PE Modernization of WSS Services (P157043) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 26-July-2018 July 9, 2010 PROCUREMENT Peru : Modernization of Water Supply and Sanitation Services PLAN General Information Country: Peru 2019-07-18 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2024-09-02 if none) Project ID: P157043 GPN Date: 2019-10-31 Project Name: Modernization of Water Supply and Sanitation Services Loan / Credit No: IBRD / 88990 The Technical Organization for the Administration of WSS Services Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving Governance of Wa SDO N° 0001-2020-MVCS-UE Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 75,757.58 0.00 Cancelado 2020-04-20 2020-04-26 2020-06-02 2020-06-08 2020-06-26 2020-07-31 003-OTASS / Servidor VMCS s nvelope rvice Providers SDO N° 0002-2020-MVCS-UE Improving Governance of Wa Solicitud de oferta Single Stage - One E 003-OTASS / Adquisición de o IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 185,206.06 0.00 Cancelado 2020-04-20 2020-04-26 2020-06-02 2020-06-08 2020-06-26 2020-07-31 s nvelope tros equipos de apoyo a las E rvice Providers PS y OSN SDC N° 005-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 33,147.27 0.00 Cancelado 2020-05-13 2020-05-27 2020-06-26 03-OTASS / Licencia CAD on ciones nvelope SDC N° 006-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 12,765.45 0.00 Cancelado 2020-05-20 2020-06-03 2020-06-30 03-OTASS / Licencia S10 on ciones nvelope SDC N° 007-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 18,593.94 0.00 Cancelado 2020-05-08 2020-05-20 2020-06-19 03-OTASS / Licencia MS Proje on ciones nvelope ct SDC N° 008-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 46,484.85 0.00 Cancelado 2020-05-11 2020-05-29 2020-07-30 03-OTASS / Camioneta on ciones nvelope SDO N° 0003-2020-MVCS-UE General Project Administrati Solicitud de oferta Single Stage - One E IBRD / 88990 Posterior Open - National 102,911.82 0.00 Cancelado 2020-05-04 2020-05-09 2020-06-20 2020-06-25 2020-07-15 2020-08-17 003-OTASS / Videoconferenci on s nvelope a SDC N° 09-2020-MVCS-UE00 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 49,850.00 0.00 Cancelado 2020-05-04 2020-05-14 2020-05-29 3-OTASS / Licencia Arc Gis on ciones nvelope SDC N° 010-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 4,290.91 0.00 Cancelado 2020-05-07 2020-05-18 2020-05-26 03-OTASS / Lap Top on ciones nvelope SDC N° 011-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E 03-OTASS / Computadoras de IBRD / 88990 Posterior Limited 25,030.30 0.00 Cancelado 2020-05-05 2020-05-18 2020-05-29 on ciones nvelope ingenieria SDC N° 012-2020-MVCS-UE0 General Project Administrati Solicitud de cotiza Single Stage - One E 03-OTASS / Computadoras de IBRD / 88990 Posterior Limited 42,909.09 0.00 Cancelado 2020-05-06 2020-05-18 2020-05-28 on ciones nvelope escritorio PE-OTASS-266597-NC-RFQ / General Project Administrati Solicitud de cotiza Single Stage - One E Adquisición de mobiliario par IBRD / 88990 Posterior Limited 20,000.00 0.00 Cancelado 2021-12-18 2022-02-12 2022-08-11 on ciones nvelope a la Unidad Ejecutora N°003 PE-OTASS-446644-GO-RFB / Improving Governance of Wa Adquisición de equipos para l Solicitud de oferta Single Stage - One E Ejecución pe IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 185,185.19 0.00 2024-08-27 2024-09-01 2024-10-13 2024-11-12 2024-12-17 2025-03-17 a detección de fugas no visibl s nvelope ndiente rvice Providers es para EPS Huaral y Barranc a NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDC 001 / SERVICIO DE CON Improving Governance of Wa TRATACIÓN CONVOCATORIA Solicitud de cotiza Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 21,060.00 19,161.09 Firmado 2020-02-12 2020-02-17 2020-02-18 2020-03-12 2020-04-03 Y ESCENARIO PRINCIPAL IMPL ciones nvelope rvice Providers EMENTACIÓN PRIMER ENCUE NTRO AGUA TODAS SDC 002 / SERVICIO DE CON TRATACIÓN ACREDITACIÓN, P Improving Governance of Wa Solicitud de cotiza Single Stage - One E ROTOCOLO, SEGURIDAD Y CA IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 30,394.00 23,298.76 Rescindido 2020-02-12 2020-02-17 2020-02-18 2020-03-15 2020-04-03 ciones nvelope TERING IMPLEMENTACION DE rvice Providers L PRIMER ENCUENTRO AGUA S TODAS SDC 003 / SERVICIO DE CON Improving Governance of Wa Solicitud de cotiza Single Stage - One E TRATACION GESTION DE PRE IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 8,400.00 7,372.85 Rescindido 2020-02-12 2020-02-17 2020-02-18 2020-03-14 2020-04-03 ciones nvelope NSA PRIMER ENCUENTRO AG rvice Providers UA TODAS SDC N 015 / SERVICIO DE CO NTRATACIÓN DEL SISTEMA S Improving Governance of Wa Solicitud de cotiza Single Stage - One E TREAMING PARA LA TRANSMI IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 7,575.76 6,382.38 Finalizado 2020-06-09 2020-06-26 2020-06-22 2020-06-23 2020-07-13 2020-07-15 ciones nvelope SIÓN VIRTUAL DEL “PRIMER E rvice Providers NCUENTRO AGUAS TODAS SDC 16 / CONTRATACIÓN DE L SERVICIO DE GESTIÓN DE P AUTA PUBLICITARIA Y MONIT Improving Governance of Wa Solicitud de cotiza Single Stage - One E OREO Y REPORTE DE INDICA IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 24,242.22 22,215.68 Firmado 2020-08-05 2020-10-29 2020-08-13 2020-11-19 2021-04-30 ciones nvelope DORES PARA REDES SOCIALE rvice Providers S FACEBOOK Y WHATSAPP EN EL MARCO DE LA CAMPANA G UERREROS/AS POR EL AGUA SDC 17 / CONTRATACIÓN DE L SERVICIO DE PRODUCCION Improving Governance of Wa Y DIFUSION DE SPOT RADIAL Solicitud de cotiza Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Limited 30,303.03 27,762.61 Firmado 2020-08-05 2020-10-27 2020-08-13 2020-11-19 2021-04-30 ES EN EMISORAS LOCALES Y ciones nvelope rvice Providers REGIONALES EN EL MARCO D E LA CAMPANA GUERREROS/ AS POR EL AGUA PE-OTASS-264505-NC-RFQ / General Project Administrati Adquisición direct Alquiler de oficina para el pro IBRD / 88990 Posterior Direct 48,000.00 0.00 Cancelado 2021-11-26 2021-11-30 2021-12-01 2022-01-05 2022-07-04 on a grama de modernización Page 1 PE-OTASS-266598-NC-RFQ / Servicio de implementación d General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 20,000.00 0.00 Firmado 2021-12-18 2022-03-01 2022-02-12 2022-03-19 2022-08-11 e puntos de red y eléctricos p on ciones nvelope ara la Unidad Ejecutora N°00 3 PE-OTASS-276843-NC-DIR / A General Project Administrati Adquisición direct lquiler de local para las Activi IBRD / 88990 Posterior Direct 60,000.00 0.00 Firmado 2022-02-08 2022-01-27 2022-02-09 2022-01-27 2022-02-11 2022-02-19 2023-02-14 on a dades del Programa PE-OTASS-278702-NC-RFB / Improving Governance of Wa Servicio de implementación d Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,523,000.00 0.00 Cancelado 2022-03-14 2022-05-02 2022-03-19 2022-06-30 2022-05-03 2022-07-05 2022-06-02 2022-07-26 2022-07-14 2023-07-09 e la cartografía en EPS prioriz s nvelope rvice Providers adas por OTASS y en EPS ám bito del Programa PE-OTASS-280752-NC-RFQ / General Project Administrati Solicitud de cotiza Single Stage - One E Servicio de limpieza para el p IBRD / 88990 Posterior Limited 12,400.00 0.00 Firmado 2022-03-05 2022-04-01 2022-04-30 2022-04-25 2023-04-25 on ciones nvelope iso 9 y piso 10 PE-OTASS-278702-NC-RFB-2 Improving Governance of Wa / Implementación de la Carto Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,881,675.04 0.00 Cancelado 2022-09-20 2022-10-30 2022-09-25 2022-10-29 2022-11-09 2022-12-28 2022-12-09 2023-01-20 2024-01-15 grafía en EPS priorizadas por s nvelope rvice Providers OTASS y en EPS ámbito del Pr ograma PE-OTASS-278702-NC-RFB-3 Improving Governance of Wa / Implementación de la Carto Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,881,675.04 0.00 Firmado 2023-02-20 2023-02-19 2023-02-25 2023-04-11 2023-04-12 2023-05-11 2023-04-26 2023-06-22 2023-06-16 2024-06-16 grafía en EPS priorizadas por s nvelope rvice Providers OTASS y en EPS ámbito del Pr ograma PE-OTASS-356425-NC-RFB / Servicio de Implementación d Improving Governance of Wa Solicitud de oferta Single Stage - One E e un Programa de Reducción IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 507,614.21 0.00 Cancelado 2023-04-17 2023-12-24 2023-04-22 2023-12-27 2023-06-03 2023-07-03 2023-08-06 2024-07-31 s nvelope de Agua No Facturada para la rvice Providers ciudad de Huacho en la EPS A gua de Lima Norte S.A PE-OTASS-393051-NC-RFQ / Servicio de Limpieza y mante nimiento para el Programa de Modernización de la Prestació General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 39,789.47 0.00 Firmado 2023-11-21 2023-11-29 2024-01-16 2023-12-29 2024-07-14 n de los Servicios de Agua Po on ciones nvelope table y Saneamiento en las E PS EMAPACOP, SEDACUSCO, SEDAPAR,SEMAPA BARRANCA ,EMAPA HUARAL Y EMAPA HU ACHO PE-OTASS-393052-NC-RFQ / Servicio de Seguridad y vigila ncia para el Programa de Mo dernización de la Prestación General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited 20,425.26 0.00 Firmado 2023-11-21 2023-11-29 2024-01-16 2023-12-29 2024-07-14 de los Servicios de Agua Pota on ciones nvelope ble y Saneamiento en las EPS EMAPACOP, SEDACUSCO, SE DAPAR, BARRANCA,EMAPA H UARAL Y EMAPA HUACHO PE-OTASS-410009-NC-RFB / Servicio de implementación d Improving Governance of Wa Solicitud de oferta Single Stage - Two E e un programa de reducción IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 996,842.27 0.00 En ejecución 2024-02-23 2024-04-21 2024-02-23 2024-07-08 2024-05-03 2024-07-16 2024-08-20 2026-02-11 s nvelope de agua no facturada para la rvice Providers localidad de Mollendo en la E PS SEDAPAR PE-OTASS-414661-NC-RFB / Servicio de implementación d Improving Governance of Wa Solicitud de oferta Single Stage - Two E e un programa de reducción IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,190,476.19 0.00 En ejecución 2024-03-13 2024-05-09 2024-03-13 2024-07-08 2024-05-22 2024-08-04 2024-09-05 2025-08-31 s nvelope de agua no facturada para la rvice Providers localidad de Vilcanota en la E PS SEDACUSCO PE-OTASS-356425-NC-RFB1 / Servicio de Implementación d Improving Governance of Wa Solicitud de oferta Single Stage - Two E e un Programa de Reducción IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 507,614.21 0.00 Cancelado 2024-02-21 2024-02-21 2024-02-26 2024-05-10 2024-06-14 2025-06-09 s nvelope de Agua No Facturada para la rvice Providers ciudad de Huacho en la EPS A gua de Lima Norte S.A PE-OTASS-356425-NC-RFB1- 2 / Servicio de Implementació Improving Governance of Wa n de un Programa de Reducci Solicitud de oferta Single Stage - Two E Ejecución pe IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 899,470.90 0.00 2024-03-15 2024-03-15 2024-05-24 2024-08-06 2024-09-10 2025-07-07 ón de Agua No Facturada par s nvelope ndiente rvice Providers a la ciudad de Huacho en la E PS Agua de Lima Norte S.A PE-OTASS-414667-NC-RFB / Improving Governance of Wa Servicio de actualización del Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 767,195.77 0.00 En ejecución 2024-04-21 2024-05-12 2024-04-21 2024-07-08 2024-06-30 2024-07-30 2024-09-03 2025-05-31 catastro comercial georrefere s nvelope rvice Providers nciado de la EPS SEDACUSCO PE-OTASS-410007-NC-RFB / Servicio de auscultación, det Improving Governance of Wa ección y reparación de fugas Solicitud de oferta Single Stage - One E IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 797,785.71 0.00 En ejecución 2024-04-19 2024-04-21 2024-04-21 2024-07-08 2024-06-30 2024-07-30 2024-09-03 2025-04-01 no visibles en redes primarias s nvelope rvice Providers , secundarias y conexiones d omiciliarias de agua potable para las EPS Huaral y Barranc a PE-OTASS-425544-NC-RFB / Servicio de implementación d Improving Governance of Wa Solicitud de oferta Single Stage - Two E e un programa de reducción IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,147,267.20 0.00 En ejecución 2024-05-10 2024-05-26 2024-05-10 2024-07-08 2024-07-19 2024-10-01 2024-11-05 2026-04-29 s nvelope de agua no facturada para la rvice Providers ciudad de Huacho en la EPS A gua de Lima Norte S.A PE-OTASS-434366-NC-RFQ / Servicio de Seguridad y vigila ncia para el Programa de Mo dernización de la Prestación General Project Administrati Solicitud de cotiza Single Stage - One E IBRD / 88990 Posterior Limited - National 24,518.52 0.00 En ejecución 2024-06-26 2024-07-23 2025-09-16 de los Servicios de Agua Pota on ciones nvelope ble y Saneamiento en las EPS EMAPACOP, SEDACUSCO, SE DAPAR, BARRANCA, EMAPA H UARAL Y EMAPA HUACHO PE-OTASS-434553-NC-RFB / Servicio de implementación d Improving Governance of Wa e programa de modelamiento Solicitud de oferta Single Stage - Two E Ejecución pe IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 978,835.98 0.00 2024-06-21 2024-06-26 2024-08-07 2024-10-20 2024-11-24 2025-05-23 s hidráulicos, planes de mant s nvelope ndiente rvice Providers enimiento preventivos y redu cción de agua no facturada d e la EPS EMAPACOP S.A. PE-OTASS-446643-NC-RFB / Servicio de auscultación, det Improving Governance of Wa ección y reparación de fugas Solicitud de oferta Single Stage - One E Ejecución pe IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 476,190.48 0.00 2024-08-26 2024-08-31 2024-10-12 2024-11-11 2024-12-16 2025-07-14 no visibles en redes primarias s nvelope ndiente rvice Providers , secundarias y conexiones d omiciliarias de agua potable para las EPS Huaral y Barranc a CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 1.3.6.1 / Contratación de Fir ma “Programa de Capacitació Improving Governance of Wa n Especializado para el Desar Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 817,621.00 0.00 Cancelado 2020-01-06 2020-02-17 2020-01-12 2020-02-07 2020-03-06 2020-04-05 2020-05-10 2020-06-14 2021-06-14 rollo de Capacidades de Gesti en calidad y costo rvice Providers ón, Administración y Operaci ón de Empresas Prestadoras de Servicios de Saneamiento" SDP N° 001-2020-MVCS-UE0 03-OTASS / Contratación de F irma “Programa de Capacitac Improving Governance of Wa Selección basada ión Especializado para el Des IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 1,220,884.79 0.00 Cancelado 2020-02-28 2020-03-02 2020-03-01 2020-04-14 2020-05-12 2020-06-11 2020-07-16 2020-08-20 2021-08-20 en calidad y costo arrollo de Capacidades de Ge rvice Providers stión, Administración y Opera ción de Empresas Prestadora s de Servicios de Saneamient o" SDP N° 0001-2020-MVCS-UE 003-OTASS / Contratación de Firma “Programa de Capacita Improving Governance of Wa Selección basada ción Especializado para el De IBRD / 88990 ter Supply and Sanitation Se Previa Open - National 1,220,884.79 369,419.99 Firmado 2020-03-05 2020-03-05 2020-03-08 2020-07-14 2020-04-21 2020-09-23 2020-05-19 2020-10-26 2020-06-18 2020-12-22 2020-07-23 2021-09-28 2020-08-27 2021-01-15 2021-08-27 en calidad y costo sarrollo de Capacidades de G rvice Providers estión, Administración y Oper ación de Empresas Prestador as de Servicios de Saneamien to" SDP N° 0005-2020-MVCS-UE Improving Governance of Wa 003-OTASS / Operatividad de Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 86,363.64 0.00 Cancelado 2020-06-01 2020-06-07 2020-06-30 2020-07-30 2020-08-04 2020-08-13 2020-08-31 2021-02-26 la Estrategia del ¨Programa d en calidad y costo rvice Providers e Modernización SDP N° 0006-2020-MVCS-UE Improving Governance of Wa Selección basada 003-OTASS / Pagina Web UE IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 10,606.06 0.00 Cancelado 2020-05-01 2020-05-10 2020-06-24 2020-06-26 2020-07-10 2020-08-10 003 rvice Providers e consultores SDP N° 0002-2020-MVCS-UE 003-OTASS / Revisíon del Mar co normativo para elaborar y Improving Governance of Wa Selección basada aplicar una escala salarial y u IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 23,636.36 0.00 Cancelado 2020-04-20 2020-04-26 2020-05-13 2020-05-28 2020-06-01 2020-08-03 na política salarial integral en rvice Providers e consultores las EPS en RAT; y elaboración de propuesta de Política salar ial integral para las EPS en R AT. SDP N° 0004-2020-MVCS-UE Improving Governance of Wa Selección basada 003-OTASS / Elaboración de u IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 18,181.82 0.00 Cancelado 2020-04-20 2020-04-26 2020-05-13 2020-05-28 2020-06-01 2020-08-31 n plan de desarrollo y línea d rvice Providers e consultores e carrera para el personal en las EPS. SDP N° 0007-2020-MVCS-UE 003-OTASS / Servicio de Cons ultoria en el análisis y la elab oración del marco normativo Improving Governance of Wa Selección basada para el diseño e implementac IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 45,250.78 0.00 Cancelado 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-05-07 en calidad y costo ion del sistema salarial integr rvice Providers al, evaluación de rendimiento , plan de desarrollo y línea de carrera para las Empresas Pr estadoras de Servicios de Sa nea SDP N° 0003-2020-MVCS-UE 003-OTASS / Servicio de Cons Improving Governance of Wa Selección basada ultoria para el Diseño de un S IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 167,888.85 0.00 Cancelado 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-04-07 en calidad y costo istema Salarial Integral para l rvice Providers as Empresas Prestadoras de Servicios de Sanea SDP N° 0008-2020-MVCS-UE 003-OTAS / Servicio de Consu ltoria para el Diseño de un Sis Improving Governance of Wa Selección basada tema de Evaluación del Rendi IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 107,182.56 0.00 Cancelado 2020-08-17 2020-08-19 2020-08-22 2020-09-17 2020-10-27 2020-10-30 2020-11-13 2020-12-07 2021-03-22 en calidad y costo miento, Plan de desarrollo y L rvice Providers inea de Carrera para las Emp resas Prestadoras de Servicio s Municipales SDP N° 0009-2020-MVCS-UE 003-OTASS / Servicio de Cons Improving Governance of Wa Selección basada ultoría para el Diseño de un S IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 167,888.85 161,814.51 Firmado 2020-09-15 2020-09-25 2020-09-22 2020-11-03 2020-10-07 2020-11-26 2020-10-29 2021-02-24 2020-11-04 2021-03-18 2021-03-05 istema Salarial Integral para l rvice Providers e consultores as Empresas Prestadoras de Servicios de Saneamiento Mu nicipales SDP N° 0010-2020-MVCS-UE 003-OTASS / Servicio de Cons ultoría para el Diseño de un S Improving Governance of Wa Selección basada istema de Evaluación del Ren IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 107,182.56 100,235.38 Firmado 2020-09-15 2020-09-25 2020-09-22 2020-11-03 2020-10-07 2020-11-28 2020-10-29 2021-03-22 2020-11-04 2021-04-04 2021-02-17 dimiento, Plan de desarrollo y rvice Providers e consultores Línea de Carrera para las Em presas Prestadoras de Servici os Municipales PE-OTASS-211887-CS-LCS / Auditoría Financiera al Progra ma “Modernización de la Pres tación de los Servicios de Agu Improving Governance of Wa Selección basada a Potable y Saneamiento de l IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 333,880.73 0.00 Firmado 2021-01-08 2021-03-12 2021-01-29 2021-03-14 2021-03-25 2021-04-11 2021-04-09 2021-05-11 2021-04-09 2021-06-15 2021-05-25 2021-07-20 2021-08-23 2022-01-16 en el menor costo as EPS EMAPACOP, SEDACUS rvice Providers CO, SEDAPAR, SEMAPA BARR ANCA, EMAPA HUARAL Y EMA PA HUACHO” financiado con “ Contrato de Préstamo No 889 9-PE” PE-OTASS-225691-CS-QCBS / Contratación de una solución informática mediante un soft Improving Governance of Wa Selección basada ware integrado con los proce IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 6,863,774.28 0.00 Cancelado 2021-03-22 2021-06-01 2021-04-12 2021-05-26 2021-06-23 2021-07-23 2021-08-27 2021-10-01 2022-10-01 en calidad y costo sos administrativos, comercia rvice Providers les, operacionales y corporati vos, alineado al modelo prop uesto por OTASS - PROYECTO GO PE-OTASS-228498-CS-CQS / consultoría para asesoría de l Improving Governance of Wa Selección basada a formulación de reglas, disp IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 20,000.00 0.00 Finalizado 2021-04-20 2021-06-28 2021-05-11 2021-06-24 2022-03-22 2021-07-24 2022-05-09 2021-08-28 2022-05-27 2021-09-06 2022-08-28 osiciones y procedimiento es rvice Providers e consultores pecial, Articulo 103 del D.L. N °1280 PE-OTASS-229755-CS-CQS / Improving Governance of Wa Selección basada Análisis de la implementación IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 67,429.00 0.00 Firmado 2021-05-03 2021-05-14 2021-05-24 2021-07-07 2021-10-12 2021-08-06 2021-12-07 2021-09-10 2021-12-30 2022-03-09 de la reforma sectorial en ser rvice Providers e consultores vicios de saneamiento 2016- 2021 PE-OTASS-229757-CS-CQS / Improving Governance of Wa Selección basada Elaboración de propuesta par IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 26,971.00 0.00 Cancelado 2021-05-03 2021-04-26 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 a la actualización de la Polític rvice Providers e consultores a Nacional de Saneamiento ( PNS). PE-OTASS-229758-CS-CQS / Elaboración de una nueva pro Improving Governance of Wa Selección basada puesta de reestructuración d IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 16,857.00 0.00 Cancelado 2021-05-03 2021-06-28 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 el esquema de Gobierno Corp rvice Providers e consultores orativo para las EPS. Page 3 PE-OTASS-229761-CS-CQS / Diseño e implementación de Improving Governance of Wa Selección basada un programa de capacitación IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 87,657.00 0.00 Cancelado 2021-05-03 2021-11-30 2021-05-24 2022-02-03 2021-07-07 2022-03-31 2021-08-06 2022-06-30 2021-09-10 2022-03-09 para el personal de los Centr rvice Providers e consultores os de Atención al Ciudadano ( CAC) del PNSU PE-OTASS-245389-CS-CQS / Servicio de Elaboración de Té Improving Governance of Wa Selección basada rminos de Referencia para el IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 19,736.84 41,765.59 Firmado 2021-09-06 2021-10-04 2021-09-17 2021-12-22 2021-10-31 2022-02-08 2021-11-30 2022-03-17 2022-01-04 2022-05-30 2022-07-03 Desarrollo de una Nueva Vers rvice Providers e consultores ión del PRESET - MVCS PE-OTASS-245390-CS-CQS / Improving Governance of Wa Selección basada Servicio de Supervisión de la IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 236,842.11 0.00 Cancelado 2021-09-06 2021-09-27 2021-11-10 2021-12-10 2022-01-14 2022-07-13 Construcción de la Solución I rvice Providers e consultores nformática del Proyecto GO PE-OTASS-245413-CS-QCBS / Improving Governance of Wa Selección basada Servicio de Reingeniería de P IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 197,368.42 269,555.87 Firmado 2021-09-06 2021-10-26 2021-09-27 2021-12-22 2021-11-10 2022-02-22 2021-12-08 2022-04-11 2022-01-07 2022-05-10 2022-02-11 2022-06-21 2022-03-18 2022-07-11 2023-03-18 en calidad y costo rocesos de Información del Pr rvice Providers oyecto GO PE-OTASS-229756-CS-CQS / Elaboración de curso MOOC p Improving Governance of Wa Selección basada ara fortalecer las capacidade IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 40,457.00 60,918.19 Firmado 2021-05-03 2021-10-18 2021-05-24 2021-12-22 2021-07-07 2022-09-17 2021-08-06 2022-04-26 2021-09-10 2022-06-13 2022-03-09 s de los profesionales vincula rvice Providers e consultores dos al sector saneamiento PE-OTASS-264286-CS-QCBS / Contratación de una solución informática mediante un soft Improving Governance of Wa Selección basada ware integrado con los proce IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 6,863,774.20 0.00 Cancelado 2021-11-30 2021-11-24 2021-12-21 2022-01-13 2022-02-03 2022-07-12 2022-03-03 2022-04-02 2022-05-07 2022-06-11 2023-06-11 en calidad y costo sos administrativos, comercia rvice Providers les, operacionales y corporati vos, alineado al modelo prop uesto por OTASS - PROYECTO GO PE-OTASS-272764-CS-CQS / Actividad 1.1: Contratación d e un servicio que incluya el di Improving and Expanding W agnóstico (completo) y el TD Selección basada ater Supply and Sanitation S R para la implementación del IBRD / 88990 Posterior en calificaciones d Open - National 150,000.00 0.00 Firmado 2022-02-14 2022-03-13 2022-03-07 2022-04-20 2022-05-23 2022-05-20 2022-08-05 2022-06-24 2022-09-14 2023-02-19 ervices in the Participating E sistema de información integr e consultores PS ado entre prestadores urbano s y rurales incluyendo sistem a de información de contabili dad regulatoria PE-OTASS-272765-CS-CQS / Improving and Expanding W Selección basada ctividad 1.3: Consultoría de u ater Supply and Sanitation S IBRD / 88990 Posterior en calificaciones d Open - National 83,000.00 0.00 Cancelado 2022-02-14 2022-03-07 2022-04-20 2022-05-20 2022-06-24 2023-02-19 n tercero supervisor de la im ervices in the Participating E e consultores plementación del Sistema (fu PS ncional y técnico) PE-OTASS-275037-CS-CQS / Desarrollo de instrumentos q Improving Governance of Wa Selección basada ue permitan incorporar la ges IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 305,000.00 0.00 Firmado 2022-06-27 2022-04-27 2022-07-11 2022-08-08 2022-06-28 2022-08-15 2022-08-15 2022-08-29 2022-10-06 2023-06-25 tión del riesgo de cambio cli rvice Providers e consultores mático en la regulación del s ervicio de saneamiento PE-OTASS-275038-CS-CQS / Validación de lineamientos y Improving Governance of Wa Selección basada elaboración de guía metodoló IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 186,000.00 0.00 Cancelado 2022-06-24 2022-07-11 2022-08-08 2022-08-15 2022-08-29 2023-07-25 gica para la evaluación de la rvice Providers e consultores viabilidad económica y financ iera de los MRSEH PE-OTASS-275041-CS-CQS / Diseño de metodologías para Improving Governance of Wa Selección basada la optimización del esquema IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 206,000.00 0.00 Cancelado 2022-08-08 2022-10-04 2022-08-29 2022-11-22 2022-09-19 2023-03-23 2022-10-03 2022-10-24 2023-10-19 de subsidios cruzados y estim rvice Providers e consultores ación de funciones de costos PE-OTASS-275042-CS-CQS / Análisis de competencia y de Improving Governance of Wa Selección basada sarrollo de aspectos regulator IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 63,000.00 64,790.53 Firmado 2022-06-06 2022-01-31 2022-06-27 2022-07-25 2022-06-08 2022-08-01 2022-07-20 2022-08-15 2022-08-21 2023-02-11 ios en mercados de producto rvice Providers e consultores s derivados del saneamiento. PE-OTASS-275043-CS-QCBS / Improving Governance of Wa Implementación de fábrica de Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 381,000.00 0.00 En ejecución 2022-08-08 2023-11-06 2022-08-29 2023-11-13 2022-10-12 2022-11-26 2022-12-26 2023-01-30 2023-03-06 2023-11-01 software para nueva versión en calidad y costo rvice Providers de PRESET y SSP PE-OTASS-275045-CS-QCBS / Servicio de implementación d Improving Governance of Wa Selección basada Ejecución pendien e las metodologías BIM, siste IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 266,000.00 0.00 2022-07-11 2022-08-01 2022-09-14 2022-10-14 2022-11-13 2022-12-18 2023-01-22 2024-07-15 en calidad y costo te ma GIS y guía PMBOK en el S rvice Providers ector Saneamiento PE-OTASS-275046-CS-CQS / Improving Governance of Wa Selección basada Diagnóstico, lecciones apren IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 107,000.00 0.00 Firmado 2022-05-23 2022-05-12 2022-06-13 2022-06-28 2022-07-18 2022-08-18 2022-08-01 2022-11-23 2022-08-29 2023-01-21 2023-02-25 didas y propuestas normativa rvice Providers e consultores s para el mejor aprovechamie nto de APP PE-OTASS-275047-CS-QCBS / Improving Governance of Wa Diagnóstico y plan estratégic Selección basada Ejecución pendien IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 400,000.00 0.00 2022-03-30 2022-04-20 2022-06-03 2022-07-18 2022-08-17 2022-09-21 2022-10-26 2023-10-26 o para el fortalecimiento del t en calidad y costo te rvice Providers ratamiento de aguas residual es. PE-OTASS-275055-CS-CQS / Improving Governance of Wa Selección basada Diseño de un plan de acción IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 76,000.00 0.00 Firmado 2022-05-05 2022-03-03 2022-05-26 2022-05-02 2022-06-30 2022-06-20 2022-07-21 2022-08-22 2022-08-18 2022-09-15 2022-12-16 para la integración de las EPS rvice Providers e consultores AGUAS DE LIMA NORTE, HUA RAL y BARRANCA PE-OTASS-275056-CS-CQS / Improving Governance of Wa Selección basada Elaboración de planes de inte IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 124,000.00 0.00 Cancelado 2022-05-12 2022-06-02 2022-07-16 2022-08-06 2022-09-03 2023-03-02 gración a mediano plazo rvice Providers e consultores PE-OTASS-275509-CS-CQS / Improving Governance of Wa Selección basada Aseguramiento de la calidad IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 381,000.00 0.00 Cancelado 2022-06-06 2022-04-12 2022-06-27 2022-08-10 2022-09-09 2022-10-14 2023-04-12 del Proyecto GO (Supervisión rvice Providers e consultores ) PE-OTASS-275061-CS-QCBS / Servicio de implementación d Improving Governance of Wa Selección basada e la Cartografía en EPS prioriz IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 1,523,000.00 0.00 Cancelado 2022-02-28 2022-03-21 2022-05-04 2022-06-18 2022-07-18 2022-08-22 2022-09-26 2023-09-26 en calidad y costo adas por OTASS y en EPS ám rvice Providers bito del Programa PE-OTASS-275063-CS-CQS / Supervisión de implementaci Improving Governance of Wa Selección basada ón de la Cartografía en EPS p IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 162,000.00 0.00 Cancelado 2022-04-18 2022-05-27 2022-05-09 2022-06-21 2022-06-22 2022-07-13 2022-08-10 2023-06-06 riorizadas por OTASS y en EP rvice Providers e consultores S ámbito del Programa Page 4 PE-OTASS-229762-CS-CQS / Estudio de factibilidad para la Improving Governance of Wa Selección basada implementación de "Call Cent IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 57,143.00 0.00 Cancelado 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 ers" de alcance regional o ma rvice Providers e consultores croregional, para las EPS EM APACOP, SEDACUSCO, SEDAP AR y EMAPA HUACHO PE-OTASS-229764-CS-CQS / Estudio de factibilidad para la implementación de "Bancos d Improving Governance of Wa Selección basada e Medidores" de alcance regi IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 57,143.00 0.00 Cancelado 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 onal o macroregional, para la rvice Providers e consultores s EPS EMAPACOP, SEDACUSC O, SEDAPAR y EMAPA HUACH O. PE-OTASS-229760-CS-CQS / Diseño y validación del marc Improving Governance of Wa Selección basada o normativo para regulación, IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 43,896.00 0.00 Cancelado 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 supervisión y sanción de pres rvice Providers e consultores tadores de pequeñas ciudade s y comunidades rurales. PE-OTASS-229759-CS-CQS / Improving Governance of Wa Selección basada Estudio de análisis de la probl IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 25,286.00 0.00 Cancelado 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 emática de las inversiones de rvice Providers e consultores las EPS medianas y grandes. PE-OTASS-229763-CS-CQS / Estudio de factibilidad para la implementación de "Laborato Improving Governance of Wa Selección basada rios de Control de Calidad" de IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 57,143.00 0.00 Cancelado 2021-05-03 2021-05-24 2021-07-07 2021-08-06 2021-09-10 2022-03-09 alcance regional o macroregi rvice Providers e consultores onal, para las EPS EMAPACOP , SEDACUSCO, SEDAPAR y EM APA HUACHO. PE-OTASS-278683-CS-CQS / Improving Governance of Wa Selección basada Diseño e implementación de IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 55,980.00 0.00 Cancelado 2022-04-05 2022-04-26 2022-06-09 2022-07-09 2022-08-13 2022-10-12 campaña de educación sanita rvice Providers e consultores ria. PE-OTASS-278684-CS-CQS / Improving Governance of Wa Selección basada Organización de talleres para IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 76,336.00 0.00 Cancelado 2022-06-02 2022-06-23 2022-08-06 2022-09-05 2022-10-10 2023-01-08 el personal de atención al clie rvice Providers e consultores nte y comunicadores de las E PS PE-OTASS-278685-CS-CQS / Improving Governance of Wa Selección basada Producción de actividades y s IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 58,015.00 0.00 Cancelado 2022-04-05 2022-04-26 2022-06-09 2022-07-09 2022-08-13 2023-02-09 ervicios comunicacionales rvice Providers e consultores PE-OTASS-278688-CS-QCBS / Improving Governance of Wa Implementación de módulos Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 342,640.00 0.00 Cancelado 2022-11-02 2022-11-23 2023-01-06 2023-02-03 2023-03-05 2023-04-09 2023-05-14 2023-11-10 de gestión integral de agua p en calidad y costo rvice Providers otable y alcantarillado PE-OTASS-278692-CS-QCBS / Actualización de seis (06) PM Improving Governance of Wa Selección basada O y desarrollo de metodologí IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 1,142,132.00 0.00 Cancelado 2022-11-14 2022-10-28 2022-12-05 2023-01-03 2023-01-18 2023-03-06 2023-02-15 2023-05-17 2023-03-17 2023-07-10 2023-04-21 2023-09-18 2023-05-26 2023-11-22 en calidad y costo a y elaboración de tres (03) P rvice Providers lanes de reflotamiento en EP S en RAT PE-OTASS-280749-CS-QCBS / Improving Governance of Wa Selección basada Elaboración de políticas finan IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 605,313.00 0.00 Cancelado 2022-04-15 2022-04-12 2022-05-06 2022-08-03 2022-06-10 2022-07-10 2022-07-31 2022-09-04 2022-10-09 2023-10-09 en calidad y costo ciera sectorial rvice Providers PE-OTASS-280750-CS-CQS / Servicio de diagnóstico, análi sis y evaluación del PNSU con Improving Governance of Wa Selección basada la finalidad de plantear su ree IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 89,060.00 0.00 Cancelado 2022-04-11 2022-05-02 2022-06-15 2022-07-15 2022-08-19 2023-02-15 structuración para que como rvice Providers e consultores UE del sector contribuya al ci erre de brechas de manera s ostenible PE-OTASS-292797-CS-QCBS / Improving Governance of Wa Aseguramiento de la Calidad Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - National 381,000.00 0.00 Cancelado 2022-04-27 2022-04-27 2022-05-18 2022-07-01 2022-07-29 2022-08-28 2022-10-02 2022-10-24 2022-10-31 del Proyecto Go (Supervisión en calidad y costo rvice Providers ) - Actividad 15 PE-OTASS-293001-CS-QCBS / Improving Governance of Wa Selección basada Aseguramiento de la Calidad IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 381,000.00 0.00 Cancelado 2022-04-30 2022-04-29 2022-05-21 2022-06-02 2022-07-04 2022-08-01 2022-08-31 2022-10-05 2022-11-09 2024-10-29 en calidad y costo del proyecto GO (Supervisión rvice Providers ) PE-OTASS-275052-CS-CQS / Improving Governance of Wa Selección basada Diseño de un plan de retiro v IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 155,000.00 0.00 Firmado 2022-05-11 2022-05-10 2022-06-01 2022-07-19 2022-07-15 2022-08-10 2022-08-05 2022-10-21 2022-09-02 2022-11-17 2023-04-30 oluntario para las EPS Munici rvice Providers e consultores pales PE-OTASS-275058-CS-QCBS / Improving Governance of Wa Selección basada Elaboración de planes de inte IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 381,000.00 0.00 Cancelado 2022-02-14 2022-03-07 2022-04-20 2022-06-04 2022-07-04 2022-08-08 2022-09-12 2023-09-12 en calidad y costo gración en poblaciones de m rvice Providers ás de 15,000 PE-OTASS-295444-CS-CQS / Improving Governance of Wa Selección basada Diseño e implementación de IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 81,425.00 0.00 Cancelado 2022-06-20 2022-07-11 2022-08-24 2022-09-23 2022-10-28 2023-04-26 campaña de educación sanita rvice Providers e consultores ria PE-OTASS-295457-CS-QCBS / Elaboración de planes que de terminen las estrategias, acci ones y/o actividades para pro Improving Governance of Wa Selección basada mover la integración territori IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 626,747.00 0.00 Cancelado 2022-05-23 2022-06-08 2022-06-13 2022-08-23 2022-07-27 2022-08-24 2022-09-23 2022-10-28 2022-12-02 2023-08-29 en calidad y costo al de prestadores ubicados e rvice Providers n las regiones de las EPS EMA PACOP, SEDACUSCO, SEDAPA R, SEMAPA BARRANCA, EMAP A HUARAL y EMAPA HUACHO PE-OTASS-295446-CS-CQS / Improving Governance of Wa Selección basada Diseño e implementación de IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 50,890.00 0.00 Firmado 2022-06-30 2022-10-25 2022-07-21 2022-11-29 2022-09-03 2022-12-19 2022-10-03 2023-02-07 2022-11-07 2023-03-03 2022-11-19 curso especializado de atenci rvice Providers e consultores ón al cliente PE-OTASS-295441-CS-CQS / Improving Governance of Wa Selección basada Rediseño del Programa presu IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 97,583.00 0.00 Firmado 2022-06-13 2023-08-24 2022-07-04 2023-09-22 2022-08-17 2023-11-24 2022-09-16 2024-03-11 2022-10-21 2024-05-06 2023-01-19 puestal 0082 del PNSU rvice Providers e consultores PE-OTASS-275040-CS-CQS / Preparación de la guía de pro Improving Governance of Wa Selección basada cedimientos para el registro y IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 54,106.00 0.00 Cancelado 2022-07-18 2022-07-15 2022-08-08 2022-12-29 2022-09-01 2023-03-24 2022-09-15 2022-09-29 2023-07-26 acceso a la información de co rvice Providers e consultores ntabilidad regulatoria basada en costos por actividades - A BC PE-OTASS-303270-CS-CQS / Validación de lineamientos y Improving Governance of Wa Selección basada desarrollo de guía metodológi IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 150,875.77 0.00 Cancelado 2022-07-18 2022-08-02 2022-08-08 2022-08-05 2022-09-21 2022-09-26 2022-10-21 2022-11-25 2023-05-24 ca para la evaluación de los rvice Providers e consultores Mecanismos de Retribución d e los Servicios Ecosistémicos Hídricos (MRSEH) Page 5 PE-OTASS-305699-CS-CQS / Elaboración de la guía metod Improving Governance of Wa Selección basada ológica para el proceso de el IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 156,812.33 0.00 En ejecución 2022-08-08 2022-09-27 2022-08-29 2022-10-12 2022-11-11 2022-12-16 2023-06-14 aboración, actualización, seg rvice Providers e consultores uimiento y evaluación de los planes regionales de saneami ento (PSR) PE-OTASS-295437-CS-CQS / Improving Governance of Wa Selección basada Evaluación y Propuesta de Re IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 84,420.99 0.00 Firmado 2022-08-12 2022-09-19 2022-09-02 2022-10-16 2022-11-14 2022-11-15 2023-02-20 2022-12-20 2023-03-15 2023-03-20 diseño y Mejoras del Program rvice Providers e consultores a Nacional de Saneamiento U rbano (PNSU) PE-OTASS-295445-CS-CQS / Improving Governance of Wa Selección basada Consultoria para el Entrenami IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 12,826.00 0.00 Cancelado 2022-08-30 2022-09-01 2022-09-20 2022-09-19 2022-11-03 2022-10-20 2022-12-03 2022-12-18 2023-02-01 ento de voceros del OTASS y rvice Providers e consultores de las EPS PE-OTASS-275069-CS-QCBS / Improving Governance of Wa Asistencia técnica en gestión Selección basada IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 5,450,630.96 0.00 Cancelado 2022-09-23 2023-04-25 2022-10-14 2023-05-30 2022-11-27 2023-07-20 2022-12-25 2023-11-30 2023-01-24 2023-12-22 2023-02-28 2023-04-04 2024-04-03 a las seis EPS del ámbito de i en calidad y costo rvice Providers ntervención del Programa de Modernización PE-OTASS-315637-CS-CQS / Contratación de Entidad Educ ativa para el "Diseño e imple mentación de un programa d Improving Governance of Wa Selección basada e capacitación para el person IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 87,657.00 0.00 Firmado 2022-09-23 2022-10-28 2022-10-14 2022-11-23 2022-11-27 2022-12-13 2022-12-27 2023-02-28 2023-01-31 2023-03-26 2023-07-30 al que brinda asistencia técni rvice Providers e consultores ca sobre proyectos de agua y saneamiento del ámbito urba no en los Centros de Atención al Ciudadano" PE-OTASS-318418-CS-CQS / Supervisión de implementaci Improving Governance of Wa Selección basada ón de la Cartografía en EPS p IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 133,216.79 0.00 Firmado 2022-09-30 2022-10-04 2022-10-21 2022-11-22 2022-12-04 2022-12-16 2022-12-25 2023-06-05 2023-01-22 2023-06-17 2023-11-18 riorizadas por OTASS y en EP rvice Providers e consultores S ámbito del Programa. PE-OTASS-319483-CS-QCBS / Elaboración de planes que de terminen las estrategias, acci ones y/o actividades que per Improving Governance of Wa Selección basada mitan promover la integració IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 626,747.00 0.00 Firmado 2022-10-10 2022-10-06 2022-10-31 2022-10-29 2022-12-14 2022-11-28 2023-01-11 2023-01-30 2023-02-10 2023-03-08 2023-03-17 2023-04-13 2023-04-21 2023-05-26 2024-01-16 en calidad y costo n territorial de prestadores u rvice Providers bicados en las regiones de la s EPS EMAPACOP, SEDACUSC O, SEDAPAR, SEMAPA BARRA NCA, EMAPA HUARAL y EMAP A HUACHO PE-OTASS-341419-CS-QCBS / Improving Governance of Wa Implementación integral del Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 610,687.00 0.00 En ejecución 2023-05-01 2023-11-30 2023-05-22 2024-02-02 2023-07-05 2024-02-22 2023-08-02 2023-09-01 2023-10-06 2023-11-10 2024-11-09 Sistema de Transferencia de I en calidad y costo rvice Providers nformación de Prestadores PE-OTASS-341421-CS-CQS / Improving Governance of Wa Selección basada Supervisión de la implementa IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 101,781.17 0.00 En ejecución 2023-02-08 2023-11-30 2023-03-01 2024-01-18 2023-04-14 2024-03-15 2023-05-14 2023-06-18 2023-12-15 ción del Sistema de Transfere rvice Providers e consultores ncia de Información de Presta dores PE-OTASS-341425-CS-CQS / Servicio de implementación y Improving Governance of Wa Selección basada acompañamiento en metodol IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 254,452.93 0.00 Firmado 2023-02-08 2023-06-15 2023-03-01 2023-04-14 2023-07-18 2023-05-14 2023-11-15 2023-06-18 2024-01-15 2023-12-15 ogía BIM, herramientas de ge rvice Providers e consultores stión PMI e integración de sist emas GIS en el PNSU PE-OTASS-356410-CS-CQS / Fortalecimiento de las capaci Improving Governance of Wa Selección basada dades de las EPS en estrategi IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 81,218.27 0.00 Firmado 2023-04-17 2023-09-22 2023-05-08 2023-06-21 2023-11-22 2023-07-21 2024-01-25 2023-08-24 2024-02-26 2023-12-22 as comunicacionales para el rvice Providers e consultores desarrollo de campañas de v aloración de los servicios de s aneamiento. PE-OTASS-356412-CS-CQS / Improving Governance of Wa Selección basada Servicio de Consultoria para IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 25,380.71 0.00 Firmado 2023-04-17 2023-04-13 2023-05-08 2023-10-03 2023-06-21 2023-10-24 2023-07-21 2024-02-02 2023-08-25 2024-02-26 2023-10-09 el entrenamiento de voceros rvice Providers e consultores del OTASS y de las EPS PE-OTASS-275049-CS-QCBS / Servicio de asistencia especia Improving Governance of Wa lizada al OTASS en el desarrol Selección basada IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 2,725,819.34 0.00 Cancelado 2022-05-02 2022-05-23 2022-07-06 2022-08-20 2022-09-19 2022-10-24 2022-11-28 2023-11-28 lo e implementación de estra en calidad y costo rvice Providers tegias para la gestión y asiste ncia técnica a las EPS PE-OTASS-275041-CS-CQS-2 / Desarrollo de instrumentos metodológicos para la estima Improving Governance of Wa Selección basada ción de costos, estudios que IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 336,842.11 0.00 Firmado 2023-08-17 2023-09-05 2023-09-07 2023-09-08 2023-10-21 2023-11-20 2023-11-20 2024-04-05 2023-12-25 2024-06-22 sustentan el cálculo de tarifa rvice Providers e consultores s y propuestas para el mejora miento del esquema de subsi dios entre usuarios de los ser vicios de saneamiento PE-OTASS-377880-CS-QCBS / Consultoria para el desarrollo Improving Governance of Wa de una solución informática i Selección basada IBRD / 88990 ter Supply and Sanitation Se Previa Open - International 3,136,118.42 0.00 Bajo Revision 2023-08-23 2023-09-05 2023-09-13 2023-10-02 2023-10-27 2023-11-21 2023-11-24 2024-02-02 2023-12-24 2024-02-27 2024-01-28 2024-05-08 2024-03-03 2025-03-03 ntegrada con los procesos ad en calidad y costo rvice Providers ministrativos, comerciales y o peracionales, alineado al mod elo propuesto por OTASS PE-OTASS-384665-CS-QCBS / Improving Governance of Wa Consultoría para el Aseguram Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 377,802.12 0.00 Cancelado 2023-09-29 2023-10-23 2023-10-20 2023-11-20 2023-12-03 2024-01-05 2023-12-31 2024-02-28 2024-01-30 2024-03-13 2024-03-05 2024-04-09 2025-04-09 iento de la Calidad del Proyec en calidad y costo rvice Providers to GO (Supervisión) PE-OTASS-401961-CS-CQS / Elaboración de guías sobre lo Improving Governance of Wa Selección basada s procedimientos del Sistema IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 131,402.93 0.00 En ejecución 2024-01-10 2024-02-19 2024-01-31 2024-02-23 2024-03-15 2024-04-05 2024-04-14 2024-05-19 2024-11-15 de contabilidad regulatoria, i rvice Providers e consultores ncorporando el enfoque basa do en actividades PE-OTASS-409999-CS-QCBS / Improving Governance of Wa Elaboración de guía metodoló Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 537,634.41 0.00 En ejecución 2024-02-16 2024-06-28 2024-03-08 2024-04-15 2024-04-21 2024-05-19 2024-06-18 2024-07-23 2024-08-27 2025-08-27 gica para los Planes de Reflot en calidad y costo rvice Providers amiento y actualización del P MO de SEDAPAR PE-OTASS-414655-CS-QCBS / Contratación de plataformas tecnológicas integradas para Improving Governance of Wa Selección basada el apoyo a los procesos opera IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,005,291.01 0.00 En ejecución 2024-03-15 2024-05-13 2024-04-05 2024-05-24 2024-05-19 2024-06-16 2024-07-16 2024-08-20 2024-09-24 2025-07-21 en calidad y costo cionales y toma de decisione rvice Providers s empresariales de las EPS SE DAPAR y Aguas de Lima Nort e Page 6 PE-OTASS-414668-CS-QCBS / Improving Governance of Wa Servicio de asistencia técnica Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,243,386.24 0.00 En ejecución 2024-03-12 2024-04-16 2024-03-27 2024-05-02 2024-04-25 2024-05-23 2024-06-22 2024-07-27 2024-08-28 2025-08-28 en gestión operacional y com en calidad y costo rvice Providers ercial a la EPS EMAPACOP PE-OTASS-414670-CS-QCBS / Improving Governance of Wa Servicio de asistencia técnica Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,190,476.19 0.00 En ejecución 2024-03-12 2024-04-17 2024-03-27 2024-05-02 2024-04-25 2024-05-23 2024-06-22 2024-07-27 2024-08-28 2025-08-28 en gestión operacional y com en calidad y costo rvice Providers ercial a la EPS SEDACUSCO PE-OTASS-414671-CS-QCBS / Servicio de asistencia técnica Improving Governance of Wa Selección basada en gestión operacional y com IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 1,296,296.30 0.00 En ejecución 2024-03-12 2024-04-09 2024-03-27 2024-05-02 2024-04-25 2024-05-20 2024-05-23 2024-07-01 2024-06-22 2024-08-12 2024-07-27 2024-08-31 2025-08-31 en calidad y costo ercial a las EPS Aguas de Lim rvice Providers a Norte, Huaral y Barranca PE-OTASS-414673-CS-QCBS / Contratación de consultoría p Improving Governance of Wa Selección basada ara desarrollar acciones relac IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 423,280.42 0.00 En ejecución 2024-03-12 2024-06-06 2024-04-02 2024-06-14 2024-05-16 2024-06-13 2024-07-13 2024-08-17 2024-09-21 2025-05-19 en calidad y costo ionadas al Programa Avanzad rvice Providers o en Dirección de Agua y San eamiento (PADAS II) PE-OTASS-373449-CS-QCBS / Asistencia Especializada al O Improving Governance of Wa Selección basada TASS en el Desarrollo de Estr IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 986,842.11 0.00 Cancelado 2023-07-31 2023-08-30 2023-08-21 2023-09-19 2023-10-04 2023-10-11 2023-11-01 2023-12-15 2023-12-01 2024-01-12 2024-01-05 2024-02-09 2025-02-08 en calidad y costo ategias para la Gestión y Asis rvice Providers tencia Técnica a Las EPS PE-OTASS-403573-CS-QCBS / Servicio de capacitación y as Improving Governance of Wa Selección basada esoría en costeo basado en a IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 317,460.32 0.00 En ejecución 2024-03-22 2024-05-28 2024-04-12 2024-06-14 2024-05-26 2024-06-23 2024-07-23 2024-08-27 2024-10-01 2025-02-28 en calidad y costo ctividades y adopción de NIF rvice Providers para las Seis EPS del Program a de Modernización PE-OTASS-427529-CS-CQS / Validación y asistencia técnic a en la implementación de un Improving Governance of Wa Selección basada a guía metodológica para el p IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 317,460.32 0.00 En ejecución 2024-05-30 2024-07-08 2024-06-20 2024-07-30 2024-08-03 2024-09-02 2024-10-07 2025-04-05 roceso de formulación, actual rvice Providers e consultores ización, seguimiento y evalua ción de los Planes Regionales de Agua Potable y Saneamie nto (PRAS) PE-OTASS-427530-CS-QCBS / Elaboración de un plan estrat Improving Governance of Wa Selección basada égico nacional para el tratami IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 658,730.16 0.00 En ejecución 2024-05-20 2024-06-25 2024-06-10 2024-07-08 2024-07-24 2024-08-21 2024-09-20 2024-10-25 2024-11-29 2025-07-27 en calidad y costo ento y reúso de aguas residu rvice Providers ales con enfoque de economí a circular PE-OTASS-427532-CS-QCBS / Improving Governance of Wa Servicio de asistencia técnica Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 568,783.07 0.00 Cancelado 2024-05-30 2024-06-20 2024-08-03 2024-08-31 2024-09-30 2024-11-04 2024-12-09 2025-10-05 a OTASS en estrategias de tr en calidad y costo rvice Providers ansformación digital PE-OTASS-427533-CS-CQS / Improving Governance of Wa Selección basada Servicio de asistencia técnica IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 396,825.40 0.00 En ejecución 2024-05-30 2024-06-21 2024-06-20 2024-07-08 2024-08-03 2024-09-02 2024-10-07 2025-08-03 en la implementación de la m rvice Providers e consultores etodología BIM en OTASS y E PS piloto PE-OTASS-427539-CS-CQS / Plan de sensibilización en la v Improving Governance of Wa Selección basada Ejecución pendien aloración de servicios de san IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 158,730.16 0.00 2024-05-30 2024-06-20 2024-08-03 2024-09-02 2024-10-07 2025-06-04 te eamiento y promoción de con rvice Providers e consultores exiones intradomiciliarias PE-OTASS-427540-CS-QCBS / Improving Governance of Wa Servicio de asistencia técnica Selección basada IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 952,380.95 0.00 En ejecución 2024-05-30 2024-05-20 2024-06-20 2024-05-24 2024-08-03 2024-08-31 2024-09-30 2024-11-04 2024-12-09 2025-10-05 en gestión operacional y del t en calidad y costo rvice Providers alento humano a la EPS SEDA PAR PE-OTASS-434552-CS-CQS / Improving Governance of Wa Selección basada Ejecución pendien Elaboración de la política y es IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - International 317,460.32 0.00 2024-06-21 2024-07-12 2024-08-25 2024-09-24 2024-10-29 2025-04-27 te trategia financiera del sector rvice Providers e consultores saneamiento PE-OTASS-434551-CS-CQS / Desarrollo de una solución inf ormática mediante un softwa Improving Governance of Wa Selección basada re integrado con los procesos IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 571,428.57 0.00 En ejecución 2024-06-19 2024-06-28 2024-07-10 2024-08-23 2024-09-20 2024-10-20 2024-11-24 2024-12-29 2025-10-25 en calidad y costo de registro, evaluación y seg rvice Providers uimiento de expedientes técn icos (PRESET) y sistema de se guimiento de proyectos (SSP) PE-OTASS-446639-CS-CQS / Asistencia técnica en la form Improving Governance of Wa Selección basada ulación del plan estratégico d Ejecución pendien IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 396,825.40 0.00 2024-08-26 2024-09-16 2024-10-30 2024-11-29 2025-01-03 2025-07-02 e gobierno y transformación te rvice Providers e consultores digital e instrumentos comple mentarios para el OTASS PE-OTASS-446640-CS-QCBS / Implementación de un sistem Improving Governance of Wa Selección basada Ejecución pendien a de gestión de recursos hum IBRD / 88990 ter Supply and Sanitation Se Posterior Open - International 529,100.53 0.00 2024-08-26 2024-09-10 2024-10-24 2024-11-21 2024-12-21 2025-01-19 2025-02-03 2025-08-31 en calidad y costo te anos y un sistema de gestión rvice Providers administrativa para el OTASS PE-OTASS-446642-CS-CQS / Asistencia técnica para el fort Improving Governance of Wa Selección basada Ejecución pendien alecimiento institucional del IBRD / 88990 ter Supply and Sanitation Se Posterior en calificaciones d Open - National 396,825.40 0.00 2024-08-26 2024-09-16 2024-10-30 2024-11-29 2025-01-03 2025-08-31 te OTASS en la implementación rvice Providers e consultores de las funciones establecidas en el DL1620 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant tract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1.1.1.1-CI-8899 / Diagnóstico de la situación actual de los s istemas de información de pr Improving Governance of Wa estadores urbanos y rurales y IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 30,303.00 0.00 Cancelado 2019-09-02 2019-09-07 2019-09-28 2019-11-02 2019-12-17 propuesta de sistema integra rvice Providers do considerando el compone nte georreferenciado y la con tabilidad regulatoria 1.1.1.2-CI-8899 / Diagnóstico para la identificación de la inf ormación necesaria y relevan Improving Governance of Wa te de los prestadores urbanos IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 30,303.00 0.00 Cancelado 2019-09-02 2019-09-07 2019-09-28 2019-11-02 2019-12-17 y rurales para el sector sanea rvice Providers miento y las estrategias para su recopilación e integración Page 7 1.1.5.1-CI-8899 / Levantamie nto y procesamiento de infor Improving Governance of Wa mación de la implementacion IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 16,787.00 0.00 Cancelado 2019-09-16 2019-09-21 2019-10-12 2019-11-16 2019-12-31 de los proyectos contenidos e rvice Providers n los Planes Regionales de Sa neamiento vinculados al cierr e de brechas 3.3.4-CI-8899 / Consultoría p General Project Administrati IBRD / 88990 Posterior Individual Limited 121,212.00 0.00 Cancelado 2019-09-09 2019-09-14 2019-10-05 2019-11-09 2020-03-08 ara la Elaboración Línea de B on ase 3.3.5-CI-8899 / Diseño del so General Project Administrati IBRD / 88990 Posterior Individual Limited 15,152.00 0.00 Cancelado 2019-09-13 2019-09-18 2019-10-09 2019-11-13 2020-01-12 ftware de evaluación y segui on miento 3.4.14-CI-8899 / Proceso de General Project Administrati Contratación del Especialista IBRD / 88990 Posterior Individual Limited 78,787.88 0.00 Cancelado 2019-08-22 2019-09-07 2019-08-27 2019-09-17 2019-10-22 2023-12-31 on 02 para Componente 1 3.4.1-SD-8899 / Proceso de C General Project Administrati Selección directa ontratación del Director de l IBRD / 88990 Previa Direct 310,909.00 0.00 Cancelado 2019-07-26 2019-08-20 2019-07-28 2019-07-31 2023-12-31 on de consultores a Unidad Ejecutora del Progra ma (UE003) 3.4.3-SD-8899 / Proceso de C General Project Administrati Selección directa ontratación del Especialista e IBRD / 88990 Posterior Direct 241,818.00 0.00 Cancelado 2019-07-19 2019-09-19 2019-07-21 2019-07-24 2023-12-31 on de consultores n Adquisiciones (Jefe Área de Adquisiciones) 3.4.2-CI-8899 / Proceso de C General Project Administrati ontratación del Coordinador IBRD / 88990 Posterior Individual Limited 271,515.00 26,690.27 Rescindido 2019-08-05 2020-01-08 2019-08-10 2020-01-08 2019-08-31 2020-01-15 2019-10-05 2020-02-09 2023-12-31 on Administrativo 3.4.7-CI-8899 / Proceso de C General Project Administrati ontratación del Especialista Fi IBRD / 88990 Posterior Individual Limited 237,576.00 105,638.70 Firmado 2019-08-05 2019-08-20 2019-08-10 2019-10-08 2019-08-31 2019-10-17 2019-10-05 2019-11-02 2023-12-31 on nanciero (Jefe Área de Finanz as) 3.4.8-CI-8899 / Proceso de C General Project Administrati ontratación del Especialista e IBRD / 88990 Posterior Individual Limited 233,333.00 9,108.22 Firmado 2019-08-22 2019-10-21 2019-08-27 2020-02-10 2019-09-17 2020-02-24 2019-10-22 2020-03-17 2023-12-31 on n Contabilidad (Jefe Área de Contabilidad) 3.4.11-CI-8899 / Proceso de Contratación del Especialista General Project Administrati IBRD / 88990 Posterior Individual Limited 159,090.91 99,156.10 Firmado 2019-08-22 2019-10-21 2019-08-27 2019-11-05 2019-09-17 2019-11-18 2019-10-22 2019-12-09 2023-12-31 en Comunicación (Jefe Área d on e Comunicaciones) 3.4.22-CI-8899 / Proceso de General Project Administrati Contratación de Especialista IBRD / 88990 Posterior Individual Limited 151,515.15 0.00 Cancelado 2019-08-26 2021-06-10 2019-08-31 2019-09-21 2019-10-26 2023-12-31 on en indicadores y Base de Dat os 3.4.10-CI-8899 / Proceso de General Project Administrati Contratación del Asesor Legal IBRD / 88990 Posterior Individual Limited 263,030.30 30,832.93 Firmado 2019-08-05 2020-02-21 2019-08-10 2020-02-27 2019-08-31 2020-03-02 2019-10-05 2020-03-20 2023-12-31 on (Jefe Área de Asesoría Legal) 3.4.6-CI-8899 / Proceso de C ontratación del Especialista e General Project Administrati IBRD / 88990 Posterior Individual Limited 248,939.00 10,718.00 Firmado 2019-08-05 2019-09-03 2019-08-10 2019-10-01 2019-08-31 2019-10-03 2019-10-05 2019-10-28 2023-12-31 n Planeamiento y Presupuest on o (Jefe Área de Planeam. Ppto ) 3.4.12-CI-8899 / Proceso de General Project Administrati Contratación del Coordinador IBRD / 88990 Posterior Individual Limited 240,909.09 57,115.17 Firmado 2019-08-05 2019-09-03 2019-08-10 2021-03-16 2019-08-31 2021-03-29 2019-10-05 2021-04-23 2023-12-31 on Técnico Componente 1 3.4.21-CI-8899 / Proceso de General Project Administrati Contratación de Especialista IBRD / 88990 Posterior Individual Limited 151,515.15 0.00 Cancelado 2019-08-26 2019-08-31 2019-09-21 2019-10-26 2023-12-31 on en presupuesto 3.4.13-CI-8899 / Proceso de General Project Administrati Contratación del Especialista IBRD / 88990 Posterior Individual Limited 151,515.15 110,284.25 Firmado 2019-08-22 2019-09-03 2019-08-27 2019-09-04 2019-09-17 2019-09-09 2019-10-22 2019-09-26 2023-12-31 on 01 para Componente 1 3.4.9-CI-8899 / Proceso de C ontratación del Especialista e General Project Administrati IBRD / 88990 Posterior Individual Limited 263,030.30 87,164.03 Finalizado 2019-08-05 2019-09-03 2019-08-10 2019-09-04 2019-08-31 2019-09-11 2019-10-05 2019-09-24 2023-12-31 2021-02-03 n Monitoreo y Evaluación (Jef on e Área de Monitoreo y Evalua ción) 3.4.20-CI-8899 / Proceso de Contratación de Analista Amb General Project Administrati IBRD / 88990 Posterior Individual Limited 151,515.15 14,813.38 Firmado 2019-08-05 2019-10-21 2019-08-10 2019-11-06 2019-08-31 2019-11-18 2019-10-05 2019-12-10 2023-12-31 2020-05-20 iental y Social (Especialista e on n Salvaguarda Ambiental y S ocial) 3.4.23-CI-8899 / Coordinador General Project Administrati Responsable del Componente IBRD / 88990 Posterior Individual Limited 237,576.00 97,949.86 Finalizado 2019-07-29 2019-09-03 2019-08-03 2019-09-26 2019-08-24 2019-10-04 2019-09-28 2019-10-20 2023-12-31 2021-10-22 on 2 (apoyo al PNSU) 3.4.24-CI-8899 / Especialista General Project Administrati IBRD / 88990 Posterior Individual Limited 186,667.00 96,669.08 Firmado 2019-07-29 2019-09-03 2019-08-03 2019-09-25 2019-08-24 2019-10-04 2019-09-28 2019-10-20 2023-12-31 Adquisiciones (apoyo al PNSU on ) 3.4.28-CI-8899 / Especialista General Project Administrati IBRD / 88990 Posterior Individual Limited 176,667.00 90,044.41 Firmado 2019-07-29 2019-09-03 2019-08-03 2019-10-01 2019-08-24 2019-10-15 2019-09-28 2019-10-31 2023-12-31 Presupuesto (apoyo al PNSU) on 3.4.29-CI-8899 / Especialista General Project Administrati Financiero IBRD / 88990 Posterior Individual Limited 186,667.00 45,421.56 Firmado 2019-07-29 2019-09-03 2019-08-03 2019-10-04 2019-08-24 2019-10-15 2019-09-28 2019-10-31 2023-12-31 on (apoyo al PNSU) 3.4.30.CI-8899 / Especialista General Project Administrati IBRD / 88990 Posterior Individual Limited 183,333.00 11,616.49 Rescindido 2019-08-12 2019-11-29 2019-08-17 2019-12-04 2019-09-07 2019-12-20 2019-10-12 2020-01-16 2023-12-31 en Contabilidad on 3.4.31-CI.8899 / Especialista General Project Administrati IBRD / 88990 Posterior Individual Limited 176,667.00 101,357.30 Finalizado 2019-08-12 2019-10-10 2019-08-17 2019-10-11 2019-09-07 2019-10-18 2019-10-12 2019-11-18 2023-12-31 2023-01-18 Legal on (apoyo al PNSU) 3.4.32-CI-8899 / Coordinador General Project Administrati técnico del componente 2 IBRD / 88990 Posterior Individual Limited 208,333.00 90,333.36 Firmado 2019-08-12 2019-10-16 2019-08-17 2019-10-16 2019-09-07 2019-10-24 2019-10-12 2019-11-18 2023-12-31 on (apoyo al PNSU) 3.4.33-CI-8899 / Coordinador General Project Administrati 01 de Proyecto IBRD / 88990 Posterior Individual Limited 103,333.00 50,559.02 Firmado 2019-08-12 2019-10-11 2019-08-17 2019-10-14 2019-09-07 2019-10-18 2019-10-12 2019-10-31 2021-12-31 on (apoyo al PNSU) 3.4.34-CI.8899 / Coordinador General Project Administrati 02 de Proyecto IBRD / 88990 Posterior Individual Limited 53,333.00 94,997.48 Finalizado 2019-08-12 2019-10-11 2019-08-17 2019-10-11 2019-09-07 2019-10-18 2019-10-12 2019-11-03 2020-12-31 on (apoyo al PNSU) 3.4.35-CI-8899 / Coordinador General Project Administrati 03 de Proyecto IBRD / 88990 Posterior Individual Limited 50,000.00 94,158.30 Firmado 2019-09-15 2019-10-11 2019-09-20 2019-10-11 2019-10-11 2019-10-14 2019-11-15 2019-11-03 2020-12-31 on (apoyo al PNSU) 3.4.50-CI-8899 / Especialista General Project Administrati Social IBRD / 88990 Posterior Individual Limited 173,333.00 90,111.03 Firmado 2019-08-12 2019-09-03 2019-08-17 2019-10-14 2019-09-07 2019-10-28 2019-10-12 2019-11-15 2023-12-31 on (apoyo al PNSU) Page 8 3.4.51-CI-8899 / Especialista General Project Administrati Ambiental IBRD / 88990 Posterior Individual Limited 173,333.00 90,880.26 Firmado 2019-08-12 2019-09-03 2019-08-17 2019-10-28 2019-09-07 2019-11-05 2019-10-12 2019-11-25 2023-12-31 on (apoyo al PNSU) 3.4.52-CI-8899 / Especialista General Project Administrati en proyectos de inversión IBRD / 88990 Posterior Individual Limited 133,333.00 9,025.83 Firmado 2019-08-12 2019-11-07 2019-08-17 2019-12-13 2019-09-07 2019-12-26 2019-10-12 2020-01-22 2022-12-31 on (apoyo al PNSU) 3.4.57-CI-8899 / Especialista General Project Administrati en Saneamiento Fisico Legal IBRD / 88990 Posterior Individual Limited 121,212.00 26,707.96 Firmado 2019-08-12 2019-11-26 2019-08-17 2019-12-11 2019-09-07 2019-12-16 2019-10-12 2020-01-05 2022-12-31 on (apoyo al PNSU) 3.4.36-CI-8899 / COORDINAD Improving Governance of Wa OR DE PROYECTOS 2 - SEDAC IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 90,000.00 32,599.11 Firmado 2019-10-10 2019-10-09 2019-10-15 2019-11-18 2019-11-05 2019-11-26 2019-12-10 2019-12-13 2020-06-07 USCO UIC2 rvice Providers PE-OTASS-144409-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 216,363.00 57,120.96 Finalizado 2019-10-01 2019-09-24 2019-10-06 2019-09-26 2019-10-27 2019-10-03 2019-12-01 2019-10-14 2020-05-29 2020-11-03 Especialista en Adquisiciones on UE003 CONS IND 3.4.24 / ESPECIALI General Project Administrati STA EN PLANEAMIENTO Y PRE IBRD / 88990 Posterior Individual Limited 174,242.00 28,707.46 Firmado 2020-02-20 2020-10-23 2020-02-21 2020-11-05 2020-02-26 2020-11-06 2020-02-28 2020-11-14 2023-12-31 on SUPUESTO DE LA UE 003 1.2.7.2 ARQUITECTURA DE SI STEMAS / Consultoria Individu Improving Governance of Wa al Diagnostico de procesos d IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 6,666.67 6,066.46 Rescindido 2020-03-04 2020-06-16 2020-03-06 2020-07-15 2020-03-10 2020-08-20 2020-03-16 2020-08-29 2020-05-15 e evaluación de expedientes rvice Providers técnicos - Arquitectura de Sis temas 1.2.7.1 ARQUITECTURA DE P ROCESOS / Consultoria Diagn Improving Governance of Wa ostico de procesos de evalua IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 6,666.67 6,066.46 Rescindido 2020-03-04 2020-06-04 2020-03-06 2020-07-29 2020-03-10 2020-08-17 2020-03-16 2020-09-24 2020-05-15 ción de expedientes técnicos rvice Providers - Arquitectura de Procesos 3.4.27 ESPECIALISTA EN PLA General Project Administrati NEAMIENTO UIC2 / ESPECIALI IBRD / 88990 Posterior Individual Limited 150,000.00 42,269.44 Firmado 2020-03-04 2020-03-09 2020-03-06 2021-03-29 2020-03-10 2021-03-31 2020-03-16 2021-04-14 2023-12-31 on STA EN PLANEAMIENTO UIC 2 3.4.4 PROFESIONAL EN ADQ General Project Administrati UISICIONES / PROFESIONAL E IBRD / 88990 Posterior Individual Limited 136,363.64 0.00 Cancelado 2020-03-13 2020-03-16 2020-03-24 2020-03-31 2023-12-31 on N ADQUISICIONES UE 003 CONS IND 1.1.7.5 METOD DE INDICADORES / Contratación de servicio de consul individ para la elaboración de un inst Improving Governance of Wa rumento de planificación aso IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 11,363.64 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 ciado a la metodología e indic rvice Providers adores de los criterios para el cofinanciamiento de los costo s de operación y mantenimie nto de proyectos APP de San eamiento CONS IND 1.1.7.6 PROYECTO S APP / Contratación de servi cio de consultoría individual p Improving Governance of Wa ara la elaboración de una pro IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 5,454.55 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-06-30 puesta de instrumento de pla rvice Providers nificación de los proyectos en Asociaciones Público Privadas del Sector Saneamiento CONS IND 1.1.7.7 ING. SANIT CHINCHA-CUS / Contratación Improving Governance of Wa de servicio de consultoría indi IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 10,909.09 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 vidual para la evaluación de rvice Providers aspectos de ingeniería sanita ria de los proyectos APP PTAR Chincha y PTAR Cusco CONS IND 1.1.7.8 ING. SANIT ARIA TARAPOTO / Contratació Improving Governance of Wa n de servicio de consultoría in IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 10,909.09 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 dividual para la evaluación d rvice Providers e aspectos de ingeniería sanit aria de los proyectos APP PTA R Tarapoto y PTAR Cajamarca CONS IND 1.1.7.9 GEOTECNI A, SUELOS Y TOP / Contrataci ón de servicio de consultoría i Improving Governance of Wa ndividual para la evaluación IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 10,909.09 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 de aspectos de geotecnia, m rvice Providers ecánica de suelos y topografí a de los proyectos APP PTAR Chincha, PTAR Tarapoto, PTA R Cusco y PTAR Cajamarca CONS IND 1.1.7.10 INTERFER ENCIAS / Contratación de ser vicio de consultoría individual Improving Governance of Wa para la evaluación de los asp IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 10,909.09 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 ectos de interferencias y estu rvice Providers dio de canteras de los proyec tos APP PTAR Chincha, PTAR Tarapoto, PTAR Cusco y PTAR Cajamarca CONS IND 1.1.7.11 ANALISIS DE RIESGO / Contratación de servicio de consultoría individ ual para la evaluación de los Improving Governance of Wa aspectos de análisis de riesg IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 10,909.09 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 os referido a la integridad físi rvice Providers ca y/o estructural de la infrae structura de los proyectos AP P PTAR Chincha, PTAR Cusco, PTARTarapoto y PTAR Cajama rca CONS IND 1.1.7.12 GESTIÓN SOCIAL / Contratación de ser Improving Governance of Wa vicio de consultoría individual IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 9,090.91 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 para la gestión social para ob rvice Providers tener la aceptación social de l os proyectos APP PTAR Chinc ha, PTAR Tarapoto y PTAR Cu sco CONS IND 1.1.7.13 GESTIÓN DE PROYECTOS / Contratació Improving Governance of Wa n de servicio de consultoría in IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 9,090.91 0.00 Cancelado 2020-04-15 2020-04-18 2020-04-20 2020-04-27 2020-04-30 2020-07-31 dividual para la gestión oport rvice Providers una de los proyectos APP y ar ticulación con los gobiernos s ubnacionales CONS IND 1.2.3.1 ESTRATEGI Improving Governance of Wa A DE COMUNICAC / Elaboraci IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 7,878.79 0.00 Cancelado 2020-04-24 2020-04-29 2020-05-08 2020-05-13 2020-07-13 ón de la Estrategia de Comun rvice Providers icación del ¨Programa de Mo dernización Page 9 SD 1.2.3.4 DISEÑO E IMPLEM ENT-CORNAVI / Diseño e Impl Improving Governance of Wa ementación de Campana de IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 13,939.39 13,579.14 Finalizado 2020-04-15 2020-04-16 2020-04-16 2020-04-21 2020-04-17 2020-04-22 2020-04-17 2020-04-29 2020-07-31 2020-12-31 Valorización del Servicio de A rvice Providers gua y Saneamiento Brindado por las EPS a Nivel Nacional e n Tiempos de Coronavirus SD 1.2.3.4 CREATIVO Y PRO DUCCIÓN / Diseno Creativo y Producción de Materiales de l Improving Governance of Wa a Campana Valorización del S IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 12,909.09 12,575.46 Finalizado 2020-04-15 2020-04-16 2020-04-16 2020-04-21 2020-04-17 2020-04-22 2020-04-17 2020-04-29 2020-05-30 2020-11-16 ervicio de Agua y Saneamient rvice Providers o Brindado por las EPS a Nive l Nacional en Tiempos de Cor onavirus CONS IND 1.3.2.4 ESTRATEGI A COMUNICACIO / Consultoria Improving Governance of Wa para el Diagnóstico y el Inven IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 15,151.52 0.00 Cancelado 2020-05-04 2020-05-08 2020-05-18 2020-05-25 2020-07-27 tario de los equipos que sopo rvice Providers rtan los sistemas administrat ivos y gerenciales de las EPS CONS IND 1.3.4.5.DIAGNOST ICO E INVENTARI / Consultori Improving Governance of Wa a para el Diagnóstico y el Inv IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 15,151.52 0.00 Cancelado 2020-05-04 2020-05-08 2020-05-15 2020-05-20 2020-07-21 entario de los equipos que so rvice Providers portan los sistemas comercia les de las EPS SD 1.3.1.1 DETERMINACION ALCANCE EPS / SERVICIO DE CONSULTORIA PARA LA DETE RMINACIÓN DEL ALCANCE Y CONTENIDO DEL PLAN DE AC Improving Governance of Wa CIONES DE URGENCIA Y DEL IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 10,000.00 9,598.46 Finalizado 2020-05-13 2020-05-15 2020-05-14 2020-05-15 2020-05-15 2020-05-15 2020-05-18 2020-06-01 2020-06-18 2020-07-28 PLAN DE REFLOTAMIENTO DE rvice Providers LAS EMPRESAS PRESTADORA S DE SERVICIOS DE SANEAMI ENTO DE ACCIONARIADO MU NICIPAL INCORPORADAS AL R ÉGIMEN DE APOYO TRANSITO R CONS IND 1.2.1.1 / CONTRAT Improving Governance of Wa ACIÓN DE CONSULTORIA INDI IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 182,424.24 0.00 Cancelado 2020-06-03 2020-06-08 2020-06-12 2020-06-19 2023-12-30 VIDIAL SUPERVISION DE PRO rvice Providers YECTOS DEL COMPONENTE 2 DEL PROGRAMA SD 1.2.3.2 SEGUIMIENTO ES TRATEGIA / SERVICIO PARA E Improving Governance of Wa L SEGUMIENTO A LA IMPLEME IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 4,848.48 0.00 Cancelado 2020-06-15 2020-06-17 2020-06-16 2020-06-17 2020-06-18 2020-08-17 NTACIÓN DE ACCIONES PREVI rvice Providers AS DE LA ESTRATEGIA DE CO MUNICACIONES SD N° 1.3.4.3 SISTEMATIZAC Improving Governance of Wa ION / SISTEMATIZACION DEL IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 3,030.30 0.00 Cancelado 2020-06-22 2020-06-23 2020-06-24 2020-06-25 2020-07-24 PRIMER ENCUENTRO AGUAS rvice Providers TODAS SD 1.2.3.6 PG WEB MIGRACI ON A PLATAFORMA / CONTRA CION DEL SERVICIO DE CONS Improving Governance of Wa ULTORIA PARA LA IMPLEMENT IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 6,060.61 5,553.94 Finalizado 2020-08-10 2020-10-13 2020-08-17 2020-10-19 2020-08-19 2020-10-30 2020-08-20 2020-11-19 2020-10-08 2021-02-14 ACION DE LA PAGINA WEB IN rvice Providers STITUSIONAL Y MIGRACIÓN A LA PLATAFO RMA ÚNICA DIGITAL GOB.PE DE UE 003 CI 1.2.3.2 ESP EN COMUNICA CIONES / CONSULTORIA INDI VIDUAL PARA EL SERVICIO DE Improving Governance of Wa UN ESPECIALISTA EN COMUNI IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 8,181.82 0.00 Cancelado 2020-08-10 2020-08-17 2020-08-20 2020-08-24 2020-11-23 CACIONES PARA EL DSARROL rvice Providers LO DE LAS ACCIONES DE PRO MOCIÓN Y DIFUSIÓN DE LA E STRATEGIA DE COMUNICACIO NES CONS IND 1.1.7 / CONSULTO RIA ASESORIA EN LA ESTAND Improving Governance of Wa ARIZACION DE CONTENIDOS IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 9,090.91 8,272.44 Finalizado 2020-08-17 2020-08-04 2020-08-25 2020-08-20 2020-08-31 2020-08-25 2020-09-04 2020-09-01 2020-11-03 2020-11-14 DE PLANTEAMIENTO TÉCNICO rvice Providers DE LOS PROYECTOS DE APP CI 1.2.2.1.1 / Servicio de con sultora individual, para la revi sion,evaluacion, analisis y dia Improving Governance of Wa gnostico de la normatividad y IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 7,272.73 6,617.95 Firmado 2020-09-07 2020-09-24 2020-09-10 2020-10-05 2020-09-11 2020-10-06 2020-09-15 2020-10-19 2020-11-04 jurisprudencia vigentes y apli rvice Providers cables a las EPS municipales, para el diseño e implementac ion de un sistema salarial int egral. CI 1.2.2.1.2 / Serv. C.I.. para la revision,evaluacion, analisi s y diagnostico de la normati Improving Governance of Wa vidad y jurisprudencia vigent IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 7,272.73 0.00 Cancelado 2020-09-07 2020-11-12 2020-09-10 2020-09-11 2020-09-15 2020-11-04 es y aplicables a las EPS mun rvice Providers icipales, diseño e implementa cion del sistema de evaluacio n de rendimiento, plan de de sarrollo y linea de carrera CI 1.2.2.1.3 / Serv CI revision ,evaluacion, analisis y diagno stico de los convenios colecti Improving Governance of Wa vos, suscritos por las 18 EPS IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 7,272.73 6,617.95 Firmado 2020-09-07 2020-09-24 2020-09-10 2020-10-05 2020-09-11 2020-10-08 2020-09-15 2020-10-19 2020-11-14 en RAT y 01 UE Agua Tumbes rvice Providers y la problemática y obstacul os que influyen en la definicio n de un sistema salarial integ ral CI 3.4.15 ESP 3 COMP 1 / Co General Project Administrati ntratacion de Especialista Téc IBRD / 88990 Posterior Individual Limited 147,727.27 66,479.69 Firmado 2020-09-07 2020-09-26 2020-09-14 2020-10-05 2020-09-18 2020-10-12 2020-09-22 2020-10-22 2023-12-31 on nico 03 DEL COMPONENTE 1 CI 3.4.14 ESP 2 COMP 1 / CO General Project Administrati NTRATACIÓN DE ESPECIALIST IBRD / 88990 Posterior Individual Limited 147,727.27 65,088.78 Firmado 2020-09-15 2020-09-26 2020-09-22 2020-10-21 2020-09-28 2020-10-22 2020-09-30 2020-11-14 2023-12-31 on A TÉCNICO 02 DEL COMPONE NTE 1 CI 3.4.58 COMUNICACIONES General Project Administrati IBRD / 88990 Posterior Individual Limited 94,545.45 9,900.12 Firmado 2020-09-21 2020-09-24 2020-09-24 2020-10-02 2020-09-28 2020-10-08 2020-09-30 2020-10-19 2023-12-31 / ESP EN COMUNICACIONES on PE-OTASS-213910-CS-INDV / General Project Administrati Especialista en adquisiciones IBRD / 88990 Posterior Individual Limited 136,000.00 13,388.49 Firmado 2021-02-01 2021-02-05 2021-02-10 2021-02-23 2021-02-22 2021-02-24 2021-03-01 2021-03-18 2022-02-28 on - Jefe área de adquisiciones PE-OTASS-213911-CS-INDV / General Project Administrati Especialista en Contabilidad - IBRD / 88990 Posterior Individual Limited 136,000.00 9,730.15 Firmado 2021-02-01 2021-02-12 2021-02-08 2021-03-15 2021-02-15 2021-03-29 2021-03-01 2021-04-14 2022-02-28 on Jefe del Área de Contabilidad Page 10 PE-OTASS-213919-CS-INDV / Especialista en Planeamiento General Project Administrati IBRD / 88990 Posterior Individual Limited 136,000.00 20,740.02 Firmado 2021-02-01 2021-01-21 2021-02-06 2021-03-16 2021-02-23 2021-03-29 2021-03-01 2021-04-21 2022-02-28 y Presupuesto - Jefe Área de on Planeamiento y Presupuesto PE-OTASS-213923-CS-INDV / General Project Administrati Director de la Unidad Ejecuto IBRD / 88990 Previa Individual Limited 310,909.00 60,232.72 Bajo Revision 2021-02-01 2021-01-21 2021-02-05 2021-01-27 2021-02-15 2021-02-02 2021-03-01 2021-02-23 2022-02-28 on ra del Programa (UE003) PE-OTASS-218456-CS-INDV / Especialista en Monitoreo y E General Project Administrati IBRD / 88990 Posterior Individual Limited 159,696.97 0.00 Firmado 2021-03-01 2021-02-12 2021-03-06 2021-02-18 2021-03-27 2021-02-22 2021-05-01 2021-03-08 2023-12-31 valuación (Jefe Área de Monit on oreo y Evaluación) PE-OTASS-220816-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 6,794.57 7,155.45 Finalizado 2021-03-15 2021-03-09 2021-03-20 2021-03-31 2021-04-04 2021-04-12 2021-05-04 2021-05-05 2021-07-18 2021-09-30 Especialista GIS en Fotogram on etria PE-OTASS-220824-CS-INDV / Improving and Expanding W Especialista GIS en Modelo Di IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 7,360.14 7,430.55 Finalizado 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-07-24 2021-09-30 gital de Terreno ervices in the Participating E PS PE-OTASS-220828-CS-INDV / Improving and Expanding W Analista GIS en Sistema de A IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 6,340.58 6,677.35 Finalizado 2021-03-15 2021-03-09 2021-03-20 2021-03-26 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-05-17 2021-09-30 gua Potable ervices in the Participating E PS PE-OTASS-220830-CS-INDV / Improving and Expanding W Especialista GIS en Sistemas IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 6,190.94 6,250.16 Finalizado 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-05-17 2021-09-30 de Alcantarillado ervices in the Participating E PS Improving and Expanding W PE-OTASS-220832-CS-INDV / IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 6,431.88 6,493.41 Finalizado 2021-03-15 2021-03-18 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-07-24 2021-09-30 Analista BIM en Arquitectura ervices in the Participating E PS Improving and Expanding W PE-OTASS-220834-CS-INDV / IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 6,892.21 6,951.73 Finalizado 2021-03-15 2021-03-18 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-07-24 2021-09-30 Analista BIM en Sanitaria ervices in the Participating E PS PE-OTASS-220835-CS-INDV / Improving and Expanding W Especialista GIS en Sistema C IBRD / 88990 ater Supply and Sanitation S Posterior Individual Limited 6,018.48 6,076.05 Finalizado 2021-03-15 2021-03-09 2021-03-20 2021-04-05 2021-04-04 2021-04-12 2021-05-10 2021-05-05 2021-07-24 2021-09-30 omercial ervices in the Participating E PS PE-OTASS-224959-CS-INDV / General Project Administrati Especialista técnico 04 del co IBRD / 88990 Posterior Individual Open 123,134.32 33,578.02 Firmado 2021-04-01 2021-04-06 2021-05-05 2021-07-14 2021-05-26 2021-07-15 2021-06-30 2021-09-11 2021-12-27 on mponente 1 PE-OTASS-224960-CS-INDV / General Project Administrati Especialista en supervisión e IBRD / 88990 Posterior Individual Open 123,134.32 44,607.03 Firmado 2021-04-01 2021-03-12 2021-05-05 2021-04-26 2021-05-26 2021-04-28 2021-06-30 2021-05-23 2021-12-27 on n actividades y proyectos del programa PE-OTASS-224962-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Open 78,805.97 21,727.27 Firmado 2021-04-01 2021-03-12 2021-04-21 2021-04-26 2021-05-12 2021-04-27 2021-06-16 2021-05-20 2021-12-13 Profesional en comunicacione on s PE-OTASS-225692-CS-INDV / Generación de capacidades d Improving Governance of Wa e planificación, articulación y IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 9,571.42 8,627.35 Finalizado 2021-03-22 2021-04-05 2021-03-27 2021-07-06 2021-04-17 2021-07-12 2021-05-22 2021-08-05 2021-11-18 2021-12-09 seguimiento del sector sanea rvice Providers miento en el MVCS PE-OTASS-229598-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 136,363.64 18,059.42 Firmado 2021-05-03 2021-04-29 2021-05-06 2021-05-19 2021-05-14 2021-05-27 2021-06-07 2021-06-11 2025-02-19 Profesional en Adquisiciones on PE-OTASS-229754-CS-INDV / General Project Administrati Coordinador administrativo d IBRD / 88990 Posterior Individual Open 200,000.00 51,562.81 Firmado 2021-05-03 2021-04-29 2021-06-21 2021-05-21 2021-07-12 2021-05-24 2021-08-16 2021-06-07 2022-02-12 on el Componente 3 PE-OTASS-235401-CS-INDV / Improving Governance of Wa Elaboración de propuesta par IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 26,971.00 20,698.58 Firmado 2021-05-24 2021-05-31 2021-05-29 2021-07-15 2021-06-19 2021-07-20 2021-07-24 2021-08-04 2022-01-20 a la actualización de la Polític rvice Providers a Nacional de Saneamiento ( PNS). PE-OTASS-235831-CS-INDV / General Project Administrati COORDINADOR DE PROYECT IBRD / 88990 Posterior Individual Limited 60,789.00 33,753.29 Firmado 2021-05-24 2021-06-16 2021-05-29 2021-06-23 2021-06-19 2021-06-25 2021-07-24 2021-07-19 2022-01-20 on OS 1 PARA EL AMBITO DE LA EPS SEDAPAR PE-OTASS-234106-CS-INDV / General Project Administrati Especialista en Adquisiciones IBRD / 88990 Posterior Individual Open 104,729.73 0.00 Cancelado 2021-05-17 2021-05-13 2021-07-05 2021-07-26 2021-08-30 2022-02-26 on Componente 3 PE-OTASS-234106-CS-INDV-2 General Project Administrati / Especialista en Adquisicione IBRD / 88990 Previa Individual Open 104,729.73 9,181.28 Firmado 2021-06-04 2021-06-09 2021-07-23 2021-06-28 2021-08-13 2021-06-30 2021-09-17 2021-07-08 2022-03-16 on s Componente 3 PE-OTASS-238337-CS-CDS / General Project Administrati Especialista de Contabilidad: IBRD / 88990 Posterior Individual Open 99,000.00 40,209.01 Firmado 2021-06-30 2021-06-18 2021-08-18 2021-07-05 2021-09-08 2021-07-14 2021-10-13 2021-08-01 2022-04-11 on Jefe del Área de Contabilidad PE-OTASS-238821-CS-INDV / Improving Governance of Wa Implementación Sistema de e IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 12,631.00 12,331.56 Firmado 2021-06-30 2021-07-14 2021-08-18 2021-08-20 2021-09-08 2021-08-23 2021-10-13 2021-09-14 2022-04-11 valuación de rendimiento rvice Providers PE-OTASS-238825-CS-INDV / Improving Governance of Wa Implementación de un Sistem IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 12,631.00 12,382.30 Firmado 2021-06-30 2021-06-16 2021-08-18 2021-08-10 2021-09-08 2021-08-12 2021-10-13 2021-08-31 2022-04-11 a Salarial Integral rvice Providers PE-OTASS-242381-CS-INDV / Elaboración de una nueva pro Improving Governance of Wa puesta de reestructuración d IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 13,000.00 12,969.16 Finalizado 2021-08-09 2021-07-27 2021-09-27 2021-10-29 2021-10-18 2021-11-22 2021-11-22 2022-01-13 2022-05-21 2022-05-22 el esquema de Gobierno Corp rvice Providers orativo para las EPS. PE-OTASS-245680-CS-INDV / Especialista en Planeamiento General Project Administrati IBRD / 88990 Posterior Individual Open 107,692.30 35,098.03 Firmado 2021-08-02 2021-08-20 2021-09-20 2021-08-31 2021-10-11 2021-09-07 2021-11-15 2021-10-14 2022-05-14 y Presupuesto - Jefe Área de on Planeamiento y Presupuesto PE-OTASS-250375-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Open 9,000.00 28,312.72 Firmado 2021-09-30 2021-09-03 2021-11-18 2021-12-29 2021-12-09 2021-12-29 2022-01-13 2022-03-16 2022-07-12 Especialista Financiero UIC2 on PE-OTASS-250386-CS-INDV / General Project Administrati Profesional especialista en in IBRD / 88990 Posterior Individual Open 80,000.00 21,632.67 Firmado 2021-09-30 2021-09-14 2021-11-18 2021-10-01 2021-12-09 2021-10-04 2022-01-13 2021-11-10 2022-07-12 on dicadores de saneamiento de l programa PE-OTASS-250387-CS-INDV / Especialista en elaboración d General Project Administrati IBRD / 88990 Posterior Individual Open 10,000.00 12,088.65 Finalizado 2021-09-30 2021-09-14 2021-11-18 2021-10-01 2021-12-09 2021-10-01 2022-01-13 2021-11-01 2022-07-12 2022-03-24 e la teoría de cambio y línea on de base del programa Page 11 PE-OTASS-250940-CS-INDV / General Project Administrati Especialista Legal (Jefe del ár IBRD / 88990 Posterior Individual Open 15,000.00 48,032.54 Firmado 2021-10-20 2021-10-18 2021-12-08 2022-03-19 2021-12-29 2021-12-02 2022-02-02 2022-01-08 2022-08-01 on ea de asesoría Legal) PE-OTASS-250943-CS-INDV / General Project Administrati IBRD / 88990 Previa Individual Open 7,000.00 0.00 Cancelado 2021-09-27 2021-09-17 2021-11-15 2021-12-06 2022-01-10 2022-07-09 Profesional en Adquisiciones on PE-OTASS-252864-CS-INDV / General Project Administrati Asistente Administrativo para IBRD / 88990 Posterior Individual Limited 2,380.95 11,132.55 Firmado 2021-10-15 2021-09-23 2021-10-20 2021-10-05 2021-11-10 2021-10-15 2021-12-15 2021-11-01 2022-06-13 on adquisiciones del component e3 PE-OTASS-252865-CS-INDV / General Project Administrati Asistente Administrativo para IBRD / 88990 Posterior Individual Limited 2,380.95 3,046.61 Finalizado 2021-10-15 2021-09-23 2021-10-20 2021-10-05 2021-11-10 2021-10-18 2021-12-15 2021-10-23 2022-06-13 2022-01-05 on planeamiento y presupuesto PE-OTASS-252867-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 1,904.76 8,624.32 Firmado 2021-10-15 2021-09-23 2021-10-20 2021-10-05 2021-11-10 2021-10-18 2021-12-15 2021-11-01 2022-06-13 Secretaria de áreas on PE-OTASS-253551-CS-INDV / General Project Administrati Especialista en Adquisiciones IBRD / 88990 Previa Individual Limited 8,928.57 0.00 Cancelado 2021-09-20 2021-09-17 2021-09-25 2021-10-06 2021-10-16 2021-11-20 2022-05-19 on del componente 3 PE-OTASS-261404-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 122,000.00 67,005.97 Firmado 2021-11-08 2021-11-04 2021-11-12 2021-11-12 2021-11-22 2021-11-16 2021-12-06 2021-12-04 2023-12-31 Director UE 003 on PE-OTASS-250943-CS-INDV-2 General Project Administrati IBRD / 88990 Previa Individual Open 57,000.00 15,619.71 Firmado 2021-11-08 2021-11-11 2021-12-27 2021-12-09 2022-01-17 2021-12-13 2022-02-21 2022-01-08 2022-08-20 / Profesional en Adquisiciones on PE-OTASS-263466-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Open 90,000.00 49,294.49 Rescindido 2021-11-18 2021-11-19 2022-01-06 2021-12-07 2022-01-27 2021-12-07 2022-03-03 2021-12-25 2022-08-30 Coordinador Responsable de l on a UIC2 PE-OTASS-264712-CS-INDV / General Project Administrati Profesional de comunicacione IBRD / 88990 Posterior Individual Open 62,500.00 0.00 Cancelado 2021-11-30 2022-01-18 2022-02-08 2022-03-15 2022-09-11 on s en periodismo PE-OTASS-264713-CS-INDV / General Project Administrati Asesoría y asistencia especial IBRD / 88990 Posterior Individual Limited 90,000.00 46,532.15 Firmado 2022-01-03 2021-12-14 2022-01-08 2021-12-24 2022-01-29 2021-12-29 2022-03-05 2022-01-15 2022-09-01 on izada para la dirección de la UE 003 PE-OTASS-266042-CS-INDV / General Project Administrati Especialista en Adquisiciones IBRD / 88990 Previa Individual Open 84,000.00 0.00 Finalizado 2021-12-06 2021-12-07 2022-01-24 2021-12-13 2022-02-14 2023-02-24 2022-03-21 2022-01-01 2022-09-17 2023-07-27 on del Componente 3 PE-OTASS-266596-CS-INDV / General Project Administrati Profesional en adquisiciones IBRD / 88990 Previa Individual Limited 47,000.00 10,709.50 Firmado 2021-12-13 2021-12-13 2021-12-18 2021-12-14 2022-01-08 2022-01-13 2022-02-12 2022-02-12 2022-08-11 on de la UIC2 PE-OTASS-267425-CS-INDV / General Project Administrati Coordinador Técnico del Com IBRD / 88990 Posterior Individual Limited 80,000.00 42,523.36 Rescindido 2021-12-13 2021-12-13 2021-12-18 2021-12-14 2022-01-08 2021-12-17 2022-02-12 2022-01-04 2022-08-11 on ponente 2 PE-OTASS-275044-CS-INDV / Elaboración de TDR para el s Improving Governance of Wa ervicio de implementación de IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 19,000.00 0.00 Firmado 2022-03-03 2022-03-29 2022-03-10 2022-05-31 2022-03-31 2022-06-14 2022-05-05 2022-06-29 2022-09-02 las metodologías BIM, sistem rvice Providers a GIS y guía PMBOK en el Sec tor Saneamiento PE-OTASS-275048-CS-INDV / Elaboración de los TDR del se Improving Governance of Wa rvicio de asistencia especializ IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 13,000.00 0.00 Cancelado 2022-02-21 2022-07-07 2022-02-26 2022-03-12 2022-04-09 2022-05-24 ada al OTASS en desarrollo d rvice Providers e estrategias de reestructura ción y asistencia técnica a las EPS PE-OTASS-250390-CS-INDV / Improving Governance of Wa Especialista en Gestión de En IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 10,000.00 0.00 Cancelado 2021-09-30 2021-09-03 2021-11-18 2021-12-09 2022-01-13 2022-07-12 tidades Prestadoras de Servic rvice Providers ios de Saneamiento (EPS) del programa PE-OTASS-278680-CS-INDV / Elaboración de Términos de R Improving Governance of Wa eferencia para la validación d IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 3,817.00 0.00 Cancelado 2022-02-15 2022-02-22 2022-02-20 2022-03-13 2022-04-17 2022-05-17 e lineamientos y el desarrollo rvice Providers de la guía metodológica de lo s MERESE PE-OTASS-278681-CS-INDV / Elaboración de términos de r eferencia para la validación d Improving Governance of Wa el plan de contabilidad regula IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 7,634.00 0.00 Cancelado 2022-02-15 2022-02-22 2022-02-20 2022-03-13 2022-04-17 2022-10-14 toria y elaboración de las guí rvice Providers as de procedimientos para el registro de costos basados en actividades PE-OTASS-278682-CS-INDV / Elaboración de lineamientos Improving Governance of Wa para la formulación, aprobaci IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 7,634.00 0.00 Finalizado 2022-02-16 2022-02-24 2022-02-21 2022-04-22 2022-03-14 2022-04-25 2022-04-18 2022-05-03 2022-10-15 2022-06-12 ón, modificación y evaluación rvice Providers de los planes estratégicos ins titucionales de las EPS en RA T PE-OTASS-278686-CS-INDV / Improving Governance of Wa Elaboración de términos de r IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 7,634.00 0.00 Cancelado 2022-03-07 2022-03-12 2022-04-02 2022-05-07 2022-11-03 eferencia para el contrato de rvice Providers gestión de EMAPACOP. PE-OTASS-278687-CS-INDV / Improving Governance of Wa Elaboración de TDR para el s IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 15,228.00 0.00 Cancelado 2022-03-01 2022-03-06 2022-03-27 2022-05-01 2022-05-31 ervicio de asistencia técnica rvice Providers de seis EPS PE-OTASS-278689-CS-INDV / Elaboración de TDR para la a Improving Governance of Wa ctualización de seis (06) PMO IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 28,940.00 12,755.10 Firmado 2022-03-02 2022-03-24 2022-03-07 2022-04-26 2022-03-28 2022-05-03 2022-05-02 2022-05-24 2022-07-01 y desarrollo de metodología y rvice Providers elaboración de tres (03) Plan es de reflotamiento en EPS e n RAT PE-OTASS-278691-CS-INDV / Improving Governance of Wa Contratación de tres consulto IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 25,381.00 0.00 Cancelado 2022-02-16 2022-04-06 2022-04-27 2022-06-01 2022-11-28 res para el servicio de diagnó rvice Providers stico rápido de necesidades d e AT en 6 EPDS PE-OTASS-288838-CS-INDV / Asesoría y elaboración de los Improving Governance of Wa términos de referencia para l IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Direct 35,005.26 0.00 Finalizado 2022-04-07 2022-04-07 2022-04-17 2022-04-08 2022-05-08 2022-04-11 2022-06-12 2022-04-25 2022-12-09 2022-10-18 a selección y contratación de rvice Providers una firma consultora que brin de asistencia técnica en gesti ón a seis EPS Page 12 PE-OTASS-295443-CS-INDV / Determinación de las Reglas Improving Governance of Wa Principales y Procedimi¿ental IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open 25,445.00 0.00 Cancelado 2022-06-28 2022-08-16 2022-09-06 2022-10-11 2023-01-09 es para las contrataciones ba rvice Providers jo el Régimen especial en las EPS PE-OTASS-295453-CS-INDV / Diseño e implementación de Improving Governance of Wa un programa de comunicació IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 25,445.00 0.00 Cancelado 2022-07-01 2022-07-06 2022-07-27 2022-08-31 2023-02-27 n con enfoque preventivo ant rvice Providers e las problemáticas sociales de las EPS PE-OTASS-298679-CS-INDV / General Project Administrati Especialista en Adquisiciones IBRD / 88990 Previa Individual Limited 70,000.00 22,243.70 Firmado 2022-06-08 2022-06-08 2022-06-13 2022-06-08 2022-07-04 2022-06-21 2022-08-08 2022-07-16 2023-12-31 on del Componente 3 PE-OTASS-300635-CS-INDV / General Project Administrati Especialista Técnico 05 del co IBRD / 88990 Posterior Individual Open 17,000.00 0.00 Firmado 2022-06-27 2022-06-23 2022-08-15 2022-07-25 2022-09-05 2022-07-25 2022-10-10 2022-08-04 2023-04-08 on mponente 1 PE-OTASS-304305-CS-CDS / Servicio de “Seguimiento a la Improving Governance of Wa Selección directa implementación de acciones IBRD / 88990 ter Supply and Sanitation Se Posterior Direct - National 4,050.63 4,097.15 Finalizado 2022-07-19 2022-07-18 2022-07-29 2022-07-19 2022-10-02 2022-08-01 2023-03-31 de consultores priorizadas de los Planes de 1 rvice Providers 00 días en seis EPS del Progr ama” PE-OTASS-275066-CS-INDV / Diagnóstico de madurez digit al y elaboración de términos Improving Governance of Wa de referencia para la implem IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 19,410.00 0.00 Cancelado 2022-08-30 2022-09-01 2022-09-04 2022-09-18 2022-09-28 2022-12-27 entación de programa de red rvice Providers ucción de agua no facturada de las EPS AGUAS DE LIMA N ORTE S.A PE-OTASS-313845-CS-INDV / Diseño e Implementación de Improving Governance of Wa un Taller Sobre Elaboración d IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 8,307.53 0.00 Cancelado 2022-09-09 2022-09-30 2022-09-14 2022-09-18 2022-10-03 2022-11-22 e Planes Estratégicos de Com rvice Providers unicación para Comunicadore s de 23 EPS PE-OTASS-311164-CS-INDV / Elaboración de los TDR del se Improving Governance of Wa rvicio de asistencia especializ IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 21,000.00 0.00 Cancelado 2022-08-23 2022-08-25 2022-08-28 2022-09-18 2022-10-23 2023-04-21 ada al OTASS en desarrollo d rvice Providers e estrategias de reestructura ción y asistencia técnica a las EPS. PE-OTASS-316650-CS-INDV / Elaboración de los términos d e referencia del servicio de a Improving Governance of Wa sistencia especializada al OT IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 9,200.00 0.00 Firmado 2022-09-20 2022-09-20 2022-09-25 2022-10-06 2022-10-01 2022-11-03 2022-10-03 2022-11-23 2023-04-01 ASS en el desarrollo e imple rvice Providers mentación de estrategias par a la gestión y asistencia técni ca a las EPS PE-OTASS-319491-CS-CDS / General Project Administrati Selección directa Coordinador Responsable del IBRD / 88990 Posterior Direct - National 102,000.00 0.00 Firmado 2022-10-07 2022-10-06 2022-10-17 2022-09-30 2022-12-21 2022-10-20 2023-06-19 on de consultores Componente 2 - UIC2 PE-OTASS-319492-CS-CDS / General Project Administrati Selección directa Coordinador Técnico del Com IBRD / 88990 Posterior Direct - National 95,000.00 0.00 Firmado 2022-10-07 2022-10-06 2022-10-17 2022-09-30 2022-12-21 2022-10-20 2023-06-19 on de consultores ponente 2 - UIC2 PE-OTASS-322977-CS-INDV / Diseño e Implementación de Improving Governance of Wa un Taller Sobre Elaboración d IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open - National 8,307.53 0.00 Firmado 2022-10-26 2022-10-28 2022-12-14 2022-11-28 2023-01-04 2022-12-21 2023-02-08 2023-01-13 2023-08-07 e Planes Estratégicos de Com rvice Providers unicación para Comunicadore s de 23 EPS PE-OTASS-357916-CS-INDV / General Project Administrati Profesional en Adquisiciones IBRD / 88990 Previa Individual Open - National 85,279.19 0.00 Cancelado 2023-04-21 2023-04-28 2023-06-09 2023-06-30 2023-08-04 2025-08-30 on de la U.E.003 PE-OTASS-357922-CS-INDV / General Project Administrati Analista en Adquisiciones de l IBRD / 88990 Previa Individual Open - National 71,065.99 0.00 Cancelado 2023-04-21 2023-04-28 2023-06-09 2023-06-30 2023-08-04 2025-08-30 on a U.E. N°003 PE-OTASS-361532-CS-INDV / Coordinación, Seguimiento y Improving Governance of Wa Monitoreo de Consultoría de IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open - International 113,684.21 0.00 Firmado 2023-05-16 2023-06-15 2023-07-04 2023-07-03 2023-07-25 2023-07-11 2023-08-29 2023-07-28 2025-08-18 Actualización y Elaboración d rvice Providers e Planes Maestros Optimizad os y Planes de Reflotamiento de EPS PE-OTASS-362098-CS-INDV / General Project Administrati Profesional en Adquisiciones IBRD / 88990 Previa Individual Limited 85,279.19 0.00 Firmado 2023-05-17 2023-05-18 2023-05-22 2023-05-19 2023-06-12 2023-06-01 2023-07-17 2023-05-31 2024-01-13 on de la U.E.003 PE-OTASS-366809-CS-INDV / Especialista en elaboración d e diseño muestral, diseño de encuesta y mejora en la reco General Project Administrati pilación para el indicador de IBRD / 88990 Posterior Individual Open - International 11,578.95 0.00 Firmado 2023-06-13 2023-06-22 2023-08-01 2023-07-19 2023-08-22 2023-07-21 2023-09-26 2023-07-28 2024-03-24 on satisfacción del cliente compi lado por SUNASS para la UE 0 03: Modernización de la prest ación de los servicios de agu a potable y saneamiento PE-OTASS-366812-CS-INDV / General Project Administrati Asistente Administrativo 1 pa IBRD / 88990 Posterior Individual Limited 9,473.68 0.00 Firmado 2023-06-13 2023-06-14 2023-06-18 2023-06-16 2023-07-09 2023-06-22 2023-08-13 2023-06-26 2024-02-09 on ra la UE003 PE-OTASS-366816-CS-INDV / General Project Administrati Asistente en logística y sopor IBRD / 88990 Posterior Individual Limited 7,894.74 0.00 Firmado 2023-06-13 2023-06-14 2023-06-18 2023-06-16 2023-07-09 2023-06-22 2023-08-13 2023-06-30 2024-02-09 on te operativo para el Program a PE-OTASS-367633-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited 82,105.26 0.00 Firmado 2023-07-10 2023-07-11 2023-07-15 2023-10-11 2023-08-05 2023-10-26 2023-09-09 2023-11-07 2024-03-07 Especialista Legal para la UIC on 2 PE-OTASS-366814-CS-INDV / General Project Administrati Asistente Administrativo 2 pa IBRD / 88990 Posterior Individual Limited 9,473.68 0.00 Cancelado 2023-06-13 2023-06-14 2023-06-18 2023-07-09 2023-08-13 2024-02-09 on ra la UE003 PE-OTASS-374377-CS-INDV / General Project Administrati Asistente Administrativo y de IBRD / 88990 Posterior Individual Limited 7,500.00 0.00 Firmado 2023-08-01 2023-08-02 2023-08-06 2023-08-04 2023-08-27 2023-08-11 2023-10-01 2023-08-17 2024-03-29 on Gestión para la UE003 PE-OTASS-362101-CS-INDV / General Project Administrati Analista en Adquisiciones de l IBRD / 88990 Posterior Individual Limited 71,065.99 0.00 Cancelado 2023-05-17 2023-05-18 2023-05-22 2023-05-22 2023-06-12 2023-07-17 2024-01-13 on a U.E. N°003 Page 13 PE-OTASS-377072-CS-INDV / Improving Governance of Wa COORDINADOR DE PROYECT IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Limited 72,368.42 0.00 Firmado 2023-08-16 2023-08-15 2023-08-21 2023-09-19 2023-09-11 2023-09-26 2023-10-16 2023-10-11 2024-04-13 OS 2 PARA EL AMBITO DE LA rvice Providers EPS AREQUIPA PARA LA UIC2 PE-OTASS-382188-CS-INDV / General Project Administrati Especialista Técnico 5 del co IBRD / 88990 Posterior Individual Open - National 78,947.37 0.00 Firmado 2023-09-15 2023-09-14 2023-11-03 2023-10-20 2023-11-24 2023-10-25 2023-12-29 2023-11-03 2025-08-30 on mponente 1 PE-OTASS-382189-CS-INDV / General Project Administrati Especialista Técnico 3 del Co IBRD / 88990 Posterior Individual Limited 78,947.37 0.00 Firmado 2023-09-15 2023-09-14 2023-09-20 2023-10-12 2023-10-11 2023-10-19 2023-11-15 2023-10-25 2025-08-30 on mponente 1 PE-OTASS-388057-CS-INDV / General Project Administrati Contratación de Especialista IBRD / 88990 Posterior Individual Open - National 77,284.95 0.00 Cancelado 2023-10-19 2023-10-18 2023-12-07 2023-12-28 2024-02-01 2024-07-30 on Técnico 2 del Componente 1 PE-OTASS-394351-CS-INDV / General Project Administrati Contratación de Especialista IBRD / 88990 Posterior Individual Limited 77,284.95 0.00 Cancelado 2023-11-24 2023-11-30 2023-11-29 2023-12-20 2024-01-24 2024-07-22 on Técnico 2 del Componente 1 PE-OTASS-401109-CS-INDV / General Project Administrati Especialista en proyectos de i IBRD / 88990 Posterior Individual Limited 58,201.06 0.00 Firmado 2024-01-08 2024-01-08 2024-01-13 2024-01-23 2024-02-03 2024-01-30 2024-03-09 2024-02-06 2024-09-05 on nversión para la UIC2 PE-OTASS-401958-CS-INDV / General Project Administrati Contratación de Especialista IBRD / 88990 Posterior Individual Limited 66,137.57 0.00 Firmado 2024-01-09 2024-01-17 2024-01-12 2024-01-19 2024-01-26 2024-01-22 2024-02-20 2024-01-24 2024-12-31 on Técnico 2 del Componente 1 PE-OTASS-414652-CS-INDV / General Project Administrati Profesional en Adquisiciones IBRD / 88990 Previa Individual Limited - National 53,968.25 0.00 Firmado 2024-03-08 2024-03-21 2024-03-13 2024-03-22 2024-04-03 2024-04-04 2024-05-08 2024-04-04 2025-08-30 on de la UE003 PE-OTASS-409983-CS-CDS / Asesoría especializada para l a elaboración de la propuesta Improving Governance of Wa Selección directa Direct - Internation de la estrategia nacional de a IBRD / 88990 ter Supply and Sanitation Se Posterior 43,010.75 0.00 Cancelado 2024-02-15 2024-02-19 2024-02-21 2024-04-26 2024-10-23 de consultores al gua y saneamiento al 2050 e rvice Providers n el marco de la Plataforma d e Acción Unidos por el Agua y Saneamiento PE-OTASS-409991-CS-CDS / Asesoría para el desarrollo e i Improving Governance of Wa Selección directa mplementación de la Platafor IBRD / 88990 ter Supply and Sanitation Se Posterior Direct - National 23,006.85 0.00 Cancelado 2024-02-15 2024-02-19 2024-02-21 2024-04-26 2024-10-23 de consultores ma de Acción Unidos por el A rvice Providers gua y Saneamiento PE-OTASS-418098-CS-INDV / General Project Administrati Especialista Ambiental (apoy IBRD / 88990 Posterior Individual Limited - National 49,470.90 0.00 Firmado 2024-03-22 2024-04-05 2024-03-27 2024-04-15 2024-03-30 2024-04-24 2024-04-06 2024-05-06 2025-08-29 on o al PNSU) PE-OTASS-424371-CS-INDV / General Project Administrati Especialista Técnico 5 (Agua IBRD / 88990 Posterior Individual Limited - National 52,910.05 0.00 Firmado 2024-04-26 2024-04-30 2024-05-01 2024-05-06 2024-05-22 2024-05-15 2024-06-26 2024-05-23 2024-12-23 on y Saneamiento) del compone nte 1 PE-OTASS-427325-CS-INDV / Coordinador de Proyectos par General Project Administrati IBRD / 88990 Posterior Individual Limited - National 43,651.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-05-24 2024-06-11 2024-06-04 2024-07-16 2024-06-24 2025-08-31 a el ámbito de la EPS Lima No on rte para la UIC2 PE-OTASS-427327-CS-INDV / Coordinador de Proyectos par General Project Administrati IBRD / 88990 Posterior Individual Limited - National 43,651.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-05-24 2024-06-11 2024-06-04 2024-07-16 2024-06-24 2025-01-12 a el ámbito de EPS Barranca on y EPS Huaral para la UIC2 PE-OTASS-427328-CS-INDV / Profesional social para los Pro General Project Administrati IBRD / 88990 Posterior Individual Limited - National 39,683.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-06-03 2024-06-11 2024-06-18 2024-07-16 2024-06-28 2025-08-31 yectos de la UIC2 con la EPS on SEDACUSCO y N31, N39 Are quipa PE-OTASS-427329-CS-INDV / Profesional social para los P E General Project Administrati PS Aguas de Lima Norte, EPS IBRD / 88990 Posterior Individual Limited - National 39,683.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-06-06 2024-06-11 2024-06-18 2024-07-16 2024-06-28 2025-08-31 on Barranca y EPS Huaral y los P royectos Caravelí y Chuquiba mba PE-OTASS-427330-CS-INDV / General Project Administrati Profesional Ambiental para l IBRD / 88990 Posterior Individual Limited - National 39,683.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-05-29 2024-06-11 2024-06-17 2024-07-16 2024-06-24 2025-08-31 on os Proyectos de la UIC2 PE-OTASS-427331-CS-INDV / Profesional de Seguridad, Sal General Project Administrati IBRD / 88990 Posterior Individual Limited - National 39,683.00 0.00 Firmado 2024-05-16 2024-05-20 2024-05-21 2024-06-03 2024-06-11 2024-06-17 2024-07-16 2024-06-28 2025-08-31 ud ocupacional (SSOMA) para on los proyectos de la UIC2 PE-OTASS-427537-CS-INDV / Servicio de supervisión de au scultación, detección y repar Improving Governance of Wa aciones de fugas no visibles e IBRD / 88990 ter Supply and Sanitation Se Posterior Individual Open - National 27,777.78 0.00 En ejecución 2024-05-30 2024-05-20 2024-07-18 2024-08-08 2024-09-12 2025-04-10 n redes primarias, secundaria rvice Providers s y conexiones domiciliarias d e agua potable en EPS Barran ca S.A. y Emapa Huaral S.A. PE-OTASS-435645-CS-INDV / General Project Administrati IBRD / 88990 Posterior Individual Limited - National 74,074.07 0.00 En ejecución 2024-06-25 2024-06-26 2024-06-30 2024-07-01 2024-07-21 2024-08-25 2025-10-19 Director de la UE 003 on PE-OTASS-445310-CS-CDS / General Project Administrati Selección directa Direct - Internation Especialista en Adquisiciones IBRD / 88990 Previa 34,920.63 0.00 Cancelado 2024-08-13 2024-08-20 2024-08-23 2024-08-28 2024-08-31 2025-08-31 on de consultores al para la UIC2 PE-OTASS-445153-CS-CDS / General Project Administrati Selección directa Profesional en Adquisiciones IBRD / 88990 Previa Direct - National 38,095.24 0.00 En ejecución 2024-08-14 2024-08-20 2024-08-24 2024-08-21 2024-09-06 2025-08-31 on de consultores de la UE003 PE-OTASS-446629-CS-INDV / General Project Administrati Consultor en Adquisiciones 1 IBRD / 88990 Previa Individual Limited - National 15,873.02 0.00 En ejecución 2024-08-22 2024-08-28 2024-08-26 2024-08-28 2024-09-01 2024-12-31 on para la UE003 PE-OTASS-446631-CS-INDV / General Project Administrati Consultor en Adquisiciones 2 IBRD / 88990 Previa Individual Limited - National 15,873.02 0.00 En ejecución 2024-08-22 2024-08-28 2024-08-26 2024-08-28 2024-09-01 2024-12-31 on para la UE003 PE-OTASS-446636-CS-INDV / General Project Administrati IBRD / 88990 Previa Individual Open - National 27,513.23 0.00 En ejecución 2024-08-22 2024-08-28 2024-10-10 2024-10-31 2024-12-05 2025-08-31 Profesional en Adquisiciones on UIC2 PE-OTASS-445310-CS-CDS-A General Project Administrati Selección directa Ejecución pendien / Especialista en Adquisicione IBRD / 88990 Previa Direct - National 34,920.63 0.00 2024-08-12 2024-08-22 2024-10-26 2025-08-31 on de consultores te s para la UIC2 Page 14