July 12, 2023 Mr. K. Manicka Raj Joint Secretary, (FB & ADB) Department of Economic Affairs (DEA) Ministry of Finance Government of India North Block New Delhi 110 001 Dear Mr. Manicka Raj: INDIA: Uttarakhand Water Supply Program for Peri-Urban Areas (Loan Number 8805-IN) Amendment No. 3 to the Loan Agreement We refer to the Loan Agreement between India (“Borrower”) and the International Bank for Reconstruction and Development (“Bank”) dated January 22, 2018, as amended to date, for the above- mentioned project (“Project”). We also refer to the letter from DEA dated June 20, 2023, requesting a restructuring of the Program. We are pleased to inform you that after due consideration the Bank has agreed to DEA’s request and proposes to amend the Loan Agreement as set forth below: 1. Section IV.B.5. of Schedule 2 is amended to read as follows: “The Closing Date is June 30, 2025.” 2. Schedule 4 (Disbursement Linked Indicators, Disbursement-Linked Results and Allocated Amount(s) Applicable to the Program) is revised to read as set forth in Annexure I to this letter. 3. Section I. 30 of the Appendix is amended to read as follows: “Efficiency of Water Supply Service Delivery means, for purposes of DLI#6, the system for water supply service delivery administrated by an Operator within a selected Peri-urban Area, which has met or exceeded the requirement to maintain: (a) Energy Intensity- measured in kilowatt hour per cubic meter of water pumped- not more than five percent threshold of the optimal benchmark level established for the water supply system by an energy auditor certified by the Bureau of Energy Efficiency; and/or (b) non-revenue water level below 30% for a water supply system, all as further detailed in the Program Operations Manual.” 4. The Results Framework of the Program is revised and is set forth in Annexure II to this letter. Except as specifically amended in this letter, all other terms and conditions of the Loan Agreement shall remain in full force and effect. India Country Office, 70 Lodi Estate, New Delhi 110 003, India P.O. Box 416, Phone: +911141479301 / +911149247601 Mr. K. Manicka Raj -2- July 12, 2023 The Bank will disclose this letter and related information in accordance with the World Bank’s Policy on Access to Information. By agreeing to this letter, the Borrower consents to the disclosure of this letter and related information. Please confirm your agreement to the foregoing by signing the form of confirmation set forth below, and returning one fully executed original of this letter to us and retaining one original for your records. This letter shall become effective as of the date of the countersignature, upon receipt by the Bank of the duly countersigned original of this letter. Yours sincerely, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Auguste Tano Kouame Country Director, India AGREED: INDIA By: _____________________________ Authorized Representative K. Manicka Raj Name: ____________________________ Joint Secretary, FB&ADB Title: _____________________________ 27-Jul-2023 Date: ____________________________ Mr. K. Manicka Raj -3- July 12, 2023 cc: Mr. Parameswaran Iyer, Executive Director (India), World Bank Mr. Rajeev Topno, Senior Advisor to Executive Director (India), World Bank Government of India Mr. Rajesh Kumar, Deputy Secretary, DEA, Ministry of Finance Mr. Ashok Kumar, Controller of Aid Accounts & Audit, DEA, Ministry of Finance Ms. Vini Mahajan, Secretary, Department of Drinking Water and Sanitation, Ministry of Jal Shakti Government of Uttarakhand Dr. S.S. Sandhu, Chief Secretary Mr. Arvind Singh Hyanki, Secretary, Department of Drinking Water and Sanitation Mr. R. Meenakshi Sundaram Secretary, Finance Department Ms. Iva Ashish Srivastava, Program Director, State Water and Sanitation Mission, Dehradun Mr. Uday Raj Singh, Managing Director, Uttarakhand Peyjal Nigam Ms. Neelima Garg, Chief General Manager, Uttarakhand Jal Sansthan Mr. K. Manicka Raj -4- July 12, 2023 Annexure I Revised Schedule 4 to Loan Agreement Disbursement-Linked Indicators, Disbursement-Linked Results and Allocated Amount(s) Applicable to the Program DLI Results to be Achieved/Indicative timeline for DLI achievement DLI Baseline Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 DLI#1: Number of Water Connections Providing Improved Water Supply Services in peri-urban Ya 0 0 0 0 9,519 26,860 87,757 87,757 areas (cumulative) Yb 0 0 0 0 0 22,446 93,314 268,828 (US$ 325 x Ya) + (US$ 28 x Yb) where: Disbursement formula Ya = Number of new water connections installed in any year and providing at least three (3) months of Improved Water Service; and Yb = Number of water connections installed previously and provided Improved Water Services for at least 150 days 1, during the previous six months (180 days). Yb will be evaluated every six months and thus would be eligible for two disbursements of US$ 28 in a year. Tentative allocated amount in US$ million (Total 0 0 0 3.09 6.27 21.77 6.57 US$ 37.7 m) DLI#2: Sustainability of water supply service Xa 0 0 0 13.6 22.1 35.86 delivery in peri-urban areas Xb 0 0 0 16 39.6 39.6 Disbursement formula (US$ 144,000 x Xa) + (US$ 144,000 x Xb) where Xa is the sum of scores of two sub-indicators of TSI: performance agreement (score: 1) and customer satisfaction (score 0.7). Xa will be measured annually and the score for each system could range between 0 and 1.7. Each system is eligible for one annual disbursement for Xa. Xb is the sum of scores of two sub-indicators of TSI: metering (score :1), O&M cost recovery (score 1). Xb will be measured quarterly and the score for each system could range between 0 and 2 in any year. Each system is eligible for disbursement starting from the first quarter of the year. If a water system is not able to get the maximum score (2.0) in the first quarter but improves the score in the subsequent quarters of the same year, it will be eligible to a payment for the incremental improvement. For example, if the performance of a water system in the first quarter is 1.5, it will be eligible for a payment of 1.5 x US$ 144,000 for the first quarter. If the performance of this system improves to 1.75 in the second quarter, it will be eligible for a disbursement equal to the incremental progress, i.e., 0.25 x US$ 144,000, for that quarter. If in the fourth quarter, its performance reaches 2.0, the incremental progress would justify a disbursement of 0.25 x US$ 144,000 for that system in Q4. Thus, this change provides a clear incentive to improve performance from one quarter to the next and will allow using the TSI score as a tool to monitor systems’ performance. The IVA will monitor this indicator quarterly, twice based on field visits and twice based on desk review. Tentative allocated Amount in US$ million (Total 0 0 0 0 4 6.35 13.48 US$23.83m) DLI #3: Improved Program policy in Peri-urban Policy No WSS policy Areas adopted state- for peri-urban wide by areas GoUK Allocated Amount in US$ million (Total US$ 14m) 14 1 In case the service area is formally declared disaster affected during the period, such days will be exempted. Mr. K. Manicka Raj -5- July 12, 2023 Results to be Achieved/Indicative timeline for DLI achievement DLI DLI Baseline Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 DLI#4: Strengthened Program M&E systems in M&E plan M&E plan M&E plan Peri-urban Areas M&E plan implemented implemented Existing M&E reviewed M&E plan implemented in an in an systems do not M&E plan M&E system identifying implemented cover peri-urban in at least 4 additional 3 additional 8 prepared designed future in 22 peri areas Peri-urban Peri-urban Peri-urban needs and urban areas Areas Areas (Total: Areas (Total: changes 7) 15) Tentative Allocated Amount in US$ million (Total 1 5 8 3 2 0.5 0.5 US$ 20m) DLI #5: Number of Approved Master Plans for No WSS policy 2 3 water supply in Peri-urban Areas Tentative Allocated Amount in US$ million (Total 12.17 0 US$ 12.17m) DLI #6: Efficiency of water supply service Za 0 20 20 delivery in peri-urban areas Zb 130 200 270 Disbursement formula (US$ 150,000 x Za) + (US$ 10,000 x Zb) where Za is the number of schemes that maintains the Energy Intensity (EI), which is defined as average amount of energy used in kilowatt hour to pump one cubic meter of water (kWh/m3), within 5% threshold of the benchmark level established for a water supply system by an energy auditor certified by the Bureau of Energy Efficiency, following the protocol detailed in the Program Operations Manual (POM). The amount to be disbursed on a quarterly basis will be the sum of scheme-wise eligible disbursements. The following incentive scale is proposed for each scheme per year, with an average incentive of US$ 150,000 per scheme per year: • US$ 200,000 for the schemes that maintain the EI at its benchmark level or better. • US$ 150,000 for the schemes that maintain the EI not more than 2.5% threshold of its benchmark level • US$ 100,000 for the schemes that maintain the EI not more than 5% threshold of its benchmark level. • No incentive for the schemes that is unable to maintain the EI within 5% threshold of its benchmark level. A water supply system will be eligible for incentive every year. A water system will be incentivized to improve performance from the previous quarter in the same year, but a system not improving EI level from the previous quarter in the same year will not be eligible for additional incentive. The incentive calculation is reset and starts again each year. Zb is the sum of scheme-wise eligible disbursements for the quarter. To simplify the quarterly calculation, and create a measurable target value, each quarterly payment will be obtained by multiplying the number of NRW percentage points eligible for payment by a multiplier corresponding to the number of US$ 10,000 increments applicable to the NRW percentage point reduced below 30%. The value reported will be the sum of weighted percentage point reduced in all water supply systems in O&M phase for at least three months. NRW will be calculated as the percentage of the net loss of water - measured as difference between the total amount of water leaving all the reservoirs in a water supply system and sum of meter readings of all metered connections in the system - divided by the total amount of water leaving from all the reservoirs in the system in a quarter. For each system, percentage reduction in NRW will be multiplied with weights to arrive at weighted Zb for each system as follows: - Weight of 1 for each percentage point of NRW reduction below 30% till 26% (Maximum 4) - Weight of 3 for each percentage point of NRW reduction from 25% till 21% (Maximum 15) - Weight of 5 for each percentage point of NRW reduction to 20% or below (Capped at 15) Thus if NRW is 28%, Zb would be (30-28)*1 = 2 (eligible disbursement of US$ 20,000 for this scheme) Mr. K. Manicka Raj -6- July 12, 2023 If NRW =25%, Zb will be (30-26)*1 + (26-25)*3 = 7 (eligible disbursement of US$ 70,000) If NRW = 18, Zb will be (30-26)*1 + (26-21)*3 + (21-18)*5 = 4 + 15 + 15 = 34 (US$ 340,000) The NRW will be rounded off to the nearest integer. NRW evolution will be monitored using actual number (not rounded) and the difference from one quarter to the next will be rounded to the nearest integer (0.4 is rounded to 0 and 0.5 is rounded to 1). A water supply system will be eligible for incentive every year if NRW is maintained below the contractual and policy target of 30%. A water system will be incentivized to improve performance from the previous quarter, but a system maintaining same or lower NRW level from the previous quarter in the same year will not be eligible for additional incentive. The incentive calculation is reset and starts again each year. Tentative Allocated Amount in US$ million (Total 1.3 5 5.7 US$ 12m) Mr. K. Manicka Raj -7- July 12, 2023 Annexure II Revised Results Framework of the Program India: Uttarakhand Water Supply Program for Peri-Urban Areas Program Development Objective: To increase access to improved water supply services in peri-urban areas in Uttarakhand Target Values Responsibili PDO Level Results Unit of Data Source/ Core Baseline Frequency ty for Data DLI Indicators Measure Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Methodology Collection PDO Indicator 1: (a) Number 0 0 38,076 134,300 436,800 436,800 Annual MIS Reports SWSM/SPSU, (a) Number of people of people from UJN and UJS, UJN receiving improved (cumulative) UJS; physical water supply services survey on in peri-urban areas; sample basis (b) Number of people receiving improved ☒ ☐ (b) Number 0 0 19,038 67,150 218,400 218,400 Annual MIS Reports SWSM/SPSU, water supply services of people – from UJN and UJS, UJN in peri-urban areas – female UJS; physical female (cumulative) survey on sample basis PDO Indicator 2: (a) Number 0 0 104,260 226,710 436,800 436,800 Annual MIS Reports (a)Number of of from UJN and SWSM/SPSU, beneficiaries beneficiaries UJS; physical UJS, UJN (cumulative) survey on (b) Number of sample basis beneficiaries- female ☒ (b) Number SWSM/SPSU, of 0 0 52,130 113,355 218,400 218,400 Annual UJS, UJN beneficiaries – female (cumulative) PDO Indicator 3: ☐ Number of 0 0 0 5 10 22 22 22 Annual Annual Report SWSM/SPSU Number of peri-urban Peri-urban of SWSM areas with improved areas policy, planning and ☒ M&E systems implemented PDO Indicator 4: ☐ ☐ Number of 0 0 0 0 0 4 11 20 Annual Annual Report SWSM/SPSU Number of schemes Peri-urban of SWSM that provided water areas supply services for at Mr. K. Manicka Raj -8- July 12, 2023 least one year with a minimum of sixteen (16) hours of supply per day for at least three hundred (300) days over the course of a Year Target Values Responsibility Core DLI Intermediate Unit of Data Source/ Baseline Frequency for Data Results Indicators Measure Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Methodology Collection Results Area 1: Increased access to improved water supply services in peri-urban areas Intermediate Number of 0 0 0 0 9,153 26,860 87,757 87,757 Annual MIS UJS, UJN, Results Indicator connections Reports SWSM/SPSU, 1.1: Number of (cumulative) from UJN and IVA water connections and UJS; providing improved ☐ ☒ physical water supply survey on services in peri- sample basis urban areas Intermediate TSI score 0 0 0 0 0 29.6 61.7 81.4 Annual MIS UJS, UJN, Results Indicator for water Reports SWSM/SPSU, 1.2: Sustainability supply from UJN and IVA of water supply ☐ ☒ systems in and UJS; service delivery in peri-urban physical peri-urban areas areas survey on sample basis Intermediate Percentage No report 0 0 70% 70% 70% Annual IVA Report IVA Results Indicator on 1.3: Customer customer satisfaction with ☐ ☒ satisfaction improved water supply services Intermediate Hours 0 0 0 0.5 0.5 0.5 Annual IVA Report IVA Results Indicator 1.4: Number of hours per day per ☐ ☐ household saved due to water connection – female Mr. K. Manicka Raj -9- July 12, 2023 Intermediate Number 0 0 0 0 0 7 11 16 Annual MIS UJS, UJN, Results Indicator Reports SWSM/SPSU, 1.5: Number of from UJN and IVA schemes that meet ☐ ☒ and UJS 100% O&M cost recovery Intermediate Number 0 0 0 0 0 7 11 20 Annual MIS UJS, UJN, Results Indicator Reports SWSM/SPSU, 1.6: Number of from UJN and IVA water supply and UJS systems that ☐ ☒ maintains efficiency of water supply service delivery Results Area 2: Improved policy, planning and M&E systems for water supply program for peri-urban areas Intermediate Actions to No specific Policy Annual Annual SWSM/SPSU Results Indicator improve water adopted Report of 2.1: Improved policy supply state- SWSM policy for water ☐ ☒ policy for wide by supply program in peri-urban GoUK peri-urban areas areas Intermediate ☒ Actions to Existing Define M&E M&E M&E M&E plan M&E Annual Annual SWSM/SPSU Results Indicator improve M&E M&E system plan plan implemente plan Report of 2.2: Strengthened M&E system is needs designed impleme impleme d in 15 Peri- implemen SWSM M&E systems for systems limited in and nted in nted in 7 urban ted in 22 water supply scope and prepare at least 4 Peri- Areas; plan peri program in peri- does not impleme Peri- urban reviewed urban urban areas cover per- ntation urban Areas identifying areas urban plan Areas future needs areas and change Intermediate ☐ ☒ No. of 0 0 2 3 3 3 3 3 Annual Annual SWSM/SPSU Results Indicator master- Report of 2.3: Number of plans SWSM approved master-plans (cumulative) for water supply in peri-urban areas Intermediate Annual No report Annual Annual Annual Annual Annual Annual Annual SWSM/SPSU Results Indicator Report on service report report report report report Report of 2.4: Annual report performan prepared prepare prepare prepared prepared SWSM on water services ☐ ☒ ce and d and d and and and performance in peri- published publishe publishe published published urban areas d d Mr. K. Manicka Raj -10- July 12, 2023 Intermediate Number 0 5 10 15 20 25 30 30 Annual MIS UJS, UJN, Results Indicator Reports SWSM/SPSU, 2.5: Number of from UJN and IVA training programs and UJS for women to ☐ ☐ enhance their capacity for involvement in water supply prog Intermediate percentage 2 2 5 8 15 20 20 20 Annual Annual SWSM/SPSU Results Indicator staff Report of 2.6: Percentage of SWSM women staff ☐ ☐ employed by sector agencies