Procurement Plan – Component 1 as of April 2021 Envisaged R Start of Cont e Procurement ract Procur Revie f Process(but Dura Ty ement w . Description Estimated not earlier tion pe Metho Prior N Cost than the (mo d /Post o project nths . effectiveness ) date), Component 1: Irrigation and Drainage Improvement Component Additional Financing US 7,735,36 1 Rehabilitation works on W- D 6.64 . Tbisi-Kumisi Secondary RFB May-20 25 Prior 1 EU 6,889,35 1 Network R 4.00 US 214,431. 1 Supply of Computer G- D 22 . hardware for RFB May-20 3 Post 1 EU 190,979 2 NSLMLUMA R Supply of Drones for US 20,421.4 1 remote monitoring and G- D 9 . RFQ May-20 2 Post inventory for 1 EU 18,188.0 3 NSLMLUMA R 0 US 81,688.1 1 Supply of SUV Vehicles G- D 9 . RFB May-20 3 Post for NSLMLUMA 1 EU 72,754 4 R US 1,021,09 1 Feasibility Study for 20 CS D 9.02 . QCBS May-20 15 Prior Reservoirs -1 EU 909,422 5 R Consultancy Services US 91,898.9 1 for Institutional CS D 3 . CQS May-20 12 Post strengthening of -1 EU 81,848 6 NSLMLUMA R Financial Statements US Audit of the Irrigation 8,500 D 1 and Land Market CS . Development Project SSS April -21 14 Post -1 EU 7 (ILMDP) Additional 7,570 Financing (AF) for FY R 2020 and 2021. Financial Statements US Audit of the Irrigation 15,000 1 D and Land Market CS . LCS June - 22 10 Post Development Project -1 8 EU (ILMDP) Additional 13,359 Financing (AF) for FY R 2022. U Total Component S 9,188, 1: D 405.50 E U 8,183, R 475 Procurement Plan – Component 2 as of March, 2021 USD TO Ref. EUR Estimated Reference No. No. exchang Cost Typ e rate Description e 0.8376 USD 252,510.0 2.2.1 External Quality Control NCS LMDC/NCS/RFB/01 EUR 211,499.4 USD 252,510.0 Total Component 2.2 EUR 211,499.4 USD 852,000.0 2.3.1 Server / storage G LMDC/G/RFB/07 EUR 713,625.2 USD 380,000.0 2.3.2 PC and Office Equipment, Plotter G LMDC/G/RFB/06 EUR 318,283.5 USD 450,000.0 2.3.3 Vehicles (Pick-Up) G LMDC/G/RFB/05 EUR 376,914.7 USD 175,000.0 2.3.4 GNSS Smart Antenna G LMDC/G/RFB/04 EUR 146,577.9 USD 22,200.00 2.3.5 Full box (11 each)1 G LMDC-G-RFQ-01 EUR 18,594.46 2.3.6 Drone (2 each)2 G LMDC-G-RFQ-02 USD 20,000.00 111 Full boxes have been added for already purchased 11 pick-up vehicles; 2 2 Drones have been added for testing of modern measuring practices and technologies, also for creating high resolution orthophoto material and assessment of accuracy of digitalization. EUR 15,574.50 USD 1,899,200. Total Component 2.3 EUR 1,589,570. USD 94,289.87 2.4.1 Project Manager CS LMDC/CS/IC/003 EUR 78,976.09 USD 53,837.12 2.4.2 Finance Manager CS LMDC/CS/D/01 EUR 45,093.34 Accounting Software Maintenance 2.4.3 CS LMDC/CS/IC/007 USD and upgrading Specialist 9,005.48 USD 39,154.27 2.4.4 Procurement Manager CS LMDC/CS/IC/010 EUR 32,795.16 USD 22,320.90 2.4.5 M&E Specialist CS LMDC/CS/IC/008 EUR 18,695.72 USD 39,953.33 2.4.6 Chief legal consultant CS LMDC/CS/IC/011 EUR 33,464.45 USD 28,000.00 2.4.7 Senior Legal Consultant CS LMDC/CS/IC/019 EUR 23,452.47 USD 26,000.00 2.4.8 Legal consultant CS LMDC/CS/IC/020 EUR 21,777.30 USD 45,946.33 2.4.9 Project Coordinator CS LMDC/CS/IC/03 EUR 38,484.11 USD 11,525.02 2.4.10 Communication Consultant CS LMDC/CS/IC/002 EUR 9,653.22 USD 20,745.02 2.4.11 Chief surveyor CS LMDC/CS/IC/006 EUR 17,375.78 USD 63,625.69 2.4.12 IT Manager CS LMDC/CS/D/02-01 EUR 53,292.13 2.4.13 Translator CS LMDC/CS/IC/012 USD 18,025.45 EUR 15,097.91 USD 34,959.17 2.4.14 Procurement Assistant CS LMDC/CS/IC/04-01 EUR 29,281.39 USD 40,000.00 2.4.15 Land Consolidation Expert CS LMDC/CS/IC/018 EUR 33,503.53 USD 33,513.80 2.4.16 IT Component Coordinator CS LMDC/CS/IC/017 EUR 28,070.77 USD 34,959.17 2.4.17 Administration Assistant CS LMDC/CS/IC/011-01 EUR 29,281.39 Software Assets Assessment, USD Business Process Analysis and 20,000.00 2.4.18 CS LMDC/CS/IC/015 System Architecture Design EUR Consultant (local consultant)3 16,751.77 ICT Readiness Assessment USD 93,700.00 2.4.19 Consultant (International CS LMDC-CS-DC-03 Consultant)4 EUR 78,482.02 USD 15,000.00 2.4.20 Financial Analyst CS LMDC/CS/IC/021 EUR 12,563.82 USD 10,000.00 2.4.21 Gender Consultant CS LMDC/CS/IC/022 EUR 8,375.88 Software Assets Assessment, USD Business Process Analysis and 64,000.00 2.4.22 System Architecture Design CS LMDC/CS/IC/023 Consultant (International EUR 53,605.65 Consultant) USD 818,560.6 Total Component 2.4 EUR 685,616.7 3 Following rejection of all candidates who expressed their interest for consultancy assignment advertised by NAPR for selection of national consultant for Software Assets Assessment, Business Process Analysis and System Architecture Design Consultant, the Evaluation Committee made decision to re-advertise the assignment internationally or explore the other available options. 4 The estimated cost for hiring the international consultant for ICT Readiness Assessment is based on market analysis and the expected higher qualification of the international consultant, as well as reimbursable expenses related to his overseas assignment. USD 2,970,270. GRAND TOTAL: EUR 2,486,686. PROCUREMENT Georgia : Irrigation and Land Market Development Project PLAN General Information Country: Georgia 2016-09-15 Bank’s Approval Date of the Original Procurement Plan: 2023-09-04 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P133828 GPN Date: Project Name: Irrigation and Land Market Development Project Loan / Credit No: IDA / 54560, IBRD / 90430 Ministry of Agriculture of Georgia Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDIC/CW/ICB/01 / Rehabilitati on of Irrigation Scheme Main Component 1 Irrigation and Open - Internationa Single Stage - One E 14,623,975. 2018-08 IDA / 54560 Prior Request for Bids Completed 2016-02-23 2016-03-20 Canals and Electrical and Me Drainage Improvement l nvelope 02 -13 chanical parts of main canal and headwork IDIC/CW/NCB/01 / Sioni and Component 1 Irrigation and Single Stage - One E 2018-09-0 IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2017-12-01 2017-12-15 2018-01-14 2018-02-13 2018-03-13 Algeti Dams Safety Works Drainage Improvement nvelope 9 IDIC/CW/ICB/02 / Rehabilitati on of secondary networks for Component 1 Irrigation and Open - Internationa Single Stage - One E 2019-07-2 IDA / 54560 Prior Request for Bids 0.00 Canceled 2018-11-05 2018-11-19 2018-12-31 2019-01-30 2019-02-27 Zeda Ru, Tbisi-Kumisi and Ze Drainage Improvement l nvelope 7 mo Samgori Irrigation Schem es IDIC/CW/NCB/02 / Kvemo Sa Component 1 Irrigation and Single Stage - One E 2021-05-1 mgori On-Farm Network Reh IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2020-02-14 2020-02-19 2020-04-01 2020-05-01 2020-06-05 Drainage Improvement nvelope 6 abilitation, Section G33 IDIC/CW/ICB/03 / Kvemo Sa Component 1 Irrigation and Open - Internationa Single Stage - One E 8,699,977.7 2021-10-0 mgori On-Farm Network Reh IDA / 54560 Post Request for Bids Signed 2020-01-31 2020-02-06 2020-02-05 2020-02-06 2020-03-18 2020-05-01 2020-04-17 2020-06-04 2020-05-22 2020-06-09 Drainage Improvement l nvelope 2 1 abilitation, section G1-G32 IDIC/CW/NCB/01-1 / Sioni an Component 1 Irrigation and Single Stage - One E 2020-11-2 IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2020-03-27 2020-03-31 2020-04-03 2020-05-03 2020-04-30 2020-05-18 2020-06-02 d Algeti Dams Safety Works Drainage Improvement nvelope 9 IDIC/CW/ICB/04 / Zeda Ru O Component 1 Irrigation and Open - Internationa Single Stage - One E 6,930,148.5 2021-12-2 IDA / 54560 Post Request for Bids Signed 2020-03-30 2020-04-03 2020-04-04 2020-04-03 2020-05-16 2020-07-10 2020-06-05 2020-09-03 2020-06-22 2020-10-02 n-Farm Network Rehabilitatio Drainage Improvement l nvelope 7 2 n IDIC/AF/W/RFB/01 / Rehabilit Component 1 Irrigation and Open - Internationa Single Stage - One E 2022-08-2 ation works on Tbisi-Kumisi S IBRD / 90430 Post Request for Bids 0.00 Canceled 2020-05-04 2020-05-09 2020-06-20 2020-07-10 2020-07-27 Drainage Improvement l nvelope 6 econdary Network IDIC/CW/NCB/01-2 / Sioni an Component 1 Irrigation and Single Stage - One E 1,689,890.3 2021-07-3 2021-10 IDA / 54560 Post Request for Bids Open - National Completed 2020-05-25 2020-05-25 2020-05-26 2020-06-25 2020-06-25 2020-07-10 2020-07-10 2020-07-31 2020-08-08 d Algeti Dams Safety Works Drainage Improvement nvelope 3 1 -20 IDIC/CW/ICB/05 / Kvemo Sa Component 1 Irrigation and Open - Internationa Single Stage - One E 11,226,782. 2022-03-2 mgori On-Farm Network Reh IDA / 54560 Prior Request for Bids Signed 2020-06-15 2020-08-05 2020-06-17 2020-08-19 2020-08-05 2020-10-26 2020-09-04 2020-12-28 2020-10-04 2021-01-24 Drainage Improvement l nvelope 71 8 abilitation, section G33. G33- 1 Request for B IDIC/CW/NCB/03 / ZEDA-RU I ids - Small W Component 1 Irrigation and Single Stage - One E 2023-06-2 RRIGATION SYSTEM’S MAIN C IBRD / 90430 Post Request for Bids Open - National orks SPD (1 e 0.00 Signed 2022-06-29 2022-07-18 2022-07-11 2022-08-22 2022-08-29 2022-09-21 2022-10-04 2022-10-26 2022-10-30 Drainage Improvement nvelope 3 ANAL AND SECONDARY NET nvelope proc WORK ess) Request for B IDIC/CW/NCB/04 / Reservoir ids - Small W Component 1 Irrigation and Single Stage - One E 2023-08-2 Area Cleaning on Kvemo Sa IDA / 54560 Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2022-10-03 2022-10-08 2022-11-19 2022-12-19 2023-01-23 Drainage Improvement nvelope 1 mgori Head Structure nvelope proc ess) Request for IDIC/G/SH/26 / Kvemo Samg Component 1 Irrigation and Request for Quota Single Stage - One E Quotations ( 2023-09-3 ori On-Farm Network Rehabili IDA / 54560 Post Limited 0.00 Signed 2023-02-18 2023-01-23 2023-02-23 2023-03-01 Drainage Improvement tions nvelope Non Bank-SP 0 tation, Sections G27, G28, an D) d G30 IDIC/CW/SH/27 / Rehabilitati Request for on of G-2 secondary canal on Component 1 Irrigation and Request for Quota Single Stage - One E Quotations ( 2023-09-3 IDA / 54560 Post Limited 0.00 Signed 2023-03-20 2023-01-23 2023-03-27 2023-03-22 -farm network of Kvemo Sam Drainage Improvement tions nvelope Non Bank-SP 0 gori Right Main Canal Irrigati D) on Scheme GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDIC/G/SH/07 / PPMD office F Component 3 Project Manag Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2018-01-17 2018-02-14 2018-04-15 urniture ement tions nvelope IDIC/G/SH/08 / Environmenta Component 3 Project Manag Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2018-01-17 2018-02-14 2018-04-15 l Monitoring Field Equipment ement tions nvelope IDIC/G/SH/09 / Environmenta Component 3 Project Manag Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2018-01-17 2018-02-14 2018-04-15 l Monitoring Program ement tions nvelope IDIC/G/DC/01 / Procurement Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 0.00 Canceled 2017-02-17 2017-02-27 2017-03-11 2017-05-10 of Agricultural software - Sic Drainage Improvement ^2 IDIC/G/SH/10 / Supply of Tac Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2017-07-06 2017-08-08 2017-10-07 hometer for Georgian Amelio Drainage Improvement tions nvelope ration IDIC/G/SH/13 / Supply of 5 u Component 1 Irrigation and Request for Quota Single Stage - One E nits of off-road small size tru IDA / 54560 Post Open - National 0.00 Canceled 2017-10-05 2017-10-28 2017-12-27 Drainage Improvement tions nvelope cks to the Georgian Ameliora tion (GA) IDIC/G/NCB/02 / Supply of M Component 1 Irrigation and Single Stage - One E achinery and Equipment to G IDA / 54560 Post Request for Bids Open - National 80,241.94 Completed 2017-12-04 2017-11-13 2017-12-18 2018-01-17 2017-12-15 2018-02-16 2018-01-30 2018-03-09 2018-02-17 2018-06-07 2018-04-02 Drainage Improvement nvelope eorgian Amelioration IDIC/G/NCB/03 / PPMD Equip Component 3 Project Manag Single Stage - One E IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2018-01-10 2018-01-24 2018-02-23 2018-03-25 2018-04-22 2018-06-21 ment - Vehicles ement nvelope Page 1 IDIC/G/NCB/01 / Supply of IT Component 1 Irrigation and Single Stage - One E IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2017-04-25 2017-10-23 2017-05-09 2017-06-08 2017-12-05 2017-07-08 2017-07-29 2017-09-27 equipment to Georgian Ameli Drainage Improvement nvelope oration IDIC/G/SH/06 / Supply of IT O ffice Equipment for DPMMU a Component 3 Project Manag Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2018-01-17 2018-02-14 2018-04-15 nd Amelioration and Land Ma ement tions nvelope nagement Department of Mo A IDIC/G/SH/11 / Supply Echo-s Component 1 Irrigation and Request for Quota Single Stage - One E ounder and 10 units of Leveli IDA / 54560 Post Open - National 0.00 Canceled 2017-03-02 2017-01-26 2017-04-02 2017-06-01 Drainage Improvement tions nvelope ng Instrument to Georgian A melioration IDIC/G/NCB/02-1 / Supply of Component 1 Irrigation and Single Stage - One E Machinery and Equipment to IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2018-02-27 2018-02-27 2018-03-29 2018-04-28 2018-05-19 2018-07-18 Drainage Improvement nvelope Georgian Amelioration IDIC/G/SH/14 / Supply of 2 u Component 1 Irrigation and Request for Quota Single Stage - One E nits of Off-Road 4X4 vehicles IDA / 54560 Post Open - National 44,019.87 Completed 2018-03-28 2018-04-30 2018-05-29 2018-07-02 2018-06-03 Drainage Improvement tions nvelope for Georgian Amelioration IDIC/G/SH/06-1 / Re-announc ement of Supply of IT Office Component 3 Project Manag Request for Quota Single Stage - One E Equipment for DPMMU and A IDA / 54560 Post Open - National 0.00 Canceled 2018-04-27 2018-05-18 2018-06-17 ement tions nvelope melioration and Land Manag ement Department of MEPA IDIC/G/SH/15 / Supply of GPS Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 17,920.02 Completed 2018-11-07 2018-12-28 2020-01-07 2019-06-26 2020-07-23 Navigators for GA Drainage Improvement tions nvelope IDIC/G/SH/16 / Supply of Prin Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 1,705.17 Completed 2018-11-05 2018-12-28 2019-05-17 2019-06-26 2019-05-31 ting and Scanning Instrumen Drainage Improvement tions nvelope ts for GA IDIC/G/SH/17 / Supply of Net Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 2,367.80 Completed 2018-11-05 2018-12-28 2019-01-02 2019-06-26 2019-01-16 work Equipment fro GA Drainage Improvement tions nvelope IDIC/G/SH/18 / Supply of Pho Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 6,087.28 Completed 2018-11-07 2018-12-28 2019-05-19 2019-06-26 2019-06-21 tography Tools for GA Drainage Improvement tions nvelope IDIC/G/SH/19 / Supply of Aut Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 12,834.62 Completed 2018-11-07 2018-12-28 2019-01-26 2019-06-26 2019-03-18 omotive Equipment for GA Drainage Improvement tions nvelope IDIC/G/ICB/01 / Supply of IT Component 1 Irrigation and Open - Internationa Single Stage - One E IDA / 54560 Post Request for Bids 56,110.00 Completed 2018-11-02 2018-12-14 2018-11-07 2019-02-15 2018-12-19 2019-02-25 2019-01-18 2019-05-06 2019-02-16 2019-05-11 2019-08-15 2019-07-09 equipment for Georgian Amel Drainage Improvement l nvelope ioration IDIC/G/NCB/04 / Supply of S Component 1 Irrigation and Single Stage - One E IDA / 54560 Post Request for Bids Open - National 359,300.60 Completed 2018-11-20 2019-01-25 2018-11-20 2018-12-20 2019-02-25 2019-01-10 2019-03-18 2019-02-01 2019-03-25 2019-04-02 2019-04-20 UV vehicles for Georgian Am Drainage Improvement nvelope elioration IDIC/G/SH/21 / Unionalls (Uni Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 14,668.13 Completed 2019-02-13 2019-03-27 2019-04-22 2019-07-25 2019-06-08 forms) for GA Drainage Improvement tions nvelope IDIC/G/SH/22 / Supply of Prin Component 1 Irrigation and Request for Quota Single Stage - One E ting Equipment to the Georgi IDA / 54560 Post Open - National 10,927.76 Completed 2019-03-27 2019-05-07 2019-05-19 2019-08-05 2019-06-21 Drainage Improvement tions nvelope an Amelioration IDIC/G/NCB/01-1 / Supply of I Component 1 Irrigation and Single Stage - One E IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2018-01-29 2018-02-03 2018-03-05 2018-04-04 2018-04-25 2018-07-24 T equipment to Georgian Am Drainage Improvement nvelope elioration IDIC/G/SH/22-1 / Supply of Pr Component 1 Irrigation and Request for Quota Single Stage - One E inting Equipment for Georgia IDA / 54560 Post Open - National 14,775.76 Completed 2019-06-25 2019-08-05 2019-08-10 2019-10-04 2019-10-25 Drainage Improvement tions nvelope n Amelioration IDIC/G/SH/12 / Supply of 3 u nits of Automatic Flow Measu Component 1 Irrigation and Request for Quota Single Stage - One E ring Devices and 15 units of IDA / 54560 Post Open - National 0.00 Canceled 2018-02-08 2018-03-11 2018-05-10 Drainage Improvement tions nvelope water flow velocity measure ment equipment for Georgia n Amelioration (GA) IDIC/G/NCB/05 / Computer h Component 1 Irrigation and Single Stage - One E IDA / 54560 Post Request for Bids Open - National 96,969.16 Completed 2019-07-09 2019-07-10 2019-07-12 2019-08-11 2019-08-09 2019-08-26 2019-09-25 2019-09-17 2019-10-05 2019-12-16 2019-12-25 ardware for Georgian Amelior Drainage Improvement nvelope ation IDIC/G/SH/20 / Automotive a Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 29,498.04 Completed 2019-11-04 2019-12-12 2020-01-08 2020-03-11 2020-07-24 nd Network Equipment for G Drainage Improvement tions nvelope A IDIC/AF/G/RFB/01 / Supply of Component 1 Irrigation and Open - Internationa Single Stage - One E IBRD / 90430 Post Request for Bids 0.00 Canceled 2020-05-29 2020-06-03 2020-07-15 2020-08-14 2020-09-12 2020-12-22 Computer hardware for NSLM Drainage Improvement l nvelope LUMA IDIC/AF/G/RFQ/01 / Supply of Component 1 Irrigation and Request for Quota Single Stage - One E Drones for remote monitorin IBRD / 90430 Post Open - National 0.00 Canceled 2020-06-06 2020-07-17 2020-09-15 Drainage Improvement tions nvelope g and inventory for NSLMLU MA IDIC/AF/G/RFB/02 / Supply of Component 1 Irrigation and Single Stage - One E IBRD / 90430 Post Request for Bids Open - National 79,051.99 Completed 2020-05-25 2020-11-11 2020-05-25 2020-06-24 2020-11-19 2020-07-15 2020-11-27 2020-08-06 2020-12-17 2020-11-04 2020-12-20 SUV Vehicles for NSLMLUMA Drainage Improvement nvelope IDIC/AF/G/RFB/03 / Supply of Component 1 Irrigation and Open - Internationa Single Stage - One E IBRD / 90430 Post Request for Bids 191,332.51 Completed 2021-12-15 2022-01-17 2021-12-20 2022-01-20 2022-01-31 2022-03-01 2022-03-02 2022-03-28 2022-03-31 2022-03-31 2022-07-10 2022-07-09 Computer hardware for NSLM Drainage Improvement l nvelope LUMA IDIC/G/AF/SH/24 / Supply of Component 1 Irrigation and Request for Quota Single Stage - One E IBRD / 90430 Post Open - National 0.00 Canceled 2022-05-16 2022-07-11 2023-01-07 Drones for NSLMLUMA Drainage Improvement tions nvelope IDIC/G/AF/SH/25 / IT equipm Component 1 Irrigation and Request for Quota Single Stage - One E ent for Biodiversity and Fores IBRD / 90430 Post Open - National 0.00 Completed 2022-08-20 2022-10-01 2022-10-09 2022-12-30 2022-12-13 Drainage Improvement tions nvelope try department of MEPA IDIC/G/NCB/06 / Supply of ve Component 1 Irrigation and Single Stage - One E hicles for Ministry of Environ IDA / 54560 Post Request for Bids Open - National 0.00 Completed 2022-11-15 2022-11-15 2022-11-20 2022-12-20 2022-12-14 2023-01-04 2022-12-21 2023-01-25 2023-01-05 2023-04-25 Drainage Improvement nvelope mental Protection and Agricu lture IDIC/G/AF/NCB/07 / Supply of Component 1 Irrigation and Single Stage - One E 6 units of off-road small-size IBRD / 90430 Post Request for Bids Open - National 0.00 Canceled 2023-05-12 2023-05-19 2023-05-13 2023-06-03 2023-06-09 2023-06-13 2023-06-29 2023-09-30 Drainage Improvement nvelope trucks to the Georgian Ameli oration (GA) IDIC/G/AF/SH/26 / Drones for Component 1 Irrigation and Request for Quota Single Stage - One E IBRD / 90430 Post Open - National 0.00 Canceled 2023-06-05 2023-07-15 2023-09-13 Georgian Amelioration Drainage Improvement tions nvelope IDIC/G/AF/SH/27 / Electric ta Component 1 Irrigation and Request for Quota Single Stage - One E Under Imple IBRD / 90430 Post Open - National 0.00 2023-06-05 2023-07-15 2023-09-13 chometer in the set Drainage Improvement tions nvelope mentation Page 2 IDIC/G/AF/SH/28 / Water leve Component 1 Irrigation and Request for Quota Single Stage - One E l indicator and Water consum IBRD / 90430 Post Open - National 0.00 Canceled 2023-06-07 2023-07-13 2023-09-29 Drainage Improvement tions nvelope ption meter IDIC/G/AF/SH/29 / Purchase Component 1 Irrigation and Request for Quota Single Stage - One E Pending Impl IBRD / 90430 Post Open - National 0.00 2023-09-05 2023-09-28 2023-09-30 of one sedan car for MEPA Drainage Improvement tions nvelope ementation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDIC/NCS/NCB/02 / Bathymet Component 1 Irrigation and Single Stage - One E ric survey for Algeti, Sioni an IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2018-02-12 2018-02-17 2018-03-19 2018-04-18 2018-05-09 2018-11-05 Drainage Improvement nvelope d Tbilisi Reservoirs IDIC/NCS/NCB/01 / Topograp hic Survey for Tbisi Kumisi, K Component 1 Irrigation and Single Stage - One E IDA / 54560 Post Request for Bids Open - National 0.00 Canceled 2017-02-27 2017-03-10 2017-03-06 2017-03-10 2017-03-27 2017-04-18 2017-04-10 2017-04-17 2017-08-15 vemo Samgori and Zeda Ru I Drainage Improvement nvelope rrigation Schemes IDIC/G/SH/23 / Bathymetric Component 1 Irrigation and Request for Quota Single Stage - One E IDA / 54560 Post Open - National 0.00 Canceled 2019-04-22 2019-06-17 2019-12-14 Survey for Algeti and Tbilisi R Drainage Improvement tions nvelope eservoirs CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ILMDP/C/QCBS/01-2015 / Co nsulting Services for Supervis ion of Civil Works to be imple Component 1 Irrigation and Quality And Cost- Open - Internationa mented under Irrigation and IDA / 54560 Prior 2,506,926.80 Signed 2016-02-03 2016-03-03 Drainage Improvement Based Selection l Land Market Development Pr oject - Irrigation And Drainag e Improvement Component (I LMDP) IDIC/CS/LCS/02 / GILMDP Pro Component 1 Irrigation and Least Cost Selecti Open - Internationa ject Financial Audit for 2015- IDA / 54560 Post 36,167.00 Completed 2016-11-07 2016-11-10 2016-11-17 2016-11-10 2016-12-22 2017-01-11 2017-01-12 2017-02-01 2017-02-11 2017-02-27 2017-03-11 2017-03-13 2017-03-18 2017-03-18 2019-07-31 2019-12-24 Drainage Improvement on l 2019 fiscal years IDIC/CS/CQS/01 / Strengthen ing of Designing Capacity an Component 1 Irrigation and Consultant Qualifi IDA / 54560 Post Open - National 0.00 Canceled 2017-12-11 2017-12-25 2018-01-15 2018-02-05 2018-02-12 2019-02-12 d Technical maintenance of Drainage Improvement cation Selection Georgian Amelioration IDIC/CS/QCBS/03 / Institution Component 1 Irrigation and Quality And Cost- Open - Internationa al Strengthening of Georgian IDA / 54560 Prior 0.00 Canceled 2017-11-01 2017-11-15 2017-12-13 2018-01-10 2018-02-09 2018-03-02 2018-03-16 2019-09-07 Drainage Improvement Based Selection l Amelioration IDIC/CS/CQS/05 / National Te Component 3 Project Manag Consultant Qualifi IDA / 54560 Post Open - National 0.00 Canceled 2018-03-01 2018-03-15 2018-04-19 2018-05-03 2018-05-10 2018-11-06 chnical Assistance ement cation Selection IDIC/CS/CQS/03 / Independe nt Dam Safety Assessment a Component 1 Irrigation and Consultant Qualifi Open - Internationa IDA / 54560 Post 257,415.49 Completed 2017-07-31 2017-10-11 2017-08-14 2017-10-12 2017-09-18 2018-06-19 2017-10-09 2018-10-17 2017-10-23 2018-10-21 2019-02-15 2020-12-19 nd Design and Supervision of Drainage Improvement cation Selection l Dam Safety Activities for Alg eti and Sioni Dams IDIC/CS/CQS/07 / Design Eng Component 1 Irrigation and Consultant Qualifi IDA / 54560 Post Open - National 0.00 Canceled 2017-02-27 2017-01-25 2017-03-13 2017-01-25 2017-04-24 2017-03-16 2017-05-08 2017-05-15 2018-02-09 ineering Consultancy Service Drainage Improvement cation Selection s IDIC/CS/QCBS/02 / Preparati on of Detailed Engineering D esign and Construction Super Component 1 Irrigation and Quality And Cost- Open - Internationa IDA / 54560 Prior 3,928,541.41 Signed 2017-09-25 2017-10-09 2017-10-09 2017-11-13 2018-08-21 2017-12-11 2018-10-19 2018-01-10 2018-12-27 2018-01-31 2019-01-29 2018-02-21 2019-02-05 2019-08-15 vision services for Kvemo Sa Drainage Improvement Based Selection l mgori, Tbisi-Kumisi and Zeda Ru irrigation system's second ary, tertiary and on-farm net work IDIC/CS/CQS/08 / Preparatio Component 1 Irrigation and Consultant Qualifi Open - Internationa n of Training Modules and Co IDA / 54560 Post 0.00 Canceled 2018-10-01 2018-10-26 2018-10-15 2018-10-29 2018-11-14 2018-11-25 2019-12-31 Drainage Improvement cation Selection l nduction of Training Courses IDIC/CS/LCS/03 / ILMDP Proje Component 1 Irrigation and Least Cost Selecti Open - Internationa ct Financial Audit for 2019-20 IDA / 54560 Post 21,420.00 Completed 2020-01-22 2020-01-22 2020-02-01 2020-01-27 2020-03-01 2020-02-07 2020-03-16 2020-02-21 2020-03-31 2020-03-02 2020-04-28 2020-03-09 2020-05-18 2020-03-13 2021-07-31 2022-05-31 Drainage Improvement on l 21 fiscal years IDIC/AF/CS/QCBS/01 / Feasib Component 1 Irrigation and Quality And Cost- Open - Internationa IBRD / 90430 Prior 323,475.89 Signed 2020-04-10 2020-06-09 2020-04-24 2020-06-30 2020-05-22 2020-11-25 2020-06-19 2021-04-14 2020-07-04 2021-08-03 2020-07-18 2021-09-30 2020-07-25 2021-10-16 2021-10-28 ility Study for 20 Reservoirs Drainage Improvement Based Selection l IDIC/AF/CS/CQS/01 / Consult Component 1 Irrigation and Consultant Qualifi Open - Internationa ancy Services for Institutiona IBRD / 90430 Post 0.00 Canceled 2020-04-30 2020-05-14 2020-06-18 2020-07-09 2020-07-23 2021-07-23 Drainage Improvement cation Selection l l strengthening of NSLMLUMA IDIC/CS/CQS/09 / Developme nt, implementation and moni toring of Communication, Soc Component 1 Irrigation and Consultant Qualifi ial Mobilization and Media Str IDA / 54560 Post Open - National 0.00 Canceled 2020-07-19 2020-07-20 2020-07-26 2020-08-30 2020-09-13 2020-10-11 2022-06-03 Drainage Improvement cation Selection ategy to support the Activitie s of Water Users Organizatio n’s Development in the ILMD Project areas IDIC/CS/CQS/09-1 / Strategic planning for facilitation of est Component 1 Irrigation and Consultant Qualifi IDA / 54560 Post Open - National 0.00 Canceled 2020-12-07 2021-01-18 2020-12-21 2021-01-18 2021-01-25 2021-02-06 2022-09-29 ablishment of the Water User Drainage Improvement cation Selection Organizations (WUO) in the I LMDP Project areas IDIC/AF/CS/LCS/04 / Financia l Statements Audit of the Irri Component 3 Project Manag Least Cost Selecti Open - Internationa gation and Land Market Deve IBRD / 90430 Post 0.00 Canceled 2022-04-18 2022-05-09 2022-06-06 2022-07-06 2022-07-20 2022-08-10 2022-08-31 2023-06-27 ement on l lopment Project (ILMDP) Addi tional Financing (AF) for FY 2 022 IDIC/AF/CS/CQS/02 / Concept for Establishment and Develo Component 1 Irrigation and Consultant Qualifi IBRD / 90430 Post Open - National 0.00 Completed 2021-09-17 2021-09-23 2021-09-27 2021-11-10 2021-11-24 2021-12-10 2021-12-29 2021-12-25 2022-01-17 2022-06-05 2022-09-21 pment of an Integrated Dat Drainage Improvement cation Selection abase on Land Resources Page 3 IDIC/CS/CQS/09-2 / WUO Ori Component 1 Irrigation and Consultant Qualifi entation Communication and IDA / 54560 Post Open - National 0.00 Signed 2022-09-29 2022-10-03 2022-10-20 2022-11-16 2022-12-27 2022-11-30 2023-01-23 2022-12-28 2023-02-13 2023-09-24 Drainage Improvement cation Selection In-field Training Program IDIC/AF/CS/AF/LCS/05 / FINA NCIAL STATEMENTS AUDIT O F THE IRRIGATION AND LAND MARKET DEVELOPMENT PROJ Component 1 Irrigation and Least Cost Selecti IBRD / 90430 Post Open - National 0.00 Signed 2022-12-29 2022-12-23 2023-01-12 2023-02-02 2023-02-01 2023-03-04 2023-02-15 2023-03-18 2023-03-09 2023-04-08 2023-03-20 2023-04-29 2023-03-28 2024-02-02 ECT ADDITIONAL fINANCING ( Drainage Improvement on ILMDPAF) FOR THE YEARS EN DED DECEMBER 31, 2022, D ECEMBER 31, 2023 AND JAN UARY 31, 2024 (INCLUDING GRACE PERIOD) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS/IC/10 / Procurement Cons Component 1 Irrigation and Individual Consult IDA / 54560 Prior Open 303,743.89 Signed 2015-02-25 2015-02-27 ultant Drainage Improvement ant Selection IDIC/CS/IC/03 / Water Resour Component 1 Irrigation and Individual Consult ce and Climate Advisor for In IDA / 54560 Prior Open 42,611.12 Signed 2015-04-24 2015-04-27 Drainage Improvement ant Selection stitutional Strengthening of U ASCG IDIC/CS/IC/04 / Agricultural E Component 1 Irrigation and Individual Consult IDA / 54560 Prior Open 43,266.65 Signed 2015-04-23 2015-04-26 conomist Drainage Improvement ant Selection IDIC/CS/IC/05 / Water Resour Component 1 Irrigation and Individual Consult IDA / 54560 Prior Open 34,272.44 Signed 2015-05-22 2015-06-18 ce Legal Advisor Drainage Improvement ant Selection IDIC/CS/IC/01 / Management Component 1 Irrigation and Individual Consult Operation and Maintenance ( IDA / 54560 Prior Open 55,932.00 Signed 2015-04-24 2015-06-30 Drainage Improvement ant Selection MOM) Advisor IDIC/CS/SSS/01 / Local-level Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 114,971.33 Completed 2015-07-10 2018-08-04 Water Management Institutio Drainage Improvement ns Advisor IDIC/CS/SSS/04 / Component Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 147,323.87 Signed 2015-07-04 Director Drainage Improvement IDIC/CS/SSS/05 / Financial M Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 142,505.96 Signed 2015-07-04 anager Drainage Improvement IDIC/CS/SSS/06 / Accountant Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 111,917.50 Signed 2015-07-04 and Disbursement Specialist Drainage Improvement IDIC/CS/SSS/02 / Irrigation P Component 1 Irrigation and olicy Specialist and Strategy IDA / 54560 Prior Direct Selection Direct 37,366.67 Completed 2015-07-18 2017-01-03 Drainage Improvement Team Leader IDIC/CS/IC/14 / Component C Component 1 Irrigation and Individual Consult IDA / 54560 Prior Open 225,460.76 Terminated 2015-07-08 2015-07-12 oordinator Drainage Improvement ant Selection IDIC/CS/SSS/03 / Accounting Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 39,616.36 Signed 2015-11-20 Software Maintenance Specia Drainage Improvement list IDIC/CS/SSS/08 / Water Reso Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 23,862.23 Signed 2016-02-20 urce and Climate Advisor Drainage Improvement IDIC/CS/SSS/09 / Agricultural Component 1 Irrigation and IDA / 54560 Prior Direct Selection Direct 55,263.33 Completed 2016-02-20 2017-01-03 Economist Drainage Improvement IDIC/CS/SSS/10 / Water Reso Component 1 Irrigation and urce Legal advisory services IDA / 54560 Prior Direct Selection Direct 67,587.78 Completed 2016-04-02 2018-02-03 Drainage Improvement for Institutional Strengthenin g of GA IDIC/CS/IC/29 / Designing ad visory services for Institution Component 1 Irrigation and Individual Consult al Strengthening of Georgian IDA / 54560 Post Open 45,076.00 Terminated 2016-10-10 2016-09-20 2016-11-19 2016-10-26 2016-12-03 2016-10-28 2016-12-17 2016-11-04 2017-12-17 Drainage Improvement ant Selection Amelioration (Consultant wit h international experience) IDIC/CS/SSS/13 / Team Lead Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 20,256.67 Completed 2016-10-24 2016-10-24 2016-11-03 2016-11-04 2016-11-24 2016-11-22 2017-05-23 2017-06-03 er for finalization of Irrigation Drainage Improvement Strategy IDIC/CS/IC/17 / PPMD Engine Component 3 Project Manag Individual Consult IDA / 54560 Post Open 127,612.34 Signed 2017-02-20 2017-02-06 2017-03-18 2017-02-13 2017-03-25 2017-02-13 2017-03-30 2017-02-18 2019-07-28 er 2 ement ant Selection IDIC/CS/IC/21 / Environment Component 3 Project Manag Individual Consult IDA / 54560 Post Open 0.00 Canceled 2018-01-11 2018-02-13 2018-02-27 2018-03-04 2019-03-04 al Specialist ement ant Selection IDIC/CS/IC/30 / Agricultural E conomics advisory services f Component 1 Irrigation and Individual Consult or Institutional Strengthening IDA / 54560 Post Open 45,217.60 Completed 2017-02-27 2017-02-22 2017-03-30 2017-03-22 2017-04-09 2017-03-31 2017-04-12 2017-04-03 2018-01-07 2019-01-03 Drainage Improvement ant Selection of Georgian Amelioration (Co nsultant with international ex perience) IDIC/CS/IC/32 / Local Consult Component 1 Irrigation and Individual Consult ant for Preparation of Georgi IDA / 54560 Post Open 7,069.67 Completed 2017-04-17 2017-03-30 2017-05-16 2017-05-01 2017-05-23 2017-05-01 2017-05-24 2017-05-04 2017-08-22 2017-10-03 Drainage Improvement ant Selection an National Drainage Strateg y IDIC/CS/IC/33 / Regional Advi sor to the Georgian Ameliora Component 1 Irrigation and Individual Consult IDA / 54560 Post Open 142,426.00 Signed 2017-09-25 2017-09-13 2017-10-24 2017-11-08 2017-11-03 2017-11-10 2017-11-08 2017-11-15 2019-02-01 tion (GA) for Water Users Org Drainage Improvement ant Selection anisations (WUO) strategy de velopment IDIC/CS/IC/34 / Consultant fo r supervision of implementati on of civil works under Batch Component 1 Irrigation and Individual Consult 1 for Zeda Ru, Kvemo Samgo IDA / 54560 Post Open 13,136.62 Completed 2017-09-25 2017-09-28 2017-10-13 2017-10-05 2017-10-20 2017-10-05 2017-10-21 2017-10-10 2018-07-08 2018-08-04 Drainage Improvement ant Selection ri and Tbisi-Kumisi Irrigation Schemes in compliance with the ESMF and EMPs and cons ultations for Drainage Strate gy IDIC/CS/IC/35 / Team Leader Component 1 Irrigation and Individual Consult for Water Users Developmen IDA / 54560 Post Open 31,593.25 Completed 2018-01-22 2018-02-18 2018-02-23 2018-02-26 2018-06-16 2018-08-25 2020-04-04 Drainage Improvement ant Selection t Support Unit Page 4 IDIC/CS/IC/36 / Assistant Pro Component 3 Project Manag Individual Consult IDA / 54560 Post Open 114,041.17 Signed 2018-01-08 2018-01-05 2018-01-23 2018-01-26 2018-01-27 2018-01-20 2019-07-21 curement Consultant ement ant Selection IDIC/CS/IC/37 / Senior Specia list for irrigation engineering, Component 1 Irrigation and Individual Consult IDA / 54560 Post Open 20,946.14 Completed 2018-01-22 2018-02-18 2018-02-23 2018-02-26 2018-06-18 2018-08-25 2020-04-03 operation and maintenance o Drainage Improvement ant Selection f Water Users Development S upport Unit IDIC/CS/IC/26 / Preparation o Component 1 Irrigation and Individual Consult f Environment Management IDA / 54560 Post Open 0.00 Canceled 2017-11-15 2017-12-18 2018-01-01 2018-01-06 2018-03-07 Drainage Improvement ant Selection Plan for Batch 2 IDIC/CS/IC/31 / Complete leg Component 1 Irrigation and Individual Consult islative framework analysis r IDA / 54560 Post Open 0.00 Canceled 2017-04-03 2017-05-04 2017-05-02 2017-05-12 2017-05-15 2017-07-14 Drainage Improvement ant Selection egarding agricultural land in Georgia IDIC/CS/SSS/14 / Accountant Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 47,414.85 Signed 2018-03-20 2018-03-30 2018-05-06 2019-03-06 2018-11-02 and Disbursement Specialist Drainage Improvement IDIC/CS/SSS/15 / Internation Component 1 Irrigation and al Lead-Consultant Irrigation IDA / 54560 Post Direct Selection Direct 56,679.33 Completed 2018-03-29 2018-04-02 2018-04-09 2018-04-09 2018-10-06 2018-10-09 Drainage Improvement and Drainage IDIC/CS/IC/39 / Deputy Team Component 1 Irrigation and Individual Consult leader for Water Users Devel IDA / 54560 Post Open 20,485.79 Completed 2018-05-16 2018-06-13 2018-06-18 2018-10-17 2018-06-21 2018-10-05 2018-12-21 2020-04-04 Drainage Improvement ant Selection opment Support Unit IDIC/CS/IC/40 / Water manag Component 1 Irrigation and Individual Consult ement Specialist Water Users IDA / 54560 Post Open 16,797.65 Completed 2018-05-18 2018-06-23 2018-06-28 2018-07-01 2018-11-21 2018-12-31 2020-04-04 Drainage Improvement ant Selection Development Support Unit IDIC/CS/IC/41 / Regional Tea Component 1 Irrigation and Individual Consult m Leader for Water Users De IDA / 54560 Post Open 17,564.20 Completed 2018-05-18 2018-06-23 2018-06-28 2018-09-28 2018-07-01 2018-10-05 2018-12-31 2020-04-04 Drainage Improvement ant Selection velopment Support Unit for T bisi-Kumisi IDIC/CS/IC/42 / Regional Tea Component 1 Irrigation and Individual Consult m Leader for Water Users De IDA / 54560 Post Open 17,564.20 Completed 2018-05-18 2018-06-23 2018-06-28 2018-09-28 2018-07-01 2018-10-05 2018-12-31 2020-04-04 Drainage Improvement ant Selection velopment Support Unit for Z eda Ru IDIC/CS/IC/43 / Regional Tea Component 1 Irrigation and Individual Consult m Leader for Water Users De IDA / 54560 Post Open 17,559.25 Completed 2018-05-18 2018-06-23 2018-06-28 2018-09-28 2018-07-01 2018-10-05 2018-12-31 2020-04-04 Drainage Improvement ant Selection velopment Support Unit for Z emo Samgori IDIC/CS/IC/44 / Regional Tea Component 1 Irrigation and Individual Consult m Leader for Water Users De IDA / 54560 Post Open 0.00 Canceled 2018-05-18 2018-06-23 2018-06-28 2018-07-01 2018-12-31 Drainage Improvement ant Selection velopment Support Unit for K vemo Samgori IDIC/CS/SSS/-16 / Water Res Component 1 Irrigation and ource Legal advisory services IDA / 54560 Prior Direct Selection Direct 0.00 Canceled 2018-06-19 2018-06-19 2018-06-27 2019-06-27 Drainage Improvement for Institutional Strengthenin g of GA IDIC/CS/SSS/-16/1 / Water Re Component 1 Irrigation and source Legal advisory service IDA / 54560 Post Direct Selection Direct 46,741.10 Completed 2018-06-22 2018-06-22 2018-06-30 2018-07-06 2019-06-30 2022-01-04 Drainage Improvement s for Institutional Strengtheni ng of GA IDIC/CS/SSS/17 / Local-level Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 84,370.00 Completed 2018-09-28 2018-10-05 2018-11-01 2018-11-13 2020-01-11 2022-01-04 Water Management Institutio Drainage Improvement ns Advisor IDIC/CS/SSS/18 / Training Co Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 3,915.38 Completed 2019-02-08 2019-02-20 2019-02-15 2019-03-22 2019-02-25 2019-07-20 2020-01-05 urse for GA Drainage Improvement IDIC/CS/SSS/19 / Local Envir Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 40,588.29 Signed 2019-04-03 2019-06-18 2019-04-07 2019-04-18 2019-06-23 2019-12-30 onmental and Social Speciali Drainage Improvement st IDIC/CS/IC/38 / Financial Man Component 1 Irrigation and Individual Consult IDA / 54560 Post Open 0.00 Canceled 2018-03-25 2018-05-01 2018-05-22 2018-06-26 2018-12-23 ager Drainage Improvement ant Selection IDIC/CS/SSS/20 / Mid-term S Component 1 Irrigation and urvey for Irrigation and Drain IDA / 54560 Post Direct Selection Direct 34,741.20 Completed 2019-11-04 2019-11-19 2019-11-10 2019-11-22 2019-12-12 2020-01-22 2020-06-09 2021-02-26 Drainage Improvement age Improvement Componen tI IDIC/CS/SSS/21 / Procureme Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 39,200.00 Terminated 2020-06-02 2020-06-03 2020-06-02 2020-06-02 2020-06-05 2020-06-05 2020-09-03 nt Consultant Drainage Improvement IDIC/CS/SSS/22 / Project Engi Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 42,500.00 Signed 2021-01-18 2021-01-21 2021-01-22 2021-01-22 2021-01-30 2021-02-07 2022-09-22 neer (Individual Consultant) Drainage Improvement IDIC/CS/IC/45 / International Component 1 Irrigation and Individual Consult IDA / 54560 Post Limited 0.00 Canceled 2021-04-05 2021-04-01 2021-04-10 2021-04-07 2021-04-24 2021-05-15 2022-09-27 dam and dam safety speciali Drainage Improvement ant Selection st IDIC/AF/CS/SSS/23 / Financia l Statements Audit of the Irri Component 3 Project Manag gation and Land Market Deve IBRD / 90430 Post Direct Selection Direct 8,437.00 Completed 2021-04-08 2021-04-06 2021-04-12 2021-04-08 2021-04-30 2021-04-16 2022-06-24 2022-06-01 ement lopment Project (ILMDP) Addi tional Financing (AF) for FY 2 020 and 2021 IDIC/AF/CS/IC/45 / Internatio Component 1 Irrigation and Individual Consult IBRD / 90430 Post Limited 55,814.00 Signed 2021-05-03 2021-05-03 2021-05-08 2021-05-19 2021-05-22 2021-06-04 2021-06-12 2021-06-06 2022-09-25 nal dam and dam safety spec Drainage Improvement ant Selection ialist IDIC/CS/SSS/24 / Georgian Ir Component 1 Irrigation and rigation and Land Market Proj IDA / 54560 Post Direct Selection Direct 17,187.30 Completed 2022-02-10 2022-02-09 2022-02-16 2022-03-16 2022-03-04 2022-03-20 2022-06-02 2022-06-20 Drainage Improvement ect (GILDMP) Baseline Survey IDIC/CS/IC/46 / Local expert f or preparation of ESF (enviro Component 1 Irrigation and Individual Consult IDA / 54560 Post Limited 0.00 Canceled 2022-04-19 2022-06-03 2022-04-24 2022-05-01 2022-05-05 2022-10-02 nmental and social framewor Drainage Improvement ant Selection k) for GRAIL Project. IDIC/CS/SSS/25 / Senior Engi Component 1 Irrigation and IDA / 54560 Post Direct Selection Direct 10,790.00 Signed 2022-05-16 2022-05-19 2022-05-17 2022-05-20 2022-05-20 2022-06-03 2023-08-31 neer Drainage Improvement IDIC/CS/IC/47 / International Component 1 Irrigation and Individual Consult IDA / 54560 Post Limited 0.00 Signed 2022-07-08 2022-09-16 2022-07-13 2023-02-22 2022-08-03 2023-03-16 2022-08-27 2023-03-22 2022-09-15 expert for PFMA Drainage Improvement ant Selection IDIC/CS/AF/IC/47 / Compone Component 1 Irrigation and Individual Consult IBRD / 90430 Post Open - National 0.00 Signed 2022-08-16 2022-08-16 2022-09-22 2022-09-19 2022-09-27 2022-10-05 2022-10-13 2022-10-11 2023-09-30 nt Coordinator Drainage Improvement ant Selection Page 5 IDIC/CS/IC/46-1 / Local exper t for preparation of Resettle ment Policy Framework, Stak Component 1 Irrigation and Individual Consult IDA / 54560 Post Limited 0.00 Signed 2022-09-23 2022-09-23 2022-09-24 2022-06-03 2022-10-01 2022-09-27 2022-10-22 2022-10-06 2023-03-21 eholder Engagement Plan an Drainage Improvement ant Selection d Environmental and Social Management Framework for GRAIL Project IDIC/CS/IC/46-2 / Local exper t for preparation of Environm Component 1 Irrigation and Individual Consult ental and Social Managemen IDA / 54560 Post Limited 0.00 Terminated 2022-09-23 2022-09-23 2022-09-24 2022-06-03 2022-10-01 2022-09-27 2022-10-22 2022-10-06 2023-03-21 Drainage Improvement ant Selection t Framework and Labor Mana gement Procedure for GRAIL Project. IDIC/CS/AF/SSS/25 / End-line Component 1 Irrigation and IBRD / 90430 Post Direct Selection Direct - National 0.00 Signed 2023-02-06 2023-02-02 2023-02-16 2023-02-10 2023-03-31 2023-04-08 2023-06-30 Survey Drainage Improvement IDIC/CS/AF/SSS/26 / Pilot Proj Component 1 Irrigation and ect on the Development and IBRD / 90430 Post Direct Selection Direct - National 0.00 Signed 2023-03-08 2023-03-10 2023-03-10 2023-03-24 2023-03-22 2023-04-10 2023-07-22 Drainage Improvement Establishment of an Integrat ed Database Page 6