PROCUREMENT PLAN (Textual Part) Project information: Burundi - Great Lakes Trade Facilitation and Integration Project] (P174814) Project Implementation agency: Burundi-Ministry of Finance, Budget and Privatization Date of the Procurement Plan: November 8, 2021 Period covered by this Procurement Plan: December 2017 – December 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables : Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is Not Applicable Works: is not Applicable PROCUREMENT Eastern and Southern Africa : Great Lakes Trade Facilitation and Integration Project PLAN General Information Country: Eastern and Southern Africa 2018-07-23 Bank’s Approval Date of the Original Procurement Plan: 2023-07-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174814 GPN Date: Project Name: Great Lakes Trade Facilitation and Integration Project Loan / Credit No: IDA / V1000, IDA / V3250, IDA / V0960, IDA / V3940, IDA / E0700, IDA / E0710 Burundi-Ministry of Finance, Budget and Privatization Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-BI-MOF-71885-CW-DIR / A Component 1. Improving Poli Passation de marc En cours d'e 2019-01-1 dduction d'eau au poste front IDA / V1000 cy and Regulatory Environm A priori Direct 28,600.00 0.00 2018-07-27 2018-08-01 2018-09-18 hé de gré à gré xécution 7 ière de Gatumba (Interventio ent for cross border trade n rapide) BI-BI-MOF-71888-CW-RFQ / Improving core trade infrastr Aménagement des Latrines e Single Stage - One E 2019-01-0 IDA / V1000 ucture and facilities in the b A posteriori Demande de prix Limited 11,000.00 10,186.24 Achevé 2018-08-11 2018-08-10 2018-10-02 2018-09-06 t douches au port de Rumon nvelope 4 order areas ge (Intervention urgente) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOF-170418-GO-RFQ / Implementation support, Co Single Stage - One E Acquisition des équipements IDA / V3250 mmunication, Monitoring, an A posteriori Demande de prix Limited 50,000.00 16,881.67 Signé 2020-07-25 2022-02-22 2020-09-19 2022-01-25 2020-10-30 nvelope de bureau (mobilier et photo d Evaluation copieuse) BI-BI-MOF-170426-GO-RFQ / Implementation support, Co Single Stage - One E Acquisition du matériel infor IDA / V3250 mmunication, Monitoring, an A posteriori Demande de prix Limited 30,000.00 42,446.89 Achevé 2020-07-12 2020-10-12 2020-08-28 2021-01-20 2020-10-09 2021-06-08 nvelope matique pour l'UGP d Evaluation BI-BI-MOF-170423-GO-RFB / Implementation support, Co Acquisition de Trois véhicules Single Stage - One E IDA / V3250 mmunication, Monitoring, an A posteriori Appel d'offres Open - National 250,000.00 0.00 Annulé 2020-07-15 2020-07-20 2020-08-31 2020-09-15 2020-10-09 2020-12-01 (One station wagon 4*4 et de nvelope d Evaluation ux camionnettes) BI-BI-MOF-319184-GO-RFB / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition des équipements IDA / E0700 plementation and Monitoring A posteriori Appel d'offres Open - National 50,000.00 0.00 2022-12-15 2022-12-20 2023-01-31 2023-03-02 2023-04-06 2023-06-15 nvelope exécution mobiliers pour l'UGP and Evaluation BI-BI-MOF-319187-GO-RFB / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition du matériel infor IDA / E0700 plementation and Monitoring A posteriori Appel d'offres Open - National 100,000.00 0.00 2022-12-15 2022-12-20 2023-01-31 2023-03-02 2023-04-06 2023-06-30 nvelope exécution matique pour l'UGP and Evaluation BI-BI-MOF-319182-GO-RFB / Component 4: Supporting Im Acquisition de 4 véhicules (1 Single Stage - One E IDA / E0700 plementation and Monitoring A posteriori Appel d'offres Open - National 350,000.00 0.00 Annulé 2022-11-15 2022-11-20 2023-01-01 2023-01-20 2023-02-17 2023-04-21 jeep station wagon ou équiva nvelope and Evaluation lent + 3 pick up) BI-BI-MOF-355350-GO-DIR / Acquisition de 4 véhicules (1 Component 4: Supporting Im Passation de marc Direct - Internation En cours d'ex station wagon 4X4 et 3 cami IDA / E0700 plementation and Monitoring A posteriori 300,000.00 0.00 2023-04-21 2023-06-02 2023-05-02 2023-03-25 2023-05-23 2023-11-19 hé de gré à gré al écution onnettes double cabine 4X4) and Evaluation auprès de l'agence des Natio ns Unies UNOPS BI-BI-MOF-357226-GO-RFB / Component 4: Supporting Im Open - Internationa Single Stage - One E En attente d' Acquisition d'un système de IDA / E0700 plementation and Monitoring A posteriori Appel d'offres 60,000.00 0.00 2023-04-28 2023-05-03 2023-06-14 2023-06-21 2023-07-26 2023-10-27 l nvelope exécution vidéoconférence and Evaluation BI-BI-MOF-360294-GO-RFB / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition de 14 batteries d' IDA / E0700 plementation and Monitoring A posteriori Appel d'offres Open - National 20,000.00 0.00 2023-05-19 2023-05-24 2023-07-05 2023-08-04 2023-09-08 2023-12-15 nvelope exécution un système de back-up élect and Evaluation rique BI-BI-MOF-367786-GO-RFQ / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition du mobilier de bu IDA / E0700 plementation and Monitoring A posteriori Demande de prix Limited 10,000.00 0.00 2023-07-05 2023-08-16 2023-10-20 nvelope exécution reau and Evaluation BI-BI-MOF-367788-GO-RFQ / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition du matériel infor IDA / E0700 plementation and Monitoring A posteriori Demande de prix Limited 15,000.00 0.00 2023-07-10 2023-08-21 2023-10-27 nvelope exécution matique pour l'UGP and Evaluation BI-BI-MOF-367790-GO-RFQ / Component 4: Supporting Im Single Stage - One E En attente d' Acquisition des climatiseurs IDA / E0700 plementation and Monitoring A posteriori Demande de prix Limited 18,000.00 0.00 2023-07-16 2023-08-25 2023-11-30 nvelope exécution de remplacement and Evaluation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/010/PFCGL-II/2018 / Con Improving core trade infrastr Sélection fondée s ception détaillée nécessaire Open - Internationa IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le 200,000.00 187,605.23 Achevé 2018-04-20 2018-04-16 2018-06-15 2018-09-13 2018-07-22 2018-07-05 2018-08-23 2018-09-28 2018-09-15 2018-10-05 2018-10-20 2018-10-23 2018-11-10 2018-02-15 2019-02-11 2019-11-06 pour le site du projet de cons l order areas coût truction du Port de Rumonge BI-BI-MOF-65618-CS-QCBS / Improving core trade infrastr Sélection fondée s Conception détaillée nécessa Open - Internationa IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le 200,000.00 0.00 Annulé 2018-07-05 2018-07-26 2018-08-31 2018-10-03 2018-10-19 2018-11-16 2018-12-07 2019-02-07 ire pour les sites du poste fro l order areas coût ntalier et du marché frontalie r de Gatumba Page 1 BI-BI-MOF-65723-CS-QCBS / Improving core trade infrastr Sélection fondée s Conception des infrastructur IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le Open - National 60,000.00 0.00 Annulé 2018-07-15 2018-08-10 2018-09-10 2018-10-15 2018-10-31 2018-11-21 2018-12-05 2019-03-05 es provisoires aux postes fro order areas coût ntaliers de Gatumba et au po rt de Rumonge BI-BI-MOF-71876-CS-QCBS / Improving core trade infrastr Sélection fondée s Conception détaillée nécessa Open - Internationa IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le 80,000.00 118,150.00 Achevé 2018-08-20 2018-11-19 2018-09-10 2018-11-20 2018-10-15 2019-01-24 2018-11-27 2019-01-15 2018-12-14 2019-01-25 2019-01-18 2019-04-15 2019-02-22 2020-08-20 2019-05-27 2021-07-05 ire pour les sites du poste fro l order areas coût ntière de Gatumba BI-BI-MOF-71879-CS-QCBS / Improving core trade infrastr Sélection fondée s Conception détaillée nécessa IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le Open - National 43,130.00 8,504.99 Achevé 2018-08-23 2018-09-07 2018-09-13 2018-09-12 2018-10-19 2018-11-08 2018-11-23 2019-01-15 2018-12-10 2019-10-28 2019-01-14 2019-10-28 2019-02-11 2019-03-20 2019-05-13 2020-04-22 ire pour le marché frontalier order areas coût de Gatumba BI-BI-MOF-96822-CS-LCS / A Implementation support, Co udit comptable et financier d Sélection au moin Open - Internationa IDA / V1000 mmunication, Monitoring, an A posteriori 25,000.00 13,684.46 Achevé 2019-01-28 2019-02-22 2019-02-18 2019-05-20 2019-04-03 2019-10-30 2019-05-01 2019-10-30 2019-05-31 2019-10-30 2019-07-05 2022-02-19 2019-08-09 2019-11-19 2020-02-05 2019-12-06 u PFCGL-II de la période allan dre coût l d Evaluation t du 07/08/2017 au 30/06/20 19 BI-BI-MOF-102626-CS-QCBS / Recrutement d'une firme de Improving core trade infrastr Sélection fondée s consultants pour le contrôle Open - Internationa IDA / V1000 ucture and facilities in the b A posteriori ur la qualité et le 100,000.00 0.00 Annulé 2019-03-14 2019-04-04 2019-05-17 2019-07-04 2019-07-19 2019-08-16 2019-10-08 2020-10-07 et la surveillance des travaux l order areas coût de construction du port de R umonge et provision de servi ces connexes BI-BI-MOF-203512-CS-CQS / Recrutement d'un bureau en charge de l'élaboration de l'é Improving core trade infrastr Sélection fondée s tude technique pour l'aména Open - Internationa IDA / V3250 ucture and facilities in the b A posteriori ur les qualification 80,000.00 0.00 Annulé 2020-12-01 2020-12-08 2021-01-14 2021-01-29 2021-02-11 2021-05-11 gement et le bitumage de la l order areas s des consultants RP 108: RN4(PK 14 + 8)/Gatu mba-Vuggizo/Frontière RDC ( 8km)+Etude d'Impact Enviro nnemental et Social (EIES) BI-BI-MOF-203525-CS-CQS / Improving core trade infrastr Sélection fondée s Etude de faisabilité sur les ch Open - Internationa IDA / V3250 ucture and facilities in the b A posteriori ur les qualification 200,000.00 0.00 Annulé 2020-12-15 2020-12-22 2021-02-04 2021-02-18 2021-03-04 2021-05-19 aînes de valeur des produits l order areas s des consultants agricoles, de pêche et de frui ts BI-BI-MOF-203488-CS-CQS / Etude pour la construction du Improving core trade infrastr Sélection fondée s marché transfrontalier de Ru IDA / V3250 ucture and facilities in the b A posteriori ur les qualification 50,000.00 0.00 Annulé 2020-11-27 2020-12-10 2021-01-23 2021-02-10 2021-03-17 2021-05-25 monge (incluant l'étude de re order areas s des consultants ntabilité et Etude d'Impact E nironnemental et Social (EIES )) BI-BI-MOF-204468-CS-QCBS / Recrutement d'un cabinet p Implementation of policy an our la réalisation de l'audit o d procedural reforms and ca Sélection fondée s pérationnel des administratio Open - Internationa IDA / V3250 pacity building to facilitate c A posteriori ur la qualité et le 150,000.00 0.00 Annulé 2020-12-21 2021-01-04 2021-02-03 2021-03-11 2021-03-30 2021-05-04 2021-05-31 2021-10-14 ns des services des frontière l ross-border trade in goods a coût s: étude sur l'efficacité et l'ef nd servic es ficience institutionnelle des a dministrations des services d es frontières BI-BI-MOF-207626-CS-CQS / Component 1. Improving Poli Sélection fondée s Etude pour la constructiondu En attente d'exéc IDA / V3250 cy and Regulatory Environm A posteriori ur les qualification Open - National 40,000.00 0.00 2021-03-08 2021-03-15 2021-04-28 2021-05-28 2021-06-11 2021-09-30 marché transfrontalier de Ru ution ent for cross border trade s des consultants monge incluant l'étude de re ntabilité BI-BI-MOF-207711-CS-CQS / Etude technique pour l'amén Component 1. Improving Poli Sélection fondée s Open - Internationa En cours d'exécut agement et le bitumage de l IDA / V3250 cy and Regulatory Environm A posteriori ur les qualification 55,000.00 0.00 2020-12-09 2021-01-27 2020-12-14 2021-02-15 2021-01-20 2022-02-21 2021-02-05 2021-02-15 2021-05-28 l ion a RP 108: RN4 (PK14 + 8)Gat ent for cross border trade s des consultants umba-Vugizo/frontière BI-BI-MOF-207744-CS-CQS / Recrutement d'un cabinet po Implementation of policy an ur la réalisation de l'audit op d procedural reforms and ca Sélection fondée s érationnel des administration Open - Internationa IDA / V3250 pacity building to facilitate c A posteriori ur les qualification 150,000.00 108,130.00 Signé 2021-01-15 2020-12-21 2021-01-29 2021-03-15 2021-03-14 2022-02-17 2021-04-13 2022-02-17 2021-05-04 2021-12-03 2021-10-31 s des services des frontières l ross-border trade in goods a s des consultants : étude sur l'efficacité et l'effi nd servic es cience institutionnelle des ad ministrations des services de s frontières BI-BI-MOF-207751-CS-CQS / Improving core trade infrastr Sélection fondée s Etude de faisabilité sur les ch Open - Internationa IDA / V3250 ucture and facilities in the b A posteriori ur les qualification 200,000.00 0.00 Annulé 2020-12-15 2020-12-21 2020-12-22 2021-01-26 2021-02-04 2022-02-18 2021-03-06 2021-03-19 2021-06-18 aînes de valeurs des produits l order areas s des consultants agricoles, de pêche et de frui ts BI-BI-MOF-221288-CS-LCS / Implementation support, Co Audit comptable et financier Sélection au moin Open - Internationa IDA / V0960 mmunication, Monitoring, an A posteriori 20,000.00 6,074.00 Achevé 2021-03-02 2021-03-01 2021-03-23 2021-05-10 2021-05-06 2022-02-15 2021-06-03 2022-02-15 2021-07-03 2022-02-21 2021-08-07 2022-02-21 2021-10-15 2021-12-07 2021-12-15 2021-12-25 du projet pour la période alla dre coût l d Evaluation nt du 01/07/2020 au 30/06/2 021 BI-BI-MOF-290037-CS-QCBS Component 3: Supporting Co Sélection fondée s / Recrutement d'un coonsulta Open - Internationa En cours d'exécut IDA / V3250 mmercialization of Selected A posteriori ur la qualité et le 200,000.00 0.00 2022-04-14 2022-04-13 2022-04-20 2022-07-12 2022-05-20 2023-03-22 2022-06-17 2022-07-11 2022-08-15 2022-09-19 2022-12-30 nt chargé de l'étude de l"état l ion Cross-border Value Chains coût des lieux des chaînes de vale ur de l'agribusiness BI-BI-MOF-303406-CS-QCBS / Recrutement d'un consultan Component 3: Supporting Co Sélection fondée s t chargé de l'élaboration du Open - Internationa IDA / V3940 mmercialization of Selected A posteriori ur la qualité et le 100,000.00 0.00 Annulé 2022-08-19 2022-10-04 2022-09-09 2022-10-23 2022-11-20 2022-12-20 2023-01-24 2023-02-28 2023-04-26 manuel de gestion des subve l Cross-border Value Chains coût ntions aux associations et co opératives des commerçants dans le cadre du PFCIGL BI-BI-MOF-319236-CS-QCBS / Recrutement d'un bureau p Sélection fondée s our l'élaboration d'une étude Component 2: Improving Cor Open - Internationa En cours d'exécut IDA / E0700 A posteriori ur la qualité et le 200,000.00 0.00 2022-11-02 2023-01-13 2022-11-09 2023-04-07 2022-12-23 2023-01-20 2023-02-10 2023-03-03 2023-03-31 2023-07-14 technique pour l'aménageme e Trade Infrastructure l ion coût nt et modernisation des infra structures du poste frontière de Vugizo-Kiliba BI-BI-MOF-207635-CS-CQS / Component 1. Improving Poli Sélection fondée s Etude pour l'aménagement e Open - Internationa IDA / V3250 cy and Regulatory Environm A posteriori ur les qualification 40,000.00 0.00 Annulé 2020-12-11 2020-12-22 2020-12-18 2021-01-26 2021-01-22 2021-02-21 2021-03-05 2021-05-17 t la modernisation du poste-f l ent for cross border trade s des consultants rontière Vugizo-Kiliba Page 2 BI-BI-MOF-203504-CS-CQS / Recrutement d'un bureau ch argé de l'élaboration de l'étu Improving core trade infrastr Sélection fondée s de pour l'aménagement et m IDA / V3250 ucture and facilities in the b A posteriori ur les qualification Open - National 60,000.00 0.00 Annulé 2020-11-18 2020-11-25 2021-01-08 2021-02-07 2021-02-19 2021-04-26 odernisation poste-frontière order areas s des consultants Vugizo-Kiliba + Etude d'Imp act Environnemental et Socia l (EIES) BI-BI-MOF-335979-CS-QCBS / Recrutement d'un bureau d' un bureau pour la réalisation Sélection fondée s Component 2: Improving Cor Open - Internationa En cours d'exécut de la réalisation d'une étude IDA / E0700 A posteriori ur la qualité et le 100,000.00 0.00 2023-01-20 2023-04-04 2023-01-25 2023-06-05 2023-02-17 2023-04-03 2023-04-14 2023-05-12 2023-06-09 2023-09-15 e Trade Infrastructure l ion de rentabilité économique et coût l'adaptation de l'étude techni que pour la construction du marché transfrontalier de Ga tumba BI-BI-MOF-335987-CS-QCBS / Recrutement d'un bureau p Sélection fondée s Component 2: Improving Cor Open - Internationa En cours d'exécut our la surveillance/contrôle d IDA / E0700 A posteriori ur la qualité et le 700,000.00 0.00 2023-01-20 2023-01-18 2023-01-27 2023-04-05 2023-02-17 2023-04-04 2023-04-14 2023-05-05 2023-05-29 2024-05-28 e Trade Infrastructure l ion es travaux de construction d coût u poste frontière de Gatumb a-Kavimvira BI-BI-MOF-335989-CS-QCBS / Recrutement d'un bureau p our la surveillance/contrôle d Sélection fondée s Component 2: Improving Cor Open - Internationa En cours d'exécut es travaux de construction d IDA / E0700 A posteriori ur la qualité et le 1,800,000.00 0.00 2023-01-24 2023-01-19 2023-01-31 2023-02-23 2023-02-21 2023-04-05 2023-04-19 2023-05-05 2023-05-31 2026-05-29 e Trade Infrastructure l ion u port de Rumonge et provisi coût on de services connexes y co mpris l'actualisation des étud es techniques BI-BI-MOF-338261-CS-QCBS / Recrutement d'un bureau c Sélection fondée s hargé de l'élaboration de l'ét Component 2: Improving Cor Open - Internationa En cours d'exécut IDA / E0710 A posteriori ur la qualité et le 200,000.00 0.00 2023-02-15 2023-01-25 2023-02-21 2023-03-30 2023-03-30 2023-05-10 2023-05-26 2023-06-30 2023-07-21 2023-10-30 ude technique d'aménageme e Trade Infrastructure l ion coût nt et de bitumage de la RP 1 08: RN 4/Gatumba - Vugizo/fr ontière RDC (8 km) BI-BI-MOF-338268-CS-QCBS / Recrutement d'une firme ch Component 3: Supporting Co Sélection fondée s Open - Internationa En cours d'exécut argée de la gestion du méca IDA / E0700 mmercialization of Selected A posteriori ur la qualité et le 300,000.00 0.00 2023-02-20 2023-03-13 2023-02-27 2023-03-30 2023-04-05 2023-05-12 2023-05-26 2023-06-30 2023-07-21 2025-07-18 l ion nisme de subventions aus as Cross-border Value Chains coût sociations et coopératives de commerçants BI-BI-MOF-357217-CS-QCBS / Recrutement d'un bureau d' Sélection fondée s Component 2: Improving Cor Open - Internationa En cours d'exécut étude pour l'aménagement e IDA / E0700 A posteriori ur la qualité et le 400,000.00 0.00 2023-04-24 2023-04-26 2023-04-26 2023-06-12 2023-06-02 2023-07-07 2023-07-28 2023-08-25 2023-09-22 2023-12-29 e Trade Infrastructure l ion t modernisation des postes fr coût ontières de Buganda et Mpar ambo BI-BI-MOF-362749-CS-QCBS / Recrutement d'une ONG po Component 4: Supporting Im Sélection fondée s Open - Internationa En cours d'exécut ur la mise en oeuvre des PAR IDA / E0700 plementation and Monitoring A posteriori ur la qualité et le 100,000.00 0.00 2023-05-31 2023-05-29 2023-06-07 2023-07-14 2023-08-11 2023-08-25 2023-09-22 2023-10-20 2024-06-28 l ion du port de Rumonge et du po and Evaluation coût ste frontière de Gatumba BI-BI-MOF-365295-CS-QCBS / Recrutement d'un bureau c Sélection fondée s hargé de l'étude d'aménage Component 2: Improving Cor Open - Internationa En cours d'exame IDA / E0700 A posteriori ur la qualité et le 200,000.00 0.00 2023-06-12 2023-06-19 2023-06-20 2023-08-03 2023-08-31 2023-09-22 2023-10-20 2023-11-17 2024-02-28 ment et de bitumage des voi e Trade Infrastructure l n coût es d'accès aux postes frontiè res de Buganda et Mparamb o BI-BI-MOF-367793-CS-LCS / Component 4: Supporting Im Sélection au moin En cours d'exécut Recrutement d'un cabinet d' IDA / E0700 plementation and Monitoring A posteriori Open - National 15,000.00 0.00 2023-06-30 2023-06-27 2023-07-10 2023-07-19 2023-08-16 2023-08-23 2023-09-08 2023-09-29 2023-10-27 2024-10-26 dre coût ion audit interne du projet and Evaluation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/002/PFCGL-II/2017 / Ela boration du Cadre de Politiqu e des Peuples Autochtones ( Improving core trade infrastr En attente d'exéc CPPA), du Plan en faveur des IDA / V1000 ucture and facilities in the b A posteriori Individuel Open 30,000.00 0.00 2017-12-11 2018-01-20 2018-02-06 2018-02-09 2018-03-18 ution populations autochtones (PP order areas A) du Cadre de Politique de R éinstallation (CPR) pour les a ctivitésdu Projet GLTFP BI-BI-MOF-65639-CS-INDV / Improving core trade infrastr IDA / V1000 A posteriori Individuel Open 50,000.00 0.00 Annulé 2018-07-27 2018-09-05 2018-09-19 2018-10-04 2018-12-18 Etude sur la logistique et le tr ucture and facilities in the b ansport order areas BI-BI-MOF-65645-CS-INDV / Implementation of policy an Enquête auprès des commer d procedural reforms and ca çants des associations profes IDA / V1000 pacity building to facilitate c A posteriori Individuel Open 60,000.00 0.00 Annulé 2018-08-05 2018-09-12 2018-09-26 2018-10-10 2019-01-10 sionnelles et évaluation des ross-border trade in goods a besoins pour le renforcement nd servic es des capacités BI-BI-MOF-71086-CS-INDV / Implementation support, Co En attente d'exéc Consultant Expert en Sauveg IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 40,800.00 0.00 2018-07-24 2018-10-28 2018-11-20 2018-11-23 2019-05-19 ution ardes Environnementales et d Evaluation Sociales BI-BI-MOF-71104-CS-INDV / Improving core trade infrastr Elaboration du Cadre de Gest En attente d'exéc IDA / V1000 ucture and facilities in the b A posteriori Individuel Open 16,210.00 0.00 2018-07-24 2018-08-31 2018-09-24 2018-09-25 2018-11-01 ion Environnementale et Soci ution order areas ale (CGES) du Projet GLTFP DMI/006/PFCGL-II/2018 / Con Implementation support, Co En attente d'exéc sultant Responsable en Suivi- IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 40,800.00 0.00 2018-07-24 2018-09-16 2018-12-02 2018-12-03 2019-12-02 ution Evaluation d Evaluation DMI/004/PFCGL-II/2018 / Con Implementation support, Co En cours d'exécut sultant Expert en Facilitation IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 40,800.00 0.00 2018-01-26 2018-01-25 2018-05-25 2018-05-25 2018-05-28 2019-05-27 ion du Commerce d Evaluation BI-BI-MOF-65604-CS-INDV / Implementation support, Co En attente d'exéc Consultant Responsable Adm IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 40,800.00 0.00 2018-06-07 2018-07-10 2018-07-17 2018-07-23 2019-07-22 ution inistratif et Financier d Evaluation DMI/003/PFCGL-II/2018 / Con Implementation support, Co En cours d'exame sultant Coordinateur du proje IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 48,000.00 0.00 2018-01-26 2018-01-19 2018-05-10 2018-05-10 2018-05-14 2019-05-13 n t d Evaluation Page 3 DMI/007/PFCGL-II/2018 / Con Implementation support, Co En attente d'exéc sultant Responsable Passatio IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 40,800.00 0.00 2018-01-26 2018-05-25 2018-05-28 2018-05-28 2019-05-27 ution n des Marchés d Evaluation Implementation support, Co DMI/009/PFCGL-II/2018 / Con En cours d'exame IDA / V1000 mmunication, Monitoring, an A posteriori Individuel Open 24,000.00 0.00 2018-01-26 2018-06-08 2018-06-05 2018-06-07 2018-07-01 2019-06-30 sultant Comptable du projet n d Evaluation BI-BI-MOF-65720-CS-INDV / Implementation of policy an Enumérateurs et Superviseur d procedural reforms and ca En cours d'exécut s pour l'enquête de base et p IDA / V1000 pacity building to facilitate c A posteriori Individuel Open 16,631.00 0.00 2018-06-27 2018-11-05 2018-08-06 2018-08-20 2018-08-31 2018-10-31 ion our la collecte des données s ross-border trade in goods a ur le commerce transfrontali nd servic es er BI-BI-MOF-170399-CS-INDV / Recrutement d'un consultant Improving service delivery b pour réaliser l'identification e IDA / V3250 y agencies at the border/por A posteriori Individuel Open 30,000.00 43,617.38 Achevé 2020-08-25 2020-11-05 2020-10-13 2022-02-21 2020-11-03 2022-02-21 2020-12-08 2021-01-13 2021-02-13 2021-04-24 t la cartographie des associat t and citizen engagement ions des commerçants transf rontaliers BI-BI-MOF-170412-CS-INDV / Implementation support, Co Recrutement d'un consultant En attente d'exéc IDA / V3250 mmunication, Monitoring, an A posteriori Individuel Open 20,000.00 0.00 2020-07-31 2020-09-18 2020-10-09 2020-11-13 2021-01-22 en charge de l'élaboration d' ution d Evaluation une stratégie de communicat ion du projet BI-BI-MOF-182061-CS-INDV / Implementation support, Co En cours d'exécut Conception et réalisation du IDA / V3250 mmunication, Monitoring, an A posteriori Individuel Open 20,000.00 0.00 2020-08-24 2023-02-21 2020-10-12 2020-11-02 2020-12-07 2021-01-29 ion site web PFCGL-II d Evaluation BI-BI-MOF-182703-CS-CDS / Implementation support, Co Sélection de cons Audit comptable et financier IDA / V3250 mmunication, Monitoring, an A posteriori ultants par entent Direct 20,000.00 10,844.85 Achevé 2020-08-04 2020-07-15 2020-08-14 2020-08-11 2020-10-09 2020-11-03 2020-11-30 2020-12-29 du projet (exercice de juillet d Evaluation e directe 2019 à juin 2020) BI-BI-MOF-203519-CS-INDV / Improving core trade infrastr Recrutement d'un consultant IDA / V3250 ucture and facilities in the b A posteriori Individuel Open 20,000.00 0.00 Annulé 2020-11-17 2020-12-29 2021-01-12 2021-02-09 2021-03-15 pour la mise à jour du CGES order areas et du CPR BI-BI-MOF-207798-CS-INDV / Component 1. Improving Poli En cours d'exécut Recrutement d'un expert en i IDA / V3250 cy and Regulatory Environm A posteriori Individuel Open 40,000.00 0.00 2020-12-09 2020-12-18 2021-01-20 2022-01-06 2021-02-03 2022-01-11 2021-02-08 2022-01-31 ion nfrastructures ent for cross border trade BI-BI-MOF-207950-CS-CDS / Entente Directe avec le Cons Improving core trade infrastr Sélection de cons ultant Dr NIYONKURU Charles IDA / V3250 ucture and facilities in the b A posteriori ultants par entent Direct 15,000.00 0.00 Annulé 2020-12-10 2020-12-14 2020-12-24 2021-01-29 pour l'Elaboration du CGES + order areas e directe Plan de Gestion des Pestes et Pesticides (PGPP) BI-BI-MOF-207964-CS-CDS / Entente Directe avec le Cons ultant CIMPAYE Joachim pour Improving core trade infrastr Sélection de cons la Mise à jour des rapports d'I IDA / V3250 ucture and facilities in the b A posteriori ultants par entent Direct 10,000.00 0.00 Annulé 2020-12-12 2020-12-22 2021-01-06 2021-02-15 mpact Environnemental et S order areas e directe ocial (EIES) pour la constructi on du Port de Rumonge et la construction du marché de G atumba BI-BI-MOF-207970-CS-CDS / Entente Directe avec le Cons Improving core trade infrastr Sélection de cons ultant Dr MISAGO Aloispour l IDA / V3250 ucture and facilities in the b A posteriori ultants par entent Direct 10,000.00 0.00 Annulé 2020-12-18 2020-12-28 2021-01-13 2021-02-19 a Préparation du Plan dActio order areas e directe n de Réinstallation (PAR) des Personnes affectées pour la c onstruction du Port de Rumo nge BI-BI-MOF-225823-CS-CDS / Entente Directe avec Monsie ur NDIKUMANA Denis pour l'a Improving core trade infrastr Sélection de cons ctualisation/mise à jour des E IDA / V0960 ucture and facilities in the b A posteriori ultants par entent Direct 10,000.00 9,834.66 Achevé 2021-03-24 2021-03-24 2021-03-26 2021-03-25 2021-04-02 2021-03-31 2021-05-03 2021-10-20 IES du sous-projet de constru order areas e directe ction du port de Rumonge et celui de construction du mar ché transfrontalier de Gatum ba BI-BI-MOF-239602-CS-CDS / Implementation support, Co Sélection de cons Entente Directe avec le bure IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 79,400.00 70,447.09 Signé 2021-06-22 2021-06-17 2021-07-02 2022-02-15 2021-07-30 2021-10-06 2022-01-14 au GETA pour pour l'élaborat d Evaluation e directe ion du CGES du PFCIGL BI-BI-MOF-207962-CS-CDS / Entente Directe avec le Cons ultant BARAKAMFITIYE Tharci Improving core trade infrastr Sélection de cons sse pour l'Elaboration du Cad IDA / V3250 ucture and facilities in the b A posteriori ultants par entent Direct 15,000.00 0.00 Annulé 2020-12-11 2020-12-21 2021-01-12 2021-02-16 re de Politique de Réinstallati order areas e directe on (CPR) + Cadre de Planifica tion en faveur des Peuples A utochtones (CPPA) BI-BI-MOF-246029-CS-CDS / Implementation support, Co Sélection de cons Entente directe avec Madam IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 26,000.00 33,246.84 Signé 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-05-12 2021-11-01 e Clotilde NIZIGAMA, Coordo d Evaluation e directe nnateur du projet pour l'Actu alisation du contrat BI-BI-MOF-246032-CS-CDS / Entente directe avec Mr BAT Implementation support, Co Sélection de cons UNGWANAYO Léonidas, Resp IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 21,600.00 30,476.27 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-07-27 2022-04-30 onsable Administratif et Fina d Evaluation e directe ncier pour l'Actualisation du contrat BI-BI-MOF-246034-CS-CDS / Entente directe avec Monsie Implementation support, Co Sélection de cons ur Cyprien BARAMBONERANY IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 24,700.00 27,710.10 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-05-29 2022-04-30 E, Responsable de la Passati d Evaluation e directe on des Marchés pour l'actuali sation du contrat BI-BI-MOF-246037-CS-CDS / Entente directe avec Mr BIRE Implementation support, Co Sélection de cons HANISENGE Adophe, Expert IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 24,800.00 30,224.40 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-05-29 2022-04-30 en Facilitation du Commerce d Evaluation e directe et Secteur Privé pour l'actuali sation du contrat BI-BI-MOF-246040-CS-CDS / Entente directe avec Madam Implementation support, Co Sélection de cons e KABURA Marie Rose, Respo IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 19,800.00 27,705.70 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-07-21 2022-04-30 nsable des Sauvegardes envi d Evaluation e directe ronnementales pour l'actuali sation du contrat BI-BI-MOF-246044-CS-CDS / Implementation support, Co Sélection de cons Entente directe avec Mr Césa IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 19,800.00 27,705.70 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-06-08 2022-04-30 r Abel MAYELE pour l'actualis d Evaluation e directe ation du contrat Page 4 BI-BI-MOF-246046-CS-CDS / Implementation support, Co Sélection de cons Entente directe avec Madam IDA / V0960 mmunication, Monitoring, an A posteriori ultants par entent Direct 17,700.00 16,623.42 Signé 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-07-01 2022-04-30 e NIYOKINDI Consolée pour l' d Evaluation e directe actualisation du contrat BI-BI-MOF-253433-CS-INDV / Implementation support, Co Réalisation d'une enquête de IDA / V0960 mmunication, Monitoring, an A posteriori Individuel Open 45,000.00 41,703.71 Signé 2021-09-17 2021-09-17 2021-10-29 2022-02-15 2021-11-05 2022-02-15 2021-11-16 2021-12-16 2022-05-15 base dans la zone du PFCIGL d Evaluation BI-BI-MOF-257902-CS-INDV / Entente Directe avec Monsie ur Denis NDIKUMANA pour l'É Component 2: Improving Cor laboration du PAR pour la co IDA / V3250 A posteriori Individuel Direct 12,000.00 14,557.51 Signé 2021-10-25 2021-11-22 2021-11-04 2022-02-01 2021-11-15 2022-02-01 2021-11-21 2021-12-14 2021-12-31 e Trade Infrastructure nstruction du port de Rumon ge et l’actualisation du PAR p our le poste frontière de Gat umba BI-BI-MOF-262743-CS-CDS / Entente Directe avec la firme CHEMAS pour l'élaboration d Sélection de cons Component 2: Improving Cor e l'EIES/PGES et du PAR de la IDA / V3250 A posteriori ultants par entent Direct 420,000.00 0.00 Annulé 2021-11-15 2021-11-19 2022-01-14 2022-02-28 e Trade Infrastructure RN3, projet pilote TNM, du Bo e directe ulevard NDADAYE et du Cont ournement Ouest de Bujumb ura pour le PRT BI-BI-MOF-262749-CS-CDS / Entente Directe avec la firme CHEMAS pour l'assistance te chnique en sauvegardes envi Sélection de cons Component 2: Improving Cor ronnementales et sociales et IDA / V3250 A posteriori ultants par entent Direct 300,000.00 0.00 Annulé 2021-11-15 2021-11-21 2022-01-05 2022-03-15 e Trade Infrastructure la préparation des dossiers d e directe u Cadre Environnemental et Social pour PRT et le contrô le qualité des documents de sauvegarde du PFCIGL BI-BI-MOF-303392-CS-CDS / Entente Directe avec Mr NIVY Component 4: Supporting Im Sélection de cons En cours d'exécut INTIZO Scarie pour l'élaborati IDA / V3940 plementation and Monitoring A posteriori ultants par entent Direct 50,000.00 0.00 2022-07-13 2022-08-11 2022-07-23 2022-10-18 2022-08-30 2022-10-29 ion on des manuels de procédur and Evaluation e directe es et d'execution du Projet BI-BI-MOF-303396-CS-INDV / Component 2: Improving Cor En attente d'exéc Etude de rentabilité du marc IDA / V3940 A posteriori Individuel Open 50,000.00 0.00 2022-08-15 2022-10-03 2022-10-24 2022-11-28 2023-01-27 e Trade Infrastructure ution hé transfrontalier de Gatumb a BI-BI-MOF-303470-CS-INDV / Component 4: Supporting Im En cours d'exécut Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring A posteriori Individuel Open 3,500.00 0.00 2022-07-29 2022-08-24 2022-09-16 2022-10-07 2022-11-11 2023-02-10 ion en communication and Evaluation BI-BI-MOF-303472-CS-INDV / Component 4: Supporting Im En cours d'exécut Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring A posteriori Individuel Open 4,000.00 0.00 2022-08-04 2022-09-12 2022-09-22 2022-10-13 2022-11-17 2023-02-16 ion en VBG and Evaluation BI-BI-MOF-303474-CS-INDV / Component 4: Supporting Im En cours d'exécut Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring A posteriori Individuel Open 4,000.00 0.00 2022-08-10 2022-09-06 2022-09-28 2022-10-19 2022-11-23 2023-02-22 ion en Développement social and Evaluation BI-BI-MOF-304400-CS-INDV / Actualisation de l'étude d'im Component 4: Supporting Im pact environnemental et soci En cours d'exécut IDA / V3250 plementation and Monitoring A posteriori Individuel Open - National 15,000.00 0.00 2022-07-19 2022-08-09 2022-09-06 2022-09-27 2022-11-01 2022-12-06 al (EIES) pour la construction ion and Evaluation et modernisation du poste fr ontière de Gatumba-Kavimvir a BI-BI-MOF-312567-CS-CDS / Component 4: Supporting Im Sélection de cons Entente Directe avec le cabin Direct - Internation En cours d'exécut IDA / V3250 plementation and Monitoring A posteriori ultants par entent 15,000.00 0.00 2022-09-06 2022-09-19 2022-09-16 2022-10-14 2022-11-11 2022-12-15 et pour l'audit comptable et f al ion and Evaluation e directe inancier exercice de juillet 20 21 à juin 2022 BI-BI-MOF-319230-CS-INDV / Recrutement d'un Consultant pour l'élaboration d'une étud Component 1. Improving Poli e sur les natures et causes d En attente d'exéc IDA / E0700 cy and Regulatory Environm A posteriori Individuel Open - National 30,000.00 0.00 2022-12-15 2023-02-02 2023-02-23 2023-03-16 2023-05-30 es conflits entre les administr ution ent for cross border trade ations des frontières et les co mmerçants, entre les service s ou entre les commerçants au niveau des frontières ciblé es du projet BI-BI-MOF-319247-CS-INDV / Réalisation de l'Etude d'Impa ct Environnemental et Social Component 2: Improving Cor En attente d'exéc IDA / E0700 A posteriori Individuel Open - National 25,000.00 0.00 2023-04-20 2023-06-08 2023-06-22 2023-07-13 2023-09-22 (EIES) des travaux d'aménag e Trade Infrastructure ution ement et modernisation des i nfrastructures du poste fronti ère de Vugizo-Kiliba BI-BI-MOF-319248-CS-INDV / Recrutement d'un consultant pour la préparation du plan d Component 2: Improving Cor En attente d'exéc 'action de réinstallation des t IDA / E0700 A posteriori Individuel Open - National 30,000.00 0.00 2023-04-27 2023-06-08 2023-06-22 2023-07-13 2023-09-29 e Trade Infrastructure ution ravaux d'aménagement et m odernisation des infrastructur es du poste frontière de Vugi zo-Kiliba BI-BI-MOF-335993-CS-INDV / Component 4: Supporting Im En cours d'exécut Recrutement d'un assistant e IDA / E0700 plementation and Monitoring A posteriori Individuel Open - National 36,000.00 0.00 2023-01-18 2023-01-19 2023-02-15 2023-03-08 2023-03-30 2024-03-29 ion n passation des marchés and Evaluation BI-BI-MOF-335996-CS-INDV / Component 4: Supporting Im En cours d'exécut Recrutement d'un assistant c IDA / E0700 plementation and Monitoring A posteriori Individuel Open - National 36,000.00 0.00 2023-01-26 2023-01-30 2023-03-01 2023-03-15 2023-04-05 2024-04-04 ion omptable and Evaluation BI-BI-MOF-344280-CS-QCBS Component 4: Supporting Im / Recrutement d'un bureau p Open - Internationa IDA / E0700 plementation and Monitoring A posteriori Individuel 100,000.00 0.00 Annulé 2023-03-31 2023-04-03 2023-05-03 2023-05-24 2023-06-21 2023-09-29 our effectuer un audit techni l and Evaluation que du Bureau Burundais de Normalisation (BBN) BI-BI-MOF-353142-CS-INDV / Recrutement d'un consultant Component 2: Improving Cor En cours d'exécut individuel pour la conception IDA / E0700 A posteriori Individuel Open - National 20,000.00 0.00 2023-03-31 2023-04-03 2023-05-03 2023-05-17 2023-06-16 2023-08-16 e Trade Infrastructure ion des infrastructures provisoire s aux postes frontières de Bu ganda et Mparambo Page 5 BI-BI-MOF-360296-CS-CDS / Entente Directe avec le cabin Component 4: Supporting Im Sélection de cons Direct - Internation En cours d'exécut et ABC pour l'audit comptabl IDA / E0700 plementation and Monitoring A posteriori ultants par entent 15,000.00 0.00 2023-05-12 2023-05-20 2023-05-22 2023-05-29 2023-07-26 2023-11-15 al ion e et financier de l'exercice de and Evaluation e directe juillet 2022 à juin 2023 BI-BI-MOF-364126-CS-INDV / RECRUTEMENT D'UN CONSUL TANT CHARGE D'EFFECTUER Component 3: Supporting Co UN AUDIT TECHNIQUE ET INS Open - Internationa En cours d'exécut IDA / E0700 mmercialization of Selected A posteriori Individuel 100,000.00 0.00 2023-06-05 2023-06-05 2023-07-17 2023-07-31 2023-09-04 2023-11-17 TITUTIONNEL DU BUREAU BU l ion Cross-border Value Chains RUNDAIS DE NORMALISATIO N ET CONTROLE DE LA QUALI TE (BBN) EN MATIERE DE CE RTIFICATION BI-BI-MOF-365300-CS-INDV / Component 4: Supporting Im Recrutement d'un consultant En attente d'exéc IDA / E0700 plementation and Monitoring A posteriori Individuel Open - National 25,000.00 0.00 2023-07-20 2023-08-31 2023-09-14 2023-10-19 2023-12-15 pour l'élaboration du plan de ution and Evaluation gestion de la biodiversité BI-BI-MOF-372403-CS-INDV / Component 4: Supporting Im En cours d'exame Recrutement d'un expert juni IDA / E0700 plementation and Monitoring A posteriori Individuel Limited 36,000.00 0.00 2023-07-27 2023-07-26 2023-08-01 2023-08-22 2023-09-20 2024-09-19 n or en passation des marchés and Evaluation BI-BI-MOF-374125-CS-INDV / Recrutement d'un consultant individuel en charge de la ré Component 1. Improving Poli En attente d'exéc alisation d'une étude sur l'ha IDA / E0700 cy and Regulatory Environm A posteriori Individuel Open - National 50,000.00 0.00 2023-08-10 2023-09-21 2023-10-12 2023-11-09 2024-02-15 ution rmonisation des différents te ent for cross border trade xtes juridiques sur les norme s et les procédures en matièr e de commerce transfrontali er Page 6