Sample Procurement Plan P146206 - District Heating Energy Efficiency Project I. General 1. Bank’s approval Date of the procurement Plan Original: November 6, 2017 2. Date of General Procurement Notice: December 24, 206 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Contract Prior Review Comments Method Value Threshold Threshold, US$ US$ 1. ICB and LIB (Goods) >=1,000,000 Above 1,500,000 All 2. NCB (Goods) <=1,000,000 Above 100,000 First contract 3. ICB (Works) >=5,000,000 Above 5,000,000 All 4. NCB (Works) <=5,000,000 Above 1,000,000 First contract 5. Shopping(Non- <=100,000 Above 50,000 First contract Consultant Services) 6. SSS and Direct n/a n/a All Contracting 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Project P146206 - District Heating Energy Efficiency Project 5. Any Other Special Procurement Arrangements: None July 9, 2010 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 R Description Estimat Packag Domest Revie Comments e ed es ic w f. Cost Prefere by N US$ nce Bank o million (yes/no (Prior . ) / Post) Summary of 92.39 10 Yes Prior the ICB (Works) Summary of 35.79 4 No Prior/ ICB-14-all the ICB post is subject (Goods) to post review Summary of none none No Post 1st contract the NCB for Prior (Works) Review Summary of none none No Post 1st contract the NCB for Prior (Goods) Review Shopping(Non- 0.032 1 No Post Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 300,000 2. Single Source (Firms and All Individuals) 3. Individual Above US$ 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national July 9, 2010 consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 3 3 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Uzbekistan : District Heating Energy Efficiency Project PLAN General Information Country: Uzbekistan 2019-01-10 Bank’s Approval Date of the Original Procurement Plan: 2024-08-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146206 GPN Date: 2018-04-03 Project Name: District Heating Energy Efficiency Project Loan / Credit No: IDA / 61730 PСU for Uzbekistan District Heating Energy Efficiency Project, Agency «Kommunkhizmat» Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LS-1-ALL / Electrical distribut ion network, partial reconstr Modernization of District He Request for Propo Open - Internationa Single Stage - Two E 2020-07-0 IDA / 61730 Post 2,530,000.00 0.00 Canceled 2019-06-14 2019-06-19 2019-08-03 2019-11-30 2020-01-04 and Water supply network, p ating Systems sals l nvelope 2 artial reconstruction ICB-03-CHIE / DH network Re Modernization of District He Request for Propo Open - Internationa Single Stage - Two E 2020-03-0 habilitation CHIE-1.02 CHIE-1 IDA / 61730 Prior 5,640,000.00 0.00 Canceled 2019-03-18 2019-06-24 2019-03-23 2019-07-16 2019-05-07 2019-10-04 2019-08-04 2019-09-08 ating Systems sals l nvelope 6 .03 CHIE-1.04 CHIE-1.05 ICB-01-CHIE / Modernization of boiler plant, DH network R Modernization of District He Request for Propo Open - Internationa Single Stage - Two E 2020-01-2 IDA / 61730 Prior 6,880,000.00 0.00 Canceled 2019-01-21 2019-11-14 2019-01-26 2019-03-12 2019-10-04 2019-06-24 2019-07-29 ehabilitation, IHS with heat ating Systems sals l nvelope 5 meters in Chirchik ICB-DH-01-CHIE / Modernizat ion of boiler plant, DH networ Modernization of District He Request for Propo Open - Internationa Single Stage - One E 4,889,997.0 2022-01-3 IDA / 61730 Prior 6,880,000.00 Signed 2019-12-28 2020-02-10 2020-01-01 2020-01-24 2019-10-04 2020-01-24 2020-03-03 2020-01-31 2020-02-24 k Rehabilitation, IHS with hea ating Systems sals l nvelope 0 0 t meters in Chirchik ICB-DH-03-CHIE / DH networ Modernization of District He Request for Propo Open - Internationa Single Stage - One E 2021-07-1 k Rehabilitation CHIE-1.02; C IDA / 61730 Prior 5,640,000.00 0.00 Canceled 2020-03-15 2020-03-22 2020-05-06 2020-06-05 2020-07-10 ating Systems sals l nvelope 0 HIE-1.03; CHIE-1.04; CHIE-1.0 5 ICB-05-BEM / DH network Re Modernization of District He Open - Internationa Single Stage - One E 3,799,847.1 2021-12-2 IDA / 61730 Post Request for Bids 3,730,000.00 Signed 2020-09-14 2020-09-21 2020-09-28 2020-10-16 2020-11-12 2021-01-08 2020-12-12 2021-04-30 2020-12-26 2021-08-01 habilitation in Bukhara ating Systems l nvelope 1 6 ICB-08-AVIM / DH network R ehabilitation Modernization of District He Open - Internationa Single Stage - One E 5,549,999.6 2022-02-2 IDA / 61730 Post Request for Bids 5,950,000.00 Signed 2020-10-30 2021-01-12 2020-11-06 2021-02-09 2020-12-21 2021-04-16 2021-01-20 2021-07-06 2021-02-24 2021-08-19 Electrical distribution networ ating Systems l nvelope 0 4 k, partial reconstruction in An dijan ICB-07-AVIM / Modernization of boiler plant Modernization of District He Open - Internationa Single Stage - One E 11,960,000.0 12,265,975. 2023-03-0 IDA / 61730 Post Request for Bids Signed 2020-10-30 2020-12-29 2020-11-13 2021-02-09 2020-12-28 2021-04-23 2021-01-27 2021-08-31 2021-03-03 2021-11-15 DH network Rehabilitation ating Systems l nvelope 0 57 3 IHS with Heat Meters in Andij an ICB-06-BEM / Modernization Modernization of District He Open - Internationa Single Stage - One E 5,855,000.0 2023-05-1 IDA / 61730 Post Request for Bids 6,100,000.00 Signed 2021-01-15 2021-07-11 2021-01-29 2021-07-27 2021-03-14 2021-09-30 2021-04-13 2021-12-24 2021-05-18 2022-03-25 of boiler plant in Bukhara ating Systems l nvelope 0 8 ICB-12-TIM / Modernization o Modernization of District He Open - Internationa Single Stage - One E 15,810,000.0 2023-05-0 IDA / 61730 Prior Request for Bids 0.00 Canceled 2021-01-05 2021-05-26 2021-01-19 2021-08-01 2021-03-04 2021-08-23 2021-04-03 2022-07-13 2021-05-01 f boiler plant in Tashkent TS- ating Systems l nvelope 0 1 8 ICB-DH-03RFB-CHIE / DH net Modernization of District He Open - Internationa Single Stage - One E 6,286,529.0 2022-05-0 IDA / 61730 Prior Request for Bids 5,640,000.00 Signed 2021-01-15 2021-05-08 2021-01-25 2021-05-09 2021-03-11 2021-06-24 2021-04-10 2021-08-13 2021-05-08 2021-10-12 work Rehabilitation in Сhirchi ating Systems l nvelope 3 8 k. Request for Bids - NCB-DH-IH-CHIE-01 / Modern Modernization of District He Single Stage - One E Small Works SPD 2022-04-2 ization of in-buildings and in- IDA / 61730 Post Request for Bids Open - National 2,200,000.00 0.00 Canceled 2021-06-28 2021-07-12 2021-08-26 2021-09-25 2021-10-30 ating Systems nvelope (1 envelope proce 8 apartment heating systems i ss) n Chirchik. ICB-10-SIM / Modernization o f boiler plant Modernization of District He Open - Internationa Single Stage - One E Other (with field f 10,550,000.0 11,796,837. 2023-12-1 DH network Rehabilitation IDA / 61730 Prior Request for Bids Signed 2021-08-09 2021-09-06 2021-08-23 2021-10-09 2021-10-22 2021-12-24 2021-11-21 2022-05-13 2021-12-19 2022-06-25 ating Systems l nvelope or explanation) 0 00 9 IHS with Heat Meters in Sam arkand Request for Bids - ICB-13-TIQ / DH network Reh Modernization of District He Open - Internationa Single Stage - One E Works (without pr 23,380,000.0 2023-02-1 IDA / 61730 Prior Request for Bids 0.00 Canceled 2021-10-15 2021-11-18 2021-10-29 2022-01-10 2021-12-13 2022-02-25 2022-01-12 2023-01-23 2022-02-16 abilitation in Tashkent ating Systems l nvelope equalification) SP 0 6 D Request for Bids - ICB-11-SIM / DH network Re Modernization of District He Open - Internationa Single Stage - One E Works (without pr 11,300,000.0 2023-02-1 IDA / 61730 Prior Request for Bids 0.00 Canceled 2021-10-15 2021-11-18 2021-10-29 2021-12-20 2021-12-13 2022-03-04 2022-01-12 2023-06-12 2022-02-16 habilitation in Samarkand ating Systems l nvelope equalification) SP 0 6 D Request for Bids - ICB-11RB-SIM / DH network Modernization of District He Open - Internationa Single Stage - One E Works (without pr 17,400,000.0 2024-09-1 IDA / 61730 Prior Request for Bids 0.00 Signed 2023-06-12 2023-08-17 2023-06-17 2023-10-18 2023-07-17 2023-10-31 2023-08-16 2024-04-19 2023-09-20 2024-06-03 Rehabilitation in Samarkand ating Systems l nvelope equalification) SP 0 9 D NCB-DH-IH-CHIE / Moderniza Modernization of District He Single Stage - One E Other (with field f 2024-06-2 tion of in-building and in-apar IDA / 61730 Post Request for Bids Open - National 7,900,000.00 0.00 Signed 2023-09-29 2023-10-03 2023-10-13 2023-10-04 2023-11-10 2023-11-17 2023-12-10 2024-01-26 2023-12-27 2024-03-06 ating Systems nvelope or explanation) 4 tment heat supply systems in Chirchik NCB-DH-IH-AVIM / Moderniza Modernization of District He Single Stage - One E Other (with field f 2024-07-0 tion of in-building and in-apar IDA / 61730 Post Request for Bids Open - National 6,800,000.00 0.00 Signed 2023-10-13 2024-02-07 2023-10-27 2024-02-09 2023-11-24 2024-03-27 2023-12-24 2024-07-27 2024-01-10 ating Systems nvelope or explanation) 8 tment heat supply systems in Andijan NCB-DH-IH-SIM / Modernizati Modernization of District He Single Stage - One E Other (with field f Pending Imp 2024-08-0 on of in-building and in-apart IDA / 61730 Post Request for Bids Open - National 7,500,000.00 0.00 2023-11-10 2023-11-24 2023-12-22 2024-01-21 2024-02-07 ating Systems nvelope or explanation) lementation 5 ment heat supply systems in Samarkand National Procure NCB-DH-IH-BEM / Modernizat ment Document - In-building and In-apartment Single Stage - One E Under Imple 2025-05-1 ion of in-building and in-apart IDA / 61730 Post Request for Bids Open - National 1 Envelope proce 2,500,000.00 0.00 2024-07-28 2024-07-26 2024-08-02 2024-07-26 2024-09-16 2024-10-16 2024-11-20 Infrastructure nvelope mentation 9 ment heat supply systems in ss (Non Bank-SPD Bukhara ) National Procure NCB-06-FS-BEM / Backup fue ment Document - Modernization of District He Single Stage - Two E Pending Imp 2025-07-2 l storage of the Central boiler IDA / 61730 Post Request for Bids Open - National 1 Envelope proce 390,000.00 0.00 2024-08-25 2024-08-30 2024-10-11 2024-12-24 2025-01-28 ating Systems nvelope lementation 7 house in Bukhara ss (Non Bank-SPD ) National Procure NCB-LS-BEM / External Elect ment Document - Modernization of District He Single Stage - Two E Pending Imp 2025-07-2 rical Supply 10/0,4 kV of “BE IDA / 61730 Post Request for Bids Open - National 1 Envelope proce 190,000.00 0.00 2024-08-26 2024-08-31 2024-10-12 2024-12-25 2025-01-29 ating Systems nvelope lementation 8 M” Central Boiler House in Bu ss (Non Bank-SPD khara ) GOODS Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ICB-02-BEM / Installation of I Modernization of District He Open - Internationa Single Stage - Two E IDA / 61730 Post Request for Bids 4,260,000.00 0.00 Canceled 2019-01-21 2019-05-29 2019-01-26 2019-07-10 2019-03-12 2019-10-04 2019-06-09 2019-07-24 2020-01-20 HS and heat meters ating Systems l nvelope ICB-DH-02-BEM / Installation Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 4,260,000.00 0.00 Canceled 2019-12-28 2020-01-01 2020-02-01 2019-10-04 2020-02-01 2020-03-16 2020-02-01 2020-12-28 of IHS and heat meters ating Systems l nvelope ICB-DH-02RB-BEM / Installati Modernization of District He Open - Internationa Single Stage - One E on of individual heat stations IDA / 61730 Prior Request for Bids 4,260,000.00 3,999,057.53 Signed 2020-03-25 2020-04-07 2020-04-08 2020-04-14 2020-05-22 2020-07-03 2020-07-06 2020-10-21 2020-08-03 2020-11-22 2021-03-31 ating Systems l nvelope with heat metering devices i n Bukhara. ICB-04-3 CITIES / IHS with H Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 20,690,000.00 0.00 Canceled 2020-05-05 2020-05-19 2020-07-16 2020-09-16 2020-10-14 2023-10-14 eat Meters in 3 cities ating Systems l nvelope ICB-09-AVIM / Installation of Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 4,190,000.00 6,140,416.00 Signed 2020-10-30 2021-01-15 2020-11-13 2021-02-09 2020-12-28 2021-04-16 2021-01-27 2021-08-13 2021-02-24 2021-10-04 2022-02-24 IHS with Heat Meters ating Systems l nvelope ICB-DH-04-CHIE / IHS with H Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 3,031,000.00 3,513,188.01 Signed 2020-12-29 2021-05-05 2021-01-13 2021-05-08 2021-02-26 2021-06-21 2021-03-28 2021-09-21 2021-04-25 2022-01-05 2022-04-25 eat Meters in Chirchik ating Systems l nvelope ICB-DH-04-TIQ / IHS with He Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 11,020,300.00 0.00 Canceled 2021-01-11 2021-09-08 2021-01-25 2021-09-29 2021-03-11 2021-11-11 2021-04-10 2023-01-13 2021-05-08 2022-05-08 at Meters in Tashkent ating Systems l nvelope NCB-LS-AVIM-07 / External E Modernization of District He Single Stage - One E lectrical Distribution Network IDA / 61730 Post Request for Bids Open - National 330,000.00 306,623.48 Signed 2021-07-15 2021-08-31 2021-07-20 2021-08-31 2021-08-31 2021-10-15 2021-09-30 2021-12-04 2021-11-04 2021-12-15 2022-05-03 ating Systems nvelope Rehabilitation in Andijan ICB-14-ALL / Maintenance to Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Post Request for Bids 1,040,000.00 0.00 Canceled 2020-11-06 2021-08-03 2020-11-13 2021-08-02 2020-12-28 2021-09-17 2021-01-18 2021-12-24 2021-02-15 2021-08-14 ols, equipment, vehicles ating Systems l nvelope ICB-DH-04-SIM / IHS with He Modernization of District He Open - Internationa Single Stage - One E IDA / 61730 Prior Request for Bids 6,638,700.00 0.00 Signed 2021-06-25 2021-12-13 2021-07-10 2022-01-19 2021-08-24 2022-03-15 2021-09-26 2022-10-10 2021-10-24 2022-12-15 2023-10-24 at Meters in Samarkand ating Systems l nvelope NCB-LS-CHIE-01 / External El Modernization of District He Single Stage - One E ectrical Distribution Network IDA / 61730 Post Request for Bids Open - National 472,000.00 425,638.51 Signed 2021-09-15 2021-09-28 2021-09-20 2021-10-02 2021-10-18 2021-10-23 2021-11-08 2021-11-19 2021-11-29 2021-12-05 2022-05-28 ating Systems nvelope Rehabilitation in Chirchik ICB-14RB-ALL / Maintenance Modernization of District He Open - Internationa Single Stage - One E Under Imple IDA / 61730 Prior Request for Bids 2,400,000.00 0.00 2023-05-15 2023-10-12 2023-05-20 2023-12-06 2023-07-01 2024-01-23 2023-07-31 2024-04-09 2023-08-28 2024-02-24 tools, equipment and vehicle ating Systems l nvelope mentation s NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZB-DH-CONS-01 / Design a Implmentation Support and Quality And Cost- Open - Internationa nd supervision consultancy f IDA / 61730 Prior 3,600,000.00 3,599,000.00 Signed 2019-01-18 2019-04-03 2019-02-08 2019-04-22 2019-03-24 2019-11-27 2019-04-21 2019-10-31 2019-05-21 2020-01-07 2019-06-25 2020-03-17 2019-07-30 2020-03-24 2020-07-29 Capacity Building Based Selection l or the PCU Support UZB-DH-CONS-03 / Project fi Modernization of District He Least Cost Selecti Open - Internationa IDA / 61730 Prior 400,000.00 0.00 Canceled 2019-04-04 2019-03-06 2019-04-25 2019-05-24 2019-06-08 2020-01-17 2019-07-06 2020-02-21 2019-08-05 2019-09-09 2019-10-14 2020-04-11 nancial audit ating Systems on l UZB-DH-CONS-04 / Reserve f Modernization of District He Fixed Budget Sele Open - Internationa IDA / 61730 Prior 1,000,000.00 0.00 Canceled 2019-01-03 2019-01-24 2019-03-09 2019-04-06 2019-05-06 2019-06-10 2019-07-15 2020-07-14 unds ating Systems ction l UZB-DH-05-CS-CQS / trainin Implmentation Support and Consultant Qualifi IDA / 61730 Post Open - National 30,000.00 0.00 Canceled 2019-03-12 2019-06-11 2019-03-26 2019-05-24 2019-06-23 2019-07-28 2019-08-27 g on enviroment for employe Capacity Building cation Selection es UZB-DH-05RB-CS-CQS / Trai Implmentation Support and Consultant Qualifi IDA / 61730 Post Open - National 30,000.00 29,895.54 Signed 2020-01-31 2020-02-03 2020-02-21 2020-02-18 2020-03-27 2020-04-13 2020-04-10 2020-05-15 2020-05-01 2020-06-02 2023-05-01 ning on environment for emp Capacity Building cation Selection loyees UZB-DH-06-CS-CQS / Consult Implmentation Support and Consultant Qualifi IDA / 61730 Post Open - National 39,800.00 43,500.00 Signed 2020-03-25 2020-03-09 2020-04-08 2020-03-25 2020-05-22 2020-06-04 2020-07-06 2020-07-09 2020-08-03 2020-07-16 2023-08-03 ing Services on Social Safegu Capacity Building cation Selection ards UZB-DH-07-CS-CQS / Consult ing services on development Implmentation Support and Consultant Qualifi Open - Internationa and implementation of mech IDA / 61730 Post 200,000.00 182,290.00 Signed 2020-03-31 2020-03-09 2020-04-14 2020-04-01 2020-06-12 2020-06-09 2020-07-12 2020-07-10 2020-08-02 2020-07-27 2023-08-02 Capacity Building cation Selection l anism of informed public mo nitoring and dialogue (MIPM) UZB-DH-CONS-02 / Sector D Modernization of District He Quality And Cost- Open - Internationa IDA / 61730 Prior 1,000,000.00 0.00 Canceled 2019-05-07 2019-05-28 2019-07-11 2019-08-08 2019-09-07 2019-10-12 2019-11-16 2020-11-15 evelopment Consultancy ating Systems Based Selection l UZB-DH-CS-LCS-03 / Project Implmentation Support and Least Cost Selecti Open - Internationa IDA / 61730 Post 40,000.00 49,720.00 Signed 2020-10-12 2020-10-26 2020-10-19 2020-11-17 2020-12-02 2020-12-21 2020-12-30 2021-01-25 2021-01-13 2021-02-01 2021-01-27 2021-05-19 2021-02-17 2021-05-30 2024-02-18 financial audit for 2020-2022 Capacity Building on l . UZB-DH-08-CS-CQS / Implem entation and technical super Implmentation Support and Consultant Qualifi IDA / 61730 Post Open - National 100,000.00 59,961.15 Signed 2020-12-29 2021-01-04 2021-01-12 2021-01-06 2021-02-28 2021-02-05 2021-03-30 2021-03-04 2021-04-27 2021-03-09 2021-10-24 vision consultancy for moder Capacity Building cation Selection nization of in-building heatin g systems in Chirchik UZB-DH-09-CS-CQS / Project Implmentation Support and Consultant Qualifi feasibility study adjustment IDA / 61730 Post Open - National 113,362.00 0.00 Signed 2022-11-25 2022-12-13 2022-12-09 2023-01-04 2022-12-23 2023-01-28 2022-12-30 2023-02-28 2023-01-13 2023-03-12 2023-03-14 Capacity Building cation Selection Consultant UZB-DH-CS-LCS-04 / Project Implmentation Support and Least Cost Selecti Open - Internationa IDA / 61730 Post 25,000.00 0.00 Signed 2024-02-06 2024-03-21 2024-02-27 2024-04-16 2024-03-19 2024-05-17 2024-04-16 2024-05-31 2024-04-23 2024-06-07 2024-05-07 2024-06-13 2024-05-21 2024-06-14 2024-12-31 financial audit for 2023-2024 Capacity Building on l Page 2 UZB-DH-10-CS-CQS / Consult ant's services on conducting public awareness campaign a Implmentation Support and Consultant Qualifi Under Implement IDA / 61730 Post Open - National 334,000.00 0.00 2024-02-07 2024-08-02 2024-03-08 2024-04-05 2024-04-12 2024-04-26 2025-02-20 mong the population to assis Capacity Building cation Selection ation t in the implementation of dis trict heating and hot water s upply system INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZB-DH-CONS-03-1DC / Proj Implmentation Support and IDA / 61730 Post Direct Selection Direct 10,000.00 9,858.00 Signed 2020-04-20 2020-04-14 2020-04-25 2020-04-21 2020-06-06 2020-06-10 2020-07-31 ect financial audit for 2019 Capacity Building UZB-DH-IC-01 / Individual Co Implmentation Support and Individual Consult Under Implement IDA / 61730 Post Open - National 48,000.00 0.00 2023-04-10 2023-04-30 2023-05-18 2023-05-21 2023-06-07 2025-06-06 nsultant - Engineer Capacity Building ant Selection ation UZB-DH-CONS-10DC / Consu lting services for conducting Implmentation Support and social survey among the pop IDA / 61730 Post Direct Selection Direct - National 35,000.00 0.00 Signed 2023-12-13 2023-12-26 2023-12-23 2023-12-27 2024-01-11 2023-12-28 2024-03-11 Capacity Building ulation on modernization of i n-building heating systems UZB-DH-IC-02 / Individual Co Implmentation Support and Individual Consult Under Implement nsultant - Consulting services IDA / 61730 Post Open - National 31,500.00 0.00 2024-01-30 2024-03-18 2024-02-28 2024-03-06 2024-03-16 2024-12-31 Capacity Building ant Selection ation on social protection measure s UZB-DH-IC-03 / Monitoring s Implmentation Support and Individual Consult IDA / 61730 Post Open - National 28,000.00 0.00 Under Review 2024-04-10 2024-04-02 2024-05-20 2024-06-03 2024-06-17 2024-12-31 pecialist Capacity Building ant Selection Page 3