PROCUREMENT PLAN (Textual Part) Project information: KAZAKHSTAN – RESILIENT LANDSCAPE RESTORATION PROJECT, P171577 Project Implementation agency: FORESTRY AND WILDLIFE COMMITTEE Date of the Procurement Plan: NOVEMBER 18, 2021 Period covered by this Procurement Plan: NOVEMBER 2021 – MARCH 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as agreed upon with the Bank, the standard national procurement documents shared with the project should be used, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: is not applicable Works: is not applicable PROCUREMENT Kazakhstan : Kazakhstan Resilient Landscapes Restoration Project PLAN General Information Country: Kazakhstan 2021-11-25 Bank’s Approval Date of the Original Procurement Plan: 2024-09-04 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171577 GPN Date: Project Name: Kazakhstan Resilient Landscapes Restoration Project Loan / Credit No: TF / B6007 Forestry and Wildlife Committee Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KZRESILAND/KYZYORDA-100 Piloting community – center 0HA/DC-01-2022 / Direct con Other (with fi ed approach on dryland agro Under Imple 2025-07-0 tracting of designated entitie TF / B6007 Post Direct Selection Direct - National eld for expla 0.00 2022-10-17 2022-09-28 2022-10-22 2022-10-03 2022-11-26 forestry and landscape resto mentation 1 s as prescribed by the forestr nation) ration y legislation. Justifications ar e attached in the STEP. KZRESILAND/SHIELI-1000HA/ Piloting community – center DC-02-2022 / Direct contracti Other (with fi ed approach on dryland agro Under Imple 2025-07-0 ng of designated entities as TF / B6007 Post Direct Selection Direct - National eld for expla 0.00 2022-10-17 2022-09-28 2022-10-22 2022-10-03 2022-11-26 forestry and landscape resto mentation 1 prescribed by the forestry le nation) ration gislation. Justifications are at tached in the STEP. KZRESILAND/SYRDARYA-496 Piloting community – center HA/DC-03-2022 / Direct contr Other (with fi ed approach on dryland agro Under Imple 2025-07-0 acting of designated entities TF / B6007 Post Direct Selection Direct - National eld for expla 0.00 2022-10-17 2022-09-28 2022-10-22 2022-10-03 2022-11-26 forestry and landscape resto mentation 1 as prescribed by the forestry nation) ration legislation. Justifications are attached in the STEP. KZRESILAND/ZHALAGASH-50 Piloting community – center 3HA/DC-04-2022 / Direct con Other (with fi ed approach on dryland agro 2025-07-0 tracting of designated entitie TF / B6007 Post Direct Selection Direct - National eld for expla 0.00 Signed 2022-10-17 2022-09-28 2022-10-22 2022-10-12 2022-11-26 2022-10-13 forestry and landscape resto 1 s as prescribed by the forestr nation) ration y legislation. Justifications ar e attached in the STEP. KZRESILAND/FORESTNURSE RY/RFB-NCB-04/2023 / Works on the construction of a fores Piloting community – center Other (with fi t nursery, including an irrigat ed approach on dryland agro Single Stage - One E Pending Imp 2025-09-3 TF / B6007 Post Request for Bids Open - National eld for expla 0.00 2023-07-13 2023-07-13 2023-08-11 2023-08-14 2023-08-25 ion project on the territory of forestry and landscape resto nvelope lementation 0 nation) the Kazalinsky State Instituti ration on for the Protection of Fores ts and Wildlife of the Kyzylor da region, on an area of 33.5 hectares GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KZRESILAND/RFQ-IT-2021 / Project coordination and mo Request for Quota Single Stage - One E TF / B6007 Post Open - National 8,193.42 Signed 2021-11-27 2022-01-22 2022-01-19 2022-07-21 Computers and multifunction nitoring tions nvelope al devises KZRESILAND/RFQ-FRNTR-20 Project coordination and mo Request for Quota Single Stage - One E TF / B6007 Post Open - National 0.00 Signed 2021-11-27 2022-01-22 2022-01-20 2022-07-21 21 / Office furniture nitoring tions nvelope KZRESILAND/SEEDSBANK/G- Capacity building of the Fore NCB-03-2022-4LOTS / Equipp stry and Wildlife Committee Single Stage - One E Under Imple TF / B6007 Post Request for Bids Open - National 0.00 2022-02-15 2022-02-01 2022-02-28 2022-03-22 2022-05-26 2022-04-22 2022-04-27 2022-05-11 2022-12-31 ing the Schuchinsk Forestry S (FWC) for integrated landsca nvelope mentation eeds Gene Bank pe management KZRESILAND/KOSKUDUK/G-N Piloting community – center Single Stage - One E Under Imple CB-01-2022-9 LOTS / Equippi TF / B6007 ed approach on dryland agro Post Request for Bids Open - National 0.00 2022-02-01 2022-02-01 2022-03-01 2022-04-01 2022-05-23 2022-04-11 2022-04-29 2022-12-31 nvelope mentation ng the Koskuduk Forestry forestry and landscape resto ration KZRESILAND/KAZALINSK/G-N Piloting community – center Single Stage - One E Under Imple CB-02-2022-4LOTS / Equippin TF / B6007 ed approach on dryland agro Post Request for Bids Open - National 0.00 2022-02-01 2022-02-01 2022-03-01 2022-04-01 2022-05-23 2022-04-11 2022-05-31 2022-04-29 2022-12-31 nvelope mentation g the Kazalinsk Forestry forestry and landscape resto ration RSILAND/SEEDSBANK/G-IT-R Piloting community – center FQ-04-2022/8LOTS / IT Equip ed approach on dryland agro Request for Quota Single Stage - One E TF / B6007 Post Limited 0.00 Canceled 2022-02-28 2022-01-26 2022-05-11 2022-12-31 ment for the Schuchinsk Fore forestry and landscape resto tions nvelope stry Seeds Gene Bank ration RESILAND/SEEDSBANK/G-RF Piloting community – center Q-03-2022/11LOTS / Furnitur ed approach on dryland agro Request for Quota Single Stage - One E TF / B6007 Post Limited 0.00 Canceled 2022-02-28 2022-01-24 2022-05-11 2022-12-31 e for the Schuchinsk Forestry forestry and landscape resto tions nvelope Seeds Gene Bank ration RESILAND/SEEDSBANK/G-RF Capacity building of the Fore Q-03-2022/11LOT-2 / Furnitur stry and Wildlife Committee Request for Quota Single Stage - One E Under Imple TF / B6007 Post Limited 0.00 2022-03-17 2022-01-26 2022-05-25 2022-12-31 e for the Schuchinsk Forestry (FWC) for integrated landsca tions nvelope mentation Seeds Gene Bank pe management RSILAND/SEEDSBANK/G-IT-R Capacity building of the Fore FQ-04-2022/8LOT / IT Equipm stry and Wildlife Committee Request for Quota Single Stage - One E TF / B6007 Post Limited 0.00 Signed 2022-03-17 2022-01-24 2022-05-28 2022-12-31 ent for the Schuchinsk Forest (FWC) for integrated landsca tions nvelope ry Seeds Gene Bank pe management KZRESILAND/SEEDSBANK/RF Q-05-2022/6LOTS / Goods pu Capacity building of the Fore rchased for the creation of a stry and Wildlife Committee Request for Quota Single Stage - One E Under Imple genetic seed bank of forest s TF / B6007 Post Limited 0.00 2022-08-17 2022-08-04 2022-10-14 2022-12-31 (FWC) for integrated landsca tions nvelope mentation pecies growing on arid lands pe management and degraded landscapes on the basis of the Republican F orest Breeding and Seed Cen ter KZRESILAND/KOSKUDUK/RF Piloting community – center Q-06-2022/2LOTS / Goods pu ed approach on dryland agro Request for Quota Single Stage - One E Under Imple TF / B6007 Post Limited 0.00 2022-08-17 2022-08-04 2022-10-14 2022-12-31 rchased for the Koskuduk Sta forestry and landscape resto tions nvelope mentation te Institution for the Protectio ration n of Forests and Wildlife Page 1 KZRESILAND/KOSKUDUK/RF Piloting community – center Q-07-2022/4LOTS / Goods pu ed approach on dryland agro Request for Quota Single Stage - One E TF / B6007 Post Limited 0.00 Signed 2022-08-17 2022-08-04 2022-10-14 2022-09-07 2022-12-31 rchased for the Koskuduk Sta forestry and landscape resto tions nvelope te Institution for the Protectio ration n of Forests and Wildlife KZRESILAND/KAZALINSK/RF Piloting community – center Q-08-2022/1LOT / Goods pur ed approach on dryland agro Request for Quota Single Stage - One E TF / B6007 Post Limited 0.00 Signed 2022-08-17 2022-08-04 2022-10-14 2022-09-24 2022-12-31 chased for the Kazalinsk Stat forestry and landscape resto tions nvelope e Institution for the Protectio ration n of Forests and Wildlife KZRESILAND/KAZALINSK/RF Piloting community – center Q-09-2022/4LOTS / Goods pu ed approach on dryland agro Request for Quota Single Stage - One E Under Imple TF / B6007 Post Limited 0.00 2022-08-17 2022-08-04 2022-10-14 2022-12-31 rchased for the Kazalinsk Sta forestry and landscape resto tions nvelope mentation te Institution for the Protectio ration n of Forests and Wildlife KZRESILAND/RADIOS/RFQ-1 Capacity building of the Fore Request for Quota Single Stage - One E Pending Impl 1/2023 / purchase of radio eq TF / B6007 stry and Wildlife Committee Post Open - National 0.00 2024-06-24 2024-08-19 2025-02-15 tions nvelope ementation uipment for the Forestry Com (FWC) for integrated landsca mittee pe management KZRESILAND/NURSERYEQUIP MENT/RFQ-12/2024 / Supply of a front-end loader and a di Capacity building of the Fore tch-digger plow for the Kazali stry and Wildlife Committee Request for Quota Single Stage - One E Pending Impl TF / B6007 Post Open - National 0.00 2024-07-22 2024-09-16 2025-03-15 nsk State Institution for the P (FWC) for integrated landsca tions nvelope ementation rotection of Forests and Wildl pe management ife of the Department of Natu ral Resources and Environme ntal Regulation of the Kyzylor da Region. KZRESILAND/NURSERYEQUIP MENT/RFQ-13/2024 / Supply of a wheeled tractor for the K Piloting community – center azalinsk State Institution for t ed approach on dryland agro Request for Quota Single Stage - One E Pending Impl TF / B6007 Post Open - National 0.00 2024-09-18 2024-11-11 2024-12-29 he Protection of Forests and forestry and landscape resto tions nvelope ementation Wildlife of the Department of ration Natural Resources and Enviro nmental Regulation of the Ky zylorda Region. KZRESILAND/COMMIITTEQUI Capacity building of the Fore PMENT/RFQ-14/2024 / Purcha stry and Wildlife Committee Request for Quota Single Stage - One E Pending Impl TF / B6007 Post Open - National 0.00 2024-09-18 2024-10-25 2024-12-31 se of five satellite phones (Th (FWC) for integrated landsca tions nvelope ementation uraya) for the Forestry Com pe management mittee NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KZRESILAND/MEDIASERVICE S-NCS-RFQ-10/2023 / Creatio n of videos and coverage in t Project coordination and mo Request for Quota Single Stage - One E Under Imple TF / B6007 Post Open - National 0.00 2023-08-09 2024-03-13 2023-09-11 2023-12-31 he media and social network nitoring tions nvelope mentation s of the work carried out with in the framework of the proje ct RESILAND/PRESENTAT/2LOT S-NCS-RFQ-11/2024 / Purcha Capacity building of the Fore se of non-consulting services stry and Wildlife Committee Request for Quota Single Stage - One E Under Imple for the production of present TF / B6007 Post Open - National 0.00 2024-02-19 2024-04-12 2024-04-04 2024-12-31 (FWC) for integrated landsca tions nvelope mentation ation materials and brochure pe management s on issues of forest reproduc tion, afforestation and landsc aping settlements. 2 Lots. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KZRESILAND/ZHAMBYL-6-PIL Capacity building of the Fore OTS/CQS-03-2022 / Survey-D stry and Wildlife Committee Consultant Qualifi TF / B6007 Post Open - National 0.00 Completed 2021-12-30 2021-12-27 2022-02-15 2022-03-04 2022-03-11 2022-03-15 2022-03-15 2022-04-29 2022-06-04 2023-01-10 2023-01-15 esign for Agro-Forestry Piloti (FWC) for integrated landsca cation Selection ng in 6 Zhambyl Farms pe management KZRESILAND/FORESTINVENT Piloting community – center ORY/CS-DC-01-2022 / Invent ed approach on dryland agro Consultant Qualifi ory of Undocumented Forests TF / B6007 Post Open - National 0.00 Canceled 2021-12-30 2021-12-27 2022-02-15 2022-03-04 2022-03-15 2022-04-29 2025-06-01 forestry and landscape resto cation Selection and Development of the Fore ration st Management Plans RESILAND/DASB PLANTING/C Piloting community – center Consultant Qualifi QS-05-2022 / Survey-Design TF / B6007 ed approach on dryland agro Post Open - National 0.00 Canceled 2021-12-30 2021-12-28 2022-02-15 2022-03-04 2022-03-15 2022-04-29 2022-12-31 cation Selection for Dry Aral Sea Bed Planting forestry and landscape resto ration RESILAND/DASB PLANTING/C Capacity building of the Fore Consultant Qualifi QS-05-2022-2 / Survey-Desig TF / B6007 stry and Wildlife Committee Post Open - National 161,983.56 Signed 2022-03-04 2021-12-27 2022-03-25 2022-05-08 2022-05-10 2022-06-07 2022-06-07 2022-07-12 2022-05-22 2022-12-31 cation Selection n for Dry Aral Sea Bed Planti (FWC) for integrated landsca ng pe management KZRESILAND/KYZYLORDA FO Capacity building of the Fore Consultant Qualifi REST/CQS-01-2022 / Survey- TF / B6007 stry and Wildlife Committee Post Open - National 0.00 Canceled 2021-12-30 2021-12-27 2022-02-15 2022-03-04 2022-03-15 2022-04-29 2022-12-31 cation Selection Design for Kyzylorda Forestat (FWC) for integrated landsca ion pe management KZRESILAND/KYZYLORDA FO Piloting community – center Consultant Qualifi REST/CQS-01-202-2 / Survey- TF / B6007 ed approach on dryland agro Post Open - National 40,161.54 Signed 2022-03-04 2022-03-04 2022-04-20 2022-05-07 2022-03-09 2022-05-18 2022-04-18 2022-07-02 2022-05-22 2022-12-31 cation Selection Design for Kyzylorda Forestat forestry and landscape resto ion ration KZRESILAND/KAZALINSK NU Capacity building of the Fore Consultant Qualifi RSERY/CQS-04/2022 / Survey TF / B6007 stry and Wildlife Committee Post Open - National 0.00 Canceled 2021-12-30 2021-12-27 2022-02-15 2022-02-07 2022-03-04 2022-03-15 2022-04-29 2023-01-03 cation Selection -Design for Kazalinsk Nursery (FWC) for integrated landsca pe management KZRESILAND/KAZALINSK NU Piloting community – center Consultant Qualifi Under Implement RSERY/CQS-04/20-2 / Survey- TF / B6007 ed approach on dryland agro Post Open - National 0.00 2022-03-03 2022-03-03 2022-03-24 2022-05-07 2022-03-09 2022-06-06 2022-07-11 2022-12-31 cation Selection ation Design for Kazalinsk Nursery forestry and landscape resto ration KZRESILAND/3MODELS-KYZY Capacity building of the Fore Consultant Qualifi LORDA/CQS-02-2021 / Surve TF / B6007 stry and Wildlife Committee Post Open - National 0.00 Canceled 2021-12-30 2021-12-27 2022-02-15 2022-02-07 2022-03-04 2022-03-15 2022-04-29 2022-12-31 cation Selection y-Design for 3 Models in Kyzy (FWC) for integrated landsca lorda pe management KZRESILAND/3MODELS-KYZY Capacity building of the Fore Consultant Qualifi LORDA/CQS-02-20-2 / Survey TF / B6007 stry and Wildlife Committee Post Open - National 23,762.39 Signed 2022-03-04 2022-03-04 2022-03-25 2022-05-08 2022-04-01 2022-06-07 2022-06-05 2022-07-12 2022-05-22 2022-12-31 cation Selection -Design for Kyzylorda Foresta (FWC) for integrated landsca tion pe management Page 2 KZRESILAND/NURSERYEXPE RTISE/CQS-06-2022 / Consult ant services for comprehensi Piloting community – center ve non-departmental experti ed approach on dryland agro Consultant Qualifi Under Implement se in Organizational and eco TF / B6007 Post Open - National 0.00 2022-11-28 2022-11-23 2022-12-19 2023-02-01 2023-03-03 2023-04-07 2023-12-30 forestry and landscape resto cation Selection ation nomic plan of the forest nurs ration ery, including the project irri gation on the territory of the Kazaly State Institution for pr otection of Forests and Wildli fe. KZRESILAND/PMUAUDITSER VICES/CQS-07/2023 / Audit s ervices for project’s financial Project coordination and mo Consultant Qualifi Pending Impleme TF / B6007 Post Limited 0.00 2023-04-14 2023-05-01 2023-05-07 2023-06-11 2023-12-29 position as at the end of 202 nitoring cation Selection ntation 1,2022 years and of the inco me and expenditure for the a ccounting period. RESILAND/NURSERYTECHSU PERVIS/CQS-08-2023 / techni cal supervision of the constru Piloting community – center ction of a forest nursery, incl ed approach on dryland agro Consultant Qualifi Under Implement uding an irrigation project on TF / B6007 Post Open - National 0.00 2023-10-01 2023-10-01 2023-10-03 2024-04-09 2023-10-04 2023-10-04 2023-10-18 2024-12-31 forestry and landscape resto cation Selection ation the territory of the Kazalinsk ration y State Institution for the Pro tection of Forests and Wildlif e of the Kyzylorda region, wit h an area of 33.5 hectares INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KZRESILAND/PMU-FS-IC/202 Project coordination and mo Individual Consult 1-04 / PMU Fiduciary Speciali TF / B6007 Post Direct 220.29 Signed 2021-11-12 2021-11-12 2021-11-18 2021-11-18 2021-11-22 2021-11-22 2021-11-26 2022-07-11 2025-09-30 nitoring ant Selection st - disbursement and procur ement KZRESILAND/PMU-PM-IC/202 Project coordination and mo Individual Consult 1-01 / PMU Project Manager-c TF / B6007 Post Direct 0.00 Signed 2021-11-12 2021-11-12 2021-11-18 2021-11-18 2021-11-22 2021-11-22 2021-11-26 2021-07-08 2025-09-30 nitoring ant Selection oordination and control KZRESILAND/PMU-TC-IC/202 1-03 / PMU Technical Consult Project coordination and mo Individual Consult TF / B6007 Post Direct 100,000.00 Signed 2021-11-12 2021-11-12 2021-11-18 2021-11-18 2021-11-22 2021-11-22 2021-12-08 2021-07-07 2025-10-12 ant - preparation of technical nitoring ant Selection conditions and technical spec ifications KZRESILAND/PMU-SEC-IC/20 21-02 / PMU Social and Envir Project coordination and mo Individual Consult onmental Consultant- guidan TF / B6007 Post Direct 95,000.00 Signed 2021-11-12 2021-11-12 2021-11-18 2021-11-18 2021-11-22 2021-11-22 2021-11-26 2021-07-07 2025-09-30 nitoring ant Selection ce and control over complian ce with the environmental, s ocial and labor legislation KZRESILAND/PMU-AA-IC/202 1-05 / PMU Administrative As Project coordination and mo Individual Consult TF / B6007 Post Direct 75,000.00 Signed 2021-11-12 2021-11-12 2021-11-18 2021-11-18 2021-11-22 2021-11-22 2021-11-26 2021-08-06 2025-09-30 sistant - organization/mainte nitoring ant Selection nance of office work KZRESILAND/DC-IC/2021-06 Capacity building of the Fore Individual Consult Under Implement / Individual consultant - Supp TF / B6007 stry and Wildlife Committee Post Direct 0.00 2021-11-12 2021-11-01 2021-11-18 2021-10-14 2021-11-22 2021-10-19 2021-11-26 2022-11-01 ant Selection ation ort to FWC with Forestry Legi (FWC) for integrated landsca slation Drafting pe management KZRESILAND/FORESTINVENT Capacity building of the Fore ORY/CS-DS-01-2022 / Invento stry and Wildlife Committee Under Implement ry of Undocumented Forests TF / B6007 Post Direct Selection Direct 0.00 2022-05-13 2021-10-08 2022-06-07 2022-07-18 2025-06-01 (FWC) for integrated landsca ation and Development of the Fore pe management st Management Plans KZRESILAND/DC-IC/2022-07 / Individual consultant - impr ovement of legislation and d Capacity building of the Fore evelopment of proposals for stry and Wildlife Committee Individual Consult TF / B6007 Post Limited 0.00 Signed 2022-08-05 2022-06-01 2022-08-10 2022-06-06 2022-08-31 2022-06-01 2022-10-05 2023-04-03 a long-term strategy for the (FWC) for integrated landsca ant Selection development of the forest clu pe management ster, including wood harvesti ng, processing, processing, p roduction of finished woodwo rking products. KZRESILAND/FORESTSUPER VISION/DC-02-2022 / Carryin Piloting community – center g out architectural supervisio ed approach on dryland agro Under Implement n of the implementation Wor TF / B6007 Post Direct Selection Direct - National 0.00 2022-11-28 2022-11-23 2022-12-08 2022-11-23 2022-12-18 2025-09-30 forestry and landscape resto ation king project for the creation ration of protective plantings aroun d the city of Kyzylorda on an area of ​3000 hectares KZRESILAND/3MODELSUPER VISION/DC-03-2022 / the aut hor's supervision of the imple Piloting community – center mentation working projects o ed approach on dryland agro Under Implement n the creation of 3 model plo TF / B6007 Post Direct Selection Direct - National 0.00 2022-12-20 2022-12-19 2022-12-30 2023-01-11 2025-09-30 forestry and landscape resto ation ts on a total area of 15 hecta ration res of 5 hectares each in the green belt of the city of Kyzyl orda in order to demonstrate innovative ways of agroforest ry KZRESILAND/6FARMSSUPER VISION/DC-04-2022 / The aut hor's supervision of the imple Piloting community – center mentation Working projects o ed approach on dryland agro Under Implement n the creation of pilot project TF / B6007 Post Direct Selection Direct - National 0.00 2022-12-20 2022-12-19 2022-12-30 2023-01-11 2025-09-30 forestry and landscape resto ation s on agroforestry on a total a ration rea of 120 hectares of 20 hec tares each in 6 farms engage d in long-term forest manage ment in Zhambyl region. KZRESILAND/CS-IC-08-2023 / Consultant for cover the act ivities of the Ministry of Ecolo Capacity building of the Fore gy and Natural Resources of stry and Wildlife Committee Individual Consult Under Implement TF / B6007 Post Open - National 0.00 2023-04-24 2023-06-06 2023-06-27 2023-12-25 2024-06-22 the Republic of Kazakhstan a (FWC) for integrated landsca ant Selection ation nd the Committee within the pe management framework of capasity buildin g of the Committee raising a wareness of the population. Page 3 KZRESILAND/CS-IC-09-2023 / Individual Consultant for ob Capacity building of the Fore taining positive conclusions o stry and Wildlife Committee Individual Consult Pending Impleme f a comprehensive non-depar TF / B6007 Post Open - National 0.00 2023-05-15 2023-07-03 2023-07-24 2023-08-28 2024-03-05 (FWC) for integrated landsca ant Selection ntation tmental expertise for the dev pe management eloped working projects for t he irrigation of forest nurseri es services. RESILAND/NURSERYSUPERVI SION/CSDC-05/2023 / the aut hor's supervision of the imple Capacity building of the Fore mentation a working project - stry and Wildlife Committee Under Implement development of the project o TF / B6007 Post Direct Selection Direct - National 0.00 2023-07-10 2023-06-10 2023-07-19 2023-08-01 2024-04-01 (FWC) for integrated landsca ation f the organizational and econ pe management omic plan of the forest nurse ry, including the irrigation pr oject on the territory Kazalins ky State Institution KZRESILAND/CS-IC-10-2023. / Short term advisory service s consultant on analyzing the Capacity building of the Fore economic efficiency of activit stry and Wildlife Committee Individual Consult Under Implement TF / B6007 Post Open - National 0.00 2023-10-20 2023-10-20 2023-10-30 2023-10-30 2023-11-01 2024-09-30 ies carried out in within the fr (FWC) for integrated landsca ant Selection ation amework of the Message of t pe management he Head of the State People of Kazakhstan about planting 2 billion trees in the forest fu nd KZRESILAND/AUDIT-CS-DS/2 Capacity building of the Fore 024-11 / Audit services for pr stry and Wildlife Committee Under Implement oject’s financial position as a TF / B6007 Post Direct Selection Direct - National 0.00 2024-05-06 2023-05-05 2024-05-15 2024-04-29 2024-05-20 2024-12-31 (FWC) for integrated landsca ation t the end of 2023 year and of pe management the income and expenditure f or the accounting period. KZRESILAND/FORESTREGUL Capacity building of the Fore ATIONS/ICS/2023-11 / Short-t stry and Wildlife Committee Individual Consult Under Implement erm consultant for consultan TF / B6007 Post Open - National 0.00 2024-06-28 2024-06-21 2024-07-21 2024-07-24 2024-07-30 2024-12-31 (FWC) for integrated landsca ant Selection ation cy services. Analysis of legal pe management and regulatory instruments g overning forest financing Page 4