PROCUREMENT PLAN (Textual Part) Project information: [Mozambiquey] [Regional Climate Resilience Program for Eastern & Southern Africa] [P180171] Project Implementation agency: [Direcção Nacional de Gestão de Recursos Hídricos] Date of the Procurement Plan: [February 25, 2023] Period covered by this Procurement Plan: [February 25, 2023 – March 25, 2023] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Eastern and Southern Africa : Regional Climate Resilience Program for Eastern and Southern Africa Project PLAN General Information Country: Eastern and Southern Africa 2023-08-02 Bank’s Approval Date of the Original Procurement Plan: 2024-09-04 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P180171 GPN Date: Project Name: Regional Climate Resilience Program for Eastern and Southern Africa Project Loan / Credit No: IDA / 73260 EMERGENCY PREVENTION AND MANAGEMENT UNIT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MD-CPGU-T002 / Travaux de construction de quatre (04) n 2. Infrastructure Investment Demande de cota ouvelles cabines du système s and Sustainable Asset Man Single Stage - One E tions (DTPM ne pr 2024-10-1 IDA / 73260 A posteriori Demande de prix Open - National 40,000.00 0.00 Annulé 2024-02-20 2024-04-16 d'alerte précoce de l'APIPA p agement for Climate Resilie nvelope ovenant pas de la 3 our la résilience de l'agglomé nce Banque) ration d'Antananarivo face a ux inondations Demande de cota MD-CPGU-T003 / Travaux de 2. Infrastructure Investment Single Stage - One E tions (DTPM ne pr En attente d 2024-07-2 réhabilitation de bureau pour IDA / 73260 s and Sustainable Asset Man A posteriori Demande de prix Open - National 15,000.00 0.00 2024-04-08 2024-06-20 nvelope ovenant pas de la 'exécution 0 l'UGP agement for Climate Resilie Banque) nce GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-CPGU-F002 / Fourniture, pose et installation des équip 1. Risk Management and Cli Single Stage - One E En attente d' ements et matériels pour le s IDA / 73260 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-10-26 2023-10-31 2023-12-12 2024-01-11 2024-02-15 2024-08-13 mate Financing nvelope exécution ystème hydrométéorologique au niveau du Mandrare MD-CPGU-F003 / Acquisition 1. Risk Management and Cli Single Stage - One E En attente d' IDA / 73260 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-10-26 2023-10-31 2023-12-12 2024-01-11 2024-02-15 2024-08-13 des matériels et mobiliers de mate Financing nvelope exécution bureaux MD-CPGU-F005 / Acquisition 3. Adaptive Climate Services Single Stage - One E En cours d'ex de disaster kits (sacs au dos, IDA / 73260 A posteriori Appel d'offres Open - National 1,380,000.00 0.00 2023-11-24 2023-11-29 2024-01-10 2024-02-09 2024-03-15 2024-09-11 for Resilient Communities nvelope écution matériels de secours d'urgen ces, etc...) MD-CPGU-F006 / Acquisition Passation de marc En cours d'ex IDA / 73260 4. Project Management A posteriori Direct - National 20,000.00 0.00 2023-10-16 2024-04-29 2023-10-21 2024-05-02 2023-11-18 2024-01-02 de logiciel comptable TOM2P hé de gré à gré écution RO MD-CPGU-F004 / Acquisition, acheminement et installation 3. Adaptive Climate Services Single Stage - One E En attente d' IDA / 73260 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-11-15 2023-11-20 2024-01-01 2024-01-31 2024-03-06 2024-09-02 des sirènes électriques et à for Resilient Communities nvelope exécution manivelles, ainsi que formati on des acteurs MD-CPGU-F001 / Fournitures , pose et installation des équi 1. Risk Management and Cli Open - Internationa Single Stage - One E En cours d'ex IDA / 73260 A priori Appel d'offres 4,000,000.00 0.00 2024-02-08 2024-02-13 2024-03-26 2024-04-25 2024-05-30 2025-02-24 pements des systèmes de su mate Financing l nvelope écution rveillance hydrométéorologiq ue et des SAP MD-CPGU-F009 / Location de 1. Risk Management and Cli Single Stage - One E En attente d' serveur Cloud pour le mécani IDA / 73260 A posteriori Appel d'offres Open - National 120,000.00 0.00 2024-02-26 2024-03-02 2024-04-13 2024-05-13 2024-06-17 2025-06-17 mate Financing nvelope exécution sme de digitalisation MD-CPGU-F010 / Acquisition de matériels et équipements 1. Risk Management and Cli Single Stage - One E En attente d' pour le mécanisme de digitali IDA / 73260 A posteriori Appel d'offres Open - National 180,000.00 0.00 2024-03-18 2024-03-23 2024-05-04 2024-06-03 2024-07-08 2024-09-06 mate Financing nvelope exécution sation et la collecte des donn ées du modèle économétriqu e MD-CPGU-F007 / Acquisition des matériels techniques du 1. Risk Management and Cli Single Stage - One E SAP de l'APIPA pour la résilie IDA / 73260 A posteriori Appel d'offres Open - National 800,000.00 0.00 Annulé 2024-05-15 2024-05-20 2024-07-01 2024-07-31 2024-09-04 2025-03-03 mate Financing nvelope nce d'agglomération d'Antan anarivo face aux inondations MD-CPGU-F013 / Acquisition 1. Risk Management and Cli Single Stage - One E En attente d' IDA / 73260 A posteriori Appel d'offres Open - National 170,000.00 0.00 2024-04-03 2024-04-03 2024-04-17 2024-05-01 2024-05-29 2024-09-26 de deux (02) véhicules 4*'4 p mate Financing nvelope exécution our l'UGP MD-CPGU-F011 / Acquisition 1. Risk Management and Cli Single Stage - One E En attente d' IDA / 73260 A posteriori Demande de prix Open - National 38,000.00 0.00 2024-06-15 2024-07-16 2024-09-14 de matériels informatiques p mate Financing nvelope exécution our l'UGP MD-CPGU-F012 / Acquisition 2. Infrastructure Investment Single Stage - One E En attente d' de mobiliers de bureau pour l IDA / 73260 s and Sustainable Asset Man A posteriori Demande de prix Open - National 17,000.00 0.00 2024-06-15 2024-07-14 2024-09-12 nvelope exécution 'UGP agement for Climate Resilie nce MD-CPGU-F015 / Acquisition 1. Risk Management and Cli Single Stage - One E En attente d' IDA / 73260 A posteriori Demande de prix Open - National 8,000.00 0.00 2024-06-15 2024-07-04 2024-07-10 matériel de communication p mate Financing nvelope exécution our l'UGP MD-CPGU-F016 / Acquisition Single Stage - One E En attente d' IDA / 73260 4. Project Management A posteriori Demande de prix Open - National 5,300.00 0.00 2024-09-04 2024-10-08 2024-10-23 de produits d'entretien pour l nvelope exécution 'UGP MD-CPGU-F019 / Acquisition 1. Risk Management and Cli Single Stage - One E En attente d' IDA / 73260 A posteriori Appel d'offres Open - National 75,000.00 0.00 2024-09-27 2024-10-02 2024-11-13 2024-12-13 2025-01-17 2025-02-16 d'un véhicule 4*4 pick-up po mate Financing nvelope exécution ur l'APIPA NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C006 / Recrutement d'un ca Sélection fondée s binet pour le développement 3. Adaptive Climate Services En cours d'exécut IDA / 73260 A posteriori ur les qualification Open - National 100,000.00 0.00 2023-10-04 2024-02-12 2023-10-25 2023-12-08 2024-01-07 2024-02-11 2024-08-09 d’un schéma d’aménagemen for Resilient Communities ion s des consultants t intercommunale pour la zon e d’intervention MD-CPGU-C008 / Recruteme 2. Infrastructure Investment nt d'un Cabinet pour l'études Sélection fondée s s and Sustainable Asset Man Open - Internationa APS, APD, DAO, EIES pour les IDA / 73260 A posteriori ur la qualité et le 800,000.00 0.00 Annulé 2023-11-09 2023-11-30 2024-01-13 2024-02-10 2024-03-11 2024-04-15 2024-05-20 2024-11-16 agement for Climate Resilie l travaux prioritaires pour la g coût nce estion des inondations (Mana njary, Fort Dauphin) MD-CPGU-C013 / Recruteme 2. Infrastructure Investment Sélection fondée s nt d'un Cabinet pour l'évalua s and Sustainable Asset Man En cours d'exame IDA / 73260 A posteriori ur la qualité et le Open - National 250,000.00 0.00 2023-11-06 2024-08-28 2023-11-27 2024-01-10 2024-02-07 2024-03-08 2024-04-12 2024-05-17 2025-01-12 tion et diagnostic de la situat agement for Climate Resilie n coût ion actuelle du territoire mari nce time. MD-CPGU-C021 / Recruteme Sélection fondée s nt d'un Cabinet pour la Form IDA / 73260 4. Project Management A posteriori ur les qualification Open - National 100,000.00 0.00 Annulé 2023-11-08 2023-11-29 2024-01-12 2024-02-11 2024-03-17 2024-04-16 ation sur la lutte contre la co s des consultants rruption et la fraude MD-CPGU-C012 / Recruteme 2. Infrastructure Investment Sélection fondée s nt de cabinet pour la mise à j s and Sustainable Asset Man En attente d'exéc IDA / 73260 A posteriori ur les qualification Open - National 155,000.00 0.00 2023-10-24 2023-11-14 2023-12-28 2024-01-27 2024-03-02 2024-08-29 our, vulgarisation et formatio agement for Climate Resilie ution s des consultants n sur la norme NIHYCRI nce MD-CPGU-C007 / Recruteme nt d'un Cabinet pour la réact 2. Infrastructure Investment Sélection fondée s ualisation de l'APD, DAO, EIE s and Sustainable Asset Man Open - Internationa En cours d'exame IDA / 73260 A posteriori ur la qualité et le 750,000.00 0.00 2023-10-17 2024-08-28 2023-11-07 2023-12-21 2024-01-18 2024-02-17 2024-03-23 2024-04-27 2024-10-24 S pour les travaux prioritaire agement for Climate Resilie l n coût s pour la gestion des inondati nce ons (Tamatave, Majunga et T uléar) MD-CPGU-C011 / Recruteme nt d'un Cabinet pour l'élabor ation de Plans d’urbanisme D Sélection fondée s 3. Adaptive Climate Services En cours d'exécut irecteur suivi d’études de vul IDA / 73260 A priori ur la qualité et le Open - National 1,250,000.00 0.00 2023-11-06 2023-11-27 2024-01-10 2024-02-07 2024-03-08 2024-04-12 2024-05-17 2024-11-13 for Resilient Communities ion nérabilité des 5 villes vulnéra coût bles : Manakara, Vaingandra no, Mahanaro, Vatomandry, Soanierana Ivongo MD-CPGU-C015 / Recruteme Sélection fondée s nt d'un Cabinet pour le dével 3. Adaptive Climate Services Open - Internationa En cours d'exame IDA / 73260 A posteriori ur les qualification 100,000.00 0.00 2023-11-20 2024-08-08 2023-12-11 2024-01-24 2024-02-23 2024-03-29 2024-09-25 oppement d'un Guide de solu for Resilient Communities l n s des consultants tions techniques face au cha ngement climatique. MD-CPGU-C022 / Recruteme 2. Infrastructure Investment Sélection fondée s nt de cabinet pour la mise à j s and Sustainable Asset Man En attente d'exéc IDA / 73260 A posteriori ur les qualification Open - National 155,000.00 0.00 2023-10-24 2023-11-14 2023-12-28 2024-01-27 2024-03-02 2024-08-29 our , vulgarisation et formati agement for Climate Resilie ution s des consultants on sur la directive AEP nce MD-CPGU-C026 / Recruteme 2. Infrastructure Investment nt de cabinet pour la finalisat Sélection fondée s s and Sustainable Asset Man En cours d'exécut ion et vulgarisation de la Poli IDA / 73260 A posteriori ur les qualification Open - National 200,000.00 0.00 2023-10-24 2024-02-08 2023-11-14 2023-12-28 2024-01-27 2024-03-02 2024-08-29 agement for Climate Resilie ion tique Nationale de Développ s des consultants nce ement des Infrastructures et des Equipement (PNDIE) MD-CPGU-C002 / Recruteme nt d'un Bureau d'étude pour l 2. Infrastructure Investment Sélection fondée s 'études APS, APD, DAO relati s and Sustainable Asset Man Open - Internationa IDA / 73260 A posteriori ur la qualité et le 2,000,000.00 0.00 Annulé 2023-11-10 2023-12-07 2023-12-01 2024-01-14 2024-02-11 2024-03-12 2024-04-16 2024-05-21 2025-05-21 ve aux travaux de réhabilitati agement for Climate Resilie l coût on des pistes et ouvrages reli nce ant Amboasary- Tranomaro- Tsivory- Ebelo. MD-CPGU-C018 / Recruteme nt d'un cabinet pour effectue Sélection fondée s 3. Adaptive Climate Services En attente d'exéc r la collecte des données pou IDA / 73260 A posteriori ur la qualité et le Open - National 300,000.00 0.00 2023-11-08 2023-11-29 2024-01-12 2024-02-09 2024-03-10 2024-04-14 2024-05-19 2024-11-15 for Resilient Communities ution r le Registre Social Unique (R coût SU) dans les zones sélection nés. MD-CPGU-C020 / Recruteme Sélection fondée s En attente d'exéc nt d'un Cabinet pour l'évalua IDA / 73260 4. Project Management A posteriori ur la qualité et le Open - National 350,000.00 0.00 2025-06-19 2025-07-10 2025-08-23 2025-09-20 2025-10-20 2025-11-24 2025-12-29 2027-12-29 ution tion à mi-parcours et de fin d coût e projet MD-CPGU-C004 / Recruteme 2. Infrastructure Investment Sélection fondée s Open - Internationa nt d'un Bureau d'étude pour l IDA / 73260 s and Sustainable Asset Man A priori ur la qualité et le 2,000,000.00 0.00 Annulé 2024-06-21 2024-07-12 2024-08-25 2024-09-22 2024-10-22 2024-11-26 2024-12-31 2025-09-27 l 'étude EIES, PAR du barrage agement for Climate Resilie coût Mandrare nce MD-CPGU-C023 / Recruteme nt de cabinet pour la vulgaris 2. Infrastructure Investment ation et formation sur la nor Sélection fondée s s and Sustainable Asset Man En attente d'exéc me bâtiment ;sur le guide de IDA / 73260 A posteriori ur la qualité et le Open - National 420,000.00 0.00 2024-01-09 2024-01-30 2024-03-14 2024-04-11 2024-05-11 2024-06-15 2024-07-20 2025-07-20 agement for Climate Resilie ution construction de case d'habita coût nce tion traditionnelle; et sur le g uide d'intégration de la résili ence climatique dans les SR AT et PRD MD-CPGU-C016 / Recruteme nt d'un Cabinet pour la mise Sélection fondée s 3. Adaptive Climate Services à jour des manuels d'informa IDA / 73260 A posteriori ur la qualité et le Open - National 500,000.00 0.00 Annulé 2023-11-15 2023-12-06 2024-01-19 2024-02-16 2024-03-17 2024-04-21 2024-05-26 2024-11-22 for Resilient Communities tion des zones géographique coût s et les investissements tech niques pendant la SOP-2 MD-CPGU-C027 / Recruteme nt d'un cabinet chargé de col lecte de donnée du modèle é Sélection fondée s 3. Adaptive Climate Services En attente d'exéc conométrique de suivi de la v IDA / 73260 A posteriori ur les qualification Open - National 145,000.00 0.00 2024-02-22 2024-03-14 2024-04-27 2024-05-27 2024-07-01 2024-12-28 for Resilient Communities ution ulnérabilité et résilience de la s des consultants population face au changem ent climatique au niveau nati onal C017 / Recrutement d'un ca Sélection fondée s 3. Adaptive Climate Services En cours d'exécut binet pour effectuer le dével IDA / 73260 A posteriori ur les qualification Open - National 100,000.00 0.00 2024-02-21 2024-03-21 2024-03-13 2024-06-21 2024-04-26 2024-05-26 2024-06-30 2024-12-27 for Resilient Communities ion oppement du mécanisme de s des consultants digitalisation Page 2 MD-CPGU-C001 / Recruteme nt d'un Cabinet pour les étud es techniques (APS, APD) et 2. Infrastructure Investment Sélection fondée s élaboration du DAO pour le b s and Sustainable Asset Man Open - Internationa IDA / 73260 A priori ur la qualité et le 6,500,000.00 0.00 Annulé 2024-01-17 2024-02-07 2024-03-22 2024-04-19 2024-05-19 2024-06-23 2024-07-28 2025-04-24 arrage sur le Mandrare ( AEP, agement for Climate Resilie l coût Systèmes d'irrigation, stocka nce ge, stabilisation des rives) , e t la préparation du plan d'ex ploitation et de maintenance (E&M) MD-CPGU-C034 / Recruteme Sélection fondée s 1. Risk Management and Cli Open - Internationa En attente d'exéc nt d'un cabinet pour l'amélior IDA / 73260 A posteriori ur les qualification 100,000.00 0.00 2024-09-27 2024-10-18 2024-12-01 2024-12-31 2025-02-04 2025-05-05 mate Financing l ution ation du modèle de prévision s des consultants de l'APIPA INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-CPGU-C014 / Recruteme 2. Infrastructure Investment nt d'un Cabinet pour la mise Sélection de cons s and Sustainable Asset Man En cours d'exame à jour APS, APD pour les Abri IDA / 73260 A posteriori ultants par entent Direct - National 50,000.00 0.00 2023-11-06 2024-08-28 2023-11-16 2024-01-20 2024-04-19 agement for Climate Resilie n s Communautaires à Usage e directe nce Multiple - ACUM (Toliary, Mah ajanga) MD-CPGU-CI013 / Recruteme En cours d'exécut nt d'un consultant individuel IDA / 73260 4. Project Management A posteriori Individuel Open - National 32,000.00 0.00 2023-10-31 2023-12-07 2023-12-19 2024-01-09 2024-02-13 2028-12-29 ion chargé de l'audit interne MD-CPGU-CI012 / Recruteme nt d'un consultant Individuel En cours d'exame IDA / 73260 4. Project Management A posteriori Individuel Open - National 50,000.00 0.00 2024-04-16 2024-08-28 2024-06-04 2024-06-25 2024-07-30 2025-01-26 International pour l'évaluatio n n du cadre Genre MD-CPGU-CI010 / Recruteme nt d'un (e) Consultant Individ uel International pour le renf 1. Risk Management and Cli Open - Internationa IDA / 73260 A posteriori Individuel 100,000.00 0.00 Annulé 2024-06-21 2024-08-09 2024-08-30 2024-10-04 2024-11-03 orcement de la capacité en c mate Financing l e qui concerne l'accès aux fo nds pour le climat pour la CP GU MD-CPGU-CI009 / Recruteme En cours d'exécut nt d'un (e) Assistant (e) en P IDA / 73260 4. Project Management A posteriori Individuel Open - National 26,800.00 0.00 2023-11-10 2023-12-07 2023-12-14 2023-12-14 2024-01-03 2028-12-28 ion assation de Marchés MD-CPGU-CI002 / Recruteme En cours d'exécut nt d'un (e) Responsable Admi IDA / 73260 4. Project Management A posteriori Individuel Open - National 56,000.00 0.00 2023-11-07 2024-02-26 2023-12-04 2023-12-04 2024-01-03 2028-12-28 ion nistratif et Financier MD-CPGU-CI008 / Recruteme En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 56,000.00 0.00 2023-11-07 2023-12-07 2023-12-05 2023-12-26 2024-01-30 2028-12-28 nt d'un (e) Responsable en V ion BG/Genre MD-CPGU-CI007 / Recruteme En cours d'exécut nt d'un (e) Responsable Sauv IDA / 73260 4. Project Management A posteriori Individuel Open - National 56,000.00 0.00 2023-11-13 2023-12-07 2023-12-10 2023-12-10 2024-01-03 2028-12-28 ion egarde Environnementale MD-CPGU-CI006 / Recruteme En cours d'exécut nt d'un (e) Responsable Sauv IDA / 73260 4. Project Management A posteriori Individuel Open - National 56,000.00 0.00 2023-11-13 2023-12-07 2023-12-17 2023-12-17 2024-01-03 2028-12-28 ion egarde Sociale MD-CPGU-CI005 / Recruteme En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 32,000.00 0.00 2023-11-10 2023-12-07 2023-12-14 2023-12-14 2024-01-03 2028-12-28 nt d'un (e) Comptable ion MD-CPGU-CI003 / Recruteme En cours d'exécut nt d'un (e) Responsable en P IDA / 73260 4. Project Management A priori Individuel Open - National 56,000.00 0.00 2023-11-07 2023-12-19 2023-12-04 2024-07-29 2023-12-04 2024-08-09 2024-01-03 2028-12-28 ion assation de Marchés MD-CPGU-CI004 / Recruteme En cours d'exécut nt d'un (e) Responsable Suivi IDA / 73260 4. Project Management A posteriori Individuel Open - National 56,000.00 0.00 2023-11-10 2023-12-07 2023-12-14 2023-12-14 2024-01-03 2028-12-28 ion -Evaluation MD-CPGU-CI001 / Recruteme Sélection de cons En cours d'exécut nt d'un (e) Responsable Tech IDA / 73260 4. Project Management A posteriori ultants par entent Direct - National 56,000.00 0.00 2023-12-21 2024-01-12 2023-12-31 2024-02-20 2024-02-16 2029-03-13 ion nique e directe MD-CPGU-CI014 / Recruteme nt d'un consultant individuel chargé de la mise à jour des En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 10,000.00 0.00 2024-01-18 2024-02-07 2024-02-23 2024-03-15 2024-04-19 2024-10-16 manuels de procédures opér ion ationnels des programmes d e protection sociale adaptés au changement climatique MD-CPGU-CI015 / Recruteme nt d'un consultant individuel chargé de l'analyse multidim En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 15,000.00 0.00 2024-01-18 2024-02-07 2024-03-09 2024-03-30 2024-05-04 2024-10-31 ensionnel des systèmes adap ion tatifs de protection sociale et spatiale sensibles aux chang ements climatiques MD-CPGU-CI016 / Recruteme nt d'un consultant individuel chargé du développement d' un modèle économétrique po En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 30,000.00 0.00 2024-01-18 2024-02-07 2024-03-09 2024-03-30 2024-05-04 2024-10-31 ur identifier les indicateurs d ion e suivi de la vulnérabilité et r ésilience de la population fac e au changement climatique au niveau national MD-CPGU-CI017 / Recruteme nt d'un Consultant Individuel En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 10,000.00 0.00 2024-01-18 2024-03-21 2024-03-09 2024-03-30 2024-05-04 2024-10-31 chargé de l'étude sur les typ ion es de travaux HIMO adaptatif s aux chocs MD-CPGU-CI011 / Recruteme Sélection de cons nt d'un consultant individuel En cours d'exécut IDA / 73260 4. Project Management A posteriori ultants par entent Direct - National 10,000.00 0.00 2024-02-21 2024-02-26 2024-02-23 2024-02-27 2024-04-27 pour l'élaboration du Manuel ion e directe d'Exécution du Projet (MEP) Page 3 MD-CPGU-CI018 / Recruteme nt d'un Consultant Individuel chargé de l'élaboration d'un En cours d'exécut IDA / 73260 4. Project Management A posteriori Individuel Open - National 30,000.00 0.00 2024-03-06 2024-02-26 2024-04-03 2024-04-10 2024-04-25 2024-07-24 plan de renforcement de cap ion acité sur la protection sociale adaptative et infrastructures résilientes MD-CPGU-CI020 / Recruteme En attente d'exéc nt d'un(e) stagiaire en passat IDA / 73260 4. Project Management A posteriori Individuel Limited - National 7,200.00 0.00 2024-04-02 2024-04-16 2024-04-19 2024-06-02 2026-06-02 ution ion de marchés MD-CPGU-CI019 / Recruteme nt d'un(e) stagiaire en passat IDA / 73260 4. Project Management A posteriori Individuel Open - National 7,200.00 0.00 Annulé 2024-03-06 2024-04-24 2024-05-15 2024-06-19 2026-06-19 ion de marchés MD-CPGU-CI021 / Recruteme En attente d'exéc nt d'un (e) stagiaire en passa IDA / 73260 4. Project Management A posteriori Individuel Limited - National 7,200.00 0.00 2024-06-04 2024-06-18 2024-06-21 2024-07-17 2026-07-17 ution tion de marchés MD-CPGU-CI027 / Recruteme 2. Infrastructure Investment En cours d'exame nt de Chargé de communicat IDA / 73260 s and Sustainable Asset Man A posteriori Individuel Open - National 48,000.00 0.00 2024-06-28 2024-08-28 2024-08-16 2024-09-06 2024-10-11 2028-10-10 n ion locale du projet HAVELO agement for Climate Resilie Mandrare nce MD-CPGU-CI028 / Recruteme 2. Infrastructure Investment En cours d'exame nt d' un Expert en communic IDA / 73260 s and Sustainable Asset Man A posteriori Individuel Open - National 72,000.00 0.00 2024-06-28 2024-08-28 2024-08-16 2024-09-06 2024-10-11 2028-10-10 n ation du PRRC agement for Climate Resilie nce MD-CPGU-CI029 / Recruteme nt d'un Consultant individuel 1. Risk Management and Cli Open - Internationa En attente d'exéc chargé de l'étude de faisabili IDA / 73260 A posteriori Individuel 50,000.00 0.00 2024-09-27 2024-11-15 2024-12-06 2025-01-10 2025-04-10 mate Financing l ution té pour le MH EWS (Multi Haz ard Early Warning System) MD-CPGU-CI030 / Recruteme nt d'un CI chargé de l'élabora 1. Risk Management and Cli En attente d'exéc IDA / 73260 A posteriori Individuel Open - National 15,000.00 0.00 2024-09-27 2024-11-15 2024-12-06 2025-01-10 2025-04-10 tion de politique nationale su mate Financing ution r les Abris Communautaire Page 4