PROCUREMENT PLAN (Textual Part)
Project information: Nigeria [NG-Electricity Transmission Project]
[P146330]
Project Implementation agency: Transmission Company of Nigeria
Date of the Procurement Plan: May 2017
Period covered by this Procurement Plan: May 2017 to December 2017


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system will be
used to prepare, clear and update Procurement Plans and conduct all
procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the country’s own
procurement procedures may be used.
    When the Borrower uses its own national open competitive procurement
    arrangements as set forth in [insert appropriate references to the national
    procurement legislation], such arrangements shall be subject to
    paragraph 5.4 of the Procurement Regulations and the following
    conditions.
    None
    When other national procurement arrangements other than national open
    competitive procurement arrangements are applied by the Borrower,
    such arrangements shall be subject to paragraph 5.5 of the Procurement
    Regulations.
Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan tables. Not Applicable
Procurement of Second Hand Goods as specified under paragraph 5.11 of
the Procurement Regulations – is allowed for those contracts identified in the
Procurement Plan tables Not Applicable
Domestic preference as specified under paragraph 5.51 of the Procurement
Regulations (Goods and Works).
    Goods: [is not applicable/is applicable for those contracts identified in the
    Procurement Plan tables];
    Works: [is not applicable/is applicable for those contracts identified in the
    Procurement Plan tables]
Other Relevant Procurement Information.
None
PROCUREMENT
                Nigeria : NG-Electricity Transmission Project
PLAN
General Information
Country:           Nigeria                                                                                  2017-05-24
                                                       Bank’s Approval Date of the Original Procurement Plan:
                                                                                                            2023-07-14
                                                       Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:        P146330                             GPN Date:
Project Name:      NG-Electricity Transmission Project
Loan / Credit No:   / , IDA / 61850, IDA / 61860
                   TCN Project Management Unit
Executing Agency(ies):

WORKS
Activity Reference No. /                                                                                                                                                                         Estimated Actual Am                                                                                                                                                                                   Bid Evaluation Report
                                Loan / Credit N                                                                      Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D                     Process St Draft Pre-qualification Prequalification Evalu                           Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /                                                               Contract Complet
       Description                                       Component                 Review Type       Method                                                                                      Amount (U ount (US$                                                                                                                                                                                   and Recommendation                    Signed Contract
                                       o.                                                                                   h             cess           (Y/N)             isk     ocument Type                         atus         Documents               ation Report                                 ent / Justification Notice / Invitation                  s Issued        Opening / Minutes                                                                        ion
                                                                                                                                                                                                     S$)       )                                                                                                                                                                                             for Award
                                                                                                                                                                                                                                 Planned     Actual      Planned      Actual                             Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual                 Planned       Actual      Planned

 NTP-W1 / Partitioning of the
new Office Accommodation o
                                                  Transmission Network Stren                     Request for Quota                       Single Stage - One E                                                                                                                                                                                                                                                                                                        2021-01-0
f a 2-Storey building at Plot N IDA / 61850                                     Post                               Limited                                                                                 200,000.00    195,849.70     Completed                                                                                  2020-10-16   2020-10-12                                                                                 2020-11-20   2020-10-28
                                                  gthening and Improvement                       tions                                   nvelope                                                                                                                                                                                                                                                                                                                         4
o. 1226, Cadastral Zone A07,
Aminu Kano Crescent, Wuse
2, Abuja

 NTP-W2 / Refurbishment & E
                                                  Transmission Network Stren                                                             Single Stage - One E                                                            2,091,648.7                                                                                                                                                                                                                                 2022-02-1
xtension of two existing Cont IDA / 61850                                       Post             Request for Bids    Open - National                                                                      3,110,513.00                  Signed                                                           2020-10-19   2020-11-30   2020-11-02   2020-12-04                             2020-12-14   2021-01-28   2021-01-13   2021-02-18   2021-02-17   2021-03-15
                                                  gthening and Improvement                                                               nvelope                                                                                   5                                                                                                                                                                                                                                     7
rol Centers at Benin & Ikeja
West

 NTP-TR6C / Rehabilitation of                     Transmission Network Stren                     Request for Propo   Open - Internationa Single Stage - Two E                          Other (with field f 58,000,000.0 55,341,490.                                                                                                                                                                                                                                  2023-12-3
                                IDA / 61850                                     Prior                                                                                                                                                   Signed       2021-05-31                2021-08-16   2022-01-06   2021-09-27   2022-01-23   2021-06-05                                          2021-12-06   2022-04-26                             2022-03-25   2022-08-26
SCADA System in Transmissi                        gthening and Improvement                       sals                l                   nvelope                                       or explanation)                0         90                                                                                                                                                                                                                                       1
on Network



GOODS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                     Bid Evaluation Report
                                Loan / Credit N                                                                      Market Approac Procurement Pro Prequalification Estimated Am Actual Amount           Process St Draft Pre-qualification Prequalification Evalu            Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /
       Description                                       Component                 Review Type       Method                                                                                                                                                                                                                                                                  and Recommendation                    Signed Contract         Contract Completion
                                       o.                                                                                   h             cess           (Y/N)        ount (US$)      (US$)                  atus         Documents              ation Report                   ent / Justification Notice / Invitation                  s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                   for Award
                                                                                                                                                                                                                          Planned         Actual     Planned       Actual      Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual                 Planned       Actual      Planned       Actual

 NETAP-T1 / Rehabilitation an
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - Two E
d Reinforcement 330/132kV       /                                               Prior            Request for Bids                                                     104,164,995.00               0.00   Canceled       2017-05-10     2017-08-02   2017-08-03                2017-10-03                2017-05-31   2017-08-07                             2017-12-05                2018-02-10                2018-03-10                2020-03-09
                                                  gthening and Improvement                                           l                   nvelope
Transmission Substations


 NTP-TR2 / Rehabilitation and
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
Reinforcement 330/132kV Tr IDA / 61850                                          Prior            Request for Bids                                                      78,740,445.00    112,392,367.31    Signed         2018-03-01     2018-04-04   2018-06-07   2019-08-13   2018-07-31   2019-10-28   2018-03-26   2018-04-11                             2018-10-18   2020-02-13   2018-11-09   2020-09-02   2019-01-07   2020-11-15   2021-04-06
                                                  gthening and Improvement                                           l                   nvelope
ansmission Substations (Pack
age 2)

 NTP-TR5 / Reconductoring of                      Transmission Network Stren                                         Open - Internationa Single Stage - One E
                             IDA / 61850                                        Prior            Request for Bids                                                      49,581,750.00               0.00   Canceled       2018-10-02                  2019-01-08                2019-02-18                2018-10-28                                          2019-05-06                2019-05-27                2019-07-19                2021-10-21
Transmission Lines                                gthening and Improvement                                           l                   nvelope


 NTP-TR6 / Rehabilitation of S
CADA System in Transmissio
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
n Network and Supply & Inst IDA / 61850                                         Prior            Request for Bids                                                      79,000,596.00               0.00   Canceled       2018-05-07                  2018-08-20                2018-11-12                2018-05-28                                          2019-02-12                2019-03-05                2019-04-22                2021-07-22
                                                  gthening and Improvement                                           l                   nvelope
allation of Static Voltage Cap
acitors (SVC) for Gombe 330/
132kV Substation

 NTP-TR4 / Supply of Substati
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
on Essential Power Equipmen IDA / 61850                                         Prior            Request for Bids                                                      30,989,995.00     30,321,536.75    Signed                                                               2018-11-23   2019-02-06   2018-12-07   2019-04-08                             2019-02-05   2019-05-31   2019-03-05   2019-12-06   2019-04-23   2020-02-22   2020-01-18
                                                  gthening and Improvement                                           l                   nvelope
t to Ojo Stores, Lagos


 NTP-TR1 / Rehabilitation and
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
Reinforcement 330/132kV Tr IDA / 61850                                          Prior            Request for Bids                                                     104,164,995.00               0.00   Canceled       2017-05-10                  2017-08-07   2019-03-26   2017-08-07   2019-06-17   2017-05-24                                          2017-10-16   2019-10-03   2017-11-15                2017-12-20                2019-06-13
                                                  gthening and Improvement                                           l                   nvelope
ansmission Substations (Pack
age 1)

 NTP-TR8 / Supply of Battery
                                                  Capacity Building and Techn                                                            Single Stage - One E
Charger and Testing Equipm      IDA / 61850                                     Post             Request for Bids    Open - National                                    1,317,580.00       1,380,765.66   Signed                                                               2019-08-05   2020-02-06   2019-08-10                                          2019-09-21   2020-03-24   2019-10-12   2020-08-13   2019-11-23   2020-09-12   2020-05-21
                                                  ical Assistance                                                                        nvelope
ent to Ojo Stores, Lagos


 NTP-TR7 / Supply of Tranfor
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
mer oil Regeneration Machin     IDA / 61850                                     Prior            Request for Bids                                                       4,147,332.00       3,646,592.83   Signed                                                               2019-06-03   2020-03-06   2019-06-17   2020-04-21                             2019-07-29   2020-05-13   2019-08-28   2020-09-23   2019-10-11   2020-10-24   2020-04-08
                                                  gthening and Improvement                                           l                   nvelope
e, Crane and Hiab Trucks to
Ojo Stores, Lagos

 NTP-TR3 / Rehabilitation and
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
Reinforcement 330/132kV Tr IDA / 61850                                          Prior            Request for Bids                                                      61,795,000.00               0.00   Canceled       2018-06-04     2018-07-23   2018-08-29                2018-10-11                2018-06-30   2018-08-22                             2019-01-07                2019-01-28                2019-03-25                2021-06-24
                                                  gthening and Improvement                                           l                   nvelope
ansmission Substations (Pack
age 3)

 NGP-T6 LOT 2 / Supply and I
nstallation of Substation Esse                    Transmission Network Stren
                               IDA / 61850                                      Prior            Direct Selection    Direct                                             7,936,526.00       8,770,761.95   Signed                                                               2019-04-15   2019-07-24   2019-04-29   2019-07-24                                                                                 2019-05-27   2019-09-24   2019-11-23
ntial Power Equipment- NGP-                       gthening and Improvement
T6 Lot 2: Addendum No. 3


 NGP-T10 LOT 2 / Supply of B
ulk GAP Conductors and Circ                       Transmission Network Stren
                              IDA / 61850                                       Prior            Direct Selection    Direct                                               396,870.00        396,870.00    Signed                                                               2019-04-15   2019-07-24   2019-04-29   2019-07-26                                                                                 2019-05-27   2019-08-29   2019-11-23
uit Breakers for Transmission                     gthening and Improvement
Company of Nigeria (TCN) Lo
t2

 NGP-T10 LOT 1 / Supply of B
ulk GAP Conductors and Circ                       Transmission Network Stren
                              IDA / 61850                                       Prior            Direct Selection    Direct                                             3,315,800.00       3,315,799.68   Signed                                                               2019-04-15   2019-08-12   2019-04-29   2019-08-12                                                                                 2019-05-27   2019-09-19   2019-08-25
uit Breakers for Transmission                     gthening and Improvement
Company of Nigeria (TCN) T1
0 Lot 1

 NTP-TR3A / Rehabilitation an
                                                  Transmission Network Stren                                         Open - Internationa Single Stage - One E
d Reinforcement 330/132kV     IDA / 61850                                       Prior            Request for Bids                                                      61,795,000.00               0.00   Canceled       2019-08-15                  2019-09-16                2019-09-30                2019-08-19                                          2019-12-09                2019-12-30                2020-02-03                2022-01-23
                                                  gthening and Improvement                                           l                   nvelope
Transmission Substations (Pa
ckage 3)

 NTP-TR3B / Rehabilitation an
                                                  Transmission Network Stren                                                             Single Stage - One E
d Reinforcement of 330/132k IDA / 61850                                         Prior            Request for Bids    Limited                                           61,795,000.00     89,541,870.27    Signed         2019-08-21     2019-09-17   2019-09-09   2020-03-02   2019-10-09   2020-05-17                                                       2019-12-18   2020-09-02   2020-01-17   2020-12-22   2020-02-21   2021-02-02   2022-02-10
                                                  gthening and Improvement                                                               nvelope
V Transmission Substations (
Package 3)

 NTP-TR10 / Completion of Bil                     Transmission Network Stren                                                             Single Stage - One E
                              IDA / 61850                                       Post             Request for Bids    Open - National                                    2,000,000.00       1,853,388.37   Signed                                                               2019-12-23   2020-01-10   2019-12-28   2020-01-20                             2020-02-08   2020-02-26   2020-03-09   2020-05-04   2020-04-13   2020-09-12   2021-01-08
liri 132/33kV Transmission Su                     gthening and Improvement                                                               nvelope
bstation

 NTP -TR5A / RECONDUCTORI
NG AND RECONSTRUCTION O                           Transmission Network Stren                                         Open - Internationa Single Stage - One E
                          IDA / 61850                                           Prior            Request for Bids                                                      35,553,050.00               0.00   Canceled                                                             2020-04-13                2020-04-27                                          2020-07-08                2020-08-07                2020-09-11                2022-09-01
F 132kV TRANSMISSION LINE                         gthening and Improvement                                           l                   nvelope
S (PACKAGE 5A)


 NTP-TR5B / RECONDUCTORI
NG AND RECONSTRUCTION O                           Transmission Network Stren                                         Open - Internationa Single Stage - One E
                          IDA / 61850                                           Prior            Request for Bids                                                      36,039,000.00               0.00   Canceled                                                             2020-07-06                2020-07-20                                          2020-09-30                2020-10-30                2020-12-04                2022-11-24
F 132kV TRANSMISSION LINE                         gthening and Improvement                                           l                   nvelope
S (PACKAGE 5B)




                                                                                                                                                                                                                               Page 1
 NTP-TR5C / Supply of GAP C
onductors and Accessories fo                       Transmission Network Stren                                         Open - Internationa Single Stage - One E
                             IDA / 61860                                         Prior            Request for Bids                                                    25,000,000.00             0.00   Canceled                                                        2020-06-30                2020-07-10                                     2020-08-25                2020-09-15                2020-10-20                2021-07-12
r the Reconductoring and Co                        gthening and Improvement                                           l                   nvelope
nstruction of 132kV Transmis
sion Lines

 NTP-TR1A / Rehabilitation &
Reinforcement of 330/132kV                         Transmission Network Stren                                                             Single Stage - One E                                         Under Revie
                             IDA / 61850                                         Prior            Request for Bids    Limited                                        104,164,995.00   105,349,138.14                                                                   2020-07-27   2020-07-27   2020-08-10   2020-10-01                        2020-10-06   2020-09-29   2020-10-27   2021-03-31   2021-01-07   2021-07-13   2023-01-07
and 132/33kV Transmission S                        gthening and Improvement                                                               nvelope                                                      w
ubstations (Package 1)


 NTP-TR11 / SUPPLY OF OFFIC                        Transmission Network Stren                     Request for Quota                       Single Stage - One E
                            IDA / 61850                                          Post                               Limited                                               50,000.00        48,534.06   Completed                                                                                 2020-08-04   2020-07-29                                                                            2020-09-08   2020-08-11   2020-09-29   2020-09-03
E EQUIPMENT                                        gthening and Improvement                       tions                                   nvelope


 NTP-TR9 / SUPPLY OF EQUIP
                                                   Transmission Network Stren                                         Open - Internationa Single Stage - One E
MENT FOR DIGITIZATION OF         IDA / 61850                                     Prior            Request for Bids                                                    11,000,000.00             0.00   Canceled                                                        2020-08-17                2020-08-22                                     2020-10-17                2020-11-16                2020-12-21                2022-02-19
                                                   gthening and Improvement                                           l                   nvelope
OLD TRANSMISSION SUBSTA
TIONS

 NTP-TR5E / Supply and Instal
lation of GAP Conductors and                       Transmission Network Stren                                         Open - Internationa Single Stage - One E
                              IDA / 61850                                        Prior            Request for Bids                                                    22,537,750.00             0.00   Canceled                                                        2020-12-07   2021-02-10   2020-12-14   2021-02-17                        2021-02-12   2021-05-19   2021-03-14                2021-04-18                2022-04-18
its Accessories for the Recon                      gthening and Improvement                                           l                   nvelope
ductoring of 132kV Transmis
sion Lines

 NTP-TR5F / Supply of GAP Co
nductors and its Accessories                       Transmission Network Stren                                         Open - Internationa Single Stage - One E
                               IDA / 61850                                       Prior            Request for Bids                                                     6,336,850.00     5,430,975.21   Signed                                                          2020-09-08   2020-09-11   2020-09-15   2020-09-15                        2020-11-14   2020-11-17   2020-12-14   2021-02-15   2021-01-18   2021-03-11   2022-01-18
for the Construction of Lokoja                     gthening and Improvement                                           l                   nvelope
-Okeagbe 132kV Transmissio
n Lines

 NTP-S01 / Supply of Office fu
rniture for the new Office Acc
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E
ommodation at Plot No. 1226 IDA / 61850                                          Post                               Limited                                             100,000.00         96,147.20   Completed                                                                                 2020-10-18   2020-10-06                                                                            2020-11-15   2020-10-23   2020-12-06   2020-12-09
                                                   gthening and Improvement                       tions                                   nvelope
, Cadastral Zone A07, Aminu
Kano Crescent, Wuse 2, Abuj
a

 NTP-TR12 / Digitization of th
                                                   Transmission Network Stren                                         Open - Internationa Single Stage - One E
e old Transmission Substatio     IDA / 61850                                     Prior            Request for Bids                                                     7,400,607.00     2,860,170.38   Signed                                                          2020-10-19   2021-01-22   2020-11-02   2021-01-29                        2020-12-24   2021-04-21   2021-01-14   2021-09-20   2021-02-18   2021-11-05   2022-05-19
                                                   gthening and Improvement                                           l                   nvelope
ns (Zones 1 and 2)


 NTP-TR5D / Supply and Insta
llation of GAP Conductors an
                                                   Transmission Network Stren                                         Open - Internationa Single Stage - One E
d its Accessories for the Cons IDA / 61850                                       Prior            Request for Bids                                                    39,729,300.00             0.00   Canceled                                                        2020-09-08                2020-09-15                                     2020-11-14                2020-12-14                2021-01-18                2022-01-18
                                                   gthening and Improvement                                           l                   nvelope
truction and Reconductoring
of 132kV Transmission Lines


 NTP-TR5G / Reconductoring                         Transmission Network Stren                                         Open - Internationa Single Stage - One E
                                 IDA / 61850                                     Prior            Request for Bids                                                     6,625,000.00             0.00   Canceled                                                        2020-10-27   2021-02-10   2020-11-03   2021-02-17                        2020-12-15   2021-05-19   2021-01-14   2021-09-23   2021-02-18                2023-02-18
of 132kV Transmission Lines                        gthening and Improvement                                           l                   nvelope


 NTP-SH02 / Supply of additio
                                                   Capacity Building and Techn                    Request for Quota                       Single Stage - One E
nal Office Equipment to the n IDA / 61850                                        Post                               Limited                                               35,000.00        33,931.62   Completed                                                                                 2020-11-27   2020-11-11                                                                            2020-12-28   2020-11-21   2021-01-11   2020-12-09
                                                   ical Assistance                                tions                                   nvelope
ewly TCN-PMU project staff


 NTP-SH04 / Supply of Project
Vehicles to Transmission Co                        Transmission Network Stren                     Request for Quota                       Single Stage - One E
                              IDA / 61850                                        Post                               Limited                                             461,500.00       448,518.25    Terminated                                                                                2020-12-08   2020-12-11                                                                            2021-01-05   2020-12-30   2021-01-26
mpany of Nigeria-Project Man                       gthening and Improvement                       tions                                   nvelope
agement Unit (TCN-PMU)


 NTP-SH07 / Supply and Insta
llation of two (2) Video Confe
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E
rencing equipment at TCN-P IDA / 61850                                           Post                               Limited                                               21,000.00        19,879.68   Completed                                                                                 2020-12-26   2020-12-18                                                                            2021-01-30   2021-01-05   2021-02-20   2021-02-06
                                                   gthening and Improvement                       tions                                   nvelope
MU Conference rooms in the
new office accommodation


 NTP-SH04A / Supply of Proje
ct Vehicles to Transmission C                      Transmission Network Stren                     Request for Quota                       Single Stage - One E
                              IDA / 61850                                        Post                               Limited                                             423,000.00       440,163.74    Signed                                                                                    2021-03-22   2021-03-16                                                                            2021-04-19   2021-03-20   2021-05-10
ompany of Nigeria-Project Ma                       gthening and Improvement                       tions                                   nvelope
nagement Unit (TCN-PMU)


 NTP-SH09 / SUPPLY OF ADDI
TIONAL LAPTOP & DESKPTOP
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E
COMPUTER SYSTEMS TO TRA IDA / 61850                                              Post                               Limited                                               18,500.00        18,074.47   Signed                                                                                    2021-04-02   2021-03-25                                                                            2021-04-30   2021-04-07   2021-05-21
                                                   gthening and Improvement                       tions                                   nvelope
NSMISSION COMPANY OF NIG
ERIA-PROJECT MANAGEMENT
UNIT

 NTP-TR6A / Rehabilitation of                      Transmission Network Stren                     Request for Propo   Open - Internationa
                                 IDA / 61850                                     Prior                                                    Multi Stage                 58,000,000.00             0.00   Canceled                                                        2020-10-20                2020-10-25                                     2021-01-03                                          2021-05-22                2021-08-03
SCADA System in Transmissi                         gthening and Improvement                       sals                l
on Network

 NTP-TR6B / Rehabilitation of                      Transmission Network Stren                     Request for Propo   Open - Internationa Single Stage - Two E
                                 IDA / 61850                                     Prior                                                                                58,000,000.00             0.00   Canceled       2021-04-25    2021-05-31   2021-07-02            2021-07-02                2021-04-30   2021-06-03                        2021-08-27                                          2021-12-05                2023-12-30
SCADA System in Transmissi                         gthening and Improvement                       sals                l                   nvelope
on Network

 NTP-SH10 / Relocation of 2N
o 33kV Feeders on TCN Right
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E
of Way to the new 33kV Swit IDA / 61850                                          Post                               Limited                                             123,000.00              0.00   Signed                                                                                    2022-08-29   2022-09-30                                                                            2022-09-26                2022-11-10
                                                   gthening and Improvement                       tions                                   nvelope
chyard at Sagamu 132/33kV
Transmission Substation


 NG-TCN- PMU-356526-GO-RF
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E                                         Under Imple
Q / SUPPLY OF LAPTOP SYSTE IDA / 61850                                           Post                               Limited                                               64,000.00             0.00                                                                                             2023-05-02   2023-04-25                                                                            2023-05-23                2023-06-22
                                                   gthening and Improvement                       tions                                   nvelope                                                      mentation
M FOR TCN-WB PROJECT STA
FF.

 NTP-SH-12 / Supply of Office
                                                   Transmission Network Stren                     Request for Quota                       Single Stage - One E                                         Pending Impl
Equipment to the Internation     IDA / 61850                                     Post                               Limited                                               28,000.00             0.00                                                                                             2023-07-21                                                                                         2023-08-16                2023-09-15
                                                   gthening and Improvement                       tions                                   nvelope                                                      ementation
al Economy Relations Depart
ment



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                             Bid Evaluation Report
                                 Loan / Credit N                                                                      Market Approac Procurement Pro Prequalification Estimated Am Actual Amount       Process St Draft Pre-qualification Prequalification Evalu       Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /
       Description                                        Component                 Review Type       Method                                                                                                                                                                                                                                                         and Recommendation               Signed Contract         Contract Completion
                                        o.                                                                                   h             cess           (Y/N)        ount (US$)      (US$)              atus         Documents              ation Report              ent / Justification Notice / Invitation                  s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                           for Award
                                                                                                                                                                                                                      Planned        Actual      Planned      Actual   Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual            Planned       Actual      Planned       Actual
 NTP-TC24 / Engagement of F
acility Manager for cleaning a                     Capacity Building and Techn                    Request for Quota                       Single Stage - One E
                                IDA / 61850                                      Post                               Limited                                               31,000.00        28,326.39   Signed                                                                                    2021-03-02   2021-04-12                                                                            2021-03-30   2021-04-28   2022-03-30
nd maintenance of all facilitie                    ical Assistance                                tions                                   nvelope
s in the new office accommo
dation for TCN-PIUs

 NTP-FM01 / Facility Manage
ment of the Transmission Co                        Capacity Building and Techn                    Request for Quota                       Single Stage - One E
                                 IDA / 61850                                     Post                               Limited                                               35,000.00        33,757.61   Signed                                                                                    2022-05-09   2022-05-05                                                                            2022-06-06   2022-05-24   2023-06-06
mpany of Nigeria -Project Im                       ical Assistance                                tions                                   nvelope
plementation Unit's Office




CONSULTING FIRMS




                                                                                                                                                                                                                           Page 2
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                         Combined Evaluation
                                Loan / Credit N                                                                       Market Approac        Contract Type   Estimated Amo Actual Amount                                                   Expression of Interest Short List and Draft R Request for Proposals Opening of Technical         Evaluation of Technic
       Description                                       Component                 Review Type        Method                                                                            Process Status         Terms of Reference                                                                                                                                Report and Draft Neg            Signed Contract         Contract Completion
                                       o.                                                                                    h                                 unt (US$)      (US$)                                                              Notice          equest for Proposals        as Issued         Proposals / Minutes              al Proposal
                                                                                                                                                                                                                                                                                                                                                                    otiated Contract
                                                                                                                                                                                                               Planned       Actual        Planned      Actual      Planned       Actual      Planned   Actual   Planned       Actual      Planned      Actual    Planned     Actual           Planned       Actual      Planned       Actual
 NTP-TC1 / Engineering Super
vision and Site Management
for the Construction of New 3
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa
30/132 and 132/33kV Substa IDA / 61850                                          Prior                                                                          4,500,000.00   2,514,349.17   Signed            2018-02-01   2018-01-30    2018-02-15   2018-02-13   2018-03-15   2019-06-14                      2018-04-05   2019-08-20   2018-04-26   2019-10-14   2018-06-28   2020-02-02   2018-08-12   2020-03-02   2020-09-30
                                                  ical Assistance                                Based Selection      l
tions and Reinforcement/ Re
habilitation Old 132/33kV Tra
nsmission Substations (Packa
ge 1)

 NTP-TC2 / Engineering Super
vision and Site Management
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa
for Reinforcement & Rehabili IDA / 61850                                        Prior                                                                          4,000,000.00   2,597,473.30   Under Review      2018-07-02   2018-07-10    2018-08-08   2018-07-23   2018-08-27   2019-04-16                      2018-10-03   2019-07-04   2018-10-24   2019-09-30   2018-12-17   2020-02-02   2019-01-23   2020-02-29   2021-02-15
                                                  ical Assistance                                Based Selection      l
tation of 330/132kV and 132/
33kV Transmission Substatio
ns (Package 2 )

 NTP-TC3 / Engineering Super
vision and Site Management
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa
for Reinforcement & Rehabili IDA / 61850                                        Prior                                                                          2,500,000.00   2,478,260.52   Signed            2018-09-03   2019-01-30    2018-09-24   2020-01-29   2018-11-13   2020-05-21                      2018-11-21   2020-08-03   2018-12-19   2020-09-08   2019-02-11   2020-12-15   2019-03-20   2021-01-22   2021-04-12
                                                  ical Assistance                                Based Selection      l
tation of 330/132kV and 132/
33kV Transmission Substatio
ns (Package 3 )

 NTP-TC4 / Engineering Super
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa
vision and Site Management IDA / 61850                                          Prior                                                                          5,000,000.00   1,435,753.57   Signed            2018-12-03   2020-11-08    2018-12-31   2020-12-18   2019-03-03   2021-03-10                      2019-04-09   2021-04-27   2019-04-30   2021-06-04   2019-06-26   2021-09-03   2019-08-08   2021-09-14   2021-08-31
                                                  ical Assistance                                Based Selection      l
of Reconductoring of Transmi
ssion Lines

 NTP-TC5 / Engineering Super
vision and Site Management
for the Rehabilitation of Tran
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa
smission SCADA System and IDA / 61850                                           Prior                                                                          3,000,000.00           0.00   Canceled          2018-10-03   2019-10-16    2018-10-31   2020-01-08   2018-12-25   2020-08-07                      2019-02-07   2020-10-15   2019-03-09   2020-11-12   2019-04-17                2019-05-24                2021-06-16
                                                  ical Assistance                                Based Selection      l
Supply & Installation of Static
Voltage Capacitors (SVC) for
Gombe 330/132kV Substatio
n

 NTP-TC10 / Consultancy serv
ices for the Establishment of
                                                  Transmission Network Stren                     Consultant Qualifi
Grievance Redress Mechanis IDA / 61850                                          Post                                  Open - National                           290,000.00     386,538.08    Completed         2018-11-20   2018-10-24    2018-12-26                2019-02-15   2019-06-27                                                                          2019-03-08   2019-10-30   2019-04-05   2019-11-21   2019-08-03   2021-01-07
                                                  gthening and Improvement                       cation Selection
m (GRM) and Preparation of
a Stakeholder Engagement Pl
an for NETAP

 NTP-TC11 / Consultacy servi
ces for the E&S Screening of
                                                  Transmission Network Stren                     Consultant Qualifi
the Proposed Re-Conductorin IDA / 61850                                         Post                                  Open - National                           200,000.00     167,390.46    Completed         2018-11-19   2018-10-24    2018-12-25                2019-02-14   2019-06-27                                                                          2019-03-07   2019-08-15   2019-04-04   2019-08-26   2019-07-03   2020-11-20
                                                  gthening and Improvement                       cation Selection
g (Re-stringing) of Transmisio
n Lines under the NETAP


 NTP-TC12 / Consultancy serv
ices for the Preparation of Fe
asibility studies for closing of                  Transmission Network Stren                     Consultant Qualifi
                                 IDA / 61850                                    Post                                  Open - National                           155,000.00            0.00   Canceled          2018-11-30   2018-10-24    2019-01-05                2019-02-25                                                                                       2019-04-02                2019-05-07                2019-09-04
the 330kV Lagos Loop (Akan                        gthening and Improvement                       cation Selection
gba-Ijora-Alagbon 330kV Dou
ble Circuit Transmission Line)


 NTP-TC9 / Engagement of Co                       Capacity Building and Techn                    Consultant Qualifi                                                                          Pending Impleme
                             IDA / 61850                                        Post                                  Open - National                           150,000.00            0.00                     2019-06-03                 2019-06-17                2019-07-08                                                                                       2019-07-15                2019-08-05                2020-02-01
nsultant for Safeguard Revie                      ical Assistance                                cation Selection                                                                            ntation
w

 NTP-TC13 / Consultancy for t
                                                  Capacity Building and Techn                    Consultant Qualifi
he Preparation of Resettleme IDA / 61850                                        Post                                  Open - National                           150,000.00     142,319.48    Signed            2019-09-10   2020-09-24    2019-10-01                2019-10-29   2021-01-05                                                                          2019-11-19   2021-02-04   2019-12-17   2021-02-19   2020-06-14
                                                  ical Assistance                                cation Selection
nt Action Plan – North-East


 NTP-TC14 / Consultancy for t
                                                  Capacity Building and Techn                    Consultant Qualifi
he Preparation of Resettleme IDA / 61850                                        Post                                  Open - National                           300,000.00     263,805.79    Signed            2019-09-10   2020-09-24    2019-09-24                2019-10-22   2021-01-05                                                                          2019-10-29   2021-02-08   2019-11-19   2021-02-12   2020-05-17
                                                  ical Assistance                                cation Selection
nt Action Plan – South-South
and South-West

 NTP-TC15 / Preparation of Si
                                                  Capacity Building and Techn                    Quality And Cost-    Open - Internationa                                                    Pending Impleme
te Specific Environmental an    IDA / 61850                                     Prior                                                                           500,000.00            0.00                     2019-06-10                 2019-07-01                2019-07-29                                   2019-08-26                2019-09-25                2019-10-30                2019-12-04                2020-12-03
                                                  ical Assistance                                Based Selection      l                                                                      ntation
d Social Management Plans (
ESMPs)

 NTP-TC17 / Engagement of P
reparation of Environmental                       Capacity Building and Techn                    Consultant Qualifi
                              IDA / 61850                                       Post                                  Open - National                           400,000.00     353,945.08    Signed            2019-12-03   2020-09-24    2019-12-24                2020-01-21   2021-01-05                                                                          2020-02-04   2021-02-08   2020-03-10   2021-02-11   2021-01-24
and Social Management Plan                        ical Assistance                                cation Selection
s (ESMPs) for Transmission li
nes and Substations

 NTP-TC19 / Technical Feasibi                     Capacity Building and Techn                    Quality And Cost-    Open - Internationa                                                    Pending Impleme
                              IDA / 61850                                       Prior                                                                          1,425,000.00           0.00                     2019-03-11                 2019-04-01                2019-05-15                                   2019-06-12                2019-07-12                2019-08-16                2019-09-20                2020-09-19
lity Studies of Eastern Backb                     ical Assistance                                Based Selection      l                                                                      ntation
one

 NTP-TC20 / Consultancy serv
ices for the design of the pro
posed National Control Centr                      Capacity Building and Techn                    Consultant Qualifi
                               IDA / 61850                                      Post                                  Open - National                           155,000.00     203,217.06    Completed         2019-02-18   2019-04-16    2019-03-04                2019-04-01   2019-05-27                                                                          2019-04-08   2019-07-17   2019-04-22   2019-07-22   2019-07-21   2020-01-03
e, Regional Control Centre Pr                     ical Assistance                                cation Selection
ototype and Rehabilitation of
three existing Regional Contr
ol Centres

 NTP-TC16 / Engagement of C
                                                  Capacity Building and Techn                    Consultant Qualifi                                                                          Pending Impleme
onsultant for HIV/AIDS Aware IDA / 61850                                        Post                                  Open - National                           500,000.00            0.00                     2019-10-07                 2019-10-28                2019-11-25                                                                                       2019-12-16                2019-12-30                2020-08-26
                                                  ical Assistance                                cation Selection                                                                            ntation
ness Campaign


 NTP-TC8 / The Appointment
                                                  Capacity Building and Techn                    Least Cost Selecti
of External Auditor for the Ni IDA / 61850                                      Post                                  Open - National                           500,000.00            0.00   Canceled          2019-10-22   2019-07-31    2019-11-05                2019-12-19                                   2020-01-02                2020-01-16                2020-02-20                2020-03-26                2022-03-16
                                                  ical Assistance                                on
geria Electricity Transmission
Project (NETAP)

 NTP-TC8A / The Appointmen
                                                  Capacity Building and Techn                    Consultant Qualifi
t of External Auditor for the N IDA / 61850                                     Post                                  Limited                                   290,000.00      44,391.83    Signed            2019-10-28   2019-10-28                              2019-11-11   2020-02-12                                                                          2019-12-11   2020-03-05   2020-01-08   2020-04-01   2021-01-07
                                                  ical Assistance                                cation Selection
igeria Electricity Transmissio
n Project (NETAP)

 NTP-TC21 / Engagement of C
onsultant for Training of som                     Capacity Building and Techn                    Quality And Cost-    Open - Internationa
                              IDA / 61850                                       Prior                                                                          1,150,000.00   1,100,419.94   Signed            2020-03-24   2020-03-19    2020-04-14   2020-05-21   2020-05-28   2020-10-27                      2020-06-25   2020-12-22   2020-07-25   2021-01-21   2020-08-29   2021-03-26   2020-10-03   2021-04-01   2021-04-01
e selected Field Engineers in                     ical Assistance                                Based Selection      l
Transmission Company of Ni
geria (TCN)

 NTP-TC7 / Hiring of Consulta                     Capacity Building and Techn                    Quality And Cost-    Open - Internationa
                              IDA / 61850                                       Prior                                                                          1,200,000.00           0.00   Canceled          2018-06-04                 2018-06-25                2018-08-30                                   2018-10-12                2018-11-10                2019-01-07                2019-02-21                2021-03-21
nt to provide Support for TCN                     ical Assistance                                Based Selection      l
-PMU

 NTP-TC6 / Advisory Services
for Public Private Partnership                    Capacity Building and Techn                    Quality And Cost-    Open - Internationa
                               IDA / 61850                                      Prior                                                                          2,000,000.00           0.00   Canceled          2018-11-05                 2018-11-26                2019-01-19                                   2019-02-25                2019-03-18                2019-05-11                2019-06-20                2021-07-17
(PPP) arrangements for the C                      ical Assistance                                Based Selection      l
onstruction of New Transmiss
ion




                                                                                                                                                                                                                                 Page 3
 NTP-TC23 / Engineering Sup
ervision and Site Manageme                          Capacity Building and Techn                    Quality And Cost-    Open - Internationa
                                  IDA / 61850                                     Prior                                                                          3,000,000.00   2,655,311.21   Signed      2021-02-08   2021-02-02    2021-02-22   2021-02-09   2021-04-05   2021-05-04                             2021-04-19   2021-06-28   2021-05-03   2021-08-16   2021-06-07   2021-09-28   2021-07-05   2021-10-01   2024-07-04
nt for the Rehabilitation of Tr                     ical Assistance                                Based Selection      l
ansmission SCADA System


 NTP-TC25 / Consultancy Con
tract for the Assessment of L
ocal Meter Manufacturers Ins
                                                    Capacity Building and Techn                    Consultant Qualifi
talled and Operational Capac IDA / 61850                                          Post                                  Limited                                    71,000.00      70,129.20    Signed      2021-12-26   2022-01-10                              2022-01-02   2022-01-13                                                                                 2022-01-16   2022-02-28   2022-01-30   2022-03-01   2022-03-31
                                                    ical Assistance                                cation Selection
ities for all NERC Certified Me
ter Manufacturers for Phase
1 of the National Mass Meteri
ng Program (NMMP)

 NTP-TC26 / Consultancy Ser
vice for the Price Discovery E
                                                    Capacity Building and Techn                    Consultant Qualifi
xercise for the Procurement    IDA / 61850                                        Post                                  Limited                                    23,000.00      22,018.99    Signed      2021-12-27   2022-01-10                              2022-01-03   2022-01-13                                                                                 2022-01-10   2022-02-16   2022-01-31   2022-03-01   2022-04-01
                                                    ical Assistance                                cation Selection
of Meters under Phase 1 of th
e National Mass Metering Pro
gram (NMMP)

 NTP-TC18 / Engagemment of
                                                    Capacity Building and Techn                    Consultant Qualifi
Consultant for Environmental IDA / 61850                                          Post                                  Open - National                           200,000.00            0.00   Canceled    2019-06-10                 2019-07-01                2019-07-29                                                                                              2019-08-12                2019-09-09                2020-07-25
                                                    ical Assistance                                cation Selection
and Social Compliance Audits




INDIVIDUAL CONSULTANTS
Activity Reference No. /
                                  Loan / Credit N                                                                       Market Approac        Contract Type   Estimated Amo Actual Amount                                             Invitation to Identifie Draft Negotiated Cont
       Description                                         Component                 Review Type        Method                                                                            Process Status   Terms of Reference                                                               Signed Contract         Contract Completion
                                         o.                                                                                    h                                 unt (US$)      (US$)                                                 d/Selected Consultant            ract
                                                                                                                                                                                                           Planned       Actual        Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual
 NTP-TC22 / Engagemment of                          Capacity Building and Techn                    Individual Consult
                              IDA / 61850                                         Post                                  Limited                                   200,000.00     211,665.52    Signed      2020-03-24   2022-02-07    2020-03-29   2022-04-26   2020-04-19   2022-04-30   2020-05-24   2022-05-03   2022-05-24
Probity Assurance Provider fo                       ical Assistance                                ant Selection
r NETAP

 NGP-TC19 / Consultancy Ser
vices for Forensic Audit of Ab                      Capacity Building and Techn
                               IDA / 61850                                        Post             Direct Selection     Direct                                    720,000.00     378,178.90    Signed      2020-03-31   2020-03-25    2020-04-10   2020-03-26                             2020-06-14   2020-05-16   2020-11-11
uja, Benin and Eko Distributio                      ical Assistance
n Companies (Discos) for NE
RC

 NGP-TC20 / Consultancy Ser
vices for Forensic Audit of En                      Capacity Building and Techn
                               IDA / 61850                                        Post             Direct Selection     Direct                                    720,000.00            0.00   Canceled    2020-03-31   2020-03-25    2020-04-10   2020-03-26                             2020-06-14                2020-11-11
ugu, Kaduna and Kano Distri                         ical Assistance
bution Companies (Discos) fo
r NERC

 NGP-TC21 / Consultancy Ser
vices for Forensic Audit of Po                      Capacity Building and Techn
                                  IDA / 61850                                     Post             Direct Selection     Direct                                    480,000.00     549,946.71    Signed      2020-03-31   2020-03-25    2020-04-10   2020-03-26                             2020-06-14   2020-05-16   2020-11-11
rt Harcourt and Jos Distributi                      ical Assistance
on Companies (Discos) for N
ERC

 NGP-TC22 / Consultancy Ser
vices for Forensic Audit of Iba                     Capacity Building and Techn
                                IDA / 61850                                       Post             Direct Selection     Direct                                    720,000.00            0.00   Canceled    2020-03-31   2020-03-25    2020-04-10   2020-03-26                             2020-06-14                2020-11-11
dan, Ikeja and Yola Distributi                      ical Assistance
on Companies (Discos) for N
ERC

 NTP-IC-01 / Consultancy serv
ices for the preparation of an
Environmental and Social Ma                         Capacity Building and Techn                    Individual Consult
                               IDA / 61850                                        Post                                  Limited                                    30,000.00      27,865.75    Signed      2020-10-05   2020-09-27    2020-10-10   2020-12-14   2020-10-17   2020-12-22   2020-10-31   2020-12-31   2020-11-21
nagement Framework (ESMF)                           ical Assistance                                ant Selection
for the proposed Nigeria Dist
ribution Sector Recovery Pro
gram (DISREP)

 NTP-IC-02 / Consultancy serv
ices for the preparation of a L
                                                    Capacity Building and Techn                    Individual Consult
abour Management Procedur IDA / 61850                                             Post                                  Limited                                    30,000.00      27,865.75    Signed      2020-10-05   2020-09-27    2020-10-10   2020-12-14   2020-10-17   2020-12-22   2020-10-31   2020-12-31   2020-11-21
                                                    ical Assistance                                ant Selection
e (LMP) for the proposed Nig
eria Distribution Sector Reco
very Program (DISREP)

 NTP-IC-03 / Consultancy serv
ices for the preparation of St
                                                    Capacity Building and Techn                    Individual Consult
akeholder Engagement Plan ( IDA / 61850                                           Post                                  Limited                                    30,000.00      27,865.75    Signed      2020-10-05   2020-09-27    2020-10-10   2020-12-14   2020-10-17   2020-12-22   2020-10-31   2020-12-31   2020-11-21
                                                    ical Assistance                                ant Selection
SEP) for the proposed Nigeria
Distribution Sector Recovery
Program (DISREP)

 NTP-IC-04 / Consultancy Ser
vices for Technical Advisor -D
                                                    Capacity Building and Techn                    Individual Consult
isCo Governance and Perfor     IDA / 61850                                        Post                                  Limited                                    50,000.00      45,598.50    Signed      2020-10-27   2020-11-09    2020-11-01   2020-11-16   2020-11-15   2020-11-24   2020-12-06   2020-11-25   2021-12-06
                                                    ical Assistance                                ant Selection
mance ("DGP"), Power Sector
Supervisory Working Group
Secretariats

 NTP-IC-05 / Consultancy Ser
vices for Technical Advisor -
                                                    Capacity Building and Techn                    Individual Consult
Sector Operations, Monitorin      IDA / 61850                                     Post                                  Limited                                    50,000.00      60,838.52    Signed      2020-10-27   2020-11-09    2020-11-01   2020-11-16   2020-11-15   2020-11-24   2020-12-06   2020-12-01   2021-12-06
                                                    ical Assistance                                ant Selection
g and Evaluation ("SOME"), P
ower Sector Supervisory Wor
king Group Secretariats

 NTP-IC-06 / Consultancy Ser
vices for Technical Specialist                      Capacity Building and Techn                    Individual Consult
                               IDA / 61850                                        Post                                  Limited                                    50,000.00      60,798.00    Signed      2020-10-27   2020-11-09    2020-11-10   2020-11-16   2020-11-24   2020-11-24   2020-12-08   2020-11-25   2021-12-08
for PSRP-PAF & Power Sector                         ical Assistance                                ant Selection
Supervisory Working Group S
ecretariats

 NTP-IC-07 / Consultancy Ser
vices for Commercial Speciali                       Capacity Building and Techn                    Individual Consult
                              IDA / 61850                                         Post                                  Limited                                    50,000.00      47,118.45    Signed      2020-10-27   2020-11-09    2020-11-01   2020-11-16   2020-11-02   2020-11-24   2020-12-07   2020-11-25   2021-12-07
st for the PSRP-PAF & Power                         ical Assistance                                ant Selection
Sector Supervisory Working
Group Secretariats

 NTP-IC-08 / Consultancy Ser
                                                    Capacity Building and Techn                    Individual Consult
vices for Advisory Assistant o IDA / 61850                                        Post                                  Limited                                    50,000.00      46,510.47    Signed      2020-10-27   2020-11-21    2020-11-01   2020-11-27   2020-11-15   2020-12-15   2020-12-06   2020-12-24   2021-12-06
                                                    ical Assistance                                ant Selection
n Power Sector Coordination


 NTP-IC-09 / Consultancy Ser
                                                    Capacity Building and Techn                    Individual Consult
vices for Advisory Assistant o IDA / 61850                                        Post                                  Limited                                    50,000.00      46,510.47    Signed      2020-10-27   2020-11-21    2020-11-01   2020-11-27   2020-11-22   2020-12-15   2020-12-27   2020-12-24   2022-12-27
                                                    ical Assistance                                ant Selection
n DisCos Governance and Op
erations

 NTP-CDS01 / Consultancy se
rvices for supervision of the c
onstruction of two new Contr                        Capacity Building and Techn
                                IDA / 61850                                       Post             Direct Selection     Direct                                    450,000.00     427,585.43    Signed      2020-11-22   2020-12-01    2020-12-06   2020-12-10                             2021-01-10   2021-01-30   2022-01-10
ol Centers at Osogbo & Shiro                        ical Assistance
ro and Refurbishment & Exte
nsion of two existing Control
Centers at Benin & Ikeja Wes
t




                                                                                                                                                                                                                             Page 4
 NTP-IC-10 / Consultancy Ser
vices Monitoring and Evaluati
on of Financial Interventions                   Capacity Building and Techn          Individual Consult
                                IDA / 61850                                   Post                        Limited    50,000.00    45,173.08   Signed            2021-02-23   2021-02-18    2021-02-28   2021-02-23   2021-03-07   2021-02-26   2021-04-04   2021-03-02   2022-04-04
for the Improvement of Paym                     ical Assistance                      ant Selection
ent Discipline (MEFIIPD) in th
e Nigerian Electricity Supply I
ndustry (NESI)

 NGP-TC20A / Consultancy Se
rvice on Regulatory Open Bo                     Capacity Building and Techn
                             IDA / 61850                                      Post   Direct Selection     Direct    480,000.00         0.00   Canceled          2021-02-23   2021-02-19    2021-03-05                                          2021-04-03                2021-08-31
ok Review of Kaduna and Jos                     ical Assistance
Distribution Companies (Disc
os) for NERC

 NGP-TC22A / Consultancy Se
rvice on Regulatory Open Bo                     Capacity Building and Techn
                              IDA / 61850                                     Post   Direct Selection     Direct    720,000.00         0.00   Canceled          2021-02-23   2021-02-19    2021-03-05                                          2021-04-16                2021-09-13
ok Review of Ibadan, Ikeja an                   ical Assistance
d Yola Distribution Companie
s (Discos) for NERC

 NTP-IC-11 / Consultancy Ser
vices for Gender-Based Viole
                                                Capacity Building and Techn          Individual Consult
nce (GBV)/Sexual Exploitatio      IDA / 61850                                 Post                        Limited   300,000.00   323,865.51   Signed            2021-05-10   2021-04-29    2021-05-15   2021-05-19   2021-05-29   2021-05-28   2021-06-12   2021-06-01   2023-06-12
                                                ical Assistance                      ant Selection
n and Abuse (SEA) Specialist
for the Nigeria Electricity Tra
nsmission Project (NETAP)

 NTP-IC-12 / Consultancy Ser
vices for Advisor to Federal M
                                                Capacity Building and Techn          Individual Consult
inistry of Power (FMoP) Liaiso IDA / 61850                                    Post                        Limited    50,000.00    47,941.75   Signed            2021-06-13   2021-06-06    2021-06-18   2021-06-15   2021-06-25   2021-06-22   2021-07-09   2021-06-25   2022-07-09
                                                ical Assistance                      ant Selection
n and Communication for the
Power Sector Supervisory Wo
rking Group (PSSWG)

 NTP-IC-13 / Consultancy Ser
vices for Advisor to Lawsuits
                                                Capacity Building and Techn          Individual Consult
and Sanctity of Contract and      IDA / 61850                                 Post                        Limited    50,000.00    48,961.79   Signed            2021-06-13   2021-06-06    2021-06-18   2021-06-15   2021-06-25   2021-06-22   2021-07-09   2021-06-25   2022-07-09
                                                ical Assistance                      ant Selection
Agreements in the Nigeria El
ectricity Supply Industry (NE
SI) - LawSCAN

 NTP-IC-14 / Consultancy Ser
vices for Technical Advisor S
                                                Capacity Building and Techn          Individual Consult
upporting Power Generation I IDA / 61850                                      Post                        Limited    50,000.00    48,961.79   Signed            2021-08-23   2021-08-12    2021-08-28   2021-08-24   2021-09-04   2021-09-06   2021-09-18   2021-09-02   2022-09-18
                                                ical Assistance                      ant Selection
nitiatives of the Power Sector
Reforms Coordination Workin
g Group (PSRCWG).

 NTP-IC-15 / Consultancy Ser
vices for Coordination and M
                                                Capacity Building and Techn          Individual Consult
anagement of Communicatio IDA / 61850                                         Post                        Limited    50,000.00    48,961.79   Signed            2021-08-23   2021-08-12    2021-08-28   2021-08-24   2021-09-04   2021-09-06   2021-09-18   2021-09-02   2022-09-18
                                                ical Assistance                      ant Selection
n of Principals of the Power S
ector Supervisory Working Gr
oup (PSSWG)

 NTP-IC-20 / Consultancy Ser
vice for Improving the Functi
                                                Capacity Building and Techn          Individual Consult
onal and Technical Specificat IDA / 61850                                     Post                        Limited    65,000.00    71,300.00   Signed            2021-11-29   2021-11-26    2021-12-04   2021-12-02   2021-12-09   2022-01-05   2021-12-19   2022-03-26   2022-10-20
                                                ical Assistance                      ant Selection
ions of AMI Implementation i
n Electricity Distribution


 NTP-IC-16 / CONSULTANCY S
ERVICES FOR LEGAL ADVISO
R – MANAGEMENT OF SERVIC
E LEVEL AGREEMENT (SLA) E
                                                Capacity Building and Techn          Individual Consult
XPECTATIONS FOR THE TRAN IDA / 61850                                          Post                        Limited    50,000.00    48,403.35   Signed            2022-01-31   2022-02-09    2022-02-05   2022-03-09   2022-02-12   2022-03-21   2022-02-26   2022-03-31   2023-02-26
                                                ical Assistance                      ant Selection
SMISSION COMPANY OF NIGE
RIA (TCN) UNDER THE TRANS
MISSION-DISTRIBUTION INTE
RFACE OPTIMIZATION PROJE
CTS OF THE NIGERIA ELECTRI
CITY SUPPLY INDUSTRY
 NTP-TC18A / Engagemment
                                                Capacity Building and Techn          Individual Consult
of Consultant for Environmen IDA / 61850                                      Post                        Limited   200,000.00   193,036.13   Signed            2022-05-16   2022-06-07    2022-05-21   2022-06-21   2022-05-28   2022-06-30   2022-06-11   2022-07-11   2023-12-31
                                                ical Assistance                      ant Selection
tal and Social Compliance Au
dits

 NTP-BPE-IC-01 / Consultancy
services for engagement of E                    Capacity Building and Techn          Individual Consult
                             IDA / 61850                                      Post                        Limited    30,000.00         0.00   Signed            2022-08-08   2022-08-18    2022-08-13   2022-08-19   2022-08-20   2022-09-26   2022-09-17                2022-12-16
nvironmental and Social Risk                    ical Assistance                      ant Selection
Management Consultant


 NTP-IC-21 / Consultancy Ser
vices for Supporting the Mini                   Capacity Building and Techn          Individual Consult                                       Under Implement
                              IDA / 61850                                     Post                        Limited    35,000.00         0.00                     2023-01-30   2023-03-08    2023-02-01   2023-03-13   2023-02-06                2023-02-13                2023-05-31
ster of Power - Team Lead, M                    ical Assistance                      ant Selection                                            ation
inisterial Strategy Team