-10 2020-10-16 2020-11-20 rtas nvelope 9 Jaguari, Jacareí e Cachoeira d increase system resilience in the MRSP BR-SABESP-165391-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-08-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-06-15 2020-06-20 2020-06-23 2020-07-23 2020-08-27 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 7 de social - Extremo Norte in the MRSP BR-SABESP-182851-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-10-0 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-07-31 2020-08-05 2020-08-08 2020-09-07 2020-10-12 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 2 de social - Santo André in the MRSP BR-SABESP-182852-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-10-0 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-07-31 2020-08-05 2020-08-08 2020-09-07 2020-10-12 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 2 de social - São Miguel in the MRSP BR-SABESP-182853-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-10-0 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-07-31 2020-08-05 2020-08-08 2020-09-07 2020-10-12 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 2 de social - Pantanal - Várzea in the MRSP do Tiête BR-SABESP-175912-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-09-0 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-06-30 2020-07-05 2020-07-08 2020-08-07 2020-09-11 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 1 de social - Itaquera in the MRSP BR-SABESP-165395-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-08-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-06-15 2020-06-20 2020-06-23 2020-07-23 2020-08-27 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 7 de social - Osasco in the MRSP BR-SABESP-165396-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-08-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-06-15 2020-06-20 2020-06-23 2020-07-23 2020-08-27 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 7 de social - Cotia in the MRSP BR-SABESP-165390-CW-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2022-08-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-06-15 2020-07-08 2020-06-20 2020-08-19 2020-06-23 2020-07-23 2020-08-27 m áreas de alta vulnerabilida d increase system resilience rtas nvelope 7 de social - Guarulhos in the MRSP BR-SABESP-216713-CW-RFB Expand access to water serv / Obras de Substituição de R ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-01-0 edes de Água - Setores: Sant IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-04-30 2021-05-05 2021-06-16 2021-07-16 2021-08-20 d increase system resilience rtas nvelope 1 ana, Derivação Santana e S in the MRSP anto Amaro - Campo Belo BR-SABESP-216718-CW-RFB / Obras de Substituição de R Expand access to water serv edes de Água - Setores: Jardi ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-01-0 ns - Setor Lapa, Jardins - Seto IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-04-30 2021-05-05 2021-06-16 2021-07-16 2021-08-20 d increase system resilience rtas nvelope 1 r Vila Romana, Jardins - Setor in the MRSP Lapa, Jardins - Setor Derivaçã o Brooklin e Jardins - Setor Ja rdim América BR-SABESP-216720-CW-RFB Expand access to water serv / Obras de Substituição de R ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-01-0 edes de Água - Setores: Buta IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 d increase system resilience rtas nvelope 3 ntã - Setor Morumbi, Jardins - in the MRSP Setor Vila Romana e São Mig uel - Setor Penha Page 1 BR-SABESP-216722-CW-RFB / Obras de Substituição de R Expand access to water serv edes de Água - Setores: São ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-04-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-03-13 2022-03-18 2022-04-29 2022-05-29 2022-07-03 Miguel - Setor Der. Vila Matil d increase system resilience rtas nvelope 8 de + Penha, Santana - Setor in the MRSP Tucuruvi e Butantã - Setor M orumbi BR-SABESP-216725-CW-RFB / Obras de Substituição de R edes de Água - Setores: Tiête Expand access to water serv - Setor Barueri Jd. Tupã (Mun. ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-04-1 Jandira), Setor Carapicuíba V IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-03-13 2022-03-18 2022-04-29 2022-05-29 2022-07-03 d increase system resilience rtas nvelope 8 ila Dirce e Tiête - Setor Carap in the MRSP icuíba Centro + Carapicuíba COHAB / Ipiranga - Setor Deri v Cambuci e Butantã - Setor Vila Sônia + Jaguaré BR-SABESP-216729-CW-RFB / Obras de Substituição de R Expand access to water serv edes de Água - Setores: Perdi ices, reduce water losses, an Solicitação de Ofe Single Stage - One E 2025-04-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-03-13 2022-03-18 2022-04-29 2022-05-29 2022-07-03 zes, Osasco Vila Iracema I + d increase system resilience rtas nvelope 8 Osasco Quitaúna + Osasco B in the MRSP ela Vista + Osasco Conceição e Artur Alvim BR-SABESP-86310-CW-RFB / Execução de obras para impl antação dos sistemas de rem oção de sólidos e contingênci Reduce pollution loads to sc Solicitação de Ofe Single Stage - One E 2021-04-0 a de bombeamento, incluind IBRD / 89160 arce water resources in the Posterior Open - National 0.00 Cancelado 2020-06-15 2019-04-09 2020-06-20 2020-08-01 2020-08-31 2020-10-05 rtas nvelope 3 o montagem e fornecimento Guarapiranga Water Basin de equipamentos e adequaç ão nas instalações elétricas e m seis Estações Elevatórias d e Esgoto Documento Nacional de L icitação - pro Expand access to water serv cesso de 1 e BR-SABESP-230942-CW-RFB ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 1,738,398.2 2022-04-1 / Piloto - Substituição de Red IBRD / 89160 Posterior Open - National Assinado 2021-06-30 2022-02-18 2021-07-05 2022-03-17 2021-08-16 2022-04-12 2021-09-15 2022-04-29 2021-10-20 2022-07-29 d increase system resilience rtas nvelope cumento Não 8 8 es - Deriv. Santana in the MRSP Padrão do Ba nco Mundial - Documento P adrão de Aqu isição (DPA) Documento Nacional de L BR-SABESP-230951-CW-RFB icitação - pro / Implementação de eficiênci Expand access to water serv cesso de 1 e a nas redes e ramais de distri ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2022-06-1 buição de água, por meio da IBRD / 89160 Prévia Open - National 0.00 Assinado 2021-08-31 2022-09-27 2021-09-05 2022-11-29 2021-10-17 2022-12-14 2021-11-16 2023-02-24 2021-12-21 2023-05-11 d increase system resilience rtas nvelope cumento Não 9 substituição de infraestrutura in the MRSP Padrão do Ba linear comissionada - Licitaçã nco Mundial - o 3 - Troca de Redes Documento P adrão de Aqu isição (DPA) Documento Nacional de L BR-SABESP-230954-CW-RFB icitação - pro / Implementação de eficiênci Expand access to water serv cesso de 1 e a nas redes e ramais de distri ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2022-10-2 buição de água, por meio da IBRD / 89160 Prévia Open - National 0.00 Assinado 2022-01-02 2022-09-27 2022-01-07 2022-11-29 2022-02-18 2022-12-15 2022-03-20 2023-03-29 2022-04-24 2023-05-17 d increase system resilience rtas nvelope cumento Não 1 substituição de infraestrutura in the MRSP Padrão do Ba linear comissionada - Licitaçã nco Mundial - o 4 - Troca de Redes Documento P adrão de Aqu isição (DPA) Reduce pollution loads to sc BR-SABESP-86309-CW-RFP / Solicitação de Pro Open - Internationa Single Stage - Two E 2021-10-0 IBRD / 89160 arce water resources in the Prévia 0.00 Cancelado 2020-10-30 2020-11-04 2020-12-16 2021-02-28 2021-04-04 Remoção de Carga Poluidora postas l nvelope 1 Guarapiranga Water Basin Solicitação d BR-SABESP-216732-CW-RFB e Ofertas - P / Implementação de eficiênci Expand access to water serv equenas Obr a nas redes e ramais de distri ices, reduce water losses, an Solicitação de Ofe Single Stage - One E as Document 2024-06-2 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-09-12 2021-09-17 2021-10-29 2021-11-28 2022-01-02 buição de água, por meio da d increase system resilience rtas nvelope o Padrão de 0 substituição de infraestrutura in the MRSP Aquisição (D linear comissionada - Plano B PA) - process - Troca de Redes o de 1 envelo Solicitação pe d BR-SABESP-290423-CW-RFB Expand access to water serv e Ofertas - O / MANUTENÇÃO DAS BARRAG ices, reduce water losses, an Solicitação de Ofe Single Stage - One E bras (sem pr 2023-02-1 IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-05-02 2022-04-18 2022-05-07 2022-06-18 2022-07-18 2022-08-22 ENS JAGUARI, JACAREÍ E CAC d increase system resilience rtas nvelope equalificação 8 HOEIRA (TR19) in the MRSP ) Documento Padrão de aq uisição (DPA) Documento BR-SABESP-299720-CW-RFB Nacional de L / SES EMBU das ARTES - 2ª E icitação - pro tapa - Execução de rede cole cesso de 1 e toras de esgoto no Jardim Vis Reduce pollution loads to sc Implementa Solicitação de Ofe Single Stage - One E nvelope (Do 2025-03-2 ta Alegre e no Jardim Santa R IBRD / 89160 arce water resources in the Posterior Open - National 0.00 ção Pendent 2023-02-24 2023-03-01 2023-04-12 2023-05-12 2023-06-16 rtas nvelope cumento Não 7 ita, de ligações domiciliares Guarapiranga Water Basin e Padrão do Ba e de execução de EEE Jardim nco Mundial - Vista Alegre e EEE Jardim Sa Documento P nta Rita, em Embu das Artes. adrão de Aqu isição (DPA) Documento Nacional de L icitação - pro BR-SABESP-299727-CW-RFB Expand access to water serv cesso de 1 e / Adequação da estação de tr Em fase de I ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2025-06-0 atamento de água eng. Rodo IBRD / 89160 Prévia Open - National 0.00 mplementa 2023-02-28 2023-02-02 2023-03-05 2023-04-16 2023-05-16 2023-06-20 d increase system resilience rtas nvelope cumento Não 9 lfo José da Costa e Silva (ETA ção in the MRSP Padrão do Ba RJCS, antiga ETA ABV). nco Mundial - Documento P adrão de Aqu isição (DPA) Solicitação d e Proposta d e Obras e Op eração de Se BR-SABESP-279566-CW-RFP rviço - Projet / IMPLANTAÇÃO DE INFRAEST Reduce pollution loads to sc o, Construçã Solicitação de Pro Open - Internationa Single Stage - Two E 2023-02-0 RUTURA E DO SISTEMA DE R IBRD / 89160 arce water resources in the Prévia o e Operação 0.00 Cancelado 2022-03-03 2022-03-08 2022-04-19 2022-07-02 2022-08-06 postas l nvelope 2 EMOÇÃO DE NUTRIENTES NO Guarapiranga Water Basin de Estações RIO EMBU MIRIM | ERN de Tratament o de Água e Efluentes Do cumento Pad rão de Aquisi ção (DPA) (Fa Documento BR-SABESP-308629-CW-RFB se única) de L Nacional / SES EMBU das ARTES - 1ª E icitação - pro tapa - Execução do Coletor T cesso de 1 e ronco Jardim Magali, de rede Reduce pollution loads to sc Solicitação de Ofe Single Stage - One E nvelope (Do 2025-06-0 coletoras de Esgoto no Jardi IBRD / 89160 arce water resources in the Prévia Open - National 0.00 Assinado 2022-08-26 2022-10-05 2022-08-31 2022-12-22 2022-10-12 2023-02-28 2022-11-11 2023-03-29 2022-12-16 2023-08-10 rtas nvelope cumento Não 3 m Magali e no Jardim Isis Cris Guarapiranga Water Basin Padrão do Ba tina, de ligações domiciliares nco Mundial - e de Retrofit da EEE Embu 4, Documento P no município de Embu das Ar adrão de Aqu tes. isição (DPA) Page 2 Documento Nacional de L BR-SABESP-230955-CW-RFB icitação - pro / Implementação de eficiênci Expand access to water serv cesso de 1 e a nas redes e ramais de distri ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2024-09-1 buição de água, por meio da IBRD / 89160 Prévia Open - National 0.00 Assinado 2022-09-15 2022-10-05 2022-10-15 2022-11-29 2022-11-26 2022-12-16 2022-12-26 2023-02-24 2023-02-28 2023-05-20 d increase system resilience rtas nvelope cumento Não 0 substituição de infraestrutura in the MRSP Padrão do Ba linear comissionada - Licitaçã nco Mundial - o 5 - Troca de Redes Documento P adrão de Aqu isição (DPA) Documento Nacional de L BR-SABESP-230957-CW-RFB icitação - pro / Implementação de eficiênci Expand access to water serv cesso de 1 e a nas redes e ramais de distri Em fase de I ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2025-05-0 buição de água, por meio da IBRD / 89160 Prévia Open - National 0.00 mplementa 2022-12-30 2023-02-24 2023-01-29 2023-08-14 2023-03-12 2023-08-31 2023-04-11 2023-05-16 d increase system resilience rtas nvelope cumento Não 5 substituição de infraestrutura ção in the MRSP Padrão do Ba linear comissionada - Licitaçã nco Mundial - o 6 - Troca de Redes Documento P adrão de Aqu isição (DPA) Documento BR-SABESP-86326-CW-RFB / Nacional de L SES EMBU das ARTES - 1ª Et icitação - pro apa - Execução do Coletor Tr cesso de 1 e onco Jardim Magali, de rede c Reduce pollution loads to sc Solicitação de Ofe Single Stage - One E nvelope (Do 2025-06-0 oletoras de Esgoto no Jardim IBRD / 89160 arce water resources in the Posterior Open - National 0.00 Cancelado 2022-08-26 2022-07-29 2022-08-31 2022-10-12 2022-11-11 2022-12-16 rtas nvelope cumento Não 3 Magali e no Jardim Isis Cristin Guarapiranga Water Basin Padrão do Ba a, de ligações domiciliares e nco Mundial - de Retrofit da EEE Embu 4, n Documento P o município de Embu das Art adrão de Aqu es. isição (DPA) Documento BR-SABESP-299738-CW-RFB Nacional de L / Execução de obras e monta icitação - pro gens dos equipamentos para cesso de 1 e Retrofit das Estações Elevató Reduce pollution loads to sc Em fase de I Solicitação de Ofe Single Stage - One E nvelope (Do 2024-11-1 rias de Esgoto IBRD / 89160 arce water resources in the Posterior Open - National 0.00 mplementa 2023-01-31 2023-04-14 2023-02-05 2023-03-19 2023-04-18 2023-05-23 rtas nvelope cumento Não 3 Talamanca. Riviera, Jardim S Guarapiranga Water Basin ção Padrão do Ba olange (Retrofit EEE - Lote 1) nco Mundial - e Estações Elevatórias de Es Documento P goto Iporã e Caulim (Retrofit adrão de Aqu EEE - Lote 2) isição (DPA) Documento BR-SABESP-230955-CW-RFB Nacional de L CONT LOTE 1 E 3 / Implemen icitação - pro tacao de eficiencia nas redes Expand access to water serv cesso de 1 e e ramais de distribuicao de a ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2023-10-1 gua, por meio da substituica IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-01-02 2022-10-05 2022-01-07 2022-02-18 2022-03-20 2022-04-24 d increase system resilience rtas nvelope cumento Não 6 o de infraestrutura linear co in the MRSP Padrão do Ba missionada - Licitação 5 - Tro nco Mundial - ca de Redes - Lote 1 e 3 con Documento P tinuacao adrão de Aqu isição (DPA) Documento BR-SABESP-230955-CW-RFB Nacional de L CONT L 1 E 3 / Implementaca icitação - pro o de eficiencia nas redes e ra Expand access to water serv cesso de 1 e mais de distribuicao de agua, ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2022-10-2 por meio da substituicao de i IBRD / 89160 Posterior Open - National 0.00 Assinado 2022-01-02 2022-01-07 2022-02-18 2022-03-20 2023-07-11 2022-04-24 2023-07-05 d increase system resilience rtas nvelope cumento Não 1 nfraestrutura linear comissio in the MRSP Padrão do Ba nada - Licitação 5 - Troca de nco Mundial - Redes - Lote 1 e 3 continuac Documento P ao adrão de Aqu isição (DPA) Documento BR-SABESP-371622-CW-RFB Nacional de L / Implementação de eficiênci icitação - pro a das redes e ramais de água Expand access to water serv cesso de 1 e Em fase de I , por meio da substituição da ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2027-05-0 IBRD / 89160 Posterior Open - National 0.00 mplementa 2023-07-21 2023-07-19 2023-09-19 2023-09-11 2023-12-18 2024-01-17 2024-02-21 infraestrutura linear comissio d increase system resilience rtas nvelope cumento Não 6 ção nada - Licitação 7.1 - Lote 1 - in the MRSP Padrão do Ba Setor de Abastecimento Tucu nco Mundial - ruvi - Troca de Redes Documento P adrão de Aqu isição (DPA) Documento Nacional de L BR-SABESP-230960-CW-RFB icitação - pro / Implementação de eficiênci Expand access to water serv cesso de 1 e a nas redes e ramais de distri ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2026-08-0 buição de água, por meio da IBRD / 89160 Prévia Open - National 0.00 Cancelado 2023-05-02 2023-05-07 2023-06-18 2023-07-18 2023-08-22 d increase system resilience rtas nvelope cumento Não 6 substituição de infraestrutura in the MRSP Padrão do Ba linear comissionada - Licitaçã nco Mundial - o 8 - Troca de Redes Documento P adrão de Aqu isição (DPA) Documento BR-SABESP-230959-CW-RFB Nacional de L / Implementação de eficiênci icitação - pro a nas redes e ramais de distri Expand access to water serv cesso de 1 e buição de água, por meio da Em fase de I ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2027-02-2 substituição de infraestrutura IBRD / 89160 Posterior Open - National 0.00 mplementa 2023-08-27 2023-07-19 2023-09-26 2023-09-11 2023-11-25 2024-01-04 2024-02-08 d increase system resilience rtas nvelope cumento Não 2 linear comissionada - Licitaçã ção in the MRSP Padrão do Ba o 7 Lote 1 - Setor de Abasteci nco Mundial - mento Morumbi - Troca de R Documento P edes adrão de Aqu isição (DPA) Documento BR-SABESP-372828-CW-RFB Nacional de L / Implementação de eficiênci icitação - pro a das redes e ramais de água Expand access to water serv cesso de 1 e , por meio da substituição da ices, reduce water losses, an Solicitação de Ofe Single Stage - One E nvelope (Do 2027-03-0 infraestrutura linear comissio IBRD / 89160 Prévia Open - National 0.00 Em Análise 2023-08-27 2023-08-02 2023-10-18 2023-11-29 2024-01-08 2024-02-21 d increase system resilience rtas nvelope cumento Não 7 nada - Licitação 8 - Lotes 1 e in the MRSP Padrão do Ba 2 - Setor de Abastecimento C nco Mundial - arapicuíba Vila Dirce e Moru Documento P mbi - Troca de Redes adrão de Aqu isição (DPA) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SABESP-233538-GO-RFB Expand access to water serv Solicitação de Ofe Single Stage - One E / AQUISIÇÃO DE TUBOS - SUB IBRD / 89160 ices, reduce water losses, an Prévia Open - National 2,832,892.57 Assinado 2021-06-30 2021-08-30 2021-07-05 2021-10-22 2021-08-16 2021-10-19 2021-09-15 2021-11-04 2021-10-20 2021-12-03 2022-04-18 rtas nvelope STITUIÇÃO DE REDES d increase system resilience in the MRSP BR-SABESP-233539-GO-RFB Expand access to water serv Solicitação de Ofe Single Stage - One E / AQUISIÇÃO DE CONEXÕES - IBRD / 89160 ices, reduce water losses, an Prévia Open - National 1,869,411.20 Assinado 2021-06-30 2021-08-30 2021-07-05 2021-10-22 2021-08-16 2021-10-21 2021-09-15 2022-01-13 2021-10-20 2022-02-22 2022-04-18 rtas nvelope SUBSTITUIÇÃO DE REDES d increase system resilience in the MRSP BR-SABESP-86314-GO-RFB / Expand access to water serv Solicitação de Ofe Open - Internationa Single Stage - One E Tubos para Renovação de Re IBRD / 89160 ices, reduce water losses, an Prévia 0.00 Cancelado 2020-08-30 2020-09-04 2020-10-16 2020-11-15 2020-12-20 2021-06-18 rtas l nvelope des Secundárias (parte 01) d increase system resilience in the MRSP BR-SABESP-86328-GO-RFB / Technical assistance and Pro Implantação de pilotos de Efi Solicitação de Ofe Single Stage - One E / ject management and super Posterior Open - National 0.00 Cancelado 2020-06-01 2020-06-06 2020-07-18 2020-08-17 2020-09-21 2021-03-20 ciência Energética - BFT (Bo rtas nvelope vision mba operando como turbina) Page 3 BR-SABESP-86325-GO-RFB / Technical assistance and Pro Implantação de pilotos de Efi Solicitação de Ofe Single Stage - One E / ject management and super Posterior Open - National 0.00 Cancelado 2020-03-01 2020-03-06 2020-04-17 2020-05-17 2020-06-21 2020-12-18 ciência Energética - Acionam rtas nvelope vision ento de motor à gás encanad o BR-SABESP-244315-GO-RFB / Fornecimento de equipame Reduce pollution loads to sc Solicitação de Ofe Single Stage - One E ntos e adequação nas instala IBRD / 89160 arce water resources in the Prévia Open - National 0.00 Cancelado 2021-09-30 2021-10-05 2021-11-16 2021-12-16 2022-01-20 2022-07-19 rtas nvelope ções elétricas - Sistema Marg Guarapiranga Water Basin em Esquerda: EEEs RIVIERA, TALAMANCA e SOLANGE BR-SABESP-244316-GO-RFB / Execução de obras para im plantação dos sistemas de re moção de sólidos e contingê Reduce pollution loads to sc Solicitação de Ofe Single Stage - One E ncia de bombeamento, inclui IBRD / 89160 arce water resources in the Posterior Open - National 0.00 Cancelado 2021-10-31 2021-11-05 2021-12-17 2022-01-16 2022-02-20 2022-08-19 rtas nvelope ndo montagem e fornecimen Guarapiranga Water Basin to de equipamentos e adequ ação nas instalações elétrica s - Sistema Margem Direita: EEEs IPORÃ e CAULIM BR-SABESP-86312-GO-RFB / Technical assistance and Pro Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-04-15 2022-06-13 2020-04-20 2020-05-20 2020-06-19 2020-07-24 2021-01-20 Automação - projeto piloto B ject management and super rtas nvelope arueri vision BR-SABESP-299792-GO-RFB Reduce pollution loads to sc Em fase de I / Fornecimento de equipame Solicitação de Ofe Single Stage - One E IBRD / 89160 arce water resources in the Posterior Open - National 0.00 mplementaç 2023-07-12 2023-07-04 2023-07-17 2023-08-18 2023-08-28 2023-09-27 2023-11-01 2024-06-18 ntos para trituração e remoç rtas nvelope Guarapiranga Water Basin ão ão de sólidos para o Retrofit das EEEs. BR-SABESP-299795-GO-RFB Reduce pollution loads to sc Em fase de I / Fornecimento e instalação d Solicitação de Ofe Single Stage - One E IBRD / 89160 arce water resources in the Posterior Open - National 0.00 mplementaç 2023-07-14 2023-06-13 2023-07-19 2023-08-30 2023-09-29 2023-11-03 2024-03-02 e painéis elétricos e gerador rtas nvelope Guarapiranga Water Basin ão es para o Retrofit das EEEs. BR-SABESP-362091-GO-RFB Reduce pollution loads to sc Em fase de I Solicitação de Ofe Single Stage - One E / Fornecimento de conjunto IBRD / 89160 arce water resources in the Posterior Open - National 0.00 mplementaç 2023-07-14 2023-08-17 2023-07-19 2023-08-30 2023-09-29 2023-11-03 2024-03-02 rtas nvelope motobombas para o Retrofit Guarapiranga Water Basin ão das EEEs. BR-SABESP-372841-GO-RFB Expand access to water serv Em fase de I Solicitação de Ofe Single Stage - One E / AQUISIÇÃO DE CONEXÕES - IBRD / 89160 ices, reduce water losses, an Posterior Open - National 0.00 mplementaç 2023-09-04 2023-08-21 2023-09-09 2023-11-08 2023-12-28 2024-02-01 2025-08-24 rtas nvelope SUBSTITUIÇÃO DE REDES - C d increase system resilience ão OMPRA 2 in the MRSP BR-SABESP-372836-GO-RFB Expand access to water serv Solicitação de Ofe Single Stage - One E / AQUISIÇÃO DE TUBOS - SUB IBRD / 89160 ices, reduce water losses, an Prévia Open - National 0.00 Em Análise 2023-09-04 2023-09-25 2023-11-24 2024-01-23 2024-03-05 2025-09-26 rtas nvelope STITUIÇÃO DE REDES - COMP d increase system resilience RA 2 in the MRSP NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SABESP-191289-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-09-30 2021-05-21 2020-10-05 2021-05-26 2020-11-16 2021-06-25 2020-12-16 2021-08-05 2021-01-20 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social -São Miguel in the MRSP BR-SABESP-191290-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2020-09-30 2020-10-05 2020-10-05 2021-05-26 2020-11-16 2021-06-25 2020-12-16 2021-08-05 2021-01-20 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Pantanal / Várzea in the MRSP do Tiête BR-SABESP-191291-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,132,014.32 Assinado 2020-09-30 2021-05-03 2020-10-05 2021-05-03 2020-11-16 2021-05-26 2020-12-16 2021-06-16 2021-01-20 2022-01-14 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Extremo Norte in the MRSP BR-SABESP-191292-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E m áreas de alta vulnerabilida IBRD / 89160 Posterior Open - National 2,530,608.92 Assinado 2020-09-30 2021-05-11 2020-10-05 2021-05-25 2020-11-16 2021-06-28 2020-12-16 2021-07-26 2021-01-20 2022-01-29 2021-07-19 d increase system resilience rtas nvelope de social - Cotia, Taboão da S in the MRSP erra, Itapevi, Osasco, Barueri BR-SABESP-191293-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,115,977.23 Assinado 2020-09-30 2021-05-03 2020-10-05 2021-05-03 2020-11-16 2021-06-28 2020-12-16 2021-07-21 2021-01-20 2022-02-04 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Freguesia do Ó / S in the MRSP antana BR-SABESP-191295-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,986,584.39 Assinado 2020-09-30 2020-10-05 2020-10-05 2020-11-13 2020-11-16 2020-12-14 2020-12-16 2021-01-06 2021-01-20 2021-04-16 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Centro UGRs in the MRSP BR-SABESP-191296-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,267,799.23 Assinado 2020-09-30 2020-09-01 2020-10-05 2020-11-16 2020-10-27 2020-12-16 2020-11-25 2021-01-20 2021-04-23 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Itaquera in the MRSP BR-SABESP-191297-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 2,446,057.20 Assinado 2020-09-30 2020-10-05 2020-10-05 2020-11-12 2020-11-16 2020-12-14 2020-12-16 2021-01-21 2021-01-20 2021-04-20 2021-07-19 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Santo André in the MRSP BR-SABESP-192964-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Prévia Open - National 1,502,916.12 Assinado 2020-06-15 2020-11-12 2020-06-20 2020-08-01 2020-10-09 2020-08-31 2020-12-15 2020-10-05 2021-04-16 2021-04-03 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Guarulhos (correta in the MRSP ) BR-SABESP-207023-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 778,240.31 Assinado 2021-02-28 2021-05-04 2021-03-05 2021-05-06 2021-04-16 2021-06-02 2021-05-16 2021-06-21 2021-06-20 2021-11-20 2021-12-17 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Interlagos in the MRSP BR-SABESP-230965-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,726,266.99 Assinado 2021-06-30 2021-11-29 2021-07-05 2021-12-10 2021-08-16 2022-01-13 2021-09-15 2022-04-14 2021-10-20 2022-07-14 2022-04-18 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Guarulhos II in the MRSP BR-SABESP-230964-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 1,226,338.01 Assinado 2021-06-30 2021-11-29 2021-07-05 2021-12-10 2021-08-16 2022-01-14 2021-09-15 2022-04-06 2021-10-20 2022-07-24 2022-04-18 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - Pirituba III in the MRSP Page 4 BR-SABESP-249548-NC-DIR / Expand access to water serv EXECUÇÃO DE LEVANTAMEN ices, reduce water losses, an IBRD / 89160 Posterior Aquisição Direta Direct 144,315.37 Concluído 2021-09-10 2021-09-02 2021-09-15 2021-11-03 2021-10-20 2022-01-03 2022-04-18 2022-07-03 TO GEOFÍSICO NA BARRAGE d increase system resilience M ATIBAINHA (TR13 - Willows in the MRSP tick). BR-SABESP-254285-NC-RFB / EXECUÇÃO DE ENSAIO PIZO Expand access to water serv CONE (CPTu), INSTALAÇÃO D ices, reduce water losses, an Solicitação de Ofe Single Stage - One E E MEDIDORES DE NÍVEL D'ÁG IBRD / 89160 Posterior Open - National 139,129.06 Assinado 2021-10-31 2021-11-19 2021-11-05 2022-03-15 2021-12-17 2022-04-07 2022-01-16 2022-05-30 2022-02-20 2022-07-15 2022-08-19 d increase system resilience rtas nvelope UA E PIEZÔMETROS DE TUBO in the MRSP ABERTO NA BARRAGEM ATIB AINHA – SISTEMA CANTAREIR A (TR14) BR-SABESP-257101-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 3,676,868.76 Assinado 2021-11-22 2022-02-18 2021-11-27 2022-01-08 2022-03-29 2022-02-07 2022-05-10 2022-03-14 2022-07-30 2022-09-10 m áreas de alta vulnerabilida d increase system resilience rtas nvelope de social - São Miguel in the MRSP BR-SABESP-257109-NC-RFB Expand access to water serv / Regularização de ligações e ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 4,421,756.15 Assinado 2021-11-22 2022-02-18 2021-11-27 2022-01-08 2022-03-29 2022-02-07 2022-05-10 2022-03-14 2022-07-29 2022-09-10 m área de alta vulnerabilidad d increase system resilience rtas nvelope e social - Pantanal / Várzea d in the MRSP o Tietê BR-SABESP-208469-NC-RFB / Regularização de ligações d e água, supressão da infraest Expand access to water serv rutura irregular e recuperaçã ices, reduce water losses, an Solicitação de Ofe Single Stage - One E o de clientes, por meio de co IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-02-28 2021-06-04 2021-03-05 2021-04-16 2021-07-12 2021-05-16 2021-06-20 2021-12-17 d increase system resilience rtas nvelope ntrato de performance, visan in the MRSP do o aumento da eficiência o peracional nos setores de ab astecimento de água Suzano e Recanto Mônica BR-SABESP-248804-NC-RFB / EXECUÇÃO DE SERVIÇOS D E ENGENHARIA PARA MANUT Technical assistance and Pro ENÇÃO DAS BARRAGENS DA Solicitação de Ofe Single Stage - One E IBRD / 89160 ject management and super Posterior Open - National 0.00 Cancelado 2021-09-30 2022-01-03 2021-10-05 2021-11-16 2021-12-16 2022-01-20 2022-07-19 DIRETORIA METROPOLITANA rtas nvelope vision E ESTRUTURAS ASSOCIADAS NO ÂMBITO DO PROGRAMA S ANEAMENTO SUSTENTÁVEL E INCLUSIVO BR-SABESP-299730-NC-RFB Expand access to water serv / Serviços de inspeção e elab Em fase de I ices, reduce water losses, an Solicitação de Ofe Single Stage - One E oração de laudo de diagnósti IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-09-01 2022-07-04 2022-09-06 2023-09-04 2022-10-18 2022-11-17 2022-12-22 2023-06-20 d increase system resilience rtas nvelope co das estruturas de concret ão in the MRSP o submersas de barragens (T R4A) BR-SABESP-254281-NC-RFB / Fornecimento e instalação d Expand access to water serv e extensômetro de haste em ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-10-31 2021-11-05 2021-12-17 2022-01-16 2022-02-20 2022-08-19 estruturas de concreto de uni d increase system resilience rtas nvelope dades Operacionais de Produ in the MRSP ção de Água da Sabesp (TR1 2). BR-SABESP-299808-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-12-08 2023-02-13 2022-12-13 2023-04-28 2023-01-24 2023-05-29 2023-02-23 2023-08-01 2023-03-30 2025-05-28 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - UGRs Fregu esia do Ó e Santana (TR 15) BR-SABESP-182857-NC-RFB / PRESTAÇÃO DE SERVIÇOS D Expand access to water serv E ENGENHARIA PARA GESTÃ ices, reduce water losses, an Solicitação de Ofe Open - Internationa Single Stage - One E O E MONITORAMENTO DOS R IBRD / 89160 Prévia 0.00 Cancelado 2020-09-30 2020-10-05 2020-11-16 2020-12-16 2021-01-20 2021-07-19 d increase system resilience rtas l nvelope ESULTADOS DA in the MRSP INSTRUMENTAÇÃO DE BARR AGENS E ESTRUTURAS HIDR ÁULICAS ASSOCIADAS (TDR1 ) BR-SABESP-254266-NC-RFB / Prestação de serviços de So Expand access to water serv ndagem, Coleta de Amostras ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2021-10-31 2021-10-06 2021-11-05 2022-03-15 2021-12-17 2022-04-13 2022-01-16 2022-02-20 2022-08-19 e Ensaios em Estruturas de C d increase system resilience rtas nvelope oncreto de Unidades Operaci in the MRSP onais de Produção de Água d a Sabesp (TR10/11). BR-SABESP-314515-NC-RFB / Prestação de serviços de So Expand access to water serv ndagem, Coleta de Amostras ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Cancelado 2022-09-06 2022-09-03 2022-09-11 2022-09-13 2022-10-23 2022-10-06 2022-11-22 2022-11-07 2022-12-27 2024-03-21 e Ensaios em Estruturas de C d increase system resilience rtas nvelope oncreto de Unidades Operaci in the MRSP onais de Produção de Água d a Sabesp (TR10/11). BR-SABESP-318184-NC-RFB / (Automação) Prestação de s erviços de engenharia para f ornecimento, desenvolvimen Technical assistance and Pro to, instalação, integração, Solicitação de Ofe Single Stage - One E IBRD / 89160 ject management and super Posterior Open - National 0.00 Cancelado 2022-10-11 2022-12-01 2022-10-16 2022-12-01 2022-11-15 2023-01-17 2022-12-06 2023-01-10 2025-01-09 comissionamento, manutenç rtas nvelope vision ão e disponibilidade de Hard ware e Software do sistema de supervisão e controle na E TE Barueri. BR-SABESP-299924-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv de social - Setores de Abaste ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Assinado 2022-12-01 2023-02-19 2022-12-06 2023-04-24 2023-01-17 2023-05-24 2023-02-16 2023-06-11 2023-03-23 2025-05-31 cimento Vila Jaguara, Jaraguá d increase system resilience rtas nvelope , Perus, Pirituba e Parque An in the MRSP hanguera - Unidade de Geren ciamento Regional (UGR) Piri tuba (TR 14). BR-SABESP-299802-NC-DIR / Technical assistance and Pro Serviços de engenharia para IBRD / 89160 ject management and super Posterior Aquisição Direta Direct 0.00 Cancelado 2022-11-01 2022-11-06 2022-12-11 2023-06-09 inspeção e elaboração de lau vision do de integridade de túneis ( TR 4) BR-SABESP-318398-NC-RFB Technical assistance and Pro Em fase de I / Serviços de engenharia par Solicitação de Ofe Single Stage - One E IBRD / 89160 ject management and super Posterior Open - National 0.00 mplementaç 2022-10-31 2023-07-18 2022-11-05 2023-09-04 2022-12-17 2023-01-26 2023-03-09 2024-03-03 a inspeção e elaboração de l rtas nvelope vision ão audo de integridade de túnei s (TR 4) Page 5 BR-SABESP-321872-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Assinado 2022-10-31 2023-02-13 2022-11-05 2023-04-28 2022-12-17 2023-05-26 2023-01-16 2023-06-27 2023-02-20 2023-08-28 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Guarulhos III (TR 16) BR-SABESP-321880-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-04-20 2022-11-05 2023-05-05 2022-12-17 2023-06-12 2023-01-16 2023-07-27 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Mauá e Sant o André II (TR 17) BR-SABESP-321882-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-04-20 2022-11-05 2023-05-03 2022-12-17 2023-06-13 2023-01-16 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Centro UGR s II (TR 18) BR-SABESP-321885-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-02-13 2022-11-05 2023-04-28 2022-12-17 2023-05-30 2023-01-16 2023-06-15 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Butantã I (T R 19) BR-SABESP-321887-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-02-13 2022-11-05 2023-04-28 2022-12-17 2023-05-31 2023-01-16 2023-06-15 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Butantã Pira jussaraI (TR 20) BR-SABESP-321888-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-02-13 2022-11-05 2023-04-28 2022-12-17 2023-06-01 2023-01-16 2023-08-02 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Extremo Nor te/Pirituba (TR 21) BR-SABESP-321889-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv Em fase de I de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 mplementaç 2022-10-31 2023-04-03 2022-11-05 2023-04-28 2022-12-17 2023-05-31 2023-01-16 2023-06-23 2023-02-20 2025-06-09 larização de ligações de água d increase system resilience rtas nvelope ão e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Guarulhos I V (TR 22) BR-SABESP-321890-NC-RFB / Regularização de ligações e m áreas de alta vulnerabilida Expand access to water serv de social, com ações de regu ices, reduce water losses, an Solicitação de Ofe Single Stage - One E Implementaç IBRD / 89160 Posterior Open - National 0.00 2022-12-11 2022-12-16 2023-01-27 2023-02-26 2023-04-02 2025-07-20 larização de ligações de água d increase system resilience rtas nvelope ão Pendente e esgoto, supressão da infrae in the MRSP strutura irregular e recupera ção de clientes - Itaquera Pay olzinho (TR 23) BR-SABESP-314515-NC-RFB - NOVA / Prestacao de servic Expand access to water serv os de sondagem, coleta de a ices, reduce water losses, an Solicitação de Ofe Single Stage - One E IBRD / 89160 Posterior Open - National 0.00 Assinado 2022-09-03 2022-09-03 2022-09-08 2022-10-20 2022-10-06 2022-11-19 2022-11-04 2022-12-24 2023-02-07 2023-06-22 mostras e ensaios em estrut d increase system resilience rtas nvelope uras de concreto de unidade in the MRSP s operacionais de producao e m aguas da SABEST (TR10-1 1) BR-SABESP-318184-NC-RFB- 2 / Prestação de serviços de engenharia para forneciment Technical assistance and Pro Em fase de I o, desenvolvimento, instalaç Solicitação de Ofe Single Stage - One E IBRD / 89160 ject management and super Posterior Open - National 0.00 mplementaç 2023-03-24 2023-06-11 2023-03-29 2023-06-22 2023-04-28 2023-07-21 2023-05-13 2023-06-12 2025-06-11 ão, integração, comissionam rtas nvelope vision ão ento, manutenção e disponib ilidade de Hardware e Softwa re do sistema de supervisão e controle na ETE Barueri (Au tomação). CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SABESP-182859-NC-RFB / PRESTAÇÃO DE SERVIÇOS D Expand access to water serv E ENGENHARIA PARA DESEN Seleção Baseada ices, reduce water losses, an Em fase de Imple VOLVIMENTO DE SISTEMA IN IBRD / 89160 Posterior na Qualidade e Cu Open - National 0.00 2020-09-30 2021-04-27 2020-10-21 2021-05-14 2020-12-04 2023-07-28 2021-01-01 2021-01-31 2021-03-07 2021-04-11 2022-04-11 d increase system resilience mentação FORMATIZADO DE MONITOR sto in the MRSP AMENTO E INSPEÇÃO DAS BA RRAGENS E ESTRUTURAS HI DRÁULICAS (TDR2) BR-SABESP-189732-NC-RFB / PRESTAÇÃO DE SERVIÇOS D E ENGENHARIA PARA IMPLEM Technical assistance and Pro Seleção Baseada Open - Internationa Em fase de Imple ENTAÇÃO E OPERACIONALIZ IBRD / 89160 ject management and super Prévia na Qualidade e Cu 0.00 2020-09-30 2021-07-08 2020-10-21 2020-12-04 2022-11-14 2021-01-01 2021-01-31 2021-03-07 2021-04-11 2022-04-11 l mentação AÇÃO DO PLANO DE AÇÃO E vision sto MERGENCIAL (PAE) DAS BAR RAGENS E ESTRUTURAS HID RÁULICAS (TDR3) BR-SABESP-86311-CS-QCBS Technical assistance and Pro Seleção Baseada / Consultoria para avaliar pot IBRD / 89160 ject management and super Posterior na Qualidade e Cu Open - National 0.00 Cancelado 2020-06-30 2020-10-09 2020-09-11 2020-09-27 2020-10-12 2020-11-11 2020-12-16 2021-01-20 2022-01-20 enciais para Eficiência Energ vision sto ética - EEA e EEE Page 6 BR-SABESP-278388-CS-QCB S / ELABORAÇÃO DE PROJET O BÁSICO E EXECUTIVO DAS OBRAS NECESSÁRIAS PARA Technical assistance and Pro Seleção Baseada MANUTENÇÃO DAS BARRAGE IBRD / 89160 ject management and super Posterior na Qualidade e Cu Open - National 0.00 Cancelado 2022-02-20 2022-04-13 2022-03-13 2022-04-26 2022-05-24 2022-06-23 2022-07-28 2022-09-01 2023-09-01 NS CAPIVARI, POÇO PRETO, vision sto OMBREIRA ESQUERDA DO CA CHOEIRA, OMBREIRAS DO JA CAREÍ E PAVIMENTAÇÃO DAS CRISTAS DE ÁGUAS CLARAS E CASCATA (TR6) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SABESP-182423-CS-CDS / Contratação direta de PAUL O TEIXEIRA DA CRUZ CONSU LTORIA EM GEOTECNIA LTDA Technical assistance and Pro Seleção Direta de - Consultor Geotécnico para IBRD / 89160 ject management and super Posterior Direct 16,631.55 Assinado 2020-07-30 2020-06-10 2020-08-09 2020-07-08 2020-10-13 2020-07-24 2021-04-11 Consultores avaliar informações, diagnóst vision ico e sugestão de investigaçõ es do aumento das cargas pi ezométricas e encharcament o do pé de jusante da barrag em Atibainha. BR-SABESP-182427-CS-CDS / Contratação direta de Ricar do Abrahão Geociências S/S. - Consultor Hidrogeólogo par Technical assistance and Pro Seleção Direta de a avaliar informações, diagnó IBRD / 89160 ject management and super Posterior Direct 16,852.43 Assinado 2020-07-30 2020-06-10 2020-08-09 2020-07-08 2020-10-13 2020-07-24 2021-04-11 Consultores stico e sugestão de investiga vision ções no tema do aumento da s cargas piezométricas e enc harcamento do pé de jusante da barragem Atibainha. BR-SABESP-174589-CS-CDS / Ahmed Fouad CHRAIBI - Co Technical assistance and Pro nsultor Geotécnico para o De Seleção Direta de IBRD / 89160 ject management and super Posterior Direct 188,661.92 Assinado 2020-07-31 2020-07-23 2020-08-10 2020-07-23 2020-10-14 2020-08-06 2021-04-12 senvolvimento do Plano de A Consultores vision ção relacionado à Barragem Atibainha (Sistema de Produç ão de Água Cantareira) BR-SABESP-174591-CS-CDS / Wynfrith Hugo Rodolf Klaus Riemer - Consultor Hidrogeól Technical assistance and Pro Seleção Direta de ogo para o Desenvolvimento IBRD / 89160 ject management and super Posterior Direct 122,572.91 Assinado 2020-07-30 2020-07-23 2020-08-09 2019-12-23 2020-10-13 2020-08-02 2021-04-11 Consultores do Plano de Ação relacionado vision à Barragem Atibainha (Siste ma de Produção de Água Can tareira) BR-SABESP-246834-CS-CDS Technical assistance and Pro / PRESTAÇÃO DE SERVIÇOS D Seleção Direta de IBRD / 89160 ject management and super Posterior Direct 42,253.52 Assinado 2021-10-31 2021-08-19 2021-11-10 2021-10-03 2022-01-14 2021-10-23 2022-07-13 E ENGENHARIA-CONSULTOR Consultores vision HDROGEÓLOGO Ricardo Anto nio Abrahão BR-SABESP-246832-CS-CDS Technical assistance and Pro / PRESTAÇÃO DE SERVIÇOS D Seleção Direta de IBRD / 89160 ject management and super Posterior Direct 38,732.39 Assinado 2021-10-31 2021-08-20 2021-11-10 2021-10-03 2022-01-14 2021-10-18 2022-07-13 E ENGENHARIA - CONSULTOR Consultores vision GEOTÉCNICO Paulo Teixeira da Cruz BR-SABESP-285415-CS-CDS / Prestação de serviços de Co Technical assistance and Pro Seleção Direta de nsultoria em Barragens e Est IBRD / 89160 ject management and super Posterior Direct 0.00 Assinado 2022-03-21 2022-07-11 2022-03-31 2022-09-21 2022-06-04 2023-01-14 2022-12-01 Consultores ruturas de Concreto - Especia vision lidade Cálculo Estrutural (TR 17) BR-SABESP-285419-CS-CDS / Prestação de serviços de co Technical assistance and Pro Seleção Direta de nsultoria em Barragens e Est IBRD / 89160 ject management and super Posterior Direct 0.00 Rescindido 2022-03-21 2022-07-11 2022-03-31 2022-09-05 2022-06-04 2022-12-08 2022-12-01 Consultores ruturas de Concreto - Especia vision lidade Tecnologia dos Materi ais (TR 18) BR-SABESP-285419-CS-CDS - CORRETO / Prestação de se Technical assistance and Pro Seleção Direta de Implementação P rviços de consultoria em Barr IBRD / 89160 ject management and super Posterior Direct - National 0.00 2022-03-21 2022-03-31 2022-06-04 2022-12-01 Consultores endente agens e Estruturas de Concre vision to - Especialidade Tecnologia dos Materiais (TR 18) Page 7