PROCUREMENT PLAN Project information: ORINOQUIA INTEGRATED SUSTAINABLE LANDSCAPES P167830 Project Implementation agency: WORLD WILDLIFE FUND WWF Date of the Procurement Plan: 04/08/2020 Period covered by this Procurement Plan: 04/08/2020 – 12/31/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Orinoquia Integrated Sustainable Landscapes PLAN General Information Country: Colombia 2020-09-24 Bank’s Approval Date of the Original Procurement Plan: 2023-07-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167830 GPN Date: 2020-09-21 Project Name: Orinoquia Integrated Sustainable Landscapes Loan / Credit No: TF / B0740 World Wildlife Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-WWF-246732-GO-RFQ / Project Management, Imple Adquisición de equipos de có mentation, Coordination, Co Solicitud de cotiza Single Stage - One E mputo y accesorios para el fo TF / B0740 Posterior Limited 6,800.00 6,219.08 Finalizado 2021-08-11 2021-08-27 2021-08-30 2021-09-30 2021-09-30 2021-11-05 mmunication, Monitoring an ciones nvelope rtalecimiento de la capacidad d Evaluation operativa de la Unidad de Co ordinación del proyecto CO-WWF-293630-GO-RFQ / Landscape management for Dotación de bienes, equipos connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 23,866.00 0.00 Firmado 2022-09-20 2022-10-26 2022-12-08 2022-12-25 y suministros para DNMI Cina n priority biodiversity and ec ciones nvelope ruco osystem services areas CO-WWF-293645-GO-RFQ / Landscape management for Dotación de bienes, equipos connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 23,886.00 0.00 Finalizado 2022-09-08 2022-10-14 2022-10-21 2022-12-13 2022-11-26 y suministros para PNN Tupa n priority biodiversity and ec ciones nvelope rro osystem services areas CO-WWF-258406-GO-RFQ / Adquisición de dos vehículos: Effective integration of envir Camionetas 4X4 mecanica, D onmental considerations at Solicitud de cotiza Single Stage - One E iesel, una para realizar el mo TF / B0740 Posterior Open - National 90,000.00 0.00 Cancelado 2022-06-17 2022-07-30 2022-09-28 appropriate scales in territor ciones nvelope nitoreo de especies críticas e ial and sector planning n el PNN Tuparro y otra para el área protegida del DNMI Ci naruco. Effective integration of envir CO-WWF-289464-GO-RFQ / onmental considerations at Solicitud de cotiza Single Stage - One E Compra de artículos de biose TF / B0740 Posterior Open - National 2,000.00 0.00 Cancelado 2022-09-14 2022-10-21 2022-12-20 appropriate scales in territor ciones nvelope guridad ial and sector planning CO-WWF-323461-GO-RFQ / Adquisición de dos vehículos Effective integration of envir automotores tipo camioneta onmental considerations at Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 90,000.00 0.00 Firmado 2022-11-15 2022-12-14 2022-12-22 2023-03-14 doble cabina, 4x4, para el Pa appropriate scales in territor ciones nvelope rque Nacional Natural El Tup ial and sector planning arro y para el área protegida del DNMI Cinaruco. CO-WWF-308898-GO-RFQ / Effective integration of envir Compra de equipos de seguri onmental considerations at Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 11,272.00 0.00 Cancelado 2022-08-27 2022-09-19 2022-11-18 dad y equipo y accesorios de appropriate scales in territor ciones nvelope cómputo ial and sector planning Effective integration of envir CO-WWF-343458-GO-RFQ / onmental considerations at Solicitud de cotiza Single Stage - One E Compra de equipos y accesor TF / B0740 Posterior Limited 10,000.00 0.00 Cancelado 2023-03-15 2023-03-26 2023-06-30 appropriate scales in territor ciones nvelope ios de cómputo - UIP ial and sector planning CO-WWF-343422-GO-RFQ / Effective integration of envir Compra de equipos de seguri onmental considerations at Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Limited 1,408.00 0.00 Cancelado 2023-03-15 2023-03-29 2023-06-30 dad (Equipo satelital), para c appropriate scales in territor ciones nvelope ampo. ial and sector planning Effective integration of envir CO-WWF-347054-GO-RFQ / onmental considerations at Solicitud de cotiza Single Stage - One E Ejecución pe Compra de equipos de seguri TF / B0740 Posterior Open - National 1,408.00 0.00 2023-04-10 2023-04-25 2023-06-30 appropriate scales in territor ciones nvelope ndiente dad (Equipo satelital) ial and sector planning Effective integration of envir CO-WWF-347056-GO-RFQ / onmental considerations at Solicitud de cotiza Single Stage - One E Compra de equipos y accesor TF / B0740 Posterior Open - National 10,000.00 0.00 Firmado 2023-04-01 2023-04-25 2023-05-05 2023-06-30 appropriate scales in territor ciones nvelope ios de cómputo - UIP ial and sector planning NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Landscape management for CO-WWF-285456-NC-RFQ / R connectivity and resilience i Solicitud de cotiza Single Stage - One E ealización de piezas audiovis TF / B0740 Posterior Open - National 11,000.00 0.00 Cancelado 2022-05-18 2022-06-30 2022-12-27 n priority biodiversity and ec ciones nvelope uales para el proyecto. osystem services areas CO-WWF-326627-NC-DIR / Pr oporcionar los servicios logíst icos de alimentación, hosped Landscape management for aje y transporte dentro del re connectivity and resilience i Adquisición direct sguardo AWIA Tuparro, para l TF / B0740 Posterior Direct - National 33,488.00 0.00 Firmado 2022-11-25 2022-11-21 2022-12-10 2022-11-21 2022-12-17 2022-11-26 2023-05-16 n priority biodiversity and ec a a realización de los talleres d osystem services areas e consulta del plan de manej o del PNN El Tuparro en el m arco de la implementación d e la ruta metodológica CO-WWF-367234-NC-RFQ / L Landscape management for levar a cabo el taller de segu connectivity and resilience i Solicitud de cotiza Single Stage - One E ridad en primeros auxilios y s TF / B0740 Posterior Open - National 5,300.00 0.00 En ejecución 2023-06-23 2023-07-12 2023-07-17 n priority biodiversity and ec ciones nvelope alvamiento acuático en camp osystem services areas o, para todo el personal del P royecto GEF Orinoquia. Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-WWF-265787-CS-QCBS / Consultoría para el levantami ento de información ambient Effective integration of envir al clave en las áreas abastec onmental considerations at Selección basada edoras de los municipios a in TF / B0740 Posterior Open - National 439,749.00 0.00 Firmado 2021-12-01 2021-11-25 2021-12-10 2022-01-05 2022-03-18 2022-01-20 2022-05-20 2022-01-26 2022-06-24 2022-02-08 2022-08-01 2022-02-14 2022-09-01 2023-07-13 appropriate scales in territor en calidad y costo tervenir para la identificación ial and sector planning de la EEP y la frontera agrícol a para su integración en la pl aneación territorial y sectoria l a escalas aprop CO-WWF-285173-CS-QCBS / Landscape management for Lineamientos para la gestión Selección basada connectivity and resilience i y ordenamiento ambiental de TF / B0740 Posterior en calificaciones d Open - National 121,806.00 0.00 Firmado 2022-04-29 2022-09-05 2022-05-09 2022-06-08 2022-10-28 2022-06-13 2023-03-13 2022-06-23 2023-04-04 2023-06-23 n priority biodiversity and ec la Reserva de la Biósfera El T e consultores osystem services areas uparro formulados y ruta de i mplementación CO-WWF-285176-CS-QCBS / Identificación actores (produ ctores, asociaciones de prod Landscape management for uctores y autoridades locales connectivity and resilience i Selección basada ), diseño de estrategia de apr TF / B0740 Posterior Open - National 547,321.00 0.00 Cancelado 2023-02-15 2023-03-02 2023-05-01 2023-05-11 2023-05-21 2023-06-10 2023-06-20 2024-06-19 n priority biodiversity and ec en calidad y costo oximación, sensibilización y osystem services areas negociación para la firma de acuerdos que favorezcan la c onectividad, firma implement ación de los acuerdos. Landscape management for CO-WWF-293612-CS-CQS / R Selección basada connectivity and resilience i ealización de piezas audiovis TF / B0740 Posterior en calificaciones d Open - National 12,300.00 0.00 Firmado 2022-07-15 2022-10-10 2022-07-20 2022-08-10 2022-12-14 2022-08-16 2023-04-12 2022-08-22 2023-04-16 2023-01-19 n priority biodiversity and ec uales e consultores osystem services areas CO-WWF-291564-CS-CQS / D Landscape management for Selección basada iseño del manual de marca d connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 2,105.00 0.00 Cancelado 2022-05-10 2022-05-20 2022-06-14 2022-06-24 2022-07-04 2022-09-02 el proyecto, logo, imagen y l n priority biodiversity and ec e consultores a presentación del proyecto. osystem services areas CO-WWF-283724-CS-QCBS / Identificación de productos d e la bioeconomía regional co Landscape management for n la participación de grupos c Selección basada connectivity and resilience i ientíficos y de investigación r TF / B0740 Posterior en calificaciones d Open - National 83,432.00 0.00 Cancelado 2022-10-07 2022-10-22 2022-11-14 2022-11-19 2022-11-28 2023-11-28 n priority biodiversity and ec egionales, comunidades, aso e consultores osystem services areas ciaciones, análisis de mercad o internacional y nacional pa ra al menos dos productores priorizados por mosaico CO-WWF-298835-CS-CQS / A poyo y acompañamiento a la implementación de acciones Landscape management for priorizadas en el Plan de ord Selección basada connectivity and resilience i enación y manejo de la cuen TF / B0740 Posterior en calificaciones d Open - National 59,700.00 0.00 En ejecución 2022-08-26 2022-09-19 2022-08-30 2022-09-27 2023-02-10 2022-10-04 2022-10-10 2023-06-30 n priority biodiversity and ec ca hidrográfica -POMCA- del e consultores osystem services areas Río Bita en articulación con e l plan de manejo Rámsar Río Bita. y fortalecimiento y dina mización del funcionamiento CO-WWF-298681-CS-CQS / F ormulación Plan de manejo d Landscape management for Selección basada e la Reserva Forestal Protect connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 121,806.00 0.00 En ejecución 2022-08-26 2022-11-04 2022-08-30 2022-09-25 2022-09-27 2022-10-03 2023-06-30 ora Nacional Cuenca Alta del n priority biodiversity and ec e consultores Río Satocá formulado y repor osystem services areas te del avance del proceso de adopción por parte del MADS CO-WWF-309087-CS-CQS / C Landscape management for Selección basada onsultoría para llevar a cabo connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 26,500.00 0.00 Cancelado 2022-08-26 2022-09-09 2022-10-28 2022-10-29 2022-10-30 2023-01-28 la Evaluación de medio térmi n priority biodiversity and ec e consultores no osystem services areas CO-WWF-309117-CS-CQS / C Project Management, Imple Selección basada ontratación Auditoria del Pro TF / B0740 mentation, Coordination, Co Posterior en calificaciones d Open - National 5,704.00 0.00 Cancelado 2022-09-05 2022-11-11 2022-09-19 2022-11-07 2022-11-11 2022-11-14 2023-02-12 yecto mmunication, Monitoring an e consultores d Evaluation CO-WWF-329045-CS-CQS / C Project Management, Imple Selección basada ontratacion auditoria del pro TF / B0740 mentation, Coordination, Co Posterior en calificaciones d Limited 5,704.00 0.00 En ejecución 2022-12-12 2022-11-14 2023-01-26 2023-03-07 2023-01-31 2023-04-24 2023-02-04 2023-05-15 yecto GEF Orinoquia mmunication, Monitoring an e consultores d Evaluation CO-WWF-309153-CS-CQS / F ormular los planes integrales de manejo para los corredore Landscape management for s de las especies amenazada Selección basada connectivity and resilience i s y en conflicto con los actor TF / B0740 Posterior en calificaciones d Open - National 50,323.00 0.00 En ejecución 2023-01-10 2023-02-21 2023-01-24 2023-02-05 2023-02-08 2023-02-12 2023-06-30 n priority biodiversity and ec es productivos y comunidade e consultores osystem services areas s étnicas, en el mosaico Cocu y-Piedemonte-Cinaruco, Pant hera onca (jaguar) y Tapirus terrestris (tapir). CO-WWF-285172-CS-QCBS / Effective integration of envir Selección basada Desarrollo de estudios de an onmental considerations at TF / B0740 Posterior en calificaciones d Open - National 60,000.00 0.00 Cancelado 2022-05-02 2022-07-07 2022-05-17 2022-06-11 2022-10-07 2022-06-16 2022-06-26 2023-06-26 álisis de dinámica Hídrica y P appropriate scales in territor e consultores ulsos de inundación (para DN ial and sector planning MI Cinaruco) CO-WWF-342861-CS-CQS / C onsultoría para la adaptación Landscape management for Selección basada del modelo ITPS para ganade connectivity and resilience i Ejecución pendien TF / B0740 Posterior en calificaciones d Open - National 27,906.00 0.00 2023-05-20 2023-05-30 2023-06-22 2023-06-25 2023-06-29 2023-06-30 ría sostenible en piedemonte n priority biodiversity and ec te e consultores , sabana inundable y altillanu osystem services areas ra y validación del instrumen to financiero CO-WWF-343429-CS-CQS / D Effective integration of envir Selección basada esarrollo de estudios de análi onmental considerations at TF / B0740 Posterior en calificaciones d Open - National 21,903.00 0.00 En ejecución 2023-03-15 2023-03-16 2023-03-29 2023-05-18 2023-05-19 2023-05-21 2023-05-25 2023-06-20 sis de dinámica Hídrica y Pul appropriate scales in territor e consultores sos de inundación (para DNM ial and sector planning I Cinaruco) CO-WWF-309085-CS-CQS / C onsultoría para el desarrollo Landscape management for e implementación de al men Selección basada connectivity and resilience i os 3 procesos de ordenamien TF / B0740 Posterior en calificaciones d Open - National 110,710.00 0.00 Cancelado 2022-12-02 2022-12-16 2023-02-02 2023-02-09 2023-02-16 2023-06-30 n priority biodiversity and ec to pesquero que contengan l e consultores osystem services areas ineamientos técnicos de man ejo para recursos hidrobiológ icos en la cuenca del río Bita Page 2 CO-WWF-285175-CS-QCBS / Consultoría para el diseño e i mplementación del protocolo Effective integration of envir de gestión de información int Selección basada onmental considerations at erna para Corporinoquia para TF / B0740 Posterior en calificaciones d Open - National 83,705.00 0.00 Cancelado 2023-01-10 2023-01-25 2023-02-06 2023-02-08 2023-02-12 2023-06-30 appropriate scales in territor la gestión de metadatos, cap e consultores ial and sector planning tura, manejo e incoporación de información a los subsiste mas de información que conf orman el SIAC CO-WWF-298837-CS-CQS / R Landscape management for Selección basada ealización de podcasts para connectivity and resilience i TF / B0740 Posterior en calificaciones d Limited 9,000.00 0.00 Cancelado 2023-01-16 2023-01-31 2023-02-05 2023-02-08 2023-06-30 el proyecto GEF paisajes inte n priority biodiversity and ec e consultores grados sostenibles de la Orin osystem services areas oquía CO-WWF-342854-CS-CQS / C onsultoría para la firma de ac Landscape management for Selección basada uerdos voluntarios de conser connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 12,002.00 0.00 Cancelado 2023-04-10 2023-04-24 2023-06-01 2023-06-04 2023-06-08 2023-06-30 vación-producción que favor n priority biodiversity and ec e consultores ezcan la conectividad en pais osystem services areas ajes de altillanura y acompañ amiento en su implementaci ón CO-WWF-342857-CS-CQS / C onsultoría para la firma de ac Landscape management for Selección basada uerdos voluntarios de conser connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 12,002.00 0.00 Cancelado 2023-04-10 2023-04-24 2023-06-01 2023-06-04 2023-06-10 2023-06-30 vación-producción que favor n priority biodiversity and ec e consultores ezcan la conectividad en sab osystem services areas anas inundables y acompaña miento en su implementació n CO-WWF-369976-CS-CQS / R ealizar el análisis de conectiv idad en los paisajes producti Landscape management for vos priorizados por el proyec Selección basada connectivity and resilience i to, identificar y seleccionar p TF / B0740 Posterior en calificaciones d Open - National 38,285.00 0.00 En ejecución 2023-07-07 2023-06-30 2023-07-22 2023-09-10 2023-09-13 2023-09-18 2025-03-16 n priority biodiversity and ec redios estratégicos para dise e consultores osystem services areas ñar rutas de conectividad, el aborar planes prediales parti cipativos y firmar los acuerdo s de conservación CO-WWF-369983-CS-CQS / R ealizar el análisis de conectiv idad en los paisajes producti Landscape management for vos priorizados por el proyec Selección basada connectivity and resilience i to, identificar y seleccionar p TF / B0740 Posterior en calificaciones d Open - National 38,285.00 0.00 En ejecución 2023-07-07 2023-06-30 2023-07-22 2023-09-10 2023-09-15 2023-09-24 2025-03-22 n priority biodiversity and ec redios estratégicos para dise e consultores osystem services areas ñar rutas de conectividad, el aborar planes prediales parti cipativos y firmar los acuerdo s de conservación CO-WWF-372356-CS-CQS / E valuar de manera tendencial la sostenibilidad de los paisaj Effective integration of envir es priorizados por el proyect Selección basada onmental considerations at Ejecución pendien o y su impacto sobre la biodi TF / B0740 Posterior en calificaciones d Open - National 153,846.00 0.00 2023-08-01 2023-08-16 2023-10-07 2023-10-11 2023-10-15 2024-10-14 appropriate scales in territor te versidad y los SE, así como, e consultores ial and sector planning generar una propuesta de lin eamientos técnicos que incor poren la conservación de la b iodiversidad y la provi INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-WWF-192634-CS-CQS / R esponsable de realizar los pr ocesos de adquisiciones y co Project Management, Imple ntrataciones que se requiera mentation, Coordination, Co n, de conformidad con lo est TF / B0740 Posterior Individual Limited 89,906.00 0.00 Cancelado 2020-09-22 2020-09-30 2020-09-27 2020-10-18 2020-11-22 2023-06-30 mmunication, Monitoring an ablecido en el Acuerdo Legal, d Evaluation el Manual Operativo del Proy ecto, el Plan de Adquisicione s, las Regulaciones de adquis iciones del Banco CO-WWF-192637-CS-INDV / El Especialista Financiero, ser á responsable de la gestión fi Project Management, Imple nanciera y administrativa del mentation, Coordination, Co Proyecto, de conformidad co TF / B0740 Posterior Individual Limited 96,110.00 0.00 Cancelado 2020-09-22 2020-09-30 2020-09-27 2020-10-18 2020-11-22 2023-06-30 mmunication, Monitoring an n lo establecido en el Acuerd d Evaluation o Legal, el MOP, el PA, las re gulaciones financieras y de a dquisiciones del Banco, de W WF y demás normas. CO-WWF-188773-CS-CDS / E l Coordinador del proyecto se Effective integration of envir encargará de asegurar la coo onmental considerations at rdinación e integralidad de lo TF / B0740 Posterior Individual Direct 231,527.00 0.00 Cancelado 2020-10-01 2020-10-07 2020-10-06 2020-10-08 2020-10-20 2023-07-09 appropriate scales in territor s aspectos técnicos, administ ial and sector planning rativos, logísticos y legales q ue se requieran para la ejecu ción de éste. Effective integration of envir CO-WWF-210819-CS-INDV / onmental considerations at El Especialista de Planeación TF / B0740 Posterior Individual Limited 110,555.00 37,728.00 Firmado 2021-01-12 2021-06-09 2021-01-17 2021-07-27 2021-02-07 2021-08-03 2021-03-14 2021-08-08 2022-03-14 appropriate scales in territor y Monitoreo ial and sector planning CO-WWF-210836-CS-INDV / Landscape management for Especialista en Salvaguardas connectivity and resilience i TF / B0740 Posterior Individual Limited 119,929.00 0.00 Cancelado 2021-01-12 2021-05-10 2021-01-17 2021-02-07 2021-03-14 2022-03-14 /Estándares Sociales, particip n priority biodiversity and ec ación y gobernanza osystem services areas Effective integration of envir CO-WWF-210842-CS-INDV / onmental considerations at Especialista en Salvaguardas TF / B0740 Posterior Individual Limited 119,929.00 0.00 Cancelado 2021-01-12 2021-05-10 2021-01-17 2021-02-07 2021-03-14 2022-03-14 appropriate scales in territor / Estándares Ambientales ial and sector planning CO-WWF-223879-CS-INDV / El Coordinador del proyecto s Effective integration of envir e encargará de asegurar la c onmental considerations at oordinación e integralidad de TF / B0740 Posterior Individual Direct 42,857.00 36,474.78 Firmado 2021-05-10 2021-05-12 2021-05-15 2021-05-13 2021-05-22 2021-05-24 2021-05-29 2021-05-29 2022-05-28 2022-06-01 appropriate scales in territor los aspectos técnicos, admini ial and sector planning strativos, logísticos y legales que se requieran para la ejec ución de éste. Page 3 CO-WWF-232274-CS-INDV / El Especialista de Adquisicion es, será́ responsable de reali Project Management, Imple zar los procesos de adquisici mentation, Coordination, Co TF / B0740 Posterior Individual Direct 77,202.00 23,446.44 Firmado 2021-05-10 2021-05-07 2021-05-13 2021-05-12 2021-05-20 2021-05-24 2021-05-25 2021-06-04 2022-05-24 ones y contrataciones que se mmunication, Monitoring an requieran, de conformidad co d Evaluation n lo establecido en el Acuerd o Legal, el Manual Operativo del Proyecto, el PA, las Regul aciones (...) CO-WWF-233338-CS-INDV / El Especialista Ambiental- Sal vaguardas es el encargado d Effective integration of envir e orientar y asesorar técnica onmental considerations at TF / B0740 Posterior Individual Direct 200,503.00 64,451.50 Firmado 2021-05-17 2021-05-10 2021-05-27 2021-05-28 2021-05-31 2021-05-31 2021-06-02 2021-06-05 2022-06-01 mente a la UIP en temas am appropriate scales in territor bientales así como la articula ial and sector planning ción del proyecto con iniciati vas y actores claves en regió n y socios del proyecto (...) CO-WWF-192637-CS-INDV-2 / El Especialista Financiero, s erá responsable de la gestión Project Management, Imple financiera y administrativa d mentation, Coordination, Co TF / B0740 Posterior Individual Direct 83,230.00 24,385.66 Firmado 2021-05-18 2021-05-13 2021-05-23 2021-05-13 2021-05-30 2021-05-24 2021-06-04 2021-06-05 2022-06-03 el Proyecto, de conformidad mmunication, Monitoring an con lo establecido en el Acue d Evaluation rdo Legal, el MOP, el PA, las r egulaciones financieras y de adquisiciones del Banco. CO-WWF-238941-CS-INDV / El Especialista en Salvaguard as Sociales, participación y g Landscape management for obernanza es el encargado d connectivity and resilience i e asegurar que las actividade TF / B0740 Posterior Individual Limited 114,046.00 31,131.53 Firmado 2021-06-09 2021-06-10 2021-06-16 2021-07-27 2021-06-30 2021-08-09 2021-07-13 2021-08-10 2022-07-12 2022-10-30 n priority biodiversity and ec s del proyecto en campo y ofi osystem services areas cina, incluyen las medidas ne cesarias para anticipar, evita r, minimizar, mitigar o compe nsar los riesgos (...) CO-WWF-242725-CS-INDV / Liderar la implementación de las acciones relacionadas co Landscape management for n paisajes y sistemas product connectivity and resilience i ivos sostenibles contemplada TF / B0740 Posterior Individual Open 121,720.00 0.00 Cancelado 2021-07-16 2021-08-23 2021-08-13 2021-08-16 2021-08-25 2022-08-25 n priority biodiversity and ec s por el proyecto, en las área osystem services areas s de intervención del mismo, bajo los lineamientos de trab ajo de WWF Colombia en sist emas alimentarios sostenib CO-WWF-242879-CS-INDV / El profesional de Áreas Prote Landscape management for gidas se encargará de orient connectivity and resilience i ar técnicamente y liderar el d TF / B0740 Posterior Individual Limited 63,948.00 22,202.04 Firmado 2021-07-16 2021-07-21 2021-07-26 2021-08-05 2021-07-30 2021-08-31 2021-08-05 2021-09-17 2022-08-05 n priority biodiversity and ec esarrollo de las actividades d osystem services areas el proyecto relacionadas con áreas protegidas (nuevas áre as, efectividad de manejo). CO-WWF-242882-CS-INDV / El profesional de Ecosistema s Estratégicos prestará sus s Landscape management for ervicios profesionales orienta connectivity and resilience i ndo técnicamente y liderand TF / B0740 Posterior Individual Limited 63,948.00 22,300.32 Firmado 2021-07-16 2021-07-21 2021-07-23 2021-08-23 2021-07-28 2021-09-30 2021-08-06 2021-10-11 2022-08-06 n priority biodiversity and ec o el desarrollo de las activida osystem services areas des del proyecto Paisajes Int egrados Sostenibles de la Ori noquía (P167830) relacionad as con ecosistemas estrat CO-WWF-247722-CS-INDV / Landscape management for Comunicador del proyecto en connectivity and resilience i cargado de diseñar e implem TF / B0740 Posterior Individual Open 75,933.00 22,175.16 Firmado 2021-08-13 2021-08-13 2021-09-02 2021-08-23 2021-09-06 2021-09-29 2021-09-11 2021-10-10 2022-09-11 n priority biodiversity and ec entar la estrategia de comuni osystem services areas caciones del proyecto en arti culación con la UIP. Landscape management for CO-WWF-257258-CS-INDV / connectivity and resilience i Especialista de Paisajes y Sis TF / B0740 Posterior Individual Open 107,142.00 30,879.53 Firmado 2021-10-08 2021-10-01 2021-10-26 2021-10-11 2021-10-28 2021-12-02 2021-11-01 2021-12-12 2022-11-01 n priority biodiversity and ec temas Productivos osystem services areas CO-WWF-261246-CS-CDS / E l Asistente administrativo, ap Project Management, Imple oyará a la Unidad de Implem mentation, Coordination, Co entación del Proyecto (UIP) e TF / B0740 Posterior Individual Direct 43,870.00 11,209.93 Firmado 2021-11-05 2021-10-29 2021-11-09 2021-11-02 2021-11-10 2021-10-29 2021-11-11 2021-11-08 2022-11-06 mmunication, Monitoring an n la realización de las activid d Evaluation ades administrativas y logísti cas que faciliten la ejecución del Proyecto CO-WWF-285444-CS-INDV / Landscape management for Apoyo a la implementación d connectivity and resilience i TF / B0740 Posterior Individual Limited 46,452.00 16,992.14 Firmado 2022-04-04 2022-05-20 2022-04-19 2022-06-13 2022-04-24 2022-06-28 2022-05-01 2022-07-20 2023-05-01 el plan de manejo (para DN n priority biodiversity and ec MI Cinaruco) osystem services areas CO-WWF-269476-CS-INDV / Landscape management for Consutor 1, Diseño e implem connectivity and resilience i TF / B0740 Posterior Individual Limited 40,968.00 9,790.85 Firmado 2022-03-18 2022-04-05 2022-04-07 2022-04-08 2022-04-15 2022-05-16 2022-05-01 2022-06-06 2022-12-27 entación de estrategia de soc n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), CO-WWF-269471-CS-INDV / Landscape management for Consutor 2, Diseño e implem connectivity and resilience i TF / B0740 Posterior Individual Limited 40,967.00 10,123.78 Firmado 2022-03-21 2022-04-05 2022-04-08 2022-04-08 2022-04-18 2022-05-23 2022-05-01 2022-06-06 2022-12-27 entación de estrategia de soc n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), Landscape management for CO-WWF-285446-CS-INDV / connectivity and resilience i Consultor 1, Diagnóstico de c TF / B0740 Posterior Individual Open 6,842.00 0.00 Cancelado 2022-04-04 2022-05-09 2022-05-17 2022-06-01 2022-09-29 n priority biodiversity and ec onflicto social y ambiental osystem services areas CO-WWF-285447-CS-INDV / Landscape management for Consultor 2, Caracterización connectivity and resilience i TF / B0740 Posterior Individual Open 6,842.00 0.00 Cancelado 2022-04-04 2022-05-13 2022-05-21 2022-06-01 2022-09-29 de actores e intereses como i n priority biodiversity and ec nsumo para la consolidación osystem services areas del centro regional CO-WWF-293454-CS-INDV / Coordinador para la impleme ntación del programa de mo Effective integration of envir nitoreo y el portafolio de pro onmental considerations at TF / B0740 Posterior Individual Open 18,456.00 0.00 Firmado 2022-06-24 2022-06-29 2022-07-15 2022-07-21 2022-07-18 2022-09-13 2022-07-22 2022-09-22 2023-07-22 yectos de investigación del P appropriate scales in territor NN El Tuparro, análisis de la i ial and sector planning nformación y elaboración de informe con recomendacione s de manejo. Page 4 CO-WWF-293648-CS-INDV / Profesional 2. Implementació Effective integration of envir n de los protocolos de monito onmental considerations at reo y desarrollo de actividad TF / B0740 Posterior Individual Open 7,558.00 0.00 Cancelado 2022-08-22 2022-09-14 2022-09-16 2022-09-20 2023-03-19 appropriate scales in territor es en campo para PNN Tupar ial and sector planning ro, análisis de la información y elaboración de informe con recomendaciones de manejo CO-WWF-293647-CS-INDV / Profesional 1. Implementació n de los protocolos de monito Effective integration of envir reo y desarrollo de actividad onmental considerations at es en campo para PNN Tupar TF / B0740 Posterior Individual Open 7,558.00 0.00 Cancelado 2022-08-22 2022-09-12 2022-09-14 2022-09-19 2023-03-18 appropriate scales in territor ro, análisis de la información ial and sector planning y elaboración de informe con recomendaciones de manejo, esta subactividad se enmarc a en la actividad No. 1.2.4 CO-WWF-293646-CS-INDV / Preparación, consulta e imple Landscape management for mentación de un Marco de G connectivity and resilience i estión Ambiental y Social (M TF / B0740 Posterior Individual Open 21,838.00 0.00 Cancelado 2022-07-08 2022-08-05 2022-08-08 2022-08-12 2023-04-09 n priority biodiversity and ec GAS), Manejo Integrado de Pl osystem services areas agas y Plan de manejo soste nible para especes/poblacion es silvestre afectada. CO-WWF-298649-CS-INDV / Landscape management for Realizar el avaluo para la ad connectivity and resilience i TF / B0740 Posterior Individual Open 2,059.00 0.00 Cancelado 2022-10-21 2022-11-12 2022-11-16 2022-11-19 2022-12-19 quisición de la sede (para DN n priority biodiversity and ec MI Cinaruco) osystem services areas CO-WWF-293591-CS-INDV / Gestor local: Apoyo local/co Effective integration of envir munitario en la organización onmental considerations at TF / B0740 Posterior Individual Open 7,955.00 0.00 Cancelado 2022-07-11 2022-08-03 2022-08-05 2022-08-09 2023-02-05 de talleres, jornadas y event appropriate scales in territor os de acercamiento, socializa ial and sector planning ción, articulación y participac ión con actores clave CO-WWF-298810-CS-INDV / Especialista indígena /comun Effective integration of envir itario en la organización de t onmental considerations at TF / B0740 Posterior Individual Open 5,304.00 0.00 Cancelado 2022-07-15 2022-08-05 2022-08-08 2022-08-10 2022-12-08 alleres, jornadas y eventos d appropriate scales in territor e acercamiento, socialización ial and sector planning , articulación y participación con actores clave CO-WWF-298819-CS-INDV / Apoyo a la facilitación gráfica Effective integration of envir en la realización de talleres, j onmental considerations at TF / B0740 Posterior Individual Open 13,365.00 0.00 Cancelado 2022-06-27 2022-07-18 2022-08-19 2022-08-22 2023-08-22 ornadas y eventos de acerca appropriate scales in territor miento, socialización, articul ial and sector planning ación y participación con act ores clave CO-WWF-298834-CS-INDV / Landscape management for Profesional. Formulación e im connectivity and resilience i TF / B0740 Posterior Individual Open 7,056.00 0.00 Firmado 2022-06-24 2022-06-29 2022-07-15 2022-09-05 2022-07-18 2022-08-23 2022-07-22 2022-09-15 2023-03-19 plementación temprana del n priority biodiversity and ec Régimen Especial de Manejo osystem services areas del PNN El Tuparro CO-WWF-293629-CS-INDV / Landscape management for Consultor de apoyo a la AUN connectivity and resilience i TF / B0740 Posterior Individual Open 19,355.00 0.00 Cancelado 2022-08-10 2022-09-14 2022-09-19 2022-09-29 2023-09-24 AP en la implementación del n priority biodiversity and ec POPE osystem services areas CO-WWF-293640-CS-INDV / Landscape management for Diagnóstico de conflicto soci connectivity and resilience i al y ambiental y caracterizaci TF / B0740 Posterior Individual Open 10,753.00 0.00 Cancelado 2022-07-08 2022-07-29 2022-08-03 2022-08-10 2023-06-06 n priority biodiversity and ec ón de actores e intereses co osystem services areas mo insumo para la consolida ción del centro regional CO-WWF-285443-CS-INDV / Acuerdos con asociaciones d Landscape management for e base para la implementaci connectivity and resilience i ón de acciones de Restauraci TF / B0740 Posterior Individual Open 34,839.00 0.00 Cancelado 2022-08-26 2022-09-22 2022-09-26 2022-10-03 2023-10-03 n priority biodiversity and ec ón de rondas de ríos prioriza osystem services areas dos en Arauca (Mano de obra no calificada y otros gastos d e funcionamiento). CO-WWF-285439-CS-INDV / Consultor 1, Definición e impl Landscape management for ementación de planes integr connectivity and resilience i ados de manejo de corredore TF / B0740 Posterior Individual Open 25,161.00 0.00 Cancelado 2022-08-22 2022-09-19 2022-09-23 2022-10-03 2023-10-03 n priority biodiversity and ec s de especies amenazadas y osystem services areas de conflicto con los actores p roductivos y comunidades ét nicas CO-WWF-285442-CS-INDV / Consultor 2, Definición e imp Landscape management for lementación de planes integr connectivity and resilience i ados de manejo de corredore TF / B0740 Posterior Individual Open 25,162.00 0.00 Cancelado 2022-08-22 2022-09-19 2022-09-22 2022-09-26 2023-09-26 n priority biodiversity and ec s de especies amenazadas y osystem services areas de conflicto con los actores p roductivos y comunidades ét nicas CO-WWF-285453-CS-INDV / I Landscape management for dentificación y priorización d connectivity and resilience i e oportunidades y avance en TF / B0740 Posterior Individual Open 29,232.00 0.00 Cancelado 2022-09-15 2022-10-18 2022-10-23 2022-11-02 2023-11-02 n priority biodiversity and ec diseño y formulación o apres osystem services areas tamiento de convocatorias CO-WWF-298641-CS-INDV / Coordinador del proyecto Ase Effective integration of envir gurar la coordinación e integr onmental considerations at alidad de los aspectos geren TF / B0740 Posterior Individual Direct 37,636.00 37,172.65 Firmado 2022-06-15 2022-06-15 2022-06-16 2022-06-16 2022-06-16 2022-06-16 2022-06-17 2022-06-26 2023-06-17 2022-10-30 appropriate scales in territor ciales, administrativos, logísti ial and sector planning cos y legales que se requiera n para la ejecución del Proye cto. CO-WWF-285445-CS-INDV / Apoyo y acompañamiento a l Landscape management for a implementación de accione connectivity and resilience i s priorizadas en el Plan de or TF / B0740 Posterior Individual Open 25,263.00 0.00 Cancelado 2022-04-08 2022-05-06 2022-05-11 2022-05-20 2023-05-20 n priority biodiversity and ec denación y manejo de la cue osystem services areas nca hidrográfica -POMCA- del Río Bita en articulación con e l plan de manejo Rámsar Río Bita Page 5 CO-WWF-285450-CS-INDV / Consultor 1, Formulación Pla Landscape management for n de manejo de la Reserva F connectivity and resilience i orestal Protectora Nacional C TF / B0740 Posterior Individual Open 34,883.00 0.00 Cancelado 2022-06-15 2022-08-09 2022-08-19 2022-09-01 2023-05-29 n priority biodiversity and ec uenca Alta del Río Satocá for osystem services areas mulado y reporte del avance del proceso de adopción por parte del MADS CO-WWF-285451-CS-INDV / Consultor 2, Formulación Pla Landscape management for n de manejo de la Reserva F connectivity and resilience i orestal Protectora Nacional C TF / B0740 Posterior Individual Open 34,883.00 0.00 Cancelado 2022-05-10 2022-06-29 2022-07-09 2022-07-19 2023-04-15 n priority biodiversity and ec uenca Alta del Río Satocá for osystem services areas mulado y reporte del avance del proceso de adopción por parte del MADS CO-WWF-285452-CS-INDV / Landscape management for Fortalecer y dinamizar el fun connectivity and resilience i TF / B0740 Posterior Individual Open 34,286.00 0.00 Cancelado 2022-03-28 2022-05-23 2022-06-02 2022-06-15 2023-06-15 cionamiento del Consejo de n priority biodiversity and ec Cuenca del Río Bita osystem services areas CO-WWF-285448-CS-INDV / Landscape management for Consultor 3, Gestor local par connectivity and resilience i a la promoción y puesta en TF / B0740 Posterior Individual Open 35,526.00 0.00 Cancelado 2022-04-11 2022-05-31 2022-06-10 2022-06-20 2023-06-20 n priority biodiversity and ec marcha de centro regional de osystem services areas diálogo para la Orinoquía. CO-WWF-309149-CS-INDV / Landscape management for Realización de podcasts para connectivity and resilience i TF / B0740 Posterior Individual Open - National 9,000.00 0.00 Cancelado 2022-08-22 2022-09-14 2022-09-15 2022-09-19 2023-03-18 el proyecto GEF paisajes inte n priority biodiversity and ec grados sostenibles de la Orin osystem services areas oquía Project Management, Imple CO-WWF-309104-CS-INDV / TF / B0740 mentation, Coordination, Co Posterior Individual Direct - National 17,820.00 0.00 Firmado 2022-08-22 2022-08-22 2022-08-23 2022-08-22 2022-09-05 2022-09-05 2022-09-05 2022-09-06 2023-06-30 Apoyo de adqusiciones mmunication, Monitoring an d Evaluation CO-WWF-298671-CS-CQS / C Landscape management for onsultor individual en diseño connectivity and resilience i TF / B0740 Posterior Individual Open - National 12,300.00 0.00 Firmado 2022-08-22 2022-08-22 2022-09-14 2022-10-18 2022-09-16 2022-10-12 2022-09-22 2022-10-28 2023-05-20 gráfico del proyecto GEF pais n priority biodiversity and ec ajes integrados sostenibles d osystem services areas e la Orinoquía CO-WWF-309110-CS-CDS / A Project Management, Imple sesor Experto en adqusicione TF / B0740 mentation, Coordination, Co Posterior Individual Direct - National 12,000.00 9,761.82 Firmado 2022-08-22 2022-08-22 2022-08-27 2022-08-22 2022-09-05 2022-08-24 2022-09-05 2022-09-15 2023-06-30 s mmunication, Monitoring an d Evaluation CO-WWF-310259-CS-INDV / Facilitación gráfica en el proc eso de identificación de actor Effective integration of envir es e instancias clave, diseño onmental considerations at e implementación de la ruta TF / B0740 Posterior Individual Open - National 16,866.00 0.00 Firmado 2022-08-22 2022-08-22 2022-09-15 2022-10-12 2022-09-19 2022-10-06 2022-09-24 2022-10-15 2023-06-30 appropriate scales in territor de aproximación específica c ial and sector planning on partes interesadas (autori dades, comunidades, sectore s) aportando claridad y herra mientas de comunicación CO-WWF-310260-CS-INDV / Gestor indígena para la ident ificación de actores e instanc Effective integration of envir ias clave, diseño e implemen onmental considerations at tación de la ruta de aproxima TF / B0740 Posterior Individual Open - National 7,955.00 0.00 Firmado 2022-08-22 2022-08-22 2022-09-15 2022-09-26 2022-09-19 2022-09-29 2022-09-24 2022-10-06 2023-03-23 appropriate scales in territor ción específica con partes int ial and sector planning eresadas (autoridades, comu nidades, sectores) garantizan do el diálogo y la construcció n participativa CO-WWF-310255-CS-INDV / Consultor profesional 1 para Effective integration of envir el desarrollo de actividades e onmental considerations at n campo para la implementa TF / B0740 Posterior Individual Open - National 7,558.00 0.00 Firmado 2022-08-26 2022-09-06 2022-09-19 2022-11-04 2022-09-22 2022-10-21 2022-09-26 2022-12-02 2023-03-25 appropriate scales in territor ción de los protocolos de mo ial and sector planning nitoreo de ungulados, tortug as y otras especies en el PNN Tuparro. CO-WWF-310252-CS-INDV / Consultor profesional 2 para Effective integration of envir el desarrollo de actividades e onmental considerations at n campo para la implementa TF / B0740 Posterior Individual Open - National 7,558.00 0.00 Firmado 2022-08-26 2022-09-06 2022-09-17 2022-11-04 2022-09-20 2022-10-21 2022-09-25 2022-11-22 2023-03-24 appropriate scales in territor ción de los protocolos de mo ial and sector planning nitoreo de ungulados, tortug as y otras especies en el PNN Tuparro. CO-WWF-310250-CS-INDV / Gestor local para la identifica ción de actores e instancias c Effective integration of envir lave, diseño e implementació onmental considerations at TF / B0740 Posterior Individual Open - National 19,623.00 0.00 Firmado 2022-08-22 2022-08-22 2022-09-15 2022-10-14 2022-09-17 2022-10-06 2022-09-23 2022-10-28 2023-06-30 n de la ruta de aproximación appropriate scales in territor específica con partes interes ial and sector planning adas (autoridades, comunida des, sectores) garantizando el diálogo y la construcción p articipativa CO-WWF-309093-CS-INDV / Landscape management for Consultoría para la elaboraci connectivity and resilience i ón de bases de datos del sist TF / B0740 Posterior Individual Open - National 5,569.00 0.00 Firmado 2022-08-29 2022-08-25 2022-09-26 2022-10-14 2022-09-27 2022-10-14 2022-10-03 2022-10-28 2023-04-01 n priority biodiversity and ec ema de monitoreo del proyec osystem services areas to y gestión de archivo en lín ea. CO-WWF-293651-CS-INDV / Consultor operario 2 para el Effective integration of envir desarrollo de actividades en onmental considerations at campo para la implementaci TF / B0740 Posterior Individual Limited 2,387.00 0.00 Firmado 2022-09-02 2022-09-06 2022-09-17 2022-11-15 2022-09-20 2022-11-30 2022-09-27 2022-12-10 2023-03-26 appropriate scales in territor ón de los protocolos de monit ial and sector planning oreo de ungulados, tortugas y otras especies en el PNN T uparro. CO-WWF-293649-CS-INDV / Consultor operario 1 para el Effective integration of envir desarrollo de actividades en onmental considerations at campo para la implementaci TF / B0740 Posterior Individual Limited 2,387.00 0.00 Firmado 2022-09-02 2022-09-06 2022-09-17 2022-11-30 2022-09-20 2022-12-01 2022-09-25 2022-12-10 2023-03-24 appropriate scales in territor ón de los protocolos de monit ial and sector planning oreo de ungulados, tortugas y otras especies en el PNN T uparro. CO-WWF-320697-CS-INDV / Landscape management for Consultoría individual para ll connectivity and resilience i TF / B0740 Posterior Individual Limited 26,500.00 0.00 Firmado 2022-10-28 2022-10-26 2022-11-12 2022-11-18 2022-11-17 2022-11-18 2022-11-21 2022-12-10 2023-02-19 evar a cabo la revisión de me n priority biodiversity and ec dio término del proyecto osystem services areas Page 6 CO-WWF-310254-CS-INDV / Landscape management for Avalúo y preparación de doc connectivity and resilience i TF / B0740 Posterior Individual Open - National 2,000.00 0.00 Cancelado 2022-09-02 2022-09-26 2022-09-29 2022-10-05 2022-12-04 umentación necesaria para l n priority biodiversity and ec a adquisición de sede para D osystem services areas NMI Cinaruco CO-WWF-310253-CS-INDV / Elaboración de línea base en Landscape management for género, análisis de vulnerabil connectivity and resilience i TF / B0740 Posterior Individual Open - National 14,320.00 0.00 Cancelado 2022-08-22 2022-08-22 2022-09-13 2022-10-27 2022-09-16 2022-09-20 2023-03-19 idad de actores y estrategia n priority biodiversity and ec para la transversalización del osystem services areas enfoque de género en el proy ecto. CO-WWF-320698-CS-INDV / Liderar la generación de herr amientas para la integración Effective integration of envir efectiva de las consideracion onmental considerations at es ambientales y escalas apr TF / B0740 Posterior Individual Direct - National 33,503.00 0.00 Firmado 2022-10-31 2022-11-07 2022-11-06 2022-11-11 2022-11-09 2022-11-15 2022-11-13 2023-03-17 2023-06-23 appropriate scales in territor opiadas en la planeación terr ial and sector planning itorial y sectorial basadas en la identificación de la Estruct ura Ecológica Principal (EEP) y la determinación CO-WWF-324425-CS-INDV / Elaboración de línea base en Landscape management for género, análisis de vulnerabil connectivity and resilience i TF / B0740 Posterior Individual Open - National 14,320.00 0.00 Firmado 2022-11-15 2022-11-09 2022-12-10 2023-02-03 2022-12-13 2023-02-03 2022-12-18 2023-02-17 2023-06-30 idad de actores y estrategia n priority biodiversity and ec para la transversalización del osystem services areas enfoque de género en el proy ecto. CO-WWF-310258-CS-INDV / Landscape management for Diagnóstico de conflicto soci connectivity and resilience i al y ambiental y caracterizaci TF / B0740 Posterior Individual Open - National 10,753.00 0.00 Cancelado 2022-08-26 2022-09-19 2022-09-23 2022-09-28 2023-06-30 n priority biodiversity and ec ón de actores e intereses co osystem services areas mo insumo para la consolida ción del centro regional CO-WWF-310256-CS-INDV / Consultoría para el mapeo de acciones de restauración en Landscape management for el territorio y municipios PDE connectivity and resilience i T, selección del área a resta TF / B0740 Posterior Individual Open - National 34,839.00 0.00 En ejecución 2022-12-02 2023-02-15 2022-12-26 2022-12-30 2023-01-04 2023-06-29 n priority biodiversity and ec urar, identificación de actore osystem services areas s clave y firma de acuerdos c on asociaciones de base para la implementación de accion es de restauración de CO-WWF-332963-CS-INDV / Coordinar la ejecución del Pr oyecto GEF 6 “Paisajes Integr Effective integration of envir ados Sostenibles de la Orino onmental considerations at TF / B0740 Posterior Individual Limited 20,533.00 0.00 Firmado 2022-12-30 2023-01-27 2023-01-04 2023-02-15 2023-01-25 2023-02-22 2023-03-01 2023-03-15 2023-06-30 quia”, supervisar y asegurar l appropriate scales in territor a integralidad de los aspecto ial and sector planning s técnicos, legales, administr ativos, operativos y logísticos del mismo, garantizando que se cumplan CO-WWF-310257-CS-INDV / Preparación, consulta e imple mentación de un Marco de G Landscape management for estión Ambiental y Social (M connectivity and resilience i GAS) para las actividades pre TF / B0740 Posterior Individual Open - National 21,838.00 0.00 Cancelado 2022-12-05 2022-12-27 2022-12-31 2023-01-04 2023-06-30 n priority biodiversity and ec vistas bajo 2.1.5 y 2.2. hacie osystem services areas ndo especial enfasis en Plan de gestion ambiental a todas los obras de infraestructura, Programa Manejo Integrado CO-WWF-343431-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i laboración del programa de TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-04-20 2023-05-12 2023-05-14 2023-06-06 2023-06-29 n priority biodiversity and ec manejo integrado de plagas osystem services areas y uso de agroquímicos del pr oyecto CO-WWF-343438-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-04-20 2023-05-12 2023-05-14 2023-05-18 2023-06-30 laboración del plan de manej n priority biodiversity and ec o sostenible de especies/pobl osystem services areas aciones silvestres. CO-WWF-342865-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-05-20 2023-06-11 2023-06-13 2023-06-17 2023-06-30 laboración del plan de gestió n priority biodiversity and ec n de la salud y la seguridad d osystem services areas e la comunidad CO-WWF-343456-CS-INDV / Consultor individual para la a ctualización del Marco de Pro Landscape management for ceso para la prevención o mi connectivity and resilience i Ejecución pendien TF / B0740 Posterior Individual Open - National 4,563.00 0.00 2023-04-20 2023-05-15 2023-05-18 2023-05-21 2023-06-30 tigación de restricciones en l n priority biodiversity and ec te os usos de la tierra o en el ac osystem services areas ceso a recursos naturales por la declaración de áreas prote gidas (MP) CO-WWF-343454-CS-INDV / Formulación de 2 proyectos que promueven la sostenibili Landscape management for dad en Orinoquia a través de connectivity and resilience i Ejecución pendien TF / B0740 Posterior Individual Limited 4,928.00 0.00 2023-05-15 2023-05-29 2023-06-03 2023-06-07 2023-06-30 la financiación de iniciativas n priority biodiversity and ec te de conservación - producción osystem services areas y presentación de los mismo s al sistema de regalías o a o tros mecanismos de financia miento. CO-WWF-342832-CS-INDV / Elaboración de un portafolio r Landscape management for egional (por mocaicos) de pr connectivity and resilience i Ejecución pendien oductos priorizados de la bio TF / B0740 Posterior Individual Open - National 6,160.00 0.00 2023-03-24 2023-04-17 2023-04-22 2023-04-27 2023-06-30 n priority biodiversity and ec te economía con un component osystem services areas e de innovación, ciencia y tec nología y con potencial de es calamiento comercial. CO-WWF-343449-CS-INDV / Project Management, Imple Apoyo de archivo adquisicion TF / B0740 mentation, Coordination, Co Posterior Individual Open - National 3,582.00 0.00 Firmado 2023-02-20 2023-02-13 2023-03-14 2023-03-31 2023-03-17 2023-03-31 2023-03-21 2023-04-11 2023-06-30 es mmunication, Monitoring an d Evaluation CO-WWF-343195-CS-INDV / Consultoría individual para la Effective integration of envir gobernanza territorial alrede onmental considerations at dor del agua y articulación d TF / B0740 Posterior Individual Limited 9,126.00 0.00 Cancelado 2023-04-20 2023-05-04 2023-05-12 2023-05-16 2023-06-30 appropriate scales in territor e los procesos de zonificació ial and sector planning n ambiental, POTs y agricultu ra, con base en Minambiente y en articulación con la UIP Page 7 CO-WWF-342864-CS-INDV / Consultoría individual para la Effective integration of envir articulación de componentes onmental considerations at TF / B0740 Posterior Individual Limited 9,126.00 0.00 Cancelado 2023-03-27 2023-04-10 2023-04-14 2023-04-20 2023-06-30 técnicos del proyecto entre l appropriate scales in territor as distintas dependencias del ial and sector planning Minambiente que participan en el proyecto CO-WWF-343443-CS-INDV / Effective integration of envir Consultoría para apoyar el pr onmental considerations at TF / B0740 Posterior Individual Limited 2,396.00 0.00 Cancelado 2023-04-17 2023-05-01 2023-05-06 2023-05-28 2023-06-30 oceso de fortalecimiento de c appropriate scales in territor apacidad de los periodistas a ial and sector planning mbientales CO-WWF-342867-CS-INDV / Landscape management for Consutor 1. Diseño e implem connectivity and resilience i entación de estrategia de soc TF / B0740 Posterior Individual Limited 5,476.00 0.00 Firmado 2023-03-01 2023-02-13 2023-03-15 2023-03-15 2023-03-18 2023-03-16 2023-03-22 2023-03-30 2023-06-30 n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), consultor a mbiental CO-WWF-329046-CS-INDV / Asegurar la coordinación e in tegralidad de los aspectos ge Landscape management for renciales, administrativos, té connectivity and resilience i cnicos, logísticos y legales qu TF / B0740 Posterior Individual Limited 20,534.00 0.00 Cancelado 2022-12-12 2022-12-27 2022-12-30 2023-01-03 2023-06-30 n priority biodiversity and ec e se requieran para la ejecuci osystem services areas ón del Proyecto, así como fo mentar con otras iniciativas c lave en territorio y hacer seg uimiento a la ejec CO-WWF-323895-CS-INDV / Prestar servicios profesionale s desde el ámbito ambiental Landscape management for para la caracterización y anál connectivity and resilience i Ejecución pendien TF / B0740 Posterior Individual Open - National 9,767.00 0.00 2023-03-27 2023-04-17 2023-04-20 2023-04-26 2023-06-30 isis de los conflictos socioam n priority biodiversity and ec te bientales, que contribuya a l osystem services areas a Implementación del Centro Regional de Diálogo Ambient al de la Orinoquía (CRDAO). CO-WWF-308856-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at idades y apoyar el diseño e i TF / B0740 Posterior Individual Open - National 14,000.00 0.00 Cancelado 2023-03-15 2023-04-09 2023-04-10 2023-04-11 2023-06-30 appropriate scales in territor mplementación de la estrate ial and sector planning gia de capacidades del proye cto. CO-WWF-323894-CS-INDV / Prestar servicios profesionale s desde el ámbito social para Landscape management for la caracterización y análisis d connectivity and resilience i Ejecución pendien TF / B0740 Posterior Individual Open - National 9,767.00 0.00 2023-03-27 2023-04-22 2023-04-24 2023-04-28 2023-06-30 e los conflictos socioambient n priority biodiversity and ec te ales, que contribuya a la Impl osystem services areas ementación del Centro Regio nal de Diálogo Ambiental de l a Orinoquía (CRDAO) CO-WWF-323898-CS-INDV / Coordinar la consolidación e i mplementación del Centro R Landscape management for egional de Diálogo Ambiental connectivity and resilience i Ejecución pendien de la Orinoquía (CRDAO), co TF / B0740 Posterior Individual Open - National 11,163.00 0.00 2023-03-27 2023-04-18 2023-04-20 2023-04-24 2023-06-30 n priority biodiversity and ec te mo plataforma de participaci osystem services areas ón regional para la construcc ión de alternativas dirigidas hacia la prevención y transfo rmación positiva CO-WWF-343434-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-05-20 2023-06-11 2023-06-13 2023-06-16 2023-06-30 laboración del plan de gestió n priority biodiversity and ec n ambiental obras de infraest osystem services areas ructura CO-WWF-344590-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at idades y apoyar el diseño e i TF / B0740 Posterior Individual Limited 6,160.00 0.00 Cancelado 2023-03-10 2023-03-24 2023-03-29 2023-04-02 2023-06-30 appropriate scales in territor mplementación de la estrate ial and sector planning gia de capacidades del proye cto. CO-WWF-352132-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at idades y apoyar el diseño e i TF / B0740 Posterior Individual Limited 14,000.00 0.00 En ejecución 2023-03-23 2023-06-20 2023-04-06 2023-06-02 2023-04-13 2023-04-16 2023-06-29 appropriate scales in territor mplementación de la estrate ial and sector planning gia de capacidades del proye cto. CO-WWF-343194-CS-INDV / Consultor individual experto Landscape management for en estándares ambientales y connectivity and resilience i Ejecución pendien sociales como enlace técnico TF / B0740 Posterior Individual Limited 9,126.00 0.00 2023-05-29 2023-05-31 2023-06-01 2023-06-02 2023-06-30 n priority biodiversity and ec te en la Subdirección de Educac osystem services areas ión y Participación del MinAm biente, con base en MinAmbi ente y en articulación con la UIP. Landscape management for CO-WWF-358787-CS-INDV / connectivity and resilience i Especialista en Gestion Socia TF / B0740 Posterior Individual Limited 2,522.00 0.00 En ejecución 2023-04-27 2023-06-15 2023-05-07 2023-05-10 2023-05-16 2023-06-15 n priority biodiversity and ec l/Estandares Sociales osystem services areas CO-WWF-343193-CS-INDV / Consultoría para el desarrollo Landscape management for e implementación de al men connectivity and resilience i os 3 procesos de ordenamien TF / B0740 Posterior Individual Limited 16,427.00 0.00 Cancelado 2023-03-15 2023-03-29 2023-04-03 2023-04-08 2023-06-30 n priority biodiversity and ec to pesquero que contengan l osystem services areas ineamientos técnicos de man ejo para recursos hidrobiológ icos en la cuenca del río Bita CO-WWF-368243-CS-INDV / Contratación de un asesor ex perto en adquisiciones bajo l Landscape management for as Regulaciones del Banco M connectivity and resilience i TF / B0740 Posterior Individual Direct - National 6,812.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-07 2023-07-09 2023-07-11 2024-01-07 undial con el fin de fortalecer n priority biodiversity and ec la capacidad del Proyecto en osystem services areas adquisiciones y apoyar la agil ización de la ejecución del Pl an de Adquisiciones CO-WWF-368352-CS-INDV / Liderar la implementación de Landscape management for las acciones relacionadas co connectivity and resilience i TF / B0740 Posterior Individual Direct - National 32,295.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n paisajes y sistemas product n priority biodiversity and ec ivos sostenibles contemplada osystem services areas s por el proyecto, en las área s de intervención del mismo. Page 8 CO-WWF-368346-CS-INDV / Orientar técnicamente y lider ar el desarrollo de las activid Landscape management for ades del proyecto Paisajes In connectivity and resilience i TF / B0740 Posterior Individual Direct - National 22,403.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 tegrados Sostenibles de la Or n priority biodiversity and ec inoquía (P167830) relacionad osystem services areas as con ecosistemas estratégi cos en el área de jurisdicción de Corporinoquia CO-WWF-368347-CS-INDV / Coordinar la ejecución del Pr oyecto GEF 6 “Paisajes Integr Landscape management for ados Sostenibles de la Orino connectivity and resilience i TF / B0740 Posterior Individual Direct - National 41,265.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 quia”, supervisar y asegurar l n priority biodiversity and ec a integralidad de los aspecto osystem services areas s técnicos, legales, administr ativos, operativos y logísticos del mismo CO-WWF-368348-CS-INDV / Recopilar y administrar los d atos e información necesaria Landscape management for s que permitan verificar peri connectivity and resilience i ódicamente los avances y cu TF / B0740 Posterior Individual Direct - National 40,241.00 0.00 En ejecución 2023-07-04 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec mplimiento de las actividade osystem services areas s, indicadores, objetivos y eje cución de los componentes d el Proyectoe identificar oport unidades para la mejora co CO-WWF-368354-CS-INDV / Enlace con las comunidades organizaciones locales para l Landscape management for a implementación del Proye connectivity and resilience i cto, aportar insumos para im TF / B0740 Posterior Individual Direct - National 18,445.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec plementación del (PPPI) la es osystem services areas trategia de FC y la estrategia de comunicaciones del Proye cto, de acuerdo a los (EAS) d el (EAS 7 y 10) CO-WWF-368313-CS-INDV / Apoyar implementación del p rograma de monitoreo y del Effective integration of envir portafolio proyectos de inves onmental considerations at tigación del Distrito Nacional TF / B0740 Posterior Individual Direct - National 18,668.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 appropriate scales in territor de Manejo Integrado Cinaruc ial and sector planning o y aportar al conocimiento d e sus valores objeto de conse rvación con los lineamientos institucionales de PNN CO-WWF-368355-CS-INDV / Coordinar la implementación del programa de monitoreo y Effective integration of envir del portafolio de proyectos d onmental considerations at e investigación para la toma TF / B0740 Posterior Individual Direct - National 18,030.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 appropriate scales in territor de decisiones en el Parque N ial and sector planning acional Natural El Tuparro, d e acuerdo plan de trabajo de estos programas y a los linea mientos de PNN CO-WWF-368353-CS-INDV / Apoyar operativa y logística mente el desarrollo de activi Effective integration of envir dades en campo planificadas onmental considerations at TF / B0740 Posterior Individual Direct - National 4,720.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 para la implementación de lo appropriate scales in territor s protocolos establecidos en ial and sector planning el programa de monitoreo y el portafolio de proyectos de investigación del PNN El Tup arro CO-WWF-368305-CS-INDV / Apoyar la implementación de la hoja de ruta para el registr Landscape management for o de Reservas Naturales de l connectivity and resilience i a Sociedad Civil en la Orinoq TF / B0740 Posterior Individual Direct - National 15,406.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec uia en los mosaicos priorizad osystem services areas os por el proyecto GEF Orino quia, en el Sistemas de Infor mación Geográfica -SIG y car tografía asociada. CO-WWF-368357-CS-INDV / Apoyar al PNN Tuparro en so cialización e implementación Landscape management for de su plan de manejo a travé connectivity and resilience i s de la orientación técnica en TF / B0740 Posterior Individual Direct - National 16,693.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec los procesos de gobernanza osystem services areas y relacionamiento con actore s estratégicos nivel local y re gional, incluyendo los diálogo s con los PI CO-WWF-368344-CS-INDV / Apoyar implementación de l a hoja de ruta para el registr Landscape management for o de Reservas Naturales de l connectivity and resilience i TF / B0740 Posterior Individual Direct - National 15,406.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 a Sociedad Civil en la Orinoq n priority biodiversity and ec uia, con énfasis en los mosai osystem services areas cos priorizados por el proyect o GEF Orinoquia y los lineami entos institucionales de PNN CO-WWF-368358-CS-INDV / Liderar la implementación de Landscape management for la estrategia de comunicacio connectivity and resilience i nes del Proyecto GEF Paisaje TF / B0740 Posterior Individual Direct - National 25,763.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec s Integrados Sostenibles de l osystem services areas a Orinoquia – GEF Orinoquia en articulación con la UIP y lo s socios del Proyecto. CO-WWF-368299-CS-INDV / Potenciar el posicionamiento y la divulgación de las accion Landscape management for es del Proyecto GEF, y contr connectivity and resilience i ibuir a su implementación, p TF / B0740 Posterior Individual Direct - National 17,875.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec or medio de la creación oport osystem services areas una de su logo su manual de marca lineamientos de imag en y el servicio de diseño par a de piezas gráficas CO-WWF-368309-CS-INDV / Orientar técnicamente y lider Landscape management for ar el desarrollo de las activid connectivity and resilience i TF / B0740 Posterior Individual Direct - National 25,002.00 0.00 En ejecución 2023-07-04 2023-07-05 2023-07-07 2023-07-09 2024-07-03 ades relacionadas con áreas n priority biodiversity and ec protegidas para la implement osystem services areas ación del Proyecto GEF Orino quia. Page 9 CO-WWF-368359-CS-INDV / Elaborar bases de datos que alimenten el sistema de moni Landscape management for toreo del Proyecto, apoyar en connectivity and resilience i el diseño de talleres para la s TF / B0740 Posterior Individual Direct - National 11,265.00 0.00 En ejecución 2023-07-04 2023-06-30 2023-07-05 2023-07-07 2023-07-09 2024-07-03 n priority biodiversity and ec istematización de informació osystem services areas n y/o hallazgos y gestionar el archivo en línea y elaborar fo rmularios en la herramienta Kobo Toolbox. CO-WWF-369957-CS-INDV / Apoyar técnicamente a la Dir ección de Ordenamiento Am Effective integration of envir biental Territorial de MinAmb onmental considerations at iente en el dise-ño participati TF / B0740 Posterior Individual Open - National 22,008.00 0.00 En ejecución 2023-07-07 2023-06-30 2023-07-29 2023-07-31 2023-08-04 2024-08-03 appropriate scales in territor vo y puesta en marcha de la ial and sector planning ruta de implementación del “ Programa territorial de orde- namiento y gobernanza alred edor del agua” priorizado par a CO-WWF-369964-CS-INDV / Apoyar a la Dirección de Bos ques, Biodiversidad y Servici Landscape management for os Ecosistémicos (DBBSE) del connectivity and resilience i Ministerio de Ambiente y Des TF / B0740 Posterior Individual Limited 22,008.00 0.00 En ejecución 2023-07-07 2023-06-30 2023-07-21 2023-07-26 2023-08-01 2024-07-31 n priority biodiversity and ec arrollo Sostenible, ejerciendo osystem services areas el rol de enlace y articulación entre las distintas depen-den cias del MinAmbiente con la UIP y los socios del CO-WWF-369968-CS-INDV / Desarrollar lineamientos técn icos de manejo para el recurs Effective integration of envir o pesquero en el mosaico Ra onmental considerations at msar Bita – RB e implementa TF / B0740 Posterior Individual Open - National 22,008.00 0.00 En ejecución 2023-07-07 2023-06-30 2023-07-29 2023-07-31 2023-08-23 2024-08-22 appropriate scales in territor r acciones para el ordenamie ial and sector planning nto en la pesca de consumo f amiliar y comercial, pesca or namental y deportiva con co nsideraciones de biodiversid ad Page 10