Mpatamanga Hydropower Project Environmental & Social Impact Assessment Volume II – Main ESIA Report Sub-volume 5: Chapter 5 – Annexes 28 to 31 Prepared for MHPL Revision A 31 July 2024 Revision Record Revision Date Prepared by: Checked by: Description: A 31 July 2024 SLR Consulting D. Buffin Issue for WB RSA review See Section 1 for authors To limit the size of the files Volume II – ESIA Report of the ESIA document Chapter 1: Introduction disclosed on internet, the Chapter 2: Project description ESIA Volume II has been Chapter 3: ESIA Process and Methodology divided into sub-volumes. Chapter 4: Policy, Legal and Institutional Framework Chapter 5: Environmental and Social Baseline Data This sub-volume 5 contains Chapter 5 Annexes – 1 to 16 Chapter 5 annexes 28 to 31. Chapter 5 Annexes – 17 to 27 Chapter 5 Annexes – 28 to 31 This sub-volume Chapter 6: Alternative Analysis Chapter 7: Stakeholder Engagement Chapter 8: Impact Assessment & Mitigation Measures Chapter 9: Environmental Flows Assessment Chapter 10: Climate Change Chapter 11: Cumulative Impact Assessment Chapter 12 Transboundary Impact Assessment Citation: SLR Consulting (2024). Mpatamanga Hydropower Project: Environmental and Social Impact Assessment, ESIA Report Revision 1, July 2024. Disclaimer: This document has been prepared by SLR with reasonable skill, care and diligence, and taking account of the timescales and resources devoted to it by agreement with MHPL (the Client) as part or all of the services it has been appointed by the Client to carry out. It is subject to the terms and conditions of that appointment. SLR shall not be liable for the use of or reliance on any information, advice, recommendations and opinions in this document for any purpose by any person other than the Client. Reliance may be granted to a third party only in the event that SLR and the third party have executed a reliance agreement or collateral warranty. Information reported herein may be based on the interpretation of public domain data collected by SLR, and/or information supplied by the Client and/or its other advisors and associates. These data have been accepted in good faith as being accurate and valid. The copyright and intellectual property in all drawings, reports, specifications, bills of quantities, calculations and other information set out in this report remain vested in SLR unless the terms of appointment state otherwise. This document may contain information of a specialised and/or highly technical nature and the Client is advised to seek clarification on any elements which may be unclear to it. Information, advice, recommendations and opinions in this document should only be relied upon in the context of the whole document and any documents referenced explicitly herein and should then only be used within the context of the appointment. SLR Consulting France SAS 2 Square Roger Genin, 38000 Grenoble, France T: +33 6 23 37 14 14 www.slrconsulting.com Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Annex 5-28: Viewpoint Photography Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-940 APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 1: LOCAL ROAD, PHOMBEYA SUBSTATION GRID REFERENCE: E:702705.839, N:8310703.955 ELEVATION: 586M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-10-23 TAKEN AT 10:57 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 1 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 1: LOCAL ROAD, PHOMBEYA SUBSTATION. GRID REFERENCE: E:702705.839, N:8310703.955 ELEVATION: 586 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-10-23 TAKEN AT 10:57 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 1 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 3: ZALEG VILLAGE, M1/D314 JUNCTION GRID REFERENCE: E:697916.229, N:8310703.955 ELEVATION: 464 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA:NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 12:15 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW:WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 3 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 3: ZALEG VILLAGE, M1/D314 JUNCTION GRID REFERENCE:E:697916.229, N:8293883.312 ELEVATION:464 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 12:15 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 3 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 4: MAKALE RIVER, NEAR JOHATHAN VILLAGE GRID REFERENCE: E:683932.104, N:8275693.960 ELEVATION: 333 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 12:56 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 4 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 4: MAKALE RIVER, NEAR JOHATHAN VILLAGE GRID REFERENCE: E:683932.104, N:8275693.960 ELEVATION: 333 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 12:56 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 4 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA 400KV TANSMISSION LINE JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 5: S137 ROAD, FEREMU VILLAGE GRID REFERENCE: E:680058.621, N:8263290.464 ELEVATION: 329 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 14:12 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT X DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 5: S137 ROAD, FEREMU VILLAGE GRID REFERENCE: E:680058.621, N:8263290.464 ELEVATION: 329 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 14:12 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT X DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 6: S137 ROAD, NANO BANK OF SHIRE RIVER GRID REFERENCE: E:683616.568, N:8263392.887 ELEVATION: 274 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA:NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 14:41 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 6A DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 6: S137 ROAD, NANO BANK OF SHIRE RIVER GRID REFERENCE:E:683616.568, N:8263392.887 ELEVATION:274 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-11-23 TAKEN AT 14:41 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 6A DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 8: ISOLATED HILL, WEST OF MPATAMANGA GORGE GRID REFERENCE: E:682294.820, N:8260327.185 ELEVATION: 335 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 23-10-23 TAKEN AT 16:20 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW:NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 8 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA 400KV TRANSMISSION LINE JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 8: ISOLATED HILL, WEST OF MPATAMANGA GORGE GRID REFERENCE: E:682294.820, N:8260327.185 ELEVATION:335 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 23-10-23 TAKEN AT 16:20 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 8 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 9C: HALL MARTIN, MAJETE WILDLIFE PARK GRID REFERENCE: E:686183.556, N:8242373.552 ELEVATION: 174 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:02 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9C DRAWING NO: XX DIRECTION OF KAPICHIRA DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 9C: HALL MARTIN, MAJETE WILDLIFE PARK GRID REFERENCE: E:686183.556, N:8242373.552 ELEVATION: 174 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:02 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 10: HALL MARTIN DECK, MAJETE WILDLIFE PARK GRID REFERENCE: E:685826.236, N:8243195.435 ELEVATION: 178 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:20 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 10 DRAWING NO: XX JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 10: HALL MARTIN DECK, MAJETE WILDLIFE PARK GRID REFERENCE: E:685826.236, N:8243195.435 ELEVATION: 178 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:20 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EASTNORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 10 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 14C: COMMUNAL DECK AREA, MKULUMADZI LODGE, MAJETE WILDLIFE PARK GRID REFERENCE: E:685739.411, N:8250612.480 ELEVATION: 168 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 16:42 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 14C: COMMUNAL DECK AREA, MKULUMADZI LODGE, MAJETE WILDLIFE PARK GRID REFERENCE: E:685739.411, N:8250612.480 ELEVATION: 168 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 16:42 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 15: MKULUMADZI LODGE, SHIRE RIVER GRID REFERENCE: E:685738.163, N:8250461.250 ELEVATION: 184 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 10:15 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 15 DRAWING NO: XX JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 15: MKULUMADZI LODGE, SHIRE RIVER GRID REFERENCE: E:685738.163, N:8250461.250 ELEVATION: 184 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 10:15 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 15 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA DIRECTION OF MPATAMANGA REGULATION DAM POWER STATION DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 16C: MKULUMADZI LODGE ‘STARBED’, MAJETE WILDLIFE PARK GRID REFERENCE: E:684909.669, N:8251334.934 ELEVATION: 241 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 17:45 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16C DRAWING NO: XX DIRECTION OF KAPICHIRA DAM JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 16C: MKULUMADZI LODGE ‘STARBED’, MAJETE WILDLIFE PARK GRID REFERENCE: E:684909.669, N:8251334.934 ELEVATION: 241 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 17:45 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA DIRECTION OF MPATAMANGA REGULATION DAM POWER STATION DIRECTION OF JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW MPATAMANGA MAIN DAM VIEWPOINT 17: CHINWALA HILL, MAJETE WILDLIFE PARK GRID REFERENCE: E:677100.743, N:8250617.559 ELEVATION: 380 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 13:04 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 17 DRAWING NO: XX DIRECTION OF KAPICHIRA DAM JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 17: CHINWALA HILL, MAJETE WILDLIFE PARK GRID REFERENCE: E:677100.743, N:8250617.559 ELEVATION: 380 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 13:04 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH EAST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 17 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 18: LOCAL ELEVATED POINT, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:687961.475, N:8250271.261 ELEVATION: 278 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 09:14 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 18 DRAWING NO: XX DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA MAIN DAM JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE DIRECTION OF MPATAMANGA POWER STATION 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 18: LOCAL ELEVATED POINT, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:687961.475, N:8250271.261 ELEVATION: 278 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 09:14 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 18 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 19: EAST OF ZIKUYENDA VILLAGE, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:691363.680, N:8253278.54 ELEVATION: 379 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 10:43 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 19 DRAWING NO: XX JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 19: EAST OF ZIKUYENDA VILLAGE, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:691363.680, N:8253278.54 ELEVATION: 379 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 10:43 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 19 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 21: WEST OF MBWINJA VILLAGE, BLANTYRE BANK OF SHIRE RIVER GRID REFERENCE: E:688593.274, N:8253432.838 ELEVATION: 284 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 12:54 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 22 DRAWING NO: XX DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE POWER STATION DIRECTION OF MPATAMANGA MAIN DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 21: WEST OF MBWINJA VILLAGE, BLANTYRE BANK OF SHIRE RIVER GRID REFERENCE: E:688593.274, N:8253432.838 ELEVATION: 284 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 12:54 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 22 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 22: EAST OF MBWINJA VILLAGE, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:689761.760, N:8254767.619 ELEVATION: 334 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 12:54 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 22 DRAWING NO: XX DIRECTION OF MPATAMANGA MAIN DAM JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE DIRECTION OF MPATAMANGA POWER STATION 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 22: EAST OF MBWINJA VILLAGE, BLANTYRE SIDE OF THE SHIRE RIVER GRID REFERENCE: E:689761.760, N:8254767.619 ELEVATION: 334 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 12:54 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 22 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 23: NORTH OF MBWINJA VILLAGE, BLANTYRE BANK GRID REFERENCE: E:688519.828, N:8256827.168 ELEVATION: 320 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 13:45 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 23 DRAWING NO: XX DIRECTION OF MPATAMANGA MAIN DAM DIRECTION OF MPATAMANGA JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE POWER STATION 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 23:NORTH OF MBWINJA VILLAGE, BLANTYRE BANK GRID REFERENCE: E:688519.828, N:8256827.168 ELEVATION: 320 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 13:45 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 23 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 24: MPATAMANGA GORGE, EDGE OF SOUTHERN SLOPES BLANTYRE BANK GRID REFERENCE: E:687070.952, N:8258084.177 ELEVATION: 279 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 14:23 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 24 DRAWING NO: XX DIRECTION OF MPATAMANGA MAIN DAM DIRECTION OF MPATAMANGA JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE POWER STATION 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 24: MPATAMANGA GORGE, EDGE OF SOUTHERN SLOPES BLANTYRE BANK GRID REFERENCE: E:687070.952, N:8258084.177 ELEVATION: 279M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 14:23 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 24 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 25: S137 ROAD, BLANTYRE BANK GRID REFERENCE: E:685908.878, N:8261874.738 ELEVATION: 301 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 15:39 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 25 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 25: S137 ROAD, BLANTYRE BANK GRID REFERENCE: E:685908.878, N:8261874.738 ELEVATION: 301 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 15:39 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 25 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 26: S137 ROAD, ABOVE CHASWANTHAKA VILLAGE GRID REFERENCE: E:686486.847, N:8263072.525 ELEVATION: 312 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 15:59 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 26 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 26: S137 ROAD, ABOVE CHASWANTHAKA VILLAGE GRID REFERENCE: E:686486.847, N:8263072.525 ELEVATION: 312 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 15:59 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 26 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR DIRECTION OF MPATAMANGA MAIN DAM JOINS TO LEFT SIDE OF PHOTOGRAPH BELOW VIEWPOINT 27: S137 ROAD, EAST OF INOSI (TBC) VILLAGE GRID REFERENCE: E:687932.155, N:8264141.408 ELEVATION: 354 M AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 16:21 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: WEST OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 27 DRAWING NO: XX APPROXIMATE EXTENT OF MPATAMANGA MAIN RESERVOIR JOINS TO RIGHT SIDE OF PHOTOGRAPH ABOVE 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 27: S137 ROAD, EAST OF INOSI (TBC) VILLAGE GRID REFERENCE: E:687932.155, N:8264141.408 ELEVATION: 354 M AOD SCALEBAR FOR PDF VIEWING AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 27-10-23 TAKEN AT 16:21 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 27 DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Annex 5-29: Night-Time Views Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-941 DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 9C: HALL MARTIN VIEW POINT IN THE LATE AFTERNOON IN THE MAJETE WILDLIFE RESERVE. LOOKING NORTH ACROSS A ROLLING TERRAIN ON INTACK MIOMBO WOODLAND AND EAST TO THE KAPICHIRA DAM HYDRO ELECTRIC PROJECT. NOTICE THE LIGHT POLLUTION GENERATED AT THIS LOCATION. HAZE OBSCURES THE MPATAMANGA MOUNTAIN ON THE FAR HORIZON. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:02 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9C DRAWING NO: XX DIRECTION OF KAPICHIRA DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 9C: HALL MARTIN VIEW POINT IN THE LATE AFTERNOON IN THE MAJETE WILDLIFE RESERVE. LOOKING NORTH ACROSS A ROLLING TERRAIN ON INTACK MIOMBO WOODLAND AND EAST TO THE KAPICHIRA DAM HYDRO ELECTRIC PROJECT. NOTICE THE LIGHT POLLUTION GENERATED AT THIS LOCATION. HAZE OBSCURES THE MPATAMANGA MOUNTAIN ON THE FAR HORIZON. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 15:02 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 9C: HALL MARTIN VIEW POINT AT NIGHT IN THE MAJETE WILDLIFE RESERVE. LOOKING NORTH ACROSS A ROLLING TERRAIN ON INTACK MIOMBO WOODLAND AND EAST TO THE KAPICHIRA DAM HYDRO ELECTRIC PROJECT. NOTICE THE LIGHT POLLUTION GENERATED AT THIS LOCATION. HAZE OBSCURES THE MPATAMANGA MOUNTAIN ON THE FAR HORIZON. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 18:00 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9F DRAWING NO: XX DIRECTION OF KAPICHIRA DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOIN 9C: HALL MARTIN VIEW POINT AT NIGHT IN THE MAJETE WILDLIFE RESERVE. LOOKING NORTH ACROSS A ROLLING TERRAIN ON INTACK MIOMBO WOODLAND AND EAST TO THE KAPICHIRA DAM HYDRO ELECTRIC PROJECT. NOTICE THE LIGHT POLLUTION GENERATED AT THIS LOCATION. HAZE OBSCURES THE MPATAMANGA MOUNTAIN ON THE FAR HORIZON. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 24-10-23 TAKEN AT 18:00 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 9F DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 14C: MKULUMADZI LODGE FROM A COMMUNAL SEATING AREA LOOKING NORTH IN THE LATE AFTERNOON TOWARDS THE MPATAMANGA GORGE. NOTICE THE DINNER TABLES IN THE FOREGROUND. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 16:42 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 14C: MKULUMADZI LODGE FROM A COMMUNAL SEATING AREA LOOKING NORTH IN THE LATE AFTERNOON TOWARDS THE MPATAMANGA GORGE. NOTICE THE DINNER TABLES IN THE FOREGROUND. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 16:42 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA REGULATION DAM DIRECTION OF MPATAMANGA POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 14C: MKULUMADZI LODGE FROM A COMMUNAL SEATING AREA LOOKING NORTH IN THE EVENING TOWARDS THE MPATAMANGA GORGE. NOTICE THE DINNER TABLES IN THE FOREGROUND. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: REPRESETNATION OF NIGHT TIME LIGHTING FROM DAYTIME PHOTOGRAPH TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 14C: MKULUMADZI LODGE FROM A COMMUNAL SEATING AREA LOOKING NORTH IN THE EVENING TOWARDS THE MPATAMANGA GORGE. NOTICE THE DINNER TABLES IN THE FOREGROUND. GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: REPRESETNATION OF NIGHT TIME LIGHTING FROM DAYTIME PHOTOGRAPH TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 14C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA DIRECTION OF MPATAMANGA REGULATION DAM POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 16C: STARBED SITE LATE AFTERNOON LOOKING NORTH TO THE MPATAMANGA GORGE (LOCATION OF THE MAIN DAM) GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 17:45 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16C DRAWING NO: XX DIRECTION OF KAPICHIRA DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 16C: STARBED SITE LATE AFTERNOON LOOKING NORTH TO THE MPATAMANGA GORGE (LOCATION OF THE MAIN DAM) GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 17:45 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: NORTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16C DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. DIRECTION OF MPATAMANGA DIRECTION OF MPATAMANGA REGULATION DAM POWER STATION DIRECTION OF MPATAMANGA MAIN DAM VIEWPOINT 16D: STARBED SITE LATE AFTERNOON SOUTH TO THE KAPICHIRA DAM SITE GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY TYPE 1 VIEWPOINT PHOTOGRAPHY DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 18:07 TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16D DRAWING NO: XX DIRECTION OF KAPICHIRA DAM 231120_901.000030.00001_29_XX.XX_VIEWPOINT PHOTOGRAPHY_HD VIEWPOINT 16D: STARBED SITE LATE AFTERNOON SOUTH TO THE KAPICHIRA DAM SITE GRID REFERENCE: E:XX, N:XX ELEVATION: XXM AOD SCALEBAR FOR VIEWING PDF AND PRINTING PURPOSES ONLY VIEWING BOX INCORPORATES UP TO 90° HORIZONTAL FIELD OF VIEW MAKE AND MODEL OF CAMERA: NIKON D750 DATE AND TIME OF PHOTOGRAPHY: 25-10-23 TAKEN AT 18:07 TYPE 1 VIEWPOINT PHOTOGRAPHY TO BE PRINTED AT A1 FOR ASSESSMENT PURPOSES MAKE AND FOCAL LENGTH OF LENS: 50MM MPATAMANGA HPP DIRECTION OF VIEW: SOUTH OCTOBER 2023 PHOTOGRAPHY MALAWI ESIA INCEPTION MPATAMANGA VIEW AT COMFORTABLE ARM’S LENGTH PROJECTION: CYLINDRICAL VIEWPOINT PHOTOGRAPHY 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ENLARGEMENT FACTOR: 96% TO BE PRINTED AT A1 JOB NO. 901.000030.00001 CM DATE: NOV 23 DRAWN: HD CHECKED: MJ APPROVED: MJ VIEWPOINT 16D DRAWING NO: XX © This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons. Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Annex 5-30: Noise Survey Results Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-942 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Table: 5-minute Attended History Results – MD1_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 11:45 31.8 22.9 35.0 53.3 Wed 01/11/2023 11:50 31.4 21.7 34.1 50.7 Wed 01/11/2023 11:55 34.0 23.2 34.4 58.5 Wed 01/11/2023 12:00 31.5 23.3 34.6 49.5 Wed 01/11/2023 12:05 32.7 24.5 35.2 51.8 Wed 01/11/2023 12:10 33.1 22.9 35.4 52.8 Wed 01/11/2023 12:15 41.6 23.9 43.8 61.7 Wed 01/11/2023 12:20 40.0 24.8 40.2 60.1 Wed 01/11/2023 12:25 43.0 30.2 44.8 69.1 Wed 01/11/2023 12:30 40.7 28.2 40.6 66.9 Wed 01/11/2023 12:35 35.2 26.7 38.6 54.7 Wed 01/11/2023 12:40 42.2 30.4 46.1 55.5 Wed 01/11/2023 12:45 45.6 32.9 48.0 63.0 Table: 5-minute Attended History Results – MD1_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 23:40 37.1 32.3 38.4 58.7 Wed 01/11/2023 23:45 40.4 34.1 43.2 57.0 Wed 01/11/2023 23:50 35.7 30.1 38.3 52.8 Wed 01/11/2023 23:55 38.7 31.3 41.4 58.3 Thu 02/11/2023 00:00 37.7 32.2 40.2 58.7 Thu 02/11/2023 00:05 34.3 29.2 36.9 53.0 Thu 02/11/2023 00:10 37.7 30.8 40.3 57.0 Table: 5-minute Attended History Results – MD2_D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 09:55 48.5 33.9 50.8 67.7 Wed 01/11/2023 10:00 54.3 34.6 55.6 79.3 Wed 01/11/2023 10:05 50.8 34.5 51.8 74.3 Wed 01/11/2023 10:10 48.8 36.0 52.3 70.6 Wed 01/11/2023 10:15 48.9 35.7 50.5 69.6 Wed 01/11/2023 10:20 48.9 35.1 51.3 71.8 Wed 01/11/2023 10:25 47.8 33.2 49.7 73.4 Table: 5-minute Attended History Results – MD2_N(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 00:10 40.2 32.2 42.9 65.2 Wed 01/11/2023 00:15 40.5 30.7 45.1 55.9 Wed 01/11/2023 00:20 39.8 32.5 43.3 56.9 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-943 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 00:25 42.4 33.2 45.3 64.1 Wed 01/11/2023 00:30 41.5 34.6 45.4 54.0 Wed 01/11/2023 00:35 36.6 31.9 39.4 53.6 Wed 01/11/2023 00:40 40.1 32.6 43.8 58.7 Table: 5-minute Attended History Results – MD2_D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 10:35 42.1 28.2 43.7 62.7 Wed 01/11/2023 10:40 42.8 28.0 43.1 66.8 Wed 01/11/2023 10:45 43.2 26.5 40.4 66.4 Wed 01/11/2023 10:50 41.0 25.1 41.7 64.6 Wed 01/11/2023 10:55 39.4 29.0 42.3 59.6 Wed 01/11/2023 11:00 38.2 26.4 39.7 58.5 Wed 01/11/2023 11:05 38.5 27.3 41.0 55.8 Table: 5-minute Attended History Results – MD2_N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 00:10 41.1 31.0 45.1 55.6 Wed 01/11/2023 00:15 44.3 30.5 49.1 59.2 Wed 01/11/2023 00:20 41.4 32.1 45.5 56.7 Wed 01/11/2023 00:25 43.6 34.0 46.9 57.0 Wed 01/11/2023 00:30 44.2 35.1 48.0 66.1 Wed 01/11/2023 00:35 38.2 32.6 41.4 50.2 Wed 01/11/2023 00:40 42.0 33.0 45.7 61.0 Table: 5-minute Attended History Results – MD2_D(3), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 10:35 41.8 30.3 43.6 60.6 Wed 01/11/2023 10:40 46.4 30.5 47.4 69.3 Wed 01/11/2023 10:45 47.2 30.2 44.0 69.3 Wed 01/11/2023 10:50 47.6 29.1 46.1 65.9 Wed 01/11/2023 10:55 43.8 31.3 46.2 63.8 Wed 01/11/2023 11:00 42.8 31.5 45.1 62.5 Wed 01/11/2023 11:05 44.5 33.0 47.3 60.0 Table: 5-minute Attended History Results – MD3_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Mon 30/10/2023 16:45 48.9 41.1 51.6 69.7 Mon 30/10/2023 16:50 46.8 40.4 49.7 63.2 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-944 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Mon 30/10/2023 16:55 46.2 40.3 49.7 58.9 Mon 30/10/2023 17:00 45.2 40.2 48.2 60.2 Mon 30/10/2023 17:05 44.8 36.5 48.7 59.7 Mon 30/10/2023 17:10 41.9 36.7 44.7 55.8 Mon 30/10/2023 17:15 44.6 38.1 48.3 58.0 Table: 5-minute Attended History Results – MD4_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Mon 30/10/2023 15:10 44.7 42.0 46.3 49.9 Mon 30/10/2023 15:10 44.5 39.9 47.5 59.4 Mon 30/10/2023 15:15 42.1 39.0 42.7 62.6 Mon 30/10/2023 15:20 43.8 38.2 47.2 60.4 Mon 30/10/2023 15:25 43.4 38.8 46.1 58.2 Mon 30/10/2023 15:30 41.9 38.7 44.6 54.6 Mon 30/10/2023 15:35 43.5 38.9 46.2 58.6 Mon 30/10/2023 15:40 47.1 40.7 49.1 65.2 Mon 30/10/2023 15:45 43.8 39.3 46.7 56.5 Mon 30/10/2023 15:50 40.4 37.7 42.0 52.7 Mon 30/10/2023 15:55 42.8 39.0 44.9 55.7 Mon 30/10/2023 16:00 41.9 39.0 44.1 56.1 Mon 30/10/2023 16:05 43.2 39.8 45.5 58.0 Mon 30/10/2023 16:10 43.6 39.0 45.3 61.5 Table: 5-minute Attended History Results – MD4_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 00:20 42.0 39.6 43.4 57.3 Tue 31/10/2023 00:25 41.5 40.0 42.0 57.3 Tue 31/10/2023 00:30 40.7 38.4 41.9 55.2 Tue 31/10/2023 00:35 39.9 38.4 40.7 51.0 Tue 31/10/2023 00:40 40.0 38.8 40.9 50.7 Tue 31/10/2023 00:45 39.9 38.4 41.1 47.5 Tue 31/10/2023 00:50 41.5 39.2 41.8 66.5 Tue 31/10/2023 00:55 39.9 36.5 41.6 51.2 Table 5-minute Attended History Results – RD1_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 13:36 36.8 28.7 39.9 57.8 Wed 01/11/2023 13:40 32.6 24.9 35.7 50.1 Wed 01/11/2023 13:45 38.7 26.5 43.2 57.0 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-945 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 13:50 33.5 25.8 36.9 50.8 Wed 01/11/2023 13:55 34.4 26.1 39.1 46.4 Wed 01/11/2023 14:00 35.6 28.6 39.1 55.7 Wed 01/11/2023 14:05 34.9 28.1 38.8 47.7 Table: 5-minute Attended History Results – RD1_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 22:17 41.9 36.4 44.6 54.6 Wed 01/11/2023 22:20 46.0 38.6 49.5 62.1 Wed 01/11/2023 22:25 48.5 42.2 51.6 65.7 Wed 01/11/2023 22:30 44.3 39.4 46.6 58.9 Wed 01/11/2023 22:35 42.1 36.8 44.8 53.1 Wed 01/11/2023 22:40 45.0 38.2 47.9 63.6 Wed 01/11/2023 22:45 45.7 40.7 48.9 56.4 Table: 5-minute Attended History Results – RD2_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 12:45 38.0 30.1 39.6 67.0 Tue 31/10/2023 12:50 34.6 30.7 37.4 48.8 Tue 31/10/2023 12:55 38.6 33.2 41.4 53.7 Tue 31/10/2023 13:00 39.3 34.8 42.6 51.4 Tue 31/10/2023 13:05 38.5 35.0 41.1 47.4 Tue 31/10/2023 13:10 38.3 32.6 42.1 53.0 Tue 31/10/2023 13:15 42.3 37.5 45.3 53.4 Tue 31/10/2023 13:20 53.1 35.2 57.9 69.6 Tue 31/10/2023 13:25 41.3 33.5 43.4 61.6 Tue 31/10/2023 13:30 41.6 36.4 44.0 55.3 Tue 31/10/2023 13:35 49.8 31.2 54.6 63.3 Tue 31/10/2023 13:40 52.0 32.0 57.4 65.3 Tue 31/10/2023 13:45 37.4 32.1 40.7 49.2 Table: 5-minute Attended History Results – RD2_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Mon 30/10/2023 22:30 42.3 37.2 44.2 63.3 Mon 30/10/2023 22:35 39.8 36.0 42.8 56.1 Mon 30/10/2023 22:40 41.0 37.5 43.7 51.9 Mon 30/10/2023 22:45 44.2 38.6 46.7 58.7 Mon 30/10/2023 22:50 40.9 37.0 43.1 63.0 Mon 30/10/2023 22:55 44.1 39.5 46.8 56.2 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-946 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Mon 30/10/2023 23:00 42.1 35.5 43.8 70.1 Table: 5-minute Attended History Results – RD3_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Thu 02/11/2023 15:25 48.3 47.3 49.2 52.1 Thu 02/11/2023 15:30 47.3 45.4 48.7 51.4 Thu 02/11/2023 15:35 47.1 45.4 48.3 52.5 Thu 02/11/2023 15:40 46.8 45.0 47.3 62.5 Thu 02/11/2023 15:45 46.1 45.0 46.7 56.6 Thu 02/11/2023 15:50 46.2 45.1 47.1 55.7 Thu 02/11/2023 15:55 46.5 45.3 46.9 61.6 Thu 02/11/2023 16:00 46.7 45.3 46.9 59.2 Thu 02/11/2023 16:05 47.4 44.7 47.1 62.1 Thu 02/11/2023 16:10 46.1 45.1 46.9 48.9 Thu 02/11/2023 16:15 46.6 45.5 47.4 54.3 Thu 02/11/2023 16:20 46.2 45.3 47.0 48.8 Table: 5-minute Attended History Results – RD3_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Thu 02/11/2023 22:15 49.5 48.4 50.1 61.9 Thu 02/11/2023 22:20 49.6 48.9 50.1 51.4 Thu 02/11/2023 22:25 49.7 48.7 50.4 51.7 Thu 02/11/2023 22:30 49.5 48.6 50.2 52.1 Thu 02/11/2023 22:35 49.6 48.6 50.2 54.5 Thu 02/11/2023 22:40 49.5 48.9 50.0 51.3 Thu 02/11/2023 22:45 49.9 48.9 50.5 51.5 Thu 02/11/2023 22:50 49.8 48.9 50.4 51.6 Thu 02/11/2023 22:55 49.9 49.2 50.5 51.7 Thu 02/11/2023 23:00 50.2 49.3 50.9 51.9 Thu 02/11/2023 23:05 50.1 49.3 50.6 51.3 Thu 02/11/2023 23:10 50.0 49.2 50.6 51.5 Thu 02/11/2023 23:15 49.6 48.8 50.2 51.3 Table: 5-minute Attended History Results – RD4_D, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Thu 02/11/2023 15:20 47.3 45.8 48.2 64.2 Thu 02/11/2023 15:25 51.7 49.7 52.8 54.2 Thu 02/11/2023 15:30 50.0 45.6 52.5 54.2 Thu 02/11/2023 15:35 46.2 45.0 47.3 49.4 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-947 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Thu 02/11/2023 15:40 48.0 45.4 49.2 65.8 Thu 02/11/2023 15:45 47.2 45.8 48.1 54.1 Thu 02/11/2023 15:50 47.0 45.9 48.2 55.3 Thu 02/11/2023 15:55 46.3 45.2 47.0 56.0 Thu 02/11/2023 16:00 47.3 45.5 48.1 64.8 Thu 02/11/2023 16:05 47.0 45.6 48.3 59.6 Thu 02/11/2023 16:10 46.7 45.2 48.1 55.5 Thu 02/11/2023 16:15 48.5 46.0 49.9 60.1 Thu 02/11/2023 16:20 63.5 45.3 48.5 95.6 Table: 5-minute Attended History Results – RD4_N, dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Thu 02/11/2023 22:25 47.3 45.9 47.6 67.7 Thu 02/11/2023 22:30 47.0 46.2 47.8 49.5 Thu 02/11/2023 22:35 47.0 46.2 47.6 54.9 Thu 02/11/2023 22:40 46.4 45.8 46.9 50.0 Thu 02/11/2023 22:45 46.6 45.9 47.1 49.1 Thu 02/11/2023 22:50 46.3 45.7 46.8 47.8 Thu 02/11/2023 22:55 46.2 45.5 46.8 49.1 Thu 02/11/2023 23:00 46.1 45.3 46.6 53.5 Thu 02/11/2023 23:05 46.0 45.5 46.4 47.7 Thu 02/11/2023 23:10 46.2 45.5 46.7 50.2 Thu 02/11/2023 23:15 46.2 45.5 46.8 48.3 Thu 02/11/2023 23:20 46.3 45.6 46.7 52.0 Table: 5-minute Attended History Results – S137_1D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 11:25 45.1 36.0 49.5 56.2 Tue 31/10/2023 11:32 45.7 38.4 48.0 64.9 Tue 31/10/2023 11:35 47.8 37.8 50.5 67.2 Tue 31/10/2023 11:40 48.2 37.5 49.0 72.0 Tue 31/10/2023 11:45 45.5 37.0 48.0 60.6 Tue 31/10/2023 11:50 44.8 36.9 47.6 63.0 Tue 31/10/2023 11:55 43.0 38.6 45.8 48.3 Table: 5-minute Attended History Results – S137_1D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 11:20 49.9 33.6 53.9 66.0 Tue 31/10/2023 11:25 40.4 31.4 41.9 63.2 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-948 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 11:30 39.9 32.1 41.7 59.2 Tue 31/10/2023 11:35 39.8 32.3 42.5 57.9 Tue 31/10/2023 11:40 41.4 34.2 44.2 61.4 Tue 31/10/2023 11:45 39.6 31.6 43.5 54.9 Tue 31/10/2023 11:50 40.0 32.5 42.0 65.6 Table: 5-minute Attended History Results – S137_1D(3), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 12:05 47.6 30.2 47.6 68.2 Tue 31/10/2023 12:10 38.9 31.9 41.3 57.7 Tue 31/10/2023 12:15 46.4 36.4 49.0 67.9 Tue 31/10/2023 12:20 41.9 30.5 45.1 62.6 Tue 31/10/2023 12:25 39.3 27.7 43.1 56.1 Tue 31/10/2023 12:30 50.2 34.4 52.7 66.8 Tue 31/10/2023 12:35 43.1 35.0 46.8 58.9 Table: 5-minute Attended History Results – S137_1D(4), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 12:05 49.6 29.2 45.7 70.9 Tue 31/10/2023 12:10 47.1 29.7 40.4 77.3 Tue 31/10/2023 12:15 52.9 34.1 50.1 79.6 Tue 31/10/2023 12:20 38.3 29.6 41.4 58.8 Tue 31/10/2023 12:25 36.7 27.7 39.4 55.1 Tue 31/10/2023 12:30 51.0 31.9 53.2 70.2 Tue 31/10/2023 12:35 41.1 33.7 43.6 58.3 Table: 5-minute Attended History Results – S137_1N(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Fri 03/11/2023 22:15 39.1 33.4 41.9 56.5 Fri 03/11/2023 22:20 38.6 33.4 41.6 47.4 Fri 03/11/2023 22:30 45.2 32.7 41.2 74.3 Fri 03/11/2023 22:35 39.0 34.9 41.8 49.7 Fri 03/11/2023 22:40 41.9 36.3 44.9 50.9 Fri 03/11/2023 22:45 47.8 35.7 49.4 71.2 Table: 5-minute Attended History Results – S137_1N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Fri 03/11/2023 22:15 43.0 30.5 42.5 70.0 Fri 03/11/2023 22:20 36.8 31.3 38.5 62.0 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-949 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Fri 03/11/2023 22:25 32.6 30.3 34.3 41.6 Fri 03/11/2023 22:30 33.8 31.0 36.0 41.1 Fri 03/11/2023 22:35 37.1 32.9 39.2 56.8 Fri 03/11/2023 22:40 37.8 32.9 40.4 44.9 Fri 03/11/2023 22:45 37.0 31.8 40.8 44.3 Table: 5-minute Attended History Results – S137_2D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 15:10 44.0 30.3 47.4 61.7 Tue 31/10/2023 15:15 46.1 30.8 42.0 66.9 Tue 31/10/2023 15:20 45.2 33.3 42.0 64.0 Tue 31/10/2023 15:25 44.1 29.8 47.8 56.2 Tue 31/10/2023 15:30 42.9 29.3 42.2 63.1 Tue 31/10/2023 15:35 40.2 31.0 38.6 63.6 Tue 31/10/2023 15:40 41.6 31.9 43.3 66.1 Table: 5-minute Attended History Results – S137_2D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 15:10 41.6 30.0 43.9 57.1 Tue 31/10/2023 15:15 43.8 32.5 44.2 61.7 Tue 31/10/2023 15:20 42.4 34.6 43.3 57.8 Tue 31/10/2023 15:25 43.2 30.9 46.9 52.6 Tue 31/10/2023 15:30 40.6 31.0 43.6 55.8 Tue 31/10/2023 15:35 39.5 33.2 41.1 60.3 Tue 31/10/2023 15:40 42.4 33.5 43.4 66.3 Table : 5-minute Attended History Results – S137_2D(3), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 15:55 44.8 35.0 48.3 62.3 Tue 31/10/2023 16:00 51.6 37.2 53.6 76.2 Tue 31/10/2023 16:05 45.9 35.7 47.5 69.0 Tue 31/10/2023 16:10 51.7 34.4 46.4 83.7 Tue 31/10/2023 16:15 48.9 38.0 51.1 71.3 Tue 31/10/2023 16:20 43.0 34.5 46.3 59.3 Tue 31/10/2023 16:25 45.3 36.3 48.7 59.9 Table : 5-minute Attended History Results – S137_2D(4), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 15:55 40.5 30.9 43.0 57.1 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-950 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 16:00 43.7 32.5 44.7 64.3 Tue 31/10/2023 16:05 39.0 31.6 41.2 57.8 Tue 31/10/2023 16:10 39.9 29.6 40.1 61.3 Tue 31/10/2023 16:15 41.1 33.0 43.6 60.7 Tue 31/10/2023 16:20 38.5 30.6 41.3 55.8 Tue 31/10/2023 16:25 43.2 31.6 46.8 62.1 Table : 5-minute Attended History Results – S137_2N(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 22:25 38.6 31.7 41.7 55.7 Tue 31/10/2023 22:30 37.7 30.3 41.1 53.1 Tue 31/10/2023 22:35 37.5 32.9 39.8 55.1 Tue 31/10/2023 22:40 35.7 30.6 37.6 51.9 Tue 31/10/2023 22:45 36.1 31.5 38.3 51.5 Tue 31/10/2023 22:50 34.3 30.1 37.1 49.9 Tue 31/10/2023 22:55 34.9 28.9 38.2 48.0 Table : 5-minute Attended History Results – S137_2N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 22:25 49.0 36.1 46.1 79.5 Tue 31/10/2023 22:30 40.8 33.3 44.5 55.0 Tue 31/10/2023 22:35 40.2 35.5 42.7 55.0 Tue 31/10/2023 22:40 39.2 33.6 41.5 57.6 Tue 31/10/2023 22:45 39.5 34.7 42.4 54.7 Tue 31/10/2023 22:50 38.1 33.2 40.7 48.6 Tue 31/10/2023 22:55 39.6 31.8 42.4 55.9 Table : 5-minute Attended History Results – S137_3D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 13:05 51.0 48.0 52.0 70.9 Tue 31/10/2023 13:10 50.8 40.6 51.9 77.7 Tue 31/10/2023 13:15 49.2 42.0 50.9 71.5 Tue 31/10/2023 13:20 47.0 40.8 49.6 63.8 Tue 31/10/2023 13:25 49.3 45.0 51.5 60.0 Tue 31/10/2023 13:30 49.0 44.7 51.3 58.8 Tue 31/10/2023 13:35 48.8 44.4 50.6 61.4 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-951 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Table : 5-minute Attended History Results – S137_3D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 13:05 51.0 48.0 52.0 70.9 Tue 31/10/2023 13:10 50.8 40.6 51.9 77.7 Tue 31/10/2023 13:15 49.2 42.0 50.9 71.5 Tue 31/10/2023 13:20 47.0 40.8 49.6 63.8 Tue 31/10/2023 13:25 49.3 45.0 51.5 60.0 Tue 31/10/2023 13:30 49.0 44.7 51.3 58.8 Tue 31/10/2023 13:35 48.8 44.4 50.6 61.4 Table : 5-minute Attended History Results – S137_3D(3), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 13:50 51.3 42.6 54.5 67.6 Tue 31/10/2023 13:55 54.9 44.1 57.4 77.3 Tue 31/10/2023 14:00 52.5 42.8 54.7 71.6 Tue 31/10/2023 14:05 54.2 41.3 54.1 76.8 Tue 31/10/2023 14:10 54.8 40.6 55.1 78.1 Tue 31/10/2023 14:15 54.7 40.1 59.0 69.3 Table : 5-minute Attended History Results – S137_3D(4), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 13:45 48.4 39.5 51.6 70.4 Tue 31/10/2023 13:50 52.3 40.4 53.7 70.0 Tue 31/10/2023 13:55 50.6 42.9 51.8 68.6 Tue 31/10/2023 14:00 49.3 42.2 51.7 67.9 Tue 31/10/2023 14:05 54.9 40.8 52.3 77.2 Tue 31/10/2023 14:10 61.0 39.7 55.0 88.5 Tue 31/10/2023 14:15 54.4 40.1 59.0 71.4 Table : 5-minute Attended History Results – S137_3N(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Fri 03/11/2023 23:25 35.9 29.4 39.1 50.6 Fri 03/11/2023 23:30 40.5 28.6 45.3 55.2 Fri 03/11/2023 23:35 42.0 28.7 43.6 60.4 Fri 03/11/2023 23:40 35.4 27.4 37.0 56.2 Fri 03/11/2023 23:45 40.9 28.7 46.5 56.1 Fri 03/11/2023 23:50 40.4 30.4 42.9 61.1 Fri 03/11/2023 23:55 36.4 30.3 39.0 52.1 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-952 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Table : 5-minute Attended History Results – S137_3N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Fri 03/11/2023 23:25 38.5 28.3 42.4 56.4 Fri 03/11/2023 23:30 39.7 28.4 44.6 53.1 Fri 03/11/2023 23:35 38.6 28.8 43.1 55.3 Fri 03/11/2023 23:40 38.7 27.7 40.8 61.2 Fri 03/11/2023 23:45 41.7 27.8 47.3 55.5 Fri 03/11/2023 23:50 39.6 29.8 43.6 54.9 Fri 03/11/2023 23:55 37.4 29.1 39.1 56.5 Table : 5-minute Attended History Results – S137_4D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 16:55 47.6 41.7 50.2 65.1 Tue 31/10/2023 17:00 57.1 42.6 57.4 77.1 Tue 31/10/2023 17:05 48.6 41.4 51.3 63.0 Tue 31/10/2023 17:10 51.1 44.9 54.6 62.3 Tue 31/10/2023 17:15 48.8 42.0 50.7 65.7 Tue 31/10/2023 17:20 54.5 41.1 50.5 76.7 Tue 31/10/2023 17:25 48.5 43.6 50.6 62.5 Table : 5-minute Attended History Results – S137_4D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 16:55 45.2 39.4 45.5 67.5 Tue 31/10/2023 17:00 54.1 39.5 50.5 77.3 Tue 31/10/2023 17:05 49.4 39.9 47.3 71.6 Tue 31/10/2023 17:10 45.4 42.2 47.2 61.2 Tue 31/10/2023 17:15 44.9 41.1 47.3 60.0 Tue 31/10/2023 17:20 44.4 39.8 46.4 62.2 Tue 31/10/2023 17:25 44.2 41.9 45.6 60.1 Table : 5-minute Attended History Results – S137_4N(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 23:25 40.8 38.1 42.8 56.6 Tue 31/10/2023 23:30 39.4 35.6 41.8 48.2 Tue 31/10/2023 23:35 39.5 36.0 42.0 50.7 Tue 31/10/2023 23:40 37.9 34.1 40.5 51.5 Tue 31/10/2023 23:45 40.4 35.8 43.1 52.8 Tue 31/10/2023 23:50 40.1 34.9 42.9 49.9 Tue 31/10/2023 23:55 42.9 36.2 46.3 54.8 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-953 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Table : 5-minute Attended History Results – S137_4N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Tue 31/10/2023 23:25 41.4 37.9 42.3 60.6 Tue 31/10/2023 23:30 39.3 36.9 41.5 48.7 Tue 31/10/2023 23:35 39.3 36.1 41.3 53.8 Tue 31/10/2023 23:40 37.4 34.1 39.4 53.6 Tue 31/10/2023 23:45 40.7 36.2 43.3 49.9 Tue 31/10/2023 23:50 39.4 35.2 41.8 49.7 Tue 31/10/2023 23:55 39.9 35.6 42.6 51.6 Table: 5-minute Attended History Results – S137_5D(1), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 09:55 48.5 33.9 50.8 67.7 Wed 01/11/2023 10:00 54.3 34.6 55.6 79.3 Wed 01/11/2023 10:05 50.8 34.5 51.8 74.3 Wed 01/11/2023 10:10 48.8 36.0 52.3 70.6 Wed 01/11/2023 10:15 48.9 35.7 50.5 69.6 Wed 01/11/2023 10:20 48.9 35.1 51.3 71.8 Wed 01/11/2023 10:25 47.8 33.2 49.7 73.4 Table: 5-minute Attended History Results – S137_5D(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 10:35 42.1 28.2 43.7 62.7 Wed 01/11/2023 10:40 42.8 28.0 43.1 66.8 Wed 01/11/2023 10:45 43.2 26.5 40.4 66.4 Wed 01/11/2023 10:50 41.0 25.1 41.7 64.6 Wed 01/11/2023 10:55 39.4 29.0 42.3 59.6 Wed 01/11/2023 11:00 38.2 26.4 39.7 58.5 Wed 01/11/2023 11:05 38.5 27.3 41.0 55.8 Table : 5-minute Attended History Results – S137_5D(3), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 10:35 41.8 30.3 43.6 60.6 Wed 01/11/2023 10:40 46.4 30.5 47.4 69.3 Wed 01/11/2023 10:45 47.2 30.2 44.0 69.3 Wed 01/11/2023 10:50 47.6 29.1 46.1 65.9 Wed 01/11/2023 10:55 43.8 31.3 46.2 63.8 Wed 01/11/2023 11:00 42.8 31.5 45.1 62.5 Wed 01/11/2023 11:05 44.5 33.0 47.3 60.0 Table : 5-minute Attended History Results – S137_5N(1), dB Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-954 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 00:15 40.5 30.7 45.1 55.9 Wed 01/11/2023 00:20 39.8 32.5 43.3 56.9 Wed 01/11/2023 00:25 42.4 33.2 45.3 64.1 Wed 01/11/2023 00:30 41.5 34.6 45.4 54.0 Wed 01/11/2023 00:35 36.6 31.9 39.4 53.6 Wed 01/11/2023 00:40 40.1 32.6 43.8 58.7 Wed 01/11/2023 00:45 37.8 35.5 39.7 42.5 Table : 5-minute Attended History Results – S137_5N(2), dB Day, Date and Time LAeq,5min LA90,5min LA10,5min LAmax(F) Wed 01/11/2023 00:15 44.3 30.5 49.1 59.2 Wed 01/11/2023 00:20 41.4 32.1 45.5 56.7 Wed 01/11/2023 00:25 43.6 34.0 46.9 57.0 Wed 01/11/2023 00:30 44.2 35.1 48.0 66.1 Wed 01/11/2023 00:35 38.2 32.6 41.4 50.2 Wed 01/11/2023 00:40 42.0 33.0 45.7 61.0 Wed 01/11/2023 00:45 40.5 37.6 41.5 52.2 Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-955 Mpatamanga HPP – 2024 ESIA – Chapter 5 - Environmental & Social Baseline Annex 5-31: Consolidated Laboratory Results for Surface Water Quality Confidential - 901.30.1_Mpatamanga HPP_ESIA_Chapter 5_Baseline_31Jul2024 Page 5-956 Shire d/s Kamuzu Lisungwe tributary Shire d/s Tedzani Malawi ANZECC Bridge Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline SW06 SW05 SW04 A B A B A B In-situ probe pH [5;9] [6.5;9] 7.99 7.99 8.38 8.38 8.35 8.35 ORP (mV) 110.40 110.4 127.20 127.2 146.60 146.6 Electrical Conductivity (µS/cm) <1,500 292.0 292 310.0 309.97 290.5 290.5 Total Dissolved Solids (mg/L) 190.0 190 213.0 213 189.0 189 Dissolved Oxygen (mg/L) >6 5.22 5.22 7.27 7.27 7.98 7.98 Dissolved Oxygen (%) >80-90% 69.57 69.57 102.82 102.82 108.47 108.47 Temperature (°C) 28.91 28.91 32.70 32.7 30.49 30.49 Turbidity (NTU) 50 16.87 16.87 364.57 364.57 51.34 51.34 Salinity (PSU) 0.14 0.14 0.132 0.132 0.159 0.159 Laboratory analysis Total Dissolved Solids (mg/L) 171.0 171 181.0 181 181.0 181 Turbidity (NTU) 50 22.60 22.6 357.00 357 19.40 19.4 Biochemical Oxygen Demand (mg/L) 9.11 9.11 2.76 2.76 5.56 5.56 Chemical Oxygen Demand (mg/L) 50.20 50.2 32.10 32.1 59.70 59.7 Total Suspended Solids (mg/L) 14.0 14 210.0 210 13.0 13 Total Organic Carbon (mg/L) 0.071 0.071 1.079 1.079 0.410 0.41 Dissolved Organic Carbon (mg/L) 0.056 0.0563 0.058 0.058 0.101 0.101 Alkalinity (Carbonate (CO32-)) (mg/L) 16.0 16 14.0 14 10.0 10 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 114.0 114 137.0 137 131.0 131 Total Alkalinity (mg/L) Acidity (mg/L) NA NA NA NA NA NA Floride F- (mg/L) 0.620 0.62 0.320 0.32 0.340 0.34 Chloride Cl- (mg/L) 18.30 18.3 18.30 18.3 20.90 20.9 Sulphate SO42- (mg/L) 3.21 3.21 0.90 0.9 3.21 3.21 Silica (SiO2) (mg/L) 1.522 1.522 2.110 2.11 1.500 1.5 Orthophosphate PO43- (mg/L) 0.08 0.08 0.17 0.17 0.13 0.13 Dissolved Inorganic Phosphorus (DIP) (mg/L) 0.04 0.04 1.66 1.66 0.09 0.09 Total Phosphorus (TP) (mg/L) 0.160 0.16 0.130 0.13 0.090 0.09 Total Phosphate (mg/L) Nitrates (mgNO3-/L) 2.4 0 0 9.11 9.11 0 0 Nitrites (mgNO2-/L) 0.02 0.02 0.09 0.09 0.07 0.07 Total Nitrogen (mgN/L) 0.094 0.094 0.392 0.392 0.319 0.319 Total Kjeldhal Nitrogen (mgN/L) 0.032 0.032 0.281 0.281 0.126 0.126 Ammonia-N (mgN/L) 0.121 0.121 0.506 0.506 0.412 0.412 Ammoniacal-N (mgN/L) 0.121 0.121 0.506 0.506 0.412 0.412 Dissolved Inorganic Nitrogen (DIN) (mgN/L) NA NA NA NA NA NA Hardness on dissolved fraction (mg/L) 90.210 90.21 88.330 88.33 92.300 92.3 Hardness on total fraction (mg/L) 104.18 104.18 101.85 101.85 108.09 108.09 Agressive CO2 (mg/L) 2.93 2.93 0 0 0 0 Boron (mg/L) 0.94 0.027 0.027 0.033 0.033 0.029 0.029 Dissolved salts Calcium (mg/L) 20.740 20.74 18.570 18.57 20.160 20.16 Magnesium (mg/L) 9.330 9.33 10.470 10.47 10.190 10.19 Potassium (mg/L) 7.40 7.4 4.40 4.4 7.50 7.5 Sodium (mg/L) 22.0 22 21.0 21 26.0 26 Total salts Calcium (mg/L) 24.80 24.8 22.30 22.3 24.80 24.8 Magnesium (mg/L) 10.260 10.26 11.520 11.52 11.210 11.21 Potassium (mg/L) 7.90 7.9 6.00 6 7.80 7.8 Sodium (mg/L) 27.0 27 26.0 26 33.0 33 Dissolved trace elements Iron (mg/L) <0.0046 <0.0046 0.024 0.0236 1.142 1.142 Aluminium (mg/L) 0.055 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Manganese (µg/L) 1900 <0.05 <0.05 0.067 0.067 <0.05 <0.05 Selenium (µg/L) 11 3.1 3.1 3.5 3.5 3.6 3.6 Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 0.009 0.009 0.002 0.002 0.011 0.011 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 0 0 0.024 0.024 0.005 0.005 Mercury (mg/L) 0.0006 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 Arsenic (mg/L) Total trace elements Aluminium (mg/L) 0.055 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Iron (mg/L) 1.835 1.835 17.459 17.459 3.711 3.711 Manganese (mg/L) <0,002 <0,002 0.48 0.48 0.106 0.106 Selenium (µg/L) 11 3.3 3.3 3.8 3.8 3.7 3.7 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 0 0 0.03 0.03 0.006 0.006 Arsenic (mg/L) Bacteriological parameter Faecal coliform (CFU/100mL) 180 180 268 268 120 120 Faecal Streptococus (CFU/100mL) NA NA NA NA NA NA Page 1 of 10 Shire at Main Res Shire u/s Likabula Shire d/s Likabula Malawi ANZECC site confluence confluence Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline SW03 SW02 SW01 A B A B A B In-situ probe pH [5;9] [6.5;9] 8.34 8.34 8.35 8.35 8.35 8.35 ORP (mV) 104.20 104.2 105.60 105.6 88.00 88 Electrical Conductivity (µS/cm) <1,500 290.1 290.11 291.3 291.29 274.9 274.9 Total Dissolved Solids (mg/L) 189.0 189 189.0 189 176.0 176 Dissolved Oxygen (mg/L) >6 7.79 7.79 7.56 7.56 7.34 7.34 Dissolved Oxygen (%) >80-90% 105.14 105.14 104.98 104.98 100.04 100.04 Temperature (°C) 29.69 29.69 31.65 31.65 30.25 30.25 Turbidity (NTU) 50 52.08 52.08 122.54 122.54 97.51 97.51 Salinity (PSU) 0.138 0.138 0.123 0.123 0.121 0.121 Laboratory analysis Total Dissolved Solids (mg/L) 168.0 168 187.0 187 180.0 180 Turbidity (NTU) 50 11.60 11.6 87.70 87.7 56.20 56.2 Biochemical Oxygen Demand (mg/L) 1.56 1.56 1.88 1.88 3.99 3.99 Chemical Oxygen Demand (mg/L) 11.20 11.2 22.10 22.1 31.20 31.2 Total Suspended Solids (mg/L) 8.0 8 63.0 63 38.0 38 Total Organic Carbon (mg/L) 0.062 0.062 0.065 0.065 0.054 0.054 Dissolved Organic Carbon (mg/L) 0.011 0.011 0.030 0.0298 0.047 0.0471 Alkalinity (Carbonate (CO32-)) (mg/L) 14.0 14 18.0 18 16.0 16 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 122.0 122 120.0 120 124.0 124 Total Alkalinity (mg/L) Acidity (mg/L) NA NA NA NA NA NA Floride F- (mg/L) 0.420 0.42 0.290 0.29 0.260 0.26 Chloride Cl- (mg/L) 17.40 17.4 19.20 19.2 20.90 20.9 Sulphate SO42- (mg/L) 2.82 2.82 3.46 3.46 5.13 5.13 Silica (SiO2) (mg/L) 3.340 3.34 1.120 1.12 1.420 1.42 Orthophosphate PO43- (mg/L) 0.25 0.25 0.39 0.39 0.43 0.43 Dissolved Inorganic Phosphorus (DIP) (mg/L) 0.13 0.13 0.19 0.19 0.38 0.38 Total Phosphorus (TP) (mg/L) 0.090 0.09 0.130 0.13 0.170 0.17 Total Phosphate (mg/L) Nitrates (mgNO3-/L) 2.4 0 0 0 0 0 0 Nitrites (mgNO2-/L) 0.06 0.06 0.02 0.02 0.04 0.04 Total Nitrogen (mgN/L) 0.245 0.245 0.098 0.098 0.196 0.196 Total Kjeldhal Nitrogen (mgN/L) 0.131 0.131 0.082 0.082 0.052 0.052 Ammonia-N (mgN/L) 0.316 0.316 0.126 0.126 0.252 0.252 Ammoniacal-N (mgN/L) 0.316 0.316 0.126 0.126 0.252 0.252 Dissolved Inorganic Nitrogen (DIN) (mgN/L) NA NA NA NA NA NA Hardness on dissolved fraction (mg/L) 88.530 88.53 86.160 86.16 78.630 78.63 Hardness on total fraction (mg/L) 101.81 101.81 101.19 101.19 88.06 88.06 Agressive CO2 (mg/L) 0 0 0 0 0 0 Boron (mg/L) 0.94 0.028 0.028 0.011 0.011 0.025 0.025 Dissolved salts Calcium (mg/L) 17.480 17.48 21.230 21.23 16.580 16.58 Magnesium (mg/L) 10.900 10.9 8.280 8.28 9.040 9.04 Potassium (mg/L) 7.30 7.3 7.50 7.5 7.70 7.7 Sodium (mg/L) 26.0 26 27.0 27 26.0 26 Total salts Calcium (mg/L) 21.00 21 25.50 25.5 19.70 19.7 Magnesium (mg/L) 11.990 11.99 9.110 9.11 9.867 9.867 Potassium (mg/L) 7.40 7.4 7.80 7.8 7.90 7.9 Sodium (mg/L) 31.0 31 33.0 33 28.0 28 Dissolved trace elements Iron (mg/L) 1.227 1.227 2.858 2.858 2.043 2.043 Aluminium (mg/L) 0.055 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Manganese (µg/L) 1900 0.264 0.264 0.404 0.404 0.180 0.18 Selenium (µg/L) 11 3.2 3.2 3.4 3.4 3.2 3.2 Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 0.001 0.001 0.001 0.001 0.01 0.01 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 0 0 0 0 0.006 0.006 Mercury (mg/L) 0.0006 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 Arsenic (mg/L) Total trace elements Aluminium (mg/L) 0.055 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Iron (mg/L) 5.917 5.917 9.342 9.342 6.808 6.808 Manganese (mg/L) 0.092 0.092 0.245 0.245 0.236 0.236 Selenium (µg/L) 11 3.4 3.4 3.5 3.5 3.4 3.4 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 0 0 0 0 0.007 0.007 Arsenic (mg/L) Bacteriological parameter Faecal coliform (CFU/100mL) 206 206 110 110 50 50 Faecal Streptococus (CFU/100mL) NA NA NA NA NA NA Page 2 of 10 Shire Matope Gorge Lisungwe tributary Upper Mkulumadzi Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline WQ1 WQ2A WQ4A A B A B A B In-situ probe pH [5;9] [6.5;9] ORP (mV) Electrical Conductivity (µS/cm) <1,500 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 Dissolved Oxygen (%) >80-90% Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) Laboratory analysis Total Dissolved Solids (mg/L) 172 172 199 199 138 138 Turbidity (NTU) 50 39.4 39.4 148 148 45.3 45.3 Biochemical Oxygen Demand (mg/L) Chemical Oxygen Demand (mg/L) NA NA NA NA NA NA Total Suspended Solids (mg/L) 21 21 105 105 32 32 Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 10 10 12 12 10 10 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 114 114 124 124 89 89 Total Alkalinity (mg/L) Acidity (mg/L) 0 0 0 0 0 0 Floride F- (mg/L) 0.37 0.37 0.15 0.15 0.45 0.45 Chloride Cl- (mg/L) 18.3 18.3 18.3 18.3 20.1 20.1 Sulphate SO42- (mg/L) 4.23 4.23 11.79 11.79 4.74 4.74 Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.098 0.098 0.809 0.809 0.771 0.771 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) 0.022 0.022 0.15 0.15 0.055 0.055 Nitrates (mgNO3-/L) 2.4 0.294 0.294 2.427 2.427 2.133 2.133 Nitrites (mgNO2-/L) Total Nitrogen (mgN/L) 0.29 0.29 0.293 0.293 2.551 2.551 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) Dissolved Inorganic Nitrogen (DIN) (mgN/L) 0.11 0.11 0 0 0.50 0.504 Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) NA NA NA NA NA NA Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 22.39 22.39 25.8 25.8 27.2 27.2 Magnesium (mg/L) 10.29 10.29 14.27 14.27 12.51 12.51 Potassium (mg/L) 7.40 7.4 4.6 4.6 3.7 3.7 Sodium (mg/L) 23 23 52 52 13 13 Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) 0.858 0.858 3.038 3.038 0.147 0.147 Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Manganese (µg/L) 1900 <0.002 <0.002 0.211 0.211 0.046 0.046 Selenium (µg/L) 11 NA NA NA NA NA NA Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Mercury (mg/L) 0.0006 Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Total trace elements Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Iron (mg/L) 2.679 2.679 9.06 9.06 3.747 3.747 Manganese (mg/L) 0.075 0.075 0.293 0.293 0.137 0.137 Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Bacteriological parameter Faecal coliform (CFU/100mL) 120 120 240 240 110 110 Faecal Streptococus (CFU/100mL) 52 52 100 100 62 62 Page 3 of 10 Shire u/s Shire d/s Shire d/s Kapichira Malawi ANZECC confluence with confluence with Standard for Aquatic Mkulumadze Mkulumadze Water Quality Parameters Recreational Ecosystems Water Guideline WQ4B WQ4 WQ5 A B A B A B In-situ probe pH [5;9] [6.5;9] ORP (mV) Electrical Conductivity (µS/cm) <1,500 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 Dissolved Oxygen (%) >80-90% Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) Laboratory analysis Total Dissolved Solids (mg/L) 108 108 192 192 180 180 Turbidity (NTU) 50 8.88 8.88 32.4 32.4 34.2 34.2 Biochemical Oxygen Demand (mg/L) Chemical Oxygen Demand (mg/L) NA NA NA NA NA NA Total Suspended Solids (mg/L) 3 3 16 16 21 21 Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 12 12 8 8 16 16 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 91 91 129 129 116 116 Total Alkalinity (mg/L) Acidity (mg/L) 5 5 0 0 0 0 Floride F- (mg/L) 0.05 0.05 0.62 0.62 0.53 0.53 Chloride Cl- (mg/L) 14.1 14.1 21.8 21.8 17.4 17.4 Sulphate SO42- (mg/L) 2.69 2.69 4.10 4.1 3.72 3.72 Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.132 0.132 0.25 0.25 0.775 0.775 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) 0.024 0.024 0.013 0.013 0.094 0.094 Nitrates (mgNO3-/L) 2.4 0.396 0.396 0.75 0.75 2.325 2.325 Nitrites (mgNO2-/L) Total Nitrogen (mgN/L) 1.33 1.33 0.437 0.437 0.519 0.519 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) Dissolved Inorganic Nitrogen (DIN) (mgN/L) 0 0.019 0 0 0 0.06 Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) NA NA NA NA NA NA Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 24.66 24.66 24.66 24.66 26.58 26.58 Magnesium (mg/L) 9.06 9.06 12.88 12.88 13.5 13.5 Potassium (mg/L) 1.9 1.9 7.2 7.2 7.4 7.4 Sodium (mg/L) 11.2 11.2 24 24 22 22 Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) 0.33 0.33 <0.004 <0.004 0.716 0.716 Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Manganese (µg/L) 1900 0.092 0.092 0.046 0.046 0.013 0.013 Selenium (µg/L) 11 NA NA NA NA NA NA Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Mercury (mg/L) 0.0006 Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Total trace elements Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Iron (mg/L) 1.385 1.385 2.677 2.677 2.366 2.366 Manganese (mg/L) 0.168 0.168 0.106 0.106 0.262 0.262 Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Bacteriological parameter Faecal coliform (CFU/100mL) 126 126 42 42 22 22 Faecal Streptococus (CFU/100mL) 62 62 12 12 6 6 Page 4 of 10 Shire u/s Likabula Shire d/s Likabula Lake North of Malawi ANZECC Likabula Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline WQ5A WQChik WQLake1 A B A B A B In-situ probe pH [5;9] [6.5;9] ORP (mV) Electrical Conductivity (µS/cm) <1,500 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 Dissolved Oxygen (%) >80-90% Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) Laboratory analysis Total Dissolved Solids (mg/L) 192 192 190 190 234 234 Turbidity (NTU) 50 59.4 59.4 84.9 84.9 13.6 13.6 Biochemical Oxygen Demand (mg/L) Chemical Oxygen Demand (mg/L) NA NA NA NA NA NA Total Suspended Solids (mg/L) 40 40 57 57 10 10 Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 8 8 16 16 0 0 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 127 127 127 127 176 176 Total Alkalinity (mg/L) Acidity (mg/L) 0 0 0 0 5 5 Floride F- (mg/L) 0.86 0.86 0.29 0.29 0.55 0.55 Chloride Cl- (mg/L) 20.8 20.8 17.3 17.3 25.3 25.3 Sulphate SO42- (mg/L) 4.10 4.1 5.00 5 5.77 5.77 Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.299 0.299 0.911 0.911 0.206 0.206 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) 0.015 0.015 0.038 0.038 0.025 0.025 Nitrates (mgNO3-/L) 2.4 0.897 0.897 2.733 2.733 0.618 0.618 Nitrites (mgNO2-/L) Total Nitrogen (mgN/L) 0.163 0.163 2.54 2.54 0.52 0.52 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) Dissolved Inorganic Nitrogen (DIN) (mgN/L) 0 0 0 0 0 0 Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) NA NA NA NA NA NA Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 29.75 29.75 26.58 26.58 28.51 28.51 Magnesium (mg/L) 15.25 15.25 13.25 13.25 20.74 20.74 Potassium (mg/L) 7.5 7.5 7.3 7.3 2.3 2.3 Sodium (mg/L) 23 23 37 37 22 22 Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) <0.004 <0.004 0.716 0.716 <0.004 <0.004 Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Manganese (µg/L) 1900 <0.002 <0.002 0.101 0.101 0.124 0.124 Selenium (µg/L) 11 NA NA NA NA NA NA Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Mercury (mg/L) 0.0006 Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Total trace elements Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Iron (mg/L) 5.08 5.083 6.51 6.509 0.23 0.227 Manganese (mg/L) <0.002 <0.002 0.106 0.106 0.137 0.137 Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Bacteriological parameter Faecal coliform (CFU/100mL) 840 840 230 230 70 70 Faecal Streptococus (CFU/100mL) 305 305 72 72 12 12 Page 5 of 10 Mwamphanzi u/s Nchalo offtake Bangula Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline WQMWAM WQNchalo WQ6 A B A B A B In-situ probe pH [5;9] [6.5;9] ORP (mV) Electrical Conductivity (µS/cm) <1,500 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 Dissolved Oxygen (%) >80-90% Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) Laboratory analysis Total Dissolved Solids (mg/L) 199 199 190 190 200 200 Turbidity (NTU) 50 17.1 17.1 94.5 94.5 70.2 70.2 Biochemical Oxygen Demand (mg/L) Chemical Oxygen Demand (mg/L) NA NA NA NA NA NA Total Suspended Solids (mg/L) 12 12 74 74 44 44 Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 10 10 8 8 8 8 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 131 131 124 124 141 141 Total Alkalinity (mg/L) Acidity (mg/L) 0 0 0 0 0 0 Floride F- (mg/L) 0.65 0.65 0.35 0.35 0.58 0.58 Chloride Cl- (mg/L) 31.9 31.9 20.1 20.1 19.2 19.2 Sulphate SO42- (mg/L) 6.67 6.67 5.51 5.51 4.62 4.62 Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.127 0.127 0.412 0.412 0.554 0.554 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) 0.025 0.025 0.048 0.048 0.012 0.012 Nitrates (mgNO3-/L) 2.4 0.381 0.381 1.236 1.236 1.60 1.602 Nitrites (mgNO2-/L) Total Nitrogen (mgN/L) 0.165 0.165 1.632 1.632 1.66 1.661 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) Dissolved Inorganic Nitrogen (DIN) (mgN/L) 0 0 0 0.407 0 0 Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) NA NA NA NA NA NA Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 22.39 22.39 22.09 22.09 26.58 26.58 Magnesium (mg/L) 15.16 15.16 6.96 6.96 13.25 13.25 Potassium (mg/L) 2.8 2.8 7.2 7.2 6.9 6.9 Sodium (mg/L) 22 22 25 25 25 25 Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) <0.004 <0.004 1.948 1.948 <0.004 <0.004 Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Manganese (µg/L) 1900 0.104 0.104 0.179 0.179 0.090 0.09 Selenium (µg/L) 11 NA NA NA NA NA NA Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Mercury (mg/L) 0.0006 Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Total trace elements Aluminium (mg/L) 0.055 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 Iron (mg/L) 1.39 1.385 7.40 7.4 6.24 6.241 Manganese (mg/L) 0.106 0.106 0.262 0.262 0.137 0.137 Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 <0.012 <0.012 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA NA NA NA NA Arsenic (mg/L) <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 Bacteriological parameter Faecal coliform (CFU/100mL) 140 140 40 40 1 1 Faecal Streptococus (CFU/100mL) 60 60 20 20 0 0 Page 6 of 10 Ruo River Shire Shire Shire Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline WQ7 HSM01 HSM01 HSM01 A B 23/08/2023 24/09/2023 23/10/2023 In-situ probe pH [5;9] [6.5;9] 8.5 8.47 8.06 ORP (mV) 190.3 82.2 162.3 Electrical Conductivity (µS/cm) <1,500 262 262 152 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 80.1 8.49 3.94 Dissolved Oxygen (%) >80-90% 101.3 112.3 54.8 Temperature (°C) 27.2 27.3 29.9 Turbidity (NTU) 50 Salinity (PSU) 0.12 0.12 0.07 Laboratory analysis Total Dissolved Solids (mg/L) 150 150 131 131 76 Turbidity (NTU) 50 13.2 13.2 Biochemical Oxygen Demand (mg/L) 0.28 0.9 Chemical Oxygen Demand (mg/L) NA NA 3 31 Total Suspended Solids (mg/L) 9 9 Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 12 12 9.6 2.4 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 73 73 178 178 Total Alkalinity (mg/L) 162 150 Acidity (mg/L) 6.67 6.67 Floride F- (mg/L) 0.51 0.51 Chloride Cl- (mg/L) 27.0 27 Sulphate SO42- (mg/L) 3.59 3.59 Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.617 0.617 0.07 0.08 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) 0.049 0.049 Nitrates (mgNO3-/L) 2.4 1.85 1.851 7.4 5.5 Nitrites (mgNO2-/L) 0.19 0.74 Total Nitrogen (mgN/L) 1.41 1.407 0.23 0.24 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) 0.14 0.16 Dissolved Inorganic Nitrogen (DIN) (mgN/L) 0 0.084 Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) NA NA Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 25.94 25.94 18.1 9.8 Magnesium (mg/L) 13.25 13.25 7.2 9.3 Potassium (mg/L) 2.2 2.2 Sodium (mg/L) 16 16 Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) 0.662 0.662 0.1 <0.01 Aluminium (mg/L) 0.055 <0.03 <0.03 Manganese (µg/L) 1900 0.080 0.08 Selenium (µg/L) 11 NA NA Dissolved heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA Mercury (mg/L) 0.0006 Arsenic (mg/L) <0.001 <0.001 Total trace elements Aluminium (mg/L) 0.055 <0.03 <0.03 Iron (mg/L) 1.88 1.876 Manganese (mg/L) 0.293 0.293 Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 <0.012 <0.012 Cadmium (mg/L) 0.01 0.0002 <0.0028 <0.0028 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 <0.004 <0.004 Zinc (mg/L) 0.008 <0.003 <0.003 Nickel (mg/L) 0.011 NA NA Arsenic (mg/L) <0.001 <0.001 Bacteriological parameter Faecal coliform (CFU/100mL) 440 440 Faecal Streptococus (CFU/100mL) 105 105 Page 7 of 10 Shire Shire Shire Mkulumadzi Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline HSM01 HSM01 HSM01 HSM02 15/11/2023 19/11/2023 17/12/2023 24/08/2023 In-situ probe pH [5;9] [6.5;9] 8.45 8.4 8.35 8.47 ORP (mV) 146 104.9 42.9 219.3 Electrical Conductivity (µS/cm) <1,500 250 251 256 134 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 7.62 7.53 7.05 8.07 Dissolved Oxygen (%) >80-90% 101.3 102.3 99.7 109.6 Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) 0.12 0.12 0.12 9.06 Laboratory analysis Total Dissolved Solids (mg/L) 125 126 128 67 Turbidity (NTU) 50 Biochemical Oxygen Demand (mg/L) 2.2 Chemical Oxygen Demand (mg/L) 0 Total Suspended Solids (mg/L) Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 0.04 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 90 Total Alkalinity (mg/L) 73.9 Acidity (mg/L) Floride F- (mg/L) Chloride Cl- (mg/L) Sulphate SO42- (mg/L) Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.11 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) Nitrates (mgNO3-/L) 2.4 6 Nitrites (mgNO2-/L) 0.04 Total Nitrogen (mgN/L) 0.12 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) 0.18 Dissolved Inorganic Nitrogen (DIN) (mgN/L) Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 4 Magnesium (mg/L) 3.3 Potassium (mg/L) Sodium (mg/L) Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) 0.1 Aluminium (mg/L) 0.055 Manganese (µg/L) 1900 Selenium (µg/L) 11 Dissolved heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Mercury (mg/L) 0.0006 Arsenic (mg/L) Total trace elements Aluminium (mg/L) 0.055 Iron (mg/L) Manganese (mg/L) Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Arsenic (mg/L) Bacteriological parameter Faecal coliform (CFU/100mL) Faecal Streptococus (CFU/100mL) Page 8 of 10 Mkulumadzi Mkulumadzi Mkulumadzi Mkulumadzi Mkulumadzi Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline HSM02 HSM02 HSM02 HSM02 HSM02 24/09/2023 25/10/2023 18/11/2023 21/11/2023 14/12/2023 In-situ probe pH [5;9] [6.5;9] 8.47 8.31 8.22 8.24 8.23 ORP (mV) 96.7 89 150.9 104.5 70.8 Electrical Conductivity (µS/cm) <1,500 144 136 144 142 256 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 8.42 7.41 6.4 7.03 7.05 Dissolved Oxygen (%) >80-90% 110.4 103.1 98.5 98.1 89.9 Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) 0.07 0.06 0.07 0.07 0.12 Laboratory analysis Total Dissolved Solids (mg/L) 72 68 72 71 128 Turbidity (NTU) 50 Biochemical Oxygen Demand (mg/L) 0 0.31 Chemical Oxygen Demand (mg/L) 0 9 Total Suspended Solids (mg/L) Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 2.4 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 104.92 Total Alkalinity (mg/L) 90.1 Acidity (mg/L) Floride F- (mg/L) Chloride Cl- (mg/L) Sulphate SO42- (mg/L) Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.05 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) Nitrates (mgNO3-/L) 2.4 3.2 Nitrites (mgNO2-/L) 0.03 Total Nitrogen (mgN/L) 0.1 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) 0.07 Dissolved Inorganic Nitrogen (DIN) (mgN/L) Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 3.5 Magnesium (mg/L) 4.6 Potassium (mg/L) Sodium (mg/L) Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) <0.01 Aluminium (mg/L) 0.055 Manganese (µg/L) 1900 Selenium (µg/L) 11 Dissolved heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Mercury (mg/L) 0.0006 Arsenic (mg/L) Total trace elements Aluminium (mg/L) 0.055 Iron (mg/L) Manganese (mg/L) Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Arsenic (mg/L) Bacteriological parameter Faecal coliform (CFU/100mL) Faecal Streptococus (CFU/100mL) Page 9 of 10 Lisungwe Lisungwe Lisungwe Lisungwe Lisungwe Malawi ANZECC Standard for Aquatic Water Quality Parameters Recreational Ecosystems Water Guideline HSM03 HSM03 HSM03 HSM03 HSM03 24/08/2023 25/10/2023 18/11/2023 20/11/2023 14/12/2023 In-situ probe pH [5;9] [6.5;9] 8.7 8.51 8.42 8.44 8.74 ORP (mV) 185.9 86 163.8 129.8 65.2 Electrical Conductivity (µS/cm) <1,500 274 264 247 226 347 Total Dissolved Solids (mg/L) Dissolved Oxygen (mg/L) >6 8.06 6.78 7.23 6.54 6.13 Dissolved Oxygen (%) >80-90% 107.5 101.8 98.8 96.6 90.5 Temperature (°C) Turbidity (NTU) 50 Salinity (PSU) 0.13 0.12 0.12 0.1 0.16 Laboratory analysis Total Dissolved Solids (mg/L) 137 132 124 115 174 Turbidity (NTU) 50 Biochemical Oxygen Demand (mg/L) 0.15 0.59 Chemical Oxygen Demand (mg/L) 0 21 Total Suspended Solids (mg/L) Total Organic Carbon (mg/L) Dissolved Organic Carbon (mg/L) Alkalinity (Carbonate (CO32-)) (mg/L) 12 7.2 Alkalinity (Bicarbonate (HCO3-)) (mg/L) 159 163 Total Alkalinity (mg/L) 150.4 145.8 Acidity (mg/L) Floride F- (mg/L) Chloride Cl- (mg/L) Sulphate SO42- (mg/L) Silica (SiO2) (mg/L) Orthophosphate PO43- (mg/L) 0.16 0.14 Dissolved Inorganic Phosphorus (DIP) (mg/L) Total Phosphorus (TP) (mg/L) Total Phosphate (mg/L) Nitrates (mgNO3-/L) 2.4 3.9 21 Nitrites (mgNO2-/L) 0.05 5.2 Total Nitrogen (mgN/L) 0.15 0.05 Total Kjeldhal Nitrogen (mgN/L) Ammonia-N (mgN/L) Ammoniacal-N (mgN/L) 0.2 0.22 Dissolved Inorganic Nitrogen (DIN) (mgN/L) Hardness on dissolved fraction (mg/L) Hardness on total fraction (mg/L) Agressive CO2 (mg/L) Boron (mg/L) 0.94 Dissolved salts Calcium (mg/L) 7.7 7.4 Magnesium (mg/L) 7.6 9.6 Potassium (mg/L) Sodium (mg/L) Total salts Calcium (mg/L) Magnesium (mg/L) Potassium (mg/L) Sodium (mg/L) Dissolved trace elements Iron (mg/L) 0.8 <0.01 Aluminium (mg/L) 0.055 Manganese (µg/L) 1900 Selenium (µg/L) 11 Dissolved heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Mercury (mg/L) 0.0006 Arsenic (mg/L) Total trace elements Aluminium (mg/L) 0.055 Iron (mg/L) Manganese (mg/L) Selenium (µg/L) 11 Total heavy metals Lead (mg/L) 0.0034 Cadmium (mg/L) 0.01 0.0002 Chromium (mg/L) 0.1 0.0033 Copper (mg/L) 0.0014 Zinc (mg/L) 0.008 Nickel (mg/L) 0.011 Arsenic (mg/L) Bacteriological parameter Faecal coliform (CFU/100mL) Faecal Streptococus (CFU/100mL) Page 10 of 10 End of this section