PROCUREMENT PLAN Project information: Country: Brazil Project Name: Energy and Mineral Sectors Strengthening Project II – META II (P170850) Project Implementation agency: Ministry of Energy and Mines Date of the Procurement Plan: December 17, 2020 Period covered by this Procurement Plan: The first 18 months of project implementation from the date of its effectiveness. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Procurement National Law or Federal Decree 10,024/2019 regulating e-reverse auctions procedures, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. a) open advertising of the procurement opportunity at the national level; b) the procurement is open to eligible firms from any country; c) the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d) contracts with an appropriate allocation of responsibilities, risks, and liabilities; e) publication of contract award information; f) rights for the Bank to review procurement documentation and activities; g) an effective complaints mechanism; and h) maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. PROCUREMENT Brazil : Energy and Mineral Sectors Strengthening Project II PLAN General Information Country: Brazil 2022-01-04 Bank’s Approval Date of the Original Procurement Plan: 2023-07-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170850 GPN Date: 2022-10-26 Project Name: Energy and Mineral Sectors Strengthening Project II Loan / Credit No: IBRD / 90740 National Operator of the Electric System Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1 – Technical as SUBPROJETO 23-4 BR-ONS-2 sistance to increase efficienc Seleção Baseada Open - Internationa Implementação P 68480-CS-QCBS / Estudos de IBRD / 90740 y, long term infrastructure a Posterior na Qualidade e Cu 290,896.00 0.00 2022-04-15 2022-05-06 2022-06-19 2022-07-17 2022-08-16 2022-09-20 2022-10-25 2023-10-25 l endente Paleoclimatologia dequacy and climate resilien sto ce in the energy and mining sectors. SUBPROJETO 24 BR-ONS-268 Component 1 – Technical as 466-CS-QCBS / Contratacao c sistance to increase efficienc Seleção Baseada Open - Internationa onsultoria para desenvolvime IBRD / 90740 y, long term infrastructure a Posterior na Qualidade e Cu 2,186,419.75 0.00 Cancelado 2022-08-30 2022-07-22 2022-09-20 2022-09-09 2022-11-03 2022-12-21 2022-12-01 2023-03-09 2022-12-31 2023-04-19 2023-02-04 2023-03-11 2024-03-10 l nto de modelo de previsao d dequacy and climate resilien sto e Geracao de Fonte Solar ce in the energy and mining sectors. SUBPROJETO 23-1 - BR-ONS- 268231-CS-QCBS / Contratac Component 1 – Technical as ao de consultoria para desen sistance to increase efficienc volvimento de pesquisa Coor Seleção Baseada y, long term infrastructure a Open - Internationa Em fase de Imple denação da coleta e analise IBRD / 90740 Posterior na Qualidade e Cu 921,171.00 0.00 2022-04-15 2022-05-02 2022-05-06 2022-04-13 2022-06-19 2022-07-22 2022-07-17 2022-09-29 2022-08-16 2022-11-29 2022-09-20 2023-01-02 2022-10-25 2023-10-25 dequacy and climate resilien l mentação de dados meteorologicos par sto ce in the energy and mining a identificacao de mudanças sectors. no regime de vazoes e das pr incipais variaveis de interess e para operacao do SIN SUBPROJETO 23-5 BR-ONS-2 68483-CS-QCBS / Contrataca Component 1 – Technical as o consultoria para realizar es sistance to increase efficienc Seleção Baseada tudo de previsibilidade, alter y, long term infrastructure a Open - Internationa Implementação P IBRD / 90740 Posterior na Qualidade e Cu 678,758.00 0.00 2022-04-15 2022-05-06 2022-06-19 2022-07-17 2022-08-16 2022-09-20 2022-10-25 2023-10-25 acao e manutencao e definic dequacy and climate resilien l endente sto ao de indices climaticos dos ce in the energy and mining Oceanos e atmosfera, bem c sectors. omo a incorporacao de varia veis em modelos de planeja mento. SUBPROJETO 23-6 BR-ONS-2 Component 1 – Technical as 68491-CS-QCBS / Contrataca sistance to increase efficienc Seleção Baseada Open - Internationa Implementação P o consultoria para Metodolog IBRD / 90740 y, long term infrastructure a Posterior na Qualidade e Cu 242,414.00 0.00 2022-04-15 2022-05-06 2022-06-19 2022-07-17 2022-08-16 2022-09-20 2022-10-25 2023-10-25 l endente ia para Estimativa de cenario dequacy and climate resilien sto s hidrologicos e meteorologic ce in the energy and mining os sectors. SUBPROJETO 22 - BR-ONS-2 Component 1 – Technical as 68230-CS-QCBS / Contratar c sistance to increase efficienc Seleção Baseada Open - Internationa Em fase de Imple onsultoria para estabelecer IBRD / 90740 y, long term infrastructure a Posterior na Qualidade e Cu 950,617.29 0.00 2022-12-13 2022-05-31 2023-01-03 2022-07-08 2023-02-16 2022-11-10 2023-03-16 2023-01-26 2023-04-15 2023-03-07 2023-05-20 2023-04-12 2023-06-24 2024-06-23 l mentação metodologia para calculo do dequacy and climate resilien sto valor agregado pela atuacao ce in the energy and mining do ONS. sectors. SUBPROJETO 24-1 BR-ONS-3 Component 1 – Technical as 71928-CS-QCBS / Contrataçã sistance to increase efficienc Seleção Baseada o de consultoria para o dese y, long term infrastructure a Open - Internationa Implementação P IBRD / 90740 Posterior na Qualidade e Cu 900,000.00 0.00 2023-07-21 2023-08-11 2023-09-24 2023-10-22 2023-11-21 2023-12-26 2024-01-30 2025-01-29 nvolvimento de um modelo d dequacy and climate resilien l endente sto e previsão de geração solar f ce in the energy and mining otovoltaica para o curtíssimo sectors. e curto prazo. SUBPROJETO 24-2 BR-ONS-3 Component 1 – Technical as 71929-CS-QCBS / Contrataçã sistance to increase efficienc Seleção Baseada o de consultoria para o dese y, long term infrastructure a Open - Internationa Implementação P IBRD / 90740 Posterior na Qualidade e Cu 500,000.00 0.00 2023-10-20 2023-11-10 2023-12-24 2024-01-21 2024-02-20 2024-03-26 2024-04-30 2025-04-30 nvolvimento de um modelo d dequacy and climate resilien l endente sto e previsão de geração solar f ce in the energy and mining otovoltaica para o tempo real sectors. . SUBPROJETO 24-3 BR-ONS-3 Component 1 – Technical as 71930-CS-QCBS / Contrataçã sistance to increase efficienc Seleção Baseada o de consultoria para o dese y, long term infrastructure a Open - Internationa Implementação P IBRD / 90740 Posterior na Qualidade e Cu 786,419.75 0.00 2024-01-12 2024-02-02 2024-03-17 2024-04-14 2024-05-14 2024-06-18 2024-07-23 2025-07-23 nvolvimento e análise de me dequacy and climate resilien l endente sto todologias para viabilizar a e ce in the energy and mining volução da previsão de geraç sectors. ão de fontes renováveis. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1