PROCUREMENT PLAN (Textual Part) Climate Resilience and Water Security in Angola - RECLIMA (P177004) Project Implementation agency: Financial and Contract Management Unit (FCMU) Date of the Procurement Plan: July 2022 Period covered by this Procurement Plan: July – December 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. - Not Applicable. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). - Not Applicable Other Relevant Procurement Information: None. PROCUREMENT Angola : Climate Resilience and Water Security in Angola-RECLIMA PLAN General Information Country: Angola 2022-07-29 Bank’s Approval Date of the Original Procurement Plan: 2024-08-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P177004 GPN Date: 2023-10-24 Project Name: Climate Resilience and Water Security in Angola-RECLIMA Loan / Credit No: IBRD / 93700 National Directorate of Water Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 14W1/MENONGUE/UCP/ R/23 Request for Bids - / Design and Construction of Strengthening Water Service Open - Internationa Single Stage - One E Works (without pr 18,000,000.0 2026-12-1 the Water Distribution Netwo IBRD / 93700 s for Water Security in Urban Prior Request for Bids 0.00 Canceled 2024-02-19 2024-02-24 2024-04-06 2024-05-06 2024-06-10 l nvelope equalification) SP 0 7 rk and Household Connection and Rural Areas D s in the East Side of Menong ue’s city 21W1/UCP/R/23 / Design and Request for Propo Construction of the Expansio Strengthening Water Service Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 16,000,000.0 2027-12-2 n of M'Banza-Congo's city Bul IBRD / 93700 s for Water Security in Urban Prior 0.00 Canceled 2024-04-30 2024-07-16 2024-07-16 2024-05-05 2024-09-24 2024-12-07 2025-01-11 sals l nvelope ild - Works SPD (S 0 7 k Water Supply System - Con and Rural Areas ingle-stage) veyance and Storage 22W1/UCP/R/23 / Design and Request for Propo Construction of the Expansio Strengthening Water Service Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 34,000,000.0 2028-07-0 n and Densification of the Dis IBRD / 93700 s for Water Security in Urban Prior 0.00 Canceled 2024-05-15 2024-07-31 2024-07-31 2024-05-20 2024-10-09 2024-12-22 2025-01-26 sals l nvelope ild - Works SPD (S 0 9 tribution Network and House and Rural Areas ingle-stage) hold Connections in the city of M'Banza-Congo 23W1/UCP/R/23 / Design and Request for Propo Strengthening Water Service Construction of the Distributi Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 12,000,000.0 2027-01-3 IBRD / 93700 s for Water Security in Urban Post 0.00 Canceled 2024-05-30 2024-08-15 2024-08-15 2024-06-04 2024-10-24 2025-01-06 2025-02-10 on Network and Household C sals l nvelope ild - Works SPD (S 0 1 and Rural Areas onnections in the city of Tom ingle-stage) boco 21W1/MBANZA-CONGO/UCP/ Request for Propo R/23 / Design and Constructi Strengthening Water Service Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 16,000,000.0 Pending Imp 2027-12-2 on of the Expansion of M'Ban IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-04-30 2024-07-16 2024-07-16 2024-05-05 2024-09-24 2024-12-07 2025-01-11 sals l nvelope ild - Works SPD (S 0 lementation 7 za-Congo's city Bulk Water S and Rural Areas ingle-stage) upply System - Conveyance and Storage 22W1/MBANZA-CONGO/UCP/ R/23 / Design and Constructi Request for Propo Strengthening Water Service on of the Expansion and Den Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 34,000,000.0 Pending Imp 2028-07-0 IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-05-15 2024-07-31 2024-07-31 2024-05-20 2024-10-09 2024-12-22 2025-01-26 sification of the Distribution sals l nvelope ild - Works SPD (S 0 lementation 9 and Rural Areas Network and Household Con ingle-stage) nections in the city of M'Banz a-Congo 23W1/TOMBOCO/UCP/R/23 / Request for Propo Strengthening Water Service Design and Construction of t Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 12,000,000.0 Pending Imp 2025-04-2 IBRD / 93700 s for Water Security in Urban Post 0.00 2024-05-30 2024-08-15 2024-08-15 2024-06-04 2024-10-24 2025-01-06 2025-02-10 he Distribution Network and sals l nvelope ild - Works SPD (S 0 lementation 3 and Rural Areas Household Connections in th ingle-stage) e city of Tomboco 24W1/SOYO/UCP/R/23 / Desi Request for Propo Strengthening Water Service gn and Construction of the R Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 27,000,000.0 Pending Imp 2028-02-2 IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-06-30 2024-09-15 2024-09-15 2024-07-05 2024-11-24 2025-02-06 2025-03-13 einforcement and Expansion sals l nvelope ild - Works SPD (S 0 lementation 6 and Rural Areas of Soyo's city Bulk Water Sup ingle-stage) ply System 25W1/SOYO/UCP/R/23 / Desi Request for Propo Strengthening Water Service gn and Construction of the Di Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 32,000,000.0 Pending Imp 2028-03-2 IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-07-30 2024-10-15 2024-10-15 2024-08-04 2024-12-24 2025-03-08 2025-04-12 stribution Network and Hous sals l nvelope ild - Works SPD (S 0 lementation 7 and Rural Areas ehold Connections in the Nor ingle-stage) thern city of Soyo 14AW1/MENONGUE/UCP/R/2 Request for Propo 4 / Design and Construction Strengthening Water Service Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 18,000,000.0 Pending Imp 2027-08-0 of the Water Distribution Net IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-05-19 2024-08-04 2024-08-04 2024-05-24 2024-10-13 2024-12-26 2025-01-30 sals l nvelope ild - Works SPD (S 0 lementation 8 work and Household Connect and Rural Areas ingle-stage) ions in the East Side of Meno ngue´s City 13W1/MENONGUE/UCP/R/23 / Design and Construction of Request for Propo Strengthening Water Service the Reinforcement and Exten Request for Propo Open - Internationa Single Stage - Two E sal Design and Bu 35,000,000.0 Pending Imp 2026-08-0 IBRD / 93700 s for Water Security in Urban Prior 0.00 2024-05-31 2024-08-16 2024-08-16 2024-06-05 2024-10-25 2025-01-07 2025-02-11 sion of the Menongue’s Bulk sals l nvelope ild - Works SPD (S 0 lementation 5 and Rural Areas Water Supply System to supp ingle-stage) ly the East Side of Menongue ’s city” GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 12G3/UCP/R/23 / Procureme Direct - Internation Under Imple IBRD / 93700 Project Management Post Direct Selection 60,000.00 0.00 2023-12-01 2023-11-23 2023-12-06 2023-12-12 2024-01-10 2026-01-09 nt of TOMPRO Accounting Sof al mentation tware 21G3/UCP/R/UNWEBBUY/23 / Direct - Internation Under Imple IBRD / 93700 Project Management Post Direct Selection 700,000.00 0.00 2024-03-14 2024-03-28 2024-03-19 2024-04-23 2024-10-20 Project vehicles al mentation 31G3/UCP/R/24 / Procureme Request for Quota Open - Internationa Single Stage - One E Pending Impl nt of Production app for the IBRD / 93700 Project Management Post 60,000.00 0.00 2024-05-17 2024-07-17 2025-01-13 tions l nvelope ementation GRM of RECLIMA and Social media 32G3/UCP/R/24 / Procureme nt of Production of RECLIMA Request for Quota Single Stage - One E Pending Impl IBRD / 93700 Project Management Post Open - National 30,000.00 0.00 2024-05-20 2024-07-20 2024-10-18 Environmental and Social Sta tions nvelope ementation ndards Training Manuals 33G3/UCP/R/24 / Procureme Request for Quota Single Stage - One E Pending Impl nt of Preparation and reprod IBRD / 93700 Project Management Post Open - National 45,000.00 0.00 2024-05-21 2024-07-21 2024-10-19 tions nvelope ementation uction of pedagogical materi als for MRR training NON CONSULTING SERVICES Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 51NC1/ZAIRE/R/24 / MANAG EMENT, OPERATIONS AND M Contingent Emergency Resp Open - Internationa Single Stage - Two E Pending Impl IBRD / 93700 Prior Request for Bids 6,500,000.00 0.00 2024-06-30 2024-07-05 2024-08-16 2024-10-29 2024-12-03 2028-12-02 AINTENANCE SERVICES FOR onse Component (CERC) l nvelope ementation ZAIRE PROVINCE WATER SUP PLY SYSTEMS 52NC1/KWANZASUL/R/24 / M ANAGEMENT, OPERATIONS A Contingent Emergency Resp Open - Internationa Single Stage - Two E Pending Impl ND MAINTENANCE SERVICES IBRD / 93700 Prior Request for Bids 6,500,000.00 0.00 2024-06-30 2024-07-05 2024-08-16 2024-10-29 2024-12-03 2028-12-02 onse Component (CERC) l nvelope ementation FOR KWANZA SUL PROVINCE WATER SUPPLY SYSTEMS 53NC1/CUANDOCUBANGO/R /24 / MANAGEMENT, OPERATI Contingent Emergency Resp Open - Internationa Single Stage - Two E Under Imple ONS AND MAINTENANCE SER IBRD / 93700 Prior Request for Bids 6,500,000.00 0.00 2024-06-30 2024-07-05 2024-08-16 2024-10-29 2024-12-03 2028-12-02 onse Component (CERC) l nvelope mentation VICES FOR CUANDO CUBANG O PROVINCE WATER SUPPLY SYSTEMS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 8CS2/UCP/R/23 / Regional W Strengthening Water Resour Quality And Cost- Open - Internationa Under Implement IBRD / 93700 Post 1,500,000.00 0.00 2023-05-22 2023-09-01 2023-06-12 2023-10-05 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 ater Availability and Harvesti ces Management for Climate Based Selection l ation ng Study Resilience 15CS2/UCP/R/23 / Consulting Strengthening Water Resour Services for a feasibility stud Quality And Cost- Open - Internationa Under Implement IBRD / 93700 ces Management for Climate Post 300,000.00 0.00 2023-12-01 2023-11-24 2023-12-22 2024-02-04 2024-03-03 2024-04-02 2024-05-07 2024-06-11 2025-06-11 y for the rehabilitation of Sen Based Selection l ation Resilience di and Kimaya Dams and irri gation system 13CS1/MENONGUE/UCP/R/23 / Design Check and Works Su Strengthening Water Service pervision of the Reinforceme Quality And Cost- Open - Internationa IBRD / 93700 s for Water Security in Urban Prior 3,000,000.00 0.00 Canceled 2024-02-07 2024-02-28 2024-04-12 2024-05-10 2024-06-09 2024-07-14 2024-08-18 2027-04-15 nt and Extension of the Meno Based Selection l and Rural Areas ngue’s Bulk Water Supply Sy stem to supply the East Side of Menongue’s city 14CS1/MENONGUE/UCP/ R/2 3 / Design Check and Works Strengthening Water Service Quality And Cost- Open - Internationa Supervision of the Water Dist IBRD / 93700 s for Water Security in Urban Prior 3,000,000.00 0.00 Canceled 2024-02-05 2024-02-26 2024-04-10 2024-05-08 2024-06-07 2024-07-12 2024-08-16 2025-08-16 Based Selection l ribution Network and Househ and Rural Areas old Connections in the East S ide of Menongue’s city 21CS1/UCP/R/23 / Design Ch eck and Works Supervision of Strengthening Water Service Quality And Cost- Open - Internationa the Expansion of M'Banza-Co IBRD / 93700 s for Water Security in Urban Prior 3,500,000.00 0.00 Canceled 2024-03-30 2024-04-20 2024-06-03 2024-07-01 2024-07-31 2024-09-04 2024-10-09 2027-09-24 Based Selection l ngo's city Bulk Water Supply and Rural Areas System - Conveyance and St orage 22CS1/UCP/R/23 / Design Ch eck and Works Supervision of Strengthening Water Service the Expansion and Densificat Quality And Cost- Open - Internationa IBRD / 93700 s for Water Security in Urban Prior 6,400,000.00 0.00 Canceled 2024-03-15 2024-04-05 2024-05-19 2024-06-16 2024-07-16 2024-08-20 2024-09-24 2028-03-07 ion of the Distribution Networ Based Selection l and Rural Areas k and Household Connection s in the city of M'Banza-Cong o 23CS1/UCP/R/23 / Design Ch Strengthening Water Service eck and Works Supervision of Quality And Cost- Open - Internationa IBRD / 93700 s for Water Security in Urban Prior 2,000,000.00 0.00 Canceled 2024-03-30 2024-04-20 2024-06-03 2024-07-01 2024-07-31 2024-09-04 2024-10-09 2026-09-29 the Distribution Network and Based Selection l and Rural Areas Household Connections in th e city of Tomboco 51CS1/ZAIRE/R/23 / MANAG Strengthening Water Service EMENT, OPERATIONS AND M Quality And Cost- Open - Internationa Pending Impleme IBRD / 93700 s for Water Security in Urban Prior 6,500,000.00 0.00 2024-03-01 2024-03-22 2024-05-05 2024-06-02 2024-07-02 2024-08-06 2024-09-10 2025-09-10 AINTENANCE SERVICES FOR Based Selection l ntation and Rural Areas ZAIRE PROVINCE WATER SUP PLY SYSTEMS 52CS1/CUANDOCUBANGO/R/ 23 / MANAGEMENT, OPERATI Strengthening Water Service Quality And Cost- Open - Internationa ONS AND MAINTENANCE SER IBRD / 93700 s for Water Security in Urban Prior 6,500,000.00 0.00 Canceled 2024-03-15 2024-04-05 2024-05-19 2024-06-16 2024-07-16 2024-08-20 2024-09-24 2025-09-24 Based Selection l VICES FOR ZAIRE PROVINCE and Rural Areas WATER SUPPLY SYSTEMS 21CS1/MBANZA-CONGO/UCP /R/23 / Design Check and Wo Strengthening Water Service Quality And Cost- Open - Internationa rks Supervision of the Expans IBRD / 93700 s for Water Security in Urban Prior 3,500,000.00 0.00 Canceled 2024-03-30 2024-04-20 2024-06-03 2024-07-01 2024-07-31 2024-09-04 2024-10-09 2027-09-24 Based Selection l ion of M'Banza-Congo's city B and Rural Areas ulk Water Supply System - C onveyance and Storage 22CS1/MBANZA-CONGO/UCP /R/23 / Design Check and Wo Strengthening Water Service rks Supervision of the Expans Quality And Cost- Open - Internationa IBRD / 93700 s for Water Security in Urban Prior 6,400,000.00 0.00 Canceled 2024-03-15 2024-04-05 2024-05-19 2024-06-16 2024-07-16 2024-08-20 2024-09-24 2028-03-07 ion and Densification of the Based Selection l and Rural Areas Distribution Network and Hou sehold Connections in the cit y of M'Banza-Congo 23CS1/TOMBOCO/UCP/R/23 / Design Check and Works Sup Strengthening Water Service Quality And Cost- Open - Internationa Pending Impleme ervision of the Distribution N IBRD / 93700 s for Water Security in Urban Prior 2,000,000.00 0.00 2024-03-30 2024-04-20 2024-06-03 2024-07-01 2024-07-31 2024-09-04 2024-10-09 2026-09-29 Based Selection l ntation etwork and Household Conne and Rural Areas ctions in the city of Tomboco 24CS1/SOYO/UCP/R/23 / Des ign Check and Works Supervi Strengthening Water Service Quality And Cost- Open - Internationa sion of the Reinforcement an IBRD / 93700 s for Water Security in Urban Prior 3,600,000.00 0.00 Canceled 2024-06-20 2024-07-11 2024-08-24 2024-09-21 2024-10-21 2024-11-25 2024-12-30 2027-12-15 Based Selection l d Expansion of Soyo's city Bu and Rural Areas lk Water Supply System 25CS1/SOYO/UCP/R/23 / Des ign Check and Works Supervi Strengthening Water Service Quality And Cost- Open - Internationa sion of the Distribution Netw IBRD / 93700 s for Water Security in Urban Prior 2,900,000.00 0.00 Canceled 2024-07-26 2024-08-16 2024-09-29 2024-10-27 2024-11-26 2024-12-31 2025-02-04 2028-01-20 Based Selection l ork and Household Connectio and Rural Areas ns in the Northern city of Soy o Page 2 26CS1/MBANZA-CONGO & M ENONGUE/UCP/R/24 / CONSU LTANCY SERVICES FOR DEVE LOPING CIRCULAR ECONOMY Strengthening Water Service Quality And Cost- Open - Internationa Under Implement -BASED PARTICIPATORY SANI IBRD / 93700 s for Water Security in Urban Post 550,000.00 0.00 2024-04-22 2024-08-05 2024-05-13 2024-06-26 2024-07-24 2024-08-23 2024-09-27 2024-11-01 2026-04-25 Based Selection l ation TATION MASTER PLANS IN M and Rural Areas banza Congo And Menongue - ANGOLA, IN LINE WITH CITY WIDE INCLUSIVE SANITATION (CWIS) APPROACH 28CS2/CUROCA & WEST-CU Strengthening Water Resour NENE/UCP/R/24 / Hydrogeolo Quality And Cost- Open - Internationa Under Implement IBRD / 93700 ces Management for Climate Post 1,500,000.00 0.00 2024-05-20 2024-04-18 2024-06-10 2024-07-24 2024-08-21 2024-09-20 2024-10-25 2024-11-29 2026-11-19 gic Studies and Drilling Prosp Based Selection l ation Resilience ection Plan for Curoca and W est Cunene Basins 29CS2/NAMIBE/UCP/R/24 / H Strengthening Water Resour ydrogeologic Studies and Dril Quality And Cost- Open - Internationa Under Implement IBRD / 93700 ces Management for Climate Post 1,500,000.00 0.00 2024-05-31 2024-04-18 2024-06-21 2024-08-04 2024-09-01 2024-10-01 2024-11-05 2024-12-10 2026-11-30 ling Prospection Plan for Bero Based Selection l ation Resilience , Giraul and Bentiaba Basins 36CS2/UCP/R/24 / Hydrogeol Strengthening Water Resour ogic Studies and Drilling Pros Quality And Cost- Open - Internationa Pending Impleme IBRD / 93700 ces Management for Climate Post 1,500,000.00 0.00 2024-09-30 2024-10-21 2024-12-04 2025-01-18 2025-02-17 2025-03-24 2025-04-28 2027-04-18 pection Plan for Coporolo, Ca Based Selection l ntation Resilience rumjamba and Serra das Nev es 41CS1/URBAN ESIA/R/24 / E nvironmental and Social Imp act Assessment (ESIA) for the Contingent Emergency Resp Quality And Cost- Open - Internationa Under Implement IBRD / 93700 Post 900,000.00 0.00 2024-06-30 2024-08-07 2024-07-21 2024-09-03 2024-10-15 2024-11-14 2024-12-19 2025-01-23 2026-01-23 Urban Water Projects to be i onse Component (CERC) Based Selection l ation mplemented in the Provinces of Cuando-Cubango, Zaire an d Cuanza Sul. 13CS1/MENONGUE/R/24 / De sign Check and Works Super vision of the Reinforcement a Strengthening Water Service Quality And Cost- Open - Internationa Pending Impleme nd Extension of the Bulk Wat IBRD / 93700 s for Water Security in Urban Prior 5,000,000.00 0.00 2024-08-01 2024-08-22 2024-10-05 2024-11-02 2024-12-02 2025-01-06 2025-02-10 2027-10-08 Based Selection l ntation er Supply System, the Water and Rural Areas Distribution Network and Hou sehold Connections at the Ea st Side of Menongue city 21CS1/MBANZA-CONGO/R/2 4 / Design Check and Works Strengthening Water Service Supervision of the Expansion Quality And Cost- Open - Internationa Pending Impleme IBRD / 93700 s for Water Security in Urban Prior 8,500,000.00 0.00 2024-08-01 2024-08-22 2024-10-05 2024-11-02 2024-12-02 2025-01-06 2025-02-10 2028-01-26 of the Water Supply System Based Selection l ntation and Rural Areas and of the Distribution Netwo rk and Household Connection s in M'Banza-Congo city 24CS1/SOYO/R/24 / Design C heck and Works Supervision Strengthening Water Service of the Expansion of the Wate Quality And Cost- Open - Internationa Pending Impleme IBRD / 93700 s for Water Security in Urban Prior 5,500,000.00 0.00 2024-08-01 2024-08-22 2024-10-05 2024-11-02 2024-12-02 2025-01-06 2025-02-10 2028-01-26 r Supply System and of the D Based Selection l ntation and Rural Areas istribution Network and Hous ehold Connections in Soyo Ci ty 42CS1/SENDI & QUIMAIA/ESI Contingent Emergency Resp Quality And Cost- Open - Internationa Pending Impleme A/R/24 / ESIA for rehabilitatio IBRD / 93700 Post 400,000.00 0.00 2024-09-01 2024-09-22 2024-11-05 2024-12-03 2025-01-02 2025-02-06 2025-03-13 2026-03-13 onse Component (CERC) Based Selection l ntation n of Sendi and Quimaia dams 43CS2/SANDDAMS/ESIA/R/2 Strengthening Water Resour Quality And Cost- Open - Internationa Pending Impleme 4 / ESIA & RAP for the constr IBRD / 93700 ces Management for Climate Post 300,000.00 0.00 2024-09-02 2024-09-23 2024-11-06 2024-12-04 2025-01-03 2025-02-07 2025-03-14 2026-03-14 Based Selection l ntation uction of 10 sand dams Resilience INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1CS3/UCP/R/2022 / Senior T Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Canceled 2022-12-19 2022-08-03 2023-02-06 2023-02-27 2023-04-03 2025-04-22 echnical Subcoordinator ant Selection l 2CS3/UCP/R/2022 / Environ Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Signed 2022-12-12 2022-08-02 2023-01-30 2023-02-28 2023-02-20 2023-05-05 2023-03-27 2023-06-28 2025-04-15 mental Specialist ant Selection l 3CS3/UCP/R/2022 / Social S Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Canceled 2022-12-16 2022-08-12 2023-02-03 2023-02-24 2023-03-31 2025-04-19 pecialist ant Selection l 4CS3/UCP/R/2022 / Procure Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Canceled 2022-12-19 2022-08-02 2023-02-06 2023-02-27 2023-04-03 2025-04-22 ment Officer ant Selection l 3ACS3/UCP/R/2022 / Social S Individual Consult IBRD / 93700 Project Management Prior Direct - National 430,000.00 0.00 Signed 2022-12-19 2022-09-20 2022-12-29 2022-10-05 2023-01-19 2022-10-24 2023-02-23 2023-06-01 2025-02-22 pecialist ant Selection 1ACS3/UCP/R/2022 / Senior Individual Consult Open - Internationa IBRD / 93700 Project Management Post 430,000.00 0.00 Signed 2023-03-22 2022-11-28 2023-05-10 2023-05-12 2023-05-31 2023-05-19 2023-07-05 2023-06-29 2025-07-24 Technical Subcoordinator ant Selection l 5CS3/UCP/R/22 / Hydrologist Individual Consult Open - Internationa IBRD / 93700 Project Management Post 430,000.00 0.00 Signed 2023-03-10 2022-12-22 2023-04-28 2023-06-14 2023-05-19 2023-06-20 2023-06-23 2023-07-14 2025-06-22 /Hydrogeologist ant Selection l 6CS3/UCP/R/22 / Rural Wate Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Post 430,000.00 0.00 2023-03-22 2022-12-22 2023-05-10 2023-05-31 2023-07-05 2023-09-16 r Supply Specialist ant Selection l ation 7CS3/UCP/R/22 / Water Utilit Individual Consult Open - Internationa IBRD / 93700 Project Management Post 430,000.00 0.00 Canceled 2023-03-28 2023-02-01 2023-05-16 2023-06-06 2023-07-11 2024-01-07 y Management Specialist ant Selection l 4ACS3/UCP/R/23 / Procurem Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Post 430,000.00 0.00 2023-04-10 2023-03-14 2023-05-29 2023-06-19 2023-07-24 2025-08-12 ent Officer ant Selection l ation 9CS3/UCP/R/23 / Senior Proc Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Canceled 2023-12-11 2024-01-29 2024-02-19 2024-03-25 2026-04-04 urement Especialist ant Selection l 10CS3 UCP R 23 / Gender-ba Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Prior 430,000.00 0.00 2023-09-01 2023-10-11 2023-10-20 2023-11-10 2023-12-15 2024-06-12 sed Violence Specialist ant Selection l ation 6ACS3 UCP R 23 / Rural Wat Individual Consult Open - Internationa IBRD / 93700 Project Management Prior 430,000.00 0.00 Signed 2023-09-01 2023-08-23 2023-10-20 2023-11-30 2023-11-10 2023-12-14 2023-12-15 2024-02-27 2024-06-12 er Supply Specialist ant Selection l 4BSCS3 UCP R 23 / Procure Individual Consult Under Implement IBRD / 93700 Project Management Prior Open - National 250,000.00 0.00 2023-09-01 2023-09-08 2023-10-20 2023-11-10 2023-12-15 2024-06-12 ment Officer ant Selection ation Page 3 11CS3 UCP R 23 / Procurem Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Prior 430,000.00 0.00 2023-09-01 2023-10-14 2023-10-20 2023-11-10 2023-12-15 2024-06-12 ent Specialist ant Selection l ation 7ACS3/UCP/R/23 / Water Ser Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Prior 430,000.00 0.00 2023-09-14 2023-10-04 2023-11-02 2024-04-08 2023-11-23 2024-07-08 2023-12-28 2025-12-31 vices Management Specialist ant Selection l ation 16CS3/UCP/R/23 / SENIOR P Individual Consult Under Implement IBRD / 93700 Project Management Post Open - National 200,000.00 0.00 2024-01-30 2024-05-03 2024-03-19 2024-04-09 2024-05-14 2026-05-14 ROJECT ACCOUNTANT ant Selection ation 17CS3/UCP/R/23 / ASSITANT Individual Consult Under Implement IBRD / 93700 Project Management Post Open - National 155,000.00 0.00 2024-01-30 2024-05-03 2024-03-19 2024-04-09 2024-05-14 2026-05-14 PROJECT ACCOUNTANT ant Selection ation 18CS3/UCP/R/23 / FINANCIAL Individual Consult Pending Impleme IBRD / 93700 Project Management Post Open - National 100,000.00 0.00 2024-01-30 2024-03-19 2024-04-09 2024-05-14 2026-05-14 AND ADMINISTRATIVE ASSIST ant Selection ntation ANT 27CS2/UCP/R/24 / Geotechni Strengthening Water Resour Individual Consult Open - Internationa Under Implement cal Specialist, member of the IBRD / 93700 ces Management for Climate Post 100,000.00 0.00 2024-03-15 2024-05-14 2024-05-03 2024-05-24 2024-06-28 2026-06-18 ant Selection l ation Dam Safety Panel of Experts Resilience (DSPE) 30CS2/UCP/R/24 / Hydrology Strengthening Water Resour Individual Consult Open - Internationa Under Implement & Hydraulic Specialist, Memb IBRD / 93700 ces Management for Climate Post 100,000.00 0.00 2024-03-20 2024-05-14 2024-05-08 2024-05-29 2024-07-03 2026-06-23 ant Selection l ation er of the Dam Safety Panel of Resilience Experts (DSPE) 34CS3/UCP/R/24 / Water Sup Individual Consult Open - Internationa Under Implement IBRD / 93700 Project Management Post 350,000.00 0.00 2024-05-07 2024-07-07 2024-06-25 2024-07-16 2024-08-20 2026-08-10 ply Design Engineer ant Selection l ation 35CS3/UCP/R/24 / Senior Pro Individual Consult Open - Internationa Pending Impleme IBRD / 93700 Project Management Prior 400,000.00 0.00 2024-08-30 2024-10-18 2024-11-08 2024-12-13 2026-12-03 curement Specialist ant Selection l ntation 19CS3/UCP/R/24 / Project Ac Strengthening Water Resour Individual Consult Pending Impleme IBRD / 93700 Post Open - National 200,000.00 0.00 2024-09-01 2024-10-20 2024-11-10 2024-12-15 2026-12-15 countant ces Management for Climate ant Selection ntation Resilience Page 4