Knowledge, innovation, excellency LILONGWE UNIVERSITY OF AGRICULTURE AND NATURAL RESOURCES (LUANAR) PROCUREMENT PLAN FOR AQUAFISH CENTRE FOR EXCELLENCY WORLD BANK PROJECT I. General 1. Project Information Country: Malawi Project Name: Aqua fish Centre for Excellency Project ID: P151847, Loan IDA: 58020 2. Project Implementation Agency: Lilongwe University of Agriculture and Natural Resources (Luanar) 3. Date of the Procurement Plan: 13th May 2017 4. Period Covered by this procurement plan: May 2017- May 2018 II. Thresholds for Prior Review, Procurement Approaches and Methods A. Goods, Works and Non-Consulting Services Procurement Approaches and Methods (US$ Prior Review millions) Category (US$ Open Open Request for millions) International National Quotation (RfQ) Works ≥ 10 ≥ 15.0 < 15 ≤ 0.2 Goods, IT, and non- ≥2 ≥5 <5 ≤ 0.1 consulting services B. Consulting Services Category Prior Review Short List of National Consultants (US$ (US$ million) millions) Consulting Engineering and Services Construction Supervision Consultants ≥1 ≤ 0.3 ≤ 0.3 (Firms) 1 Individual ≥ 0.3 NA. NA. Consultants [Overall Project Procurement Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 2 III. Packages for Goods, Works and Non-Consulting Services Sr./ Contract Description Estimated Review Market Selectio Evaluation Procure Preq Dome Expec Expect No Cost (US$) by Bank Approac n Options ment ualifi stic ted ed date (Prior/P h (Open- Method (BAFO, Process: catio Prefer date of ost) National (RFP, Rated (Single/ n ence of bid/ Contrac / RFB, Criteria Multiple (Yes/ (Yes/N propo t Internati RFQ, DS etc.) Stages; No) o) sal Signatu onal etc.) One/Two openin re Limited Envelop g etc.) es etc) Goods 1 Procurement of Project Post Open – Reque Single No No 5th 9th June Motor vehicles 60,000.00 Nation st for May 2017 al Bids 2017 2 Procurement of ICT Post Open – Reque Single No No 24th 30th Equipment 32,582.00 Nation st for June August al Bids 2017 2017 3 Procurement of ICT Post Limite Reque Single No No 10th 10th Equipment 918.00 d st for May May Quotat 2017 2017 ion 4 Procurement of Post Limite Reque Single No No 24th 30th Stationery 2,000.00 d st for June August Quotat 2017 2017 ion 5 Procurement of Office 15,000.00 Post Open – Reque Single No No 24th 30th Furniture Nation st for June August al Bids 2017 2017 6 Procurement of lab 36,550.0.0 Post Open- Reque Single No No 24th 30th equipment (Ice plant 0 Nation st for June August and processing unit) al Bids 2017 2017 7 Procurement of project 9,870.00 Post Nation Reque Single No No 20th 30th management module to al st for June August add to Sage ACCPAC Bids 2017 2017 3 ERP including Training. 8 Procurement of project 3,130.00 Post Limite Reque Single No No 9th 9th May management module to d st for May 2017 add to Sage ACCPAC Quotat 2017 ERP. ions Works 1 Rehabilitation of Post Open - Qualifica Single No No 28th 30th Computer Laboratories 72,756.00 Nation tion June August for 5 Departments al Criteria 2017 2017 Non-Consulting Services 1 Procurement of Air Post Limite Reque Qualifica Single No No As As Tickets 102,500.0 d st for tion requir require 0 Quotat Criteria ed d ions 2 Procurement of Motor 3,500.00 Post Open Reque Qualifica Single No No 15th 30th Vehicle Insurance Nation st for tion July August al Bids Criteria 2017 2017 4 IV. Packages for Consulting Services Sr. No Contract Description Estimated Review Market Selection Evaluatio Shortlisti Expected date of Expected date Cost (US$) by Bank Approach Method n Options ng bid/ proposal of Contract (Prior/Pos (Open- (QCBS, FBBS, (BAFO, (Yes/ No) opening Signature t) National/ LCBS, QBS, Rated International CQS, DS etc.) Criteria Limited etc.) etc.) 1 Procurement of consultancy 5,000.00 Post National CQS Rated Yes 20th June 2017 30th August Criteria 2017 services to engage a consultant to develop website and support Wi-Fi access 2 Procurement of Consultancy 10,000.00 Post National CQS Rated Yes 20th June 2017 30th August Criteria 2017 Services to engage a consultant to develop student tracking system 3 Procurement of consultant 40,000.00 Post National LCS Rated Yes 20th June 2017 30th August Criteria 2017 to facilitate the trainers on e-learning 4 Procurement of external 9,000.00 Post National LCS Rated Yes 20th June 2017 30th August Criteria 2017 auditors 5 PROCUREMENT Eastern and Southern Africa : Eastern and Southern Africa Higher Education Centers of Excellence PLAN General Information Country: Eastern and Southern Africa 2023-05-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151847 GPN Date: Project Name: Eastern and Southern Africa Higher Education Centers of Excellence Loan / Credit No: IDA / 71650 Lilongwe University of Agriculture and Natural Resources Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 1: Strengthening Request for Quota MW-LUANAR-330819-CW-RF Request for Quota Single Stage - One E Pending Imp 2024-02-0 IDA / 71650 Africa Centers of Excellence Post Limited tions (Non Bank-S 25,000.00 0.00 2023-11-11 2024-01-28 Q / Commercial BSF Facilities tions nvelope lementation 6 (ACEs) in Regional Priority Ar PD) eas MW-LUANAR-330756-CW-RF Component 1: Strengthening Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-04-0 Q / Cannabis Irrigation Syste IDA / 71650 Africa Centers of Excellence Post Limited tions (Non Bank-S 50,000.00 0.00 2023-12-20 2024-03-28 tions nvelope lementation 6 m (Pumps, Pipes, Sprinklers (ACEs) in Regional Priority Ar PD) and Fittings) eas Request for Bids - MW-LUANAR-330798-CW-RF Component 1: Strengthening Single Stage - One E Small Works SPD 2024-09-0 B / Renovation and Maintena IDA / 71650 Africa Centers of Excellence Post Request for Bids Open - National 107,204.00 0.00 Canceled 2023-10-14 2023-10-29 2023-12-13 2024-01-27 2024-03-11 nvelope (1 envelope proce 7 nce of Data Centre and Offic (ACEs) in Regional Priority Ar ss) es eas MW-LUANAR-330821-CW-RF Component 1: Strengthening Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-06-2 Q / Commercial Aquaponics F IDA / 71650 Africa Centers of Excellence Post Limited tions (Non Bank-S 37,500.00 0.00 2023-12-27 2024-03-25 tions nvelope lementation 3 acilities (ACEs) in Regional Priority Ar PD) eas MW-LUANAR-330788-CW-RF Component 1: Strengthening Request for Quota Request for Quota Single Stage - One E Pending Imp 2025-03-1 Q / Refurbishment of the nur IDA / 71650 Africa Centers of Excellence Post Limited tions (Non Bank-S 30,000.00 0.00 2024-10-30 2025-01-17 tions nvelope lementation 8 sery at LUANAR (ACEs) in Regional Priority Ar PD) eas GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LUANAR-329456-GO-RF Component 1: Strengthening Q / Agri-Food processing Plan Africa Centers of Excellence Request for Quota Single Stage - One E Pending Impl IDA / 71650 Post Limited 100,000.00 0.00 2023-11-10 2024-01-09 2024-07-07 t (Canning Machine, Boiler, R (ACEs) in Regional Priority Ar tions nvelope ementation etort, Extruder, Dryer) eas MW-LUANAR-329477-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Disaster recovery system IDA / 71650 Africa Centers of Excellence Post Limited 75,000.00 0.00 2023-11-04 2024-01-22 2024-03-22 tions nvelope ementation plus ambient control system (ACEs) in Regional Priority Ar eas Component 1: Strengthening MW-LUANAR-330754-GO-RF Single Stage - One E Pending Impl IDA / 71650 Africa Centers of Excellence Post Request for Bids Open - National 535,000.00 0.00 2023-06-22 2023-06-30 2023-08-14 2023-09-13 2023-10-22 2023-12-21 B / Motor Vehicles nvelope ementation (ACEs) in Regional Priority Ar eas MW-LUANAR-330764-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Office Furniture and Equi IDA / 71650 Africa Centers of Excellence Post Limited 90,000.00 0.00 2023-08-16 2023-10-19 2023-12-03 tions nvelope ementation pment (ACEs) in Regional Priority Ar eas Component 1: Strengthening MW-LUANAR-330809-GO-RF Request for Quota Single Stage - One E Pending Impl IDA / 71650 Africa Centers of Excellence Post Limited 10,000.00 0.00 2024-02-14 2024-04-18 2024-06-17 Q / Model Integrated System tions nvelope ementation (ACEs) in Regional Priority Ar eas MW-LUANAR-330770-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Solar Powered Storage Fa IDA / 71650 Africa Centers of Excellence Post Limited 25,000.00 0.00 2024-02-05 2024-04-14 2024-06-13 tions nvelope ementation cility (ACEs) in Regional Priority Ar eas MW-LUANAR-330778-GO-RF B / ICT Items and Savers (Ga ming Computers 3, laptops C Component 1: Strengthening omputers 47, tablets 42 , po Africa Centers of Excellence Single Stage - One E Pending Impl wer banks 5, desktops 38, Lo IDA / 71650 Post Request for Bids Open - National 276,500.00 0.00 2023-11-15 2023-12-30 2024-02-13 2024-03-29 2024-05-12 2024-08-10 (ACEs) in Regional Priority Ar nvelope ementation wer spec printers 20, Heavy eas Duty Printers 5, 3D Printer 1, Saver and Its Accessories 1, Digital Cameras 6, Projectors 21, Voice Recorder 10, TV 6) Component 1: Strengthening MW-LUANAR-330766-GO-RF Request for Quota Single Stage - One E Pending Impl IDA / 71650 Africa Centers of Excellence Post Limited 20,000.00 0.00 2024-04-10 2024-06-17 2024-08-16 Q / Drones tions nvelope ementation (ACEs) in Regional Priority Ar eas Component 1: Strengthening MW-LUANAR-330787-GO-RF Request for Quota Single Stage - One E Pending Impl IDA / 71650 Africa Centers of Excellence Post Limited 51,800.00 0.00 2024-03-25 2024-06-03 2024-07-18 Q / Artificial insemination kit tions nvelope ementation (ACEs) in Regional Priority Ar eas MW-LUANAR-330784-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Video Conferencing Equip IDA / 71650 Africa Centers of Excellence Post Limited 20,000.00 0.00 2024-02-09 2024-04-19 2024-06-18 tions nvelope ementation ment (ACEs) in Regional Priority Ar eas MW-LUANAR-330785-GO-RF Component 1: Strengthening Single Stage - One E Pending Impl B / Equipment for food proce IDA / 71650 Africa Centers of Excellence Post Request for Bids Open - National 172,000.00 0.00 2024-10-18 2024-11-02 2024-12-17 2025-01-31 2025-03-11 2025-06-09 nvelope ementation ssing plant (ACEs) in Regional Priority Ar eas MW-LUANAR-329470-GO-RF Component 1: Strengthening Single Stage - One E Pending Impl B. / Supply and Delivery of E IDA / 71650 Africa Centers of Excellence Post Request for Bids Open - National 266,000.00 0.00 2024-06-12 2024-07-17 2024-08-31 2024-09-30 2024-11-03 2025-02-01 nvelope ementation quipment for Design Studio (ACEs) in Regional Priority Ar eas MW-LUANAR-329470-GO-RF Component 1: Strengthening Single Stage - One E B / Equipment for Design Stu IDA / 71650 Africa Centers of Excellence Post Request for Bids Open - National 136,000.00 0.00 Canceled 2023-06-06 2023-06-21 2023-08-05 2023-09-19 2023-11-02 2024-04-30 nvelope dio (ACEs) in Regional Priority Ar eas Component 1: Strengthening MW-LUANAR-330751-GO-RF Request for Quota Single Stage - One E Pending Impl IDA / 71650 Africa Centers of Excellence Post Limited 20,000.00 0.00 2024-03-19 2024-05-22 2024-07-21 Q / PA System tions nvelope ementation (ACEs) in Regional Priority Ar eas MW-LUANAR-365798-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Procurement of Data Proc IDA / 71650 Africa Centers of Excellence Post Limited 100,000.00 0.00 2023-12-29 2024-02-27 2024-05-27 tions nvelope ementation essing Servers (Microsoft and (ACEs) in Regional Priority Ar Unix) eas Page 1 MW-LUANAR-365804-GO-RF Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl Q / Procurement of a two GP IDA / 71650 Africa Centers of Excellence Post Limited 600.00 0.00 2024-01-24 2024-04-03 2024-05-03 tions nvelope ementation S Receivers (ACEs) in Regional Priority Ar eas NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 18-MONTH PROCUREMENT PLAN Project information: Phase I of Improved Child Survival Program for Human Capital MPA- P167156-- Immunization Plus and Malaria Progress by Accelerating Coverage and Transforming Services (IMPACT) Project Project Implementation Agencies: Federal Ministry of Health (NMEP and NPHCDA) Date of the Procurement Plan: January 1, 2020 Period covered by this Procurement Plan: January 2020 to June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016), revised on November 1, 2017 and on August 1, 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Nigeria Public Procurement Act 2007, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [15% is applicable for those contracts identified in the Procurement Plan tables]; Works: [ 7.5% is applicable for those contracts identified in the Procurement Plan tables] I. Threshold for Prior Review – Goods, Works, Non-Consulting Services and Consulting Services Prior-review Thresholds Thresholds for Procurement Methods High Substanti Moderate Low Risk Goods, IT & Non-Consulting Shortlist of National Procurement Type Risk al Risk Risk Works ($'000) ($'000) ($'000) ($'000) Services Consultants Request Request Engineering Open for for Open Open Open Consultin & Quotatio Quotatio 10,0 15,0 20,0 Internatio National internatio National g Constructio Works n or n or 5,000 00 00 00 nal or ICB or NCB National nal or ICB or NCB National Services n ($'000) ($'000) ($'000) ($'000) ($'000) Supervision Shopping Shopping ($'000) ($'000) ($'000) Goods, IT & Non- 2,0 4,0 6,0 Consulting Services 1,500 00 00 00 ≧ < ≦ ≧ < ≦ < ≦ Consultants 1,0 2,0 4,0 20,0 20,0 5,0 5,0 1 3 5 200 (Firms) 500 00 00 00 00 00 00 00 00 00 00 Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Goods, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): Selec Evaluation Market tion Options Approa Review Meth (Most Expected ch Prequal- Domestic Expected by od Advantageo date of Sr. Contract Estimated (Open- ification Preferenc date of Bank (RFP, us Bid, bid/ No Description Cost (US$) Nation (Yes/ e Contract (Prior/ RFB, BAFO, proposal al/ No) (Yes/No) Signature Post) RFQ, Rated opening Limited DS Criteria etc.) etc.) etc.) Nigeria Malaria Elimination Programme (NMEP) GOODS Procurement of Long Lasting Open- Insecticide Internati Most Treated Nets 45,852,523 3rd Feb 13th July 1 Prior onal RFB Advantageou No Yes (Mass .29 2020 2020 s Bid Campaign & Routine Distribution) Procurement of Artemisinin based Open - Most National 3rd Feb 13th July 2 Combination Post 2,381,472 RFB Advantageou No No 2020 2020 Therapy (ACT)- s Bid (Public and Private) Procurement of Open- Most Rapid National 3rd Feb 13th July 3 Post 1,960,202 RFB Advantageou No No Diagnostics 2020 2020 s Bid Tests (RDTs) Most Artesunate Open- 3rd Feb 13th July 4 Post 420,881.89 RFB Advantageou No No Injection National 2020 2020 s Bid Sulphodoxine/P Most Open - 3rd Feb 13th July 5 yrimethamine_I Post 612,322 RFB Advantageou No No National 2020 2020 PTp s Bid Amodiaquine/Su Most lphodoxine/Pyri 2,990,781. Open - 3rd Feb 13th July 6 Post RFB Advantageou No No methamine 47 National 2020 2020 s Bid (SPAQ) Most Open - 3rd Feb 13th July 7 Sharp Boxes Post 152,122,43 RFB Advantageou No No National 2020 2020 s Bid Most Microscope Open - 3rd Feb 13th July 8 Post 491,031 RFB Advantageou No No commodities National 2020 2020 s Bid NON-CONSULTING SERVICES - NMEP State Malaria Elimination MOU/P Programme erform 10th 2,250,000. 9th July 1 (SMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Malaria Elimination MOU/P Programme erform 10th 1,500,000. 9th July 2 (NMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Primary Health Care Development Agency (NPHCDA) GOODS Procurement of Most vaccines and 61,380,767 5th Feb 13th July 1 Prior UN RFB Advantageou No No devices for .00 2020 2020 s Bid immunization Procurement and maintenance of Most UN 5th Feb 13th July 2 Generators and Post 900,000.00 RFB Advantageou No No System 2020 2020 Cold Chain s Bid Equipment (CCEs) Procurement and installation of Cold Chain Most 4,500,000. 5th Feb 13th July 3 Hubs (3 Prior UN RFB Advantageou No No 00 2020 2020 walking-in cold s Bid rooms) in Lagos Procurement of Emergency Transport 5th Feb 13th July 4 Service (ETS) Post 45,101.72 Limited RFQ Rated Criteria No No 2020 2020 vouchers, handbooks, and logbooks Procurement of Most Open- 5th Feb 13th July 5 equipment for Post 281,969.00 RFB Advantageou No No National 2020 2020 call centre s Bid Most Procurement of Open- 5th Feb 13th July 6 Post 969,529.00 RFB Advantageou No No 14 vehicles National 2020 2020 s Bid Procurement of 5th Feb 13th July 7 14 computer Post 14,000 Limited RFQ Rated Criteria No No 2020 2020 sets II. Summary of the procurement packages for Consulting Services -Planned for the first 18 months after project effectiveness): Selection Market Method Review Approach Expected Expected Estimate (QCBS, Shortlisti Sr. by Bank (Open - date of bid/ date of Contract Description d Cost FBS, ng No (Prior/ International proposal Contract (US$) LCBS, (Yes/ No) Post) / National/ opening Signature QBS, CQS, etc.) DS etc.) Nigeria Malaria Elimination Programme (NMEP) NGOs Service Contract (for 5 11,525,51 Open 10th Feb 31st Aug 1 Prior QCBS Yes states) 1.00 International 2020 2020 Technical Assistance to SMEP in 5 participating states, 630,000.0 10th Feb 31st July 2 Prior Limited INDV No multiple contracts by 0 2020 2020 different consultants Technical Assistance to NMEP (including procurement 150,000.0 10th Feb 31st July 3 Post Limited INDV No consultant), multiple 0 2020 2020 contracts. Independent Verification 300,000.0 Open- 10th Feb 31st July 4 Post CQS No Agents (IVA) for NGOs 0 National 2020 2020 Social and Behavioral Change 3,000,000. Open 10th Feb 31st Aug 5 Prior QCBS Yes Communication (SBCC) 00 International 2020 2020 Operations research on 2,131,148. Open 10th Feb 31st Aug 6 Prior QCBS Yes disease vector mapping 00 International 2020 2020 Operations research on entomological surveillance by 655,738.0 10th Feb 31st July 7 Prior Direct DS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Operations research on therapeutic efficacy by 655,738.0 10th Feb 31st July 8 Prior Direct CDS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Consultancy on warehouse 10th Feb 31st July 9 Post 32,131.00 Limited INDV No assessment 2020 2020 Programme Management Training (case management, 2,000,000. 10th Feb 31st July 10 Prior Limited INDV No M&E, IVM etc.) Multiple 00 2020 2020 Contracts National Primary Health Care Development Agency (NPHCDA) Technical assistance support 9,869,000. 10th Feb 31st July 1 to government for polio Prior UN CDS No 00 2020 2020 surveillance Technical assistance support to government for polio 15,301,00 10th Feb 31st July 2 Supplemental Immunization Prior UN CDS No 0.00 2020 2020 Activities (SIAs) surveillance through WHO Technical assistance support to government for polio 4,830,000. 10th Feb 31st July 3 logistics and social Prior UN CDS No 00 2020 2020 mobilization for polio through UNICEF Procurement of consultant for 10th Feb 31st July 4 Post 20,000.00 Limited INDV No landscape survey (SQUATS) 2020 2020 Technical assistance support 837,673.1 10th Feb 31st July 5 Prior Open-National INDV No to 12 SPHCDA PIU 3 2020 2020 Technical assistance support 10th Feb 31st July 6 Post 89,750.63 Limited INDV No to NPHCDA PIU 2020 2020 Procurement of Emergency Transport Services (ETS), MOU with National Union of 530,794.3 10th Feb 31st July 7 Prior Direct CDS No Road Transport Workers 9 2020 2020 (NURTW) and NACTOROMAS Training of ETS service providers, MOU with Federal 207,672.0 10th Feb 31st July 8 Post Direct CDS No Road Safety Commission 0 2020 2020 (FRSC) Conduct PAPA – Lot Quality Assurance Sampling, MOU 2,213,850. 10th Feb 31st July 9 Prior Limited CDS No with National Bureau of 00 2020 2020 Statistics (NBS) Consultancy for RCT research 1,902,356. 10th Feb 31st Aug 10 services with Nigerian Prior Open-National QCBS Yes 00 2020 2020 Universities Procurement of operations 1,689,751. Open- 10th Feb 31st Aug 11 Prior QCBS Yes research services 00 International 2020 2020 Support to Cold Chain Equipment (CCE) 23,000,00 10th Feb 31st July 12 Prior UN CDS No optimization platform 0.00 2020 2020 through UNICEF Technical assistance to 1,553,185. 10th Feb 31st July 13 LGHAs (89 total), multiple Post Open-National INDV No 50 2020 2020 contracts Technical assistance 310,076.0 10th Feb 31st July 14 Post Open-National QCBS Yes management firm 0 2020 2020 10th Feb 31st July 15 IVA for performance contract Post 300,000 Open-National CQS No 2020 2020 Procurement of services 3,203,345 Open- 10th Feb 31st Aug 16 for GIS imagery and Prior QCBS Yes .45 International 2020 2020 microplanning Procurement of Social Behaviour Change Open- 10th Feb 31st Aug 17 Prior 5,000,000 QCBS Yes Communication (SBCC) International 2020 2020 services Contracting of direct 2,000,000. Open- 10th Feb 31st Aug 18 Prior QCBS Yes facility financing firms 00 International 2020 2020 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Nigeria : Nigeria Improved Child Survival Program for Human Capital MPA PLAN General Information Country: Nigeria 2022-06-26 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167156 GPN Date: Project Name: Nigeria Improved Child Survival Program for Human Capital MPA Loan / Credit No: IDA / 65390 Kaduna MPA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NG-KADUNA MPA-301387-G Request for Quota Component 2: Immunization Request for Quota Single Stage - One E 2023-03-0 O-RFQ / Renovation of SPIU T IDA / 65390 Post Limited tions (Non Bank-S 8,403.15 7,673.45 Completed 2022-07-09 2022-07-19 2022-09-03 2022-08-16 Plus tions nvelope 2 emporary Project Office for I PD) mpact Project GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-KADUNA MPA-300437-G Component 2: Immunization Request for Quota Single Stage - One E Under Imple O-RFQ / Procurement of SPIU IDA / 65390 Post Limited 77,732.22 0.00 2022-07-09 2022-07-22 2022-09-03 2023-03-02 Plus tions nvelope mentation office equipment and ICT equ ipments NG-KADUNA MPA-300438-G Component 2: Immunization Request for Quota Single Stage - One E O-RFQ / Procurement of SPIU IDA / 65390 Post Limited 16,425.00 0.00 Signed 2022-07-09 2022-07-22 2022-09-03 2023-03-02 Plus tions nvelope office furnitures NG-KADUNA MPA-301392-G O-RFQ / Procurement of two Component 2: Immunization Request for Quota Single Stage - One E IDA / 65390 Post Limited 150,000.00 0.00 Completed 2022-07-09 2022-07-22 2022-09-03 2023-03-02 2022-09-22 double cab small trucks vehi Plus tions nvelope cles for project implementati on and supervision NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-KADUNA MPA-362791-N C-RFQ / Engagement of Exter Component 2: Immunization Pending Impl IDA / 65390 Post Direct Selection Direct - National 9,619.69 0.00 2023-05-25 2023-05-30 2023-07-04 2023-12-31 nal Audit Firm for 2022 Finan Plus ementation cial Audit of KADUNA IMPACT PROJECT PIU Account CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-KADUNA MPA-326112-CS -CDS / Procurement and insta Component 2: Immunization Under Implement IDA / 65390 Post Direct Selection Direct - National 11,073.17 0.00 2022-11-12 2022-11-15 2022-11-22 2023-01-26 2023-07-25 llation of Flexible accounting Plus ation software for Kaduna IMPACT Project NG-KADUNA MPA-331557-CS -CDS / Engagement of DFF T Component 2: Immunization Under Implement echnical Assistant (TA) consu IDA / 65390 Post Direct Selection Direct - National 19,767.44 0.00 2022-12-14 2022-12-20 2022-12-24 2022-12-19 2023-02-27 2023-08-26 Plus ation ltant to support the Health Fa cilities on investment unit im plementation Page 1 PROCUREMENT PLAN (Textual Part) Project information: INDIA, Proposed Tripura Rural Economic Growth and Service Delivery Project (P178418) Project Implementation agency: Multiple, lead by Tribal Welfare Department Date of the Procurement Plan: March 2022 Period covered by this Procurement Plan (textual part): From March, 2022 onwards till publication of next version of the Procurement Plan. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018, and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Procurement for the project will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers, July 2016, Revised November 2017, August 2018, November 2020 and applicable to Investment Project Financing (IPF). The project will be subject to the World Bank’s Anticorruption Guidelines, dated October 15, 2006, as revised in January 2011 and July 2016. The table below describes various procurement methods to be used for activities financed by the loan. The thresholds (Error! Reference source not found.) indicated will govern the procurement approach and methods; Table 1: Procurement Approaches and Methods Procurement Approaches Thresholds (US$ equivalent) and Methods For any value activity Open international Open national (works – Up to 40 million including turnkey, supply and installation of plant and equipment and PPP) Open national (goods, IT Up to 10 million system, and non- consulting services) National request for Up to 100,000 quotation (works, goods, IT system and non-consulting services) Direct selection No threshold; For works, goods, non-consulting services and IT system procurement: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations National Market Approach Up to 2 million for Selection of Consultants Prior Review Thresholds Works including Supply & All contracts more than or equal to US$ 10 million Installation of Plant and equivalent. Equipment Goods, IT system and Non- All contracts more than or equal to US$2 million consulting services equivalent Consultants All contracts (i) more than or equal to US$1 million equivalent for firms; and (ii) more than or equal to US$300,000 equivalent for individuals. Prior Review contracts Irrespective of the contract value, the following irrespective of value procurement activities are subject to the Bank’s procurement prior review: (a)procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulation for Borrowers (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations for Borrowers; and (e) best and final offer. To help borrower undertake emergency procurement through faster means, market approaches and review requirements as defined below would be applicable only under component-3 and only for the period of emergency. Table2: Procurement Approaches & Methods for Component -03 applicable only for the emergency period Category of Market approach threshold Prior review procurement threshold (US $m) Works Above US$40 M for ICP Up to None for emergency US$40 M for NCP Up to US$1 M for period. Standard RFQ review procedure will Goods & Non- Above US$25 M for ICP Up to -do- after this period. apply Consultancy US$25 M for NCP Up to US$1 m for services RFQ Consultancy US$ 0.8 M for NPP (with option for -do- Services direct RFP) Above US$0.8 M-Other methods Note: Direct contracting/single source prior review will follow the requirements of the category of procurement (goods, works and services). Higher thresholds (US$ 25M for Goods NCP and US$ 1 M for RFQ) are applicable only for emergency response period, normal threshold (US$ 10M for Goods NCP and US$ 100,000 for RFQ will be used thereafter. Domestic preference- The provision of domestic preference for goods will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. National Procurement Arrangements: National competition for the procurement of works, goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: 1. Only the model bidding documents for National Competitive Procurement (NCP) agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. 2. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. 3. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. 4. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. 5. Government e-Marketplace (GeM) set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. 6. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. 7. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 8. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 9. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. 10. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. Procurement of Works, Goods (Supply and Installation; and IT Equipment), Non-Consultancy Services and Consultancy Services – As per procurement plan approved in STEP. PROCUREMENT India : Tripura Rural Economic Growth and Service Delivery Project PLAN General Information Country: India 2023-04-26 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P178418 GPN Date: Project Name: Tripura Rural Economic Growth and Service Delivery Project Loan / Credit No: / PWD (Buildings), Government of Tripura Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-PWD(B)-358058-CW-RFB / Infrastructure Development o Request for Bids - f Chalita Bankul Colony H.S. Investing in Services to Dev Single Stage - Two E Small Works SPD Under Imple 2025-04-0 / Post Request for Bids Open - National 1,467,642.00 0.00 2023-05-10 2023-04-29 2023-05-15 2023-05-19 2023-06-26 2023-09-08 2023-10-13 School at Rupaichari Block, S elop Human Capital nvelope (2 envelope proce mentation 5 outh District, Tripura under ss) World Bank Aided Project na mely, TRESP. IN-PWD(B)-359937-CW-RFB / Request for Bids - Infrastructure development o Investing in Services to Dev Single Stage - Two E Small Works SPD Under Imple 2025-04-0 / Post Request for Bids Open - National 1,573,936.00 0.00 2023-05-12 2023-05-06 2023-05-17 2023-05-19 2023-06-28 2023-09-10 2023-10-15 f Ek-Jatan Kumar H.S. School elop Human Capital nvelope (2 envelope proce mentation 7 under Karbook Block, Gomati ss) District, Tripura IN-PWD(B)-360327-CW-RFB / Request for Bids - Infrastructure development o Investing in Services to Dev Single Stage - Two E Small Works SPD Under Imple 2025-04-1 / Post Request for Bids Open - National 1,868,438.00 0.00 2023-05-15 2023-05-06 2023-05-20 2023-05-19 2023-07-01 2023-09-13 2023-10-18 f Chlakaham H.S. School und elop Human Capital nvelope (2 envelope proce mentation 0 er Karbook Block, Gomati Dis ss) trict, Tripura. IN-PWD(B)-362618-CW-RFB / Request for Bids - Infrastructure development o Investing in Services to Dev Single Stage - Two E Small Works SPD Pending Imp 2025-04-1 f Bashi Chandra Para English / Post Request for Bids Open - National 1,776,021.00 0.00 2023-05-22 2023-05-27 2023-07-08 2023-09-20 2023-10-25 elop Human Capital nvelope (2 envelope proce lementation 7 Medium H.S. School under Ka ss) rbook Block, Gomati District, Tripura. IN-PWD(B)-362862-CW-RFB / Request for Bids - Infrastructure Development o Investing in Services to Dev Single Stage - Two E Small Works SPD Pending Imp 2025-04-2 / Post Request for Bids Open - National 1,625,829.00 0.00 2023-05-25 2023-05-30 2023-07-11 2023-09-23 2023-10-28 f Bachaibari H.S. School unde elop Human Capital nvelope (2 envelope proce lementation 0 r Tulashikar Block, Khowai Di ss) strict, Tripura. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PLANO DE AQUISIÇÃO PARA O PROJETO DA GUINÉ-BISSAU DE REFORÇO INSTITUCIONAL E EDUCAÇÃO DE QUALIDADE PARA TODOS Informação do Projeto: Resposta de Emergência para a Educação no contexto da Covid-19 Agência de Implementação do Projeto: Unidade de Implementação de Projetos, Ministério da Educação Nacional e Ensino Superior (MENES) Data do Plano de Aquisição: 01 de julho 2021 Período abrangido por este Plano de Aquisição: 15 de julho de 2021 a dezembro 2022 Preâmbulo De acordo com o paragrafo n.º 5.9 do "Regulamento de Aquisição do Banco Mundial para Mutuários do IPF " (julho de 2016, revisto em novembro de 2017 e agosto de 2018) ("Regulamentos de Aquisição"), o sistema de rastreio e trocas sistemáticas em Aquisição (STEP) do Banco será utilizado para preparar, limpar e atualizar Planos de Aquisição e realizar todas as operações de aquisição para o Projeto. Este texto, juntamente com as tabelas do Plano de Aquisição em STEP constituem o Plano de Aquisição do Projeto. As seguintes condições aplicam-se a todas as atividades de aquisição no Plano de Aquisição. Os outros elementos do Plano de Aquisição, conforme exigido nos termos do ponto 4.4 do Regulamento de Aquisição, são estabelecidos no STEP. Os documentos-tipo de aquisição do Banco devem ser utilizados para todos os contratos sujeitos a concorrência internacional e para os contratos especificados nos quadros do Plano de Aquisição no STEP. Disposições nacionais em matéria de contratos públicos: Em conformidade com o ponto 5.3 do Regulamento relativo aos contratos públicos, quando se adota a abordagem ao mercado nacional (tal como especificado nos quadros do Plano de Aquisição no STEP), podem ser utilizados os procedimentos de contratação do próprio país. Quando o mutuário utilizar as suas próprias disposições nacionais de contratação em aberto, essas disposições ficarão sujeitas ao ponto 5.4 do Regulamento relativo aos contratos públicos e às seguintes condições: - Os documentos de pedidos de ofertas/pedidos de propostas deverão exigir que os licitadores/proponentes que apresentem ofertas/propostas apresentem uma aceitação assinada no momento da licitação para serem incorporados em quaisquer contratos resultantes, confirmando a aplicação e cumprimento das Orientações Anticorrupção do Banco, incluindo sem limitação o direito de sanção do Banco e os direitos de inspeção e auditoria do Banco; - A aceitação dos Direitos do Banco para rever a documentação e as atividades de aquisição. Quando forem aplicados pelo Mutuário outras disposições de licitação nacional de contratos públicos que não sejam nacionais abertos, essas disposições serão sujeitas ao ponto 5.5 do Regulamento de Aquisição. Ativos locados, conforme especificado no ponto 5.10 do Regulamento de Aquisição: O arrendamento pode ser utilizado para os contratos identificados nas tabelas do Plano de Aquisição. "Não aplicável" Aquisição de bens em segunda mão, conforme especificado no ponto 5.11 do Regulamento de Aquisição – é permitido para os contratos identificados nas tabelas do Plano de Aquisição "Não Aplicável" Preferência doméstica, tal como especificado nos termos do ponto 5.51 do Regulamento de Aquisição (Bens e Obras). Bens: "Não aplicável" Obras: "Não aplicável" Suporte prático de implementação alargado (HEIS), conforme especificado nos pontos 3.10 e 3.11 do Regulamento de Aquisição. "Não aplicável" II. Consultores Data de abertura No Custo em Método de Revisão Descrição prevista Comentários artigo (USD) Aquisição pelo Banco para a licitação Contrato de um Especialista em Educação a ser ano com 1 50,000 IC Posterior 15/7/2021 baseado no INDE condições renováveis Posterior Contrato de um Economista de Educação/Especialista ano com 2 50,000 IC 15/7/2021 em M&E a ser baseado no GEPASE condições renováveis Posterior Contrato de um Especialista em Administração Pública ano com 3 50,000 IC 15/7/2021 a ser baseado na DGRH condições renováveis Especialista em Desenvolvimento Posterior Contrato de um 4 50,000 IC 15/7/2021 Social ano com condições renováveis Firma para rever o organigrama e Posterior desenvolver o manual de 5 procedimentos, perfil do pessoal e 200,000 QCS 15/8/2021 plano de capacitação para DGE, IGF, INDE e GEPASE Firma para realizar Mapa Educativo e 6 desenvolver plano e orçamento para 500,000 QCBS Priori 30/8/2021 alcançar educação primária universal Consultor para desenvolver Código de Continuação do Conduta e formação em VBG para trabalho de um professores consultor que trabalha em 7 20,000 Direto Posterior 15/1/2022 questões relacionadas com a VGB na Guiné-Bissau Data de Custo abertura No Compone Referência e Descrição est prevista Comentários artigo nte (USD) para a licitação 01 PRIEQT/CI/2021: Especialista em 1 50,000 1 Educação a ser baseado no INDE 02 PRIEQT/CI/2021: Economista de 2 Educação/Especialista em M&E a ser 50,000 1 baseado no GEPASE 03 PRIEQT/CI/2021: Especialista em 3 Administração Pública a ser baseado 50,000 1 na DGRH 04 PRIEQT/CI/2021: Especialista em 4 50,000 3 Desenvolvimento Social 05 PRIEQT/SC/2021: Firma para 5 rever o organigrama do MENES e 200,000 1 desenvolver o Manual de Procedimentos, perfil do pessoal e Plano de Capacitação para DGE, IGE, INDE, DGRH e GEPASE 06 PRIEQT/SC/2021: Firma para realizar Mapa Educativo e 6 500,000 2 desenvolver plano e orçamento para alcançar educação primária universal 07 PRIEQT/CI-CD/2021: Consultor 7 para desenvolver Código de Conduta 20,000 3 e formação em VBG para professores PROCUREMENT Guinea-Bissau : Institutional Strengthening and the Quality Education for All Project PLAN General Information Country: Guinea-Bissau 2021-12-20 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P176697 GPN Date: 2021-09-22 Project Name: Institutional Strengthening and the Quality Education for All Project Loan / Credit No: TF / B6234 Unité de Coordination du Projet Education de Qualité pour Tous. Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 05 PRIEQT/SC/2021 / Recrut amento de uma Firma para r ever o Organigrama do MENE Strengthen Institutional Cap Consultant Qualifi Open - Internationa Pending Impleme S e Desenvolver o Manual de TF / B6234 Post 200,000.00 0.00 2021-10-28 2021-11-18 2022-01-01 2022-01-31 2022-03-07 2022-09-03 acity cation Selection l ntation Procedimentos, Perfil do Pess oal e Plano de capacitação p ara DGE, IGE, INDE, DGRH e GEPASE 06 PRIEQT/SC/2021 / Recrut amento de Firma para realiza Improve Planning and Mana Quality And Cost- Open - Internationa r mapa educativo e desenvol TF / B6234 Prior 500,000.00 0.00 Canceled 2021-10-28 2021-11-18 2022-01-01 2022-01-29 2022-02-28 2022-04-04 2022-05-09 2023-05-09 gement of Resources Based Selection l ver plano e orçamento para alcançar educação primária universal INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01 PRIEQT/CI/2021 / Especial Strengthen Institutional Cap Individual Consult ista em Educação a ser base TF / B6234 Post Open 50,000.00 0.00 Under Review 2021-10-12 2022-03-07 2021-11-30 2021-12-07 2021-12-28 2022-12-28 acity ant Selection ado no INDE 02 PRIEQT/CI/2021 / Econom Strengthen Institutional Cap Individual Consult Under Implement ista de Educação/Especialista TF / B6234 Post Open 50,000.00 0.00 2021-10-12 2022-03-07 2021-11-30 2022-11-14 2021-12-07 2022-12-14 2021-12-28 2022-12-28 acity ant Selection ation em M&E a ser baseado no GE PASE 03 PRIEQT/CI/2021 / Especial Strengthen Institutional Cap Individual Consult Under Implement ista em Administração Públic TF / B6234 Post Open 50,000.00 0.00 2021-10-12 2022-03-07 2021-11-30 2022-11-15 2021-12-07 2022-12-09 2021-12-28 2022-12-28 acity ant Selection ation a a ser baseado na DGRH 04 PRIEQT/CI/2021 / Especial Strengthen Citizen Engagem Individual Consult TF / B6234 Post Open 50,000.00 8,681.74 Signed 2021-10-12 2022-03-10 2021-11-30 2022-04-25 2021-12-07 2022-04-29 2021-12-28 2022-05-26 2022-12-28 ista em Desenvolvimento So ent and Address Gender Nor ant Selection cial ms 07 PRIEQT/CI-CD/2021 / Con Strengthen Citizen Engagem sultor para desenvolver códi Individual Consult TF / B6234 ent and Address Gender Nor Post Direct 20,000.00 0.00 Signed 2022-03-01 2022-05-06 2022-03-11 2023-04-25 2022-04-01 2023-05-07 2022-05-06 2022-11-02 go de conduta e formação e ant Selection ms m VBG para professores 01 PRIEQT/ED/2023 / Assistê ncia Técnica para implement ar o PASEC - Programa de An Strengthen Institutional Cap Direct - Internation álise do Sistema Educativo d TF / B6234 Post Direct Selection 776,673.00 0.00 Under Review 2023-04-14 2023-04-20 2023-04-24 2023-06-28 2025-07-31 acity al os países da CONFEMEN (Con ferência dos ministros da edu cação dos países da francofo nia). 02PRIEQT/CD/2023 / Recruta mento da UNICEF para o leva ntamento de dados no quadr Improve Planning and Mana Direct - Internation Under Implement TF / B6234 Post Direct Selection 500,000.00 0.00 2023-05-24 2023-05-23 2023-05-24 2023-05-25 2023-06-07 2023-12-04 o da realização do mapa edu gement of Resources al ation cativo e desenvolver plano e orçamento para alcançar edu cação primária universal Page 1 PROCUREMENT PLAN (Textural Part) Project information Country: Federal Democratic Republic of Ethiopia Project Name: Development Response to Displacement Impacts Project in the Horn of Africa Phase II (DRDIP II) Project ID: P178047 Project Implementation Agency: Ministry of Agriculture (MoA) Date of the Procurement Plan: September 2022 Period covered by this Procurement Plan: September 2022 to December 2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” dated November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Procurement Directives of the Federal and Regional Governments of Ethiopia such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations. Goods: Applicable Works: Applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Proposed Procedures for CDD Components: Applicable Other Relevant Procurement Information: The procurement procedures for Situations in Urgent Need of Assistance or Capacity Constraints described under paragraph 12 of Section III of the World Bank Policy on IPF, which will be applicable to fast track emergency procurements shall not apply. PROCUREMENT Eastern and Southern Africa : Development Response to Displacement Impacts Project in the Horn of Africa Phase II PLAN General Information Country: Eastern and Southern Africa 2023-04-25 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P178047 GPN Date: 2022-10-05 Project Name: Development Response to Displacement Impacts Project in the Horn of Africa Phase II Loan / Credit No: IDA / E0590 Somali Regional State Bureau of Agriculture Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure ET-SRS-BOA-363217-CW-RF ment Document - B / (CONSTRUCTION OF SMAL Sustainable Environmental Single Stage - One E Pending Imp 2025-03-0 IDA / E0590 Post Request for Bids Open - National 1 Envelope proce 1,521,983.83 0.00 2023-05-26 2023-05-31 2023-07-12 2023-08-11 2023-09-15 L SCALE IRRIGATION IN BOQ Management nvelope lementation 8 ss (Non Bank-SPD OLMAYO (SEDE) ) at Reginal ) Bureau Of Agriculture ET-SRS-BOA-363219-CW-RF National Procure B / (CONSTRUCTION OF SMA ment Document - Sustainable Environmental Single Stage - One E Pending Imp 2025-03-0 LL SCALE IRRIGATION IN DOL IDA / E0590 Post Request for Bids Open - National 1 Envelope proce 1,537,019.01 0.00 2023-05-26 2023-05-31 2023-07-12 2023-08-11 2023-09-15 Management nvelope lementation 8 LO -ADO (GERBA ADO)) At Re ss (Non Bank-SPD gional Bureau Of Agriculture ) ET-SRS-BOA-364130-CW-RF Request for Quota Q / ((Construction of market Social and Economic Service Request for Quota Single Stage - One E Pending Imp 2024-02-0 IDA / E0590 Post Limited tions (Non Bank-S 199,997.00 0.00 2023-06-10 2023-08-05 center)Strategic Investment s and Infrastructure tions nvelope lementation 1 PD) Fund (SIF)) by Boqolmayo wo reda office of Finance ET-SRS-BOA-364132-CW-RF Q / ((Construction of Grain St Request for Quota Social and Economic Service Request for Quota Single Stage - One E Pending Imp 2024-02-0 ore and DA house ) Strategic IDA / E0590 Post Limited tions (Non Bank-S 199,997.00 0.00 2023-06-10 2023-08-05 s and Infrastructure tions nvelope lementation 1 Investment Fund (SIF)) by a PD) wbere Woreda Office of Finan ce ET-SRS-BOA-364136-CW-RF Request for Quota Q / ((Health center expansion Social and Economic Service Request for Quota Single Stage - One E Pending Imp 2024-02-0 IDA / E0590 Post Limited tions (Non Bank-S 199,997.00 0.00 2023-06-10 2023-08-05 ) Strategic Investment Fund ( s and Infrastructure tions nvelope lementation 1 PD) SIF)) by K/bayah Woreda Offi ce of Finance GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-SRS-BOA-355602-GO-RF Q / purchase of farmers seed Request for Quota Single Stage - One E Pending Impl IDA / E0590 Livelihoods Program Post Limited 69,811.32 0.00 2023-05-05 2023-06-30 2023-12-27 (awbare ,k/bayah, dolla-ado tions nvelope ementation & Bokolmayo) at regional lev el ET-SRS-BOA-355597-GO-RF Q / Purchase of Solar Light ( awbare(for the new Kebeles only) ,k/bayah(for the new Ke Request for Quota Single Stage - One E Pending Impl IDA / E0590 Livelihoods Program Post Limited 74,490.57 0.00 2023-04-30 2023-06-25 2023-12-22 beles only),K/bayah City Adm tions nvelope ementation inistration, Dollo-ado(for the new Kebeles only) , Bokolma yo (for the new Kebeles only) , Dollo Bay) at regional level ET-SRS-BOA-355598-GO-RF Q / purchase of farm tools aw bare(for the new Kebeles onl y) ,k/bayah(for the new Kebel Sustainable Environmental Request for Quota Single Stage - One E Pending Impl IDA / E0590 Post Limited 33,962.26 0.00 2023-05-01 2023-06-26 2023-12-23 es only),K/bayah City Admini Management tions nvelope ementation stration, Dollo-ado(for the ne w Kebeles only) , Bokolmayo (for the new Kebeles only), D ollo Bay) at regional level ET-SRS-BOA-355600-GO-RF Q / purchase of ICT Equipme nt awbare(for the new Kebel es only) ,k/bayah(for the new Social and Economic Service Request for Quota Single Stage - One E Pending Impl Kebeles only),K/bayah City A IDA / E0590 Post Limited 93,396.23 0.00 2023-05-02 2023-06-27 2023-12-24 s and Infrastructure tions nvelope ementation dministration New Staff, Doll o-ado(for the new Kebeles on ly) , Bokolmayo (for the new Kebeles only), Dollo Bay New Staff) at regional level ET-SRS-BOA-355601-GO-RF Q / Purchase of office Furnitu re awbare(for the new Kebel es only) ,k/bayah(for the new Social and Economic Service Request for Quota Single Stage - One E Pending Impl Kebeles only),K/bayah City A IDA / E0590 Post Limited 59,150.94 0.00 2023-05-02 2023-06-27 2023-12-24 s and Infrastructure tions nvelope ementation dministration New staff, Doll o-ado(for the new Kebeles on ly) , Bokolmayo (for the new Kebeles only), Dollo Bay new Staff ) at regional level ET-SRS-BOA-355596-GO-RF Q / purchase of cooking stov es awbare(for the new Kebel es only) ,k/bayah(for the new Sustainable Environmental Request for Quota Single Stage - One E Pending Impl IDA / E0590 Post Limited 33,254.72 0.00 2023-04-29 2023-06-24 2023-12-21 Kebeles only),K/bayah City A Management tions nvelope ementation dministration, Dollo-ado(for t he new Kebeles only) , Bokol mayo (for the new Kebeles o nly), Dollo Bay) at regional le vel NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 SWEDD – BURKINA FASO Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: November 30, 2016; Revision 1: February 24, 2017 Revision 2: June 27th, 2017 Revision 3: August 25th 2017 2. Date of General Procurement Notice: March 27, 2017 and again August 24th, 2017 (transition into new procurement system STEP) 3. Period covered by this procurement plan: January – December 2017 II. Goods and Works and non-consulting services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$2,000,000 and All above 2. NCB (Goods) US$2,000,000 and All above 3. ICB (Works) US$2,000,000 and All above 4. NCB (Works) US$2,000,000 and All above 5. Non-Consultant Services US$2,000,000 and All above 2. Prequalification. Bidders for N/A shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines: N/A 3. Reference to (if any) Project Operational/Procurement Manual: N/A 4. Any Other Special Procurement Arrangements: N/A 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Descripti Estimated Packag Domesti Review Comments No. on Cost es c by US$ Prefere Bank nce (Prior / (yes/no) Post) BF- Purchase of 720,000 1 Yes Post RFB PADS- school 26149 supplies to -GO- benefit RFB / MENA BF- School 615,000 1 Yes Post RFB PADS- equipment 26151 for DGPML -GO- (DRD and RFB / MEG posts) BF- Purchase of 500,000 1 Yes Post RFB PADS- teaching 26154 materials -GO- for public RFB / health schools BF- Purchase of 345,000 1 Yes Post RFB PADS- IT 26234 equipment -GO- (computers, RFB / printers, scanner) BF- Purchase of 1,185,000 1 No Post RFB PADS- transport 26233 (all-terrain -GO- vehicles and RFB / bikes) BF- Printing 80,000 1 Yes Post RFQ PADS- documents 26158 for DGPML -GO- RFQ / III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$1,000,000 2. Single Source (Firms) Above US$1,000,000 3. Individual Above US$300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: N/A 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) BF-PADS- Recruit an 1,035,000 1 Prior QBS 26099-CS- NGO to carry QBS / out subproject "DEMOUSSO KANA YIRWA to promote education of girls" BF-PADS- Recruit an 1,800,000 1 Prior QBS 26100-CS- NGO to carry QBS / out subproject "Female Undertaking" BF-PADS- Recruit an 985,000 1 Prior QBS 26102-CS- NGO to carry QBS / out the subproject "School for husbands and future spouses" BF-PADS- Recruit and 4,500,000 1 Prior QBS 26103-CS- NGO to carry QBS / out the subproject "SUKABE RAWLE" or fight against child marriage PROCUREMENT Western and Central Africa : Sahel Women's Empowerment and Demographics Project PLAN General Information Country: Western and Central Africa 2020-11-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150080 GPN Date: 2017-08-24 Project Name: Sahel Women's Empowerment and Demographics Project Loan / Credit No: IDA / V3330, IDA / V3310, IDA / 66600, IDA / 66590 Sahel Women's Empowerment and Demographics Project Cameroon Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-SWEDD-CA-257673-GO- RFQ / Fournitures des kits de Request for Quota Single Stage - One E Under Imple formation en fabrication des IDA / V3330 Addition of Burkina Faso Post Limited 71,318.00 0.00 2021-12-05 2021-11-24 2022-01-30 2022-02-20 tions nvelope mentation masques et des savons dans le cadre du Projet SWEDD CM-SWEDD-CA-225220-GO- RFQ / Fourniture du matériel pour la mise en place de mic Request for Quota Single Stage - One E ro savonneries en vue de la r IDA / V3330 Addition of Burkina Faso Post Limited 30,189.00 0.00 Canceled 2021-06-01 2021-07-27 2022-01-23 tions nvelope ésilience socioéconomique d es femmes et jeunes dans le s régions d’intervention du pr ojet SWEDD CM-SWEDD-CA-224550-GO- RFQ / Fourniture du matériel de la mise en place des ateli Request for Quota Single Stage - One E ers de confection des masqu IDA / V3330 Addition of Burkina Faso Post Limited 27,546.00 0.00 Canceled 2021-05-18 2021-07-16 2021-08-15 tions nvelope es barrières en vue de la rési lience socioéconomique des f emmes et jeunes dans les ré gions d’intervention du proje t SWEDD CM-SWEDD-CA-009-GO-RFB Open - Internationa Single Stage - One E Pending Impl / Fourniture de véhicules au IDA / 66600 Addition of Burkina Faso Post Request for Bids 823,430.00 0.00 2023-03-27 2023-04-01 2023-06-30 2023-07-30 2023-09-03 2024-09-02 l nvelope ementation Projet SWEDD en deux lots di stincts CM-SWEDD-CA-006-GO-RFB Single Stage - One E Pending Impl / Fourniture du mobilier de b IDA / 66600 Addition of Burkina Faso Post Request for Bids Open - National 103,409.00 0.00 2022-12-20 2022-12-25 2023-02-05 2023-03-07 2023-04-11 2023-05-26 nvelope ementation ureau à l'UCP CM-SWEDD-CA-012-GO-RFQ / Acquisition du matériel de r Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 39,506.00 0.00 2023-03-20 2023-05-15 2023-06-05 eprographie en procédure d' tions nvelope ementation urgence au Projet SWEDD CM-SWEDD-CA-004-GO-RFB / Fourniture d'équipements in Single Stage - One E IDA / 66600 Addition of Burkina Faso Post Request for Bids Open - National 220,000.00 0.00 Canceled 2022-07-30 2022-08-04 2022-09-15 2022-10-15 2022-11-19 2023-01-03 formatiques au Projet SWED nvelope D en deux lots distincts CM-SWEDD-CA-005-GO-RFB / Fourniture des consommabl Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Request for Bids Open - National 211,669.00 0.00 2023-03-13 2023-03-18 2023-04-29 2023-05-29 2023-07-03 2024-07-02 es informatiques au Projet S nvelope ementation WEDD en deux lots distincts CM-SWEDD-CA-008-GO-RFQ Request for Quota Single Stage - One E / Fourniture de consommable IDA / 66600 Addition of Burkina Faso Post Limited 69,939.00 0.00 Canceled 2022-08-04 2022-09-29 2023-09-29 tions nvelope s pour les campagnes PF dan s les FOSA CM-SWEDD-CA-011-GO-RFQ / Acquisition des étagères de Request for Quota Single Stage - One E Pending Impl rangement entrepôt de nivea IDA / 66600 Addition of Burkina Faso Post Limited 50,934.00 0.00 2023-06-25 2023-08-20 2023-09-19 tions nvelope ementation u industriel en acier galvanis é pour le stockage des médic aments CM-SWEDD-CA-009-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Fournitures des extincteurs IDA / 66600 Addition of Burkina Faso Post Limited 50,615.00 0.00 2023-10-24 2023-12-19 2024-06-16 tions nvelope ementation à mousse pour les FRPS et le s FOSA CM-SWEDD-CA-010-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Acquisition des transpalette IDA / 66600 Addition of Burkina Faso Post Limited 8,352.00 0.00 2023-07-02 2023-08-27 2023-09-26 tions nvelope ementation s manuelles CM-SWEDD-CA-002-GO-RFQ / Acquisition du matériel d'an Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 18,222.00 0.00 2023-04-02 2023-05-28 2023-06-18 imation du Mécanisme de Ge tions nvelope ementation stion des Plaintes (MGP) au P rojet SWEDD CM-SWEDD-CA-022-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Acquisition de 15 glacières i IDA / 66600 Addition of Burkina Faso Post Limited 8,351.00 0.00 2023-07-24 2023-09-18 2023-11-02 tions nvelope ementation sothermes pour les FRPS au Projet SWEDD CM-SWEDD-CA-023-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Acquisition de 3 charriots él IDA / 66600 Addition of Burkina Faso Post Limited 25,467.00 0.00 2023-07-15 2023-09-09 2023-10-24 tions nvelope ementation évateurs pour les FRPS au Pr ojet SWEDD CM-SWEDD-CA-005-GO-RFQ Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 28,774.00 0.00 2023-04-04 2023-05-30 2024-05-29 / Fourniture de bureau à l'UC tions nvelope ementation P CM-SWEDD-CA-003-GO-RFB / Fourniture de bureau et pro Single Stage - One E IDA / 66600 Addition of Burkina Faso Post Request for Bids Open - National 183,878.00 0.00 Canceled 2022-12-02 2022-11-17 2022-12-07 2023-01-18 2023-02-17 2023-03-24 2024-03-23 duits d'entretien au Projet S nvelope WEDD en deux lots distincts Page 1 CM-SWEDD-CA-006-GO-RFQ / Acquisition d'ordinateurs po Request for Quota Single Stage - One E Pending Impl IDA / 66590 Addition of Burkina Faso Post Limited 25,467.00 0.00 2023-03-29 2023-05-24 2024-05-23 tables au personnel de l'UCP tions nvelope ementation du Projet SWEDD CM-SWEDD-CA-001-GO-RFB / Acquisition des fournitures de l'appui pédagogique à 33 Single Stage - One E IDA / 66600 Addition of Burkina Faso Post Request for Bids Open - National 207,409.00 0.00 Canceled 2022-11-14 2022-11-17 2022-11-19 2022-12-31 2023-01-30 2023-03-06 2023-03-27 0 établissements du seconda nvelope ire et 60 inspection d'arrondi ssement de l'éducation de ba se CM-SWEDD-CA-007-GO-RFB / Fournitures de 02 camions Open - Internationa Single Stage - One E IDA / 66600 Addition of Burkina Faso Post Request for Bids 540,001.00 0.00 Canceled 2022-08-18 2022-08-23 2022-10-04 2022-11-03 2022-12-08 2023-06-06 avec glacières isothermiques l nvelope pour la distribution des médi caments CM-SWEDD-CA-008-GO-RFB Open - Internationa Single Stage - One E Pending Impl / Fourniture des véhicules sp IDA / 66600 Addition of Burkina Faso Post Request for Bids 1,006,791.00 0.00 2023-07-19 2023-07-24 2023-10-22 2023-11-21 2023-12-26 2024-12-25 l nvelope ementation écialisées de la santé CM-SWEDD-CA-003-GO-RFQ / Fourniture, installation et p aramétrage des licences pou r la plateforme TOMATE (TO Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 70,959.00 0.00 2023-03-26 2023-05-21 2024-05-20 M2PRO version 2 complète m tions nvelope ementation ultisites, monoprojet web loc al et Tom monitoring version 2 complète multisites, mono projet version web et local CM-SWEDD-CA-016-GO-RFB / Sélection d'un prestataire p Open - Internationa Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Request for Bids 739,378.00 0.00 2023-05-26 2023-05-31 2023-06-30 2023-07-21 2023-08-14 2023-09-28 our la fourniture des kits scol l nvelope ementation aires pour les 4 000 bénéficia ires du Projet SWEDD NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-SWEDD-CA-227089-NC- DIR / Recrutement d'une Age nce de paiement pour assure r le paiement de la bourse de Under Imple IDA / V3330 Addition of Burkina Faso Post Direct Selection Direct 8,384.00 0.00 2021-04-20 2021-04-09 2021-04-30 2021-04-16 2021-06-11 2021-10-09 soutien a la scolarisation des mentation filles vulnérables au décroch age scolaire dans le cadre de l’intervention scolarisation-co ntexte COVID de SWEDD2 CM-SWEDD-CA-203202-NC-R FQ / Fourniture des Tee-shirt, Request for Quota Single Stage - One E IDA / V3330 Addition of Burkina Faso Post Limited 8,300.00 0.00 Signed 2021-07-31 2021-07-26 2021-09-25 2021-10-16 casquettes, sacs, banderoles tions nvelope estampillés et banderoles au projet SWEDD CM-SWEDD-CA-017-NC-RFQ / Installation de réseaux infor Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 8,319.00 0.00 2023-04-18 2023-06-13 2023-07-04 matique à l'Unité de Coordin tions nvelope ementation ation du Projet SWEDD CM-SWEDD-CA-003-NC-RFQ / Fourniture des services de Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 14,577.00 0.00 2023-03-25 2023-05-20 2024-05-19 gardiennage à l'Unité de Coo tions nvelope ementation rdination du Projet SWEDD CM-SWEDD-CA-001-GO-RFQ / Fourniture des kits des men Request for Quota Single Stage - One E tores des espaces sûrs scolai IDA / 66600 Addition of Burkina Faso Post Limited 98,083.00 0.00 Canceled 2023-02-21 2023-04-18 2023-06-02 tions nvelope res (sac bandoulière à rabas, polos, blouses, casquesttes e stampillés SWEDD) CM-SWEDD-CA-001-NC-RFQ / Recrutement d'une Agence Request for Quota Single Stage - One E de Paiement chargée d'assur IDA / 66600 Addition of Burkina Faso Post Limited 39,003.00 0.00 Canceled 2022-11-29 2023-01-24 2023-07-23 tions nvelope er le paiement de la bourse d e soutien à la scolarisation CM-SWEDD-CA-005-NC-RFQ / Recrutement d'une agence Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Limited 15,426.00 0.00 2023-03-20 2023-05-15 2024-05-14 de nettoyage pour la propret tions nvelope ementation é des bureaux de l'UCP CM-SWEDD-CA-008-NC-RFQ / Recrutement d'une agence Request for Quota Single Stage - One E Pending Impl IDA / 66600 Addition of Burkina Faso Post Open - National 77,519.00 0.00 2023-04-03 2023-05-29 2023-11-25 de logistique chargée de la di tions nvelope ementation stribution des 4 000 kits scol aires du Projet SWEDD CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-SWEDD-CA-201409-CS-C QS / Sélection d’un cabinet d Consultant Qualifi Under Implement e consultant pour l’élaboratio IDA / V3330 Addition of Burkina Faso Post Open - National 120,000.00 0.00 2020-11-19 2020-12-02 2020-11-29 2021-01-03 2021-02-02 2021-03-09 2021-06-07 cation Selection ation n des manuels de mise en œ uvre du SWEDD-Cameroun CM-SWEDD-CA-201417-CS-C QS / Sélection d’un cabinet d Consultant Qualifi e consultant pour la réalisati IDA / V3330 Addition of Burkina Faso Post Open - National 200,000.00 0.00 Under Review 2020-12-07 2021-01-26 2020-12-17 2021-01-21 2021-02-20 2021-03-27 2021-06-25 cation Selection on de l’étude sur la situation des activités économiques d es femmes du sahel CM-SWEDD-CA-224540-CS-C QS / Sélection d’un cabinet d e consultant pour la réalisati Consultant Qualifi Under Implement on de l’étude sur le décrocha IDA / V3310 Addition of Burkina Faso Post Open - National 125,000.00 0.00 2021-03-31 2021-10-11 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2021-12-06 cation Selection ation ge scolaire et les stratégies d e maintien des filles a l’école dans les régions septentriona les du Cameroun Page 2 CM-SWEDD-CA-201555-CS-C QS / Sélection d’un cabinet d e consultant pour la réalisati Consultant Qualifi IDA / V3330 Addition of Burkina Faso Post Open - National 60,000.00 47,743.08 Signed 2021-05-14 2021-01-26 2021-05-24 2021-06-28 2021-09-20 2021-07-28 2021-11-25 2021-09-01 2022-01-14 2021-11-30 on de l’étude sur la distributi cation Selection on à base communautaire de s produits de la Planification f amiliale CM-SWEDD-CA-201416-CS-C QS / Sélection d’un cabinet d Consultant Qualifi Under Implement e consultant pour la réalisati IDA / V3330 Addition of Burkina Faso Post Open - National 200,000.00 0.00 2021-04-30 2021-04-20 2021-05-10 2021-06-14 2021-09-20 2021-07-14 2022-02-07 2021-08-18 2021-11-16 cation Selection ation on de l’enquête sur le nivea u de prestations relatif à la q ualité des soins de santé CM-SWEDD-CA-236805-CS-C QS / Sélection d'une firme de consultants pour la réalisatio Consultant Qualifi Under Implement n de l’évaluation sociale du p IDA / V3330 Addition of Burkina Faso Post Open - National 49,980.00 0.00 2021-06-30 2021-06-09 2021-07-21 2021-09-03 2021-09-20 2021-10-03 2021-11-07 2022-02-05 cation Selection ation rojet d’autonomisation des fe mmes et dividende démogra phique au Sahel au Camerou n (SWEDD 2) CM-SWEDD-CA-236808-CS-C QS / Sélection d'une firme de consultants pour réaliser l' E tude sur la qualité de prestati Consultant Qualifi IDA / V3330 Addition of Burkina Faso Post Open - National 85,000.00 0.00 Canceled 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 on de soin de santé reproduc cation Selection tive des jeunes femmes et de s adolescentes dans les régio ns de l’Adamaoua, de l’Extrê me-nord et du Nord. CM-SWEDD-CA-001-CS-QCB S / Recrutement d’une Organ isation Non Gouvernemental e (ONG) ou d’un consortium Quality And Cost- Open - Internationa d’ONG/association/OCB pour IDA / 66600 Addition of Burkina Faso Post 884,291.00 0.00 Canceled 2022-07-23 2022-08-01 2022-08-13 2022-09-26 2022-10-24 2022-11-23 2023-01-06 2023-02-10 2024-12-28 Based Selection l appuyer la mise en œuvre du sous-projet « Autonomisation des femmes » de la sous-co mposante 1.2 dans l'Extrême -Nord, le Nord et l'Adamaoua CM-SWEDD-CA-002-CS-QCB S / Recrutement d’une ONG o u d’un consortium d’ONG/Ass ociation/OCB pour l’appui à l Quality And Cost- Open - Internationa a mise en œuvre du sous-pro IDA / 66600 Addition of Burkina Faso Post 1,093,357.00 0.00 Canceled 2022-07-23 2022-08-01 2022-08-13 2022-09-26 2022-10-24 2022-11-23 2023-01-06 2023-02-10 2024-12-28 Based Selection l jet "Compétences de vie, san té reproductive des adolesce ntes et des jeunes, et lutte c ontre les VBG" dans l'Extrêm e-Nord, le Nord et l'Adamaou a CM-SWEDD-CA-236809-CS-C QS / Sélection d'une firme de consultants pour réaliser l'ét ude pour évaluer la stratégi Consultant Qualifi e de distribution à base com IDA / V3330 Addition of Burkina Faso Post Open - National 60,000.00 0.00 Canceled 2021-06-30 2021-01-26 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-03-07 cation Selection munautaire (DBC) des produi ts contraceptifs modernes da ns les régions d'intervention du Projet SWEDD (ADAMAOU A, EXTRÊME-NORD ET NORD) CM-SWEDD-CA-003-CS-QCB S / Recrutement d'une ONG o u d'un Consortium d'ONG/AS SOCIATION/OBC pour l'Appui Quality And Cost- Open - Internationa à la mise en œuvre du sous p IDA / 66600 Addition of Burkina Faso Post 1,093,027.00 0.00 Canceled 2022-07-23 2022-08-01 2022-08-13 2022-09-26 2022-10-24 2022-11-23 2023-01-06 2023-02-10 2024-12-28 Based Selection l rojet "Autonomisation des fe mmes" de la sous-composant e "maintien des filles à l'écol e" de la sous-composante 1, 2 dans l'Extrême-Nord, le Nor d et l'AD CM-SWEDD-CA-201414-CS-C QS / Sélection d’un cabinet d Consultant Qualifi e consultant pour la réalisati IDA / V3330 Addition of Burkina Faso Post Open - National 60,000.00 0.00 Canceled 2021-04-30 2021-05-10 2021-06-14 2021-07-14 2021-08-18 2021-10-17 cation Selection on de l’étude sur la revue de s indicateurs de base du cadr e de résultat CM-SWEDD-CA-001-CS-CQS / Sélection d’un cabinet de c Consultant Qualifi onsultant pour la réalisation IDA / 66600 Addition of Burkina Faso Post Open - National 90,000.00 0.00 Canceled 2022-12-29 2023-01-19 2023-03-04 2023-04-03 2023-05-08 2023-11-04 cation Selection de l’étude sur la revue des in dicateurs de base du cadre d e résultat CM-SWEDD-CA-004-CS-QCB S / Recrutement d’une Organ isation Non Gouvernemental e (ONG) internationaleou d’u Quality And Cost- Open - Internationa Under Implement n consortium d’ONG/associati IDA / 66600 Addition of Burkina Faso Post 413,312.00 0.00 2023-03-22 2023-04-13 2023-04-12 2023-05-26 2023-06-23 2023-07-23 2023-09-05 2023-10-10 2024-10-09 Based Selection l ation on/OCB pour appuyer la mise en œuvre du sous-projet « A utonomisation des femmes » de la sous-composante 1.2 d ans l'Extrême-Nord, le Nord e t l'Adamaoua CM-SWEDD-CA-005-CS-QCB S / Recrutement d'une ONG i nternationale ou d'un Consor tium d'ONG/ASSOCIATION/OB Quality And Cost- Open - Internationa Under Implement C pour l'Appui à la mise en œ IDA / 66600 Addition of Burkina Faso Post 509,949.00 0.00 2023-03-20 2023-04-13 2023-04-10 2023-05-24 2023-06-21 2023-07-21 2023-09-03 2023-10-08 2024-10-07 Based Selection l ation uvre de la sous-composante "maintien des filles à l'école" de la sous-composante 1,2 d ans l'Extrême-Nord, le Nord e t l'Adamaoua CM-SWEDD-CA-006-CS-QCB S / Recrutement d’une ONG i nternationale ou d’un consort ium d’ONG/Association/OCB Quality And Cost- Open - Internationa Under Implement IDA / 66600 Addition of Burkina Faso Post 549,371.00 0.00 2023-03-23 2023-04-13 2023-04-13 2023-05-27 2023-06-24 2023-07-24 2023-09-06 2023-10-11 2024-10-10 pour l’appui à la mise en œu Based Selection l ation vre du sous-projet "Compéte nces de vie, santé reproducti ve des adolescentes et des je unes, et lutte contre les VBG" CM-SWEDD-CA-007-CS-QCB S / Recrutement d'un ONG/C onsortium d'ONG pour l'appu Quality And Cost- Open - Internationa Under Implement IDA / 66600 Addition of Burkina Faso Post 641,549.00 0.00 2023-04-14 2023-04-13 2023-05-05 2023-06-18 2023-07-16 2023-08-15 2023-09-28 2023-11-02 2024-11-01 i à la mise en œuvre du volet Based Selection l ation VBG, appui à la production d es actes de naissance et du MGP Page 3 CM-SWEDD-CA-004-01-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 189,570.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du sous-projet « Autono Based Selection ntation misation des femmes » de la sous-composante 1.2 dans l' Extrême-Nord CM-SWEDD-CA-004-02-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 173,363.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du sous-projet « Autono Based Selection ntation misation des femmes » de la sous-composante 1.2 dans le Nord CM-SWEDD-CA-004-03-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 173,363.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du sous-projet « Autono Based Selection ntation misation des femmes » de la sous-composante 1.2 dans l' Adamaoua CM-SWEDD-CA-005-01-CS-Q CBS / Recrutement des ONG pour l'Appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 380,817.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre de la sous-composante " Based Selection ntation maintien des filles à l'école" de la sous-composante 1,2 d ans l'Extrême-Nord CM-SWEDD-CA-005-02-CS-Q CBS / Recrutement des ONG pour l'Appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 232,360.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre de la sous-composante " Based Selection ntation maintien des filles à l'école" de la sous-composante 1,2 d ans le Nord CM-SWEDD-CA-005-03-CS-Q CBS / Recrutement des ONG pour l'Appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 232,360.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre de la sous-composante " Based Selection ntation maintien des filles à l'école" de la sous-composante 1,2 d ans l'Adamaoua CM-SWEDD-CA-006-01-CS-Q CBS / Recrutement des ONG pour l’appui à la mise en œu Quality And Cost- Pending Impleme vre du sous-projet "Compéte IDA / 66600 Addition of Burkina Faso Prior Open - National 558,743.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 Based Selection ntation nces de vie, santé reproducti ve des adolescentes et des je unes, et lutte contre les VBG" dans la Région de l'Extrême- Nord CM-SWEDD-CA-006-02-CS-Q CBS / Recrutement des ONG pour l’appui à la mise en œu Quality And Cost- Pending Impleme vre du sous-projet "Compéte IDA / 66600 Addition of Burkina Faso Post Open - National 328,433.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 Based Selection ntation nces de vie, santé reproducti ve des adolescentes et des je unes, et lutte contre les VBG" dans la Région du Nord CM-SWEDD-CA-006-03-CS-Q CBS / Recrutement des ONG pour l’appui à la mise en œu Quality And Cost- Under Implement vre du sous-projet "Compéte IDA / 66600 Addition of Burkina Faso Post Open - National 311,123.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 Based Selection ation nces de vie, santé reproducti ve des adolescentes et des je unes, et lutte contre les VBG" dans la Région de l'Adamaou a CM-SWEDD-CA-007-01-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Prior Open - National 572,195.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du volet VBG, appui à la Based Selection ntation production des actes de nais sance et du MGP dans la Régi on de l'Extrême-Nord CM-SWEDD-CA-007-02-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 317,665.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du volet VBG, appui à la Based Selection ntation production des actes de nais sance et du MGP dans la Régi on du Nord CM-SWEDD-CA-007-03-CS-Q CBS / Recrutement des ONG pour l'appui à la mise en œu Quality And Cost- Pending Impleme IDA / 66600 Addition of Burkina Faso Post Open - National 317,665.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-11-30 vre du volet VBG, appui à la Based Selection ntation production des actes de nais sance et du MGP dans la Régi on de l'Adamaoua INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-SWEDD-CA-201539-CS-I NDV / Sélection d’un consult ant individuel pour la réalis Individual Consult Under Implement IDA / V3330 Addition of Burkina Faso Post Open 60,000.00 0.00 2020-11-25 2021-01-26 2021-01-13 2021-04-02 2021-02-03 2021-04-06 2021-03-10 2021-05-09 ation de l’étude sur la scolari ant Selection ation sation de la jeune fille victim e de grossesse précoce en m ilieu scolaire CM-SWEDD-CA-201543-CS-I NDV / Sélection d’un consulta nt individuel pour l’élaboratio n des outils de communicatio Individual Consult Under Implement n du projet SWEDD, y compri IDA / V3330 Addition of Burkina Faso Post Limited 8,300.00 0.00 2020-11-25 2021-01-26 2020-11-30 2021-02-01 2020-12-21 2021-02-16 2021-01-25 2021-02-14 ant Selection ation s les outils de communicatio n relatif à la lutte contre la C OVID 19 dans le cadre du pro jet SWEDD (logo, outils de c ommunication, etc.) CM-SWEDD-CA-227093-CS-I NDV / Recrutement d'un cons ultant individuel pour appuye Individual Consult Pending Impleme r l'équipe de Passation des m IDA / V3330 Addition of Burkina Faso Post Direct 15,000.00 0.00 2021-04-15 2021-04-25 2021-05-16 2021-06-20 2021-11-17 ant Selection ntation archés du Projet Filets Sociau x dans la préparation des dos siers de passation des march és du Projet SWEDD en prépa ration. Page 4 CM-SWEDD-CA-236733-CS-C DS / Convention de partenari Under Implement at avec l'Institut National de l IDA / V3330 Addition of Burkina Faso Prior Direct Selection Direct 1,200,000.00 0.00 2021-06-15 2021-06-20 2021-06-30 2021-09-03 2022-05-01 ation a Statistique (INS) pour la réa lisation de l’enquête Proxy M eans Test (PMT) CM-SWEDD-CA-254668-CS-I NDV / La réalisation d’un sing le régional en langue officiell Pending Impleme e pour le compte de la camp IDA / V3330 Addition of Burkina Faso Post Direct Selection Direct 8,257.00 0.00 2021-10-11 2021-10-21 2021-12-25 2022-03-25 ntation agne pour le changement so cial et comportemental « stro nger together : éducation de s filles et leadership féminin » CM-SWEDD-CA-254679-CS-C DS / Consultant chargé de la réalisation d’un single dans l a langue la plus parlée des z Pending Impleme ones d’intervention du projet IDA / V3330 Addition of Burkina Faso Post Direct Selection Direct 8,257.00 0.00 2021-10-11 2021-10-21 2021-12-25 2022-03-25 ntation pour le compte de la campag ne pour le changement social et comportemental « stronge r together : éducation des fill es et leadership féminin » CM-SWEDD-CA-002-CS-INDV / Recrutement d'un Consulta Individual Consult nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Open - National 55,507.00 0.00 Canceled 2022-07-28 2022-09-14 2022-09-15 2022-10-06 2022-11-10 2023-05-09 ant Selection on de l'enquête complément aire au PMT dans le Nord CM-SWEDD-CA-003-CS-INDV / Recrutement d'un Consulta Individual Consult nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Open - National 73,246.00 0.00 Canceled 2022-07-29 2022-09-14 2022-09-16 2022-10-07 2022-11-11 2023-05-10 ant Selection on de l'enquête complément aire au PMT dans l'Extrême-N ord CM-SWEDD-CA-004-CS-INDV / Recrutement d'un Consulta Individual Consult nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Open - National 51,164.00 0.00 Canceled 2022-07-29 2022-09-14 2022-09-16 2022-10-07 2022-11-11 2023-05-10 ant Selection on de l'enquête complément aire au PMT dans l'Adamaoua CM-SWEDD-CA-201536-CS-I NDV / Sélection d’un consult Individual Consult ant individuel pour l’élabora IDA / V3330 Addition of Burkina Faso Post Open 40,000.00 0.00 Canceled 2021-07-31 2021-09-18 2021-10-09 2021-11-13 2022-01-12 ant Selection tion d’un plan de communica tion pour le SWEDD-Camerou n CM-SWEDD-CA-021-CS-INDV / Recrutement d'un consultan Individual Consult Under Implement t national senior pour la prod IDA / 66600 Addition of Burkina Faso Post Limited 38,943.00 0.00 2023-03-17 2023-04-04 2023-03-22 2023-04-12 2023-05-17 2023-08-15 ant Selection ation uction d'un recueil de textes juridique relatif aux droits de s femmes et des filles. CM-SWEDD-CA-025-CS-INDV / Recrutement d'un consultan t pour Elaborer un guide d’ac Individual Consult Pending Impleme IDA / 66600 Addition of Burkina Faso Post Limited 24,093.00 0.00 2023-05-18 2023-05-23 2023-06-13 2023-07-18 2023-09-16 compagnement des filles et f ant Selection ntation emmes en justice (Adapté au x deux sous systèmes FR et ANG) CM-SWEDD-CA-009-CS-INDV / Recrutement d'un Consulta Individual Consult Pending Impleme nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Limited 17,396.00 0.00 2023-10-10 2023-10-15 2023-11-05 2023-12-10 2024-03-09 ant Selection ntation on de l'enquête sur la satisfa ction des bénéficiaires du Pro jet SWEDD CM-SWEDD-CA-008-CS-INDV / Recrutement d'un Consulta Individual Consult nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Open - National 47,841.00 0.00 Canceled 2023-03-13 2023-05-01 2023-05-22 2023-06-26 2023-09-24 ant Selection on d'une étude de faisabilité sur les garderies communaut aires CM-SWEDD-CA-007-CS-INDV / Recrutement d'un Consulta Individual Consult nt Individuel pour la réalisati IDA / 66600 Addition of Burkina Faso Post Open - National 78,111.00 0.00 Canceled 2023-02-02 2023-03-23 2023-04-13 2023-05-18 2023-08-16 ant Selection on d'une étude d'impact sur l es garderies communautaire s CM-SWEDD-CA-005-CS-INDV / Recrutement d'un Consulta nt Individuel pour l'exploitati Individual Consult on des données collectées da IDA / 66600 Addition of Burkina Faso Post Limited 38,333.00 0.00 Canceled 2023-03-02 2023-03-07 2023-03-28 2023-05-02 2023-09-29 ant Selection ns le cadre de l'enquête légè re pour l'identification de 20 000 bénéficiaires de kits scol aires et autres CM-SWEDD-CA-006-CS-INDV / Recrutement d'un Consulta nt Individuel pour l'adaptatio n et l'harmonisation des curri Individual Consult IDA / 66600 Addition of Burkina Faso Post Limited 27,232.00 0.00 Canceled 2022-07-26 2022-09-14 2022-07-31 2022-08-21 2022-09-25 2023-03-24 cula régionaux des espaces s ant Selection ûrs et du guide d'animation d es mentores aux espaces sûr s scolaires et le développem ent des outils d'animation CM-SWEDD-CA-001-CS-INDV / Recrutement d'un Consulta nt Individuel pour la concepti on de l'application sur le syst Individual Consult ème d'alerte et de remontée IDA / 66600 Addition of Burkina Faso Post Limited 53,201.00 0.00 Canceled 2022-12-14 2022-12-19 2022-12-21 2023-01-25 2023-07-24 ant Selection de données sur le décrochag e, le paramétrage des tablett es, la formation des utilisate urs et rendre fonctionnel le d ispositif de 47 établisse CM-SWEDD-CA-010-CS-INDV / Recrutement d'un consultan t individuel chargé d'élaborer Individual Consult IDA / 66600 Addition of Burkina Faso Post Open - National 21,458.00 0.00 Canceled 2022-11-23 2023-01-11 2023-02-01 2023-03-08 2023-09-04 la cartographie des acteurs i ant Selection ntervenants sur les questions de DD et d'autonomisation CM-SWEDD-CA-015-CS-INDV / Recrutement d'un consultan Individual Consult Under Implement IDA / 66600 Addition of Burkina Faso Post Limited 8,418.00 0.00 2023-07-12 2023-07-17 2023-08-07 2023-09-11 2024-09-10 t individuel chargé de la trad ant Selection ation uction des documents du Pro jet Page 5 CM-SWEDD-CA-001-CS-CDS / Recrutement d'un Cabinet ch argé de la réalisation de l'au Under Implement IDA / 66600 Addition of Burkina Faso Post Direct Selection Direct - National 24,491.00 0.00 2023-03-30 2023-03-21 2023-04-09 2023-06-13 2023-07-28 dit financier et comptable du ation Projet SWEDD pour le compt e des exercices 2020, 2021 e t 2022 Page 6 PROCUREMENT PLAN FOR THE PROJECT (COMPLETE) General 1. Project Information Country: Federal Republic of Somalia Full Project Name: Somalia: Education for Human Capital Development Project Total Finance ($): US$40M Project Number: P172434 Project Development In unserved areas, increase access to primary Objective (PDO) education with a focus on girls and improve quality of instruction. Project Ministry of Education, Culture & Higher Education, Implementation Federal Republic of Somalia Agency Date May 2021 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised and updated November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second hand Goods: Not Applicable VII. Domestic Preference: Not Applicable 1 VIII. Hands on Expanded Implementation Support (HEIS): To be used IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Procurement Methods (US$ millions)–Goods, Works, and Non- Consulting Services Category Open Open Reques Direct Internation Nation t for Selecti al al Quotati on on (RfQ) Works All ≥ 5.0 < 5.0 ≤ 0.2 Values Goods, IT, and non-consulting All services ≥ 0.5 < 0.5 ≤ 0.1 Values Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Short List of National Consultants Consulting Engineering and Services Construction Supervision Consultants (Firms) ≤0.1 ≤0.2 Individual Consultants N/A N/A Direct Selection Consultants (Firms) All Values All Values Individual Consultants All Values All Values 2 Procurement Plan for Project Preparation Advance for the proposed Somalia Education for Human Capital Development Project XI. Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) Re Contract Estimated Revie Marke Select Evalu Procure Preq Domes Expe Expec f. Description Cost (US$) w by t ion ation ment ualif tic cted ted N Bank Appro Meth Optio Process icati Prefer date date o (Prior ach od ns (Single on ence of of / (Open (RFP, stage- (Yes (Yes/N bid/ Contr Post) - RFB, single / No) o) propo act Natio RFQ envelop sal Signa nal/ etc.) e etc.) openi ture Limit ng ed etc.) Goods Office Equipment Most Single for PMU & Limite advan stage 1-Jul- 16-Jul- G1 PIUs -$10K $80,000.00 Prior RFQ N/A N/A d tageo One- 2021 2021 for each us Bid Envelop state, BNR & MoECHE Office Furniture for Most Single PMU & PIUs- Limite advan stage 2-Jul- 16-Jul- G2 $10K for $80,000.00 Prior RFQ N/A N/A d tageo One- 2021 2021 each state, us Bid Envelop BNR & MoECHE 3 Re Contract Estimated Revie Marke Select Evalu Procure Preq Domes Expe Expec f. Description Cost (US$) w by t ion ation ment ualif tic cted ted N Bank Appro Meth Optio Process icati Prefer date date o (Prior ach od ns (Single on ence of of / (Open (RFP, stage- (Yes (Yes/N bid/ Contr Post) - RFB, single / No) o) propo act Natio RFQ envelop sal Signa nal/ etc.) e etc.) openi ture Limit ng ed etc.) Equipment for the student Most Single teacher (as Open - 31 advan stage 15 Oct G3 per the $900,000.00 Prior Intern RFB N/A N/A Dec tageo One- 2021 recommenda ational 2021 us Bid Envelop tions of the rapid assessment) Solar equipment Most Single Open 31 for remote advan stage 15 Oct G4 $200,000.00 Prior nation RFB N/A N/A Dec schools- tageo One- 2022 al 2022 500schools* us Bid Envelop $400 $1,260,000. Total Goods 00 Works Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 1 0 tageo One- 2021 Banadir al 2021 us Bid Envelop Construction Open 31- W $2,501,750.0 Most Single 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 2 0 advan stage 2021 Jubbaland al 2021 4 Re Contract Estimated Revie Marke Select Evalu Procure Preq Domes Expe Expec f. Description Cost (US$) w by t ion ation ment ualif tic cted ted N Bank Appro Meth Optio Process icati Prefer date date o (Prior ach od ns (Single on ence of of / (Open (RFP, stage- (Yes (Yes/N bid/ Contr Post) - RFB, single / No) o) propo act Natio RFQ envelop sal Signa nal/ etc.) e etc.) openi ture Limit ng ed etc.) tageo One- us Bid Envelop Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 3 0 tageo One- 2021 Southwest al 2021 us Bid Envelop Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 4 0 tageo One- 2021 Hirshabelle al 2021 us Bid Envelop Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 5 0 tageo One- 2021 Galmudug al 2021 us Bid Envelop Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 6 0 tageo One- 2021 Puntland al 2021 us Bid Envelop Most Single Construction Open 31- W $2,501,750.0 advan stage 30-Sep- of schools in Prior Nation RFB N/A N/A Oct- 7 0 tageo One- 2021 Somaliland al 2021 us Bid Envelop Open 31- W Office Most Single 30-Sep- $400,000.00 Prior Nation RFB N/A N/A Oct- 8 refurbishmen advan stage 2021 al 2021 5 Re Contract Estimated Revie Marke Select Evalu Procure Preq Domes Expe Expec f. Description Cost (US$) w by t ion ation ment ualif tic cted ted N Bank Appro Meth Optio Process icati Prefer date date o (Prior ach od ns (Single on ence of of / (Open (RFP, stage- (Yes (Yes/N bid/ Contr Post) - RFB, single / No) o) propo act Natio RFQ envelop sal Signa nal/ etc.) e etc.) openi ture Limit ng ed etc.) t for tageo One- Jubbaland us Bid Envelop Office Most Single Open 31- W refurbishmen advan stage 30-Sep- $400,000.00 Prior Nation RFB N/A N/A Oct- 9 t for tageo One- 2021 al 2021 Hirshabelle us Bid Envelop $18,312,25 Total Works 0 .00 Non-Consulting Services Framework Agreement for Cost of Most Single Open 15 N internet advan stage 15 Oct $192,000.00 Prior Nation RFB N/A N/A Dec C1 access tageo One- 2021 al 2021 (mobile data) us Bid Envelop the student teachers Total Non- $192,000.0 Consulting 0 Services Consulting Services 6 Ref Contract Description Estimated Revie Market Expected Expected No. Cost (US$) w by Approa Selectio Date of Bid Date of Bank ch n Proposal Contract (Prio (Open- Method Opening Signature r/Pos Nation (QCBS, t) al/ LCBCS, Limited QBS, DS etc.) Program Manager-national Open- C1 $ 245,000.00 Prior INDV 15-Jun-2021 1-July-2021 National Financial Management Open- C2 $ 147,000.00 Prior INDV 15-Jun-2021 1-July-2021 Specialist – national National Procurement Specialist- Open- C3 $ 122,500.00 Prior INDV 15-Jun-2021 1-July-2021 national National Open- C4 M&E Specialist $ 12,500.00 Prior INDV 15-Jun-2021 1-July-2021 National Senior Social Safeguards Prior Open- C5 $147,500.00 INDV 15-Jun-2021 1-July-2021 Specialist National Prior Open- C6 Environment Specialist $122,500.00 INDV 15-Jun-2021 1-July-2021 National Prior Open- C7 GBV specialist $64,000.00 INDV 15-Jun-2021 1-July-2021 National FMS focal points/project $482,000.00 Open- C8 Prior INDV 15-Jul-2021 1-Aug-2021 coordinators National Open C9 $177,000.00 Prior INDV 15-Jul-2021 1-Aug-2021 Project Accountants for FMS national Open C10 $177,000.00 Prior INDV 15-Jul-2021 1-Aug-2021 Procurement officer for FMS national Open C11 $250,000.00 Prior INDV 15-Jul-2021 1-Aug-2021 Social Specialist for FMS national Consultancy to develop Open 01-Sep- C12 regulatory and policy $200,000.00 Prior QCBS 1-Aug-2021 National 2021 frameworks 7 Ref Contract Description Estimated Revie Market Expected Expected No. Cost (US$) w by Approa Selectio Date of Bid Date of Bank ch n Proposal Contract (Prio (Open- Method Opening Signature r/Pos Nation (QCBS, t) al/ LCBCS, Limited QBS, DS etc.) Consultancy establishing a Open 01-Aug- C13 national student learning $400,000.00 Prior QCBS 1-Jul-2021 National 2021 assessment system Open- 01-Aug- C14 $200,000.00 Prior CQS 15-Jul-2021 EMIS consultants National 2021 District needs assessment Open C15 including security $250,000.00 Prior CQS 1-Jul-2021 15-Jul-2021 national assessment Consultancy to design and Open- C16 $50,000 Prior INDV 1-Jul-2021 15-Jul-2021 prepare manual for the NSIP National Construction design & Open- 01-Oct- C17 $100,000.00 Prior CQS 1-Sep-2021 supervision consultant firm National 2021 Design, development, Open maintenance & training of 01-Oct- C18 $857,600.00 Prior Internat QCBS 1-Sep-2021 Online Learning 2021 ional Management System Consultancy for Review of Open 15-Aug- C19 syllabus & study guide $150,000.00 Prior QCBS 15-Jul-2021 National 2021 Consulting firm for preparation & translation of Open 15-Sep- C20 teacher training $304,000.00 Prior QCBS 15-Aug-2021 National 2021 manual/quizzes/assignment s & reference materials Consulting firm for Preparation of Functional 15-Nov- C21 Prior Limited CQS 15-Oct-2021 specification development $25,000.00 2021 for online technology 8 Ref Contract Description Estimated Revie Market Expected Expected No. Cost (US$) w by Approa Selectio Date of Bid Date of Bank ch n Proposal Contract (Prio (Open- Method Opening Signature r/Pos Nation (QCBS, t) al/ LCBCS, Limited QBS, DS etc.) platforms and rapid testing to identify type of devices to be used and their specifications Consultancy to Design Prior strategy and tools for 15-Oct- C22 Limited INDV 15-Sep-2021 summative evaluation & $12,000.00 2021 teacher certification Consultancy to Prepare Prior Open C23 Somali teacher professional INDV 15-Jul-2021 1-Aug-2021 $40,000.00 national development strategy. Consulting firm to Develop Prior in-service CPD course/s for 15-Sep- C24 Limited CQS 15-Aug-2021 small scale deployment and $40,000.00 2021 evaluation. Quality Assurance External Prior 15-Sep- C25 $12,000.00 Limited INDV 15-Aug-2021 consultant- 1 2021 Delivery of blended teacher Open 01-Jan- C26 training program- Lot1 $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Banadir Delivery of blended teacher Open 01-Jan- C27 training program - $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Hirshabelle Delivery of blended teacher Open 01-Jan- C28 training program- $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Southwest 9 Ref Contract Description Estimated Revie Market Expected Expected No. Cost (US$) w by Approa Selectio Date of Bid Date of Bank ch n Proposal Contract (Prio (Open- Method Opening Signature r/Pos Nation (QCBS, t) al/ LCBCS, Limited QBS, DS etc.) Delivery of blended teacher Open 01-Jan- C29 training program - $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Jubbaland Delivery of blended teacher Open 01-Jan- C30 training program - $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Galmudug Delivery of blended teacher Open 01-Jan- C31 $462,857.14 Prior QCBS 1-Dec-2021 training program - Puntland national 2022 Delivery of blended teacher Open 01-Jan- C32 training program - $462,857.14 Prior QCBS 1-Dec-2021 national 2022 Somaliland Open Conduct external mid-term 01-Jan- C33 $22,500.00 Prior internat INDV 1-Dec-2023 TPDP evaluation -consultant 2024 ional Open Conduct external end-term 15-May- C34 $22,500.00 Prior internat INDV 15-Apr-2026 TPDP evaluation-consultant 2026 ional Total Consulting $7,872,599.9 Services 8 $27,636,849. Grand Total 98 10 PROCUREMENT Somalia : Somalia Education for Human Capital Development Project PLAN General Information Country: Somalia 2021-09-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172434 GPN Date: Project Name: Somalia Education for Human Capital Development Project Loan / Credit No: IDA / D8370 Ministry of Education, Culture and Higher Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOECHE-338218-GO-RF Request for Quota Single Stage - One E Under Imple Q / Procurement of Furniture IDA / D8370 Project management Prior Limited 79,290.00 0.00 2023-02-02 2023-03-18 2023-03-30 2023-04-24 tions nvelope mentation & Equipment for MoECHE NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOECHE-314831-CS-QCB Expansion of access to quali S / Needs Assessment and M Consultant Qualifi Open - Internationa Under Implement IDA / D8370 ty schooling for the disadvan Prior 65,000.00 0.00 2022-09-12 2022-10-26 2022-09-16 2022-11-02 2022-10-07 2023-02-16 2022-10-12 2023-03-30 2022-10-27 2022-12-11 apping Exercise in Selected cation Selection l ation taged Districts in Somalia SO-MOECHE-332197-CS-QCB Expansion of access to quali Quality And Cost- Open - Internationa Under Implement S / Provision of security risk IDA / D8370 ty schooling for the disadvan Prior 300,000.00 0.00 2022-12-16 2022-12-22 2022-12-19 2022-12-26 2023-01-08 2023-04-16 2023-01-22 2023-06-01 2023-02-01 2023-02-21 2023-03-13 2023-08-12 Based Selection l ation management services taged SO-MOECHE-340346-CS-CQS Consultant Qualifi Open - Internationa / Third Party Monitoring Agen IDA / D8370 Project management Prior 100,000.00 0.00 Under Review 2023-02-06 2023-02-27 2023-04-07 2023-04-27 2023-06-01 2023-11-28 cation Selection l t Services INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOECHE-252699-CS-IND Individual Consult IDA / D8370 Project management Prior Open 60,000.00 73,380.00 Signed 2021-09-09 2021-09-11 2021-09-26 2021-11-08 2021-09-27 2021-11-29 2021-09-28 2021-12-05 2022-03-27 V / Project Manager ant Selection SO-MOECHE-252706-CS-IND Individual Consult IDA / D8370 Project management Prior Open 36,000.00 49,920.00 Signed 2021-09-09 2021-10-04 2021-09-25 2021-12-19 2021-09-26 2021-12-22 2021-09-27 2021-12-24 2022-03-28 V / Financial Management Sp ant Selection ecialist SO-MOECHE-252710-CS-IND Individual Consult IDA / D8370 Project management Prior Open 30,000.00 49,920.00 Signed 2021-09-09 2021-09-11 2021-09-26 2021-11-22 2021-09-26 2021-11-29 2021-09-28 2021-12-05 2021-09-28 V / Procurement Specialist ant Selection SO-MOECHE-252718-CS-IND Individual Consult IDA / D8370 Project management Prior Open 30,000.00 49,920.00 Terminated 2021-09-09 2021-09-11 2021-09-26 2021-11-27 2021-09-27 2021-12-02 2021-09-28 2021-12-07 2022-03-27 V / Monitoring & Evaluation S ant Selection pecialist SO-MOECHE-252721-CS-IND Individual Consult IDA / D8370 Project management Prior Open 54,000.00 54,600.00 Signed 2021-09-09 2021-09-11 2021-09-26 2021-12-22 2021-09-26 2021-12-23 2021-09-28 2021-12-24 2022-03-29 V / Senior Social Safeguards ant Selection Specialist SO-MOECHE-252723-CS-IND Individual Consult IDA / D8370 Project management Prior Open 48,000.00 49,200.00 Signed 2021-09-09 2021-09-12 2021-09-26 2021-12-22 2021-09-27 2021-12-23 2021-10-28 2021-12-29 2022-04-26 V / Environment Specialist ant Selection SO-MOECHE-252728-CS-IND Individual Consult IDA / D8370 Project management Prior Open 16,000.00 49,200.00 Signed 2021-09-09 2021-09-11 2021-09-26 2021-12-23 2021-09-27 2021-12-23 2021-09-28 2021-12-24 2022-03-27 V / GBV Specialist ant Selection SO-MOECHE-297452-CS-IND Individual Consult IDA / D8370 Project management Prior Open 49,200.00 0.00 Canceled 2022-05-30 2022-06-23 2022-06-19 2022-06-21 2022-07-06 2023-07-01 V / Monitoring & Evaluation S ant Selection pecialist SO-MOECHE-299614-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open 24,000.00 0.00 2022-06-15 2022-08-25 2022-07-06 2023-04-26 2022-07-10 2023-05-06 2022-07-18 2023-07-17 V / Project Coordinator - Gal ant Selection ation mudug SO-MOECHE-299618-CS-IND Individual Consult IDA / D8370 Project management Prior Open 24,000.00 0.00 Canceled 2022-06-15 2022-08-25 2022-07-08 2022-07-14 2022-08-02 2023-07-31 V / Project Coordinator - Hirs ant Selection habele SO-MOECHE-299624-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open 24,000.00 0.00 2022-06-15 2022-08-25 2022-07-15 2023-05-17 2022-07-17 2023-05-29 2022-08-04 2023-08-03 V / Project Coordinator - Jubal ant Selection ation and SO-MOECHE-299689-CS-IND Individual Consult IDA / D8370 Project management Prior Open 11,000.00 0.00 Canceled 2022-06-15 2022-08-25 2022-07-15 2022-07-17 2022-08-04 2023-08-03 V / Finance Officer - Banadir ant Selection SO-MOECHE-299679-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 24,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-04-06 2022-09-21 2023-05-08 2022-10-26 2023-04-24 V / Project Coordinator - Sout ant Selection ation hwest SO-MOECHE-299697-CS-IND Individual Consult IDA / D8370 Project management Prior Open - National 11,000.00 0.00 Canceled 2022-07-13 2022-08-25 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Procurement Officer - Ban ant Selection adir Page 1 SO-MOECHE-299688-CS-IND Individual Consult Pending Impleme IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Finance Officer - Puntland ant Selection ntation SO-MOECHE-299700-CS-IND Individual Consult V / Social safeguards Officer - IDA / D8370 Project management Prior Open - National 12,600.00 0.00 Canceled 2022-07-13 2022-08-25 2022-08-31 2022-09-21 2022-10-26 2023-04-24 ant Selection Galmudug SO-MOECHE-299708-CS-IND Individual Consult Under Implement V / Social safeguards officer - IDA / D8370 Project management Prior Open - National 12,600.00 0.00 2022-07-13 2022-08-25 2022-08-31 2022-09-21 2022-10-26 2023-04-24 ant Selection ation Hirshabele SO-MOECHE-299686-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-04-06 2022-09-21 2023-05-02 2022-10-26 2023-04-24 V / Finance Officer - Southwe ant Selection ation st SO-MOECHE-299694-CS-IND Individual Consult IDA / D8370 Project management Prior Open - National 11,000.00 0.00 Signed 2022-07-13 2022-08-25 2022-08-31 2023-04-26 2022-09-21 2023-05-23 2022-10-26 2023-06-16 2023-04-24 V / Procurement Officer - Hirs ant Selection habele SO-MOECHE-299709-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 12,600.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-05-17 2022-09-21 2023-05-29 2022-10-26 2023-04-24 V / Social Safeguards Officer ant Selection ation - Jubaland SO-MOECHE-299687-CS-IND Individual Consult IDA / D8370 Project management Prior Open - National 11,000.00 0.00 Signed 2022-07-13 2022-08-25 2022-08-31 2023-04-26 2022-09-21 2023-05-06 2022-10-26 2023-06-16 2023-04-24 V / Finance Officer - Hirshabe ant Selection le SO-MOECHE-299682-CS-IND Individual Consult IDA / D8370 Project management Prior Open - National 24,000.00 0.00 Canceled 2022-07-13 2022-09-08 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Project Coordinator - Ban ant Selection adir SO-MOECHE-299712-CS-IND Individual Consult IDA / D8370 Project management Prior Open - National 12,600.00 0.00 Canceled 2022-07-13 2022-08-25 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Social safeguards Officer - ant Selection Banadir SO-MOECHE-299685-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Finance Officer - Jubaland ant Selection ation SO-MOECHE-299696-CS-IND Individual Consult Pending Impleme IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Procurement Officer - Pun ant Selection ntation tland SO-MOECHE-299710-CS-IND Individual Consult Pending Impleme IDA / D8370 Project management Prior Open - National 12,600.00 0.00 2022-07-13 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Social safeguards officer - ant Selection ntation Puntland SO-MOECHE-299680-CS-IND Individual Consult Pending Impleme IDA / D8370 Project management Prior Open - National 24,000.00 0.00 2022-07-13 2022-08-31 2022-09-21 2022-10-26 2023-04-24 V / Project Coordinator - Punt ant Selection ntation land SO-MOECHE-299691-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-05-06 2022-09-21 2023-05-08 2022-10-26 2023-04-24 V / Procurement Officer - Gal ant Selection ation mudug SO-MOECHE-299695-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-04-06 2022-09-21 2023-05-23 2022-10-26 2023-04-24 V / Procurement Officer - Sou ant Selection ation thwest SO-MOECHE-299683-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-05-17 2022-09-21 2023-05-30 2022-10-26 2023-04-24 V / Finance Officer - Galmud ant Selection ation ug SO-MOECHE-299711-CS-IND Individual Consult Under Implement V / Social safeguards officer - IDA / D8370 Project management Prior Open - National 12,600.00 0.00 2022-07-13 2022-08-25 2022-08-31 2023-04-06 2022-09-21 2023-05-02 2022-10-26 2023-04-24 ant Selection ation Southwest SO-MOECHE-299692-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 11,000.00 0.00 2022-07-22 2022-09-01 2022-09-09 2023-05-17 2022-09-30 2023-05-29 2022-11-04 2023-05-03 V / Procurement officer - Juba ant Selection ation land SO-MOECHE-318365-CS-CQS Individual Consult IDA / D8370 Project management Prior Open - National 54,360.00 0.00 Under Review 2022-10-07 2022-11-29 2022-11-25 2022-12-16 2023-01-20 2024-01-20 / Security Specialist ant Selection SO-MOECHE-326279-CS-IND Individual Consult V / Short term consultancy to IDA / D8370 Enhanced instruction quality Prior Direct - National 12,000.00 0.00 Signed 2022-11-14 2022-11-25 2022-11-19 2022-12-08 2022-12-20 2022-12-21 2022-12-21 2023-01-15 ant Selection asses teacher training institu tes in Somalia SO-MOECHE-331685-CS-IND Individual Consult Under Implement IDA / D8370 System building Prior Limited 38,400.00 0.00 2022-12-16 2022-12-22 2022-12-21 2023-01-16 2023-01-11 2023-02-10 2023-02-15 2023-08-14 V / Principal Advisor ECE ant Selection ation SO-MOECHE-331697-CS-IND Individual Consult Under Implement IDA / D8370 System building Prior Limited 38,400.00 0.00 2022-12-16 2023-02-03 2022-12-21 2023-02-13 2023-01-11 2023-03-18 2023-01-30 2024-01-25 V / Legal Advisor ant Selection ation SO-MOECHE-342221-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 54,360.00 0.00 2023-02-14 2023-02-15 2023-04-04 2023-04-25 2023-05-30 2024-05-29 V / Security Advisor ant Selection ation SO-MOECHE-350396-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 24,000.00 0.00 2023-03-20 2023-03-29 2023-04-22 2023-05-06 2023-06-03 2024-05-28 V / Project Coordinator - Hirs ant Selection ation habelle SO-MOECHE-350397-CS-IND Individual Consult Under Implement V / Social safeguards officer - IDA / D8370 Project management Prior Open - National 12,600.00 0.00 2023-03-20 2023-03-29 2023-04-22 2023-05-06 2023-06-10 2024-06-04 ant Selection ation Galmudug SO-MOECHE-299682-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 24,000.00 0.00 2023-04-11 2023-04-14 2023-05-30 2023-06-20 2023-07-25 2024-07-19 V-2 / Project Coordinator - Ba ant Selection ation nadir SO-MOECHE-299712-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 13,440.00 0.00 2023-04-11 2023-04-14 2023-05-30 2023-06-20 2023-07-25 2024-07-19 V-2 / Social safeguards Office ant Selection ation r - Banadir SO-MOECHE-299697-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 13,440.00 0.00 2023-04-11 2023-04-14 2023-05-30 2023-06-20 2023-07-25 2024-07-19 V-2 / Procurement Officer - B ant Selection ation anadir SO-MOECHE-299689-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 13,440.00 0.00 2023-04-11 2023-04-14 2023-05-11 2023-05-13 2023-05-31 2024-05-29 V-2 / Finance Officer - Banadi ant Selection ation r SO-MOECHE-361816-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 49,680.00 0.00 2023-05-16 2023-06-08 2023-07-04 2023-07-25 2023-08-29 2024-08-23 V / Communications specialis ant Selection ation t SO-MOECHE-361819-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Limited 51,960.00 0.00 2023-05-16 2023-06-08 2023-05-21 2023-06-11 2023-07-16 2024-07-10 V / M&E Specialist ant Selection ation SO-MOECHE-362217-CS-IND Individual Consult Under Implement IDA / D8370 Project management Prior Open - National 54,360.00 0.00 2023-05-25 2023-05-30 2023-07-25 2023-08-15 2023-09-19 2024-09-13 V / Quantity Surveyor ant Selection ation Page 2 Coopération Cameroun – Banque Mondiale Ministère de l’Habitat et du Développement Urbain Ministry of Housing and Urban Development SECRETARIAT GENERAL- GENERAL SECRETARIAT Cellule de Préparation – Preparation Unit Projet de Développement des Villes Inclusives –Preparation of the proposed Cameroon Inclusive Cities Project PPA IDA V0100 PLAN DE PASSATION DES MARCHES-JANVIER 2017 VERSION N°4 I. GENERAL 1. Informations sur le Projet Emprunteur : REPUBLIQUE DU CAMEROUN Ministère Responsable: MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN Nom du Projet : Projet de Développement des Villes Inclusives au Cameroun (PDVI) Agence d’exécution du Projet en phase de préparation: Cellule de Préparation du PDVI (CP/PDVI). 2. Date d’approbation de la version originale (version N°1) par la Banque du Plan de Passation des Marchés : 12/01/2016 3. Date de publication de l’Avis Général de Passation des Marchés: 4. Période couverte par le Plan de Passation des Marchés : 1er janvier 2017 au 31 décembre 2017 5. Evaluation de risque par P-RAMS (Procurement Risk Asses ment and Management System) : Elevé II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1 1. Dispositions relatives aux seuils de revue préalable : seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans l’annexe 1 des "Directives de Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) par les Emprunteurs de la Banque mondiale dans le cadre des prêts de la BIRD et des crédits de l’AID". Catégories de Seuils de revue Observations marchés/Méthode de passation a priori des marchés Montants estimatifs des contrats en millions de dollars américains Travaux, Contrats clé en main et Contrats de Fourniture et Montage >= 5 d’Installations Fournitures, Système d’information, et Services autres que les services >= 1.5 de consultants Travaux, Contrats clé en main et Contrats de >= 5 Les Fourniture et justifications de Montage Contrats à passer l’entente d’Installations par entente directe devront Fournitures, directe être jointes et Système approuvées d’information, avec le PPM et Services >= 1.5 autres que les services de consultants 2. Pré qualification : les soumissionnaires, en cas de pré- qualification, (voir dans le tableau ci-joint) seront pré qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives. 3. Seuils pour les méthodes de passation des marchés : les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : 2 FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) AOI AON CF AOI AON CF ≥10,000,00 <10,000, < ≥1,000, <1,000,00 < 0 000 200,000 000 0 100,000 4. Dispositions spéciales sur les marchés : concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). 5. Liste des marchés de fourniture Coût Coût Revue Date Observat Méthod Estimatif Estimati par la prévue ions/ Réf e de Description (USD) f Banque de Date fin . sélectio prestatio HTVA (USD) (Priori/P l'ouvert n ns TTC ost) ure Gestion du projet Acquisition d'un logiciel comptable et suivi-évaluation Date de (TOM2PRO/TOM2MO 43,725 clôture 1 36,667 SED Post N/A NITORING) y compris du la formation et projet l’assistance technique Renouvellement Contrat annuel de gardiennage des biens et locaux de la 31/12/1 2 Cellule de 7,200 8,587 SED Post N/A Préparation du Projet 7 de Développement des villes Inclusives (PDVI) Renouvellement du contrat annuel de la Couverture médicale du personnel de la 43,725 28/05/1 3 Cellule de 36,667 SED Post N/A Préparation du Projet 8 de Développement des villes Inclusives (PDVI) 3 Marché à commande pour la maintenance 31/05/1 4 des véhicules du 27,926 33,300 SED Post N/A Projet pour une 8 durée d’un an Fourniture de 18/04/1 08/05/1 5 mobilier pour la 45,833 54,656 CF Post CP/PDVI 7 7 Total 183,99 154,293 3 III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans l’annexe 1 du Guide de Sélection et d’Emploi des Consultants par les Emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. Méthode de Seuils de revue Observations sélection/Catégories de a priori marchés Montants estimatifs des contrats en millions de dollars américains Méthode compétitive/Firmes >= 0.5 de consultants Entente directe/firmes de >= 0.5 consultants Les justifications de Entente directe/Consultants >= 0.2 l’entente directe devront individuel être jointes et approuvées Méthode Compétitive >= 0.2 avec le PPM (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: la liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 2.7 des Directives de Sélection et d’Emploi des Consultants, et l’Emprunteur ne procède pas à une publication dans UNDB. 4 3. Autre arrangement spécial de Sélection de consultants : le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 3.7 des directives pour la sélection et l’emploi des consultants par les emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. 4. Liste des Consultations, avec les méthodes de sélection et les dates de mise en œuvre CONSULTANTS 1 2 3 4 5 6 7 8 9 Coût Revu Préfér Coût Estima Métho Pré e Date Etape/ ence Estim tif de qualifi Banq prévue Date fin Nation Réf Description atif (USD) passati cation ue ouvertu des ale (USD) TTC on du (oui/no (Prior re prestati (oui/no HTVA marché n) i/ offres ons n) Post) Recrutement d’un consultant (firme) pour la réalisation des EIES et PAR des sous 166,66 198,75 22/06/1 1 projets de 7 0 QC non non post N/A proximité dans 7 les villes de Yaoundé, Douala, Batouri, Kumba et Ngaoundéré Recrutement d’un consultant formateur dans le cadre de 11,666 13,912 30/04/1 2 l’atelier CI non non post N/A itinérant sur la 7 note méthodologiqu e CCE dans les 5 villes Recrutement de l’évaluateur externe pour la 31/12/1 3 mise en œuvre 7,000 8,347 CI non non post N/A des PAR dans 7 les villes de Yaoundé, 5 Douala, Batouri, Kumba et Ngaoundéré. Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 142,0 169,43 22/12/1 4 QC non non post N/A de travaux 83 4 7 d'Aménageme nt de proximité dans les villes de Batouri, Kumba, et Ngaoundéré Recrutement d’un consultant (firme) pour la réalisation des études 139,3 166,15 22/12/1 5 QC non non post N/A APS/APD/DAO 33 5 7 de travaux d'Aménageme nt de proximité dans la ville de Douala Recrutement d’un consultant (firme) pour la réalisation des études 137,5 163,96 22/12/1 6 QC non non post N/A APS/APD/DAO 00 9 7 de travaux d'Aménageme nt de proximité dans la ville de Yaoundé Recrutement d’un consultant (firme) pour la réalisation des études APS/APD/DAO 21/12/1 7 de travaux 70,00 QC non non post N/A pilotes pour la 83,500 7 0 mobilité piétonne dans certains quartiers de la ville de Yaoundé 6 Gestion du Projet Avenant au contrat du 8 49,603 59,151 SED Non Non Priori 30/09/17 Coordonnate N/A ur du PDVI Avenant au contrat du Responsable 9 16,931 20,190 CI Non Non Priori N/A 30/09/17 Administratif et Financier du PDVI Avenant au contrat du 10 15,873 18,929 SED Non Non Priori N/A 30/09/17 Comptable du PDVI Avenant au Contrat du Responsable 11 environnem 15,873 18,929 SED Non Non Priori N/A 30/09/17 ental et social du PDVI Recrutemen t d’un Spécialiste en 12 22,500 26,831 CI Non Non Priori N/A 31/12/19 développem ent social au sein de la CP/PDVI Recrutemen Activité t d‘un de consultant passatio (firme) - n des marchés chargé de menée l’audit 13 33,334 39,750 SFQC Non Non Priori par le comptable MINEPAT et financier du PDVI, exercices 2016 et 2017 Avenant au Contrat de l’Assistant 14 7,937 9,464 SED Non Non Post N/A 30/09/17 Administratif et financier du PDVI Avenant au contrat de FCP 15 4,762 5,679 SED Non Non Post N/A l’Assistante 30/09/17 du 7 coordonnate ur Avenant au FCP Contrat de 31/12/17 16 l’Assistant 10,582 12,619 SED Non Non Post N/A Avenant de Passation signé des Marchés Avenant au FCP contrat de 31/12/17 17 2,540 3,029 SED Non Non Post N/A l’Agent Avenant administratif signé Total 924,104 1, 101 994 NB :Le taux du dollar (USD) appliqué est de 1USD= 600 F CFA. Le Taux de conversion du dollar (USD) utilisé est le Cours du dollar à la date de financement des fonds de préparation du Projet(PPA) SFQC : Sélection fondée sur la Qualité et le Coût DC/CF : Demande de Cotations/ Consultation Fournisseurs SMC : Sélection fondée sur le Moindre Coût CI : Consultant Individuel QC : Sélection basée sur les qualifications des Consultants SED/ED: Sélection par Entente Directe / Entente Directe SCBD : Sélection dans le Cadre d’un Budget Déterminé Post : Revue à postériori Priori : Revue à priori MINHDU : Ministère de l’Habitat et du Développement Urbain CP : Cellule de Préparation du Projet PPM: Plan de Passation des Marchés FCP : Fonds de contrepartie 8 PROCUREMENT Cameroon : Cameroon: Inclusive and Resilient Cities Development Project PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan:2017-04-10 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156210 GPN Date: 2019-08-05 Project Name: Cameroon: Inclusive and Resilient Cities Development Project Loan / Credit No: IDA / V0100, IDA / 61320 MINISTERE DE L'HABITAT ET DU DEVELOPPEMENT URBAIN Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process S Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendatio Signed Contract o. h cess (Y/N) isk ocument Type tatus n Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CM-MINHDU-91226-CW-RFB Improving Connectivity and Single Stage - One 1,958,297.0 2,506,561.2 2021-09-3 / Réalisation des travaux de IDA / 61320 Living environment in Benef Post Request for Bids Open - National Signed 2020-01-20 2020-03-19 2020-02-19 2020-04-03 2020-04-29 2020-05-03 2020-08-12 2020-06-07 2020-10-08 Envelope 0 8 0 voiries structurantes dans la iciary Cities ville de Batouri CM-MINHDU-91158-CW-RFB Improving Connectivity and / Réalisation des travaux de Open - Internation Single Stage - One 27,090,022. 15,579,588. 2022-07-3 IDA / 61320 Living environment in Benef Prior Request for Bids Signed 2019-12-15 2020-03-10 2020-01-26 2020-03-31 2020-04-25 2020-05-26 2020-06-06 2021-06-04 2020-07-11 2021-07-30 voiries structurantes dans la al Envelope 00 70 1 iciary Cities ville de Yaoundé CAY5 et CA Y7 CM-MINHDU-91198-CW-RFB Improving Connectivity and / Réalisation des travaux de Open - Internation Single Stage - One 16,746,128. 10,761,781. 2022-08-3 IDA / 61320 Living environment in Benef Prior Request for Bids Signed 2020-01-15 2020-03-04 2020-02-26 2020-03-30 2020-05-26 2020-05-28 2020-07-07 2021-02-16 2020-08-11 2021-04-19 voiries structurantes dans le al Envelope 00 72 1 iciary Cities s Arrondissements de Doual a 3e et 5e CM-MINHDU-91349-CW-RFB Improving Connectivity and / réalisation des travaux de Single Stage - One 2022-12-0 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 490,462.00 0.00 Canceled 2020-05-19 2020-06-12 2020-07-17 2020-08-16 2020-09-20 plantation d'arbres dans les Envelope 9 iciary Cities arrondissements de Douala 3e et 5e CM-MINHDU-91218-CW-RFB Improving Connectivity and Single Stage - One 6,557,298.0 2022-10-1 / Réalisation des travaux de IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 Canceled 2020-06-15 2020-07-06 2020-08-17 2020-09-16 2020-10-21 Envelope 0 1 voiries structurantes dans la iciary Cities ville de Kumba CM-MINHDU-91344-CW-RFB Improving Connectivity and / Réalisation des travaux d'o Open - Internation Single Stage - One 21,638,050. 14,416,042. 2022-08-3 IDA / 61320 Living environment in Benef Prior Request for Bids Signed 2020-01-15 2020-03-04 2020-02-26 2020-05-12 2020-05-26 2020-05-26 2020-07-07 2021-02-23 2020-08-11 2021-04-16 uvrages de drainage structu al Envelope 00 38 1 iciary Cities rants dans les arrondisseme nts de Douala 3e et 5e CM-MINHDU-91229-CW-RFB Improving Connectivity and / Réalisation des travaux de Single Stage - One 8,217,373.0 2022-05-2 IDA / 61320 Living environment in Benef Prior Request for Bids Open - National 0.00 Canceled 2019-12-25 2020-02-05 2020-03-18 2020-04-29 2020-06-03 voiries structurantes dans l Envelope 0 4 iciary Cities a ville de Ngaoundéré CM-MINHDU-168199-CW-RF Improving Connectivity and B / Réalisation des travaux d Open - Internation Single Stage - One 8,217,373.0 8,134,425.5 2022-02-2 IDA / 61320 Living environment in Benef Prior Request for Bids Signed 2020-05-15 2020-04-24 2020-05-20 2020-04-24 2020-07-01 2020-06-11 2020-07-31 2020-11-02 2020-09-04 2020-12-22 e voiries structurantes dans al Envelope 0 5 6 iciary Cities la ville de Ngaoundéré– Cam eroun CM-MINHDU-169945-CW-RF Project Management, Coord Q / Travaux de cloisement d Request for Quot Single Stage - One 2020-11-1 IDA / 61320 ination, Monitoring and Eval Post Limited 8,393.00 7,511.75 Completed 2020-08-25 2020-07-07 2020-10-20 2020-09-15 es espaces pour créer des b ations Envelope 9 uation ureaux à la Cellule de Coordi nation du projet CM-MINHDU-212924-NC-RF Project Management, Coord Q / Petit travaux d'installatio Request for Quot Single Stage - One 2021-04-1 IDA / 61320 ination, Monitoring and Eval Post Limited 6,860.00 6,977.65 Signed 2021-03-06 2021-02-05 2021-04-03 2021-03-13 n du groupe électrogène SD ations Envelope 3 uation MO 16KVA avec inverseur a utomatique au PDVIR CM-MINHDU-233545-CW-RF Request for Bids - B / Travaux de voiries struct Improving Connectivity and Single Stage - One Works French Civ 6,910,337.0 5,426,941.6 2023-04-3 urantes dans l’Arrondisseme IDA / 61320 Living environment in Benef Post Request for Bids Open - National Signed 2021-06-15 2021-05-03 2021-07-15 2021-08-26 2021-07-29 2021-09-25 2021-08-25 2021-11-06 2022-01-19 Envelope il Law (French) SP 0 4 0 nt de Douala 5ème, Camero iciary Cities D un : Tronçon : PK 11-Fin gou dron Logpom CM-MINHDU-246631-CW-RF B / Travaux de voiries struct urantes complémentaires da Request for Bids - ns l’Arrondissement de Yaou Improving Connectivity and Single Stage - One Works French Civ 4,911,540.0 Under Impl 2023-02-1 ndé 5è au Cameroun: Sectio IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2021-08-30 2021-09-20 2021-09-04 2021-10-16 2021-11-09 2021-11-15 2021-11-22 2021-12-20 Envelope il Law (French) SP 0 ementation 3 n 5.4 et 5.5 Carrefour SAFAR iciary Cities D I – Carrefour Fabrique– Carre four MEBE CITY , 1387ml; Se ction 5.6; Momebelengal – C arrefour Fabrique, 1249ml CM-MINHDU-259465-CW-RF Request for Bids - B / Travaux de construction Improving Connectivity and Single Stage - One Works (without p 2022-10-0 des bâtiments et aménagem IDA / 61320 Living environment in Benef Post Request for Bids Open - National 513,873.00 0.00 Canceled 2021-12-15 2021-12-20 2022-01-31 2022-03-02 2022-04-06 Envelope requalification) S 3 ent des espaces aux quartie iciary Cities PD rs GADA MABANGA et DJALI NGO à Ngaoundéré. CM-MINHDU-259463-CW-RF Request for Bids - B / Travaux de voiries et bâti Improving Connectivity and Single Stage - One Works French Civ 2,937,642.0 Under Impl 2022-10-0 ments de proximité aux qua IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2021-12-15 2022-04-26 2021-12-20 2022-05-09 2022-01-31 2022-06-21 2022-03-02 2022-07-18 2022-04-06 Envelope il Law (French) SP 0 ementation 3 rtiers GADA MABANGA et DJ iciary Cities D ALINGO à Ngaoundéré II en deux (02) lots séparés. CM-MINHDU-289647-CW-RF Request for Bids - Improving Connectivity and B / Travaux de voiries et bâti Single Stage - One Works French Civ 3,026,713.0 Under Impl 2023-02-2 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2022-05-12 2022-05-13 2022-05-17 2022-06-28 2022-07-13 2022-07-28 2022-09-01 ments de proximité au quart Envelope il Law (French) SP 0 ementation 8 iciary Cities ier Mokolo à Batouri en deux D (02) lots séparés CM-MINHDU-301004-CW-RF Request for Bids - Improving Connectivity and B / Réalisation des travaux d Single Stage - One Small Works SPD Under Impl 2023-04-2 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 205,549.24 0.00 2022-07-07 2022-08-30 2022-07-12 2022-08-23 2022-09-22 2022-10-27 e plantation d’arbres dans le Envelope (1 envelope proc ementation 5 iciary Cities s arrondissements de Doual ess) a 3e et 5e CM-MINHDU-303209-CW-RF Request for Bids - B / Travaux de voirie et équi Improving Connectivity and Single Stage - One Works French Civ 9,773,910.0 Under Impl 2023-05-1 pements de proximité dans l IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2022-07-30 2022-07-27 2022-08-04 2022-08-04 2022-09-15 2022-10-15 2022-11-19 Envelope il Law (French) SP 0 ementation 8 es Arrondissements de Doua iciary Cities D la 3 et 5 en 3 lots séparés CM-MINHDU-303211-CW-RF B / Travaux de construction Request for Bids - Improving Connectivity and d’une Station de Traitement Open - Internation Single Stage - One Works French Civ 11,447,380. 2023-05-1 IDA / 61320 Living environment in Benef Prior Request for Bids 0.00 Signed 2022-07-30 2022-09-13 2022-08-04 2022-10-07 2022-09-15 2022-12-07 2022-10-15 2023-02-10 2022-11-19 des Boues de Vidange (STBV al Envelope il Law (French) SP 00 8 iciary Cities ) à Ngombè dans l’Arrondiss D ement de Douala 5ème au C ameroun CM-MINHDU-306788-CW-RF Project Management, Coord Request for Quot Q / Réfection des placards, p Request for Quot Single Stage - One Under Impl 2023-04-0 IDA / 61320 ination, Monitoring and Eval Post Limited ations (Non Bank 6,852.00 0.00 2022-08-13 2022-11-11 2022-10-08 ause serrure et réfection de ations Envelope ementation 6 uation -SPD) certains meubles de la CC/P DVIR CM-MINHDU-311974-CW-RF Request for Bids - B / Travaux de voiries et équ Improving Connectivity and Single Stage - One Works French Civ 8,656,683.0 Under Impl 2023-07-1 ipements de proximité dans IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2022-09-21 2022-08-08 2022-09-26 2022-10-05 2022-11-07 2022-12-07 2023-01-11 Envelope il Law (French) SP 0 ementation 0 les Arrondissements de Yao iciary Cities D undé 5èmeet 7ème au Cam eroun en 3 lots séparés Page 1 CM-MINHDU-318709-CW-RF Request for Bids - B / Travaux d'amélioration d Improving Connectivity and Open - Internation Single Stage - One Works French Civ 10,585,786. Under Revi 2023-08-0 e la mobilité Piétonne dans c IDA / 61320 Living environment in Benef Prior Request for Bids 0.00 2022-10-13 2022-11-21 2022-10-18 2022-12-20 2022-11-29 2023-01-31 2022-12-29 2023-02-02 al Envelope il Law (French) SP 00 ew 1 ertains quartiers de Yaoundé iciary Cities D en 02 lots séparés (Lot 1 Cit é verte; Lot2 Nkolmesseng CM-MINHDU-318845-CW-RF Request for Bids - B / Travaux de voiries et bâti Improving Connectivity and Single Stage - One Works French Civ 7,442,138.0 Under Impl 2023-08-0 ments de proximité aux qua IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 2022-10-13 2022-10-18 2022-11-29 2022-12-29 2023-02-02 Envelope il Law (French) SP 0 ementation 1 rtiers OURO TCHEDE ZILING iciary Cities D à Maroua I, en deux (02) lots séparés CM-MINHDU-259460-CW-RF Request for Bids - Improving Connectivity and B / Travaux de voiries de pro Single Stage - One Works (without p 2,312,825.0 2022-10-0 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 Canceled 2021-12-15 2021-12-20 2022-01-31 2022-03-02 2022-04-06 ximité et aménagements co Envelope requalification) S 0 3 iciary Cities nnexes au quartier Mokolo à PD Batouri CM-MINHDU-259461-CW-RF Request for Bids - Improving Connectivity and B / Travaux de construction Single Stage - One Works (without p 2022-10-0 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 599,520.00 0.00 Canceled 2021-12-15 2021-12-20 2022-01-31 2022-03-02 2022-04-06 des bâtiments et aménagem Envelope requalification) S 3 iciary Cities ent des espaces au quartier PD Mokolo à Batouri CM-MINHDU-340958-CW-RF Request for Quot Project Management, Coord Q / Pose de cloison et portes Request for Quot Single Stage - One ations - Small Wo Under Impl 2023-10-2 IDA / 61320 ination, Monitoring and Eval Post Limited 1,713.00 0.00 2023-02-26 2023-02-20 2023-04-23 de séparation en aluminium ations Envelope rks (Emergency) ementation 0 uation pour le local du serveur de l SPD -Competitive a CC PDVIR CM-MINHDU-366032-CW-RF B / Travaux de bâtiments et Request for Bids - Improving Connectivity and Pending Im équipements de proximité d Single Stage - One Works French Civ 1,924,073.0 2024-01-3 IDA / 61320 Living environment in Benef Post Request for Bids Open - National 0.00 plementatio 2023-07-10 2023-07-15 2023-08-14 2023-09-04 2023-10-02 ans les quartiers Sultanat et Envelope il Law (French) SP 0 0 iciary Cities n Lacka à KOUSSERI au Camer D oun, en trois (03) lots séparé s GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11636-GO-RFQ Project Management, Coord Request for Quot Single Stage - One IDA / V0100 Post Limited 54,656.00 0.00 Canceled 2017-06-11 2017-07-20 2017-08-03 / Fourniture de mobilier pour ination, Monitoring and Eval ations Envelope la CP/PDVI uation CM-MINHDU-91885-GO-RFB Strengthening Capacity for I / Acquisition de logiciels pou Single Stage - One IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2020-01-20 r la programmation de l'ent Envelope n Management retien des VRD et drains CM-MINHDU-91875-GO-RFQ / Acquisition du matériel pou Strengthening Capacity for I Request for Quot Single Stage - One r la mise en place d'une gest IDA / 61320 nclusive and Resilient Urba Post Open - National 83,334.00 0.00 Canceled 2019-09-04 2019-10-30 2019-12-29 ations Envelope ion informatisée des opérati n Management ons d'investissement à la D OU CM-MINHDU-91851-GO-RFB / Achat des équipements po Strengthening Capacity for I Single Stage - One ur le centre de formation de IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 210,000.00 0.00 Canceled 2019-08-01 2019-08-06 2019-09-17 2019-10-17 2019-11-21 2019-12-21 Envelope s jeunes aux travaux urbains n Management à Kumba et Ngaoundére CM-MINHDU-125030-GO-RF Project Management, Coord B / Acquisition des matériels Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Request for Bids Open - National 128,468.00 0.00 Canceled 2019-08-30 2019-09-04 2019-10-04 2019-11-03 2019-12-08 2020-01-07 informatiques et de bureau Envelope uation pour la Cellule de Coordinati on et les UTL du PDVIR CM-MINHDU-144044-GO-RF Q / Fourniture du matériel d Project Management, Coord Request for Quot Single Stage - One e bureau, des produits de ré IDA / 61320 ination, Monitoring and Eval Post Limited 8,393.00 41,873.01 Signed 2019-12-10 2020-09-14 2020-02-04 2020-10-10 2020-03-05 ations Envelope ception et d’entretien à la C uation ellule de Coordination du PD VIR CM-MINHDU-91924-GO-RFQ Project Management, Coord Request for Quot Single Stage - One / Acquisition de matériel info IDA / 61320 ination, Monitoring and Eval Post Open - National 41,661.00 0.00 Canceled 2019-12-07 2020-02-01 2020-04-01 ations Envelope rmatique pour les UTL uation CM-MINHDU-139715-GO-RF Project Management, Coord Q / Acquisition du matériel e Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 59,952.00 0.00 Canceled 2019-12-25 2020-02-19 2020-03-20 t équipement informatique à ations Envelope uation la Cellule de Coordination du PDVIR CM-MINHDU-91926-GO-RFQ Project Management, Coord Request for Quot Single Stage - One / Achat de 05 véhicules pick IDA / 61320 ination, Monitoring and Eval Post Limited 214,113.00 0.00 Canceled 2019-12-07 2020-02-01 2020-05-31 ations Envelope up double cabine respective uation ment pour les UTL CM-MINHDU-91929-GO-RFQ Project Management, Coord Request for Quot Single Stage - One / Fourniture de bureau et co IDA / 61320 ination, Monitoring and Eval Post Open - National 8,393.00 0.00 Canceled 2019-12-07 2020-02-01 2020-03-02 ations Envelope nsommable informatique à l uation a CC/PDVIR CM-MINHDU-169961-GO-RF Project Management, Coord Request for Quot Single Stage - One Q / Acquisition du petit maté IDA / 61320 ination, Monitoring and Eval Post Limited 6,851.00 3,863.70 Completed 2020-05-20 2020-07-07 2020-07-15 2020-09-15 2020-08-14 2020-11-28 ations Envelope riel de lutte contre le COVID uation 19. CM-MINHDU-144105-GO-RF B / Acquisition d'un (01) véhi Project Management, Coord cule 4X4 station Wagon pour Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Request for Bids Open - National 299,759.00 310,893.09 Signed 2020-05-30 2020-10-12 2020-06-04 2020-10-15 2020-07-16 2020-11-12 2020-08-15 2020-12-09 2020-09-19 2021-01-19 2020-11-18 la Cellule de Coordination du Envelope uation PDVIR et de cinq (05) véhicu les pickup double cabine po ur les UTL. CM-MINHDU-91887-GO-RFQ Project Management, Coord Request for Quot Single Stage - One / Fourniture et pose des babi IDA / 61320 ination, Monitoring and Eval Post Open - National 70,808.00 0.00 Canceled 2020-05-20 2020-07-15 2021-07-15 ations Envelope llards dans les CTD de resso uation rt du Projet CM-MINHDU-169970-GO-RF Project Management, Coord Request for Quot Single Stage - One Q / Acquisition fournitures d IDA / 61320 ination, Monitoring and Eval Post Limited 42,000.00 3,520.43 Signed 2020-08-04 2020-09-14 2020-09-29 2020-10-10 2021-09-24 ations Envelope e Bureau, d'entretien et de uation pose café CM-MINHDU-169989-GO-RF Project Management, Coord Q / Acquisition mobilier de b Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 13,700.00 13,585.38 Signed 2020-09-20 2020-09-14 2020-11-15 2020-10-14 2020-12-15 ureau pour le nouveau perso ations Envelope uation nnel (personnel clé et d'app ui) CM-MINHDU-196965-GO-RF Project Management, Coord Q / Fourniture du mobilier de Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 32,550.00 33,527.10 Signed 2020-11-25 2020-12-28 2021-01-13 2021-02-27 2021-02-12 bureau au profit des UTL da ations Envelope uation ns le cadre du PDVIR CM-MINHDU-144060-GO-RF Q / Acquisition du matériel i nformatique pour la Cellule Strengthening Capacity for I Single Stage - One de Coordination (CC), les Uni IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 214,113.00 0.00 Canceled 2020-08-30 2020-08-13 2020-08-31 2020-10-12 2020-09-30 2020-11-11 2020-12-16 2021-01-15 Envelope tés Techniques de Liaison (U n Management TL) et les Collectivités Territ oriales Décentralisées (CTD) ou mairies concernées par le projet. Page 2 CM-MINHDU-197279-GO-RF B / Fourniture et installation du matériel informatique à l a Cellule de coordination, au Strengthening Capacity for I Single Stage - One x Unités Techniques de Liais IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 393,000.00 0.00 Canceled 2020-11-30 2020-12-14 2020-12-05 2020-12-16 2021-01-04 2021-01-22 2021-01-19 2021-02-16 2021-03-18 Envelope on (UTL) et aux collectivités n Management territoriales décentralisées ( CTD) du projet de développe ment des villes inclusives et résilientes ( quatre lots) CM-MINHDU-179225-GO-DI Strengthening Capacity for I R / Fourniture de matériels d IDA / 61320 nclusive and Resilient Urba Post Direct Selection Direct 215,826.00 0.00 Canceled 2020-07-30 2020-08-04 2020-09-08 2020-11-07 e lutte contre le Covid-19 da n Management ns toutes les villes du projet. CM-MINHDU-196921-GO-RF Q / Production et édition des supports de communication Strengthening Capacity for I Request for Quot Single Stage - One pour la CCP/PDVIR et les UTL IDA / 61320 nclusive and Resilient Urba Post Limited 25,693.00 0.00 Canceled 2020-12-12 2021-01-09 2021-01-30 ations Envelope (Agendas, stylos personnalis n Management é, casquettes, polos, carte d e visite, plaquette mural, cal endriers, auto collants sur le s véhicules CM-MINHDU-223169-GO-RF Project Management, Coord Q / Achat du nouveau matéri Request for Quot Single Stage - One Under Imple IDA / 61320 ination, Monitoring and Eval Post Limited 3,430.00 0.00 2021-04-10 2021-05-22 2021-06-21 el contre la COVID-19 pour l ations Envelope mentation uation a Cellule de Coordination du Projet CM-MINHDU-226972-GO-RF Q / Souscription d’une police d’assurance annuelle pour le s sept nouveaux véhicules d Project Management, Coord Request for Quot Single Stage - One Under Imple e la Cellule de Coordination IDA / 61320 ination, Monitoring and Eval Post Limited 27,444.00 0.00 2021-05-15 2021-06-22 2021-07-05 2021-07-19 ations Envelope mentation du Projet de Développemen uation t des Villes Inclusives et Rési lientes (PDVIR) et des Unités Techni ques de Liaison (UTL) CM-MINHDU-226967-GO-RF Q / Acquisition des outils de communication : Téléphones Project Management, Coord Request for Quot Single Stage - One Under Imple portables et Modem internet IDA / 61320 ination, Monitoring and Eval Prior Limited 18,765.00 0.00 2021-08-04 2021-07-15 2021-09-22 2021-10-06 ations Envelope mentation au profit du personnel de la uation Cellule de Coordination du P DVIR (CCP) et des Unités Te chniques de Liaison (UTL) CM-MINHDU-221645-GO-RF Project Management, Coord Q / Acquisition du matériel p Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 6,861.00 8,426.89 Signed 2021-04-10 2021-06-18 2021-06-05 2021-07-28 2021-06-20 our la tenue des visio confér ations Envelope uation ences de groupe (micro,cam era, ecran ect...) CM-MINHDU-91853-GO-RFB Strengthening Capacity for I / Fourniture d'un drone profe Open - Internation Single Stage - One IDA / 61320 nclusive and Resilient Urba Post Request for Bids 208,334.00 0.00 Canceled 2020-08-20 2020-12-16 2020-08-25 2020-12-16 2020-10-24 2021-01-25 2020-11-23 2020-12-28 2021-02-26 ssionnelle et d'une platefor al Envelope n Management me photogrammétrique au MINDCAF CM-MINHDU-229311-GO-RF Project Management, Coord Q / Acquisition et installation Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 26,573.45 0.00 Signed 2021-08-31 2022-02-02 2021-10-12 2021-10-27 des splits pour les bureaux d ations Envelope uation e la Cellule de Coordination du PDVIR CM-MINHDU-242723-GO-RF Q / Acquisition du mobilier d’ archivage et fourniture de b ureau au profit des commun Strengthening Capacity for I Single Stage - One Under Imple autés urbaines de Ndéré, Mr IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 256,937.00 0.00 2021-08-30 2021-09-06 2021-09-04 2021-09-10 2021-10-16 2021-10-12 2021-11-15 2021-10-20 2021-12-20 2022-06-18 Envelope mentation oua et Kumba; des commun n Management es d’arrondissement de Dla I II, Dla V, Ydé V, Ydé VII, Mro ua I, Ndéré II, Kumba II; des communes de Kousséri et B atouri. CM-MINHDU-212718-GO-RF B / Fourniture du matériel d' hygiène et de salubrité au pr Strengthening Capacity for I ofit des communautés urbai Single Stage - One Under Imple IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 137,221.00 0.00 2021-04-15 2021-09-06 2021-04-20 2021-09-10 2021-06-01 2021-07-01 2021-08-05 2021-10-04 nes de Ndéré, Mroua et Kum Envelope mentation n Management ba; des communes d’arrondi ssement de Dla III, Dla V, Yd é V, Ydé VII, Mroua I, Ndéré I I, Kumba II; des communes de Kousséri et Batouri. CM-MINHDU-91853-GO-RFB -2 / ACQUISITION DE DEUX ( 02) DRONES DE TOPOGRAP Strengthening Capacity for I HIE ET DE CARTOGRAPHIE A Single Stage - One Under Imple IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 208,334.00 0.00 2021-11-01 2021-07-05 2021-11-06 2021-12-06 2021-12-18 2021-12-29 2022-01-17 2022-01-13 2022-02-21 2022-05-22 GRANDE ECHELLE POUR LES Envelope mentation n Management TRAVAUX DE PRECISIONS D U CADASTRE AU MINISTERE DES DOMAINES, DU CADAST RE ET DES AFFAIRES FONCIE RES. CM-MINHDU-259775-GO-RF B / Fourniture et installation du matériel informatique à l a Cellule de coordination, au Strengthening Capacity for I Single Stage - One Under Imple x Unités Techniques de Liais IDA / 61320 nclusive and Resilient Urba Post Request for Bids Limited 628,387.00 0.00 2021-11-05 2021-11-05 2021-12-11 2022-01-11 2021-12-11 2022-03-04 2022-01-10 2022-04-07 2022-01-25 2022-04-17 2022-02-23 2022-03-25 Envelope mentation on (UTL) et aux collectivités n Management territoriales décentralisées ( CTD) du projet de développe ment des villes inclusives et résilientes ( quatre lots) CM-MINHDU-259002-GO-RF B / Fourniture des matériaux de construction aux personn Improving Connectivity and Single Stage - One Under Imple es affectées par le projet (PA IDA / 61320 Living environment in Benef Post Request for Bids Open - National 240,567.00 0.00 2022-01-21 2022-01-26 2022-03-09 2022-04-08 2022-05-13 2022-11-09 Envelope mentation P) dans les villes de Yaound iciary Cities é, Douala et Ngaoundéré ay ant des montants additionn els sur leur construction. CM-MINHDU-259197-GO-RF Q / Fourniture des matériaux Improving Connectivity and de construction aux personn Request for Quot Single Stage - One Under Imple IDA / 61320 Living environment in Benef Post Limited 11,300.00 0.00 2022-01-26 2022-05-26 2022-03-23 2022-09-19 es affectées par le projet (PA ations Envelope mentation iciary Cities P) dans la ville de Batouri ay ant des montants additionne ls sur leur construction. CM-MINHDU-91862-GO-RFB / Acquisition de GPS bi-fréqu Strengthening Capacity for I Single Stage - One ence au profit de trois délég IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 125,000.00 0.00 Canceled 2020-06-15 2020-12-10 2020-06-20 2020-12-16 2020-08-01 2021-01-21 2020-08-31 2020-10-05 2020-12-04 Envelope ations départementales du n Management MINDCAF( N'Gaoundéré, Ku mba et Batouri) CM-MINHDU-91862-GO-RFB -2 / Acquisition de quatre (0 4) couples de récepteurs GN Strengthening Capacity for I Single Stage - One Under Imple SS base bi fréquence pour le IDA / 61320 nclusive and Resilient Urba Post Request for Bids Open - National 137,033.00 0.00 2022-02-07 2022-03-21 2022-02-12 2022-05-19 2022-03-26 2022-07-05 2022-04-25 2022-08-08 2022-05-30 2022-07-29 Envelope mentation s travaux de précisions du c n Management adastre au Ministère des do maines, du Cadastre et des Affaires Foncières CM-MINHDU-281521-GO-RF Project Management, Coord Q / Acquisition des équipem Request for Quot Single Stage - One Under Imple IDA / 61320 ination, Monitoring and Eval Post Limited 812.00 0.00 2022-03-12 2022-05-07 2022-11-03 ents pour la mise en place d ations Envelope mentation uation u réseau local (LAN) à la CC/ PDVIR CM-MINHDU-303047-GO-RF Project Management, Coord Request for Quot Single Stage - One Under Imple Q / Fourniture de bureau au IDA / 61320 ination, Monitoring and Eval Post Limited 7,117.00 0.00 2022-07-13 2022-09-07 2023-03-06 ations Envelope mentation profit de la CCP uation Page 3 CM-MINHDU-303050-GO-RF Project Management, Coord Request for Quot Single Stage - One Under Imple Q / Fourniture matériel d'ent IDA / 61320 ination, Monitoring and Eval Post Limited 7,058.00 0.00 2022-07-13 2022-09-07 2023-03-06 ations Envelope mentation retien et de pause-café au p uation rofit la CCP CM-MINHDU-319790-GO-RF Project Management, Coord Q / Acquisition de deux (02) Request for Quot Single Stage - One Under Imple IDA / 61320 ination, Monitoring and Eval Post Limited 261,219.00 0.00 2022-10-24 2022-10-27 2022-12-19 2023-06-17 véhicules 4X4 station Wago ations Envelope mentation uation n et trois (03) véhicules pick up pour le PDVIR CM-MINHDU-321595-GO-RF Project Management, Coord Request for Quot Single Stage - One Q / Fourniture de bureau au IDA / 61320 ination, Monitoring and Eval Post Limited 1,819.00 0.00 Signed 2022-10-29 2022-10-26 2022-12-24 2023-06-22 ations Envelope profit de l'UTL Yaoundé uation CM-MINHDU-326821-GO-RF Q / Production des supports Project Management, Coord Request for Quot Single Stage - One Under Imple d’information et outils de vis IDA / 61320 ination, Monitoring and Eval Post Limited 8,633.00 0.00 2022-12-17 2023-02-11 2023-08-10 ations Envelope mentation ibilité du Projet de Développ uation ement des Villes Inclusives e t résilientes (PDVIR). CM-MINHDU-333844-GO-RF Q / Demande de Cotation en Project Management, Coord Request for Quot Single Stage - One Under Imple vue de la conclusion d’un Ac IDA / 61320 ination, Monitoring and Eval Post Limited 28,777.00 0.00 2023-02-13 2023-04-12 2023-04-10 2023-10-07 ations Envelope mentation cord-Cadre pour l’acquisition uation des fournitures de bureau p our la CCP CM-MINHDU-333848-GO-RF Q / Demande de Cotation en Project Management, Coord Request for Quot Single Stage - One Under Imple vue de la conclusion d’un Ac IDA / 61320 ination, Monitoring and Eval Post Limited 27,407.00 0.00 2023-03-05 2023-04-12 2023-04-30 2023-10-27 ations Envelope mentation cord-Cadre pour l’acquisition uation des fournitures pause café à la CC PDVIR CM-MINHDU-333852-GO-RF Q / Demande de Cotation en Project Management, Coord vue de la conclusion d’un Ac Request for Quot Single Stage - One Pending Impl IDA / 61320 ination, Monitoring and Eval Post Limited 30,832.00 0.00 2023-03-05 2023-04-30 2023-10-27 cord-Cadre pour l’acquisition ations Envelope ementation uation des consommables informati ques fournitures de bureau pour la CCP CM-MINHDU-326824-GO-RF Q / Production des plaques e Project Management, Coord Request for Quot Single Stage - One Under Imple t panneaux pour du Projet d IDA / 61320 ination, Monitoring and Eval Post Limited 10,275.00 0.00 2023-02-08 2023-02-13 2023-04-05 2023-10-02 ations Envelope mentation e Développement des Villes uation Inclusives et résilientes (PDV IR) CM-MINHDU-267656-GO-RF Q / DEMANDE DE COTATION Project Management, Coord EN VUE DE LA CONCLUSION Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Open - National 85,645.50 0.00 Canceled 2022-01-10 2022-03-07 2022-09-03 D’UN ACCORD-CADRE POUR ations Envelope uation L’ACQUISITION DES FOURNI TURES DE BUREAU. POUR LA CCP ET LES UTLs CM-MINHDU-91891-NC-RFQ / Production et édition des s upports de communication d Project Management, Coord estinés à améliorer la visibil Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Open - National 42,881.00 0.00 Canceled 2021-08-04 2021-10-14 2022-10-09 ité du projet au plan nationa ations Envelope uation l comme au niveau local (roll up, flyers, porte-document, plaquettes, agendas, calend riers, gadgets, magazine, et c.) pour un an. CM-MINHDU-289155-GO-RF Project Management, Coord Q / Acquisition de trois (03) Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 179,856.00 0.00 Canceled 2022-04-27 2022-06-22 2022-12-19 véhicules station wagon pou ations Envelope uation r la Cellule de Coordination du PDVIR CM-MINHDU-340964-GO-RF Project Management, Coord Request for Quot Single Stage - One Q / Fourniture matériel d'ent IDA / 61320 ination, Monitoring and Eval Post Limited 2,056.00 0.00 Signed 2023-02-26 2023-02-09 2023-04-23 2023-10-20 ations Envelope retien à la CC PDVIR uation CM-MINHDU-144110-GO-RF Q / Fourniture et pose des b Project Management, Coord Request for Quot Single Stage - One abillards dans les Collectivit IDA / 61320 ination, Monitoring and Eval Post Limited 70,808.00 0.00 Canceled 2020-10-05 2020-11-30 2020-12-30 ations Envelope és Territoriales Décentralisé uation es (CTD) de ressort du projet . CM-MINHDU-359132-GO-RF Project Management, Coord Q / Fourniture et installation Request for Quot Single Stage - One Pending Impl IDA / 61320 ination, Monitoring and Eval Post Limited 1,713.00 0.00 2023-06-06 2023-07-18 2023-08-17 de deux split dans les locaux ations Envelope ementation uation du serveur de la CC/PDVIR CM-MINHDU-330447-GO-RF Project Management, Coord Request for Quot Single Stage - One Q / Acquisition consommabl IDA / 61320 ination, Monitoring and Eval Post Limited 1,653.00 0.00 Canceled 2022-12-25 2023-02-19 2023-08-18 ations Envelope es informatiques au profit de uation l'UTL de Douala CM-MINHDU-169984-GO-RF Project Management, Coord Q / Acquisition des consom Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 68,000.00 0.00 Canceled 2020-08-30 2020-10-11 2021-10-06 mable informatiques pour la ations Envelope uation Cellule de Coordination du P DVIR et les UTL CM-MINHDU-361653-GO-RF Project Management, Coord Request for Quot Single Stage - One Pending Impl Q / Acquisition d'une suite lo IDA / 61320 ination, Monitoring and Eval Post Limited 1,713.00 0.00 2023-05-31 2023-07-03 2023-08-02 ations Envelope ementation gicielle pour la création grap uation hique NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-MINHDU-11327-NC-DIR / Acquisition d'un logiciel com Project Management, Coord ptable et suivi-évaluation (T IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 43,725.00 34,496.28 Signed 2017-01-10 2016-06-17 2017-01-17 2016-09-07 2017-02-21 2017-06-19 2023-02-21 OM2PRO/TOM2MONITORING uation ) y compris la formation et l’ assistance technique CM-MINHDU-11332-NC-DIR / Project Management, Coord Marché à commande pour la IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 33,300.00 0.00 Canceled 2017-03-31 2017-04-05 2017-05-10 2018-05-10 maintenance des véhicules uation du Projet pour une durée d'u n an CM-MINHDU-11326-NC-DIR / Renouvellement Contrat ann Project Management, Coord uel de gardiennage des bien IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 8,587.00 0.00 Canceled 2017-05-15 2017-05-21 2017-06-28 2018-06-28 s et locaux de la Cellule de P uation réparation du Projet de Déve loppement des villes Inclusiv es (PDVI) CM-MINHDU-11329-NC-DIR / Renouvellement du contrat Project Management, Coord annuel de la Couverture mé IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 4,725.00 0.00 Canceled 2017-04-18 2017-04-23 2017-05-18 2018-05-18 dicale du personnel de la Cel uation lule de Préparation du Projet de Développement des villes Inclusives (PDVI) CM-MINHDU-17089-NC-RFQ Project Management, Coord / Marché à commande pour l Request for Quot Single Stage - One IDA / V0100 ination, Monitoring and Eval Post Limited 33,330.00 0.00 Canceled 2017-06-19 2017-08-05 2018-08-05 a maintenance des véhicule ations Envelope uation s du Projet pour une durée d 'un an Page 4 CM-MINHDU-17127-NC-RFQ / Contrat annuel de gardienn Project Management, Coord Request for Quot Single Stage - One age des biens et locaux de l IDA / V0100 ination, Monitoring and Eval Post Limited 8,587.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 ations Envelope a Cellule de Préparation du uation Projet de Développement de s villes Inclusives (PDVI) CM-MINHDU-17129-NC-RFQ / Contrat annuel de la Couve Project Management, Coord Request for Quot Single Stage - One rture médicale du personnel IDA / V0100 ination, Monitoring and Eval Post Limited 43,725.00 0.00 Canceled 2017-06-19 2017-08-14 2018-08-14 ations Envelope de la Cellule de Préparation uation du Projet de Développement des villes Inclusives (PDVI) CM-MINHDU-27490-NC-RFQ Project Management, Coord Request for Quot Single Stage - One / Maintenance du matériel in IDA / 61320 ination, Monitoring and Eval Post Limited 5,000.00 0.00 Canceled 2017-10-02 2017-11-06 2018-11-01 ations Envelope formatique du PDVIR uation CM-MINHDU-111114-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Prestation de services po IDA / V0100 ination, Monitoring and Eval Post Limited 27,926.00 0.00 Canceled 2019-09-27 2019-11-22 2020-11-21 ations Envelope ur la maintenance des véhic uation ules du Projet CM-MINHDU-91913-NC-RFQ Project Management, Coord Request for Quot Single Stage - One / Couverture médicale du pe IDA / 61320 ination, Monitoring and Eval Post Limited 34,258.00 25,938.79 Signed 2019-12-22 2020-03-02 2020-02-16 2020-05-01 2021-02-15 ations Envelope rsonnel de la CC/ PDVIR uation CM-MINHDU-144285-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Service de gardiennage IDA / 61320 ination, Monitoring and Eval Post Open - National 8,221.00 17,040.38 Signed 2020-01-25 2020-03-21 2020-05-01 2021-03-16 ations Envelope à la Cellule de Coordination uation du PDVIR CM-MINHDU-144284-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Maintenance de cinq (05 IDA / 61320 ination, Monitoring and Eval Post Limited 34,258.00 23,167.07 Signed 2020-01-25 2020-04-09 2020-03-21 2020-07-24 2021-03-16 ations Envelope ) véhicules du Projet. uation CM-MINHDU-169948-NC-RF Project Management, Coord Q / Reprographie externe de Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 8,393.00 8,792.18 Signed 2020-05-30 2020-07-06 2020-07-25 2020-09-23 2021-07-20 s documents très volumineu ations Envelope uation x (DAO, plans etc..) (accord cadre renouvelable) CM-MINHDU-169953-NC-RF Project Management, Coord Q / Fourniture connexion int Request for Quot Single Stage - One IDA / 61320 ination, Monitoring and Eval Post Limited 7,194.00 7,511.75 Signed 2020-06-27 2020-06-15 2020-08-22 2020-09-15 2021-08-17 ernet haut débit à la cellule ations Envelope uation de Coordination du Projet CM-MINHDU-156983-NC-RF Project Management, Coord Request for Quot Single Stage - One Under Imple Q / Assurance des véhicules IDA / 61320 ination, Monitoring and Eval Post Limited 8,564.00 0.00 2020-03-01 2020-04-26 2020-05-26 ations Envelope mentation de la Cellule de Coordination uation du projet CM-MINHDU-169951-NC-RF Project Management, Coord Request for Quot Single Stage - One IDA / 61320 Post Limited 8,000.00 4,449.98 Signed 2020-08-15 2020-09-25 2020-10-10 2020-12-17 2021-10-05 Q / Entretien et réparation d ination, Monitoring and Eval ations Envelope es copieurs uation CM-MINHDU-144808-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Maintenance du matériel IDA / 61320 ination, Monitoring and Eval Post Limited 8,000.00 4,302.91 Signed 2019-12-22 2020-01-03 2020-02-16 2020-01-21 2021-02-10 ations Envelope informatique. uation CM-MINHDU-221664-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Police d'assurance du pe IDA / 61320 ination, Monitoring and Eval Post Limited 64,198.00 0.00 Signed 2021-05-05 2021-06-16 2021-06-30 2022-06-25 ations Envelope rsonnel de la CCP et des UTL uation CM-MINHDU-212920-NC-RF Q / Fourniture de services de Project Management, Coord Request for Quot Single Stage - One Under Imple maintenance préventive et c IDA / 61320 ination, Monitoring and Eval Post Limited 4,112.00 0.00 2021-01-25 2021-03-01 2022-02-24 ations Envelope mentation urative des réseaux électriq uation ues et de climatisation des l ocaux du PDVIR CM-MINHDU-328867-NC-RF Q / Couverture médicale du personnel de la cellule de co Project Management, Coord Request for Quot Single Stage - One Under Imple ordination et des Unités Tec IDA / 61320 ination, Monitoring and Eval Post Limited 76,224.50 0.00 2023-02-01 2023-01-25 2023-03-29 2024-03-23 ations Envelope mentation hniques de Liaison (UTL) du uation Projet de Développement de s Villes Inclusives et Résilien tes (PDVIR) CM-MINHDU-277338-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / fourniture de la connexio IDA / 61320 ination, Monitoring and Eval Post Limited 6,851.64 0.00 Canceled 2022-03-05 2022-04-30 2022-08-28 ations Envelope n internet à la Cellule de Co uation ordination du PDVIR CM-MINHDU-340933-NC-RF Project Management, Coord Request for Quot Single Stage - One Q / Maintenance préventive IDA / 61320 ination, Monitoring and Eval Post Limited 4,111.00 0.00 Canceled 2023-02-26 2023-04-23 2023-10-20 ations Envelope et curative du parc informati uation que CM-MINHDU-340939-NC-RF Q / Maintenance préventive Project Management, Coord Request for Quot Single Stage - One Under Imple et curative des photocopieur IDA / 61320 ination, Monitoring and Eval Post Limited 6,165.00 0.00 2023-02-26 2023-02-21 2023-04-23 2023-10-20 ations Envelope mentation s et imprimantes de la Cellul uation e de Coordination du PDVIR CM-MINHDU-340954-NC-RF Q / Fourniture et configurati Project Management, Coord on des circuits d'alimentatio Request for Quot Single Stage - One Under Imple IDA / 61320 ination, Monitoring and Eval Post Limited 2,227.00 0.00 2023-02-26 2023-02-20 2023-04-23 2023-10-20 n électrique des appareillag ations Envelope mentation uation es de bureau, électrifié le lo cal du serveur et entretien d u groupe électrogène de la CC PDVIR CM-MINHDU-341003-NC-RF Project Management, Coord Q / Fourniture internet haut Request for Quot Single Stage - One Under Imple IDA / 61320 ination, Monitoring and Eval Post Limited 6,852.00 0.00 2023-02-26 2023-04-23 2023-10-20 débit 10 MEGA dédié pour u ations Envelope mentation uation ne période de quatre (04) m ois à la CC PDVIR CM-MINHDU-340982-NC-RF Q / Mise à niveau du réseau informatique, configuration et déploiement du serveur e Project Management, Coord Request for Quot Single Stage - One Under Imple t les 30 terminaux de conne IDA / 61320 ination, Monitoring and Eval Post Limited 7,366.00 0.00 2023-03-05 2023-02-21 2023-04-30 2023-10-27 ations Envelope mentation xions (PC, SMARTPHONE,IMP uation RIMANTE, COPIEURS,...), fou rniture et installation d'un o nduleur hybride de 3500 VA de 12 h d'autonomie à la CC PDVIR CM-MINHDU-357149-NC-RF Q / SOUSCRIPTION D'UNE PO LICE D'ASSURANCE TOUT RI Project Management, Coord Request for Quot Single Stage - One Pending Impl SQUE AUTOMOBILE ANNUEL IDA / 61320 ination, Monitoring and Eval Post Limited 8,222.00 0.00 2023-05-19 2023-06-10 2023-12-07 ations Envelope ementation LE DE CINQ VEHICULES DU P uation ROJET DE DEVELOPPEMENT DES VILLES INCLUSIVES ET R ESILIENTES (PDVIR) CM-MINHDU-366651-NC-RF Project Management, Coord Q / Fourniture de la connexi Request for Quot Single Stage - One Pending Impl IDA / 61320 ination, Monitoring and Eval Post Open - National 41,110.00 0.00 2023-07-01 2023-08-26 2024-02-22 on internet à la Cellule de C ations Envelope ementation uation oordination du PDVIR CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) t (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 CM-MINHDU-11686-CS-CQS / Recrutement d'un consulta Improving Connectivity and nt (firme) pour la réalisation Consultant Qualifi IDA / V0100 Living environment in Benef Post Open - National 163,969.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 des études APS/APD/DAO de cation Selection iciary Cities travaux d'Aménagement de proximité dans la ville de Ya oundé CM-MINHDU-11647-CS-CQS / Recrutement d'un consulta Project Management, Coord nt (firme) pour la réalisation Consultant Qualifi IDA / V0100 ination, Monitoring and Eval Post Open - National 198,750.00 0.00 Canceled 2017-05-15 2017-06-05 2017-07-05 2017-07-15 2017-08-04 2017-11-02 des EIES et PAR des sous pr cation Selection uation ojets de proximité dans les v illes de Yaoundé, Douala, Ba touri, Kumba et Ngaoundéré CM-MINHDU-11677-CS-CQS / Recrutement d'un consulta nt (firme) pour la réalisation Improving Connectivity and Consultant Qualifi des études APS/APD/DAO de IDA / V0100 Living environment in Benef Post Open - National 169,434.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 cation Selection travaux d'Aménagement de iciary Cities proximité dans les villes de Batouri, Kumba, et Ngaoun déré CM-MINHDU-11689-CS-CQS / Recrutement d'un consulta Improving Connectivity and nt (firme) pour la réalisation Consultant Qualifi IDA / V0100 Living environment in Benef Post Open - National 83,500.00 0.00 Canceled 2017-05-01 2017-05-22 2017-06-21 2017-07-01 2017-07-21 2018-01-17 des études APS/APD/DAO de cation Selection iciary Cities travaux pilotes pour la mobi lité piétonne dans certains q uartiers de la ville de Yaoun dé CM-MINHDU-11682-CS-CQS / Recrutement d'un consulta Improving Connectivity and nt (firme) pour la réalisation Consultant Qualifi IDA / V0100 Living environment in Benef Post Open - National 166,155.00 0.00 Canceled 2017-11-01 2017-11-22 2017-12-22 2018-01-01 2018-01-21 2018-07-20 des études APS/APD/DAO de cation Selection iciary Cities travaux d'Aménagement de proximité dans la ville de Do uala CM-MINHDU-11762-CS-QCB S / Recrutement d'un consul Project Management, Coord Quality And Cost- tant (firme) chargé de l'audit IDA / V0100 ination, Monitoring and Eval Prior Open - National 39,750.00 0.00 Canceled 2017-04-16 2017-05-07 2017-06-20 2017-07-18 2017-08-17 2017-09-21 2017-10-26 2018-10-26 Based Selection comptable et financier du P uation DVI, exercices 2016 et 2017 CM-MINHDU-91365-CS-QCB S / Contrôle et surveillance p Improving Connectivity and our la réalisation des travau Quality And Cost- Open - Internation IDA / 61320 Living environment in Benef Prior 1,790,321.00 1,960,522.84 Signed 2019-01-26 2019-11-15 2019-02-23 2019-12-13 2019-05-06 2020-04-24 2019-06-05 2020-06-03 2019-07-17 2020-09-24 2019-09-11 2020-12-22 2019-10-16 2021-02-05 2022-01-03 x de voiries et ouvrages de Based Selection al iciary Cities drainage structurants dans l es arrondissements de Doua la 3e et 5e CM-MINHDU-91367-CS-QCB Improving Connectivity and S / Contrôle et surveillance p Quality And Cost- IDA / 61320 Living environment in Benef Post Open - National 140,116.00 106,549.83 Signed 2020-02-20 2019-06-04 2020-03-19 2020-05-30 2020-01-30 2020-06-29 2020-05-13 2020-08-10 2020-06-02 2020-10-05 2020-08-24 2020-11-09 2020-10-07 2022-03-04 our la réalisation des travau Based Selection iciary Cities x de voiries structurants dan s la ville de Batouri CM-MINHDU-91433-CS-QCB S / Maitrise d'œuvre complèt Improving Connectivity and Quality And Cost- Open - Internation e pour la réalisation des trav IDA / 61320 Living environment in Benef Post 622,817.00 538,291.14 Signed 2019-05-14 2020-05-26 2019-06-11 2020-06-10 2019-08-22 2021-05-04 2019-09-21 2021-06-03 2019-11-02 2021-06-10 2019-12-28 2021-07-16 2020-02-01 2021-10-05 2022-03-22 Based Selection al aux de voiries et d'équipem iciary Cities ents de proximité de Douala 3e et 5e CM-MINHDU-91375-CS-QCB S / Contrôle et surveillance p Improving Connectivity and Quality And Cost- our la réalisation des travau IDA / 61320 Living environment in Benef Post Open - National 587,953.00 0.00 Canceled 2019-02-19 2019-03-19 2019-05-30 2019-06-29 2019-08-10 2019-10-05 2019-11-09 2021-11-28 Based Selection x de voiries structurants dan iciary Cities s la ville de Ngaoundere CM-MINHDU-122434-CS-CQ S / Etudes techniques (APS/A PD), et production de Dossie Improving Connectivity and r d’Appel d’Offres(DAO) en v Consultant Qualifi IDA / V0100 Living environment in Benef Post Open - National 160,000.00 148,746.20 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-07 2016-05-20 2016-04-20 2016-06-24 2016-06-01 2016-12-21 ue de la réalisation de trava cation Selection iciary Cities ux de voiries et ouvrages de drainage structurants dans l es arrondissements de Doua la 3ème et 5ème . CM-MINHDU-122432-CS-CQ Strengthening Capacity for I Consultant Qualifi S / Appui à la préparation de IDA / V0100 nclusive and Resilient Urba Post Open - National 170,000.00 119,006.34 Signed 2016-07-28 2016-03-16 2016-08-18 2016-10-01 2016-05-09 2016-10-31 2016-09-20 2016-12-05 2016-12-10 2017-06-03 cation Selection s contrats de ville de Ngaou n Management ndéré et Batouri. CM-MINHDU-122442-CS-CQ S / Appui à la préparation de Strengthening Capacity for I Consultant Qualifi s contrats de ville des comm IDA / 61320 nclusive and Resilient Urba Post Open - National 190,000.00 148,376.65 Signed 2016-07-27 2016-08-08 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-09-30 2016-12-04 2016-11-29 2017-06-02 cation Selection unes d’arrondissements de n Management Yaoundé 5, 7, Douala 3 et D ouala 5. CM-MINHDU-122439-CS-CQ Strengthening Capacity for I Consultant Qualifi S / Appui à la préparation du IDA / V0100 nclusive and Resilient Urba Post Open - National 150,000.00 92,114.65 Signed 2016-07-27 2016-03-23 2016-08-17 2016-09-30 2016-05-09 2016-10-30 2016-10-13 2016-12-04 2016-12-10 2017-06-02 cation Selection contrat de ville de Kumba n Management CM-MINHDU-122440-CS-CQ S / Etudes techniques (APS/A PD), et production de Dossie Improving Connectivity and Consultant Qualifi r d’Appel d’Offres(DAO) en v IDA / V0100 Living environment in Benef Post Open - National 155,000.00 144,470.34 Signed 2016-02-15 2016-03-07 2016-03-07 2016-04-20 2016-03-28 2016-05-20 2016-05-03 2016-06-24 2016-06-01 2016-12-21 cation Selection ue de la réalisation de trava iciary Cities ux de voiries et équipement s structurants dans les villes de Kumba, Batouri et Ngaou ndéré CM-MINHDU-122443-CS-CQ S / Etudes techniques (APS/A PD), et production de Dossie Improving Connectivity and Consultant Qualifi r d’Appel d’Offres(DAO) en v IDA / V0100 Living environment in Benef Post Open - National 150,000.00 135,517.80 Signed 2016-02-15 2016-02-15 2016-03-07 2016-04-20 2016-04-13 2016-05-20 2016-05-23 2016-06-24 2016-07-13 2016-12-21 cation Selection ue de la réalisation de trava iciary Cities ux de voiries structurants da ns les arrondissements de Y aoundé 5ème et 7ème. CM-MINHDU-123791-CS-CQ Project Management, Coord S / Sélection d’un Consultant Consultant Qualifi IDA / V0100 ination, Monitoring and Eval Post Open - National 18,000.00 18,503.23 Signed 2016-03-20 2016-02-02 2016-04-10 2016-05-24 2016-04-04 2016-06-23 2016-06-30 2016-07-28 2016-07-28 2017-01-24 Firme pour l’élaboration du cation Selection uation Cadre de Politique de Recas ement du PDVI. CM-MINHDU-91524-CS-CQS / Elaboration des plans de se Strengthening Capacity for I Consultant Qualifi cteur et enquêtes parcellaire IDA / 61320 nclusive and Resilient Urba Post Open - National 250,000.00 0.00 Canceled 2019-08-30 2019-09-27 2019-11-22 2019-12-27 2020-01-24 2020-10-20 cation Selection s dans les zones cibles de N' n Management Gaoundéré, Kumba et Batou ri CM-MINHDU-118420-CS-QC BS / Contrôle et surveillance Project Management, Coord Quality And Cost- pour la réalisation des trava IDA / 61320 ination, Monitoring and Eval Prior Open - National 587,953.00 591,949.14 Signed 2020-01-15 2019-11-15 2020-01-16 2019-12-06 2020-02-29 2020-04-02 2020-03-28 2020-05-28 2020-04-27 2020-09-03 2020-06-01 2020-11-19 2020-07-06 2020-12-13 2022-06-26 Based Selection ux de voiries structurantes d uation ans la ville de Ngaoundéré CM-MINHDU-91528-CS-QCB S / Développement d'un outi l de programmation et de ge stion de l'entretien des VRD Strengthening Capacity for I Quality And Cost- Open - Internation en 02 missions séparées: Mi IDA / 61320 nclusive and Resilient Urba Prior 1,000,000.00 0.00 Canceled 2019-11-03 2019-12-01 2020-02-09 2020-03-10 2020-05-05 2020-07-02 2020-07-30 2021-04-26 Based Selection al ssion 01- Développement d' n Management un outil de programmation e t de gestion de l'entretien d es VRD à Yaoundé, Mission 0 2-Développement d'un outil etc Page 6 CM-MINHDU-94779-CS-QCB S / Mairies d'œuvre complèt Improving Connectivity and Quality And Cost- e pour la réalisation des trav IDA / 61320 Living environment in Benef Post Open - National 388,764.00 0.00 Canceled 2019-05-14 2019-06-11 2019-08-22 2019-09-21 2019-11-02 2019-12-28 2020-02-01 2022-03-22 Based Selection aux de voiries et d'équipem iciary Cities ents de proximité dans la vill e de Maroua CM-MINHDU-91547-CS-CQS Strengthening Capacity for I / Etude stratégique sur la pr Consultant Qualifi Open - Internation IDA / 61320 nclusive and Resilient Urba Post 250,000.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2022-02-13 ogrammation et la gestion d cation Selection al n Management es investissements du MINH DU financés par le BIP CM-MINHDU-91538-CS-QCB Strengthening Capacity for I S / Appui à l'actualisation de Quality And Cost- Open - Internation IDA / 61320 nclusive and Resilient Urba Post 250,000.00 0.00 Canceled 2020-01-02 2020-01-30 2020-03-26 2020-04-25 2020-06-06 2020-07-20 2020-08-17 2021-02-13 l'adressage et à la mise en p Based Selection al n Management lace d'un applicatif fiscal à Y aoundé CM-MINHDU-91542-CS-QCB Strengthening Capacity for I S / Inventaire pour la progra Quality And Cost- Open - Internation IDA / 61320 nclusive and Resilient Urba Prior 433,334.00 0.00 Canceled 2020-01-02 2020-01-30 2020-04-09 2020-05-09 2020-07-04 2020-08-31 2020-09-28 2021-03-27 mmation des équipements Based Selection al n Management marchands à Yaoundé, Kum ba, et Ngaoundére CM-MINHDU-91536-CS-CQS / Valorisation de l'étude "éta Strengthening Capacity for I t des lieux des équipements Consultant Qualifi IDA / 61320 nclusive and Resilient Urba Post Open - National 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 marchands" dans l'objectif d cation Selection n Management 'une programmation raisonn ée des interventions et des améliorations de gestion à D ouala CM-MINHDU-91560-CS-CQS / Etude sur les méthodes d'a Strengthening Capacity for I Consultant Qualifi ménagement concerté en zo IDA / 61320 nclusive and Resilient Urba Post Open - National 166,666.00 0.00 Canceled 2019-10-03 2019-10-31 2019-12-26 2020-01-30 2020-02-27 2020-11-23 cation Selection ne urbaine dense et dans les n Management zones d'extension urbaine CM-MINHDU-91520-CS-QCB Strengthening Capacity for I S / Elaboration du plan de se Quality And Cost- IDA / 61320 nclusive and Resilient Urba Post Open - National 400,000.00 0.00 Canceled 2020-09-30 2020-11-21 2020-10-28 2020-12-23 2021-01-22 2021-03-05 2021-04-18 2021-05-16 2022-02-10 cteur dans les Communes d' Based Selection n Management Arrondissement de Yaoundé 5ème et 7ème CM-MINHDU-91491-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant Qualifi pour la réalisation des trava IDA / 61320 Living environment in Benef Post Open - National 155,351.00 0.00 Canceled 2019-07-17 2019-08-14 2019-09-27 2019-11-08 2019-12-13 2022-04-01 cation Selection ux de voiries et d'équipeme iciary Cities nts de proximité de Kumba CM-MINHDU-91533-CS-CQS / Evaluation de l'opération fi chiers des contribuables réal Strengthening Capacity for I Consultant Qualifi Open - Internation isée par le PDUE dans les 6 IDA / 61320 nclusive and Resilient Urba Post 166,666.00 0.00 Canceled 2019-09-30 2019-10-28 2019-12-23 2020-01-27 2020-02-24 2020-08-22 cation Selection al Communes d'Arrondissemen n Management t de Douala et développeme nt d'un applicatif fiscal de l'a dressage CM-MINHDU-91511-CS-QCB S / Elaboration des plans de secteur en 03 missions sép arées: Mission 01- Elaboratio Strengthening Capacity for I Quality And Cost- Open - Internation n du plan de secteur dans le IDA / 61320 nclusive and Resilient Urba Prior 783,334.00 0.00 Canceled 2019-08-30 2019-09-27 2019-12-06 2020-01-05 2020-03-01 2020-04-28 2020-05-26 2021-02-20 Based Selection al s Communes d'Arrondissem n Management ent de Douala 3ème et 5èm e Mission 02- Elaboration du plan de secteur autour de l'E NSET à Kumba, Mission 3- etc CM-MINHDU-143813-CS-QC BS / Maîtrise d’œuvre compl Improving Connectivity and Quality And Cost- Under Implement ète pour la réalisation des tr IDA / 61320 Living environment in Benef Post Open - National 544,964.00 0.00 2020-05-25 2020-05-26 2020-06-15 2020-06-16 2020-07-29 2021-03-08 2020-08-26 2021-05-05 2020-09-25 2021-06-17 2020-10-30 2021-08-06 2020-12-04 2022-05-28 Based Selection ation avaux de voiries et d’équipe iciary Cities ments de proximité à Yaoun dé 5ème et 7ème CM-MINHDU-91451-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant Qualifi pour la réalisation des trava IDA / 61320 Living environment in Benef Post Open - National 199,629.00 191,823.43 Signed 2020-06-20 2020-06-09 2020-07-18 2020-08-31 2020-12-24 2020-10-12 2021-01-14 2020-11-16 2021-02-23 2023-05-05 cation Selection ux de voiries et d'équipeme iciary Cities nts de proximité à Ngaound eré CM-MINHDU-91386-CS-QCB Improving Connectivity and S / Contrôle et surveillance d Quality And Cost- IDA / 61320 Living environment in Benef Post Open - National 464,908.00 0.00 Canceled 2020-02-20 2020-03-19 2020-05-30 2020-06-29 2020-08-10 2020-10-05 2020-11-09 2022-03-04 es travaux de voiries structu Based Selection iciary Cities rants dans la ville de Kumba CM-MINHDU-91437-CS-CQS / Maitrise d'œuvre complète Improving Connectivity and Consultant Qualifi pour la réalisation des trava IDA / 61320 Living environment in Benef Post Open - National 108,735.00 136,975.50 Signed 2020-08-31 2020-06-09 2020-09-28 2020-11-27 2020-12-24 2021-01-08 2021-01-14 2021-02-12 2021-01-26 2023-07-02 cation Selection ux de voiries et d'équipeme iciary Cities nts de proximité dans la ville de Batouri CM-MINHDU-91474-CS-CQS / Recrutement d'un consulta Improving Connectivity and Consultant Qualifi nt (firme) pour la réalisation IDA / 61320 Living environment in Benef Post Open - National 61,658.00 0.00 Canceled 2020-01-28 2020-02-25 2020-04-21 2020-05-05 2020-05-26 2021-01-21 cation Selection des EIES et PAR des sous pr iciary Cities ojets de proximité dans la vil le de Douala CM-MINHDU-179938-CS-CQ S / Réalisation des études te Improving Connectivity and chniques des sous-projets pil Consultant Qualifi IDA / 61320 Living environment in Benef Post Open - National 52,202.00 61,283.04 Signed 2018-04-04 2018-01-26 2018-04-25 2018-06-08 2018-03-13 2018-07-08 2018-04-27 2018-08-12 2019-11-08 2019-02-08 otes pour l'amélioration de l cation Selection iciary Cities a mobilité piétonne dans cer tains quartiers de la ville de Yaoundé CM-MINHDU-179147-CS-CQ S / Recrutement d’un consul Strengthening Capacity for I Quality And Cost- Open - Internation Under Implement tant pour l’élaboration des p IDA / 61320 nclusive and Resilient Urba Post 450,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-09-01 2021-01-02 2021-10-29 2021-02-01 2021-03-08 2021-04-12 2022-04-12 Based Selection al ation lans de secteur (PS) à Doual n Management a 3 (Ndogpassi) et Douala 5 (Beedi) CM-MINHDU-179149-CS-CQ S / Recrutement d’un consul Strengthening Capacity for I Quality And Cost- Open - Internation Under Implement tant pour l’élaboration des p IDA / 61320 nclusive and Resilient Urba Post 380,000.00 0.00 2020-10-01 2020-11-18 2020-10-22 2020-12-04 2020-12-05 2021-08-19 2021-01-02 2021-10-29 2021-02-01 2021-03-08 2021-04-12 2022-04-12 Based Selection al ation lans de secteur (PS) à Yaoun n Management dé 5 (Nkolmessen) et Yaoun dé 7 (Oyom abang) CM-MINHDU-91725-CS-QCB Project Management, Coord S / Recrutement d'un consul Quality And Cost- Open - Internation IDA / 61320 ination, Monitoring and Eval Prior 1,520,000.00 0.00 Canceled 2020-08-15 2020-09-12 2020-11-21 2020-12-21 2021-02-15 2021-04-14 2021-05-12 2024-04-26 tant (firme) chargé de l'assis Based Selection al uation tance à maitrise d'ouvrage a uprès des CTD CM-MINHDU-206619-CS-CQ S / Recrutement d'un consul Improving Connectivity and Consultant Qualifi Under Implement tant(firme) pour la réalisatio IDA / 61320 Living environment in Benef Post Open - National 34,260.00 0.00 2021-03-10 2021-03-03 2021-03-31 2021-05-26 2021-05-06 2021-05-21 2021-06-14 2021-06-15 cation Selection ation n des PAR des sous projets d iciary Cities e proximité dans la ville de Y aoundé CM-MINHDU-215990-CS-CQ S / Réalisation de l'EIES des Improving Connectivity and Consultant Qualifi Under Implement travaux pilotes pour la mobil IDA / 61320 Living environment in Benef Post Open - National 17,129.00 0.00 2021-03-25 2021-02-27 2021-04-15 2021-05-29 2021-09-23 2021-06-28 2021-08-02 2022-01-29 cation Selection ation ité piétonne dans certains q iciary Cities uartiers de la ville de Yaoun dé CM-MINHDU-215993-CS-CQ S / Réalisation du PAR des t Improving Connectivity and Consultant Qualifi Under Implement ravaux pilotes pour la mobili IDA / 61320 Living environment in Benef Post Open - National 30,832.00 0.00 2021-02-26 2021-02-26 2021-03-19 2021-05-02 2021-12-06 2021-06-01 2021-07-06 2022-01-02 cation Selection ation té piétonne dans certains qu iciary Cities artiers de la ville de Yaound é Page 7 CM-MINHDU-213480-CS-CQ S / Recrutement d'un consul Improving Connectivity and Consultant Qualifi Under Implement tant pour la réalisation des E IDA / 61320 Living environment in Benef Post Open - National 17,153.00 0.00 2021-04-12 2021-03-26 2021-04-14 2021-05-14 2022-01-06 2021-05-29 2021-06-15 2021-10-13 cation Selection ation IES des sous projets de proxi iciary Cities mité dans les villes de Kouss éri et Maroua CM-MINHDU-212905-CS-CQ S / Sélection d’un consultant Improving Connectivity and Consultant Qualifi Under Implement pour l’élaboration des PAR d IDA / 61320 Living environment in Benef Post Open - National 24,014.00 0.00 2021-04-07 2021-03-03 2021-04-28 2021-05-27 2021-06-11 2021-07-04 2021-12-31 cation Selection ation es sous projets de proximité iciary Cities dans les villes de Batouri et Ngaoundéré CM-MINHDU-213479-CS-CQ S / Sélection d'un Consultant Strengthening Capacity for I Consultant Qualifi pour la réalisation des PAR d IDA / 61320 nclusive and Resilient Urba Post Open - National 25,694.00 24,224.55 Signed 2021-04-05 2021-03-03 2021-04-26 2021-04-28 2021-05-25 2021-07-05 2021-06-09 2021-10-29 2021-07-02 2021-12-24 2021-12-29 cation Selection es sous-projets de proximité n Management dans les villes de Douala 3è et 5è CM-MINHDU-94781-CS-CQS / Recrutement d'un consulta Improving Connectivity and Consultant Qualifi Under Implement nt (firme) pour la réalisation IDA / 61320 Living environment in Benef Post Open - National 24,014.00 0.00 2021-09-30 2021-03-03 2021-10-28 2021-12-23 2022-01-22 2022-02-19 2022-08-18 cation Selection ation des PAR des sous projets de iciary Cities proximité dans les villes de Kousserie et Maroua CM-MINHDU-91466-CS-CQS / Recrutement d'un consulta Improving Connectivity and Consultant Qualifi nt(firme) pour la réalisation IDA / 61320 Living environment in Benef Post Open - National 61,658.00 0.00 Canceled 2020-06-10 2020-07-08 2020-09-02 2020-09-23 2020-10-14 2021-06-11 cation Selection des EIES et PAR des sous pr iciary Cities ojets de proximité dans la vil le de Yaoundé CM-MINHDU-169915-CS-CQ S / Recrutement d'un consul Improving Connectivity and Consultant Qualifi tant (firme) pour la réalisatio IDA / 61320 Living environment in Benef Post Open - National 34,258.00 0.00 Canceled 2020-06-30 2020-07-21 2020-09-03 2020-10-03 2020-11-07 2021-05-06 cation Selection n des EIES et PAR des sous p iciary Cities rojets de proximité Kousséri CM-MINHDU-179199-CS-CQ S / Recrutement d’un consul Strengthening Capacity for I Quality And Cost- Open - Internation tant pour le développement IDA / 61320 nclusive and Resilient Urba Post 475,000.00 0.00 Canceled 2020-09-15 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2022-03-27 Based Selection al d'un outil de programmation n Management et de gestion de l'entretien des VRD à Douala CM-MINHDU-91498-CS-CQS / Recrutement d’un consulta Improving Connectivity and nt pour l’actualisation des P Consultant Qualifi Pending Impleme IDA / 61320 Living environment in Benef Post Open - National 51,388.00 0.00 2021-05-31 2021-06-28 2021-08-23 2021-09-13 2021-10-11 2022-06-08 GES des sous projets de pro cation Selection ntation iciary Cities ximité dans les villes de Bat ouri, Douala, Ngaoundéré et Yaoundé . CM-MINHDU-212759-CS-QC BS / Recrutement d'un cons Strengthening Capacity for I ultant pour l'assainissement Quality And Cost- IDA / 61320 nclusive and Resilient Urba Post Open - National 351,629.00 0.00 Canceled 2021-04-08 2021-04-29 2021-06-12 2021-07-10 2021-07-31 2021-08-29 2021-09-27 2022-03-26 des comptes des communes Based Selection n Management des ville Batouri, Douala, Ng aoundéré, Yaoundé et Kouss éri dans le cadre du PDVIR CM-MINHDU-214526-CS-CQ S / Recrutement d'un consul Strengthening Capacity for I tant pour la réalisation de l'é Consultant Qualifi IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 Canceled 2021-05-10 2021-05-11 2021-05-31 2021-06-15 2021-06-30 2021-07-23 2022-01-19 tude sur les méthodes d'am cation Selection n Management énagement concerté en zon e urbaine dense et dans les zones d'extension urbaine CM-MINHDU-169848-CS-CQ Strengthening Capacity for I Consultant Qualifi S / Appui à la préparation de IDA / 61320 nclusive and Resilient Urba Post Open - National 53,956.00 0.00 Canceled 2020-06-15 2020-06-30 2020-07-06 2020-08-19 2020-12-10 2020-09-18 2020-10-23 2021-04-21 cation Selection s contrats de ville de Maroua n Management et Kousséri CM-MINHDU-179152-CS-CQ S / Recrutement d’un consul tant (firme) pour l’élaboratio Strengthening Capacity for I n du Plan d’Organisation et Consultant Qualifi IDA / 61320 nclusive and Resilient Urba Post Open - National 222,678.00 0.00 Canceled 2020-10-01 2021-05-12 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-05-09 d’Optimisation des Effectifs ( cation Selection n Management POE) de la CU de Ndéré; des CA de Dla III, Dla V, Ydé V, Y dé VII, Mroua I, Ndéré des c ommunes de Kousséri et Bat ouri CM-MINHDU-143812-CS-CQ S / Maîtrise d’œuvre complèt Improving Connectivity and Consultant Qualifi e pour la réalisation travaux IDA / 61320 Living environment in Benef Post Open - National 214,113.00 0.00 Canceled 2020-01-20 2020-06-29 2020-02-10 2020-03-25 2020-12-11 2020-04-24 2020-05-29 2021-11-20 cation Selection de voiries et d’équipements iciary Cities de proximité dans la ville de Maroua CM-MINHDU-236635-CS-QC BS / Recrutement d’un cons ultant (firme) pour l’élaborat Strengthening Capacity for I ion du Plan d’Organisation e Quality And Cost- Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 308,324.00 0.00 2021-06-30 2021-06-07 2021-07-21 2021-09-03 2022-06-07 2021-10-01 2022-02-15 2021-10-31 2022-03-30 2021-12-05 2022-12-12 2022-01-09 2022-07-08 t d’Optimisation des Effectifs Based Selection ation n Management (POE) de la CU de Ndéré; de s CA de Dla III, Dla V, Ydé V, Ydé VII, Mroua I, Ndéré des c ommunes de Kousséri et Bat ouri CM-MINHDU-236634-CS-QC BS / Recrutement d'un cons Strengthening Capacity for I ultant pour la réalisation de l Quality And Cost- Open - Internation Under Implement IDA / 61320 nclusive and Resilient Urba Post 256,937.00 0.00 2021-06-30 2021-06-07 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-11-05 'étude sur les méthodes d'a Based Selection al ation n Management ménagement concerté en zo ne urbaine dense et dans les zones d'extension urbaine CM-MINHDU-236426-CS-CQ Strengthening Capacity for I Consultant Qualifi S / Appui à la préparation de IDA / 61320 nclusive and Resilient Urba Post Open - National 102,915.00 107,142.60 Signed 2020-06-15 2020-06-30 2020-07-07 2020-12-10 2020-08-28 2020-12-22 2021-04-23 2021-01-26 2021-06-24 2021-08-09 cation Selection s contrats de ville de Maroua n Management et Kousséri CM-MINHDU-236165-CS-CQ S / Maîtrise d’œuvre complèt Improving Connectivity and Consultant Qualifi e pour la réalisation travaux IDA / 61320 Living environment in Benef Post Open - National 446,219.00 585,370.02 Signed 2020-01-20 2020-06-29 2020-07-07 2020-09-22 2020-09-22 2020-11-23 2021-01-12 2021-09-10 2021-07-28 2023-04-18 cation Selection de voiries et d’équipements iciary Cities de proximité dans la ville de Maroua CM-MINHDU-237968-CS-CQ S / Appui au PDVIR dans la mise en œuvre du plan d'act Improving Connectivity and Consultant Qualifi Under Implement ions de prévention et d’atté IDA / 61320 Living environment in Benef Post Open - National 146,692.00 0.00 2021-01-13 2020-09-17 2021-02-03 2021-03-19 2021-01-11 2021-04-18 2021-06-10 2021-05-23 2022-01-18 cation Selection ation nuation des VBG, des VCE et iciary Cities des EAS, dans sept villes (B atouri, Douala, Kousséri, Ku mba, Maroua, Ngaoundéré e t Yaoundé CM-MINHDU-179413-CS-CQ S / Recrutement d'un consul Improving Connectivity and tant (ONG) spécialisée VBG Consultant Qualifi IDA / 61320 Living environment in Benef Post Open - National 123,330.00 0.00 Canceled 2020-10-01 2021-01-13 2020-10-22 2020-12-05 2021-01-11 2021-01-04 2021-02-08 2021-08-07 pour appuyer la Cellule de C cation Selection iciary Cities oordination du Projet dans l a préparation et la mise en o euvre des activités de VBG. CM-MINHDU-179179-CS-CQ S / Recrutement d'un consul tant pour la réalisation de l'E tude de faisabilité de la mise Strengthening Capacity for I Consultant Qualifi en place des outils et métho IDA / 61320 nclusive and Resilient Urba Post Open - National 137,000.00 0.00 Canceled 2021-07-30 2021-08-12 2021-08-20 2021-10-03 2021-11-02 2021-12-07 2022-04-06 cation Selection des en vue de l’optimisation n Management du rendement des recettes de la Communauté urbaine et des Communes d’arrondis sement de Ngaoundéré Page 8 CM-MINHDU-238083-CS-CQ S / Étude de faisabilité de de Strengthening Capacity for I ux applicatifs de l’adressage Consultant Qualifi Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 128,468.27 0.00 2021-06-30 2021-08-11 2021-07-21 2021-09-09 2021-09-03 2021-10-03 2021-11-07 2022-03-07 de Yaoundé (gestion des tax cation Selection ation n Management es et gestion des travaux su r les Voiries et Réseaux Dive rs) CM-MINHDU-212755-CS-CQ S / Recrutement d'un consul Strengthening Capacity for I Consultant Qualifi tant en vue de l'élaboration IDA / 61320 nclusive and Resilient Urba Post Open - National 171,526.00 0.00 Canceled 2021-05-31 2021-06-21 2021-07-26 2021-08-10 2021-08-28 2021-12-26 cation Selection du schéma directeur des ma n Management rchés et des pôles commerci aux de la ville de Douala. CM-MINHDU-169871-CS-CQ S / Recrutement d’une ONG chargée de la mise en œuvr e du programme de subvent Improving Connectivity and Quality And Cost- Under Implement ions aux initiatives d'inclusio IDA / 61320 Living environment in Benef Post Open - National 527,906.00 0.00 2021-07-30 2021-10-27 2021-08-20 2021-12-06 2021-10-03 2022-06-29 2021-10-31 2022-08-02 2021-11-30 2022-01-04 2022-02-08 2023-02-03 Based Selection ation n économique des groupes d iciary Cities e jeunes dans les villes de, B atouri, Douala, Kousseri, Ku mba, Maroua, Ngaoundéré e t Yaoundé, pour le compte d u PDVIR. CM-MINHDU-242716-CS-CQ S / recrutement d'un consult ant pour l'étude de faisabilit Strengthening Capacity for I é de la mise en place des ou Consultant Qualifi Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 68,517.00 0.00 2021-08-30 2021-08-03 2021-09-20 2021-09-09 2021-11-03 2022-03-16 2021-12-03 2022-01-07 2022-05-07 tils et méthodes en vue de l’ cation Selection ation n Management optimisation du rendement des recettes de la Communa uté urbaine et des Commun es d’arrondissement de Nga oundéré CM-MINHDU-122444-CS-CQ S / Sélection d’un Consultant Project Management, Coord Consultant Qualifi Firme pour l’élaboration du IDA / V0100 ination, Monitoring and Eval Post Open - National 25,000.00 0.00 Canceled 2021-02-23 2021-03-16 2021-04-29 2021-05-29 2021-07-03 2021-10-01 cation Selection Cadre de Gestion Environne uation mentale et Sociale du PDVI CM-MINHDU-179248-CS-CQ Strengthening Capacity for I S / Recrutement d’un consul Consultant Qualifi Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 170,786.03 0.00 2021-09-20 2022-01-28 2021-10-11 2022-02-14 2021-11-24 2022-04-11 2021-12-24 2022-07-28 2022-01-28 2022-07-27 tant pour l’appui à l'opératio cation Selection ation n Management nnalisation de la BDU CM-MINHDU-179208-CS-CQ S / Recrutement d’un consul Strengthening Capacity for I Quality And Cost- Open - Internation Under Implement tant pour le développement IDA / 61320 nclusive and Resilient Urba Post 513,874.00 0.00 2021-11-15 2022-08-23 2021-12-06 2022-01-19 2022-02-16 2022-03-18 2022-04-22 2022-05-27 2023-05-27 Based Selection al ation d'un outil de programmation n Management et de gestion de l'entretien des VRD à Douala CM-MINHDU-91720-CS-CQS Project Management, Coord / Recrutement d'un consulta Consultant Qualifi IDA / 61320 ination, Monitoring and Eval Post Open - National 50,000.00 0.00 Canceled 2022-07-12 2021-08-19 2022-08-09 2022-09-20 2022-10-11 2022-11-01 2023-04-30 nt (firme) pour l'audit techni cation Selection uation que des activités du PDVIR CM-MINHDU-256568-CS-LCS / Recrutement d’un auditeur Project Management, Coord Least Cost Selecti Under Implement externe pour l’audit compta IDA / 61320 ination, Monitoring and Eval Post Open - National 51,384.00 0.00 2021-11-01 2021-10-20 2021-11-22 2021-11-30 2022-01-05 2022-02-23 2022-02-02 2022-03-29 2022-03-04 2022-04-11 2022-04-08 2022-05-13 2022-11-09 on ation ble et financier du PDVIR ( e uation xercice 2021, 2022 et 2023) CM-MINHDU-268583-CS-CQ S / Recrutement de l'auditeu Improving Connectivity and Consultant Qualifi Under Implement r externe de mise en œuvre IDA / 61320 Living environment in Benef Post Open - National 25,694.00 0.00 2022-01-05 2022-02-14 2022-01-26 2022-03-11 2022-04-20 2022-04-10 2022-05-15 2022-11-11 cation Selection ation des PAR (sous-projets struct iciary Cities urants) des villes de Douala et Yaoundé CM-MINHDU-271579-CS-QC Strengthening Capacity for I BS / Elaboration du schéma Quality And Cost- Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 2022-01-05 2022-01-12 2022-01-26 2022-03-11 2022-04-08 2022-05-08 2022-06-12 2022-07-17 2023-07-17 directeur des marches et pôl Based Selection ation n Management es commerciaux de la ville d e Yaoundé ; CM-MINHDU-271580-CS-QC Strengthening Capacity for I BS / Elaboration du schéma Quality And Cost- Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 162,727.00 0.00 2022-01-05 2022-01-12 2022-01-26 2022-03-11 2022-04-08 2022-05-08 2022-06-12 2022-07-17 2023-07-17 directeur des marches et pôl Based Selection ation n Management es commerciaux de la ville de Ngaoundéré ; CM-MINHDU-212884-CS-CQ S / Sélection d'un consultant pour l'élaboration du bilan d Strengthening Capacity for I Consultant Qualifi e la politique de contractuali IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.03 0.00 Canceled 2021-09-20 2021-10-11 2021-11-09 2021-11-24 2021-12-17 2022-06-15 cation Selection sation (CDV MINHDU/CTD, st n Management ratégie d'intervention et gui de méthodologique) dans le cadre du PDVIR CM-MINHDU-272811-CS-CQ S / Etude de faisabilité en vu e de la mise en place d’un s Strengthening Capacity for I ystème d’archivage électron Consultant Qualifi Open - Internation Under Implement IDA / 61320 nclusive and Resilient Urba Post 100,000.00 0.00 2021-11-15 2022-01-28 2021-12-06 2022-01-19 2022-02-18 2022-03-25 2022-09-21 ique et la gestion document cation Selection al ation n Management aire a la direction des Opera tions urbaines (DOU) du min istère de l’Habitat et du Dév eloppement Urbain (MINHDU ) CM-MINHDU-271394-CS-QC Strengthening Capacity for I Quality And Cost- Under Implement BS / Etude sur le bilan de 20 IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 2022-01-20 2022-01-28 2022-02-10 2022-03-26 2022-04-23 2022-05-23 2022-06-27 2022-08-01 2023-08-01 Based Selection ation ans de contractualisation Et n Management at-Villes CM-MINHDU-285610-CS-QC BS / Maitrise d œuvre compl Improving Connectivity and Quality And Cost- Under Implement ète (etude et Contrôle) de tr IDA / 61320 Living environment in Benef Post Open - National 342,582.06 0.00 2022-04-05 2022-04-08 2022-04-26 2022-06-09 2022-07-14 2022-07-07 2022-08-31 2022-08-06 2022-09-06 2022-09-10 2022-09-23 2022-10-15 2023-10-15 Based Selection ation avaux de voiries Tronçon : C iciary Cities ARREFOUR CCC – CARREFO UR St MICHEL CM-MINHDU-286842-CS-QC BS / Contrôle et la Surveillan Improving Connectivity and ce des travaux de constructi Quality And Cost- Open - Internation Under Implement IDA / 61320 Living environment in Benef Post 513,873.09 0.00 2022-04-08 2022-04-08 2022-04-29 2022-04-23 2022-05-29 2022-06-26 2022-07-11 2022-08-11 2022-09-15 2023-09-15 on d’une Station de Traitem Based Selection al ation iciary Cities ent de Boues de Vidange (ST BV) dans le quartier de Ngo mbé à Douala 5e CM-MINHDU-288858-CS-CQ Strengthening Capacity for I S / Appui a l’opérationnalisat Consultant Qualifi Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 2022-04-11 2022-04-11 2022-04-25 2022-05-09 2022-06-08 2022-07-13 2023-01-09 ion d’une base de données u cation Selection ation n Management rbaines dans les villes de Do uala et Batouri CM-MINHDU-273813-CS-QC Strengthening Capacity for I BS / Appui a l’opérationnalis Quality And Cost- IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 Canceled 2022-01-20 2022-02-10 2022-03-26 2022-04-23 2022-05-23 2022-06-27 2022-08-01 2023-08-01 ation d’une base de données Based Selection n Management urbaines dans les villes de D ouala et Batouri CM-MINHDU-289641-CS-QC BS / Contrôle et la surveillan Improving Connectivity and ce des travaux d'amélioratio Quality And Cost- Open - Internation Under Implement IDA / 61320 Living environment in Benef Post 642,341.36 0.00 2022-05-02 2022-04-30 2022-05-23 2022-06-27 2022-08-08 2022-08-18 2022-09-22 2022-10-20 2023-10-20 n de la mobilité Piétonne da Based Selection al ation iciary Cities ns certains quartiers de Yao undé (Cité verte; Nkolmesse ng) CM-MINHDU-291856-CS-CQ Improving Connectivity and S / Sélection du consultant p Consultant Qualifi Under Implement IDA / 61320 Living environment in Benef Post Open - National 6,938.00 0.00 2022-05-02 2022-04-27 2022-05-07 2022-05-13 2022-05-14 2022-05-16 2022-06-05 our la formation sur l’approp cation Selection ation iciary Cities riation des Plan HSSE Page 9 CM-MINHDU-295342-CS-CQ S / Contrôle et surveillance d Improving Connectivity and Consultant Qualifi Under Implement es travaux de plantation d'ar IDA / 61320 Living environment in Benef Post Open - National 25,694.00 0.00 2022-05-23 2022-06-01 2022-06-13 2022-07-27 2022-08-26 2022-09-30 2023-03-29 cation Selection ation bres dans les arrondissemen iciary Cities ts de Douala 3eme et 5eme CM-MINHDU-296616-CS-QC BS / Maîtrise d'œuvre compl Improving Connectivity and Quality And Cost- Under Implement ète (Etudes et Contrôle) pou IDA / 61320 Living environment in Benef Post Open - National 342,582.06 0.00 2022-05-31 2022-06-05 2022-06-21 2022-08-04 2022-09-01 2022-10-01 2022-11-05 2022-12-10 2023-12-10 Based Selection ation r la réalisation des travaux d iciary Cities e voiries et équipements de proximité à Kousseri. CM-MINHDU-298049-CS-QC BS / Etudes de conception d e solutions basées sur la nat ure pour la préservation de l Improving Connectivity and Quality And Cost- Open - Internation Under Implement a capacité de drainage et d’ IDA / 61320 Living environment in Benef Post 300,598.00 0.00 2022-06-16 2022-06-11 2022-07-07 2022-07-19 2022-08-20 2022-09-17 2022-10-17 2022-11-21 2022-12-26 2023-12-26 Based Selection al ation adaptation naturelle des bas iciary Cities -fonds au changement clima tique dans les Communes d e Batouri, Dla III et Dla V, Ng aoundéré II, Ydé V et Ydé VII CM-MINHDU-304588-CS-QB S / Etude sur la gestion de la Improving Connectivity and Quality Based Sel Open - Internation Under Implement Station de Traitement des B IDA / 61320 Living environment in Benef Post 231,244.00 0.00 2022-08-01 2022-07-20 2022-08-22 2022-08-25 2022-10-05 2022-11-02 2022-12-02 2023-01-01 2023-02-05 2024-02-05 ection al ation oues de Vidange (STBV) de iciary Cities Ngombé à Douala, à constru ire dans le cadre du PDVIR. CM-MINHDU-316069-CS-QC BS / Recrutement d'un Cons Strengthening Capacity for I Quality And Cost- Under Implement ultant (Firme) pour l'élabora IDA / 61320 nclusive and Resilient Urba Post Open - National 214,114.00 0.00 2022-09-28 2022-10-07 2022-10-19 2022-10-11 2022-12-02 2022-12-30 2023-01-29 2023-03-05 2023-04-09 2024-04-08 Based Selection ation tion d’un Plan de Secteur (P n Management S) à Ngaoundéré dans le qu artier Mayo Daneeyel CM-MINHDU-321589-CS-QB S / Recrutement d’une ONG chargée de la mise en œuvr e du programme de subvent Improving Connectivity and Quality Based Sel Under Implement ions aux initiatives d’inclusio IDA / 61320 Living environment in Benef Post Open - National 527,906.00 0.00 2022-10-20 2022-11-01 2022-11-03 2022-11-06 2022-11-28 2022-12-26 2023-01-05 2023-02-04 2023-02-19 2024-02-19 ection ation n économique des groupes d iciary Cities e jeunes dans les villes de, B atouri, Douala, Kousseri, Ku mba, Maroua, Ngaoundéré e t Yaoundé, pour le compte d u PDVIR. CM-MINHDU-324077-CS-CQ S / Recrutement d’un Consul Project Management, Coord tant (firme) pour la concepti Consultant Qualifi Under Implement IDA / 61320 ination, Monitoring and Eval Post Open - National 5,139.00 0.00 2022-11-11 2022-11-10 2022-12-02 2023-01-15 2023-02-14 2023-03-21 2023-09-17 on et développement d’un si cation Selection ation uation te web pour du Projet de Dé veloppement des Villes Inclu sives et résilientes (PDVIR) CM-MINHDU-330396-CS-QB S / Recrutement d’un Consul Strengthening Capacity for I Quality Based Sel Open - Internation Under Implement tant (firme) pour l’élaboratio IDA / 61320 nclusive and Resilient Urba Post 102,775.00 0.00 2022-12-20 2022-12-23 2023-01-10 2023-02-07 2023-02-23 2023-03-23 2023-04-22 2023-05-22 2023-06-26 2024-06-25 ection al ation n d’une méthodologie opéra n Management tionnelle de libération des zo nes marécageuses CM-MINHDU-331141-CS-CQ S / Recrutement d'un Consul tant (Firme) charge du suivi Improving Connectivity and Consultant Qualifi Under Implement de la prise en charge des su IDA / 61320 Living environment in Benef Post Open - National 77,081.00 0.00 2022-12-26 2023-01-06 2023-01-16 2023-03-01 2023-03-31 2023-05-05 2023-11-01 cation Selection ation rvivantes de VBG/VCE/EAS/H iciary Cities S dans les villes de Batouri, Douala, KOUSSERI, KUMBA, Maroua, Ngaoundéré et Yao undé CM-MINHDU-221641-CS-CQ S / Recrutement d’un consul Project Management, Coord tant (firme) chargé de la mis Consultant Qualifi IDA / 61320 ination, Monitoring and Eval Post Open - National 17,152.00 0.00 Canceled 2021-04-15 2021-05-06 2021-06-19 2021-07-19 2021-08-23 2022-08-18 e en place et de l’animation cation Selection uation d’un site web, d’une page Fa cebook et conception d’un magazine trimestriel. CM-MINHDU-333862-CS-QC BS / Recrutement un Consult ant (Firme) chargé du dével Strengthening Capacity for I Quality And Cost- Under Implement oppement d’un outil de prog IDA / 61320 nclusive and Resilient Urba Post Open - National 513,874.00 0.00 2023-01-18 2023-02-13 2023-02-08 2023-03-24 2023-04-21 2023-05-21 2023-06-25 2023-07-30 2024-07-29 Based Selection ation rammation et de gestion de n Management l’entretien de la Voirie et Ré seaux Divers (VRD) de la Vill e de Yaoundé CM-MINHDU-179320-CS-IND V / Recrutement d’un consul tant pour la finalisation des études APS/APD/DAO en vue Improving Connectivity and Consultant Qualifi des travaux de préservation IDA / 61320 Living environment in Benef Post Open - National 10,277.00 0.00 Canceled 2021-06-02 2021-06-23 2021-08-06 2021-09-05 2021-10-10 2022-04-08 cation Selection de la capacité de drainage e iciary Cities t d’adaptation naturelle au c hangement climatique dans les villes de Yaoundé, Doual a, Batouri et Ngaoundéré CM-MINHDU-179172-CS-CQ S / Recrutement d’un consul tant pour l’évaluation de l'op Strengthening Capacity for I ération fichiers des contribu Consultant Qualifi IDA / 61320 nclusive and Resilient Urba Post Open - National 171,291.00 0.00 Canceled 2020-10-01 2020-10-22 2020-12-05 2021-01-04 2021-02-08 2021-05-09 ables réalisés par le PDUE d cation Selection n Management ans les six Communes d'Arro ndissement de Douala et les sept communes d’arrondisse ment de Yaoundé et orientat ion CM-MINHDU-91541-CS-QCB S / Appui à l'amélioration de Strengthening Capacity for I Quality And Cost- Open - Internation la programmation et de la ré IDA / 61320 nclusive and Resilient Urba Post 666,666.00 0.00 Canceled 2021-12-20 2022-01-17 2022-03-28 2022-04-27 2022-06-22 2022-08-19 2022-09-16 2023-03-15 Based Selection al alisation du budget à Douala n Management , Yaoundé, Ngaoundere et K umba CM-MINHDU-212750-CS-QC BS / Sélection d'un consulta Strengthening Capacity for I nt pour l'élaboration des sc Quality And Cost- IDA / 61320 nclusive and Resilient Urba Post Open - National 334,476.00 0.00 Canceled 2021-10-25 2021-11-15 2021-12-14 2022-01-11 2022-01-12 2022-02-16 2022-03-17 2022-08-14 hémas directeurs des équip Based Selection n Management ements marchands des ville s de Ngaoundéré et Yaound é dans le cadre du PDVIR CM-MINHDU-347168-CS-QC BS / Actualisation du Plan So Strengthening Capacity for I mmaire d’Urbanisme de la C Quality And Cost- Open - Internation Under Implement IDA / 61320 nclusive and Resilient Urba Post 471,050.00 0.00 2023-03-08 2023-03-09 2023-03-29 2023-03-24 2023-05-12 2023-06-09 2023-07-09 2023-08-13 2023-09-17 2024-09-16 ommune de Bikok, à travers Based Selection al ation n Management la planification et l’aménage ment partiel d’une zone situ ée au nord de ladite Commu ne. CM-MINHDU-169825-CS-CQ S / Maîtrise d’œuvre complèt Improving Connectivity and Consultant Qualifi e pour la réalisation travaux IDA / 61320 Living environment in Benef Post Open - National 85,645.00 0.00 Canceled 2020-06-25 2021-01-13 2020-07-16 2020-08-29 2020-09-28 2020-11-02 2022-06-25 cation Selection de voiries et d’équipements iciary Cities de proximité dans la ville de Kousseri CM-MINHDU-361652-CS-CQ Project Management, Coord S / Recrutement d'un Consul Consultant Qualifi Pending Impleme IDA / 61320 ination, Monitoring and Eval Post Open - National 7,023.00 0.00 2023-05-29 2023-06-19 2023-08-02 2023-09-01 2023-10-06 2024-08-31 tant (Firme) pour la producti cation Selection ntation uation on du bulletin d'information du PDVIR INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Identifie Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference d/Selected Consultan Signed Contract Contract Completion o. h unt (US$) t (US$) tract t Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 10 CM-MINHDU-11672-CS-INDV / Recrutement de l'évaluate Project Management, Coord Individual Consult ur externe pour la mise en IDA / V0100 ination, Monitoring and Eval Post Limited 8,347.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-04 2018-01-03 ant Selection œuvre des PAR dans les ville uation s de Yaoundé, Douala, Batou ri, Kumba et Ngaoundéré. CM-MINHDU-11666-CS-INDV / Recrutement d'un consulta Project Management, Coord Individual Consult nt formateur dans le cadre d IDA / V0100 ination, Monitoring and Eval Post Limited 13,912.00 0.00 Canceled 2017-05-15 2017-05-20 2017-05-30 2017-06-19 2017-07-19 ant Selection e l'atelier itinérant sur la not uation e méthodologique CCE dans les 5 villes CM-MINHDU-17030-CS-CDS / Recrutement d'un consulta Improving Connectivity and nt individuel pour l'étude d'o IDA / V0100 Living environment in Benef Post Direct Selection Direct 23,850.00 0.00 Canceled 2017-06-06 2017-06-16 2017-08-20 2017-11-18 ptimisation du design techni iciary Cities que de la station de traitem ent des boues de vidange de Ngombè CM-MINHDU-17131-CS-INDV / Recrutement d'un consulta Project Management, Coord Individual Consult nt formateur dans le cadre d IDA / V0100 ination, Monitoring and Eval Post Limited 13,912.00 0.00 Canceled 2017-10-15 2017-10-20 2017-11-10 2017-12-15 2017-12-20 ant Selection e l'atelier itinérant sur la not uation e méthodologique CCE dans les 5 villes CM-MINHDU-11761-CS-INDV Project Management, Coord / Recrutement d'un Spécialis Individual Consult IDA / V0100 ination, Monitoring and Eval Prior Open 26,831.00 0.00 Canceled 2017-08-31 2017-10-19 2017-10-29 2017-11-18 2018-11-18 te en développement social ant Selection uation au sein de la CP/PDVI CM-MINHDU-17144-CS-INDV Project Management, Coord / Recrutement d'un spécialis Individual Consult IDA / V0100 ination, Monitoring and Eval Prior Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 te en développement munici ant Selection uation pal au sein de la CC/PDVI CM-MINHDU-17147-CS-INDV Project Management, Coord Individual Consult / Recrutement d'un auditeur IDA / V0100 ination, Monitoring and Eval Prior Open 37,857.00 0.00 Canceled 2017-07-31 2017-09-18 2017-10-09 2017-11-13 2018-11-13 ant Selection interne au sein de la CC/PDV uation I CM-MINHDU-11759-CS-CDS Project Management, Coord / Contrat du Responsable en IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 vironnemental et social du P uation DVI CM-MINHDU-91716-CS-INDV Project Management, Coord Individual Consult / Recrutement de l'auditeur i IDA / 61320 ination, Monitoring and Eval Post Open 32,528.00 60,147.50 Signed 2019-08-30 2019-10-10 2019-10-25 2020-04-14 2019-11-22 2020-05-13 2019-12-06 2020-06-23 2020-12-05 ant Selection nterne de la CC/PDVIR uation CM-MINHDU-91718-CS-INDV Project Management, Coord / Recrutement d'un Spécialis Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 24,635.00 106,189.41 Signed 2019-08-30 2019-10-11 2019-10-25 2020-04-15 2019-11-22 2020-05-14 2019-12-06 2020-06-19 2020-12-05 te en développement social ant Selection uation au sein de la CC/PDVIR CM-MINHDU-11743-CS-CDS Project Management, Coord / Avenant au contrat du Coo IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 59,151.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-20 2017-11-16 rdonnateur du PDVI uation CM-MINHDU-27471-CS-CDS Project Management, Coord / Avenant au contrat du coor IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 59,192.00 0.00 Canceled 2017-09-06 2017-09-16 2017-10-03 2018-06-30 donnateur du PDVIR uation CM-MINHDU-27476-CS-CDS Project Management, Coord / Avenant au contrat du resp IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 onsable environnemental et uation social du PDVIR CM-MINHDU-27473-CS-CDS Project Management, Coord / Avenant au contrat du Res IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 30,286.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 ponsable administratif et fin uation ancier du PDVIR CM-MINHDU-27477-CS-CDS Project Management, Coord / Avenant au contrat du Res IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 ponsable de Passation des uation marchés du PDVIR CM-MINHDU-11757-CS-CDS Project Management, Coord / Avenant au contrat du Com IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-04-05 2017-04-25 2017-04-15 2017-05-15 2017-09-30 ptable du PDVI uation CM-MINHDU-11748-CS-CDS Project Management, Coord / Avenant au contrat du Res IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 20,190.00 0.00 Canceled 2017-04-05 2017-04-15 2017-05-15 2017-09-30 ponsable Administratif et Fin uation ancier du PDVI CM-MINHDU-27475-CS-CDS Project Management, Coord / Avenant au contrat du Com IDA / V0100 ination, Monitoring and Eval Prior Direct Selection Direct 18,929.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 ptable du PDVIR uation CM-MINHDU-27480-CS-CDS Project Management, Coord / Avenant au contrat du cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 uffeur 2 au sein du PDVIR uation CM-MINHDU-27483-CS-CDS Project Management, Coord / Avenant au contrat d'un ag IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 ent d'entretien 1 au sein du uation PDVIR CM-MINHDU-27481-CS-CDS Project Management, Coord / Avenant au contrat du Cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 uffeur 3 au sein du PDVIR uation CM-MINHDU-27485-CS-CDS Project Management, Coord / Avenant au contrat d'un ag IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 ent d'entretien 2 au sein du uation PDVIR CM-MINHDU-27479-CS-CDS Project Management, Coord / Avenant au contrat du cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-03-26 uffeur 1 au sein du PDVIR uation CM-MINHDU-27478-CS-CDS Project Management, Coord / Avenant au contrat de l'Ass IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-09-06 2017-09-16 2017-09-27 2018-06-24 istant administratif et financi uation er du PDVIR CM-MINHDU-12004-CS-CDS Project Management, Coord / Avenant au Contrat du Cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 5,679.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 uffeur 3 au sein du PDVI uation CM-MINHDU-12001-CS-CDS Project Management, Coord / Avenant au Contrat du Cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 uffeur 1 au sein du PDVI uation CM-MINHDU-12003-CS-CDS Project Management, Coord / Avenant au Contrat du Cha IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 4,732.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 uffeur 2 au sein du PDVI uation CM-MINHDU-11998-CS-CDS Project Management, Coord / Avenant au Contrat de l'As IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 9,464.00 0.00 Canceled 2017-04-06 2017-04-18 2017-04-16 2017-05-16 2017-09-30 sistant Administratif et finan uation cier du PDVI CM-MINHDU-12005-CS-CDS Project Management, Coord / Avenant au contrat d'un ag IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 ent 1 d'entretien uation Page 11 CM-MINHDU-12012-CS-CDS Project Management, Coord / Avenant au Contrat d'un ag IDA / V0100 ination, Monitoring and Eval Post Direct Selection Direct 1,325.00 0.00 Canceled 2017-04-06 2017-04-16 2017-05-16 2017-09-30 ent 2 d'entretien uation CM-MINHDU-111502-CS-IND Project Management, Coord V / Recrutement du Respons Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 43,200.00 40,980.09 Signed 2019-04-22 2019-03-18 2019-06-10 2019-05-17 2019-07-01 2019-05-21 2019-08-05 2019-05-29 2020-08-04 able en Passation des march ant Selection uation és de la CC/PDVIR CM-MINHDU-116139-CS-IND Project Management, Coord V / Recrutement d'un Respo Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 37,857.00 95,636.92 Signed 2019-05-27 2020-09-24 2019-07-29 2020-06-01 2019-08-19 2020-06-05 2019-09-23 2020-07-08 2020-09-22 nsable en Développement M ant Selection uation unicipal au sein de la CC/PD VIR CM-MINHDU-116141-CS-CD Project Management, Coord S / Recrutement d'un Respo IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 45,036.00 123,799.81 Signed 2019-05-23 2019-04-29 2019-06-11 2019-05-14 2019-08-15 2019-05-23 2020-08-14 nsable Administratif et Finan uation cier au sein de la CC/PDVIR CM-MINHDU-116347-CS-CD Project Management, Coord S / Recrutement d'un Compt IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 27,210.00 72,000.76 Signed 2019-05-23 2019-05-02 2019-06-11 2019-05-06 2019-08-15 2019-05-23 2020-08-14 able au sein de la CC/PDVIR uation CM-MINHDU-116759-CS-CD Project Management, Coord S / Recrutement d'un Coordo IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 167,800.00 259,577.91 Signed 2019-05-31 2019-05-02 2019-06-10 2019-05-17 2019-08-14 2019-05-23 2021-08-13 nnateur à la CC/PDVIR uation CM-MINHDU-123018-CS-IND Improving Connectivity and V / Recrutement d’un consul Individual Consult IDA / V0100 Living environment in Benef Post Open 18,000.00 20,005.88 Signed 2016-01-23 2016-07-29 2016-03-12 2016-11-01 2016-04-02 2016-11-23 2016-05-07 2017-01-06 2016-11-03 tant individuel chargé de l’a ant Selection iciary Cities nalyse économique du PDVI. CM-MINHDU-91719-CS-INDV Project Management, Coord Individual Consult / Recrutement de l'assistant IDA / 61320 ination, Monitoring and Eval Post Open 13,051.00 16,481.41 Signed 2019-11-10 2019-11-22 2020-01-05 2020-11-30 2020-01-19 2020-12-29 2020-02-02 2021-01-07 2021-02-01 ant Selection au responsable en suivi éval uation uation CM-MINHDU-91712-CS-INDV / Recrutement d'un consulta Project Management, Coord Individual Consult nt individuel pour la concept IDA / 61320 ination, Monitoring and Eval Post Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 ant Selection ion, mise en ligne, administr uation ation du site web du Projet CM-MINHDU-91713-CS-INDV / Recrutement d'un consulta Project Management, Coord Individual Consult nt individuel pour appui à la IDA / 61320 ination, Monitoring and Eval Post Open 33,335.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-11-21 ant Selection communication dans les CT uation D de ressort du PDVIR et à l a CC/PDVIR CM-MINHDU-91561-CS-INDV / Recrutement d'un Consulta nt individuel chargé de l'app Strengthening Capacity for I Individual Consult ui à l'élaboration du bilan de IDA / 61320 nclusive and Resilient Urba Post Open 33,334.00 0.00 Canceled 2019-09-30 2019-11-25 2019-12-09 2019-12-23 2020-06-20 ant Selection 15 ans de contractualisation n Management Etat-villes, y compris l'élabor ation d'une stratégie d'inter vention et d'un guide métho dologique. CM-MINHDU-91717-CS-INDV Project Management, Coord / Recrutement d'un spécialis Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 32,528.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-22 2019-12-06 2020-12-05 te en développement munici ant Selection uation pal au sein de la CC/PDVIR CM-MINHDU-94783-CS-INDV / Etude de programmation d Improving Connectivity and Individual Consult es travaux d'amélioration de IDA / 61320 Living environment in Benef Post Open 68,539.00 0.00 Canceled 2019-05-31 2019-08-09 2019-08-30 2019-09-27 2020-01-25 ant Selection l'accès aux services de base iciary Cities dans certains quartiers dans la ville de kousseri CM-MINHDU-91803-CS-INDV Strengthening Capacity for I Individual Consult / modes de gestion et entret IDA / 61320 nclusive and Resilient Urba Post Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 ant Selection ien des ouvrages communau n Management taires CM-MINHDU-91456-CS-INDV / Contrôle et surveillance po Improving Connectivity and Individual Consult ur la réalisation des travaux IDA / 61320 Living environment in Benef Post Open 49,046.00 0.00 Canceled 2020-05-29 2020-07-17 2020-08-07 2020-09-11 2022-10-01 ant Selection de plantation d'arbres dans l iciary Cities es arrondissements de Doua la 3e et 5e CM-MINHDU-91802-CS-INDV Strengthening Capacity for I Individual Consult / tenue des livres comptable IDA / 61320 nclusive and Resilient Urba Post Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 ant Selection s et suivi des dépenses com n Management munautaires, CM-MINHDU-91804-CS-INDV / formation des personnels d Strengthening Capacity for I es services financiers des co Individual Consult IDA / 61320 nclusive and Resilient Urba Post Open 46,248.00 0.00 Canceled 2019-08-30 2019-11-22 2019-12-22 2020-01-12 2020-07-10 mmunes impliquées dans la ant Selection n Management mise en œuvre du PDVIR en finances locales, comptabilit é et fiscalité CM-MINHDU-91801-CS-INDV / la communication sociale: Strengthening Capacity for I gestion des sources, canaux Individual Consult IDA / 61320 nclusive and Resilient Urba Post Open 11,408.00 0.00 Canceled 2019-08-30 2019-10-25 2019-11-08 2019-11-22 2020-05-20 et type d'informations, évalu ant Selection n Management ation des enjeux et impacts de l'information sur les popu lations CM-MINHDU-139683-CS-IND Project Management, Coord V / Recrutement d'un Ingéni Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 32,626.00 121,483.66 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-19 2020-08-31 eur de Génie Civil à la Cellul ant Selection uation e de Coordination du PDVIR CM-MINHDU-139685-CS-IND Project Management, Coord Individual Consult V / Recrutement d'un Respo IDA / 61320 ination, Monitoring and Eval Post Open 32,626.00 67,526.27 Signed 2019-11-20 2019-10-22 2020-01-08 2020-03-02 2020-01-29 2020-04-17 2020-03-04 2020-06-19 2020-08-31 ant Selection nsable en Gestion Environne uation mentale CM-MINHDU-139689-CS-IND Project Management, Coord V / Recrutement d'un Assista Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 21,751.00 20,552.67 Signed 2019-11-20 2019-12-04 2020-01-08 2020-06-16 2020-01-29 2020-06-22 2020-03-04 2020-08-21 2020-08-31 nt en Passation des marchés ant Selection uation à la Cellule de Coordination du PDVIR CM-MINHDU-139693-CS-IND Project Management, Coord V / Recrutement d'un Assista Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 10,875.00 47,120.31 Signed 2019-11-20 2019-12-18 2020-01-08 2020-11-30 2020-01-29 2020-12-29 2020-03-04 2021-01-11 2021-02-27 nt Administratif et Financier ant Selection uation à la Cellule de Coordination du PDVIR CM-MINHDU-139702-CS-IND V / Recrutement d'un Assista Project Management, Coord Individual Consult nt des Responsables de gest IDA / 61320 ination, Monitoring and Eval Post Open 10,875.00 17,070.03 Signed 2019-11-20 2019-11-22 2020-01-08 2020-11-30 2020-01-29 2020-11-30 2020-03-04 2021-01-07 2021-02-27 ant Selection ion environnementale et soc uation iale au sein de la Cellule de Coordination du PDVIR CM-MINHDU-139706-CS-IND Project Management, Coord V / Recrutement d'une Assist Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 10,875.00 40,992.91 Signed 2019-11-20 2020-07-14 2020-01-08 2020-11-30 2020-01-29 2020-12-30 2020-03-04 2021-01-07 2021-02-27 ante de projet au sein de la ant Selection uation Cellule de Coordination du P DVIR CM-MINHDU-139707-CS-IND Project Management, Coord V / Recrutement d'une secré Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 8,700.00 11,493.21 Signed 2019-11-20 2019-11-22 2020-01-08 2020-06-30 2020-01-29 2020-10-29 2020-03-04 2020-11-03 2020-08-31 taire au sein de la Cellule de ant Selection uation Coordination du PDVIR Page 12 CM-MINHDU-91658-CS-INDV Project Management, Coord / Recrutement d'un ingénieu Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 21,751.00 60,080.62 Signed 2019-11-30 2019-11-22 2020-01-25 2020-08-31 2020-02-15 2020-09-29 2020-02-29 2020-10-08 2021-02-23 r assistant à la Cellule de Co ant Selection uation ordination du PDVIR CM-MINHDU-27468-CS-INDV / Recrutement d'un consulta Strengthening Capacity for I nt individuel pour l'optimisat Individual Consult IDA / 61320 nclusive and Resilient Urba Post Limited 81,221.00 84,419.60 Signed 2017-09-06 2017-08-17 2017-09-11 2017-08-24 2017-09-21 2020-10-27 2017-10-08 2020-12-11 2018-01-06 ion des études techniques d ant Selection n Management u projet de construction de l a station de traitement des boues de vidange de Ngomb è CM-MINHDU-144175-CS-CD S / Renouvellement des cont Project Management, Coord Under Implement rats de trois (03) chauffeurs IDA / 61320 ination, Monitoring and Eval Post Direct Selection 16,443.00 0.00 2019-12-15 2021-01-13 2019-12-27 2020-01-17 2021-01-11 ation pour les véhicules de la Cell uation ule de Coordination du PDVI R CM-MINHDU-144176-CS-CD Project Management, Coord S / Renouvellement des cont Under Implement IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 4,110.00 0.00 2019-12-17 2019-11-22 2019-12-27 2020-02-07 2021-02-01 rats de deux (02) agents d’e ation uation ntretien à la Cellule de Cordi nation du PDVIR CM-MINHDU-144288-CS-CD S / Recrutement d'un audite Project Management, Coord Under Implement ur externe pour l'audit comp IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 51,712.00 0.00 2019-11-30 2021-01-13 2019-12-10 2020-02-13 2021-02-07 ation table et financier du PDVIR ( uation période PPA , exercice 2019 et 2020) CM-MINHDU-169875-CS-IND Improving Connectivity and V / Recrutement de l'évaluat Individual Consult IDA / 61320 Living environment in Benef Post Limited 7,023.00 7,919.68 Signed 2020-06-15 2020-11-24 2020-06-20 2020-11-30 2020-07-11 2020-12-29 2020-08-15 2021-01-28 2020-09-14 eur externe de la mise en œ ant Selection iciary Cities uvre du PAR (sous-projets st ructurants) CM-MINHDU-179928-CS-IND V / Recrutement d'un Consul Improving Connectivity and tant Individuel chagé de la p Individual Consult IDA / 61320 Living environment in Benef Post Open 61,234.00 60,826.48 Signed 2016-06-29 2016-06-29 2016-08-24 2016-09-30 2016-09-14 2016-09-30 2016-10-19 2017-01-06 2017-04-17 réparation d'une étude socia ant Selection iciary Cities le et d'un plan de développe ment communautaire de la J eunesse CM-MINHDU-179937-CS-CD S / Réalisation des Plans d'A ctions de Réinstallation des populations affectées dans l Improving Connectivity and Under Implement e cadre des travaux d'amén IDA / 61320 Living environment in Benef Post Direct Selection Direct 13,718.00 0.00 2016-11-11 2021-01-13 2016-11-21 2017-01-25 2017-07-24 ation agement de certaines voirie iciary Cities s structurantes dans les arro ndissements de Yaoundé 5 e t 7, Douala 3 et 5, Ngaoundé ré 2, Kumba 2 et Batouri CM-MINHDU-215982-CS-IND V / Recrutement d'un Spécia Project Management, Coord liste en Passation junior à l' Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 15,225.00 1,205.44 Signed 2021-03-25 2021-03-05 2021-05-13 2021-10-25 2021-06-03 2021-11-16 2021-07-08 2021-11-26 2022-01-04 Unité de Liaison Technique ( ant Selection uation UTL) de Yaoundé du Projet d e Développement des villes I nclusives et résilientes (PDVI R) CM-MINHDU-215972-CS-IND V / Recrutement d'un Spécia Project Management, Coord liste en passation junior à l' Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 15,225.00 351.16 Signed 2021-02-25 2021-03-05 2021-04-15 2021-10-25 2021-05-06 2021-10-29 2021-06-10 2021-11-26 2021-12-07 Unité de Liaison Technique ( ant Selection uation UTL) de Douala du Projet de Développement des villes In clusives et résilientes (PDVI R) CM-MINHDU-212726-CS-IND V / Sélection d'un consultant Strengthening Capacity for I individuel pour l'évaluation Individual Consult Under Implement IDA / 61320 nclusive and Resilient Urba Post Limited 20,583.00 0.00 2021-04-07 2021-03-26 2021-04-12 2021-04-15 2021-04-22 2021-05-15 2021-07-14 de la capacité de réponse de ant Selection ation n Management s communes à la crise sanit aire liée au Covid-19 dans le cadre du PDVIR CM-MINHDU-179158-CS-CQ S / Recrutement d’un consul tant individuel pour l’assista Strengthening Capacity for I nce technique d’accompagn Individual Consult IDA / 61320 nclusive and Resilient Urba Post Limited 15,416.00 0.00 Canceled 2020-08-10 2020-08-15 2020-09-05 2020-10-10 2021-01-08 ement des CTD à l'identificat ant Selection n Management ion et à la mise en œuvre de s mesures de lutte contre le covid-19 (yaoundé, ngdéré, maroua, kousseri, douala, b atouri) CM-MINHDU-169893-CS-CD S / Recrutement d’un consul tant (ONG) chargé des Etude s pour les travaux destinée Improving Connectivity and s à préserver la capacité de IDA / 61320 Living environment in Benef Post Direct Selection Direct 10,277.00 0.00 Canceled 2020-06-30 2020-07-10 2020-09-06 2021-09-01 drainage naturelle et contrib iciary Cities uer à l’adaptation au change ment climatique dans les vill es bénéficiaires (Batouri, Do uala, Ngaoundéré et Yaound é) CM-MINHDU-221625-CS-CD Project Management, Coord S / Recrutement d'un Assista IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct 21,000.00 35.59 Signed 2021-03-15 2021-02-26 2021-03-25 2021-03-02 2021-05-29 2021-03-16 2022-05-24 nt en Passation des marchés uation à la Cellule de Coordination du PDVIR CM-MINHDU-144177-CS-IND Project Management, Coord V / Recrutement d'un chauff Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 5,138.00 0.00 Canceled 2019-12-15 2021-01-13 2020-02-02 2020-02-23 2020-03-29 2021-03-24 eur à la Cellule de Coordinat ant Selection uation ion du PDVIR pour le nouvea u véhicule. CM-MINHDU-226965-CS-IND Project Management, Coord V / Recrutement d'un Respo Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 39,206.00 3,062.79 Signed 2021-05-03 2021-04-22 2021-06-05 2021-06-28 2021-06-19 2021-06-29 2021-07-10 2021-07-02 2022-07-10 nsable de la Passation des ant Selection uation marchés à la Cellule de Coor dination du PDVIR CM-MINHDU-240588-CS-IND V / Recrutement d'un consul Project Management, Coord Individual Consult Under Implement tant individuel chargé de l'él IDA / 61320 ination, Monitoring and Eval Post Limited 23,980.74 0.00 2021-09-13 2021-10-25 2021-09-18 2021-11-15 2021-09-28 2022-02-28 2021-10-21 2021-11-30 ant Selection ation aboration du rapport de la re uation vue à mi-parcours du PDVIR CM-MINHDU-139682-CS-IND Project Management, Coord V / Recrutement d'un Consei Individual Consult IDA / 61320 ination, Monitoring and Eval Post Open 32,626.00 0.00 Canceled 2019-11-20 2021-01-13 2020-01-08 2020-01-29 2020-03-04 2020-08-31 ller Principal à la Cellule de ant Selection uation Coordination du PDVIR CM-MINHDU-257597-CS-IND V / le recrutement d’un Cons ultant Individuel (CI) chargé de la réalisation de la format Strengthening Capacity for I Individual Consult Under Implement ion sur le thème : «Gestion d IDA / 61320 nclusive and Resilient Urba Post Limited 47,105.00 0.00 2021-10-13 2021-10-15 2021-10-18 2021-11-03 2021-11-08 2021-12-13 2022-06-11 ant Selection ation es Contrats » au profit des U n Management TL et des autres acteurs imp liqués dans la mise en œuvr e du PDVIR dans les Villes d e Batouri, Ngaoundéré, Dou ala CM-MINHDU-261381-CS-IND V / Appui de la CCP pour la v Improving Connectivity and érification de la polygonale Individual Consult Under Implement IDA / 61320 Living environment in Benef Post Limited 6,852.00 0.00 2021-12-07 2021-12-20 2021-12-12 2021-12-31 2022-01-02 2022-02-06 2022-08-05 et données topographiques ant Selection ation iciary Cities de base des travaux de la vo irie structurante de la ville d e Yaoundé (CAY 5 et CAY 7). Page 13 CM-MINHDU-266122-CS-IND Project Management, Coord V / Recrutement d’un consul Individual Consult Under Implement IDA / 61320 ination, Monitoring and Eval Post Open 30,833.00 0.00 2021-12-06 2021-12-03 2022-01-24 2022-03-31 2022-02-14 2022-03-21 2022-09-17 tant individuel chargé de l’a ant Selection ation uation ppui à la communication du PDVIR CM-MINHDU-267647-CS-IND V / RECRUTEMENT D’UN CO NSULTANT INDIVIDUEL CHA Project Management, Coord RGE DE LA TRADUCTION EN Individual Consult Under Implement IDA / 61320 ination, Monitoring and Eval Post Limited 8,393.26 0.00 2021-12-23 2021-12-14 2021-12-28 2022-01-18 2022-02-22 2022-08-21 LANGUE ANGLAISE ET/OU FR ant Selection ation uation ANÇAISE DES DOCUMENTS DU PROJET DE DEVELOPPEM ENT DES VILLES INCLUSIVES ET RESILIENTES (PDVIR) CM-MINHDU-267652-CS-IND Project Management, Coord Individual Consult Under Implement V / RENOUVELLEMENT DU C IDA / 61320 ination, Monitoring and Eval Post Direct 10,277.50 0.00 2021-12-23 2021-12-16 2022-01-02 2022-01-23 2022-02-27 2022-08-26 ant Selection ation ONTRAT D'UN CHAUFFEUR A uation LA CCP/PDVIR CM-MINHDU-268579-CS-CD Improving Connectivity and S / Recrutement d'un Consul Under Implement IDA / 61320 Living environment in Benef Post Direct Selection Direct 30,833.00 0.00 2021-12-21 2021-12-27 2021-12-31 2022-03-09 2022-03-06 2022-09-02 tant (firme) en charge de l’é ation iciary Cities valuation sociale dans la vill e de Kumba CM-MINHDU-240579-CS-IND V / Recrutement d'un Assista Project Management, Coord Individual Consult nt au Responsable en Dével IDA / 61320 ination, Monitoring and Eval Post Open 15,769.63 0.00 Signed 2021-07-30 2022-02-17 2021-09-17 2022-05-09 2021-10-08 2022-06-14 2021-11-12 2022-11-07 ant Selection oppement Urbain et Municip uation al au sein de la Cellule de Co ordination du PDVIR CM-MINHDU-299940-CS-CD S / Recrutement d'un consul Improving Connectivity and tant pour la gestion des dolé Under Implement IDA / 61320 Living environment in Benef Post Direct Selection Direct 102,775.00 0.00 2022-06-29 2022-06-22 2022-07-09 2022-09-12 2023-03-11 ances à travers un Centre d' ation iciary Cities Appel et un numéro vert dan s le cadre de la mise en œuv re des activités du PDVIR CM-MINHDU-306415-CS-IND V / Recrutement d'un Consul Strengthening Capacity for I tant pour l'appui technique Individual Consult Under Implement IDA / 61320 nclusive and Resilient Urba Post Open - National 25,694.00 0.00 2022-08-10 2022-07-28 2022-09-28 2022-10-19 2022-11-23 2023-05-22 à la préparation du program ant Selection ation n Management me pour le financement de l’ Habitat Résilient au Camero un. CM-MINHDU-331138-CS-CD Project Management, Coord S / Visibilité des activités du Under Implement IDA / 61320 ination, Monitoring and Eval Post Direct Selection Direct - National 1,713.00 0.00 2023-02-21 2023-02-14 2023-03-03 2023-05-07 2023-11-03 PDVIR à Batouri et accompa ation uation gnement les campagnes de sensibilisation CM-MINHDU-335287-CS-IND V / Recrutement d'un Consul tant individuel externe char gé de l'audit de la mise en Improving Connectivity and Individual Consult Under Implement œuvre des aspects Hygiène, IDA / 61320 Living environment in Benef Post Open - National 25,694.00 0.00 2023-01-23 2023-02-13 2023-03-13 2023-04-03 2023-05-08 2023-11-04 ant Selection ation Sécurité et Environnement ( iciary Cities HSE) au sein des chantiers d es travaux structurants du P rojet de Développement des Villes Inclusives et Résiliente s dans l CM-MINHDU-339287-CS-IND V / Recrutement d’un Audite Improving Connectivity and Individual Consult Under Implement ur Technique Individuel des IDA / 61320 Living environment in Benef Post Open - National 24,323.00 0.00 2023-02-13 2023-02-14 2023-04-03 2023-04-24 2023-05-29 2023-11-25 ant Selection ation activités du Projet de Dévelo iciary Cities ppement des Villes Inclusive s et Résilientes (PDVIR) CM-MINHDU-340636-CS-IND V / Recrutement d'un Consul Improving Connectivity and Individual Consult Under Implement tant (Consultant Individuel) IDA / 61320 Living environment in Benef Post Limited 25,694.00 0.00 2023-02-20 2023-01-18 2023-02-25 2023-03-18 2023-04-22 2023-10-19 ant Selection ation en vue de la conduite d'une iciary Cities évaluation des risques sécur itaires dans la ville de Kumb a CM-MINHDU-343991-CS-CD S / Recrutement d’un(e) Enq Improving Connectivity and uêteur/ice) Indépendant(e) d Under Implement IDA / 61320 Living environment in Benef Post Direct Selection Direct - National 6,852.00 0.00 2023-02-28 2023-03-01 2023-03-06 2023-03-06 2023-03-09 2023-03-29 ans le cadre d’une investiga ation iciary Cities tion d’une allégation d’Explo itation et Abus Sexuel (EAS), et de Harcèlement Sexuel (H S) CM-MINHDU-357159-CS-IND V / SELECTION D’UN CONSU LTANT INDIVIDUEL EN VUE D U DEPLOIEMENT D’UN SYSTE Improving Connectivity and Individual Consult Pending Impleme ME DE GESTION ELECTRONI IDA / 61320 Living environment in Benef Post Limited 6,852.00 0.00 2023-05-02 2023-05-07 2023-05-28 2023-06-26 2023-09-24 ant Selection ntation QUE DE DOCUMENT (GED) P iciary Cities OUR LA CELLULE DE COORDI NATION DU PROJET DE DEVE LOPPEMENT DES VILLES INC LUSIVES ET RESILIENTES (PD VIR) Page 14 Viet Nam: Investing and Innovating for Grassroots Service Delivery Reform PROJECT Procurement Plan (as of February 20, 2019) 1. Project information: Country: Viet Nam Borrower/Recipient: Socialist Republic of Viet Nam Project Name: Investing and Innovating for Grassroots Service Delivery Reform Project Project ID No: P161283 Project Implementing Agency: MoH and participating provinces 2. Bank’s approval date of the Procurement Plan • Original Plan: at project negotiation. • First Revision: … 3. Date of General Procurement Notice: …. 4. Period covered by this procurement plan: the first 18 months implementation I. Works and Goods and Non-Consultant Services: 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category thresholds Applicable (in US$ Remarks thresholds Remarks equivalent (in US$) ) Works RFB through ≥ 20 million – Above US$ 10 Open million International market approach RFB through ≥ 200,000 – Above US$ 10 Open National < 20 million million market approach Request for < 200,000 – None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection 1 of regulations 7.13-7.15 Goods and Non-Consulting Services RFB through ≥ 3 million – Above US$ 2 Open million International market approach RFB through ≥ 100,000 - Above US$ 2 Open National < 3 million million market approach Request for < 100,000 None Quotation Direct None No threshold; Same as for Selection meet competitive requirements selection of regulations 7.13-7.15 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 5.4 of the Procurement Regulations and the conditions specified in Annex 1 to this Procurement Plan 4. Leased assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of second hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Hands-on Expanded Implementation Support (HEIS) as specified under paragraph 3.10 and 3.11 of the Procurement Regulations: Not applicable. 7. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - construction of CHSs in Lowest Ngoc Phai, W_1_BC 440 RFB Post Q3 2020 National Evaluate Quang Bach d Cost commune (Cho Don District) 2 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Bac Can - Renovation of Lowest W_2_BC 5 CHSs in 286 RFB Post Q2 2020 National Evaluate Ngan Son d Cost District Bac Can - Lowest Renovation of W_3_BC 158 RFQ Post Q3 2020 National Evaluate 3 CHSs in Na d Cost Ri District Ha Giang - construction of CHSs in Lowest W_1_H Ngam La, 704 RFB Post Q3 2020 National Evaluate G Sung Thai d Cost (Yen Minh District) Ha Giang - - Lowest W_2_H Renovation of 440 RFB Post Q2 2020 National Evaluate G 5 CHSs in Meo d Cost Vac District Ha Giang - - Renovation of Lowest W_3_H 3 CHSs in 528 RFB Post Q3 2020 National Evaluate G Quan Ba d Cost District Son La - construction Lowest W_1_SL of 4 CHSs in 880 RFB Post Q2 2020 National Evaluate Thuan Chau d Cost District Son La - construction Lowest W_2_SL of 4 CHSs in 880 RFB Post Q3 2020 National Evaluate Luc Yen d Cost District Yen Bai- construction of CHSs in Lowest Lang Nhi, Ta W_1_YB 540 RFB Post Q3 2020 National Evaluate Xi Lang d Cost communes (Tram Tau District) Yen Bai - Lowest Renovation of W_2_YB 265 RFB Post Q2 2020 National Evaluate 4 CHSs in Yen d Cost Binh District Yen Bai - Lowest Renovation of W_3_YB 735 RFB Post Q3 2020 National Evaluate 4 CHSs in Luc d Cost Yen District 3 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hoa Binh - construction of CHS in Tan Lowest W_1_HB Son 364 RFB Post Q3 2020 National Evaluate Commune in d Cost Mai Chau District Hoa Binh - Lowest Renovation of W_2_HB 440 RFB Post Q2 2020 National Evaluate 3 CHSs in Mai d Cost Chau District Hoa Binh - Lowest Renovation of W_3_HB 295 RFB Post Q3 2020 National Evaluate 3 CHSs in Da d Cost Bac District Quang Binh - construction of 2 CHSs in Lowest W_1_Q Tan Trach, 140 RFQ Post Q3 2020 National Evaluate B Thuong Trach d Cost communes in Bo Trach District Quang Binh - Renovation of Lowest W_2_Q 4 CHSs in 194 RFQ Post Q2 2020 National Evaluate B Quang Ninh d Cost District Quang Binh - Renovation of Lowest W_3_Q 3 CHSs in 195 RFQ Post Q3 2020 National Evaluate B Quang Trach d Cost District Quang Tri - construction of 2 CHSs in Lowest Cam Tuyen, W_1_QT 300 RFB Post Q3 2020 National Evaluate Cam Chinh d Cost communes in Cam Lo District Quang Tri - Renovation of Lowest W_3_QT 3 CHSs in 466 RFB Post Q2 2020 National Evaluate Vinh Linh d Cost District Quang Ngai - construction Lowest W_1_Q of 3 CHSs in 660 RFB Post Q2 2020 National Evaluate B Binh Son d Cost District 4 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Quang Ngai - Renovation of Lowest W_1_Q 3 CHSs in 352 RFB Post Q2 2020 National Evaluate N Quang Ninh d Cost District Quang Ngai - Lowest W_2_Q Renovation of 264 RFB Post Q3 2020 National Evaluate N 3 CHSs in Tra d Cost Bong District Ninh Thuan - construction of CHS in Lowest W_1_NT Phuong Hai 119 RFQ Post Q3 2020 National Evaluate communes in d Cost Ninh Hai District Ninh Thuan - Renovation of Lowest W_2_NT 4 CHSs in 185 RFQ Post Q2 2020 National Evaluate Thuan Nam d Cost District Bac Lieu - construction of CHS in Lowest Long Dien W_1_BL 264 RFB Post Q3 2020 National Evaluate Dong A d Cost commune in Dong Hai District Bac Lieu - Lowest Renovation of W_2_BL 132 RFQ Post Q2 2021 National Evaluate 2 CHSs in Hoa d Cost Binh District Tra Vinh - construction of 2 CHSs in Lowest W_1_TV Ham Giang, 380 RFB Post Q2 2020 National Evaluate Kim Son d Cost communes in Tra Cu District Tra Vinh - Lowest Renovation of W_2_TV 332 RFB Post Q2 2020 National Evaluate 4 CHSs in Cau d Cost Ngang District Hau Giang - construction Lowest W_1_H of CHS in Mai 704 RFB Post Q3 2020 National Evaluate G Dam town in d Cost Chau Thanh District 5 Works Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Works by provinces A Component 1 - Construction/Renovations of CHS/DHC Hau Giang - Renovation of Lowest W_2_H 4 CHSs in 372 RFB Post Q2 2020 National Evaluate G Long My d Cost District Long An - construction Lowest W_1_LA of 3 CHSs in 572 RFB Post Q2 2020 National Evaluate Tan Hung d Cost District Long An - Lowest Renovation of W_2_LA 334 RFB Post Q2 2020 National Evaluate 4 CHSs in Moc d Cost Hoa District Long An - Lowest Renovation of W_3_LA 202 RFB Post Q3 2020 National Evaluate 3 CHSs in Ben d Cost Luc District Total Works 12,758 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 GeneXpert equipment Ha Giang - G_1_HG GeneXpert 34.29 DS Post Q3 2020 DS NA equipment Ye Bai - 34.29 G_1_YB GeneXpert DS Post Q3 2020 DS NA equipment Hoa Binh - 68.57 G_1_HB GeneXpert DS Post Q3 2020 DS NA equipment Quang Binh - 102.86 G_1_QB GeneXpert DS Post Q3 2020 DS NA equipment Quang Tri - 102.86 G_1_QT GeneXpert DS Post Q3 2020 DS NA equipment Quang Ngai - 205.71 G_1_QN GeneXpert DS Post Q3 2020 DS NA equipment 6 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Ninh Thuan - 137.14 G_1_NT GeneXpert DS Post Q3 2020 DS NA equipment Bac Lieu - 102.86 G_1_BL GeneXpert DS Post Q3 2020 DS NA equipment Tra Vinh - 137.14 G_1_TV GeneXpert DS Post Q3 2020 DS NA equipment Hau Giang - G_1_Hu 68.57 GeneXpert DS Post Q3 2020 DS NA G equipment Long An - 205.71 G_1_LA GeneXpert DS Post Q3 2020 DS NA equipment Total GE 1,200 Vaccine Cold Chain equipment Bac Can - 77.89 G_2_BC Vaccine Cold DS Post Q3 2020 DS NA Chain Ha Giang - 168.38 G_2_HG Vaccine Cold DS Post Q3 2020 DS NA Chain Son La - 148.91 G_2_SL Vaccine Cold DS Post Q3 2020 DS NA Chain Yen Bai - 103.09 G_2_YB Vaccine Cold DS Post Q3 2020 DS NA Chain Hoa Binh - 126.00 G_2_HB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Binh - 68.73 G_2_QB Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Tri - 59.56 G_2_QT Vaccine Cold DS Post Q3 2020 DS NA Chain Quang Ngai - 95.07 G_2_QN Vaccine Cold DS Post Q3 2020 DS NA Chain Ninh Thuan - 27.49 G_2_NT Vaccine Cold DS Post Q3 2020 DS NA Chain Bac Lieu - 27.49 G_2_BL Vaccine Cold DS Post Q3 2020 DS NA Chain Tra Vinh - 45.82 G_2_TV Vaccine Cold DS Post Q3 2020 DS NA Chain 7 Goods Estimat Expecte Contract Revie Market Evaluati Ref. ed Cost Procureme d bid (Description w by approa on No. (US$10 nt Method opening ) Bank ch Method 00) time Goods by provinces B Component 2 Hau Giang - G_2_Hu 13.75 Vaccine Cold DS Post Q3 2020 DS NA G Chain Long An - 37.80 G_2_LA Vaccine Cold DS Post Q3 2020 DS NA Chain Total VCC 1,000 DS Post Q3 2020 DS NA Total Works and 14,958 Goods 8 II. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category Applicable thresholds thresholds (in US$ Remarks Remarks (in US$, equivalent millions) ) QCBS, QBS, ≥ 300,000 Shortlist of only ≥ 1.0 million FBS, LCS National (Using the Consultants most (Firms) for appropriate contract agreed market in the PP approach) CQS (Open or < 300,000 QCBS, QBS, FBS, None limited LCS) can be competition applied for through contracts with national or value under international $300,000 market approach, specified in the PP and agreed with the Bank. Direct None No threshold; Same as for Selection of meet competitive firms requirements of selection regulations 7.13- 7.15 Individual N/A Essential ≥ 300,000 depending individual and for the Consultants on nature of assignments will positions as services be defined in the specified in Procurement the PP agreed Plan agreed with with the Bank the Bank and in line with regulations 7.34- 7.39 using the most appropriate market approach 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in 9 accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 3. Consultancy Assignments with Selection Methods and Time Schedule Consulting Services Expecte Estimate Selecti d Revie Market Ref. Description of d Cost on Proposa Remar w by approa No. Assignment (US$ Metho l k Bank ch 1000) d Submiss ion Time B. Component 2 Post Training need assessment, development 12 and revisions of C_2b_ Nationa months professional 24 IC Post Q1 2020 1 l in 3 and years management training material C_2b_ IEC and Health Nationa 200 CQS Post Q1 2020 1 promotion l Development of the Balanced 6 C_2c_ Score cards - Nationa months 12 IC Post Q1 2020 1 health l in 1 system/public year health expert Development of 6 C_2c_ the Balanced Nationa months 12 IC Post Q1 2020 2 Score cards - l in 1 clinical expert year C. Component 3 Development of decree on functions and responsibilities of District 5 man- C_3a_ Health Center Nationa months 25 CQS/IC Post Q2 2020 1 (that cover l in a Regional clinic year and CHS) for primary health care at grassroot level Evidence for tracer conditions in the project to 5 man- C_3a_ provide inputs Nationa months 25 CQS/IC Post Q2 2020 2 for l in a development of year guidelines for Primary Healthcare at 10 commune level (to replace Decision 2919/QD-BYT International Experience on e-learning for continuous training, to 3 man- C_3a_ provide inputs Nationa months 15 CQS/IC Post Q3 2020 3 for the l in 6 development of months new decree replacing decree 22/2013/TT-BYT Development and supervision of the implementation 36 of electronic man- C_3b_ health record Nationa 500 QCBS Post Q3 2020 month 1 module at l in 5 commune level years (trans district- commune), balanced score card software Design and pilot C_3b_ implementation Nationa 25 CQS/IC Post Q2 2021 2 of community l health screening Design and C_3b_ implementation Nationa 6 25 CQS/IC Post Q4 2020 3 of tools for l months clinical decision C_3b_ Nationa 6 Quality service 25 CQS/IC Post Q2 2021 4 l months C_3d_ Auditing Nationa 50 CQS Post Q2 2021 1 Service l C_3d_ Nationa Coordinator 36 IC Post Q1 2020 2 l C_3d_ Nationa Planning Expert 27 IC Post Q1 2021 3 l C_3d_ Disbursement Nationa 27 IC Post Q1 2022 4 Expert l C_3d_ Nationa FM expert 27 IC Post Q1 2023 5 l C_3d_ Procurement Nationa 27 IC Post Q1 2024 6 Expert l Total consulting services 1,082 Total Works, Goods and Consulting 16,040 Services 11 12 Annex 1 - Additional National Procurement Provisions. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 1. Open Competitive Procurement: When the Recipient uses its own national open competitive procurement arrangements as set forth in (a) Article 20 on Open Bidding of the Recipient’s Law on Procurement No. 43/2013/QH13 dated November 26, 2013 and related provisions necessary to effect the same; and (b) the Recipient’s Decree No. 63/2014/ND-CP dated June 26, 2014 Guiding Implementation of the Law on the Procurement (collectively, “National Procurement Laws”), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (i) No domestic preference over foreign bidders shall be granted to national bidders in bid evaluation, nor shall foreign bidders be asked or required to form joint ventures with or be subcontractors to national bidders in order to submit a bid. (ii) The model bidding documents (harmonized model bidding documents) agreed with the Association shall be used. (iii) No bid shall be eliminated from detailed evaluation on the basis of minor, non-substantive deviations. The evaluation of bidder’s qualifications shall be conducted separately subsequent to the technical and commercial evaluation of the bid. (iv) A bidder shall neither be required nor permitted, as a condition for award, to undertake obligations not specified in the bidding documents or otherwise to modify the bid as originally submitted. (v) No bid shall be rejected on the basis of a comparison with the employer’s estimate and budget ceiling. (vi) The Recipient shall implement an effective mechanism allowing bidders to complaint and have their complaints handled in a timely manner. The complaints mechanism shall allow the submission of anonymous complaints. 13 PROCUREMENT Vietnam : Investing and Innovating for Grassroots Health Service Delivery PLAN General Information Country: Vietnam 2020-10-08 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161283 GPN Date: 2020-09-14 Project Name: Investing and Innovating for Grassroots Health Service Delivery Loan / Credit No: IDA / 64390 Hoa Binh Provincial Project Management Unit for GSD Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HB/XL01 / Improving and up grading commune health sat Component 1: Upgrading of Request for Quota Single Stage - One E 2021-06-0 IDA / 64390 Post Open - National 188,672.00 191,338.87 Signed 2020-11-08 2020-12-11 2020-12-16 ation Lo Son, Tan Lac District CHS Infrastructure tions nvelope 9 , Hoa Binh Province. HB-2021-XL01 / Upgrade an National Procure d revovate 2 commune Healt ment Document - Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 h stations in Lac Luong com IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 303,652.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 CHS Infrastructure nvelope lementation 7 mune and Ngoc Luong comm ss (Non Bank-SPD une, Yen Thuy district. ) HB-2021-XL2 / Upgrade and National Procure revovate 4 commune Health ment Document - stations in Tan Minh commun Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 289,044.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 e; Tan Pheo commune; Dong CHS Infrastructure nvelope lementation 7 ss (Non Bank-SPD Chum commune; Giap Dat co ) mmune, Yen Thuy district National Procure HB-2021-XL3 / Construct the ment Document - Component 1: Upgrading of Request for Quota Single Stage - One E Pending Imp 2022-05-1 commune health station of D IDA / 64390 Post Open - National 1 Envelope proce 189,460.00 0.00 2021-10-20 2021-11-12 CHS Infrastructure tions nvelope lementation 1 ong Nghe, Da Bac district ss (Non Bank-SPD ) National Procure HB-2021-XL4 / Upgrade and ment Document - revovate 2 commune Health Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 284,146.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 stations in Mai Ha commune CHS Infrastructure nvelope lementation 7 ss (Non Bank-SPD and Chieng Chau commune, ) Mai Chau district National Procure HB-2021-XL5 / Upgrade and ment Document - Component 1: Upgrading of Request for Quota Single Stage - One E Pending Imp 2022-05-1 renovate the commune healt IDA / 64390 Post Open - National 1 Envelope proce 189,722.00 0.00 2021-10-20 2021-11-12 CHS Infrastructure tions nvelope lementation 1 h station of Hang Kia, Mai Ch ss (Non Bank-SPD au district ) HB-2021-XL6 / Upgrade and National Procure renovate 2 commune health ment Document - Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 station of Thanh Nong, Lac T IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 233,151.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 CHS Infrastructure nvelope lementation 7 huy district and Phu Vinh co ss (Non Bank-SPD mmune, Tan Lac district ) National Procure HB-2021-XL7 / Upgrade and ment Document - Component 1: Upgrading of Request for Quota Single Stage - One E Pending Imp 2022-05-1 renovate the commune healt IDA / 64390 Post Open - National 1 Envelope proce 168,511.00 0.00 2021-10-20 2021-11-12 CHS Infrastructure tions nvelope lementation 1 h station of Mien Doi, Lac So ss (Non Bank-SPD n district ) National Procure HB-2021-XL8 / Construct the ment Document - Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 commune health station of D IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 357,971.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 CHS Infrastructure nvelope lementation 7 inh Cu, Lac Son district ss (Non Bank-SPD ) National Procure HB-2021-XL9 / Construct the ment Document - Component 1: Upgrading of Single Stage - One E Pending Imp 2022-07-0 commune health station of M IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 214,914.00 0.00 2021-10-20 2021-10-20 2021-11-19 2021-12-03 2021-12-09 CHS Infrastructure nvelope lementation 7 y Hoa, Kim Boi district ss (Non Bank-SPD ) HB-2022-XL1 / Upgrade and National Procure revovate 3 commune Health ment Document - Component 1: Upgrading of Single Stage - One E Under Imple 2023-08-0 stations in Suoi Nanh commu IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 399,000.00 0.00 2022-09-14 2022-10-10 2022-09-14 2022-10-14 2022-10-10 2022-10-24 2022-11-16 2022-10-28 CHS Infrastructure nvelope mentation 4 ne; Hao Ly commune; Muong ss (Non Bank-SPD Tuong commune, Da Bac dist ) rict HB-2022-XL2 / Upgrade and National Procure revovate 3 commune Health ment Document - Component 1: Upgrading of Single Stage - One E Under Imple 2023-08-0 stations in Kim Son commun IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 320,924.00 0.00 2022-09-14 2022-10-10 2022-09-14 2022-10-14 2022-11-10 2022-10-24 2022-11-15 2022-10-28 CHS Infrastructure nvelope mentation 4 e; Hop Dong commune; Lien ss (Non Bank-SPD Hoa commune, Lac Thuy dis ) trict HB-2022-XL3 / Upgrade and National Procure revovate 2 commune Health ment Document - Component 1: Upgrading of Request for Quota Single Stage - One E Under Imple 2023-05-2 stations in Xuan Phong com IDA / 64390 Post Open - National 1 Envelope proce 191,015.00 0.00 2022-09-15 2022-10-14 CHS Infrastructure tions nvelope mentation 2 mune, Cao Phong district; Ph ss (Non Bank-SPD ong Phu commune, Tan Lac d ) istrict. National Procure HB-2022-XL4 / Upgrade and ment Document - revovate 2 commune Health Component 1: Upgrading of Single Stage - One E Under Imple 2023-08-0 IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 242,994.00 0.00 2022-09-14 2022-10-10 2022-09-14 2022-10-14 2022-11-10 2022-10-24 2022-11-21 2022-10-28 stations in Phuc San commun CHS Infrastructure nvelope mentation 4 ss (Non Bank-SPD e; Bao La commune, Mai Cha ) u district HB-2022-XL6 / Upgrade and National Procure revovate 3 commune Health ment Document - Component 1: Upgrading of Single Stage - One E Under Imple 2023-08-0 stations in Phuc Tuy commun IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 380,190.00 0.00 2022-09-14 2022-10-07 2022-09-14 2022-10-14 2022-11-10 2022-10-24 2022-12-01 2022-10-28 CHS Infrastructure nvelope mentation 4 e; Chi Thien commune; Phu L ss (Non Bank-SPD uong commune, Lac Son dist ) rict HB-2022-XL7 / Upgrade and National Procure revovate 3 commune Health ment Document - Component 1: Upgrading of Single Stage - One E Under Imple 2023-08-0 stations in Binh Hem commu IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 346,015.00 0.00 2022-09-14 2022-10-07 2022-09-14 2022-10-14 2022-11-10 2022-10-24 2022-11-21 2022-10-28 CHS Infrastructure nvelope mentation 4 ne; An Nghia commune; Ngo ss (Non Bank-SPD c Son commune, Lac Son dist ) rict National Procure HB-2022-XL5 / Construct the ment Document - Component 1: Upgrading of Request for Quota Single Stage - One E Under Imple 2023-05-2 commune health station of T IDA / 64390 Post Open - National 1 Envelope proce 192,126.00 0.00 2022-09-15 2022-10-14 CHS Infrastructure tions nvelope mentation 2 an Son, Mai Chau district ss (Non Bank-SPD ) National Procure HB-2023-XL1 / Construct the ment Document - Component 1: Upgrading of Single Stage - One E Pending Imp 2024-02-1 commune health station of T IDA / 64390 Post Request for Bids Open - National 1 Envelope proce 223,194.00 0.00 2023-06-02 2023-06-02 2023-07-02 2023-07-12 2023-07-19 CHS Infrastructure nvelope lementation 4 huong Coc, Lac Son district ss (Non Bank-SPD ) GOODS Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Improving the HB-2022-TBYT1 / Supply dia Single Stage - One E Under Imple IDA / 64390 Readiness of CHS to Manage Post Request for Bids Open - National 881,400.00 0.00 2022-11-15 2022-11-18 2022-11-15 2022-12-15 2022-12-19 2022-12-23 2022-12-27 2023-05-26 gnostic imaging equipment nvelope mentation Tracer Conditions HB-2022-TBYT2 / Supply of e Component 2: Improving the Single Stage - One E xamination equipment and ot IDA / 64390 Readiness of CHS to Manage Post Request for Bids Open - National 627,220.00 0.00 Canceled 2022-11-15 2022-11-15 2022-12-15 2022-12-23 2022-12-27 2023-05-26 nvelope her medical equipment Tracer Conditions HB-2022-TBYT2-2 / Supply of Component 2: Improving the Single Stage - One E Pending Impl examination equipment and IDA / 64390 Readiness of CHS to Manage Post Request for Bids Open - National 640,000.00 0.00 2022-12-28 2022-12-28 2023-02-06 2023-03-08 2023-03-20 2023-08-17 nvelope ementation other medical equipment Tracer Conditions NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) Project information: Albania, Regional and Local Roads Connectivity Project (RLRCP), P163239 Project Implementation agency: Albanian Development Fund Date of the Procurement Plan: May 25, 2018 Period covered by this Procurement Plan: September 2018 - December 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”, July 2016, (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitutes the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Law article no. 30, 36 & 38 and National Procurement Regulations Article no. 3, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts; e. contracts with an appropriate allocation of responsibilities, risks, and liabilities; f. publication of contract award information; g. rights for the Bank to review procurement documentation and activities; h. an effective complaints mechanism; and i. maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables - Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables - Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) - Not Applicable. I. Works. 1. Prior Review Threshold: Procurements subject to Prior Review by the Bank in accordance with Bank Guidance "Thresholds for procurement approaches and methods by country" and procurement Risk Ratings: Procurement Contract Value Bank Prior No. Method (US$) Review All ≥US$15 1 RFB/International ≥5,000,000 million contracts 2 RFB/National <5,000,000 3 RFQ/National ≤200,000 4 DS n.a. All 2. Pre-qualification. Bidders for RFB (Pre-qualification) shall be prequalified in accordance with the provisions of Procurement Regulations for IPF Borrowers issued in July 2016. 3. Reference to (if any) Project Operational Manual: Project Operational Manual for World Bank Loan 8850-AL, Project ID Number: P163239 “Regional and Local Roads Connectivity Project”, date August 30, 2018, issued by ADF. 4. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] Not applicable. 5. Summary of the Procurement Packages planned during project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Domesti Estimat Review c N Descripti ed Cost Packag by Bank Comme Prefere o. on US$ es (Prior / nts nce(yes/ million Post) no) Summary Works Procurem 1 30.104 2 No Prior ent Internatio nal Summary Works Procurem 2 7.236 1 No Post ent Internatio nal Summary Works 3 Procurem 7.685 2 No Post ent National II. Selection of Consultants 1. Prior Review Threshold: Procurements subject to Prior Review by the Bank in accordance with Bank Guidance "Thresholds for procurement approaches and methods by country" and procurement Risk Ratings: Procurement Contract Value Bank Prior No. Method (US$) Review - QCBS, QBS, FBS, All ≥US$2 million 1 LCS, and CQS - ≥ 300,000 contracts International IC - International All ≥US$400,000 2 ≥ 300,000 contracts 3 DS n.a. All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 N Description of Estimate Review o. Assignment d Cost Package by Bank Comme US$ s (Prior / nts million Post) Summary of 1 consultancy 1.2 1 Prior QCBS services Summary of 2 consultancy 1.45 4 Post QCBS services Summary of 3 consultancy 0.23 2 Post CQS services III. Goods and non-consulting services. No goods or non-consulting services are planned. PROCUREMENT Albania : Regional and Local Roads Connectivity PLAN General Information Country: Albania 2018-09-12 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163239 GPN Date: 2018-05-25 Project Name: Regional and Local Roads Connectivity Loan / Credit No: IBRD / 88500 Albanian Development Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AL-ADF-79162-CW-RFB / Rec Component 1 - Accessibility I Open - Internationa Single Stage - One E 2020-05-0 onstruction of the road "Qafe IBRD / 88500 Post Request for Bids 7,236,000.00 0.00 Canceled 2018-10-22 2019-01-14 2019-01-31 2018-10-29 2019-03-18 2019-04-18 2019-05-06 mprovement l nvelope 6 Thore - Theth", Shkoder AL-ADF-79179-CW-RFB / Rec Component 1 - Accessibility I Single Stage - One E 2020-12-2 onstruction of the road in the IBRD / 88500 Post Request for Bids Open - National 6,685,000.00 0.00 Canceled 2019-05-20 2019-09-05 2019-09-20 2019-06-20 2019-11-05 2019-12-05 2019-12-23 mprovement nvelope 3 second year * AL-ADF-79175-CW-RFB / Rec Component 1 - Accessibility I Open - Internationa Single Stage - One E 3,430,803.8 2019-11-1 onstruction of the road "Pogr IBRD / 88500 Prior Request for Bids 5,569,000.00 Signed 2018-10-22 2018-12-03 2018-12-04 2019-01-22 2019-01-22 2019-02-21 2019-04-17 2019-03-12 2019-05-27 mprovement l nvelope 2 2 adec-Tushemisht" AL-ADF-79190-CW-RFB / Rec Component 1 - Accessibility I Open - Internationa Single Stage - One E 24,535,000.0 2020-11-2 IBRD / 88500 Prior Request for Bids 0.00 Canceled 2019-05-02 2019-07-20 2019-08-07 2019-05-03 2019-09-23 2019-10-23 2019-11-20 onstruction of the road "Fier - mprovement l nvelope 0 0 Seman" AL-ADF-105310-CW-RFB / Re Component 1 - Accessibility I Single Stage - Two E 2021-04-0 construction of the road in th IBRD / 88500 Post Request for Bids Open - National 6,685,000.00 0.00 Canceled 2019-11-01 2019-12-02 2020-01-17 2020-04-03 mprovement nvelope 3 e second year * AL-ADF-105319-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - Two E 6,588,841.6 2020-08-1 construction of the road "Qaf IBRD / 88500 Post Request for Bids 7,236,000.00 Signed 2019-03-11 2019-03-13 2019-04-01 2019-05-20 2019-05-03 2019-08-12 2019-07-09 mprovement l nvelope 0 2 e Thore - Theth", Shkoder AL-ADF-121538-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - Two E 15,124,000.0 2021-06-1 construction of the road "Fier IBRD / 88500 Prior Request for Bids 0.00 Canceled 2019-07-19 2019-07-29 2019-07-25 2019-07-30 2019-09-13 2019-09-13 2019-10-31 2019-12-13 mprovement l nvelope 0 3 -Seman", Lot I AL-ADF-79184-CW-RFB / Roa Component 1 - Accessibility I Single Stage - Two E 2022-01-2 IBRD / 88500 Post Request for Bids Open - National 1,000,000.00 0.00 Signed 2020-08-03 2022-05-19 2020-09-01 2020-10-15 2022-07-04 2020-12-05 2022-07-25 2021-01-20 d safety improvements works mprovement nvelope 0 AL-ADF-125738-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - Two E 5,780,441.0 2021-01-0 construction of the road “Gus IBRD / 88500 Post Request for Bids 9,628,800.00 Signed 2019-08-20 2019-08-05 2019-08-20 2019-10-10 2019-09-20 2019-12-02 2019-10-30 2020-01-07 2019-12-04 mprovement l nvelope 0 7 mar – Kuc” AL-ADF-128704-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - Two E Under Imple 2020-08-1 construction of the road Lekd IBRD / 88500 Post Request for Bids 5,132,700.00 0.00 2019-09-16 2019-09-11 2019-09-21 2019-09-12 2019-11-02 2019-10-30 2020-01-15 2019-11-22 2020-02-19 mprovement l nvelope mentation 7 ush-Bence-Tepelene, Lot 2 AL-ADF-180287-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - One E 10,000,000.0 4,474,685.1 2021-10-2 construction of the road "Ros IBRD / 88500 Post Request for Bids Signed 2020-07-01 2020-12-10 2020-07-06 2021-01-26 2020-08-20 2021-01-27 2020-09-19 2021-02-14 2020-10-25 2021-03-13 mprovement l nvelope 0 6 5 kovec Poshnje" AL-ADF-180292-CW-RFB / Re Component 1 - Accessibility I Open - Internationa Single Stage - One E 4,467,343.0 2022-08-2 habilitation of secondary roa IBRD / 88500 Post Request for Bids 9,899,831.00 Signed 2021-04-20 2021-04-13 2021-05-03 2021-04-15 2021-06-17 2021-05-31 2021-07-17 2021-06-16 2021-08-20 2021-07-28 mprovement l nvelope 0 0 d in touristic area Plepa- Gole m AL-ADF-225648-CW-RFB / Co Component 1 - Accessibility I Single Stage - One E 2021-12-0 nstruction of bridge no. 5, Ho IBRD / 88500 Post Request for Bids Open - National 714,468.00 0.00 Canceled 2021-04-14 2021-04-13 2021-04-14 2021-04-15 2021-05-31 2021-06-30 2021-08-06 mprovement nvelope 6 xhare, Fier – Seman Road Request for Bids - AL-ADF-230863-CW-RFB / Co Component 1 - Accessibility I Single Stage - One E Small Works SPD 2,033,178.4 2021-12-1 nstruction of bridge no. 2, k IBRD / 88500 Post Request for Bids Open - National 2,711,566.00 Signed 2021-04-25 2021-04-22 2021-04-30 2021-05-24 2021-06-11 2021-06-03 2021-07-11 2021-06-14 2021-08-15 2021-07-30 mprovement nvelope (1 envelope proce 0 5 m 7+500, Fier – Seman Road ss) Request for Bids - AL-ADF-262864-CW-RFB / Co Component 1 - Accessibility I Open - Internationa Single Stage - One E Small Works SPD Under Imple 2022-09-1 nstruction of the road Pograd IBRD / 88500 Post Request for Bids 7,618,000.00 0.00 2021-11-19 2021-12-20 2021-11-24 2021-12-20 2022-01-05 2022-02-10 2022-02-04 2022-03-11 mprovement l nvelope (1 envelope proce mentation 1 ec-Tushemisht-Dogane, Lot 2 ss) AL-ADF-345484-CW-RFB / Re Request for Bids - habilitation of Road “Spille, G Component 1 - Accessibility I Open - Internationa Single Stage - One E Small Works SPD 2024-04-0 uri i lëmuar” to “Hauzi i Vilëb IBRD / 88500 Post Request for Bids 8,500,000.00 0.00 Signed 2023-03-20 2023-03-08 2023-03-24 2023-03-08 2023-05-08 2023-04-28 2023-06-07 2023-05-02 2023-07-06 mprovement l nvelope (1 envelope proce 1 ashtovës” and Road “Vath Ko ss) reshi, Lushnja ring Road GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AL-ADF-275186-GO-RFB / De velopment of a Regional and Component 2 - Capacity Buil Single Stage - One E IBRD / 88500 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2022-01-30 2022-02-05 2022-03-19 2022-04-18 2022-05-23 2022-12-23 Local Road Network Databas ding for Municipalities nvelope e, Assessment and Prioritizati on of Investments NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 AL-ADF-71841-CS-CQS / Sup Component 1 - Accessibility I Consultant Qualifi ervision services for the road IBRD / 88500 Post Limited 200,000.00 349,300.93 Signed 2018-09-25 2018-09-25 2018-10-25 2018-12-19 2018-12-21 2019-04-30 2019-01-30 2019-05-27 2019-09-30 mprovement cation Selection "Pogradec-Tushemisht" AL-ADF-79182-CS-QCBS / Su Component 1 - Accessibility I Quality And Cost- Open - Internationa pervision services for roads r IBRD / 88500 Prior 1,200,000.00 863,873.00 Signed 2018-11-22 2018-12-13 2019-01-07 2019-02-25 2019-06-12 2019-04-15 2019-07-26 2019-05-15 2019-10-10 2019-06-25 2020-03-20 2019-07-22 2020-04-17 2022-07-24 mprovement Based Selection l econstruction (approx. 45 km ) AL-ADF-79185-CS-QCBS / Co nsultancy services for identifi Component 1 - Accessibility I Quality And Cost- cation and supervision of pot IBRD / 88500 Post Open - National 200,000.00 166,650.00 Signed 2019-04-01 2019-04-01 2019-04-25 2019-06-12 2019-06-06 2019-07-29 2019-07-25 2019-08-29 2019-08-15 2019-09-18 2019-09-18 2019-10-18 2019-10-30 2020-03-18 mprovement Based Selection ential road safety interventio ns and road safety inspection s AL-ADF-79188-CS-CQS / Imp Component 3 - Implementati Consultant Qualifi Pending Impleme IBRD / 88500 Post Open - National 30,000.00 0.00 2022-04-15 2022-05-09 2022-06-18 2022-09-09 2022-10-05 2022-12-05 act Evaluation on Management Support cation Selection ntation AL-ADF-79183-CS-QCBS / De Component 1 - Accessibility I Quality And Cost- Pending Impleme sign services for road constru IBRD / 88500 Post Open - National 250,000.00 0.00 2020-02-03 2020-03-04 2020-04-15 2020-06-01 2020-07-01 2020-07-20 2020-09-01 2021-03-01 mprovement Based Selection ntation ction/reconstruction* AL-ADF-79186-CS-QCBS / Co nsultancy services for Buildin Component 2 - Capacity Buil Quality And Cost- Open - Internationa IBRD / 88500 Post 500,000.00 0.00 Canceled 2020-02-03 2020-02-26 2020-04-15 2020-06-01 2020-07-01 2020-07-17 2020-09-01 2021-03-01 g Municipal Capacity to Mana ding for Municipalities Based Selection l ge and Maintain their Road N etworks AL-ADF-79187-CS-QCBS / Co Component 2 - Capacity Buil Quality And Cost- Open - Internationa nsultancy services for Buildin IBRD / 88500 Post 500,000.00 0.00 Canceled 2020-02-03 2020-02-26 2020-04-15 2020-06-01 2020-07-01 2020-07-17 2020-09-01 2021-03-01 ding for Municipalities Based Selection l g New Rural Economies AL-ADF-259192-CS-CQS / De sign for construction of Road Component 1 - Accessibility I Consultant Qualifi IBRD / 88500 Post Open - National 250,000.00 248,880.00 Signed 2021-11-01 2021-11-18 2021-11-22 2022-01-05 2022-02-02 2022-02-04 2022-03-10 2022-03-11 2022-03-24 2022-06-11 Prekal – Qafa e Shoshit - Lota mprovement cation Selection j and Lekbibaj – Qafa e Agrit - Nderlysaj AL-ADF-275185-CS-CQS / Su pervision of the road Pograde Component 1 - Accessibility I Consultant Qualifi Under Implement IBRD / 88500 Post Open - National 210,000.00 0.00 2022-01-30 2022-03-09 2022-02-26 2022-03-18 2022-04-11 2022-05-06 2022-04-26 2022-05-30 2022-05-31 2022-12-01 c -Tushemisht - Dogane, Lot mprovement cation Selection ation 2 and other roads AL-ADF-275187-CS-CQS / Bui lding New Rural Economies t hrough the promotion of agro Component 2 - Capacity Buil Consultant Qualifi -tourism on the Areas of 100 IBRD / 88500 Post Open - National 250,000.00 0.00 Signed 2022-03-24 2022-03-29 2022-04-20 2022-06-03 2022-06-17 2022-06-18 2022-08-15 2022-07-23 2023-02-23 ding for Municipalities cation Selection Villages of Albania by linking agricultural producers to loca l demand through local mark ets promotional activities AL-ADF-298561-CS-CQS / De velopment of a Regional and Component 2 - Capacity Buil Consultant Qualifi IBRD / 88500 Post Open - National 299,700.00 0.00 Signed 2022-06-08 2022-06-13 2022-06-24 2022-07-10 2022-07-28 2022-08-04 2022-08-29 2022-08-23 2023-10-17 Local Road Network Databas ding for Municipalities cation Selection e, Assessment and Prioritizati on of Investments AL-ADF-362722-CS-CQS / Su pervision of work for “Rehabil Component 1 - Accessibility I Consultant Qualifi Under Implement itation of Road “Spille, Guri i l IBRD / 88500 Post Limited 239,280.00 0.00 2023-05-23 2023-05-23 2023-06-06 2023-05-31 2023-07-06 2023-06-12 2023-08-10 2024-02-06 mprovement cation Selection ation ëmuar” to “Hauzi i Vilëbasht ovës” and Road “Vath Koresh i, Lushnja ring Road”. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN Project information: Higher Education for Economic Transformation Project P166415 Project Implementation agency: ARU, COSTECH, DUCE, HESLB, MJNUAT,MOCU, MUCE, MUHAS,MUST, MZUMBE, MoEST, OUT, SUA, SUZ, TCU, UDOM, UDSM Date of the Procurement Plan: Sep 28, 2021 Period covered by this Procurement Plan: Oct 2021- Oct 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: When approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. For national open competitive procurement the requirements as per National Procurement Procedure (5.4) of Bank’s Procurement Regulations will apply Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not applicable Other Relevant Procurement Information. None PROCUREMENT Tanzania : Higher Education for Economic Transformation Project PLAN General Information Country: Tanzania 2021-12-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166415 GPN Date: 2021-11-28 Project Name: Higher Education for Economic Transformation Project Loan / Credit No: IDA / 68870 University of Dar es Salaam Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TZ-UDSM-355259-CW-RFQ / Strengthening the Learning Renovation of Existing Server Request for Quota Environments and Labor Mar Request for Quota Single Stage - One E Under Imple 2023-08-1 and Termination Rooms at t IDA / 68870 Post Open - National tions (Non Bank-S 42,019.80 0.00 2023-05-02 2023-06-12 ket Alignment of Priority Pro tions nvelope mentation 1 he University of Dar-es-Salaa PD) grams m Mwalimu Julius Nyerere Ml imani Campus - Lot 9 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-UDSM-260998-GO-RFB / Strengthening the Learning Single Stage - One E Procurement of smart teachi IDA / 68870 Environments and Labor Mar Post Request for Bids Open - National 230,000.00 0.00 Canceled 2023-01-01 2023-01-06 2023-02-17 2023-03-19 2023-04-23 2023-10-20 nvelope ng aid facilities ket Alignment of Priority Pro grams TZ-UDSM-261004-GO-RFB / Strengthening the Learning Procurement of multimedia f Environments and Labor Mar Single Stage - One E IDA / 68870 Post Request for Bids Open - National 730,800.00 0.00 Canceled 2022-01-31 2022-02-05 2022-03-19 2022-04-18 2022-05-23 2022-11-19 acilities for University lecture ket Alignment of Priority Pro nvelope theatres and classrooms grams TZ-UDSM-261005-GO-RFB / Strengthening the Learning Procurement and installation Environments and Labor Mar Single Stage - One E IDA / 68870 Post Request for Bids Open - National 500,000.00 0.00 Canceled 2022-01-25 2022-01-30 2022-03-13 2022-04-12 2022-05-17 2022-11-13 of new ICT data communicat ket Alignment of Priority Pro nvelope ion networks, including Core grams , LAN, and WLAN (Wi-Fi) TZ-UDSM-260908-GO-RFB / Procure a fully fledged Marin Strengthening the Learning e vessel (with navigational a Environments and Labor Mar Single Stage - One E nd sonar system) with 30 stu IDA / 68870 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2022-01-25 2022-01-30 2022-03-13 2022-04-12 2022-05-17 2022-11-13 ket Alignment of Priority Pro nvelope dents capacity for advanced grams research, training and learnin g for Aquatic Sciences and Fi sheries at Kunduchi. TZ-UDSM-260953-GO-RFB / Strengthening the Learning Supply, install and commissi Environments and Labor Mar Single Stage - One E IDA / 68870 Post Request for Bids Open - National 260,000.00 0.00 Canceled 2022-01-13 2022-01-18 2022-03-01 2022-03-31 2022-05-05 2022-11-01 on equipment for Centre for ket Alignment of Priority Pro nvelope Climate Change . grams TZ-UDSM-260995-GO-RFB / Strengthening the Learning Procure equipment and new Environments and Labor Mar Single Stage - One E software for students with sp IDA / 68870 Post Request for Bids Open - National 300,000.00 0.00 Canceled 2022-07-01 2022-07-06 2022-08-17 2022-09-16 2022-10-21 2023-04-19 ket Alignment of Priority Pro nvelope ecial needs and re-designed grams and operationalize the existi ng software TZ-UDSM-260985-GO-RFB / Supply, installation and com Strengthening the Learning missioning of UDSM smart ca Environments and Labor Mar Single Stage - One E mpus infrastructure (Automa IDA / 68870 Prior Request for Bids Open - National 2,117,470.00 0.00 Canceled 2022-01-25 2022-01-30 2022-03-13 2022-04-12 2022-05-17 2022-11-13 ket Alignment of Priority Pro nvelope ted systems to enhance acce grams ssibility of Colleges/UDSM res ources and enhance security of facilities, equipment and s ystems) TZ-UDSM-260964-GO-RFB / Strengthening the Learning Procurement of three vehicle Environments and Labor Mar Single Stage - One E s (Toyota Land Cruiser Prado IDA / 68870 Post Request for Bids Open - National 257,500.00 0.00 Canceled 2022-01-25 2022-01-30 2022-03-13 2022-04-12 2022-05-17 2022-11-13 ket Alignment of Priority Pro nvelope TX-L) for project coordination grams activities and promotion of in dustrial linkages TZ-UDSM-260962-GO-RFQ / Strengthening the Learning Request for Quota Single Stage - One E Procurement of office furnitur IDA / 68870 Environments and Labor Mar Post Open - National 20,000.00 0.00 Completed 2022-08-06 2022-10-01 2023-03-30 2023-04-21 tions nvelope e for HEET coordinator office ket Alignment of Priority Pro s. grams TZ-UDSM-267594-GO-RFB / Strengthening the Learning Single Stage - One E Procure multimedia facilities IDA / 68870 Environments and Labor Mar Post Request for Bids Open - National 730,800.00 0.00 Canceled 2022-08-01 2023-03-21 2022-08-06 2022-12-22 2022-09-17 2022-10-17 2022-11-21 2023-05-20 nvelope for University lecture theatre ket Alignment of Priority Pro s and classrooms grams TZ-UDSM-261007-GO-RFB / Procurement and installation Strengthening the Learning of electric power stabilizatio Environments and Labor Mar Single Stage - One E Under Imple n system for running the ICT IDA / 68870 Post Request for Bids Open - National 1,000,000.00 0.00 2022-08-15 2023-01-10 2022-08-20 2023-01-10 2022-10-01 2023-03-27 2022-10-31 2023-05-13 2022-12-05 2023-06-03 ket Alignment of Priority Pro nvelope mentation Infrastructure and services; a grams nd install new ICT data com munication networks, includi ng Core, LAN, and WLAN (Wi- Fi) at UDSM TZ-UDSM-260956-GO-RFQ / Procurement of computers, p Strengthening the Learning rojectors and ipads to faciliat Environments and Labor Mar Request for Quota Single Stage - One E IDA / 68870 Post Open - National 45,000.00 0.00 Signed 2022-08-25 2022-10-20 2023-04-18 e information collection repor ket Alignment of Priority Pro tions nvelope t preparations disermination grams and storage for HEET coordin ator offices. TZ-UDSM-260955-GO-RFB / Strengthening the Learning Supply, install and commissio Environments and Labor Mar Single Stage - One E Under Imple IDA / 68870 Post Request for Bids Open - National 630,000.00 0.00 2022-08-20 2022-12-08 2022-08-25 2022-12-22 2022-10-06 2023-01-23 2022-11-05 2023-03-12 2022-12-10 2023-06-08 n equipment for Technology ket Alignment of Priority Pro nvelope mentation Development and Transfer C grams entre TZ-UDSM-318648-GO-RFB / Procurement of four vehicles Strengthening the Learning (Three Toyota Land Cruiser P Environments and Labor Mar Single Stage - One E IDA / 68870 Post Request for Bids Open - National 307,500.00 0.00 Signed 2022-10-14 2022-12-08 2022-10-19 2022-12-11 2022-11-30 2023-01-16 2022-12-30 2023-02-10 2023-02-03 2023-08-02 rado TX-L and one Toyota Pic ket Alignment of Priority Pro nvelope kup) for project coordination grams activities and promotion of in dustrial linkages Page 1 TZ-UDSM-331314-GO-RFB / Strengthening the Learning Single Stage - One E Procurement of equipment fo IDA / 68870 Environments and Labor Mar Post Request for Bids Open - National 220,000.00 0.00 Signed 2022-12-30 2022-12-15 2023-01-04 2022-12-19 2023-02-06 2023-01-16 2023-03-08 2023-02-10 2023-03-31 2023-06-29 nvelope r students with special needs ket Alignment of Priority Pro at SENU-SoED grams TZ-UDSM-337340-GO-RFQ / Supply, installation and com Project Coordination and Ma Request for Quota Single Stage - One E Under Imple missioning of internet and vo IDA / 68870 Post Limited 5,500.00 0.00 2023-01-25 2023-02-08 2023-03-08 2023-04-07 nagement tions nvelope mentation ice connectivity for HEET PIU office and boardroom at UDS M Mlimani Campus TZ-UDSM-349905-GO-RFQ / Procurement, supply and inst allation of ICT devices for HE Strengthening the Learning ET public relations and comm Environments and Labor Mar Request for Quota Single Stage - One E Under Imple IDA / 68870 Post Limited 40,000.00 0.00 2023-03-28 2023-05-11 2023-05-07 2023-06-21 unication unit, management ket Alignment of Priority Pro tions nvelope mentation and information and support grams desk for students with specia l needs unit at UDSM MJKN Ml imani Campus TZ-UDSM-267594-GO-RFB-2 / Supply, Installation, Testing , Training and Commissionin Strengthening the Learning g of Multimedia facilities for t Environments and Labor Mar Single Stage - One E Under Imple IDA / 68870 Post Request for Bids Open - National 730,800.00 0.00 2023-03-22 2023-03-27 2023-03-22 2023-03-27 2023-04-21 2023-05-11 2023-05-05 2023-06-02 2023-09-30 he University of Dar es Salaa ket Alignment of Priority Pro nvelope mentation m lecture Halls. Lot 1: Dar-es grams -Salaam Campuses, Lot 2: Do doma MRI Campus and Lot 3: Zanzibar IMS Campus TZ-UDSM-356502-GO-RFQ / Procurement, installation and Strengthening the Learning commissioning of Cooling Sy Environments and Labor Mar Request for Quota Single Stage - One E Under Imple IDA / 68870 Post Open - National 36,580.00 0.00 2023-05-02 2023-06-12 2023-08-11 stems for Server rooms UCC ket Alignment of Priority Pro tions nvelope mentation and Hall 5 at Mwalimu Julius grams Kambarage Nyerere Mlimani Campus - Lot 7 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-UDSM-260984-CS-QCBS / Procure consultant to re-desi Strengthening the Learning gn and operationalize special Environments and Labor Mar Quality And Cost- Open - Internationa IDA / 68870 Post 475,000.00 0.00 Canceled 2022-01-25 2022-02-15 2022-03-31 2022-04-28 2022-05-28 2022-07-02 2022-08-06 2023-08-06 software and mobile applicati ket Alignment of Priority Pro Based Selection l ons for special needs staff an grams d students for digital inclusin ess. TZ-UDSM-306201-CS-QCBS / Consultant for conducting En vironmental and Social Impa Strengthening the Learning ct Assessment (ESIA) for con Environments and Labor Mar Consultant Qualifi IDA / 68870 Post Open - National 122,500.00 0.00 Signed 2022-07-29 2022-09-23 2022-08-19 2022-10-22 2022-10-02 2023-01-10 2022-11-01 2023-03-09 2022-12-06 2023-06-04 struction of buildings: Packag ket Alignment of Priority Pro cation Selection e 1 (MJN Mlimani, Kijitonyam grams a and Kunduchi; and IMS-Zan zibar campuses), Package 2 ( UDSM-Lindi Campus) TZ-UDSM-260899-CS-QCBS / Consultant for conducting En vironmental and Social Impa Strengthening the Learning ct Assessment (ESIA) for: Pac Environments and Labor Mar Consultant Qualifi kage 1 (Office buildings at D IDA / 68870 Post Open - National 138,000.00 0.00 Canceled 2022-02-28 2022-02-05 2022-03-21 2022-05-04 2022-06-03 2022-07-08 2023-01-04 ket Alignment of Priority Pro cation Selection SM (Main, Kijitonyama and K grams unduchi campuses), Package 2 (office and Hostels at Lindi and Zanzibar) and package 3 (Hostels at DSM) TZ-UDSM-260906-CS-QCBS / Design, preparation of biddin g documents and cost estima Strengthening the Learning tes and supervision of renova Environments and Labor Mar Quality And Cost- Open - Internationa tion of existing buildings and IDA / 68870 Prior 1,386,545.00 0.00 Canceled 2022-08-20 2022-09-10 2022-10-24 2022-11-21 2022-12-21 2023-01-25 2023-03-01 2024-02-29 ket Alignment of Priority Pro Based Selection l construction of buildings. Pac grams kage 1 (hostels, academic an d Office Buildings-DSM) and Package 2 (UDSM-Lindi and I MS-Zanzibar) TZ-UDSM-318645-CS-QCBS / Provision of consultancy serv ices for design, preparation o Strengthening the Learning f bidding documents, cost est Environments and Labor Mar Quality And Cost- Open - Internationa Under Implement IDA / 68870 Prior 1,040,000.00 0.00 2022-10-03 2022-11-17 2022-10-24 2022-12-06 2022-12-07 2023-05-15 2023-01-18 2023-06-19 2023-02-17 2023-03-24 2023-04-28 2024-04-27 imates and supervision of Pa ket Alignment of Priority Pro Based Selection l ation ckage 1 projects (renovation grams and construction buildings an d related infrastructure at Da r es Salaam campuses) TZ-UDSM-318646-CS-QCBS / Provision of consultancy serv ices for design, preparation o Strengthening the Learning f bidding documents and cost Environments and Labor Mar Quality And Cost- Open - Internationa Under Implement estimates and supervision of IDA / 68870 Prior 1,000,000.00 0.00 2022-10-03 2022-11-15 2022-10-24 2022-12-06 2022-12-07 2023-05-15 2023-01-18 2023-06-19 2023-02-17 2023-03-24 2023-04-28 2024-04-27 ket Alignment of Priority Pro Based Selection l ation Package 2 projects (construc grams tion of buildings and related i nfrastructure for IMS – Zanzi bar, Ngongo – Lindi and Liku nja – Ruangwa campuses TZ-UDSM-341921-CS-QCBS / Procurement of consultant fo Strengthening the Learning r reviewing designs and supe Environments and Labor Mar Quality And Cost- rvision of construction of aca IDA / 68870 Post Open - National 326,850.00 0.00 Canceled 2023-03-01 2023-03-29 2023-03-31 2023-05-15 2023-05-22 2023-06-05 2023-06-26 2023-07-31 2024-07-30 ket Alignment of Priority Pro Based Selection demic buildings, administrati grams on buildings, laboratories an d students' hostels for UDSM- Kagera Campus Page 2 TZ-UDSM-341921-CS-QCBS- 2 / Provision of Consultancy S Strengthening the Learning ervices for Design Review an Environments and Labor Mar Quality And Cost- Open - Internationa Under Implement d Supervision of Construction IDA / 68870 Post 400,000.00 0.00 2023-05-31 2023-05-28 2023-06-30 2023-06-06 2023-08-14 2023-08-16 2023-08-30 2023-09-15 2023-10-20 2025-04-30 ket Alignment of Priority Pro Based Selection l ation of Package 3 Project (Constru grams ction of New Buildings and R elated Infrastructure for Kage ra Campus) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-UDSM-261009-CS-CDS / Strengthening the Learning Hire Technical Assistants (Pro Environments and Labor Mar Individual Consult IDA / 68870 Post Open 45,000.00 0.00 Signed 2022-02-18 2022-02-18 2022-04-08 2022-09-02 2022-04-29 2022-11-04 2022-06-03 2022-11-30 curement Specialist ) throug ket Alignment of Priority Pro ant Selection h National Market Approach grams Page 3 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya 2020-01-24 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000 Turkana County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-TURKANA COUNTY-15513 0-CW-RFB / Construction of t Supporting County Communi Single Stage - One E 2020-09-2 IDA / 59000 Post Request for Bids Open - National 980,000.00 421,979.87 Completed 2020-01-22 2020-04-20 2020-01-27 2020-02-03 2020-05-06 2020-02-10 2020-05-25 2020-02-24 2020-06-26 he proposed KAPU Multi-com ty-Led Development nvelope 1 munity investment project KE-TURKANA COUNTY-17737 6-CW-RFB / Construction of t Supporting Community-Driv Single Stage - One E 2021-12-0 he proposed Losajait multi-co IDA / 59000 Post Request for Bids Open - National 442,000.00 276,297.68 Signed 2020-06-05 2020-07-13 2020-06-12 2020-06-19 2020-08-07 2020-06-26 2020-09-07 2020-08-02 2020-10-06 en Development nvelope 2 mmunity investment project i n Turkana west sub location KE-TURKANA COUNTY-17737 7-CW-RFB / Construction of t Supporting Community-Driv Single Stage - One E 2021-10-2 he proposed Lopeduru multi- IDA / 59000 Post Request for Bids Open - National 423,000.00 0.00 Canceled 2020-06-09 2020-06-14 2020-06-19 2020-06-26 2020-08-02 en Development nvelope 6 community investment proje ct at Turkana east sub count y KE-TURKANA COUNTY-20965 Project Coordination and Ma Request for Quota Single Stage - One E 2021-04-1 9-CW-RFQ / Construction of I IDA / 59000 Post Limited 36,290.40 72,743.99 Completed 2020-12-20 2021-04-27 2021-01-15 2021-05-25 nagement tions nvelope 5 ct conference Room KE-TURKANA COUNTY-29842 Request for Bids - 9-CW-RFB / Construction of K Supporting County Communi Single Stage - One E Small Works SPD Under Imple 2024-01-1 achoda water pan and associ IDA / 59000 Post Request for Bids Open - National 360,000.00 0.00 2023-05-14 2023-05-19 2023-06-18 2023-07-02 2023-07-23 ty-Led Development nvelope (1 envelope proce mentation 9 ated infrastructure in Lapur ss) ward Turkana North subcoun ty. National Procure KE-TURKANA COUNTY -1773 ment Document - Supporting County Communi Single Stage - One E Pending Imp 2023-06-1 77CW-RFB-REPLACE. / LOPED IDA / 59000 Post Request for Bids Open - National 1 Envelope proce 197,085.60 0.00 2022-09-23 2022-09-28 2022-10-28 2022-11-11 2022-12-16 ty-Led Development nvelope lementation 4 URU EARTH DAM ss (Non Bank-SPD ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TURKANA COUNTY-15514 Project Coordination and Ma Request for Quota Single Stage - One E 1-GO-RFQ / Purchase of Offic IDA / 59000 Post Limited 18,000.00 16,444.03 Completed 2020-01-25 2018-05-15 2020-02-18 2018-06-09 2020-03-19 2018-06-20 nagement tions nvelope e Furniture and Fittings KE-TURKANA COUNTY-15512 Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 20,000.00 18,180.16 Completed 2020-01-25 2018-04-17 2020-02-15 2018-05-19 2020-05-15 2018-06-23 2-GO-RFQ / Refurbishment of nagement tions nvelope office KE-TURKANA COUNTY-15511 Project Coordination and Ma Request for Quota Single Stage - One E Under Imple 6-GO-RFQ / Purchase of offic IDA / 59000 Post Limited 9,225.00 0.00 2020-01-25 2020-02-20 2020-03-21 nagement tions nvelope mentation e printers and backups KE-TURKANA COUNTY-15513 Project Coordination and Ma Single Stage - One E Pending Impl 6-GO-RFQ / Purchase and deli IDA / 59000 Post Request for Bids Open - National 73,500.00 0.00 2020-01-22 2020-01-25 2020-02-01 2020-02-04 2020-02-18 2020-03-19 nagement nvelope ementation very of Project Motorcycle KE-TURKANA COUNTY-15511 7-GO-RFQ / Purchase and deli Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 58,300.00 19,436.75 Completed 2020-01-27 2019-12-19 2020-02-20 2020-01-18 2020-03-21 2020-03-05 very of instrumentation and ty-Led Development tions nvelope calibration equipment for co mp 3 KE-TURKANA COUNTY-17392 1-GO-RFQ / Supply, Delivery Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 80,000.00 69,726.43 Completed 2020-05-26 2021-04-27 2020-06-29 2021-05-25 2020-07-27 2021-06-29 and installation of Video conf nagement tions nvelope erence equipment KE-TURKANA COUNTY-15512 Project Coordination and Ma Request for Quota Single Stage - One E Pending Impl 4-GO-RFQ / Laptops (5) were IDA / 59000 Post Limited 7,500.00 0.00 2020-01-25 2020-02-20 2020-03-21 nagement tions nvelope ementation procured by the project. KE-TURKANA COUNTY-36715 8-GO-RFQ / Supply and deliv Supporting Community-Driv Request for Quota Single Stage - One E Pending Impl ery of 7 Laptops for FPO and IDA / 59000 Post Limited 28,776.00 0.00 2023-06-19 2023-08-14 2023-11-12 en Development tions nvelope ementation 4 desktops /printers and 16 laptops for S ACCOs. KE-TURKANA COUNTY-36291 Strengthening Producer Org 9-GO-RFQ / The purchase of Request for Quota Single Stage - One E IDA / 59000 anizations and Value Chain Post Limited 9,074.40 0.00 Canceled 2023-05-25 2023-07-20 2023-08-19 Laptops (7) for FPO, desktop tions nvelope Development and HP Printer for (20) SACC OS. KE-TURKANA COUNTY-36291 Strengthening Producer Org Pending Impl 4-GO-DIR / Supply and delive IDA / 59000 anizations and Value Chain Post Direct Selection Direct - National 5,807.60 0.00 2023-05-31 2023-06-05 2023-07-17 2023-10-15 ementation ry of tracking system for 12 t Development ractors. KE-TURKANA COUNTY-36289 8-GO-DIR / Supply and delive Strengthening Producer Org Pending Impl ry of operating license , soft IDA / 59000 anizations and Value Chain Post Direct Selection Direct - National 9,872.96 0.00 2023-05-31 2023-06-07 2023-07-19 2023-10-17 ementation ware technical support, integ Development ration, customization and aft er sale services. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Page 1 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TURKANA COUNTY-15511 3-NC-RFP / Undertake ESIA fo Supporting County Communi Request for Propo Single Stage - One E Pending Impl IDA / 59000 Post Limited 12,000.00 0.00 2020-01-22 2020-01-25 2020-02-01 2020-02-06 2020-02-20 2020-03-21 r Proposed KAPU Multi-comm ty-Led Development sals nvelope ementation unity investments Project CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TURKANA COUNTY-17392 2-CS-CQS / Recruitment of se Supporting County Communi Consultant Qualifi Pending Impleme IDA / 59000 Post Open - National 50,000.00 0.00 2020-06-16 2020-06-23 2020-07-07 2020-07-21 2020-09-03 2021-12-02 rvice provider for local chicke ty-Led Development cation Selection ntation n value chain extension advi sory service KE-TURKANA COUNTY-17392 7-CS-CQS / Recruitment of se Supporting County Communi Consultant Qualifi Under Implement rvice provider for Sorghum a IDA / 59000 Post Open - National 50,000.00 0.00 2020-06-16 2020-08-01 2020-06-23 2020-07-07 2020-07-14 2020-08-20 2021-12-02 ty-Led Development cation Selection ation nd cow-peas inter crop value chain extension advisory ser vices KE-TURKANA COUNTY-17392 5-CS-CQS / recruitment of ser Supporting County Communi Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Under Review 2020-06-16 2020-08-01 2020-06-23 2020-07-07 2020-07-14 2020-08-20 2021-12-02 vice provider for apiculture v ty-Led Development cation Selection alue chain extension advisor y services KE-TURKANA COUNTY-17969 3-CS-CQS / Skill Training and Strengthening Producer Org Consultant Qualifi Pending Impleme Development of beehive ent IDA / 59000 anizations and Value Chain Post Open - National 75,000.00 0.00 2020-06-19 2020-06-26 2020-07-17 2020-07-31 2020-09-13 2021-12-07 cation Selection ntation erprise to create employmen Development t opportunities and instill ent repreneul skills to youth KE-TURKANA COUNTY-25357 7-CS-CQS / to improve acces Strengthening Producer Org s to structured honey market Consultant Qualifi IDA / 59000 anizations and Value Chain Post Open - National 200,000.00 0.00 Canceled 2021-09-15 2021-10-06 2021-11-19 2021-12-19 2022-01-23 2022-07-22 , diversification of honey pro cation Selection Development duct and increased productiv ity for increased income and profitability. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TURKANA COUNTY-15514 Strengthening Producer Org 3-CS-INDV / Procurement of S Individual Consult Under Implement IDA / 59000 anizations and Value Chain Post Open 50,000.00 0.00 2020-01-22 2020-08-05 2020-02-08 2020-02-15 2020-02-29 2020-06-28 ervice Providers(SPs) for mea ant Selection ation Development t goat value chain KE-TURKANA COUNTY-15514 Strengthening Producer Org 6-CS-INDV / procurement of s Individual Consult Under Implement IDA / 59000 anizations and Value Chain Post Open 50,000.00 0.00 2020-01-22 2021-07-23 2020-02-08 2020-02-15 2020-02-29 2020-06-28 ervice providers for sorghum ant Selection ation Development cowpeas value chain KE-TURKANA COUNTY-15514 Strengthening Producer Org Individual Consult Pending Impleme 8-CS-INDV / procurement for IDA / 59000 anizations and Value Chain Post Open 50,000.00 0.00 2020-01-22 2020-02-08 2020-02-15 2020-02-29 2020-06-28 ant Selection ntation service providers for poultry Development value chain KE-TURKANA COUNTY-15515 Strengthening Producer Org Individual Consult Pending Impleme 1-CS-INDV / procurement of s IDA / 59000 anizations and Value Chain Post Open 50,000.00 0.00 2020-01-22 2020-02-08 2020-02-15 2020-02-29 2020-06-28 ant Selection ntation ervice providers for beekeepi Development ng value chain Page 2 PROCUREMENT PLAN (Textual Part) Project information: Pakistan- - Sindh Integrated Health and Population Project (P178530) Project Implementation agency: Province of Sindh Date of the Procurement Plan: April 28, 2023 Period covered by this Procurement Plan: May 2023- June 2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” ((July 2016, Revised November 2017, August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Rules 2004 Revised 2020, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Sindh Integrated Health and Population Project PLAN General Information Country: Pakistan 2023-05-05 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P178530 GPN Date: Project Name: Sindh Integrated Health and Population Project Loan / Credit No: IDA / 72370 Sindh Integrated Health and Population Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure PK-SIHPP-357656-CW-RFB / Component 1: Improving RM ment Document - Establishment Hospital Base NCAH+N services utilization Single Stage - One E Pending Imp 2024-01-2 IDA / 72370 Post Request for Bids Open - National 1 Envelope proce 1,226,923.00 0.00 2023-05-19 2023-05-24 2023-06-13 2023-06-28 2023-07-28 d Blood Bank in 4 District He and quality and support duri nvelope lementation 4 ss (Non Bank-SPD ad Quarters ng public health emergencie ) s PK-SIHPP-359379-CW-RFB / Component 1: Improving RM National Procure Rehabilitation & Upgradation NCAH+N services utilization ment Document - of 06 Regional Head Quarters Single Stage - One E Pending Imp 2024-01-2 IDA / 72370 and quality and support duri Post Request for Bids Open - National 1 Envelope proce 4,049,289.00 0.00 2023-05-19 2023-05-24 2023-06-13 2023-06-28 2023-07-28 and 02 Taluka Head Quarters nvelope lementation 4 ng public health emergencie ss (Non Bank-SPD of District SBA and 03 Region s ) al Head Quarters in District J acobabad. PK-SIHPP-359338-CW-RFB / Component 1: Improving RM Request for Bids - Re-Construction of 16 Fully D NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-01-3 amaged Basic Health Units of IDA / 72370 and quality and support duri Post Request for Bids Open - National 2,064,942.00 0.00 2023-05-26 2023-05-31 2023-06-20 2023-07-05 2023-08-04 nvelope (1 envelope proce lementation 1 District N.Feroze 07, SBA 03 ng public health emergencie ss) & Sanghar 06 During Floods. s PK-SIHPP-359376-CW-RFB / Component 1: Improving RM Request for Bids - Rehabilitation & Upgradation NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-02-2 of 15 Government Dispensari IDA / 72370 and quality and support duri Post Request for Bids Open - National 2,688,674.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 nvelope (1 envelope proce lementation 1 es and 02 Taluka Head Quart ng public health emergencie ss) ers of District Jamshoro. s PK-SIHPP-359324-CW-RFB / Component 1: Improving RM Request for Bids - Re-Construction of 12 Fully D NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-01-3 amaged Basic Health Units of IDA / 72370 and quality and support duri Post Request for Bids Open - National 1,548,707.00 0.00 2023-05-26 2023-05-31 2023-06-20 2023-07-05 2023-08-04 nvelope (1 envelope proce lementation 1 District Dadu 03, Jamshoro 0 ng public health emergencie ss) 5, Sukkur 04 During Floods. s PK-SIHPP-359378-CW-RFB / Component 1: Improving RM Request for Bids - Rehabilitation & Upgradation NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-02-2 of 13 Government Dispensari IDA / 72370 and quality and support duri Post Request for Bids Open - National 3,426,895.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 nvelope (1 envelope proce lementation 1 es, 03 Regional Head Quarter ng public health emergencie ss) s and 02 Taluka Head Quarte s rs of District Larkana. PK-SIHPP-359380-CW-RFB / Component 1: Improving RM Request for Bids - Rehabilitation & Upgradation NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-02-2 IDA / 72370 Post Request for Bids Open - National 6,958,930.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 of 11 Taluka Head Quarters i and quality and support duri nvelope (1 envelope proce lementation 1 n different Districts of Sindh. ng public health emergencie ss) s PK-SIHPP-359374-CW-RFB / Component 1: Improving RM Request for Bids - Rehabilitation & Upgradation NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-02-2 of 15 Government Dispensari IDA / 72370 and quality and support duri Post Request for Bids Open - National 3,307,347.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 nvelope (1 envelope proce lementation 1 es, 02 Regional Head Quarter ng public health emergencie ss) s and 02 Taluka Head Quarte s rs of District Dadu. PK-SIHPP-359312-CW-RFB / Component 1: Improving RM Request for Bids - Re-Construction of 12 Fully D NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-01-3 IDA / 72370 Post Request for Bids Open - National 1,548,707.00 0.00 2023-05-26 2023-05-31 2023-06-20 2023-07-05 2023-08-04 amaged Basic Health Units of and quality and support duri nvelope (1 envelope proce lementation 1 District Kamber Shahdadkot ng public health emergencie ss) During Floods. s PK-SIHPP-359355-CW-RFB / Component 1: Improving RM Request for Bids - Rehabilitation & Upgradation NCAH+N services utilization Single Stage - One E Small Works SPD Pending Imp 2024-02-2 of 04 Regional Training Instit IDA / 72370 and quality and support duri Post Request for Bids Open - National 3,679,373.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 nvelope (1 envelope proce lementation 1 utes, 03 Public Health School ng public health emergencie ss) s and 05 CMW Schools in diff s erent Districts of Sindh. PK-SIHPP-359377-CW-RFB / Component 1: Improving RM Rehabilitation & Upgradation Request for Bids - NCAH+N services utilization of 07 Government Dispensari Single Stage - One E Small Works SPD Pending Imp 2024-02-2 IDA / 72370 and quality and support duri Post Request for Bids Open - National 2,224,899.00 0.00 2023-06-16 2023-06-21 2023-07-11 2023-07-26 2023-08-25 es, 03 Regional Head Quarter nvelope (1 envelope proce lementation 1 ng public health emergencie s and 01 Taluka Head Quarte ss) s rs of District Kambar Shahda dkot. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improving RM PK-SIHPP-357664-GO-RFB / P NCAH+N services utilization Single Stage - One E Pending Impl rocurement of 10 Field Hospi IDA / 72370 Post Request for Bids Open - National 1,692,307.00 0.00 2023-05-12 2023-05-17 2023-06-06 2023-06-21 2023-07-21 2024-01-17 and quality and support duri nvelope ementation tals with all Equipment's ng public health emergencie s PK-SIHPP-357668-GO-RFB / E Component 3: Project Manag Single Stage - One E Pending Impl stablishment of IT units at PM IDA / 72370 ement, Monitoring and Evalu Post Request for Bids Open - National 1,787,636.00 0.00 2023-05-12 2023-05-17 2023-06-06 2023-06-21 2023-07-21 2024-01-17 nvelope ementation U and in Districts ation and Research PK-SIHPP-355329-GO-RFQ / Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl Procurement of IT Equipment IDA / 72370 ement, Monitoring and Evalu Post Open - National 50,680.00 0.00 2023-05-04 2023-06-17 2023-07-17 tions nvelope ementation 's for PMU ation and Research PK-SIHPP-355337-GO-RFQ / Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl Procurement of Essential Equ IDA / 72370 ement, Monitoring and Evalu Post Open - National 88,275.00 0.00 2023-05-04 2023-06-15 2023-07-30 tions nvelope ementation ipment & Office appliances f ation and Research or PMU PK-SIHPP-355460-GO-RFQ / Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl Procurement of Stationary Ite IDA / 72370 ement, Monitoring and Evalu Post Open - National 26,690.00 0.00 2023-05-04 2023-06-11 2023-06-26 tions nvelope ementation ms for newly established PM ation and Research U Office Page 1 PK-SIHPP-357643-GO-RFB / P Component 1: Improving RM rocurement of Medical Equip NCAH+N services utilization Single Stage - One E Pending Impl IDA / 72370 Post Request for Bids Open - National 1,209,164.00 0.00 2023-05-15 2023-05-20 2023-06-09 2023-06-24 2023-07-24 2024-01-20 ment's/Instruments for Reha and quality and support duri nvelope ementation bilitated Government Dispen ng public health emergencie saries for 2022-23 s PK-SIHPP-357647-GO-RFB / P Component 1: Improving RM rocurement of Medical Equip NCAH+N services utilization Single Stage - One E Pending Impl ment / Instruments for Labor IDA / 72370 and quality and support duri Post Request for Bids Open - National 556,459.00 0.00 2023-05-19 2023-05-24 2023-06-13 2023-06-28 2023-07-28 2024-01-24 nvelope ementation Rooms of Rural Health Cente ng public health emergencie rs (Referral Hospitals) 2022-2 s 3 PK-SIHPP-357660-GO-RFB / E Component 1: Improving RM stablishment of Hospital Bas NCAH+N services utilization ed Blood Bank at 04 DHQs H Single Stage - One E Pending Impl IDA / 72370 and quality and support duri Post Request for Bids Open - National 1,102,399.00 0.00 2023-05-12 2023-05-17 2023-06-06 2023-06-21 2023-07-21 2024-01-17 ospitals Kashmore @ Kandhk nvelope ementation ng public health emergencie ot, Sujawal, T Allahyar and T s M Khan to be linked with Reg ional Blood Centers PK-SIHPP-357659-GO-RFB / P Component 1: Improving RM rocurement of Medical Equip NCAH+N services utilization Single Stage - Two E IDA / 72370 Prior Request for Bids Open - National 2,172,414.00 0.00 Canceled 2023-05-29 2023-06-03 2023-06-23 2023-09-06 2024-03-04 ment's for 30 Mobile Medical and quality and support duri nvelope Vans ng public health emergencie s PK-SIHPP-360401-GO-RFB / S Component 1: Improving RM trengthening of Operation Th NCAH+N services utilization eatres, 10 bedded nurseries, Open - Internationa Single Stage - Two E Pending Impl IDA / 72370 and quality and support duri Prior Request for Bids 4,414,432.00 0.00 2023-06-23 2023-06-28 2023-08-12 2023-10-26 2024-04-23 Labor Rooms and Diagnostic l nvelope ementation ng public health emergencie Laboratories at THQs Hospita s ls (Referral Hospitals) for 202 2-23 PK-SIHPP-357657-GO-RFB / E Component 2: Strengthening stablishment of Tele Health/ demand for RMNCAH+N ser Open - Internationa Single Stage - Two E Pending Impl IDA / 72370 Prior Request for Bids 3,939,942.00 0.00 2023-05-29 2023-06-03 2023-07-18 2023-10-01 2024-03-29 Tele Medicine Centers Netwo vices including women’s em l nvelope ementation rk powerment for availing healt h services PK-SIHPP-362939-GO-DIR / P Component 3: Project Manag Pending Impl rocurement of Vehicles for P IDA / 72370 ement, Monitoring and Evalu Post Direct Selection Direct - National 486,046.00 0.00 2023-06-02 2023-06-12 2023-07-27 2024-01-23 ementation MU ation and Research Component 1: Improving RM PK-SIHPP-362942-GO-DIR / P NCAH+N services utilization Pending Impl rocurement of 30 Mobile Med IDA / 72370 Post Direct Selection Direct - National 2,793,103.00 0.00 2023-06-02 2023-06-12 2023-07-27 2024-01-23 and quality and support duri ementation ical Vans with Equipment ng public health emergencie s PK-SIHPP-362943-GO-DIR / P Component 1: Improving RM rocurement of 60 Ambulance NCAH+N services utilization Pending Impl IDA / 72370 Post Direct Selection Direct - National 3,931,033.00 0.00 2023-06-02 2023-06-12 2023-07-27 2024-01-23 s along with equipment's/inst and quality and support duri ementation ruments, fabrication for Emer ng public health emergencie gency Response s Component 1: Improving RM PK-SIHPP-362944-GO-DIR / P NCAH+N services utilization Pending Impl rocurement of 05 Mobile Lab IDA / 72370 Post Direct Selection Direct - National 1,724,138.00 0.00 2023-06-02 2023-06-12 2023-07-27 2024-01-23 and quality and support duri ementation oratories ng public health emergencie s NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SIHPP-355244-NC-RFQ / Component 1: Improving RM Hiring a Firm to Develop a Da NCAH+N services utilization Request for Quota Single Stage - One E Pending Impl IDA / 72370 Post Open - National 51,213.00 0.00 2023-04-20 2023-06-06 2023-09-04 shboard for PPP Node Health and quality and support duri tions nvelope ementation Dept Karachi ng public health emergencie s PK-SIHPP-357636-NC-RFB / H Component 3: Project Manag Single Stage - One E Pending Impl iring a Firm to Develop The M IDA / 72370 ement, Monitoring and Evalu Post Request for Bids Open - National 312,156.00 0.00 2023-05-15 2023-05-20 2023-06-09 2023-06-24 2023-07-24 2024-01-20 nvelope ementation edical Record Software (MR) ation and Research CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SIHPP-355694-CS-QCBS / Component 3: Project Manag Quality And Cost- Pending Impleme Hiring of Design, Supervision IDA / 72370 ement, Monitoring and Evalu Post Open - National 337,774.00 0.00 2023-05-12 2023-05-17 2023-06-21 2023-07-21 2023-08-05 2023-09-04 2023-10-04 2026-06-29 Based Selection ntation and Quality Assurance Firm. ation and Research INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 MINISTERE DE L’ENVIRONNEMENT REPUBLIQUE DE COTE ET DU DEVELOPPEMENT DURABLE D’IVOIRE Union-Discipline-Travail ---------------- -------------- PROJET D’INVESTISSEMENT FORESTIER Phase 2 ………………………………………. DRAFT DU PLAN DE PASSATION DES MARCHES Financement IDA Période : 2022 – 2023 Mai 2022 PLAN DE PASSATION DE MARCHÉS Page | 0 Information sur le Projet : Agence d’exécution du Projet : Date du plan de passation des marchés : Période couverte par ce plan de passation des marchés Niveau de risque évalué : Modéré Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas Page | 1 II. Fournitures, Travaux et Services Assimilés 1. Seuils d'examen préalable : Marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions du paragraphe 3.5 et suivant du Règlement de Passation des Marchés pour les emprunteurs sollicitant le Financement de Projets d’Investissements (FPI). Nouveaux Seuils de Revue a priori de la Banque Mondiale – Effectifs depuis Juillet 2016 Categories de Niveau de risque du projet marchés Risque élevé Risque Risque Risque Bas - - Substantiel - Modéré - Tout marché de Tout marché Tout marché de Tout marché … estimé égal de … estimé … estimé égal de … estimé ou supérieur à : égal ou ou supérieur à : égal ou supérieur à : supérieur à : Travaux (incluant clé à main, Fourniture et $5,000,000 $10,000,000 $15,000,000 $20,000,000 Installation, et les Partenariat Public - Privé -PPP) Biens, Système d’Information et de Services autres que $1,500,000 $2,000,000 $4,000,000 $6,000,000 les Services intellectuels 2. Préqualification : N/A1 3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : N/A 4. Référence (si nécessaire) au Manuel opérationnel de passation de marchés : N/A 5. Autres arrangements spécifiques pour la passation de marchés : Non Applicable 6. Marchés et Planning et Méthode de Passation : 1 Non Applicable Page | 2 I. Travaux, Fourniture et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions relatives aux nouveaux seuil de revue de la Banque mondiale. Contrats soumis Valeur seuil Nature des Méthode de passation à examen du marché $ dépenses de marchés préalable de US l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés en AON < 10,000,000 Tous les contrats main, Fourniture et Demande de cotation – < 200,000 de 15.000.000 $US montage au moins 3 offres et plus d’installations et Entente Directe (*) PPP) Pas de seuil 2. Fournitures, AOI ≥ 1,000,000 Tous les contrats Systèmes AON < 1,000,000 ≥ 4.000.000 $US Page | 3 d’Informations Consultation de et Services Fournisseurs à l’échelle < 100,000 autres que les Nationale - Au moins 3 services de offres Consultants Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500,000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil (*) Le justificatif de toute entente directe doit être transmis avec le PPM à la Direction des Marchés Publics pour une autorisation préalable de passer marché par cette méthode 2.2. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés :  Manuel de procédure en matière de passation des marchés Page | 4 2.3. Contrats de Travaux, fournitures et services assimilés avec Méthode de sélection et planning 2.3.1 Type de marchés : Travaux 1 2 3 4 5 6 7 8 9 Métho Préféren Examen de de Pré- ce Date de Montant (a passati qualificati national signatur Réf Contrat estimatif priori/a Commentaires on de on e e du . (Description) (en $ US) posterio march (oui/non) (oui/non contrat ri) és ) à Réhabilitation pistes 10/11/ 1 3 460 000 AON Non Non posterior 2 lots : C3.1 & C2.1 d'accès 2023 i Réhabilitation base- vies/postes de contrôle à 1 815 1/08/202 3 lots : C2.1 ; C2.2 2 FC C3 + réhabilitation AON Non Non posterior 000 3 & C3.1 base-vie pour centre i formation à Réalisation de forages et 09/06/20 3 93 400 DC Non Non posterior retenues d'eau 23 i Convention avec l’ONG N’ZI River pour la à construction de la clôture 22/05/20 Recommandations 4 740 000 SED Non N/A posterior électrique de MAFA et 23 PAD. i Besse-Boko 6 108 Sous-total travaux 400 Page | 5 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s Commande avec UNOPS pour la fourniture des véhicules de SED avec à patrouille, de transport de 2 590 20/11/202 UNOPS 3 lots : 1 SED Non N/A posterior troupes et de liaison, motos et 700 3 C2.2 ; C3.1 & i les drones, matériel de C5.1 navigation (hors-bord) à Achat de tablettes pour 49 280 03/04/202 2 DC Non Non posterior surveillance 3 i à Achat de matériel technique 44 800 03/04/202 3 DC Non Non posterior (GPS) 3 i à 4 Acquisition de carburant 495 000 DC Non Non posterior 1/06/2023 i à Achat de Tricycles 03/04/202 5 9 340 DC Non Non posterior 3 i à Achat de Petits matériels 01/06/202 6 46 700 DC Non Non posterior 3 i Page | 6 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s à Achat de sachet pour 1 809 10/08/202 7 AOI Non Non posterior pépinière des plants 600 3 i à 31/03/202 8 Achat d’ordinateurs 32 000 DC Non Non posterior 3 i à Achat de photocopieuses 12 000 10/11/202 9 DC Non Non posterior 2 i à Achat de fourniture de bureau 60 000 31/03/202 10 DC Non Non posterior 3 i Achat de consommables à 50 000 31/03/202 11 informatiques DC Non Non posterior 3 i Acquisition d'équipements de à 20 000 01/08/202 12 communication DC Non Non posterior 3 i Acquisition de matériels et à équipements pour les agents 80 000 01/08/202 13 DC Non Non posterior de surveillance 3 i Acquisition de matériel pour le à 80 000 01/08/202 14 suivi écologique DC Non Non posterior 3 i Page | 7 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s 5 379 Sous-total fourniture 420 2.3.3 Type de marchés : Services assimilés 1 2 3 4 5 6 7 8 9 Méthode Pré- Préféren Examen Date de Montant de qualific ce (a priori/a signature Réf Contrat estimatif passatio ation national posteriori du . (Description) en $ US n de (oui/non e Commentaires ) contrat marchés ) (oui/non) Recrutement d’un prestataire pour à 01/08/20 1 la production de support de 100 000 AON Non Non communication postériori 23 Convention avec les Convention avec les radios de à 01/02/20 radios locales avec 2 proximité 168 750 SED Non N/A postériori 23 recommandations PAD Recrutement d'une agence de à 01/08/20 3 80 000 DC Non Non communication postériori 23 Convention avec Care 56 000 à 01/02/20 4 International pour la mise en SED Non N/A C3.2 postériori 23 œuvre des AGR Page | 8 2.3.3 Type de marchés : Services assimilés 1 2 3 4 5 6 7 8 9 Méthode Pré- Préféren Examen Date de Montant de qualific ce (a priori/a signature Réf Contrat estimatif passatio ation national posteriori du . (Description) en $ US n de (oui/non e Commentaires ) contrat marchés ) (oui/non) Recrutement d’un prestataire pour à 15/12/202 5 l’édition et la vulgarisation des 50 000 DC Non Non Posteriori 3 PAPF Convention avec Convention avec l’OIREN pour le A 01/02/20 l’OIREN avec 6 suivi indépendant des activités du 60 000 SED Non N/A Postériori 23 recommandations projet PAD Convention avec un prestataire A 03/01/20 7 pour la fourniture de connexion 60 000 SED Non N/A Postériori 23 internet A 03/01/20 8 Entretien de matériel roulant 60 000 DC Non N/A Postériori 23 Convention avec MTN (opérateur Selon A 03/01/20 9 GSM) pour les paiements basés sur 300 000 SED Non N/A recommandations Postériori 23 les résultats PAD 934 Sous-total services assimilés 750 Page | 9 III. Sélection de Consultants 1. Seuil d'examen préalable : Nouveaux Seuils de Revue a priori de la Banque Mondiale – Effectifs depuis Juillet 2016 Catégorie de Niveau de risque du projet marchés Risque Risque Risque Risque Bas - élevé - Substantiel - Modéré - Tout marché de … Tout marché Tout marché de Tout marché estimé égal ou de … estimé … estimé égal de … estimé supérieur à : égal ou ou supérieur à : égal ou supérieur à : supérieur à : Services $500,000 $1,000,000 $2,000,000 $4,000,000 Consultant (Firmes) Consultant $200,000 $300,000 $400,000 $500,000 Individuel Nature de Méthode de passation Valeur Contrats soumis à examen dépenses de marchés seuil du préalable 2 SFQC : Sélection Fondée sur la Qualitécontrat et le Coût 3 SFQ : Sélection fondée sur la qualité $EU Consulta SFQC2, 4 SMC : Sélection SFQ3, coût au moindre SMC4, ≥ 300.000 nts SCBD5, 5 SCBD : Sélection dans le cadre d’un budget déterminé Firmes SFQC, SFQ, SMC, SCBD, 5 QC : Sélection < 300.000 Tout contrat de 2 000.000 $US QC5 basée sur les Qualifications des Consultants ou plus de d’Intérêt CI : Consultant Individuel : AMI : Avis à Manifestation Pas Selection directe seuil Page | 10 Consulta Consultant individuel ≥ 100.000 nts (AMI) Tout contrat de 400.000 $US ou plus Individuel Consultant individuel (3 < 100.000 s CV) Pas de Selection directe seuil Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. Page | 11 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) Recrutement d’un cabinet pour SFQC Posterio 31/10/20 1 600 000 Non faire l’état de lieux des FC C4 /c ri 23 Recrutement d’un cabinet pour l’ Posterio 31/10/20 2 300 000 SMC Non élaboration des EIES ri 23 Recrutement d’un cabinet pour 31/10/202 3 réaliser une étude socio- SFQC Non Priori 3 économique 3 000 000 Recrutement d’un cabinet pour Posterio 15/08/202 4 réaliser l’ Etude/analyse des 100 000 SQC Non conflits sociaux ri 3 Recrutement d’un consultant individuel pour l’ élaboration d'une Posterio 15/08/202 5 CI / AMI Non stratégie de restauration des 100 000 ri 3 moyens de subsistance Recrutement d’un cabinet pour l’ élaboration du Plan Posterio 15/08/202 6 300 000 SFQ Non d’aménagement simplifié des ri 3 forets du domaine rural Convention avec les Universités C3.1 : Convention publiques pour le Suivi scientifique Posterio 15/11/202 7 80 000 SED Non avec les universités de la régénération des sites ri 3 Publiques orpaillées C3.1 : Convention Convention avec les Universités Posterio 15/11/202 8 200 000 SED Non avec les universités publiques pour le Suivi de la ri 3 Publiques Page | 12 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) pollution des eaux et du sol des zones orpaillées Convention avec les Universités C3.1 : Convention publiques une étude sur la Posterio 15/11/202 9 200 000 SED Non avec les universités dépollution des sites orpaillées ri 3 Publiques Recrutement d’un cabinet pour une formation en agroforesterie et mise Posterio 31/10/202 10 300 000 SFQC Non en œuvre ri 2 Recrutement d’un consultant pour la production des cartes Posterio 31/10/202 11 150 000 SQC Non d'occupation des sols ri 3 Recrutement d’un prestataire pour Posterio 15/06/202 12 la mise en place de la plateforme 300 000 SFQC Non digitale de gestion E&S et MGP ri 3 Recrutement d’un cabinet d’audit Posterio 15/06/202 Publication d’AMI 13 100 000 SQC Non externe ri 3 Recrutement d’un cabinet pour une Posterio 15/09/202 14 assistance technique International 1 000 000 SFQC Non pour l’agroforesterie ri 3 Recrutement d’un bureau de 30/06/202 15 2 000 000 SFQC Non Priori supervision pour le contrôle et la 3 Page | 13 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) supervision globale , le suivi de la mise en œuvre de toutes les activités du projet exécutées par SODEFOR, OIPR et Care ainsi que l’UIAP Recrutement d’un cabinet pour le 29/09/202 16 renforcement des capacités en 8 000 000 SFQC Non Priori 3 sauvegarde environnementales 16 730 TOTAL 000 Page | 14 IV. RECAPITULATION 4.1. Financement par catégorie d’acquisition Montant Montant Commentai N° Catégorie Nombre estimatif estimatif res ordre s Contrats $ US F CFA Travaux 4 6 108 3 054 200 000 RAS 1 400 Fournitures 14 5 379 2 689 710 000 RAS 2 420 Services 9 934 467 375 000 RAS 3 Assimilés 750 Consultants 16 16 730 8 365 000 000 RAS 4 000 29 152 TOTAL 43 570 14 576 285 000 Page | 15 PROCUREMENT Cote d'Ivoire : Forest Investment Project, phase 2 PLAN General Information Country: Cote d'Ivoire 2022-11-15 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175982 GPN Date: Project Name: Forest Investment Project, phase 2 Loan / Credit No: IDA / 71870 FOREST INVESTMENT PROJECT 2 Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-FIP2-362058-CW-RFQ-202 Component 5.Project Admini Request for Quota 3 / TRAVAUX D'AMENAGEME Request for Quota Single Stage - One E Pending Imp 2023-08-2 IDA / 71870 stration, Coordination, and S Post Limited tions (Non Bank-S 157,500.00 0.00 2023-05-25 2023-06-23 NT DU BATIMENT (PARKING, tions nvelope lementation 2 afeguards PD) REZ DE CHAUSSEE, BUREAU) DU PIF 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-361718-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MATERIE IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation LS DE BURAU POUR LE PIF 2 afeguards CI-FIP2-361741-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MOBILIE IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-05-18 2023-06-16 2023-07-16 tions nvelope ementation RS DE BUREAU POUR LE PIF afeguards 2 CI-FIP2-361752-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE FOURNIT IDA / 71870 stration, Coordination, and S Post Limited 60,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation URES DE BUREAU AU PROFIT afeguards DU PIF 2 CI-FIP2-361762-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE CONSOM IDA / 71870 stration, Coordination, and S Post Limited 50,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation MABLES INFORMATIQUES AU afeguards PROFIT DU PIF 2 CI-FIP2-361767-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION DE SYSTEME Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 70,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 DE VIDEOSURVEILLANCE DES tions nvelope ementation afeguards LOCAUX AU PROFIT DU PIF 2 CI-FIP2-361787-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION DE VISIO-CO Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 40,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 NFERENCE POUR LA SALLE D tions nvelope ementation afeguards E REUNION DU PIF 2 CI-FIP2-361861-GO-DIR-202 3 / ACQUISITION DE 02 VEHIC ULES DE SURVEILLANCES ( M Component 2. Support the I INEF) /27 VEHICULES , 03 DR mplementation of Participat Pending Impl ONES , 45 GPS , 20 BOUSSOL IDA / 71870 ory Forests Management Pla Prior Direct Selection Direct - National 3,430,600.00 0.00 2023-05-22 2023-05-25 2023-06-10 2023-09-08 ementation ES ,60 MOTOS pour la SODE ns in Category 3 GFs in the FOR/ 07 VEHICULES 4X4 et 3 Cocoa Belt 0 TABLETTES , 15 GPS pour l' OIPR/ 05 VEHICULES (UCP) et 08 VEHICULES PICK UP pour l'ANDE VIA UNOPS CI-FIP2-361781-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION ET INSTALLA Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 40,000.00 0.00 2023-05-29 2023-06-27 2023-07-27 TIONS DE STORES DANS LES tions nvelope ementation afeguards LOCAUX DU PIF 2 CI-FIP2-361750-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MATERIE IDA / 71870 stration, Coordination, and S Post Limited 98,578.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation LS INFORMATIQUES AU PROFI afeguards T DU PIF 2 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-336794-NC-RFQ / Re Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl crutement d'un prestataire p IDA / 71870 stration, Coordination, and S Post Limited 70,000.00 0.00 2023-01-31 2023-02-27 2023-12-29 tions nvelope ementation our assurer le service de gar afeguards diennage CI-FIP2-337124-NC-RFQ / Re Component 5.Project Admini crutement d'un prestataire p Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-01-31 2023-02-27 2023-12-29 our assurer l'entretien des lo tions nvelope ementation afeguards caux du projet PIF 2 CI-FIP2-361961-NC-DIR-2023 / SELECTION DIRECTE AVEC Component 5.Project Admini ORANGE COTE D'IVOIRE POU Pending Impl IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 53,000.00 0.00 2023-05-26 2023-05-29 2023-06-17 2023-08-01 R LA CONNEXION FIBRE OPTI ementation afeguards QUE , EQUIPEMENTS TELECO MMUNICATIONS ET INTERNET DES LOCAUX DU PIF 2 CI-FIP2-364396-NC-DIR-2023 / FOURNITURE ET INSTALLATI Component 5.Project Admini Pending Impl ON DES LOGICIELS TOM2PRO IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 111,654.00 0.00 2023-06-02 2023-06-05 2023-06-24 2024-06-23 ementation ET TOM2PAIE AU PROFIT DU afeguards PROJET D'INVESTISSEMENT F ORESTIER 2 (PIF 2) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 CI-FIP2-326042-CS-QCBS-KR 22 / SELECTION D’UN CABINE T POUR LA CONCEPTION DE L Component 5.Project Admini Quality And Cost- Open - Internationa A PLATEFORME DIGITALE DE IDA / 71870 stration, Coordination, and S Post 305,000.00 0.00 Canceled 2022-11-14 2022-11-16 2022-11-29 2022-11-22 2022-12-19 2023-02-02 2023-02-17 2023-03-01 2023-03-13 2023-11-08 Based Selection l GESTION DE SAUVEGARDE E afeguards NVIRONNEMENTALE ET SOCI ALE ET DU MECANISME DE G ESTION DES PLAINTES DU PIF 2 CI-FIP2-337888-CS-LCS-KR-2 023 / SELECTION D’UN CABIN Component 5.Project Admini Least Cost Selecti ET D’AUDIT POUR L’EXERCIC IDA / 71870 stration, Coordination, and S Post Open - National 30,000.00 0.00 Under Review 2023-01-25 2023-01-25 2023-02-01 2023-02-21 2023-03-23 2023-03-28 2023-04-05 2023-04-12 2026-04-11 on E 2022/2023 ; 2024 et 2025 afeguards DU PROJET D’INVESTISSEME NT FORESTIER PHASE 2 CI-FIP2-326046-CS-QCBS-KR 22 / SELECTION D’UN CABINE T CHARGE DU RECRUTEMENT POUR LE RECENSEMENT DES Component 1. Support the D Quality And Cost- Open - Internationa CHEFS D’EXPLOITATION, LE L IDA / 71870 evelopment of Participatory Post 3,000,000.00 0.00 Canceled 2022-11-14 2022-11-16 2022-11-29 2022-11-17 2022-12-19 2023-02-02 2023-02-17 2023-03-01 2023-03-13 2024-03-12 Based Selection l EVE DES EXPLOITATIONS AG Forests Management Plans RICOLES ET DES INFRASTRU CTURES DE BASE DANS LES F ORETS CLASSEES DE CATEG ORIE 3 CIBLEES PAR LE PIF 2 CI-FIP2-361492-CS-QCBS-20 23 / SELECTION D’UN CABINE T CHARGE DU RECRUTEMENT POUR LE RECENSEMENT DES Component 1. Support the D Quality And Cost- Open - Internationa CHEFS D’EXPLOITATION, LE L IDA / 71870 evelopment of Participatory Prior 3,000,000.00 0.00 Under Review 2023-05-22 2023-06-14 2023-05-22 2023-06-23 2023-06-11 2023-07-26 2023-08-15 2023-08-25 2023-09-21 2024-09-20 Based Selection l EVE DES EXPLOITATIONS AG Forests Management Plans RICOLES ET DES INFRASTRU CTURES DE BASE DANS LES F ORETS CLASSEES DE CATEG ORIE 3 CIBLEES PAR LE PIF 2 CI-FIP2-361502-CS-QCBS-20 23 / RECRUTEMENT DU BURE AU EN SAUVEGARDE ENVIRO Component 5.Project Admini Quality And Cost- Open - Internationa NNEMENTALE ET SOCIALE PO IDA / 71870 stration, Coordination, and S Prior 3,000,000.00 0.00 Under Review 2023-05-22 2023-06-14 2023-05-22 2023-06-23 2023-06-11 2023-07-26 2023-08-15 2023-08-25 2023-09-21 2026-09-20 Based Selection l UR LE RENFORCEMENT DES afeguards CAPACITES DU PIF 2 ET DU S YSTÈME DE GESTION ENVIRO NNEMENTAL ET SOCIAL DU P ROJET CI-FIP2-327101-CS-QCBS-20 22 / RECRUTEMENT DU BURE AU EN SAUVEGARDE ENVIRO Component 5.Project Admini Quality And Cost- Open - Internationa NNEMENTALE ET SOCIALE PO IDA / 71870 stration, Coordination, and S Post 3,000,000.00 0.00 Canceled 2022-11-24 2022-11-24 2022-12-08 2023-01-26 2023-01-05 2023-02-21 2023-03-23 2023-04-16 2023-05-24 2029-05-22 Based Selection l UR LE RENFORCEMENT DES afeguards CAPACITES DU PIF 2 ET DU S YSTÈME DE GESTION ENVIRO NNEMENTAL ET SOCIAL DU P ROJET CI-FIP2-361874-CS-QCBS-20 23 / SELECTION D'UN CABINE Component 5.Project Admini T DANS LE CADRE D’UNE ASS Quality And Cost- Open - Internationa Under Implement IDA / 71870 stration, Coordination, and S Prior 1,300,000.00 0.00 2023-05-22 2023-06-14 2023-06-07 2023-06-23 2023-07-02 2023-08-16 2023-09-05 2023-09-15 2023-10-12 2026-10-11 ISTANCE TECHNIQUE A LA SO Based Selection l ation afeguards DEFOR POUR LA CONDUITE D E L’AGROFORESTERIE DANS LE CADRE DU PIF-2 CI-FIP2-361970-CS-QCBS-20 23 / RECRUTEMENT D'UN BU Component 5.Project Admini Quality And Cost- Open - Internationa Under Implement REAU DE SUPERVISION POUR IDA / 71870 stration, Coordination, and S Prior 1,000,000.00 0.00 2023-05-22 2023-06-14 2023-06-07 2023-06-23 2023-07-02 2023-08-16 2023-09-05 2023-09-15 2023-10-12 2025-10-11 Based Selection l ation LE PROJET D'INVESTISSEMEN afeguards T FORESTIER PHASE 2 (PIF 2) CI-FIP2-361505-CS-QCBS-20 23 / SELECTION D’UN CABINE T POUR LA CONCEPTION DE L Component 5.Project Admini Quality And Cost- Open - Internationa A PLATEFORME DIGITALE DE IDA / 71870 stration, Coordination, and S Post 480,000.00 0.00 Under Review 2023-05-26 2023-05-26 2023-06-11 2023-07-06 2023-08-20 2023-09-09 2023-09-19 2023-10-16 2025-06-12 Based Selection l GESTION DE SAUVEGARDE E afeguards NVIRONNEMENTALE ET SOCI ALE ET DU MECANISME DE G ESTION DES PLAINTES DU PIF 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-362049-CS-CDS-202 3 / SELECTION DIRECTE AVEC Component 5.Project Admini Pending Impleme LE CABINET KMPG POUR LE IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 100,000.00 0.00 2023-05-26 2023-05-31 2023-06-28 2023-07-28 ntation RECRUTEMENT DU PERSONN afeguards EL COMPLEMENTAIRE DU PIF 2 Page 2 IN: UTTARAKHAND DISASTER RECOVERY PROJECT (UDRP) (P146653) I. General 1. Bank’s approval Date of the procurement Plan: Original: October 4, 2013 2. Date of General Procurement Notice: November 13, 2013 (revised) 3. Period covered by this procurement plan: The procurement period of project covered from Year October 2013 to March 2015 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million All 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 15million All 5. Services (non-consultant) Above US$ 4 million All 6. LIB Above US$ 30,000 Procurement Methods and Threshold Category Method of Threshold (US$ Equivalent) Procurement Goods and Non- ICB >3,000,000 consultant services LIB Wherever agreed by the Bank NCB Up to 3,000,000 (with NCB conditions) Shopping Up to 500,000 DC As per Para 3.7 of the Bank Guidelines Force Account As per Para 3.9 of Guidelines Framework As per Para 3.6 of Guidelines Agreements Works ICB >40,000,000 Page 1 of 5 Category Method of Threshold (US$ Equivalent) Procurement NCB Up to 40,000,000 (with NCB conditions) Shopping Up to 1,000,000 Force Account As per Para 3.9 of Guidelines DC As per Para 3.7 of Guidelines Community As per Para 3.19 of Guidelines Participation Prior Review by the Bank. The Bank will prior review the following contracts: • Works: All contracts more than US$ 15.0 million equivalent; • Goods: All contracts more than US$ 4.0 million equivalent; • Non-Consulting Services: All contracts more than US$ 4.0 million equivalent; The above threshold value applies to single/direct contract as well. There is no separate threshold set for single source or direct contract. The PMU will ensure that Bank procurement procedures are followed for all the post review contracts. The above thresholds were revised after the Mid-Term Review (MTR) mission and will be in effect till further modification. In addition, the Bank will carry out an annual ex-post procurement review for those contracts which fall below the prior review threshold mentioned above. All contracts below the specified prior review threshold value shall be subject to Post Procurement Review (PPR). For the avoidance of doubts, the Bank shall be entitled to conduct, at any time, Independent Procurement Reviews (IPR) of all the contracts financed under the Credit. The IA shall prepare a list of contract and submit it to the Bank for conducting PPR. The PPR will be conducted on annual basis. All contracts not covered under prior review will be subject to post review during supervision missions, and/or review by consultants to be appointed by the by Bank. 2. Pre-qualification. Not applicable 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to Project Operational/Procurement Manual: The Project Operations Manual was prepared by the project and agreed by the Bank. All the contracts issued under the project will follow the World Bank’s Guidelines: Bank’s “Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011and revised in July 2014and “Guidelines: Selection and Employment of Consultants by World Bank Page 2 of 5 Borrowers” dated January 2011 and revised in July 2014. In case of any inconsistency between the Operations Manual and the Bank’s Guidelines, the latter shall prevail. 5. Any Other Special Procurement Arrangements: This is a Disaster Recovery Project and the project preparation was triggered by emergency situation (OP10.00) and therefore, provisions under paragraph 20 of OP 11.00; procurement under emergency situation is applied. Procurement of goods, works and non-consulting services shall be conducted through e-procurement portal http://www.uktenders.gov.in using Bank’s standard bidding documents. International Competitive Bidding (ICB) is the preferred method for procurement of goods, works and non-consulting services. However, it is unlikely that there will be any ICB contract. All National Competitive Bidding (NCB) shall be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines. In addition, following additional provisions as agreed with GOI task force (as amended form time to time) shall apply: • Only the model bidding documents for NCB as agreed with the GoI Task Force (and as amended from time to time), shall be used for bidding; • Invitation to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. For smaller packages (lesser than US$1 million for Works and US$ 500,000 for Goods), advertisement in state newspapers will be accepted with at least 15 days given for submission of bids; • No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprise from any given State; • Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; • For prior review contracts, extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such Page 3 of 5 concurrence will be considered by Bank only in cases of Force Majeure and circumstance beyond the control of the Purchaser/Employer); • For prior review contracts , re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank; • The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project; • Rates contract entered into by Directorate General of Supplies and Disposal (DGS & D) will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however, for any procurement under the Shopping procedure; • Two or three envelop system will not be used (expect when suing e-procurement system assessed and agreed by the Bank. To meet the Bank's requirements for right to audit and F&C, these clauses may be included in the Purchase Orders, in case the purchasers are directly placing the purchase orders to DGS&D rate contract holders and government e-Marketplace. On the other hand, if indent is placed through DGS&D, the Purchaser has the option to sign a separate undertaking with DGS&D rate contract holder, where Bank’s right to audit and F&C clauses could be mentioned; 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness: Available in separate Excel file for the past contrasts and in STEP for the new contract packages. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comment Threshold 1. Competitive Methods (Firms) Above US$ 2 million All contract 2. Single Source (Firms) Above US$ 2 million All contract 3. Individual Above US$ 400,000 All contracts 4. CQS/LCS Up to US$ 300,000 All contracts 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Page 4 of 5 3. Any Other Special Selection Arrangements: the disaster recovery project activities are spread across the states. Majority of the sites are in remote areas and therefore, it is likely that there will be no contractors to participate in bidding process in remote areas. For those contracts, it is likely that project may have to use force account. Such cases, if any, shall be taken up separately on case by case basis. Further, it is likely that project may use the service of government institutions such as IIT to review the reports prepared by the consultants. Such cases, if required, will be taken up case by case basis. 4. Consultancy Assignments with Selection Methods and Time Schedule: Available on STEP. Page 5 of 5 PROCUREMENT India : Uttarakhand Disaster Recovery Project PLAN General Information Country: India 2020-06-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146653 GPN Date: Project Name: Uttarakhand Disaster Recovery Project Loan / Credit No: IBRD / 89210 PIU - CERC Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/PIU-HEALTH/CERC/UDRP- AF/2020 / Augmentation of A Contingency Emergency Res Single Stage - Two E mbulance network by additio IBRD / 89210 Post Request for Bids Open - National 4,881,429.00 5,015,687.63 Completed 2020-06-26 2020-06-28 2020-07-01 2020-07-09 2020-07-16 2020-07-22 2020-08-05 2020-08-28 2020-10-10 2020-11-26 2021-03-23 ponse nvelope n of 100 Basic Life Support ( BLS) & 40 Advance Life Supp ort (ALS) 01/PIU-HEALTH/CERC/UDRP- Contingency Emergency Res Single Stage - Two E AF/2020 / CT Scan Machine f IBRD / 89210 Post Request for Bids Open - National 2,857,143.00 3,494,541.90 Completed 2020-06-29 2020-06-28 2020-07-01 2020-07-09 2020-07-16 2020-07-22 2020-08-10 2020-08-28 2020-08-25 2020-10-20 2020-11-23 2021-09-28 ponse nvelope or 5 Tertiary Care Hospitals o f the State 03/PIU-HEALTH/CERC/UDRP- Contingency Emergency Res Request for Quota Single Stage - One E AF/2020 / Procurement of Ho IBRD / 89210 Post Open - National 571,429.00 25,447.78 Completed 2020-07-04 2020-07-09 2020-08-29 2020-08-22 2020-11-27 2020-10-27 ponse tions nvelope spital beds for temporary CO VID-19 Hospitals 05/PIU-HEALTH/CERC/UDRP- AF/2020 / Procurement of La Contingency Emergency Res Single Stage - Two E IBRD / 89210 Post Request for Bids Open - National 714,286.00 671,655.39 Completed 2020-09-11 2020-10-05 2020-09-13 2020-09-28 2020-11-26 2020-10-20 2020-12-07 2020-11-17 2020-12-31 2021-02-15 2021-04-18 b Equipment for District Leve ponse nvelope l Labs of Health Department, Uttarkhand 08/PIU-HEALTH/CERC/UDRP- AF/2020 / Procurement of 65 Contingency Emergency Res Request for Quota Single Stage - One E IBRD / 89210 Post Open - National 175,714.00 167,189.85 Completed 2021-06-13 2021-07-18 2021-11-28 2021-10-16 0 Fowler Beds (Both Sides Inc ponse tions nvelope liner) for COVID Hospitals un der CERC 07/PIU-HEALTH/CERC/UDRP- AF/2020 / Supply and Installa Contingency Emergency Res Single Stage - Two E IBRD / 89210 Post Request for Bids Open - National 428,571.00 314,402.38 Completed 2021-06-10 2021-07-20 2021-06-15 2021-06-30 2021-09-09 2021-07-20 2021-09-28 2021-08-09 2021-11-10 2021-12-07 2022-03-26 tion of Digital Radiology Syst ponse nvelope em (800 mA) for Govt. Medic al College, Haldwani IN-CERC-255035-GO-RFB / S upply and Installation of 1 No Contingency Emergency Res Single Stage - Two E IBRD / 89210 Post Request for Bids Open - National 714,285.71 0.00 Canceled 2021-09-27 2021-10-02 2021-10-02 2021-10-17 2021-11-08 2021-12-01 2022-03-31 . CT Scan Machine (64 Slices) ponse nvelope for Nainital under CERC 06/PIU-HEALTH/CERC/UDRP- AF/2020 / Supply and Installa Contingency Emergency Res Single Stage - Two E IBRD / 89210 Post Request for Bids Open - National 2,428,571.00 0.00 Canceled 2021-06-10 2021-07-22 2021-06-15 2021-10-02 2021-06-30 2021-10-25 2021-07-20 2021-08-09 2021-12-07 tion of 2 Nos. MRI Medium 1. ponse nvelope 5 Tesla for Govt. Medical Coll eges of Uttarakhand IN-CERC-271102-GO-RFB / S upply and installation of 03 n Contingency Emergency Res Single Stage - Two E Under Imple os MRI Medium 1.5 Tesla for IBRD / 89210 Post Request for Bids Open - National 4,000,000.00 0.00 2022-01-07 2022-03-02 2022-01-12 2022-03-03 2022-02-11 2022-06-20 2022-03-08 2022-09-06 2022-04-03 2022-09-30 ponse nvelope mentation Government Medical College s with 05 years Warranty 11/PIU-HEALTH/CERC/UDRP- AF/2022-23 / Supply & Install Contingency Emergency Res Single Stage - Two E Under Imple IBRD / 89210 Post Request for Bids Open - National 1,625,000.00 0.00 2023-03-07 2023-03-06 2023-03-09 2023-04-01 2023-04-20 2023-05-04 2023-07-03 2023-08-07 2023-12-05 ation of 1 Nos. MRI Medium 1 ponse nvelope mentation .5 Tesla for government medi cal college Rudrapur 11(N)/PIU-HEALTH/CERC/UD RP-AF/2023 / Supply & Install Contingency Emergency Res Single Stage - Two E Pending Impl IBRD / 89210 Post Request for Bids Open - National 1,625,000.00 0.00 2023-06-01 2023-06-06 2023-06-21 2023-07-17 2023-08-01 2023-09-30 ation of 1 No. MRI Medium 1. ponse nvelope ementation 5 Tesla for Govt. medical Coll ege Rudrapur NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 04/PIU-HEALTH/CERC/UDRP- Contingency Emergency Res AF/2020 / Hiring of firm to pr IBRD / 89210 Post Direct Selection Direct 216,812.00 180,068.54 Completed 2020-09-04 2020-08-25 2020-09-09 2020-09-09 2020-09-23 2020-10-28 2021-09-23 2022-04-01 ponse ovide Lab Technicians for He alth Department CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 18-MONTH PROCUREMENT PLAN Project information: Phase I of Improved Child Survival Program for Human Capital MPA- P167156-- Immunization Plus and Malaria Progress by Accelerating Coverage and Transforming Services (IMPACT) Project Project Implementation Agencies: Federal Ministry of Health (NMEP and NPHCDA) Date of the Procurement Plan: January 1, 2020 Period covered by this Procurement Plan: January 2020 to June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016), revised on November 1, 2017 and on August 1, 2018 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Nigeria Public Procurement Act 2007, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [15% is applicable for those contracts identified in the Procurement Plan tables]; Works: [ 7.5% is applicable for those contracts identified in the Procurement Plan tables] I. Threshold for Prior Review – Goods, Works, Non-Consulting Services and Consulting Services Prior-review Thresholds Thresholds for Procurement Methods High Substanti Moderate Low Risk Goods, IT & Non-Consulting Shortlist of National Procurement Type Risk al Risk Risk Works ($'000) ($'000) ($'000) ($'000) Services Consultants Request Request Engineering Open for for Open Open Open Consultin & Quotatio Quotatio 10,0 15,0 20,0 Internatio National internatio National g Constructio Works n or n or 5,000 00 00 00 nal or ICB or NCB National nal or ICB or NCB National Services n ($'000) ($'000) ($'000) ($'000) ($'000) Supervision Shopping Shopping ($'000) ($'000) ($'000) Goods, IT & Non- 2,0 4,0 6,0 Consulting Services 1,500 00 00 00 ≧ < ≦ ≧ < ≦ < ≦ Consultants 1,0 2,0 4,0 20,0 20,0 5,0 5,0 1 3 5 200 (Firms) 500 00 00 00 00 00 00 00 00 00 00 Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Goods, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): Selec Evaluation Market tion Options Approa Review Meth (Most Expected ch Prequal- Domestic Expected by od Advantageo date of Sr. Contract Estimated (Open- ification Preferenc date of Bank (RFP, us Bid, bid/ No Description Cost (US$) Nation (Yes/ e Contract (Prior/ RFB, BAFO, proposal al/ No) (Yes/No) Signature Post) RFQ, Rated opening Limited DS Criteria etc.) etc.) etc.) Nigeria Malaria Elimination Programme (NMEP) GOODS Procurement of Long Lasting Open- Insecticide Internati Most Treated Nets 45,852,523 3rd Feb 13th July 1 Prior onal RFB Advantageou No Yes (Mass .29 2020 2020 s Bid Campaign & Routine Distribution) Procurement of Artemisinin based Open - Most National 3rd Feb 13th July 2 Combination Post 2,381,472 RFB Advantageou No No 2020 2020 Therapy (ACT)- s Bid (Public and Private) Procurement of Open- Most Rapid National 3rd Feb 13th July 3 Post 1,960,202 RFB Advantageou No No Diagnostics 2020 2020 s Bid Tests (RDTs) Most Artesunate Open- 3rd Feb 13th July 4 Post 420,881.89 RFB Advantageou No No Injection National 2020 2020 s Bid Sulphodoxine/P Most Open - 3rd Feb 13th July 5 yrimethamine_I Post 612,322 RFB Advantageou No No National 2020 2020 PTp s Bid Amodiaquine/Su Most lphodoxine/Pyri 2,990,781. Open - 3rd Feb 13th July 6 Post RFB Advantageou No No methamine 47 National 2020 2020 s Bid (SPAQ) Most Open - 3rd Feb 13th July 7 Sharp Boxes Post 152,122,43 RFB Advantageou No No National 2020 2020 s Bid Most Microscope Open - 3rd Feb 13th July 8 Post 491,031 RFB Advantageou No No commodities National 2020 2020 s Bid NON-CONSULTING SERVICES - NMEP State Malaria Elimination MOU/P Programme erform 10th 2,250,000. 9th July 1 (SMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Malaria Elimination MOU/P Programme erform 10th 1,500,000. 9th July 2 (NMEP) Prior Limited ance Rated Criteria No NA February 00 2020 Performance Contra 2020 Contract and ct Operations National Primary Health Care Development Agency (NPHCDA) GOODS Procurement of Most vaccines and 61,380,767 5th Feb 13th July 1 Prior UN RFB Advantageou No No devices for .00 2020 2020 s Bid immunization Procurement and maintenance of Most UN 5th Feb 13th July 2 Generators and Post 900,000.00 RFB Advantageou No No System 2020 2020 Cold Chain s Bid Equipment (CCEs) Procurement and installation of Cold Chain Most 4,500,000. 5th Feb 13th July 3 Hubs (3 Prior UN RFB Advantageou No No 00 2020 2020 walking-in cold s Bid rooms) in Lagos Procurement of Emergency Transport 5th Feb 13th July 4 Service (ETS) Post 45,101.72 Limited RFQ Rated Criteria No No 2020 2020 vouchers, handbooks, and logbooks Procurement of Most Open- 5th Feb 13th July 5 equipment for Post 281,969.00 RFB Advantageou No No National 2020 2020 call centre s Bid Most Procurement of Open- 5th Feb 13th July 6 Post 969,529.00 RFB Advantageou No No 14 vehicles National 2020 2020 s Bid Procurement of 5th Feb 13th July 7 14 computer Post 14,000 Limited RFQ Rated Criteria No No 2020 2020 sets II. Summary of the procurement packages for Consulting Services -Planned for the first 18 months after project effectiveness): Selection Market Method Review Approach Expected Expected Estimate (QCBS, Shortlisti Sr. by Bank (Open - date of bid/ date of Contract Description d Cost FBS, ng No (Prior/ International proposal Contract (US$) LCBS, (Yes/ No) Post) / National/ opening Signature QBS, CQS, etc.) DS etc.) Nigeria Malaria Elimination Programme (NMEP) NGOs Service Contract (for 5 11,525,51 Open 10th Feb 31st Aug 1 Prior QCBS Yes states) 1.00 International 2020 2020 Technical Assistance to SMEP in 5 participating states, 630,000.0 10th Feb 31st July 2 Prior Limited INDV No multiple contracts by 0 2020 2020 different consultants Technical Assistance to NMEP (including procurement 150,000.0 10th Feb 31st July 3 Post Limited INDV No consultant), multiple 0 2020 2020 contracts. Independent Verification 300,000.0 Open- 10th Feb 31st July 4 Post CQS No Agents (IVA) for NGOs 0 National 2020 2020 Social and Behavioral Change 3,000,000. Open 10th Feb 31st Aug 5 Prior QCBS Yes Communication (SBCC) 00 International 2020 2020 Operations research on 2,131,148. Open 10th Feb 31st Aug 6 Prior QCBS Yes disease vector mapping 00 International 2020 2020 Operations research on entomological surveillance by 655,738.0 10th Feb 31st July 7 Prior Direct DS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Operations research on therapeutic efficacy by 655,738.0 10th Feb 31st July 8 Prior Direct CDS No Nigeria Institute of 0 2020 2020 Medical Research (NIMR) Consultancy on warehouse 10th Feb 31st July 9 Post 32,131.00 Limited INDV No assessment 2020 2020 Programme Management Training (case management, 2,000,000. 10th Feb 31st July 10 Prior Limited INDV No M&E, IVM etc.) Multiple 00 2020 2020 Contracts National Primary Health Care Development Agency (NPHCDA) Technical assistance support 9,869,000. 10th Feb 31st July 1 to government for polio Prior UN CDS No 00 2020 2020 surveillance Technical assistance support to government for polio 15,301,00 10th Feb 31st July 2 Supplemental Immunization Prior UN CDS No 0.00 2020 2020 Activities (SIAs) surveillance through WHO Technical assistance support to government for polio 4,830,000. 10th Feb 31st July 3 logistics and social Prior UN CDS No 00 2020 2020 mobilization for polio through UNICEF Procurement of consultant for 10th Feb 31st July 4 Post 20,000.00 Limited INDV No landscape survey (SQUATS) 2020 2020 Technical assistance support 837,673.1 10th Feb 31st July 5 Prior Open-National INDV No to 12 SPHCDA PIU 3 2020 2020 Technical assistance support 10th Feb 31st July 6 Post 89,750.63 Limited INDV No to NPHCDA PIU 2020 2020 Procurement of Emergency Transport Services (ETS), MOU with National Union of 530,794.3 10th Feb 31st July 7 Prior Direct CDS No Road Transport Workers 9 2020 2020 (NURTW) and NACTOROMAS Training of ETS service providers, MOU with Federal 207,672.0 10th Feb 31st July 8 Post Direct CDS No Road Safety Commission 0 2020 2020 (FRSC) Conduct PAPA – Lot Quality Assurance Sampling, MOU 2,213,850. 10th Feb 31st July 9 Prior Limited CDS No with National Bureau of 00 2020 2020 Statistics (NBS) Consultancy for RCT research 1,902,356. 10th Feb 31st Aug 10 services with Nigerian Prior Open-National QCBS Yes 00 2020 2020 Universities Procurement of operations 1,689,751. Open- 10th Feb 31st Aug 11 Prior QCBS Yes research services 00 International 2020 2020 Support to Cold Chain Equipment (CCE) 23,000,00 10th Feb 31st July 12 Prior UN CDS No optimization platform 0.00 2020 2020 through UNICEF Technical assistance to 1,553,185. 10th Feb 31st July 13 LGHAs (89 total), multiple Post Open-National INDV No 50 2020 2020 contracts Technical assistance 310,076.0 10th Feb 31st July 14 Post Open-National QCBS Yes management firm 0 2020 2020 10th Feb 31st July 15 IVA for performance contract Post 300,000 Open-National CQS No 2020 2020 Procurement of services 3,203,345 Open- 10th Feb 31st Aug 16 for GIS imagery and Prior QCBS Yes .45 International 2020 2020 microplanning Procurement of Social Behaviour Change Open- 10th Feb 31st Aug 17 Prior 5,000,000 QCBS Yes Communication (SBCC) International 2020 2020 services Contracting of direct 2,000,000. Open- 10th Feb 31st Aug 18 Prior QCBS Yes facility financing firms 00 International 2020 2020 Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Nigeria : Nigeria Improved Child Survival Program for Human Capital MPA PLAN General Information Country: Nigeria 2022-02-25 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167156 GPN Date: Project Name: Nigeria Improved Child Survival Program for Human Capital MPA Loan / Credit No: IDA / 65390 Rivers MPA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Quota RS-IMPACT/WKS/RFQ/001/22 Component 1:Malaria Contro Request for Quota Single Stage - One E 2022-10-2 IDA / 65390 Post Limited tions (Non Bank-S 14,444.44 0.00 Signed 2022-03-05 2022-06-30 2022-04-30 / Office Renovation l tions nvelope 7 PD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-IMPACT/GO/RFQ/002/22 / Component 1:Malaria Contro Request for Quota Single Stage - One E IDA / 65390 Post Limited 25,638.89 0.00 Signed 2022-04-30 2022-07-21 2022-06-25 2022-12-22 Procurement of Office Equip l tions nvelope ment RS-IMPACT/GO/RFQ/004/22 / Component 1:Malaria Contro Request for Quota Single Stage - One E Printing of Office Files, Letter IDA / 65390 Post Limited 3,805.55 0.00 Canceled 2022-05-28 2022-07-23 2023-01-19 l tions nvelope headed Papers, etc. RS-IMPACT/GO/RFQ/005/22 / Component 1:Malaria Contro Request for Quota Single Stage - One E Procurement of One Unit of 4 IDA / 65390 Post Limited 77,777.78 0.00 Completed 2022-05-13 2022-07-15 2022-06-11 2022-06-18 2022-07-30 l tions nvelope WD Hilux Pick-up Van RS-IMPACT/GO/RFQ/007/22 / Component 1:Malaria Contro Request for Quota Single Stage - One E IDA / 65390 Post Limited 833.33 0.00 Completed 2022-06-12 2022-10-06 2022-08-07 2023-02-03 2022-10-20 Procurement of Office Station l tions nvelope ery RS-IMPACT/GO/RFQ/006/22 / Component 1:Malaria Contro Request for Quota Single Stage - One E IDA / 65390 Post Limited 7,777.78 0.00 Canceled 2022-06-04 2022-08-08 2022-07-30 2023-01-26 Insurance and Registration of l tions nvelope Vehicles RS-IMPACT/GO/RFQ/009/22 / Procurement of Office Furnitu Component 1:Malaria Contro Request for Quota Single Stage - One E Under Imple IDA / 65390 Post Limited 2,388.89 0.00 2022-05-16 2022-06-15 2022-07-11 2023-01-07 re which includes filling cabin l tions nvelope mentation ets, office tables, and chairs. RS-IMPACT/GO/RFQ/008/22 / Procurement of Refrigerators Component 1:Malaria Contro Request for Quota Single Stage - One E IDA / 65390 Post Limited 2,444.45 0.00 Completed 2022-06-25 2022-07-26 2022-08-20 2023-02-16 , Air-Conditioners, TV Sets an l tions nvelope d Rechargeable Standing Fan NG-RIVERS MPA-311321-GO- Component 1:Malaria Contro Request for Quota Single Stage - One E IDA / 65390 Post Limited 2,361.11 0.00 Canceled 2022-08-27 2022-10-22 2023-04-20 RFQ / Repair of commodity v l tions nvelope an. NG-RIVERS MPA-311604-GO- RFQ / Procurement of Person Component 1:Malaria Contro Request for Quota Single Stage - One E Under Imple al Protective Equipment (PPE IDA / 65390 Post Limited 6,649.07 0.00 2022-08-29 2022-08-09 2022-10-24 2023-04-22 l tions nvelope mentation )-FACE MASK, PPE-TABLE WIP E, AND PPE- HAND SANITIZER S NG-RIVERS MPA-308567-GO- RFQ / Procurement of alterna tive power supply(Solar). 1 350W Solar panel 2 5kva 48V Hybrid inverter Component 1:Malaria Contro Request for Quota Single Stage - One E 3 200AH 12V SMF Batteries IDA / 65390 Post Limited 43,666.11 0.00 Completed 2022-08-19 2023-01-24 2022-10-14 2023-04-12 2023-03-31 l tions nvelope 4 Roof panel rack 5 Battery rack 6 16mm DC Cables 7 Distribution and earth ca bles 8 Breakers and accessories NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-RIVERS MPA-302233-CS- QCBS / Engagement of Non S Component 1:Malaria Contro Quality And Cost- Under Implement tate Actors/NGOs to carry out IDA / 65390 Prior Open - National 2,113,873.00 0.00 2022-06-29 2022-07-28 2022-07-20 2022-08-05 2022-09-02 2022-11-03 2022-09-30 2022-11-30 2022-10-30 2023-02-27 2022-12-04 2023-05-31 2023-01-08 2024-01-08 l Based Selection ation full scale implementation of t he malaria interventions in th e States NG-RIVERS MPA-302233 / En gagement of NON-State Acto Component 1:Malaria Contro Quality And Cost- Under Implement rs/NGOs to carry out the full- IDA / 65390 Prior Open - National 2,113,873.00 0.00 2022-08-05 2022-08-26 2022-10-09 2022-11-06 2022-12-06 2023-01-10 2023-02-14 2024-02-14 l Based Selection ation Scale implementation of the malaria interventions in the S tate NG-RIVERS MPA-359382-CS- Component 1:Malaria Contro Consultant Qualifi Under Implement IDA / 65390 Post Limited 2,778.00 0.00 2023-05-05 2023-05-23 2023-05-19 2023-05-24 2023-06-18 2023-05-30 2023-07-23 2024-01-19 CQS / External Auditor l cation Selection ation INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-RIVERS MPA-313967-CS- CDS / JUSTIFICATION FOR FA 2000+ 1.FA 200+ is world bank-app Component 1:Malaria Contro Under Implement IDA / 65390 Post Direct Selection Direct - National 9,523.81 0.00 2022-10-28 2022-10-26 2022-11-07 2023-02-23 2023-01-11 2023-07-10 roved Accounting Software fo l ation r all WB FUNDED Projects in Nigeria. 2.It is designed for easy/time retrieval of error-free financi al information about the proj ects. Page 2 P169134 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: 02/18/2020 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: 02/18/2020 – 08/18/2021 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. Goods, Non-Consultant Services Above US$ 4M 2. Works Above US$ 15M 3. Consulting Firms Above US$ 4M 4. Consulting Individuals Above US$ 400,000 2. Prequalification. Bidders for shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable_ 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P169134issued by SECOP on xx/xx/xxxx 5. Any Other Special Procurement Arrangements: None_ 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 68 2 No Prior of Works internation al approach Summary 0 0 of Goods internation al approach Summary 0 0 of Non- Consultant Services internation al approach III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 3. Consulting Firms Above US$ 4M 4. Consulting Individuals Above US$ 400,000 3. Single Source (Firms) Above US$ 4M 2. Requests for Expressions of Interest International Publication: Consultants for services, estimated to cost more than $_300,000_equivalent per contract, shall be internationally advertised. 3. Any Other Special Selection Arrangements: none 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 1.7 1 Post of number of contracts that will be let under QCBS Summary 7.8 5 Post LCS of number of contracts that will be let under other methods PROCUREMENT Brazil : Improving Mobility and Urban Inclusion in the Amazonas Corridor in Belo Horizonte PLAN General Information Country: Brazil 2020-02-19 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169134 GPN Date: 2023-01-24 Project Name: Improving Mobility and Urban Inclusion in the Amazonas Corridor in Belo Horizonte Loan / Credit No: / , IBRD / 90690 Secretariat of Works and Infrastructure of the Municipality of Belo Horizonte Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SMOBI-160006-CW-RFB-S Component 1: Implementati Open - Internationa Single Stage - Two E 2021-12-0 UDECAP / Obras do Corredor / Prior Request for Bids 0.00 Canceled 2020-12-31 2021-01-05 2021-02-16 2021-05-01 2021-06-05 on of the Amazonas Express l nvelope 2 Amazonas Incluindo Estacoes BR-SMOBI-160017-NC-RFB-U Component 2: Urban upgrad Single Stage - One E 2021-01-1 / Post Request for Bids Open - National 0.00 Canceled 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 RB / Servicos de Demolicao n ing of Vila Cabana do Pai To nvelope 7 o Cabana más BR-SMOBI-160014-CW-RFB- Component 2: Urban upgrad Open - Internationa Single Stage - Two E 2021-12-0 URB / Obras de Urbanizacao / ing of Vila Cabana do Pai To Prior Request for Bids 0.00 Canceled 2020-12-31 2021-01-05 2021-02-16 2021-05-01 2021-06-05 l nvelope 2 e unidades habitacionais do más Cabana Request for B BR-SMOBI-323428-CW-RFB / Component 1: Implementati Open - Internationa Single Stage - One E ids - Works ( Pending Imp 2028-02-1 IBRD / 90690 Prior Request for Bids 0.00 2025-08-19 2025-08-24 2025-10-05 2025-11-04 2025-12-09 Obras do Corredor Amazonas on of the Amazonas Express l nvelope without preq lementation 7 ualification) SPD Request for B BR-SMOBI-323429-CW-RFB / Component 2: Urban upgrad ids - Works ( Open - Internationa Single Stage - One E Pending Imp 2026-06-2 Obras de urbanizacao e unid IBRD / 90690 ing of Vila Cabana do Pai To Prior Request for Bids without preq 0.00 2023-06-13 2023-06-18 2023-07-30 2023-08-29 2023-10-03 l nvelope lementation 9 ades habitacionais na Vila Ca más ualification) bana Pai Tomas SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SMOBI-160011-GO-RFQ- Component 1: Implementati Request for Quota Single Stage - One E / Post Open - National 0.00 Canceled 2020-03-07 2020-05-02 2020-10-29 BHTRANS / Botoeiras sonoras on of the Amazonas Express tions nvelope BR-SMOBI-160021-GO-RFQ- Component 3: Strategic Plan Request for Quota Single Stage - One E BHTRANS / Inovacoes Tecnol / ning for Urban Mobility and Post Open - National 0.00 Canceled 2020-04-05 2020-05-31 2020-11-27 tions nvelope ogicas Contador de Ciclistas Upgrading of Informal Settle ments BR-SMOBI-160004-GO-RFQ- BHTRANS / Sistema de Geren Component 1: Implementati Single Stage - One E / Post Request for Bids Open - National 0.00 Canceled 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 2021-01-17 ciamento do Trafego on of the Amazonas Express nvelope SCAT BR-SMOBI-160022-GO-RFB-B Component 1: Implementati Single Stage - One E / Post Request for Bids Open - National 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 2020-12-19 HTRANS / Mobiliario Semafori on of the Amazonas Express nvelope co BR-SMOBI-160040-GO-RFQ / Aquisicao de Equipamentos e Component 1: Implementati Single Stage - One E / Post Request for Bids Open - National 0.00 Canceled 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 2021-01-17 Servico de Instalacao para G on of the Amazonas Express nvelope estao do Transito e Transport e Coletivo BR-SMOBI-159734-GO-RFQ- Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl CTGM / Capacitacoes, Certific IBRD / 90690 ement and Institutional Stre Post Open - National 0.00 2024-01-20 2024-03-16 2024-09-12 tions nvelope ementation acoes, Equipamentos CTGM ngthening NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SMOBI-160027-NC-RFB-B Component 3: Strategic Plan HTRANS / Inovacoes Tecnolo ning for Urban Mobility and Single Stage - One E / Post Request for Bids Open - National 0.00 Canceled 2020-03-31 2020-04-05 2020-05-17 2020-06-16 2020-07-21 2021-01-17 gicas plataforma para servic Upgrading of Informal Settle nvelope o Noturno sob demanda ments BR-SMOBI-323430-NC-RFB / Component 2: Urban upgrad Single Stage - One E Under Imple Servicos de demolicao na Vil IBRD / 90690 ing of Vila Cabana do Pai To Post Request for Bids Open - National 0.00 2023-05-23 2023-05-09 2023-05-28 2023-05-09 2023-07-09 2023-08-08 2023-09-12 2024-10-16 nvelope mentation a Cabana Pai Tomas más BR-SMOBI-160013-NC-RFB-U Component 2: Urban upgrad Single Stage - One E Under Imple RB / Trabalho Tecnico Social IBRD / 90690 ing of Vila Cabana do Pai To Post Request for Bids Open - National 0.00 2023-05-05 2023-05-09 2023-05-10 2023-05-24 2023-06-21 2023-07-21 2023-08-25 2027-10-03 nvelope mentation na Vila Cabana Pai Tomas más CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-SMOBI-159730-CS-CQS-B HTRANS / Pesquisa de Trafeg Component 1: Implementati Consultant Qualifi / Post Open - National 0.00 Canceled 2020-05-31 2020-06-21 2020-08-04 2020-09-03 2020-10-08 2021-04-06 o e Transportes do Corredor on of the Amazonas Express cation Selection Amazonas Alimenta Simulaca o BR-SMOBI-160024-CS-CQS-U Component 2: Urban upgrad RB / Estudos e Projetos Comp Consultant Qualifi / ing of Vila Cabana do Pai To Post Open - National 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-04 2020-08-08 2021-02-04 lementares de Mobilidade na cation Selection más Area do Cabana BR-SMOBI-160003-CS-CQS / Component 3: Strategic Plan Consultant Qualifi Estudos Urbanisticos Estacao / ning for Urban Mobility and Post Open - National 0.00 Canceled 2020-05-31 2020-06-21 2020-08-04 2020-09-03 2020-10-08 2021-04-06 cation Selection Diamante Upgrading of Informal Settle ments Page 1 BR-SMOBI-160032-CS-CQS / Component 4: Project Manag Consultant Qualifi Desenvolvimento de Capacid / ement and Institutional Stre Post Open - National 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-04 2020-08-08 2021-02-04 cation Selection ade CTGM ngthening BR-SMOBI-159733-CS-CQS-B Component 3: Strategic Plan Least Cost Selecti HTRANS / Inovacoes Tecnolo / ning for Urban Mobility and Post Open - National 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-02 2020-08-01 2020-09-05 2020-10-10 2021-04-08 on gicas Pesquisa Origem Desti Upgrading of Informal Settle no ments BR-SMOBI-160008-CS-LCS-S UDECAP / O Engenheiro do C Component 1: Implementati Least Cost Selecti Open - Internationa Pending Impleme IBRD / 90690 Prior 0.00 2025-08-19 2025-09-09 2025-10-23 2025-11-20 2025-12-20 2026-01-24 2026-02-28 2028-11-14 orredor Amazonas: Apoio a G on of the Amazonas Express on l ntation estao de Projetos e Obras BR-SMOBI-160029-CS-LCS-S Component 1: Implementati Least Cost Selecti Under Implement UDECAP / Estudos e Projetos IBRD / 90690 Post 0.00 2023-05-09 2023-01-25 2023-05-30 2023-03-09 2023-07-13 2023-06-05 2023-08-10 2023-09-09 2023-10-14 2023-11-18 2025-07-10 on of the Amazonas Express on ation do Corredor Amazonas BR-SMOBI-160019-CS-LCS-U Component 2: Urban upgrad Least Cost Selecti Open - Internationa Pending Impleme RB / O Engenheiro Vila Caban IBRD / 90690 ing of Vila Cabana do Pai To Prior 0.00 2023-06-05 2023-06-26 2023-08-09 2023-09-06 2023-10-06 2023-11-10 2023-12-15 2028-01-23 on l ntation a Pai Tomás más BR-SMOBI-160018-CS-QCBS Component 3: Strategic Plan Quality And Cost- Open - Internationa Under Implement / Plano de Estruturacao Urba IBRD / 90690 ning for Urban Mobility and Post 0.00 2023-03-06 2023-01-26 2023-03-27 2023-01-26 2023-05-10 2023-06-05 2023-06-07 2023-07-07 2023-08-11 2023-09-15 2025-05-07 Based Selection l ation na da Regiao do Jatoba Upgrading of Informal Settle ments BR-SMOBI-160005-CS-QCBS Component 3: Strategic Plan Quality And Cost- Open - Internationa Pending Impleme / Projeto da Estacao Salgado IBRD / 90690 ning for Urban Mobility and Post 0.00 2024-05-13 2024-06-03 2024-07-17 2024-08-14 2024-09-13 2024-10-18 2024-11-22 2025-11-22 Based Selection l ntation Filho e modelo PPP Upgrading of Informal Settle ments BR-SMOBI-159732-CS-LCS-U Component 3: Strategic Plan Least Cost Selecti Open - Internationa Pending Impleme RB / Projetos de Engenharia - IBRD / 90690 ning for Urban Mobility and Post 0.00 2023-10-15 2023-11-05 2023-12-19 2024-01-16 2024-02-15 2024-03-21 2024-04-25 2025-05-30 on l ntation loteamento Novo Lajedo Upgrading of Informal Settle ments BR-SMOBI-160016-CS-LCS / Component 3: Strategic Plan Projetos de Engenharia - lote ning for Urban Mobility and Least Cost Selecti Open - Internationa Pending Impleme IBRD / 90690 Post 0.00 2023-05-14 2023-06-04 2023-07-18 2023-08-15 2023-09-14 2023-10-19 2023-11-23 2024-12-27 amentos -Maria Tereza, Mont Upgrading of Informal Settle on l ntation es Claros e Jardim Getsemani ments BR-SMOBI-160025-CS-LCS-S Component 3: Strategic Plan Least Cost Selecti Open - Internationa Pending Impleme UDECAP / Projeto de engenh IBRD / 90690 ning for Urban Mobility and Post 0.00 2023-11-26 2023-12-17 2024-01-30 2024-02-27 2024-03-28 2024-05-02 2024-06-06 2025-07-11 on l ntation aria ligacao da Tereza Cristin Upgrading of Informal Settle a com Rua Tupa ments BR-SMOBI-322863-CS-QCBS Component 3: Strategic Plan Quality And Cost- Open - Internationa Pending Impleme / Estudos Urbanisticos Estaca IBRD / 90690 ning for Urban Mobility and Post 0.00 2024-08-26 2024-09-16 2024-10-30 2024-11-27 2024-12-27 2025-01-31 2025-03-07 2026-03-07 Based Selection l ntation o Diamante Upgrading of Informal Settle ments BR-SMOBI-322876-CS-LCS / Component 4: Project Manag Least Cost Selecti Open - Internationa Pending Impleme IBRD / 90690 Post 0.00 2024-02-12 2024-03-04 2024-04-17 2024-05-15 2024-06-14 2024-07-19 2024-08-23 2025-02-19 Desenvolvimento capacidade ement and Institutional Stre on l ntation CTGM ngthening INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Nigeria For Women Project PROCUREMENT PLAN (Textual Part) Project information: [Nigeria] [Nigeria For Women Project] P161364] Project Implementation agency: [Federal Ministry of Women Affairs and Social Development] Date of the Procurement Plan: [August 31, 2018] Period covered by this Procurement Plan: [August 31,2018 to December 2019] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).Not Applicable. Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable Other Relevant Procurement Information. The project will use the CDD procurement under this project. CDD manual will be produced by the project. PROCUREMENT Nigeria : Nigeria For Women Project PLAN General Information Country: Nigeria 2020-09-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161364 GPN Date: Project Name: Nigeria For Women Project Loan / Credit No: IDA / 62710 Nigeria for Women Project - Ogun State Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-OGUN STATE-201 995-GO-RFQ / Procurement o f 98 Nos of Android Tablets. Project Management, Monito Request for Quota Single Stage - One E 93 Nos of Tablet for Ward fac IDA / 62710 ring and Evaluation and Lear Post Limited 21,480.00 0.00 Canceled 2020-11-11 2021-01-06 2021-07-05 tions nvelope ilitators ning 3 Nos. of Tablets for LFSs 2 Nos. of Tablets for M&E Ad visor and Anchor NG-NFWP-OGUN STATE-202 077-GO-RFQ / Procurement o Project Management, Monito f 3 Nos. Desktops, 20 Nos. La Request for Quota Single Stage - One E IDA / 62710 ring and Evaluation and Lear Post Limited 19,305.00 16,976.98 Completed 2020-11-11 2020-11-11 2021-01-06 2020-12-01 2021-07-05 2020-12-22 ptops, 3 Nos. Printers, 4 Nos. tions nvelope ning Scanners, 15 Nos. External D rives, 12 Nos. Flash Drives an d 12 Nos. Calculators NG-NFWP-OGUN STATE-202 079-GO-RFQ / Procurement o Project Management, Monito f 50 Nos. Office Chairs, 12 No Request for Quota Single Stage - One E IDA / 62710 ring and Evaluation and Lear Post Limited 11,891.00 0.00 Completed 2020-11-11 2021-05-18 2021-01-06 2021-07-05 2021-07-10 s. Office Tables, 3 Nos. File C tions nvelope ning abinets, 1 No. Fire Proof Safe , 1 No. Cash till box, and 4 N os. 4Seat Workstation. NG-NFWP-OGUN STATE-202 081-GO-RFQ / Procurement o f 3 Nos. Public Address Syste ms, 12 Nos. Rechargeable Fa Project Management, Monito Request for Quota Single Stage - One E ns, 3 Nos. Refrigerators, 3 No IDA / 62710 ring and Evaluation and Lear Post Limited 11,836.00 0.00 Completed 2020-11-11 2021-05-19 2021-01-06 2021-07-05 2021-07-09 tions nvelope s. UPs, 6 Nos. Stabilizers, 12 ning Nos. Extention wire, 3 Nos. G enerator, 1 Nos. Android pho ne, 6 Nos. Air - Conditioner a nd 7 Nos. Television set. NG-NFWP-OGUN STATE-202 Project Management, Monito Request for Quota Single Stage - One E 084-GO-RFQ / Procurement o IDA / 62710 ring and Evaluation and Lear Post Limited 68,494.00 0.00 Canceled 2020-11-11 2021-01-06 2021-07-05 tions nvelope f 1 No. 16 seater bus ning NG-NFWP-OGUN STATE-204 261-GO-RFQ / Procurement o f 98 Nos. Android Tablet. Project Management, Monito 93 Nos. of Tablets for ward fa Request for Quota Single Stage - One E IDA / 62710 ring and Evaluation and Lear Post Limited 32,220.00 20,970.71 Completed 2020-11-17 2020-11-06 2021-01-12 2022-01-02 2021-07-11 2022-01-01 cilitators, tions nvelope ning 3Nos. of Tablets for LFs 2Nos. of Tablet for M & E Adv isor and Anchor NG-NFWP-OGUN STATE-208 Project Management, Monito Request for Quota Single Stage - One E 833-GO-RFQ / Procurement o IDA / 62710 ring and Evaluation and Lear Post Limited 68,494.00 0.00 Completed 2020-12-14 2021-02-09 2021-02-08 2021-08-07 2021-02-03 tions nvelope f 1 No. 18 Seater Bus ning NG-NFWP-OGUN STATE-212 Request for Quota Single Stage - One E 913-GO-RFQ / Procurement o IDA / 62710 Building Social Capital Post Limited 100,000.00 88,798.67 Completed 2021-01-16 2021-06-21 2021-03-13 2021-07-08 2021-09-09 2021-09-25 tions nvelope f 2000 units of Saving kits for WAG members. NG-NFWP-OGUN STATE-228 897-GO-RFQ / Procurement o Project Management, Monito Request for Quota Single Stage - One E f three (3) additional project IDA / 62710 ring and Evaluation and Lear Post Limited 120,732.00 0.00 Canceled 2021-05-05 2021-06-30 2021-12-27 tions nvelope vehicles (truck) using N410 t ning o 1 USD as the conversion ra te. NG-NFWP-OGUN STATE-231 519-GO-RFQ / Procurement o Request for Quota Single Stage - One E f 179 pieces of Android Table IDA / 62710 Building Social Capital Post Limited 56,756.00 132.39 Completed 2021-05-05 2021-02-22 2021-06-30 2021-03-11 2021-12-27 2021-05-13 tions nvelope ts with accessories (Solar Po werbanks, Pouches and Scre en guards) NG-NFWP-OGUN STATE-231 511-GO-RFQ / Procurement o f Covid - 19 Personal Protecti ve Equipment such as: Hand washing buckets with t Request for Quota Single Stage - One E aps IDA / 62710 Building Social Capital Post Limited 98,537.00 231.31 Completed 2021-06-05 2021-09-15 2021-07-31 2021-10-02 2022-01-27 2021-11-16 tions nvelope Branded re-washable Nose M asks Hand-held Infrared Thermom eter; for all the Ward facilitat ors across the 3 LGAs. Conversion rate used is N410 to USD 1 NG-NFWP-OGUN STATE-252 Project Management, Monito Request for Quota Single Stage - One E 305-GO-RFQ / Procurement o IDA / 62710 ring and Evaluation and Lear Post Limited 153,800.00 152,123.82 Completed 2021-09-15 2021-03-29 2021-11-10 2021-09-17 2022-05-09 2021-10-07 tions nvelope f addition three (3) truck vehi ning cles for project NG-NFWP-OGUN STATE-273 281-GO-RFQ / Procurement o Request for Quota Single Stage - One E f 55Nos. Android Tablets and IDA / 62710 Building Social Capital Post Limited 25,824.00 0.00 Completed 2022-01-22 2022-01-17 2022-03-19 2022-09-15 2022-02-25 tions nvelope Accessories for Phase 3 Ward Facilitators. The conversion r ate used is N410 to 1USD Page 1 NG-NFWP-OGUN STATE-285 002-GO-RFQ / Procurement o Request for Quota Single Stage - One E IDA / 62710 Building Social Capital Post Limited 98,781.00 95,177.28 Completed 2022-04-09 2022-02-28 2022-06-04 2022-03-15 2022-12-01 2022-05-24 f additional 1620Nos. Saving tions nvelope Kits for WAG members NG-NFWP-OGUN STATE-288 779-GO-RFQ / Procurement o Request for Quota Single Stage - One E Under Imple f Training Materials for traini IDA / 62710 Building Social Capital Post Limited 11,499.00 0.00 2022-04-11 2022-09-30 2022-06-06 2022-12-03 tions nvelope mentation ng of Ward Facilitators acros s the 3 LGAs for year 2022 NG-NFWP-OGUN STATE-292 296-GO-RFQ / Procurement o Project Management, Monito f 4Nos. printers, 1No. photoc Request for Quota Single Stage - One E IDA / 62710 ring and Evaluation and Lear Post Limited 18,232.00 0.00 Completed 2022-04-30 2022-04-01 2022-06-25 2022-12-22 2022-05-18 opier machine, 20Nos. Androi tions nvelope ning d Tablets, 1Nos. Camera , 1N o. Headset Mic and 5Nos. Offi ce Cabinets. NG-NFWP-OGUN STATE-300 771-GO-RFQ / Procurement o f 1No. Laptop, 1No. Printer, 1 No. Public Address System, 1 Project Management, Monito Request for Quota Single Stage - One E 10Nos. Android Tablets & Acc IDA / 62710 ring and Evaluation and Lear Post Limited 56,996.00 0.00 Completed 2022-08-09 2022-05-13 2022-10-04 2023-04-02 2022-07-15 tions nvelope essories, 4Nos each of office ning chair & table and 1No. Extern al Hard Drive for Ikenne LGA staff. The conversion rate us ed is N410 to USD 1 NG-NFWP-OGUN STATE-315 625-GO-RFQ / PROCUREMEN Request for Quota Single Stage - One E IDA / 62710 Building Social Capital Post Limited 18,293.00 0.00 Completed 2022-09-18 2022-08-16 2022-11-13 2023-05-12 2022-10-01 T OF 300 UNITS OF SAVINGS tions nvelope KITS FOR IKENNE LGA WAGs NG-NFWP-OGUN STATE-329 395-GO-RFQ / PROCUREMEN T OF 4NOs. MOTORCYCLES F Request for Quota Single Stage - One E IDA / 62710 Building Social Capital Post Limited 7,357.00 0.00 Completed 2022-12-05 2022-11-01 2023-01-30 2023-07-29 2022-12-14 OR THE 4 IMPLEMENTING LG tions nvelope As (The conversion rate used is N435 to 1USD NG-NFWP-OGUN STATE-247 658-GO-RFQ / Procurement o Request for Quota Single Stage - One E IDA / 62710 Building Social Capital Post Limited 1,281.00 0.00 Canceled 2021-09-01 2021-10-27 2022-04-25 f Life Jackets and Rain Boots tions nvelope for Ward facilitators at Ijebu North East LGA NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-OGUN STATE-202 087-GO-RFQ / Printing of proj ect newsletter (coloured), Pr Request for Quota Single Stage - One E IDA / 62710 Building Social Capital Post Limited 23,562.00 47.54 Completed 2020-11-11 2021-06-04 2021-01-06 2021-06-19 2021-07-05 2021-07-30 oduction of project IEC mater tions nvelope ials, Production & Branding o f project materials e.g T. shirt s, Program jackets, etc. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-NFWP-OGUN STATE-195 Project Management, Monito Individual Consult 751-CS-INDV / Engagement o IDA / 62710 ring and Evaluation and Lear Post Open 13,019.00 0.00 Under Review 2020-09-29 2020-09-29 2020-11-17 2020-12-08 2021-01-12 2021-07-11 ant Selection f Gender & GBV Advisor ning NG-NFWP-OGUN STATE-195 Project Management, Monito 909-CS-INDV / Engagement o Individual Consult IDA / 62710 ring and Evaluation and Lear Post Open 21,107.00 0.00 Under Review 2020-09-29 2020-09-29 2020-11-17 2020-12-08 2021-01-12 2021-07-11 f Community Mobilization an ant Selection ning d Capacity Building Advisor NG-NFWP-OGUN STATE-195 Project Management, Monito Individual Consult 910-CS-INDV / Engagement o IDA / 62710 ring and Evaluation and Lear Post Open 7,101.00 0.00 Under Review 2020-09-29 2020-09-29 2020-11-17 2020-12-08 2021-01-12 2021-07-11 ant Selection f Odeda Local Government C ning oordinator NG-NFWP-OGUN STATE-195 Project Management, Monito 911-CS-CDS / Procurement of IDA / 62710 ring and Evaluation and Lear Prior Direct Selection Direct 3,288.00 0.00 Under Review 2020-10-11 2020-10-21 2020-12-25 2021-06-23 Flexible Accounting Software ning Package NG-NFWP-OGUN STATE-230 570-CS-CDS / Engagement of Project Management, Monito External Auditor. IDA / 62710 ring and Evaluation and Lear Post Direct Selection Direct 2,927.00 0.00 Under Review 2021-04-30 2021-04-01 2021-05-10 2021-07-14 2022-01-10 Conversion rate used is N410 ning to USD 1 NG-NFWP-OGUN STATE-255 392-CS-INDV / Renewal of In Project Management, Monito stitution and Capacity Adviso Under Implement IDA / 62710 ring and Evaluation and Lear Post Direct Selection Direct 18,791.00 0.00 2021-10-13 2021-10-13 2021-10-23 2021-08-25 2021-12-27 2022-06-25 r engagement contract from ation ning November, 2021 to October, 2022 (Conversion rate used i s N410 to 1 USD NG-NFWP-OGUN STATE-255 395-CS-INDV / Renewal of Ge Project Management, Monito nder, GBV and Social safegua IDA / 62710 ring and Evaluation and Lear Post Direct Selection Direct 11,590.00 0.00 Under Review 2021-10-13 2021-08-31 2021-10-23 2021-12-27 2022-06-25 rd Advisor's engagement con ning tract from October, 2021 to S eptember, 2022 (Conversion rate used is N410 to 1 USD) Page 2 NG-NFWP-OGUN STATE-255 401-CS-INDV / Renewal of Lo Project Management, Monito cal government Field Supervi IDA / 62710 ring and Evaluation and Lear Post Direct Selection Direct 6,322.00 0.00 Under Review 2021-10-13 2021-08-31 2021-10-23 2021-12-27 2022-06-25 sor's engagement contract fr ning om October, 2021 to Septem ber, 2022 (Conversion rate u sed is N410 to 1 USD) NG-NFWP-OGUN STATE-255 403-CS-INDV / Engagement o Project Management, Monito Individual Consult f Management Information S IDA / 62710 ring and Evaluation and Lear Post Limited 5,854.00 0.00 Under Review 2021-10-10 2021-10-07 2021-10-15 2021-11-05 2021-12-10 2022-06-08 ant Selection ystem Specialist (conversion ning rate used is N410 to 1 USD) NG-NFWP-OGUN STATE-255 Project Management, Monito 404-CS-INDV / Engagement o Individual Consult IDA / 62710 ring and Evaluation and Lear Post Limited 3,512.00 0.00 Under Review 2021-10-10 2021-10-10 2021-10-15 2021-11-05 2021-12-10 2022-06-08 f ICT Officer (conversion rate ant Selection ning used is N410 to 1USD) Page 3 PROCUREMENT PLAN (Textual Part) Project information: Uzbekistan Agriculture Modernization Project (P158372) Project Implementation agency: Agency for the Implementation of Projects in the field of Agroindustry and Food Security (UZAIFSA), Republic of Uzbekistan, Ministry of Agriculture (Agroindustry and Food Security Agency - UZAIFSA) Date of the Procurement Plan: October 2020 Period covered by this Procurement Plan: October 2020 – 30 June 2026 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Law dated January 25, 2018 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a) Open advertising of the procurement opportunity at the national level - this requirement is met - PPL January 25, 2018: Articles 8; 24; 47; 49; 52; 61. (b) The procurement is open to eligible firms from any country - the requirement is met - PPL January 25, 2018: Articles 17; 28; 29; 34. (c) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights – the requirement is met conditionally - The Bank’s Anti-Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. This condition shall be reflected under the list of applicable conditions for National Procurement Arrangements in the textual part of the procurement plan of the project to be financed by the World Bank in Uzbekistan. (d) Contracts with an appropriate allocation of responsibilities, risks, and liabilities - the requirement is met conditionally - This condition shall be reflected under the list of applicable conditions for National Procurement Arrangements in the textual part of the procurement plan of the project to be financed by the WB. (e) Publication of contract award information - the requirement is met - PPL January 25, 2018: Articles 32; 55; 64. (f) Rights for the Bank to review procurement documentation and activities - the requirement is met - PPL January 25, 2018: (g) An effective complaints mechanism - the requirement is met - PPL January 25, 2018: (h) Maintenance of records of the Procurement Process - the requirement is met - PPL January 25, 2018. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. PROCUREMENT Uzbekistan : Agriculture Modernization Project PLAN General Information Country: Uzbekistan Bank’s Approval Date of the Original Procurement Plan: 2019-08-22 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-23 none) Project ID: P158372 GPN Date: 2020-09-26 Project Name: Agriculture Modernization Project Loan / Credit No: TF / A9955, IDA / 65490, IDA / 65500 International Centre for Food and Agriculture Strategic Development and Research under the Ministry of Agriculture of the Republic of Uzbekistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AMP/C1/CW/01 / Reconstruct National Procure ion of the former building of t 1. Enhancing productivity-su ment Document - Single Stage - One E 3,623,707.1 2023-02-2 he academic lyceum of the D IDA / 65490 pporting agricultural service Post Request for Bids Open - National 1 Envelope proce 4,400,000.00 Signed 2021-11-01 2021-10-07 2021-11-06 2021-11-01 2021-12-18 2021-11-10 2022-01-17 2021-12-12 2022-02-21 2021-12-29 nvelope 7 1 epartment of Agriculture of t s ss (Non Bank-SPD he Fergana region in the villa ) ge of Yormozor AMP/C1/RFB/04 / Turn Key E stablishment of an Intensive 1. Enhancing productivity-su Open - Internationa Single Stage - One E Other (with field f 2025-02-1 Nectarine Orchard in Chinoz IDA / 65490 pporting agricultural service Post Request for Bids 1,500,000.00 0.00 Canceled 2021-10-29 2021-10-22 2021-11-03 2021-10-22 2021-12-15 2021-12-10 2022-01-14 2021-12-24 2022-02-18 l nvelope or explanation) 7 district of Tashkent region an s d its Operational Managemen t for Three Vegetation Period s National Procure AMP/C1/CW/02 / Reconstruct 1. Enhancing productivity-su ment Document - ion of the existing building of Single Stage - One E 2023-03-2 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 1 Envelope proce 1,125,000.00 936,989.83 Signed 2021-11-30 2021-10-26 2021-12-05 2021-10-27 2022-01-16 2021-11-30 2022-02-15 2021-12-28 2022-03-22 2022-01-20 AKIS Center in Andijan region nvelope 2 s ss (Non Bank-SPD in the village of Kuygan-yor i ) n Andijan district AMP/C1/RFB/04-RB / Turn Ke y Establishment of an Intensi 1. Enhancing productivity-su ve Nectarine Orchard in Chin Open - Internationa Single Stage - One E Other (with field f 2025-05-2 IDA / 65490 pporting agricultural service Post Request for Bids 1,500,000.00 0.00 Canceled 2022-01-31 2022-01-25 2022-02-05 2022-01-31 2022-03-19 2022-03-11 2022-04-18 2022-05-23 oz district of Tashkent region l nvelope or explanation) 2 s and its Operational Managem ent for Three Vegetation Peri ods AMP/C1/RFB/11 / Turnkey es tablishment of an intensive a 1. Enhancing productivity-su Open - Internationa Single Stage - One E Other (with field f 2022-11-1 pple orchard in Jomboy distri IDA / 65490 pporting agricultural service Post Request for Bids 3,300,000.00 0.00 Canceled 2022-01-31 2022-01-25 2022-02-05 2022-01-31 2022-03-19 2022-03-11 2022-04-18 2022-05-23 l nvelope or explanation) 9 ct of Samarkand region and i s ts operational management f or three vegetation periods AMP/C1/RFB/10 / Turnkey es tablishment of an intensive a 1. Enhancing productivity-su lmond orchard in Kamashi di Open - Internationa Single Stage - One E Other (with field f 2025-05-2 IDA / 65490 pporting agricultural service Post Request for Bids 1,000,000.00 0.00 Canceled 2022-01-31 2022-01-25 2022-02-05 2022-01-31 2022-03-19 2022-03-11 2022-04-18 2022-05-23 strict of Kashkadarya region l nvelope or explanation) 2 s and its operational managem ent for three vegetation peri ods AMP/C1/RFB/12 / Turnkey Es tablishment of an Intensive C 1. Enhancing productivity-su herry Orchard in Turakurgan Single Stage - One E Other (with field f 2025-06-1 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 800,000.00 0.00 Canceled 2022-02-28 2022-02-05 2022-03-05 2022-02-07 2022-04-16 2022-03-15 2022-05-16 2022-06-20 district of Namangan region nvelope or explanation) 9 s and its Operational Managem ent for Three Vegetation Peri ods Request for Bids - AMP/C1/CW/03 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Under Imple 2023-08-1 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 1,000,000.00 0.00 2022-04-29 2022-04-13 2022-05-04 2022-05-12 2022-06-15 2022-05-13 2022-07-15 2022-07-08 2022-08-19 nvelope (1 envelope proce mentation 9 KIS Center in Navoi region s ss) Request for Bids - AMP/C1/CW/07 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Under Imple 2023-11-1 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 1,900,000.00 0.00 2022-07-30 2022-07-08 2022-08-04 2022-08-22 2022-09-15 2022-08-30 2022-10-15 2022-09-20 2022-11-19 nvelope (1 envelope proce mentation 9 KIS Center in Jizzakh region s ss) AMP/C1/CW/15 / Constructio n of a hangar for the plant fo Request for Bids - 1. Enhancing productivity-su r sorting and chemical proce Single Stage - One E Small Works SPD Under Imple 2023-12-2 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 600,000.00 0.00 2022-09-05 2022-07-27 2022-09-10 2022-10-22 2022-08-30 2022-11-21 2022-09-20 2022-12-26 ssing of seeds of LLC "Andijo nvelope (1 envelope proce mentation 6 s n paxta urugchiligi" in MFY " ss) Chumbogich" of Andijan distr ict of Andijan region AMP/C1/RFB/19 / Design and 1. Enhancing productivity-su supply of equipment for the Open - Internationa Single Stage - One E Other (with field f Under Imple 2023-06-1 IDA / 65490 pporting agricultural service Post Request for Bids 3,500,000.00 0.00 2022-08-25 2022-08-03 2022-08-30 2022-08-03 2022-10-11 2022-09-20 2022-11-10 2022-12-15 Center for Certification and T l nvelope or explanation) mentation 3 s esting of Agricultural Machin ery Request for Bids - AMP/C1/CW/11 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-06-2 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 800,000.00 0.00 2023-03-01 2023-03-06 2023-04-17 2023-05-17 2023-06-21 nvelope (1 envelope proce lementation 0 KIS Center in Surkhandarya r s ss) egion Request for Bids - AMP/C1/CW/05 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Under Imple 2023-01-2 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 2,200,000.00 0.00 2021-10-01 2022-09-09 2021-10-06 2022-09-14 2021-11-17 2022-10-10 2021-12-17 2022-11-11 2022-01-21 nvelope (1 envelope proce mentation 1 KIS Center in Samarkand regi s ss) on AMP/C1/CW/16 / Renovation Request for Bids - 1. Enhancing productivity-su of a 2-storey laboratory build Single Stage - One E Small Works SPD Under Imple 2024-03-0 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 100,000.00 0.00 2022-11-16 2022-10-03 2022-11-21 2023-01-07 2023-01-02 2022-11-04 2023-02-01 2022-11-04 2023-03-08 ing on the territory of the AKI nvelope (1 envelope proce mentation 7 s S center in the Tashkent regi ss) on Request for Bids - AMP/C1/CW/06 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-07-1 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 800,000.00 0.00 2023-03-30 2023-04-04 2023-05-16 2023-06-15 2023-07-20 nvelope (1 envelope proce lementation 9 KIS Center in Namangan regi s ss) on Request for Bids - AMP/C1/CW/08 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-09-2 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 800,000.00 0.00 2023-06-05 2023-06-10 2023-07-22 2023-08-21 2023-09-25 nvelope (1 envelope proce lementation 4 KIS Center in Bukhara region s ss) AMP/C1/CW/14 / Renovation Request for Bids - 1. Enhancing productivity-su and construction of laborator Single Stage - One E Small Works SPD Pending Imp 2024-06-2 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 500,000.00 0.00 2023-03-10 2023-03-15 2023-04-26 2023-05-26 2023-06-30 y building of Center for Varie nvelope (1 envelope proce lementation 9 s ty Testing of Crops ss) Request for Bids - AMP/C1/CW/04 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-08-2 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 1,000,000.00 0.00 2023-05-01 2023-05-06 2023-06-17 2023-07-17 2023-08-21 nvelope (1 envelope proce lementation 0 KIS Center in Sirdarya region s ss) Page 1 AMP/C1/RFB/19-RB / Design, reconstruction and supply of 1. Enhancing productivity-su equipment for the Center for Open - Internationa Single Stage - One E Other (with field f Pending Imp 2024-01-1 IDA / 65490 pporting agricultural service Post Request for Bids 2,600,000.00 0.00 2023-03-24 2023-03-29 2023-05-10 2023-06-09 2023-07-14 Certification and Testing of A l nvelope or explanation) lementation 0 s gricultural Machinery and Te chnologies under the Ministry of Agriculture AMP/C4/RFB/49 / Repair of b Request for Quota uilding of the International C 4. Supporting project manag Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 65490 Post Open - National tions (Non Bank-S 30,000.00 0.00 2023-01-25 2023-03-22 entre for Food and Agricultur ement tions nvelope lementation 8 PD) e Strategic Development and Research AMP/C1/CW/17 / Capital repa Request for Bids - ir and modernization of the p 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-06-0 roduction and technical base IDA / 65490 pporting agricultural service Post Request for Bids Open - National 650,000.00 0.00 2023-02-17 2023-02-22 2023-04-05 2023-05-05 2023-06-09 nvelope (1 envelope proce lementation 8 of Center for Certification an s ss) d Testing of Agricultural Mac hinery and Technologies AMP/C3/CW/18 / Constructio Request for Bids - n of Agrologistic center at K. 3. Facilitating trade and mar Single Stage - One E Small Works SPD Under Imple 2024-07-0 IDA / 65500 Post Request for Bids Open - National 5,100,000.00 0.00 2023-03-13 2023-05-02 2023-03-18 2023-05-24 2023-04-29 2023-05-29 2023-07-03 Tulokov SIU, makhalla «Bakh keting nvelope (1 envelope proce mentation 2 or» in Angor district of Surkh ss) andarya region Request for Bids - AMP/C1/CW/09 / Renovation 1. Enhancing productivity-su Single Stage - One E Small Works SPD Pending Imp 2024-10-0 and construction works for A IDA / 65490 pporting agricultural service Post Request for Bids Open - National 800,000.00 0.00 2023-06-12 2023-06-17 2023-07-29 2023-08-28 2023-10-02 nvelope (1 envelope proce lementation 1 KIS Center in Khorezm region s ss) AMP/C1/RFQ/70 / Works for i mprovement and landscapin 1. Enhancing productivity-su Request for Quota g of the Kashkadarya Resear Request for Quota Single Stage - One E Pending Imp 2024-01-0 IDA / 65490 pporting agricultural service Post Open - National tions (Non Bank-S 90,000.00 0.00 2023-05-15 2023-07-10 ch Station of the Research In tions nvelope lementation 6 s PD) stitute of Horticulture, Viticul ture and Winemaking named after M. Mirzaev AMP/C1/RFQ/76 / Additional 1. Enhancing productivity-su Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-02-2 construction works in the buil IDA / 65490 pporting agricultural service Post Open - National tions (Non Bank-S 70,000.00 0.00 2023-07-02 2023-08-27 tions nvelope lementation 3 ding of the Tashkent regional s PD) AKIS AMP/C1/CW/19 / Constructio Request for Bids - n and renovation of buildings 1. Enhancing productivity-su Open - Internationa Single Stage - One E Works (without pr Pending Imp 2024-05-2 of Tashkent Best Seeds LLC a IDA / 65490 pporting agricultural service Post Request for Bids 890,000.00 0.00 2023-06-25 2023-08-09 2023-09-20 2023-10-20 2023-11-24 l nvelope equalification) SP lementation 2 t the Seed Development Cen s D ter in Buka district, Tashkent region AMP/C1/CW/20 / Constructio Request for Bids - 1. Enhancing productivity-su n of manufactory for the See Single Stage - One E Small Works SPD Pending Imp 2024-05-2 IDA / 65490 pporting agricultural service Post Request for Bids Open - National 276,000.00 0.00 2023-06-25 2023-08-09 2023-09-20 2023-10-20 2023-11-24 d Development Center in Ris nvelope (1 envelope proce lementation 2 s htan district, Fergana region ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AMP/C4/SH/02 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E t of IT equipment for Central IDA / 65490 Post Open - National 61,000.00 52,917.09 Completed 2020-10-17 2020-10-24 2020-12-12 2020-11-14 2021-06-10 2020-12-16 ement tions nvelope Office and Regional Offices AMP/C4/SH/03 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E t of Office furniture for Centr IDA / 65490 Post Open - National 26,500.00 13,391.49 Completed 2020-10-17 2020-12-12 2021-01-15 2021-06-10 2021-02-13 ement tions nvelope al Office and Regional Offices AMP/C4/SH/04 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E t of kitchen appliances for Ce IDA / 65490 Post Open - National 1,500.00 1,479.95 Completed 2020-10-17 2020-10-24 2020-12-12 2020-11-20 2021-06-10 2020-11-26 ement tions nvelope ntral Office and Regional Offi ces AMP/C4/SH/01 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E IDA / 65490 Post Open - National 55,000.00 51,711.06 Completed 2020-10-20 2020-12-15 2020-11-21 2021-06-13 2020-12-17 t of vehicles for Central Offic ement tions nvelope e (3 pcs) AMP/C4/SH/05 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E IDA / 65490 Post Open - National 86,154.00 82,207.28 Completed 2020-12-12 2021-02-06 2020-12-23 2021-08-05 2021-05-01 t of vehicles for Regional Offi ement tions nvelope ces (8 pcs) AMP/C4/SH/06 / Procuremen 4. Supporting project manag IDA / 65490 Post Direct Selection Direct 53,846.00 52,966.19 Completed 2021-01-29 2021-02-08 2021-02-03 2021-07-23 2021-03-10 2021-07-30 2021-09-06 2022-01-01 t of Vehicles for Regional Offi ement ces (5 pcs) AMP/C3/RFB/01 / Equipment for pest identification for the central laboratory of SPQI. 3. Facilitating trade and mar Open - Internationa Single Stage - One E Laboratory equipment for fu IDA / 65490 Prior Request for Bids 2,848,000.00 447,215.00 Signed 2021-06-30 2021-08-17 2021-07-05 2021-08-19 2021-08-16 2021-11-10 2021-09-15 2022-04-26 2021-10-20 2022-07-01 2022-10-20 keting l nvelope migation testing/analysis in S PQI, and for pest detection a nd eradication (plant protecti on) activities. AMP/C1/RFQ/17 / Air conditio 4. Supporting project manag Request for Quota Single Stage - One E ners for Central Office and R IDA / 65490 Post Open - National 8,000.00 1,487.31 Completed 2021-12-27 2022-02-21 2021-08-14 2022-08-20 2021-09-02 ement tions nvelope egional Offices AMP/C1/RFQ/18 / Furniture, equipment and tools for and 3. Facilitating trade and mar Request for Quota Single Stage - One E IDA / 65490 Post Open - National 70,000.00 36,073.32 Completed 2021-12-27 2022-02-21 2021-10-19 2022-08-20 2021-12-04 minor repairs of the Incubati keting tions nvelope on Center of Tashkent State Agrarian University AMP/C1/RFQ/13 / Equipment 1. Enhancing productivity-su Request for Quota Single Stage - One E for land surveying for AKIS C IDA / 65490 pporting agricultural service Post Open - National 110,000.00 78,609.05 Signed 2021-11-06 2022-01-01 2021-09-30 2022-06-30 tions nvelope enter in Tashkent region s AMP/C1/RFQ/12 / Office Appl 1. Enhancing productivity-su Request for Quota Single Stage - One E IDA / 65490 Post Open - National 90,000.00 26,827.90 Signed 2021-12-06 2022-01-31 2021-12-18 2022-07-30 iances for AKIS Center in Tas pporting agricultural service tions nvelope hkent region s AMP/C3/RFQ/19 / Procureme nt of tablet computers for the 3. Facilitating trade and mar Request for Quota Single Stage - One E use of the Ministry of Agricult IDA / 65490 Post Open - National 125,000.00 114,240.25 Completed 2021-11-03 2021-10-09 2021-12-29 2021-11-18 2022-06-27 2021-12-02 keting tions nvelope ure in implementation of the Geographic Information Syst em. Page 2 AMP/C1/RFB/07 / Laboratory equipment for Center for Cer tification and Testing of Agric 1. Enhancing productivity-su Open - Internationa Single Stage - One E ultural Machinery and Techn IDA / 65490 pporting agricultural service Prior Request for Bids 6,107,000.00 0.00 Canceled 2021-11-30 2021-12-05 2022-01-16 2022-02-15 2022-03-22 2023-03-22 l nvelope ologies under the MoA. s Laboratory equipment for Sta te unitary company “Service Center in the agro-industrial complex”. AMP/C1/RFQ/24 / Vehicles fo r the laboratory of Center for 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple Certification and Testing of A IDA / 65490 pporting agricultural service Post Open - National 110,000.00 0.00 2021-11-22 2021-11-29 2022-01-17 2022-07-16 tions nvelope mentation gricultural Machinery and Te s chnologies under the MoA AMP/C1/RFQ/21 / Laboratory furniture and accessories for 1. Enhancing productivity-su Request for Quota Single Stage - One E the Center for Certification a IDA / 65490 pporting agricultural service Post Open - National 80,000.00 61,006.52 Signed 2021-12-15 2022-02-09 2022-05-12 2022-08-08 tions nvelope nd Testing of Agricultural Ma s chinery and Technologies un der the MoA AMP/C1/RFQ/22 / Furniture f 1. Enhancing productivity-su or the Center for Certification Request for Quota Single Stage - One E IDA / 65490 pporting agricultural service Post Open - National 110,000.00 57,956.25 Signed 2021-12-11 2022-02-05 2022-02-01 2022-08-04 and Testing of Agricultural M tions nvelope s achinery and Technologies u nder the MoA AMP/C1/RFQ/23 / Computer and office equipment for the 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple Center for Certification and T IDA / 65490 pporting agricultural service Post Open - National 110,000.00 0.00 2021-12-12 2022-02-06 2022-08-05 tions nvelope mentation esting of Agricultural Machin s ery and Technologies under t he MoA AMP/C1/RFB/08 / Equipment 1. Enhancing productivity-su Open - Internationa Single Stage - One E for LLC "Design and Technolo IDA / 65490 pporting agricultural service Post Request for Bids 1,500,000.00 0.00 Canceled 2021-12-26 2021-12-31 2022-02-11 2022-03-13 2022-04-17 2023-04-17 l nvelope gy Center of Agricultural mac s hinery" AMP/C1/RFQ/28 / Procureme 1. Enhancing productivity-su Request for Quota Open - Internationa Single Stage - One E nt of an inductively coupled IDA / 65490 pporting agricultural service Post 125,000.00 117,160.00 Signed 2022-03-12 2022-05-07 2022-04-16 2023-05-07 tions l nvelope plasma mass spectrometer s AMP/C1/RFQ/29 / Procureme 1. Enhancing productivity-su nt of a total carbon analyzer Request for Quota Open - Internationa Single Stage - One E IDA / 65490 pporting agricultural service Post 80,000.00 83,940.00 Signed 2022-03-15 2022-05-10 2022-04-16 2023-05-10 for the SUE "Analytical Cente tions l nvelope s r for Soil quality, composition and repositories" AMP/С1/RFQ/26 / Computers , office equipment, furniture, 1. Enhancing productivity-su uniform and stationary goods Request for Quota Single Stage - One E IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 Canceled 2022-04-05 2022-05-31 2022-11-27 for individual local consultant tions nvelope s s of AKIS Tashkent region (Ak kurgan and Yukori Chirchiq di stricts) AMP/C1/RFQ/25 / Vehicles fo 1. Enhancing productivity-su r local individual consultants Request for Quota Single Stage - One E IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 Canceled 2022-04-09 2022-06-04 2023-06-04 of AKIS Tashkent region (Akk tions nvelope s urgan and Yukori Chirchiq dis tricts) AMP/C1/DS/06 / Procuremen t of an apparatus for germina 1. Enhancing productivity-su ting seeds in the light accordi IDA / 65490 pporting agricultural service Post Direct Selection Direct 300,000.00 0.00 Canceled 2022-05-05 2022-05-10 2022-06-14 2023-06-14 ng to the Jacobsen method fo s r the SUE “Service Center in t he agro-industrial complex” AMP/C1/RFQ/31 / Furniture, computer, office and kitchen 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple appliances, as well as promot IDA / 65490 pporting agricultural service Post Open - National 50,000.00 0.00 2022-05-05 2022-05-12 2022-06-30 2022-12-27 tions nvelope mentation ional materials for equipping s AKIS Center in Ferghana regi on AMP/C1/RFQ/32 / Vehicles fo 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple IDA / 65490 Post Open - National 60,000.00 0.00 2022-05-05 2022-06-02 2022-06-30 2022-12-27 r AKIS Center in Ferghana re pporting agricultural service tions nvelope mentation gion s AMP/C1/RFQ/34 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E nt of a vehicle for AKIS Cente IDA / 65490 pporting agricultural service Post Open - National 50,000.00 40,570.94 Signed 2022-05-04 2022-06-29 2022-05-20 2023-01-25 tions nvelope r in Tashkent. s AMP/C1/RFB/15 / Procureme 1. Enhancing productivity-su Single Stage - One E Under Imple nt of laboratory equipment fo IDA / 65490 pporting agricultural service Post Request for Bids Open - National 120,000.00 0.00 2022-06-30 2022-06-07 2022-07-05 2022-06-07 2022-08-16 2022-09-15 2022-10-20 2023-10-20 nvelope mentation r Andijan seed center s AMP/C3/RFQ/37 / Procureme 3. Facilitating trade and mar Request for Quota Single Stage - One E nt of pheromone traps for Ag IDA / 65490 Post Open - National 120,000.00 0.00 Canceled 2022-06-28 2022-08-23 2023-03-21 keting tions nvelope ency of Plant Protection and Quarantine AMP/C1/RFQ/33 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple nt of equipment for the Rice IDA / 65490 pporting agricultural service Post Open - National 115,000.00 0.00 2022-06-25 2022-08-20 2023-03-18 tions nvelope mentation Research Institute s AMP/C1/RFB/13 / 1. Lab equi pment for SUE “Service Cent 1. Enhancing productivity-su er in the agro-industrial com Open - Internationa Single Stage - One E Under Imple IDA / 65490 pporting agricultural service Prior Request for Bids 4,800,000.00 0.00 2022-07-20 2022-06-13 2022-07-25 2022-06-29 2022-09-05 2022-08-10 2022-10-05 2022-11-10 2022-11-09 2024-05-10 plex”. l nvelope mentation s 2. Equipment for LLC "Design and Technology Center of Ag ricultural machinery". AMP/C1/RFQ/40 / Procureme 1. Enhancing productivity-su nt of a SUV vehicle for the Ag Request for Quota Single Stage - One E IDA / 65490 pporting agricultural service Post Open - National 50,000.00 42,098.52 Signed 2022-07-15 2022-06-20 2022-09-09 2022-07-16 2023-04-07 ency of Horticulture and Gre tions nvelope s enhouse Development AMP/C1/RFB/17 / Laboratory 1. Enhancing productivity-su equipment for Center for Cer Single Stage - One E Under Imple IDA / 65490 pporting agricultural service Post Request for Bids Open - National 130,000.00 0.00 2022-07-20 2022-06-14 2022-07-25 2022-06-13 2022-09-05 2022-10-05 2022-11-09 2023-05-08 tification and Testing of Agric nvelope mentation s ultural Machinery and Techn ologies under the MOA AMP/C3/RFB/16 / Procureme 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple nt of equipment for SUE "Cen IDA / 65490 Prior Request for Bids 2,400,000.00 0.00 2022-07-27 2022-09-15 2022-08-01 2022-09-20 2022-09-12 2022-10-31 2022-10-12 2023-01-02 2022-11-16 2023-11-16 keting l nvelope mentation ter of digitalization" AMP/C1/RFB/06 / Procureme 1. Enhancing productivity-su Open - Internationa Single Stage - One E IDA / 65490 Post Request for Bids 1,600,000.00 0.00 Canceled 2022-07-20 2022-06-20 2022-07-25 2022-06-20 2022-09-05 2022-08-02 2022-10-05 2022-11-09 2023-11-09 nt of equipment for Andijan s pporting agricultural service l nvelope eed center s Page 3 AMP/C1/RFQ/15 / Drip irrigati 1. Enhancing productivity-su Request for Quota Single Stage - One E on system for National Cente IDA / 65490 pporting agricultural service Post Open - National 120,000.00 118,928.76 Signed 2022-07-10 2022-07-07 2022-09-04 2022-05-27 2023-03-03 tions nvelope r for Knowledge and Innovati s on in Agriculture AMP/C3/RFB/14 / Equipment 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple for Scientific Research Institu IDA / 65490 Prior Request for Bids 2,000,000.00 0.00 2022-09-20 2022-08-10 2022-09-25 2022-08-31 2022-11-06 2022-10-14 2022-12-06 2023-01-10 2024-01-10 keting l nvelope mentation te of Plant Protection AMP/C1/RFQ/09 / IT equipme 1. Enhancing productivity-su Request for Quota Single Stage - One E Under Imple IDA / 65490 Post Open - National 100,000.00 0.00 2022-08-06 2022-10-02 2022-10-01 2023-03-30 nt for AKIS Center in Tashken pporting agricultural service tions nvelope mentation t region s AMP/C1/RFB/18 / Supply, pla 1. Enhancing productivity-su Open - Internationa Single Stage - One E Under Imple nting and operational manag IDA / 65490 pporting agricultural service Prior Request for Bids 6,500,000.00 0.00 2022-08-30 2022-08-09 2022-09-04 2022-08-10 2022-10-16 2022-09-09 2022-11-15 2022-12-28 2022-12-20 2023-12-20 l nvelope mentation ement of intensive orchards s AMP/C3/RFB/13 / Equipment for Fumigation Laboratory an 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple IDA / 65490 Post Request for Bids 1,100,000.00 0.00 2022-10-10 2022-09-20 2022-10-15 2022-09-19 2022-11-26 2022-10-31 2022-12-26 2023-01-30 2024-01-30 d Decontamination of Agency keting l nvelope mentation of Plant Protection and Quara ntine AMP/C3/RFB/20 / Procureme 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple nt of UAVs for SUE "Center of IDA / 65490 Prior Request for Bids 3,220,000.00 0.00 2022-10-20 2022-09-12 2022-10-25 2022-09-15 2022-12-06 2022-10-31 2023-01-05 2023-02-09 2024-02-09 keting l nvelope mentation digitalization" AMP/C1/RFB/06-RB / Procure 1. Enhancing productivity-su Open - Internationa Single Stage - One E Under Imple ment of equipment for Andija IDA / 65490 pporting agricultural service Post Request for Bids 1,880,000.00 0.00 2022-11-30 2022-11-06 2022-12-05 2022-11-06 2023-01-16 2022-12-19 2023-02-15 2023-01-27 2023-03-22 2024-03-21 l nvelope mentation n seed center s AMP/C1/RFB/03 / Laboratory 1. Enhancing productivity-su Open - Internationa Single Stage - One E equipment for Center for Vari IDA / 65490 pporting agricultural service Prior Request for Bids 2,885,000.00 0.00 Canceled 2022-12-01 2022-12-06 2023-01-17 2023-02-16 2023-03-23 2024-03-22 l nvelope ety Testing of Crops s AMP/C3/RFB/22 / Procureme 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple nt of X-ray machine for Agen IDA / 65490 Post Request for Bids 1,300,000.00 0.00 2022-10-31 2022-09-26 2022-11-05 2022-09-26 2022-12-17 2023-01-16 2023-02-20 2024-02-20 keting l nvelope mentation cy of Plant Protection and Qu arantine AMP/C1/RFB/16 / Proсureme nt of laboratory equipment fo 1. Enhancing productivity-su Open - Internationa Single Stage - Two E r the Republican Center of Ag IDA / 65490 pporting agricultural service Post Request for Bids 1,000,000.00 0.00 Canceled 2022-11-17 2022-11-22 2023-01-03 2023-03-18 2023-04-22 2023-10-19 l nvelope rochemical Analysis of the Ag s ency for Plant Protection and Quarantine AMP/C1/RFQ/41 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl IDA / 65490 Post Open - National 135,000.00 0.00 2022-12-20 2023-02-14 2023-09-12 nt of vehicles for AKIS in Tas pporting agricultural service tions nvelope ementation hkent region s AMP/C1/RFQ/14 / Greenhous 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl e accessories and chemicals IDA / 65490 pporting agricultural service Post Open - National 30,000.00 0.00 2023-01-25 2023-03-22 2023-09-18 tions nvelope ementation for AKIS Center in Tashkent r s egion AMP/C1/RFQ/44 / Procureme 1. Enhancing productivity-su Request for Quota Open - Internationa Single Stage - One E Under Imple nt of a SUV-type automobile f IDA / 65490 pporting agricultural service Post 135,000.00 0.00 2022-12-05 2023-01-30 2023-08-28 tions l nvelope mentation or AKIS in Tashkent region s AMP/C1/RFQ/43 / Procureme 1. Enhancing productivity-su nt of laboratory equipment fo Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2022-12-10 2023-02-04 2023-08-03 r SUE "Analytical Center for S tions nvelope ementation s oil quality, composition and r epositories" AMP/C1/RFQ/36 / Vehicles fo 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl r Field Advisors of AKIS Cente IDA / 65490 pporting agricultural service Post Open - National 100,000.00 0.00 2022-12-05 2023-01-30 2023-07-29 tions nvelope ementation rs in Samarkand and Tashke s nt regions. AMP/C1/RFQ/35 / Furniture, computer, office appliances, 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl promo-materials for Field Ad IDA / 65490 pporting agricultural service Post Open - National 100,000.00 0.00 2022-12-03 2023-01-28 2023-07-27 tions nvelope ementation visors of AKIS Centers in Sam s arkand and Tashkent regions AMP/C1/RFQ/10 / Mobile labo 1. Enhancing productivity-su Request for Quota Open - Internationa Single Stage - One E Pending Impl ratory bus for AKIS Center in IDA / 65490 pporting agricultural service Post 80,000.00 0.00 2023-04-05 2023-05-31 2023-11-27 tions l nvelope ementation Tashkent region s AMP/C1/RFQ/11 / Studio Equi 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl IDA / 65490 Post Open - National 40,000.00 0.00 2023-04-26 2023-06-21 2023-12-18 pment for AKIS Center in Tas pporting agricultural service tions nvelope ementation hkent region s AMP/C4/SH/07 / Procuremen 4. Supporting project manag Request for Quota Single Stage - One E Pending Impl IDA / 65490 Post Open - National 6,500.00 0.00 2023-05-31 2023-07-26 2023-11-23 t of Office furniture for Regio ement tions nvelope ementation nal Offices AMP/C1/RFQ/42 / Portable eq 1. Enhancing productivity-su Single Stage - One E Pending Impl uipment for AKIS centres in T IDA / 65490 pporting agricultural service Post Request for Bids Open - National 80,000.00 0.00 2023-04-14 2023-04-19 2023-05-31 2023-06-30 2023-08-04 2024-08-03 nvelope ementation ashkent, Samarkand and Fer s ghana regions AMP/C1/RFB/24 / Procureme nt of Equipment for Republic 1. Enhancing productivity-su Open - Internationa Single Stage - Two E Under Imple an Centre for Agrochemical A IDA / 65490 pporting agricultural service Post Request for Bids 1,000,000.00 0.00 2023-02-23 2023-01-09 2023-02-28 2023-01-10 2023-04-11 2023-02-20 2023-06-24 2023-07-29 2024-01-25 l nvelope mentation nalysis of Agency for Quarant s ine and Plant Protection of th e Republic of Uzbekistan AMP/C1/RFQ/47 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of laboratory equipment fo IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-02-20 2023-04-17 2023-10-14 tions nvelope ementation r GMO to the Centre of Variet s y testing of crops AMP/C1/RFB/26 / Procureme nt of testing equipment for th 1. Enhancing productivity-su Open - Internationa Single Stage - One E Pending Impl e Center for Certification and IDA / 65490 pporting agricultural service Post Request for Bids 1,100,000.00 0.00 2023-04-19 2023-04-24 2023-06-05 2023-07-05 2023-08-09 2024-02-05 l nvelope ementation Testing of Agricultural Machi s nery and Technologies under the Ministry of Agriculture AMP/C1/RFQ/50 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of irrigation system for int IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-03-22 2023-05-17 2023-11-13 tions nvelope ementation ensive orchard in Chinoz dist s rict AMP/C3/RFB/13-RB / Procure ment of Equipment for Fumig 3. Facilitating trade and mar Open - Internationa Single Stage - Two E Pending Impl ation and Decontamination L IDA / 65490 Post Request for Bids 1,400,000.00 0.00 2023-03-30 2023-04-04 2023-05-16 2023-07-29 2023-09-02 2024-02-29 keting l nvelope ementation aboratory of Agency of Plant Protection and Quarantine Page 4 AMP/C3/RFB/27 / Procureme nt of equipment for Agrologis 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple IDA / 65500 Prior Request for Bids 5,900,000.00 0.00 2023-04-11 2023-02-13 2023-04-16 2023-02-14 2023-05-28 2023-06-27 2023-08-01 2024-07-31 tical Center in Altiarik district keting l nvelope mentation in Ferghana region AMP/C3/RFB/28 / Procureme nt of equipment for Agrologis 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple IDA / 65500 Prior Request for Bids 3,200,000.00 0.00 2023-03-21 2023-02-08 2023-03-26 2023-02-14 2023-05-07 2023-06-06 2023-07-11 2024-07-10 tical Center in Bulungur distri keting l nvelope mentation ct in Samarkand region AMP/C3/RFB/29 / Procureme nt of equipment for Agrologis 3. Facilitating trade and mar Open - Internationa Single Stage - One E Under Imple IDA / 65500 Prior Request for Bids 6,700,000.00 0.00 2023-03-15 2023-03-02 2023-03-20 2023-03-02 2023-05-01 2023-05-31 2023-07-05 2024-07-04 tical Center in Sherabad distr keting l nvelope mentation ict of Surkhandarya region AMP/C1/RFB/30 / Supply, pla nting and operational manag 1. Enhancing productivity-su Open - Internationa Single Stage - One E Pending Impl ement of intensive orchards f IDA / 65490 pporting agricultural service Post Request for Bids 1,600,000.00 0.00 2023-03-31 2023-04-05 2023-05-17 2023-06-16 2023-07-21 2027-01-19 l nvelope ementation or 3 vegetation periods in Urt s achirchik and Turakurgan dis tricts AMP/C4/RFQ/51 / Engaging media (PR) companies to imp 4. Supporting project manag Request for Quota Single Stage - One E Pending Impl IDA / 65490 Post Open - National 125,000.00 0.00 2023-04-02 2023-05-28 2023-11-24 lement a communication stra ement tions nvelope ementation tegy with the public AMP/C1/RFQ/52 / Supply and 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl installation of an irrigation sy IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-03-29 2023-05-24 2023-11-20 tions nvelope ementation stem in Urtachirchik district s AMP/C1/RFQ/39 / Vehicles fo 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl r the Agency for Horticulture IDA / 65490 pporting agricultural service Post Open - National 600,000.00 0.00 2023-03-06 2023-05-01 2023-10-28 tions nvelope ementation and Greenhouse Developme s nt AMP/C1/RFQ/38 / Computers 1. Enhancing productivity-su , office and mobile equipmen Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 50,000.00 0.00 2023-03-22 2023-05-17 2023-11-13 t for the Agency for Horticult tions nvelope ementation s ure and Greenhouse Develop ment AMP/C4/RFQ/53 / Furniture ( 4. Supporting project manag Request for Quota Single Stage - One E Under Imple Storage cabinets and shelvin IDA / 65490 Post Open - National 9,000.00 0.00 2023-02-08 2023-04-05 2023-10-02 ement tions nvelope mentation g) for the Central office of PI U AMP/C1/RFB/31 / Production 1. Enhancing productivity-su lines and laboratory equipme Open - Internationa Single Stage - One E Under Imple IDA / 65490 pporting agricultural service Prior Request for Bids 3,500,000.00 0.00 2023-04-20 2023-02-13 2023-04-25 2023-02-14 2023-06-06 2023-05-04 2023-07-06 2023-08-10 2024-08-09 nt for the Seed centers in Tas l nvelope mentation s hkent and Ferghana regions AMP/C1/RFB/32 / Lot 1. - Lab oratory equipment for SRI of 1. Enhancing productivity-su Soil Science. Open - Internationa Single Stage - One E IDA / 65490 pporting agricultural service Post Request for Bids 488,000.00 0.00 Canceled 2023-04-28 2023-05-03 2023-06-14 2023-07-14 2023-08-18 2024-02-14 Lot 2. - Gas chromatograph f l nvelope s or SUE «Analytical Center of Soil Quality, Composition and Repository». AMP/C1/RFQ/45 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of laboratory equipment fo IDA / 65490 pporting agricultural service Post Open - National 100,000.00 0.00 2023-05-15 2023-07-10 2024-01-06 tions nvelope ementation r the Centre of Variety testin s g of crops AMP/C1/RFQ/57 / Supply and 1. Enhancing productivity-su installation of transformed su Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-03-15 2023-05-10 2023-11-06 bstation and auxiliary equip tions nvelope ementation s ment for AKIS in Tashkent re gion AMP/C1/RFQ/58 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of furniture and blinds for IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-04-25 2023-06-20 2023-12-17 tions nvelope ementation AKIS in Andijan region s AMP/C1/RFQ/59 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of computers and office ap IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-03-28 2023-05-23 2023-11-19 tions nvelope ementation pliances for AKIS in Andijan r s egion AMP/C1/RFQ/61 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl IDA / 65490 Post Open - National 40,000.00 0.00 2023-04-01 2023-05-27 2023-12-23 nt of vehicles for Tashkent A pporting agricultural service tions nvelope ementation KIS center s AMP/C1/RFB/34 / Procureme 3. Facilitating trade and mar Open - Internationa Single Stage - One E Pending Impl nt of cartographic drones for IDA / 65490 Prior Request for Bids 2,100,000.00 0.00 2023-04-21 2023-04-26 2023-06-07 2023-07-07 2023-08-11 2024-08-10 keting l nvelope ementation Ministry of Agriculture AMP/C1/RFB/21 / Procureme 1. Enhancing productivity-su Open - Internationa Single Stage - One E Pending Impl nt of Equipment for Research IDA / 65490 pporting agricultural service Post Request for Bids 1,600,000.00 0.00 2023-03-31 2023-04-05 2023-05-17 2023-06-16 2023-07-21 2024-07-20 l nvelope ementation Institute of Agricultural Mech s anization. AMP/C3/RFQ/46 / Procureme 3. Facilitating trade and mar Request for Quota Single Stage - One E Under Imple nt of auxiliary equipment for IDA / 65490 Post Open - National 125,000.00 0.00 2023-03-18 2023-05-13 2023-11-09 keting tions nvelope mentation SUE "Center of Digitalization" AMP/C1/RFB/33 / 1) Procure ment of equipment for the Ri ce research Institute and Sci 1. Enhancing productivity-su entific Research Institute of Open - Internationa Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Prior Request for Bids 4,300,000.00 0.00 2023-04-10 2023-04-15 2023-05-27 2023-06-26 2023-07-31 2024-01-27 Grain and Leguminous Crops. l nvelope ementation s 2) Equipment for LLC "Design and Technology Center of Ag ricultural machinery" AMP/C1/RFB/25 / 1) Laborato ry equipment for AKIS Center in Ferghana Region and regio nal AKISes. 1. Enhancing productivity-su Open - Internationa Single Stage - Two E Pending Impl 2) Laboratory equipment for IDA / 65490 pporting agricultural service Prior Request for Bids 2,100,000.00 0.00 2023-03-30 2023-04-04 2023-05-16 2023-07-29 2023-09-02 2024-02-29 l nvelope ementation SRI of Soil Science and its re s gional branches. 3) Gas chromatograph for SU E «Analytical Center of Soil Q uality, Composition and Repo sitory». AMP/C1/RFQ/63 / Procureme 1. Enhancing productivity-su nt of arable tractors for the R Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-05-13 2023-07-08 2024-01-04 esearch Institute of vegetabl tions nvelope ementation s e-melon crops and potato Page 5 AMP/C1/RFQ/68 / Procureme nt of agricultural techniques 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl (potato planter, potato digge IDA / 65490 pporting agricultural service Post Open - National 115,000.00 0.00 2023-07-08 2023-09-02 2024-02-29 tions nvelope ementation r, trailer) for the Research Ins s titute of vegetable-melon cro ps and potato AMP/C1/RFQ/64 / Procureme 1. Enhancing productivity-su nt of pneumatic seeders for t Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-05-27 2023-07-22 2024-01-18 he Research Institute of vege tions nvelope ementation s table-melon crops and potato AMP/C1/RFQ/66 / Procureme nt of agricultural techniques 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl (disc harrow, baler, revolving IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-06-24 2023-08-19 2024-02-15 tions nvelope ementation plow) for the Research Institu s te of vegetable-melon crops and potato AMP/C1/RFQ/67 / Procureme nt of agricultural techniques 1. Enhancing productivity-su (manure spreader, cultivator- Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 2023-07-08 2023-09-02 2024-02-29 plant feeder, silo harvester) f tions nvelope ementation s or the Research Institute of v egetable-melon crops and po tato AMP/C1/RFQ/65 / Procureme nt of agricultural machinery ( 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl backhoe loader, forklift) for t IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 2023-06-10 2023-08-05 2024-02-01 tions nvelope ementation he Research Institute of vege s table-melon crops and potato AMP/C1/RFQ/73 / Purchase o 1. Enhancing productivity-su f handouts for a printing hou Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 90,000.00 0.00 2023-05-28 2023-07-23 2024-01-19 se and books for the SRI of V tions nvelope ementation s egetables, Melons and Potato es AMP/C1/RFQ/75 / Purchase o f ICT equipment and furnitur 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl e for the Kashkadarya scienti IDA / 65490 pporting agricultural service Post Open - National 50,000.00 0.00 2023-06-04 2023-08-06 2024-02-02 tions nvelope ementation fic and experimental station s of the SRI named M. Mirzaev AMP/C1/RFQ/72 / Procureme 1. Enhancing productivity-su nt of cotton seeds for Cotton Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 90,000.00 0.00 2023-06-01 2023-07-27 2024-01-23 Breeding, Seed Production, a tions nvelope ementation s nd Agrtechnologies Research Institute AMP/C3/RFB/35 / Equipment 3. Facilitating trade and mar Open - Internationa Single Stage - One E Pending Impl for “Spatial Water Manageme IDA / 65490 Post Request for Bids 1,600,000.00 0.00 2023-06-11 2023-07-26 2023-08-02 2023-09-01 2023-10-06 2024-04-03 keting l nvelope ementation nt” Information System AMP/C1/RFQ/80 / Supply of s 1. Enhancing productivity-su eedlings for a greenhouse in Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 40,000.00 0.00 2023-06-18 2023-08-13 2024-02-09 the Kashkadarya Scientific St tions nvelope ementation s ation of the SRT named M. Mi rzaev AMP/C1/RFQ/77 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of computer and office eq IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-07-02 2023-08-27 2024-02-23 tions nvelope ementation uipment for the Fergana regi s onal AKIS AMP/C1/RFQ/78 / Procureme 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl nt of office furniture for the F IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-07-02 2023-08-27 2024-02-23 tions nvelope ementation ergana regional AKIS s AMP/C1/RFB/36 / Supply, pla 1. Enhancing productivity-su nting and operational manag Open - Internationa Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Request for Bids 624,000.00 0.00 2023-06-18 2023-08-02 2023-09-13 2023-10-13 2023-11-17 2024-05-15 ement of intensive orchard in l nvelope ementation s Yangiabad district of Jizzakh r egion AMP/C1/RFB/37 / Supply, pla 1. Enhancing productivity-su nting and operational manag Open - Internationa Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Request for Bids 389,000.00 0.00 2023-06-18 2023-08-02 2023-09-13 2023-10-13 2023-11-17 2024-05-15 ement of intensive orchard in l nvelope ementation s Forish district of Jizzakh regio n AMP/C1/RFB/38 / Supply, pla 1. Enhancing productivity-su nting and operational manag Open - Internationa Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Request for Bids 239,000.00 0.00 2023-06-18 2023-08-02 2023-09-13 2023-10-13 2023-11-17 2024-05-15 ement of intensive orchard in l nvelope ementation s Fergana district of Fergana r egion NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AMP/C4/SH/08 / Adaptation a nd implementation of softwar e products "1C: Enterprise 8. 4. Supporting project manag Request for Quota Single Stage - One E IDA / 65490 Post Open - National 15,000.00 4,940.33 Completed 2021-07-05 2021-04-26 2021-08-30 2021-05-11 2022-02-26 2021-09-11 Accounting in Uzbekistan" for ement tions nvelope financial management and a ccounting of PIU (for 4 years) AMP/C1/RFQ/16 / Making a p 1. Enhancing productivity-su Request for Quota Single Stage - One E rototype model of the Center IDA / 65490 pporting agricultural service Post Open - National 15,000.00 12,023.96 Completed 2021-10-06 2021-12-01 2021-08-10 2022-05-30 2021-12-10 tions nvelope of Excellence s AMP/C1/DS/02 / Making a pr 1. Enhancing productivity-su ototype model of the Centre IDA / 65490 pporting agricultural service Post Direct Selection Direct 24,000.00 22,730.10 Completed 2021-10-31 2021-10-21 2021-11-05 2021-10-22 2021-12-10 2021-10-30 2022-06-08 2021-12-10 of Excellence (additional volu s me) AMP/C1/RFQ/27 / Making an 1. Enhancing productivity-su Request for Quota Single Stage - One E alternative prototype model IDA / 65490 pporting agricultural service Post Open - National 100,000.00 100,000.00 Completed 2022-03-12 2022-05-07 2022-03-15 2022-11-03 2022-03-19 tions nvelope of the Centre of Excellence s AMP/C1/RFQ/56 / Design doc umentation services and con 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl struction of a box (shed) for s IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-03-20 2023-05-15 2023-11-11 tions nvelope ementation torage of agricultural machin s ery of Research Institute for Agricultural Mechanization. Page 6 AMP/C1/RFQ/62 / Services fo 1. Enhancing productivity-su Request for Quota Single Stage - One E Pending Impl r organization of trip to Turke IDA / 65490 pporting agricultural service Post Open - National 70,000.00 0.00 2023-05-27 2023-07-22 2024-01-18 tions nvelope ementation y for SRI of vegetable-melon s crops and potato AMP/C1/RFQ/71 / Design doc 1. Enhancing productivity-su umentation services and con Request for Quota Single Stage - One E Pending Impl IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-06-04 2023-07-30 2024-01-26 struction works for fencing th tions nvelope ementation s e land area located in AKIS c enter in Tashkent region AMP/C4/RFQ/74 / Providing o 4. Supporting project manag Request for Quota Single Stage - One E Pending Impl f services on organizational i IDA / 65490 Post Open - National 30,000.00 0.00 2023-05-26 2023-07-21 2024-01-17 ement tions nvelope ementation ssues of the World Bank train ing seminar CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AMCP/CQS/04 / Establishme Consultant Qualifi TF / A9955 Post Open - National 40,000.00 39,510.39 Signed 2019-08-21 2019-08-14 2019-09-11 2019-10-25 2019-09-04 2019-11-24 2019-09-23 2019-12-29 2019-10-03 2020-06-26 nt of Regional Agri-logistics C cation Selection enters AMCP/CQS/07 / Environment al and Social Management Fr Consultant Qualifi amework (ESMF), Labor Man TF / A9955 Post Open - National 40,000.00 25,378.19 Signed 2019-08-21 2019-06-26 2019-09-11 2019-10-25 2019-07-09 2019-11-24 2019-08-20 2019-12-29 2019-08-23 2020-06-26 cation Selection agement Procedure (LMP), St akeholder Engagement Plan ( SEP) AMCP/CQS/06 / Project feasi 4. Supporting project manag Consultant Qualifi bility study, Project Operatio TF / A9955 Post Open - National 65,000.00 100,475.28 Completed 2019-09-20 2019-11-20 2019-10-11 2019-11-24 2020-01-11 2019-12-24 2020-01-19 2020-01-28 2020-01-22 2020-07-26 2020-06-27 ement cation Selection ns Manual, inc. M&E framewo rk AMCP/CQS/08 / Workshops f 1. Enhancing productivity-su Consultant Qualifi TF / A9955 Post Open - National 17,000.00 0.00 Canceled 2020-04-05 2020-04-26 2020-06-09 2020-07-09 2020-08-13 2021-02-09 or Disemmination of Studies pporting agricultural service cation Selection Results s 4. Supporting project manag Consultant Qualifi AMCP/CQS/09 / Grant audit TF / A9955 Post Open - National 10,000.00 0.00 Canceled 2020-04-12 2020-05-03 2020-06-16 2020-07-16 2020-08-20 2021-02-16 ement cation Selection AMCP/CQS/10 / Fiduciary an 2. Supporting investments in Consultant Qualifi TF / A9955 Post Open - National 21,000.00 0.00 Canceled 2019-09-10 2019-10-01 2019-11-14 2019-12-14 2020-01-18 2020-07-16 d safeguards training high-value horticulture value cation Selection chains AMCP/LCS/09 / AUDIT OF TH E “ECAPDEV PROJECT PREPA 4. Supporting project manag Least Cost Selecti RATION GRANT FOR THE PRO TF / A9955 Post Open - National 10,000.00 2,541.57 Signed 2020-05-21 2020-05-27 2020-06-05 2020-06-15 2020-05-29 2020-06-30 2020-06-08 2020-07-05 2020-06-09 2020-07-15 2020-06-19 2020-07-21 2020-06-23 2020-08-20 ement on POSED AGRICULTURE MODE RNIZATION PROJECT” (TF0A9 955) AMP/C1/CQS/01 / Company/l 1. Enhancing productivity-su Consultant Qualifi aboratory to conduct soil and IDA / 65490 pporting agricultural service Post Open - National 22,000.00 21,757.97 Signed 2021-03-18 2021-03-18 2021-04-08 2021-03-19 2021-05-22 2021-04-09 2021-06-21 2021-04-20 2021-07-26 2021-05-21 2022-01-22 cation Selection water analysis s AMP/C3/QCBS/01 / SELECTIN 3. Facilitating trade and mar Quality And Cost- Open - Internationa G AN ARCHITECT TO DEVELO IDA / 65490 Prior 2,000,000.00 1,384,335.00 Signed 2021-06-30 2021-04-23 2021-07-21 2021-05-04 2021-09-03 2021-08-28 2021-10-01 2021-10-05 2021-10-31 2021-11-26 2021-12-05 2021-12-26 2022-01-09 2022-01-12 2023-01-09 keting Based Selection l P CONCEPT AND GENERAL A RCHITECTURE AMP/C4/CQS/02 / Baseline St 4. Supporting project manag Consultant Qualifi IDA / 65490 Post Open - National 50,000.00 39,192.00 Signed 2021-06-30 2021-05-06 2021-07-21 2021-05-12 2021-09-03 2021-06-09 2021-10-03 2021-06-23 2021-11-07 2021-07-08 2022-05-06 udy ement cation Selection AMP/C1/CQS/05 / Consulting company for development of 1. Enhancing productivity-su Consultant Qualifi design documentation of con IDA / 65490 pporting agricultural service Post 45,000.00 33,038.72 Signed 2021-06-30 2021-05-12 2021-07-21 2021-05-30 2021-09-03 2021-06-11 2021-10-03 2021-07-09 2021-11-07 2021-07-16 2022-05-06 cation Selection struction works for AKIS Cent s er in Samarkand region AMP/C1/CQS/04 / Consulting 1. Enhancing productivity-su company for development of Consultant Qualifi IDA / 65490 pporting agricultural service Post Open - National 105,000.00 0.00 Canceled 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 design documentation of con cation Selection s struction works for AKIS Cent ers AMP/C1/CQS/06 / Consulting company for development of 1. Enhancing productivity-su Consultant Qualifi design documentation of con IDA / 65490 pporting agricultural service Post Open - National 35,000.00 33,714.00 Signed 2021-08-20 2021-06-10 2021-09-10 2021-10-24 2021-08-06 2021-11-23 2021-07-28 2021-12-28 2021-08-20 2022-06-26 cation Selection struction works for AKIS Cent s er in Namangan region AMP/C1/CQS/08 / Consulting 1. Enhancing productivity-su company for development of Consultant Qualifi IDA / 65490 pporting agricultural service Post Open - National 35,000.00 0.00 Canceled 2021-08-20 2021-06-10 2021-09-10 2021-10-24 2021-11-23 2021-12-28 2022-06-26 design documentation of con cation Selection s struction works for AKIS Cent er in Bukhara region AMP/C1/CQS/09 / Consulting 1. Enhancing productivity-su company for development of Consultant Qualifi IDA / 65490 pporting agricultural service Post Open - National 35,000.00 33,714.00 Signed 2021-08-20 2021-06-10 2021-09-10 2021-10-24 2021-08-06 2021-11-23 2021-08-12 2021-12-28 2021-08-20 2022-06-26 design documentation of con cation Selection s struction works for AKIS Cent er in Khorezm region AMP/C1/CQS/10 / Consulting 1. Enhancing productivity-su company for development of Consultant Qualifi IDA / 65490 pporting agricultural service Post Open - National 35,000.00 0.00 Canceled 2021-08-20 2021-06-10 2021-09-10 2021-10-24 2021-11-23 2021-12-28 2022-06-26 design documentation of con cation Selection s struction works for AKIS Cent er in Sirdarya region AMP/C1/QCBS/02 / Consultin 1. Enhancing productivity-su g company for development Quality And Cost- Open - Internationa IDA / 65490 pporting agricultural service Prior 2,000,000.00 0.00 Canceled 2021-09-01 2021-09-22 2021-11-05 2021-12-03 2022-01-02 2022-02-06 2022-03-13 2023-03-13 of design documentation for Based Selection l s construction of Center of Exc ellence AMP/C1/FBS/01 / Constructio n supervision during the cons 1. Enhancing productivity-su truction of the Agricultural Kn Fixed Budget Sele Open - Internationa IDA / 65490 pporting agricultural service Prior 1,600,000.00 0.00 Signed 2021-11-30 2021-11-05 2021-12-21 2021-11-24 2022-02-03 2022-03-18 2022-03-03 2022-04-19 2022-04-02 2022-08-02 2022-05-07 2022-09-20 2022-06-11 2025-06-10 owledge and Innovation Syst ction l s ems (AKIS) buildings across a ll regions of Republic of Uzbe kistan AMP/C3/CQS/03 / Сapacity d evelopment of SPQI for pest 3. Facilitating trade and mar Consultant Qualifi control to perform plant prot IDA / 65490 Post Open - National 152,000.00 0.00 Canceled 2022-03-01 2022-03-22 2022-05-05 2022-06-04 2022-07-09 2023-01-05 keting cation Selection ection, phytosanitary inspecti on, testing and certification a ctions Page 7 AMP/C1/QCBS/03 / Consultin g company for preparation of bid documentation for design 1. Enhancing productivity-su Quality And Cost- Open - Internationa Under Implement and supply of equipment for IDA / 65490 pporting agricultural service Prior 6,000,000.00 0.00 2022-02-01 2022-01-27 2022-02-22 2022-04-20 2022-04-07 2022-09-08 2022-05-05 2022-10-13 2022-06-04 2022-12-22 2022-07-09 2022-08-13 2025-08-12 Based Selection l ation NARCE; and design documen s tation and construction super vision during the constructio n of NARCE. AMP/C4/LCS/01 / Audit of the 4. Supporting project manag Least Cost Selecti IDA / 65490 Post Open - National 45,000.00 49,200.00 Signed 2022-02-28 2022-02-01 2022-03-21 2022-05-04 2022-02-07 2022-06-01 2022-03-10 2022-07-01 2022-03-24 2022-08-05 2022-03-29 2022-09-09 2022-04-12 2023-03-08 project for the period of 4 fin ement on ancial years AMP/C1/CQS/12 / Consulting 1. Enhancing productivity-su company for development of Consultant Qualifi Under Implement IDA / 65490 pporting agricultural service Post Open - National 35,000.00 0.00 2022-06-20 2022-05-20 2022-07-11 2022-07-18 2022-08-24 2022-07-18 2022-09-23 2022-08-08 2022-10-28 2023-04-26 design documentation of con cation Selection ation s struction works for AKIS Cent er in Karakalpakstan AMP/C1/CQS/11 / Consulting company for development of 1. Enhancing productivity-su Consultant Qualifi design documentation of con IDA / 65490 pporting agricultural service Post Open - National 35,000.00 32,218.56 Signed 2022-06-30 2022-05-20 2022-07-21 2022-07-18 2022-09-03 2022-07-18 2022-10-03 2022-08-08 2022-11-07 2022-08-09 2023-05-06 cation Selection struction works for AKIS Cent s er in Surkhandarya region AMP/C1/CQS/17 / Consulting company for improving the e fficiency of the use of househ 1. Enhancing productivity-su Consultant Qualifi Under Implement old plots by disseminating m IDA / 65490 pporting agricultural service Post Open - National 100,000.00 0.00 2022-08-30 2022-08-16 2022-09-20 2022-12-23 2022-11-03 2022-09-30 2022-12-03 2022-10-19 2023-01-07 2023-08-05 cation Selection ation odern knowledge and innova s tive technologies, strengthen ing the capacity of rural wom en and youth in the Tashkent region AMP/C3/QCBS/04 / Selecting a company for developing an 3. Facilitating trade and mar Quality And Cost- Open - Internationa Under Implement Agro-Integrated Land Manag IDA / 65490 Prior 8,400,000.00 0.00 2022-10-10 2022-09-05 2022-10-31 2022-09-09 2022-12-14 2023-05-25 2023-01-11 2023-02-10 2023-03-17 2023-04-21 2025-04-20 keting Based Selection l ation ement System using modern technologies for the Ministry of Agriculture AMP/C3/QCBS/05 / Selecting a company for developing an 3. Facilitating trade and mar Quality And Cost- Open - Internationa information system “Spatial IDA / 65490 Prior 6,300,000.00 0.00 Under Review 2022-10-18 2022-09-05 2022-11-08 2022-09-08 2022-12-22 2023-05-18 2023-01-19 2023-02-18 2023-03-25 2023-04-29 2025-04-28 keting Based Selection l Water Management” for the Ministry of Agriculture AMP/C1/CQS/18 / Consulting services for conducting a Stu 1. Enhancing productivity-su Consultant Qualifi dy-tour to France and Spain t IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 Under Review 2022-10-31 2022-09-23 2022-11-21 2023-01-04 2023-02-03 2023-03-10 2023-10-06 cation Selection o learn international best pra s ctices in Agricultural Advisor y Services AMP/C1/CQS/15 / Consulting 1. Enhancing productivity-su company for provision of co Consultant Qualifi Under Implement IDA / 65490 pporting agricultural service Post Open - National 80,000.00 0.00 2022-12-20 2022-12-14 2023-01-10 2023-02-23 2023-03-25 2023-04-29 2023-10-26 mmunication services to AKI cation Selection ation s S Center in Tashkent region AMP/C1/CQS/16 / Consulting 1. Enhancing productivity-su company for increasing hum Consultant Qualifi Open - Internationa Under Implement IDA / 65490 pporting agricultural service Post 130,000.00 0.00 2022-11-21 2022-08-09 2022-12-12 2023-03-09 2023-01-25 2022-12-21 2023-02-24 2023-03-31 2023-09-27 an resources in the field of so cation Selection l ation s il laboratory analysis AMP/C4/CQS/19 / TECHNICAL , FINANCIAL, ENVIRONMENTA 4. Supporting project manag Consultant Qualifi Under Implement TF / A9955 Post Open - National 100,000.00 0.00 2022-11-20 2022-11-07 2022-12-11 2023-01-24 2023-02-23 2023-03-30 2023-09-26 L AND SOCIAL REVIEW (MONI ement cation Selection ation TORING) OF THE PROJECT CR EDIT LINE AMP/C1/CQS/21 / Consulting 1. Enhancing productivity-su services for training and cap Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2024-03-20 acity building on soil system cation Selection ntation s management in Germany AMP/C1/CQS/22 / Consulting 1. Enhancing productivity-su services for training and cap Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 2023-06-21 2023-07-12 2023-08-25 2023-09-24 2023-10-29 2024-04-26 acity building on soil system cation Selection ntation s management in South Korea AMP/C1/CQS/20 / Consulting 1. Enhancing productivity-su services for training and cap Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 120,000.00 0.00 2023-03-31 2023-04-21 2023-06-04 2023-07-04 2023-08-08 2024-02-04 acity building on soil system cation Selection ntation s management in Netherlands AMP/C1/CQS/23 / Preparatio 1. Enhancing productivity-su n of design and estimate doc Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 100,000.00 0.00 2023-03-17 2023-04-07 2023-05-21 2023-06-20 2023-07-25 2024-01-21 umentations for reconstructi cation Selection ntation s on/construction works for Ric e Research Institute. AMP/C3/CQS/24 / Consulting services to support and coor dinate work on the managem ent and development of pers 3. Facilitating trade and mar Consultant Qualifi Open - Internationa IDA / 65490 Post 125,000.00 0.00 Canceled 2023-03-17 2023-02-27 2023-04-07 2023-05-21 2023-06-20 2023-07-25 2024-01-21 onnel in the agro-industrial c keting cation Selection l omplex and agriculture of th e Republic of Uzbekistan with in the framework of the Digit al Uzbekistan 2020-2030 proj ect AMP/C1/CQS/25 / Consulting services for professional dev 1. Enhancing productivity-su Consultant Qualifi Under Implement elopment, business training a IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-04-21 2023-03-27 2023-05-12 2023-03-30 2023-06-25 2023-07-25 2023-08-29 2024-02-25 cation Selection ation nd climate-resilient technolo s gies of AKIS employees and f armers AMP/C3/CQS/26 / Constructi on supervision for Agrologisti 3. Facilitating trade and mar Consultant Qualifi Under Implement IDA / 65500 Post Open - National 130,000.00 0.00 2023-05-10 2023-03-11 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2024-03-15 c Center in Angor district of S keting cation Selection ation urkhandarya region AMP/C1/CQS/27 / Procureme 1. Enhancing productivity-su Consultant Qualifi Under Implement nt of a branding company for IDA / 65490 pporting agricultural service Post Open - National 90,000.00 0.00 2023-04-28 2023-05-30 2023-05-19 2023-07-02 2023-08-01 2023-09-05 2024-03-03 cation Selection ation AKIS centers s AMP/C1/CQS/24 / Consulting services to support and coor 1. Enhancing productivity-su dinate work on the managem Consultant Qualifi Under Implement IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-03-23 2023-03-07 2023-04-13 2023-03-23 2023-05-27 2023-06-26 2023-07-31 2024-01-27 ent and development of pers cation Selection ation s onnel in the agro-industrial c omplex and agriculture of th e Republic of Uzbekistan Page 8 AMP/C1/CQS/30 / Final const 1. Enhancing productivity-su Consultant Qualifi Pending Impleme ruction measurement of the IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-25 2023-09-29 2024-03-27 cation Selection ntation AKIS building in the Tashkent s region AMP/C1/CQS/31 / Developm ent of design and constructio 1. Enhancing productivity-su Consultant Qualifi Under Implement n engineering/reconstruction IDA / 65490 pporting agricultural service Post Open - National 125,000.00 0.00 2023-04-28 2023-03-30 2023-05-19 2023-04-01 2023-07-02 2023-08-01 2023-09-05 2024-03-03 cation Selection ation of the complex of buildings o s f the "Center of Excellence (C oE)" AMP/C1/CQS/29 / Consulting services for conducting a Stu dy-tour to European countrie 1. Enhancing productivity-su Consultant Qualifi Pending Impleme s on learning production and IDA / 65490 pporting agricultural service Post Open - National 70,000.00 0.00 2023-06-07 2023-06-28 2023-08-11 2023-09-10 2023-10-15 2024-04-12 cation Selection ntation testing of agricultural equip s ment for the staff of Center f or Certification and Testing o f Agricultural Machinery and Technologies AMP/C1/CQS/28 / Consulting services for organization of tr 1. Enhancing productivity-su ip to Turkey, UAE, Japan and Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 130,000.00 0.00 2023-07-10 2023-07-31 2023-09-13 2023-10-13 2023-11-17 2024-05-15 South Korea for the staff of C cation Selection ntation s enter for Certification and Te sting of Agricultural Machiner y and Technologies AMP/C1/CQS/32 / DIAGNOSTI 1. Enhancing productivity-su CS OF THE CURRENT STATE Consultant Qualifi Under Implement IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-05-22 2023-04-19 2023-06-12 2023-07-26 2023-08-25 2023-09-29 2024-03-27 OF UZBEKISTAN GREENHOUS cation Selection ation s E SECTOR WITHIN THE FRAM EWORK OF THE PROJECT AMP/C1/CQS/33 / Consultant 1. Enhancing productivity-su for the design of irrigation an Consultant Qualifi Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 140,000.00 0.00 2023-05-29 2023-06-19 2023-08-02 2023-09-01 2023-10-06 2024-04-03 d trellis systems for the inten cation Selection ntation s sive orchards and vineyards INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AMCP/IC/01 / Strengthening Individual Consult TF / A9955 Post Open 43,500.00 11,434.33 Signed 2019-08-21 2019-08-20 2019-10-09 2019-11-01 2019-10-30 2019-11-20 2019-12-04 2019-11-22 2020-06-01 Delivery of Key Agricultural S ant Selection ervices AMCP/IC/03 / Establishment Individual Consult of Agricultural Advisory/Exte TF / A9955 Post Open 43,500.00 43,300.00 Completed 2019-08-21 2019-08-14 2019-10-09 2019-10-16 2019-10-30 2019-11-11 2019-12-04 2019-11-05 2020-06-01 2020-02-29 ant Selection nsion Services AMCP/IC/11 / Project coordin Individual Consult TF / A9955 Post Direct 4,800.00 4,800.00 Signed 2019-08-21 2019-05-02 2019-08-31 2019-05-07 2019-09-21 2019-04-30 2019-10-26 2019-05-01 2020-04-23 ator ant Selection AMCP/SSS/12 / Procurement Individual Consult TF / A9955 Post Direct 4,400.00 4,400.00 Signed 2019-08-21 2019-05-02 2019-08-31 2019-05-07 2019-09-21 2019-04-30 2019-10-26 2019-05-01 2020-04-23 specialst ant Selection AMCP/SSS/13 / Financal spec Individual Consult TF / A9955 Post Direct 4,400.00 4,400.00 Signed 2019-08-21 2019-05-02 2019-08-31 2019-05-07 2019-09-21 2019-04-30 2019-10-26 2019-05-01 2020-04-23 ialist ant Selection AMCP/SSS/14 / Specialist on Individual Consult TF / A9955 Post Direct 4,400.00 4,400.00 Signed 2019-08-21 2019-05-02 2019-08-31 2019-05-07 2019-09-21 2019-04-30 2019-10-26 2019-05-01 2020-04-23 public and private sector inv ant Selection estments AMCP/SSS/05 / Procurement TF / A9955 Post Direct Selection Direct 26,000.00 24,300.00 Signed 2019-08-21 2019-05-21 2019-08-31 2019-08-20 2019-11-04 2019-08-28 2020-05-02 Assessment and PPSD AMCP/IC/02 / Strengthening Individual Consult TF / A9955 Post Open 43,500.00 0.00 Canceled 2019-08-21 2019-08-14 2019-10-09 2019-10-30 2019-12-04 2020-06-01 Organization of Horticulture ant Selection Value Chains AMCP/SSS/16 / Guidance in 1. Enhancing productivity-su designing the core elements TF / A9955 pporting agricultural service Post Direct Selection Direct 15,000.00 14,950.00 Completed 2020-04-01 2020-04-27 2020-04-08 2020-04-08 2020-04-20 2020-04-29 2020-06-20 2020-06-27 for an Uzbek Advisory Servic s es Strategy and Action Plan & UAKIS AMCP/SSS/15 / Training on t 1. Enhancing productivity-su he Environmental and Social TF / A9955 pporting agricultural service Post Direct Selection Direct 25,000.00 18,964.61 Signed 2020-04-02 2020-05-04 2020-04-09 2020-05-11 2020-04-30 2020-05-16 2020-06-29 Framework (ESF) s AMP/C1/IC/02 / International 4. Supporting project manag Individual Consult Advisor for R&D, Component IDA / 65490 Post Open 105,000.00 104,945.00 Completed 2020-11-05 2020-11-10 2020-12-24 2020-11-30 2021-01-14 2020-12-03 2021-02-18 2020-12-04 2021-08-17 2021-12-11 ement ant Selection 1 and sub-component 3.2 AMP/C1/IC/01 / International Advisor (consultant) on estab 4. Supporting project manag Individual Consult IDA / 65490 Post Open 105,000.00 104,965.00 Completed 2020-11-05 2020-11-10 2020-12-24 2020-11-28 2021-01-14 2020-12-02 2021-02-18 2020-12-03 2021-08-17 2021-12-03 lishment of turnkey intensive ement ant Selection orchards and vineyards AMP/C1/DS/01 / UK Bangor U niversity consultancy service s for development of concept 1. Enhancing productivity-su note for establishment of the IDA / 65490 pporting agricultural service Post Direct Selection Direct 75,000.00 26,282.00 Signed 2020-12-11 2020-12-14 2020-12-21 2020-12-16 2021-02-24 2021-02-16 2021-08-23 national agricultural research s centre of excellence of the Mi nistry of the Agriculture of Uz bekistan AMP/C4/IC/01 / Project Mana 4. Supporting project manag Individual Consult IDA / 65490 Post Open 75,600.00 72,000.00 Completed 2021-03-10 2021-03-10 2021-04-28 2021-08-17 2021-05-19 2021-06-21 2021-06-23 2021-08-18 2021-12-20 2021-10-01 ger Selection ement ant Selection AMP/C1/IC/06 / International Advisor for Support on Agricu 4. Supporting project manag Individual Consult IDA / 65490 Post Open 105,000.00 106,080.00 Signed 2021-06-30 2021-05-27 2021-08-18 2021-07-06 2021-09-08 2021-08-18 2021-10-13 2021-08-19 2022-05-11 ltural Advisory and Extension ement ant Selection Services in the AKIS Centers AMP/C1/IC/07 / Local Consult ant for Support on Agricultur 4. Supporting project manag Individual Consult IDA / 65490 Post Open 30,000.00 23,100.74 Signed 2021-06-30 2021-05-27 2021-08-18 2021-10-11 2021-09-08 2021-10-21 2021-10-13 2021-10-22 2022-05-11 al Advisory and Extension Se ement ant Selection rvices in the AKIS Centers AMP/C1/IC/05 / Assistant to I 4. Supporting project manag Individual Consult IDA / 65490 Post Open 50,000.00 24,489.22 Signed 2021-06-30 2021-05-27 2021-08-18 2021-08-02 2021-09-08 2021-08-05 2021-10-13 2021-08-06 2022-04-11 nternational Advisor: Financi ement ant Selection al Specialist Page 9 AMP/C1/IC/03 / Assistant to I 4. Supporting project manag Individual Consult nternational Advisor: Trellis S IDA / 65490 Post Open 50,000.00 25,000.00 Signed 2021-06-30 2021-05-27 2021-08-18 2021-08-25 2021-09-08 2021-08-25 2021-10-13 2021-09-01 2022-04-11 ement ant Selection ystem Specialist AMP/C1/IC/04 / Assistant to I 4. Supporting project manag Individual Consult IDA / 65490 Post Open 50,000.00 16,119.84 Signed 2021-06-30 2021-05-24 2021-08-18 2021-07-29 2021-09-08 2021-08-02 2021-10-13 2021-08-03 2022-04-11 nternational Advisor: Irrigatio ement ant Selection n Specialist AMP/C1/IC/09 / International consultant for the creation a 1. Enhancing productivity-su nd testing of new agricultural Individual Consult IDA / 65490 pporting agricultural service Post Open 60,000.00 0.00 Canceled 2021-12-22 2021-08-10 2022-02-09 2022-03-02 2022-04-06 2022-10-03 machinery, as well as imple ant Selection s mentation in agriculture for t he Design and Technology C enter for Agricultural Machin ery AMP/C1/IC/08 / International Consultant for development 1. Enhancing productivity-su Individual Consult of technical specifications of l IDA / 65490 pporting agricultural service Post Open 100,000.00 19,700.00 Signed 2021-12-22 2021-08-10 2022-02-09 2021-12-11 2022-03-02 2022-02-28 2022-04-06 2022-03-01 2022-10-03 ant Selection aboratory equipment for Cen s ter for Variety Testing of Cro ps AMP/C1/IC/12 / International consultant for development o 1. Enhancing productivity-su f technical specifications of la Individual Consult IDA / 65490 pporting agricultural service Post Open 100,000.00 0.00 Canceled 2021-12-22 2021-08-10 2022-02-09 2022-03-02 2022-04-06 2022-10-03 boratory equipment for the C ant Selection s enter of Certification and Tes ting of Agricultural Machinery and Technologies AMP/C1/DS/03 / International 1. Enhancing productivity-su Individual Consult Advisor for R&D, Component IDA / 65490 pporting agricultural service Post Direct 125,000.00 124,670.00 Signed 2021-12-07 2021-12-01 2021-12-17 2021-12-11 2022-01-07 2021-12-14 2022-02-11 2021-12-15 2023-02-11 ant Selection 1 and Sub-component 3.2 s AMP/C1/DS/04 / International 1. Enhancing productivity-su Advisor (consultant) on estab Individual Consult IDA / 65490 pporting agricultural service Post Direct 125,000.00 58,270.00 Signed 2021-12-10 2021-12-06 2021-12-20 2021-12-28 2022-01-10 2022-01-05 2022-02-14 2022-01-06 2023-02-14 lishment of turnkey intensive ant Selection s orchards and vineyards AMP/C1/IC/10 / International Consultant for development 1. Enhancing productivity-su of technical specifications of l Individual Consult IDA / 65490 pporting agricultural service Post Open 100,000.00 0.00 Canceled 2021-12-22 2022-02-09 2022-03-02 2022-04-06 2022-10-03 aboratory equipment for Stat ant Selection s e unitary company “Service Center in the agro-industrial complex” AMP/C1/IC/11 / Local agrono mist to assist PIU in establish 4. Supporting project manag Individual Consult IDA / 65490 Post Open 40,000.00 0.00 Canceled 2022-05-05 2022-06-23 2022-07-14 2022-08-18 2023-03-16 ment of turnkey intensive orc ement ant Selection hards and vineyards AMP/C1/DS/08 / Assistant to 1. Enhancing productivity-su International Advisor on esta Individual Consult Under Implement IDA / 65490 pporting agricultural service Post Direct 15,000.00 0.00 2022-04-28 2022-04-15 2022-05-08 2022-06-23 2022-05-29 2022-07-03 2022-12-30 blishment of intensive orchar ant Selection ation s ds: Trellis System Specialist AMP/C1/DS/09 / Assistant to 1. Enhancing productivity-su International Advisor on esta Individual Consult IDA / 65490 pporting agricultural service Post Direct 15,000.00 13,752.00 Signed 2022-04-28 2022-04-15 2022-05-08 2022-06-24 2022-05-29 2022-07-01 2022-07-03 2022-07-02 2022-12-30 blishment of intensive orchar ant Selection s ds: Irrigation Specialist AMP/C1/DS/10 / Assistant to 1. Enhancing productivity-su International Advisor on esta Individual Consult Under Implement IDA / 65490 pporting agricultural service Post Direct 25,000.00 0.00 2022-04-28 2022-04-15 2022-05-08 2022-06-24 2022-05-29 2022-06-27 2022-07-03 2022-12-30 blishment of intensive orchar ant Selection ation s ds: Finance Specialist AMP/C3/DS/07 / Consulting c ompany for provision of traini 3. Facilitating trade and mar IDA / 65490 Post Direct Selection Direct 125,000.00 113,380.55 Signed 2022-05-10 2022-04-05 2022-05-20 2021-11-23 2022-07-24 2022-05-11 2023-01-20 ng course for staff of the Age keting ncy of Plant Protection and Q uarantine AMP/C1/DS/11 / International 1. Enhancing productivity-su Advisor for Support on Agricu Individual Consult IDA / 65490 pporting agricultural service Post Direct 136,000.00 135,680.00 Signed 2022-06-30 2022-06-15 2022-07-10 2022-06-23 2022-07-31 2022-06-29 2022-09-04 2022-06-30 2024-02-06 ltural Advisory and Extension ant Selection s Services in the AKIS Centers (II. volume) AMP/C1/DS/12 / Local Consul 1. Enhancing productivity-su tant for Support on Agricultur Individual Consult IDA / 65490 pporting agricultural service Post Direct 100,000.00 90,172.64 Signed 2022-06-30 2022-06-15 2022-07-10 2022-06-22 2022-07-31 2022-06-22 2022-09-04 2022-06-23 2024-02-14 al Advisory and Extension Se ant Selection s rvices in the AKIS Centers (II. Volume) AMP/C1/IC/14 / Local Consult 1. Enhancing productivity-su ant on establishment of agro- Individual Consult IDA / 65490 pporting agricultural service Post Open 20,000.00 0.00 Canceled 2022-08-30 2022-10-18 2022-11-08 2022-12-13 2023-12-13 complexes in Kashkadarya a ant Selection s nd Surkhandarya regions AMP/C1/IC/15 / Hiring 13 sho 1. Enhancing productivity-su Individual Consult Under Implement rt-term individual consultants IDA / 65490 pporting agricultural service Post Open 80,000.00 0.00 2022-07-10 2022-06-29 2022-08-28 2022-09-18 2022-10-23 2023-10-23 ant Selection ation for AKIS in Tashkent region s AMP/C1/IC/16 / Hiring 13 sho 1. Enhancing productivity-su Individual Consult Under Implement rt-term individual consultants IDA / 65490 pporting agricultural service Post Open 80,000.00 0.00 2022-07-14 2022-06-29 2022-09-01 2022-09-22 2022-10-27 2023-10-27 ant Selection ation for AKIS in Samarkand region s AMP/C1/IC/17 / Hiring 13 sho 1. Enhancing productivity-su Individual Consult Under Implement rt-term individual consultants IDA / 65490 pporting agricultural service Post Open 80,000.00 0.00 2022-07-19 2022-06-29 2022-09-06 2022-09-27 2022-11-01 2023-11-01 ant Selection ation for AKIS in Ferghana region s AMP/C3/IC/18 / Local consult ant to support and coordinat 3. Facilitating trade and mar Individual Consult Under Implement e the construction of Agrologi IDA / 65500 Post Open 80,000.00 0.00 2022-08-10 2022-06-30 2022-09-28 2022-08-19 2022-10-19 2022-08-22 2022-11-23 2023-11-23 keting ant Selection ation stic centers in the regions of the Republic of Uzbekistan AMP/C1/IC/19 / International invidual advisor (consultant) 4. Supporting project manag Individual Consult Open - Internationa Under Implement IDA / 65490 Post 120,000.00 0.00 2022-10-21 2022-07-27 2022-12-09 2022-12-30 2023-02-03 2024-02-03 on establishment of turnkey i ement ant Selection l ation ntensive orchards and vineya rds AMP/C3/IC/13 / Local consult ant to support trade facilitati 3. Facilitating trade and mar Individual Consult IDA / 65490 Post Open 32,000.00 0.00 Canceled 2022-04-30 2022-04-01 2022-06-18 2022-07-09 2022-08-13 2022-12-31 on and marketing, and coordi keting ant Selection nation with government agen cies Page 10 AMP/C1/IC/20 / Local consult 1. Enhancing productivity-su ant for the creation of an exp Individual Consult Pending Impleme IDA / 65490 pporting agricultural service Post Open - National 35,000.00 0.00 2023-04-04 2023-05-23 2023-06-13 2023-07-18 2024-01-14 erimental greenhouse compl ant Selection ntation s ex at the Mirzaev Research I nstitute AMP/C1/IC/21 / Assistant to I nternational advisor on estab 1. Enhancing productivity-su Individual Consult Open - Internationa Under Implement lishment of turnkey intensive IDA / 65490 pporting agricultural service Post 40,000.00 0.00 2023-04-10 2023-02-08 2023-05-29 2023-06-19 2023-07-24 2024-07-18 ant Selection l ation orchards and vineyards: Irrig s ation and trellis system speci alist AMP/C3/IC/22 / Consultant to support and coordinate work on the development of a digit 3. Facilitating trade and mar Individual Consult Open - Internationa Under Implement IDA / 65490 Post 125,000.00 0.00 2023-05-01 2023-02-01 2023-06-19 2023-07-10 2023-08-14 2024-02-10 alization system in the agro-i keting ant Selection l ation ndustrial complex and agricu lture of the Republic of Uzbe kistan AMP/C1/IC/23 / International 1. Enhancing productivity-su consultant to support the org Individual Consult Open - Internationa Under Implement IDA / 65490 pporting agricultural service Post 125,000.00 0.00 2023-05-05 2023-01-20 2023-06-23 2023-07-14 2023-08-18 2025-08-17 anization and development o ant Selection l ation s f agricultural and advisory se rvices in AKIS centers AMP/C1/IC/24 / Local consult ant for the support of Interna 1. Enhancing productivity-su Individual Consult Under Implement tional consultant to support t IDA / 65490 pporting agricultural service Post Open - National 30,000.00 0.00 2023-05-08 2023-02-03 2023-06-26 2023-07-17 2023-08-21 2025-08-20 ant Selection ation he organization and develop s ment of agricultural and advi sory services in AKIS centers AMP/C1/DS/13 / International 1. Enhancing productivity-su Advisor (individual consultant Individual Consult Direct - Internation Under Implement IDA / 65490 pporting agricultural service Post 125,000.00 0.00 2023-02-28 2023-03-10 2023-03-10 2023-03-23 2023-03-31 2023-05-05 2024-05-04 ) for R&D, Component 1 and ant Selection al ation s Sub-component 3.2 AMP/C1/DS/14 / Consulting s ervices for technical, financia l, environmental and social r eview (monitoring) of the cre 4. Supporting project manag Direct - Internation Under Implement IDA / 65490 Post Direct Selection 125,000.00 0.00 2023-04-10 2023-03-06 2023-04-20 2023-06-24 2023-12-21 dit line of the project with tra ement al ation inings on guarantees and oth er activities for interaction wi th stakeholders within the fra mework of the project AMP/C1/DS/15 / Education of 1. Enhancing productivity-su Scientific Soil Research Instit Direct - Internation Under Implement IDA / 65490 pporting agricultural service Post Direct Selection 90,000.00 0.00 2023-05-01 2023-03-02 2023-05-11 2023-07-15 2024-01-11 ute staff at Wageningen Univ al ation s ersity & Research AMP/C1/DS/16 / Individual co 1. Enhancing productivity-su Individual Consult Pending Impleme IDA / 65490 Post Direct - National 140,000.00 0.00 2023-06-05 2023-06-15 2023-07-06 2023-08-10 2024-02-06 nsultants (14) for AKIS center pporting agricultural service ant Selection ntation s s Page 11 PROCUREMENT PLAN Project information: India; Second National Ganga River Basin Project (P169111) Project Implementation agency: NMCG will continue to be responsible for overall Project implementation. At State level, SMCGs are the extended arm of the NMCG and will coordinate implementation of activities in the State. Investments are executed by different Executing Agencies (EAs). The investments to be carried over from the ongoing NGRBP to the proposed SNGRBP are located in UP, Bihar and West Bengal. The corresponding EAs are the UP Jal Nigam, Bihar Urban Infrastructure Development Corporation (BUIDCO), and the Kolkata Municipal Corporation and the Kolkata Metropolitan Development Authority in West Bengal. Date of the Procurement Plan: April 21, 2020 Period covered by this Procurement Plan: 18 months [as updated regularly on STEP] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.6 of Section V of the Regulations and the following provisions: 1. Only the model bidding documents for National Competitive Procurement (NCP) agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. 2. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. 3. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, State-owned enterprises, small-scale enterprises or enterprises from any given State. 4. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. 5. Government e-Marketplace (GeM)* set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. 6. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. 7. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 8. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 9. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. 10. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. *Use of GeM will be allowed in lieu of RFQ/Shopping as per following details: • up to INR 50,000 in catalog mode (viz. any available item could be selected by IA without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. • up to INR 3 Million from the Supplier having lowest price amongst at least three Suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. • up to INR equivalent of US$ 100,000 from the Supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three Suppliers, using online bidding or reverse auction tool provided on GeM. Leased Assets Not Applicable Procurement of Secondhand Goods: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations. Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable Other Relevant Procurement Information. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. Even for Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. PROCUREMENT India : Second National Ganga River Basin Project PLAN General Information Country: India 2020-04-22 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169111 GPN Date: 2020-06-16 Project Name: Second National Ganga River Basin Project Loan / Credit No: / , IBRD / 91360 National Mission for Clean Ganga Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-NMCG-169661-CW-RFB / Rehabilitation/Renovation of Public Private Part Open - Internationa Single Stage - Two E 105,926,600. 74,652,859. 2037-12-2 Agra Sewerage Scheme (I & / Infrastructure Development Prior Signed 2020-05-31 2021-05-05 2020-06-05 2021-09-03 2020-07-17 2021-09-22 2020-11-16 2022-05-02 2020-12-21 2022-08-26 nership l nvelope 00 74 1 D works) in Uttar Pradesh Sta te under Hybrid Annuity PPP Mode IN-NMCG-169662-CW-RFB / Pollution Abatement Works f or River Kaliat Meerut under Public Private Part Open - Internationa Single Stage - Two E 86,037,300.0 Under Imple 2038-01-0 / Infrastructure Development Prior 0.00 2020-06-15 2021-08-27 2020-06-20 2021-11-16 2020-08-01 2022-03-08 2020-12-01 2023-04-04 2021-01-05 Meerut municipality (Intercep nership l nvelope 0 mentation 5 tion & Diversion with STP) in Uttar Pradesh State under Hy brid Annuity PPP Mode IN-NMCG-169663-CW-RFB / I &D and STP works at Sahara Public Private Part Open - Internationa Single Stage - Two E 59,214,000.0 Under Revie 2038-02-2 / Infrastructure Development Prior 0.00 2020-07-31 2022-11-15 2020-08-05 2022-11-16 2020-09-16 2023-03-23 2021-01-16 2021-02-20 npur in Uttar Pradesh State u nership l nvelope 0 w 0 nder Hybrid Annuity PPP Mod e IN-NMCG-349280-CW-RFB / Pollution Abatement Work for Open - Internationa Single Stage - Two E Other (with field f 76,699,300.0 Under Imple 2041-03-1 Rejuvenation of River Adi Ga IBRD / 91360 Infrastructure Development Prior Request for Bids 0.00 2023-04-14 2023-04-19 2023-05-31 2023-08-13 2023-09-17 l nvelope or explanation) 0 mentation 6 nga (Tolly's Nullah), Kolkata, in West Bengal State under D BOT mode GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-NMCG-175505-GO-RFB / I nstrumentation & Equipment Single Stage - Two E Pending Impl / Institutional Development Post Request for Bids Open - National 2,000,000.00 0.00 2021-03-10 2021-04-04 2021-05-19 2021-10-01 2021-11-05 2022-05-04 Supply, Installation and Oper nvelope ementation ationalization of Ganga Know ledge Centre (GKC) IN-NMCG-342251-GO-RFP / P Single Stage - Two E Pending Impl rocurement of A0 Size Plotter IBRD / 91360 Institutional Development Post Request for Bids Open - National 10,910.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-19 nvelope ementation for CPCB HO, Delhi IN-NMCG-342254-GO-RFP / P Single Stage - Two E Pending Impl rocurement of A0 Size Scann IBRD / 91360 Institutional Development Post Request for Bids Open - National 10,910.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation er for CPCB HO, Delhi IN-NMCG-342255-GO-RFP / P Single Stage - Two E Pending Impl rocurement of A0 Size Scann IBRD / 91360 Institutional Development Post Request for Bids Open - National 10,910.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation er for CPCB RD, Lucknow IN-NMCG-342256-GO-RFP / P Single Stage - Two E Pending Impl rocurement of A0 Size Scann IBRD / 91360 Institutional Development Post Request for Bids Open - National 10,910.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation er for CPCB RD, Kolkata IN-NMCG-342257-GO-RFP / P Single Stage - Two E Pending Impl rocurement of A0 Size Scann IBRD / 91360 Institutional Development Post Request for Bids Open - National 10,910.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation er for CPCB RD, Chandigarh IN-NMCG-342258-GO-RFP / P rocurement of 5 nos. Colour Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 6,100.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 Photocopier cum Printer for C nvelope ementation PCB HO, Delhi and NMCG IN-NMCG-342261-GO-RFP / P Single Stage - Two E Pending Impl rocurement of 1 no. Colour P IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,250.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation hotocopier cum Printer for CP CB RD, Lucknow IN-NMCG-342262-GO-RFP / P Single Stage - Two E Pending Impl rocurement of 1 no. Colour P IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,250.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation hotocopier cum Printer for CP CB RD, Kolkata IN-NMCG-342263-GO-RFP / P rocurement of 1 no. Colour P Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,250.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 hotocopier cum Printer for CP nvelope ementation CB RD, Chandigarh IN-NMCG-342264-GO-RFP / P Single Stage - Two E Pending Impl rocurement of 35 nos. Comp IBRD / 91360 Institutional Development Post Request for Bids Open - National 29,700.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation uters/Laptops for CPCB HO, D elhi and NMCG IN-NMCG-342265-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 7 nos. Comput IBRD / 91360 Institutional Development Post Request for Bids Open - National 6,000.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation ers/Laptops for CPCB RD, Luc know IN-NMCG-342267-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 20 nos. Comp IBRD / 91360 Institutional Development Post Request for Bids Open - National 17,000.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation uters/Laptops for CPCB RD, K olkata IN-NMCG-342268-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 3 nos. Comput IBRD / 91360 Institutional Development Post Request for Bids Open - National 2,600.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation ers/Laptops for CPCB RD, Ch andigarh IN-NMCG-342269-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 4 nos. Photoco IBRD / 91360 Institutional Development Post Request for Bids Open - National 2,950.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation pier for CPCB HO, Delhi and NMCG Page 1 IN-NMCG-342271-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. Photoco IBRD / 91360 Institutional Development Post Request for Bids Open - National 800.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation pier for CPCB RD, Lucknow IN-NMCG-342272-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. Photoco IBRD / 91360 Institutional Development Post Request for Bids Open - National 800.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation pier for CPCB RD, Kolkata IN-NMCG-342273-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. Photoco IBRD / 91360 Institutional Development Post Request for Bids Open - National 800.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation pier for CPCB RD, Chandigarh IN-NMCG-342274-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 26 nos. Printer IBRD / 91360 Institutional Development Post Request for Bids Open - National 4,750.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation s for CPCB HO, Delhi and NM CG IN-NMCG-342275-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 3 nos. Printers IBRD / 91360 Institutional Development Post Request for Bids Open - National 550.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Lucknow IN-NMCG-342276-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 3 nos. Printers IBRD / 91360 Institutional Development Post Request for Bids Open - National 550.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Kolkata IN-NMCG-342277-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 3 nos. Printers IBRD / 91360 Institutional Development Post Request for Bids Open - National 550.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Chandigarh IN-NMCG-342278-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 3 nos. GPS Tra IBRD / 91360 Institutional Development Post Request for Bids Open - National 365.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation cking System for CPCB HO, D elhi and NMCG IN-NMCG-342279-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. GPS Trac IBRD / 91360 Institutional Development Post Request for Bids Open - National 125.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation king System for CPCB RD, Lu cknow IN-NMCG-342280-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. GPS Trac IBRD / 91360 Institutional Development Post Request for Bids Open - National 125.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation king System for CPCB RD, Kol kata IN-NMCG-342281-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. GPS Trac IBRD / 91360 Institutional Development Post Request for Bids Open - National 125.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation king System for CPCB RD, Ch andigarh IN-NMCG-342283-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 4 nos. LCD/LE IBRD / 91360 Institutional Development Post Request for Bids Open - National 4,850.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation D for CPCB HO, Delhi and NM CG IN-NMCG-342284-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. LCD/LED IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Lucknow IN-NMCG-342285-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. LCD/LED IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Kolkata IN-NMCG-342286-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. LCD/LED IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation for CPCB RD, Chandigarh IN-NMCG-342288-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. 25 KVA IBRD / 91360 Institutional Development Post Request for Bids Open - National 3,050.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation UPS for CPCB HO, Delhi IN-NMCG-342289-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. 10 KVA IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation UPS for CPCB RD, Lucknow IN-NMCG-342290-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. 10 KVA IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation UPS for CPCB RD, Kolkata IN-NMCG-342292-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 1 no. 10 KVA IBRD / 91360 Institutional Development Post Request for Bids Open - National 1,220.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation UPS for CPCB RD, Chandigarh IN-NMCG-342293-GO-RFB / P rocurement of other IT equip Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 2,450.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ment (scanner, hard disk etc. nvelope ementation ) for CPCB HO, Delhi IN-NMCG-342295-GO-RFB / P rocurement of 65 nos. Opera Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 9,450.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ting System for PC/Laptops, nvelope ementation MS Office, Antivirus for CPCB HO, Delhi and NMCG IN-NMCG-342297-GO-RFB / P Single Stage - Two E Pending Impl rocurement of 5 nos. TDS, GS IBRD / 91360 Institutional Development Post Request for Bids Open - National 3,650.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation T and Tally software for CPCB HO, Delhi IN-NMCG-342299-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 12,200.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (1 no. Spectrophotom nvelope ementation eter) CPCB RD, Kolkata IN-NMCG-342300-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 18,200.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (2 nos. Portable Spec nvelope ementation trophotometer) CPCB RD, Kol kata IN-NMCG-342301-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 2,425.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (2 nos. Handheld Nep nvelope ementation helometer) CPCB RD, Kolkata IN-NMCG-342302-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl ipment (2 nos. Handheld pH, IBRD / 91360 Institutional Development Post Request for Bids Open - National 18,200.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation EC, Chloride and DO meter (Y eokal Hydro lab)) CPCB RD, K olkata Page 2 IN-NMCG-342303-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 6,060.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (1 no. Rotary evapora nvelope ementation tor) CPCB RD, Kolkata IN-NMCG-342305-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl ipment (2 nos. Mechanical Sh IBRD / 91360 Institutional Development Post Request for Bids Open - National 3,640.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation aker Vertical (for Solvent extr action)) CPCB RD, Kolkata IN-NMCG-342306-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl ipment (2 nos. Portable Curre IBRD / 91360 Institutional Development Post Request for Bids Open - National 18,200.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation nt meter (for Flow measurem ent)) CPCB RD, Kolkata IN-NMCG-342307-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 60,600.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (1 no. TOC-N analyser nvelope ementation ) CPCB RD, Kolkata IN-NMCG-342309-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 6,060.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (8 nos. Niskin Sample nvelope ementation rs) CPCB RD, Kolkata IN-NMCG-342310-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl ipment (1 no. Fourier Transfo IBRD / 91360 Institutional Development Post Request for Bids Open - National 6,060.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 nvelope ementation rm Infrared Spectrophotomet er (FTIR)) CPCB RD, Kolkata IN-NMCG-342311-GO-RFB / P rocurement of laboratory equ Single Stage - Two E Pending Impl IBRD / 91360 Institutional Development Post Request for Bids Open - National 8,490.00 0.00 2023-02-26 2023-02-26 2023-03-13 2023-04-11 2023-04-11 2023-07-10 ipment (1 no. pH and Potenti nvelope ementation ometer connected dosimeter ) CPCB RD, Kolkata NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-NMCG-175503-NC-RFB / S Open - Internationa Single Stage - Two E Pending Impl upply, Installation and Opera / Institutional Development Prior Request for Bids 7,000,000.00 0.00 2020-10-15 2020-11-09 2020-12-24 2021-04-19 2021-05-24 2021-11-20 l nvelope ementation tion of 150 Water Quality Mo nitoring Stations IN-NMCG-214289-NC-DIR / C hacha Chawdhary as a Brand IBRD / 91360 Institutional Development Post Direct Selection Direct 309,405.00 291,552.49 Signed 2021-01-22 2021-01-16 2021-01-27 2021-09-01 2021-02-16 2021-11-06 2022-02-16 Ambassador of Namami Gan ge Programme for a period of One Year IN-NMCG-362293-NC-RFB / P rocurement of Continuous Re Open - Internationa Single Stage - Two E Under Imple IBRD / 91360 Infrastructure Development Prior Request for Bids 12,052,000.00 0.00 2023-05-25 2023-06-11 2023-07-31 2023-10-13 2023-12-05 2029-08-05 al Time Water Quality Monito l nvelope mentation ring Data (110 RTWQM Statio ns) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-NMCG-175506-CS-QCBS / Strengthening the Institution al Framework for Ganga Rive r Basin Management, with th Quality And Cost- Pending Impleme e Roles and Responsibility to / Institutional Development Post Open - National 250,000.00 0.00 2020-07-31 2020-08-21 2020-09-12 2020-10-03 2020-12-02 2021-01-06 2021-02-10 2022-02-10 Based Selection ntation be shared by various stakeho lders in realizing the same, r oadmap for implementation and capacity building of Key Stakeholders/ Partners IN-NMCG-175507-CS-QCBS / Integrated WRM Data & Kno Quality And Cost- Pending Impleme wledge Management System / Institutional Development Post Open - National 700,000.00 0.00 2020-09-10 2020-10-01 2020-11-14 2020-12-12 2021-02-10 2021-03-17 2021-04-21 2022-04-21 Based Selection ntation improvement, Monitoring & Data Analytics Consultants IN-NMCG-175508-CS-QCBS / Institutional Strengtheing UL Bs and its stakeholders in pla nning & execution of activitie Quality And Cost- Open - Internationa Pending Impleme / Institutional Development Prior 3,000,000.00 0.00 2021-02-10 2021-03-03 2021-05-01 2021-05-29 2021-07-13 2021-08-17 2021-09-21 2022-09-21 s related to reduction of pollu Based Selection l ntation tion in Ganga, revenue gener ation, development of multih azard preparedness plans an d emergency response future disasters IN-NMCG-175509-CS-QCBS / Communications Agency to d Program Communications an Quality And Cost- Open - Internationa Pending Impleme evelop and produce a 360-de / Post 800,000.00 0.00 2020-07-15 2020-08-05 2020-10-03 2020-10-31 2020-12-15 2021-01-19 2021-02-23 2022-02-23 d Management Based Selection l ntation gree communications campai gn for awareness-generation and behavior change IN-NMCG-175510-CS-QCBS / Program Communications an Quality And Cost- Pending Impleme City-specific Outreach Camp / Post Open - National 300,000.00 0.00 2020-07-15 2020-08-05 2020-10-03 2020-10-31 2020-12-15 2021-01-19 2021-02-23 2022-02-23 d Management Based Selection ntation aign for One City IN-NMCG-293466-CS-QCBS / Engagement of Media Agenc Quality And Cost- y for production of Television IBRD / 91360 Institutional Development Post Open - National 385,900.00 0.00 Signed 2022-05-06 2022-05-19 2022-05-12 2022-07-18 2022-06-09 2022-12-01 2022-07-07 2022-12-26 2022-07-27 2023-01-20 2022-08-24 2023-02-08 2022-09-21 2023-03-20 Based Selection Commercials (TVCs) under K artavya Ganga Campaign IN-NMCG-298097-CS-QCBS / Engagement of Consultancy Quality And Cost- Open - Internationa Under Implement IBRD / 91360 Institutional Development Prior 2,000,000.00 0.00 2022-06-10 2022-06-23 2022-07-05 2022-07-28 2022-07-30 2023-05-30 2022-08-29 2022-09-13 2022-10-03 2022-11-03 2026-11-02 Firm for Water Balance Studi Based Selection l ation es for Ganga River Basin Page 3 IN-NMCG-312325-CS-QCBS / Engagement of Consultant fo r Occupational Health & Safe Quality And Cost- IBRD / 91360 Institutional Development Post Open - National 439,000.00 0.00 Canceled 2022-08-31 2022-11-07 2022-09-21 2023-01-16 2022-10-26 2022-11-23 2022-12-23 2023-01-20 2023-02-17 2023-08-16 ty Audit (OHSA) for the ongoi Based Selection ng sewerage and Ghat and C rematoria development proje cts IN-NMCG-312325-CS-QCBS-2 / Direct RFP - Selection of Co nsultancy Firm for Occupatio nal Health & Safety Audit (O Quality And Cost- Under Implement IBRD / 91360 Institutional Development Post Open - National 439,000.00 0.00 2023-03-24 2023-03-22 2023-04-05 2023-05-20 2023-05-25 2023-05-30 2023-06-18 2023-07-16 2024-04-11 HSA) for the ongoing sewera Based Selection ation ge and Ghat and Crematoria development projects (includ ing recently started and rece ntly completed projects) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-NMCG-200058-CS-CDS / Ganga Quest and Continuous Learning Activity Portal (CLA IBRD / 91360 Institutional Development Post Direct Selection Direct 449,200.00 380,255.01 Signed 2020-10-19 2020-10-20 2020-10-24 2020-12-24 2020-11-13 2021-01-20 2023-11-13 P) proposal for community en gagement for a period of 3 y ears IN-NMCG-265637-CS-CDS / C onsultancy Services for Integ rated Assessment of Wastew IBRD / 91360 Institutional Development Post Direct Selection Direct 62,900.00 59,792.59 Completed 2021-11-30 2021-12-02 2021-12-03 2021-12-17 2021-12-10 2021-12-18 2022-03-10 2022-07-01 ater Generation and Treatme nt Capacity in Meerut IN-NMCG-289884-CS-INDV / Engagement of International Individual Consult Under Implement IBRD / 91360 Institutional Development Post Open 100,000.00 0.00 2022-04-15 2022-04-13 2022-05-12 2022-05-19 2022-05-31 2023-03-31 Legal Consultant for Compre ant Selection ation hensive Institutional Assessm ent Study IN-NMCG-289896-CS-INDV / Engagement of National Leg Individual Consult IBRD / 91360 Institutional Development Post Open 50,000.00 0.00 Canceled 2022-04-15 2022-04-13 2022-05-12 2022-05-19 2022-05-31 2023-03-31 al Consultant for Comprehen ant Selection sive Institutional Assessment Study IN-NMCG-320597-CS-INDV / Engagement of National Leg Individual Consult Under Implement IBRD / 91360 Institutional Development Post Open - National 50,000.00 0.00 2022-10-14 2022-10-13 2022-11-13 2022-11-20 2022-12-02 2023-10-02 al Consultant for Comprehen ant Selection ation sive Institutional Assessment Study (2nd Call) Page 4 TNRTP- P157702- Procurement Arrangements and Thresholds- SUBSTANTIAL RISK 1. Procurement for the proposed project will be carried out in accordance with the Bank’s Procurement Regulations for Borrowers for Goods, Works, Non- Consulting and Consulting Services dated July 1, 2016 and applicable to Investment Project Financing (IPF) here in after referred to as “Regulations”. The project will be subject to the Bank’s anticorruption Guidelines3, dated October 15, 2006, and revised in January 2011 and as of July 1, 2016. 2. As per the requirement of the Regulations, a Project Procurement Strategy Document (PPSD) has been developed, based on which the procurement plan has been prepared and sets out the selection methods to be followed by the Borrower during project implementation in the procurement of goods, works, non-consulting and consulting services financed by the Bank. The Procurement Plan will be updated annually for larger procurements like NCB or as required to reflect the actual project implementation needs and improvements in institutional capacity. 3. Procurement methods: The table below describes various procurement methods to be used for activities financed by the loan. These along with agreed thresholds will be reproduced in the procurement plan. The thresholds indicated in the following table apply to the initial 18 month implementation period and are based on the procurement performance of the project; these thresholds may be subsequently modified. Table 7 – Procurement method threshold Thresholds for Procurement Thresholds (US$ equivalent) Approaches and Methods Open International (Goods, IT and > 3 million non-consulting services) Open National (Goods, IT and non- > 100,000 and up to 3 million consulting services) National Request For Quotation Up to 100,000 (Goods / Works) Open International (Works) > 40 million Open National (Works) > 100,000 and up to 40 million Direct Selection No threshold; For Goods / Works / non-consulting services: As per paragraph 6.8-6.10 of Regulation. For Consultants: As per paragraph 7.13-7.15 of Regulation. Shortlist of National Consultants Up to 800,000 4. Procurement Prior Review Thresholds: The World Bank will prior review (thresholds are based on SUBSTANTIAL rating) the following contracts: a) Works: All contracts more than US$ 10 million equivalent b) Goods and Information Technology: All contracts more than US$ 2 million equivalent c) Non-Consulting Services: All contracts more than US$ 2 million equivalent; d) Consultants: All contracts > US$ 1 million equivalent for firms and > US$ 300,000 equivalent for individuals. e) Direct Selection: All contracts more than US$ 100,000 equivalent 5. The above thresholds are for the initial 18 month implementation period; based on the procurement performance of the project these thresholds may be subsequently modified. Even for large value Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. The prior review thresholds will also be indicated in the procurement plan. The procurement plan will be subsequently updated annually (or at any other time if required) and will reflect any change in prior review thresholds. The prior review thresholds will be mutually reviewed during project implementation and modified based on the risk assessment. 6. In the case of contracts subject to prior review, the Implementing Agency shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non- consulting services or consulting services, other significant changes to the terms and conditions of the contract; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; (d) the proposed termination of the contract. 7. National Procurement Procedure Conditions: National competition for the procurement of goods, works and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.5 of Section V of the Regulations and the following provisions: (a) Only the model bidding documents agreed with the GoI task force (and as amended for time to time) shall be used for bidding. (b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. (d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the Directorate General of Supplies and Disposals (DGS&D) will not be acceptable as a substitute for national competition procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts and its new version will be acceptable, however, for any procurement under the shopping procedures. (g) No negotiations are conducted even with the lowest evaluated responsive bidders. 8. Domestic Preference. The provision of domestic preference will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. 9. Record keeping. All records pertaining to award of tenders, including bid notification, register pertaining to sale and receipt of bids, bid opening minutes, bid evaluation reports and all correspondence pertaining to bid evaluation, communication sent to/with the Bank in the process, bid securities, and approval of invitation/evaluation of bids would be retained by IAs. 10. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: (a) a Procurement Plan and updates; (b) an invitation for bids for goods and works for all contracts; (c) request for expression of interest for selection/hiring of consulting services; (d) contract awards of goods and works procured following international and national procedures; (e) a list of contracts/ purchase orders placed following shopping procedures on a quarterly basis; (f) a list of contracts following direct contracting (DC) on a quarterly basis; (g) a monthly financial and physical progress report of all contracts; and (h) an action taken report on the complaints received on a quarterly basis. 11. The following details shall be sent to the Bank for publishing on the United Nations Development Bank and Bank external website: (a) an invitation for bids for procurement of goods and works using open international procedures; (b) contract award details of all procurement of goods and works using open international procedure; and (c) a list of contracts/ purchase orders placed following DC procedures on a quarterly basis. 12. Further, SPIU will also publish on their website any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. 13. Oversight and Monitoring by the Bank. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. 14. The high risk and high value procurements, if any will be identified for increased contract management support and indicated in the procurement plan. The SPIU will develop key performance indicators (KPIs) for such identified contracts and the KPIs would be monitored during actual execution of contracts. Bank team will provide additional due diligence and independent review of the contract performance of such identified procurements. Frequency of procurement supervision, the World Bank will normally carry out implementation support missions, including review and support on procurement, on a semi-annual basis. Mission frequency may be increased or decreased based on the procurement performance of the project. *** PROCUREMENT India : Tamil Nadu Rural Transformation Project (TNRTP) PLAN General Information Country: India 2018-12-05 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157702 GPN Date: Project Name: Tamil Nadu Rural Transformation Project (TNRTP) Loan / Credit No: IBRD / 87950 Tamil Nadu Rural Transformation Society Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 058/TNRTP/2018 / Refurbish Project Management, Result ment of Identified Space for Single Stage - One E 2019-05-0 IBRD / 87950 s Monitoring and Implement Post Request for Bids Open - National 384,615.00 0.00 Canceled 2018-12-07 2018-12-12 2019-01-11 2019-01-18 2019-02-01 Setting up of State Project M nvelope 2 ation Support Systems anagement Unit (SPMU) IN-TNRTS-152334-CW-RFB / Project Management, Result Single Stage - One E 2020-05-2 Office Refurbishment for Stat IBRD / 87950 s Monitoring and Implement Post Request for Bids Open - National 214,285.00 211,732.61 Completed 2019-12-30 2019-12-31 2020-01-05 2020-05-13 2020-02-05 2020-02-18 2020-02-12 2020-05-11 2020-02-26 2020-06-16 nvelope 6 e Project Management Unit o ation Support Systems f TNRTP. IN-TNRTS-365347-CW-DIR / Project Management, Result Office refurbishment in the a Other (with field f Pending Imp 2024-01-2 IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct - National 26,623.53 0.00 2023-06-21 2023-06-26 2023-07-31 dditional space identified at t or explanation) lementation 7 ation Support Systems he TANSI building for TNRTP. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 043/TNRTP/2018 / Purchase Project Management, Result Request for Quota Single Stage - One E of Vehicles for SPMU of TNRT IBRD / 87950 s Monitoring and Implement Post Limited 70,000.00 46,501.12 Completed 2018-12-20 2018-12-20 2019-01-04 2018-12-29 2019-02-03 2018-12-31 tions nvelope P ation Support Systems ROC.NO.045/TNRTP/2018 / P Project Management, Result Request for Quota Single Stage - One E urchase of Desktops, Laptops IBRD / 87950 s Monitoring and Implement Post Open - National 57,392.00 50,862.42 Completed 2019-10-01 2019-11-26 2019-09-23 2020-05-24 2019-10-04 tions nvelope and Printers in TNRTP SPMU ation Support Systems ROC.NO.101/TNRTP/2018 / P Project Management, Result Request for Quota Single Stage - One E rinting of Diaries, Note Books IBRD / 87950 s Monitoring and Implement Post Open - National 34,632.00 34,544.81 Completed 2019-11-23 2020-01-18 2019-10-24 2020-07-16 2019-12-17 tions nvelope , Binding Pads & Wrapper Sh ation Support Systems eets 090/TNRTP/2019 / Printing of Rural Enterprise Ecosystem Request for Quota Single Stage - One E PGP Manuals for Participatory IBRD / 87950 Post Limited 20,000.00 18,346.76 Completed 2020-02-12 2019-12-03 2020-04-08 2019-12-19 2020-10-05 2020-01-11 Development tions nvelope Growth plan exercise ROC NO:90A/TNRTP/2019 / D Rural Enterprise Ecosystem Request for Quota Single Stage - One E esigning and printing of PGP IBRD / 87950 Post Limited 70,140.00 52,738.34 Completed 2020-03-22 2020-03-19 2020-05-17 2020-03-31 2020-11-13 2020-05-20 Development tions nvelope pamphlet for PGP exercise 29/TNRTP/2020 / Printing of Project Management, Result Vouchers,Registers and bindi Request for Quota Single Stage - One E IBRD / 87950 s Monitoring and Implement Post Limited 15,567.00 13,621.03 Completed 2020-05-31 2020-01-03 2020-07-26 2020-01-15 2021-01-22 2020-02-15 ng pads for DPMU,BPMU tions nvelope ation Support Systems and SPMU office use for TNRT P ROC.NO:045A/TNRTP/2018 / Project Management, Result Request for Quota Single Stage - One E Purchase of Printers, Laptop/I IBRD / 87950 s Monitoring and Implement Post Limited 5,000.00 960.39 Completed 2020-06-27 2020-07-31 2020-08-22 2020-08-18 2021-02-18 2020-08-19 tions nvelope pad, and CCTV camera for TN ation Support Systems RTP SPMU. ROC.NO:045B/TNRTP/2018 / Project Management, Result Request for Quota Single Stage - One E Fully Digital conference hall f IBRD / 87950 s Monitoring and Implement Post Limited 38,237.00 17,249.28 Completed 2020-08-21 2020-08-24 2020-10-16 2021-01-14 2021-04-14 2021-03-11 tions nvelope or the new office at TNSIDCO ation Support Systems Complex ROC.NO.1133/EED/2020 / Pri Rural Enterprise Ecosystem Request for Quota Single Stage - One E nting of Loan repayment Reg IBRD / 87950 Post Limited 14,935.04 7,522.49 Completed 2020-10-31 2021-01-14 2020-12-26 2021-01-01 2021-06-24 2021-02-19 Development tions nvelope ister for IE,IA & SYMR 1363/EED/PGP/2020 / Printin Rural Enterprise Ecosystem Request for Quota Single Stage - One E g of PGP IEC Material and Re IBRD / 87950 Post Limited 4,062.76 3,063.70 Completed 2020-12-09 2020-12-04 2021-02-03 2020-12-22 2021-08-02 2021-01-19 Development tions nvelope ady Reckoner for PGP Exercis e 1446/P&C/2020 / Purchase o Project Management, Result Request for Quota Single Stage - One E f Server and printer for Tally IBRD / 87950 s Monitoring and Implement Post Limited 2,000.00 2,206.80 Completed 2020-12-26 2020-12-22 2021-02-20 2021-01-09 2021-08-19 2021-01-20 tions nvelope software Accounts section un ation Support Systems der TNRTP ROC.NO: 1505/KMC/TNRTP/2 Project Management, Result Request for Quota Single Stage - One E 020 / Printing of Diaries and IBRD / 87950 s Monitoring and Implement Post Limited 5,430.00 9,715.52 Completed 2020-12-29 2021-01-13 2021-02-23 2021-01-28 2021-08-22 2021-02-21 tions nvelope Calender for TNRTP ation Support Systems ROC.NO: 1506/EED/TNRTP/2 020 / Printing of ECPs Guideli Rural Enterprise Ecosystem Request for Quota Single Stage - One E IBRD / 87950 Post Limited 6,109.00 3,899.38 Completed 2021-01-02 2021-01-11 2021-02-27 2021-01-26 2021-08-26 2021-02-25 nes and IEC material for Ente Development tions nvelope rprise Community profession al in TNRTP ROC.NO.005/TNRTP/2018 / P Project Management, Result urchase of Sofa/Furniture for IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 1,508.00 1,500.84 Completed 2021-02-04 2021-02-04 2021-02-09 2021-02-08 2021-03-16 2021-02-10 2021-09-12 2021-02-12 TNRTP office ation Support Systems 2016/MIS/2021 / Purchase of Project Management, Result Request for Quota Single Stage - One E UPS and network switches fo IBRD / 87950 s Monitoring and Implement Post Limited 2,535.00 0.00 Canceled 2021-04-26 2021-06-03 2021-06-21 2021-12-18 tions nvelope r SPMU ation Support Systems ROC.NO.3029/BPF/2021 / De signing and Printing of MGP Enterprise Business Plan Fin Request for Quota Single Stage - One E IBRD / 87950 Post Limited 20,000.00 18,265.12 Signed 2021-06-01 2021-05-27 2021-07-27 2021-06-12 2022-01-23 Manual, MGP handbook, and ancing tions nvelope MGP training manuals for TN RTP Staffs ROC.NO.3527/P&C/UPS/2021 Project Management, Result Request for Quota Single Stage - One E / Purchase of UPS and Netwo IBRD / 87950 s Monitoring and Implement Post Limited 6,726.36 3,363.53 Completed 2021-10-09 2021-10-06 2021-12-04 2021-12-17 2022-06-02 2022-02-19 tions nvelope rks Switches for SPMU office, ation Support Systems TNRTP Page 1 3529/P&C/VEHICLE/2021 / P Project Management, Result Request for Quota Single Stage - One E urchase of MUV Vehicle for th IBRD / 87950 s Monitoring and Implement Post Limited 40,045.00 23,148.71 Completed 2021-11-06 2021-12-01 2022-01-01 2021-12-03 2022-06-30 2021-12-25 tions nvelope e use of Filed visit by TNRTP ation Support Systems officers IN-TNRTS-269349-GO-RFQ / Procurement of Desktop, Prin Rural Enterprise Ecosystem Request for Quota Single Stage - One E Pending Impl IBRD / 87950 Post Limited 71,730.00 0.00 2021-12-27 2022-02-21 2022-08-20 ters, and refurbishment for t Development tions nvelope ementation he establishment of OSF IN-TNRTS-269351-GO-RFQ / Printing of capacity building Rural Enterprise Ecosystem Request for Quota Single Stage - One E IBRD / 87950 Post Limited 24,324.00 0.00 Signed 2021-12-28 2022-10-27 2022-02-22 2022-08-21 and strengthening of CBOs tr Development tions nvelope aining manual for TNRTP IN-TNRTS-269352-GO-RFQ / Project Management, Result Request for Quota Single Stage - One E Pending Impl Purchase of communication e IBRD / 87950 s Monitoring and Implement Post Limited 12,973.00 0.00 2021-12-22 2022-02-16 2022-08-15 tions nvelope ementation quipment (Camera & Project ation Support Systems or) for Districts IN-TNRTS-320364-GO-RFQ / Project Management, Result Request for Quota Single Stage - One E Printing of capacity building IBRD / 87950 s Monitoring and Implement Post Limited 5,745.73 0.00 Signed 2022-10-17 2022-11-28 2022-12-12 2023-06-10 tions nvelope handbook for EMF & SMF ation Support Systems IN-TNRTS-327743-GO-RFQ / Procurement of goods for est Request for Quota Single Stage - One E Under Imple IBRD / 87950 Skills and Job Opportunities Post Limited 13,332.79 0.00 2022-11-27 2022-12-20 2023-01-22 2023-07-21 ablishing the Youth Develop tions nvelope mentation ment Centre (YDC) in the Ch engalpattu district IN-TNRTS-327982-GO-RFQ / Printing of Guidelines, Pamph Rural Enterprise Ecosystem Request for Quota Single Stage - One E IBRD / 87950 Post Limited 55,000.00 0.00 Signed 2022-11-28 2022-12-16 2023-01-23 2023-07-22 lets, Training Manuals & Com Development tions nvelope munity Operational Manuals of PC & PG IN-TNRTS-330124-GO-DIR / T esting and certifying the biod egradability and compostabili Project Management, Result ty of the raw materials of the IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct - National 6,131.00 0.00 Signed 2022-12-07 2022-12-15 2022-12-12 2022-12-15 2023-01-16 2023-07-15 product under IS17088 for th ation Support Systems e pilot of biodegradable Sanit ary Napkin production in 5 di stricts of VKP. IN-TNRTS-330244-NC-RFQ / Printing of guidelines, Pamph Rural Enterprise Ecosystem Request for Quota Single Stage - One E lets, Training Manuals, and C IBRD / 87950 Post Limited 48,881.53 0.00 Signed 2022-12-12 2022-12-13 2023-02-06 2023-08-05 Development tions nvelope ommunity Operational Manu als of EG, ECP, and OSF. IN-TNRTS-330477-GO-RFQ / Project Management, Result Request for Quota Single Stage - One E Printing of Diary and Calende IBRD / 87950 s Monitoring and Implement Post Limited 47,321.45 0.00 Signed 2022-12-12 2022-12-07 2023-02-06 2023-08-05 tions nvelope r for VKP ation Support Systems IN-TNRTS-353668-GO-RFQ / Project Management, Result Request for Quota Single Stage - One E Purchase of Standee for placi IBRD / 87950 s Monitoring and Implement Post Limited 2,430.00 0.00 Signed 2023-04-08 2023-04-05 2023-06-03 2023-11-30 tions nvelope ng promotional display for VK ation Support Systems P at SPMU IN-TNRTS-305256-GO-RFQ / Project Management, Result Purchase of New Desktop, La Request for Quota Single Stage - One E Pending Impl IBRD / 87950 s Monitoring and Implement Post Limited 24,268.90 0.00 2022-07-30 2022-09-24 2023-03-23 ptop, and Printers for State P tions nvelope ementation ation Support Systems roject Management unit IN-TNRTS-365340-GO-DIR / P Project Management, Result urchase of Conference Table Pending Impl IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct - National 5,445.93 0.00 2023-06-05 2023-06-10 2023-07-15 2024-01-11 and Revolving chair for the c ementation ation Support Systems onsultants and TNRTP staff. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 099/TNRTP/2018 / Selecting Project Management, Result Request for Quota Single Stage - One E an Outsourcing Agency for re IBRD / 87950 s Monitoring and Implement Post Limited 30,000.00 2,356.92 Signed 2018-12-20 2019-02-18 2019-01-07 2019-06-01 2020-01-07 tions nvelope cruiting Non-Technical Basic ation Support Systems staff for TNRTP 098/TNRTP/2018 / Taking Vi Project Management, Result Request for Quota Single Stage - One E deo film and Documentary a IBRD / 87950 s Monitoring and Implement Post Limited 96,000.00 83,956.87 Completed 2018-12-24 2018-12-21 2019-01-10 2018-12-29 2019-03-26 2020-08-29 tions nvelope bout TNRTP and its compone ation Support Systems nts Project Management, Result 43/TNRTP/2018 / Hiring of V Request for Quota Single Stage - One E IBRD / 87950 s Monitoring and Implement Post Limited 37,000.00 601.47 Completed 2018-12-22 2018-12-20 2019-01-01 2018-12-31 2019-01-03 2020-12-06 ehicles for SPMU of TNRTP tions nvelope ation Support Systems 1316/A/2020/T1 / The hiring Project Management, Result Request for Quota Single Stage - One E of Vehicles for SPMU of TNRT IBRD / 87950 s Monitoring and Implement Post Limited 37,984.82 35,925.47 Signed 2020-12-19 2020-12-16 2021-02-13 2021-01-06 2021-08-12 tions nvelope P ation Support Systems ROC.NO. 3036/A1/2021 / Hiri Project Management, Result Request for Quota Single Stage - One E ng an Outsourcing Agency fo IBRD / 87950 s Monitoring and Implement Post Limited 31,000.00 10,604.34 Signed 2021-06-05 2021-08-10 2021-07-31 2021-09-30 2022-01-27 tions nvelope r recruiting Non-Technical Ba ation Support Systems sic staff for TNRTP IN-TNRTS-316047-GO-RFQ / Project Management, Result Request for Quota Single Stage - One E Video and Photo Documentat IBRD / 87950 s Monitoring and Implement Post Limited 25,316.00 0.00 Signed 2022-09-20 2022-09-16 2022-11-15 2023-05-14 tions nvelope ion of Project beneficiaries ation Support Systems IN-TNRTS-316175-NC-RFQ / Project Management, Result Request for Quota Single Stage - One E Pending Impl The hiring of Vehicles on a C IBRD / 87950 s Monitoring and Implement Post Limited 42,531.00 0.00 2022-09-23 2022-11-18 2023-05-17 tions nvelope ementation ontract basis for SPMU office ation Support Systems officials IN-TNRTS-316179-NC-RFQ / Project Management, Result Hiring an Outsourcing Agenc Request for Quota Single Stage - One E IBRD / 87950 s Monitoring and Implement Post Limited 25,316.00 0.00 Signed 2022-09-23 2022-11-03 2022-11-18 2023-05-17 y for recruiting Non-Technical tions nvelope ation Support Systems Basic staff for VKP (2022-202 3) IN-TNRTS-326968-NC-RFQ / Engagement of service provi Project Management, Result Request for Quota Single Stage - One E Pending Impl ders for Annual Maintenance IBRD / 87950 s Monitoring and Implement Post Limited 4,216.43 0.00 2022-11-22 2023-01-17 2023-07-16 tions nvelope ementation Contracts for Desktops, Lapt ation Support Systems ops, and Printers used in VKP SPMU. Page 2 ROC. NO. 9403/P&C/MSC/20 23 / Service providers in Che Request for Quota Single Stage - One E Pending Impl IBRD / 87950 Skills and Job Opportunities Post Open - National 91,207.03 0.00 2023-05-24 2023-07-19 2024-01-15 nnai, Coimbatore, Tiruppur, a tions nvelope ementation nd Hosur for Migration Suppo rt Centers under TNRTP CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 096/TNRTP/2018 / Hiring of Agency for Capacity Building Rural Enterprise Ecosystem Quality And Cost- IBRD / 87950 Prior Open - National 2,000,000.00 1,680,270.92 Signed 2018-12-15 2019-12-04 2018-12-20 2019-01-19 2019-04-09 2019-02-18 2019-05-28 2019-02-28 2019-12-27 2019-03-13 2020-03-11 2019-04-17 2020-05-23 2022-04-16 Support for Development an Development Based Selection d Strengthening for Producer Collectives under TNRTP. 381/TNRTP/2017 / Matching Enterprise Business Plan Fin Consultant Qualifi IBRD / 87950 Post Open - National 21,000.00 43,940.35 Completed 2019-01-31 2019-02-19 2019-02-21 2019-03-17 2019-08-21 2019-04-16 2019-10-18 2019-05-21 2019-11-23 2019-11-17 2021-09-09 Grants Program ancing cation Selection 002-A/TNRTP/2019 / Statutor Project Management, Result Consultant Qualifi y Auditor procurement for 3 IBRD / 87950 s Monitoring and Implement Post Limited 4,500.00 0.00 Canceled 2019-04-05 2019-04-19 2019-05-04 2019-05-18 2022-05-17 cation Selection Years (2018-19,2019-20 and ation Support Systems 2020-21) 001/TNRTP/2019 / Internal A uditor procurement for 3 Yea Project Management, Result Least Cost Selecti rs (2019-20,2020-21 and 202 IBRD / 87950 s Monitoring and Implement Post Open - National 90,270.00 0.00 Canceled 2019-04-05 2019-09-25 2019-04-26 2019-06-09 2019-07-07 2019-07-22 2019-08-26 2019-09-30 2022-09-29 on 1-22) - Converted Rupees in ation Support Systems Current Dollar Rate (68.76) ROC.NO.051/TNRTP/2019 / T ransaction Manager is an ag ency who will identify and e Enterprise Business Plan Fin Quality And Cost- IBRD / 87950 Post Open - National 249,000.00 0.00 Canceled 2019-09-25 2019-10-17 2019-10-16 2019-11-29 2019-12-27 2020-01-26 2020-03-01 2020-04-05 2021-04-05 nter into partnership with diff ancing Based Selection erent financial Institution for implementation of Matching Grant Program. ROC.NO.122/MIS/2019 / Syst em Integrator to Design, Dev Project Management, Result Quality And Cost- elop, Deploy and Operation & IBRD / 87950 s Monitoring and Implement Prior Open - National 1,714,286.00 925,175.63 Signed 2019-12-03 2019-12-30 2019-12-24 2020-02-09 2020-02-06 2020-03-31 2020-03-05 2020-05-21 2020-04-04 2020-11-13 2020-05-09 2020-12-14 2020-06-13 2021-01-07 2021-06-13 Based Selection Maintenance(OM) of Integrat ation Support Systems ed Digital Platform for TNRTP . 068/TNRTP/2019 / Hiring age ncy to design, develop and ef Project Management, Result Quality And Cost- fectively deploy the knowled IBRD / 87950 s Monitoring and Implement Post Open - National 500,000.00 365,795.96 Signed 2020-01-05 2020-01-06 2020-01-26 2020-02-24 2020-03-10 2020-07-07 2020-04-07 2020-08-10 2020-05-07 2020-08-13 2020-06-11 2020-08-29 2020-07-16 2020-10-02 2021-07-16 Based Selection ge management and commu ation Support Systems nication strategy for the proj ect . ROC.NO 02/TNRTP/ESMF/202 0 / Hiring State Resource Env Project Management, Result ironment Agency for developi Quality And Cost- IBRD / 87950 s Monitoring and Implement Post Open - National 147,158.78 282,358.49 Signed 2020-02-10 2020-02-13 2020-03-02 2020-02-26 2020-04-15 2020-07-11 2020-05-13 2021-06-07 2020-06-12 2021-06-28 2020-07-17 2021-10-07 2020-08-21 2021-12-25 2021-08-21 ng EA tools, EMF manual, Ca Based Selection ation Support Systems pacity Building, Environment Audit and Internal Monitoring of EMF implementation. ROC.NO.002-B/TNRTP/2019 / Project Management, Result Consultant Qualifi Statutory Auditor procureme IBRD / 87950 s Monitoring and Implement Post Limited 47,285.00 0.00 Canceled 2020-02-14 2020-03-20 2020-02-28 2020-03-29 2020-05-03 2020-10-30 cation Selection nt for 3 Years (2019-20,2020- ation Support Systems 21 and 2021-22) 001A/TNRTP/2019 / Internal Auditor procurement for 3 Ye Project Management, Result Quality And Cost- ars (2020-21,2021-22 and 20 IBRD / 87950 s Monitoring and Implement Post Open 84,818.00 30,774.45 Completed 2020-03-18 2020-05-18 2020-04-08 2020-06-13 2020-05-22 2020-07-28 2020-06-19 2020-08-27 2020-07-19 2020-09-03 2020-08-23 2020-10-09 2020-09-27 2020-10-16 2021-09-27 2021-08-11 Based Selection 22-23) - Converted Rupees in ation Support Systems Current Dollar Rate (73.18) ROC.NO.002B/TNRTP/2019 / Project Management, Result Statutory auditor procureme Quality And Cost- IBRD / 87950 s Monitoring and Implement Post Open - National 47,285.00 16,473.16 Signed 2020-05-27 2020-05-27 2020-06-17 2020-07-24 2020-07-31 2020-08-29 2020-08-28 2020-09-28 2020-09-27 2020-09-30 2020-11-01 2020-10-23 2020-12-06 2020-11-01 2021-12-06 nt for 3 Years ( 2019-20, 202 Based Selection ation Support Systems 0 - 21 and 2021 - 2022 ) ROC.NO. 3528/P&C/HR/2021 Project Management, Result / The hiring of a recruitment Consultant Qualifi IBRD / 87950 s Monitoring and Implement Post Open - National 82,191.00 54,296.12 Signed 2021-10-04 2021-10-11 2021-10-25 2021-10-21 2021-12-08 2021-12-17 2022-01-07 2022-01-03 2022-02-11 2022-02-02 2022-08-10 agency for engagement of se cation Selection ation Support Systems nior staff and Field staff for T NRTP IN-TNRTS-255199-CS-CQS / Project Management, Result Engagement of new internal Consultant Qualifi IBRD / 87950 s Monitoring and Implement Post Limited 48,000.00 0.00 Signed 2021-10-04 2021-10-06 2021-10-18 2021-12-31 2021-11-17 2022-06-02 2021-12-22 2022-06-20 auditor firm for the financial cation Selection ation Support Systems year 2021 - 2022 to 2023 – 2 024 IN-TNRTS-324557-CS-CQS / Project Management, Result Engagement of chartered ac Consultant Qualifi Under Implement IBRD / 87950 s Monitoring and Implement Post Limited 18,228.00 0.00 2022-11-07 2022-11-16 2022-11-21 2023-01-28 2022-12-21 2023-03-17 2023-01-25 2023-07-24 countant firm for statutory a cation Selection ation ation Support Systems udit in VKP for the FY ( 2022- 23 and 2023 - 2024 ) ROC.NO.1012/BPF/2020 / Te chnical Support agency for c Enterprise Business Plan Fin Quality And Cost- IBRD / 87950 Post Open - National 339,432.71 0.00 Canceled 2020-10-26 2020-10-28 2020-11-16 2020-12-05 2020-12-30 2021-02-02 2021-01-27 2021-02-26 2021-04-02 2021-05-07 2022-05-07 apacity building support to E ancing Based Selection nterprise Business plan finan cing IN-TNRTS-360317-CS-CDS / Technical Support Agency for Enterprise Business Plan Fin Consultant Qualifi Under Implement identifying start-ups and scal IBRD / 87950 Post Limited 24,471.57 0.00 2023-05-09 2023-05-15 2023-05-23 2023-06-22 2023-07-27 2024-01-23 ancing cation Selection ation able innovative solutions for Agriculture, Creative and Gre en Enterprises INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 002/TNRTP/2019 / Statutory Project Management, Result Auditor procurement for 201 IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 1,500.00 1,371.58 Completed 2019-02-14 2019-07-23 2019-02-17 2019-07-08 2019-02-20 2019-07-26 2019-03-12 2020-03-19 7-18 ation Support Systems ROC.NO.115/MIS/2019 / Dev eloping a Field Level Data Ca Rural Enterprise Ecosystem IBRD / 87950 Post Direct Selection Direct 41,907.00 38,163.04 Signed 2019-11-26 2019-11-26 2019-12-06 2019-11-12 2020-02-09 2019-12-11 2020-08-07 pturing Mobile Application Fo Development r Participatory Growth Plan (P GP) Exercise. Page 3 ROC. NO: 496/KMC/TNRTP/2 Project Management, Result 020 / Engaging creative agen IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 21,430.00 17,814.69 Completed 2020-05-27 2020-05-27 2020-06-06 2020-06-01 2020-08-10 2020-07-16 2021-02-06 2021-01-26 cy for TNRTP's Covid-19 Assis ation Support Systems tance Package (CAP) Commu nication activities. ROC.NO:631/MIS/2020 / Desi gn and Development of Web Project Management, Result Portal for TNRTP Project with IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 24,000.00 13,433.55 Signed 2020-07-13 2020-07-14 2020-07-23 2020-07-14 2020-09-26 2020-07-23 2021-03-25 integrated web application fo ation Support Systems r COVID-19 Assistance Packa ge (CAP) ROC.NO: 309/FIN/2020 / PRO Project Management, Result CUREMENT/ CUSTOMIZATION IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 11,321.00 8,963.67 Completed 2020-07-23 2020-07-25 2020-08-02 2020-07-31 2020-10-06 2020-08-27 2021-04-04 2021-08-27 OFTALLY BASED FINANCIAL ation Support Systems MANAGEMENT SYSTEM FOR T NRTP ROC.NO:848/MIS/2020 / Sec Project Management, Result urity Audit of the Web Portal IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 5,445.00 3,423.43 Completed 2020-09-07 2020-09-16 2020-09-17 2020-10-13 2020-11-21 2020-11-21 2021-05-20 2021-03-16 developed for Tamil Nadu Ru ation Support Systems ral Transformation Project ROC.NO : 685/M&E/2020 / Hi Project Management, Result ring External Monitoring & Ev IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 88,415.53 74,140.03 Signed 2020-09-16 2020-09-17 2020-09-26 2020-09-18 2020-11-30 2020-10-16 2021-05-29 aluation Agency for COVID-1 ation Support Systems 9 Assistance Package (CAP) IN-TNRTS-281164-CS-CDS / Hiring Technical Supporting Enterprise Business Plan Fin Agency for the pilot of Bio de IBRD / 87950 Post Direct Selection Direct 33,783.78 0.00 Canceled 2022-03-02 2022-03-02 2022-03-12 2022-05-16 2022-11-12 ancing gradable Sanitary Napkin Pro duction & Marketing in TNRT P IN-TNRTS-283168-CS-CDS / Hiring Technical Supporting Enterprise Business Plan Fin Agency for the pilot of Biode IBRD / 87950 Post Direct Selection Direct 5,400.00 4,797.68 Signed 2022-03-09 2022-03-15 2022-03-19 2022-03-17 2022-05-23 2022-04-28 2022-11-19 ancing gradable Sanitary Napkin Production & Marketi ng in TNRTP IN-TNRTS-284597-CS-CDS / Hiring agency to develop a pr IBRD / 87950 Skills and Job Opportunities Post Direct Selection Direct 13,176.00 11,421.85 Signed 2022-03-15 2022-03-21 2022-03-25 2022-04-29 2022-05-29 2022-06-15 2022-11-25 ogressive web application to effectively manage the MSC operations IN-TNRTS-295387-CS-CDS / Project Management, Result Hiring External Monitoring & IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct 51,948.05 0.00 Signed 2022-05-18 2022-06-25 2022-05-28 2022-07-01 2022-08-01 2023-01-28 Evaluation Agency for the CO ation Support Systems VID-19 Assistance Package ( CAP) IN-TNRTS-300091-CS-CDS / Hiring Technical Support Age Enterprise Business Plan Fin IBRD / 87950 Post Direct Selection Direct 13,333.33 0.00 Signed 2022-06-19 2022-06-21 2022-06-29 2022-07-05 2022-09-02 2023-03-01 ncy for implementing the inn ancing ovations pilot in pottery sect or in TNRTP IN-TNRTS-321947-CS-CDS / Hiring of a Technical Support Enterprise Business Plan Fin Agency for the implementati IBRD / 87950 Post Direct Selection Direct - National 24,150.00 0.00 Signed 2022-10-19 2022-11-22 2022-10-29 2022-11-29 2023-01-02 2023-07-01 ancing on of a business innovation p ilot in Banana Bark products IN-TNRTS-326652-CS-CDS / Hiring agency for digital book Enterprise Business Plan Fin Under Implement keeping solutions, providing t IBRD / 87950 Post Direct Selection Direct - National 45,790.00 0.00 2022-12-30 2023-01-10 2023-01-09 2023-03-15 2023-09-11 ancing ation raining and handholding sup port to entrepreneurs. IN-TNRTS-334718-CS-CDS / The hiring of a technical supp Enterprise Business Plan Fin orting agency for the establis IBRD / 87950 Post Direct Selection Direct - National 90,912.89 0.00 Canceled 2023-01-05 2023-02-17 2023-01-15 2023-03-21 2023-09-17 ancing hment and development of a co-creation centre in VKP IN-TNRTS-344075-CS-CDS / The hiring of agency for the Enterprise Business Plan Fin Under Implement pilot DART tool by assessing IBRD / 87950 Post Direct Selection Direct - National 36,210.51 0.00 2023-02-24 2023-03-03 2023-03-06 2023-05-10 2023-11-06 ancing ation 2 PLFs, all SHGs, and Individu al members in two village pa nchayats of VKP. IN-TNRTS-355795-CS-CDS / Hiring of M/s. M-CRIL agency Enterprise Business Plan Fin Under Implement IBRD / 87950 Post Direct Selection Direct - National 30,490.00 0.00 2023-04-11 2023-05-24 2023-04-21 2023-06-25 2023-12-22 for the rating of producer coll ancing ation ectives, assessing the credit worthiness of the PCs. 7282/P&C/TNRTP/2022 / Tec hnical Support Agency for co Enterprise Business Plan Fin Under Implement IBRD / 87950 Post Direct Selection Direct - National 183,541.24 0.00 2023-05-08 2023-05-16 2023-05-18 2023-07-22 2024-01-18 nceptualize and operationaliz ancing ation e the cocreation centre unde r TNRTP ROC. NO. 9402/P&C/VKP/202 Project Management, Result Under Implement 3 / Technical Facilitation Age IBRD / 87950 s Monitoring and Implement Post Direct Selection Direct - National 182,259.58 0.00 2023-05-19 2023-05-23 2023-05-29 2023-08-02 2024-01-29 ation ncy for Impact Evaluation of ation Support Systems TNRTP ROC. NO. 9435/P&C/VKP/202 3 / Technical Support Agency Rural Enterprise Ecosystem Under Implement for digitalization of producer IBRD / 87950 Post Direct Selection Direct - National 30,376.60 0.00 2023-05-19 2023-05-25 2023-05-29 2023-08-02 2024-01-29 Development ation collectives & Value added ser vices to farmers & PCs Page 4 Ministry of Tourism, Arts and Culture Procurement Plan General 1. Bank’s approval Date of the procurement Plan May 28, 2018. 2. Date of General Procurement Notice: June 20, 2018 3. Period covered by this procurement plan: January 2018 to June, 2019 II. Goods, Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Banks Regulation for IPF Borrowers. No. Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Not applicable All 2. NCB (Goods) ≥US$ 1,500,000 All 3. ICB (Works) Not Applicable All 4. NCB (Works) ≥US$ 5,000,000 All 5. (Non-Consultant Services) ≥US$ 1,500,000 All 6 National Shopping / Request for ≥US$1,500,000 All Quotation 2. Prequalification. Bidders when applicable shall be prequalified in accordance with the Banks Regulation for IPF Borrowers. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Estimate Domesti Review Ref Description d Packag c by Bank Comments . Cost es Prefere (Prior / No. US$ nce Post) (yes/no) Summary of the ICB (Goods) None None None None 1 Summary of the NCB (Goods) 372,000 3 No Prior 2 Summary of the ICB (Non- 3 Consultant None None None None Services) Summary of the NCB (Non- 4 Consultant 100,000 1 None Prior Services) Summary of the National 5 Shopping/Request None None None None for Quotation III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in the Banks Regulation for IPF Borrowers. Selection Method Prior Review Threshold Comments 1. Competitive Methods ≥US$ 500,000 (Firms) 2. Single Source (Firms) ≥US$ 100,000 3. Individual ≥ US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the Banks Regulation for IPF Borrowers. 3. Any Other Special Selection Arrangements: 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref Description of Estimated Review . Assignment Cost Packag by Bank Commen No. US$ es (Prior / ts million Post) Summary of 1 number of 1,850,000 8 Prior contracts that will be let under QCBS Summary of 2 number of 1,293,000 13 Prior contracts that will be let under other methods PROCUREMENT Ghana : Tourism Development Project PLAN General Information Country: Ghana 2018-07-09 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164211 GPN Date: 2018-06-20 Project Name: Tourism Development Project Loan / Credit No: IDA / V1730, IDA / 63000 Ministry of Tourism Arts and Culture Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOTAC/TDP/WKS/0001/2018 / RENOVATION OF 4No. OFFI Project management and ins Request for Quota Single Stage - One E 2019-03-1 CES, CONFERENCE ROOM, W IDA / V1730 Post Limited 37,000.00 28,100.00 Completed 2018-07-22 2018-08-15 2018-09-16 2018-09-04 titutional strengthening tions nvelope 5 ASHROOM AND STORE FOR T HE PROJECT COORDINATION UNIT AT KAWUKUDI GH-TOURISM-103568-CW-RF Q / Nzulezu - Receptive Facili Developing tourism sites an Request for Quota Single Stage - One E 2020-12-3 IDA / V1730 Post Limited 30,000.00 52,419.81 Completed 2020-05-09 2019-10-16 2020-07-04 2020-02-14 ty/ Waiting Pavilion at Beyin d destinations tions nvelope 1 where Boat Ride begins GH-TOURISM-103566-CW-RF Q / Fort St Antonio - Construc Developing tourism sites an Request for Quota Single Stage - One E 2020-11-1 IDA / V1730 Post Limited 60,000.00 148,955.34 Signed 2020-03-21 2020-08-26 2020-05-16 2020-10-07 tion of Sanitary Facilities and d destinations tions nvelope 2 Landscaping of Areas around the Fort GH-TOURISM-103576-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2020-12-1 IDA / V1730 Post Limited 30,000.00 27,946.47 Completed 2020-04-19 2019-10-14 2020-06-14 2020-03-14 Q / Ankasa - Receptive Facilit d destinations tions nvelope 1 y GH-TOURISM-103586-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2020-12-0 Q / Kintampo - Constructio IDA / V1730 Post Limited 30,000.00 53,378.33 Signed 2020-04-17 2020-07-22 2020-06-12 2020-10-10 d destinations tions nvelope 9 n of Sanitary Facility and Anc illary Works GH-TOURISM-103593-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2019-11-0 Q / Gwollu - Construction of R IDA / V1730 Post Limited 20,000.00 22,887.32 Signed 2019-03-18 2019-10-16 2019-05-13 2020-02-22 d destinations tions nvelope 9 eceptive Facility and Ancillar y Works GH-TOURISM-103603-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2019-11-1 Q / Gushegu - Construction of IDA / 63000 Post Limited 80,000.00 74,921.98 Signed 2019-03-20 2019-10-15 2019-05-15 2020-02-14 d destinations tions nvelope 1 Tourist Information Centre an d Other Works GH-TOURISM-188650-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2021-09-1 Q / Construction of Damang IDA / 63000 Post Limited 100,000.00 100,968.18 Signed 2021-01-06 2020-09-01 2021-03-17 2021-01-13 d destinations tions nvelope 3 Arts Training Center GH-TOURISM-103561-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2019-11-0 Q / Fort St Antonio - Washroo IDA / V1730 Post Limited 30,000.00 0.00 Canceled 2019-03-10 2019-05-05 d destinations tions nvelope 1 m and Toilet Facilities GH-TOURISM-173064-CW-RF Project management and ins Request for Quota Single Stage - One E 2021-07-1 Q / Renovation and Refurbish IDA / 63000 Post Limited 70,000.00 71,970.47 Signed 2021-02-15 2020-09-23 2021-04-19 2021-08-14 titutional strengthening tions nvelope 8 ment of Offices at Kawukudi Phase 2 GH-TOURISM-103609-CW-RF Q / Construction of Bonwire R Developing tourism sites an Request for Quota Single Stage - One E 2021-08-0 IDA / 63000 Post Limited 100,000.00 135,070.14 Signed 2020-12-02 2020-07-22 2021-02-10 2020-10-07 eceptive Facilities, Kente Mus d destinations tions nvelope 9 eum and Tourist Information Center GH-TOURISM-103610-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2021-08-0 IDA / V1730 Post Limited 20,000.00 0.00 Canceled 2020-11-25 2021-02-03 Q / Bonwire - Tourist Informat d destinations tions nvelope 2 ion Centre GH-TOURISM-103597-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2022-02-1 Q / Bunsu Arboretum - Impro IDA / V1730 Post Limited 30,000.00 0.00 Canceled 2021-06-05 2021-08-14 d destinations tions nvelope 0 vement of Receptive Facility GH-TOURISM-103612-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2022-03-0 IDA / V1730 Post Limited 30,000.00 0.00 Canceled 2021-06-30 2021-09-08 Q / Bonwire - Creation of Ken d destinations tions nvelope 7 te Museum GH-TOURISM-103577-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2022-01-1 Q / Nkroful - Rehabilitation of IDA / V1730 Post Limited 30,000.00 0.00 Canceled 2021-05-11 2021-07-20 d destinations tions nvelope 6 Receptive Facility GH-TOURISM-103589-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2021-10-2 Q / Paga - Fencing and Const IDA / V1730 Post Limited 20,000.00 0.00 Canceled 2021-02-24 2021-04-28 d destinations tions nvelope 5 ruction defined Entrance GH-TOURISM-103592-CW-RF Q / Paga - Construction of Su Developing tourism sites an Request for Quota Single Stage - One E 2022-03-2 IDA / V1730 Post Limited 20,000.00 0.00 Canceled 2021-07-29 2021-09-30 mmer Huts/ Pavilion for Prem d destinations tions nvelope 9 ises and Crocodile Viewing GH-TOURISM-181263-CW-RF Q / Construction of Receptive Developing tourism sites an Request for Quota Single Stage - One E 2021-12-0 IDA / 63000 Post Limited 170,000.00 0.00 Canceled 2021-03-26 2021-06-04 Facility, Viewing Platforms an d destinations tions nvelope 1 d the Northern Gate at Mole GH-TOURISM-103599-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2022-01-1 IDA / V1730 Post Limited 30,000.00 0.00 Canceled 2021-04-29 2021-07-15 Q / Gushegu - Washroom Fac d destinations tions nvelope 1 ility GH-TOURISM-103587-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2021-11-0 Q / Kintampo - Pavement of A IDA / V1730 Post Limited 10,000.00 0.00 Canceled 2021-02-24 2021-05-05 d destinations tions nvelope 1 ccess ways GH-TOURISM-103579-CW-RF Developing tourism sites an Request for Quota Single Stage - One E 2021-07-1 Q / Akosombo, Akwamu Mus IDA / V1730 Post Limited 20,000.00 0.00 Canceled 2021-05-17 d destinations tions nvelope 6 eum - Rehabilitation of Recep tive Facility Request for Bids - GH-TOURISM-212561-CW-RF Developing tourism sites an Single Stage - One E Small Works SPD 2,350,108.9 2022-09-0 B / Renovation of the Kwame IDA / 63000 Post Request for Bids Open - National 3,100,000.00 Signed 2021-11-16 2022-01-28 2021-11-23 2022-01-04 2022-03-22 2022-02-03 2022-05-27 2022-03-10 2022-07-09 d destinations nvelope (1 envelope proce 4 6 Nkrumah Mausoleum and Me ss) morial Park Page 1 GH-TOURISM-292145-CW-RF Q / CONSTRUCTION OF RECO Request for Quota Developing tourism sites an Request for Quota Single Stage - One E 2023-04-0 MMENDED PAVING & SITE IM IDA / 63000 Post Limited tions (Non Bank-S 200,000.00 0.00 Signed 2022-08-08 2022-09-02 2022-10-03 d destinations tions nvelope 1 PROVEMENT WORKS AT KINT PD) AMPO WATERFALLS TOURIST SITE GH-TOURISM-292147-CW-RF Request for Quota Developing tourism sites an Request for Quota Single Stage - One E Under Imple 2023-11-2 Q / CONSTRUCTION OF AKWA IDA / 63000 Post Limited tions (Non Bank-S 50,000.00 0.00 2023-04-04 2022-08-31 2023-05-30 d destinations tions nvelope mentation 6 MUFIE MUSEUM PH 2 PD) GH-TOURISM-103608-CW-RF Request for Quota Q / Gushegu - Smock Weavin Developing tourism sites an Request for Quota Single Stage - One E Pending Imp 2024-01-2 IDA / V1730 Post Limited tions (Non Bank-S 120,000.00 0.00 2023-06-05 2023-07-31 g Shed, Landscaping and oth d destinations tions nvelope lementation 7 PD) er Ancillary Works Request for Bids - GH-TOURISM-212569-CW-RF Developing tourism sites an Single Stage - One E Small Works SPD 2024-02-0 B / Construction of Shai, Mole IDA / 63000 Post Request for Bids Open - National 2,700,000.00 0.00 Canceled 2023-04-20 2023-04-27 2023-06-08 2023-07-08 2023-08-12 d destinations nvelope (1 envelope proce 8 and Kakum National Park ss) GH-TOURISM-362437-CW-RF Request for Quota Q / Construction of Pavilions Developing tourism sites an Request for Quota Single Stage - One E Pending Imp 2023-10-2 IDA / 63000 Post Limited tions (Non Bank-S 80,000.00 0.00 2023-06-04 2023-07-23 and Landscaping Works arou d destinations tions nvelope lementation 1 PD) nd the Fort St Antonio GH-TOURISM-362441-CW-RF Request for Quota Q / ADDITIONAL CONSTRUCTI Developing tourism sites an Request for Quota Single Stage - One E Pending Imp 2023-09-2 IDA / 63000 Post Limited tions (Non Bank-S 60,000.00 0.00 2023-06-05 2023-07-24 ON WORKS ON THE DARMAN d destinations tions nvelope lementation 2 PD) G ARTS TRAINING CENTER GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOTAC/TDP/GDS/0001/2018 / PROCUREMENT OF OFFICE E QUIPMENT (2NO. PHOTOCOPI Project management and ins Single Stage - One E ER, 10NO. LAPTOP COMPUTE IDA / V1730 Post Request for Bids Open - National 100,000.00 41,110.00 Completed 2018-06-25 2018-08-20 2018-06-30 2018-07-30 2018-11-29 2018-08-29 2018-12-11 2018-10-03 2019-01-03 2018-11-02 2019-02-11 titutional strengthening nvelope RS, 2NO. PRINTERS, 10NO. D ESKTOP COMPUTERS ETC.) F OR THE PROJECT COORDINAT ION UNIT (PCU) MOTAC/TDP/GDS/0003/2018 / PROCUREMENT OF 2 NO. PI Project management and ins Single Stage - One E CK-UP, 1 No. CROSS COUNTR IDA / V1730 Post Request for Bids Open - National 172,000.00 73,430.00 Completed 2018-06-27 2018-08-14 2018-07-02 2018-08-01 2018-11-29 2018-08-31 2018-12-11 2018-10-05 2019-01-10 2018-12-04 2019-05-28 titutional strengthening nvelope Y VEHICLE AND 1No. MOTOC YCLE FOR THE PROJECT COO RDINATING UNIT (PCU) MOTAC/TDP/GDS/0002/2018 / PROCUREMENT OF OFFICE F Project management and ins Single Stage - One E URNITURE (OFFICE DESK, SW IDA / V1730 Post Request for Bids Open - National 100,000.00 10,480.00 Completed 2018-06-20 2018-08-10 2018-06-25 2018-07-25 2018-11-29 2018-08-24 2018-12-11 2018-09-28 2019-01-03 2018-10-28 2019-01-24 titutional strengthening nvelope IVEL CHAIR, VISITOR CHAIR E .T.C) FOR THE PROJECT IMPL EMENTATION UNIT GH-TOURISM-96784-GO-RFQ Project management and ins Request for Quota Single Stage - One E / Procurement Of Vehicles: 1 IDA / 63000 Post Limited 170,000.00 64,249.60 Completed 2019-02-06 2019-07-30 2019-04-10 2020-06-19 2019-10-07 2020-07-04 titutional strengthening tions nvelope No. SUV and 1No. S. Car GH-TOURISM-166684-GO-RF B / Supply and Delivery of 1 Project management and ins Single Stage - One E IDA / 63000 Post Request for Bids Open - National 400,000.00 385,751.53 Completed 2020-03-30 2020-03-30 2020-04-04 2020-04-08 2020-04-25 2020-04-17 2020-05-09 2020-04-20 2020-05-30 2020-05-06 2020-06-27 2020-08-21 No Cross Country Vehicle an titutional strengthening nvelope d 5 No Double Cabin Pickups GH-TOURISM-166685-GO-RF B / Supply and Delivery of E mergency Items including Ha nd Sanitizes 500 boxes, Nose Project management and ins Request for Quota Single Stage - One E Masks-1600 boxes, Temp Gu IDA / 63000 Post Limited 350,000.00 315,843.10 Completed 2020-03-31 2020-03-12 2020-04-29 2020-05-08 2020-05-13 2020-10-12 titutional strengthening tions nvelope n-100, Gloves, Liquid Soap-7 10 boxes, Veronica Buckets- 4800, Wash Hand Basin 4800 , to combat Covid-19 Pande mic for the Tourism and Hosp itality S GH-TOURISM-174585-GO-RF Q / Supply and Delivery of Of fice Equipment including 8No Project management and ins Request for Quota Single Stage - One E IDA / 63000 Post Limited 70,000.00 17,249.70 Completed 2020-09-30 2020-07-03 2020-11-25 2020-08-12 2021-02-23 2020-08-22 laptops, 12No printers, 3No c titutional strengthening tions nvelope ameras, stationary itmes, ton er cartridges, furniture for PC U GH-TOURISM-191116-GO-RF Q / SUPPLY AND DELIVERY O F OFFICE EQUIPMENT INCLUD Project management and ins Request for Quota Single Stage - One E IDA / 63000 Post Limited 50,000.00 16,741.25 Completed 2021-01-03 2020-09-18 2021-02-28 2020-11-18 2021-08-27 2021-11-18 ING 6 NO Laptops, 5 NO DES titutional strengthening tions nvelope KTOPS, 5 NO PRINTERS, STA TIONARY ITEMS, TONER CAR TRIDGES for THE GTDC GH-TOURISM-193953-GO-RF Q / Procurement of Media Ad verts, Radio Jingles, TV Produ ctions, Outdoor Branding Par Project management and ins Request for Quota Single Stage - One E aphernalia, media planning a IDA / 63000 Post Limited 100,000.00 89,664.99 Completed 2020-10-22 2020-09-25 2020-12-24 2020-12-01 2021-06-22 2021-02-12 titutional strengthening tions nvelope nd buying and social/digital media engagements etc. tow ards the Domestic Tourism A ction Plan and Campaign for the Ghana Tourism Authority (GTA) GH-TOURISM-186837-GO-RF B / Design, Supply, Install, Bu Strengthening the tourism e Open - Internationa Single Stage - One E ild Capacity and Deploy Elect IDA / 63000 Post Request for Bids 800,000.00 0.00 Canceled 2020-11-17 2020-10-12 2020-11-22 2020-10-21 2021-01-03 2021-02-02 2021-03-09 2021-09-05 nabling environment l nvelope ronic Visa Solution (e- visa) f or the Ghana Immigration Se rvices (GIS) GH-TOURISM-229508-GO-RF B / Design, Supply, Install, Bu Strengthening the tourism e Single Stage - One E ild Capacity and Deploy Elect IDA / 63000 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2021-06-08 2021-06-13 2021-07-25 2021-08-24 2021-09-28 2022-03-27 nabling environment nvelope ronic Visa Solution (e- visa) f or the Ghana Immigration Se rvices (GIS) GH-TOURISM-230715-GO-RF Project management and ins Request for Quota Single Stage - One E Q / Supply and Delivery of 1 IDA / 63000 Post Limited 80,000.00 0.00 Canceled 2021-06-27 2021-09-05 2021-11-04 titutional strengthening tions nvelope No Cross Country Vehicle for the TDP Page 2 GH-TOURISM-163780-GO-RF Project management and ins Single Stage - One E B / Supply and Delivery of 1 IDA / 63000 Post Request for Bids Open - National 130,000.00 0.00 Canceled 2020-03-30 2020-04-04 2020-05-16 2020-06-15 2020-07-20 2021-01-16 titutional strengthening nvelope No. Cross Country Vehicle to MOTAC GH-TOURISM-292084-GO-RF B / SUPPLY AND DELIVERY OF Project management and ins Single Stage - One E 2 NO. SAFARI VEHICLES (4W IDA / 63000 Post Request for Bids Open - National 365,000.00 0.00 Signed 2022-05-17 2022-06-10 2022-05-22 2022-06-16 2022-07-03 2022-07-20 2022-08-02 2022-09-05 2022-09-06 2023-03-05 titutional strengthening nvelope D) FOR SHAI HILLS, 1 NO. 4/ 4 SUV AND 1 NO. 4/4 PICKUP AND 1 NO SALOON VEHICLE GH-TOURISM-292085-GO-RF Q / SUPPLY AND DELIVERY O F 5 LAPTOPS,1 ALL IN ONE D Project management and ins Request for Quota Single Stage - One E IDA / 63000 Post Limited 32,500.00 0.00 Signed 2022-08-01 2022-06-27 2022-09-26 2022-10-05 ESKTOP WITH UPS, 6 ALL IN titutional strengthening tions nvelope ONE PRINTERS, 2 NO PHOTO COPIERS, 2 NO. DIGITAL CAM ERAS. GH-TOURISM-292404-GO-RF Project management and ins Request for Quota Single Stage - One E Q / SUPPLY AND DELIVERY O IDA / 63000 Post Limited 15,000.00 0.00 Canceled 2022-05-29 2022-07-24 2023-01-20 titutional strengthening tions nvelope F TONERS TO THE PCU GH-TOURISM-292083-GO-RF B / SUPPLY, DELIVERY AND IN STALLATION OF 5 NO. MULTI Strengthening the tourism e Single Stage - One E Under Imple IDA / 63000 Post Request for Bids Open - National 1,250,000.00 0.00 2022-08-22 2022-09-12 2022-08-29 2022-09-14 2022-10-10 2022-10-28 2022-11-09 2022-12-14 2023-06-12 PURPOSE MEMBRANE STRUC nabling environment nvelope mentation TURES (DOME THEATRES) FO R CREATIVE PERFORMERS - P HASE 1 GH-TOURISM-292403-GO-RF Q / SUPPLY, DELIVERY AND I Project management and ins Request for Quota Single Stage - One E Pending Impl IDA / 63000 Post Limited 45,000.00 0.00 2023-01-31 2023-03-28 2023-09-24 NSTALLATION OF 2NO GENE titutional strengthening tions nvelope ementation RATORS FOR MOTAC AND PC U GH-TOURISM-361500-GO-RF Q / Supply, Delivery and Inst Developing tourism sites an Request for Quota Single Stage - One E Pending Impl IDA / 63000 Post Limited 100,000.00 0.00 2023-05-22 2023-07-17 2023-08-07 allation of Furniture for the K d destinations tions nvelope ementation wame Nkrumah Memorial Par k GH-TOURISM-361517-GO-RF Q / Supply, Delivery and Inst Developing tourism sites an Request for Quota Single Stage - One E Pending Impl IDA / 63000 Post Limited 100,000.00 0.00 2023-06-13 2023-08-08 2023-08-10 allation of Equipment for the d destinations tions nvelope ementation Kwame Nkrumah Memorial P art NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-TOURISM-191102-NC-RF Strengthening the tourism e Single Stage - One E B / Consultancy Service for th IDA / 63000 Post Request for Bids Open - National 160,000.00 0.00 Canceled 2021-01-03 2021-01-08 2021-02-19 2021-03-21 2021-04-25 2021-10-22 nabling environment nvelope e development of a Beyond t he Return Portal CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOTAC/TDP/CS/0012/2018 / CONSULTANCY FOR ECONOM Developing tourism sites an Consultant Qualifi IDA / V1730 Post Limited 50,000.00 0.00 Canceled 2018-07-31 2018-08-14 2018-09-13 2018-10-18 2019-01-16 IC AND FINANCIAL ANALYSIS d destinations cation Selection OF POTENTIAL TOURISM SITE S MOTAC/TDP/0013/2018 / CO Strengthening the tourism e Quality And Cost- NSULTANCY FOR MARKET ST IDA / V1730 Post Open - National 100,000.00 90,155.44 Completed 2018-08-06 2019-06-05 2018-08-27 2018-10-10 2019-10-02 2018-11-07 2019-11-20 2018-12-07 2019-12-11 2019-01-11 2020-03-02 2019-02-15 2020-03-17 2019-06-15 2020-09-26 nabling environment Based Selection UDY AND DESIGN OF MARKE TING CAMPAIGNS MOTAC/TDP/CS/0015/2018 / CONSULTANCY SERVICES FO Strengthening the tourism e Quality And Cost- R A COMPREHENSIVE STUDY IDA / V1730 Post Open - National 130,000.00 0.00 Canceled 2018-08-14 2018-09-13 2018-09-04 2018-10-18 2018-11-15 2018-12-15 2019-01-19 2019-02-23 2019-05-24 nabling environment Based Selection OF THE ECONOMIC IMPACT A ND COST STRUCTURE OF TO URISM IN GHANA MOTAC/TDP/CS/0016/2018 / CONSULTANCY FOR CAPACIT Y BUILDING ASSESSMENT AN Strengthening the tourism e Quality And Cost- IDA / V1730 Post Open - National 100,000.00 67,012.86 Completed 2018-08-21 2018-12-05 2018-09-11 2018-10-25 2019-09-16 2018-11-22 2019-10-21 2018-12-22 2019-11-18 2019-01-26 2020-01-21 2019-03-02 2020-02-29 2019-06-30 2020-10-01 D DESIGN OF A PROGRAM FO nabling environment Based Selection R PUBLIC SECTOR TOURISM S TAKEHOLDERS (MoTAC, GTA, GTDC, GIPC, MoFA, E.T.C) MOTAC/TDP/CS/0009/2018 / Tourism enterprise support Consultant Qualifi CONSULTANCY FOR TOURISM IDA / V1730 Post Limited 50,000.00 0.00 Canceled 2018-07-17 2019-01-13 2018-07-31 2018-08-30 2018-10-04 2019-02-01 program cation Selection ENTERPRISE DIAGNOSTICS GH-TOURISM-96811-CS-QCB Tourism enterprise support Quality And Cost- S / RECRUITMENT OF GRANT IDA / 63000 Prior Open - National 130,000.00 146,747.84 Completed 2019-01-31 2019-05-23 2019-02-21 2019-04-06 2019-11-25 2019-05-04 2020-01-08 2019-06-03 2020-03-09 2019-07-08 2020-04-28 2019-08-12 2020-05-19 2020-08-11 2021-06-24 program Based Selection MANAGEMENT FIRM GH-TOURISM-98104-CS-CQS Project management and ins Consultant Qualifi IDA / 63000 Post Open - National 50,000.00 63,727.00 Completed 2019-01-31 2019-05-08 2019-02-21 2019-04-06 2019-12-13 2019-05-06 2020-05-07 2019-06-10 2020-05-29 2019-12-07 2021-08-16 / TOURISM ENTERPRISE DIAG titutional strengthening cation Selection NOSTICS GH-TOURISM-98144-CS-CQS / DEVELOPMENT OF NATIONA Tourism enterprise support Consultant Qualifi L TOURISM STRATEGIC ACTIO IDA / 63000 Post Open - National 105,000.00 0.00 Canceled 2019-02-01 2019-02-22 2019-04-07 2019-05-07 2019-06-11 2019-12-08 program cation Selection N PLAN - STAKEHOLDER ENG AGEMENT/WORKSHOPS/PORT AL UPGRADE MOTAC/TDP/CS/0011/2018 / Developing tourism sites an Quality And Cost- CONSULTANCY FOR CIRCUIT IDA / V1730 Post Open - National 120,000.00 0.00 Canceled 2018-07-26 2018-08-16 2018-09-29 2018-10-27 2018-11-26 2018-12-31 2019-02-04 2019-05-05 d destinations Based Selection / CORRIDOR NEEDS ASSESSM ENT MOTAC/TDP/CS/0010/2018 / Developing tourism sites an Consultant Qualifi CONSULTANCY FOR SITE DEV IDA / V1730 Prior Limited 750,000.00 0.00 Canceled 2018-07-24 2018-08-07 2018-09-06 2018-10-11 2019-04-09 d destinations cation Selection ELOPMENT PLANS Page 3 MOTAC/TDP/CS/0020/2018 / CONSULTANCY TO IMPROVE Project management and ins Quality And Cost- EXISTING STATISTICAL AND I IDA / V1730 Post Open - National 100,000.00 0.00 Canceled 2018-09-20 2019-01-21 2018-10-11 2018-11-24 2018-12-22 2019-01-21 2019-02-25 2019-04-01 2020-03-31 titutional strengthening Based Selection NFORMATION SYSTEMS / TA TO THE GTA TOURISM SATEL LITE ACCOUNT PROCESSES MOTAC/TDP/CS/0019/2018 / Strengthening the tourism e Quality And Cost- CONSULTANCY FOR MARKETI IDA / V1730 Prior Open - National 1,000,000.00 0.00 Canceled 2018-09-11 2018-10-02 2018-11-15 2018-12-13 2019-01-12 2019-02-16 2019-03-23 2020-03-22 nabling environment Based Selection NG AND PROMOTION GH-TOURISM-78031-CS-CQS Strengthening the tourism e Quality And Cost- / Consultancy for curriculum IDA / 63000 Post Open - National 250,000.00 0.00 Canceled 2018-10-19 2018-11-09 2018-12-23 2019-01-20 2019-02-19 2019-03-26 2019-04-30 2020-04-29 nabling environment Based Selection development MOTAC/TDP/CS/0017/2018 / CONSULTANCY FOR REVIEW Strengthening the tourism e Quality And Cost- OF REGULATORY AND COST IDA / V1730 Post Open - National 150,000.00 0.00 Canceled 2018-08-28 2018-09-18 2018-11-01 2018-11-29 2018-12-29 2019-02-02 2019-03-09 2019-07-07 nabling environment Based Selection STRUCTURE OF THE INTERNA TIONAL AND DOMESTIC AVIA TION SECTOR IN GHANA MOTAC/TDP/CS/0018/2018 / CONSULTANCY FOR THE STU DY OF GHANA VISA FEES AN Strengthening the tourism e Quality And Cost- D PROCESSES, INCLUDING ST IDA / V1730 Post Open - National 150,000.00 0.00 Canceled 2018-09-04 2018-10-18 2018-09-25 2018-11-08 2018-12-06 2019-01-05 2019-02-09 2019-03-16 2019-06-14 nabling environment Based Selection UDY TOUR FOR BENCHMARKI NG, SCENARIOS AND RECOM MENDATIONS FOR INCREASI NG COMPETITIVENESS GH-TOURISM-163771-CS-CQ S / Consultancy Service for Ri Strengthening the tourism e Consultant Qualifi IDA / 63000 Prior Open - National 160,000.00 165,000.00 Signed 2020-03-25 2020-05-07 2020-04-15 2020-06-04 2020-05-29 2020-08-17 2020-06-28 2020-10-26 2020-08-02 2020-11-10 2021-01-29 sk Mitigation for the Ghanaia nabling environment cation Selection n Tourism Industry GH-TOURISM-167858-CS-QC BS / Consultancy Service for t Developing tourism sites an Quality And Cost- IDA / 63000 Post Open - National 250,000.00 237,508.50 Signed 2020-04-20 2020-04-16 2020-05-04 2020-05-02 2020-06-01 2020-06-25 2020-06-29 2020-07-24 2020-07-13 2020-08-11 2020-08-17 2020-10-28 2020-09-14 2021-01-13 2021-01-04 he Development of a Master d destinations Based Selection Plan for the Northern Touris m Enclave GH-TOURISM-167859-CS-QC BS / Consultancy Service for t Developing tourism sites an Quality And Cost- IDA / 63000 Post Open - National 250,000.00 252,984.57 Signed 2020-04-19 2020-04-16 2020-05-03 2020-05-02 2020-06-14 2020-06-25 2020-07-12 2020-07-24 2020-07-26 2020-08-11 2020-08-30 2020-10-28 2020-10-04 2021-01-13 2021-01-24 he Development of a Master d destinations Based Selection Plan for the Southern Touris m Enclave GH-TOURISM-173089-CS-QC BS / Consultancy Service for t Developing tourism sites an Consultant Qualifi IDA / 63000 Post Open - National 80,000.00 138,932.28 Signed 2020-08-18 2020-06-14 2020-09-08 2020-06-27 2020-09-29 2020-09-21 2020-10-29 2021-02-23 2020-12-03 2021-06-10 2021-06-01 he Improvement of Selected d destinations cation Selection Craft Making Sites GH-TOURISM-173458-CS-CQ Developing tourism sites an Consultant Qualifi S / CONSULTANT FOR SITE D IDA / 63000 Post Open - National 200,000.00 362,504.23 Signed 2020-09-15 2020-07-09 2020-10-06 2020-11-19 2021-01-29 2020-12-19 2021-05-28 2021-01-23 2021-06-03 2021-07-22 d destinations cation Selection EVELOPMENT PLAN FOR ELMI NA ICONIC SITE GH-TOURISM-183716-CS-CQ S / CONSULTANCY FOR THE DEVELOPMENT OF FIVE YEAR Strengthening the tourism e Consultant Qualifi IDA / 63000 Post Open - National 100,000.00 120,000.00 Completed 2020-11-02 2020-09-10 2020-11-23 2021-01-06 2020-11-30 2021-02-05 2021-02-02 2021-03-12 2021-02-03 2021-09-08 2021-07-31 STRATEGIC FRAMEWORK AN nabling environment cation Selection D IMPLEMENTATION PLAN FO R THE GHANA MUSEUMS AN D MONUMENTS BOARD GH-TOURISM-182843-CS-CQ S / Business Pulse Research Strengthening the tourism e Consultant Qualifi IDA / 63000 Post Limited 30,000.00 0.00 Canceled 2020-09-14 2020-09-28 2020-10-28 2020-12-02 2021-05-31 on the Impact of Covid-19 on nabling environment cation Selection Tourism and Hospitality SMEs GH-TOURISM-187679-CS-CQ Strengthening the tourism e Consultant Qualifi S / Baseline Study of Selecte IDA / 63000 Post Limited 160,000.00 151,940.83 Completed 2020-09-15 2020-09-10 2020-09-29 2020-10-06 2020-10-29 2020-12-04 2020-12-03 2021-02-03 2021-06-01 2021-11-02 nabling environment cation Selection d Tourist Sites/ Destinations GH-TOURISM-181129-CS-CQ S / Consultancy Service for Si Developing tourism sites an Consultant Qualifi IDA / 63000 Post Open - National 200,000.00 0.00 Canceled 2020-07-22 2020-07-17 2020-08-05 2020-09-09 2020-09-23 2020-10-28 2021-04-26 te Development Plan for the d destinations cation Selection Kakum National Park GH-TOURISM-98148-CS-CQS Tourism enterprise support Consultant Qualifi / DESIGN A SYSTEM THAT WI IDA / 63000 Post Limited 100,000.00 0.00 Canceled 2019-02-04 2020-10-07 2019-02-18 2019-03-20 2019-04-24 2019-10-21 program cation Selection LL DIGITIZE PAYMENT AT TO URIST SITES. GH-TOURISM-98099-CS-QCB Developing tourism sites an Quality And Cost- IDA / 63000 Prior Open - National 250,000.00 0.00 Canceled 2019-02-04 2019-02-25 2019-04-10 2019-05-08 2019-06-07 2019-07-12 2019-08-16 2020-08-15 S / SITE DEVELOPMENT d destinations Based Selection GH-TOURISM-181257-CS-QC Developing tourism sites an Quality And Cost- BS / Consultancy Service for IDA / 63000 Post Open - National 200,000.00 0.00 Canceled 2020-07-22 2020-07-17 2020-08-12 2020-08-28 2020-09-25 2020-10-16 2020-11-20 2021-01-01 2021-01-19 d destinations Based Selection Site Development Plan for th e Shai Hills Park GH-TOURISM-98150-CS-CQS / VALIDATE AND IMPROVE EX Tourism enterprise support Consultant Qualifi ISTING STATISTICAL AND INF IDA / 63000 Prior Limited 100,000.00 0.00 Canceled 2019-02-05 2019-02-19 2019-03-21 2019-04-25 2019-10-22 program cation Selection ORMATION SYSTEMS / TA TO THE GTA TOURISM SATELLITE ACCOUNT PROCESSES GH-TOURISM-183551-CS-CQ Developing tourism sites an Consultant Qualifi S / Consultancy Service for th IDA / 63000 Post Open - National 300,000.00 0.00 Canceled 2020-08-26 2020-09-18 2020-09-16 2020-10-30 2020-11-29 2021-01-03 2021-07-02 d destinations cation Selection e Upgrade of Kintampo Wate rfalls GH-TOURISM-191111-CS-CQ Project management and ins Consultant Qualifi S / Consultancy Service for a IDA / 63000 Post Open - National 100,000.00 0.00 Canceled 2020-10-12 2020-11-02 2020-12-16 2021-01-15 2021-02-19 2021-02-28 titutional strengthening cation Selection Mid Term Review Consultant for the TDP GH-TOURISM-173097-CS-CQ S / Consultancy for the impro Developing tourism sites an Consultant Qualifi vement of Slave Trade Herita IDA / 63000 Post Open - National 150,000.00 0.00 Canceled 2020-07-21 2020-06-10 2020-08-11 2020-06-27 2020-09-08 2020-09-21 2020-10-08 2020-11-12 2021-05-11 d destinations cation Selection ge Sites in Ghana (Slave Route Project) GH-TOURISM-219892-CS-CQ S / Consultancy Service for th e Design and Construction Su Strengthening the tourism e Consultant Qualifi IDA / 63000 Prior Open - National 500,000.00 455,707.60 Signed 2021-05-19 2021-05-17 2021-06-09 2021-06-01 2021-07-23 2021-09-02 2021-08-22 2022-04-21 2021-09-26 2022-05-27 2022-03-25 pervision of the Cape Coast C nabling environment cation Selection astle Annex Slavery Museum, Shai Hills, Mole and Kakum N ational Park Page 4 GH-TOURISM-229541-CS-CQ S / Consultancy Service for th Strengthening the tourism e Consultant Qualifi IDA / 63000 Post Open - National 200,000.00 174,751.87 Signed 2021-05-17 2021-06-19 2021-06-07 2021-07-11 2021-07-21 2021-10-25 2021-08-20 2022-02-07 2021-09-24 2022-03-12 2022-09-24 e Placement of Tourism Relat nabling environment cation Selection ed Advertisements in the Nig erian Media GH-TOURISM-229546-CS-QC BS / Consultancy Service for t Strengthening the tourism e Quality And Cost- IDA / 63000 Post Open - National 500,000.00 488,000.00 Signed 2021-05-17 2021-08-10 2021-06-07 2021-08-17 2021-07-21 2021-11-19 2021-08-18 2021-12-22 2021-09-17 2022-02-08 2021-10-22 2022-04-27 2021-11-26 2022-06-21 2022-05-25 he upgrade of Lower Level To nabling environment Based Selection urism and Hospitality Skills T raining Institutions GH-TOURISM-229816-CS-QC BS / Consultancy Service for t Project management and ins Quality And Cost- IDA / 63000 Post Open - National 350,000.00 205,074.63 Signed 2021-06-08 2021-08-15 2021-06-29 2021-08-12 2021-11-19 2021-09-09 2021-12-21 2021-10-09 2022-02-08 2021-11-13 2022-04-04 2021-12-18 2022-06-29 2022-12-18 he Recruitment of an Indepe titutional strengthening Based Selection ndent Contract Management and Monitoring Firm GH-TOURISM-229817-CS-QC BS / Consultancy Service for Strengthening the tourism e Quality And Cost- Open - Internationa IDA / 63000 Post 300,000.00 312,871.52 Signed 2021-06-08 2021-06-06 2021-06-29 2021-07-11 2021-08-12 2021-10-21 2021-09-09 2021-11-22 2021-10-09 2022-01-28 2021-11-13 2022-05-19 2021-12-18 2022-07-15 2022-06-16 a PPP Transaction Adviser for nabling environment Based Selection l the Tourism Training School GH-TOURISM-229489-CS-QC BS / Consultancy Service for Strengthening the tourism e Quality And Cost- Open - Internationa IDA / 63000 Post 500,000.00 0.00 Signed 2021-05-27 2021-06-10 2021-06-17 2021-07-11 2021-07-31 2021-10-25 2021-08-28 2021-11-26 2021-09-27 2022-01-21 2021-11-01 2022-03-28 2021-12-06 2022-12-06 Domestic Tourism Promotion nabling environment Based Selection l Campaigns and MICE Consoli dation GH-TOURISM-162744-CS-CQ S / Design Review and Constr Developing tourism sites an Quality And Cost- IDA / 63000 Post Open - National 200,000.00 0.00 Under Review 2022-05-31 2022-06-15 2022-06-21 2022-08-04 2022-09-01 2022-10-01 2022-11-05 2022-12-10 2023-06-08 uction Supervision for the Sit d destinations Based Selection e Development Works at PAG A Iconic Site. GH-TOURISM-229805-CS-QC BS / CONSULTANCY SERVICE Strengthening the tourism e Quality And Cost- Open - Internationa IDA / 63000 Post 300,000.00 0.00 Canceled 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-12-05 2022-01-09 2022-07-08 FOR THE DEVELOPMENT OF nabling environment Based Selection l A NATIONAL AVIATION MAST ER PLAN MOTAC/TDP/CS/0014/2018 / CONSULTANCY FOR THE DEV Strengthening the tourism e Consultant Qualifi IDA / V1730 Post Limited 70,000.00 0.00 Canceled 2018-08-09 2018-10-02 2018-08-23 2018-09-22 2018-10-27 2019-02-24 ELOPMENT OF NATIONAL TO nabling environment cation Selection URISM STRATEGIC ACTION PL AN GH-TOURISM-219900-CS-QC Project management and ins Quality And Cost- Open - Internationa BS / Consultancy Service to e IDA / 63000 Post 600,000.00 0.00 Canceled 2021-05-13 2021-06-03 2021-07-17 2021-08-14 2021-09-13 2021-10-18 2021-11-22 2022-11-22 titutional strengthening Based Selection l ngage a Grant Management Firm GH-TOURISMM-182844-CS-C QS / Consultancy Service for Developing tourism sites an Consultant Qualifi the Development of Plan and IDA / 63000 Post Open - National 200,000.00 225,579.68 Signed 2020-09-22 2020-09-21 2020-10-13 2020-11-26 2021-01-22 2020-12-26 2021-05-28 2021-01-30 2021-06-04 2021-07-29 d destinations cation Selection Supervision of the Renovatio n of the Kwame Nkrumah Me morial Park GH-TOURISM-182844-CS-CQ S / CONSULTANCY SERVICE F OR THE DEVELOPMENT OF PL Developing tourism sites an Consultant Qualifi IDA / 63000 Post Open - National 200,000.00 0.00 Canceled 2020-09-22 2020-09-21 2020-10-13 2021-06-30 2020-11-26 2020-12-26 2021-01-30 2021-07-29 ANS AND SUPERVISION FOR d destinations cation Selection THE RENOVATION OF THE K WAME NKRUMAH MAUSOLEU M GH-TOURISM-292082-CS-CQ S / CONSULTANCY FOR A DIG ITAL PORTAL TO TRACK TOU Developing tourism sites an Consultant Qualifi RISM LICENCING AND LEVY T IDA / 63000 Post Open - National 100,000.00 0.00 Canceled 2022-05-25 2022-05-29 2022-06-15 2022-07-29 2022-08-28 2022-10-02 2023-03-31 d destinations cation Selection AX COMPLIANCE ( RATIONALI SATION/ HARMONISATION OF STATUTORY FEES AND CHAR GES) GH-TOURISM-292388-CS-QC BS / Consultancy Service for a Master Plan including a Bea Developing tourism sites an Quality And Cost- Under Implement IDA / 63000 Post Open - National 350,000.00 0.00 2022-08-12 2022-10-31 2022-09-02 2022-11-18 2022-10-16 2022-11-13 2022-12-13 2023-01-17 2023-02-21 2024-02-21 ch front Plan for the determin d destinations Based Selection ation ation of feasibility and Cost o f potential Upgrades for the L a Pleasure Beach GH-TOURISM-301683-CS-CQ Tourism enterprise support Consultant Qualifi Under Implement S / Consultancy Service Servi IDA / 63000 Post Limited 30,000.00 0.00 2022-08-12 2023-01-11 2022-08-26 2022-09-25 2022-10-30 2023-04-28 program cation Selection ation ce for a Communications Fir m for the Grants GH-TOURISM-292149-CS-QC BS / CONSULTANCY SERVICE FOR DETAILED DESIGN AND Developing tourism sites an Quality And Cost- SUPERVISION OF THE NATUR IDA / 63000 Post Open - National 800,000.00 0.00 Canceled 2022-12-21 2023-01-11 2023-02-24 2023-03-24 2023-04-23 2023-05-28 2023-07-02 2023-12-29 d destinations Based Selection E ECO-TOURISM SITE AT WLI- AFEGAME WATERFALL IN TH E VOLTA REGION AND ABRAF O ECOTOURISM PROJECT GH-TOURISM-292419-CS-QC BS / Pre-feasibility Study for t Developing tourism sites an Quality And Cost- Under Implement IDA / 63000 Post Open - National 250,000.00 0.00 2022-08-19 2022-09-22 2022-09-09 2022-10-11 2022-10-23 2022-11-20 2022-12-20 2023-01-24 2023-02-28 2023-08-27 he Ghana Centre of the Worl d destinations Based Selection ation d Park and Iconic Tower GH-TOURISM-292389-CS-QC BS / CONSULTANCY TO DEVE LOP A NATIONAL REGISTER O F HERITAGE, ARCHAEOLOGIC Strengthening the tourism e Quality And Cost- Under Implement AL AND HISTORICAL SITES A IDA / 63000 Post Open - National 300,000.00 0.00 2022-07-26 2022-08-23 2022-08-16 2022-09-05 2022-09-29 2022-10-27 2022-11-26 2022-12-31 2023-02-04 2024-02-04 nabling environment Based Selection ation ND TO REVIEW THE WORLD HERITAGE TENTATIVE LIST A ND DELINEATE BOUNDARIES AND BUFFER ZONES FOR RES PONSIBLE MANAGEMENT GH-TOURISM-307141-CS-CQ S / Consultancy Service for th Developing tourism sites an Consultant Qualifi IDA / 63000 Post Limited 100,000.00 0.00 Signed 2022-08-12 2022-08-07 2022-08-26 2022-09-09 2022-09-25 2022-12-19 2022-10-30 2023-04-28 e Preparation of Environment d destinations cation Selection al and Social Management Pl ans (ESMPs) GH-TOURISM-333714-CS-CQ S / CONSULTANCY SERVICE F Strengthening the tourism e Consultant Qualifi OR AN INDEPTH FIDUCIARY R IDA / 63000 Post Limited 150,000.00 0.00 Signed 2023-01-13 2023-01-11 2023-01-27 2023-02-14 2023-02-26 2023-04-05 2023-04-02 2023-07-01 nabling environment cation Selection EVIEW AND TECHNICAL AUDI T OF THE GRANT DISBURSEM ENTS GH-TOURISM-333715-CS-CQ S / CONSULTANCY SERVICE F Project management and ins Consultant Qualifi OR END LINE EVALUATION O IDA / 63000 Post Limited 180,000.00 0.00 Signed 2023-01-15 2023-01-11 2023-01-29 2023-02-12 2023-02-28 2023-04-04 2023-04-04 2023-04-13 titutional strengthening cation Selection F THE GRANTS PROGRAM AN D IMPLEMENTATION COMPLE TION REPORT Page 5 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOTAC/TDP/CS/0002/2018 / Project management and ins Individual Consult CONSULTANCY FOR SOCIAL S IDA / V1730 Prior Limited 81,000.00 0.00 Canceled 2018-07-03 2018-07-26 2018-07-08 2018-07-29 2018-09-02 2019-09-02 titutional strengthening ant Selection AFEGUARDS MOTAC/TDP/CS/0006/2018 / Project management and ins Individual Consult IDA / V1730 Prior Limited 12,000.00 2,000.00 Signed 2018-07-10 2018-07-24 2018-07-15 2018-07-26 2018-08-05 2019-06-03 2018-09-09 2019-06-03 2019-09-09 RECRUITMENT FOR M&E EXP titutional strengthening ant Selection ERT MOTAC/TDP/CS/0001/2018 / Project management and ins Individual Consult CONSULTANCY FOR THE REC IDA / V1730 Prior Limited 72,000.00 48,000.00 Signed 2018-07-03 2018-07-24 2018-07-08 2018-07-26 2018-07-29 2018-10-11 2018-09-02 2018-10-11 2019-09-02 titutional strengthening ant Selection RUITMENT OF PROJECT COOR DINATOR GH-TOURISM-82042-CS-IND Project management and ins Individual Consult IDA / V1730 Prior Open 48,000.00 3,500.00 Signed 2018-10-16 2018-10-30 2018-12-04 2019-03-21 2018-12-25 2019-04-15 2019-01-29 2019-06-03 2020-01-29 V / Procurement Specialist titutional strengthening ant Selection MOTAC/TDP/CS/0007/2018 / CONSULTANCY FOR SANITATI Project management and ins Individual Consult IDA / V1730 Post Limited 12,000.00 0.00 Canceled 2018-07-12 2018-07-17 2018-08-07 2018-09-11 2018-11-10 ON SERVICES AND BEACH FR titutional strengthening ant Selection ONT IMPROVEMENT MOTAC/TDP/CS/0008/2018 / CONSULTANCY FOR COLLECT Project management and ins Individual Consult ION OF BASELINE INFORMATI IDA / V1730 Post Limited 24,000.00 0.00 Canceled 2018-07-12 2018-07-17 2018-08-07 2018-09-11 2018-11-10 titutional strengthening ant Selection ON ON VISITOR DEMOGRAPH ICS FOR PROJECT MONITORIN G GH-TOURISM-96804-CS-IND Tourism enterprise support Individual Consult V / MoTAC WEBSITE UPGRAD IDA / 63000 Post Limited 20,000.00 30,000.00 Signed 2019-01-31 2019-07-30 2019-02-05 2020-09-23 2019-02-26 2021-01-22 2019-04-02 2021-02-11 2019-09-29 program ant Selection E /PORTAL UPGRADE GH-TOURISM-96814-CS-IND V / TOURISM ADVISOR TO LE Tourism enterprise support Individual Consult IDA / 63000 Prior Limited 50,000.00 0.00 Canceled 2019-01-31 2019-02-05 2019-02-26 2019-04-02 2019-09-29 AD ESTABLISHMENT OF A PU program ant Selection BLIC PRIVATE DIALOGUE MEC HANISM GH-TOURISM-98140-CS-IND Tourism enterprise support Individual Consult V / RECRUITMENT OF ENVIRO IDA / 63000 Prior Limited 50,000.00 0.00 Canceled 2019-02-04 2019-03-16 2019-02-09 2019-03-02 2019-04-06 2019-10-03 program ant Selection NMENTAL SAFEGUARDS GH-TOURISM-96808-CS-IND Tourism enterprise support Individual Consult V / RECRUITMENT OF FINANC IDA / 63000 Prior Open 24,000.00 0.00 Canceled 2019-02-04 2019-06-03 2019-03-25 2019-04-15 2019-05-20 2019-11-16 program ant Selection IAL MANAGEMENT ADVISOR MOTAC/TDP/CS/0004/2018 / Project management and ins Individual Consult CONSULTANCY FOR PROJECT IDA / V1730 Prior Limited 40,000.00 0.00 Canceled 2018-07-05 2019-01-20 2018-07-10 2018-07-31 2018-09-04 2019-09-04 titutional strengthening ant Selection COMMUNICATION EXPERT GH-TOURISM-102872-CS-IND Project management and ins Individual Consult V / CONSULTANCY FOR SOCI IDA / V1730 Prior Limited 24,000.00 0.00 Canceled 2019-02-26 2019-03-06 2019-03-03 2019-03-24 2019-04-28 2019-10-25 titutional strengthening ant Selection AL SAFEGUARDS GH-TOURISM-96793-CS-IND Tourism enterprise support Individual Consult V / RECRUITMENT OF PROJEC IDA / 63000 Prior Limited 24,000.00 0.00 Canceled 2019-02-27 2019-04-03 2019-03-04 2019-03-25 2019-04-29 2019-10-26 program ant Selection T COMMUNICATION EXPERT GH-TOURISM-102872-CS-IND Project management and ins Individual Consult Under Implement V-2 / CONSULTANCY FOR SO IDA / V1730 Prior Open 24,000.00 0.00 2019-05-02 2019-05-08 2019-06-20 2019-07-16 2019-07-11 2019-08-15 2020-02-11 titutional strengthening ant Selection ation CIAL SAFEGUARDS GH-TOURISM-114550-CS-IND Tourism enterprise support Individual Consult V / Environmental and Social IDA / 63000 Prior Direct 11,000.00 10,000.00 Signed 2019-05-14 2019-05-13 2019-05-21 2019-05-27 2019-05-26 2019-06-03 2019-06-05 2019-06-03 2019-07-05 program ant Selection Safeguard for Quick Works GH-TOURISM-124744-CS-IND Tourism enterprise support Individual Consult V / Recruitment Of Financial IDA / 63000 Post Limited 24,000.00 10,200.00 Signed 2019-07-26 2019-08-03 2019-07-31 2020-02-10 2019-08-21 2020-02-11 2019-09-25 2020-03-03 2020-03-23 program ant Selection Management Advisor GH-TOURISM-126451-CS-IND V / Social Media Strategy and Strengthening the tourism e Individual Consult Campaign. The consultant sh IDA / 63000 Post Limited 30,000.00 30,000.00 Completed 2019-08-07 2019-08-19 2019-08-21 2019-12-23 2019-09-11 2020-01-08 2019-10-16 2020-02-13 2020-01-14 2020-08-14 nabling environment ant Selection all be required to develop an d implement a social media s trategy. MOTAC/TDP/CS/0005/2018 / Project management and ins Individual Consult CONSULTANCY FOR ENVIRON IDA / V1730 Prior Limited 48,000.00 0.00 Canceled 2018-07-10 2018-07-15 2018-08-05 2018-09-09 2019-09-09 titutional strengthening ant Selection MENTAL SAFEGUARDS GH-TOURISM-126465-CS-IND Project management and ins Individual Consult IDA / 63000 Prior Limited 25,000.00 0.00 Canceled 2019-09-30 2019-09-28 2019-10-05 2019-10-26 2019-11-30 2020-05-28 V / M&E consultant titutional strengthening ant Selection GH-TOURISM-126462-CS-IND Project management and ins Individual Consult IDA / 63000 Prior Limited 25,000.00 0.00 Canceled 2019-09-30 2019-09-28 2019-10-05 2019-10-26 2019-11-30 2020-05-28 V / Procurement Consultant titutional strengthening ant Selection GH-TOURISM-143078-CS-IND Project management and ins Individual Consult V / Recruitment of a Procure IDA / 63000 Prior Open 25,000.00 24,375.00 Signed 2019-10-29 2019-10-31 2019-12-17 2020-01-20 2020-01-07 2020-02-11 2020-02-11 2020-03-03 2020-08-09 titutional strengthening ant Selection ment advisor GH-TOURISM-143084-CS-IND Project management and ins Individual Consult IDA / 63000 Prior Open 25,000.00 24,000.00 Completed 2019-10-30 2019-11-15 2019-12-18 2020-02-05 2020-01-08 2020-02-11 2020-02-12 2020-03-03 2020-08-10 2022-03-03 V / Monitoring and Evaluation titutional strengthening ant Selection advisor GH-TOURISM-173098-CS-IND V / RESEARCH ON THE CONT Strengthening the tourism e Individual Consult IDA / 63000 Post Limited 70,000.00 87,500.00 Completed 2020-06-30 2020-06-14 2020-07-07 2020-07-14 2020-07-28 2020-08-31 2020-09-01 2020-10-02 2020-11-30 2022-08-18 RIBUTION OF WOMEN IN TOU nabling environment ant Selection RISM INFORMAL SECTOR GH-TOURISM-173456-CS-IND V / Consultancy Service to De Strengthening the tourism e Individual Consult IDA / 63000 Post Open 50,000.00 52,740.00 Completed 2020-08-18 2020-06-05 2020-09-29 2020-11-17 2020-10-20 2020-12-04 2020-11-24 2021-02-04 2021-02-22 2021-10-01 velop a Business Plan for the nabling environment ant Selection Ghana Tourism Development Company Page 6 GH-TOURISM-152486-CS-IND V / Recruitment of a Technica Project management and ins Individual Consult IDA / 63000 Prior Limited 30,000.00 0.00 Canceled 2020-03-30 2020-03-24 2020-04-06 2020-06-22 2020-04-27 2020-06-01 2020-11-28 l Adviser for the Ministry of T titutional strengthening ant Selection ourism Arts and Culture GH-TOURISM-186838-CS-IND V / Recruitment of a Technica Project management and ins Individual Consult IDA / 63000 Post Limited 30,000.00 72,000.00 Signed 2020-08-06 2020-08-28 2020-08-11 2020-09-01 2020-09-01 2020-09-04 2020-10-06 2020-10-02 2021-04-04 l Adviser for the Ministry of T titutional strengthening ant Selection ourism Arts and Culture GH-TOURISM-96793-CS-IND Tourism enterprise support Individual Consult IDA / 63000 Prior Open 24,000.00 0.00 Canceled 2019-05-02 2019-05-10 2019-06-20 2019-07-18 2019-07-11 2019-08-04 2019-08-15 2020-02-11 V-2 / Project Communication program ant Selection Expert GH-TOURISM-188652-CS-IND Project management and ins Individual Consult V / Consultancy for Project Im IDA / 63000 Post Limited 30,000.00 0.00 Canceled 2020-10-28 2020-09-18 2020-11-02 2020-09-21 2020-11-23 2020-12-28 2021-06-26 titutional strengthening ant Selection plementation Manual Review GH-TOURISM-98139-CS-IND V / DEVELOPMENT OF CITIZE Tourism enterprise support Individual Consult IDA / 63000 Post Limited 24,000.00 0.00 Canceled 2019-02-01 2019-02-25 2019-02-06 2019-02-27 2019-04-03 2019-09-30 N ENGAGEMENT PLAN AND G program ant Selection ENDER INCLUSION PLAN GH-TOURISM-188654-CS-IND Project management and ins Individual Consult V / Research on the Contribut IDA / 63000 Post Limited 35,000.00 0.00 Canceled 2020-11-02 2020-11-07 2020-11-28 2021-01-02 2021-07-01 titutional strengthening ant Selection ion of Creative Arts to the Ec onomy GH-TOURISM-188658-CS-IND Strengthening the tourism e Individual Consult V / Consultacy Service for Cr IDA / 63000 Post Limited 40,000.00 0.00 Canceled 2020-12-18 2020-12-23 2021-01-13 2021-02-17 2021-08-16 nabling environment ant Selection eative Industry Insurance GH-TOURISM-229530-CS-CD S / Consultancy Service for th Strengthening the tourism e IDA / 63000 Post Direct Selection Direct 500,000.00 500,000.00 Signed 2021-04-30 2021-06-19 2021-05-10 2021-06-28 2021-06-28 2022-07-15 2021-12-25 e recruitment of CNN to unde nabling environment rtake Advertisements on Tou rism. GH-TOURISM-229539-CS-CD S / Consultancy Service for th Strengthening the tourism e IDA / 63000 Post Direct Selection Direct 300,000.00 149,062.50 Signed 2021-05-12 2021-06-19 2021-05-22 2021-07-12 2021-07-26 2022-03-12 2022-07-26 e placement of Adverts on B nabling environment BC, CNBC, Bloomberg, Aljaze era and others GH-TOURISM-198400-CS-IND Project management and ins Individual Consult V / Consultancy Service for a IDA / 63000 Prior Open 108,000.00 0.00 Under Review 2021-05-24 2021-05-11 2021-07-12 2021-12-29 2021-08-02 2021-09-06 2023-09-30 titutional strengthening ant Selection Safeguards Specialist for the TDP GH-TOURISM-152043-CS-IND V / Consultancy Service for th Project management and ins Individual Consult IDA / 63000 Prior Open 189,000.00 160,800.00 Signed 2021-04-29 2021-05-11 2021-06-19 2021-07-27 2021-07-10 2021-08-13 2021-08-14 2021-09-02 2023-09-29 e Recruitment of a Project Co titutional strengthening ant Selection ordinator for the TDP GH-TOURISM-191113-CS-IND V / CONSULTANCY FOR INDIV Project management and ins Individual Consult IDA / 63000 Prior Open 94,500.00 42,000.00 Signed 2021-05-30 2021-05-11 2021-07-27 2021-12-29 2021-08-17 2022-05-09 2021-09-21 2022-02-02 2023-09-29 IDUAL COMMUNICATIONS EX titutional strengthening ant Selection PERT FOR THE PCU GH-TOURISM-282224-CS-CD Project management and ins S / Consultancy Service for A IDA / 63000 Post Direct Selection Direct 50,000.00 39,400.55 Signed 2022-03-04 2022-03-06 2022-03-10 2022-03-07 2022-04-28 2022-03-26 2022-10-25 titutional strengthening udit of the Tourism Develop ment Project GH-TOURISM-229506-CS-IND V / Consultancy Service for a Project management and ins Individual Consult IDA / 63000 Post Open 108,000.00 0.00 Canceled 2022-08-30 2022-10-18 2022-11-08 2022-12-13 2024-12-14 Project Analyst for the Touris titutional strengthening ant Selection m Development Project GH-TOURISM-198400-CS-IND Project management and ins Individual Consult / Consultancy Service for the IDA / 63000 Prior Open 108,000.00 48,000.00 Signed 2021-05-24 2022-04-26 2021-07-12 2021-12-29 2021-08-02 2022-04-28 2021-09-06 2022-02-02 2022-03-05 titutional strengthening ant Selection Safeguards Specialist for the TDP GH-TOURISM-191113-CS-IND / Consultancy Service for an I Project management and ins Individual Consult IDA / 63000 Prior Open 94,500.00 0.00 Under Review 2021-05-31 2022-04-26 2021-07-19 2021-12-29 2021-08-09 2021-09-13 2022-03-12 ndividual Communications Ex titutional strengthening ant Selection pert for the PCU GH-TOURISM-301608-CS-IND V / Consultancy Service for a Project management and ins Individual Consult IDA / 63000 Prior Limited 56,000.00 0.00 Canceled 2022-07-12 2022-07-20 2022-07-19 2022-09-02 2022-08-09 2022-09-13 2023-05-11 n Monitoring and Evaluation titutional strengthening ant Selection Specialist for the TDP GH-TOURISM-301611-CS-CD S / Consultancy Service for th Tourism enterprise support e Development a Grant Mana IDA / 63000 Post Direct Selection Direct 120,000.00 0.00 Signed 2022-07-08 2022-07-14 2022-07-18 2022-07-19 2022-09-21 2022-12-20 program gement Software for the Tour ism Development Project GH-TOURISM-291851-CS-CD S / Consultancy Service for th Developing tourism sites an e Demand-led Identification a IDA / 63000 Post Direct Selection Direct 20,000.00 0.00 Canceled 2022-04-25 2022-04-26 2022-05-07 2022-06-04 2022-08-03 d destinations nd Prioritization of Tourism Si tes for Development. GH-TOURISM-98140-CS-IND Tourism enterprise support Individual Consult V-2 / RECRUITMENT OF ENVI IDA / 63000 Post Open 50,000.00 0.00 Canceled 2019-05-02 2019-05-08 2019-06-20 2019-07-17 2019-07-11 2019-08-15 2020-02-11 program ant Selection RONMENTAL SAFEGUARDS GH-TOURISM-292081-CS-IND V / CONSULTANCY SERVICE F OR THE SCREENING OF ENVI Strengthening the tourism e Individual Consult IDA / 63000 Post Limited 100,000.00 0.00 Canceled 2022-05-10 2022-05-18 2022-05-15 2022-06-05 2022-07-10 2023-01-06 RONMENTAL AND SOCIAL SA nabling environment ant Selection FEGUARDS SCREENING AND MONITORING OF SELECTED TOURISM SITES GH-TOURISM-307934-CS-IND Developing tourism sites an Individual Consult Open - Internationa V / Technical Adivisor to the IDA / 63000 Prior 450,000.00 0.00 Signed 2022-08-08 2022-11-18 2022-09-26 2023-01-11 2022-10-17 2023-02-10 2022-11-21 2023-03-20 2023-05-20 d destinations ant Selection l Minister (MoTAC) Page 7 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya 2019-10-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000 Kiambu County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-KIAMBU COUNTY-137916 Project Coordination and Ma Request for Quota Single Stage - One E 2020-02-1 -CW-RFQ / refurbishment of IDA / 59000 Post Limited 20,000.00 18,214.59 Signed 2019-10-26 2019-11-21 2019-11-20 2019-11-19 nagement tions nvelope 8 NARIGP office (short term) KE-KIAMBU COUNTY-203604 Supporting County Communi Request for Quota Single Stage - One E Pending Imp 2021-01-1 -CW-RFQ / installation of pon IDA / 59000 Post Limited 20,524.00 0.00 2020-05-26 2020-07-21 ty-Led Development tions nvelope lementation 7 d linners for kamwamba SLM KE-KIAMBU COUNTY-203607 Supporting County Communi Request for Quota Single Stage - One E Under Imple 2021-01-2 IDA / 59000 Post Limited 6,404.00 0.00 2020-05-31 2023-02-02 2020-07-26 -CW-RFQ / SLM publicity ty-Led Development tions nvelope mentation 2 KE-KIAMBU COUNTY-175854 Supporting County Communi Single Stage - One E 2021-08-2 -CW-RFB / construction of ka IDA / 59000 Post Request for Bids Open - National 999,120.00 0.00 Canceled 2020-06-10 2020-06-11 2020-06-15 2020-12-15 2020-07-15 2020-07-27 2020-07-29 2020-08-26 ty-Led Development nvelope 2 mwamba irrigation project KE-KIAMBU COUNTY-222512 -CW-RFB / construction of irri Supporting County Communi Single Stage - One E 2021-12-3 IDA / 59000 Post Request for Bids Open - National 999,120.00 746,021.15 Signed 2021-03-09 2021-04-13 2021-03-16 2021-04-13 2021-04-15 2021-04-09 2021-04-29 2021-04-28 2021-05-20 2021-07-31 gation system for kamwamb ty-Led Development nvelope 1 a irrigation project KE-KIAMBU COUNTY-223994 Supporting County Communi Request for Quota Single Stage - One E 2021-12-3 -CW-RFQ / construction of tw IDA / 59000 Post Limited 33,968.50 0.00 Signed 2021-04-07 2021-09-27 2021-05-19 ty-Led Development tions nvelope 1 enty Water ponds for reguti SLM project KE-KIAMBU COUNTY-224004 Supporting County Communi Request for Quota Single Stage - One E Under Imple 2021-12-3 -CW-RFQ / construction of tw IDA / 59000 Post Limited 33,968.50 0.00 2021-03-29 2021-10-14 2021-05-10 ty-Led Development tions nvelope mentation 1 enty water ponds for githarur u SLM project KE-KIAMBU COUNTY-238291 Request for Quota -CW-RFQ / supply and installa Supporting County Communi Request for Quota Single Stage - One E tions - Small Work Under Imple 2021-12-3 tion of pond liners and shade IDA / 59000 Post Limited 31,565.00 0.00 2021-06-21 2021-10-14 2021-08-02 ty-Led Development tions nvelope s (Emergency) SP mentation 1 net for water ponds excavate D -Competitive d through youth employment at Kibera SLM KE-KIAMBU COUNTY-238292 Request for Quota -CW-RFQ / Supply and install Supporting County Communi Request for Quota Single Stage - One E tions - Small Work Under Imple 2021-12-3 ation of pond liners and shad IDA / 59000 Post Limited 27,905.00 0.00 2021-06-22 2021-11-24 2021-08-03 ty-Led Development tions nvelope s (Emergency) SP mentation 1 e net for water ponds excava D -Competitive ted through youth employme nt at kamae SLM KE-KIAMBU COUNTY-238294 Request for Quota -CW-RFQ / Supply and install Supporting County Communi Request for Quota Single Stage - One E tions - Small Work 2021-12-3 ation of pond liners and shad IDA / 59000 Post Limited 32,090.00 0.00 Signed 2021-06-22 2021-10-14 2021-08-03 ty-Led Development tions nvelope s (Emergency) SP 1 e net for water ponds excava D -Competitive ted through youth employme nt at gatharo SLM GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KIAMBU COUNTY-121106 Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 14,155.00 13,101.34 Signed 2019-10-15 2019-11-21 2019-11-14 2020-03-31 2019-12-14 2020-05-22 -GO-RFQ / office furniture nagement tions nvelope KE-KIAMBU COUNTY-177470 -GO-RFQ / supply delivery an Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 81,000.00 0.00 Signed 2020-06-22 2021-07-14 2020-08-10 2020-10-09 d installation of a Firewall net nagement tions nvelope work security equipment KE-KIAMBU COUNTY-177653 Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 80,000.00 0.00 Signed 2020-06-19 2022-03-03 2020-08-07 2020-10-06 -GO-RFB / procurement of m nagement tions nvelope otor cycles KE-KIAMBU COUNTY-181716 Project Coordination and Ma Request for Quota Single Stage - One E Under Imple -GO-RFQ / Hand held camcor IDA / 59000 Post Limited 9,000.00 0.00 2020-07-19 2021-03-28 2020-09-06 2020-09-27 nagement tions nvelope mentation ders or video cameras. KE-KIAMBU COUNTY-191633 Supporting County Communi Request for Quota Single Stage - One E Under Imple -GO-RFQ / procurement of su IDA / 59000 Post Limited 63,750.00 0.00 2020-09-18 2021-08-15 2020-10-23 2020-11-06 ty-Led Development tions nvelope mentation rvey equipment s KE-KIAMBU COUNTY-177473 -GO-RFB / supply, delivery, in Supporting County Communi Single Stage - One E IDA / 59000 Post Request for Bids Open - National 998,610.00 0.00 Canceled 2020-06-18 2020-06-15 2020-06-23 2020-12-18 2020-07-14 2020-07-28 2020-07-28 2020-08-18 2021-02-14 stallation, testing and commi ty-Led Development nvelope ssioning of a milk cooling equ ipment KE-KIAMBU COUNTY-219408 Supporting County Communi Request for Quota Single Stage - One E Under Imple -GO-RFQ / procurement of se IDA / 59000 Post Limited 18,600.00 0.00 2021-02-26 2021-06-01 2021-04-02 2021-12-31 ty-Led Development tions nvelope mentation edlings for five SLMs KE-KIAMBU COUNTY-221532 -GO-RFB / supply, delivery, in stallation. test and commissi Supporting County Communi Single Stage - One E IDA / 59000 Post Request for Bids Open - National 998,610.00 756,007.45 Signed 2021-03-01 2021-03-10 2021-03-08 2021-03-10 2021-04-07 2021-04-01 2021-04-14 2021-04-23 2021-05-05 2021-05-25 2021-12-31 oning of sterilizer, homogeniz ty-Led Development nvelope er and a septic pouch packin g machine for Limuru dairy f armers Page 1 KE-KIAMBU COUNTY-238130 -GO-RFQ / supply and deliver Supporting County Communi Request for Quota Single Stage - One E y of gunny bags for stabiliza IDA / 59000 Post Limited 10,975.00 0.00 Signed 2021-06-22 2021-09-20 2021-08-03 2021-12-31 ty-Led Development tions nvelope tion of embankment soil ex cavated from ponds through youth employment KE-KIAMBU COUNTY-254250 -GO-RFQ / procurement of fur Supporting Community-Driv Request for Quota Single Stage - One E Under Imple IDA / 59000 Post Limited 10,800.00 0.00 2021-10-05 2021-11-09 2021-12-31 niture and ICT equipment to en Development tions nvelope mentation support CDDC secretariat KE-KIAMBU COUNTY-254253 Supporting County Communi Request for Quota Single Stage - One E Under Imple -GO-RFQ / procurement of di IDA / 59000 Post Limited 15,000.00 0.00 2021-10-05 2021-11-22 2021-11-09 2022-01-05 ty-Led Development tions nvelope mentation gitization equipment's KE-KIAMBU COUNTY-254380 -GO-RFQ / procurement of on Supporting County Communi Request for Quota Single Stage - One E Under Imple e hundred solar pumps for th IDA / 59000 Post Limited 40,000.00 0.00 2021-10-05 2022-04-28 2021-11-09 2021-12-31 ty-Led Development tions nvelope mentation e five SLM sites to be installe d to the one hundred excava ted water ponds KE-KIAMBU COUNTY-256585 Supporting County Communi Request for Quota Single Stage - One E Under Imple -GO-RFQ / supply and deliver IDA / 59000 Post Limited 12,600.00 0.00 2021-11-02 2023-03-09 2021-12-07 2021-12-31 ty-Led Development tions nvelope mentation y of sign posts for 100 SLM si tes KE-KIAMBU COUNTY-258122 Strengthening Producer Org Request for Quota Single Stage - One E Under Imple -GO-RFQ / procurement of Pa IDA / 59000 anizations and Value Chain Post Limited 85,000.00 0.00 2021-11-02 2021-12-07 2021-12-31 tions nvelope mentation steurizer for kiriita dairy PO Development KE-KIAMBU COUNTY-258133 Project Coordination and Ma Request for Quota Single Stage - One E Under Imple -GO-RFQ / procurement of DA IDA / 59000 Post Limited 28,226.90 0.00 2021-11-02 2021-11-22 2021-12-07 2021-12-31 nagement tions nvelope mentation T equipment KE-KIAMBU COUNTY-261402 Strengthening Producer Org -GO-RFQ / Procurement of mi Request for Quota Single Stage - One E Pending Impl IDA / 59000 anizations and Value Chain Post Limited 23,270.00 0.00 2021-11-10 2021-12-15 2021-12-31 lk testing kits, for gatundu un tions nvelope ementation Development ited dairy cooperative KE-KIAMBU COUNTY-265056 Strengthening Producer Org Request for Quota Single Stage - One E Pending Impl -GO-RFQ / procurement of mi IDA / 59000 anizations and Value Chain Post Limited 38,685.00 0.00 2021-12-05 2021-12-28 2021-12-31 tions nvelope ementation lk packaging materials for li Development muru dairy KE-KIAMBU COUNTY-282179 Project Coordination and Ma Request for Quota Single Stage - One E Under Imple IDA / 59000 Post Limited 2,900.00 0.00 2022-03-15 2022-08-29 2022-04-19 2022-05-24 -GO-RFQ / procurement of a l nagement tions nvelope mentation aptop KE-KIAMBU COUNTY-306639 Strengthening Producer Org Request for Quota Single Stage - One E Pending Impl -GO-RFQ / procurement of on IDA / 59000 anizations and Value Chain Post Limited 1,357.00 0.00 2022-09-14 2022-10-19 2022-12-31 tions nvelope ementation e laptop for the coffee focal p Development erson KE-KIAMBU COUNTY-219407 Supporting County Communi Request for Quota Single Stage - One E -GO-RFQ / procurement of SL IDA / 59000 Post Limited 600.00 0.00 Canceled 2021-02-26 2021-04-02 2021-12-31 ty-Led Development tions nvelope M working tools NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KIAMBU COUNTY-261406 Strengthening Producer Org Request for Quota Single Stage - One E Pending Impl -NC-RFQ / Media advert/ brad IDA / 59000 anizations and Value Chain Post Limited 9,000.00 0.00 2021-11-10 2021-12-15 2021-12-31 tions nvelope ementation ed attires for Limuru dairy Development CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KIAMBU COUNTY-190785 Strengthening Producer Org Consultant Qualifi Under Implement -CS-CQS / online and social m IDA / 59000 anizations and Value Chain Post Open - National 110,000.00 0.00 2020-08-31 2020-07-20 2020-09-30 2021-11-29 2020-10-14 2021-11-05 2020-10-21 2020-11-11 2021-12-24 cation Selection ation edia publicity on local chicke Development n value chain KE-KIAMBU COUNTY-190792 Strengthening Producer Org Consultant Qualifi Under Implement -CS-CQS / online and social m IDA / 59000 anizations and Value Chain Post Open - National 70,000.00 0.00 2020-08-31 2021-01-19 2020-09-30 2021-11-29 2020-10-14 2021-11-03 2020-10-21 2020-11-11 2021-12-31 cation Selection ation edia publicity on dairy cow m Development ilk KE-KIAMBU COUNTY-190797 Strengthening Producer Org Consultant Qualifi Under Implement -CS-CQS / online and social m IDA / 59000 anizations and Value Chain Post Open - National 170,000.00 0.00 2020-08-31 2020-07-20 2020-09-30 2021-10-15 2020-10-14 2020-10-21 2020-11-11 2021-12-31 cation Selection ation edia publicity on potatoes va Development lue chain KE-KIAMBU COUNTY-190802 Strengthening Producer Org Consultant Qualifi Under Implement -CS-CQS / online and social m IDA / 59000 anizations and Value Chain Post Open - National 150,000.00 0.00 2020-08-31 2020-07-20 2020-09-30 2021-10-15 2020-10-14 2021-11-04 2020-10-21 2020-11-11 2021-12-31 cation Selection ation edia publicity on banana valu Development e chain KE-KIAMBU COUNTY-173915 -CS-CQS / training planning a Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-05-21 2020-06-21 2020-06-11 2020-06-26 2020-07-09 2020-07-16 2020-08-06 2021-12-24 nd development consultancy en Development cation Selection service for Irish potatoes KE-KIAMBU COUNTY-173910 -CS-CQS / Training planning a Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-05-28 2020-06-21 2020-06-18 2020-06-26 2020-07-16 2020-07-23 2020-08-13 2021-12-31 nd development consultancy en Development cation Selection service for dairy cow milk KE-KIAMBU COUNTY-173974 -CS-CQS / training planning a Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-05-28 2020-06-21 2020-06-18 2020-06-26 2020-07-16 2020-07-23 2020-08-13 2021-12-31 nd development consultancy en Development cation Selection service for banana KE-KIAMBU COUNTY-173914 -CS-CQS / training planning a Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-05-28 2020-06-21 2020-06-18 2020-06-26 2020-07-16 2020-07-23 2020-08-13 2021-12-31 nd development consultancy en Development cation Selection service for local chicken INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Procurement Plan I. General 1. Project information: Loan No Nom du Projet: SUPPORTING THE ECONOMIC INCLUSION OF YOUTH PROJECT Pays: Maroc Référence du Projet : P161169 Numéro du Prêt/Crédit : Agence d’exécution : MINISTERE DE L’EMPLOI ET DE L’INSERTION PROFESSIONNELLE - 2. Bank’s approval Date of the procurement Plan Original :7/9/2019; 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 06-2019- to-31-2020 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior review threshold 2. Type of procurement (US$ thousands) Works (including turnkey, supply & installation of plant and equipment, 10,000 and PPP) Goods, information technology and 2,000 non-consulting services Consultants: firms 1,000 Consultants: individuals 300 Table 2.7. Thresholds for Procurement Approaches and Methods (US$ thousands) Open Open RfQ =< Type of procurement international national < ≧ Works (including turnkey, supply & installation of plant and equipment, 10,000 10,000 300 and PPP) Goods, information technology and 3,000 3,000 200 non-consulting services Shortlist of national consulting firms 300 300 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: MOP of the Project 5. Any Other Special Procurement Arrangements: NA PROCUREMENT Morocco : Supporting the economic inclusion of youth PLAN General Information Country: Morocco 2020-02-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151169 GPN Date: Project Name: Supporting the economic inclusion of youth Loan / Credit No: IBRD / 89540 Agence nationale de promotion de l' emploi et des competances Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MA-ANAPEC-207327-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 IBRD / 89540 Post Open - National 25,000.00 27,786.07 Completed 2020-12-12 2021-03-02 2021-01-19 2020-12-30 Q / Aménagement EEJ Bengu ty and economic inclusion tions nvelope 8 erir MA-ANAPEC-207507-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 IBRD / 89540 Post Open - National 25,000.00 27,871.41 Completed 2020-12-12 2021-01-19 2021-01-03 Q / Aménagement EEJ Safi ty and economic inclusion tions nvelope 8 MA-ANAPEC-207510-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Marrak IBRD / 89540 Post Open - National 25,000.00 27,950.62 Terminated 2020-12-12 2021-01-19 2021-02-27 ty and economic inclusion tions nvelope 8 ech Syba Ennakhil MA-ANAPEC-207513-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Amez IBRD / 89540 Post Open - National 25,000.00 27,724.72 Terminated 2020-12-12 2021-01-19 2020-12-30 ty and economic inclusion tions nvelope 8 miz El Haouz MA-ANAPEC-207515-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Attaou IBRD / 89540 Post Open - National 25,000.00 27,793.12 Completed 2020-12-12 2021-01-19 2020-12-30 ty and economic inclusion tions nvelope 8 ia El Kalaa de Sraghna MA-ANAPEC-207517-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Echam IBRD / 89540 Post Open - National 25,000.00 27,910.96 Completed 2020-12-12 2021-01-19 2020-12-30 ty and economic inclusion tions nvelope 8 aiaa Youssoufia MA-ANAPEC-207518-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Taman IBRD / 89540 Post Open - National 25,000.00 27,947.70 Terminated 2020-12-12 2021-01-19 2021-02-27 ty and economic inclusion tions nvelope 8 ar Essaouira MA-ANAPEC-207519-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Aménagement EEJ Iminta IBRD / 89540 Post Open - National 25,000.00 27,825.37 Completed 2020-12-12 2021-01-19 2020-12-30 ty and economic inclusion tions nvelope 8 nout Chichaoua MA-ANAPEC-207521-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-07-1 Q / Acquisition et installation IBRD / 89540 Post Open - National 25,000.00 14,432.71 Completed 2020-12-12 2021-06-29 2021-01-19 2021-07-02 ty and economic inclusion tions nvelope 8 de la signalétique des 8 EEJ MA-ANAPEC-220942-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-10-1 Q / Relance aménagement E IBRD / 89540 Post Open - National 25,000.00 27,549.87 Completed 2021-02-27 2021-04-17 2021-02-27 ty and economic inclusion tions nvelope 4 EJ Amezmiz El Haouz MA-ANAPEC-220943-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-10-1 Q / Relance aménagement E IBRD / 89540 Post Open - National 25,000.00 27,897.72 Completed 2021-02-27 2021-04-17 2021-02-27 ty and economic inclusion tions nvelope 4 EJ Syba Marrakech MA-ANAPEC-220949-CW-RF Promoting youth employabili Request for Quota Single Stage - One E 2021-10-1 Q / Relance aménagement E IBRD / 89540 Post Open - National 25,000.00 27,953.48 Completed 2021-02-27 2021-04-17 2021-03-03 ty and economic inclusion tions nvelope 4 EJ Tamanar Essaouira GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ANAPEC-116706-GO-RFB Promoting youth employabili Open - Internationa Single Stage - Two E IBRD / 89540 Post Request for Bids 395,000.00 0.00 Canceled 2020-02-10 2020-04-30 2020-02-15 2020-04-30 2020-03-28 2020-07-01 2020-06-10 2020-07-07 2020-07-15 2021-01-11 / Acquisition d'unités mobiles ty and economic inclusion l nvelope MA-ANAPEC-187148-GO-RFB / ( relance suite à un AO infru ctueux) Acquisition de deux unités mobiles (deux lots) Promoting youth employabili Open - Internationa Single Stage - One E Lot 1 : deux unités mobiles p IBRD / 89540 Post Request for Bids 470,000.00 585,484.06 Completed 2020-09-30 2020-10-27 2020-10-05 2020-11-16 2020-12-03 2020-12-16 2020-12-11 2021-01-20 2021-01-01 2021-07-19 2021-10-08 ty and economic inclusion l nvelope our l’emploi (430 000 $) Lot 2 : deux Antennes VSAT à pointage automatique pour U nité mobile d’emploi (40 000 $) MA-ANAPEC-213686-GO-RFQ / Matériel de bureau pour les Promoting youth employabili Request for Quota Single Stage - One E 8 EEJ (Amizmiz, Attaouia, Be IBRD / 89540 Post Open - National 28,185.00 27,845.96 Completed 2021-02-01 2021-03-15 2021-07-27 2021-09-11 2021-08-17 ty and economic inclusion tions nvelope nguerir, Echamia, Immintano ut, Tamanar, Syba Marrakech et Safi) MA-ANAPEC-213697-GO-RFB / Appel d'offres en 2 lots : Matériel informatique (Lot 1) Promoting youth employabili Single Stage - One E et mobilier de bureau (Lot 2) IBRD / 89540 Post Request for Bids Open - National 272,830.00 223,869.73 Completed 2021-01-27 2021-03-15 2021-02-01 2021-02-22 2021-04-06 2021-03-01 2021-04-06 2021-03-22 2021-06-20 2021-09-18 2021-09-06 ty and economic inclusion nvelope pour les 8 EEJ (Amizmiz, Atta ouia, Benguerir, Echamaia, I mmintanout, Tamanar, Syba Marrakech, Safi) MA-ANAPEC-303919-GO-RFP / Renforcement du système d Promoting youth employabili Request for Propo Open - Internationa IBRD / 89540 Post Multi Stage 400,000.00 0.00 Canceled 2022-11-11 2023-02-07 2022-11-16 2023-02-07 2023-01-25 2023-03-21 2023-05-09 2023-06-13 2024-12-04 e profilage, de bilan des com ty and economic inclusion sals l pétences, de suivi et d’évalu ation MA-ANAPEC-359918-GO-RFP / Renforcement du système d Promoting youth employabili Request for Propo Open - Internationa Under Imple IBRD / 89540 Post Multi Stage 400,000.00 0.00 2023-05-07 2023-05-07 2023-05-12 2023-07-21 2023-06-19 2023-11-02 2023-12-07 2025-05-30 e profilage, de bilan des com ty and economic inclusion sals l mentation pétences, de suivi et d’évalu ation NON CONSULTING SERVICES Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ANAPEC-213855-NC-RFP Promoting youth employabili Single Stage - One E / Sélection des gestionnaires IBRD / 89540 Prior Request for Bids Open - National 4,410,000.00 4,324,840.76 Signed 2021-02-08 2021-07-28 2021-02-13 2021-08-30 2021-03-06 2021-11-04 2021-04-05 2021-12-09 2021-05-10 2022-02-19 2022-05-05 ty and economic inclusion nvelope des Espaces Emploi Jeunes (E EJ) MA-ANAPEC-258496-NC-RFB / Programme Taehil Appel d'offres réalisation d’a ctions de formations qualifia Promoting youth employabili Single Stage - One E ntes ou de reconversion au p IBRD / 89540 Post Request for Bids Open - National 520,000.00 0.00 Signed 2022-04-20 2021-12-09 2022-04-20 2022-04-27 2022-09-15 2022-05-27 2022-09-16 2022-06-24 2023-06-19 ty and economic inclusion nvelope rofit des chercheurs d’emploi non diplômés dans le cadre d u projet « Appui à l’insertion économique des jeunes dans la région de Marrakech Safi » MA-ANAPEC-258497-NC-RFB / Programme Taehil AO réalis ation d’actions de formations qualifiantes ou de reconversi Promoting youth employabili Single Stage - One E on au profit des chercheurs d IBRD / 89540 Post Request for Bids Open - National 520,000.00 0.00 Signed 2022-04-20 2021-12-09 2022-04-20 2022-04-22 2022-05-10 2022-05-22 2022-08-29 2022-06-19 2023-06-14 ty and economic inclusion nvelope ’emploi diplômés inscrits à l’ ANAPEC dans le cadre du pro jet « Appui à l’insertion écon omique des jeunes dans la ré gion de MARRAKECH SAFI » MA-ANAPEC-363415-NC-RFB / Programme Taehil Appel d'o ffre réalisation d’actions de f ormations qualifiantes ou de Promoting youth employabili Single Stage - One E Under Imple reconversion filières restante IBRD / 89540 Post Request for Bids Open - National 520,000.00 0.00 2023-06-01 2023-06-02 2023-06-05 2023-06-09 2023-06-26 2023-07-10 2023-08-07 2023-09-12 ty and economic inclusion nvelope mentation s 2022 au profit des cherche urs d’emploi non diplômés pr ojet « Appui à l’insertion éco nomique des jeunes dans la r égion de Marrakech Safi » MA-ANAPEC-363416-NC-RFB / Programme Taehil Appel d'o ffre réalisation d’actions de f ormations qualifiantes ou de Promoting youth employabili Single Stage - One E Under Imple reconversion filières restante IBRD / 89540 Post Request for Bids Open - National 520,000.00 0.00 2023-06-01 2023-06-02 2023-06-05 2023-06-09 2023-06-26 2023-07-10 2023-08-07 2024-08-01 ty and economic inclusion nvelope mentation s 2022 au profit des cherche urs d’emploi diplômés projet « Appui à l’insertion économi que des jeunes dans la régio n de Marrakech Safi » CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ANAPEC-213847-CS-QCB S / Sélection d’un bureau d’é tudes chargé de l’assistance Promoting youth employabili Consultant Qualifi IBRD / 89540 Post Open - National 45,000.00 36,110.40 Signed 2021-02-01 2021-04-19 2021-02-08 2021-03-08 2021-08-02 2021-04-07 2021-09-30 2021-05-05 2022-01-27 2021-11-01 technique pour la mise en pl ty and economic inclusion cation Selection ace et l’opérationnalisation d es Espaces Emploi Jeunes (EE J) et des Unités Mobiles (UM) MA-ANAPEC-228099-CS-CQS / Consultant pour Accompagn Promoting youth employabili Consultant Qualifi ement à IBRD / 89540 Post Open - National 7,100.00 0.00 Canceled 2021-04-06 2021-06-01 2021-04-07 2021-04-09 2021-05-09 2021-06-13 2021-08-12 ty and economic inclusion cation Selection l’aménagement et la réceptio n des EEJ MA-ANAPEC-228100-CS-CQS / Consultant pour Accompagn Promoting youth employabili Consultant Qualifi ement à IBRD / 89540 Post Open - National 7,900.00 0.00 Canceled 2021-05-17 2021-05-03 2021-05-31 2021-06-28 2021-07-28 2021-09-01 2021-11-30 ty and economic inclusion cation Selection l’aménagement et la réceptio n des UM MA-ANAPEC-239221-CS-CQS / Le suivi, le contrôle et la réc Promoting youth employabili Consultant Qualifi eption de la fabrication de de IBRD / 89540 Post Open - National 7,900.00 9,153.52 Completed 2021-06-14 2021-07-16 2021-06-24 2021-06-28 2021-07-27 2021-07-05 2021-07-27 2021-07-13 2021-07-30 2021-10-11 2021-10-14 ty and economic inclusion cation Selection ux unités mobiles d’emploi d estinées à la région MARRAK ECH – SAFI. MA-ANAPEC-239224-CS-CQS / Contrôle et réception des Tr avaux d’aménagement de hu Promoting youth employabili Consultant Qualifi it espaces Emploi des jeunes IBRD / 89540 Post Open - National 7,100.00 7,068.84 Signed 2021-06-14 2021-07-15 2021-06-24 2021-06-26 2021-07-27 2021-07-03 2021-07-27 2021-07-15 2021-07-30 2021-11-12 ty and economic inclusion cation Selection situés à : Marrakech, Amezmi z, Imintanout, El Attaouia, Be nguerir, Tamanar, Safi et Ech emaaia. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 MINISTERE DE L’EDUCATION NATIONALE, DE L’ENSEIGNEMENT TECHNIQUE ET DE LA FORMATION PROFESSIONNELLE PROJET D’AMELIORATION DE LA PRESTATION DES SERVICES EDUCATIFS (PAPSE) Don IDA (Banque Mondiale) N° TF 0A7376 PLAN DE PASSATION DES MARCHES SIMPLIFIE I. GÉNÉRALITÉS 1.1. Information générale sur le projet Pays : République de Côte d’Ivoire Emprunteur : Gouvernement de Côte d’Ivoire Nom du Projet : Projet d’Amélioration de la Prestation des Services Educatifs (PAPSE) Numéros du Don : TF 0A7376 Montant du Don : 23,35 millions de dollars EU Unité de Gestion du Projet : Unité de Gestion du Projet (UGP) 1.2 Date d’approbation du plan de passation de marchés Plan original : 19 avril 2018 1.3 Date de publication de l’Avis Général de Passation de Marchés : 26 juillet 2018 1.4 Période couverte par le Plan de passation des marchés : 18 mois Page 1 sur 11 II. Fourniture, Travaux et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux Nouveaux Seuils de Revue de la Banque Mondiale – Effectifs depuis Juillet 2016 : Niveau de risque du projet Risque élevé - Risque Risque Risque Bas - Catégorie de Tout marché Substantiel - Modéré - Tout marché marchés de … estimé Tout marché de … Tout marché de … estimé égal ou estimé égal ou de … estimé égal ou supérieur à : supérieur à : égal ou supérieur à : supérieur à : Travaux (incluant clé à main, Fourniture et Installation, et les $5, 000,000 $10, 000,000 $15, 000,000 $20, 000,000 Partenariat Public - Privé -PPP) Biens, Système d’Information et de Services autres que $1, 500,000 $2, 000,000 $4, 000,000 $6, 000,000 les Services intellectuels Services Consultant $500,000 $1, 000,000 $2, 000,000 $4, 000,000 (Firmes) Consultant Individuel $200,000 $300,000 $400,000 $500,000 II. Fournitures, Travaux et Services Assimilé 1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de passation de Valeur seuil Contrats soumis à dépenses marchés du marché examen préalable de $EU l’IDA 1. Travaux AOI ≥ 15, 000,000 AON Tous les contrats de (y compris clés en < 15, 000,000 15.000.000 $EU et plus main, Fourniture Demande de cotation – < 200,000 et montage au moins 3 offres d’installations et Entente Directe (*) PPP) Pas de seuil 2. Fournitures, AOI ≥ 4, 000,000 Systèmes d’Informations AON < 4, 000,000 Tous les contrats de et Services 4.000.000 $EU et plus Consultation de Fournisseurs à autres que les l’échelle Nationale - Au moins 3 < 100,000 services de offres Page 2 sur 11 Consultants Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 2. Pré qualification : Pré-qualification des entreprises pour les travaux des 4 zones industrielles • Le taux de conversion de dollars utilisé pour le présent PPM - 0 est de 1$ = 545 FCFA au titre des activités 2.2. Marchés, planning et Méthode de passation 2.2.1 TYPE DE MARCHES : FOURNITURES 1 2 3 4 5 6 7 8 Coût Préférenc Liste des ensembles estimé e Exam. Ouvertur P-Q fournisse Par e plis de marchés Bailleur Méthode urs Banque prévue Commentair passation locaux es Marchés A (Milliers OUI/ priori/A Date N° Description OUI/NON $EU) NON posterior prévue i Acquisition de mobiliers et de matériels ludiques pour : Spécification - 60 salles de classe A 02 s techniques préscolaire soit 30 1 144,00 AON NON NON posterior novembr et images à communautés (année 1) i e 2018 fournir. et - 114 salles de classe le préscolaire soit 87 Communautés (année 2) Acquisition et distribution Spécification de complémentaires de s déjà A Kits scolaires au profit de 09 août définies, en 2 183,500 AON NON NON posterior 10000 jeunes filles du 2018 attente de i primaire (en raison de confirmation 2500 filles/an) par la DPFC Acquisition de tablettes et de server pour les A 09 août Spécification 4 évaluations des acquis 79,00 CF NON NON posterior 2018 s transmises pour la DVSP : 100 i par la DVSP tablettes et 1 server Acquisition de tablettes et de matériels pour les observations des classes et les animations des Spécification A 09 août journées pédagogiques s transmises 5 79,00 CF NON NON posterior 2018 pour la DPFC : 70 par la DPFC i tablettes – 70 disques dur 1T – 30 vidéo projecteurs – 30 haut-parleurs et 30 multiprises électriques Page 3 sur 11 2.2.1 TYPE DE MARCHES : FOURNITURES 1 2 3 4 5 6 7 8 Coût Préférenc Liste des ensembles estimé e Exam. Ouvertur P-Q fournisse Par e plis de marchés Bailleur Méthode urs Banque prévue Commentair passation locaux es Marchés A (Milliers OUI/ priori/A Date N° Description OUI/NON $EU) NON posterior prévue i Acquisition de 3600 A 15 août Spécification 6 planches murales de 63,00 CF NON NON posterior s disponibles 2018 lectures i Acquisition et livraison de 150 motos + casques A pour l'encadrement 19 juillet Spécification 7 189,00 AON NON NON Posterior s disponibles pédagogique et les inter- 2018 i médiateurs communautaires Equipements 04 A Spécification informatiques/ 8 13,00 CF NON NON posterior septemb s disponibles bureautiques et re 2018 i logiciels/Task Force Acquisition de matériels informatiques et bureautique pour l’UGP (3 ordinateurs de bureau, 3 04 onduleurs, 6 ordinateurs A 9 portables, 1 grande 40,00 CF NON NON Posterior septemb Spécification imprimante de pool, 2 i re 2018 s disponibles petites imprimantes couleurs, 1 Scanner, 1 Dupli copieur et 1 vidéoprojecteur) Acquisition et installation A 16 de Système d’Audio- Spécification 10 8,00 CF NON NON Posterior octobre visioconférence (salle de s à définir i 2018 conférence UGP PAPSE) Achat d’un véhicule de A 16 Spécification 11 type 4X4 tout terrain 63, 158 CF NON NON posterior octobre s disponibles châssis long i 2018 Les cahiers du Acquisition de cahiers programme A 21 d’activités élèves (72 000 ED avec en vigueur 13 74,40 NON NON postérior septemb cahiers) programme en NEI CEDA sont i re 2018 vigueur exclusiveme nt vendus par NEI CEDA Achat/production de 44,00 CF NON NON A 20 Non démarré 14 supports de postérior septemb communication i re 2018 Reproduction de 4000 87,00 CF NON NON A 21 kits d’outils de formation postérior septemb 15 continue des enseignants i re 2018 du primaire / Page 4 sur 11 Page 5 sur 11 2.2.2. TYPE DE MARCHES : SERVICES ASSIMILES 1 2 3 4 5 6 7 8 Coût Préférenc Liste des ensembles estimé e Exam. Ouvertu P-Q fournisse par re plis de marchés Bailleur Méthode urs Banque prévue passation locaux Commentaire Marchés A (milliers OUI/ priori/A Date N° Description OUI/NON $EU) NON posterio prévue ri Assurances personnel et Non démarré véhicules pour l’UGP 20 En attente du (multirisques A septem recrutement du 1 professionnels, 135,62 CF NON NON posterio bre personnel et de matériels roulants, ri 2018 l’acquisition des santé personnel et véhicules individuel accident) Non démarré Assurances Consultants En attente de la 30 Techniciens Supérieurs A mise en vigueur 2 génie civil + 69,36 CF NON NON posterio septem Mobilisateurs ri bre Communautaires 2018 Achat de carburant pour Non démarré A 10 l'encadrement 3 489 ,657 CF NON NON posterio octobre En attente de la pédagogique et pour le ri 2018 mise en vigueur fonctionnement de l’UGP Entente Non démarré Directe A 4 Location des bureaux de NON NON En attente de la 62,752 avec posterio NA l’UGP mise en vigueur Propriétair ri e A 30 Non démarré 5 Services de Sécurité 18,165 CF NON NON posterio septem En attente de la ri bre mise en vigueur 2018 A 30 Non démarré 6 Services Entretien des NON NON posterio septem 21,468 CF En attente de la bureaux du l’UCP ri bre mise en vigueur 2018 A 30 Non démarré Services Entretien En attente de la 7 33,027 CF NON NON posterio septem mise en vigueur Véhicules ri bre 2018 A En raison du nombre postério d’observations Hébergement des ED avec ri dans le cadre du 8 Observations 7,00 TANGERIN NON NON N/A projet, (EGRA/EGMA) E l’Hébergement pour une période de 2 ans soit 3,5 USD par an NB : Coût estimé de la location des bureaux de l’UGP représente le cout des 18 premier mois Page 6 sur 11 III. Sélection de Consultants 3.1. Seuil d’examen préalable 3.2. Liste restreinte composée entièrement de Consultants Nationaux : Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants Nature de Méthode de passation de Valeur Contrats soumis à examen dépenses marchés seuil du préalable contrat $EU Consultant ≥2 SFQC1, SFQ2, SMC3, SCBD4, s 000.000 Tout contrat de 2.000.000 $EU ou plus Firmes SFQC, SFQ, SMC, SCBD, QC5 < 2 000.000 Même seuil que ci-dessus Entente directe (*) Pas de seuil Et Audit financier Consultant Consultant individuel (AMI) ≥ 400.000 s Tout contrat de 400.000 $ EU ou plus Individuels Consultant individuel (3 CV) < 400.000 Même seuil Entente directe (*) Pas de seuil Et Coordonnateur, SPM et RAF Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 1.2. Liste restreinte composée entièrement de Consultants Nationaux : La liste restreinte de Consultants pour les services, d'un coût estimatif inférieur à 300 0000 $ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 7.25 du Règlement de Passation de Marchés dans le Cadre du Financement de Projets d’Investissement (FPI) pour Fournitures, Travaux, Services Autres que des Services de Consultants et Services de Consultants – Juillet 2016. 1.3. Autres arrangements spécifiques pour la sélection : [y compris passation anticipée de marchés et financement rétroactif, si applicables 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt Page 7 sur 11 3.3. Contrats de sélection de consultants 3.3.1 PRESTATION DE SERVICES DE CONSULTANTS 1 2 3 5 6 7 Liste des ensembles de contrats Ouvertur Coût Examen passés par Consultation restreinte Méthode e des estimé BM Description de la mission sélection offres Commentaires (milliers A priori/A Date No. Description de la mission $EU) posteriori prévue ANO sur les TDRS dispo. CI (AMI) Recrutement de 20 Consultants 15 août 12 consultants 1 pour le Suivi et contrôle technique 266,80 A posteriori 2018 année 1 des travaux de Construction de 234 20 consultants classes préscolaires et 150 classes année 2 du primaire TdRs à élaborer 15 août ANO sur les TDRS 2018 dispo. Recrutement de 20 Consultants 12 consultants 2 pour la Mobilisation et le 381,20 CI (AMI) A posteriori année 1 renforcement des capacités 20 consultants communautaires dans 150 année 2 communautés TdRs à élaborer Recrutement d’un consultant pour la finalisation des tests d’évaluation TdRs transmis à la EGRA et EGMA, l’analyse des 30 août BM pour ANO mais résultats et pour le développement 2018 suite à de nouvelles 3 et l’installation des applicatifs 42,00 CI (AMI) A posteriori observations, les relatifs aux observations de classe Termes de et aux tests EGRA et EGMA sur les référence sont à tablettes resoumettre Entente Recrutement d'un Ingénieur Génie Directe avec En attente de la 5 44,04 A posteriori N/A Civil BALLY mise en vigueur Hermann Ex-IGC du PUAEB 6 Sélection de Consultant Individuel Entente pour le suivi de la mise œuvre des Les TdRs sont 22,02 Directe avec A posteriori N/A dispositions environnementales et disponibles Gbellé Marc sociales 7 Sélection de Consultants Individuels Donner des pour les évaluations de constats explications sur le d’impacts environnemental et montant sociale Non démarré 25 juillet En attente du 403,70 CI (AMI) A posteriori 2018 recrutement du Spécialiste en sauvegardes et les missions d’identification des sites Recrutement d’un Consultant en TdRs transmis à la Observations de classes en lecture BM pour ANO mais et écriture, l’élaboration des A posteriori suite à de nouvelles 15 août 8 modules, supports et kits et le 84,8 CI (AMI) observations, les 2018 renforcement des capacités du pool Termes de d’administrateurs et des acteurs de référence sont à terrain resoumettre Recrutement d’un Consultant en Observations de classes en TdRs transmis à la Mathématiques, élaboration des A posteriori BM pour ANO mais modules et le renforcement des 15 août suite à de nouvelles 8 84,8 CI (AMI) capacités du pool d’administrateurs 2018 observations, les et des acteurs de terrain Termes de référence sont à resoumettre Page 8 sur 11 3.3.1 PRESTATION DE SERVICES DE CONSULTANTS 1 2 3 5 6 7 Liste des ensembles de contrats Ouvertur Coût Examen passés par Consultation restreinte Méthode e des estimé BM Description de la mission sélection offres Commentaires (milliers A priori/A Date No. Description de la mission $EU) posteriori prévue Non échu TdRs en attente du A posteriori MENETFP (Elaboration de la Recrutement d’un Cabinet pour 06 mars méthodologie, 9 l’évaluation des acquis du 68,00 CI (AMI) 2020 adaptation des préscolaire outils, Formation des enquêteurs, Analysa des données) Recrutement d’un Cabinet pour l’Elaboration du plan de TdRs transmis à la communication du PAPSE et des BM pour ANO mais outils spécifiques de sensibilisation / 23 aout suite à de nouvelles 10 40,00 CI (AMI) A posteriori mobilisation de chaque catégorie 2018 observations, les d’acteurs du projet en vue de Termes de renforcer la redevabilité des acteurs référence sont à du système resoumettre Recrutement d’un Consultant pour TdRs transmis à la l’élaboration du tableau de bord, le BM pour ANO mais renforcement des capacités d’un suite à de nouvelles 11 pool de formateurs et des acteurs 17,431 CI (AMI) A posteriori observations, les locaux (CPPP et directeurs d’école) Termes de référence sont à resoumettre Conception et hébergement du site 13,00 CI (AMI) A postériori 12 internet Recrutement d’un cabinet pour la Non démarré réalisation de l’enquête de 06 mars 13 306,40 SFQC A posteriori satisfaction des bénéficiaires 2020 TdRs en attente du (préscolaires et primaires) MENETFP 14 Acquisition de licence, logiciel de 14, 206 ED avec A posteriori N/A ANO obtenue sur comptabilité/Paramétrage AGOSOFT les TdRs et la methode de PM Offres techniques et financières de AGOSOFT dispo, à transmettre la BM le 19/07/2018 Recrutement d’un cabinet pour la Non démarré réalisation des études d’impacts 15 aout 15 1348,00 SFQC A posteriori TdRs en attente de 2018 l’UGP, et du MENETFP Termes de Recrutement d’un (e) Chargé (e) de 16 44,04 CI (AMI) A posteriori NA référence élaborés la communication Entente Recrutement d’un Spécialiste en Directe avec 17 44,04 A posteriori N/A développement communautaire ADJANI Lafihu A posteriori Termes de Recrutement d’un Economiste de 18 l’Education pour le renforcement de 44.04 CI (AMI) N/A référence à capacité de la Task Force EF élaborer A posteriori Termes de Recrutement d’un Statisticien pour 19 le renforcement de capacité de la 44.04 CI (AMI) N/A référence à Task Force EF élaborer E.D avec Ex-Coordonnateur YEO du PUAEB 20 Coordonnateur du Projet 70,46 A priori N/A Péfougne Termes de Abraham référence élaborés Page 9 sur 11 3.3.1 PRESTATION DE SERVICES DE CONSULTANTS 1 2 3 5 6 7 Liste des ensembles de contrats Ouvertur Coût Examen passés par Consultation restreinte Méthode e des estimé BM Description de la mission sélection offres Commentaires (milliers A priori/A Date No. Description de la mission $EU) posteriori prévue NB : Montant annuel E.D avec NA Ex-SPM du PUAEB M’BRA NB : Montant 21 Spécialiste en Passation de Marchés 55,04 A priori Amani annuel Thierry E.D avec NA Ex-SGF du PUAEB Responsable Administratif et SANOU NB : Montant 22 50,64 A priori Financier Aldjouma annuel Franck E.D avec NA Ex-Assistant MAIGA Technique auprès Seydou du coordo. C2D Spécialiste Suivi 23 Spécialiste suivi-évaluation projet 44,04 A posteriori évaluation détaché auprès de la Task Force EF et du PUAEB E.D. avec NA Ex-Comptable du 24 Comptable 21,00 ASSALE A posteriori PUAEB Boahinin CI (AMI) NA Termes de 25 Assistant en passation des marchés 16,60 A posteriori référence (TdRs) élaborés A posteriori Termes de 26 Assistant Coordonnateur CI (AMI) NA 8,40 référence élaborés Termes de Audit du projet exercice 1er juillet 15 août 27 44,35 SFQC A priori référence à 2018 au 31 décembre 2019 2018 élaborer 44,35 SFQC A priori 18 Audit du projet exercice 1er janvier septembre 28 2020 au 31 décembre 2020 2020 44,35 SFQC A priori 20 Audit du projet exercice 1er janvier septembre 29 2021 au 31 décembre 2021 2021 44,35 SFQC A priori 18 aout Audit du projet exercice 1er janvier 30 2022 2022 au 31 décembre 2022 33, 20 CI (AMI) NA Termes de 31 Assistants comptables (2 agents) A posteriori référence (TdRs) élaborés NB : Montant des salaires calculé sur une base annuelle 4. CONVENTIONS 1 2 3 4 5 6 7 8 Coût Méthode Préférence Exam. Ouverture Liste des ensembles estimé passation P-Q fournisseu par plis de marchés Bailleur Marchés rs locaux Banque prévue Commentaires A priori/A (milliers OUI/ Date N° Description OUI/NON posterior $EU) NON prévue i 1 Conventions avec 30 49,542 Convention NON NON A NA Spécifications Communautés pour avec 30 posterior techniques et l’acquisition par communaut i images à fournir approche és (CF) communautaire de Page 10 sur 11 mobiliers et de matériels ludiques 60 salles de classe préscolaires à titre de pilote 2 Réalisation des travaux 2 644,00 Convention NON NON A NA -60 salles de de construction de 234 avec les posterior classe réalisées salles de classes Communaut i en année 1 et préscolaires dans 117 és 174 en année 2 communautés (maîtrise d'ouvrage communautaire) 3 Réalisation des travaux 2 034,00 Convention NON NON A NA de construction dans avec les posterior 150 écoles (salles de Communaut i classe/blocs és latrines/points d’eau / stations de lavage des mains (système maçonné de lave-main)) pour le primaire (maîtrise d'ouvrage communautaire) 4 Campagne de 13,11 Conventions NON NON A 20 Diffusions et sensibilisation sur avec les posterior septembre émissions Scolarisation des filles radios i 2018 5 Communication dans les 11,00 Conventions NON NON A 15 Diffusions et médias sur le contrôle avec les posterior novembre émissions citoyen radios i 2018 6 16 Reportages et 53,00 Entente NON NON A 15 Non démarré émissions télé nationale Directe avec posterior novembre la RTI i 2018 7 16 Reportages et 35,00 Convention NON NON A 08 aout 16 Reportages émissions radio avec les posterior 2018 et émissions nationale et privée radios i radio nationale locales et la et privée radio nationale 8 Développement du 4 359,60 Convention NON NON A 21 ANO obtenu sur préscolaire d’Entente posterior septembre les Termes de communautaire Directe avec i 2018 référence UNICEF 5. ACTIVITES DE RENFORCEMENT DES CAPACITES (FORMATIONS, VOYAGES) 5-1 Liste des ateliers Réf. Description du contrat Montant Durée Date de Commentaires Estimatif estimé début N° (en $EU) e (en jour) Organisation des campagnes de 03 au 17 Campagne de 1 sensibilisation sur les 2,753 15 sept 2018 sensibilisation sous-cycles dans six régions cible 2,753 Montant total : Page 11 sur 11 PROCUREMENT Cote d'Ivoire : Cote d'Ivoire: Education Service Delivery Enhancement Project PLAN General Information Country: Cote d'Ivoire 2019-01-30 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank2023-05-23 if none) Project ID: P163218 GPN Date: Project Name: Cote d'Ivoire: Education Service Delivery Enhancement Project Loan / Credit No: TF / A7376, TF / B2775 Education Service Delivery Enhancement Project Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual A Bid Evaluation Repor Loan / Credit N Market Approac Procurement Pr Prequalification High SEA/SH R Process S Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Contract Comple Description Component Review Type Method nt Docum mount (U t and Recommendati Signed Contract o. h ocess (Y/N) isk tatus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes tion ent Type S$) on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PAPSE-146409-CW-DIR / C onvention COGES - Travaux d e construction de 150 écoles( Improving Teaching and Lea salles de classe/blocs/ blocs l 2,019,248.2 2019-11-2 2020-1 TF / A7376 rning Environment for Benefi Post Direct Selection Direct Completed 2019-11-20 2019-03-01 2019-11-20 2019-03-10 2019-11-20 2019-05-16 atrines/ points d'eau/ station 1 0 1-09 ciary Schools s de lavage des mains(systè me maçonné de lave-main)) pour le primaire(maîtrise d'o uvrage communautaire). CI-PAPSE-146417-CW-DIR / C onvention COGES- Réalisatio Improving Teaching and Lea n des travaux de constructio 2,493,400.5 2019-11-2 2020-1 TF / A7376 rning Environment for Benefi Post Direct Selection Direct Completed 2019-11-20 2018-03-01 2019-11-20 2019-03-04 2019-11-20 2019-05-14 n de 234 salles de classe pré 3 0 1-09 ciary Schools -scolaire dans 117 communa utés(maîtrise d'ouvrage com munautaire). CI-PAPSE-201948-CW-RFQ / Project Implementation and Request for Quota Single Stage - One 2021-07-0 2021-0 Création et construction de b TF / B2775 Post Limited 33,086.66 Completed 2020-11-07 2020-11-12 2021-01-02 2020-12-09 Monitoring and Evaluation tions Envelope 1 6-02 ureaux annexes du siège du PAPSE. CI-PAPSE-201949-CW-RFQ / Ravalement Façade,Peinture( Project Implementation and Request for Quota Single Stage - One 2021-07-0 2021-0 TF / B2775 Post Limited 23,734.26 Completed 2020-11-07 2020-11-12 2021-01-02 2021-01-15 interne et externe) du Bâtim Monitoring and Evaluation tions Envelope 1 3-06 ent principal et des annexes. CI-PAPSE-201069-CW-DIR / C onvention avec les COGES p Improving Conditions for Im 2021-08-0 TF / B2775 Post Direct Selection Direct 0.00 Canceled 2020-12-29 2021-01-03 2021-02-07 our la construction de 77 pré proved Learning Outcomes 6 -primaires + primaire Request for CI-PAPSE-328891-CW-RFQ / Quotations - Travaux de ravalement, de p Project Implementation and Request for Quota Single Stage - One Small Works 2023-01-1 onçage du sol en marbre, de TF / B2775 Post Limited 0.00 Signed 2022-12-08 2022-12-07 2022-12-22 Monitoring and Evaluation tions Envelope (Emergency) 1 peinture intérieure et extérie SPD -Compet ure des bureaux PAPSE (bâti itive ment principal et annexe). CI-PAPSE-328986-CW-RFQ / Request for Agencement et aménageme Quotations - nt de bureaux additionnels (p Project Implementation and Request for Quota Single Stage - One Small Works 2023-01-0 TF / B2775 Post Limited 0.00 Signed 2022-12-06 2022-12-07 2022-12-20 réfabriqués) pour le personn Monitoring and Evaluation tions Envelope (Emergency) 9 el additionnel ( les spécialiste SPD -Compet s à recruter dans le cadre du itive nouveau Projet) GOODS Activity Reference No. / Bid Evaluation Repor Loan / Credit N Market Approac Procurement Pr Prequalification Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion o. h ocess (Y/N) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PAPSE-91730-GO-RFB / Ac quisition de mobiliers et de matériel ludiques pour soixa Improving Conditions for Im Single Stage - One nte salles de classes préscola TF / A7376 Post Request for Bids Open - National 0.00 Canceled 2019-03-18 2019-03-23 2019-04-23 2019-04-30 2019-05-20 2019-06-20 proved Learning Outcomes Envelope ires soit 30 communautés (a nnée 1) et 114 salles de clas se soit 87 communautés (an née 2) CI-PAPSE-91731-GO-RFQ / A Improving Conditions for Im Request for Quota Single Stage - One cquisition de 3600 planches TF / A7376 Post Limited 0.00 Canceled 2019-01-20 2019-02-17 2019-03-11 proved Learning Outcomes tions Envelope murales de lectures CI-PAPSE-91732-GO-RFQ / A Project Implementation and Request for Quota Single Stage - One chat d'un véhicule 4X4 de ty TF / A7376 Post Limited 60,702.95 Completed 2019-01-10 2019-04-16 2019-02-15 2019-07-03 2019-03-21 2019-07-08 Monitoring and Evaluation tions Envelope pe tout terrain CI-PAPSE-91733-GO-RFQ / R eproduction de 4000 kits d'o Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2019-03-06 2019-04-15 2019-05-15 utils de formation continue d proved Learning Outcomes tions Envelope es enseignant du primaire CI-PAPSE-91734-GO-RFQ / A cquisition de cahier d'activité s élèves (72 000 cahiers) du Improving Conditions for Im TF / A7376 Post Direct Selection Direct 0.00 Canceled 2018-12-17 2018-12-22 2019-01-21 2019-02-21 programme en vigueur - Les proved Learning Outcomes cahiers du programme en vig ueur sont exclusivement ven du par l'entreprise NEI-CEDA. CI-PAPSE-91735-GO-RFQ / A Improving Teaching and Lea Request for Quota Single Stage - One chat et production de suppor TF / A7376 rning Environment for Benefi Post Limited 22,460.21 Completed 2019-04-15 2019-06-18 2019-05-23 2019-08-04 2019-06-21 2020-01-16 tions Envelope ts de communication ciary Schools CI-PAPSE-91737-GO-RFQ / A cquisition d'équipements info Strenghtening Sector Manag Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2019-02-02 2019-03-13 2019-04-10 rmatique , bureautique et log ement and Accountability tions Envelope iciel pour la Task Force CI-PAPSE-91738-GO-RFQ / A Strenghtening Sector Manag Request for Quota Single Stage - One cquisition de matériels infor TF / A7376 Post Limited 110,596.90 Completed 2019-01-11 2019-02-25 2019-02-18 2019-05-21 2019-03-18 2019-08-06 ement and Accountability tions Envelope matiques et bureautiques po ur l'UGP CI-PAPSE-91741-GO-RFQ / A chat de Carburant pour l'enc Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 115,439.29 Signed 2019-01-12 2019-05-15 2019-02-20 2019-07-23 2019-02-27 adrement pédagogique et po proved Learning Outcomes tions Envelope ur le fonctionnement de l'UG P du PAPSE CI-PAPSE-97849-GO-RFQ / A Project Implementation and Request for Quota Single Stage - One cquisition de mobiliers de bu TF / A7376 Post Limited 0.00 Canceled 2019-02-20 2019-04-08 2019-05-08 Monitoring and Evaluation tions Envelope reau pour l'UGP du Projet CI-PAPSE-97886-GO-RFQ / A cquisition de matériels infor Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2019-02-23 2019-04-10 2019-05-10 matiques pour le fonctionne Monitoring and Evaluation tions Envelope ment de l'Unité de Gestion d u Projet CI-PAPSE-97991-GO-RFQ / A cquisition de tablettes et de Improving Conditions for Im Request for Quota Single Stage - One matériels pour les observati TF / A7376 Post Limited 94,457.37 Terminated 2018-09-04 2018-08-16 2018-10-23 2018-10-24 2018-11-30 proved Learning Outcomes tions Envelope ons des classes et les anim ations des journées pédagogi ques pour la DPFC. CI-PAPSE-97969-GO-RFQ / A cquisition de 100 tablettes et Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 95,445.83 Completed 2018-08-16 2018-08-16 2018-10-08 2018-10-24 2018-11-17 2018-12-10 un serveur pour les évaluatio proved Learning Outcomes tions Envelope n des acquis pour la DVSP CI-PAPSE-97960-GO-RFB / ac quisition de 90 motos plus ca Improving Conditions for Im Single Stage - One sques pour l'encadrement pé TF / A7376 Post Request for Bids Open - National 171,943.76 Completed 2018-11-01 2018-11-01 2018-11-13 2018-12-13 2018-12-13 2018-12-27 2018-12-28 2019-02-04 2019-01-23 2019-03-06 2019-02-06 proved Learning Outcomes Envelope dagogique et les inter-médiat eurs communautaires CI-PAPSE-117889-GO-RFQ / Acquisition de 45 logiciels inf Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 14,654.91 Signed 2019-06-12 2019-05-31 2019-07-09 2019-07-01 2019-08-09 2019-09-11 ormatiques et 50 Anti virus Monitoring and Evaluation tions Envelope pour l'Unité de Gestion du Pr ojet. CI-PAPSE-118155-GO-RFQ / Acquisition de logiciels infor Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 24,083.88 Completed 2019-05-10 2019-05-10 2019-06-14 2019-06-26 2019-07-15 2020-12-11 matiques pour laDPFC,la DV proved Learning Outcomes tions Envelope SP et la TASK FORCE. CI-PAPSE-118342-GO-DIR / E Improving Conditions for Im ntente Directe avec l'UNICEF TF / A7376 Post Direct Selection Direct 19,086.30 Completed 2019-06-20 2019-05-25 2019-06-25 2020-05-20 2019-07-30 2020-07-13 2019-08-30 2020-09-22 proved Learning Outcomes pour l'acquisition de KIT Peda gogiques ECD. Page 1 CI-PAPSE-125596-GO-RFQ / Confection et reproduction d Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 86,583.87 Completed 2019-08-06 2019-08-05 2019-09-23 2019-09-03 2020-03-21 2019-10-09 e 8000 decodables de lectur proved Learning Outcomes tions Envelope e pour la classe de CP1. CI-PAPSE-125598-GO-RFQ / Confection et reproduction d Improving Conditions for Im Request for Quota Single Stage - One e 500 Guides Pédagogiques TF / A7376 Post Limited 32,238.72 Completed 2019-08-02 2019-08-05 2019-08-27 2019-09-04 2020-02-23 2019-10-09 proved Learning Outcomes tions Envelope du décodable et 6350 cahier s d'exercices du décodable. CI-PAPSE-125692-GO-RFQ / Acquisition de mobiliers pou Improving Conditions for Im Request for Quota Single Stage - One r l'équipement des centres pr TF / A7376 Post Limited 65,174.07 Completed 2019-08-10 2019-08-05 2019-09-06 2019-09-30 2019-10-06 2019-10-14 proved Learning Outcomes tions Envelope éscolaires dans les 6 (six) zo nes d'intervention du Projet. CI-PAPSE-146125-GO-RFB / Acquisition et distribution de Project Implementation and Single Stage - One TF / A7376 Post Request for Bids Open - National 167,816.09 Completed 2019-11-19 2018-11-06 2019-11-20 2019-11-20 2018-12-13 2019-11-20 2018-12-13 2019-11-20 2019-01-16 2019-11-20 2019-04-26 Kits scolaires au profit de 10 Monitoring and Evaluation Envelope 000 jeunes filles du primaire. CI-PAPSE-146128-GO-RFQ / Acquisition de materiels tech Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 35,953.66 Completed 2019-11-19 2019-08-16 2019-11-19 2018-10-24 2019-11-19 2020-12-06 niques et consommables pou proved Learning Outcomes tions Envelope r deux directions du MENETF P CI-PAPSE-146212-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Acquisition de Fournitures de TF / A7376 Post Limited 11,075.61 Completed 2019-11-19 2019-04-23 2019-11-19 2019-06-08 2019-11-19 2019-06-28 Monitoring and Evaluation tions Envelope bureau pour l'UGP du PAPSE CI-PAPSE-146399-GO-RFQ / Acquisition de fournitures po Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 56,096.36 Completed 2019-11-20 2019-09-19 2019-11-20 2019-10-16 2019-11-20 2019-11-05 ur 117 centres préscolaires e proved Learning Outcomes tions Envelope t 151 écoles primaires. CI-PAPSE-146419-GO-RFQ / Acquisition de Mobiliers pour Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 41,336.70 Completed 2019-11-20 2019-10-16 2019-11-20 2019-10-22 2019-11-20 2019-11-14 l'Equipement des centres Pré proved Learning Outcomes tions Envelope scolaires construits dans le c adre du Projet. CI-PAPSE-147434-GO-RFQ / Acquisition de Matériels infor Improving Conditions for Im Request for Quota Single Stage - One matiques,logiciels informatiq TF / A7376 Post Limited 19,770.82 Completed 2020-01-20 2020-03-16 2020-03-16 2020-04-29 2020-04-15 2020-04-29 proved Learning Outcomes tions Envelope ues et antivirus pour la DEL C, DPFC,DAPS COGES,IGEN,D VSP. CI-PAPSE-147445-GO-RFQ / Acquisition de Fournitures de Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 45,359.40 Completed 2020-01-20 2020-03-16 2020-02-22 2020-05-29 2020-03-23 2020-05-29 bureau et consommables inf proved Learning Outcomes tions Envelope ormatiques pour les Ateliers DPFC/DELC/ DVSP CI-PAPSE-147594-GO-RFQ / Acquisition de matériel techn ique(video projecteur,disque Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 61,572.89 Terminated 2020-06-15 2018-08-16 2020-07-17 2018-10-24 2020-08-16 dur externe,multiprise APC,h proved Learning Outcomes tions Envelope aut parleur) et conssommabl es additionnels pour le MENE T FP CI-PAPSE-147601-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Acquisition de supports de co TF / A7376 rning Environment for Benefi Post Limited 43,770.86 Completed 2020-01-08 2020-08-04 2020-02-15 2020-10-17 2020-03-16 2021-07-07 tions Envelope mmunication ciary Schools CI-PAPSE-147605-GO-RFQ / Acquisition de matériel infor Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 25,919.87 Completed 2020-02-07 2020-03-16 2020-03-16 2020-04-29 2020-04-13 2020-04-29 matique,bureautique,logiciel Monitoring and Evaluation tions Envelope s et consommables pour l'U GP PAPSE. CI-PAPSE-147639-GO-RFQ / Reproduction de fascicules et de divers documents dans le Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 79,023.10 Completed 2020-01-16 2019-10-03 2020-02-10 2019-11-08 2020-03-11 2021-01-07 cadre de l'amélioration de l'e proved Learning Outcomes tions Envelope nseignement et des apprenti ssages des mathématiques a u CP1, CP2, et CE1 CI-PAPSE-149449-GO-RFQ / Acquisition de fournitures po Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 52,944.56 Completed 2019-12-12 2019-12-09 2019-12-18 2019-12-13 2020-01-17 2019-12-21 ur l'équipement des centres proved Learning Outcomes tions Envelope préscolaires et écoles primair es. CI-PAPSE-147620-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Acquisition et installation d'u TF / A7376 Post Limited 49,561.55 Completed 2020-09-21 2020-06-22 2020-10-27 2020-09-10 2020-11-26 2021-01-01 Monitoring and Evaluation tions Envelope n système de Visio conférenc e pour le PAPSE. CI-PAPSE-198449-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Acquisition de casques de pr TF / A7376 Post Limited 1,456.01 Completed 2020-10-25 2021-04-22 2020-12-01 2021-04-27 2020-12-31 2021-07-22 proved Learning Outcomes tions Envelope otection complète. CI-PAPSE-199436-GO-RFQ / Acquisition de Matériel techni que(vidéo projecteur, disque Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 18,006.34 Completed 2020-10-13 2020-03-16 2020-10-13 2020-04-29 2020-10-13 2020-04-29 dur externe, multiprise APC, proved Learning Outcomes tions Envelope haut parleur) et consommabl es additionnels pour le MENE T FP CI-PAPSE-200243-GO-RFQ / Reproduction de divers docu Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 104,999.49 Completed 2020-10-16 2019-11-28 2020-10-16 2019-12-24 2020-10-16 2020-01-17 ments dans le cadre de la for proved Learning Outcomes tions Envelope mation des acteurs de l'Educ ation Nationale. CI-PAPSE-147611-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Acquisition de Kits compléme TF / A7376 rning Environment for Benefi Post Limited 0.00 Canceled 2020-09-12 2020-10-23 2020-11-22 tions Envelope ntaires fille CP1, CP2, CE1(20 ciary Schools 20). CI-PAPSE-186042-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Achat de carburant pour la m TF / A7376 Post Limited 0.00 Canceled 2020-09-06 2020-10-12 2021-10-12 proved Learning Outcomes tions Envelope ission de collecte/DVSP CI-PAPSE-186039-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Achat de carburant pour l'en TF / A7376 Post Limited 0.00 Canceled 2020-09-06 2020-10-12 2021-10-12 proved Learning Outcomes tions Envelope cadrement pédagogique IEPP /FI Part variable CI-PAPSE-186045-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Achat de carburant UGP et a TF / A7376 Post Limited 0.00 Canceled 2020-09-06 2020-10-12 2021-10-12 Monitoring and Evaluation tions Envelope utres directions CI-PAPSE-186040-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Achat de carburant pour l'en TF / A7376 Post Limited 0.00 Canceled 2020-09-06 2020-10-12 2021-10-12 proved Learning Outcomes tions Envelope cadrement pédagogique CPP P/FI Part variable CI-PAPSE-175205-GO-RFQ / Achat de carburant pour les Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2020-08-15 2020-09-17 2021-09-17 CPPP et les IEPP pour l'encad proved Learning Outcomes tions Envelope rement pédagogique. CI-PAPSE-147590-GO-DIR / A cquisition de carburant pour l Improving Conditions for Im TF / A7376 Post Direct Selection Direct 96,523.20 Signed 2020-11-16 2022-02-03 2020-11-21 2021-02-05 2020-12-12 2021-02-11 2021-12-12 'encadrement pédagogique( proved Learning Outcomes CPPP,IEPP) / DPFC_FI Part var iable CI-PAPSE-125587-GO-RFB / Acquisition de fournitures po Improving Conditions for Im Single Stage - One TF / A7376 Post Request for Bids Open - National 0.00 Canceled 2019-08-01 2019-08-06 2019-09-05 2019-09-12 2019-09-20 2019-10-21 ur 117 centres préscolaires proved Learning Outcomes Envelope et 151 écoles primaires. CI-PAPSE-147783-GO-RFB / Reprographie de documents Improving Conditions for Im Single Stage - One TF / A7376 Post Request for Bids Open - National 0.00 Canceled 2019-11-29 2019-12-04 2020-01-03 2020-01-17 2020-01-31 2020-03-01 pour les élèves de CP1, CP2 proved Learning Outcomes Envelope et CE1 des 150 écoles primai res du Projet. CI-PAPSE-147618-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Acquisition de matériels tec TF / A7376 Post Limited 5,239.89 Completed 2020-02-25 2020-03-16 2020-03-28 2020-04-29 2020-04-27 2020-04-29 Monitoring and Evaluation tions Envelope hniques pour les Directions M ENET CI-PAPSE-91740-GO-RFQ / A Strenghtening Sector Manag Request for Quota Single Stage - One cquisition et Installation de S TF / A7376 Post Limited 0.00 Canceled 2019-02-23 2019-04-02 2019-05-02 ement and Accountability tions Envelope ystème d'audio-visio confére nce pour l'UGP CI-PAPSE-176254-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Achat et livraison de 18 moto TF / A7376 Post Limited 0.00 Canceled 2020-08-15 2020-09-21 2020-10-21 proved Learning Outcomes tions Envelope s pour l'encadrement pédago gique. Page 2 CI-PAPSE-201110-GO-RFB / Acqusition de Mobilier,matéri Improving Conditions for Im Single Stage - One TF / B2775 Post Request for Bids Open - National 0.00 Canceled 2021-03-01 2021-03-06 2021-04-17 2021-05-17 2021-06-21 2021-12-18 el ludique,et kits enseignants proved Learning Outcomes Envelope pour le pré-primaire ( 88 cent res) CI-PAPSE-201122-GO-DIR / A Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-03-01 2021-03-06 2021-04-10 2021-05-11 cquisition de Kits ECD (89 ce proved Learning Outcomes ntres) CI-PAPSE-201129-GO-RFB / Acquisition de Mobilier, Maté Improving Conditions for Im Single Stage - One TF / B2775 Post Request for Bids Open - National 0.00 Canceled 2021-04-01 2021-04-06 2021-05-18 2021-06-17 2021-07-22 2022-01-18 riel ludique et kits enseignan proved Learning Outcomes Envelope ts pour le Pré-primaire ( 136 centres) CI-PAPSE-201130-GO-DIR / A Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-03-15 2021-03-20 2021-04-24 2021-05-25 cquisition de Kits ECD( 136 c proved Learning Outcomes entres) CI-PAPSE-201202-GO-RFQ / Acquisition d'Equipement de Protection Individuel pour le Strenghtening Sector Manag Request for Quota Single Stage - One TF / B2775 Post Limited 9,612.80 Completed 2021-02-06 2021-08-02 2021-04-03 2021-08-11 2021-09-30 2021-10-12 suivi des chantiers( genouillè ement and Accountability tions Envelope re , casques, gants, chaussur es de chantier, imperméable) CI-PAPSE-201508-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Acquisition d'Ordinateurs Por TF / B2775 Post Limited 18,012.89 Completed 2021-06-05 2021-07-13 2021-07-13 2021-08-25 2021-08-12 2021-11-13 Monitoring and Evaluation tions Envelope tables pour le PAPSE CI-PAPSE-201515-GO-RFQ / Acquisition de Fournitures de Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 44,942.70 Completed 2021-06-08 2021-03-16 2021-07-15 2021-07-23 2021-08-14 2021-09-03 Bureau et consommables inf Monitoring and Evaluation tions Envelope ormatiques pour l'UGP PAPSE CI-PAPSE-201523-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Acquisition d'Equipement de TF / B2775 Post Limited 8,626.38 Completed 2021-03-06 2021-04-26 2021-04-15 2021-05-04 2021-05-15 2021-06-12 Monitoring and Evaluation tions Envelope Protection Individuel contre l a COVID CI-PAPSE-201932-GO-RFQ / Achat / Production de suppor Improving Teaching and Lea Request for Quota Single Stage - One ts de communication : Réalis TF / B2775 rning Environment for Benefi Post Limited 11,802.47 Signed 2021-07-08 2021-12-15 2021-08-15 2021-12-21 2021-09-14 tions Envelope ation de supports de commu ciary Schools nication et gadgets de fin d'a nnée.( Année 2021) CI-PAPSE-201946-GO-RFQ / Amenagement de la salle de Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 37,495.99 Completed 2020-11-07 2020-11-06 2020-12-24 2020-12-18 2021-01-23 2021-02-11 conférence - Acquisition de M Monitoring and Evaluation tions Envelope obiliers( Année 2021) CI-PAPSE-201947-GO-RFQ / Acquisition de Mobiliers de B ureau pour les bureaux du S Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 31,461.01 Completed 2020-11-07 2020-11-05 2020-12-24 2020-12-22 2021-01-23 2021-02-11 DC, Qualiticien, Coordonnate Monitoring and Evaluation tions Envelope ur, SPM, RAF, SSE et les nouv eaux bureaux à construire.( Année 2021) CI-PAPSE-186049-GO-DIR / A cquisition d'ouvrages pour le Improving Conditions for Im s mini bibliothèques/FI Part v TF / A7376 Post Direct Selection Direct 19,133.97 Completed 2020-09-07 2020-11-12 2020-09-10 2020-11-13 2020-10-09 2020-12-08 2021-01-07 2021-01-16 proved Learning Outcomes ariable.Cette activité a dejà é té approuvée par la Banque. CI-PAPSE-186163-GO-DIR / A chat et distribution de compl Improving Teaching and Lea éments de kits scolaires.La TF / A7376 rning Environment for Benefi Post Direct Selection Direct 108,165.80 Completed 2020-09-06 2020-11-12 2020-09-11 2020-11-13 2020-10-01 2020-12-08 2020-11-01 2021-01-06 methode de Passation de Ma ciary Schools rché avait été validée par la Banque. CI-PAPSE-147427-GO-RFQ / Improving Conditions for Im Acquisition de casques de pr TF / A7376 Post Direct Selection Direct 0.00 Canceled 2019-12-15 2019-12-20 2020-01-24 2020-02-23 proved Learning Outcomes otection complète CI-PAPSE-200654-GO-RFQ / Acquisition de trois(03) moto Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 6,843.62 Completed 2021-01-20 2020-12-16 2021-02-26 2020-12-19 2021-03-28 2021-02-04 s et trois(03) casques de prot proved Learning Outcomes tions Envelope ection dans le cadre du PAPS E.(Part Fixe) CI-PAPSE-200657-GO-RFQ / Acquisition de vingt(20) Moto Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 51,972.07 Completed 2021-01-20 2021-02-24 2021-02-26 2021-04-15 2021-03-28 2021-08-25 s et vingt(20) casques de pro proved Learning Outcomes tions Envelope tection( Part Variable) CI-PAPSE-213278-GO-RFQ / Acquisition d'un véhicule de t Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 67,158.37 Completed 2021-01-14 2020-10-13 2021-02-19 2021-04-20 2021-03-21 2021-06-23 ype 4x4, châssis long avec P Monitoring and Evaluation tions Envelope are buffle pour l'Unité de Ges tion du Projet PAPSE CI-PAPSE-175172-GO-RFQ / Acquisition de 23 tablettes ; Acquisition de 23 vidéo proje cteurs ; Acquisition de 23 mu Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 39,555.51 Signed 2020-08-17 2021-02-24 2020-09-17 2021-06-09 2020-10-17 ltiprises APC, Acquisition de proved Learning Outcomes tions Envelope 43 Haut Parleurs pour les CP PP Supplémentaires touchés par les interventions et pour l es anciens HP; CI-PAPSE-250351-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Acquisition de compléments TF / A7376 rning Environment for Benefi Post Limited 73,653.08 Completed 2021-09-07 2021-09-03 2021-10-31 2021-09-24 2021-11-10 2021-11-30 tions Envelope de kits scolaires ciary Schools CI-PAPSE-251485-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Acquisition de fournitures sc TF / B2775 rning Environment for Benefi Post Limited 53,036.52 Completed 2021-09-11 2021-09-03 2021-11-06 2021-09-24 2021-11-21 2021-11-30 tions Envelope olaires pour 224 préprimaire ciary Schools s CI-PAPSE-251507-GO-RFQ / Acquisition de matériels ludi Improving Teaching and Lea Request for Quota Single Stage - One ques pour les maternelles (sc TF / B2775 rning Environment for Benefi Post Limited 37,040.64 Completed 2021-09-11 2021-09-03 2021-11-06 2021-09-24 2021-11-21 2021-12-03 tions Envelope eaux, cordes, petites balles e ciary Schools n plastiques dur, quilles de c ouleurs...) CI-PAPSE-201206-GO-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Acquisition de Kits et Reprog TF / B2775 Post Limited 0.00 Canceled 2021-08-05 2021-09-01 2021-10-01 proved Learning Outcomes tions Envelope raphie pour ateliers de forma tion CI-PAPSE-201223-GO-RFQ / Improving Teaching and Lea Echange au sein de la Comm Request for Quota Single Stage - One TF / B2775 rning Environment for Benefi Post Limited 0.00 Canceled 2021-07-04 2021-07-31 2021-08-30 unauté sur les résultats de l' tions Envelope ciary Schools école : Reprographie des sup ports CI-PAPSE-175211-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Achat et distribution de comp TF / A7376 rning Environment for Benefi Post Limited 0.00 Canceled 2020-10-24 2020-11-27 2020-12-27 tions Envelope léments de kits scolaires ciary Schools CI-PAPSE-250499-GO-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Acquisition de mini-bibliothè TF / A7376 rning Environment for Benefi Post Limited 0.00 Canceled 2022-01-19 2022-03-12 2022-03-22 tions Envelope ques pour le Primaire /CP2 (F ciary Schools I Part variable) CI-PAPSE-175219-GO-RFQ / Achat de friandises pour l'év Improving Conditions for Im Request for Quota Single Stage - One aluation des Acquis.Evaluatio TF / A7376 Post Limited 0.00 Canceled 2020-12-20 2021-01-24 2021-02-23 proved Learning Outcomes tions Envelope n des apprentissages des éco les du PAPSE à la rentrée 202 0-2021 CI-PAPSE-176256-NC-RFQ / Improving Conditions for Im Request for Quota Single Stage - One Acquisition de petites fournit TF / A7376 Post Limited 0.00 Canceled 2021-03-15 2021-04-16 2021-05-16 proved Learning Outcomes tions Envelope ures et de stimuli pour l'éval uation des acquis CI-PAPSE-271820-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Achat de fournitures de bure TF / B2775 Post Limited 0.00 Signed 2022-03-22 2022-05-10 2022-04-25 2022-05-25 Monitoring and Evaluation tions Envelope au pour l'Unité de Gestion du Projet CI-PAPSE-271825-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Achat de consommables info TF / B2775 Post Limited 26,270.43 Signed 2022-12-05 2022-05-06 2023-01-06 2022-06-16 2023-02-05 Monitoring and Evaluation tions Envelope rmatiques pour l'Unité de Ge stion du Projet. CI-PAPSE-271822-GO-RFQ / Acquisition de masques ( cac Project Implementation and Request for Quota Single Stage - One he-nez) pour l'Unité de Gesti TF / B2775 Post Limited 13,462.39 Signed 2022-02-15 2022-03-15 2022-03-25 2022-03-29 2022-04-09 Monitoring and Evaluation tions Envelope on du Projet et les inter médi ateurs communautaires pour une période d'un an. CI-PAPSE-301556-GO-RFQ / Acquisition des Equipements Project Implementation and Request for Quota Single Stage - One de Protection Individuel (EPI) TF / B2775 Post Limited 8,530.64 Completed 2022-07-11 2022-06-22 2022-08-18 2022-07-12 2022-09-01 2022-07-20 Monitoring and Evaluation tions Envelope pour le personnel de terrain ( 40 inter médiateurs) et de su pervision. Page 3 CI-PAPSE-321836-GO-RFQ / Improving Teaching and Lea Acquisition de kits pédagogiq Request for Quota Single Stage - One TF / B2775 rning Environment for Benefi Post Limited 0.00 Signed 2022-11-04 2022-10-19 2022-12-09 2023-01-08 ues pour les 117 centres pré tions Envelope ciary Schools scolaires communautaires CI-PAPSE-321838-GO-RFQ / Acquisition de matériel infor matique + matériel techniqu Improving Teaching and Lea Request for Quota Single Stage - One Under Imple e ( 6 Laptop + 6 imprimantes TF / B2775 rning Environment for Benefi Post Limited 0.00 2022-11-15 2023-01-27 2023-01-10 2023-07-09 tions Envelope mentation + 1 photocopieuse) + fournit ciary Schools ures (rames, cartouches d'en cre)_Récompenses meilleure s écoles 2022 CI-PAPSE-321840-GO-RFQ / Acquisition de matériel infor matique + matériel techniqu Improving Teaching and Lea Request for Quota Single Stage - One Pending Impl e ( 6 Laptop + 6 imprimantes TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-09-13 2023-10-12 2023-11-11 tions Envelope ementation + 1 photocopieuse) + fournit ciary Schools ures (rames, cartouches d'en cre)_Récompenses meilleure s écoles 2023 CI-PAPSE-321853-GO-RFQ / Improving Teaching and Lea Acquisition de kits sanitaires Request for Quota Single Stage - One TF / B2775 rning Environment for Benefi Post Limited 0.00 Signed 2022-11-04 2022-10-18 2022-12-09 2023-01-08 et autres produits d'Hygiène tions Envelope ciary Schools pour les 117 centres préscola ires communautaires CI-PAPSE-321988-GO-RFQ / Achat de consommables info Project Implementation and Request for Quota Single Stage - One Pending Impl TF / B2775 Post Limited 0.00 2023-01-15 2023-03-12 2023-04-11 rmatiques pour l'Unité de Ge Monitoring and Evaluation tions Envelope ementation stion du Projet (année 2023). CI-PAPSE-321990-GO-RFQ / Project Implementation and Request for Quota Single Stage - One Pending Impl Achat de fournitures de bure TF / B2775 Post Limited 0.00 2023-01-06 2023-03-04 2023-04-03 Monitoring and Evaluation tions Envelope ementation au pour l'UGP (année 2023) CI-PAPSE-321993-GO-RFQ / Acquisition de matériel infor Project Implementation and Request for Quota Single Stage - One Pending Impl matique (Laptop complet y c TF / B2775 Post Limited 0.00 2023-03-15 2023-04-14 2023-05-14 Monitoring and Evaluation tions Envelope ementation ompris logiciels + sacs) pour l'Unité de Gestion du Projet CI-PAPSE-335331-GO-DIR / A cquisition de carburant pour l Improving Conditions for Im Under Imple TF / B2775 Post Direct Selection Direct - National 0.00 2023-01-09 2022-12-23 2023-01-09 2022-12-27 2023-01-09 2023-12-29 ’encadrement pédagogique ( proved Learning Outcomes mentation CPPP,IEPP) / DPFC_ Part varia ble CI-PAPSE-335463-GO-DIR / A chat de carburant pour les op Project Implementation and Under Imple érations des autres direction TF / B2775 Post Direct Selection Direct - National 0.00 2023-01-10 2022-12-23 2023-01-10 2022-12-28 2023-01-10 2023-12-31 Monitoring and Evaluation mentation s et pour le fonctionnement d e l'unité de gestion du projet, Part fixe CI-PAPSE-353728-GO-RFQ / Acquisition de 200 kits comp renant des tablettes, des pro Project Implementation and Request for Quota Single Stage - One Pending Impl TF / B2775 Post Limited 0.00 2023-04-17 2023-05-16 2023-05-30 tèges tablettes et des power Monitoring and Evaluation tions Envelope ementation Banks pour les évaluations st andardisées des élèves et les observations de classes. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Repor Loan / Credit N Market Approac Procurement Pr Prequalification Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion o. h ocess (Y/N) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PAPSE-91742-NC-RFQ / Fo Strenghtening Sector Manag Request for Quota Single Stage - One urniture de services d'entreti TF / A7376 Post Limited 0.00 Canceled 2019-01-24 2019-02-26 2019-02-27 ement and Accountability tions Envelope en des véhicules de l'UGP CI-PAPSE-93321-NC-CDD / R éalisation des travaux de con Improving Teaching and Lea Community Drive struction de 234 salles de cla TF / A7376 rning Environment for Benefi Post Open - National 0.00 Canceled 2019-03-04 2019-03-19 2019-04-19 2019-05-19 2019-06-09 2020-06-08 n Development sse pré-scolaire dans 117 co ciary Schools mmunautés(maîtrise d'ouvra ge communautaire). CI-PAPSE-93325-NC-CDD / R éalisation des travaux e cons truction dans 150 écoles( sall Improving Teaching and Lea es de classe/blocs/ blocs latri Community Drive TF / A7376 rning Environment for Benefi Post Open - National 0.00 Canceled 2019-03-04 2019-03-19 2019-04-19 2019-05-19 2019-06-09 2020-06-08 nes/ points d'eau/ stations de n Development ciary Schools lavage des mains(système m açonné de lave-main)) pour l e primaire(maîtrise d'ouvrag e communautaire). CI-PAPSE-93326-NC-CDD / C Improving Teaching and Lea ampagne de sensibilisation s TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2019-03-04 2019-03-09 2019-04-13 2020-04-12 ur la scolarisation des filles. ciary Schools CI-PAPSE-93327-NC-CDD / C onvention avec 30 communa Improving Teaching and Lea utés pour l'acquisition par ap Community Drive TF / A7376 rning Environment for Benefi Post Open - National 0.00 Canceled 2019-05-06 2019-05-21 2019-06-21 2019-07-21 2019-08-11 2020-08-10 proche communautaire de m n Development ciary Schools obiliers et de matériels ludiq ues (60 salles de cl asse préscolaire à titre de pil ote). CI-PAPSE-93328-NC-DIR / Co Improving Teaching and Lea mmunication dans les média TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2019-03-04 2019-03-09 2019-04-13 2020-04-12 s sur le contrôle citoyen. ciary Schools CI-PAPSE-93330-NC-DIR / Ré Improving Teaching and Lea alisation de seize reportages TF / A7376 rning Environment for Benefi Post Direct Selection Direct 7,286.15 Signed 2019-03-04 2019-07-26 2019-03-09 2020-08-01 2019-04-13 2020-01-31 2020-04-12 2020-09-22 et émissions radios nationale ciary Schools s et privées. CI-PAPSE-93332-NC-RFQ / Se rvices d'entretien et de répar Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 2,173.70 Completed 2019-01-20 2019-06-24 2019-03-17 2019-07-30 2020-03-16 2020-09-03 ation des Split,petits travaux Monitoring and Evaluation tions Envelope d'électricité,de plomberie et de menuiserie. CI-PAPSE-118163-NC-RFQ / F ourniture de services de Géol Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 22,254.54 Completed 2019-06-05 2020-07-03 2019-07-15 2020-09-17 2020-06-14 2021-03-16 ocalisation / Tracking pour le Monitoring and Evaluation tions Envelope s véhicules et motos du Proje t. CI-PAPSE-143573-NC-RFQ / Conception et reproduction d e 2310 planches pédagogiqu es murales de lecture/écritur Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 73,423.37 Completed 2019-11-01 2019-10-22 2019-11-25 2019-12-04 2019-12-25 2020-01-31 e pour les élèves de CP1 et d proved Learning Outcomes tions Envelope e 3960 planches pédagogiqu es murales de mathématique s pour les élèves de CP1,CP2 et CE1 -DPFC/MENET-FP CI-PAPSE-146235-NC-DIR / L Project Implementation and TF / A7376 Post Direct Selection Direct 48,118.55 Completed 2019-11-19 2018-07-19 2019-11-19 2018-09-05 2019-12-10 2018-09-05 2020-06-07 2019-08-31 ocation des bureaux de l’UGP Monitoring and Evaluation . CI-PAPSE-146239-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ervices de Gardiennage Des TF / A7376 Post Limited 14,664.11 Completed 2019-11-19 2018-10-09 2019-11-19 2018-12-07 2019-11-19 2019-11-04 Monitoring and Evaluation tions Envelope Locaux De l'Unité de Gestion du PAPSE. CI-PAPSE-146358-NC-RFQ / Conception, L'hébergement e Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 10,833.70 Completed 2019-11-20 2019-05-13 2019-11-20 2019-07-31 2019-11-20 2019-12-04 t l'Assistance Technique d'un Monitoring and Evaluation tions Envelope Site WEB pour le PAPSE. CI-PAPSE-146367-NC-RFQ / S ervices d'Entretien des Locau Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 12,319.45 Completed 2019-11-20 2019-11-12 2019-11-20 2019-02-06 2019-11-20 2020-01-22 x et des Espaces Verts du PA Monitoring and Evaluation tions Envelope PSE sur la période de Janvier à Décembre 2019. CI-PAPSE-146381-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ervices d'Assurance Maladie TF / A7376 Post Limited 91,205.54 Completed 2019-11-20 2018-08-17 2019-11-20 2018-12-14 2019-11-20 2020-01-07 Monitoring and Evaluation tions Envelope au profit du Personnel du PA PSE. CI-PAPSE-146388-NC-RFQ / Assurances individuelle accid Project Implementation and Request for Quota Single Stage - One TF / A7376 Post Limited 7,703.95 Completed 2019-11-20 2018-08-23 2019-11-20 2019-02-12 2019-11-20 2020-02-02 ent et multirisque profession Monitoring and Evaluation tions Envelope nelle pour le PAPSE. CI-PAPSE-146389-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ervices d'Assurance Flotte au TF / A7376 Post Limited 8,337.87 Completed 2019-11-20 2019-03-28 2019-11-20 2019-04-30 2019-11-20 2020-05-01 Monitoring and Evaluation tions Envelope tomobile et motos du PAPSE. CI-PAPSE-147678-NC-DIR / S Project Implementation and ouscription assurance individ TF / A7376 Post Direct Selection Direct 3,698.40 Signed 2019-12-01 2020-01-15 2019-12-06 2020-01-22 2020-01-01 2020-04-09 2020-12-31 Monitoring and Evaluation uelle accident BIRD Page 4 CI-PAPSE-147680-NC-DIR / S Project Implementation and ouscription Assurance Multiri TF / A7376 Post Direct Selection Direct 5,055.64 Signed 2020-01-01 2020-01-20 2020-01-06 2020-01-22 2020-01-23 2020-04-10 2021-01-22 Monitoring and Evaluation sque Professionnelle PAPSE. CI-PAPSE-147682-NC-DIR / S Project Implementation and ouscription Assurance flotte TF / A7376 Post Direct Selection Direct 15,960.80 Signed 2020-02-25 2020-03-20 2020-03-01 2020-03-24 2020-04-01 2020-03-31 2020-09-28 Monitoring and Evaluation automobile et moto du PAPS E. CI-PAPSE-147687-NC-DIR / C Project Implementation and ontrat de Bail à usage profes TF / A7376 Post Direct Selection Direct 41,360.80 Completed 2019-11-30 2019-09-02 2019-12-05 2019-09-02 2019-12-15 2019-09-17 2020-12-14 2020-09-12 Monitoring and Evaluation sionnel: Siège UGP. CI-PAPSE-147693-NC-DIR / C Strenghtening Sector Manag ontrat d'entretien et réparati TF / A7376 Post Direct Selection Direct 36,281.40 Signed 2019-12-01 2020-06-18 2019-12-06 2020-06-23 2019-12-20 2020-07-01 2020-12-19 ement and Accountability on de véhicules CI-PAPSE-147694-NC-DIR / E Project Implementation and ntretien et reparation de split TF / A7376 Post Direct Selection Direct 2,314.59 Signed 2020-07-01 2020-09-08 2020-07-06 2020-09-10 2020-08-01 2020-09-26 2021-08-01 Monitoring and Evaluation , plomberie et électricité. CI-PAPSE-93329-NC-DIR / Ré Improving Teaching and Lea alisation de seize( 16) report TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2019-03-04 2019-03-09 2019-04-13 2020-04-12 ages et émissions télé nation ciary Schools ales. CI-PAPSE-147689-NC-DIR / C Project Implementation and ontrat de service de gardienn TF / A7376 Post Direct Selection Direct 18,270.37 Completed 2019-12-01 2019-11-05 2019-12-05 2019-11-06 2019-12-15 2019-11-19 2020-12-14 2021-02-04 Monitoring and Evaluation age des locaux de l'UGP. CI-PAPSE-147696-NC-DIR / C Project Implementation and ontrat d'entretien des locaux TF / A7376 Post Direct Selection Direct 20,311.34 Signed 2019-11-30 2020-02-01 2019-12-05 2020-02-03 2019-12-15 2020-03-24 2020-12-14 Monitoring and Evaluation et espaces verts du PAPSE. CI-PAPSE-150918-NC-DIR / S Project Implementation and ouscription d'une assurance TF / A7376 Post Direct Selection Direct 125,464.08 Signed 2019-12-18 2019-12-02 2019-12-23 2019-12-02 2020-01-27 2019-12-19 2020-07-25 Monitoring and Evaluation maladie au profit des agents du PAPSE. CI-PAPSE-147631-NC-DIR / E Project Implementation and ntretien et réparation des mo TF / A7376 Post Direct Selection Direct 17,929.50 Completed 2020-01-10 2019-12-10 2020-01-15 2019-12-13 2020-02-03 2019-12-31 2021-02-02 2021-03-06 Monitoring and Evaluation tos des intermédiateurs. CI-PAPSE-177428-NC-RFB / c onception et reproduction de Improving Conditions for Im Single Stage - One TF / A7376 Post Request for Bids Open - National 307,920.97 Signed 2020-08-17 2020-09-22 2020-08-22 2020-11-19 2020-09-21 2020-12-07 2020-09-30 2020-12-11 2020-10-16 2021-02-03 2020-11-16 Décodables, Déchiffrables, G proved Learning Outcomes Envelope uides Pédagogiques et Cahie rs d'Activités Élèves. CI-PAPSE-186086-NC-RFQ / L Improving Conditions for Im Request for Quota Single Stage - One ocation de véhicules pour la TF / A7376 Post Limited 0.00 Canceled 2020-09-04 2020-10-10 2021-10-10 proved Learning Outcomes tions Envelope mission de collecte/DVSP CI-PAPSE-93331-NC-RFQ / En Project Implementation and Request for Quota Single Stage - One tretien et maintenance du m TF / A7376 Post Limited 19,767.23 Signed 2020-12-07 2021-11-11 2021-02-01 2021-12-21 2022-02-01 Monitoring and Evaluation tions Envelope atériel informatique et burea utique. CI-PAPSE-147643-NC-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Reportage,PAD,émissions tél TF / A7376 rning Environment for Benefi Post Limited 0.00 Canceled 2021-03-20 2021-04-21 2021-10-18 tions Envelope é nationale et privée(diffusio ciary Schools n) CI-PAPSE-186148-NC-RFQ / T ransport et livraison des ouv Improving Conditions for Im Request for Quota Single Stage - One rages ,outils pédagogiques e TF / A7376 Post Limited 31,976.82 Signed 2021-02-25 2021-05-19 2021-03-28 2021-07-31 2021-04-27 proved Learning Outcomes tions Envelope n région,transport de decoda bles et dechiffrables 2020 et 2021.FI/Part variable CI-PAPSE-201127-NC-RFQ / T Improving Conditions for Im Request for Quota Single Stage - One ransport et Livraison de Kits TF / B2775 Post Limited 10,633.00 Signed 2021-08-06 2022-02-19 2021-10-01 2022-02-24 2021-10-31 proved Learning Outcomes tions Envelope ECD( 89 Kits) CI-PAPSE-201131-NC-RFQ / T Improving Conditions for Im Request for Quota Single Stage - One ransport et Livraison de Kits TF / B2775 Post Limited 0.00 Canceled 2021-08-06 2021-10-01 2021-10-31 proved Learning Outcomes tions Envelope ECD ( 136 centres) CI-PAPSE-201230-NC-RFQ / P Improving Teaching and Lea Request for Quota Single Stage - One roduction d'un Film de Sensi TF / B2775 rning Environment for Benefi Post Limited 16,642.64 Completed 2021-07-06 2021-05-03 2021-08-31 2021-06-03 2022-02-27 2021-06-29 tions Envelope bilisation ciary Schools CI-PAPSE-201335-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ouscription Assurance Multiri TF / B2775 Post Limited 2,335.63 Signed 2020-12-06 2021-02-10 2021-01-01 2021-05-22 2022-01-01 Monitoring and Evaluation tions Envelope sque Professionnelle.(Contrat 2021) CI-PAPSE-201337-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ouscription Assurance Individ TF / B2775 Post Limited 5,477.64 Signed 2020-12-20 2021-02-10 2021-01-01 2021-05-22 2021-06-30 Monitoring and Evaluation tions Envelope uelle Accident pour le Projet.( Contrat 2021) CI-PAPSE-201338-NC-RFQ / S Project Implementation and Request for Quota Single Stage - One ouscription contrat Assuranc TF / B2775 Post Limited 14,326.42 Signed 2020-12-06 2021-02-10 2021-01-01 2021-05-22 2022-01-01 Monitoring and Evaluation tions Envelope e Matériel roulant( contrat 20 21) CI-PAPSE-201339-NC-RFQ / S ouscription Contrat d'Assuran Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 148,854.11 Signed 2020-12-06 2021-02-10 2021-01-01 2021-05-22 2022-01-01 ce Maladie pour le Personnel Monitoring and Evaluation tions Envelope du PAPSE ( Contrat 2021) CI-PAPSE-201509-NC-DIR / C Project Implementation and ontrat de Location des burea TF / B2775 Post Direct Selection Direct 42,083.78 Signed 2020-11-05 2020-09-23 2020-11-10 2020-09-23 2020-12-01 2020-09-24 2021-12-01 Monitoring and Evaluation ux du SIège UGP PAPSE CI-PAPSE-201512-NC-DIR / C Project Implementation and Request for Quota Single Stage - One ontrat de Sécurité et Gardien TF / B2775 Post Limited 17,736.64 Signed 2020-12-06 2020-12-04 2021-01-01 2021-02-18 2022-01-01 Monitoring and Evaluation tions Envelope nage des locaux de l'UGP PA PSE CI-PAPSE-201517-NC-DIR / S Project Implementation and Request for Quota Single Stage - One ervices d'entretien des locau TF / B2775 Post Limited 15,992.28 Signed 2020-12-06 2021-03-11 2021-01-15 2021-05-12 2022-01-15 Monitoring and Evaluation tions Envelope x et Espaces Verts du siège d e l'UGP PAPSE CI-PAPSE-201524-NC-DIR / E Project Implementation and Request for Quota Single Stage - One ntretien et réparation des vé TF / B2775 Post Limited 0.00 Canceled 2021-04-06 2021-05-20 2022-05-20 Monitoring and Evaluation tions Envelope hicules du Projet CI-PAPSE-201929-NC-DIR / R econduction des contrats ave c les 10 radios de proximlité Improving Teaching and Lea des zones d'intervention du p TF / B2775 rning Environment for Benefi Post Direct Selection Direct 15,829.20 Signed 2021-04-01 2021-02-15 2021-04-06 2021-03-08 2021-04-22 2021-04-24 2021-10-19 rojet : Programme de sensibi ciary Schools lisation à travers 10 radios d e proximité ( convention ave c les radios locales, campagn es 3,4,5,6) ( année 2021) CI-PAPSE-201511-NC-DIR / C ontrat de Location des Burea Project Implementation and TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-04-01 2021-04-06 2021-04-27 2022-04-27 ux de L'UGP PAPSE en Régio Monitoring and Evaluation n(y compris eau, électricité, gardiennage, entretien) CI-PAPSE-201294-NC-DIR / R econduction du contrat d'ent Project Implementation and TF / B2775 Post Direct Selection Direct 18,483.70 Signed 2020-12-15 2020-11-20 2020-12-20 2020-11-25 2021-01-01 2020-12-25 2022-01-01 retien et de Maintenance des Monitoring and Evaluation 40 motos du Projet dans les Régions. CI-PAPSE-147974-NC-DIR / C onvention avec la RTI en vue Improving Teaching and Lea de la diffusion de films institu TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2020-12-15 2020-12-20 2021-01-30 2021-07-29 tionnels sur l'éducation natio ciary Schools nale.La RTI étant la seule tél évision d'Etat,le gré à gré s'i mpose au Projet CI-PAPSE-147978-NC-RFQ / Reconduction du contrat d'h Project Implementation and TF / A7376 Post Direct Selection Direct 2,181.08 Completed 2021-01-20 2020-11-25 2021-01-25 2020-11-25 2021-02-18 2021-01-21 2022-02-18 2021-12-02 ebergement du site Internet Monitoring and Evaluation avec l'entreprise ACG, attrib utaire du marché initial CI-PAPSE-243684-NC-RFQ / Réalisation de 02 parutions Strenghtening Sector Manag Request for Quota Single Stage - One de 500 exemplaires du maga TF / B2775 Post Limited 0.00 Canceled 2021-08-20 2021-09-24 2021-10-24 ement and Accountability tions Envelope zine ma nouvelle école ( doss ier presse-magazine) CI-PAPSE-242883-NC-RFB / R éalisation et production de pl anches murales( planches m Improving Conditions for Im Single Stage - One TF / B2775 Post Request for Bids Open - National 0.00 Canceled 2021-07-23 2021-07-23 2021-08-16 2021-11-24 2021-09-15 2021-09-20 2021-10-11 2021-11-25 urales Mathématiques , budg proved Learning Outcomes Envelope et: 169 644 dollars, planches murales lecture, budget= 12 5 000 dollars). Page 5 CI-PAPSE-242887-NC-RFB / R éalisation (Edition CE1 et révi Improving Conditions for Im Single Stage - One sion édition CP1 et CP2) et re TF / B2775 Post Request for Bids Open - National 351,714.16 Signed 2021-07-19 2021-07-19 2021-08-10 2021-09-09 2021-09-09 2021-10-08 2021-09-14 2021-10-16 2021-10-04 2021-11-11 2021-11-18 proved Learning Outcomes Envelope production de Décodables et Déchiffrables pour l'année 20 21 CI-PAPSE-251897-NC-DIR / R enouvellement du contrat de Project Implementation and TF / B2775 Post Direct Selection Direct 44,280.29 Signed 2021-09-03 2021-09-09 2021-09-06 2021-09-09 2021-09-15 2021-09-16 2022-09-15 Bail à usage Professionnel de Monitoring and Evaluation s locaux du siège du PAPSE ( année 2021) CI-PAPSE-251898-NC-DIR / R enouvellement du contrat de Fourniture de services de Gé Project Implementation and TF / B2775 Post Direct Selection Direct 15,484.80 Signed 2021-10-11 2021-10-07 2021-10-16 2021-11-16 2021-10-29 2022-01-08 2022-10-29 olocalisation / Tracking pour l Monitoring and Evaluation es véhicules et motos du Proj et ( année 2021) avec COMA FRIQUE TECHNOLOGIES. CI-PAPSE-258994-NC-RFQ / S ervices d'Entretien, Réparati Project Implementation and Request for Quota Single Stage - One TF / B2775 Post Limited 4,232.98 Signed 2021-10-25 2021-07-09 2021-11-22 2021-08-28 2022-11-22 on des splits, plomberie et él Monitoring and Evaluation tions Envelope ectricité des locaux du Projet . CI-PAPSE-147673-NC-RFQ / Strenghtening Sector Manag Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2021-01-20 2021-02-26 2021-03-28 Appui à la revue conjointe (i ement and Accountability tions Envelope mpressions) CI-PAPSE-201796-NC-RFQ / Reproduction des supports p Strenghtening Sector Manag Request for Quota Single Stage - One TF / B2775 Post Limited 0.00 Canceled 2021-06-06 2021-08-01 2021-09-01 our l'organisation de la revue ement and Accountability tions Envelope conjointe et autres ateliers T ASK FORCE CI-PAPSE-147624-NC-RFQ / S ervices de Location de véhic Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2020-11-07 2021-01-02 2022-01-02 ules pour les diverses missio proved Learning Outcomes tions Envelope ns et pour les collectes de do nnées par la DVSP CI-PAPSE-201522-NC-DIR / S Project Implementation and ervices d'entretien, Réparati TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-07-15 2021-07-20 2021-08-01 2022-08-01 Monitoring and Evaluation on des splits, plomberie, élec tricité. CI-PAPSE-201924-NC-RFQ / Improving Teaching and Lea Reportage et émissions télé Request for Quota Single Stage - One TF / B2775 rning Environment for Benefi Post Limited 0.00 Canceled 2021-12-20 2022-01-25 2022-07-24 nationale et privée: Réalisati tions Envelope ciary Schools on d'émissions télévisées pu bliques ( année 2021) CI-PAPSE-186083-NC-RFQ / Reproduction des outils de fo Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2020-09-15 2020-10-15 2020-11-14 rmation pour l'encadrement proved Learning Outcomes tions Envelope pédagogique /FI Part variable CI-PAPSE-175136-NC-RFQ / Conception et reproduction d Improving Conditions for Im Request for Quota Single Stage - One TF / A7376 Post Limited 0.00 Canceled 2020-11-24 2020-12-27 2021-01-26 e 1156 planches murales de l proved Learning Outcomes tions Envelope ecture et mathématiques CI-PAPSE-201934-GO-RFQ / Improving Teaching and Lea Achat/ Production de support Request for Quota Single Stage - One TF / B2775 rning Environment for Benefi Post Limited 21,134.36 Signed 2021-12-06 2022-03-15 2022-01-31 2022-04-21 2022-07-30 s de communication : Réalisa tions Envelope ciary Schools tion de divers outils de sensi bilisation. ( Année 2021) CI-PAPSE-271855-NC-DIR / R econduction du contrat de ba Project Implementation and Under Imple il à usage professionnel : con TF / B2775 Post Direct Selection Direct 0.00 2022-08-10 2022-08-10 2022-08-13 2022-08-10 2022-09-01 2023-09-01 Monitoring and Evaluation mentation trat de location du siège de l' Unité de Gestion du Projet (A nnée 2022) CI-PAPSE-271857-NC-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Pending Impl Achat et production de suppo TF / B2775 rning Environment for Benefi Post Limited 0.00 2022-11-20 2023-01-05 2023-02-04 tions Envelope ementation rts de communication ( Anné ciary Schools e 2022) CI-PAPSE-271870-NC-RFQ / Improving Teaching and Lea Reportage, PAD, émissions té Request for Quota Single Stage - One Pending Impl TF / B2775 rning Environment for Benefi Post Limited 0.00 2022-10-16 2022-11-17 2023-05-16 lé nationale et privée ( diffusi tions Envelope ementation ciary Schools on) Année 2022 CI-PAPSE-271879-NC-RFB / R eprographie de manuels et c Improving Conditions for Im Single Stage - One Pending Impl TF / B2775 Post Request for Bids Open - National 0.00 2022-01-25 2022-01-30 2022-03-01 2022-03-15 2022-04-08 2022-05-23 ahiers d'exercice + révision proved Learning Outcomes Envelope ementation édition ( Année 2022 ) CI-PAPSE-271890-NC-RFQ / P aquetage et transport du ma Improving Conditions for Im Request for Quota Single Stage - One Under Imple TF / B2775 Post Limited 0.00 2022-02-21 2022-09-15 2022-03-27 2023-03-27 tériel pédagogique dans les 0 proved Learning Outcomes tions Envelope mentation 6 chefs lieu de région ( Anné e 2022) CI-PAPSE-271887-NC-DIR / C onsultation de fournisseurs p Improving Conditions for Im Request for Quota Single Stage - One TF / B2775 Post Limited 0.00 Signed 2022-02-14 2022-03-10 2022-04-11 2023-04-11 our l'entretien et la réparatio proved Learning Outcomes tions Envelope n des motos du PAPSE ( Ann ée 2022) CI-PAPSE-271819-GO-DIR / A Project Implementation and chat de Carburant pour l'Unit TF / B2775 Post Direct Selection Direct 94,060.52 Signed 2022-02-07 2022-01-31 2022-02-12 2022-01-19 2022-03-19 2022-04-08 2023-03-19 Monitoring and Evaluation é de Gestion du Projet. CI-PAPSE-273133-NC-RFQ / Project Implementation and Request for Quota Single Stage - One Réalisation et production de TF / A7376 Post Limited 92,963.45 Completed 2022-02-08 2022-02-04 2022-03-01 2022-03-10 2022-03-16 2022-04-13 Monitoring and Evaluation tions Envelope planches murales mathémati ques CI-PAPSE-271814-GO-DIR / A chat de carburant pour l'enca Improving Conditions for Im drement pédagogique (CPPP TF / B2775 Post Direct Selection Direct 51,115.59 Signed 2022-02-07 2022-04-01 2022-02-12 2022-03-15 2022-03-19 2022-04-08 2023-03-19 proved Learning Outcomes ), pour l'encadrement pédag ogique (IEPP) et pour les mis sions de la DAENF. CI-PAPSE-273137-NC-RFQ / Project Implementation and Request for Quota Single Stage - One Réalisation et production de TF / A7376 Post Limited 73,038.68 Completed 2022-02-09 2022-02-04 2022-03-02 2022-03-10 2022-03-17 2022-04-13 Monitoring and Evaluation tions Envelope planches murales lecture CI-PAPSE-276180-NC-DIR / C onventions avec les radios lo Project Implementation and Pending Impl TF / B2775 Post Direct Selection Direct 0.00 2022-03-25 2022-03-30 2022-05-04 2023-05-04 cales (émissions, reportages, Monitoring and Evaluation ementation communiqués, PAD) pour l'an née 2022 CI-PAPSE-301407-NC-RFB / R Improving Teaching and Lea éalisation et reproduction de Single Stage - One Under Imple TF / A7376 rning Environment for Benefi Post Request for Bids Open - National 0.00 2022-06-29 2022-07-28 2022-07-04 2022-08-02 2022-08-03 2022-09-29 2022-08-23 2022-10-04 2022-09-06 2022-12-05 décodables et de déchiffrabl Envelope mentation ciary Schools es, reproduction (CP1, CP2, C E1) et Edition (CE2). CI-PAPSE-321843-NC-RFQ / Improving Teaching and Lea Achat/ Production de support Request for Quota Single Stage - One Pending Impl TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-01-11 2023-02-10 2023-03-12 s de communication : Réalisa tions Envelope ementation ciary Schools tion de divers outils de sensi bilisation. (Année 2023) CI-PAPSE-321845-NC-RFQ / P roduction et reproduction de Improving Teaching and Lea Request for Quota Single Stage - One Pending Impl supports de communication s TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-01-10 2023-02-22 2023-03-24 tions Envelope ementation ur les VBG et le MGP (listes d ciary Schools es prestataires de services et autres) CI-PAPSE-321857-NC-RFQ / P aquetage et transport de ma Improving Conditions for Im Request for Quota Single Stage - One Under Imple TF / B2775 Post Limited 0.00 2022-11-30 2022-12-02 2022-12-15 2022-12-20 tériel pédagogique dans les I proved Learning Outcomes tions Envelope mentation EPP d'intervention des 6 DRE NA CI-PAPSE-322417-NC-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Under Imple Reproduction des manuels d TF / B2775 rning Environment for Benefi Post Limited 0.00 2022-10-29 2022-11-11 2022-12-24 2023-01-23 tions Envelope mentation écodables. du CP1, CP2, CE1 ciary Schools CI-PAPSE-322420-NC-RFQ / Improving Teaching and Lea Request for Quota Single Stage - One Reproduction des manuels d TF / B2775 rning Environment for Benefi Post Limited 0.00 Signed 2022-10-29 2022-11-11 2022-12-24 2023-06-22 tions Envelope échiffrables du CP1, CP2, CE1 ciary Schools . CI-PAPSE-321837-GO-RFQ / Renouvellement de la Licenc Improving Conditions for Im Request for Quota Single Stage - One Under Imple TF / B2775 Post Limited 0.00 2022-11-07 2023-01-27 2023-01-02 2024-01-02 e d'exploitation du logiciel Ta proved Learning Outcomes tions Envelope mentation ngerine pour la DVSP. CI-PAPSE-335262-NC-RFQ / P aquetages et transports du Improving Conditions for Im Request for Quota Single Stage - One Under Imple TF / B2775 Post Limited 0.00 2023-01-09 2023-01-19 2023-01-17 2023-07-16 matériel pédagogique dans l proved Learning Outcomes tions Envelope mentation es 6 chefs lieu de régions Page 6 CI-PAPSE-335309-NC-DIR / R Improving Teaching and Lea Under Imple enouvellement du contrat d'e TF / B2775 rning Environment for Benefi Post Direct Selection Direct - National 0.00 2023-04-04 2023-04-21 2023-04-09 2023-04-21 2023-04-23 2023-10-20 mentation ntretien et de réparation des ciary Schools motos du PAPSE CI-PAPSE-335341-NC-RFQ / P roduction audiovisuelle pour l a réalisation d'un film institut Improving Teaching and Lea Request for Quota Single Stage - One Under Imple ionnel sur la politique genre TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-01-18 2023-03-15 2023-04-14 tions Envelope mentation du MENA, les violences basé ciary Schools es sur le genre en milieu scol aire et les grossesses en cou rs de scolarité. CI-PAPSE-350380-NC-RFQ / Reprographie et impression d u rapport SDI et la brochure en 5000 exemplaires : le rap Improving Teaching and Lea Request for Quota Single Stage - One Under Imple port est le livrable de l'enquê TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-03-23 2023-03-23 2023-04-15 2023-04-30 tions Envelope mentation te sur les indicateurs de Pres ciary Schools tations de Services Educatifs , conduites par l'Institut natio nale des Statistiques pour le compte du GCI. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interes Short List and Draft R Request for Proposal Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) t Notice equest for Proposals s as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-PAPSE-93294-CS-QCBS / Improving Conditions for Im Consultant Qualifi Recrutement d'un cabinet po TF / A7376 Post Open - National 0.00 Canceled 2019-09-02 2019-09-17 2019-10-07 2019-10-22 2019-11-11 2019-12-11 proved Learning Outcomes cation Selection ur l'évaluation des acquis du préscolaire CI-PAPSE-93301-CS-QCBS / Recrutement d'un cabinet po Strenghtening Sector Manag Quality And Cost- Open - Internationa TF / A7376 Prior 0.00 Canceled 2019-07-25 2019-08-15 2019-09-13 2019-09-27 2019-10-18 2019-11-15 2019-12-16 2020-01-31 ur la réalisation des études d' ement and Accountability Based Selection l impact du projet(mi-parcours et fin). CI-PAPSE-93320-CS-QCBS / Recrutement d'un cabinet po Strenghtening Sector Manag Quality And Cost- TF / A7376 Prior Open - National 13,507.45 Completed 2019-06-03 2019-07-24 2019-06-24 2019-07-29 2019-07-29 2020-03-25 2019-08-19 2020-01-10 2019-09-13 2020-04-16 2019-10-18 2020-04-20 2019-11-15 2020-04-18 2019-12-16 2020-08-22 ur l'audit du projet pour l'exe ement and Accountability Based Selection rcice du 01.07.18 au 31.12.1 9 CI-PAPSE-95577-CS-CQS / Re crutement d'un économiste d Strenghtening Sector Manag Consultant Qualifi TF / A7376 Post Open - National 33,490.12 Completed 2019-01-04 2019-01-09 2019-01-16 2019-02-25 2019-03-19 2019-03-04 2019-04-30 2019-03-18 2019-05-07 2020-03-17 2020-05-02 e l'éducation pour le renforce ement and Accountability cation Selection ment de capacités de la Task Force EF. CI-PAPSE-95578-CS-CQS / Re Strenghtening Sector Manag Consultant Qualifi crutement d'un staticien en a TF / A7376 Post Open - National 33,301.42 Completed 2019-01-04 2018-12-19 2019-01-16 2019-02-18 2019-03-19 2019-02-25 2019-09-12 2019-03-18 2019-11-13 2020-03-17 2020-09-30 ement and Accountability cation Selection ppui à la task force EF. CI-PAPSE-95580-CS-CQS / Re crutement d'un consultant en observation des classes en le Improving Conditions for Im Consultant Qualifi cture et écriture,élaboration TF / A7376 Post Open - National 0.00 Canceled 2019-01-24 2019-02-14 2019-03-14 2019-03-30 2019-04-15 2019-06-14 proved Learning Outcomes cation Selection des modules,supports et kits et le renforcement des capac ités du pool d' administrateur s et des acteurs de terrain. CI-PAPSE-96823-CS-CDS / Co Improving Teaching and Lea nvention avec l'UNICEF pour l UN Agencies (Dire TF / A7376 rning Environment for Benefi Prior Direct 2,230,357.00 Signed 2018-12-26 2019-01-02 2022-07-28 e developpement du préscol ct) ciary Schools aire communautaire. CI-PAPSE-93314-CS-QCBS / Recrutement d'un cabinet po ur la réalisation de l'enquête Strenghtening Sector Manag Quality And Cost- Open - Internationa TF / A7376 Post 0.00 Canceled 2020-01-01 2020-03-31 2020-01-15 2020-02-10 2020-02-20 2020-03-01 2020-03-17 2020-04-01 2020-05-16 de satisfaction des bénéficiai ement and Accountability Based Selection l res sur le Pré-scolaire et Prim aire( collecte de données et analyses). CI-PAPSE-167807-CS-CQS / R ecrutement d'un cabinet pou r la réalisation de l'enquête d Strenghtening Sector Manag Consultant Qualifi TF / A7376 Post Open - National 83,133.16 Completed 2020-04-06 2020-04-06 2020-04-07 2020-04-20 2020-05-06 2020-06-16 2020-05-13 2020-07-06 2020-05-21 2020-07-15 2020-07-20 2020-12-31 e satisfaction des bénéficiair ement and Accountability cation Selection es sur le Pré-scolaire et Prim aire( collecte de données et analyses). CI-PAPSE-177423-CS-UN / Co nvention avec UNESCO en qu Improving Conditions for Im Non-Profit Organiz TF / A7376 Post Direct 0.00 Canceled 2020-07-07 2020-07-27 2020-08-03 2020-08-21 2020-09-18 alité d'Agent Vérificateur Ind proved Learning Outcomes ations épendant des Statistiques Sc olaires CI-PAPSE-186165-CS-CQS / S election de consultants pour l Project Implementation and Consultant Qualifi TF / A7376 Post Open - National 0.00 Canceled 2021-01-15 2021-01-19 2021-02-15 2021-02-25 2021-03-09 2021-06-09 es études d'impacts environn Monitoring and Evaluation cation Selection emementaux et sociaux CI-PAPSE-177426-CS-QCBS / Recrutement d'un Consultant Improving Conditions for Im Quality And Cost- Open - Internationa TF / A7376 Post 0.00 Canceled 2020-11-01 2020-11-22 2021-01-05 2021-01-15 2021-02-14 2021-03-10 2021-03-25 2021-04-24 pour l'élaboration du Rapport proved Learning Outcomes Based Selection l à mi-parcours: Collectes de d onnées CI-PAPSE-175230-CS-CQS / R Improving Teaching and Lea ecrutement d'ONG pour le D Consultant Qualifi TF / A7376 rning Environment for Benefi Post Open - National 587,674.50 Signed 2021-01-05 2021-03-10 2021-01-12 2021-03-12 2021-02-09 2021-07-22 2021-02-16 2021-08-20 2021-03-02 2021-08-25 2024-03-01 éveloppement de classes pas cation Selection ciary Schools serelles sur 3 ans. CI-PAPSE-201252-CS-CQS / R ecrutement d'un Cabinet Nati Improving Teaching and Lea Consultant Qualifi onal pour l'actualisation de l' TF / B2775 rning Environment for Benefi Post Open - National 52,661.39 Signed 2021-03-01 2021-05-10 2021-03-02 2021-11-18 2021-04-15 2021-09-30 2021-04-22 2021-11-01 2021-04-30 2021-11-04 2021-06-29 cation Selection Etude sur le bien être et la sé ciary Schools curité des enfants dans les é coles de Côte-d'Ivoire CI-PAPSE-175238-CS-QCBS / Strenghtening Sector Manag Quality And Cost- Recrutement d'un cabinet d' TF / A7376 Prior Open - National 0.00 Canceled 2020-11-16 2020-11-21 2020-12-29 2021-01-05 2021-01-12 2021-01-28 2021-02-14 2021-03-17 ement and Accountability Based Selection audit externe CI-PAPSE-186164-CS-CQS / R ecrutement d'un cabinet : Co Project Implementation and Consultant Qualifi Open - Internationa TF / B2775 Post 309,186.91 Completed 2021-02-01 2021-01-29 2021-02-22 2021-02-03 2021-03-14 2021-04-19 2021-03-24 2021-04-13 2021-04-08 2021-05-21 2021-07-07 2021-11-26 llecte de données pour l'éval Monitoring and Evaluation cation Selection l uation d'impact à mi parcour s CI-PAPSE-147933-CS-QCBS / Recrutement d'un cabinet : c Project Implementation and Quality And Cost- Open - Internationa TF / A7376 Post 0.00 Canceled 2020-11-10 2020-12-01 2021-01-14 2021-02-11 2021-03-13 2021-04-17 2021-05-22 2022-05-22 ollecte de données pour l'éva Monitoring and Evaluation Based Selection l luation d'impact à mi parcour s CI-PAPSE-201951-CS-QCBS / Recrutement d'un cabinet po Strenghtening Sector Manag Quality And Cost- Open - Internationa TF / B2775 Prior 0.00 Canceled 2021-04-15 2021-05-06 2021-06-19 2021-07-17 2021-08-16 2021-09-20 2021-10-25 2021-11-25 ur l'évaluation à mi- parcours ement and Accountability Based Selection l : Collecte de données CI-PAPSE-147801-CS-CQS / R Improving Teaching and Lea Consultant Qualifi elations Publiques et Relation TF / A7376 rning Environment for Benefi Post Open - National 0.00 Canceled 2021-12-15 2021-12-20 2022-01-17 2022-01-24 2022-02-07 2023-02-07 cation Selection s Presse(Consultant individue ciary Schools l). CI-PAPSE-261313-CS-QCBS / Recrutement d'un cabinet po Strenghtening Sector Manag Least Cost Selecti Under Implement TF / A7376 Post Open - National 0.00 2021-11-15 2021-11-16 2021-12-06 2021-12-07 2022-01-19 2022-01-28 2022-02-16 2022-02-08 2022-03-18 2022-02-11 2022-04-22 2022-01-24 2022-05-27 2022-11-23 ur la réalisation de l'Audit Ext ement and Accountability on ation erne du projet. (Exercice 202 1) CI-PAPSE-271969-CS-LCS / R ecrutement d'un cabinet pou Project Implementation and Least Cost Selecti Under Implement TF / B2775 Post Open - National 0.00 2022-08-15 2021-11-18 2022-09-05 2022-10-19 2022-11-16 2022-12-16 2023-01-20 2023-02-18 2023-04-04 r la réalisation de l'Audit Exte Monitoring and Evaluation on ation rne du projet. (Exercice 2022 ) CI-PAPSE-321873-CS-QCBS / Recrutement d'un cabinet po ur la réalisation de deux enq Strenghtening Sector Manag Consultant Qualifi Under Implement TF / B2775 Post Open - National 0.00 2022-11-14 2022-11-22 2022-12-05 2022-12-01 2023-01-18 2023-03-17 2023-02-17 2023-02-17 2023-03-24 2023-09-20 uêtes de satisfaction finales ement and Accountability cation Selection ation des bénéficiaires de l'interve ntion préscolaire et de l'inter vention primaire CI-PAPSE-321871-CS-CQS / R ecrutement d'un cabinet pou Project Implementation and Quality And Cost- Open - Internationa Under Implement TF / B2775 Post 0.00 2022-11-07 2022-10-19 2022-11-28 2022-12-01 2023-01-11 2023-01-27 2023-02-08 2023-03-01 2023-03-10 2023-03-08 2023-04-14 2023-03-21 2023-05-19 2024-05-18 r la collecte et l'analyse des Monitoring and Evaluation Based Selection l ation données pour l'évaluation d'i mpact final CI-PAPSE-342733-CS-LCS / R ecrutement d’un cabinet pou Project Implementation and Least Cost Selecti Open - Internationa Under Implement TF / B2775 Post 0.00 2023-02-14 2023-02-15 2023-03-01 2023-02-15 2023-03-07 2023-03-13 2023-03-17 2023-03-23 2023-03-22 2023-03-29 2023-04-01 2023-04-22 2023-05-22 r la réalisation de l’audit exte Monitoring and Evaluation on l ation rne du Projet (Exercice 2022) Page 7 CI-PAPSE-321874-CS-LCS / R ecrutement d'un cabinet pou Project Implementation and Least Cost Selecti TF / B2775 Post Open - National 0.00 Canceled 2023-07-20 2022-12-15 2023-08-10 2022-12-22 2023-09-23 2023-01-25 2023-10-21 2023-11-20 2023-12-25 2024-01-29 2024-07-27 r la réalisation de l'audit exte Monitoring and Evaluation on rne du Projet. (Exercice 2023 ) CI-PAPSE-355388-CS-CQS / S élection d’un cabinet, en vue de l’élaboration d’un docume Project Implementation and Consultant Qualifi Under Implement TF / B2775 Post Open - National 0.00 2023-04-13 2023-04-11 2023-05-04 2023-04-20 2023-06-17 2023-07-02 2023-08-06 2023-11-04 nt cadre d’évaluation des str Monitoring and Evaluation cation Selection ation uctures d’enseignement et d es personnels enseignants CI-PAPSE-362782-CS-CQS / R ecrutement d'un cabinet pou r documenter l'approche DCC Project Implementation and Consultant Qualifi Under Implement TF / B2775 Post Open - National 0.00 2023-06-15 2023-06-11 2023-06-29 2023-06-13 2023-07-30 2023-08-20 2023-09-24 2023-11-08 et élaborer du manuel simplif Monitoring and Evaluation cation Selection ation ié de l'approche communaut aire ainsi que le guide illustré e CI-PAPSE-362784-CS-CQS / R ecrutement d'un cabinet pou r l'élaboration du guide simpl Project Implementation and Consultant Qualifi Under Implement TF / B2775 Post Open - National 0.00 2023-06-16 2023-05-31 2023-06-30 2023-06-13 2023-07-31 2023-08-21 2023-09-18 2023-11-02 ifié et illustrée du dialogue ci Monitoring and Evaluation cation Selection ation toyen (implication des parent s dans l'amélioration des rés ultats d'apprentissage) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Con Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultan tract Planned Actual Planned t Actual Planned Actual Planned Actual Planned Actual CI-PAPSE-96826-CS-CDS / Re Project Implementation and crutement du Coordonnateur TF / A7376 Prior Direct Selection Direct 68,347.85 Completed 2018-03-12 2019-02-20 2018-03-22 2018-07-25 2018-08-02 2018-09-04 2019-08-01 2019-08-01 Monitoring and Evaluation du Projet. CI-PAPSE-96825-CS-INDV / R Project Implementation and Individual Consult ecrutement du Spécialiste Se TF / A7376 Prior Direct 46,650.12 Completed 2018-03-12 2019-02-20 2018-03-22 2018-07-31 2018-04-12 2019-03-01 2018-08-02 2018-08-02 2019-08-01 2019-08-01 Monitoring and Evaluation ant Selection nior en Passation des marché s. CI-PAPSE-96827-CS-CDS / Re crutement d'un consultant po Improving Conditions for Im TF / A7376 Post Direct Selection Direct 53,350.00 Signed 2019-02-01 2019-02-21 2019-02-06 2019-02-27 2019-03-01 2019-06-20 2019-03-31 ur la finalisation des tests d'e proved Learning Outcomes valuation EGRA/EGMA. CI-PAPSE-96828-CS-CDS / Re crutement d'un consultant po ur le renforcement des capac Improving Conditions for Im ités de la DPFC,la finalisation, TF / A7376 Post Direct Selection Direct 0.00 Canceled 2018-12-03 2018-12-13 2019-01-04 2019-01-11 proved Learning Outcomes l'administration,le traitement des gril:les d'observation (m athematique et lecture/écritu re). CI-PAPSE-97854-CS-INDV / R ecrutement d'un Spécialiste Project Implementation and Individual Consult TF / A7376 Post Open 39,081.74 Completed 2019-02-06 2019-03-04 2019-03-04 2019-11-29 2019-03-14 2019-11-29 2019-04-10 2020-01-29 2020-04-10 2021-02-23 en sauvegarde sociale pour l Monitoring and Evaluation ant Selection e compte de l'UGP du Projet CI-PAPSE-93287-CS-INDV / S élection de plusieurs consult Improving Conditions for Im Individual Consult ants individuels pour effectu TF / A7376 Post Open 0.00 Canceled 2019-07-14 2019-08-22 2019-08-30 2019-09-20 2019-10-21 proved Learning Outcomes ant Selection er les évaluation de constats d'impact environnemental CI-PAPSE-97859-CS-INDV / S élection de Consultants Indivi Improving Conditions for Im Individual Consult TF / A7376 Post Open 0.00 Canceled 2019-02-18 2019-03-29 2019-04-06 2019-04-27 2019-05-28 duels pour les évaluations de proved Learning Outcomes ant Selection constats d'impact social CI-PAPSE-97861-CS-INDV / R ecrutement d'un Consultant National expert en Lecture/E Improving Conditions for Im Individual Consult TF / A7376 Post Open 0.00 Canceled 2019-02-11 2018-07-25 2019-03-15 2019-03-22 2019-03-29 2019-08-30 criture pour l'élaboration des proved Learning Outcomes ant Selection modules de formation contin ue des enseignants et des fi ches pédagogiques CP2 et C E1 CI-PAPSE-97872-CS-CDS / Re crutement d'un Consultant In ternational, Expert en Lectur Improving Conditions for Im TF / A7376 Post Direct Selection Direct 0.00 Canceled 2019-02-15 2019-03-08 2019-04-01 2019-05-03 e/Ecriture pour l'élaboration proved Learning Outcomes de livres de décodable, de gu ide enseignant décodable, de fiches pédagogiques CI-PAPSE-97997-CS-INDV / R ecrutement de 20 Consultant Improving Teaching and Lea s pour le Suivi et contrôle tec Individual Consult TF / A7376 rning Environment for Benefi Post Open 158,427.45 Completed 2018-07-29 2018-07-16 2018-10-26 2019-02-27 2018-11-19 2019-03-07 2019-02-28 2019-03-16 2020-02-28 2020-01-05 hnique des travaux de const ant Selection ciary Schools ruction de 234 classes présc olaires et 150 classes du pri maires. CI-PAPSE-98021-CS-CDS / Re crutement par entente direct Strenghtening Sector Manag TF / A7376 Post Direct Selection Direct 44,040.00 Completed 2018-07-10 2018-07-10 2018-07-24 2018-07-23 2018-08-02 2018-08-02 2019-08-02 2019-08-01 e d'un Spécialiste en dévelo ement and Accountability ppement communautaire CI-PAPSE-98024-CS-CDS / Re Project Implementation and crutement d'un Responsable TF / A7376 Post Direct Selection Direct 44,040.00 Completed 2018-07-04 2018-07-10 2018-07-20 2018-07-23 2018-08-02 2018-08-01 2019-08-02 2019-08-01 Monitoring and Evaluation Administratif et Financier CI-PAPSE-98012-CS-INDV / R Improving Conditions for Im TF / A7376 Post Direct Selection Direct 44,040.00 Completed 2015-12-17 2018-07-10 2015-12-27 2018-07-23 2016-03-01 2018-08-02 2016-08-28 2019-08-01 ecrutement d'un Ingénieur G proved Learning Outcomes énie Civil CI-PAPSE-98002-CS-INDV / R ecrutement de 20 consultan Improving Teaching and Lea ts (facilitateurs communauta Individual Consult TF / A7376 rning Environment for Benefi Post Open 161,761.56 Completed 2018-07-11 2018-07-16 2018-11-13 2018-12-06 2018-12-04 2019-01-07 2019-01-04 2019-01-07 2020-01-04 2019-11-07 ires) pour la mobilisation et l ant Selection ciary Schools e renforcement des capacité s communautaires dans 150 communautés. CI-PAPSE-98271-CS-CDS / Re crutement d'un Spécialiste e Project Implementation and TF / A7376 Post Direct Selection Direct 44,040.00 Completed 2018-07-04 2018-07-10 2018-07-17 2018-07-23 2018-08-02 2018-08-02 2019-08-02 2019-08-01 n Suivi-évaluation pour l'Unit Monitoring and Evaluation é de Gestion du Projet CI-PAPSE-98291-CS-CDS / Li cence et logiciel de comptabi Project Implementation and TF / A7376 Post Direct Selection Direct 32,338.62 Completed 2018-06-12 2018-07-12 2018-07-27 2018-07-12 2018-10-15 2018-10-15 2019-03-15 2020-02-17 lité et de gestion des marché Monitoring and Evaluation s. Installation et paramétrage CI-PAPSE-98285-CS-INDV / R ecrutement d'un chargé de c Strenghtening Sector Manag Individual Consult TF / A7376 Post Open 44,040.00 Completed 2018-10-22 2018-08-17 2019-01-23 2019-01-23 2019-02-25 2019-03-13 2019-03-01 2019-03-13 2020-02-29 2020-02-29 ommunication pour l'Unité d ement and Accountability ant Selection e Gestion du Projet CI-PAPSE-98280-CS-INDV / R ecrutement d'Assistant en Pa Project Implementation and Individual Consult TF / A7376 Post Open 15,259.14 Completed 2018-10-18 2018-08-17 2019-01-29 2019-01-29 2019-02-19 2019-02-20 2019-03-01 2019-03-22 2020-02-29 2020-03-20 ssation des Marchés pour l'U Monitoring and Evaluation ant Selection nité de Gestion du Projet CI-PAPSE-98283-CS-INDV / R ecrutement de deux (2) Assis Project Implementation and Individual Consult TF / A7376 Post Open 28,992.37 Completed 2018-11-26 2018-10-04 2019-01-25 2019-01-25 2019-02-20 2019-02-20 2019-03-01 2019-03-06 2020-02-29 2020-02-29 tants comptables pour l'Unité Monitoring and Evaluation ant Selection de Gestion du Projet CI-PAPSE-98276-CS-CDS / Re Project Implementation and crutement d'un Comptable p TF / A7376 Post Direct Selection Direct 21,000.00 Completed 2018-09-04 2018-09-04 2018-09-17 2018-09-20 2018-10-05 2018-10-05 2019-10-05 2019-10-05 Monitoring and Evaluation our l'Unité de Gestion du Proj et CI-PAPSE-99523-CS-CDS / Re crutement d'un Consultant E xpert International pour la fin alisation des tests d'evaluati Improving Conditions for Im Individual Consult TF / A7376 Prior Open 0.00 Canceled 2018-10-12 2019-06-28 2018-11-12 2018-11-16 2018-11-23 2019-06-28 on EGRA /EGMA, l'analyse de proved Learning Outcomes ant Selection s resultats et pours le develo ppement st l'installation des applicatifs relatifs aux observ ations des classe et aux tests EGRA/EGMA CI-PAPSE-109129-CS-INDV / Selection du Consultant Inter Project Implementation and Individual Consult national BASTIEN Michel par TF / A7376 Post Direct 82,892.80 Signed 2019-04-08 2019-01-15 2019-04-12 2019-03-01 2019-04-16 2019-03-15 2019-05-26 2019-06-20 2022-08-01 Monitoring and Evaluation ant Selection entente directe, pour la réali sation des études d'impacts. Page 8 CI-PAPSE-125686-CS-CDS / E ntente directe avec le Profes Improving Teaching and Lea seur Annie Savard pour le re TF / A7376 rning Environment for Benefi Post Direct Selection Direct 66,830.00 Completed 2019-07-31 2019-08-01 2019-08-10 2019-08-02 2019-08-23 2019-08-08 2019-10-17 2020-02-17 nforcement des capacités de ciary Schools s enseignants et de la chaîne d'encadrement pédagogique; CI-PAPSE-146121-CS-INDV / Recrutement d’un Consultant pour l’élaboration du tableau Improving Conditions for Im Individual Consult TF / A7376 Post Open 39,410.00 Completed 2019-11-19 2018-08-02 2019-12-15 2019-01-07 2019-12-20 2019-01-11 2019-12-30 2019-03-06 2020-02-13 2020-04-01 de bord, le renforcement des proved Learning Outcomes ant Selection capacités d’un pool de forma teurs et des acteurs locaux ( CPPP et directeurs d’école) CI-PAPSE-146240-CS-INDV / Recrutement d'un Spécialiste Project Implementation and Individual Consult en Sauvegarde Environneme TF / A7376 Post Open 36,709.20 Completed 2019-11-19 2019-02-06 2019-11-19 2019-07-22 2019-11-19 2019-08-23 2019-11-19 2019-09-21 2019-11-19 2020-09-01 Monitoring and Evaluation ant Selection ntale pour le Projet d'Amélior ation de la Prestation des Ser vices Educatifs (PAPSE) CI-PAPSE-146354-CS-CDS / S élection d'un Consultant Indi Project Implementation and viduel pour le suivi de la mis TF / A7376 Post Direct Selection Direct 5,325.12 Completed 2019-11-20 2018-10-03 2019-11-20 2018-10-03 2019-11-20 2018-10-25 2019-11-20 2020-10-02 Monitoring and Evaluation e œuvre des dispositions env ironnementales et sociales. CI-PAPSE-147786-CS-CDS / C Project Implementation and ontrat de travail de l'ingénie TF / A7376 Post Direct Selection Direct 39,010.20 Completed 2019-11-28 2019-08-01 2019-11-28 2020-08-01 2019-11-28 2019-08-04 2019-11-28 2020-08-01 Monitoring and Evaluation ur Génie Civil CI-PAPSE-147791-CS-CDS / C Project Implementation and ontrat de travail du Spécialist TF / A7376 Post Direct Selection Direct 39,385.48 Signed 2020-07-22 2020-08-17 2020-08-01 2020-08-17 2020-09-01 2020-08-28 2021-09-01 Monitoring and Evaluation e en Sauvegarde Environnem entale. CI-PAPSE-147793-CS-CDS / R Improving Teaching and Lea enouvellement des contrats TF / A7376 rning Environment for Benefi Post Direct Selection Direct 31,927.60 Completed 2019-11-28 2019-10-28 2019-11-28 2019-10-28 2019-11-28 2019-11-19 2019-11-28 2020-01-01 des Facilitateurs Communaut ciary Schools aires pour deux mois. CI-PAPSE-147794-CS-CDS / C Project Implementation and ontrat de travail du Spécialist TF / A7376 Post Direct Selection Direct 36,708.38 Completed 2019-11-28 2019-08-01 2019-11-28 2019-08-01 2019-11-28 2019-09-04 2019-11-28 2020-05-23 Monitoring and Evaluation e en Développement Commu nautaire CI-PAPSE-147802-CS-CDS / C Project Implementation and ontrat de travail du Chargé d TF / A7376 Post Direct Selection Direct 39,047.22 Completed 2020-02-10 2020-02-26 2020-02-20 2020-02-26 2020-03-13 2020-03-11 2021-03-13 2021-02-27 Monitoring and Evaluation e Communication du PAPSE. CI-PAPSE-147934-CS-CDS / C Project Implementation and ontrat de travail du Coordonn TF / A7376 Prior Direct Selection Direct 71,696.69 Completed 2019-11-29 2020-09-24 2019-11-29 2020-10-12 2019-11-29 2019-09-06 2020-08-01 2020-08-01 Monitoring and Evaluation ateur du PAPSE CI-PAPSE-147935-CS-INDV / Project Implementation and Individual Consult Contrat de travail du Spéciali TF / A7376 Prior Direct 46,643.94 Signed 2019-11-29 2020-10-08 2019-11-29 2019-07-22 2019-11-29 2021-03-30 2019-11-29 2019-09-04 2020-08-01 Monitoring and Evaluation ant Selection ste Senior en Passation des Marchés. CI-PAPSE-147936-CS-CDS / C Project Implementation and ontrat de travail du Responsa TF / A7376 Post Direct Selection Direct 38,922.30 Completed 2019-11-29 2019-08-01 2019-11-29 2019-08-06 2019-11-29 2019-09-04 2020-08-01 2020-08-01 Monitoring and Evaluation ble Administratif et Financier CI-PAPSE-147937-CS-CDS / C Project Implementation and ontrat de travail du comptabl TF / A7376 Post Direct Selection Direct 21,571.85 Completed 2019-11-29 2019-10-28 2019-11-29 2019-10-29 2019-11-29 2019-11-01 2020-10-05 2020-10-01 Monitoring and Evaluation e du PAPSE CI-PAPSE-147939-CS-CDS / C Project Implementation and ontrat de travail de l'assistan TF / A7376 Post Direct Selection Direct 16,267.26 Completed 2020-01-15 2020-02-27 2020-01-25 2020-02-27 2020-03-01 2020-03-11 2021-03-01 2021-02-27 Monitoring and Evaluation te comptable 1 du PAPSE CI-PAPSE-147940-CS-CDS / C Project Implementation and ontrat de travail de l'assistan TF / A7376 Post Direct Selection Direct 16,252.73 Completed 2020-01-15 2020-02-27 2020-01-25 2020-02-27 2020-03-01 2020-03-11 2021-03-01 2021-02-27 Monitoring and Evaluation t comptable 2 du PAPSE. CI-PAPSE-147943-CS-CDS / C Project Implementation and TF / A7376 Post Direct Selection Direct 7,424.37 Completed 2019-11-29 2019-08-01 2019-11-29 2019-08-05 2019-11-29 2019-09-04 2020-08-01 2020-08-01 ontrat de travail du chauffeur Monitoring and Evaluation CI-PAPSE-149446-CS-CDS / C Project Implementation and ontrat de Travail du Spécialis TF / A7376 Post Direct Selection Direct 38,922.30 Completed 2019-12-09 2019-08-01 2019-12-09 2019-08-05 2019-12-09 2020-09-05 2019-12-09 2020-09-05 Monitoring and Evaluation te Suivi Évaluation du PAPSE. CI-PAPSE-147941-CS-CDS / C Project Implementation and ontrat de travail de l'assistan TF / A7376 Post Direct Selection Direct 16,238.21 Completed 2020-02-10 2020-03-30 2020-02-20 2020-03-30 2020-03-20 2020-05-13 2021-03-20 2021-03-21 Monitoring and Evaluation te en Passation des Marchés du PAPSE. CI-PAPSE-150922-CS-CDS / P rorogation de contrat.Entent Improving Teaching and Lea e directe avec 16 Facilitateur TF / A7376 rning Environment for Benefi Post Direct Selection Direct 55,753.55 Completed 2019-12-18 2020-01-20 2019-12-23 2020-01-20 2020-01-02 2020-01-31 2020-05-01 2020-06-01 s Communautaires pour une ciary Schools durée de cinq(05) mois. CI-PAPSE-150940-CS-CDS / P rorogation de contrat.Entent Improving Teaching and Lea e Directe avec dix(10) techni TF / A7376 rning Environment for Benefi Post Direct Selection Direct 39,773.58 Completed 2019-12-18 2020-01-20 2019-12-23 2020-01-20 2020-01-05 2020-01-31 2020-05-04 2020-06-01 ciens génies civils pour une d ciary Schools urée de cinq(05) mois. CI-PAPSE-150956-CS-INDV / Recrutement d'un Consultant Expert International pour la fi nalisation des tests d'evaluat Improving Conditions for Im Individual Consult ion EGRA /EGMA, l'analyse de TF / A7376 Post Open 59,900.00 Completed 2019-12-18 2018-08-15 2019-12-18 2018-11-07 2019-12-18 2019-11-07 2019-12-18 2018-11-27 2019-12-18 2019-10-01 proved Learning Outcomes ant Selection s resultats et pours le develo ppement st l'installation des applicatifs relatifs aux observ ations des classe et aux tests EGRA/EGMA CI-PAPSE-173141-CS-CDS / C Strenghtening Sector Manag ontrat de travail du Spécialist TF / A7376 Post Direct Selection Direct 35,758.59 Signed 2020-05-11 2020-04-06 2020-05-15 2020-04-27 2020-05-20 2020-05-23 2021-05-20 ement and Accountability e en Economie de l'Education -Task Force. CI-PAPSE-173138-CS-CDS / C Strenghtening Sector Manag ontrat de travail du Statistici TF / A7376 Post Direct Selection Direct 35,853.05 Signed 2020-08-20 2020-09-22 2020-08-30 2020-09-25 2020-09-20 2020-09-03 2021-09-20 ement and Accountability en de l'Education-Task Force. CI-PAPSE-175233-CS-CDS / R Improving Teaching and Lea econduction du contrat de 16 TF / A7376 rning Environment for Benefi Post Direct Selection Direct 150,168.32 Signed 2020-05-25 2020-05-30 2020-06-08 2020-06-01 2020-06-24 2020-06-13 2021-06-24 facilitateurs communautaires ciary Schools (12 mois) CI-PAPSE-175237-CS-CDS / R Improving Teaching and Lea econduction du contrat de 10 TF / A7376 rning Environment for Benefi Post Direct Selection Direct 85,005.72 Signed 2020-05-25 2020-05-30 2020-06-05 2020-06-01 2020-06-19 2020-06-14 2021-06-19 techniciens génie civil (12 m ciary Schools ois) CI-PAPSE-175239-CS-CDS / R ecrutement d'un cabinet pou Project Implementation and r la mise à jour du paramétra TF / A7376 Post Direct Selection Direct 9,210.96 Signed 2020-05-22 2020-06-04 2020-05-30 2020-06-25 2020-06-26 2020-07-10 2020-09-24 Monitoring and Evaluation ge en fonction du financeme nt additionnel et de l'amende ment de l'initial. CI-PAPSE-177390-CS-INDV / Strenghtening Sector Manag Individual Consult Recrutement d'un Spécialiste TF / A7376 Post Open 38,368.94 Signed 2020-06-29 2020-06-29 2020-08-02 2020-09-15 2020-08-08 2020-10-07 2020-08-20 2020-10-24 2021-08-20 ement and Accountability ant Selection en Développement Commun autaire.(SDC) CI-PAPSE-177393-CS-INDV / Strenghtening Sector Manag Individual Consult Recrutement d'un Spécialiste TF / A7376 Post Open 27,623.27 Signed 2020-06-29 2020-06-29 2020-08-02 2021-03-18 2020-08-08 2021-03-26 2020-08-25 2021-04-20 2021-08-25 ement and Accountability ant Selection Junior en Développement Co mmunautaire CI-PAPSE-177395-CS-INDV / Improving Conditions for Im Individual Consult Recrutement d'un Ingénieur TF / A7376 Post Open 27,623.27 Signed 2020-06-29 2020-06-29 2020-08-02 2021-08-11 2020-08-12 2021-08-12 2020-09-03 2021-09-03 2021-09-02 proved Learning Outcomes ant Selection des Techniques junior CI-PAPSE-177396-CS-INDV / Project Implementation and Individual Consult Recrutement de deux assista TF / A7376 Post Open 16,371.90 Signed 2020-06-29 2020-06-29 2020-08-11 2021-01-13 2020-08-18 2021-02-18 2020-08-26 2021-02-27 2021-08-26 Monitoring and Evaluation ant Selection nts en passation des marché s CI-PAPSE-177418-CS-CDS / R ecrutement d'un Vérificateur Improving Conditions for Im TF / A7376 Post Direct Selection Direct 9,169.43 Signed 2020-07-02 2020-07-27 2020-07-25 2020-07-27 2020-08-31 2020-11-11 2023-08-30 indépendant EGRA- EGMA ( proved Learning Outcomes consultant ATABANAM SIMBO U) CI-PAPSE-180774-CS-INDV / Recrutement d'un "Spécialist Project Implementation and Individual Consult TF / A7376 Post Open 38,395.30 Signed 2020-06-29 2020-06-29 2020-08-09 2020-12-22 2020-08-16 2021-04-08 2020-08-28 2021-04-27 2021-08-28 e qualité de l'éducation" pour Monitoring and Evaluation ant Selection le compte de l'UGP. Page 9 CI-PAPSE-185314-CS-INDV / Recrutement d'un Consultant Project Implementation and Individual Consult TF / A7376 Post Limited 21,403.62 Signed 2020-08-14 2020-08-17 2020-08-19 2020-10-20 2020-08-24 2020-10-26 2020-09-08 2020-11-19 2020-10-08 pour l'élaboration du Rapport Monitoring and Evaluation ant Selection d'Evaluation à mi-parcours d u PAPSE CI-PAPSE-185316-CS-INDV / Recrutement de Facilitateurs Strenghtening Sector Manag Individual Consult TF / A7376 Post Open 58,307.70 Signed 2020-08-10 2020-09-22 2020-09-20 2020-12-08 2020-09-25 2020-12-10 2020-10-10 2021-01-06 2021-10-10 communautaires complémen ement and Accountability ant Selection taires pour 12 mois renouvel ables. CI-PAPSE-185322-CS-INDV / Recrutement de techniciens Strenghtening Sector Manag Individual Consult TF / A7376 Post Open 58,621.62 Signed 2020-08-08 2020-09-22 2020-08-30 2020-12-08 2020-09-20 2020-12-11 2020-10-01 2021-01-06 2021-10-01 génie civil complémentaires ement and Accountability ant Selection pour 12 mois renouvelables. CI-PAPSE-185459-CS-CDS / R Project Implementation and ecrutement d'un Responsabl TF / A7376 Post Direct Selection Direct 39,910.02 Signed 2020-07-23 2020-07-22 2020-07-27 2020-07-24 2020-08-01 2020-07-31 2021-08-01 Monitoring and Evaluation e Administratif et Financier CI-PAPSE-185460-CS-CDS / R Project Implementation and ecrutement d'un Responsabl TF / A7376 Post Direct Selection Direct 3,723.22 Signed 2020-07-23 2020-07-22 2020-07-27 2020-07-24 2020-08-01 2020-07-31 2022-02-01 Monitoring and Evaluation e suivi et évaluation. CI-PAPSE-185462-CS-INDV / Project Implementation and Individual Consult Recrutement d'un Spécialiste TF / A7376 Prior Direct 47,042.14 Signed 2020-07-24 2020-08-13 2020-07-27 2020-07-22 2020-07-28 2020-09-24 2020-08-01 2020-07-31 2022-02-01 Monitoring and Evaluation ant Selection Senior en Passation des Marc hés CI-PAPSE-185469-CS-CDS / R Project Implementation and ecrutement du d'un Ingénieu TF / A7376 Post Direct Selection Direct 39,910.02 Completed 2020-07-24 2020-07-23 2020-07-28 2020-07-24 2020-08-01 2020-08-06 2022-02-01 2021-08-01 Monitoring and Evaluation r en Génie Civil CI-PAPSE-185470-CS-CDS / R Project Implementation and TF / A7376 Post Direct Selection Direct 21,863.29 Signed 2020-08-03 2020-09-25 2020-08-14 2020-09-28 2020-09-01 2020-10-03 2022-01-01 ecrutement d'un comptable Monitoring and Evaluation CI-PAPSE-185471-CS-CDS / R Project Implementation and ecrutement d'un chauffeur p TF / A7376 Post Direct Selection Direct 3,223.92 Completed 2020-07-25 2020-07-23 2020-07-28 2020-07-23 2020-08-01 2020-07-31 2020-12-31 2021-01-01 Monitoring and Evaluation our une durée de 05 mois CI-PAPSE-186154-CS-CDS / C ontrat de consultance pour l' appui à la DPFC pour le deve Improving Conditions for Im TF / A7376 Post Direct Selection Direct 110,314.15 Signed 2020-07-30 2020-08-17 2020-08-09 2020-08-17 2020-08-30 2020-09-11 2020-11-30 loppment du programme Mat proved Learning Outcomes hematiques-PAPSE pour les 3 premières classes du primair e/Annie Savard.FI/Part variab le CI-PAPSE-185457-CS-CDS / R Project Implementation and TF / A7376 Post Direct Selection Direct 66,121.10 Signed 2020-07-23 2020-07-22 2020-07-27 2020-07-22 2020-08-01 2020-07-28 2022-02-01 ecrutement d'un Coordonnat Monitoring and Evaluation eur CI-PAPSE-185310-CS-INDV / Recrutement de deux (02) Ill Improving Conditions for Im Individual Consult ustrateurs et deux(02) Spéci TF / A7376 Post Limited 3,601.00 Signed 2020-07-22 2020-08-20 2020-07-27 2020-08-20 2020-08-01 2020-08-25 2020-08-16 2020-10-10 2020-09-15 proved Learning Outcomes ant Selection alistes en traitement Editorial pour les outils de la DPFC. CI-PAPSE-177407-CS-CDS / E ntente directe avec Monsieur YOUAN Bi Romaric, actuel as Project Implementation and TF / A7376 Post Direct Selection Direct 15,150.16 Signed 2020-10-26 2020-11-20 2020-11-06 2020-11-23 2020-12-14 2020-11-28 2021-12-14 sistant comptable précédem Monitoring and Evaluation ment recruté sur la base d'un AMI sur les ressources Etat. CI-PAPSE-147792-CS-CDS / C onception de tableau de bord Improving Conditions for Im -école du primaire: Zaafrane TF / A7376 Post Direct Selection Direct 0.00 Canceled 2020-02-08 2020-02-18 2020-03-10 2020-06-08 proved Learning Outcomes Hafedh contrat 2 pour le renf orcement de capacité en régi on. CI-PAPSE-177420-CS-INDV / Project Implementation and Individual Consult TF / A7376 Post Limited 7,531.07 Signed 2020-11-16 2020-11-17 2020-11-21 2020-11-17 2020-12-16 2020-11-17 2020-12-30 2020-11-21 2021-12-30 Recrutement d'un chauffeur Monitoring and Evaluation ant Selection CI-PAPSE-175229-CS-CDS / C ontrat de consultance pour l' Improving Teaching and Lea appui à la DPFC pour le devel TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2020-06-15 2020-06-25 2020-07-08 2021-07-08 oppement du programme Ma ciary Schools thématique-PAPSE pour les 3 premieres classes du primair e CI-PAPSE-201204-CS-CDS / R enouvellement du contrat de Project Implementation and l'ingénieur génie civil(Entent TF / B2775 Post Direct Selection Direct 39,915.89 Signed 2021-07-01 2021-07-27 2021-07-08 2021-07-27 2021-08-01 2021-08-07 2022-08-01 Monitoring and Evaluation e Directe avec Monsieur BAL LY AGNIFIAULT ARISTIDE) CI-PAPSE-201212-CS-CDS / R enouvellement du contrat du Project Implementation and TF / B2775 Post Direct Selection Direct 38,211.62 Signed 2021-10-01 2021-10-02 2021-10-06 2021-10-07 2021-10-15 2021-10-21 2022-10-15 Spécialiste en Développeme Monitoring and Evaluation nt Communautaire CI-PAPSE-201231-CS-CDS / R enouvellement du contrat du Strenghtening Sector Manag Chargé de communication( E TF / B2775 Post Direct Selection Direct 36,113.05 Signed 2021-02-01 2021-03-04 2021-02-11 2021-03-12 2021-03-01 2021-03-23 2022-03-01 ement and Accountability ntente directe avec Monsieur ANNIN MALGRACE) CI-PAPSE-201234-CS-CDS / R enouvellement contrat écono Strenghtening Sector Manag TF / B2775 Post Direct Selection Direct 35,661.10 Signed 2021-04-20 2021-05-04 2021-04-24 2021-06-10 2021-05-02 2021-06-15 2022-05-02 miste. Entente directe avec ement and Accountability Monsieur KOUAKOU BROU N OEL. CI-PAPSE-201241-CS-CDS / R Strenghtening Sector Manag enouvellement de contrat du TF / B2775 Post Direct Selection Direct 35,499.02 Signed 2021-09-15 2021-10-04 2021-09-25 2021-10-07 2021-10-01 2021-10-21 2022-10-01 ement and Accountability Statisticien. CI-PAPSE-201285-CS-CDS / R enouvellement du contrat du Project Implementation and Spécialiste en Sauvegarde E TF / B2775 Post Direct Selection Direct 36,757.30 Signed 2021-08-10 2021-08-17 2021-08-20 2021-08-17 2021-09-01 2021-09-10 2022-09-01 Monitoring and Evaluation nvironnementale. Entente dir ecte avec Monsieur Patrick Jo el ADEBA CI-PAPSE-201287-CS-INDV / Renouvellement du Contrat Project Implementation and du Spécialiste en Sauvegard TF / B2775 Post Direct Selection Direct 39,832.83 Signed 2021-02-10 2021-02-08 2021-02-20 2021-02-08 2021-03-02 2021-03-04 2022-03-02 Monitoring and Evaluation e Sociale. Entente directe av ec Monsieur TOURE SOULEY MANE CI-PAPSE-201296-CS-CDS / R enouvellement du contrat du Project Implementation and TF / B2775 Post Direct Selection Direct 71,516.32 Signed 2021-07-15 2021-06-17 2021-07-19 2021-06-24 2021-08-01 2021-07-29 2022-08-01 Coordonnateur.Entente Direc Monitoring and Evaluation te avec Monsieur YEO P. ABR AHAM CI-PAPSE-201301-CS-CDS / R enouvellement du contrat du Project Implementation and Responsable Administratif et TF / B2775 Post Direct Selection Direct 37,051.36 Signed 2021-07-15 2021-08-17 2021-07-22 2021-08-26 2021-08-01 2021-08-31 2022-08-01 Monitoring and Evaluation Financier. Entente Directe av ec Monsieur SANOU ADJOUM A FRANCK CI-PAPSE-201310-CS-CDS / R enouvellement du contrat du Project Implementation and Responsable Suivi et évaluati TF / B2775 Post Direct Selection Direct 40,181.27 Signed 2021-07-15 2021-06-24 2021-07-19 2021-07-12 2021-08-01 2021-07-17 2022-08-01 Monitoring and Evaluation on. Entente directe avec Mon sieur MAIGA Seydou CI-PAPSE-201311-CS-INDV / Renouvellement du Contrat d Project Implementation and Individual Consult TF / B2775 Post Direct 46,501.78 Signed 2021-07-15 2021-06-17 2021-07-18 2021-06-25 2021-07-19 2021-06-25 2021-08-01 2021-07-31 2022-08-01 u Spécialiste Senior en Passa Monitoring and Evaluation ant Selection tion des Marchés CI-PAPSE-201315-CS-CDS / R Project Implementation and enouvellement du Contrat du TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-25 2021-12-01 2022-12-01 Monitoring and Evaluation Spécialiste en qualité de l'éd ucation CI-PAPSE-201316-CS-CDS / R enouvellement du contrat du Project Implementation and TF / B2775 Post Direct Selection Direct 21,642.63 Signed 2021-09-15 2021-10-05 2021-09-21 2021-10-19 2021-10-01 2021-10-22 2022-10-01 Comptable. Entente directe a Monitoring and Evaluation vec Monsieur ASSALE BOHAH ININ. CI-PAPSE-201319-CS-CDS / R enouvellement du Contrat de Project Implementation and TF / B2775 Post Direct Selection Direct 16,345.54 Signed 2021-02-15 2021-03-18 2021-02-22 2021-03-19 2021-03-01 2021-03-26 2022-03-01 travail de l'Assistante Compt Monitoring and Evaluation able 1 du PAPSE CI-PAPSE-201323-CS-CDS / R Project Implementation and enouvellement du Contrat de TF / B2775 Post Direct Selection Direct 16,330.93 Signed 2021-02-15 2021-03-18 2021-02-22 2021-03-19 2021-03-01 2021-03-25 2022-03-01 Monitoring and Evaluation l'Assistant Comptable 2 du P APSE. Page 10 CI-PAPSE-201329-CS-CDS / R enouvellement du Contrat de Project Implementation and l'Assistante en Passation des TF / B2775 Post Direct Selection Direct 16,316.32 Signed 2021-02-15 2021-03-18 2021-02-25 2021-03-19 2021-03-01 2021-03-25 2022-03-01 Monitoring and Evaluation Marchés. Entente directe ave c Madame ABIYOU LYDIE DA NIELLE CI-PAPSE-182710-CS-CDS / P roduction de quatre (04) émi ssions d'information et de se Improving Teaching and Lea nsibilisation sur les interventi TF / A7376 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2020-12-01 2020-12-02 2020-12-15 2021-01-02 2021-05-02 ons du projet.L'entente direct ciary Schools e avec la struture "MEDIAPHY L" est justifiée par le fait que cette structure a une conven tion de Production avec le ME NET-FP CI-PAPSE-199802-CS-CDS / R Improving Teaching and Lea econduction du Contrat d'un TF / A7376 rning Environment for Benefi Post Direct Selection Direct 9,682.94 Signed 2020-10-15 2020-05-31 2020-10-15 2020-06-01 2020-10-15 2020-06-14 2020-10-15 Technicien Génie Civil, BAYO ciary Schools KO KARIM ( 12 mois).Il s'agit du 14ème TGC. CI-PAPSE-201047-CS-CDS / R econduction de contrats de 2 Improving Conditions for Im 0 Techniciens Génie Civil pou TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-06-06 2021-05-28 2021-06-17 2021-07-01 2022-07-01 proved Learning Outcomes r une periode de 12 mois.(An née 2021-2022) sur le Financ ement addidtionnel. CI-PAPSE-201060-CW-DIR / C onvention avec les COGES po ur la construction de salles d Improving Teaching and Lea e classe dans 38 communaut TF / B2775 rning Environment for Benefi Prior Direct Selection Direct 0.00 Canceled 2020-12-28 2021-06-04 2021-01-07 2021-01-25 2021-04-25 és ( primaire).Il s'agit d'une p ciary Schools articipation communautaire à la Passation des Marchés,fait e ici par les COGES. CI-PAPSE-201035-CW-DIR / C onvention avec les COGES po ur la construction de 38 cent Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2020-12-28 2020-10-06 2021-01-07 2020-11-18 2021-01-25 2021-04-25 res pré-primaires.Il s'agit d'u proved Learning Outcomes ne participation communauta ire à la Passation des Marché s faite par les COGES. CI-PAPSE-201056-CW-DIR / C onvention avec les COGES po ur la construction de 50 centr Improving Conditions for Im es pré-primaires +primaire.Il TF / B2775 Prior Direct Selection Direct 0.00 Canceled 2020-12-21 2021-06-04 2020-12-31 2021-01-20 2021-04-20 proved Learning Outcomes s'agit d'une participation co mmunautraire à la Passation des Marchés ,faite par les CO GES. CI-PAPSE-177412-CS-CDS / R econduction du contrat de Monsieur KOUASSI N'dri Jose Project Implementation and TF / A7376 Post Direct Selection Direct 7,760.70 Signed 2020-09-07 2020-11-09 2020-09-17 2020-11-10 2020-10-08 2020-11-19 2021-10-07 ph , chauffeur précédemmen Monitoring and Evaluation t sélectionné sur la base de c omparaison de 3 CV sur les r essources Etat. CI-PAPSE-205511-CS-CDS / R econduction du contrat de M onsieur KOBENA Nanié , chau Project Implementation and TF / A7376 Post Direct Selection Direct 7,449.74 Signed 2021-05-10 2021-06-02 2021-05-20 2021-06-04 2021-06-03 2021-06-25 2022-06-03 ffeur précédemment recruté Monitoring and Evaluation sur la base de comparaison d e 3 CV sur les ressources Eta t. CI-PAPSE-213263-CS-INDV / Project Implementation and Individual Consult Recrutement d'un Assistant s TF / B2775 Post Open 15,346.26 Signed 2021-01-15 2021-01-14 2021-02-24 2021-03-05 2021-03-01 2021-03-18 2021-03-15 2021-04-15 2022-03-15 Monitoring and Evaluation ant Selection uivi-Evaluation pour le Projet CI-PAPSE-177403-CS-CDS / R econduction du contrat de M onsieur SOUMAÏLA KOFFI YO Project Implementation and TF / A7376 Post Direct Selection Direct 0.00 Canceled 2021-02-15 2021-02-24 2021-03-06 2022-03-05 USSOUF , actuel assistant sui Monitoring and Evaluation vi-évaluation précédemment recruté sur la base d'un AMI sur les ressources Etat. CI-PAPSE-213527-CS-CDS / R ecrutement d'un cabinet d'au Strenghtening Sector Manag dit Comptable et Financier po TF / A7376 Post Direct Selection Direct 14,745.96 Completed 2021-01-22 2021-01-29 2021-02-01 2021-03-04 2021-03-04 2021-04-02 2021-05-03 2021-08-25 ement and Accountability ur l'exercice 2020.Entente di recte avec le Groupement CE 2C/ PANAUDIT CI-PAPSE-200225-CS-CDS / R Improving Teaching and Lea éactivation du contrat de six TF / A7376 rning Environment for Benefi Post Direct Selection Direct 56,676.30 Signed 2020-10-16 2020-08-27 2020-10-16 2020-09-11 2020-10-16 2020-09-18 2020-10-16 (06) Techniciens Génies Civil ciary Schools s et un (01) facilitateur Com munautaire ( 12 mois) CI-PAPSE-213229-CS-CDS / 7 7 Conventions avec les COGE S pour la construction de ce ntres pré-primaires + primair Improving Conditions for Im es( CF liste A et Liste B appr TF / B2775 Prior Direct Selection Direct 0.00 Canceled 2021-03-14 2021-06-04 2021-03-24 2021-05-28 2021-11-24 proved Learning Outcomes ouvées par la Banque Mondia le). Cette activité consiste à conclure 77 conventions ave c 77 Communautés pour des infrastructures . CI-PAPSE-213528-CS-CDS / R ecrutement d'une Firme pour la Réalisation de l'Enquête su Project Implementation and TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-02-01 2021-01-15 2021-02-11 2021-04-17 2021-10-14 r les indicateurs de Prestatio Monitoring and Evaluation n de Services. Entente Direct e avec l'Institut National de l a Statistique (INS) CI-PAPSE-225664-CS-CDS / L A REALISATION DE L’ENQUET E SUR LES INDICATEURS DE Project Implementation and TF / B2775 Post Direct Selection Direct 515,909.38 Signed 2021-03-19 2021-03-24 2021-03-29 2022-01-29 2021-06-02 2021-06-26 2021-11-29 PRESTATIONS DE SERVICES E Monitoring and Evaluation DUCATIFS EN COTE D’IVOIRE (SDI-EDUCATION-CI-2021) CI-PAPSE-237347-CS-CDS / R enouvellement du contrat de travail de Monsieur BAYOKO KARIM pour une durée de 12 Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,313.87 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 mois ( Technicien Génie Civil proved Learning Outcomes ).Le consultant a été initiale ment recruté sur la base de L 'AMI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237357-CS-CDS / R enouvellement du contrat de Monsieur COULIBALY Kissiwo ro Roland pour une durée de Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,323.53 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 12 mois (Technicien Génie ci proved Learning Outcomes vil). Le consultant a été initi alement recruté sur la base d e L'AMI N°01/SC/PAPSE/UGP/ 18 du mardi 31 juillet 2018. CI-PAPSE-237363-CS-CDS / R enouvellement du contrat de Monsieur DIGBO DOUH WILF RIED ARNOLD pour une duré Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,323.53 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-03 2021-06-25 2021-06-09 2022-06-25 e de 12 mois (Technicien Gé proved Learning Outcomes nie Civil). Le consultant a été initialement recruté sur la ba se de L'AMI N°01/SC/PAPSE/U GP/18 du mardi 31 juillet 201 8. CI-PAPSE-237368-CS-CDS / R enouvellement du contrat de travail de Monsieur GRAGNA N GUILLAUME pour une duré Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,323.53 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-09 2022-06-25 e de 12 mois (Technicien Gé proved Learning Outcomes nie Civil). Le consultant a été initialement recruté sur la ba se de L'AMI N°01/SC/PAPSE/U GP/18 du mardi 31 juillet 201 8. CI-PAPSE-237370-CS-CDS / R enouvellement du contrat de travail de Monsieur KOUAME JEAN MICHEL pour une durée Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,323.53 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-03 2021-06-25 2021-06-09 2022-06-25 de 12 mois( Technicien Géni proved Learning Outcomes e Civil). Le consultant a été i nitialement recruté sur la bas e de L'AMI N°01/SC/PAPSE/U GP/18 du mardi 31 juillet 201 8. CI-PAPSE-237372-CS-CDS / R enouvellement du contrat de travail de Monsieur N'GORAN Improving Conditions for Im KOUAME EVERS ( TGC). Le co TF / B2775 Post Direct Selection Direct 9,115.02 Signed 2021-05-31 2021-06-03 2021-06-11 2021-06-03 2021-06-25 2021-06-09 2022-06-25 proved Learning Outcomes nsultant a été initialement re cruté sur la base de L'AMI N° 01/SC/PAPSE/UGP/18 du mar di 31 juillet 2018. Page 11 CI-PAPSE-237379-CS-CDS / R enouvellement du contrat de travail de Monsieur YACOUBA ABDEL AZIZ BISSIRI pour une Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,131.13 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-03 2021-06-25 2021-06-09 2022-06-25 durée de 12 mois.( TGC). Le proved Learning Outcomes consultant a été initialement recruté sur la base de L'AMI N°01/SC/PAPSE/UGP/18 du m ardi 31 juillet 2018. CI-PAPSE-237388-CS-CDS / R enouvellement du contrat de travail de Monsieur YOBOUE KONAN DESIRE pour une dur Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-11-04 2021-06-25 2021-06-09 2022-06-25 ée de 12 mois (Technicien G proved Learning Outcomes énie Civil) Le consultant a ét é initialement recruté sur la base de L'AMI N°01/SC/PAPS E/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237389-CS-CDS / R enouvellement du Contrat de travail de Monsieur ZILE JEAN JACQUES pour une durée de Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-11-04 2021-06-25 2021-06-09 2022-06-25 12 mois (Technicien Génie ci proved Learning Outcomes vil).Le consultant a été initial ement recruté sur la base de L'AMI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237408-CS-CDS / R enouvellement du Contrat de travail de Monsieur BLE ROM AIN GUINARD pour une durée Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-04 2021-06-25 2021-06-09 2022-06-25 de 12 mois ( Facilitateur Com proved Learning Outcomes munautaire). Le consultant a été initialement recruté sur l a base de L'AMI N°01/SC/PAP SE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237409-CS-CDS / R enouvellement du contrat de Monsieur DELOU STEPHANE pour une durée de 12 mois. ( Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 Facilitateur Communautaire). proved Learning Outcomes Le consultant a été initialem ent recruté sur la base de L'A MI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237412-CS-CDS / R enouvellement du contrat de de travail de Monsieur DIAKO DIBY JEAN DE DIEU pour une Improving Conditions for Im durée de 12 mois( Facilitateu TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 proved Learning Outcomes rs Communautaires). Le cons ultant a été initialement recr uté sur la base de L'AMI N°01 /SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237414-CS-CDS / R enouvellement du Contrat de travail de Monsieur DOSSO Improving Conditions for Im MORY pour une durée de 12 TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-08 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 proved Learning Outcomes mois( FC ) .Le consultant a ét é initialement recruté sur la base de L'AMI N°01/SC/PAPS E/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237417-CS-CDS / R enouvellement du contrat de travail de Monsieur KAMENA N N'DA JEAN MARIE pour une Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 durée de 12 mois (Facilitateu proved Learning Outcomes r Communautaire).Le consult ant a été initialement recruté sur la base de L'AMI N°01/SC /PAPSE/UGP/18 du mardi 31 j uillet 2018. CI-PAPSE-237418-CS-CDS / R enouvellement du contrat de travail de Monsieur KOUADIO KOUADIO ACHILLE pour une Improving Conditions for Im durée de 12 mois ( Facilitate TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 proved Learning Outcomes ur Communautaire). Le cons ultant a été initialement recr uté sur la base de L'AMI N°01 /SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237419-CS-CDS / R enouvellement du contrat de travail de Monsieur KPASSOU AKA RICHARD pour une duré Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-04 2021-06-25 2021-06-09 2022-06-25 e de 12 mois ( Facilitateur Co proved Learning Outcomes mmunautaire). Le consultant a été initialement recruté sur la base de L'AMI N°01/SC/PA PSE/UGP/18 du mardi 31 juill et 2018. CI-PAPSE-237420-CS-CDS / R enouvellement du contrat de de travail de Monsieur SEKA SERGE pour une durée de 12 Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 mois ( Facilitateur Communa proved Learning Outcomes utaire). Le consultant a été in itialement recruté sur la base de L'AMI N°01/SC/PAPSE/UGP /18 du mardi 31 juillet 2018. CI-PAPSE-237421-CS-CDS / R enouvellement du contrat de Monsieur SORO NELO MOUSS A pour une durée de 12 mois Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 ( Facilitateur Communautaire proved Learning Outcomes ). Le consultant a été initiale ment recruté sur la base de L 'AMI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237423-CS-CDS / R enouvellement du contrat de Monsieur TUO GONANGA KA RIM pour une durée de 12 m Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 ois( Facilitateur Communauta proved Learning Outcomes ire). Le consultant a été initia lement recruté sur la base de L'AMI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237424-CS-CDS / R enouvellement du contrat de Monsieur YEO BEH pour une durée de 12 mois (Facilitateu Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 r Communautaire). Le consul proved Learning Outcomes tant a été initialement recrut é sur la base de L'AMI N°01/S C/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-237430-CS-CDS / R enouvellement du contrat de travail de Monsieur ZOGOUE DIDIER pour une durée de 12 Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,131.13 Signed 2021-05-31 2021-06-02 2021-06-11 2021-11-03 2021-06-25 2021-06-09 2022-06-25 mois ( Facilitateur Communa proved Learning Outcomes utaire).Le consultant a été ini tialement recruté sur la base de L'AMI N°01/SC/PAPSE/UGP /18 du mardi 31 juillet 2018. CI-PAPSE-237431-CS-CDS / R enouvellement du contrat de travail de Monsieur OKA SER GE KOLY AHOUSSOU WA pou Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,087.67 Signed 2021-05-31 2021-06-02 2021-06-11 2021-06-08 2021-06-25 2021-06-11 2022-06-25 r une durée de 12 mois (FC). proved Learning Outcomes Le consultant a été initialem ent recruté sur la base de L'A MI N°01/SC/PAPSE/UGP/18 du mardi 31 juillet 2018. CI-PAPSE-251514-CS-INDV / Improving Conditions for Im Individual Consult Under Implement Recrutement d'une assistant TF / B2775 Post Limited 0.00 2021-09-08 2021-10-06 2021-09-13 2021-10-04 2021-11-08 2022-11-03 proved Learning Outcomes ant Selection ation e comptable CI-PAPSE-250251-CS-CDS / R enouvellement du contrat rel atif au recrutement d'un vérif icateur indépendant pour cer Improving Conditions for Im tifier l'atteinte des résultats d TF / A7376 Post Direct Selection Direct 17,321.30 Signed 2021-09-07 2021-10-19 2021-09-17 2021-10-26 2021-10-28 2021-11-06 2022-10-23 proved Learning Outcomes 'apprentissage des élèves du Projet d'Amélioration de la Pr estation des Services Educati fs (PAPSE) pour une durée de deux ( 02) ans. CI-PAPSE-251900-CS-CDS / R econduction du contrat de M Project Implementation and TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-10-05 2021-10-15 2021-11-01 2022-11-01 onsieur KOUASSI N'dri Joseph Monitoring and Evaluation , chauffeur (année 2021) Page 12 CI-PAPSE-251902-CS-CDS / R econduction du contrat de M Project Implementation and TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-10-25 2021-11-04 2021-11-18 2022-11-18 onsieur KOUAKOU Kouassi Eu Monitoring and Evaluation gene Joel , chauffeur (année 2021) CI-PAPSE-251909-CS-CDS / R enouvellement du contrat de Project Implementation and Monsieur YOUAN Bi Romaric, TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-10-25 2021-11-05 2021-11-18 2022-11-18 Monitoring and Evaluation Assistant Comptable Adminis tratif et Financier. ( Année 20 21) CI-PAPSE-252071-CS-CDS / R enouvellement du Contrat de travail de Monsieur KOUADIO Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,115.02 Signed 2021-09-06 2021-10-02 2021-09-10 2021-10-07 2021-09-17 2021-10-22 2022-09-17 ANGOUA FABRICE pour une d proved Learning Outcomes urée de 12 mois (Technicien Génie civil) Année 2021 CI-PAPSE-252072-CS-CDS / R enouvellement du Contrat de travail de Monsieur DANHI G Improving Conditions for Im TF / B2775 Post Direct Selection Direct 9,115.02 Signed 2021-09-06 2021-10-02 2021-09-10 2021-10-07 2021-09-17 2021-10-21 2022-09-17 NANKONHI GUY KEVIN pour u proved Learning Outcomes ne durée de 12 mois (Techni cien Génie civil) Année 2021 CI-PAPSE-252073-CS-CDS / R enouvellement du Contrat de Improving Conditions for Im travail de Monsieur KOUADIO TF / B2775 Post Direct Selection Direct 9,115.02 Signed 2021-09-06 2021-10-02 2021-09-10 2021-10-08 2021-09-17 2021-10-21 2022-09-17 proved Learning Outcomes KOUADIO JONAS pour une du rée de 12 mois (Technicien G énie civil) Année 2021 CI-PAPSE-252075-CS-CDS / R enouvellement du Contrat de Improving Conditions for Im travail de Monsieur KOUAME TF / B2775 Post Direct Selection Direct 9,115.02 Signed 2021-09-06 2021-10-02 2021-09-10 2021-10-07 2021-09-17 2021-10-21 2022-09-17 proved Learning Outcomes KOFFI pour une durée de 12 mois (Technicien Génie civil) Année 2021 CI-PAPSE-252077-CS-CDS / R enouvellement du Contrat de Improving Conditions for Im travail de Monsieur HOUNKLI TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-10-04 2021-10-08 2021-10-15 2022-10-15 proved Learning Outcomes N DOFONSOU pour une duré e de 12 mois (Technicien Gé nie civil) Année 2021 CI-PAPSE-252078-CS-CDS / R enouvellement du contrat de travail de Monsieur ADOU AS SALE JOEL STANISLAS pour u Improving Conditions for Im ne durée de 12 mois ( Facilit TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes ateur Communautaire) Anné e 2021.Le consultant a été re cruté sur la base de L'AMI N° 004/SC/PAPSE/UGP/2020 du l undi 26 Octobre 2020. CI-PAPSE-252082-CS-CDS / R enouvellement du contrat de travail de Monsieur OKPO KE SSIE LITCHE JANVIER pour un Improving Conditions for Im e durée de 12 mois ( Facilitat TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes eur Communautaire) Année 2021.Le consultant a été recr uté sur la base de L'AMI N°00 4/SC/PAPSE/UGP/2020 du lun di 26 Octobre 2020. CI-PAPSE-252083-CS-CDS / R enouvellement du contrat de travail de Monsieur KOUADIO KOUAKOU VINCENT DOMINIQ Improving Conditions for Im UE pour une durée de 12 moi TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes s ( Facilitateur Communautai re) Année 2021.Le consultant a été recruté sur la base de L 'AMI N°004/SC/PAPSE/UGP/20 20 du lundi 26 Octobre 2020. CI-PAPSE-252085-CS-CDS / R enouvellement du contrat de travail de Monsieur OBRO N' GUESSAN GUY LEOPOLD pou Improving Conditions for Im r une durée de 12 mois ( Faci TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes litateur Communautaire) Ann ée 2021.Le consultant a été r ecruté sur la base de L'AMI N °004/SC/PAPSE/UGP/2020 du lundi 26 Octobre 2020. CI-PAPSE-252088-CS-CDS / R enouvellement du contrat de travail de Monsieur WOWA D ADIE ROMAIN pour une durée Improving Conditions for Im TF / B2775 Post Direct Selection 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 de 12 mois ( Facilitateur Com proved Learning Outcomes munautaire) Année 2021.Le consultant a été recruté sur l a base de L'AMI N°004/SC/PA PSE/UGP/2020 du lundi 26 Oc tobre 2020. CI-PAPSE-252090-CS-CDS / R enouvellement du contrat de travail de Monsieur BEBO FR ANCIS pour une durée de 12 Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 mois ( Technicien Génie Civil proved Learning Outcomes ).Année 2021.Le consultant a été recruté sur la base de L'A MI N°004/SC/PAPSE/UGP/202 0 du lundi 26 Octobre 2020. CI-PAPSE-252093-CS-CDS / R enouvellement du contrat de travail de Monsieur DIGBEU K ABLAN MARCELLIN DAGO po Improving Conditions for Im ur une durée de 12 mois ( Fa TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes cilitateur Communautaire) An née 2021.Le consultant a été recruté sur la base de L'AMI N°004/SC/PAPSE/UGP/2020 d u lundi 26 Octobre 2020. CI-PAPSE-252097-CS-CDS / R enouvellement du contrat de travail de Monsieur GOZE BO LOU LEOPOLD pour une duré Improving Conditions for Im e de 12 mois ( Facilitateur Co TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes mmunautaire) Année 2021.L e consultant a été recruté su r la base de L'AMI N°004/SC/ PAPSE/UGP/2020 du lundi 26 Octobre 2020. CI-PAPSE-252098-CS-CDS / R enouvellement du contrat de travail de Monsieur KOFFI AS SOA LEONARD pour une duré Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 e de 12 mois ( Facilitateur Co proved Learning Outcomes mmunautaire) Année 2021.L e consultant a été recruté su r la base de L'AMI N°004/SC/ PAPSE/UGP/2020 du lundi 26 Octobre 2020. CI-PAPSE-252099-CS-CDS / R enouvellement du contrat de travail de Monsieur TAN DEL Y WILFRIED pour une durée d Improving Conditions for Im TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 e 12 mois ( Facilitateur Com proved Learning Outcomes munautaire) Année 2021.Le consultant a été recruté sur l a base de L'AMI N°004/SC/PA PSE/UGP/2020 du lundi 26 Oc tobre 2020. CI-PAPSE-252102-CS-CDS / R enouvellement du contrat de travail de Monsieur TOGBE K OUSSRA MARIUS ROMEO pou Improving Conditions for Im r une durée de 12 mois ( Faci TF / B2775 Post Direct Selection Direct 0.00 Canceled 2021-11-15 2021-11-26 2021-12-11 2022-12-11 proved Learning Outcomes litateur Communautaire) Ann ée 2021.Le consultant a été r ecruté sur la base de L'AMI N °004/SC/PAPSE/UGP/2020 du lundi 26 Octobre 2020. CI-PAPSE-201220-CS-CDS / R Improving Teaching and Lea enouvellement de contrats F TF / B2775 rning Environment for Benefi Post Direct Selection Direct 0.00 Canceled 2021-07-15 2021-07-22 2021-07-31 2022-07-31 acilitateurs communautaires ciary Schools ( 12 mois) CI-PAPSE-261493-CS-INDV / Recrutement d'un consultant indépendant pour la réalisati Improving Teaching and Lea Individual Consult on de l'étude sur la cartograp TF / A7376 rning Environment for Benefi Post Limited 32,130.70 Signed 2021-12-15 2021-11-05 2021-12-20 2022-01-07 2022-01-10 2022-01-25 2022-02-14 2022-02-05 2022-08-13 ant Selection hie des prestataires de servic ciary Schools es en violences basées sur le genre (VBG) dans les régions d'intervention du PAPSE. Page 13 CI-PAPSE-266659-CS-INDV / Improving Teaching and Lea Recrutement d'un (01) Tech Individual Consult TF / B2775 rning Environment for Benefi Post Limited 8,995.91 Signed 2021-12-06 2021-12-08 2021-12-08 2021-10-12 2021-12-23 2021-12-09 2021-12-28 2021-12-21 2022-12-28 nicien Génie Civil Communau ant Selection ciary Schools taire, en remplacement d'un démissionnaire. CI-PAPSE-250378-CS-INDV / Recrutements de trois (3) fac ilitateurs communautaires. Il Improving Teaching and Lea Individual Consult s viennent en remplacement TF / B2775 rning Environment for Benefi Post Limited 27,009.42 Signed 2021-12-06 2021-12-08 2021-12-08 2021-11-19 2021-12-23 2021-12-10 2021-12-28 2021-12-21 2022-12-28 ant Selection de deux (02) agents démissi ciary Schools onnaires et un autre dont le contrat ne sera pas renouvel é pour non performance CI-PAPSE-271835-CS-CDS / R econduction du contrat de m Project Implementation and Pending Impleme aintenance du logiciel de ges TF / B2775 Post Direct Selection Direct 0.00 2022-06-01 2022-06-10 2022-07-08 2023-07-08 Monitoring and Evaluation ntation tion comptable (TOMPRO) av ec le cabinet AGOSOFT CI-PAPSE-281527-CS-INDV / Improving Teaching and Lea Recrutement d’un (01) Techn Individual Consult Under Implement TF / B2775 rning Environment for Benefi Post Limited 0.00 2022-03-07 2022-03-08 2022-03-08 2022-03-10 2022-03-08 2022-03-25 2022-03-08 2023-03-08 icien Génie Civil Communaut ant Selection ation ciary Schools aire, en remplacement d’un démissionnaire. CI-PAPSE-281663-CS-CDS / E ntente directe avec le Profes seur Annie Savard pour l'app Improving Conditions for Im TF / A7376 Post Direct Selection Direct 12,677.01 Signed 2022-03-02 2022-03-08 2022-03-12 2022-03-08 2022-05-16 2022-03-16 2022-10-13 ui à L'élaboration du déchiffr proved Learning Outcomes able CE2, du guide de l'ensei gnant CE2 et du cahier d'exe rcice CE2. CI-PAPSE-299155-CS-INDV / Recrutement d’un consultant individuel pour l’élaboration du PMPP incluant la Procédur Strenghtening Sector Manag Individual Consult e de Gestion de la Main d’œu TF / B2775 Post Limited 24,498.97 Signed 2022-06-10 2022-07-22 2022-06-13 2022-07-25 2022-06-15 2022-07-28 2022-06-20 2022-08-06 2022-07-15 ement and Accountability ant Selection vre (PGMO) pour la mise en œuvre de la Composante Ass istance Technique du PPR du «Projet Capital Humain Côte d’Ivoire (PCH-CI) » CI-PAPSE-301558-CS-INDV / Recrutement d'un Technicien Project Implementation and Individual Consult Pending Impleme TF / B2775 Post Limited 0.00 2022-07-05 2022-07-10 2022-07-31 2022-08-28 2023-08-28 Génie Civil, en remplacement Monitoring and Evaluation ant Selection ntation d'un Technicien Génie Civil d émissionnaire. CI-PAPSE-321847-CS-INDV / Recrutement d'un Consultant Strenghtening Sector Manag Individual Consult Under Implement individuel pour la réalisation TF / B2775 Post Limited 0.00 2022-12-12 2023-04-12 2022-12-17 2023-01-07 2023-02-11 2023-03-28 ement and Accountability ant Selection ation d'une étude d'évaluation des comités de veille et de prote ction de l'enfant CI-PAPSE-321867-CS-INDV / Strenghtening Sector Manag Individual Consult Pending Impleme Recrutement d'un spécialiste TF / B2775 Post Limited 0.00 2022-11-10 2022-11-15 2022-12-06 2023-01-05 2023-12-31 ement and Accountability ant Selection ntation en Planification CI-PAPSE-321869-CS-INDV / Improving Teaching and Lea Recrutement d'un consultant Individual Consult Under Implement TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-06-12 2023-02-10 2023-06-17 2023-03-31 2023-07-08 2023-04-04 2023-08-12 2024-02-08 individuel pour l'évaluation d ant Selection ation ciary Schools u mécanisme de gestion des plaintes (MGP) CI-PAPSE-321980-CS-INDV / Recrutement d'un consultant Project Implementation and Individual Consult Pending Impleme TF / B2775 Post Limited 0.00 2023-04-10 2023-04-15 2023-05-06 2023-06-10 2023-12-07 individuel pour la réalisation Monitoring and Evaluation ant Selection ntation du rapport d'achèvement du Projet CI-PAPSE-321831-CS-INDV / Recrutement d'un consultant Individuel pour l'appui au Min Strenghtening Sector Manag Individual Consult istère de l'Education National TF / B2775 Post Limited 0.00 Canceled 2022-10-18 2022-10-19 2022-10-28 2022-11-18 2022-12-23 2023-06-21 ement and Accountability ant Selection e et de l'Alphabétisation (ME NA), dans le cadre de la plani fication des activités du Proje t Capital Humain. CI-PAPSE-325714-CS-INDV / Recrutement d’un consultant Individuel pour l’appui au Min Strenghtening Sector Manag Individual Consult Under Implement istère de l’Education National TF / B2775 Post Limited 0.00 2022-11-11 2022-11-16 2022-11-16 2022-10-18 2022-12-07 2022-11-17 2023-01-11 2023-04-15 ement and Accountability ant Selection ation e et de l’Alphabétisation (ME NA), dans le cadre de la plani fication des activités du Proje t Capital Humain. CI-PAPSE-329965-CS-INDV / Recrutement d'un Facilitateu Project Implementation and Individual Consult Under Implement TF / B2775 Post Limited 0.00 2022-12-05 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 r Communautaire en remplac Monitoring and Evaluation ant Selection ation ement du précédent qui est démissionnaire CI-PAPSE-329974-CS-INDV / Recrutement d'un Facilitateu Project Implementation and Individual Consult Under Implement TF / B2775 Post Limited 0.00 2022-12-05 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 r Communautaire en remplac Monitoring and Evaluation ant Selection ation ement du précédent qui est démissionnaire CI-PAPSE-329979-CS-INDV / Recrutement d'un Facilitateu Project Implementation and Individual Consult Under Implement TF / B2775 Post Limited 0.00 2022-12-05 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 r Communautaire en remplac Monitoring and Evaluation ant Selection ation ement du précédent qui est démissionnaire CI-PAPSE-329984-CS-INDV / Recrutement d'un Facilitateu Project Implementation and Individual Consult Under Implement TF / B2775 Post Limited 0.00 2022-12-05 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 r Communautaire en remplac Monitoring and Evaluation ant Selection ation ement du précédent qui est démissionnaire CI-PAPSE-329988-CS-INDV / Recrutement d'un Facilitateu Project Implementation and Individual Consult Under Implement TF / B2775 Post Limited 0.00 2022-12-05 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 r Communautaire en remplac Monitoring and Evaluation ant Selection ation ement du précédent qui est démissionnaire CI-PAPSE-329992-CS-INDV / Recrutement d'un Technicien Project Implementation and Individual Consult Under Implement Génie Civil Communautaire e TF / B2775 Post Limited 0.00 2022-12-05 2022-12-15 2022-12-07 2022-12-12 2022-12-18 2023-12-18 Monitoring and Evaluation ant Selection ation n remplacement du précéden t qui est démissionnaire CI-PAPSE-329994-CS-INDV / Recrutement d'un Technicien Project Implementation and Individual Consult Under Implement Génie Civil Communautaire e TF / B2775 Post Limited 0.00 2022-12-05 2022-12-15 2022-12-07 2022-12-12 2022-12-18 2023-12-18 Monitoring and Evaluation ant Selection ation n remplacement du précéden t qui est démissionnaire CI-PAPSE-329995-CS-INDV / Recrutement d'un Technicien Project Implementation and Individual Consult Under Implement Génie Civil Communautaire e TF / B2775 Post Limited 0.00 2022-12-05 2022-12-15 2022-12-07 2022-12-12 2022-12-18 2023-12-18 Monitoring and Evaluation ant Selection ation n remplacement du précéden t qui est démissionnaire CI-PAPSE-329996-CS-INDV / Recrutement d'un Technicien Project Implementation and Individual Consult Pending Impleme Génie Civil Communautaire e TF / B2775 Post Limited 0.00 2022-12-05 2022-12-07 2022-12-12 2022-12-18 2023-12-18 Monitoring and Evaluation ant Selection ntation n remplacement du précéden t qui est démissionnaire CI-PAPSE-335338-CS-INDV / Recrutement d'un consultant Improving Teaching and Lea Individual Consult Under Implement Individuel pour l'évaluation d TF / B2775 rning Environment for Benefi Post Limited 0.00 2023-01-10 2023-04-12 2023-01-15 2023-02-05 2023-03-12 2023-04-26 ant Selection ation es comités de protection de l' ciary Schools enfant dans le primaire. CI-PAPSE-362738-CS-INDV / Recrutement d’un « consulta nt » pour la production d’un r apport d’évaluation sur la cel Strenghtening Sector Manag Individual Consult Under Implement TF / B2775 Post Limited 0.00 2023-05-30 2023-06-04 2023-06-18 2023-07-12 2023-08-01 lule technique de coordinatio ement and Accountability ant Selection ation n et de suivi des politiques et plans stratégiques du secteu r éducation-formation, déno mmée TASK-FORCE. CI-PAPSE-362785-CS-INDV / Recrutement d'un consultant Project Implementation and Individual Consult Pending Impleme TF / B2775 Post Limited 0.00 2023-06-19 2023-06-24 2023-07-08 2023-08-08 2023-09-22 pour la documentation de l'a Monitoring and Evaluation ant Selection ntation pproche préscolaire commun autaire Page 14 Textural Procurement Plan 1. General i. Country: Ghana ii. Name of Project: Gulf of Guinea Northern Regions Social Cohesion Project (GoG- SOCO) iii. PID: P175043 2. Project Implementation Agency: Ministry of Local Government, Decentralisation and Rural Development (MLGDRD) 3. Date of General Procurement Notice: May 23, 2022 4. Period covered by this procurement plan: 18 Months (June 2022 to December 2023) In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 2. Non-consulting services. I. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II to the Regulation for Procurement: No. Procurement Method Prior Review Threshold Comments US$ 1. ICB (Non-Consultant Above US$ 4,000,000 All Services) May 2022 II. Prequalification. Bidders when applicable_ shall be prequalified in accordance with the provisions of paragraphs 6.23 and 6.24 of the Regulation. III. Proposed Procedures for CDD Components (as per paragraph. 6.9 of the Regulations: When applicable IV. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual (PIM) for World Bank Loan Project. V. Any Other Special Procurement Arrangements: Not Applicable VI. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Estimate Domesti Review Ref d Packag c by Bank . Description Cost es Prefere (Prior / Comments No. US$ nce Post) million (yes/no) Summary of the 1 RFB-International. 4.00 1 No Prior (Non-Consulting Services) Summary of the 2 RFB-National 1.80 3 No Post (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II to the Regulation Selection and Employment of Consultants: None 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000.00_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of the Consultant Regulations. 3. Any Other Special Selection Arrangements: Not Applicable May 2022 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref Description of Estimated Review . Assignment Cost Packag by Bank Commen No. US$ es (Prior / ts million Post) Summary of 0.00 30 N/A 1 number of contracts that will be carried out under QCBS Summary of 2 number of 0.3 3 Post contracts that will be carried out under other methods May 2022 PROCUREMENT Western and Central Africa : Gulf of Guinea Northern Regions Social Cohesion project PLAN General Information Country: Western and Central Africa 2022-11-17 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175043 GPN Date: 2022-08-01 Project Name: Gulf of Guinea Northern Regions Social Cohesion project Loan / Credit No: IDA / 70680, IDA / D9920 Technical Secretariat for Coordination of the Social Cohesion Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-SETCO-323364-GO-RFB / Single Stage - One E Under Imple Acquisition de matériels infor IDA / 70680 4. Project Management Post Request for Bids Open - National 201,160.00 0.00 2022-12-05 2023-03-10 2022-12-10 2023-03-10 2023-01-21 2023-02-20 2023-03-27 2023-09-23 nvelope mentation matiques au profit du projet COSO BJ-SETCO-323368-GO-RFQ / Request for Quota Single Stage - One E Under Imple Acquisition de mobiliers de b IDA / 70680 4. Project Management Post Limited 92,675.00 0.00 2022-12-17 2023-03-09 2023-02-11 2023-08-10 tions nvelope mentation ureau au profit du projet COS O BJ-SETCO-323381-GO-RFQ / Acquisition de matériels roul Direct - Internation Under Imple IDA / 70680 4. Project Management Post Direct Selection 513,846.00 0.00 2022-12-12 2022-11-21 2022-12-17 2023-02-10 2023-01-21 2023-07-20 ants au profit du SETCO, du al mentation MEF, du MAEP, du MDGL et d e l'ABeGIEF BJ-SETCO-330491-GO-RFB / Acquisition de smartphones a 2. Building foundation and c Single Stage - One E Under Imple u profit des Communautés, S IDA / 70680 apacity for inclusive and resi Post Request for Bids Open - National 214,500.00 0.00 2023-01-03 2023-05-10 2023-01-08 2023-05-13 2023-02-19 2023-03-21 2023-04-25 2023-10-22 nvelope mentation C, FC et FT dans le cadre du lient communities déploiement du eMGP et de l' application numérique DCC BJ-SETCO-361134-GO-RFB / Acquisition de motos au profi 2. Building foundation and c Single Stage - One E Under Imple t des Superviseurs Communa IDA / D9920 apacity for inclusive and resi Post Request for Bids Open - National 207,000.00 0.00 2023-05-29 2023-06-02 2023-06-03 2023-07-15 2023-08-14 2023-09-18 2024-03-16 nvelope mentation ux (SC) et des Facilitateurs C lient communities ommunautaires (FC) du proje t COSO NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-SETCO-330348-NC-DIR / F ourniture, Installation, Param Direct - Internation Under Imple IDA / 70680 4. Project Management Post Direct Selection 24,780.00 0.00 2022-12-30 2022-10-25 2023-01-04 2023-01-16 2023-02-08 2023-08-07 étrage et Suivi du Logiciel de al mentation gestion comptable et financi ère du projet COSO CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-SETCO-323314-CS-LCS / S élection d'un auditeur extern e pour la réalisation de l'audi Least Cost Selecti Under Implement IDA / 70680 4. Project Management Post Open - National 120,000.00 0.00 2022-11-21 2022-11-23 2022-12-12 2023-01-25 2023-02-22 2023-03-24 2023-04-28 2023-06-02 2023-11-29 t comptable et financier des on ation comptes du projet au titre de s exercices 2023, 2024 et 20 25 BJ-SETCO-361162-CS-CQS / Sélection d'une agence de co Consultant Qualifi Pending Impleme IDA / D9920 4. Project Management Post Open - National 58,000.00 0.00 2023-08-21 2023-09-11 2023-10-25 2023-11-24 2023-12-29 2024-06-26 mmunication pour la producti cation Selection ntation on d'émissions sur les activit és du projet BJ-SETCO-361169-CS-CQS / Sélection d'un consultant po Consultant Qualifi Pending Impleme ur la réalisation de l'Enquête IDA / D9920 4. Project Management Post Open - National 166,000.00 0.00 2023-10-20 2023-11-10 2023-12-24 2024-01-23 2024-02-27 2024-08-25 cation Selection ntation de Satisfaction des Bénéficiai res des activités d'interventio n du projet COSO INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-SETCO-323370-CS-CDS / I nstallation, Paramétrage et S Direct - Internation Under Implement IDA / 70680 4. Project Management Post Direct Selection 24,780.00 0.00 2022-11-29 2022-11-24 2022-12-09 2023-02-12 2023-08-11 uivi du Logiciel de gestion co al ation mptable et financière du proj et COSO BJ-SETCO-330341-CS-INDV / Individual Consult Under Implement Recrutement de l'Auditeur In IDA / D9920 4. Project Management Post Open - National 132,500.00 0.00 2022-12-30 2022-12-22 2023-02-17 2023-03-10 2023-04-14 2023-10-11 ant Selection ation terne du Projet COSO BJ-SETCO-330487-CS-INDV / Individual Consult Under Implement Recrutement d'un Développe IDA / D9920 4. Project Management Post Open - National 20,000.00 0.00 2022-12-30 2022-12-28 2023-02-17 2023-03-10 2023-04-14 2023-10-11 ant Selection ation ur Full-Stack au profit du COS O Page 1 BJ-SETCO-330344-CS-INDV / Recrutement du Consultant Individual Consult Under Implement IDA / D9920 4. Project Management Post Limited 27,000.00 0.00 2023-01-10 2022-12-22 2023-01-15 2023-02-24 2023-02-05 2023-04-07 2023-03-12 2023-09-08 N°2 Formateur Sénior en Ges ant Selection ation tion à la Base au profit du pr ojet COSO BJ-SETCO-330343-CS-INDV / Recrutement du consultant N Individual Consult Under Implement IDA / D9920 4. Project Management Post Limited 27,000.00 0.00 2023-01-10 2022-12-22 2023-01-15 2023-02-24 2023-02-05 2023-04-07 2023-03-12 2023-09-08 °1 Formateur Sénior en Gesti ant Selection ation on à la Base au profit du COS O BJ-SETCO-361129-CS-INDV / Recrutement d'un consultant 1. Investing in Community R Individual Consult Pending Impleme individuel pour les études ap IDA / D9920 Post Open - National 25,300.00 0.00 2023-07-03 2023-08-21 2023-09-11 2023-10-16 2024-04-13 esiliency and Inclusion ant Selection ntation profondies des besoins et du fonctionnement des marchés BJ-SETCO-361131-CS-INDV / Recrutement d'un consultant individuel pour l'opérationnal 2. Building foundation and c Individual Consult Pending Impleme isation de la stratégie de renf IDA / D9920 apacity for inclusive and resi Post Open - National 17,000.00 0.00 2023-06-26 2023-08-14 2023-09-04 2023-10-09 2024-04-06 ant Selection ntation orcement des capacités des lient communities parties prenantes des différe ntes sous-composantes du pr ojet BJ-SETCO-361137-CS-INDV / Recrutement d'un Consultant 2. Building foundation and c Individual Consult Pending Impleme individuel pour l'illustration d IDA / D9920 apacity for inclusive and resi Post Open - National 27,000.00 0.00 2023-06-14 2023-08-02 2023-08-23 2023-09-27 2024-03-25 ant Selection ntation es outils et supports de form lient communities ation des communautés BJ-SETCO-361138-CS-INDV / Recrutement d'un consultant 2. Building foundation and c pour l'ajustement des plans e Individual Consult Pending Impleme IDA / D9920 apacity for inclusive and resi Post Open - National 25,000.00 0.00 2023-06-19 2023-08-07 2023-08-28 2023-10-02 2024-03-30 t documents-types de passati ant Selection ntation lient communities on des marchés communaut aires et de construction des ouvrages/infrastructures BJ-SETCO-361139-CS-INDV / Recrutement d'un Consultant 2. Building foundation and c pour la cartographie des chaî Individual Consult Pending Impleme IDA / D9920 apacity for inclusive and resi Post Open - National 13,000.00 0.00 2023-07-28 2023-09-15 2023-10-06 2023-11-10 2024-05-08 nes des valeurs résilientes su ant Selection ntation lient communities r le plan climatique et acteur s clés dans la zone d'interven tion du projet BJ-SETCO-361145-CS-INDV / Recrutement d'un consultant pour l'élaboration de la carto 2. Building foundation and c graphie et la stratégie d'atté Individual Consult Pending Impleme IDA / D9920 apacity for inclusive and resi Post Open - National 40,000.00 0.00 2023-07-20 2023-09-07 2023-09-28 2023-11-02 2024-04-30 nuation des abus sexuels/har ant Selection ntation lient communities cèlement sexuel (EAS/HS) et des VBG d'atténuation des Vi olences Basées sur le Genre (VGB) dans les activités du p rojet BJ-SETCO-361164-CS-INDV / Recruter un Consultant pour l Individual Consult Pending Impleme IDA / D9920 4. Project Management Post Open - National 50,000.00 0.00 2023-09-04 2023-10-23 2023-11-13 2023-12-18 2024-06-15 'archivage physique et numé ant Selection ntation rique des documents sensibl es du projet COSO BJ-SETCO-361165-CS-INDV / Sélection d'un consultant po Individual Consult Pending Impleme IDA / D9920 4. Project Management Post Open - National 100,000.00 0.00 2023-10-10 2023-11-28 2023-12-19 2024-01-23 2024-07-21 ur réaliser les audits annuels ant Selection ntation de passation des marchés du projet BJ-SETCO-361166-CS-INDV / Recrutement d'un consultant Individual Consult Pending Impleme pour réaliser les audits de co IDA / D9920 4. Project Management Post Open - National 125,000.00 0.00 2023-09-20 2023-11-08 2023-11-29 2024-01-03 2024-07-01 ant Selection ntation nformité environnementale e t sociale des cycles d'activité s du projet BJ-SETCO-361167-CS-INDV / Recrutement d'un consultant Individual Consult Pending Impleme pour réaliser les audits techn IDA / D9920 4. Project Management Post Open - National 125,000.00 0.00 2023-09-29 2023-11-17 2023-12-08 2024-01-12 2024-07-10 ant Selection ntation iques des infrastructures des cycles d'investissements du projet BJ-SETCO-361328-CS-INDV / Recrutement d'un consultant Individual Consult IDA / D9920 4. Project Management Post Limited 13,500.00 0.00 Under Review 2023-06-05 2023-06-07 2023-06-10 2023-07-01 2023-08-05 2024-02-01 pour élaborer la stratégie de ant Selection communication du projet CO SO Page 2 PROCUREMENT PLAN Project information: Zambia: Mining and Environment remediation and improvement Project [P154683] Project Implementation agency: Ministry of Mines and Mineral Development Date of the Procurement Plan: February 14, 2017 Period covered by this Procurement Plan: [December 1, 2015- July 30, 2017] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. – Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). For Goods is applicable for those contracts identified in the Procurement Plan tables]; For Works is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information: Not applicable PROCUREMENT Zambia : Zambia - Mining and Environmental Remediation and Improvement Project PLAN General Information Country: Zambia 2017-01-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154683 GPN Date: Project Name: Zambia - Mining and Environmental Remediation and Improvement Project Loan / Credit No: IDA / Q9880, IDA / 59370 Ministry of Mines, Energy and Water Development Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Enhancing Institutional capa MMMD/MP/W/02/2018 / Reha Request for Quota Single Stage - One E 2018-11-0 IDA / Q9880 city to strengthen environm Post Limited 27,000.00 22,300.85 Signed 2018-03-10 2018-10-31 2018-05-05 2019-01-18 bilitation-Kitwe SubPIU tions nvelope 1 ental governance and compl iance MMMD/MP/W/03/2018 / Offic Enhancing Institutional capa Request for Quota Single Stage - One E 2018-11-0 e Rehabilitation-Mufulira Sub IDA / Q9880 city to strengthen environm Post Limited 30,000.00 22,860.15 Signed 2018-03-10 2018-08-29 2018-05-05 2019-03-08 tions nvelope 1 PIU ental governance and compl iance MMMD/MP/W/04/2018 / Offic Enhancing Institutional capa Request for Quota Single Stage - One E 2018-11-0 e Rehabilitation-Chingola Sub IDA / Q9880 city to strengthen environm Post Limited 16,000.00 13,901.69 Signed 2018-03-10 2018-08-30 2018-05-05 2018-09-26 tions nvelope 1 PIU ental governance and compl iance ZM-MMEWD-88199-CW-RFQ Project Management, Monito Request for Quota Single Stage - One E 2020-02-2 / Net Work Installation at Min IDA / Q9880 Post Limited 20,000.00 0.00 Canceled 2019-07-05 2019-08-30 ring and Evaluation tions nvelope 6 e Safety Department MMMD/MP/W/01/2018 / Offic Enhancing Institutional capa Request for Quota Single Stage - One E 2020-01-2 e Rehabilitation for Mines Saf IDA / Q9880 city to strengthen environm Post Limited 30,000.00 14,416.01 Signed 2019-06-05 2018-12-20 2019-07-31 2019-04-23 tions nvelope 7 ety Department ental governance and compl iance ZM-MMEWD-141605-CW-RF Reducing environmental hea B / Procurement for Civil and Single Stage - One E 2021-03-0 IDA / Q9880 lth risks through localized int Post Request for Bids Open - National 1,300,000.00 0.00 Canceled 2020-05-20 2020-05-25 2020-07-06 2020-08-05 2020-09-09 Engineering Works for Rehab nvelope 8 erventions ilitation and Closure of of O B 54 ZM-MMEWD-141790-CW-RF Reducing environmental hea Q / Rehabilitation and dispos Request for Quota Single Stage - One E 2020-08-2 IDA / Q9880 lth risks through localized int Post Limited 300,000.00 0.00 Canceled 2020-01-05 2020-03-01 al of expired Chemicals for tions nvelope 8 erventions MSD laboratory in Kitwe ZM-MMEWD-141608-CW-RF Reducing environmental hea B / Procurement of Civil and Open - Internationa Single Stage - One E 2021-03-0 IDA / Q9880 lth risks through localized int Post Request for Bids 6,000,000.00 0.00 Canceled 2020-05-20 2020-05-25 2020-07-06 2020-08-05 2020-09-09 Engineering Works for Closur l nvelope 8 erventions e of Additional TD and OBs ZM-MMEWD-141596-CW-RF Reducing environmental hea Open - Internationa Single Stage - One E 2021-03-0 B / Procurement of Civil and IDA / Q9880 lth risks through localized int Post Request for Bids 6,000,000.00 0.00 Canceled 2020-05-20 2020-05-25 2020-07-06 2020-08-05 2020-09-09 l nvelope 8 Engineering works for Closur erventions e of TD 10 ZM-MMEWD-144997-CW-DIR Reducing environmental hea 2020-06-2 / Emergency Works for the M IDA / Q9880 lth risks through localized int Prior Direct Selection Direct 25,000.00 15,197.75 Signed 2019-11-19 2020-07-27 2019-11-24 2020-09-24 2019-12-29 2019-11-21 6 aintenance of Tailing Dam No erventions . 10 in Mufulira MMMD/W/003/2020 / Electric Project Management, Monito Request for Quota Single Stage - One E 2021-02-2 al and Plumbing and Rehabili IDA / Q9880 Post Limited 5,000.00 0.00 Canceled 2020-07-05 2020-08-30 ring and Evaluation tions nvelope 6 tation of Laboratory MMMD\004\2020 / Procurem Enhancing Institutional capa Request for Quota Single Stage - One E 2021-05-2 ent of Labour services for wo IDA / Q9880 city to strengthen environm Post Limited 2,000.00 590.95 Completed 2020-10-05 2020-12-01 2020-11-30 2020-12-25 tions nvelope 9 rks at MSD Laboratory ental governance and compl iance MMMD/W/04/2020 / procure Reducing environmental hea ment of maintenance works Request for Quota Single Stage - One E 2021-12-2 IDA / Q9880 lth risks through localized int Post Limited 50,000.00 78,864.58 Signed 2021-05-05 2020-12-10 2021-06-30 2021-05-22 at TD 10 to prevent site dete tions nvelope 7 erventions rioration as part of upcoming rehabilitation works Request for Bids - MMMD/W/002/2020 / Civil an Remediation of Contaminate Single Stage - One E Small Works SPD Pending Imp 2023-04-1 d Engineering Works for Reh IDA / Q9880 d Hotspots and Improvemen Post Request for Bids Open - National 1,300,000.00 0.00 2022-06-30 2022-07-05 2022-08-16 2022-09-15 2022-10-20 nvelope (1 envelope proce lementation 8 abilitation and Closure of OB t of Environmental Infrastruc ss) 54 ture Request for Bids - MMMD/W/001/2020 / Civil an Remediation of Contaminate Open - Internationa Single Stage - One E Small Works SPD 18,860,000.0 2023-04-1 d Engineering Works for Clos IDA / Q9880 d Hotspots and Improvemen Prior Request for Bids 0.00 Signed 2022-06-30 2022-02-14 2022-07-05 2022-03-31 2022-08-16 2022-05-27 2022-09-15 2022-09-21 2022-10-20 2023-06-13 l nvelope (1 envelope proce 0 8 ure of TD 10 t of Environmental Infrastruc ss) ture Request for Quota MMMD/W/001/2022 / Procur Remediation of Contaminate Request for Quota Single Stage - One E tions - Small Work Pending Imp 2022-12-2 ement of Laboratory Extensi IDA / Q9880 d Hotspots and Improvemen Post Limited 22,000.00 0.00 2022-05-04 2022-06-29 tions nvelope s (Emergency) SP lementation 6 on works t of Environmental Infrastruc D -Competitive ture GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Enhancing Institutional capa ZM-MMEWD-10605-GO-RFQ Request for Quota Single Stage - One E IDA / Q9880 city to strengthen environm Prior Open - National 40,000.00 0.00 Canceled 2017-03-26 2017-05-18 2017-05-21 2017-11-17 / Purchase of motor vehicle tions nvelope ental governance and compl iance MMMD/MP/G/02/2018 / Procu Enhancing Institutional capa Single Stage - One E rement of office equipment, i IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 150,000.00 0.00 Canceled 2018-01-30 2018-02-04 2018-03-18 2018-04-17 2018-05-22 2018-11-18 nvelope nternet server and website s ental governance and compl ervices iance MMMD/MP/G/04/2018 / Procu Enhancing Institutional capa rement of remote sensing an city to strengthen environm Single Stage - One E d field equipment for RPA,MS IDA / Q9880 Prior Request for Bids Open - National 400,000.00 0.00 Canceled 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-01-05 ental governance and compl nvelope D,KCC.MMC and CMC( hand h iance eld GPS,GIS and remote sens ing equipment) Page 1 MMMD/MP/G/03/2018 / Procu Enhancing Institutional capa rement of office equipment a city to strengthen environm Single Stage - One E Under Imple IDA / Q9880 Post Request for Bids Open - National 220,000.00 0.00 2018-03-12 2018-07-09 2018-03-17 2018-04-28 2018-09-12 2018-05-28 2018-07-02 2018-12-29 nd furniture for MSD,KCC,MM ental governance and compl nvelope mentation C,CMC and RPA(MSD furnitur iance e only) MMMD/MP/G/05/2018 / Procu Enhancing Institutional capa Request for Quota Single Stage - One E rement of No.2 Project Vehicl IDA / Q9880 city to strengthen environm Post Limited 120,000.00 80,941.25 Signed 2018-03-10 2018-05-05 2018-08-10 2018-11-01 tions nvelope es ental governance and compl iance MMMD/MP/G/01/2018 / Procu Enhancing Institutional capa UN Agencies (Dire rement of Laboratory Equipm IDA / Q9880 city to strengthen environm Prior Direct 450,000.00 0.00 Canceled 2018-04-16 2018-04-21 2018-05-26 2018-11-22 ct) ent( Gas samplers, AAS and ental governance and compl XRFs iance ZM-MMEWD-92351-GO-RFB / Reducing environmental hea Single Stage - One E procurement of Laboratory E IDA / Q9880 lth risks through localized int Post Request for Bids Open - National 450,000.00 227,883.00 Signed 2018-12-26 2019-01-16 2018-12-31 2019-01-23 2019-02-11 2019-02-26 2019-03-13 2019-03-22 2019-04-17 2019-07-10 2019-10-14 nvelope quipment (Gas sampler, AAS erventions and XRF's) ZM-MMEWD-94580-GO-RFB / procurement of remote sensi Project Management, Monito Single Stage - One E ng and field equipment for R IDA / Q9880 Post Request for Bids Open - National 400,000.00 438,159.50 Signed 2019-01-18 2018-08-14 2019-01-23 2019-03-06 2018-09-12 2019-04-05 2018-10-26 2019-05-10 2019-05-15 2019-11-06 ring and Evaluation nvelope PA, MSD,KCC,MMC, and CMC (hand held GPS,GIS AND rem ote sensing equipment) ZM-MMEWD-104751-GO-RFQ Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 40,000.00 0.00 Canceled 2019-04-10 2019-06-05 2019-12-02 / Financial Management Soft ring and Evaluation tions nvelope ware ZM - MMEWD - 104646 - GO Project Management, Monito UN Agencies (Dire IDA / Q9880 Post Direct 280,000.00 128,972.72 Signed 2019-04-30 2019-04-01 2019-05-05 2019-05-10 2019-06-09 2019-11-05 2019-12-06 - RFQ / Procurement of Projec ring and Evaluation ct) t Vehicles ZM-MMEWD-88190-GO-RFQ Project Management, Monito Request for Quota Single Stage - One E / procurement of IT equipme IDA / Q9880 Post Limited 28,484.55 49,222.90 Signed 2018-12-08 2018-12-28 2019-02-02 2019-03-27 2019-08-01 ring and Evaluation tions nvelope nt for Mine Safety Departme nt ZM-MMEWD-135597-GO-RFQ Project Management, Monito Request for Quota Single Stage - One E / procurement of office equip IDA / 59370 Post Limited 35,000.00 22,215.23 Signed 2019-11-05 2020-01-03 2019-12-31 2020-02-15 2020-06-28 ring and Evaluation tions nvelope ment for sub PIUs and MSD ZM-MMEWD-141796-GO-RFB Enhancing Institutional capa Single Stage - One E / procurement of laboratory e IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 1,000,000.00 818,525.05 Signed 2019-11-29 2019-11-12 2019-12-04 2019-11-12 2020-01-15 2019-12-20 2020-02-14 2020-02-10 2020-03-20 2020-03-31 2020-09-16 nvelope quipment for Kabwe, RPA an ental governance and compl d MSD iance ZM-MMEWD-141803-GO-RFB Enhancing Institutional capa / Procurement of Network Inf city to strengthen environm Single Stage - One E IDA / Q9880 Post Request for Bids Open - National 125,000.00 58,138.68 Signed 2019-11-29 2019-11-13 2019-12-04 2020-03-06 2020-01-15 2019-11-26 2020-02-14 2020-03-13 2020-03-20 2020-03-14 2020-09-16 rastructure and Installation o ental governance and compl nvelope f Data Management iance ZM-MMEWD-141815-GO-RFB / Procurement of Media Serv Project Management, Monito Single Stage - One E IDA / Q9880 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-11-28 2019-12-03 2020-01-14 2020-02-13 2020-03-19 2020-09-15 ice and Production of Commu ring and Evaluation nvelope nications Metrials ZM-MMEWD-141810-GO-RFB Enhancing Institutional capa Request for Quota Single Stage - One E / Procurement of Laboratory IDA / Q9880 city to strengthen environm Post Limited 50,000.00 0.00 Canceled 2020-04-05 2020-05-31 2020-11-27 tions nvelope Materials ( Consumables) ental governance and compl iance ZM-MMEWD-156562-GO-RFB Enhancing Institutional capa Single Stage - One E / Procurement of Non-Distrac IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 300,000.00 0.00 Canceled 2020-02-28 2020-03-04 2020-04-15 2020-05-15 2020-06-19 2020-12-16 nvelope tive Testing Equipment for M ental governance and compl SD iance ZM-MMEWD-156565-GO-RFQ Enhancing Institutional capa Request for Quota Single Stage - One E / Procurement of Laboratory IDA / Q9880 city to strengthen environm Post Limited 50,000.00 0.00 Canceled 2020-04-05 2020-05-31 2020-11-27 tions nvelope materials and Cosumables fo ental governance and compl r MSD iance ZM-MMEWD-156810-GO-RFB Enhancing Institutional capa Single Stage - One E / Procurement of Multimedia IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 141,000.00 0.00 Canceled 2020-02-28 2020-03-04 2020-04-15 2020-05-15 2020-06-19 2020-12-16 nvelope and Digital Materials ental governance and compl iance ZM-MMEWD-156957-GO-RFB Project Management, Monito Single Stage - One E / Procurement of Printed and IDA / Q9880 Post Request for Bids Open - National 110,896.00 0.00 Canceled 2020-02-28 2020-03-04 2020-04-15 2020-05-15 2020-06-19 2020-12-16 ring and Evaluation nvelope Branded Materials MMMD/G/001/20 / Procurem Project Management, Monito Request for Quota Single Stage - One E ent of a model depicting Proj IDA / Q9880 Post Limited 3,448.28 1,946.78 Signed 2020-05-15 2020-11-27 2020-07-10 2020-12-24 2021-01-06 ring and Evaluation tions nvelope ect Interventions ZM-MMEWD-156499-GO-RFB Enhancing Institutional capa / Procurement of Personal Pr city to strengthen environm Single Stage - One E IDA / Q9880 Post Request for Bids Open - National 150,000.00 0.00 Canceled 2020-02-03 2020-02-19 2020-02-08 2020-03-21 2020-03-16 2020-04-20 2020-05-25 2020-11-21 otective Equipment (PPE) for ental governance and compl nvelope PCU, MSD and sub PIUs iance MMMD/G/004/2020 / Procure Reducing environmental hea Request for Quota Single Stage - One E ment of personal protective IDA / Q9880 lth risks through localized int Post Limited 50,000.00 7,761.87 Signed 2020-10-28 2020-11-24 2020-12-23 2020-12-17 2021-06-21 tions nvelope equipment (PPE) for PCU and erventions MSD ZM-MMEWD-188743-GO-RFQ Enhancing Institutional capa Request for Quota Single Stage - One E / Procurement of Personal Pr IDA / Q9880 city to strengthen environm Post Limited 10,000.00 6,738.31 Signed 2020-08-26 2020-08-21 2020-10-31 2020-10-01 2020-11-15 tions nvelope otective Equipment for COV ental governance and compl ID 19 (PPE) iance MMMD\G\005\2020 / Procure Enhancing Institutional capa Request for Quota Single Stage - One E ment of materials for minor IDA / Q9880 city to strengthen environm Post Limited 3,000.00 193.31 Completed 2020-10-05 2020-06-18 2020-11-30 2020-07-18 2021-05-29 2020-08-06 tions nvelope works at MSD Laboratory ental governance and compl iance MMMD/G/003/20 / Heavy dut y printer and Tablets for Proj Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 16,000.00 0.00 Canceled 2021-05-04 2021-06-29 2021-12-26 ect Coordinating Unit and Mi ring and Evaluation tions nvelope nes Safety Department Remediation of Contaminate MMMD/G/6/2021 / Procurem Request for Quota Single Stage - One E IDA / Q9880 d Hotspots and Improvemen Post Limited 20,000.00 0.00 Canceled 2021-06-05 2021-07-31 2022-01-27 ent of Fume Hood at MSD tions nvelope t of Environmental Infrastruc ture MMMD/G/002/20 / Procurem Project Management, Monito Request for Quota Single Stage - One E ent of conference furniture f IDA / Q9880 Post Limited 10,000.00 0.00 Canceled 2021-06-30 2021-08-25 2022-02-21 ring and Evaluation tions nvelope or Project Coordinating Office MMMD/G/05/2020 / Procure Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 10,000.00 0.00 Canceled 2021-04-05 2021-05-31 2021-11-27 ment of Accounting Software ring and Evaluation tions nvelope Page 2 Reducing environmental hea MMMD/G/001/2022 / Procure Request for Quota Single Stage - One E Pending Impl IDA / Q9880 lth risks through localized int Post Limited 5,000.00 0.00 2022-05-04 2022-06-29 2022-12-26 ment of the compressor tions nvelope ementation erventions Enhancing Institutional capa MMMD/G/002/2022 / Procure Request for Quota Single Stage - One E Pending Impl IDA / Q9880 city to strengthen environm Post Limited 50,000.00 0.00 2022-06-05 2022-07-31 2023-01-27 ment of fume hood tions nvelope ementation ental governance and compl iance MMMD/G/003/2022 / Procure Enhancing Institutional capa Single Stage - One E Under Imple ment of Laboratory equipme IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 120,000.00 0.00 2022-04-29 2022-03-29 2022-05-04 2022-03-29 2022-06-15 2022-07-15 2022-08-19 2023-02-15 nvelope mentation nts for RPA ental governance and compl iance MMMD/G/001/2023 / Procure Enhancing Institutional capa Single Stage - One E Under Imple ment of Laboratory Equipme IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 432,000.00 0.00 2023-02-28 2023-04-04 2023-03-05 2023-04-05 2023-04-16 2023-05-16 2023-06-20 2023-12-17 nvelope mentation nt for MSD and RPA ental governance and compl iance MMMD/G/002/2023 / Procure Project Management, Monito Request for Quota Single Stage - One E Pending Impl ment of Personal Protective E IDA / Q9880 Post Limited 30,000.00 0.00 2023-03-05 2023-04-30 2023-10-27 ring and Evaluation tions nvelope ementation quipment (PPE) Enhancing Institutional capa MMMD/G/003/2023 / Procure Request for Quota Single Stage - One E Pending Impl IDA / Q9880 city to strengthen environm Post Limited 2,000.00 0.00 2023-03-05 2023-04-30 2023-10-27 ment of MSD Coordinator tions nvelope ementation ental governance and compl iance MMMD/G/004/2023 / Procure Enhancing Institutional capa Request for Quota Single Stage - One E Pending Impl ment of IT Hardware Equipm IDA / Q9880 city to strengthen environm Post Limited 15,000.00 0.00 2023-04-05 2023-05-31 2023-11-27 tions nvelope ementation ent for MSD ental governance and compl iance MMMD/G/005/2023 / Procure Enhancing Institutional capa Request for Quota Single Stage - One E Pending Impl ment of Laptops for MSD and IDA / 59370 city to strengthen environm Post Limited 12,000.00 0.00 2023-05-03 2023-06-28 2023-12-25 tions nvelope ementation PCU ental governance and compl iance MMMD/G/006/2023 / Procure Project Management, Monito Request for Quota Single Stage - One E Pending Impl IDA / Q9880 Post Limited 54,000.00 0.00 2023-07-05 2023-08-30 2024-02-26 ment of RPA Field Vehicle ring and Evaluation tions nvelope ementation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MMMD/MP/S/01/2018 / Soil F Remediation of Contaminate Request for Quota Single Stage - One E ertility and Agriculture Exten IDA / Q9880 d Hotspots and Improvemen Post Limited 50,000.00 15,544.97 Signed 2018-08-19 2018-10-14 2018-11-28 2019-04-12 tions nvelope sion Programmein Kankoyo, t of Environmental Infrastruc Mufulira ture ZM-MMEWD-88217-NC-RFQ / Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 10,000.00 0.00 Canceled 2019-03-05 2019-04-30 2019-10-27 Website Services ring and Evaluation tions nvelope ZM-MMEWD-109462-NC-RFQ Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 12,000.00 0.00 Canceled 2019-05-20 2019-07-15 2020-01-11 / Website Design for the Proj ring and Evaluation tions nvelope ect ZM-MMEWD-111316-NC-RFB Enhancing Institutional capa Single Stage - One E / Communication and Citizen IDA / Q9880 city to strengthen environm Post Request for Bids Open - National 750,000.00 0.00 Canceled 2019-05-31 2019-06-05 2019-07-17 2019-08-16 2019-09-20 2020-03-18 nvelope Engagement Service Provider ental governance and compl iance ZM-MMEWD-141820-NC-RFQ Project Management, Monito Request for Quota Single Stage - One E IDA / Q9880 Post Limited 20,000.00 0.00 Canceled 2019-12-04 2020-01-29 2020-07-27 / Web site Hosting fees ring and Evaluation tions nvelope MMMD/NC/002/20 / procure Reducing environmental hea ment of Visual communicati IDA / Q9880 lth risks through localized int Prior Direct Selection Direct 73,482.76 0.00 Canceled 2020-05-10 2020-05-15 2020-06-19 2020-12-16 ons (TV) and Radio programs erventions MMMD/NC/004/20 / Bulk Mes Reducing environmental hea Request for Quota Single Stage - One E saging lead poisoning alerts f IDA / Q9880 lth risks through localized int Post Limited 6,896.55 6,050.53 Signed 2020-05-05 2020-07-01 2020-06-30 2021-02-04 2020-12-27 tions nvelope or cell phones erventions Reducing environmental hea MMMD/NC/005/20 / Procure Request for Quota Single Stage - One E IDA / Q9880 lth risks through localized int Post Limited 20,000.00 0.00 Canceled 2020-05-20 2020-07-15 2021-01-11 ment of phyto Remediation tions nvelope erventions MMMD\NC\006\2020 / Provisi Enhancing Institutional capa Request for Quota Single Stage - One E on of all Risk Insurance Cover IDA / Q9880 city to strengthen environm Post Limited 11,000.00 3,576.61 Completed 2020-10-28 2020-10-18 2020-12-23 2020-12-17 2021-06-21 2021-01-26 tions nvelope for Equipments Under MSD a ental governance and compl nd SUB PIUs iance MMMD/NC/001/20 / procure ment of Designing, Develop Project Management, Monito Request for Quota Single Stage - One E Pending Impl IDA / Q9880 Post Limited 30,000.00 0.00 2022-01-05 2022-03-02 2022-08-29 ment and Printing of Educat ring and Evaluation tions nvelope ementation ional and Information Materia ls MMMD/NC/003/20 / Procure Reducing environmental hea Request for Quota Single Stage - One E ment of the services of Prod IDA / Q9880 lth risks through localized int Post Limited 19,310.34 25,841.44 Signed 2020-05-09 2021-07-08 2020-07-04 2021-09-23 2020-12-31 tions nvelope uction ,Airing of Radio lead a erventions wareness Jingles MMMD/NC/001/2022 / Procur Enhancing Institutional capa Pending Impl ement of equipment consum IDA / Q9880 city to strengthen environm Post Direct Selection Direct 45,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 ementation ables and Calibration under ental governance and compl MSD and RPA iance MMMD/NC/002/2023 / Procur Enhancing Institutional capa Open - Internationa Single Stage - One E Under Imple ement of drone pilot training IDA / Q9880 city to strengthen environm Post Request for Bids 210,000.00 0.00 2023-04-28 2023-06-13 2023-05-03 2023-06-13 2023-06-14 2023-07-14 2023-08-18 2024-02-14 l nvelope mentation and software ental governance and compl iance CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MMMD/MP/CS/06/2018 / Dev Enhancing Institutional capa elopment of procedures and city to strengthen environm Consultant Qualifi IDA / Q9880 Post Open - National 150,000.00 201,733.17 Signed 2018-01-30 2018-03-02 2018-02-20 2018-04-05 2018-12-18 2018-05-05 2019-08-15 2018-06-09 2019-08-15 2018-12-06 Training for Honorary Inspect ental governance and compl cation Selection ors of Mines Safety Departm iance ent MMMD/MP/CS/07/2018 / Iden Remediation of Contaminate tification of highly radioactiv d Hotspots and Improvemen Quality And Cost- Open - Internationa Under Implement IDA / Q9880 Prior 250,000.00 0.00 2018-01-15 2018-07-26 2018-02-05 2018-08-30 2018-03-21 2019-01-04 2018-04-18 2018-05-18 2018-06-22 2018-07-27 2019-07-27 ely contaminated sites (Radi t of Environmental Infrastruc Based Selection l ation ation Hotpots) in the Copper ture belt Province Page 3 MMMD/MP/CS/10/2018 / Con Reducing environmental hea ducting a feasibility study for Consultant Qualifi IDA / Q9880 lth risks through localized int Post Open - National 50,000.00 0.00 Canceled 2018-01-30 2018-02-20 2018-11-12 2018-04-05 2018-05-05 2018-06-09 2018-12-06 integrated solid waste mana cation Selection erventions gement in the city of Kitwe MMMD/MP/CS/08/2018 / Ba Remediation of Contaminate Consultant Qualifi mboo feasibility and value ch IDA / Q9880 d Hotspots and Improvemen Post Open - National 150,000.00 195,079.16 Signed 2018-03-12 2018-08-20 2018-04-02 2018-09-04 2018-05-16 2018-12-18 2018-06-15 2019-08-15 2018-07-20 2019-08-15 2019-01-16 cation Selection ain study for specific areas in t of Environmental Infrastruc Chingol a ture MMMD/MP/CS/09/2018 / Soil Remediation of Contaminate Consultant Qualifi fertility and agriculture exten IDA / Q9880 d Hotspots and Improvemen Post Open - National 50,000.00 0.00 Canceled 2018-03-12 2018-04-02 2018-05-12 2018-06-11 2018-07-16 2019-01-12 cation Selection sion program in Kankoyo,Muf t of Environmental Infrastruc ulira ture MMMD/MP/CS/14/2018 / Revi Enhancing Institutional capa Quality And Cost- Open - Internationa ew of mining liabilities and E IDA / Q9880 city to strengthen environm Prior 1,000,000.00 0.00 Canceled 2018-07-16 2019-03-25 2018-08-06 2018-09-19 2018-10-17 2018-11-16 2018-12-21 2019-01-25 2019-07-05 Based Selection l nvironmental Protection Fun ental governance and compl d(EPF) iance MMMD/MP/CS/12/2018 / Engi Remediation of Contaminate neering Design, Preparation d Hotspots and Improvemen Quality And Cost- Open - Internationa of Bidding Documents and Su IDA / Q9880 Prior 350,000.00 0.00 Canceled 2018-06-06 2019-01-04 2018-06-27 2019-02-21 2018-08-10 2018-09-07 2018-10-07 2018-11-11 2018-12-16 2019-12-16 t of Environmental Infrastruc Based Selection l pervision,BOQ and cost estim ture ates for TD10 in Mufulira an d OB54 in Kitwe MMMD/MP/CS/13/2018 / Nati Remediation of Contaminate Quality And Cost- Open - Internationa onal Plan for Prioritisation an IDA / Q9880 d Hotspots and Improvemen Prior 400,000.00 0.00 Canceled 2018-05-22 2019-01-04 2018-06-12 2019-02-21 2018-07-26 2018-08-23 2018-09-22 2018-10-27 2018-12-01 2019-06-01 Based Selection l d Rehabilitation of TDs t of Environmental Infrastruc ture ZM-MMEWD-103033-CS-QCB S / Engineering Design, Prep Reducing environmental hea aration of BOQ, Contract Man Quality And Cost- Open - Internationa IDA / 59370 lth risks through localized int Post 350,000.00 0.00 Canceled 2019-03-28 2019-04-18 2019-06-01 2019-06-29 2019-07-29 2019-09-02 2019-10-07 2020-10-06 agement and Supervision of Based Selection l erventions works of the Rehabilitation of OB 54, TD 10 and additional Tailing Dam (TD0 ZM-MMEWD-103043-CS-QCB Remediation of Contaminate S / National Plan for Prioritiza d Hotspots and Improvemen Quality And Cost- Open - Internationa IDA / 59370 Post 400,000.00 0.00 Canceled 2019-03-28 2019-04-18 2019-06-01 2019-06-29 2019-07-29 2019-09-02 2019-10-07 2020-10-06 tion and Rehabilitation of Mi t of Environmental Infrastruc Based Selection l nes Waste Facilities ture MMMD/MP/CS/11/2018 / EIA Remediation of Contaminate Consultant Qualifi for closure of TD8,TD10 and IDA / Q9880 d Hotspots and Improvemen Post Open - National 200,000.00 750,220.00 Signed 2019-09-27 2019-04-02 2019-10-18 2019-04-02 2019-12-01 2019-05-30 2019-12-31 2019-11-18 2020-02-04 2019-12-19 2020-08-02 cation Selection OB53 and OB54 t of Environmental Infrastruc ture ZM-MMEWD-106563-CS-QCB Reducing environmental hea S / National Plan for Prioritiza Quality And Cost- Open - Internationa IDA / Q9880 lth risks through localized int Post 600,000.00 433,394.67 Signed 2019-04-05 2019-03-27 2019-04-26 2019-03-31 2019-06-09 2019-05-30 2019-07-07 2019-06-27 2019-08-06 2019-07-20 2019-09-10 2019-08-29 2019-10-15 2019-12-28 2020-10-14 tion and Rehabilitation of Mi Based Selection l erventions nes Waste Facilities ZM-MMEWD-107854-CS-QCB S / Review and Development Remediation of Contaminate of Technical and Financial In d Hotspots and Improvemen Quality And Cost- Open - Internationa IDA / Q9880 Post 850,000.00 200,824.93 Signed 2019-04-30 2019-03-27 2019-05-21 2019-03-31 2019-07-04 2019-07-11 2019-08-01 2019-07-03 2019-08-31 2019-07-20 2019-10-05 2019-08-29 2019-11-09 2019-12-19 2020-11-08 struments for Environmental t of Environmental Infrastruc Based Selection l and Social sustainability of ture Mine Sites and Mine Closure Guidelines for Zambia ZM-MMEWD-107856-CS-QCB S / Engineering Design, Prep aration of BOQ, Contract Man Project Management, Monito Quality And Cost- Open - Internationa IDA / Q9880 Post 800,000.00 924,772.55 Signed 2019-04-30 2019-03-27 2019-05-21 2019-03-31 2019-07-04 2019-06-11 2019-08-01 2019-06-27 2019-08-31 2019-07-20 2019-10-05 2019-08-29 2019-11-09 2019-12-19 2020-11-08 agement and Supervision of ring and Evaluation Based Selection l Works of the Rehabilitation o f OB 54, TD 10, and Addition al Tailing Dam (TD) ZM-MMEWD-108508-CS-QCB Enhancing Institutional capa Quality And Cost- Open - Internationa S / Communication and Citize IDA / Q9880 city to strengthen environm Prior 1,500,000.00 0.00 Canceled 2019-05-31 2019-04-10 2019-06-21 2019-08-04 2019-09-01 2019-10-01 2019-11-05 2019-12-10 2020-12-09 Based Selection l n Engagement Consultancy ental governance and compl iance ZM-MMEWD-122362-CS-CQS Project Management, Monito Consultant Qualifi IDA / 59370 Post Open - National 65,000.00 0.00 Canceled 2019-07-26 2019-07-30 2019-08-16 2019-09-29 2019-10-29 2019-12-03 2020-05-31 / Data Management Strategy ring and Evaluation cation Selection ZM-MMEWD-134924-CS-CQS Enhancing Institutional capa Consultant Qualifi / Consultancy for Training of IDA / Q9880 city to strengthen environm Post Open - National 65,000.00 0.00 Canceled 2019-10-31 2019-09-19 2019-11-21 2020-01-04 2020-02-03 2020-03-09 2020-09-05 cation Selection Honorary Inspectors ental governance and compl iance ZM-MMEWD-142216-CS-CQS Remediation of Contaminate Consultant Qualifi / Operations Support Consult IDA / Q9880 d Hotspots and Improvemen Post Open - National 60,000.00 0.00 Canceled 2019-12-31 2020-01-21 2020-03-05 2020-04-04 2020-05-09 2020-11-05 cation Selection ant t of Environmental Infrastruc ture ZM-MMEWD-142218-CS-CQS Reducing environmental hea Consultant Qualifi Open - Internationa / Engineering Design and Env IDA / Q9880 lth risks through localized int Post 200,000.00 0.00 Canceled 2020-01-15 2020-02-05 2020-03-20 2020-04-19 2020-05-24 2020-11-20 cation Selection l ironmental Impact Mining Le erventions gacy Site ZM-MMEWD-141822-CS-QCB Reducing environmental hea Quality And Cost- S / Consultancy for Developin IDA / Q9880 lth risks through localized int Post Open - National 200,000.00 0.00 Canceled 2020-04-30 2020-05-21 2020-07-04 2020-08-01 2020-08-31 2020-10-05 2020-11-09 2021-11-09 Based Selection g Occupation Health Safety ( erventions OHS) MMMD/CS/001/20 / Procure Reducing environmental hea ment of Consultancy services Consultant Qualifi IDA / Q9880 lth risks through localized int Post Open 50,000.00 0.00 Canceled 2020-04-15 2020-04-02 2020-05-06 2020-06-19 2020-07-19 2020-08-23 2021-02-19 for provision of communicati cation Selection erventions ons services across the Proje ct ZM-MMEWD-142214-CS-CQS Project Management, Monito Consultant Qualifi / Communication Consultant IDA / Q9880 Post Open - National 50,000.00 0.00 Canceled 2021-05-31 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 ring and Evaluation cation Selection for Citizen Engagement MMMD\CS\003\2020 / RADIO Reducing environmental hea NUCLDE CHARACTERISATION Consultant Qualifi IDA / Q9880 lth risks through localized int Post Open - National 250,000.00 0.00 Canceled 2021-02-26 2020-10-29 2021-03-19 2020-11-04 2021-05-02 2021-03-04 2021-06-01 2021-07-06 2022-01-02 FOR COMMUNITIES AROUND cation Selection erventions NKANA SLAG DUMP NO. 48 I N KITWE MMMD/CS/001/2013 / Consul Remediation of Contaminate Quality And Cost- Pending Impleme tancy Services for Supervisio IDA / Q9880 d Hotspots and Improvemen Post Open - National 210,000.00 0.00 2023-03-31 2023-04-21 2023-06-04 2023-07-02 2023-08-01 2023-09-05 2023-10-10 2024-10-09 Based Selection ntation n of Works, Rehabilitation an t of Environmental Infrastruc d Closure of TD10 ture P154683/2/2016 / Procurem Enhancing Institutional capa ent of Consultancy Services f city to strengthen environm Quality And Cost- Open - Internationa Under Implement IDA / Q9880 Prior 290,000.00 0.00 2015-12-05 2015-12-26 2016-02-08 2016-03-07 2016-04-06 2016-05-11 2017-05-03 2016-08-01 2017-08-01 or Envirnomental and Social ental governance and compl Based Selection l ation Management Framework iance INDIVIDUAL CONSULTANTS Page 4 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MMMD/MP/CS/01/2018 / Eng Project Management, Monito agement of Project Managem IDA / Q9880 Prior Direct Selection Direct 300,000.00 0.00 Canceled 2018-05-30 2018-06-11 2018-06-09 2018-07-18 2018-08-13 2019-08-13 ring and Evaluation ent Consultant ZM-MMEWD-108506-CS-IND Project Management, Monito Individual Consult IDA / Q9880 Post Limited 15,000.00 14,500.00 Signed 2019-05-31 2019-04-23 2019-06-05 2019-06-10 2019-06-26 2019-06-15 2019-07-31 2019-06-15 2020-01-27 V / Short term media consult ring and Evaluation ant Selection ancy MMMD/CS/002/20 / Procure Project Management, Monito ment of Project Managemen IDA / Q9880 Prior Direct Selection Direct 100,000.00 0.00 Canceled 2020-06-30 2020-06-18 2020-07-10 2020-06-26 2020-09-13 2021-09-13 ring and Evaluation t Consultancy services MMM/CS/004/2020 / Procure Enhancing Institutional capa Individual Consult ment of Civil Engineering Co IDA / Q9880 city to strengthen environm Post Limited 60,000.00 0.00 Canceled 2020-12-30 2021-01-04 2021-01-25 2021-03-01 2021-08-28 ant Selection nsultancy Services ental governance and compl iance MMMD/CS/005/2020 / Consul Project Management, Monito Individual Consult tancy services for Environme IDA / Q9880 Post Limited 60,000.00 0.00 Canceled 2020-12-30 2021-01-30 2021-04-01 2021-05-06 2021-11-02 ring and Evaluation ant Selection ntal Engineer MMMD/CS/006/2020 / Consul Project Management, Monito Individual Consult tancy Services for Project M IDA / Q9880 Post Limited 60,000.00 0.00 Canceled 2021-01-30 2021-02-26 2021-03-19 2021-05-04 2021-10-31 ring and Evaluation ant Selection onitoring and Evaluation MMMD/CS/001/2022 / Procur Reducing environmental hea Individual Consult Pending Impleme ement of a mini RAP for TD1 IDA / Q9880 lth risks through localized int Post Limited 10,000.00 0.00 2022-04-29 2022-05-04 2022-05-25 2022-06-29 2022-12-26 ant Selection ntation 0 erventions Page 5 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya 2019-10-03 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000, IDA / Q9870 Meru County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-MERU COUNTY-160797-C W-RFB / Construction of Ntha Supporting County Communi Single Stage - One E 2021-06-3 IDA / 59000 Post Request for Bids Open - National 1,000,000.00 872,679.74 Signed 2020-03-13 2020-04-01 2020-03-18 2020-04-29 2020-05-12 2020-05-29 2020-09-15 2020-07-03 2020-07-31 rene Banana Market and imp ty-Led Development nvelope 0 rovement of market adjacent roads KE-MERU COUNTY-188858-C W-RFQ / Office refurbishment ; Project Coordination and Ma Request for Quota Single Stage - One E 2020-11-2 IDA / 59000 Post Limited 5,000.00 0.00 Canceled 2020-08-28 2020-10-23 1. Floor Tiling nagement tions nvelope 2 2. Repair of office doors / rei nforcement 3. Painting { walls, ceiling, d oors} KE-MERU COUNTY-234278-C W-RFQ / improvement of spo Request for Quota Strengthening Producer Org rt roads at Kirimba, Gikiri an Request for Quota Single Stage - One E tions - Small Work 2021-10-2 IDA / 59000 anizations and Value Chain Post Limited 140,000.00 0.00 Canceled 2021-05-28 2021-07-23 d Kiamiriru . tions nvelope s (Emergency) SP 1 Development Involving construction of a ro D -Competitive ad crossing ( Box Culvert ) an d road grading. KE-MERU COUNTY-243393-C Strengthening Producer Org Request for Quota Request for Quota Single Stage - One E Pending Imp 2021-11-2 W-RFQ / construction of Box IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 29,000.00 0.00 2021-08-04 2021-08-28 tions nvelope lementation 6 Culvert at Kirimba in Mitungu Development PD) u Ward Request for Quota KE-MERU COUNTY-243397-C Strengthening Producer Org Request for Quota Single Stage - One E tions - Small Work Pending Imp 2021-11-2 W-RFQ / Grading and Graveli IDA / 59000 anizations and Value Chain Post Limited 18,700.00 0.00 2021-08-04 2021-08-28 tions nvelope s (Emergency) SP lementation 6 ng of Gikiriri road spot in Nti Development D -Competitive ma West Request for Quota KE-MERU COUNTY-243399-C Strengthening Producer Org Request for Quota Single Stage - One E tions - Small Work Pending Imp 2021-11-2 W-RFQ / Construction of road IDA / 59000 anizations and Value Chain Post Limited 52,000.00 0.00 2021-08-02 2021-08-26 tions nvelope s (Emergency) SP lementation 4 crossing at Kiamiriru Development D -Competitive KE-MERU COUNTY-265714-C Request for Quota W-RFQ / Construction of Mac Strengthening Producer Org Request for Quota Single Stage - One E tions - Small Work 2022-09-0 adamia Aggregation and Pro IDA / 59000 anizations and Value Chain Post Limited 105,746.35 0.00 Canceled 2022-01-15 2022-03-12 tions nvelope s (Emergency) SP 8 cessing Store for Tigania Mac Development D -Competitive adamia Cooperative society. KE-MERU COUNTY-266919-C W-RFQ / Construction of Irish Request for Quota Potato Collection Centre for Strengthening Producer Org Request for Quota Single Stage - One E tions - Small Work 2022-09-1 marketing, Agroprocessing a IDA / 59000 anizations and Value Chain Post Limited 94,958.93 0.00 Canceled 2022-01-22 2022-03-19 tions nvelope s (Emergency) SP 5 nd Agro Inputs Store for Ntiri Development D -Competitive miti Tumaini Cooperative So ciety. A Narigp funded Prod ucer Organization. KE-MERU COUNTY-293844-C W-RFB / Construction of Irish Potato collection center for m Request for Bids - Strengthening Producer Org arketing, agro processing an Single Stage - One E Small Works SPD Under Imple 2023-03-1 IDA / 59000 anizations and Value Chain Post Request for Bids Open - National 94,958.93 0.00 2022-05-23 2022-06-30 2022-05-28 2023-05-04 2022-07-09 2023-05-04 2022-08-08 2022-08-08 2022-09-12 d agro inputs store for Ntiri nvelope (1 envelope proce mentation 1 Development miti Tumaini coprative societ ss) y. A Narigp funded Producer or ganization. KE-MERU COUNTY-293846-C W-RFB / Construction of Mac National Procure adamia Aggregation and pro Strengthening Producer Org ment Document - Single Stage - One E Under Imple 2023-03-1 cessing store for Tigania Mac IDA / 59000 anizations and Value Chain Post Request for Bids Open - National 1 Envelope proce 105,746.35 0.00 2022-05-23 2022-07-15 2022-05-28 2023-05-10 2022-07-09 2022-08-05 2022-08-08 2022-09-12 2022-09-12 nvelope mentation 1 adamia coperative society. Development ss (Non Bank-SPD This is a Narigp funded Prod ) ucer Organization KE-MERU COUNTY-296705-C W-RFQ / Office renovations; Painting Request for Quota Project Coordination and Ma Request for Quota Single Stage - One E Pending Imp 2022-08-0 Tilling IDA / 59000 Post Limited tions (Non Bank-S 4,350.00 0.00 2022-06-10 2022-07-02 nagement tions nvelope lementation 1 Door/Window reinforcements PD) Ceiling works Roof leakage repairs KE-MERU COUNTY-300285-C Request for Bids - W-RFB / Construction of Bana Strengthening Producer Org Single Stage - One E Small Works SPD Under Imple 2023-04-1 na aggregation store for Nyo IDA / 59000 anizations and Value Chain Post Request for Bids Open - National 127,087.00 0.00 2022-06-22 2022-07-28 2022-06-27 2023-05-04 2022-08-08 2022-08-19 2022-09-07 2022-09-12 2022-10-12 nvelope (1 envelope proce mentation 0 mba ya Athi co- op Society in Development ss) Imenti Sourth Sub County. Request for Bids - KE-MERU COUNTY-314480-C Strengthening Producer Org Single Stage - One E Small Works SPD Under Imple 2023-05-2 W-RFB / construction of potat IDA / 59000 anizations and Value Chain Post Request for Bids Open - National 413,045.77 0.00 2022-09-09 2022-10-12 2022-09-30 2023-05-10 2022-10-21 2022-11-04 2022-11-25 nvelope (1 envelope proce mentation 4 o ambient store in Ntugi, Kibi Development ss) richia ward KE-MERU COUNTY-314489-C Request for Bids - Strengthening Producer Org W-RFB / Construction of Mac Single Stage - One E Small Works SPD Under Imple 2023-05-3 IDA / 59000 anizations and Value Chain Post Request for Bids Open - National 106,198.50 0.00 2022-09-09 2022-10-12 2022-09-30 2023-05-10 2022-10-21 2022-10-25 2022-11-04 2022-07-11 2022-12-02 adamia aggregation Center i nvelope (1 envelope proce mentation 1 Development n Kitheo, Akithi Ward ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MERU COUNTY-138551-G Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Open - National 500,000.00 0.00 Canceled 2019-10-13 2019-10-04 2019-12-08 2020-06-05 O-RFQ / Procurement of moto nagement tions nvelope rcycle Page 1 KE-MERU COUNTY-168215-G Project Coordination and Ma Request for Quota Single Stage - One E O-RFQ / Procurement of IP ba IDA / 59000 Post Limited 63,000.00 63,216.32 Completed 2020-04-24 2021-05-20 2020-05-17 2021-06-15 2020-05-31 2021-07-01 nagement tions nvelope sed audio visual teleconferen ce system KE-MERU COUNTY-168216-G Project Coordination and Ma Request for Quota Single Stage - One E O-RFQ / Network Router & Ne IDA / 59000 Post Limited 10,000.00 0.00 Canceled 2020-04-24 2020-05-17 2020-05-31 nagement tions nvelope twork Firewall KE-MERU COUNTY-168219-G Project Coordination and Ma Request for Quota Single Stage - One E O-RFQ / Movable/adjustable l IDA / 59000 Post Limited 3,000.00 0.00 Canceled 2020-04-24 2020-05-17 2020-05-31 nagement tions nvelope ow back office chairs KE-MERU COUNTY-168218-G Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 8,000.00 7,249.55 Completed 2020-04-24 2021-06-16 2020-05-17 2021-06-24 2020-05-31 2021-07-01 O-RFQ / Laptop Computers nagement tions nvelope KE-MERU COUNTY-188872-G Supporting Community-Driv Request for Quota Single Stage - One E O-RFQ / purchase of Motor cy IDA / 59000 Post Limited 80,000.00 0.00 Canceled 2020-09-12 2020-11-07 2020-12-05 en Development tions nvelope cles for use by field technical support staff KE-MERU COUNTY-206164-G Supporting Community-Driv Request for Quota Single Stage - One E O-RFQ / procurement of 25 N IDA / 59000 Post Limited 5,000.00 4,547.77 Completed 2020-12-22 2021-06-09 2021-01-12 2021-06-24 2021-01-26 2021-07-01 en Development tions nvelope O. Steel filing cabinets KE-MERU COUNTY-138551-G Supporting Community-Driv Request for Quota Single Stage - One E O-RFQ-2 / procurement of fiel IDA / 59000 Post Limited 80,000.00 48,804.36 Completed 2021-03-20 2021-03-02 2021-05-08 2021-05-20 2021-05-11 2021-12-02 en Development tions nvelope d motor bikes KE-MERU COUNTY-225960-G O-RFQ / procurement of Desk Supporting Community-Driv Request for Quota Single Stage - One E top Computers ( 20 NO) IDA / 59000 Post Limited 12,000.00 11,049.72 Completed 2021-04-16 2021-05-21 2021-06-11 2021-06-17 2021-07-02 2021-07-01 en Development tions nvelope procurement of Small Printer s ( 20 No ) for CDDC secretariat KE-MERU COUNTY-225962-G O-RFQ / procurement of table Supporting Community-Driv Request for Quota Single Stage - One E IDA / 59000 Post Limited 2,200.00 0.00 Canceled 2021-04-16 2021-06-11 2021-06-13 s 20No. en Development tions nvelope procurement of chairs 20NO . For CDDC secretariat KE-MERU COUNTY-296649-G O-DIR / Specially designed An droid tablet and smart digital Project Coordination and Ma Under Imple IDA / 59000 Post Direct Selection Direct 13,799.00 0.00 2022-05-31 2022-06-27 2022-06-05 2022-06-28 2022-06-15 2022-06-22 projector with agripreneurs nagement mentation digital platform license pre in stalled in the tablets. 12 kits KE-MERU COUNTY-296676-G Project Coordination and Ma Under Imple IDA / 59000 Post Direct Selection Direct 847.00 0.00 2022-05-30 2022-06-27 2022-06-04 2022-06-27 2022-06-14 2022-06-21 O-DIR / Ruka Device 2 no. nagement mentation KE-MERU COUNTY-296681-G Project Coordination and Ma Under Imple O-DIR / Procurement of 6 No. IDA / 59000 Post Direct Selection Direct 44,348.00 0.00 2022-05-30 2022-06-27 2022-06-04 2022-06-27 2022-06-14 2022-06-21 nagement mentation soil scanner kits KE-MERU COUNTY-296684-G Project Coordination and Ma Request for Quota Single Stage - One E Pending Impl O-RFQ / procurement of asso IDA / 59000 Post Limited 17,000.00 0.00 2022-07-05 2022-07-19 nagement tions nvelope ementation rted furniture and office equi pments KE-MERU COUNTY-300292-G Supporting County Communi Request for Quota Single Stage - One E Under Imple O-RFQ / Procurement of Total IDA / 59000 Post Limited 34,783.00 0.00 2022-07-09 2022-06-14 2022-08-03 2022-09-02 ty-Led Development tions nvelope mentation Station for survey works KE-MERU COUNTY-333417-G O-RFQ / Supply, Delivery, Inst Strengthening Producer Org allation, Commissioning, trai Request for Quota Single Stage - One E IDA / Q9870 anizations and Value Chain Post Limited 92,638.00 0.00 Canceled 2023-01-25 2023-03-18 2023-05-17 ning and testing of avocado tions nvelope Development processing line for Abogeta West Avocado Co-operative S ociety, Meru County KE-MERU COUNTY-362933-G O-RFQ / Supply and Delivery Supporting Community-Driv Request for Quota Single Stage - One E IDA / Q9870 Post Limited 21,770.68 0.00 Canceled 2023-05-29 2023-07-13 2024-01-09 of 20 number desktop compu en Development tions nvelope ters and 20 number printers KE-MERU COUNTY-362937-G O-RFB / Supply, Delivery, Inst Strengthening Producer Org allation, Commissioning, trai Single Stage - One E Under Imple IDA / Q9870 anizations and Value Chain Post Request for Bids Open - National 174,165.46 0.00 2023-05-26 2023-06-27 2023-05-31 2023-06-28 2023-07-12 2023-08-11 2023-09-15 2024-03-13 ning and testing of avocado nvelope mentation Development processing line for Abogeta West Avocado Co-operative S ociety, Meru County KE-MERU COUNTY-364638-G O-RFQ / Supply and delivery Supporting Community-Driv Request for Quota Single Stage - One E Pending Impl IDA / Q9870 Post Limited 10,822.51 0.00 2023-06-09 2023-08-04 2023-12-31 of 10 number desktop compu en Development tions nvelope ementation ters and 10 number printers f or CDDC SACCOs NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MERU COUNTY-317994-N Project Coordination and Ma Under Imple C-DIR / Provision of technolo IDA / 59000 Post Direct Selection Direct - National 17,530.00 0.00 2022-09-30 2022-12-15 2022-10-05 2022-12-14 2022-11-02 2023-01-31 nagement mentation gical services to farmers. KE-MERU COUNTY-302744-N Project Coordination and Ma Pending Impl C-DIR / Provision of technolo IDA / 59000 Post Direct Selection Direct - National 22,689.00 0.00 2022-09-30 2022-10-05 2022-11-02 2023-01-31 nagement ementation gical services to farmers KE-MERU COUNTY-342212-G O-DIR / Provision of M-shamb Project Coordination and Ma Under Imple IDA / Q9870 Post Direct Selection Direct - National 19,033.90 0.00 2023-02-22 2023-03-31 2023-02-27 2023-03-31 2023-04-03 2023-06-30 a licences for market technol nagement mentation ogy and famer sensitization a nd training Page 2 KE-MERU COUNTY-342216-G O-DIR / Procurement of Geos patial mapping system comp rising of farmer database, an Project Coordination and Ma Under Imple alytics dashboard and mobile IDA / Q9870 Post Direct Selection Direct - National 15,864.48 0.00 2023-02-22 2023-03-31 2023-02-27 2023-03-31 2023-04-03 2023-06-30 nagement mentation mapping application. Trainin g manuals development and production, capacity building and farmer mapping targetin g 2000 farmers KE-MERU COUNTY-342214-N C-DIR / Procurement of 8 aut Project Coordination and Ma Pending Impl omated credit scoring syste IDA / Q9870 Post Direct Selection Direct - National 27,235.77 0.00 2023-05-08 2023-05-13 2023-06-17 2023-09-30 nagement ementation m license, set up, installation , configuration of the Automa ted Credit Scoring sytem CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MERU COUNTY-182420-C S-CQS / Training planing and Supporting Community-Driv Consultant Qualifi Under Implement IDA / 59000 Post Open - National 50,000.00 0.00 2020-07-08 2020-10-06 2020-07-29 2020-09-11 2020-10-11 2020-11-15 2021-12-31 development consultancy ser en Development cation Selection ation vice for Banana value chain KE-MERU COUNTY-182422-C S-CQS / Training planning an Supporting Community-Driv Consultant Qualifi Under Implement IDA / 59000 Post Open - National 50,000.00 0.00 2020-07-08 2020-10-06 2020-07-29 2020-09-11 2020-10-11 2020-11-15 2021-12-31 d development consultancy f en Development cation Selection ation or Avocado value chain KE-MERU COUNTY-182425-C S-CQS / Training planning an Supporting Community-Driv Consultant Qualifi Under Implement IDA / 59000 Post Open - National 50,000.00 0.00 2020-07-08 2020-10-06 2020-07-29 2020-09-11 2020-10-11 2020-11-15 2021-12-31 d development of consultanc en Development cation Selection ation y service for Irish potato KE-MERU COUNTY-182429-C S-CQS / Training planning an Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-07-08 2020-10-06 2020-08-17 2020-09-21 2021-12-31 d development of consultanc en Development cation Selection y service for Macademia KE-MERU COUNTY-246772-C S-CQS / Training planning an Supporting Community-Driv Consultant Qualifi Under Implement IDA / 59000 Post Open - National 50,000.00 0.00 2021-08-04 2020-10-06 2021-08-25 2021-10-08 2021-11-07 2021-12-12 2023-12-30 d development of consultanc en Development cation Selection ation y service for Macadamia' INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 PROCUREMENT PLAN Version 1.1 – Date: August 31, 2021 Modernizing the Management of Public Resources in Indonesia MULTI-DONORS TRUST FUND FOR THE PUBLIC FINANCIAL MANAGEMENT AND REVENUE ADMINISTRATION REFORM PROJECT (PFM MDTF-3) A. Project Information: Country: Indonesia Borrower: Government of the Republic of Indonesia (GoI) Project ID: P173429 Financing Agreement TF0B5420 (signed on 18 May 2021) Number: Project Implementation Agency(ies): PMU: PSSU, Secretary General Office, Ministry of Finance (MOF) PIU: DG Budget, DG Treasury, DG Tax, DG Fiscal Balance, Central Transformation Office (CTO), Center of Information and Technology (PUSINTEK), MOF Government Internal Auditor Office (BPKP) Deputy of Development Funding, BAPPENAS DG Regional Finance, MOHA B. Key Dates: 1. Procurement Plan: a. Version 1.0 (for February 27, 2021 negotiation) Bank’s No Objection: March 19, 2021 Period covered by this March 20, 2021 – December 31, version: 2021 b. Version 1.1 this version) August 31, 2021 Bank’s No Objection: September 3, 2021 Period covered by this March 20, 2021 – December 31, version: 2021 c. [next version, if any] [to be updated] (i) General Procurement Notice: a. First Published: [to be updated] b. Revision, if any [to be updated] C. Preamble All Procurement under the Project shall be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers (Fourth Edition, November 2020) (“the Procurement Regulations”), and the provisions of the Procurement Plan and Project Operations Manual and shall take precedence over any national procurement regulations. In accordance with paragraph 5.9 of the Procurement Regulations, the Bank’s online procurement planning and tracking tools i.e. Systematic Tracking and Exchanges in Procurement (STEP) will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. D. Key Provisions The following conditions apply to all procurement activities in this Procurement Plan. The Bank’s procurement prior review thresholds: The identified procurement risk under this Project is ‘Substantial’. Accordingly, all contracts listed in the Procurement Plan that are at or above the thresholds set out below are subject to the Bank’s prior review. All other contracts are subject to the Bank’s ex-post review. Table 1. Applied Prior Review Thresholds Type of procurement Procurement Prior Review Thresholds (US$ millions) Goods, Information Technology and Non- 2 consulting Services Consultants: firms 1 Consultants: individuals 0.3 The Bank’s approved selection methods thresholds: The following selection method thresholds shall apply for procurement of Goods & Information Technology, Non-consulting Services and Consulting Services of each identified activity. Table 2. Applied Approved Selection Method Thresholds Type of Procurement and Approved Selection Method Approved Selection Method Thresholds Based on Market Approach Options (US$ millions) A. Goods, Information Technology (IT) and Non-consulting services For Goods and IT: National International (i) Request for Request for less than $2 at or above $2 Bids (RFB)* (ii) Request for Quotations less than $0.1 N/A (RFQ)** (iii) Direct Selection On exceptional basis if justified as per paragraph 6.8, 6.9 and 6.10 of the Procurement Regulations For Non-consulting National International Services: (i) Request for Request for less than $10 at or above $10 Bids (RFB) (ii) Request for Quotations less than $0.1 N/A (RFQ) (iii) Direct Selection On exceptional basis if justified as per paragraph 6.8, 6.9 and 6.10 of the Procurement Regulations Type of Procurement and Approved Selection Method Approved Selection Method Thresholds Based on Market Approach Options (US$ millions) * RFB method may be also applied for contracts estimated to be more than IDR 200 million (or $0.0015 million equivalent) and less than $0.1 mil equivalent, when use of RFQ method and/or e-catalogue is not justified. **RFQ method shall be applied for contracts estimated to be less than IDR 200 million (or $0.0015 million equivalent) without any option for use of national non-competitive method (i.e. Pengadaan Langsung and Penunjukkan Langsung) and when use of e-catalogue is not justified. B. Consulting Services For Consulting Firms National International (i) Quality Cost Based All, no monetary threshold. Selection (QCBS), Fixed Shortlist of firms for contracts below $0.4 Budget Based Selection million may comprise entirely national (FBS), Least Cost Based firms and therefore PSSU/PIUs may Selection (LCS) and exclusively approach consulting firms from Quality Based Selection the national market through open (QBS)* advertisement to seek their expression of interest. (ii) Consultant’s less than $0.3 N/A Qualifications Based Selection (CQS)** (iii) Direct Selection On exceptional basis if justified as per paragraph 7.13, 7.14 and 7.15 of the Procurement Regulations *These methods (other than CQS) may be also applied for contracts estimated to be more than IDR 100 million (or $0.0010 million equivalent) and less than $0.3 mil equivalent, when use of CQS method is not justified. **CQS method shall be applied for contracts estimated to be less than IDR 100 million (or $0.00075 million equivalent) without any option for use of national non-competitive method (i.e. Pengadaan Langsung and Penunjukkan Langsung). For Individual Consultants National International (i) Open Competitive All, no monetary threshold Selection of Individual Consultants and Limited Competitive Selection of Individual Consultants Type of Procurement and Approved Selection Method Approved Selection Method Thresholds Based on Market Approach Options (US$ millions) (ii) Direct Selection of On exceptional basis if justified as per Individual Consultants paragraph 7.39 of the Procurement Regulations Standard Procurement Documents (SPD): The Bank’s SPD shall be used when approaching the international market (specifically for international competitive procurement and those contracts shall be as specified in the Procurement Plan tables in STEP). Use of National Procurement Procedures: In accordance with paragraphs 5.3 of the Procurement Regulations, when approaching the national market all contracts to be procured through open national competitive procurement will follow the GoI’s procurement regulation. The procedures applicable to the procurement of goods and non-consulting services awarded on the basis of open national competitive procurement shall be those of the Tender method as set forth in the Peraturan Presiden No. 16/2018 and its subsequent amendment Peraturan Presiden No. 12/2021) provided that such arrangements continue to meet requirements set forth under paragraph 5.4 of these Regulations and the following conditions: 1. The procurement is open to eligible firms from any country. There shall not any restriction to the bidders’ participation including mandatory requirement to form in joint venture; 2. Any gaps between National Procurement Procedures and the Procurement Regulations will be addressed and incorporated in the harmonized bidding documents acceptable by the Bank. Use of National e-Procurement System (SPSE): Unless informed otherwise by the Bank in writing, SPSE e-procurement system may be used only for procurement of goods, and non-consultant services under Request for Bids (RFB) method through national open competitive procurement method, applying the harmonized model bidding documents for national open competitive procurement agreed by the Bank. For selection of consultant services through QCBS and CQS methods, only the modified SPSE (termed by LKPP as SPSE-“ICB”) may be used applying the Bank’s Standard Request for Proposal (SRFP) document for QCBS and Modified SRFP document for CQS until such time as the system is further enhanced and streamlined into the next version of the SPSE 4.5. Since at the present time LKPP has not yet developed the modified SPSE for procurement of goods, works and non-consultant services under international open Competitive method, nor for selection of consultants under QBS, LCS, FBS, and individual consultant selection methods, therefore procurement of all contract packages under these methods shall be carried out through non-electronic process with manual issuance of specific procurement notice (request for expression of interest or invitation for bids/proposals and receipt of bids/proposals), until such time that the modified SPSE has been completed by LKPP and assessed by the Bank to be acceptable. If the Bank determines the modified SPSE to be acceptable for use under the above-mentioned remaining procurement methods, the Bank will confirm through the Bank’s written no objection to LKPP and will also notify in writing to PSSU/PIUs. Use of National e-Catalogue System. Based on the Bank’s assessment of the national e-catalogue system, the Bank allows the Project Implementing Units (PIUs) under World Bank financed projects to use the national e- catalogue for procurement of small value of goods in lieu of the Request for Quotations (RFQ) method specified in these Regulations within the parameters as below: a) For Goods (other than medicines) with estimated cost not more than USD 15,000 equivalent per contract. PSSU/PIUs may use the national e-catalogue for procuring such items of goods within the above-specified threshold, if such goods are required under the project and specified in the Procurement Plan approved by the Bank. b) Goods (other than medicines) with estimated cost greater than USD 15,000 but less than USD 100,000 equivalent per contract. PSSU/PIUs may use the national e-catalogue for procuring such items of goods if such goods are required under the project subject to fulfilling the following additional procedural requirement as below: PSSU/PIUs shall carry out a secondary procurement process through mini competition, by comparing the prices of similar goods offered by at least three different suppliers which available in the national e-catalogue and then selecting the Supplier with the lowest evaluated price on the basis of “as delivered" price at final destination (i.e., including inland transportation, insurance, applicable taxes and any other incidental charges for the delivery of the required quantity of goods at final destination). E. Other Relevant Procurement Information • Project Operations Manual (POM) shall set out the operating procedures for procurement and contract implementation matters under the Project written in Bahasa, which shall be consistent with the procedures and rules specified under the Procurement Regulations and this Procurement Plan. In case of any difference of interpretation between the POM and the Procurement Regulations and/or the Procurement Plan, the later shall prevail; • PSSU and all other PIUs may use its own forms of contract for goods and non-consulting services procured under Request for Quotations (RFQ) method acceptable to the Bank, when approaching to the national market; • All contracts shall not be designed as single-year contract, and therefore procurement process shall continue throughout multiple calendar years without limitation of contract period up to end of the GoI’s fiscal year; • Regardless of the Bank’s review requirement (prior or post), the Bank shall review technical aspects of procurement documents and other non- procurement matters (including terms of reference, statement of works, technical specifications, environmental documents, cost estimate, etc.) related to the procurement activity in question prior to initiation of the procurement process of the relevant Activity; • The Bank will continue to provide guidance and support to the PSSU, and all other PIUs for procurement processing through the STEP. • Project Implementation Support Personnel as defined in the PPSD shall not be included in this Procurement Plan. Their selection and hiring procedures shall continue to apply the GoI’s selection and hiring procedures as further defined in the POM. The Procurement Plan is a living document and can be revised if there are any changes during the implementation of the project. The Procurement Plan table below is only prepared for first contract expected to be procured by one of PIU based on the approved activities proposals, PPSD and initial version of the Procurement Plan approved by the World Bank on February 27, 2021. The same table will be updated from time to time in the next Procurement Plan versions. PROCUREMENT Indonesia : The PFM MDTF III Support to Government of Indonesia PLAN General Information Country: Indonesia 2023-05-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173429 GPN Date: Project Name: The PFM MDTF III Support to Government of Indonesia Loan / Credit No: TF / B5420 Financial and Development Supervisory Board (BPKP) Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-BPKP-362850-CS-CQS / B PKP Integrated IT Supervisor Expenditure Policy & Manag Consultant Qualifi Pending Impleme TF / B5420 Post Open - National 52,265.00 0.00 2023-05-22 2023-06-01 2023-06-29 2023-07-06 2023-07-20 2023-09-18 y System Roadmap Impleme ement cation Selection ntation ntation Preparation Consulta nt Services ID-BPKP-362852-CS-CQS / In Expenditure Policy & Manag Consultant Qualifi Pending Impleme TF / B5420 Post Open - National 56,204.00 0.00 2024-01-01 2024-01-15 2024-02-26 2024-03-11 2024-04-02 2024-07-01 ternal Audit Data Catalog Sof ement cation Selection ntation tware ID-BPKP-363093-CS-QCBS / BPKP Integrated IT Superviso Expenditure Policy & Manag Quality And Cost- Pending Impleme ry System: Data Lakehouse TF / B5420 Post Open - National 317,718.00 0.00 2023-07-15 2023-08-05 2023-09-18 2023-10-16 2023-11-15 2023-12-20 2024-01-24 2024-04-23 ement Based Selection ntation Development in Alignment B PKP Data Driven Organizatio n ID-BPKP-363094-CS-CQS / D Expenditure Policy & Manag Consultant Qualifi Pending Impleme evelopment of BPKP HR Com TF / B5420 Post Open - National 100,412.00 0.00 2023-05-23 2023-06-02 2023-06-26 2023-07-01 2023-07-12 2023-12-24 ement cation Selection ntation petency Standard INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulations. Other Conditions: 1. Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other Model Procurement Documents agreed with the Bank) shall be used. 3. Request for Bids (Open-National), if allowed in the Procurement Plan, will be carried out under the Bank’s Procurement Regulations following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and The Public Procurement Rules 2008, as amended in August 2009) using standard/model bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. PROCUREMENT Bangladesh : Safety Net Systems for the Poorest PLAN General Information Country: Bangladesh 2017-02-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132634 GPN Date: Project Name: Safety Net Systems for the Poorest Loan / Credit No: IDA / 52810, IDA / D5910, IDA / 61370 Department of Disaster Management Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DDM-G-4 / (a) MIS Hardware Strengthening of MoDMR Pro & Equipment and (b) License Open - Internationa Single Stage - One E IDA / 52810 gram Administration and Tra Prior Request for Bids 3,205,100.00 2,652,816.20 Signed 2017-05-04 2017-05-04 2017-05-31 2017-06-11 2017-06-21 2017-08-10 2017-09-26 2017-11-06 2017-12-04 2018-02-04 d Database Software with re l nvelope nsparency quired Devices/Infrasturcture G-14 / Procurement of CCTV Strengthening of MoDMR Pro Request for Quota Single Stage - One E Camera with Monitor (16-Ca IDA / 52810 gram Administration and Tra Post Open - National 6,400.00 6,042.33 Signed 2017-08-14 2017-09-06 2017-08-31 2017-08-17 2017-09-14 tions nvelope mara + 1 Monitor) for MoDM nsparency R G-13 / Procurement of PIC M Strengthening of MoDMR Pro aterials (1,000,000 -posters Single Stage - One E IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 189,700.00 138,596.75 Signed 2017-08-31 2017-09-05 2017-12-07 2017-10-05 2017-12-18 2017-10-25 2018-01-28 2017-11-26 2018-02-13 2017-12-26 & 5,000,000- Leaflets/Brochu nvelope nsparency res) for public information ca mpaigning G-11 / Procurement of Lapto Strengthening of MoDMR Pro Single Stage - One E p computers /Note books (15 IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 109,000.00 86,794.81 Signed 2017-09-05 2017-09-10 2017-10-10 2018-01-01 2017-10-30 2018-02-01 2017-12-04 2018-03-06 2018-01-18 nvelope 0 units) for MoDMR & DDM of nsparency ficials and DRROs G-3-LOT-2 / Procurement of Strengthening of MoDMR Pro Single Stage - One E IDA / 52810 Post Request for Bids Open - National 128,200.00 0.00 Canceled 2017-09-18 2019-01-28 2017-10-03 2017-11-04 2017-12-04 2018-01-08 2018-05-08 Micro-buses (2 units) for proj gram Administration and Tra nvelope ect office nsparency G-3-LOT-3 / Procurement of Strengthening of MoDMR Pro Single Stage - One E IDA / 52810 Post Request for Bids Open - National 461,500.00 0.00 Canceled 2017-09-18 2019-01-28 2017-10-03 2017-11-04 2017-12-04 2018-01-08 2018-05-08 SUVs (2 units) for the project gram Administration and Tra nvelope nsparency G-15 / Procurement of PIC m Strengthening of MoDMR Pro aterials (1,000,000-posters & Single Stage - One E Pending Impl IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 161,500.00 0.00 2018-07-01 2018-07-06 2018-08-05 2018-09-04 2018-10-09 2018-11-23 3,000,000-leaflet/brochures) nvelope ementation nsparency for public information campai gning G-2 / Procurement of 495 nu Strengthening of MoDMR Pro Single Stage - One E Under Imple IDA / 52810 Post Request for Bids Open - National 1,250,000.00 0.00 2018-04-15 2018-04-17 2019-01-28 2018-05-17 2018-05-27 2018-06-15 2018-07-15 mber of Motorcycles gram Administration and Tra nvelope mentation nsparency G-7-3 / 2 Nos. Photocopy-cu Strengthening of MoDMR Pro Request for Quota Single Stage - One E IDA / 52810 Post Open - National 5,000.00 2,856.12 Signed 2018-08-05 2018-08-26 2018-08-20 2018-09-25 m Scanner gram Administration and Tra tions nvelope nsparency PACKAGE G-18 / Procuremen Strengthening of MoDMR Pro Request for Quota Single Stage - One E t of DNS ,NTP, and Media ser IDA / 52810 gram Administration and Tra Post Limited 30,000.00 23,105.80 Signed 2018-09-30 2018-10-04 2018-11-02 2018-10-15 2019-01-01 tions nvelope ver for additional MIS hardwa nsparency re G 21 / Cell Phone for the De partment of Disaster Manage Support to MoDMR Safety N Request for Quota Single Stage - One E Pending Impl IDA / 52810 Post Limited 5,960.00 0.00 2018-12-09 2018-12-31 2019-01-30 ment for strengthening of its et Programs tions nvelope ementation communication activities. G24 / LED Television for Mo Strengthening of MoDMR Pro Request for Quota Single Stage - One E IDA / 52810 Post Limited 5,956.00 3,910.01 Signed 2019-02-18 2019-03-25 2019-02-28 2019-04-08 2019-03-07 DMR(NDRCC) gram Administration and Tra tions nvelope nsparency G-22 / Color Photocopier and Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / 52810 Post Limited 5,960.00 0.00 2019-02-25 2019-03-12 2019-03-24 Desktop PC for DDM(One Lot) gram Administration and Tra tions nvelope ementation nsparency G-19 / Establishment of A2I Strengthening of MoDMR Pro Single Stage - One E model Network in the MoDM IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 1,125,000.00 5,703.99 Signed 2019-12-15 2020-12-30 2019-12-20 2021-10-31 2020-01-31 2021-02-03 2020-03-01 2021-05-30 2020-04-05 2021-06-30 2020-10-02 nvelope R and DDM directed by MoD nsparency MR and DDM Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl G-6.3 / Furniture for MoDMR IDA / 52810 Post Limited 6,250.00 0.00 2020-01-25 2020-02-04 2020-03-05 gram Administration and Tra tions nvelope ementation nsparency Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl G- 26 / PA set for MoDMR IDA / 52810 Post Limited 6,250.00 0.00 2020-01-25 2020-02-05 2020-03-06 gram Administration and Tra tions nvelope ementation nsparency G- 27 / Office Equipment for Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / 52810 Post Limited 6,250.00 0.00 2020-02-11 2020-03-04 2020-04-03 MoDMR gram Administration and Tra tions nvelope ementation nsparency G-31A / Advertisement on C Strengthening of MoDMR Pro Pending Impl OVID-19 and its telecasting t IDA / 52810 gram Administration and Tra Post Direct Selection Direct 55,000.00 0.00 2020-03-25 2020-03-26 2020-03-28 2020-07-26 ementation hrough BTV and different pri nsparency vate TV Channels G25 / Air conditioner for Mo Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / 52810 Post Limited 6,000.00 0.00 2020-06-11 2020-06-27 2020-08-26 MDR (NDRCC) and other equi gram Administration and Tra tions nvelope ementation pment nsparency G-32A / Advertisement on Fl Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / 52810 Post Limited 6,000.00 0.00 2020-07-16 2020-07-24 2020-08-23 ood Awareness gram Administration and Tra tions nvelope ementation nsparency G- 28 / Computer, Accessori Strengthening of MoDMR Pro Request for Quota Single Stage - One E Under Imple IDA / 52810 Post Open - National 5,815.48 0.00 2020-11-15 2021-01-10 2021-07-09 es and etc. for DDM gram Administration and Tra tions nvelope mentation nsparency G-6.5A / Furniture for Cox's Strengthening Community R Request for Quota Single Stage - One E Pending Impl IDA / D5910 Post Open - National 11,905.00 0.00 2021-01-15 2021-03-12 2021-09-08 Bazar esilience with EGPP+ tions nvelope ementation G-28A / Computer, Accessori Strengthening Community R Request for Quota Single Stage - One E Pending Impl IDA / D5910 Post Open - National 11,905.00 0.00 2020-12-20 2021-02-14 2021-08-13 es and etc. for Cox's Bazar esilience with EGPP+ tions nvelope ementation Page 1 G-7.4 / Photocopier for Cox's Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / D5910 Post Limited 5,000.00 0.00 2022-10-17 2022-11-12 2022-12-12 Bazar Project Office gram Administration and Tra tions nvelope ementation nsparency G15 / Hiring Sign board/Bill Strengthening of MoDMR Pro Single Stage - One E Pending Impl Board for EGPP+ in the Cox's IDA / D5910 gram Administration and Tra Post Request for Bids Open - National 90,000.00 0.00 2023-02-15 2023-02-20 2023-03-06 2023-03-08 2023-03-23 2023-04-06 nvelope ementation Bazar District nsparency G-30A / Laptop, Accessories Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / D5910 Post Limited 5,000.00 0.00 2023-01-28 2023-02-21 2023-03-13 and etc. for PD Office gram Administration and Tra tions nvelope ementation nsparency G32A / Air Condition for PD Strengthening of MoDMR Pro Request for Quota Single Stage - One E Pending Impl IDA / 61370 Post Limited 5,000.00 0.00 2023-01-30 2023-02-28 2023-03-16 Office gram Administration and Tra tions nvelope ementation nsparency G31A / Interior & Furniture f Strengthening of MoDMR Pro Request for Quota Single Stage - One E Under Imple IDA / 61370 Post Limited 5,000.00 0.00 2023-01-01 2023-02-01 2023-02-15 or Project Office gram Administration and Tra tions nvelope mentation nsparency NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-17A / Procurement of Adv Strengthening of MoDMR Pro Single Stage - One E Under Imple ertisement of the TV Spot, Ra IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 238,150.00 0.00 2018-09-30 2019-01-23 2018-10-01 2019-01-27 2018-10-15 2018-10-29 2018-11-12 2019-05-11 nvelope mentation dio Spot and TV scroll nsparency G-17B / Procurement of Adv Strengthening of MoDMR Pro Single Stage - One E ertisement of the TV Spot, Ra IDA / 52810 gram Administration and Tra Post Request for Bids Open - National 238,000.00 172,172.91 Signed 2019-04-11 2019-04-28 2019-04-18 2019-05-02 2019-05-12 2019-05-16 2019-05-20 2019-06-12 2019-05-30 2019-12-09 nvelope dio Spot and TV scr nsparency SF-12 / Rent a Car (Out Sour Strengthening of MoDMR Pro Single Stage - One E Pending Impl IDA / 61370 Post Request for Bids Open - National 80,000.00 0.00 2022-12-29 2023-01-01 2023-01-15 2023-01-18 2023-01-25 2024-06-30 ce) gram Administration and Tra nvelope ementation nsparency CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SF-4 / Training on Basic IT to Strengthening of MoDMR Pro Fixed Budget Sele IDA / 52810 Post Open - National 79,925.00 67,055.64 Signed 2017-08-01 2017-08-01 2017-08-01 2017-02-20 2017-08-01 2017-03-21 2017-08-01 2017-06-21 2017-08-24 2017-08-24 2017-09-13 2017-10-30 2018-04-11 field officers gram Administration and Tra ction nsparency SF-7 / HR Performance Mana Strengthening of MoDMR Pro Consultant Qualifi IDA / 52810 Post Open - National 102,600.00 94,053.48 Signed 2017-08-22 2017-07-03 2017-09-01 2017-12-07 2017-11-05 2018-08-16 2017-12-05 2018-09-30 2018-01-20 2018-09-30 2019-09-12 gement System for DDM & M gram Administration and Tra cation Selection oDMR nsparency SF-6 / System Maintenance ( Strengthening of MoDMR Pro Fixed Budget Sele Pending Impleme IDA / 52810 Post Open - National 102,600.00 0.00 2018-01-10 2018-01-30 2018-04-05 2018-05-20 2018-06-19 2018-07-23 2018-08-27 2019-12-20 MIS) gram Administration and Tra ction ntation nsparency SF-8A / Implementation Sup Strengthening Community R Quality And Cost- IDA / D5910 Post Open - National 833,333.00 605,614.50 Signed 2021-03-03 2021-04-27 2021-03-24 2021-05-07 2021-06-15 2021-06-04 2021-07-12 2021-07-04 2021-07-17 2021-08-08 2021-07-27 2021-09-12 2021-08-02 2023-09-12 port Firm esilience with EGPP+ Based Selection SF-10A / Third Party Spot Mo Strengthening Community R Quality And Cost- IDA / D5910 Post Open - National 476,190.00 298,606.92 Signed 2021-03-03 2021-03-27 2021-03-24 2021-05-07 2021-06-03 2021-06-04 2021-07-01 2021-07-04 2021-07-11 2021-08-08 2021-07-17 2021-09-12 2021-07-28 2023-09-09 nitoring & Evaluation Firm esilience with EGPP+ Based Selection DDM/SF-3 / SF-3: Training & Support to MoDMR Safety N Quality And Cost- Open - Internationa IDA / 52810 Prior 1,538,500.00 545,731.44 Signed 2016-03-03 2016-03-09 Public Information Campaign et Programs Based Selection l DDM-SF-1 / Management Inf Support to MoDMR Safety N Quality And Cost- Open - Internationa ormation System (Developm IDA / 52810 Prior 5,000,000.00 3,433,811.24 Signed 2015-10-05 2016-04-21 et Programs Based Selection l ent, Implementation, Trainin g) SF-2: Safety Nets Process M Support to MoDMR Safety N Quality And Cost- Open - Internationa onitoring / SF-2: Safety Nets IDA / 52810 Prior 400,000.00 657,666.19 Signed 2016-02-23 2016-02-29 et Programs Based Selection l Process Monitoring (Spot Che cks) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SI-5A / Selection of System E Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Open 47,300.00 0.00 Canceled 2017-12-18 2018-02-08 2018-02-11 2018-03-05 2019-06-30 ngineer for contract package gram Administration and Tra ant Selection # SI-5A nsparency SI-1C / Selection of Procure Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Limited 50,000.00 16,302.42 Signed 2018-04-01 2018-04-03 2018-03-12 2018-04-08 2018-04-12 2018-04-15 2019-06-30 ment Specialist gram Administration and Tra ant Selection nsparency S-2B / Selection of Financial Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Limited 50,000.00 35,593.13 Signed 2018-04-19 2018-04-26 2018-05-14 2018-05-09 2018-05-15 2018-06-03 2019-06-30 Management Specialist gram Administration and Tra ant Selection nsparency SI5A / Selection of System E Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Limited 47,300.00 23,321.50 Signed 2018-07-24 2018-06-14 2018-07-27 2018-06-14 2018-08-03 2018-07-19 2018-08-12 2018-07-19 2019-02-08 ngineer for contract package gram Administration and Tra ant Selection # SI-5A nsparency SI-6B / Selection of Program Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Limited 35,757.00 13,018.00 Signed 2018-12-24 2019-01-02 2018-12-31 2019-01-02 2019-01-13 2019-02-05 2019-01-20 2019-02-05 2019-06-30 Specialist gram Administration and Tra ant Selection nsparency SI-2C / Selection of Financial Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Limited 20,000.00 8,457.81 Signed 2019-01-01 2019-01-31 2019-01-06 2019-01-31 2019-01-13 2019-02-25 2019-01-15 2019-02-25 2019-06-30 Management Specialist gram Administration and Tra ant Selection nsparency S-IC / Selection of Procurem Strengthening of MoDMR Pro Individual Consult Under Implement IDA / 52810 Post Open 107,500.00 0.00 2019-11-28 2020-07-13 2019-12-22 2019-12-27 2020-01-06 2021-01-05 ent Specialist gram Administration and Tra ant Selection ation nsparency SI-7A / Program Specialist (P Strengthening Community R Individual Consult IDA / D5910 Post Open 192,857.00 48,250.46 Signed 2020-12-20 2020-12-02 2021-02-07 2021-07-25 2021-02-28 2021-08-16 2021-04-04 2021-08-17 2021-10-01 ublic Workfare) esilience with EGPP+ ant Selection SI-8A / Program Specialist (C Strengthening Community R Individual Consult IDA / D5910 Post Open 192,857.00 2,919.03 Signed 2020-12-20 2020-12-02 2021-02-07 2021-07-25 2021-02-28 2021-07-27 2021-04-04 2021-08-20 2021-10-01 ommunity Service & Gender) esilience with EGPP+ ant Selection SI-9A / Social and Environme Strengthening Community R Individual Consult IDA / D5910 Post Open 192,857.00 45,925.99 Signed 2020-12-20 2020-11-02 2021-02-07 2021-07-15 2021-02-28 2021-09-05 2021-04-04 2021-09-06 2021-10-01 nt Safeguard Specialist esilience with EGPP+ ant Selection Page 2 SI-2D / Selection of Financial Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Direct 115,000.00 62,672.48 Signed 2021-06-08 2021-06-13 2021-06-13 2021-06-20 2021-06-16 2021-06-29 2021-06-22 2021-06-30 2023-06-30 Management Specialist gram Administration and Tra ant Selection nsparency SI-3A / Selection of Training Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Direct 115,000.00 62,672.48 Signed 2021-06-08 2021-06-13 2021-06-13 2021-06-20 2021-06-16 2021-06-29 2021-06-22 2021-06-30 2023-06-30 and IEC Specialist gram Administration and Tra ant Selection nsparency SI-4A / Selection of Databas Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Direct 115,000.00 62,756.54 Signed 2021-06-08 2021-06-13 2021-06-13 2021-06-23 2021-06-16 2021-06-29 2021-06-22 2021-06-30 2023-06-30 e Management Specialist gram Administration and Tra ant Selection nsparency SI-6C / Selection of Program Strengthening of MoDMR Pro Individual Consult IDA / 52810 Post Direct 115,000.00 62,672.48 Signed 2021-06-08 2021-06-13 2021-06-13 2021-06-20 2021-06-16 2021-06-29 2021-06-22 2021-06-30 2023-06-30 Specialist gram Administration and Tra ant Selection nsparency Strengthening of MoDMR Pro Individual Consult SI-5B / System Engineer IDA / 52810 Post Open 142,000.00 0.00 Under Review 2021-03-15 2021-03-22 2021-05-03 2021-05-24 2021-06-28 2023-07-12 gram Administration and Tra ant Selection nsparency SF-8B / Implementation Sup Strengthening of MoDMR Pro port Firm for Jamalpur, Netro IDA / 61370 gram Administration and Tra Post Direct Selection Direct - National 550,000.00 0.00 Signed 2023-01-26 2023-02-09 2023-01-29 2023-02-15 2023-02-03 2023-06-30 kona, Sunamgonj, Kurigram nsparency and Gaibandha Strengthening of MoDMR Pro Individual Consult Under Implement SI-10 / MIS Specialist IDA / 61370 Post Limited 18,000.00 0.00 2023-02-05 2023-02-07 2023-02-07 2023-02-09 2023-02-12 2023-08-11 gram Administration and Tra ant Selection ation nsparency SI-11 / Procurement and Con Strengthening of MoDMR Pro Individual Consult Under Implement IDA / 52810 Post Limited 14,286.00 0.00 2023-04-30 2023-05-15 2023-05-05 2023-05-26 2023-06-30 2023-12-27 tract Management Associate gram Administration and Tra ant Selection ation nsparency SI-12 / Financial Managemen Strengthening Community R Individual Consult Under Implement IDA / D5910 Post Limited 14,286.00 0.00 2023-04-30 2023-05-28 2023-05-25 2023-06-04 2023-06-14 2023-12-11 t Associate esilience with EGPP+ ant Selection ation Page 3 PROCUREMENT PLAN (Textual Part) Project information: Log - In Georgia Project (P169896) Project Implementation agency: Open Net N(N)LE, Georgia Date of the Procurement Plan: November 11, 2020 Period covered by this Procurement Plan: November 11, 2020 – May 11, 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Law of Georgia on Public Procurement, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: Not Applicable Works: Not Applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable Other Relevant Procurement Information. Not Applicable PROCUREMENT Georgia : Log-In Georgia PLAN General Information Country: Georgia 2020-11-12 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169698 GPN Date: 2020-09-21 Project Name: Log-In Georgia Loan / Credit No: IBRD / 91610 Open Net NNLE Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-OPEN NET-199350-CW-R Increasing access to broadb Open - Internationa Single Stage - One E 2021-06-0 FB / Phase 1 of the passive in IBRD / 91610 Prior Request for Bids 0.00 Canceled 2021-04-01 2021-04-06 2021-04-21 2021-05-05 2021-05-19 and l nvelope 6 frastructure building Request for P GE-OPEN NET-226026-CW-R roposal Desig Increasing access to broadb Request for Propo Single Stage - Two E 2022-02-1 FP / Fiber optic (passive) infr IBRD / 91610 Post Open - National n and Build - 0.00 Canceled 2021-05-01 2021-05-06 2021-06-17 2021-07-29 2021-08-20 and sals nvelope 6 astructure deployment: phas Works SPD (S e1 ingle-stage) Request for B GE-OPEN NET-256405-CW-R ids - Works ( Increasing access to broadb Single Stage - One E 2,028,282.4 2022-10-0 FB / Fiber Optic (passive)infra IBRD / 91610 Post Request for Bids Open - National without preq Signed 2021-10-15 2021-11-05 2021-10-20 2021-11-16 2021-12-01 2021-12-28 2021-12-31 2022-02-08 2022-02-04 2022-03-30 and nvelope 2 2 structure deployment: phase ualification) 1 (Racha) SPD Request for B GE-OPEN NET-256409-CW-R ids - Works ( Increasing access to broadb Single Stage - One E 2,955,888.3 2022-10-0 2023-01 FB / Fiber Optic (passive) Infr IBRD / 91610 Post Request for Bids Open - National without preq Completed 2021-10-15 2021-11-05 2021-10-20 2021-11-16 2021-12-01 2021-12-27 2021-12-31 2022-03-17 2022-02-04 2022-04-18 and nvelope 4 2 -04 astructure deployment: phas ualification) e 1 (Lechkhumi) SPD Request for B GE-OPEN NET-276543-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E 2023-01-2 IBRD / 91610 Post Request for Bids without preq 0.00 Signed 2022-02-07 2022-02-08 2022-02-12 2022-02-14 2022-03-26 2022-03-29 2022-04-25 2022-04-08 2022-05-30 astructure Deployment: Phas and l nvelope 5 ualification) e 1 (Chokhatauri-Samtredia) SPD Request for B GE-OPEN NET-279085-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E 2023-02-0 IBRD / 91610 Post Request for Bids without preq 0.00 Signed 2022-02-16 2022-02-18 2022-02-21 2022-02-23 2022-04-04 2022-04-05 2022-05-04 2022-05-05 2022-06-08 astructure Deployment: Phas and l nvelope 3 ualification) e 1 (Kobuleti-Khelvachauri) SPD Request for B GE-OPEN NET-293188-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E 2023-10-2 IBRD / 91610 Post Request for Bids without preq 0.00 Canceled 2022-11-04 2022-12-28 2022-11-09 2022-12-28 2022-12-21 2023-02-10 2023-01-20 2023-02-24 astructure Deployment: Phas and l nvelope 2 ualification) e 2 (Vartsikhe-Tskaltubo) SPD Request for B GE-OPEN NET-293192-CW-R ids - Works ( Increasing access to broadb Open - Internationa Single Stage - One E 2023-08-0 FB / Fiber Optic (passive) Infr IBRD / 91610 Post Request for Bids without preq 0.00 Signed 2022-08-15 2022-09-27 2022-08-20 2022-09-29 2022-10-01 2022-11-11 2022-10-31 2023-01-04 2022-12-05 and l nvelope 2 astructure Deployment: Phas ualification) e 2 (Mestia) SPD Request for B GE-OPEN NET-300882-CW-R ids - Works ( Increasing access to broadb Single Stage - One E 2023-09-1 FB / Fiber Optic (passive) Infr IBRD / 91610 Post Request for Bids Open - National without preq 0.00 Canceled 2022-09-23 2022-09-28 2022-11-09 2022-12-09 2023-01-13 and nvelope 0 astructure Deployment: Phas ualification) e 2 (Khobi) SPD Request for B GE-OPEN NET-293191-CW-R ids - Works ( Increasing access to broadb Open - Internationa Single Stage - One E 2023-08-2 FB / Fiber Optic (passive) Infr IBRD / 91610 Post Request for Bids without preq 0.00 Canceled 2022-09-02 2022-09-07 2022-10-19 2022-11-18 2022-12-23 and l nvelope 0 astructure Deployment: Phas ualification) e 2 (Zugdidi) SPD Request for B GE-OPEN NET-322291-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Single Stage - One E 2024-01-1 IBRD / 91610 Post Request for Bids Open - National without preq 0.00 Signed 2022-11-10 2022-11-09 2022-11-13 2022-11-09 2022-12-25 2022-12-22 2023-01-14 2023-01-04 2023-02-18 astructure Deployment: phas and nvelope 4 ualification) e 2 (Zugdidi-Khobi) SPD Request for B GE-OPEN NET-293189-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E 2023-10-0 IBRD / 91610 Post Request for Bids without preq 0.00 Canceled 2022-10-14 2022-11-11 2022-10-19 2022-11-11 2022-11-30 2022-12-26 2022-12-30 2023-01-27 2023-02-03 astructure Deployment: Phas and l nvelope 1 ualification) e 2 (Abasha-Senaki) SPD Request for B GE-OPEN NET-343669-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E Under Imple 2024-02-1 IBRD / 91610 Post Request for Bids without preq 0.00 2023-02-24 2023-03-30 2023-03-01 2023-03-30 2023-04-12 2023-05-17 2023-05-12 2023-06-16 astructure Deployment: Phas and l nvelope mentation 1 ualification) e 2 (Tskaltubo-Vartsikhe-Kho SPD ni) Request for B GE-OPEN NET-353800-CW-R ids - Works ( FB / Fiber Optic (passive) Infr Increasing access to broadb Open - Internationa Single Stage - One E Under Imple 2024-06-0 IBRD / 91610 Post Request for Bids without preq 0.00 2023-03-31 2023-04-04 2023-04-05 2023-04-05 2023-05-17 2023-05-22 2023-06-07 2023-07-08 astructure Development: Pha and l nvelope mentation 2 ualification) se 2 (Abasha-Senaki) SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-OPEN NET-225229-GO-DI Increasing access to broadb R / ArcGIS Desktop Standard IBRD / 91610 Post Direct Selection Direct 10,315.00 Completed 2021-03-17 2021-03-23 2021-03-22 2021-03-25 2021-04-05 2021-04-01 2021-06-04 2021-04-17 and Single Use License GE-OPEN NET-200950-GO-R FP / Active Infrastructure for Increasing access to broadb Request for Propo Open - Internationa Single Stage - Two E IBRD / 91610 Prior 0.00 Canceled 2021-04-05 2021-04-10 2021-05-01 2021-06-28 2025-06-30 Open Net program (including and sals l nvelope IP/Transport network build) f or all phases) GE-OPEN NET-293185-GO-R FB / Active Infrastructure for Increasing access to broadb Open - Internationa Single Stage - One E IBRD / 91610 Post Request for Bids 0.00 Signed 2022-05-10 2022-06-20 2022-05-15 2022-06-21 2022-06-26 2022-08-01 2022-07-26 2022-08-29 2022-08-30 2023-05-27 Open Net program (including and l nvelope IP/Transport network build) f or Phase 1 GE-OPEN NET-293187-GO-R FB / Active Infrastructure for Increasing access to broadb Open - Internationa Single Stage - One E Pending Impl Open Net program (including IBRD / 91610 Prior Request for Bids 0.00 2022-11-25 2022-11-30 2023-01-11 2023-02-10 2023-03-17 2025-06-04 and l nvelope ementation IP/Transport network build) f or all phases except phase 1 Page 1 GE-OPEN NET-325920-GO-R Increasing access to broadb Open - Internationa Single Stage - One E Pending Impl FB / DWDM Transport Networ IBRD / 91610 Prior Request for Bids 0.00 2023-06-15 2023-06-20 2023-08-01 2023-08-31 2023-10-05 2025-06-16 and l nvelope ementation k Infrastructure for Open Net Program GE-OPEN NET-361107-GO-R Project implementation supp Request for Quota Single Stage - One E Under Imple IBRD / 91610 Post Open - National 0.00 2023-05-16 2023-06-09 2023-06-27 2023-07-27 FQ / Car for PIE ort tions nvelope mentation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-OPEN NET-200951-CS-FB S / Community needs assess Promoting the use of broadb Fixed Budget Sele IBRD / 91610 Post Open - National 0.00 Canceled 2021-01-31 2021-02-14 2021-03-10 2021-03-24 2021-04-07 2021-04-27 2021-05-17 2021-09-14 ment for 49 settlements (Pilo and-enabled digital services ction t Program in Ozurgeti) GE-OPEN NET-213928-CS-C QS / Community Needs Asses Promoting the use of broadb Consultant Qualifi IBRD / 91610 Post Open - National 18,866.24 Completed 2021-01-31 2021-01-14 2021-02-21 2021-04-29 2021-03-21 2021-06-16 2021-04-04 2021-07-02 2021-05-09 2021-07-09 2021-09-06 2021-12-21 sment for 49 settlements (Pil and-enabled digital services cation Selection ot Program in Ozurgeti) GE-OPEN NET-200253-CS-Q CBS / Creation of SIP ( consul Increasing access to broadb Quality And Cost- Open - Internationa Pending Impleme ting services for developmen IBRD / 91610 Post 0.00 2021-02-01 2021-02-22 2021-04-07 2021-05-05 2021-06-04 2021-07-09 2021-08-13 2022-07-09 and Based Selection l ntation t of regulatory, legal and ope rational aspects of SIP) as we ll as Active Equipment for SIP GE-OPEN NET-205027-CS-QB Increasing access to broadb Quality Based Sel Pending Impleme IBRD / 91610 Post Open - National 0.00 2021-11-01 2021-11-15 2021-12-06 2021-12-20 2021-12-30 2022-01-09 2022-01-29 2022-12-25 S / Business Support System and ection ntation (BSS) GE-OPEN NET-205026-CS-QB S / Operations Support Syste Increasing access to broadb Quality Based Sel Pending Impleme IBRD / 91610 Post Open - National 0.00 2021-11-01 2021-11-15 2021-12-06 2021-12-20 2021-12-30 2022-01-09 2022-01-29 2022-12-25 m (OSS), Network Analyzer, and ection ntation Optical measurment tools, ET C GE-OPEN NET-274966-CS-LC S / Engineer Consultancy Ser Increasing access to broadb Least Cost Selecti Open - Internationa IBRD / 91610 Post 0.00 Signed 2022-01-25 2022-02-03 2022-02-15 2022-02-17 2022-03-31 2022-03-17 2022-04-28 2022-03-30 2022-05-28 2022-04-08 2022-07-02 2022-04-14 2022-08-06 2023-03-04 vices for Civil Works of Fiber and on l Optic infrastructure rollout (L echkhumi and Racha) GE-OPEN NET-200242-CS-Q Promoting the use of broadb Quality And Cost- CBS / Community needs asse IBRD / 91610 Post Open - National 0.00 Canceled 2021-05-01 2021-05-11 2021-05-28 2021-06-07 2021-06-17 2021-07-07 2021-07-27 2024-06-01 and-enabled digital services Based Selection ssment for 1012 settlements GE-OPEN NET-199358-CS-FB S / Advisory services for inve Increasing access to broadb Fixed Budget Sele Open - Internationa stment attraction for internat IBRD / 91610 Post 0.00 Canceled 2021-02-01 2021-02-22 2021-03-29 2021-04-26 2021-05-26 2021-06-11 2021-07-16 2022-04-12 and ction l ional connectivity (including t he digital hub and regional d ata center in Georgia) GE-OPEN NET-250479-CS-C Increasing access to broadb Consultant Qualifi QS / Introduction of Universal IBRD / 91610 Post Open - National 0.00 Canceled 2021-08-26 2021-08-31 2021-09-16 2021-09-28 2021-10-30 2021-11-29 2022-01-03 2022-06-22 and cation Selection Service Obligation in Georgia GE-OPEN NET-296200-CS-LC S / Engineer Consultancy Ser Increasing access to broadb Least Cost Selecti Open - Internationa vices for Civil Works of Fiber IBRD / 91610 Post 0.00 Signed 2022-05-23 2022-05-30 2022-06-13 2022-06-03 2022-07-27 2022-06-28 2022-08-24 2022-07-12 2022-09-23 2022-07-15 2022-10-28 2022-07-22 2022-12-02 2023-07-30 and on l Optic infrastructure rollout (S amtredia-Chokhatauri and Ko buleti-Khelvachauri) GE-OPEN NET-300878-CS-C Promoting the use of broadb Consultant Qualifi IBRD / 91610 Post Open - National 0.00 Signed 2022-06-23 2022-06-29 2022-07-14 2022-08-27 2022-10-31 2022-09-26 2023-01-26 2022-10-31 2023-03-30 QS / Digital Inclusion Progra and-enabled digital services cation Selection m GE-OPEN NET-321796-CS-C Increasing access to broadb Consultant Qualifi Open - Internationa Pending Impleme QS / Feasibility Study for Last IBRD / 91610 Post 0.00 2022-12-05 2022-12-26 2023-02-08 2023-03-10 2023-04-14 2023-10-11 and cation Selection l ntation -mile Connectivity GE-OPEN NET-321798-CS-C Promoting the use of broadb Consultant Qualifi Open - Internationa QS / Communication Strateg IBRD / 91610 Post 0.00 Canceled 2022-12-05 2022-12-26 2023-02-08 2023-03-10 2023-04-14 2025-12-19 and-enabled digital services cation Selection l y Development and Impleme ntation GE-OPEN NET-343663-CS-LC S / Engineer Consultancy Ser Increasing access to broadb Least Cost Selecti Open - Internationa Under Implement vices for Civil Works of Fiber IBRD / 91610 Post 0.00 2023-02-20 2023-03-02 2023-03-13 2023-03-02 2023-04-26 2023-03-31 2023-05-24 2023-06-23 2023-07-28 2023-09-01 2024-06-27 and on l ation Optic infrastructure rollout ( Mestia and Zugdidi-Khobi) GE-OPEN NET-344803-CS-Q Promoting the use of broadb Quality And Cost- Open - Internationa Under Implement CBS / Communication Campa IBRD / 91610 Post 0.00 2023-03-06 2023-03-06 2023-03-27 2023-05-18 2023-04-13 2023-05-04 2023-05-14 2023-06-07 2023-06-28 2024-06-27 and-enabled digital services Based Selection l ation ign Development and Imple mentation GE-OPEN NET-346946-CS-LC Promoting the use of broadb Least Cost Selecti Under Implement IBRD / 91610 Post Open - National 0.00 2023-03-07 2023-03-13 2023-03-21 2023-03-29 2023-04-04 2023-04-20 2023-04-18 2023-04-28 2023-05-19 2023-06-02 2023-08-01 S / Annual Audit and-enabled digital services on ation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-OPEN NET-199359-CS-IN DV / Legal updates to suppor Increasing access to broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-10-24 2021-11-12 2021-11-26 2021-12-16 2022-05-15 t development of advanced c and ant Selection onnectivity services (e.g. 5G) GE-OPEN NET-199366-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 6,157.79 Completed 2021-01-22 2021-05-17 2021-02-10 2021-08-16 2021-02-24 2021-08-16 2021-03-16 2021-08-21 2022-03-11 2022-02-25 DV / Digital Ambassador and-enabled digital services ant Selection GE-OPEN NET-199373-CS-IN Project implementation supp Individual Consult IBRD / 91610 Post Open 16,331.47 Signed 2020-10-21 2020-10-21 2020-11-09 2020-12-14 2020-11-23 2020-12-18 2020-12-13 2020-12-23 2026-01-01 DV / Procurement Specialist f ort ant Selection or PIE Page 2 GE-OPEN NET-199374-CS-IN Project implementation supp Individual Consult DV / Environmental and Soci IBRD / 91610 Post Open 16,331.47 Signed 2020-10-21 2020-10-21 2020-11-09 2020-12-14 2020-11-23 2020-12-22 2020-12-13 2020-12-27 2026-01-01 ort ant Selection al specialist for PIE GE-OPEN NET-199363-CS-IN DV / Consultancy services for Synchronization of existing El Increasing access to broadb Individual Consult IBRD / 91610 Post Open 23,600.00 Terminated 2021-01-31 2021-05-27 2021-02-19 2021-09-02 2021-03-05 2021-09-02 2021-03-25 2021-10-11 2021-09-21 ectromagnetic emission (EMF and ant Selection ) framework with EU, conside ring wireless broadband netw ork deployment (5G) GE-OPEN NET-198838-CS-IN Increasing access to broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-17 2021-01-14 2021-03-07 2021-03-28 2021-05-02 2021-08-30 DV / HLD Consultant service and ant Selection GE-OPEN NET-199365-CS-IN Promoting the use of broadb Individual Consult DV / Digital Adoption Progra IBRD / 91610 Post Open 21,167.42 Completed 2020-10-30 2021-05-17 2020-11-18 2021-08-24 2020-12-02 2021-08-24 2020-12-22 2021-09-05 2021-12-17 2022-09-07 and-enabled digital services ant Selection m Coordinator GE-OPEN NET-230383-CS-IN Increasing access to broadb Individual Consult IBRD / 91610 Post Open 106,200.00 Terminated 2021-04-22 2021-01-14 2021-06-10 2021-03-02 2021-07-01 2021-03-05 2021-08-05 2021-03-10 2022-03-03 DV / HLD Consultant service f and ant Selection or PIU GE-OPEN NET-199356-CS-IN Increasing access to broadb Individual Consult DV / Legal updates to promot IBRD / 91610 Post Open 0.00 Canceled 2020-11-01 2020-11-20 2020-12-04 2020-12-24 2021-02-22 and ant Selection e universal telecom services GE-OPEN NET-199371-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2020-11-20 2022-03-30 2020-12-09 2020-12-23 2021-01-12 2021-06-11 DV / Inclusion program desig and-enabled digital services ant Selection n GE-OPEN NET-199372-CS-IN Promoting the use of broadb Individual Consult Pending Impleme DV / Communications, citizen IBRD / 91610 Post Open 0.00 2020-10-30 2020-11-18 2020-12-02 2020-12-22 2021-02-20 and-enabled digital services ant Selection ntation engagement specialist GE-OPEN NET-245468-CS-CD Project implementation supp IBRD / 91610 Post Direct Selection Direct 2,874.40 Completed 2021-07-26 2021-07-26 2021-08-05 2021-07-29 2021-10-02 2021-07-31 2021-12-01 2021-10-01 S / FIDIC Contract Consultant ort GE-OPEN NET-259949-CS-IN Increasing access to broadb Individual Consult DV / HLD Consultant: active IBRD / 91610 Post Open 0.00 Canceled 2021-11-22 2021-11-09 2022-01-10 2022-01-31 2022-03-07 2022-09-03 and ant Selection part of broadband network GE-OPEN NET-272609-CS-IN Increasing access to broadb Individual Consult DV / HLD Consultant: active IBRD / 91610 Post Open 0.00 Completed 2022-01-12 2022-01-12 2022-02-21 2022-02-08 2022-03-14 2022-02-18 2022-04-18 2022-06-17 2022-08-15 and ant Selection part of broadband network GE-OPEN NET-199354-CS-IN Project implementation supp Individual Consult DV / Field Supervision of Civil IBRD / 91610 Post Open 0.00 Canceled 2021-03-28 2021-04-23 2021-05-07 2021-05-24 2022-02-18 ort ant Selection Works (2 people) for 1 phase GE-OPEN NET-203069-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-22 2021-02-10 2021-02-24 2021-03-16 2022-03-11 DV / Digital Ambassador and-enabled digital services ant Selection GE-OPEN NET-199367-CS-IN DV / Trainers/community mo Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-22 2021-02-10 2021-02-24 2021-03-16 2022-03-11 bilizers for 5 sectors (Includin and-enabled digital services ant Selection g for persons with disabilities and ethnic minorities) GE-OPEN NET-199355-CS-IN DV / Development of legal an Increasing access to broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2020-11-01 2021-11-12 2020-11-23 2020-12-07 2020-12-27 2021-09-23 d technical framework for bro and ant Selection adband cost reduction GE-OPEN NET-203066-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-22 2021-02-10 2021-02-24 2021-03-16 2022-03-11 DV / Digital Ambassador and-enabled digital services ant Selection GE-OPEN NET-203067-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-22 2021-02-10 2021-02-24 2021-03-16 2022-03-11 DV / Digital Ambassador and-enabled digital services ant Selection GE-OPEN NET-203068-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-01-22 2021-02-10 2021-02-24 2021-03-16 2022-03-11 DV / Digital Ambassador and-enabled digital services ant Selection GE-OPEN NET-199362-CS-IN DV / Consultancy services for Increasing access to broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2020-10-30 2020-11-18 2020-12-02 2020-12-22 2021-06-20 Cybersecurity at broadband and ant Selection wireless networks (5G) GE-OPEN NET-199360-CS-IN DV / Legal updates to suppor Increasing access to broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-10-24 2021-11-12 2021-11-26 2021-12-16 2022-05-15 t development of advanced c and ant Selection onnectivity services (e.g. 5G) GE-OPEN NET-200252-CS-IN Increasing access to broadb Individual Consult DV / Consultance services for IBRD / 91610 Post Open 0.00 Canceled 2020-11-01 2020-11-20 2020-12-04 2020-12-24 2021-06-22 and ant Selection Small cell regulation/framew ork GE-OPEN NET-199357-CS-IN Increasing access to broadb Individual Consult DV / Development of investm IBRD / 91610 Post Open 0.00 Canceled 2021-09-26 2021-10-15 2021-10-29 2021-11-18 2022-02-16 and ant Selection ent guide for connectivity inf rastructure GE-OPEN NET-199364-CS-IN Promoting the use of broadb Individual Consult IBRD / 91610 Post Open 0.00 Canceled 2021-06-30 2021-07-19 2021-08-02 2021-08-22 2022-02-18 DV / Development of e-comm and-enabled digital services ant Selection erce GE-OPEN NET-306999-CS-IN Project implementation supp Individual Consult Open - Internationa Under Implement IBRD / 91610 Post 0.00 2022-08-01 2022-08-03 2022-09-19 2022-10-10 2022-11-14 2023-11-14 DV / Procurement Advisor ort ant Selection l ation GE-OPEN NET-325912-CS-IN Increasing access to broadb Individual Consult Open - Internationa Under Implement IBRD / 91610 Post 0.00 2022-11-14 2022-11-14 2022-12-15 2022-12-29 2023-01-19 2023-04-19 DV / OSS-BSS Consultancy and ant Selection l ation GE-OPEN NET-368607-CS-IN Increasing access to broadb Individual Consult Open - Internationa Under Implement IBRD / 91610 Post 0.00 2023-06-27 2023-06-23 2023-08-15 2023-09-05 2023-10-10 2024-01-08 DV / GIS Online Portal Develo and ant Selection l ation pment Page 3 PREPARATION ACTIVITIES FOR BIOCARBON FUND INITIATIVES FOR SUSTAINABLE FOREST LANDSCAPES (BIOCF ISFL) PROJECT No. TF OA7246 And TF OA7244 Procurement Plan Version No.: 2 Date: May, 16 2019 I. General Information 1. Project information: a. Country: Indonesia b. Recipient: Republic of Indonesia c. Project Name: Bio Carbon Fund ISFL , Jambi Province d. Project Executing Agency (PEA): Directorate for Mitigation of Climate Change under the Directorate General of Climate Change 2. Bank’s No Objection Date of the Procurement Plan: a. Original : July 25, 2018 b. Version 2 : May, 16, 2019 c. Version … : … 3. Date of General Procurement Notice: … 4. Period covered by this procurement plan: Feb 1, 2019 – Dec 31, 2019 II. Types of Contract, Bank’s Review Requirements and Applied Methods A. Works, Goods and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Ref. Procureme Bank’s Review Procurement Method No. nt Method Requirement 1. Shopping for Goods (RFQ) <$100k Threshold Post Review 2. Individual Consultant N/A < $0,3 million , Post (Competitive Selection ) Review , except for Procurement Specialist and Financial Management Specialist (Prior Review) 1. Pre-qualification: Not applicable. 2. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 3. Reference to (if any) Project Operational/Procurement Manual: Perpres 16/2018 from GOI and Procurement Guidelines World Bank 4. Any Other Special Procurement Arrangements: -N/A- 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descripti Estimat Packag Domesti Revie Commen No. on ed es c w ts Cost Prefere by (US$ nce Bank million) (yes/no) (Prior / Post) 1. Summary 0.098 2 Yes Post of the NCB (Goods) B. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to prior review by Bank as stated in Appendix 1 to the Guidelines for Selection and Employment of Consultants: Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement 1. Individual Competitive Selection by None, except for Consultant comparing at least three Procurement Specialist CVs and Financial Management Specialist. 2. Short list comprising entirely of national consultants: Short list of consultants for services (individual Consultant), estimated to cost less than $ 28,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: N/A 4. Summary of Consultancy Assignments with Selection Methods and Time Schedule during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 4 5 6 7 Ref Description Estimat Packag Revie Commen . of ed es/Posit w ts No. Assignments Cost ions by (US$ Bank million) (Prior / Post) 1. Summary of 0,20 13 Post Individual number of consultant individual to consultant conduct contracts that research, will be let Deputy under Coordinat competitive or and selection Supportin g Staff 2. Summary of 0,028 2 Prior Procurem number of ent individual Specialist consultant and contracts that Financial will be let Managem under ent competitive Specialist selection PROCUREMENT Indonesia : ID: Jambi Sustainable Landscape Management Project (J-SLMP) PLAN General Information Country: Indonesia 2022-06-14 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166672 GPN Date: 2021-06-24 Project Name: ID: Jambi Sustainable Landscape Management Project (J-SLMP) Loan / Credit No: TF / B3897, TF / B3999, TF / A7244, TF / B3998 Dinas Tanaman Pangan, Hortikultura dan Peternakan Provinsi Jambi Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-DTPHP-296123-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E Under Imple TF / B3897 Post Limited 7,271.00 0.00 2022-08-01 2022-09-19 2022-08-01 2022-08-01 Purchase Of Office Electronic and Management tions nvelope mentation Equipment 001/9000070/PP-DTPHP/202 Implementing Sustainable L Request for Quota Single Stage - One E 2 / Procurement Of Fertilizer TF / B3897 Post Limited 8,611.43 8,049.75 Completed 2022-03-09 2022-05-15 2022-03-22 2022-03-23 2022-03-30 2022-04-21 and Management tions nvelope Processing Machines 002/9000071/PP-DTPHP/202 Implementing Sustainable L Request for Quota Single Stage - One E TF / B3897 Post Limited 5,804.00 0.00 Canceled 2022-04-04 2022-04-14 2022-06-12 2 / Purchase Of Paddy Seeds and Management tions nvelope 003/9000072/PP-DTPHP/202 Implementing Sustainable L 2 / Procurement of Organic F TF / B3897 Post Direct Selection Direct 1,446.42 0.00 Canceled 2022-01-01 2022-01-01 2022-01-31 2022-02-07 and Management ertilizer (Kabupaten Bungo) 004/9000073/PP-DTPHP/202 Implementing Sustainable L 2 / Procurement of Organic F TF / B3897 Post Direct Selection Direct 1,500.00 1,401.54 Completed 2022-01-01 2022-06-14 2022-01-01 2022-01-17 2022-01-31 2022-02-01 2022-02-07 2022-02-03 and Management ertilizer (Kabupaten Merangi n) ID-DTPHP-302736-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E Procurement of seeds, fertiliz TF / B3897 Post Limited 14,210.00 11,094.23 Completed 2022-07-15 2022-07-23 2022-09-09 2022-07-28 2023-03-08 2022-08-05 and Management tions nvelope ers and pesticides 002B/9000071/PP-DTPHP/20 Implementing Sustainable L TF / B3999 Post Direct Selection Direct - National 5,804.00 5,297.49 Completed 2022-03-01 2022-06-14 2022-03-06 2022-04-07 2022-04-10 2022-04-15 2022-10-07 2022-06-09 22 / Purchase of Paddy Seeds and Management ID-DTPHP-354933-GO-RFQ / Procurement package for agr Implementing Sustainable L Request for Quota Single Stage - One E Pending Impl TF / A7244 Post Limited 13,100.00 0.00 2023-04-12 2023-05-20 2023-06-09 icultural equipment ( hoes, w and Management tions nvelope ementation heelbarrows, agricultural ma chinery, shovels ) ID-DTPHP-354936-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E Pending Impl TF / B3998 Post Limited 17,600.00 0.00 2023-04-13 2023-04-23 2023-05-03 tricycle and Management tions nvelope ementation ID-DTPHP-354937-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E TF / B3998 Post Limited 6,175.00 0.00 Canceled 2023-04-13 2023-04-25 2023-05-10 Rice seeds and Management tions nvelope ID-DTPHP-354999-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E TF / B3998 Post Limited 3,135.00 0.00 Canceled 2023-04-13 2023-04-23 2023-05-23 urea fertilizer and Management tions nvelope ID-DTPHP-355002-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E TF / B3998 Post Limited 40,760.00 0.00 Canceled 2023-04-13 2023-04-23 2023-05-23 organic fertiliser and Management tions nvelope ID-DTPHP-355017-GO-RFQ / Implementing Sustainable L Request for Quota Single Stage - One E TF / B3998 Post Limited 2,009.00 0.00 Canceled 2023-04-13 2023-04-23 2023-05-23 tents, tables, chairs, baskets, and Management tions nvelope rickshaws, ID-DTPHP-355027-GO-RFQ / em4, galangal ginger, tricode Implementing Sustainable L Request for Quota Single Stage - One E Pending Impl TF / B3998 Post Limited 632.00 0.00 2023-04-13 2023-04-23 2023-05-23 rma, paralon pipe urea, brow and Management tions nvelope ementation n sugar, gunny sacks, ID-DTPHP-355030-GO-RFQ / Implementing Sustainable L Pending Impl T-shirts, sacks, harvest baske TF / B3998 Post Direct Selection Direct - National 3,045.00 0.00 2023-04-10 2023-04-13 2023-04-20 2023-05-20 and Management ementation ts, tarpaulins, wheelbarrows ID-DTPHP-355060-GO-DIR / Procurement for technical gui Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 154.00 0.00 2023-04-10 2023-04-13 2023-04-20 2023-04-23 dance training such as fertiliz and Management ementation ers, pesticides, and gloves ID-DTPHP-355077-GO-DIR / Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 1,601.00 0.00 2023-04-10 2023-04-13 2023-04-20 2023-04-23 battle dress and Management ementation ID-DTPHP-355080-GO-DIR / r Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 4,434.00 0.00 2023-04-10 2023-04-13 2023-04-20 2023-05-20 ice, onions, chilies and Management ementation ID-DTPHP-355084-GO-DIR / Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 311.00 0.00 2023-04-10 2023-04-13 2023-04-20 2023-05-20 work clothes and Management ementation ID-DTPHP-357310-GO-DIR / t Project Management and Mo Pending Impl TF / B3998 Post Direct Selection Direct - National 2,009.00 0.00 2023-04-18 2023-04-21 2023-04-28 2023-05-08 ents, tables , chairs, baskets, nitoring and Evaluation ementation rickshaws ID-DTPHP-357311-GO-DIR / Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 40,760.00 0.00 2023-04-18 2023-04-21 2023-04-25 2023-05-05 organic fertiliser and Management ementation ID-DTPHP-357312-GO-DIR / Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 3,135.00 0.00 2023-04-18 2023-04-21 2023-04-28 2023-05-08 Urea fertilizer and Management ementation ID-DTPHP-357315-GO-DIR / Implementing Sustainable L Pending Impl TF / B3998 Post Direct Selection Direct - National 6,175.00 0.00 2023-04-18 2023-04-21 2023-04-28 2023-08-06 Rice seeds and Management ementation Page 1 ID-DTPHP-361692-GO-DIR / Implementing Sustainable L Pending Impl Purchase of agricultural prod TF / B3998 Post Direct Selection Direct - National 1,193.00 0.00 2023-05-15 2023-05-18 2023-05-25 2023-05-31 and Management ementation ucts for Bungo district . ID-DTPHP-361698-GO-DIR / Implementing Sustainable L Pending Impl purchase of agricultural prod TF / B3998 Post Direct Selection Direct - National 1,193.00 0.00 2023-05-15 2023-05-18 2023-05-25 2023-05-31 and Management ementation ucts for Sarolangun district. ID-DTPHP-361699-GO-DIR / Implementing Sustainable L Pending Impl purchase of agricultural prod TF / B3998 Post Direct Selection Direct - National 540.00 0.00 2023-05-15 2023-05-18 2023-05-25 2023-05-31 and Management ementation ucts for Merangin district, NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN (Textual Part) 1. Project Information Country: Rwanda 2. Project Name: Access to Finance for Recovery and Resilience Project (AIFRR) 3. Project ID: P175273 4. Project Implementation Agency: Business Development Fund 5. Date of the Procurement Plan: July 27, 2021 6. Period Covered by this procurement plan: August 2021 – Feb 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Rwanda Public Procurement Law (Law No. 12 of 2007), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. None PROCUREMENT Rwanda : Access to Finance for Recovery and Resilience Project PLAN General Information Country: Rwanda 2021-07-29 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175273 GPN Date: Project Name: Access to Finance for Recovery and Resilience Project Loan / Credit No: IDA / 69260, TF / B5809 Business Development Fund Ltd Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-327506-GO-RFB / P Component 3 – Institutional Single Stage - One E Pending Impl urchase of Server and IT net TF / B5809 Strengthening and Impleme Post Request for Bids Open - National 0.00 2023-03-05 2023-03-10 2023-04-21 2023-05-21 2023-06-25 2023-09-24 nvelope ementation work infrastructure ntation Support NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-245720-CS-QCBS / Recruitment of consultancy fi Component 3 – Institutional Quality And Cost- rm to conduct an extended s IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-07-30 2021-12-07 2021-08-20 2022-03-28 2021-09-24 2021-10-22 2021-11-12 2021-12-17 2022-01-21 2022-03-22 Based Selection urvey on PFI satisfaction and ntation Support develop a satisfaction index RW-BDF-245816-CS-QCBS / Recruitment of Consultancy f Component 3 – Institutional Quality And Cost- Under Implement irm to conduct needs assess IDA / 69260 Strengthening and Impleme Post Open - National 0.00 2021-08-05 2022-03-02 2021-08-26 2022-03-28 2021-09-30 2022-04-28 2021-10-28 2021-11-18 2021-12-23 2022-01-20 2022-04-10 Based Selection ation ment and development of co ntation Support mprehensive capacity buildin g program RW-BDF-245823-CS-QCBS / Component 3 – Institutional Recruitment of a consultancy Quality And Cost- Under Implement IDA / 69260 Strengthening and Impleme Post Open - National 0.00 2021-08-05 2022-03-02 2021-08-26 2022-06-24 2021-09-30 2021-10-28 2021-11-18 2021-12-23 2022-01-20 2022-04-20 firm for Expansion of BDS d Based Selection ation ntation Support elivery mechanism RW-BDF-327468-CS-QCBS / Recruitment of a Consulting f Component 3 – Institutional irm to conduct a feasibility st Quality And Cost- Under Implement TF / B5809 Strengthening and Impleme Post Open - National 0.00 2022-12-05 2023-03-29 2022-12-26 2023-04-26 2023-02-08 2023-03-08 2023-04-07 2023-05-12 2023-06-16 2024-06-15 udy of Implementing a Busin Based Selection ation ntation Support ess Development Fund -BDF- Integrated Management Infor mation System -MIS- RW-BDF-327520-CS-QCBS / Component 3 – Institutional Quality And Cost- Pending Impleme Acquisition of digital paymen TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-05-02 2023-05-23 2023-07-06 2023-08-03 2023-09-02 2023-10-07 2023-11-11 2024-11-10 Based Selection ntation t channels ntation Support RW-BDF-245805-CS-QCBS / Component 3 – Institutional Quality And Cost- Pending Impleme Procurement of an Integrated TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-03-05 2023-03-26 2023-04-30 2023-05-28 2023-05-30 2023-07-04 2023-08-01 2024-07-31 Based Selection ntation MIS&M&E System ntation Support RW-BDF-295933-CS-QCBS / Component 3 – Institutional Quality And Cost- Acquisition of an M&E Syste IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2022-05-24 2022-06-20 2022-06-14 2022-07-28 2022-08-25 2022-09-24 2022-10-29 2022-12-03 2023-12-03 Based Selection m for BDF ntation Support RW-BDF-245820-CS-QCBS / Component 3 – Institutional Recruitment of Consultancy f Quality And Cost- IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-08-05 2021-08-26 2021-09-11 2021-10-09 2021-11-08 2021-12-13 2022-01-17 2023-01-17 irm to develop and implemen Based Selection ntation Support t training modules and manu als RW-BDF-245811-CS-QCBS / Recruitment of a consultancy Component 3 – Institutional Quality And Cost- firm to provide a technical su IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-08-05 2021-08-26 2021-09-11 2021-10-09 2021-10-11 2021-11-15 2021-12-13 2021-12-17 Based Selection pport in service delivery, pro ntation Support cess review and improvemen t INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-245658-CS-INDV / R Component 3 – Institutional ecruitment of an expert to un Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-07-30 2021-09-08 2021-09-22 2021-10-20 2021-12-19 dertake guarantee product re ant Selection ntation Support view (model, procedures, pri cing structure, etc…) RW-BDF-245814-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant for Bridge Lending IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-10-05 2021-11-02 2022-05-01 ant Selection Window Product developmen ntation Support t, product prototype test, pro duct launch RW-BDF-245824-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of E&S specialists IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation (2) ntation Support Page 1 Component 3 – Institutional RW-BDF-245826-CS-INDV / R Individual Consult Under Implement IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ecruitment of Project Officer ant Selection ation ntation Support RW-BDF-245829-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Financial mana IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation gement specialist ntation Support RW-BDF-245832-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Procurement s IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation pecialist ntation Support RW-BDF-245834-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Bridge Lending IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-13 2021-10-11 2026-10-10 ant Selection ation Window coordinator ntation Support RW-BDF-274516-CS-INDV / I nternational expert to undert Component 2 – Risk Sharing Individual Consult IDA / 69260 Post Open 0.00 Signed 2022-01-24 2022-02-28 2022-03-14 2022-08-12 2022-04-04 2022-08-24 2022-05-09 2022-11-05 ake guarantee product revie Facility ant Selection w (model, procedures, pricin g structure, etc.…) RW-BDF-274816-CS-INDV / I nternational expert to undert Component 2 – Risk Sharing Individual Consult IDA / 69260 Post Open 0.00 Canceled 2022-01-24 2022-03-14 2022-04-04 2022-05-09 2022-11-05 ake guarantee product revie Facility ant Selection w (model, procedures, pricin g structure, etc.…) RW-BDF-295943-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant to analyse BDF bus IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2022-05-24 2022-06-10 2022-07-12 2022-08-02 2022-09-06 2023-03-05 ant Selection iness, to review technical req ntation Support uirement and develop ToRs f or BDF integrated MIS RW-BDF-290330-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant to conduct an exte IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2022-04-13 2022-05-16 2022-06-06 2022-07-11 2022-10-09 ant Selection nded survey on PFI satisfacti ntation Support on and develop a satisfaction index RW-BDF-245802-CS-INDV / R Component 3 – Institutional ecruitment of a Legal and fin Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-09-15 2021-10-13 2021-11-27 ance expert to review MOU ( ant Selection ntation Support Partial Credit guarantee agre ements with PFIs) RW-BDF-245821-CS-INDV / R Component 3 – Institutional ecruitment of an Individual C Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-10-05 2021-11-02 2026-11-01 onsultant for provision of Bus ant Selection ntation Support iness Development Services RW-BDF-360862-CS-INDV / C Component 3 – Institutional Individual Consult Under Implement USTOMER RELATIONSHIP MA TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-06-04 2023-05-24 2023-07-23 2023-08-13 2023-09-17 2025-09-16 ant Selection ation NAGER ntation Support Page 2 PROCUREMENT PLAN - Textual Part Project information: Sint Maarten Emergency Recovery Project (P167339) Project Implementation Agency: NRPB Date of the Procurement Plan: April 29, 2021 Period covered by this Procurement Plan: From April 2021 to March 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: Shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the National Procurement Legislation such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The Bank’s Anti- Corruption Guidelines and Sanctions Framework shall be incorporated into the national bidding documents by adding a page entitled “Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework”. 2. Contracts with an appropriate allocation of responsibilities, risks, and liabilities between the Borrower and the contractors/suppliers/consultants. 3. Rights for the Bank to review procurement documentation and activities. In accordance with the Procurement Regulations, each bidding document and contract shall include provisions stating the Bank's policy to sanction firms or individuals, found to have engaged in fraud and/or corruption as defined in the Procurement Regulations. In accordance with the Procurement Regulations, each bidding document and contract financed out of the proceeds of the Financing Agreement shall provide that bidders, suppliers, contractors and their subcontractors, agents, personnel, consultants, service providers, or suppliers shall permit the Bank to inspect all accounts, records and other documents relating to the bid submission and performance of the contract and to have said accounts and records audited by auditors appointed by the Bank. Acts intended to materially impede the exercise of the Bank's inspection and audit rights provided for in the Procurement Regulations constitute an obstructive practice as defined in the Regulations. 4. No bids shall be rejected solely because they fall below or exceed the estimated cost. All bids (including in the case when less than two bids are received) shall not be rejected, the procurement process shall not be cancelled, and new bids shall not be solicited without the Bank's prior written concurrence. The Bidding Documents template to be used under “national open competitive procurement arrangements” are subject to prior written concurrence by the Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: not applicable Works: not applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. Procurement in Situations of Urgent Need of Assistance or Capacity Constraints. PROCUREMENT PLAN Goods Notification Activity Draft Signed Review Procurement Evaluation of Intention Reference No. / In-Process Component Contract Contract Type Category Options of Award Description: Planned Planned Planned Restoring a community SX-NRPB- learning and 205571-GO-DIR / No cultural Post Goods Direct 2021/01/30 2021/02/13 2021/03/06 ICT Equipment environment, Project Management Consulting Services Draft Signed Negotiated Activity Contract Market Contract Reference No. In-Process Component Review Type Category Approach / Description: Planned Planned SX-NRPB- Restoring a 205590-CS- community CDS / ESS8 Consultant No learning and Post Direct 2021/03/26 2021/04/30 Cultural Services cultural Heritage environment Consultants SX-NRPB- 205594-CS- Rebuilding safe Consultant CDS / School No Prior Direct 2021/04/10 2021/05/15 schools Services and Library designs Individual Consultants Terms of Expression Signed Activity Reference of Interest Contract Reference In- Review Market Component Category No. / Process Type Approach Description: Planned Planned Planned SX-NRPB- 205589-CS- INDV / Consultant No Project Management Post Open 2021/03/04 2021/03/25 2021/06/24 MECYS Services Project Manager SX-NRPB- 205575-CS- Restoring a community INDV / learning and cultural Consultant Technical No Post Open 2021/01/04 2021/01/25 2021/04/26 environment,Project Services Assistant Management Project Engineer SX-NRPB- Restoring a community 205576-CS- learning and cultural Consultant INDV / No Post Open 2021/02/04 2021/02/25 2021/05/27 environment,Project Services Safeguards Management Specialist SX-NRPB- 205592-CS- Restoring a community INDV / Needs Consultant No learning and cultural Post Open 2021/02/04 2021/02/25 2021/05/27 Assessment Services environment for Inclusive Education SX-NRPB- 205415-CS- INDV / FRLP: Local Consultant to Restoring a community work on learning and cultural strategy and Consultant No environment,Strengthening Post Open 2021/01/04 2021/01/18 2021/04/19 Framework Services the Ministry’s Management for SXM Information System Cultural Heritage and other Learning Services SX-NRPB- 205561-CS- Consultant INDV / No Project Management Post Open 2021/01/04 2021/01/25 2021/04/26 Services Procurement Specialist SX-NRPB- 205593-CS- Strengthening the INDV / Consultant No Ministry’s Management Post Open 2021/03/01 2021/03/22 2021/06/21 Development Services Information System MIS framework PROCUREMENT St Maarten : Sint Maarten Emergency Recovery Project I PLAN General Information Country: St Maarten 2018-09-05 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167339 GPN Date: Project Name: Sint Maarten Emergency Recovery Project I Loan / Credit No: TF / A8079, TF / B5199 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SX-NRPB-156576-CW-RFB / P Housing Repair and Public B Open - Internationa Single Stage - One E 2020-12-1 ublic Building Repairs: Educa TF / A8079 uildings Repair and Reconstr Prior Request for Bids 5,000,000.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 l nvelope 9 tion Facilities uction SX-NRPB-165115-CW-RFB / Housing Repair and Public B Single Stage - One E 2,418,911.5 2021-01-1 TF / A8079 Post Request for Bids Limited 1,000,000.00 Completed 2020-03-25 2020-04-16 2020-03-30 2020-04-16 2020-05-11 2020-05-07 2020-06-10 2020-06-01 2020-07-15 2020-07-10 Rehabilitation of Shelters uildings Repair and Reconstr nvelope 4 1 uction SX-NRPB-181992-CW-RFB / P Housing Repair and Public B Single Stage - One E 1,946,600.0 2021-05-0 TF / A8079 Prior Request for Bids Limited 1,500,000.00 Signed 2020-07-14 2020-08-10 2020-07-19 2020-11-03 2020-08-30 2020-09-11 2020-09-29 2020-11-12 2020-11-03 2021-01-19 riority School Repairs uildings Repair and Reconstr nvelope 0 2 uction SX-NRPB-183349-CW-RFQ / Housing Repair and Public B Request for Quota Single Stage - One E 2021-03-0 SMHDF roof repairs, for retro TF / A8079 uildings Repair and Reconstr Post Limited 236,367.00 236,367.00 Signed 2020-07-13 2020-07-07 2020-09-07 2020-07-08 tions nvelope 6 active finance uction SX-NRPB-202289-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E 7,151,533.0 2021-08-2 Batch 2: Schools and F&A Bui TF / A8079 uildings Repair and Reconstr Post Request for Bids 4,750,000.00 Signed 2020-11-09 2021-04-27 2020-11-14 2021-05-10 2020-12-26 2021-07-06 2021-01-25 2021-10-01 2021-03-01 2021-12-21 l nvelope 0 8 lding Repairs uction SX-NRPB-202300-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E 5,471,564.0 2021-09-0 TF / A8079 Post Request for Bids 6,500,000.00 Signed 2020-11-16 2021-04-01 2020-11-21 2021-04-08 2021-01-02 2021-05-24 2021-02-01 2021-09-17 2021-03-08 2021-12-21 SMHDF Repairs Phase 2 uildings Repair and Reconstr l nvelope 0 4 uction SX-NRPB-202314-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E 2021-10-3 TF / A8079 Post Request for Bids 5,000,000.00 0.00 Canceled 2021-01-11 2021-08-31 2021-01-16 2021-08-31 2021-02-27 2021-11-09 2021-03-29 2022-01-14 2021-05-03 Batch 3: School Repairs uildings Repair and Reconstr l nvelope 0 uction Emergency measures for the SX-NRPB-202332-CW-RFB / Open - Internationa Single Stage - One E 3,779,342.0 2021-12-1 TF / A8079 recovery of disaster first res Post Request for Bids 5,000,000.00 Signed 2021-03-01 2021-08-23 2021-03-06 2021-08-23 2021-04-17 2021-10-05 2021-05-17 2021-11-05 2021-06-21 2022-01-11 GEBE Trenching Batch 1 l nvelope 0 8 ponders and preparedness f acilities SX-NRPB-208747-CW-DIR / Housing Repair and Public B 2021-07-1 Minor Repair Works to Home TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 27,772.18 28,065.55 Completed 2020-12-09 2020-12-01 2020-12-14 2020-12-01 2021-01-18 2021-01-07 7 s: Aluminum System uction Request for Bids - SX-NRPB-202315-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2022-12-1 TF / A8079 Post Request for Bids 4,500,000.00 0.00 2022-03-01 2022-03-06 2022-04-17 2022-05-17 2022-06-21 Expansion of the EOC Buildin uildings Repair and Reconstr l nvelope (1 envelope proce lementation 8 g uction ss) National Procure SX-NRPB-275606-CW-RFB / Housing Repair and Public B Single Stage - One E ment Document - 2023-02-1 Single Family Home Repairs TF / A8079 uildings Repair and Reconstr Post Request for Bids Open - National 3,000,000.00 0.00 Signed 2022-05-01 2022-06-15 2022-05-06 2022-06-16 2022-06-17 2022-08-10 2022-07-17 2022-09-28 2022-08-21 nvelope 1 Envelope proce 7 PHASE 3 uction ss (Non Bank-SPD ) Request for Bids - Emergency measures for the SX-NRPB-202333-CW-RFB / Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2022-12-1 TF / A8079 recovery of disaster first res Post Request for Bids 5,000,000.00 0.00 2022-03-01 2022-03-06 2022-04-17 2022-05-17 2022-06-21 GEBE Trenching Batch 2 l nvelope (1 envelope proce lementation 8 ponders and preparedness f ss) acilities National Procure SX-NRPB-278379-CW-RFB / P Housing Repair and Public B ment Document - rocurement of Repair and Re Open - Internationa Single Stage - One E 2022-12-0 TF / A8079 uildings Repair and Reconstr Post Request for Bids 1 Envelope proce 5,000,000.00 0.00 Signed 2022-02-14 2022-03-10 2022-02-19 2022-03-10 2022-04-02 2022-05-27 2022-05-02 2022-08-05 2022-06-06 habilitation Works for 13 SXM l nvelope 3 uction ss (Non Bank-SPD schools - relaunch ) Request for Quota SX-NRPB-278660-CW-DIR / Housing Repair and Public B 2022-09-2 TF / A8079 Post Direct Selection Direct tions (Non Bank-S 4,000.00 4,100.45 Signed 2022-02-15 2022-01-27 2022-02-20 2022-02-24 2022-03-27 2022-03-15 MAC High I.T Classroom Relo uildings Repair and Reconstr 3 PD) cation uction Request for Quota AN-NRPB-93655-CW-RFQ / M Housing Repair and Public B Request for Quota Single Stage - One E Under Imple 2020-01-2 TF / A8079 Post Open - National tions (Non Bank-S 500,000.00 0.00 2019-06-06 2019-08-01 inor Repairs to 26 Homes uildings Repair and Reconstr tions nvelope mentation 8 PD) uction Request for Quota AN-NRPB-93655A-CW-RFQ / Housing Repair and Public B Request for Quota Single Stage - One E 2021-01-2 TF / A8079 Post Open - National tions (Non Bank-S 130,000.00 0.00 Signed 2020-06-06 2020-08-01 Minor Repairs to 3 Homes uildings Repair and Reconstr tions nvelope 8 PD) uction Request for Bids - SX-NRPB-357289-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2024-08-1 TF / B5199 Post Request for Bids 4,800,000.00 0.00 2023-04-30 2023-05-05 2023-06-16 2023-07-16 2023-08-20 Renovation of Gyms uildings Repair and Reconstr l nvelope (1 envelope proce lementation 9 uction ss) Request for Bids - SX-NRPB-357290-CW-RFB / Housing Repair and Public B Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2024-08-1 TF / B5199 Post Request for Bids 3,100,000.00 0.00 2023-04-30 2023-05-05 2023-06-16 2023-07-16 2023-08-20 Renovation of Sports facilitie uildings Repair and Reconstr l nvelope (1 envelope proce lementation 9 s uction ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency measures for the SX-NRPB-136740-GO-DIR / Fi TF / A8079 recovery of disaster first res Prior Direct Selection Direct 2,250,000.00 1,938,933.00 Signed 2019-10-01 2020-06-04 2019-10-01 2020-06-18 2019-11-05 2020-02-27 2020-05-03 re Trucks ponders and preparedness f acilities Emergency measures for the SX-NRPB-143339-GO-DIR / S TF / A8079 recovery of disaster first res Prior Direct Selection Direct 15,000.00 15,120.00 Signed 2019-10-29 2020-05-27 2019-11-03 2020-06-15 2019-12-08 2020-01-09 2020-06-05 afety Shoes Fire Department ponders and preparedness f acilities Emergency measures for the SX-NRPB-157539-GO-DIR / D TF / A8079 recovery of disaster first res Post Direct Selection Direct 20,000.00 17,690.00 Signed 2020-02-09 2020-02-04 2020-02-14 2020-03-19 2020-03-20 2020-03-28 2020-09-16 iesel Water Pumps ponders and preparedness f acilities Emergency measures for the SX-NRPB-160723-GO-DIR / A TF / A8079 recovery of disaster first res Post Direct Selection Direct 60,000.00 52,355.72 Signed 2020-02-20 2019-12-11 2020-02-25 2020-03-10 2020-03-31 2020-04-15 2020-09-27 mbulance: Spare Parts ponders and preparedness f acilities SX-NRPB-160730-GO-DIR / F Emergency measures for the D&AD: Additional Radios and TF / A8079 recovery of disaster first res Post Direct Selection Direct 100,000.00 61,381.67 Signed 2020-02-20 2018-06-07 2020-02-25 2020-03-23 2020-03-31 2020-03-24 2020-09-27 Accessories ponders and preparedness f acilities Page 1 Emergency measures for the SX-NRPB-165436-GO-DIR / T TF / A8079 recovery of disaster first res Prior Direct Selection Direct 1,500,000.00 0.00 Canceled 2020-03-19 2020-06-04 2020-03-24 2020-06-18 2020-04-28 2020-10-25 ype II Ambulances ponders and preparedness f acilities Emergency measures for the SX-NRPB-167830-GO-DIR / P TF / A8079 recovery of disaster first res Post Direct Selection Direct 100,000.00 100,213.14 Signed 2020-04-06 2020-03-05 2020-04-06 2020-04-06 2020-05-11 2020-04-22 2020-11-07 roPac Isolation Capsules ponders and preparedness f acilities Emergency measures for the AN-NRPB-76471-GO-RFB / G Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Prior Request for Bids 2,385,000.00 1,645,775.00 Signed 2020-05-18 2020-06-18 2020-05-23 2020-09-14 2020-07-04 2020-09-23 2020-08-03 2020-12-10 2020-09-07 2021-02-12 2021-03-06 eneral Vehicles l nvelope ponders and preparedness f acilities Emergency measures for the SX-NRPB-160728-GO-DIR / F TF / A8079 recovery of disaster first res Post Direct Selection Direct 100,000.00 174,753.00 Signed 2020-02-20 2021-05-10 2020-02-25 2021-02-05 2020-03-31 2021-05-26 2020-09-27 D: Spare Parts ponders and preparedness f acilities Emergency measures for the SX-NRPB-160720-GO-DIR / S TF / A8079 recovery of disaster first res Prior Direct Selection Direct 170,000.00 0.00 Canceled 2020-02-20 2020-02-25 2020-03-31 2020-09-27 ubmersible Water Pumps ponders and preparedness f acilities Emergency measures for the SX-NRPB-185662-GO-RFQ / Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 320,000.00 0.00 Canceled 2020-08-12 2020-10-07 2021-04-05 Crane Trucks (2) tions l nvelope ponders and preparedness f acilities Emergency measures for the SX-NRPB-202313-GO-RFQ / Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 630,000.00 0.00 Canceled 2020-11-20 2021-03-04 2021-01-15 2021-07-14 Command Vehicles tions l nvelope ponders and preparedness f acilities SX-NRPB-213914-GO-DIR / Si Emergency measures for the nt Maarten Fire Service Repai TF / A8079 recovery of disaster first res Post Direct Selection Direct 15,400.00 21,052.00 Signed 2021-01-15 2021-03-11 2021-01-20 2021-02-05 2021-02-24 2021-04-17 2021-08-23 r Parts 2 : Waziri Export ponders and preparedness f acilities SX-NRPB-213915-GO-DIR / Si Emergency measures for the nt Maarten Fire Service Repai TF / A8079 recovery of disaster first res Post Direct Selection Direct 8,800.00 6,603.47 Signed 2021-01-15 2021-03-11 2021-01-20 2021-02-05 2021-02-24 2021-05-07 2021-08-23 r Parts 3: Saint-Martin Cars ponders and preparedness f acilities Emergency measures for the SX-NRPB-216605-GO-RFQ / T Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 90,000.00 0.00 Canceled 2021-02-03 2021-06-28 2021-03-31 2021-09-27 hirty Seater Bus (1) tions l nvelope ponders and preparedness f acilities SX-NRPB-218343-GO-DIR / Si Emergency measures for the nt Maarten Fire Service Repai TF / A8079 recovery of disaster first res Post Direct Selection Direct 27,500.00 28,132.52 Signed 2021-02-09 2021-03-11 2021-02-14 2021-02-08 2021-03-21 2021-04-14 2021-09-17 r Parts Package 4: Motorworl ponders and preparedness f d acilities SX-NRPB-218364-GO-DIR / Si Emergency measures for the nt Maarten Fire Service Repai TF / A8079 recovery of disaster first res Post Direct Selection Direct 3,000.00 2,181.54 Signed 2021-02-09 2021-03-11 2021-02-14 2021-02-08 2021-03-21 2021-04-16 2021-09-17 r Parts package 5: Napa Auto ponders and preparedness f Parts SXM acilities SX-NRPB-220199-GO-DIR / T Emergency measures for the ype II Ambulances: Wheeled TF / A8079 recovery of disaster first res Prior Direct Selection Direct 1,500,000.00 1,146,956.00 Signed 2021-02-18 2021-02-18 2021-02-23 2021-02-18 2021-03-30 2021-03-02 2021-09-26 Coach/ REV Group ponders and preparedness f acilities Emergency measures for the SX-NRPB-216373-GO-RFQ / S Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 215,000.00 0.00 Canceled 2021-02-02 2021-04-12 2021-03-30 2021-09-26 upport Vehicles - Vans tions l nvelope ponders and preparedness f acilities SX-NRPB-221791-GO-DIR / C Emergency measures for the Pending Impl omputer Tablets and Protecti TF / A8079 recovery of disaster first res Post Direct Selection Direct 3,000.00 0.00 2021-02-27 2021-03-04 2021-04-08 2021-10-05 ementation ve Cases: Keijzer Computer S ponders and preparedness f ystems NV acilities Emergency measures for the SX-NRPB-239642-GO-RFQ / Request for Quota Single Stage - One E TF / A8079 recovery of disaster first res Post Limited 215,000.00 124,500.00 Signed 2021-06-22 2021-06-21 2021-08-17 2021-09-17 2022-02-13 Vans II tions nvelope ponders and preparedness f acilities Emergency measures for the SX-NRPB-241317-GO-RFQ / Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 486,500.00 0.00 Canceled 2021-07-02 2021-07-21 2021-08-27 2022-02-23 Command Vehicles II (7) tions l nvelope ponders and preparedness f acilities Emergency measures for the SX-NRPB-241320-GO-RFQ / Request for Quota Open - Internationa Single Stage - One E TF / A8079 recovery of disaster first res Post 142,500.00 0.00 Canceled 2021-07-02 2021-07-15 2021-08-27 2022-02-23 Command Pick-up Trucks (3) tions l nvelope ponders and preparedness f acilities Emergency measures for the SX-NRPB-202345-GO-RFQ / Request for Quota Single Stage - One E TF / A8079 recovery of disaster first res Post Open - National 35,000.00 0.00 Signed 2020-12-06 2021-01-31 2021-07-30 MDS Goods tions nvelope ponders and preparedness f acilities SX-NRPB-202327-GO-RFQ / Emergency measures for the Request for Quota Open - Internationa Single Stage - One E Pending Impl MDS Automatic Weather Stat TF / A8079 recovery of disaster first res Post 350,000.00 0.00 2022-06-06 2022-08-01 2023-01-28 tions l nvelope ementation ions and Tidal Gauges ponders and preparedness f acilities Emergency measures for the SX-NRPB-275366-GO-DIR / Fi TF / A8079 recovery of disaster first res Post Direct Selection Direct 100,000.00 103,361.00 Signed 2022-02-01 2022-01-26 2022-02-06 2022-03-02 2022-03-13 2022-05-12 2022-09-09 re Suits - Viking ponders and preparedness f acilities SX-NRPB-284636-GO-RFB / F Emergency measures for the Open - Internationa Single Stage - One E Under Imple ire and Ambulance Vehicles ( TF / A8079 recovery of disaster first res Post Request for Bids 108,672.00 0.00 2022-03-21 2022-04-26 2022-03-26 2022-04-27 2022-05-07 2022-05-31 2022-06-06 2022-07-08 2022-07-11 2023-01-07 l nvelope mentation 12) ponders and preparedness f acilities Emergency measures for the SX-NRPB-284650-GO-RFB / V Open - Internationa Single Stage - One E Under Imple TF / A8079 recovery of disaster first res Post Request for Bids 200,000.00 0.00 2022-03-21 2022-07-14 2022-03-26 2022-07-19 2022-05-07 2022-10-04 2022-06-06 2022-11-16 2022-07-11 2023-01-07 ROMI Specialty Trucks l nvelope mentation ponders and preparedness f acilities SX-NRPB-288112-GO-DIR / M Emergency measures for the Pending Impl odular classrooms for tempor TF / A8079 recovery of disaster first res Post Direct Selection Direct 90,000.00 0.00 2022-04-05 2022-04-10 2022-05-15 2022-11-11 ementation ary relocation of classrooms ponders and preparedness f under repair acilities SX-NRPB-300150-GO-DIR / A Emergency measures for the mbulance Vehicle Warning Li TF / A8079 recovery of disaster first res Post Direct Selection Direct 4,000.00 0.00 Completed 2022-06-21 2022-07-01 2022-06-26 2022-07-01 2022-07-31 2023-01-27 2022-11-25 ghts & Siren ponders and preparedness f acilities NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-160721-NC-DIR / E Housing Repair and Public B mergency Mold Assessment TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 150,000.00 8,082.00 Signed 2020-02-20 2020-02-21 2020-02-25 2020-02-17 2020-03-31 2020-02-22 2020-09-27 and Remediation Action Plan uction Page 2 SX-NRPB-232003-NC-DIR / R Housing Repair and Public B etroactive Lease Agreement: TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 4,200.00 5,400.00 Signed 2021-04-30 2021-04-09 2021-05-05 2020-12-04 2021-06-09 2021-05-20 2021-12-06 Simpson Bay Community Cen uction ter SX-NRPB-278661-NC-RFQ / Housing Repair and Public B Request for Quota Single Stage - One E Pending Impl TF / A8079 Post Limited 6,000.00 0.00 2022-02-20 2022-04-17 2022-10-14 Dumpster Rental for 16 Scho uildings Repair and Reconstr tions nvelope ementation ols uction SX-NRPB-278700-NC-RFQ / Housing Repair and Public B Request for Quota Single Stage - One E TF / A8079 Post Limited 100,000.00 0.00 Signed 2022-02-20 2022-05-18 2022-04-17 2022-10-14 Moving Company for 16 Scho uildings Repair and Reconstr tions nvelope ols uction SX-NRPB-278672-NC-DIR / S Housing Repair and Public B ecurity Company Services for TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 30,000.00 0.00 Signed 2022-02-15 2022-02-11 2022-02-20 2022-02-23 2022-03-27 2022-09-23 MPC School uction SX-NRPB-278674-NC-RFQ / S Housing Repair and Public B Request for Quota Single Stage - One E torage Space/ Container Rent TF / A8079 uildings Repair and Reconstr Post Limited 130,000.00 57,995.00 Signed 2022-02-20 2022-06-13 2022-04-17 2022-08-10 2022-10-14 tions nvelope al for 16 Schools uction SX-NRPB-300184-NC-DIR / A Emergency measures for the mbulance Department Vehicl TF / A8079 recovery of disaster first res Post Direct Selection Direct 1,800.00 0.00 Completed 2022-06-21 2022-07-01 2022-06-26 2022-06-30 2022-07-31 2023-01-27 2022-12-02 e Branding and Striping ponders and preparedness f acilities SX-NRPB-311317-NC-DIR / M Housing Repair and Public B AC High Art Class Transporta TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct - National 32,000.00 0.00 Signed 2022-08-29 2022-08-19 2022-09-03 2022-08-18 2022-10-08 2023-04-06 tion Services uction Emergency measures for the SX-NRPB-312693-NC-DIR / R TF / A8079 recovery of disaster first res Post Direct Selection Direct - National 10,000.00 0.00 Signed 2022-08-31 2022-08-15 2022-09-05 2022-09-07 2022-10-10 2023-04-08 ental for MAC CSE Art Studio ponders and preparedness f acilities SX-NRPB-328192-NC-DIR / S Housing Repair and Public B Pending Impl chools Moving Services Here TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct - National 70,000.00 0.00 2021-02-25 2021-03-02 2021-04-06 2021-10-03 ementation and There Transport B.V uction SX-NRPB-328180-NC-DIR / A Housing Repair and Public B Pending Impl TF / A8079 Post Direct Selection Direct - National 5,000.00 0.00 2022-06-27 2022-07-02 2022-08-06 2023-02-02 rt Class Rental Silvia Carty uildings Repair and Reconstr ementation uction SX-NRPB-328195-NC-DIR / A Institutional Support for Rec Pending Impl dditional Structural Assessm TF / A8079 Post Direct Selection Direct - National 11,000.00 0.00 2021-02-21 2021-02-26 2021-04-02 2021-09-29 onstruction ementation ent and Design of 3 Schools I .C.E SX-NRPB-328194-NC-DIR / A Institutional Support for Rec Pending Impl dditional Structural Design a TF / A8079 Post Direct Selection Direct - National 2,432.00 0.00 2021-05-25 2021-05-30 2021-07-04 2021-12-31 onstruction ementation nd Assessment 3 Schools Pha se Two I.C.E SX-NRPB-328181-NC-DIR / S Housing Repair and Public B Pending Impl chools Security Services Haw TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct - National 15,038.00 0.00 2021-04-28 2021-05-03 2021-06-07 2021-12-04 ementation keye Security Force uction SX-NRPB-328179-NC-DIR / S Housing Repair and Public B Pending Impl chools Transportation Servic TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct - National 4,500.00 0.00 2022-04-01 2022-04-06 2022-05-11 2022-11-07 ementation es Group Transnational Trans uction port Services SX-NRPB-328183-NC-DIR / Fi Emergency measures for the Pending Impl re Dept. Suit Sizing Camille S TF / A8079 recovery of disaster first res Post Direct Selection Direct - National 1,400.00 0.00 2020-10-09 2020-10-14 2020-11-18 2021-05-17 ementation ewing & Boutique ponders and preparedness f acilities SX-NRPB-328182-NC-DIR / Fi Emergency measures for the Under Imple re Dept. Suit Sizing Camille S TF / A8079 recovery of disaster first res Post Direct Selection Direct - National 2,700.00 0.00 2021-09-15 2020-10-09 2021-09-20 2020-10-09 2021-10-25 2022-04-23 mentation ewing & Boutique ponders and preparedness f acilities SX-NRPB-328191-NC-DIR / H Institutional Support for Rec Pending Impl TF / A8079 Post Direct Selection Direct - National 3,901.00 0.00 2021-06-01 2021-06-06 2021-07-11 2022-01-07 ome Assessment I.C.E house onstruction ementation Nr.8 SX-NRPB-328189-NC-DIR / C Institutional Support for Rec Pending Impl ombining Technical Files for TF / A8079 Post Direct Selection Direct - National 1,578.00 0.00 2021-07-07 2021-07-12 2021-08-16 2022-02-12 onstruction ementation Schools RFB 3 I.C.E SX-NRPB-327303-NC-DIR / P Emergency measures for the erforated Vinyl Sides for Amb TF / B5199 recovery of disaster first res Post Direct Selection Direct - National 500.00 0.00 Completed 2022-11-23 2022-11-17 2022-11-28 2022-12-07 2023-01-02 2023-07-01 2023-01-23 ulances ponders and preparedness f acilities SX-NRPB-347195-NC-RFQ / S Housing Repair and Public B Request for Quota Single Stage - One E Under Imple TF / B5199 Post Open - National 96,140.00 0.00 2023-03-18 2023-05-13 2024-08-13 ecurity Services for 13 Schoo uildings Repair and Reconstr tions nvelope mentation ls uction SX-NRPB-347196-NC-DIR / Tr Housing Repair and Public B Pending Impl TF / B5199 Post Direct Selection Direct - National 66,667.00 0.00 2023-03-13 2023-03-18 2023-04-22 2024-03-31 ansportation Services for 13 uildings Repair and Reconstr ementation Schools uction SX-NRPB-347197-NC-DIR / L Housing Repair and Public B ease Agreement with NIPA fo Pending Impl TF / B5199 uildings Repair and Reconstr Post Direct Selection Direct - National 9,943.19 0.00 2023-03-13 2023-03-18 2023-04-22 2023-07-22 r Kitchen & Restaurant faciliti ementation uction es for Sundial School Student s SX-NRPB-347198-NC-DIR / L Housing Repair and Public B ease Agreement with NIA for Pending Impl TF / B5199 uildings Repair and Reconstr Post Direct Selection Direct - National 5,805.00 0.00 2023-03-13 2023-03-18 2023-04-22 2023-07-22 Dance Studio facilities for Su ementation uction ndial School Students CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-132867-CS-LCS / A Institutional Support for Rec Least Cost Selecti TF / A8079 Prior Open - National 150,000.00 0.00 Canceled 2019-09-05 2019-09-26 2019-11-09 2019-12-07 2020-01-06 2020-02-10 2020-03-16 2020-09-12 udit Services NRPB onstruction on Institutional Support for Rec Least Cost Selecti ERP_C_015 / Audit services TF / A8079 Post Open - National 150,000.00 421,998.00 Signed 2019-09-05 2019-02-13 2019-09-26 2019-09-18 2019-11-09 2019-04-25 2019-12-07 2019-07-11 2020-01-06 2019-07-11 2020-02-10 2019-07-11 2020-03-16 2019-09-29 2020-09-12 onstruction on SX-NRPB-160722-CS-LCS / W Housing Repair and Public B Least Cost Selecti TF / A8079 Post Open - National 25,000.00 59,696.00 Signed 2019-11-06 2020-01-30 2019-11-27 2020-01-10 2020-01-30 2020-02-07 2020-03-25 2020-03-08 2020-03-25 2020-04-12 2020-03-25 2020-05-17 2020-04-24 2020-11-13 orks Verification Audit SMHD uildings Repair and Reconstr on F uction AN-IRC-NRPB-88561-CS-CQS Housing Repair and Public B Consultant Qualifi / SMHDF Technical Assessme TF / A8079 uildings Repair and Reconstr Post Open - National 250,000.00 207,300.00 Completed 2020-10-15 2019-01-03 2020-11-05 2020-11-17 2020-12-19 2019-01-24 2021-01-18 2019-09-27 2021-02-22 2019-10-01 2021-08-21 2020-04-09 cation Selection nt and Design for Phase 2 uction Page 3 AN-IRC-NRPB-109549-CS-QC Housing Repair and Public B Quality And Cost- BS / Technical Assessment Si TF / A8079 uildings Repair and Reconstr Post Open - National 500,000.00 522,461.00 Signed 2020-11-03 2019-07-10 2020-11-24 2021-08-04 2021-01-07 2019-04-22 2021-02-04 2019-04-22 2021-03-06 2019-04-22 2021-04-10 2019-07-11 2021-05-15 2019-07-16 2022-05-15 Based Selection ngle family Home Repairs 2 uction AN-NRPB-76431-CS-CQS / Su pervision Shelter Repairs Mai Institutional Support for Rec Consultant Qualifi n and Recovery Housing Rep TF / A8079 Post Open - National 100,000.00 402,811.88 Signed 2021-05-19 2019-02-11 2021-06-09 2022-03-08 2021-07-23 2019-03-22 2021-08-22 2019-08-12 2021-09-26 2019-08-16 2022-03-25 onstruction cation Selection air and Public Buildings Repai r and Reconstruction SX-NRPB-202330-CS-CQS / E Emergency measures for the Quality And Cost- Open - Internationa Pending Impleme mergency Cell Broadcast Sys TF / A8079 recovery of disaster first res Post 350,000.00 0.00 2022-06-01 2022-06-22 2022-08-05 2022-09-02 2022-10-02 2022-11-06 2022-12-11 2023-12-11 Based Selection l ntation tem ponders and preparedness f acilities SX-NRPB-298818-CS-LCS / N Institutional Support for Rec Least Cost Selecti Open - Internationa TF / A8079 Post 545,000.00 0.00 Signed 2022-06-14 2022-06-29 2022-07-05 2022-08-18 2022-07-05 2022-09-15 2022-08-15 2022-10-15 2022-09-29 2022-11-19 2022-09-29 2022-12-24 2023-06-22 RPB Financial Audit Services onstruction on l SX-NRPB-317497-CS-CQS / S Institutional Support for Rec Consultant Qualifi Open - Internationa TF / B5199 Post 20,000.00 0.00 Canceled 2022-09-23 2022-10-23 2022-11-07 2022-12-09 2023-01-08 2023-03-08 ecurity Assessment onstruction cation Selection l SX-NRPB-338215-CS-QCBS / Emergency measures for the Quality And Cost- Open - Internationa Under Implement Project Management Service TF / B5199 recovery of disaster first res Prior 3,000,000.00 0.00 2023-01-27 2023-04-12 2023-02-17 2023-05-17 2023-04-02 2023-04-30 2023-05-30 2023-07-04 2023-08-08 2024-12-02 Based Selection l ation s for ERP-1 ponders and preparedness f acilities SX-NRPB-352121-CS-CQS / P Housing Repair and Public B Consultant Qualifi Open - Internationa Pending Impleme TF / B5199 Post 150,000.00 0.00 2023-08-06 2023-08-27 2023-10-10 2023-11-09 2023-11-27 2024-11-26 reparation GEBE Investment uildings Repair and Reconstr cation Selection l ntation Plan uction INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-124802-CS-INDV / Institutional Support for Rec Individual Consult PROJECT COORDINATOR– Sin TF / A8079 Post Open 180,000.00 267,983.36 Signed 2019-07-25 2019-07-25 2019-09-12 2019-10-18 2019-10-03 2019-11-25 2019-11-07 2020-05-30 2020-05-05 onstruction ant Selection t Maarten Digital Governmen t Project SX-NRPB-126135-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Prior Open 60,000.00 59,241.98 Signed 2019-08-03 2019-08-07 2019-09-21 2019-11-21 2019-10-12 2020-07-07 2019-11-16 2020-01-17 2020-05-14 Procurement Assistant Consu onstruction ant Selection ltant SX-NRPB-126138-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Prior Open 90,000.00 0.00 Canceled 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 Procurement Specialist Cons onstruction ant Selection ultant SX-NRPB-126137-CS-INDV / Institutional Support for Rec Individual Consult Portfolio and Accounting Offi TF / A8079 Post Open 180,000.00 0.00 Canceled 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 onstruction ant Selection cer for Small Enterprise Reco very Project SX-NRPB-126665-CS-CDS / I Institutional Support for Rec TF / A8079 Post Direct Selection Direct 14,000.00 12,150.00 Signed 2019-08-12 2019-09-01 2019-08-22 2019-08-08 2019-10-26 2019-09-01 2020-04-23 nterim Financial Managemen onstruction t Officer SX-NRPB-127209-CS-CDS / S Institutional Support for Rec TF / A8079 Post Direct Selection Direct 45,000.00 44,000.00 Signed 2019-08-14 2019-08-09 2019-08-24 2019-08-08 2019-10-28 2019-08-16 2020-04-25 takeholder Engagement Hom onstruction e Repairs SX-NRPB-128034-CS-INDV / J Institutional Support for Rec Individual Consult TF / A8079 Post Open 80,000.00 43,436.52 Terminated 2019-08-20 2019-08-23 2019-10-08 2019-10-18 2019-10-29 2019-11-12 2019-12-03 2019-11-16 2020-05-31 unior Communications Consu onstruction ant Selection ltant SX-NRPB-128036-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 40,000.00 27,000.00 Signed 2019-08-19 2019-08-22 2019-10-07 2019-11-19 2019-10-28 2019-11-26 2019-12-02 2019-11-27 2020-05-30 Financial Management Assist onstruction ant Selection ant SX-NRPB-129158-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 80,000.00 61,699.24 Signed 2019-08-26 2019-08-30 2019-10-14 2019-11-13 2019-11-04 2019-11-18 2019-12-09 2019-11-20 2020-06-06 Executive Assistant onstruction ant Selection SX-NRPB-129299-CS-INDV / J Institutional Support for Rec Individual Consult TF / A8079 Post Open 80,000.00 106,076.17 Signed 2019-08-30 2019-08-30 2019-10-18 2019-11-18 2019-11-08 2020-03-30 2019-12-13 2020-05-30 2020-06-10 r Environmental Safeguards onstruction ant Selection Specialist SX-NRPB-134548-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 25,000.00 0.00 Canceled 2019-09-16 2018-12-10 2019-11-04 2019-11-25 2019-12-30 2020-06-27 Communications Specialist onstruction ant Selection SX-NRPB-144180-CS-CDS / D Emergency measures for the esign Fire Department Renov TF / A8079 recovery of disaster first res Post Direct Selection Direct 100,000.00 0.00 Canceled 2019-11-04 2021-05-03 2019-11-04 2020-01-08 2020-07-06 ation and Expansion ponders and preparedness f acilities SX-NRPB-146192-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 150,000.00 0.00 Canceled 2019-12-12 2019-12-12 2020-02-14 2020-03-06 2020-04-10 2020-10-07 Contract Manager onstruction ant Selection SX-NRPB-153308-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 150,000.00 108,000.00 Signed 2020-01-31 2020-01-24 2020-03-20 2020-06-11 2020-04-10 2020-06-24 2020-05-15 2020-06-25 2020-11-11 Project Manager Education Pr onstruction ant Selection oject SX-NRPB-154610-CS-CDS / Institutional Support for Rec Mission Project Manager Digit TF / A8079 Post Direct Selection Direct 8,000.00 7,250.00 Signed 2020-01-20 2020-01-21 2020-01-20 2019-10-18 2020-01-27 2020-01-24 2020-02-17 onstruction al Government SX-NRPB-155761-CS-INDV / Institutional Support for Rec Individual Consult Project Manager Enterprise R TF / A8079 Post Open 150,000.00 0.00 Canceled 2020-01-24 2020-03-13 2020-04-03 2020-05-08 2020-11-04 onstruction ant Selection ecovery Project SX-NRPB-156570-CS-CDS / P Institutional Support for Rec TF / A8079 Post Direct Selection Direct 320,000.00 0.00 Canceled 2020-01-29 2020-01-29 2020-05-03 2020-10-30 rocurement Consultant Servi onstruction ces SX-NRPB-146438-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Prior Open 150,000.00 0.00 Canceled 2019-11-20 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Procurement Specialist Cons onstruction ant Selection ultant 2 SX-NRPB-156572-CS-CDS / P roject Manager ERP-1 Institutional Support for Rec This is a continuation of the c TF / A8079 Post Direct Selection Direct 185,000.00 184,500.00 Signed 2020-01-29 2020-03-10 2020-02-08 2020-03-10 2020-04-13 2020-03-26 2020-10-10 onstruction urrent contract. This contract will go into effect on April 1 - March 31 2021. SX-NRPB-146440-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Limited 50,000.00 57,975.00 Signed 2019-11-22 2019-11-27 2019-11-27 2020-01-20 2020-02-07 2020-03-09 2020-03-13 2020-03-13 2020-09-09 Activity Manager School Rep onstruction ant Selection airs SX-NRPB-159532-CS-CDS / N Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 200,000.00 49,262.46 Signed 2020-02-13 2021-02-02 2020-02-13 2020-02-13 2020-04-17 2020-02-13 2020-10-14 RPB Legal Services onstruction Page 4 SX-NRPB-161524-CS-CDS / A Institutional Support for Rec Pending Impleme TF / A8079 Post Direct Selection Direct 8,000.00 0.00 2020-02-26 2020-03-07 2020-05-11 2020-11-07 irport Benchmark Study onstruction ntation SX-NRPB-165435-CS-CDS / E Institutional Support for Rec TF / A8079 Post Direct Selection Direct 225,000.00 220,500.00 Signed 2020-03-19 2019-07-09 2020-03-29 2020-03-20 2020-06-02 2020-03-21 2020-11-29 ngineer onstruction SX-NRPB-166957-CS-CDS / P Institutional Support for Rec roject Coordinator Digital Go TF / A8079 Post Direct Selection Direct 16,000.00 40,000.00 Signed 2020-03-30 2019-12-01 2020-04-09 2020-04-02 2020-06-13 2020-04-10 2020-12-10 onstruction vernment INTERIM SX-NRPB-168099-CS-CDS / S Institutional Support for Rec TF / A8079 Post Direct Selection Direct 150,000.00 182,550.00 Signed 2020-04-08 2020-07-31 2020-04-18 2020-04-07 2020-06-22 2020-08-17 2020-12-19 ocial Safeguards Specialist onstruction SX-NRPB-168800-CS-CDS / D Institutional Support for Rec TF / A8079 Post Direct Selection Direct 120,000.00 177,000.00 Signed 2020-04-15 2020-04-14 2020-04-25 2020-05-04 2020-06-29 2020-05-05 2020-12-26 esign Rehabilitation of Shelte onstruction rs SX-NRPB-173096-CS-INDV / J Institutional Support for Rec Individual Consult TF / A8079 Post Open 60,000.00 89,982.21 Signed 2020-05-11 2019-10-01 2020-06-29 2020-05-15 2020-07-20 2020-06-19 2020-08-24 2020-06-23 2021-02-20 r Communication Officer 2 onstruction ant Selection SX-NRPB-167363-CS-CDS / Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 30,000.00 63,000.00 Signed 2020-04-02 2021-01-12 2020-04-12 2020-05-08 2020-06-16 2020-05-08 2020-12-13 MP: Procurement Consultant onstruction SX-NRPB-167376-CS-CDS / S Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 30,000.00 223,500.00 Signed 2020-04-02 2020-07-22 2020-04-12 2020-04-02 2020-06-16 2020-04-24 2020-12-13 I: Procurement Consultant onstruction SX-NRPB-186632-CS-CDS / T Housing Repair and Public B wenty Schools and F&A buildi TF / A8079 uildings Repair and Reconstr Prior Direct Selection Direct 820,600.00 790,190.00 Signed 2020-07-30 2020-08-19 2020-08-09 2020-05-19 2020-10-13 2020-09-01 2021-04-11 ng Design Consulting uction SX-NRPB-186392-CS-CDS / A Housing Repair and Public B sbestos Assessment Consulti TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 25,000.00 56,950.00 Signed 2020-07-29 2020-07-29 2020-08-08 2020-08-23 2020-10-12 2020-09-19 2021-04-10 ng Services ROBERTO DAVID uction OVICH SX-NRPB-189349-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 85,000.00 0.00 Canceled 2020-08-18 2019-11-14 2020-10-06 2020-10-27 2020-12-01 2021-05-30 HR Consultant onstruction ant Selection SX-NRPB-189691-CS-CDS / L Emergency measures for the and Negotiation for Link 6 Ro TF / A8079 recovery of disaster first res Prior Direct Selection Direct 50,000.00 0.00 Canceled 2020-08-20 2020-08-28 2020-08-30 2020-09-23 2020-11-03 2021-05-02 ad-Hubert Lopez HISMAR NV ponders and preparedness f acilities SX-NRPB-191068-CS-CDS / S Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 125,000.00 501,550.00 Signed 2020-08-28 2021-04-01 2020-09-07 2020-10-20 2020-11-11 2020-10-26 2021-05-10 GS Procurement Service onstruction SX-NRPB-196201-CS-CDS / F Institutional Support for Rec TF / A8079 Post Direct Selection Direct 30,000.00 0.00 Under Review 2020-09-25 2020-10-05 2020-12-09 2021-06-07 MO Consultant Home Based onstruction SX-NRPB-197284-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 180,000.00 181,250.00 Signed 2020-10-01 2020-12-12 2020-11-19 2020-05-18 2020-12-10 2020-06-01 2021-01-14 2021-01-12 2021-07-13 DL - Contract Manager onstruction ant Selection SX-NRPB-198813-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 150,000.00 0.00 Canceled 2020-10-15 2020-11-19 2020-12-03 2020-12-24 2021-01-28 2021-07-27 AR - Contract Manager onstruction ant Selection SX-NRPB-126986-CS-CDS / C Institutional Support for Rec Pending Impleme TF / A8079 Post Direct Selection Direct 85,690.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 orporate Governance Lawyer onstruction ntation 1 SX-NRPB-126988-CS-CDS / C Institutional Support for Rec Pending Impleme TF / A8079 Post Direct Selection Direct 61,250.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 orporate Governance Legal S onstruction ntation upport 1 SX-NRPB-126989-CS-CDS / C Institutional Support for Rec Pending Impleme TF / A8079 Post Direct Selection Direct 28,500.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 orporate Governance Legal S onstruction ntation upport 2 SX-NRPB-126987-CS-CDS / C Institutional Support for Rec Pending Impleme TF / A8079 Post Direct Selection Direct 79,000.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 orporate Governance Lawyer onstruction ntation 2 SX-NRPB-199448-CS-CDS / C Institutional Support for Rec TF / A8079 Post Direct Selection Direct 23,750.00 23,684.00 Signed 2020-10-13 2020-11-19 2020-10-23 2020-02-06 2020-12-27 2020-10-29 2021-06-25 ontract Manager (DL) Home onstruction Based SX-NRPB-170435-CS-CDS / I Institutional Support for Rec nterim Environmental Safegu TF / A8079 Post Direct Selection Direct 20,000.00 21,720.00 Signed 2020-04-24 2019-09-02 2020-05-04 2019-11-18 2020-07-08 2020-05-08 2021-01-04 onstruction ards Specialist SX-NRPB-201640-CS-CDS / J Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 95,000.00 189,000.00 Signed 2020-10-26 2020-10-29 2020-11-05 2020-10-29 2021-01-09 2021-01-01 2021-07-08 B: Procurement Coordinator onstruction SX-NRPB-201789-CS-INDV / I Institutional Support for Rec Individual Consult Under Implement TF / A8079 Post Limited 25,000.00 0.00 2020-10-27 2020-10-27 2020-11-01 2020-11-22 2020-12-27 2021-06-25 nsurance Consultant onstruction ant Selection ation SX-NRPB-201788-CS-CDS / U Institutional Support for Rec TF / A8079 Post Direct Selection Direct 155,000.00 163,252.75 Signed 2020-10-27 2020-10-21 2020-11-06 2020-09-16 2021-01-10 2020-11-03 2021-07-09 B: Activity Manager Home Re onstruction pairs SX-NRPB-201795-CS-CDS / B Institutional Support for Rec TF / A8079 Post Direct Selection Direct 200,000.00 125,000.00 Signed 2020-10-27 2020-11-24 2020-11-06 2019-11-01 2021-01-10 2020-12-17 2021-07-09 B: ICT Helpdesk onstruction SX-NRPB-205755-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 50,000.00 50,000.00 Signed 2020-11-24 2020-11-20 2021-01-12 2021-03-04 2021-02-02 2021-03-04 2021-03-09 2021-05-20 2021-09-05 Copywriter onstruction ant Selection SX-NRPB-208921-CS-CDS / Institutional Support for Rec Mold Assessment Consultanc TF / A8079 Post Direct Selection Direct 50,000.00 141,910.00 Signed 2020-12-09 2020-12-07 2020-12-19 2020-12-03 2021-02-22 2021-01-15 2021-08-21 onstruction y: Farmer Environmental Gro up SX-NRPB-214549-CS-CDS / J Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 50,000.00 48,000.00 Signed 2021-01-18 2021-01-28 2021-01-28 2021-01-07 2021-04-03 2021-02-10 2021-09-30 A: Procurement Consultant onstruction SX-NRPB-215465-CS-CDS / A Housing Repair and Public B TF / A8079 Post Direct Selection Direct 200,000.00 218,842.20 Signed 2021-01-21 2021-01-20 2021-01-31 2021-01-21 2021-04-06 2021-02-16 2021-10-03 C: Project Manager Infrastruc uildings Repair and Reconstr ture uction SX-NRPB-211337-CS-CDS / E Institutional Support for Rec TF / A8079 Post Direct Selection Direct 350,000.00 0.00 Canceled 2020-12-23 2021-01-02 2021-03-08 2021-09-04 ngineer onstruction SX-NRPB-231555-CS-INDV / J Emergency measures for the Individual Consult unior Environmental Speciali TF / A8079 recovery of disaster first res Post Open 60,000.00 70,200.00 Signed 2021-04-29 2021-05-18 2021-06-17 2021-09-06 2021-07-08 2021-09-30 2021-08-12 2021-10-01 2022-02-08 ant Selection st ponders and preparedness f acilities Page 5 SX-NRPB-232896-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 15,000.00 43,875.00 Signed 2021-05-03 2021-05-06 2021-06-21 2021-08-13 2021-07-12 2021-08-19 2021-08-16 2021-08-28 2022-02-12 HRM Consultant onstruction ant Selection SX-NRPB-236664-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 30,000.00 20,000.00 Signed 2021-05-28 2021-06-08 2021-07-16 2021-08-05 2021-08-06 2021-09-21 2021-09-10 2021-10-30 2022-03-09 Graphic Design Services onstruction ant Selection SX-NRPB-236668-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 30,000.00 35,000.00 Signed 2021-05-28 2021-06-08 2021-07-16 2021-08-05 2021-08-06 2021-09-21 2021-09-10 2021-11-04 2022-03-09 Video Production Services onstruction ant Selection SX-NRPB-236671-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 30,000.00 30,000.00 Signed 2021-05-28 2021-06-08 2021-07-16 2021-08-05 2021-08-06 2021-09-21 2021-09-10 2021-10-30 2022-03-09 Animation Services onstruction ant Selection SX-NRPB-239247-CS-CDS / S Institutional Support for Rec ocial Safeguards Consultant: TF / A8079 Post Direct Selection Direct 200,000.00 200,000.00 Signed 2021-06-14 2021-06-16 2021-06-24 2021-06-28 2021-08-28 2020-07-13 2022-02-24 onstruction Jo-Ann George SX-NRPB-240330-CS-CDS / Institutional Support for Rec TF / A8079 Post Direct Selection Direct 280,000.00 251,210.00 Signed 2021-06-18 2021-06-28 2021-06-20 2021-06-21 2021-06-23 2021-07-07 2023-05-31 MH: Project Manager EDMP onstruction SX-NRPB-241445-CS-CDS / D Emergency measures for the esign Fire Dept. Renovation a TF / A8079 recovery of disaster first res Post Direct Selection Direct 160,000.00 159,900.00 Signed 2021-06-28 2021-05-21 2021-07-08 2021-05-03 2021-09-11 2021-07-01 2022-03-10 nd Expansion: ICE ponders and preparedness f acilities SX-NRPB-242711-CS-CDS / P Institutional Support for Rec rocurement Coordinator: San TF / A8079 Post Direct Selection Direct 267,000.00 266,640.00 Signed 2021-07-11 2021-07-15 2021-07-21 2021-06-08 2021-09-24 2021-08-03 2022-03-23 onstruction tiago Ibarguen SX-NRPB-246966-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / A8079 Prior Open 80,000.00 0.00 2021-09-17 2021-09-21 2021-11-05 2021-11-26 2021-12-31 2022-06-29 NRPB Procurement Assistant onstruction ant Selection ation SX-NRPB-252781-CS-CDS / P Institutional Support for Rec roject Funding Coordinator – TF / A8079 Post Direct Selection Direct 20,000.00 0.00 Canceled 2021-09-12 2021-09-08 2021-09-22 2021-11-26 2022-05-25 onstruction Housing Project SX-NRPB-253548-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 180,000.00 102,600.00 Signed 2021-09-17 2021-09-30 2021-11-05 2021-11-15 2021-11-26 2022-01-12 2021-12-31 2022-01-13 2022-06-29 DGTP Project Manager for DL onstruction ant Selection T SX-NRPB-254305-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / A8079 Post Open 90,000.00 0.00 2021-09-24 2021-09-15 2021-11-12 2021-12-03 2022-01-07 2022-07-06 Program Management Assist onstruction ant Selection ation ant SX-NRPB-256482-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / A8079 Post Open 90,000.00 0.00 2021-10-07 2021-10-05 2021-11-25 2021-12-16 2022-01-20 2022-07-19 Project Manager - Mental Hea onstruction ant Selection ation lth Project SX-NRPB-257387-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 60,000.00 58,800.00 Signed 2021-10-12 2021-10-08 2021-11-30 2022-01-27 2021-12-21 2022-04-06 2022-01-25 2022-04-07 2022-07-24 Executive Assistant II onstruction ant Selection SX-NRPB-257388-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 180,000.00 163,500.00 Signed 2021-10-12 2021-10-07 2021-11-30 2021-09-20 2021-12-21 2021-10-19 2022-01-25 2021-10-22 2022-07-24 Engineer II onstruction ant Selection SX-NRPB-257389-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 245,000.00 244,000.00 Signed 2021-10-12 2021-10-07 2021-11-30 2021-09-22 2021-12-21 2021-10-12 2022-01-25 2021-11-02 2022-07-24 Contract Manager II onstruction ant Selection SX-NRPB-257455-CS-CDS / E Institutional Support for Rec TF / A8079 Post Direct Selection Direct 20,000.00 31,972.50 Signed 2021-10-12 2021-10-07 2021-10-22 2021-09-20 2021-12-26 2021-10-22 2022-06-24 ngineer II onstruction SX-NRPB-258195-CS-CDS / P Institutional Support for Rec TF / A8079 Prior Direct Selection Direct 40,000.00 82,400.00 Signed 2021-10-15 2021-10-19 2021-10-25 2021-10-20 2021-12-29 2021-11-02 2022-06-27 rocurement Consultant: Paol onstruction o Maculotti SX-NRPB-258246-CS-CDS / P Institutional Support for Rec roject Finance Specialist-Hou TF / A8079 Post Direct Selection Direct 20,000.00 23,240.00 Signed 2021-10-14 2021-10-13 2021-10-24 2021-10-14 2021-12-28 2021-10-15 2022-06-26 onstruction sing Project SX-NRPB-258918-CS-CDS / P Institutional Support for Rec TF / A8079 Post Direct Selection Direct 15,000.00 12,750.00 Signed 2021-10-22 2021-10-27 2021-11-01 2021-10-27 2022-01-05 2021-10-30 2022-07-04 roject Officer - Mental Health onstruction Project SX-NRPB-262565-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Direct 130,000.00 140,000.00 Signed 2021-11-12 2021-11-08 2021-11-22 2021-10-20 2021-12-13 2021-12-04 2022-01-17 2021-12-13 2022-07-16 Procurement Consultant: Ms. onstruction ant Selection Jackson SX-NRPB-270528-CS-CDS / S Housing Repair and Public B TF / A8079 Post Direct Selection Direct 350,000.00 294,850.00 Signed 2021-12-24 2022-01-17 2022-01-03 2021-12-21 2022-03-09 2022-02-20 2022-09-05 chool Gyms Technical Assess uildings Repair and Reconstr ment uction SX-NRPB-272351-CS-CDS / P Institutional Support for Rec rocurement Consultant - Ho TF / A8079 Post Direct Selection Direct 72,090.00 72,090.00 Signed 2022-01-10 2022-01-14 2022-01-20 2022-01-18 2022-03-26 2022-01-22 2022-09-22 onstruction me Based : Paolo Maculotti SX-NRPB-272355-CS-CDS / P Institutional Support for Rec roject Manager EDMP: East W TF / A8079 Post Direct Selection Direct 165,000.00 174,000.00 Signed 2022-01-10 2022-01-07 2022-01-20 2022-01-05 2022-03-26 2022-02-25 2022-09-22 onstruction est Consultancy BV SX-NRPB-278264-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 250,000.00 295,050.00 Signed 2022-02-14 2022-03-01 2022-04-04 2022-04-18 2022-04-25 2022-05-16 2022-05-30 2022-05-17 2022-11-26 Senior Project Manager ERP1 onstruction ant Selection SX-NRPB-278699-CS-CDS / D Housing Repair and Public B esign of Fire Dept. Renovatio TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 171,124.00 152,075.25 Signed 2022-02-15 2022-03-24 2022-02-25 2022-03-14 2022-05-01 2022-03-31 2022-10-28 n and Expansion completion uction of deliverables SX-NRPB-281075-CS-CDS / C Institutional Support for Rec TF / A8079 Post Direct Selection Direct 180,000.00 181,250.00 Signed 2022-02-28 2022-03-11 2022-03-10 2022-01-14 2022-05-14 2022-03-31 2022-11-10 ontract Manager - D. Louis onstruction SX-NRPB-282293-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / A8079 Post Open 245,000.00 0.00 2022-03-11 2022-03-03 2022-04-29 2022-05-20 2022-06-24 2022-12-21 Social Safeguards Specialist onstruction ant Selection ation SX-NRPB-280013-CS-CDS / E Institutional Support for Rec TF / A8079 Post Direct Selection Direct 125,000.00 112,370.00 Signed 2022-03-08 2022-03-14 2022-03-18 2022-03-04 2022-05-22 2022-03-16 2022-11-18 nvironmental Safeguards Spe onstruction cialist SX-NRPB-286353-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Direct 52,500.00 150,480.00 Signed 2022-03-28 2022-03-21 2022-04-07 2022-03-23 2022-04-28 2022-03-23 2022-06-02 2022-04-06 2022-11-29 Senior Human Resources Con onstruction ant Selection sultant SX-NRPB-286729-CS-CDS / E Housing Repair and Public B Under Implement SS8 Cultural Heritage Mental TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 20,000.00 0.00 2022-03-30 2022-04-14 2022-04-09 2022-04-21 2022-06-13 2022-12-10 ation Health Project uction SX-NRPB-287284-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Direct 105,000.00 103,106.00 Signed 2022-03-31 2022-05-24 2022-04-10 2022-05-31 2022-05-01 2022-05-31 2022-06-05 2022-06-02 2022-12-02 Activity Coordinator Home an onstruction ant Selection d Schools Page 6 SX-NRPB-288109-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / A8079 Post Direct 161,712.00 0.00 2022-04-05 2022-05-15 2022-04-15 2022-08-17 2022-05-06 2022-08-17 2022-06-10 2022-12-07 Social Safeguards Consultant onstruction ant Selection ation SX-NRPB-291870-CS-CDS / R Housing Repair and Public B eview of MET building design TF / A8079 uildings Repair and Reconstr Post Direct Selection Direct 7,400.00 6,688.00 Signed 2022-04-28 2022-05-04 2022-05-08 2022-04-13 2022-07-12 2022-05-10 2023-01-08 : Structural Integrity uction SX-NRPB-287287-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Direct 136,940.00 136,980.00 Signed 2022-05-04 2022-04-26 2022-05-14 2022-04-22 2022-06-04 2022-05-05 2022-07-09 2022-05-06 2023-01-05 Senior Advisor – Project Mana onstruction ant Selection gement SX-NRPB-294730-CS-INDV / Institutional Support for Rec Individual Consult Under Implement Medior Project Manager – Ho TF / A8079 Post Open 162,000.00 0.00 2022-05-17 2022-05-13 2022-07-05 2022-07-26 2022-08-30 2023-02-26 onstruction ant Selection ation using Project SX-NRPB-295647-CS-INDV / Institutional Support for Rec Individual Consult Communication Consultant - TF / A8079 Post Direct 63,250.00 63,000.00 Signed 2022-05-24 2022-05-16 2022-06-03 2022-06-30 2022-06-24 2022-06-30 2022-07-29 2022-07-01 2023-01-25 onstruction ant Selection Copywriter SX-NRPB-298841-CS-INDV / Institutional Support for Rec Individual Consult Communication and Commu TF / A8079 Post Direct 57,000.00 57,000.00 Signed 2022-06-10 2022-06-09 2022-06-20 2022-06-15 2022-07-11 2022-06-15 2022-08-15 2022-06-17 2023-02-11 onstruction ant Selection nity Outreach Consultant SX-NRPB-304252-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation PROJECT COORDINATOR - INF TF / A8079 Post 229,786.00 229,786.00 Signed 2022-07-21 2022-07-25 2022-07-31 2022-07-26 2022-08-21 2022-07-31 2022-09-25 2022-07-30 2024-03-25 onstruction ant Selection al RASTRUCTURE ERP-1 SX-NRPB-312698-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement Communications and Commu TF / A8079 Post 91,200.00 0.00 2022-08-31 2022-08-25 2022-10-19 2022-11-09 2022-12-14 2023-12-14 onstruction ant Selection l ation nity Outreach Consultant SX-NRPB-314853-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement Project Manager - St. Maarte TF / B5199 Post 270,000.00 0.00 2022-09-16 2022-09-20 2022-11-04 2022-11-25 2022-12-30 2024-06-30 onstruction ant Selection l ation n Wastewater Management P roject SX-NRPB-322083-CS-INDV / I Institutional Support for Rec Individual Consult Direct - Internation TF / B5199 Post 14,500.00 0.00 Signed 2022-10-21 2022-10-25 2022-10-31 2022-10-27 2022-11-21 2022-10-27 2022-12-26 2023-01-31 nterim Project coordinator W onstruction ant Selection al astewater SX-NRPB-325069-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation TF / B5199 Post 271,140.00 0.00 Signed 2022-11-15 2022-11-03 2022-11-25 2022-11-03 2022-12-16 2022-12-13 2023-01-20 2024-07-21 Head of Procurement - S.I onstruction ant Selection al SX-NRPB-326442-CS-INDV / J Institutional Support for Rec Individual Consult Pending Impleme TF / B5199 Post Open - National 90,000.00 0.00 2022-11-30 2023-01-18 2023-02-08 2023-03-15 2024-09-13 r. M&E Consultant onstruction ant Selection ntation SX-NRPB-326444-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation Under Implement TF / B5199 Post 160,000.00 0.00 2022-11-28 2022-01-11 2022-12-08 2023-01-12 2022-12-29 2023-01-12 2023-01-16 2024-07-17 Program Advisor onstruction ant Selection al ation SX-NRPB-326641-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement TF / B5199 Post 260,000.00 0.00 2022-11-30 2023-01-11 2023-01-18 2023-02-08 2023-05-08 2024-11-06 Project Manager Housing onstruction ant Selection l ation SX-NRPB-333295-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement TF / B5199 Post 45,000.00 0.00 2022-12-23 2023-01-12 2023-02-10 2023-03-03 2023-04-07 2024-04-06 Financial Management Assist onstruction ant Selection l ation ant SX-NRPB-260433-CS-INDV / Institutional Support for Rec Individual Consult TF / A8079 Post Open 25,000.00 0.00 Canceled 2021-10-29 2021-12-17 2022-01-07 2022-02-11 2022-08-10 Sector Expert - Housing onstruction ant Selection SX-NRPB-342557-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement TF / B5199 Post 110,000.00 0.00 2023-02-17 2023-02-27 2023-04-07 2023-04-28 2023-06-02 2024-06-01 Project Officer ERP-1 onstruction ant Selection l ation SX-NRPB-342572-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa TF / B5199 Post 100,000.00 0.00 Canceled 2023-02-17 2023-02-27 2023-04-07 2023-04-28 2023-06-02 2024-06-01 Senior Advisor -Housing Proje onstruction ant Selection l ct SX-NRPB-347124-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation Under Implement TF / B5199 Post 221,000.00 0.00 2023-03-05 2023-03-20 2023-03-15 2023-05-19 2023-04-05 2023-04-12 2023-05-10 2024-09-14 Coordinating Environmental onstruction ant Selection al ation Specialist SX-NRPB-347131-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement TF / B5199 Post 245,000.00 0.00 2023-03-05 2023-03-20 2023-04-23 2023-05-14 2023-06-18 2024-10-31 Social Specialist onstruction ant Selection l ation SX-NRPB-353790-CS-INDV / Institutional Support for Rec Individual Consult Under Implement TF / B5199 Post Direct - National 65,000.00 0.00 2023-04-05 2023-04-26 2023-04-15 2023-05-16 2023-05-06 2023-05-16 2023-06-10 2024-06-09 Executive Assistant Consulta onstruction ant Selection ation nt SX-NRPB-326436-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation Under Implement TF / B5199 Post 165,000.00 0.00 2022-11-15 2023-05-23 2022-11-25 2022-12-16 2023-06-01 2024-12-31 Engineer ERP-1 - K.W onstruction ant Selection al ation SX-NRPB-363223-CS-INDV / Institutional Support for Rec Individual Consult TF / B5199 Post Direct - National 15,000.00 0.00 Under Review 2023-05-28 2023-05-23 2023-06-07 2023-06-28 2023-08-02 2023-10-02 Energy Specialist onstruction ant Selection SX-NRPB-364424-CS-INDV / Institutional Support for Rec Individual Consult Open - Internationa Under Implement TF / B5199 Post 100,000.00 0.00 2023-06-09 2023-05-31 2023-07-28 2023-08-18 2023-09-22 2024-09-21 Housing Sector Expert onstruction ant Selection l ation SX-NRPB-364743-CS-INDV / Institutional Support for Rec Individual Consult TF / B5199 Prior Direct - National 242,510.00 0.00 Signed 2023-06-01 2023-06-01 2023-06-11 2023-06-02 2023-07-02 2023-06-02 2023-08-06 2024-08-05 Procurement Consultant Ms. J onstruction ant Selection ackson II SX-NRPB-364744-CS-CDS / F Institutional Support for Rec Under Implement acilitator Performance Agree TF / B5199 Post Direct Selection Direct - National 60,000.00 0.00 2023-06-09 2023-06-22 2023-06-19 2023-06-19 2023-08-23 2024-05-22 onstruction ation ment Housing SX-NRPB-368036-CS-INDV / Institutional Support for Rec Individual Consult Direct - Internation Under Implement TF / B5199 Prior 153,900.00 0.00 2023-06-25 2023-06-22 2023-07-05 2023-06-13 2023-07-26 2023-06-26 2023-08-30 2024-08-29 Procurement Consultant Mr. onstruction ant Selection al ation Maculotti II Page 7 PROCUREMENT PLAN (Textual Part) Project information: UGANDA :UG Investing in Forests and PAs Project (P170466) Project Implementation agency: Ministry of Works and Environment Date of the Procurement Plan: 15 June 2021 Period covered by this Procurement Plan: June 2021 – Dec 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act,2003 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. The BUBU Policy, Preference and Reservation Schemes shall not apply When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Uganda : Uganda Investing in Forests and Protected Areas for Climate-Smart Development Project PLAN General Information Country: Uganda 2021-08-17 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170466 GPN Date: 2021-06-23 Project Name: Uganda Investing in Forests and Protected Areas for Climate-Smart Development Project Loan / Credit No: IDA / D5960, IDA / 65920 Uganda Wildlife Authority Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UG-UWA-245772-CW-RFQ / Request for Bids - Component 2. Increased Rev Construction of 1000m of lad Single Stage - One E Small Works SPD Pending Imp 2022-07-2 IDA / D5960 enues and Jobs from Forests Post Request for Bids Open - National 405,000.00 0.00 2021-10-01 2021-10-06 2021-11-17 2021-12-17 2022-01-21 ders along Sabinyo, Ngahing nvelope (1 envelope proce lementation 0 and Wildlife Protected Areas a and Muhabura trail ss) UG-UWA-245776-CW-RFQ / Request for Bids - Component 2. Increased Rev Construction of 1,700m boar Single Stage - One E Small Works SPD Pending Imp 2022-08-0 IDA / D5960 enues and Jobs from Forests Post Request for Bids Open - National 229,500.00 0.00 2021-10-15 2021-10-20 2021-12-01 2021-12-31 2022-02-04 d walk in Kirumia, Sabinyo, M nvelope (1 envelope proce lementation 3 and Wildlife Protected Areas uhuvura, and Gahinga ss) UG-UWA-245764-CW-RFQ / Request for Bids - Component 1. Improved Ma Construction of 38 unit Junior Single Stage - One E Small Works SPD Pending Imp 2022-07-1 IDA / D5960 nagement of Protected Area Post Request for Bids Open - National 4,162,163.00 0.00 2021-09-22 2021-09-27 2021-11-08 2021-12-08 2022-01-12 staff and 16 unit senior staff nvelope (1 envelope proce lementation 1 s houses in: KCA,MFCA, QECA ss) and BMCA Request for Bids - UG-UWA-245777-CW-RFQ / Component 1. Improved Ma Single Stage - One E Small Works SPD Pending Imp 2022-10-0 Construction of 2034 concret IDA / D5960 nagement of Protected Area Post Request for Bids Open - National 1,100,394.00 0.00 2021-12-14 2021-12-19 2022-01-30 2022-03-01 2022-04-05 nvelope (1 envelope proce lementation 2 e pillars along park boundari s ss) es Request for Bids - UG-UWA-245726-CW-RFQ / Component 1. Improved Ma Single Stage - One E Small Works SPD 2022-07-1 Construction of 101 Km Elect IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 2,430,000.00 0.00 Canceled 2021-09-29 2021-10-04 2021-11-15 2021-12-15 2022-01-19 nvelope (1 envelope proce 8 ric fence in MFCA and 61 Km s ss) in QECA Request for Bids - UG-UWA-286750-CW-RFB / C Component 1. Improved Ma Single Stage - One E Small Works SPD Pending Imp 2023-02-1 onstruction of Boardwalk of 7 IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 94,500.00 0.00 2022-05-02 2022-05-07 2022-06-18 2022-07-18 2022-08-22 nvelope (1 envelope proce lementation 8 00m in Kirumia s ss) Request for Bids - UG-UWA-286754-CW-RFB / C Component 1. Improved Ma Single Stage - One E Small Works SPD Under Imple 2023-02-1 onstruction of 1000m Ladder IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 405,000.00 0.00 2022-05-02 2022-12-05 2022-05-07 2022-12-08 2022-06-18 2022-07-18 2022-08-22 nvelope (1 envelope proce mentation 8 s in Sabinyo, Ngahinga and M s ss) uhabura trails Request for Bids - UG-UWA-245732-CW-RFQ / Component 1. Improved Ma Single Stage - One E Small Works SPD Under Imple 2023-08-1 Construction of 18,000m squ IDA / D5960 nagement of Protected Area Post Request for Bids Open - National 396,000.00 0.00 2022-11-01 2022-11-03 2022-12-15 2023-01-14 2023-02-18 nvelope (1 envelope proce mentation 7 are of stone wall s ss) Request for Bids - UG-UWA-286752-CW-RFB / C Component 1. Improved Ma Single Stage - One E Small Works SPD Pending Imp 2023-09-0 onstruction of 1000m Board IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 135,000.00 0.00 2022-12-07 2022-12-08 2023-01-06 2023-02-01 2023-03-08 nvelope (1 envelope proce lementation 4 walk in Sabinyo, Muhavura a s ss) nd Gahinga Request for Bids - UG-UWA-347395-CW-RFB / C Component 1. Improved Ma Single Stage - One E Small Works SPD 2024-01-0 onstruction of 25km trenches IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 128,375.00 0.00 Canceled 2023-03-16 2023-03-21 2023-05-02 2023-06-01 2023-07-06 nvelope (1 envelope proce 2 in Kibale National Park s ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-UWA-247637-GO-RFQ / S Component 1. Improved Ma Request for Quota Single Stage - One E upply of 315 personal fire pro IDA / 65920 nagement of Protected Area Post Limited 42,525.00 0.00 Canceled 2022-01-25 2022-03-22 2022-09-18 tions nvelope tective equipment s UG-UWA-247611-GO-RFB / S Component 1. Improved Ma Single Stage - One E Under Imple IDA / 65920 Post Request for Bids Open - National 137,836.00 0.00 2021-11-19 2022-06-01 2021-11-24 2022-01-05 2022-02-04 2022-03-11 2022-09-07 upply of 34 Motor Cycles nagement of Protected Area nvelope mentation s UG-UWA-247605-GO-RFB / S Component 1. Improved Ma upply of Lorries and trucks (1 Single Stage - One E Under Imple IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 432,433.00 0.00 2021-11-19 2022-06-01 2021-11-24 2022-01-05 2022-02-04 2022-03-11 2022-09-07 tipper lorry, 1 fire truck, and nvelope mentation s 1 general purpose truck UG-UWA-247603-GO-RFB / S Component 4. Project Manag Single Stage - One E Under Imple upply of 10 Pick-ups and 2 St IDA / 65920 Post Request for Bids Open - National 960,810.00 0.00 2021-11-19 2021-11-24 2021-11-24 2022-01-05 2022-02-04 2022-03-11 2022-09-07 ement and Monitoring nvelope mentation ation Wagon Motor vehicles UG-UWA-247646-GO-RFQ / S Component 4. Project Manag Request for Quota Single Stage - One E Under Imple IDA / 65920 Post Limited 89,188.00 0.00 2021-12-20 2022-03-29 2022-02-14 2022-08-13 upply of 11 Pcs of Drones ement and Monitoring tions nvelope mentation UG-UWA-247647-GO-RFQ / S Component 4. Project Manag Request for Quota Single Stage - One E IDA / 65920 Post Limited 8,921.00 0.00 Completed 2021-12-15 2022-02-25 2022-02-09 2022-08-08 2022-08-31 upply of 11 GPS Units ement and Monitoring tions nvelope UG-UWA-247615-GO-RFQ / S Component 4. Project Manag Request for Quota Single Stage - One E IDA / 65920 Post Limited 4,200.00 3,870.00 Completed 2021-12-15 2022-04-11 2022-02-09 2022-07-02 2022-08-08 2022-09-05 upply of 2 Laptop computers ement and Monitoring tions nvelope UG-UWA-247614-GO-RFQ / S Component 4. Project Manag Request for Quota Single Stage - One E IDA / 65920 Post Limited 17,296.00 0.00 Canceled 2021-12-15 2022-02-09 2022-08-08 upply of 8 Digital Cameras ement and Monitoring tions nvelope UG-UWA-247644-GO-RFB / S upply of VHF base station for Component 4. Project Manag Single Stage - One E IDA / 65920 Post Request for Bids Open - National 270,250.00 0.00 Canceled 2021-10-14 2021-10-19 2021-11-30 2021-12-30 2022-02-03 2022-08-02 lots 43 in number lots 1 & 2, ement and Monitoring nvelope and VHF handsets 207 in nu mber for lots 3 and 4 UG-UWA-247642-GO-RFB / S Component 4. Project Manag Single Stage - One E upply of 12 radio base sets a IDA / 65920 Post Request for Bids Open - National 908,112.00 0.00 Canceled 2021-10-14 2021-10-19 2021-11-30 2021-12-30 2022-02-03 2022-08-02 ement and Monitoring nvelope nd 12 radio repeaters UG-UWA-286739-GO-RFB / S Component 1. Improved Ma Single Stage - One E Under Imple upply of Pools for Electric fen IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 98,516.00 0.00 2022-05-02 2022-06-01 2022-05-07 2022-06-18 2022-07-18 2022-08-22 2023-02-18 nvelope mentation ce construction s Page 1 UG-UWA-286741-GO-RFB / S upplies of Electric materials: Component 1. Improved Ma Single Stage - One E Under Imple Lot 1: Imported materials US IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 196,423.00 0.00 2022-05-02 2022-06-01 2022-05-07 2022-06-18 2022-07-18 2022-08-22 2023-02-18 nvelope mentation $ 98,103 s Lot 2: Local materials US $ 9 8,320 UG-UWA-286743-GO-RFQ / L Component 1. Improved Ma Request for Quota Single Stage - One E ocal construction materials f IDA / 65920 nagement of Protected Area Post Limited 6,486.00 0.00 Signed 2022-05-07 2022-06-01 2022-07-02 2022-12-29 tions nvelope or Electric fencing s UG-UWA-247606-GO-RFB / S Component 1. Improved Ma upply of Road equipment (3 Open - Internationa Single Stage - One E IDA / 65920 nagement of Protected Area Prior Request for Bids 3,093,243.00 0.00 Canceled 2021-11-19 2021-11-24 2022-01-05 2022-02-04 2022-03-11 2022-09-07 Graders, 2 Excavators, 2 Tipp l nvelope s ers, 2 Water Bowsers, 2 Bull Dozers and 1 Tractor) UG-UWA-247618-GO-RFB / E Component 1. Improved Ma Single Stage - One E stablish 800 acres of tea see IDA / 65920 nagement of Protected Area Prior Request for Bids Open - National 1,621,600.00 0.00 Canceled 2021-12-15 2021-12-20 2022-01-31 2022-03-02 2022-04-06 2022-10-03 nvelope dlings around BINP s UG-UWA-315933-GO-RFB / P Component 1. Improved Ma rocurement of Road Equipme Open - Internationa Single Stage - One E Under Imple IDA / 65920 nagement of Protected Area Prior Request for Bids 3,052,702.00 0.00 2023-02-28 2023-05-02 2023-03-14 2023-05-09 2023-04-14 2023-06-22 2023-05-14 2023-07-04 2024-07-03 nt: 3 Graders, 2 Excavators, l nvelope mentation s 2 Bull dozers, 2 Water Bowse rs and 2 Tipper Trucks UG-UWA-247642-GO-RFB-2 / Component 1. Improved Ma Supply, deliver and installatio Single Stage - One E Under Imple IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 1,178,362.00 0.00 2023-02-28 2023-06-21 2023-03-14 2023-06-21 2023-04-25 2023-05-25 2023-07-15 2024-01-11 n of assorted radio equipmen nvelope mentation s t under IFPA CD UG-UWA-347387-GO-RFQ / S Component 1. Improved Ma Request for Quota Single Stage - One E Under Imple upply and commissioning of IDA / 65920 nagement of Protected Area Post Limited 6,075.00 0.00 2023-03-21 2023-05-04 2023-05-16 2023-11-12 tions nvelope mentation 15pcs of Binoculars with acc s essories UG-UWA-347391-GO-RFQ / S Component 1. Improved Ma Request for Quota Single Stage - One E Under Imple upply and commissioning of IDA / 65920 nagement of Protected Area Post Limited 8,109.00 0.00 2023-03-22 2023-05-04 2023-05-17 2023-11-13 tions nvelope mentation 3pcs of Telescopes with acce s ssories NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-UWA-308525-CS-CQS / P reparation of architectural de signs, BOQs, technical specifi Component 2. Increased Rev Consultant Qualifi Under Implement cations, environmental and s IDA / 65920 enues and Jobs from Forests Post Open - National 10,000.00 0.00 2022-08-26 2023-03-26 2022-09-09 2023-06-01 2022-10-23 2022-11-22 2022-12-27 2023-06-25 cation Selection ation ocial due diligence for the pr and Wildlife Protected Areas oposed construction of Picnic Site in Bwindi Impenetrable P ark. UG-UWA-308530-CS-CQS / P reparation of architectural de Component 2. Increased Rev signs, BOQs, technical specifi Consultant Qualifi Under Implement IDA / 65920 enues and Jobs from Forests Post Open - National 30,000.00 0.00 2022-08-26 2023-03-26 2022-09-09 2023-06-01 2022-10-23 2022-11-22 2022-12-27 2023-06-25 cations, Environmental and S cation Selection ation and Wildlife Protected Areas ocial due diligence for the pr oposed construction f 3-peak trail in Mgahinga Gorrila NP UG-UWA-347356-CS-QCBS / Component 1. Improved Ma Consultant Qualifi Pending Impleme Consultancy services to unde IDA / 65920 nagement of Protected Area Post Limited 30,000.00 0.00 2023-03-16 2023-03-30 2023-04-29 2023-06-03 2023-11-30 cation Selection ntation rtake ESIA for Ajai boundary r s oad UG-UWA-367937-CS-CQS / C onsultancy services to undert Component 2. Increased Rev ake feasibility assessment, p Consultant Qualifi Under Implement IDA / 65920 enues and Jobs from Forests Post Limited 40,500.00 0.00 2023-06-30 2023-06-22 2023-07-14 2023-08-13 2023-09-17 2024-03-15 repare architectural designs, cation Selection ation and Wildlife Protected Areas costed BoQ's and project brie f for the construction of strea m crossing in MFCA UG-UWA-359888-CS-CQS / C onsultancy services to undert Component 2. Increased Rev ake feasibility assessment an Consultant Qualifi IDA / 65920 enues and Jobs from Forests Post Limited 45,000.00 0.00 Canceled 2023-05-14 2023-05-25 2023-05-28 2023-06-27 2023-08-01 2024-01-28 d prepare architectural desig cation Selection and Wildlife Protected Areas ns, costed BOQs, Project Brie f and supervise construction of stream crossing in MFCA INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-UWA-254516-CS-CDS / S Component 4. Project Manag IDA / 65920 Post Direct Selection Direct 210,000.00 0.00 Signed 2021-10-01 2021-10-20 2021-10-11 2021-12-20 2021-12-15 2022-06-13 hort term consultancy - Proje ement and Monitoring ct Officer UG-UWA-286746-CS-INDV / Component 4. Project Manag Individual Consult IDA / 65920 Post Open 166,668.00 0.00 Canceled 2022-03-30 2022-05-18 2022-06-08 2022-07-13 2023-01-09 Procurement Assistant for U ement and Monitoring ant Selection WA UG-UWA-299849-CS-CDS / E Component 2. Increased Rev Under Implement ngagement of New Plan ESIA IDA / 65920 enues and Jobs from Forests Post Direct Selection Direct - National 42,135.00 0.00 2022-07-27 2022-08-25 2022-08-06 2022-09-01 2022-09-27 2023-03-26 ation for canopy walk in Sebitoli K and Wildlife Protected Areas NP UG-UWA-305542-CS-INDV / Component 4. Project Manag Individual Consult Recruitment of a Procuremen IDA / 65920 Post Open - National 72,000.00 0.00 Signed 2022-07-25 2022-08-02 2022-09-12 2023-03-22 2022-10-03 2023-04-17 2022-11-07 2026-06-29 ement and Monitoring ant Selection t Officer for UWA Page 2 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : Nom du pays : République du Bénin Nom du Projet : PROJET DE GESTION DES EAUX PLUVIALES ET DE RÉSILIENCE URBAINE (PAPC) No d’identification du projet : P 167359 Agence d’exécution du Projet : Agence du cadre de vie pour le développement du territoire (ACVDT) Date du plan de passation des marchés : Novembre 2018 Période couverte par ce plan de passation des marchés : Novembre 2018 au Juin 2019 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Novembre 2017 et Août 2018) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Autres informations pertinentes sur la passation des marchés « Sans objet » PROCUREMENT Benin : Benin - Stormwater Management and Urban Resilience Project PLAN General Information Country: Benin 2019-04-08 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167359 GPN Date: 2020-07-26 Project Name: Benin - Stormwater Management and Urban Resilience Project Loan / Credit No: IDA / 64300 BENIN STORMWATER MANAGEMENT AND URBAN RESILIENCE PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-PAPC-167654-CW-RFB / Tr Component 1: Stormwater d avaux de construction des co rainage investment and com Open - Internationa Single Stage - One E 34,306,275.0 29,270,688. 2023-02-2 llecteurs d'assainissement pl IDA / 64300 munity engagement for floo Prior Request for Bids Signed 2020-06-18 2020-12-29 2020-07-30 2021-03-02 2020-09-13 2021-03-18 2020-10-13 2021-07-22 2020-11-23 2021-10-11 l nvelope 0 98 3 uvial et aménagement des v d risk reduction and climate oies connexes dans les bassi change adaptatio n ns Pa3 et Y BJ-PAPC-167657-CW-RFB / Tr Component 1: Stormwater d avaux de mise en œuvre des rainage investment and com Single Stage - One E 2022-02-2 IDA / 64300 Post Request for Bids Open - National 600,000.00 0.00 Canceled 2020-06-15 2020-07-30 2020-09-10 2020-10-10 2020-11-20 aménagements connexes da munity engagement for floo nvelope 1 ns les zones non aedificandi d risk reduction and climate change adaptatio n BJ-PAPC-280753-CW-RFB / C Component 1: Stormwater d Request for Bids - onstruction de collecteurs d'a rainage investment and com Open - Internationa Single Stage - One E Works (without pr 34,959,850.0 Under Imple 2022-12-1 IDA / 64300 Prior Request for Bids 0.00 2022-02-25 2022-11-29 2022-03-02 2022-12-01 2022-04-13 2023-01-11 2022-05-13 2023-03-17 2022-06-17 ssainissement pluvial et amé munity engagement for floo l nvelope equalification) SP 0 mentation 4 nagement des voies connexe d risk reduction and climate D s dans le bassin AAc change adaptatio n GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-PAPC-167661-GO-RFQ / A cquisition d’équipement infor matique et autres matériels( Component 3: Project mana Request for Quota Single Stage - One E 9 ordinateurs portables; 5 im IDA / 64300 gement, monitoring and eva Post Limited 90,956.00 181,912.00 Signed 2020-06-30 2020-12-02 2020-08-25 2021-02-16 2021-02-21 tions nvelope primantes tout en un, ; 6 des luation tructeurs de papier; 1 photoc opieur multifonction, 1 video projecteur, et d'autres materi els BJ-PAPC-167664-GO-RFQ / A Component 3: Project mana Request for Quota Single Stage - One E cquisition et installation d'un IDA / 64300 gement, monitoring and eva Post Limited 34,247.00 34,247.00 Signed 2020-06-15 2021-02-24 2020-08-11 2021-07-03 2020-11-09 tions nvelope serveur et câblage réseau luation BJ-PAPC-167745-GO-RFQ / A cquisition de fournitures de b Component 3: Project mana ureaux et consommables info Request for Quota Single Stage - One E IDA / 64300 gement, monitoring and eva Post Limited 85,616.00 85,616.00 Completed 2020-06-30 2021-03-01 2020-08-31 2021-06-04 2020-10-01 2021-08-06 rmatiques ( rames de papier, tions nvelope luation cartouche d’encre ; encres p our copieurs et imprimantes ) pour le Pool PAPC BJ-PAPC-126837-GO-RFQ / A cquisition de mobiliers de bur eau : 10 (Tables + retour+ c Component 3: Project mana aisson ) ; 9 fauteuils directeu Request for Quota Single Stage - One E IDA / 64300 gement, monitoring and eva Post Open - National 61,644.00 61,644.00 Completed 2019-09-07 2019-10-19 2021-02-11 2020-04-16 2021-06-08 rs; 19 chaises visiteurs ; 1tab tions nvelope luation les circulaire à 6 places + 6 c haises; 1 table de conférenc e de 30 places + 30 chaises; 4 armoires meta de range; a u profit de PAPC BJ-PAPC-126838-GO-RFQ / A Component 3: Project mana cquisition de deux véhicules Request for Quota Single Stage - One E IDA / 64300 gement, monitoring and eva Post Open - National 128,425.00 0.00 Canceled 2019-09-07 2019-11-02 2019-11-17 pour le fonctionnement du Po tions nvelope luation ol PAPC (1 pick-up et 1 véhic ule 2x4) BJ-PAPC-206754-GO-UN / Ac Component 3: Project mana quisition de deux véhicules p UN Agencies (Dire Under Imple IDA / 64300 gement, monitoring and eva Post Direct 128,425.00 0.00 2020-11-27 2021-03-30 2020-12-02 2021-04-22 2021-01-06 2021-07-05 our le fonctionnement du Poo ct) mentation luation l PAPC (1 pick-up et 1 véhicul e 2x4) BJ-PAPC-284314-GO-RFQ / A Component 3: Project mana Request for Quota Single Stage - One E cquisition d'équipements info IDA / 64300 gement, monitoring and eva Post Limited 74,816.00 0.00 Completed 2022-04-25 2022-08-02 2022-06-20 2022-12-17 2023-04-07 tions nvelope rmatiques au profit du Pool P luation APC Component 1: Stormwater d BJ-PAPC-304179-GO-RFQ / A rainage investment and com Request for Quota Single Stage - One E Pending Impl cquisition d'un véhicule Pick- IDA / 64300 Post Limited 32,168.00 0.00 2022-08-15 2022-10-10 2023-04-08 munity engagement for floo tions nvelope ementation up au profit de l'ABE d risk reduction and climate change adaptatio n NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-PAPC-172285-NC-RFQ / Ac Component 3: Project mana Request for Quota Single Stage - One E quisition d'un logiciel de Suiv IDA / 64300 gement, monitoring and eva Post Limited 17,123.00 0.00 Canceled 2020-10-31 2021-01-01 2021-06-30 tions nvelope i & Évaluation et formation d luation es utilisateurs BJ-PAPC-167787-GO-RFQ / R Component 3: Project mana ecrutement d'une agence év Request for Quota Single Stage - One E IDA / 64300 gement, monitoring and eva Post Limited 8,562.00 0.00 Canceled 2020-06-13 2020-08-08 2020-08-23 énementielle pour le lancem tions nvelope luation ent technique du projet PAPC BJ-PAPC-281124-NC-RFQ / R Component 1: Stormwater d ecrutement d'un laboratoire rainage investment and com Request for Quota Single Stage - One E pour la mise en œuvre du pla IDA / 64300 munity engagement for floo Post Open - National 77,980.00 0.00 Canceled 2022-04-20 2022-06-15 2022-12-12 tions nvelope n de suivi environnemental e d risk reduction and climate t social dans les bassins de la change adaptatio n Banque mondiale CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-PAPC-96830-CS-CQS / Rec Component 3: Project mana Consultant Qualifi rutement d'un cabinet pour l IDA / 64300 gement, monitoring and eva Post Limited 10,400.00 9,970.62 Completed 2019-01-28 2018-11-22 2019-02-11 2018-11-22 2019-03-13 2019-01-16 2019-04-17 2019-01-24 2019-10-14 2019-05-01 cation Selection a sélection des membres de l luation 'UGP du PAPC BJ-PAPC-189945-CS-QCBS / Component 1: Stormwater d Recrutement d'un cabinet ch rainage investment and com Quality And Cost- Open - Internationa argé de la mission de surveill IDA / 64300 munity engagement for floo Prior 1,500,000.00 1,544,520.55 Signed 2020-08-23 2020-10-16 2020-09-13 2020-10-24 2020-10-27 2021-05-03 2020-11-24 2021-06-18 2020-12-24 2021-08-18 2021-01-28 2021-10-21 2021-03-04 2021-11-24 2022-11-21 Based Selection l ance et contrôle général: sél d risk reduction and climate ection du Maitre d'oeuvre change adaptatio n BJ-PAPC-167996-CS-QCBS / Component 1: Stormwater d Recrutement d'un cabinet ch rainage investment and com Quality And Cost- Open - Internationa IDA / 64300 Prior 2,395,690.00 0.00 Canceled 2020-06-05 2020-07-25 2020-06-26 2020-08-09 2020-09-08 2020-10-08 2020-11-12 2020-12-21 2021-12-21 argé de la mission de surveill munity engagement for floo Based Selection l ance et contrôle général d risk reduction and climate change adaptatio n BJ-PAPC-170658-CS-LCS / Sél ection d'un Consultant pour l Component 1: Stormwater d a réalisation de l’étude d'Imp rainage investment and com act Environnementale et Soci Consultant Qualifi IDA / 64300 munity engagement for floo Post Open - National 128,420.00 0.00 Canceled 2020-06-02 2020-06-23 2020-08-06 2020-09-05 2020-10-10 2021-04-08 ale, du Plan d'Action de Réins cation Selection d risk reduction and climate tallation des rues compléme change adaptatio n ntaire et actualisation des Pl ans d'Action de Réinstallation existants, dans les bassins P a3 et Y BJ-PAPC-168002-CS-QCBS / Sélection d'un cabinet pour D évelopper et opérationaliser un Système d'Information Gé Component 2: Strengthening Quality And Cost- ographique pour la gestion d IDA / 64300 urban resilience manageme Post Open - National 86,207.00 0.00 Canceled 2020-07-10 2020-07-25 2020-08-25 2020-09-22 2020-10-12 2020-11-13 2020-12-18 2021-02-16 Based Selection es eaux pluviales et la résilie nt and capacity nce urbaine à l'échelle de la ville de Cotonou (Plateforme d'échange et de partage de d onnées pour le suivi e BJ-PAPC-167994-CS-CQS / Sé lection d'un cabinet pour dév elopper un modèle hydrologi Component 2: Strengthening Consultant Qualifi que pour la production de car IDA / 64300 urban resilience manageme Post Limited 86,207.00 0.00 Canceled 2020-12-15 2021-02-13 cation Selection tes d’aléas des inondations e nt and capacity t renforcement des capacités des acteurs pour son fonctio nnement BJ-PAPC-167991-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening r développer le plan multisec Consultant Qualifi IDA / 64300 urban resilience manageme Post Limited 86,207.00 0.00 Canceled 2020-10-15 2020-10-07 2020-10-29 2020-11-28 2021-01-02 2021-03-03 torielle de renforcement de c cation Selection nt and capacity apacité et sa mise en œuvre (Identifier et chiffrer les besoi ns en renforcement de capac ité) BJ-PAPC-228558-CS-QCBS / Recrutement d'une ONG en c Component 1: Stormwater d harge du développement et rainage investment and com Quality And Cost- Under Implement de la mise en œuvre de la str IDA / 64300 munity engagement for floo Post Open - National 123,287.67 0.00 2021-05-10 2021-06-13 2021-05-31 2021-07-20 2021-07-14 2021-08-11 2021-09-10 2021-10-15 2021-11-19 2022-11-19 Based Selection ation atégie de facilitation sociale d risk reduction and climate pour l’engagement communa change adaptatio n utaire dans sa globalité y co mpris le plan IEC BJ-PAPC-233044-CS-LCS / Re Component 3: Project mana crutement d'un cabinet pour Least Cost Selecti Under Implement IDA / 64300 gement, monitoring and eva Post Open - National 180,000.00 0.00 2021-05-14 2021-05-27 2021-06-04 2021-11-28 2021-07-18 2021-07-15 2021-08-15 2021-09-14 2021-10-19 2021-11-23 2022-05-22 réaliser l'audit financier au tit on ation luation re de l'année 2020 BJ-PAPC-167997-CS-QCBS / Recrutement d'une ONG en c Component 1: Stormwater d harge du développement et rainage investment and com Quality And Cost- de la mise en œuvre de la str IDA / 64300 munity engagement for floo Post Open - National 517,242.00 0.00 Canceled 2020-12-14 2020-12-15 2021-01-04 2021-02-17 2021-03-17 2021-04-16 2021-05-21 2021-06-25 2022-06-25 Based Selection atégie de facilitation sociale d risk reduction and climate pour l’engagement communa change adaptatio n utaire dans sa globalité y co mpris le plan IEC BJ-PAPC-117773-CS-CQS / R ecrutement d'un consultant p Component 3: Project mana Consultant Qualifi our l'élaboration du manuel d IDA / 64300 gement, monitoring and eva Post Limited 25,000.00 0.00 Canceled 2019-06-06 2019-08-07 2019-06-16 2019-11-08 2019-06-21 2019-07-01 2019-08-30 cation Selection e procédure administrative e luation t financière et du manuel d'e xécution du projet BJ-PAPC-170660-CS-CQS / R Component 3: Project mana ecrutement d'un cabinet pou Consultant Qualifi IDA / 64300 gement, monitoring and eva Post Limited 51,370.00 0.00 Canceled 2020-10-20 2020-11-03 2020-12-03 2021-01-13 2022-01-13 r la mise en place d'une plate cation Selection luation forme électronique de gestio n des plaintes BJ-PAPC-234538-CS-CQS / R Component 3: Project mana ecrutement d'un cabinet pou Consultant Qualifi Under Implement IDA / 64300 gement, monitoring and eva Post Open - National 89,281.00 0.00 2021-06-01 2021-05-28 2021-06-22 2021-07-20 2021-08-05 2021-12-14 2021-09-04 2021-10-09 2022-04-07 r développer un logiciel de su cation Selection ation luation ivi évaluation et former le pe rsonnel dédié au PAPC BJ-PAPC-186661-CS-NPO / R ecrutement d'une ONG pour l Component 1: Stormwater d 'appui à la mise en oeuvre de rainage investment and com s Plans d'Action de Réinstalla Quality Based Sel IDA / 64300 munity engagement for floo Post Open - National 21,216.00 0.00 Canceled 2020-10-15 2020-11-27 2020-11-05 2020-12-19 2021-01-16 2021-02-15 2021-03-17 2021-04-21 2022-04-21 tion (PAR) des travaux d'assa ection d risk reduction and climate inissement pluvial et d'amén change adaptatio n agement de rues dans les ba ssins AAc, Y et Pa3 la ville de Cotonou BJ-PAPC-206814-CS-QCBS / Sélection d'un firme pour dév elopper et opérationnaliser u n SIG pour la gestion des eau Component 2: Strengthening Quality And Cost- x pluviales et la résilience ur IDA / 64300 urban resilience manageme Post Open - National 172,414.00 0.00 Canceled 2021-06-09 2021-06-30 2021-08-13 2021-09-10 2021-10-10 2021-11-14 2021-12-19 2022-07-30 Based Selection baine à l'échelle de Cotonou nt and capacity et d’un modèle hydrologique pour production de cartes d’a léas des inondations et renfo rcement des capacités BJ-PAPC-250274-CS-QCBS / Sélection d'une firme pour dé velopper et opérationnaliser un SIG pour la gestion des ea Component 2: Strengthening Quality And Cost- Open - Internationa Under Implement ux pluviales et la résilience u IDA / 64300 urban resilience manageme Post 224,275.00 0.00 2021-08-30 2021-09-15 2021-09-20 2021-11-10 2021-11-03 2021-12-01 2021-12-31 2022-02-04 2022-03-11 2023-03-11 Based Selection l ation rbaine à l'échelle de Cotonou nt and capacity et d’un modèle hydrologique pour production de cartes d’a léas des inondations et renfo rcement des capacités Page 2 BJ-PAPC-280756-CS-QCBS / Component 1: Stormwater d Recrutement de la mission d rainage investment and com Quality And Cost- Open - Internationa Under Implement e surveillance et contrôle gé IDA / 64300 munity engagement for floo Post 1,554,000.00 0.00 2022-02-24 2022-03-21 2022-03-17 2022-03-28 2022-04-30 2022-05-09 2022-05-28 2022-06-27 2022-08-01 2022-09-05 2023-09-05 Based Selection l ation néral et suivi de la mise en o d risk reduction and climate euvre du PGES dans le bassin change adaptatio n AAc BJ-PAPC-281126-CS-CQS / R ecrutement d'un consultant c hargé de l'évaluation de la p Component 2: Strengthening Consultant Qualifi Under Implement erformance du mécanisme d IDA / 64300 urban resilience manageme Post Open - National 83,461.00 0.00 2022-03-23 2022-03-21 2022-04-13 2022-05-05 2022-05-27 2022-06-26 2022-07-31 2023-01-27 cation Selection ation 'entretien et de maintenance nt and capacity du réseau d'assainissement pluvial de la Ville de Cotono u BJ-PAPC-360305-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening r études de renforcement du Consultant Qualifi Pending Impleme IDA / 64300 urban resilience manageme Post Open - National 102,740.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2024-03-20 système d’archivage numéri cation Selection ntation nt and capacity que de la Direction Général p our le Développement Urbain (DGDU) BJ-PAPC-360308-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening Consultant Qualifi Pending Impleme r études de reconstitution de IDA / 64300 urban resilience manageme Post Open - National 25,685.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2024-03-20 cation Selection ntation s plans d’anciens réseaux d’a nt and capacity ssainissement dans la ville d e Cotonou. BJ-PAPC-360314-CS-CQS / R Component 2: Strengthening ecrutement d'un cabinet pou Consultant Qualifi Pending Impleme IDA / 64300 urban resilience manageme Post Open - National 42,808.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2024-03-20 r études sur le profil de risqu cation Selection ntation nt and capacity e et les seuils d’inondation p ar arrondissement. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Stormwater d BJ-PAPC-139127-CS-INDV / S rainage investment and com Individual Consult Pending Impleme IDA / 64300 Post Open 210,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 élection Coordonnateur munity engagement for floo ant Selection ntation d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139148-CS-INDV / S rainage investment and com Individual Consult Pending Impleme élection Expert Suivi Évaluat IDA / 64300 Post Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 munity engagement for floo ant Selection ntation ion d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139161-CS-INDV / S rainage investment and com Individual Consult Pending Impleme IDA / 64300 Post Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 élection Chef Comptable munity engagement for floo ant Selection ntation d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139162-CS-INDV / S rainage investment and com Individual Consult Pending Impleme élection Expert Passation Ma IDA / 64300 Post Open 135,000.00 0.00 2019-10-11 2019-11-29 2019-12-20 2020-01-24 2020-07-22 munity engagement for floo ant Selection ntation rchés d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139165-CS-INDV / S rainage investment and com Individual Consult élection Expert Sauvegarde E IDA / 64300 Post Open 135,000.00 0.00 Canceled 2019-10-11 2018-11-26 2019-11-29 2019-12-20 2020-01-24 2020-07-22 munity engagement for floo ant Selection nvrionementale d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139167-CS-INDV / S rainage investment and com Individual Consult élection Expert en sauvegard IDA / 64300 Post Open 135,000.00 0.00 Canceled 2019-10-11 2019-02-25 2019-11-29 2019-12-20 2020-01-24 2020-07-22 munity engagement for floo ant Selection e sociale d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139168-CS-INDV / S rainage investment and com Individual Consult Under Implement élection Expert en facilitation IDA / 64300 Post Open 135,000.00 0.00 2019-10-11 2019-10-30 2019-11-29 2019-12-20 2020-01-24 2020-07-22 munity engagement for floo ant Selection ation sociale d risk reduction and climate change adaptatio n Component 1: Stormwater d BJ-PAPC-139169-CS-INDV / S rainage investment and com Individual Consult Under Implement IDA / 64300 Post Open 170,400.00 0.00 2019-10-11 2019-10-15 2019-11-29 2019-12-20 2020-01-24 2020-07-22 élection Expert Hydraulicien munity engagement for floo ant Selection ation d risk reduction and climate change adaptatio n BJ-PAPC-159363-CS-INDV / E Component 3: Project mana Individual Consult Under Implement IDA / 64300 Post Open 180,000.00 0.00 2020-02-14 2020-02-19 2020-02-28 2020-03-04 2020-03-14 2020-03-19 xpert en sauvegarde sociale gement, monitoring and eva ant Selection ation luation BJ-PAPC-159583-CS-INDV / E Component 3: Project mana Individual Consult Under Implement IDA / 64300 Post Open 180,000.00 0.00 2020-02-14 2020-02-19 2020-02-28 2020-03-04 2020-03-14 2020-03-19 xpert en sauvegarde environ gement, monitoring and eva ant Selection ation nementale luation BJ-PAPC-189667-CS-INDV / R ecrutement d’un Consultant i Component 3: Project mana ndividuel pour la réalisation Individual Consult IDA / 64300 gement, monitoring and eva Post Limited 26,200.00 26,200.00 Signed 2020-10-15 2020-11-03 2020-10-20 2021-06-18 2020-11-10 2021-09-03 2020-12-16 2021-11-05 2021-02-21 de l'étude d'Impact Environn ant Selection luation emental et Social des rues co mplémentaires dans les bass ins AAc et Pa3 BJ-PAPC-202809-CS-INDV / S Component 1: Stormwater d élection d'un consultant indiv rainage investment and com iduel pour la réalisation des p Individual Consult IDA / 64300 munity engagement for floo Post Limited 47,700.00 0.00 Canceled 2020-12-01 2020-12-16 2020-12-06 2020-12-27 2021-01-31 2021-07-30 lans d'action, de réinstallatio ant Selection d risk reduction and climate n des rues complémentaires change adaptatio n dans les bassins AAc et Pa3 BJ-PAPC-206776-CS-INDV / R ecrutement d'un consultant i Component 3: Project mana Individual Consult ndividuel pour la mise en pla IDA / 64300 gement, monitoring and eva Post Limited 51,370.00 0.00 Canceled 2020-11-26 2020-12-13 2020-12-07 2020-12-28 2021-02-01 2021-07-31 ant Selection ce d'une plateforme électroni luation que de gestion des plaintes BJ-PAPC-210206-CS-INDV / R Component 3: Project mana Individual Consult Under Implement ecrutement d'un (e) Chef Co IDA / 64300 gement, monitoring and eva Post Open 135,000.00 0.00 2020-12-21 2020-12-28 2021-02-08 2021-03-01 2021-04-05 2021-10-02 ant Selection ation mptable au profit du Pool PA luation PC Page 3 BJ-PAPC-168003-CS-INDV / R ecrutement d'un consultant i Component 3: Project mana ndividuel pour la mise en pla Individual Consult IDA / 64300 gement, monitoring and eva Post Limited 17,123.00 0.00 Canceled 2020-06-22 2020-10-11 2020-07-06 2020-07-27 2020-08-31 2021-02-27 ce des outils de Suivi-évaluat ant Selection luation ion du Programme (manuel d e suivi-évaluation et autres o utils) BJ-PAPC-227338-CS-INDV / R ecrutement d'un consultant i Component 2: Strengthening ndividuel pour l'élaboration d Individual Consult Under Implement IDA / 64300 urban resilience manageme Post Limited 31,268.00 0.00 2021-06-07 2021-06-02 2021-06-12 2021-10-12 2021-07-03 2021-08-07 2022-02-03 u plan de renforcement de ca ant Selection ation nt and capacity pacités consolidé du Program me d'Assainissement Pluvial de Cotonou BJ-PAPC-236872-CS-CDS / Re Component 3: Project mana crutement du Coordonnateur IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 51,198.00 51,198.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 du Pool PAPC luation BJ-PAPC-236877-CS-CDS / Re Component 3: Project mana crutement du SPECIALISTE E IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 35,467.00 34,467.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 N SUIVI-EVALUATION / PAPC luation BJ-PAPC-236879-CS-CDS / Re Component 3: Project mana crutement de l'EXPERT EN SA IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 34,855.00 34,855.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 UVEGARDE ENVIRONNEMENT luation ALE / PAPC BJ-PAPC-236891-CS-CDS / Re Component 3: Project mana crutement de l'EXPERT EN FA IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 34,855.00 34,855.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 CILITATION SOCIALE / PAPC luation BJ-PAPC-236893-CS-CDS / Re Component 3: Project mana crutement de l'EXPERT EN SA IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 36,792.00 36,792.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 UVEGARDE SOCIALE / PAPC luation BJ-PAPC-236898-CS-CDS / Re Component 3: Project mana crutement du SPECIALISTE E IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 35,467.00 35,467.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 N PASSATION DES MARCHES luation / PAPC BJ-PAPC-236902-CS-CDS / Re Component 3: Project mana crutement de l'expert HYDRA IDA / 64300 gement, monitoring and eva Post Direct Selection Direct 36,119.00 36,119.00 Signed 2021-06-07 2021-06-02 2021-06-17 2021-06-04 2021-08-21 2021-06-22 2022-02-17 ULICIEN PAPC luation BJ-PAPC-237488-CS-INDV / R Component 3: Project mana ecrutement d'un consultant i Individual Consult Under Implement IDA / 64300 gement, monitoring and eva Post Open 15,582.19 0.00 2021-06-18 2021-06-13 2021-08-06 2021-08-27 2021-10-01 2022-03-30 ndividuel pour appuyer le Po ant Selection ation luation ol PAPC dans la passation de s marchés BJ-PAPC-250285-CS-INDV / S Component 1: Stormwater d élection d'un consultant indiv rainage investment and com iduel pour la réalisation des p Individual Consult Under Implement IDA / 64300 munity engagement for floo Post Open 47,700.00 0.00 2021-08-25 2021-08-30 2021-10-13 2021-11-03 2021-12-08 2022-06-06 lans d'action, de réinstallatio ant Selection ation d risk reduction and climate n des rues complémentaires change adaptatio n dans les bassins AAc et Pa3 BJ-PAPC-257731-CS-INDV / R Component 1: Stormwater d ecrutement d’un Consultant I rainage investment and com ndividuel pour la formation d Individual Consult Under Implement IDA / 64300 munity engagement for floo Post Limited 17,123.00 0.00 2021-10-20 2021-10-14 2021-10-25 2021-11-15 2021-12-20 2022-06-18 es acteurs en charge des sau ant Selection ation d risk reduction and climate vegardes environnementale change adaptatio n et sociale sur la restauration des zones humides BJ-PAPC-266038-CS-INDV / R Component 3: Project mana Individual Consult Under Implement ECRUTEMENT D’UN EXPERT E IDA / 64300 gement, monitoring and eva Post Open 36,792.00 0.00 2021-12-02 2021-12-08 2022-01-20 2022-02-10 2022-03-17 2022-09-13 ant Selection ation N SAUVEGARDE SOCIALE /PA luation PC BJ-PAPC-282615-CS-INDV / R Component 3: Project mana ecrutement d'un consultant i Individual Consult Under Implement IDA / 64300 gement, monitoring and eva Post Limited 85,620.00 0.00 2022-08-15 2022-07-04 2022-08-20 2022-09-10 2022-10-15 2023-04-13 ndividuel pour réaliser l'audit ant Selection ation luation de conformité environnemen tale et sociale 2022 BJ-PAPC-282616-CS-INDV / R ecrutement d'un consultant i Component 3: Project mana Individual Consult Pending Impleme ndividuel pour la réalisation IDA / 64300 gement, monitoring and eva Post Open 25,680.00 0.00 2022-10-14 2022-12-02 2022-12-23 2023-01-27 2023-07-26 ant Selection ntation de l'audit de la mise en œuvr luation e du Plan d'Actions de Réinst allation (PAR) BJ-PAPC-282617-CS-INDV / R Component 3: Project mana Individual Consult Under Implement ecrutement d'un consultant IDA / 64300 gement, monitoring and eva Post Limited 51,370.00 0.00 2022-03-14 2022-03-14 2022-03-19 2022-04-09 2022-05-14 2022-11-10 ant Selection ation pour l'évaluation à mi-parcou luation rs du PGERU BJ-PAPC-282691-CS-INDV / R ecrutement d'un Consultant i ndividuel chargé de l'élabora tion du document du Progra Component 2: Strengthening Individual Consult mme axé sur les résultats po IDA / 64300 urban resilience manageme Post Limited 68,490.00 0.00 Canceled 2022-06-15 2022-06-20 2022-07-11 2022-08-15 2023-02-11 ant Selection ur le "soutien au développem nt and capacity ent municipal et de résilience des villes" (Appui au Ministèr e du Cadre de Vie et du Déve loppement Durable) BJ-PAPC-324879-CS-CDS / Re crutement d’un consultant in Component 1: Stormwater d dividuel chargé de l’élaborati rainage investment and com Under Implement on des Plans de Restauration IDA / 64300 munity engagement for floo Post Direct Selection Direct - National 29,109.60 0.00 2022-11-25 2022-11-21 2022-12-05 2023-02-08 2023-08-07 ation de Moyens de Subsistance ( d risk reduction and climate PRMS) des personnes affecté change adaptatio n es par le Projet du PAPC (Bas sins Y, Pa3 et AAc) Page 4 PROCUREMENT PLAN (Textual Part) Project information: INDIA, Uttarakhand Disaster Preparedness and Resilience Project (P179749) Project Implementation agency: PMU, UGRIDP Date of the Procurement Plan: January 2023 Period covered by this Procurement Plan (textual part): From January 2023 until publication of next version of the Procurement Plan (Textual Part). Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018, and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Procurement for the project will be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers, July 2016, Revised November 2017, August 2018, and November 2020 and applicable to Investment Project Financing (IPF). The project will be subject to the World Bank’s Anticorruption Guidelines, dated October 15, 2006, as revised in January 2011 and July 2016. The table below describes various procurement methods to be used for activities financed by the loan. The thresholds (Error! Reference source not found.) indicated will govern the procurement approach and methods; Table 1: Procurement Approaches and Methods Procurement Approaches Thresholds (US$ equivalent) and Methods For any value activity Open international Open national (Works – Up to 40 million including turnkey, supply and installation of plant and equipment and PPP) Open national (Goods, IT Up to 10 million system, and Non- Consulting Services) National request for Up to 100,000 quotation (Works, Goods, IT system and Non- Consulting Services) Direct selection No threshold; For works, goods, non-consulting services and IT system procurement: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations National Market Approach Up to 2 M for Selection of Consultants Prior Review Thresholds Works including Supply & All contracts more than or equal to US$ 10 million Installation of Plant and equivalent. Equipment Goods, IT system and Non- All contracts more than or equal to US$2 million consulting services equivalent Consultants All contracts (i) more than or equal to US$1 million equivalent for firms; and (ii) more than or equal to US$300,000 equivalent for individuals. Prior Review contracts Irrespective of the contract value, the following irrespective of value procurement activities are subject to the Bank’s procurement prior review: (a)procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulation for Borrowers (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations for Borrowers; and (e) best and final offer. Domestic preference- The provision of domestic preference for goods will be applied in the evaluation of bids in accordance with Annex VI of the Regulations. National Procurement Arrangements: National competition for the procurement of works, goods, IT system procurement and non-consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the following provisions: 1. Only the model bidding documents for National Competitive Procurement (NCP) agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding. 2. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. 3. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state- owned enterprises, small-scale enterprises or enterprises from any given State. 4. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. 5. Government e-Marketplace (GeM) set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. 6. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. 7. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 8. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 9. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. 10. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. Procurement of Works, Goods (Supply and Installation; and IT Equipment), Non-Consultancy Services and Consultancy Services – As per procurement plan approved in STEP. Use of Government e-Marketplace will be allowed in lieu of RFQ as per following details: 1. Up to INR 50,000 in catalog mode (viz. any available item could be selected by Implementing Agency without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. 2. Up to INR 3 Million from the Supplier having lowest price amongst at least three suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. 3. Up to INR equivalent of US$ 100,000 from the supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three suppliers, using online bidding or reverse auction tool provided on GeM. 4. While making use of GeM portal, the borrower shall make use of Special Terms and Conditions meant for World Bank financed projects. PROCUREMENT India : Uttarakhand Disaster Preparedness and Resilience Project PLAN General Information Country: India 2023-01-24 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P179749 GPN Date: Project Name: Uttarakhand Disaster Preparedness and Resilience Project Loan / Credit No: / PMU-UGRIDP Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 01/BR/RFB/UGRIDP/2023 / C onstruction of 50 M Steel Tru Single Stage - Two E Other (with field f Under Imple 2024-11-1 ss Motor Bridge in Uttarkashi / Post Request for Bids Open - National 968,292.00 0.00 2023-03-15 2023-04-18 2023-03-20 2023-05-06 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) mentation 0 - Lambgaon- Ghansali- Tilwar a Motor Road KM-98 near Ha numan Temple in District Teh ri 02/BR/RFB/UGRIDP/2023 / C onstruction of 30 M span Ste Single Stage - Two E Other (with field f Under Imple 2024-11-1 el Girder Pedestrian Bridge n / Post Request for Bids Open - National 310,976.00 0.00 2023-03-15 2023-04-18 2023-03-20 2023-05-06 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) mentation 0 ear Charbag over Lwani Gad era at Silwani Tok in District Chamoli. 03/BR/RFB/UGRIDP/2023 / C onstruction of 24 M span Ste Single Stage - Two E Other (with field f 2024-08-1 el Girder Motor Bridge in Km / Post Request for Bids Open - National 523,171.00 0.00 Canceled 2023-03-15 2023-03-20 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) 2 -2 of Ujjawalpur to Gwad -Du ngri -Jaspur Motor Road in Di strict Chamoli. 04/BR/RFB/UGRIDP/2023 / C onstruction of 90 M Span Ste Single Stage - Two E Other (with field f 2025-02-0 / Post Request for Bids Open - National 925,610.00 0.00 Canceled 2023-03-15 2023-03-20 2023-05-01 2023-07-14 2023-08-18 el Arch Pedestrian Bridge ove nvelope or explanation) 8 r Kel river at Supligad in Distr ict Chamoli. 05/BR/RFB/UGRIDP/2023 / C onstruction of 60M Span 1.5 Single Stage - Two E Other (with field f Under Imple 2025-02-0 Lane Steel Truss Bridge over / Post Request for Bids Open - National 837,805.00 0.00 2023-03-15 2023-04-18 2023-03-20 2023-05-06 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) mentation 8 Jimba River at Km-01 of Sera ghat-Golpha-Bona Motor Roa d in District Pithoragarh. 06/BR/RFB/UGRIDP/2023 / C onstruction of 4 No. Intermed iate Lane RCC Bridge & Steel Single Stage - Two E Other (with field f Under Imple 2025-02-0 / Post Request for Bids Open - National 1,059,756.00 0.00 2023-03-15 2023-04-18 2023-03-20 2023-05-06 2023-05-01 2023-07-14 2023-08-18 truss in km 3, 7, 11 & 14 at N nvelope or explanation) mentation 8 andprayag Ghat Motor Road i n Karanprayag District Cham oli 07/BR/RFB-EPC/UGRIDP/202 3 / Construction of 84 M Span Single Stage - Two E Other (with field f Pending Imp 2025-02-0 Motor Bridge over Pinder Riv / Post Request for Bids Open - National 1,971,951.00 0.00 2023-03-15 2023-03-20 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) lementation 8 er in Kulsari to Sunau Motor Road & its approach in Distri ct Chamoli (EPC Mode). 08/BR/RFB-EPC/UGRIDP/202 3 / Construction of 150 M Spa Single Stage - Two E Other (with field f Pending Imp 2025-02-0 n Motor Bridge over Ratmau / Post Request for Bids Open - National 1,967,073.00 0.00 2023-03-15 2023-03-20 2023-05-01 2023-07-14 2023-08-18 nvelope or explanation) lementation 8 River in Daluwala- Lalwala-D hanauri Motor Road in Distric t Haridwar (EPC Mode). 09/BR/RFB/UGRIDP/2023 / C onstruction of 3 Nos. (24/48/ 48 M) Span motor bridges & t heir approaches in Km-2 of U Single Stage - Two E Other (with field f Pending Imp 2025-06-2 jjawalpur to Gwad Dungri Jas / Post Request for Bids Open - National 1,692,500.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 pur Motor Road, over Meeng Gadera in Km-1 of Gadhani M otor Road and in Km-2 of Gai rsain to village Devalkot Mot or Road District Chamoli-EPC 10/BR/RFB/UGRIDP/2023 / C onstruction of 2 Nos. (80/90 M) Span Pedestrian Bridges Single Stage - Two E Other (with field f Pending Imp 2025-06-2 & their approaches over Kel r / Post Request for Bids Open - National 1,662,500.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 iver at Supligad, Block- Deval and on Paithani Garkot Bridle Road, Block- Narayanbagar D istrict Chamoli - EPC 11/BR/RFB/UGRIDP/2023 / C onstruction of 65M Span sing le lane Steel Truss Pedestrian Single Stage - Two E Other (with field f Under Imple 2024-12-2 / Post Request for Bids Open - National 402,500.00 0.00 2023-08-01 2023-05-25 2023-08-06 2023-06-21 2023-09-17 2023-11-30 2024-01-04 Bridge at GandaKhali village nvelope or explanation) mentation 9 to Ucholigoth village Block- C hampawat, District Champaw at 12/BR/RFB/UGRIDP/2023 / C onstruction of 75M Span sin Single Stage - Two E Other (with field f Under Imple 2025-03-2 gle lane Steel Truss Pedestria / Post Request for Bids Open - National 821,250.00 0.00 2023-08-01 2023-05-24 2023-08-06 2023-06-21 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) mentation 9 n Bridge at gram panchayat Chauramehta to Gurudwara, Block- Pati District Champaw at 13/BR/RFB/UGRIDP/2023 / C onstruction of 120M span do uble lane R.C.C. Prestress co ncrete bridge over Sher Nala Single Stage - Two E Other (with field f Under Imple 2025-06-2 / Post Request for Bids Open - National 1,241,250.00 0.00 2023-08-01 2023-05-25 2023-08-06 2023-06-21 2023-09-17 2023-11-30 2024-01-04 in Km 82 of Ramnagar - Kala nvelope or explanation) mentation 7 dhungi - Haldwani - Kathgoda m - Chorgalia - Sitarganj - Bijt i Motor Road, Block- Haldwa ni District Nainital 14/BR/RFB/UGRIDP/2023 / C onstruction of 90m Span Pe Single Stage - Two E Other (with field f Pending Imp 2025-06-2 destrian Bridge & its approac / Post Request for Bids Open - National 1,301,250.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 h road over Kotigaad near Ti kochi Market, Block- Mori Dis trict Uttarkashi - EPC Page 1 15/BR/RFB/UGRIDP/2023 / C onstruction of 150M span Int ermediate lane Motor Bridge Single Stage - Two E Other (with field f Pending Imp 2025-06-2 / Post Request for Bids Open - National 2,206,250.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 & its approach road over Nay nvelope or explanation) lementation 7 ar River for Badkholu village, Block- Kaljikhal District Pauri -EPC 16/BR/RFB/UGRIDP/2023 / C onstruction of 150M span Int Single Stage - Two E Other (with field f Under Imple 2025-06-2 ermediate lane Motor Bridge / Post Request for Bids Open - National 767,500.00 0.00 2023-08-01 2023-05-24 2023-08-06 2023-06-21 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) mentation 7 & its approach road over Nay ar River for Badkholu village, Block- Kaljikhal District Pauri 17/BR/RFB/UGRIDP/2023 / C onstruction of 120M span Pe Single Stage - Two E Other (with field f Pending Imp 2025-06-2 / Post Request for Bids Open - National 1,720,000.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 destrain bridge over Pilang g nvelope or explanation) lementation 7 ad, Block- Bhatwari, District Uttarkashi-EPC 18/BR/RFB/UGRIDP/2023 / C onstruction of 152M Span do Single Stage - Two E Other (with field f Pending Imp 2025-06-2 uble lane Motor bridge over / Post Request for Bids Open - National 3,876,250.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 Bhagirathi River near Tamak hani, Block-Bhatwari District Uttarkashi-EPC 19/BR/RFB/UGRIDP/2023 / C onstruction of 105M span Int ermediate lane Motor Bridge Single Stage - Two E Other (with field f Pending Imp 2025-06-2 / Post Request for Bids Open - National 1,905,000.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 over Saryu River in Bankot- B nvelope or explanation) lementation 7 adgari- Sapteshwar Motor Ro ad, Block- Gangolihat Distric t Pithoragarh - EPC 20/BR/RFB/UGRIDP/2023 / C onstruction of 100M span int Single Stage - Two E Other (with field f Pending Imp 2025-06-2 ermediate lane motor bridge / Post Request for Bids Open - National 1,850,000.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 over Dholi river at Sela villag e, Block- Dharchula District Pithoragarh-EPC 21/BR/RFB/UGRIDP/2023 / C onstruction of 125M Span Si Single Stage - Two E Other (with field f Under Imple 2025-06-2 ngle lane Suspension Pedestr / Post Request for Bids Open - National 952,500.00 0.00 2023-08-01 2023-05-25 2023-08-06 2023-06-21 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) mentation 7 ian Bridge over Pinder River for Odar village, Block- Deval District Chamoli 22/BR/RFB/UGRIDP/2023 / C onstruction of 120M Span Pe Single Stage - Two E Other (with field f Pending Imp 2025-06-2 destrian Bridge over Mainag / Post Request for Bids Open - National 1,270,000.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 ad in Pipalkoti-Math-Syun-Be mru Bridle Road, Block- Dash oli District Chamoli-EPC 23/BR/RFB/UGRIDP/2023 / C onstruction of 240M Span D Single Stage - Two E Other (with field f Pending Imp 2025-06-2 ouble lane motor bridge over / Post Request for Bids Open - National 2,343,750.00 0.00 2023-08-01 2023-08-06 2023-09-17 2023-11-30 2024-01-04 nvelope or explanation) lementation 7 Suswa river in Bullawala to S attiwala motor road, Block- D oiwala District Dehradun-EPC 24/BR/RFB-EPC/UGRIDP/202 3 / Construction of 84M span Single Stage - Two E Other (with field f Pending Imp 2025-04-0 motor bridge over Kotigaad i / Post Request for Bids Open - National 2,203,750.00 0.00 2023-06-28 2023-07-03 2023-08-02 2023-09-06 2023-10-11 nvelope or explanation) lementation 3 n KM 01 of Tikochi-Duchanu- Kiranu-Sirtoli Motor Road in D istrict Uttarkashi GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/SDRF/USDMA/UGRIDP/20 23 / Supply and installation o Single Stage - Two E Under Imple / Post Request for Bids Open - National 119,931.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 f Water Flood, Rescue & Dee nvelope mentation p Diving Equipment's 04/SDRF/USDMA/UGRIDP/20 Single Stage - Two E Under Imple 23 / Supply and Installation o / Post Request for Bids Open - National 118,195.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 nvelope mentation f Deep Diving Equipments 05/SDRF/USDMA//UGRIDP/20 23 / Supply and Installation o Single Stage - Two E Under Imple / Post Request for Bids Open - National 452,000.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 f Victim Location Equipment nvelope mentation and Air Lifting Bag Equipmen t's 07/SDRF/USDMA/UGRIDP/20 Single Stage - Two E Under Imple 23 / Supply and Installation o / Post Request for Bids Open - National 150,000.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 nvelope mentation f Rope Launcher Equipment 08/SDRF/USDMA/UGRIDP/20 23 / Supply and Installation o Single Stage - Two E Under Imple / Post Request for Bids Open - National 445,000.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 f Hydraulic Ramset & Hydraul nvelope mentation ic Combination Cutter Cum S preader Equipment 09/SDRF/USDMA/UGRIDP/20 Single Stage - Two E Under Imple 23 / Supply and Installation o / Post Request for Bids Open - National 210,625.00 0.00 2023-02-26 2023-03-14 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 nvelope mentation f CSSR Equipment 10/SDRF/USDMA/UGRIDP/20 23 / Supply and Installation o Single Stage - Two E Under Imple / Post Request for Bids Open - National 211,750.00 0.00 2023-02-26 2023-03-13 2023-03-03 2023-03-25 2023-04-14 2023-06-27 2023-08-01 2024-01-28 f Remote Area Light Single H nvelope mentation ead & Thermal Imaging Cam era 02/SDRF/USDMA/UGRIDP/20 Request for Quota Single Stage - One E Under Imple 23 / Supply and Installation o / Post Open - National 60,000.00 0.00 2023-03-03 2023-03-25 2023-04-28 2023-10-25 tions nvelope mentation f Inflatable rescue Motor Boat 03/SDRF/USDMA/UGRIDP/20 Request for Quota Single Stage - One E Under Imple 23 / Supply and Installation o / Post Open - National 23,000.00 0.00 2023-03-03 2023-03-25 2023-04-28 2023-10-25 tions nvelope mentation f Floating pump & Power aut o raft pump 06/SDRF/USDMA/UGRIDP/20 Request for Quota Single Stage - One E Under Imple 23 / Supply and Installation o / Post Open - National 23,750.00 0.00 2023-03-03 2023-03-25 2023-04-28 2023-10-25 tions nvelope mentation f Power Ascender Equipment Page 2 11/SDRF/USDMA/UGRIDP/20 Request for Quota Single Stage - One E Under Imple 23 / Supply and Installation o / Post Open - National 71,789.00 0.00 2023-03-03 2023-03-25 2023-04-28 2023-10-25 tions nvelope mentation f Mountain & High Rise Equip ment 01/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Multipurpose / Post Request for Bids Open - National 1,509,375.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation Fire Tender for Fire & Emerg ency Services 02/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Fire Entry Sui / Post Request for Bids Open - National 352,500.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation ts for Fire & Emergency Servi ces 03/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Breathing Ap / Post Request for Bids Open - National 1,509,375.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation paratus for Fire & Emergency Services 04/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Thermal Ima / Post Request for Bids Open - National 129,375.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation ging Camera for Fire & Emer gency Services 05/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Victim Locati / Post Request for Bids Open - National 194,062.50 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation on Camera for Fire & Emerge ncy Services 06/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Lifting Bag fo / Post Request for Bids Open - National 280,312.50 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation r Fire & Emergency Services 07/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Safety Net fo / Post Request for Bids Open - National 149,500.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation r Fire & Emergency Services 08/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Fireman Self / Post Request for Bids Open - National 141,000.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation Rescue Device for Fire & Em ergency Services 09/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Jumping Cus / Post Request for Bids Open - National 336,375.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation hion for Fire & Emergency Se rvices 10/FIRE/RFB/UGRIDP/2023 / Single Stage - Two E Under Imple Procurement of Fire Fighting / Post Request for Bids Open - National 575,000.00 0.00 2023-04-30 2023-04-04 2023-05-05 2023-05-06 2023-06-16 2023-08-29 2023-10-03 2024-01-31 nvelope mentation Robot for Fire & Emergency S ervices NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/DRDB/CBDRM/UGRIDP/20 22-23 / Selection of consultin Quality And Cost- Under Implement / Post Open - National 475,175.00 0.00 2023-01-13 2023-02-28 2023-02-05 2023-03-21 2023-03-01 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2025-07-26 g firm for Maintenance of Dis Based Selection ation aster Risk Database 03/DC/BRIDGES/PWD/UGRID Quality And Cost- Under Implement P/2022-23 / Selection of cons / Post Open - National 750,000.00 0.00 2023-01-13 2023-02-01 2023-01-13 2023-02-26 2023-03-26 2023-04-25 2023-05-30 2023-07-04 2025-07-03 Based Selection ation ulting firm for Design Consult ant of Bridges 04/RC/HEALTH/UGRIDP/2022 -23 / Selection of consulting f irm for Review of Retrofitting Quality And Cost- Under Implement / Post Open - National 250,000.00 0.00 2023-01-13 2023-02-14 2023-01-13 2023-02-26 2023-03-26 2023-04-25 2023-05-30 2023-07-04 2025-07-03 DPRs, propose Augmentation Based Selection ation of Services & Renovation req uirements of Hospital Buildin gs in Uttarakhand 05/SSW/PWD/UGRIDP/2022- 23 / Selection of consulting fi Quality And Cost- Under Implement / Post Open - National 250,000.00 0.00 2023-01-13 2023-01-13 2023-02-26 2023-03-26 2023-04-25 2023-05-30 2023-07-04 2025-07-03 rm for Design Consultant of S Based Selection ation lope Stabilization Works 06/PCC/BS/PWD/UGRIDP/202 2-23 / Selection of consulting Quality And Cost- Under Implement / Post Open - National 250,000.00 0.00 2023-01-13 2023-01-13 2023-02-26 2023-03-26 2023-04-25 2023-05-30 2023-07-04 2025-07-03 firm for Proof Checking of Bri Based Selection ation dges & Slope Stabilization W orks INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/IC/PMU/UDRP-AF/2022-23 Individual Consult Pending Impleme / Hiring of individual consulta / Post Limited 4,400.00 0.00 2023-03-16 2023-03-21 2023-03-31 2023-05-05 2023-08-09 ant Selection ntation nt (Bridge Design) for readin ess of UGRIDP 03/IC/UDRPAF/2022-23 / Hiri Individual Consult Pending Impleme ng of Individual Consultant (E / Post Limited 4,400.00 0.00 2023-03-16 2023-03-21 2023-03-31 2023-05-05 2023-08-09 ant Selection ntation stimation) for readiness of U GRIDP 05/IC/PMU/UDRP-AF/2023 / S election of Individual Consult Individual Consult Under Implement / Post Limited 5,250.00 0.00 2023-05-31 2023-06-19 2023-06-05 2023-06-10 2023-06-20 2023-09-30 ant (Forest Fire Suppression ant Selection ation and Management Expert) for readiness of UGRIDP 04/IC/PMU/UDRP-AF/2023 / S Individual Consult Pending Impleme election of individual consult / Post Limited 15,000.00 0.00 2023-06-20 2023-06-25 2023-07-16 2023-08-20 2023-09-30 ant Selection ntation ant - Disaster management S pecialist Page 3 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: negotiations May, 2019. 2. Date of General Procurement Notice: to be published in Aug 2020 3. Period covered by this procurement plan: The procurement period of project covered from year July 2020 to Jun 2021, no procurements have commenced as yet. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement for Moderate Risk Projects: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$ 4 million All 2. NCB (Goods) US$ 4 million All 3. ICB (Works) US$ 15 million All 4. NCB (Works) US$ 15 million All 5. (Non-Consultant Services) US$ 4 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Operations Manual has been prepared and procurement is a component of it. Arrangements for local government component have been given in detail. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness The main contracts identified so far for the three implementing entities are provided in the annex below. There are no large ICBs of Works or Goods; only some consultancies are beyond the national firms thresholds, and some non consultancy contracts of ETD. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 m 2. Single Source (Firms) Above US $ 2 m Justification alongwith identification of SSS in procurement plan 3. Individual Above US$ 400, 000 In addition the selection of procurement staff 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the OPCS guidance. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: There are a number of activities for consultancy contracts. The procurement activity table is annexed which indicted the identified activities. Procurement Activities Estimat Sr. Risk Bank Procureme Evaluation ed Cost Selection No Activity Catego oversig nt selection USD method . ry ht Approach method 000s Project Implementation Unit Office - Local Government Department Annual performanc QCBS e Substant QCBS Firms Highest 1 assessment 1,230 ial Prior Selection internation ranked al of Local Councils Environme nt and Social QCBS Moderat QCBS Firms Highest 2 Safeguard 4,920 e Prior Selection internation ranked s al consultanc y Project Implementation Unit Office - Excise and Taxation Department Disaster Lowest Substant 1 recovery 5,100 ial Prior RFB ICB IT evaluated site responsive Consultanc y for QCBS Modera QCBS Firms Highest 2 software 5,000 te Prior Selection internation ranked developme al nt 14,000 RFB non Lowest Property 5-7 Moderat Single stage 3 survey e post one envelope consultanc evaluated package y responsive s 10,000 Single stage Lowest IT 2-3 Substanti 4 hardware al Prior one envelope RFB evaluated package responsive s Consulting firm for QCBS Substanti QCBS Firms Highest 5 developing 1,680 al Prior Selection internation ranked ICT al strategy Project Implementation Unit Office - Sindh Investment Department Estimat Sr. Risk Bank Procureme Evaluation ed Cost Selection No Activity Catego oversig nt selection USD method . ry ht Approach method 000s Consultanc y for QCBS Substant QCBS Firms Highest 1 bussiness 5,250 ial Prior Selection internation ranked process al mapping Automatio QCBS n of Substant QCBS Firms Highest 2 business 6,000 ial Prior Selection internation ranked al processes Sindh Solid Waste Management Board (to be executed by LGD) Baseline QCBS study for Moderat QCBS Firms Highest 1 landfill 2,000 e Prior Selection internation ranked al sites Study for mapping QCBS Moderat QCBS Firms Highest 2 of 2,100 e Prior Selection internation ranked collection al systems Review of QCBS informal Substant QCBS Firms Highest 3 sector for 1,500 ial Prior Selection internation ranked al recycling PROCUREMENT Pakistan : Competitive and Livable City of Karachi Project PLAN General Information Country: Pakistan 2020-08-21 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161402 GPN Date: Project Name: Competitive and Livable City of Karachi Project Loan / Credit No: IBRD / 89980 Local Government Department, Sindh Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-LGD -187684-CW-RFQ / U Performance-based Grants t Request for Quota Single Stage - One E 2021-04-0 PGRADATION, RENOVATION IBRD / 89980 o Local Councils and Capacit Post Limited 100,000.00 97,012.25 Signed 2020-08-11 2020-02-20 2020-10-06 2020-03-19 tions nvelope 4 AND REDESIGNING FOR OFFI y Building CE PK-LGD -237541-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 100,150.42 Signed 2021-06-08 2020-10-01 2021-08-03 2020-10-30 tions nvelope 1 Redesigning For DMC South y Building PD) Office PK-LGD -237728-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 80,760.98 Signed 2021-06-09 2020-10-01 2021-08-04 2020-10-30 tions nvelope 2 Redesigning For DMC Central y Building PD) Office PK-LGD -237795-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 71,290.07 Signed 2021-06-09 2020-09-29 2021-08-04 2020-10-23 tions nvelope 2 Redesigning For DMC East Of y Building PD) fice PK-LGD -237874-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 36,168.89 Signed 2021-06-09 2021-02-04 2021-08-04 2021-03-04 tions nvelope 2 Redesigning For DMC West O y Building PD) ffice PK-LGD -237882-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 37,776.96 Signed 2021-06-09 2020-10-14 2021-08-04 2020-11-13 tions nvelope 2 Redesigning For DMC Malir O y Building PD) ffice PK-LGD -237906-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 101,154.28 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-09 tions nvelope 2 Redesigning For DMC Korang y Building PD) i Office PK-LGD -237915-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation and IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 100,000.00 77,991.22 Signed 2021-06-09 2021-06-25 2021-08-04 2021-08-03 tions nvelope 2 Redesigning for District Coun y Building PD) cil Office PK-LGD -237922-CW-RFQ / U Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 pgradation, Renovation And IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 50,000.00 41,777.81 Signed 2021-06-09 2020-09-29 2021-08-04 2020-10-23 tions nvelope 2 Redesigning For KMC Office y Building PD) PK-LGD -237925-CW-RFQ / R Performance-based Grants t Request for Quota Request for Quota Single Stage - One E 2021-11-0 epair & rehabilitation of wash IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 90,000.00 38,507.38 Signed 2021-06-09 2020-10-01 2021-08-04 2020-10-15 tions nvelope 2 rooms at KMC building y Building PD) PK-LGD -264252-CW-RFQ / U Performance-based Grants t Request for Quota pgradation, Renovation and Request for Quota Single Stage - One E 2022-05-2 IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 95,000.00 80,229.68 Signed 2021-12-04 2022-01-17 2022-01-29 2022-02-15 Redesigning for District Muni tions nvelope 9 y Building PD) cipal Corporation Keemari Off ice PK-LGD -283578-CW-RFB / R Request for Bids - Performance-based Grants t ehabilitation & Upgradation o Single Stage - One E Small Works SPD Pending Imp 2023-01-0 IBRD / 89980 o Local Councils and Capacit Post Request for Bids Open - National 500,000.00 0.00 2022-03-21 2022-03-26 2022-05-07 2022-06-06 2022-07-11 f Exterior Works and Parking nvelope (1 envelope proce lementation 7 y Building of the PIU CLICK Building and ss) Auditorium PK-LGD -285848-CW-RFQ / U Performance-based Grants t Request for Quota pgradation, Renovation and Request for Quota Single Stage - One E 2022-08-2 IBRD / 89980 o Local Councils and Capacit Post Limited tions (Non Bank-S 95,000.00 78,236.72 Signed 2022-04-02 2022-04-01 2022-05-28 2022-04-16 Redesigning for Council Hall, tions nvelope 6 y Building PD) Committee Room and Develo pment of Ramps. PK-LGD -299495-CW-RFQ / E Improvement of City Compet Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-02-1 stablishment of Computer La IBRD / 89980 itiveness and Business Envir Post Limited tions (Non Bank-S 21,000.00 0.00 2022-06-21 2022-08-16 tions nvelope lementation 2 b in PIU CLICK. onment PD) Request for Quota PK-LGD -321044-CW-DIR / R tions - Small Work epair of roads in Karachi dam Contigent Emergency Respo 18,350,000.0 Under Imple 2023-05-2 IBRD / 89980 Prior Direct Selection Direct - National s (Emergency) SP 0.00 2022-10-17 2022-10-25 2022-10-22 2022-11-07 2022-11-26 aged in 2022 rain floods; Pha nse Component 0 mentation 5 D -Non Competiti se 1 (10 Contracts). ve Request for Quota PK-LGD -327139-CW-DIR / R tions - Small Work Contigent Emergency Respo 2023-06-2 epair of Roads Damaged in R IBRD / 89980 Post Direct Selection Direct - National s (Emergency) SP 7,062,500.00 0.00 Signed 2022-11-21 2022-12-13 2022-11-26 2023-03-10 2022-12-31 nse Component 9 ain Floods 2022, Phase 2 (6 p D -Non Competiti ackages). ve PK-LGD -363106-CW-DIR / R Contigent Emergency Respo Other (with field f 2023-09-1 epair of Roads Damaged in Fl IBRD / 89980 Post Direct Selection Direct - National 6,262,500.00 0.00 Canceled 2023-05-23 2023-05-28 2023-07-02 nse Component or explanation) 1 oods (11 Contracts). Request for Quota PK-LGD -366062-CW-RFQ / E Contigent Emergency Respo Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-02-1 mergency road repair works IBRD / 89980 Post Limited 533,640.00 0.00 2023-06-19 2023-08-14 nse Component tions nvelope s (Emergency) SP lementation 0 under CERC executed by PIU. D -Competitive PK-LGD -366066-CW-DIR / R Contigent Emergency Respo Other (with field f 2024-01-1 oad Emergency Repair Works IBRD / 89980 Post Direct Selection Direct - National 6,262,500.00 0.00 Signed 2023-06-08 2022-10-25 2023-06-13 2023-03-10 2023-07-18 nse Component or explanation) 4 under CERC; Phase-2. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187687-GO-RFQ / P Performance-based Grants t Request for Quota Single Stage - One E IBRD / 89980 Post Limited 25,000.00 15,508.28 Signed 2020-08-11 2020-08-24 2020-10-06 2020-09-19 2021-04-04 ower Generator for PIU o Local Councils and Capacit tions nvelope y Building Page 1 PK-LGD -187603-GO-RFQ / IT Equipment for PIU (Computer Performance-based Grants t Equipments (Laptops, Deskto Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 70,000.00 62,025.57 Signed 2020-08-11 2020-05-07 2020-10-06 2020-06-09 2021-01-04 ps, Laser Printers, Multimedi tions nvelope y Building a Equipment, Camera Cartrid ges, Photocopier and Softwar es)) PK-LGD -187629-GO-RFQ / F Performance-based Grants t Request for Quota Single Stage - One E IBRD / 89980 Post Limited 70,000.00 68,841.78 Signed 2020-08-11 2020-04-01 2020-10-06 2020-04-25 2021-04-04 urniture and Fixture for PIU o Local Councils and Capacit tions nvelope y Building PK-LGD -187677-GO-RFQ / O Performance-based Grants t Request for Quota Single Stage - One E ffice Appliances, Machinery a IBRD / 89980 o Local Councils and Capacit Post Limited 35,000.00 35,811.48 Signed 2020-08-11 2020-05-07 2020-10-06 2020-06-09 2020-12-05 tions nvelope nd Communication System f y Building or PIU PK-LGD -187683-GO-RFQ / M Performance-based Grants t Request for Quota Single Stage - One E IBRD / 89980 Post Limited 3,500.00 2,386.22 Signed 2020-08-11 2020-04-21 2020-10-06 2020-05-31 2021-04-04 otorbikes for PIU o Local Councils and Capacit tions nvelope y Building PK-LGD -187682-GO-RFQ / O Performance-based Grants t Request for Quota Single Stage - One E IBRD / 89980 Post Limited 90,000.00 68,716.79 Signed 2020-08-11 2020-04-17 2020-10-06 2020-05-20 2021-04-04 ffice Vehicles for PIU o Local Councils and Capacit tions nvelope y Building PK-LGD -227730-GO-RFQ / Pr ocurement of Additional IT E Performance-based Grants t Request for Quota Single Stage - One E quipment for PIU (Computer IBRD / 89980 o Local Councils and Capacit Post Limited 75,000.00 44,107.27 Signed 2021-05-30 2021-05-25 2021-07-25 2021-06-22 2021-10-23 tions nvelope Equipments (Laptops, Deskto y Building ps, Laser Printers, Multimedi a Equipment) PK-LGD -237546-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 39,581.16 Signed 2021-06-08 2020-11-16 2021-08-03 2020-12-10 2021-11-01 tions nvelope ixture for DMC South office y Building PK-LGD -237549-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 20,994.11 Signed 2021-06-08 2020-10-20 2021-08-03 2020-11-18 2021-10-02 tions nvelope or DMC South Office y Building PK-LGD -237551-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Office Applianc IBRD / 89980 o Local Councils and Capacit Post Limited 20,000.00 16,133.26 Signed 2021-06-08 2021-02-12 2021-08-03 2021-03-02 2021-10-02 tions nvelope es and Machinery For DMC S y Building outh PK-LGD -237732-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 40,312.90 Signed 2021-06-09 2020-11-16 2021-08-04 2020-11-26 2021-11-02 tions nvelope ixture for DMC Central office y Building PK-LGD -237746-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 24,700.73 Signed 2021-06-09 2020-10-22 2021-08-04 2020-11-19 2021-10-03 tions nvelope or DMC Central Office y Building PK-LGD -237785-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Office Applianc IBRD / 89980 o Local Councils and Capacit Post Limited 20,000.00 15,855.03 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-04 2021-10-03 tions nvelope es and Machinery for DMC Ce y Building ntral office PK-LGD -237796-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 16,704.41 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-04 2021-11-02 tions nvelope ixture for DMC East office y Building PK-LGD -237803-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 26,429.24 Signed 2021-06-09 2020-10-29 2021-08-04 2020-11-19 2021-10-03 tions nvelope or DMC East y Building PK-LGD -237875-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 45,468.98 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-04 2021-11-02 tions nvelope ixture for DMC West office y Building PK-LGD -237877-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 19,655.58 Signed 2021-06-09 2020-11-16 2021-08-04 2020-12-17 2021-10-03 tions nvelope or DMC West Office y Building PK-LGD -237900-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E Pending Impl ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 0.00 2021-06-09 2021-08-04 2021-11-02 tions nvelope ementation ixture for DMC Malir office y Building PK-LGD -237901-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 19,611.45 Signed 2021-06-09 2020-11-16 2021-08-04 2020-12-10 2021-10-03 tions nvelope or DMC Malir Office y Building PK-LGD -237908-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 39,984.45 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-03 2021-11-02 tions nvelope ixture for DMC Korangi office y Building PK-LGD -237909-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 19,456.45 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-09 2021-10-03 tions nvelope or DMC Korangi Office y Building PK-LGD -237910-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E Pending Impl ocurement of Office Applianc IBRD / 89980 o Local Councils and Capacit Post Limited 20,000.00 0.00 2021-06-09 2021-08-04 2021-10-03 tions nvelope ementation es and Machinery for DMC Ko y Building rangi office PK-LGD -237916-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 36,163.84 Signed 2021-06-09 2021-07-29 2021-08-04 2021-12-31 2021-11-02 tions nvelope ixture for District Council offi y Building ce PK-LGD -237917-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 19,854.15 Signed 2021-06-09 2021-02-09 2021-08-04 2021-03-11 2021-10-03 tions nvelope or District Council Office y Building PK-LGD -237930-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E Pending Impl ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 15,000.00 0.00 2021-06-09 2021-08-04 2021-11-02 tions nvelope ementation ixture for KMC office y Building PK-LGD -237931-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E Pending Impl ocurement of IT Equipment f IBRD / 89980 o Local Councils and Capacit Post Limited 20,000.00 0.00 2021-06-09 2021-08-04 2021-10-03 tions nvelope ementation or KMC Office y Building PK-LGD -237932-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Office Applianc IBRD / 89980 o Local Councils and Capacit Post Limited 10,000.00 10,057.93 Signed 2021-06-09 2021-02-08 2021-08-04 2021-03-04 2021-10-03 tions nvelope es and Machinery for KMC off y Building ice PK-LGD -242619-GO-RFQ / P Performance-based Grants t Request for Quota Single Stage - One E ROCUREMENT OF HIGH-RESO IBRD / 89980 o Local Councils and Capacit Post Limited 95,000.00 0.00 Canceled 2021-07-20 2021-09-14 2021-12-13 tions nvelope LUTION SATELLITE IMAGERY y Building Page 2 PK-LGD -242752-GO-RFQ / Pr Performance-based Grants t ocurement of Office Applianc Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 80,000.00 51,883.59 Signed 2021-07-20 2021-09-03 2021-09-14 2021-10-08 2021-11-13 es and Machinery for the offi tions nvelope y Building ces of DMC East, West, Malir and District Council PK-LGD -242755-GO-RFB / Pr Performance-based Grants t ocurement of Personal Protec Single Stage - One E Pending Impl IBRD / 89980 o Local Councils and Capacit Post Request for Bids Open - National 160,000.00 0.00 2021-07-19 2021-07-24 2021-09-04 2021-10-04 2021-11-08 2022-05-07 tive Equipments for Local Co nvelope ementation y Building uncils of Karachi. PK-LGD -258432-GO-RFQ / Pr Performance-based Grants t ocurement of IT Equipment F Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 95,000.00 77,484.97 Signed 2021-10-23 2021-10-14 2021-12-18 2021-11-09 2022-03-18 or Anti Encroachment Drive tions nvelope y Building GIS Cell Commissioner Office Karachi PK-LGD -258433-GO-RFQ / Pr Performance-based Grants t ocurement of Furniture & Fixt Request for Quota Single Stage - One E Pending Impl IBRD / 89980 o Local Councils and Capacit Post Limited 70,000.00 0.00 2021-10-23 2021-12-18 2022-03-18 ure For Anti Encroachment D tions nvelope ementation y Building rive GIS Cell Commissioner O ffice Karachi. PK-LGD -264254-GO-RFQ / Pr Performance-based Grants t ocurement of Furniture and F Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 60,000.00 40,146.21 Signed 2021-12-17 2022-02-01 2022-02-11 2022-03-02 2022-04-12 ixture for District Municipal C tions nvelope y Building orporation Keemari office PK-LGD -264255-GO-RFQ / Pr Performance-based Grants t ocurement of IT Equipment f Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 50,000.00 40,250.67 Signed 2021-12-04 2021-12-06 2022-01-29 2022-01-08 2022-03-30 or District Municipal Corporat tions nvelope y Building ion Keemari office PK-LGD -264257-GO-RFQ / Pr Performance-based Grants t ocurement of Office Applianc Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 30,000.00 24,170.90 Signed 2021-12-25 2022-02-21 2022-02-19 2022-03-22 2022-04-20 es and Machinery for District tions nvelope y Building Municipal Corporation Keema ri office PK-LGD -285849-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of Furniture and F IBRD / 89980 o Local Councils and Capacit Post Limited 60,000.00 45,655.40 Signed 2022-04-02 2022-04-11 2022-05-28 2022-05-15 2022-08-26 tions nvelope ixture for Council Hall & Com y Building mittee Room PK-LGD -285854-GO-RFQ / Pr Technical Assistance for Soli Request for Quota Single Stage - One E ocurement of IT Equipment F IBRD / 89980 Post Limited 90,000.00 24,074.85 Signed 2022-04-02 2022-03-28 2022-05-28 2022-04-23 2022-08-26 d Waste Management tions nvelope or Solid Waste Management Board PK-LGD -287172-GO-RFQ / Pr Performance-based Grants t Request for Quota Single Stage - One E ocurement of IT Equipment H IBRD / 89980 o Local Councils and Capacit Post Limited 95,000.00 53,800.58 Signed 2022-04-09 2022-04-22 2022-06-04 2022-05-18 2022-09-02 tions nvelope ardware For CCIS 1339 Call C y Building enter PK-LGD -285853-GO-RFQ / Pr Performance-based Grants t ocurement of Office Applianc Request for Quota Single Stage - One E Pending Impl IBRD / 89980 o Local Councils and Capacit Post Limited 60,000.00 0.00 2022-04-09 2022-06-04 2022-09-02 es, Sound System for Council tions nvelope ementation y Building Hall & Conference Room for KMC Office PK-LGD -294671-GO-RFB / Pr Performance-based Grants t ocurement of High-Resolutio Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Request for Bids Open - National 150,000.00 0.00 Canceled 2022-05-16 2022-06-03 2022-05-21 2022-07-02 2022-08-01 2022-09-05 2023-03-04 n GEOID-based Ortho-rectifie nvelope y Building d Satellite Imagery PK-LGD -299456-GO-RFQ / Pr Improvement of City Compet Request for Quota Single Stage - One E Pending Impl ocurement of Equipment for IBRD / 89980 itiveness and Business Envir Post Limited 29,000.00 0.00 2022-06-20 2022-08-15 2023-02-11 tions nvelope ementation New Computer Lab for PIU-CL onment ICK PK-LGD -320129-GO-RFQ / I. Modernizing Urban Property Request for Quota Single Stage - One E Pending Impl IBRD / 89980 Post Open - National 50,000.00 0.00 2022-10-22 2022-12-17 2023-06-15 T. Equipment for PIU CLICK. Tax Administration and Syst tions nvelope ementation em PK-LGD -325591-GO-RFQ / Vi deo production (Before and A Contigent Emergency Respo Request for Quota Single Stage - One E Pending Impl IBRD / 89980 Post Limited 18,180.00 0.00 2022-11-15 2023-01-10 2023-07-09 fter) of the emergency road r nse Component tions nvelope ementation ehabilitation works. PK-LGD -325594-GO-RFQ / Pr Improvement of City Compet ocurement of Printing Materi Request for Quota Single Stage - One E Pending Impl IBRD / 89980 itiveness and Business Envir Post Limited 15,000.00 0.00 2022-11-13 2023-01-08 2023-07-07 al for CLICK, 2023. (Calendar tions nvelope ementation onment s, Mugs, Souvenirs). PK-LGD -325713-GO-DIR / D Improvement of City Compet esign, Supply and Installation IBRD / 89980 itiveness and Business Envir Post Direct Selection Direct - National 500,000.00 0.00 Canceled 2022-11-10 2022-11-08 2022-11-15 2022-12-20 2023-06-18 of MIS for SFHRP. onment PK-LGD -326314-GO-RFB / Pr Modernizing Urban Property Open - Internationa Single Stage - One E IBRD / 89980 Post Request for Bids 200,000.00 0.00 Canceled 2022-11-14 2022-11-15 2022-11-19 2022-11-15 2022-12-31 2023-01-30 2023-03-06 2023-09-02 ocurement of Satellite Image Tax Administration and Syst l nvelope ry. em PK-LGD -326315-GO-RFB / D Performance-based Grants t Single Stage - One E Under Imple esign, Supply and Installation IBRD / 89980 o Local Councils and Capacit Post Request for Bids Open - National 500,000.00 0.00 2022-11-14 2022-11-10 2022-11-14 2022-11-15 2022-11-21 2022-11-22 2022-12-21 2022-12-12 2023-01-25 2023-07-24 nvelope mentation of MIS for SFHRP. y Building PK-LGD -363143-GO-RFQ / Pr Modernizing Urban Property Request for Quota Single Stage - One E Pending Impl ocurement of Furniture for UI IBRD / 89980 Tax Administration and Syst Post Limited 45,000.00 0.00 2023-05-28 2023-07-23 2024-01-19 tions nvelope ementation PT Component. em PK-LGD -363145-GO-RFQ / R Modernizing Urban Property Request for Quota Single Stage - One E Pending Impl IBRD / 89980 Post Limited 50,000.00 0.00 2023-05-28 2023-07-23 2024-01-19 enovation of UIPT Office. Tax Administration and Syst tions nvelope ementation em PK-LGD -363146-GO-RFQ / Pr Modernizing Urban Property Request for Quota Single Stage - One E Pending Impl ocurement of IT and related IBRD / 89980 Tax Administration and Syst Post Limited 95,000.00 0.00 2023-05-28 2023-07-23 2023-10-23 tions nvelope ementation equipment for UIPT and LC P em ayroll Services. PK-LGD -366061-GO-RFB / Pr Modernizing Urban Property Open - Internationa Single Stage - One E Under Imple IBRD / 89980 Post Request for Bids 500,000.00 0.00 2023-06-12 2023-06-08 2023-06-17 2023-06-14 2023-07-29 2023-08-28 2023-10-02 2024-03-30 ocurement of Satellite Image Tax Administration and Syst l nvelope mentation ry for UIPT. em NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187689-NC-RFQ / P RE-POST CLEANING SURVEY Technical Assistance for Soli Request for Quota Single Stage - One E IBRD / 89980 Post Limited 19,000.00 14,971.92 Signed 2020-08-11 2020-06-26 2020-10-06 2020-07-15 2020-12-05 OF NALLAH’S (THROUGH DR d Waste Management tions nvelope ONE CAMERA AND / OR PHYS ICAL MEANS). Page 3 PK-LGD -258437-NC-RFQ / Pr Performance-based Grants t ocurement For Developing, E Request for Quota Single Stage - One E IBRD / 89980 o Local Councils and Capacit Post Limited 25,000.00 17,758.54 Signed 2021-10-23 2021-10-14 2021-12-18 2021-11-09 2022-06-16 difying Animated Videos to R tions nvelope y Building aise Public Participation In Lo cal Governance CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187691-CS-CQS / C onsultancy Services for Envir Technical Assistance for Soli Consultant Qualifi Under Implement onmental and Social Baseline IBRD / 89980 Post Limited 35,000.00 0.00 2020-08-06 2020-06-26 2020-08-20 2020-09-19 2020-10-24 2021-01-22 d Waste Management cation Selection ation Survey under WB Environme ntal Social Safeguard Frame work PK-LGD -188167-CS-QCBS / Hiring of Consultancy Service Performance-based Grants t s for GIS Mappinng of Karachi Quality And Cost- Open - Internationa Pending Impleme IBRD / 89980 o Local Councils and Capacit Prior 5,000,000.00 0.00 2020-08-10 2020-08-31 2020-10-14 2020-11-11 2020-12-11 2021-01-15 2021-02-19 2022-08-18 along with Utility mappinng a Based Selection l ntation y Building nd Own Source Revenue Sur vey for all the LCs of Karachi PK-LGD -188171-CS-QCBS / Hiring of Firm for designing comprehensive ERP System f Performance-based Grants t or LCs (KMC, DMCs and Dist Quality And Cost- Open - Internationa Pending Impleme IBRD / 89980 o Local Councils and Capacit Post 1,500,000.00 0.00 2020-11-02 2020-12-23 2021-02-05 2021-03-05 2021-04-04 2021-05-09 2021-06-13 2022-06-13 Council) with FMIS, HRMIS, A Based Selection l ntation y Building sset Mannagement, Own Sou rce revenue and Budgeting a nd Complaint Redressal Mec hannism.along with separate Website PK-LGD -201920-CS-QCBS / Consultancy Services For Eng Performance-based Grants t Quality And Cost- Open - Internationa Under Implement ineering Design and Supervis IBRD / 89980 o Local Councils and Capacit Post 1,500,000.00 0.00 2020-11-30 2020-11-17 2020-12-21 2020-11-25 2021-02-03 2021-03-03 2021-04-02 2021-05-07 2021-06-11 2024-06-30 Based Selection l ation ion of Sub Projects (Works) fo y Building r Local Councils of Karachi PK-LGD -203742-CS-CQS / C onsultancy Services for Prep Performance-based Grants t Consultant Qualifi Pending Impleme aration of Procurement Stand IBRD / 89980 o Local Councils and Capacit Post Open - National 100,000.00 0.00 2020-11-23 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2021-09-29 cation Selection ntation ard Operating Procedures (S y Building OP's) for Local Councils for C ompliance with SPPRA Rules PK-LGD -201917-CS-CQS / C Performance-based Grants t onsultancy Services For Desi Consultant Qualifi Under Implement IBRD / 89980 o Local Councils and Capacit Post Open - National 55,000.00 0.00 2020-11-23 2020-11-24 2020-12-14 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2021-09-29 gn & Development of Websit cation Selection ation y Building es for CLICK and Local Counc ils in Karachi PK-LGD -201874-CS-CQS / C Performance-based Grants t onsultancy Services For Annu Consultant Qualifi Under Implement IBRD / 89980 o Local Councils and Capacit Post Open - National 200,000.00 0.00 2020-11-23 2020-12-03 2020-12-14 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2024-06-30 al Performance Assessment o cation Selection ation y Building f Local Councils in Karachi PK-LGD -203999-CS-CQS / C onsultancy Services for Perfo Technical Assistance for Soli Consultant Qualifi Pending Impleme IBRD / 89980 Post Open - National 300,000.00 0.00 2020-11-23 2020-12-14 2021-01-27 2021-02-26 2021-04-02 2022-04-02 rmance Management For Sin d Waste Management cation Selection ntation dh Solid Waste Management Board (SSWMB) PK-LGD -203986-CS-CQS / C Performance-based Grants t onsultancy Services For Engi Consultant Qualifi Under Implement IBRD / 89980 o Local Councils and Capacit Post Open - National 300,000.00 0.00 2020-11-23 2020-11-17 2020-12-14 2020-11-24 2021-01-27 2020-12-11 2021-02-26 2021-04-02 2022-04-02 neering Design, Quality Contr cation Selection ation y Building ol and Supervision of Subproj ects (Works) PK-LGD -227732-CS-CQS / T echnical, Financial and Legal Consultancy and Transaction Advisory Services for Perform Technical Assistance for Soli Consultant Qualifi Under Implement ance-based Solid Waste Man IBRD / 89980 Post Limited 150,000.00 0.00 2021-04-08 2021-03-03 2021-04-22 2021-05-22 2021-06-26 2021-12-23 d Waste Management cation Selection ation agement for Sindh Solid Waste Managem ent Board for District Central and District Korangi of Karac hi Division PK-LGD -235723-CS-CQS / C Performance-based Grants t Consultant Qualifi Under Implement onsultancy Services for Hirin IBRD / 89980 o Local Councils and Capacit Post Limited 250,000.00 0.00 2021-05-25 2021-10-29 2021-06-08 2021-07-08 2021-08-12 2022-08-12 cation Selection ation g of Legal firm y Building PK-LGD -235726-CS-CQS / Pr Performance-based Grants t Consultant Qualifi Pending Impleme IBRD / 89980 Post Open - National 50,000.00 0.00 2021-05-26 2021-06-16 2021-07-30 2021-08-29 2021-10-03 2022-04-01 ocurement of Data Entry Fir o Local Councils and Capacit cation Selection ntation m for ERP y Building PK-LGD -258452-CS-CQS / C Performance-based Grants t Consultant Qualifi Under Implement onsultancy Services For Fina IBRD / 89980 o Local Councils and Capacit Post Limited 150,000.00 0.00 2021-10-22 2021-11-09 2021-11-05 2021-12-05 2022-01-09 2024-06-30 cation Selection ation ncial Audits of Local Councils y Building of Karachi. PK-LGD -283575-CS-CQS / C Performance-based Grants t onsultancy services for Hirin Consultant Qualifi IBRD / 89980 o Local Councils and Capacit Post Open - National 300,000.00 0.00 Signed 2022-03-16 2022-03-29 2022-04-06 2022-05-20 2022-05-06 2022-06-19 2022-06-26 2022-07-24 2023-07-24 g of an Independent Monitori cation Selection y Building ng Consultant (IMC) PK-LGD -283593-CS-CQS / C onsultancy Services for Hirin Technical Assistance for Soli Consultant Qualifi Under Implement IBRD / 89980 Post Limited 300,000.00 0.00 2022-03-21 2022-04-19 2022-04-04 2022-05-04 2022-06-08 2022-07-14 g of Communication Firm for d Waste Management cation Selection ation Sindh Solid Waste Managem ent Board PK-LGD -287258-CS-CQS / C onsultancy services for OSR i Performance-based Grants t Consultant Qualifi Under Implement mprovement action plan and IBRD / 89980 o Local Councils and Capacit Post Open - National 250,000.00 0.00 2022-04-04 2022-06-13 2022-04-25 2022-06-29 2022-06-08 2022-07-08 2022-08-12 2023-08-12 cation Selection ation surveys to identify leakages y Building and improve tax for local cou ncils PK-LGD -293181-CS-CQS / C onsultancy Services (Technic Technical Assistance for Soli Consultant Qualifi Under Implement al Advisor) for the developme IBRD / 89980 Post Limited 300,000.00 0.00 2022-05-06 2022-05-12 2022-05-20 2022-06-19 2022-07-24 2023-01-20 d Waste Management cation Selection ation nt of Energy-from-Waste for t he Sindh Solid Waste Manage ment Board, Karachi Page 4 PK-LGD -293183-CS-CQS / C onsultancy Services for Selec tion of Financial and Legal Ad Technical Assistance for Soli Consultant Qualifi Under Implement IBRD / 89980 Post Limited 300,000.00 0.00 2022-05-06 2022-06-03 2022-05-20 2022-06-19 2022-07-24 2023-01-20 visor for the development of d Waste Management cation Selection ation Energy-From-Waste for the Si ndh Solid Waste Managemen t Board, Karachi PK-LGD -294678-CS-CQS / C onsultancy Services to carry out Geospatial, incorporating Performance-based Grants t Property Assessment and Mu Consultant Qualifi IBRD / 89980 o Local Councils and Capacit Post Open - National 20,000.00 0.00 Canceled 2022-05-22 2022-06-16 2022-06-12 2022-07-26 2022-08-25 2022-09-29 2023-03-28 nicipality Infrastructure Asset cation Selection y Building s Digital Model along with Pro cessing of High-Resolution G EOID based Ortho-rectified S atellite Imagery PK-LGD -299602-CS-CQS / Hi Improvement of City Compet ring of firm for Diagnostic Stu Consultant Qualifi Under Implement IBRD / 89980 itiveness and Business Envir Post Open - National 180,000.00 0.00 2022-06-17 2022-06-21 2022-07-08 2022-06-30 2022-08-21 2022-09-20 2022-10-25 2023-04-23 dy on introduction of country cation Selection ation onment Financial Management Infor mation Sytem. PK-LGD -337706-CS-CQS / Hi Performance-based Grants t Consultant Qualifi Under Implement ring of Firm for creation of As IBRD / 89980 o Local Councils and Capacit Post Open - National 223,000.00 0.00 2023-01-23 2023-02-08 2023-02-13 2023-03-29 2023-04-28 2023-06-02 2023-11-29 cation Selection ation set Inventory of LCs. y Building PK-LGD -337708-CS-CQS / Hi Improvement of City Compet Consultant Qualifi ring of Communication and O IBRD / 89980 itiveness and Business Envir Post Open - National 115,000.00 0.00 Signed 2023-01-23 2023-02-02 2023-02-13 2023-03-08 2023-03-29 2023-03-29 2023-04-28 2023-05-01 2023-06-02 2023-11-29 cation Selection utreach Firm. onment PK-LGD -337710-CS-CQS / Hi Performance-based Grants t Consultant Qualifi Under Implement ring of firm for Gender Aware IBRD / 89980 o Local Councils and Capacit Post Open - National 140,000.00 0.00 2023-01-24 2023-02-02 2023-02-14 2023-03-30 2023-04-29 2023-06-03 2023-11-30 cation Selection ation ness in LCs. y Building INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LGD -187695-CS-INDV / T echnical Assistance Designin g Comprehensive ERP Syste m for Local Councils of Karac Performance-based Grants t Individual Consult hi (KMC, DMC’s And Distt Cou IBRD / 89980 o Local Councils and Capacit Post Limited 6,500.00 0.00 Canceled 2020-08-06 2020-08-11 2020-09-01 2020-10-06 2021-04-04 ant Selection ncil) With IFmis, Hrmis, Asset y Building Management, Own Source Re venue, Budgeting, Complaint Redressal Mechanism Along with Separate Website. PK-LGD -188165-CS-INDV / T echnical Assistance / Individu Performance-based Grants t al Consultant for GIS Mappin Individual Consult IBRD / 89980 o Local Councils and Capacit Post Limited 6,500.00 0.00 Canceled 2020-08-10 2020-08-15 2020-09-05 2020-10-10 2021-04-08 g of Karachi along with Utility ant Selection y Building mapping for all the LCs of Ka rachi ( Short Term Contract) PK-LGD -187856-CS-INDV / A Performance-based Grants t Individual Consult ssistant Contract & Procurem IBRD / 89980 o Local Councils and Capacit Post Open 50,830.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 ant Selection ent Specialist y Building PK-LGD -187870-CS-INDV / A Performance-based Grants t Individual Consult IBRD / 89980 Post Open 50,830.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 ssistant Finance Manager o Local Councils and Capacit ant Selection y Building PK-LGD -187877-CS-INDV / E Performance-based Grants t Individual Consult IBRD / 89980 Post Open 63,537.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 nvironment Safeguard Speci o Local Councils and Capacit ant Selection alist y Building PK-LGD -187882-CS-INDV / C Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 63,537.00 0.00 Canceled 2020-08-09 2020-08-14 2020-09-04 2020-10-09 2023-10-09 ommunication Specialist o Local Councils and Capacit ant Selection y Building PK-LGD -187883-CS-INDV / Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 65,000.00 0.00 Canceled 2020-08-09 2020-08-14 2020-09-04 2020-10-09 2023-10-09 Monitoring & Evaluation Spec o Local Councils and Capacit ant Selection ialist y Building PK-LGD -187885-CS-INDV / I Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 25,415.00 0.00 Canceled 2020-08-07 2020-08-12 2020-09-02 2020-10-07 2023-10-07 T Support officer o Local Councils and Capacit ant Selection y Building PK-LGD -187875-CS-INDV / A Performance-based Grants t Individual Consult IBRD / 89980 Post Open 50,830.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 ssistant Social Safeguard Spe o Local Councils and Capacit ant Selection cialist y Building PK-LGD -187880-CS-INDV / Performance-based Grants t Individual Consult IBRD / 89980 Post Open 63,537.00 0.00 Canceled 2020-08-07 2020-09-25 2020-10-16 2020-11-20 2023-11-20 Manager Technical (Civil) o Local Councils and Capacit ant Selection y Building PK-LGD -187850-CS-INDV / T ECHNICAL ASSISTANCE / FOC Technical Assistance for Soli Individual Consult IBRD / 89980 Post Limited 7,000.00 0.00 Canceled 2020-08-07 2020-08-12 2020-09-02 2020-10-07 2021-01-05 AL PERSON FOR SWEEP NULL d Waste Management ant Selection AH CLEANING (Short Term Co ntract) PK-LGD -202053-CS-INDV / G Performance-based Grants t Individual Consult eographic Information Syste IBRD / 89980 o Local Councils and Capacit Post Limited 102,000.00 0.00 Canceled 2020-11-15 2020-11-17 2020-11-20 2020-12-11 2021-01-15 2024-06-30 ant Selection m (GIS) Specialist y Building PK-LGD -203751-CS-INDV / S Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 63,537.00 0.00 Canceled 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 ocial Safeguard Specialist o Local Councils and Capacit ant Selection y Building PK-LGD -203754-CS-INDV / A Performance-based Grants t Individual Consult ssistant Environment Safegu IBRD / 89980 o Local Councils and Capacit Post Limited 50,830.00 0.00 Canceled 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 ant Selection ard Specialist y Building PK-LGD -203755-CS-INDV / A Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 ssistant Manager (Internal Au o Local Councils and Capacit ant Selection dit) y Building PK-LGD -203757-CS-INDV / J Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2024-06-30 unior Communication Special o Local Councils and Capacit ant Selection ist y Building PK-LGD -203760-CS-INDV / P rocurement and Contract Ma Technical Assistance for Soli Individual Consult IBRD / 89980 Post Limited 65,000.00 0.00 Canceled 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 nagement Specialist for Sind d Waste Management ant Selection h Solid Waste Management B oard (SSWMB) Page 5 PK-LGD -203786-CS-INDV / F Technical Assistance for Soli Individual Consult inancial Management Special IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 d Waste Management ant Selection ist for SSWMB PK-LGD -203787-CS-INDV / E Technical Assistance for Soli Individual Consult nvironmental Safeguard Spe IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 d Waste Management ant Selection cialist For SSWMB PK-LGD -203808-CS-INDV / S Technical Assistance for Soli Individual Consult IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-16 2020-11-18 2020-11-21 2020-12-12 2021-01-16 2024-06-30 ocial Safeguard Specialist for d Waste Management ant Selection SSWMB PK-LGD -203996-CS-INDV / Technical Assistance for Soli Individual Consult IBRD / 89980 Post 50,830.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 Waste to Energy Specialist F d Waste Management ant Selection or SSWMB PK-LGD -204015-CS-INDV / S Technical Assistance for Soli Individual Consult olid Waste Management Spe IBRD / 89980 Post Limited 50,830.00 0.00 Canceled 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2024-06-30 d Waste Management ant Selection cialist for SSWMB PK-LGD -204017-CS-INDV / F Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 65,000.00 0.00 Canceled 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 inancial Advisor For PPP Unit o Local Councils and Capacit ant Selection y Building PK-LGD -204018-CS-INDV / T Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 65,000.00 0.00 Canceled 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 echnical Advisor For PPP Unit o Local Councils and Capacit ant Selection y Building PK-LGD -204022-CS-INDV / L Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 65,000.00 0.00 Canceled 2020-11-16 2020-11-17 2020-11-21 2020-12-12 2021-01-16 2024-06-30 egal Advisor for PPP Unit o Local Councils and Capacit ant Selection y Building PK-LGD -207879-CS-INDV / E Performance-based Grants t Individual Consult IBRD / 89980 Post Limited 32,000.00 0.00 Canceled 2020-12-10 2020-12-15 2021-01-05 2021-02-09 2022-02-09 RP Specialist o Local Councils and Capacit ant Selection y Building PK-LGD -186638-CS-CDS / C onsultancy Services for Third Technical Assistance for Soli Pending Impleme IBRD / 89980 Post Direct Selection Direct 200,000.00 0.00 2020-07-30 2020-08-09 2020-10-13 2021-01-11 Party Monitoring and Spot Ch d Waste Management ntation ecking of Nala Cleaning Work at Karachi PK-LGD -242747-CS-INDV / C Performance-based Grants t onsultancy Services for Mapp Individual Consult IBRD / 89980 o Local Councils and Capacit Post Limited 15,000.00 0.00 Canceled 2021-07-15 2021-07-20 2021-08-10 2021-09-14 2022-03-13 ing and Analysis the Process ant Selection y Building of Local Councils of karachi PK-LGD -299491-CS-INDV / H Improvement of City Compet Individual Consult IBRD / 89980 Post Limited 30,000.00 16,753.92 Signed 2022-06-16 2022-06-20 2022-06-21 2022-06-22 2022-07-12 2022-07-29 2022-08-16 2022-07-09 2023-02-12 iring of project restructuring itiveness and Business Envir ant Selection consultant. onment PK-LGD -325391-CS-CDS / Hi Improvement of City Compet Under Implement ring of Project Implementatio IBRD / 89980 itiveness and Business Envir Post Direct Selection Direct - National 500,000.00 0.00 2022-11-07 2022-11-07 2022-11-17 2022-11-08 2023-01-21 2023-07-20 ation n Support Consultants for SP onment HF. PK-LGD -325716-CS-CDS / Hi Improvement of City Compet Under Implement IBRD / 89980 Post Direct Selection Direct - National 50,000.00 0.00 2022-11-10 2022-11-09 2022-11-20 2022-11-20 2023-01-24 2023-07-23 ring of Legal Consultant for S itiveness and Business Envir ation FHRP. onment PK-LGD -333882-CS-INDV / H Improvement of City Compet Individual Consult Under Implement iring of Procurement Speciali IBRD / 89980 itiveness and Business Envir Post Open - National 32,608.00 0.00 2023-01-08 2023-01-16 2023-02-26 2023-06-05 2023-03-19 2023-04-23 2023-10-20 ant Selection ation st for CLICK. onment PK-LGD -349027-CS-INDV / L Improvement of City Compet Individual Consult Under Implement IBRD / 89980 Post Limited 3,400.00 0.00 2023-03-16 2023-03-15 2023-03-21 2023-04-11 2023-05-16 2024-04-30 ead Expert for SAP implemen itiveness and Business Envir ant Selection ation tation. onment PK-LGD -349030-CS-INDV / E Improvement of City Compet Individual Consult Under Implement IBRD / 89980 Post Limited 11,200.00 0.00 2023-03-17 2023-03-17 2023-03-22 2023-04-12 2023-05-17 2024-05-01 xpert for SAP Implementation itiveness and Business Envir ant Selection ation . onment PK-LGD -349032-CS-INDV / A Improvement of City Compet Individual Consult Under Implement IBRD / 89980 Post Limited 4,500.00 0.00 2023-03-20 2023-03-15 2023-03-25 2023-04-15 2023-05-20 2024-05-04 ssistant for SAP implementati itiveness and Business Envir ant Selection ation on. onment PK-LGD -361265-CS-INDV / H Improvement of City Compet Individual Consult iring of Individual Consultant IBRD / 89980 itiveness and Business Envir Post Open - National 16,600.00 0.00 Under Review 2023-05-11 2023-04-01 2023-06-27 2023-07-18 2023-08-22 2023-11-21 ant Selection for APA of KMC. onment PK-LGD -361272-CS-INDV / C Improvement of City Compet Individual Consult Pending Impleme IBRD / 89980 Post Open - National 25,000.00 0.00 2023-05-11 2023-06-27 2023-07-18 2023-08-22 2023-11-23 onsultant-I for MIS Assessme itiveness and Business Envir ant Selection ntation nt UIPT. onment PK-LGD -361279-CS-INDV / C Modernizing Urban Property Individual Consult Pending Impleme IBRD / 89980 Post Open - National 3,963.00 0.00 2023-05-29 2023-07-17 2023-07-20 2023-08-24 2023-11-23 onsultant-II for MIS Assessme Tax Administration and Syst ant Selection ntation nt, UIPT. em PK-LGD -361282-CS-INDV / T Modernizing Urban Property Individual Consult Pending Impleme IBRD / 89980 Post Open - National 12,000.00 0.00 2023-05-11 2023-06-29 2023-07-20 2023-08-24 2023-11-23 echnical Advisor, UIPT. Tax Administration and Syst ant Selection ntation em PK-LGD -361284-CS-INDV / T Modernizing Urban Property Individual Consult Pending Impleme IBRD / 89980 Post Open - National 19,286.00 0.00 2023-05-29 2023-07-17 2023-08-07 2023-09-11 2024-09-10 echnical Project Manager, UI Tax Administration and Syst ant Selection ntation PT. em PK-LGD -361286-CS-INDV / S Modernizing Urban Property Individual Consult Pending Impleme IBRD / 89980 Post Open - National 15,000.00 0.00 2023-05-29 2023-07-17 2023-08-07 2023-09-11 2024-09-10 urvey Manager, UIPT. Tax Administration and Syst ant Selection ntation em Page 6 PROCUREMENT PLAN (Textual Part) Project information: Republic of Tajikistan Project name: Tajikistan Preparedness and Resilience to Disasters Project Project ID: P177779 Project Implementation agency: MoF, MoT, CoESCD Date of the Procurement Plan: May 14, 2023 Period covered by this Procurement Plan: Only two packages were provided by MoT, not the full plan Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the Tendering with Unlimited Participation procurement method may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Law of the Republic of Tajikistan “Оn Public Procurement of Goods, Works and Services”, # 1955 dated March 15, 2023 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: a. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. b. The request for bids/request for proposals document, including contract forms, acceptable to the Bank shall be used. c. The request for bids/request for proposals document and contract shall provide the right to the Bank to review procurement documentation and activities. d. Borrower shall put in place an effective complaints review mechanism and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. e. No preference shall be applied under competitive bidding following national market approach. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables “Not Applicable”. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable”. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] “Not Applicable”. Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] “Not Applicable”. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. “Not Applicable” Other Relevant Procurement Information. No CDC activities are envisaged under the project. The MoF will implement Contingent Emergency Response Component, with technical inputs and supervision from relevant agencies such as the CoESCD, IGEES and relevant departments within the MoF. PROCUREMENT Tajikistan : Tajikistan Preparedness and Resilience to Disasters Project PLAN General Information Country: Tajikistan Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-23 none) Project ID: P177779 GPN Date: Project Name: Tajikistan Preparedness and Resilience to Disasters Project Loan / Credit No: IDA / D9780 STATE INSTITUTION "Project Implementation Unit for Access to Green and Rural Development Finance" Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOF/TPRDP/W-RFB-01 / Wor Request for Bids - ks to build or renovate faciliti Component 2: Strengthening Single Stage - One E Small Works SPD Pending Imp 2025-04-2 es to host CoESCD’s regional IDA / D9780 Disaster Risk Management C Post Request for Bids Open - National 3,000,000.00 0.00 2024-01-10 2024-01-15 2024-02-26 2024-03-27 2024-04-24 nvelope (1 envelope proce lementation 4 crisis management centers ( apacity ss) RCMCs) in Khujand, Khorog a nd Bokhtar GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF/TPRDP/G-RFB-01 / Purc Component 2: Strengthening hasing of required informatio Open - Internationa Single Stage - One E Pending Impl IDA / D9780 Disaster Risk Management C Prior Request for Bids 3,100,000.00 0.00 2024-10-13 2024-10-18 2024-11-29 2024-12-29 2025-02-02 2025-08-01 n and communication techno l nvelope ementation apacity logy equipment to be installe d within 3 RCMCs MOF/TPRDP/G-RFB-03 / Purc Component 2: Strengthening Open - Internationa Single Stage - One E Pending Impl IDA / D9780 Prior Request for Bids 2,440,000.00 0.00 2023-08-27 2023-09-01 2023-10-13 2023-11-12 2023-12-17 2024-06-14 hasing of MCCV Disaster Risk Management C l nvelope ementation apacity MOF/TPRDP/G-RFQ-01 / Proc Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl urement of office equipment IDA / D9780 Post Open - National 20,000.00 0.00 2023-07-23 2023-09-17 2024-03-15 ement tions nvelope ementation for PIU MoF staff NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF/TPRDP/CQS-03 / Prepar Component 2: Strengthening ation of capacity building pla Consultant Qualifi Pending Impleme IDA / D9780 Disaster Risk Management C Post Open - National 100,000.00 0.00 2023-08-20 2023-09-10 2023-10-24 2023-11-23 2023-12-28 2024-06-25 ns for relevant staff and oper cation Selection ntation apacity ators of the RCMCS and user s of MCCV MOF/TPRDP/CQS-04 / Furthe Component 2: Strengthening Consultant Qualifi Pending Impleme IDA / D9780 Post Open - National 50,000.00 0.00 2024-06-15 2024-07-06 2024-08-19 2024-09-18 2024-10-23 2025-04-21 r updating of the SNiP Disaster Risk Management C cation Selection ntation apacity MOF/TPRDP/CQS-05 / Buildin Component 2: Strengthening g the capacity of the SCS in t Consultant Qualifi Pending Impleme IDA / D9780 Disaster Risk Management C Post Open - National 50,000.00 0.00 2024-06-26 2024-07-17 2024-08-30 2024-09-29 2024-11-03 2025-05-02 he field of monitoring and en cation Selection ntation apacity forcement of rules and regul ations MOF/TPRDP/CQS-06 / Trainin Component 2: Strengthening g of the construction commu Consultant Qualifi Pending Impleme IDA / D9780 Disaster Risk Management C Post Open - National 50,000.00 0.00 2023-08-01 2023-08-22 2023-10-05 2023-11-04 2023-12-09 2024-06-06 nity in the application and int cation Selection ntation apacity egration of SNiP requirement s into design solutions MOF/TPRDP/CQS-07 / Consul Component 2: Strengthening ting services to assess the re Consultant Qualifi Pending Impleme IDA / D9780 Disaster Risk Management C Post Open - National 100,000.00 0.00 2023-12-25 2024-01-15 2024-02-28 2024-03-29 2024-05-03 2024-10-30 quirements, fiscal realities, n cation Selection ntation apacity eeded legislation and regulat ions MOF/TPRDP/CQS-08 / Design Component 2: Strengthening ing priority mechanisms to e Consultant Qualifi Pending Impleme IDA / D9780 Disaster Risk Management C Post Open - National 200,000.00 0.00 2024-03-26 2024-04-16 2024-05-30 2024-06-29 2024-08-03 2025-01-30 nable establishment and fun cation Selection ntation apacity ctioning of disaster risk finan cing instruments MOF/TPRDP/CQS-01 / Develo pment of feasibility study, de sign estimates, cost estimate Component 2: Strengthening Consultant Qualifi Pending Impleme s, bills of quantities for the R IDA / D9780 Disaster Risk Management C Post Open - National 300,000.00 0.00 2023-06-05 2023-06-26 2023-08-09 2023-09-08 2023-10-13 2024-04-10 cation Selection ntation CMC in Khujand, Khorog and apacity Bokhtar, technical specificati on of ICT equipment and aut hor supervision MOF/TPRDP/LCS-09 / Project Component 3: Project Manag Least Cost Selecti Pending Impleme IDA / D9780 Post Open - National 10,000.00 0.00 2023-10-01 2023-10-22 2023-12-05 2024-01-02 2024-02-01 2024-03-07 2024-04-11 2024-05-11 audit for the 2023 year ement on ntation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF/TPRDP/CQS-02 / Servic Component 2: Strengthening Pending Impleme es to expand the national op IDA / D9780 Disaster Risk Management C Post Direct Selection Direct - National 60,000.00 0.00 2023-06-22 2023-07-02 2023-09-05 2024-03-03 ntation erational manual for the RCM apacity C Page 1 PLAN DE PASSATION DES MARCHES ……….. I - Généralités 1.1. Information générale sur le projet Pays: République du Sénégal Emprunteur : République du Sénégal Nom du Projet : Projet Pilote de Bus à Haut Niveau de Service BRT Numéros du Don / Crédit : 6058-SN/ 6059- SN Montant du Don / crédit : 280 900 000 Euros Unité de Gestion du Projet : 1.2 Date d’approbation du plan de passation de marchés Plan original : lundi 10 avril 2017 Révision 1 :21/12/2017 Révision 2 : 1.3 Date de publication de l’avis général de passation de marchés : 1.4 Période couverte par le Plan de passation des marchés : 18 mois 1.5 Niveau de risque : Substantiel II- passation de marché des biens et services courants a- Tableau des seuils de passation et de contrôle des marchés Nature des Valeur seuil du Contrats soumis à examen Méthode de passation de marchés dépenses marché $EU préalable de l’IDA AOI ≥ 10.000.000 Tous les contrats de plus $10,000, 000 USD AON < 10.000.000 Aucun 1. Travaux Demande de cotation – au moins 3 offres < 200.000 aucun Entente Directe Pas de seuil Tous les contrats de $100, 000 USD et plus AOI ≥ 1 000.000 Tous les contrats de $2, 000,000 et plus AON < 1000.000 Aucun 2. Fournitures Consultation de Fournisseurs locaux au moins < 100.000 Aucun et services 3 offres assimilés Consultation de Fournisseurs locaux (véhicules < 500.000 aucun et carburant) Entente directe Pas de seuil Tous les contrats de $100, 000 USD et plus b- TRAVAUX, FOURNITURES & SERVICES COURANTS - Travaux Date Date Montant Méthode Examen Pré ou prévue prévue estimati de préalabl post pour pour N° Description du Marché f passatio e ou à Commentaires qualifi- l’ouvertu l’attributi (000$.U n du posterior cation re des on (au S) marché i offres plus tard) Composante 1 : Mise en place du BRT Travaux d’aménagement de l’infrastructure BRT de Guédiawaye à la Pré Février Septembre 01 place Cabral environ 19 kms y compris la 262 000 AOI qualificat Priori 2018 2018 construction des infrastructures connexes ion (AGEROUTE) Travaux d’aménagement et d’amélioration du maillage du réseau (voie de report de 02 trafic, accès au dépôt, voie de détour, de 45 000 AOI Oui Priori Mars 2018 Mai 2018 connexion et de rabattement) (AGEROUTE) - Fournitures Date Date Méthode Examen Montant Pré ou prévue prévue de préalabl estimati post pour pour N° Description du Marché passatio e ou à Commentaires f (000 qualifi- l’ouvertu l’attributi n du posterior $.US) cation re des on (au marché i offres plus tard) Composante 1 : Mise en place du BRT Acquisition et installation des équipements et des systèmes 1 21 000 AOI OUI Priori Juin 2018 Aout 2018 d'exploitation (Billettique et SAEIV….) (CETUD/AGEROUTE) Composante 3 : Renforcement des capacités et suivi du projet Acquisitions de véhicules Janvier Février 02 273 AON NON Post (CETUD /AGEROUTE) 2018 2018 Janvier Février Acquisitions de Matériel informatique et CFL NON Post 03 36 de logiciels (CETUD/ AGEROUTE) 2018 2017 Janvier Février Acquisitions de mobilier de bureaux CFL NON Post 04 36 (CETUD / AGEROUTE) 2018 2018 Acquisition de Consommables et Janvier Février 05 fourniture de Bureaux (CETUD / 15 CFL NON Post 2018 2018 AGEROUTE) Février 06 Assurance véhicules (CETUD) 8 CFL NON Post Mars 2018 2018 Acquisition d'une station de mesure de la 07 qualité de l'aire pour le corridor BRT 145 AON NON NON Mai 2018 Juillet 2018 (CETUD) III. Passation de marché des services de prestations intellectuelles a- Tableau des seuils de passation et de contrôle des marchés Nature de Méthode de passation de Valeur seuil du Contrats soumis à examen dépenses marchés contrat $EU préalable Consultants SBQC1; SBQ2; SCM3; SBF4 Tous contrats de $1,000,000 EU Firmes ou plus SQC5 < 200 000 Aucun Tous contrats de 100.000 $ EU Entente directe Pas de seuil ou plus Consultant individuel (CI)6 ≥ 100.000 (AMI)7 Tous contrats de 300.000 $ EU ou plus Consultants Consultant individuel (CI) (3CV) < 100.000 Individuels Tous contrats de 100.000 $ EU Entente directe Pas de seuil ou plus Tous les TDRs, quel que soit la valeur du contrat, sont soumis à examen préalable. Liste restreinte de consultants pour prestations de services, d’un coût estimatif inférieur à 300 000$ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du paragraphe 2.7 des Directives de Sélection et Emploi de Consultants 1 Sélection Basée sur la Qualité et le Coût 2 Sélection Basée sur la qualité du Consultant 3 Sélection au coût minimum 4 Sélection à Budget fixe 5 Sélection basée sur les qualifications des consultants 6 Consultant Individuel 7 Avis à Manifestation d’Intérêt b- PLAN DE PASSATION DE MARCHE DES SERVICES DE PRESTATIONS INTELLECTUELLES Examen Date Préalabl Date Métho Montant prévue e ou prevue de de estimatif pour N° Description revue à pour Commentaires sélecti (000 l’ouvertur postério l’attributio on $.US) e des ri par la n offres Banque Composante 1 : Mise en place du BRT Recrutement d'une Mission de supervision et suivi SFQC 6 500 Priori Janvier mai 2018 1 des travaux d'aménagement de l'infrastructure 2018 BRT (AGEROUTE) Recrutement d’un bureau agréé pour le contrôle 2 technique et des installations des équipements du SFQC 400 Priori Fév 2018 Juin 2018 BRT (AGEROUTE) Composante 2 : Restructuration du réseau et aménagements urbains Etude approfondie pour le développement et la SFQC 182 février 3 mise en place d'un système d'intégration tarifaire Post Juin 2018 (CETUD) 2018 Supervision et suivi des travaux d'aménagements SFQC 853 Priori Fév. 2018 Mai 2018 4 urbains (AGEROUTE) Composante 3 : Renforcement des capacités et suivi du projet Octobre décembre Recrutement d’un coordonnateur du projet BRT CI 60 Post 5 (CETUD) 2017 2017 Recrutement de deux experts en suivi évaluation CI 60 Post Octobre décembre 10 (CETUD/ AGEROUTE) Examen Date Préalabl Date Métho Montant prévue e ou prevue de de estimatif pour N° Description revue à pour Commentaires sélecti (000 l’ouvertur postério l’attributio on $.US) e des ri par la n offres Banque 2017 2017 Octobre Décembre Recrutement d’un spécialiste en passation des CI 60 Post 11 marchés (CETUD) 2017 2017 Recrutement d’un Expert transport aménagement CI 30 Post juin 2018 Juillet 2018 12 (CETUD) Recrutement d’un ingénieur circulation et sécurité CI 30 Post Mars 2018 Avril 2018 13 routière (CETUD) Recrutement d’un économiste et planificateur des CI 30 Post Mars 2018 Avril 2017 14 transports (CETUD) 15 Recrutement d’un spécialiste marketing (CETUD) CI 30 Post Juin 2017 Juillet 2017 16 Recrutement d’un ingénieur routier (CETUD) CI 30 Post Juin 2017 Juillet 2017 Recrutement d’un expert en communication CI 30 Post Juin 2017 Juillet 2017 17 sociale(CETUD) Recrutement d’un sociologue en appui au suivi des CI 54 Post Janvier 2018 Février 2018 18 mesures d’accompagnement sociales (CETUD) Recrutement d’un chargé de la base de données CI 28 Post Janvier 2018 Février 2018 19 (CETUD) 20 Recrutement d’un agent administratif (CETUD) CI 15 Post Janvier 2018 Février 2018 Recrutement d’un assistant en charge des dossiers CI 15 Post Janvier 2018 Février 2018 21 des PAP (CETUD) PROCUREMENT Senegal : Dakar Bus Rapid Transit Pilot Project PLAN General Information Country: Senegal 2018-01-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156186 GPN Date: 2018-04-06 Project Name: Dakar Bus Rapid Transit Pilot Project Loan / Credit No: IDA / 60580, IDA / 60590, IDA / 73070 CETUD Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TOOI/17 / Travaux d'aménag ement de l'infrastructure du BRT infrastructure, fleet, an Open - Internationa Single Stage - One E 262,000,000. 2020-04-1 BRT de Guédiawaye à la plac IDA / 60590 Prior Request for Bids 0.00 Canceled 2018-01-15 2018-04-02 2018-04-02 2018-01-20 2018-06-11 2018-07-11 2018-08-15 d systems l nvelope 00 2 e Cabral environ 19kms Y co mpris la construction des infr astructures connexes SN-CETUD-55546-CW-RFB / Capacity building and projec Single Stage - One E 2019-03-1 Travaux d'extension des loca IDA / 60590 Post Request for Bids Open - National 350,000.00 335,361.85 Signed 2018-06-15 2019-02-13 2018-06-20 2019-02-14 2018-07-25 2019-03-14 2018-08-10 2019-06-18 2018-08-30 2019-06-18 t management nvelope 5 ux du siège du CETUD SN-CETUD-55583-CW-RFB / Travaux de réalisation des inf rastructures routières et des équipements connexes (Pôle BRT infrastructure, fleet, an Open - Internationa Single Stage - One E 323,000,000. 2021-10-1 s d'échanges, Stations, Dépô IDA / 60580 Prior Request for Bids 0.00 Canceled 2018-04-02 2018-06-18 2018-06-18 2018-04-07 2018-08-27 2018-09-26 2018-10-31 d systems l nvelope 00 5 t, Terminaux, Systèmes d'Aid e à l'Exploitation et d'Informa tion aux Voyageurs (SAEIV) e t de Billettique) du projet pilo te Bus Rapid Transit SN-CETUD-55602-CW-RFB / Travaux d'aménagement de Public transport network rest Open - Internationa Single Stage - One E 23,000,000.0 2021-02-1 IDA / 60590 Prior Request for Bids 0.00 Canceled 2019-03-04 2019-03-09 2019-04-23 2019-05-23 2019-06-27 voiries connexes au BRT (rep ructuring and road works l nvelope 0 6 ort de trafic, d'accès aux dép ôts, voies de détour ) SN-CETUD-133303-CW-RFQ / Travaux de curage, et de dés BRT infrastructure, fleet, an Request for Quota Single Stage - One E 2020-05-1 ensablement dans les comm IDA / 60590 Post Limited 65,000.00 0.00 Canceled 2020-01-06 2020-02-12 d systems tions nvelope 2 une de Grand-Yoff, grand-Da kar, Patte d’Oies/Grand-Médi ne SN-CETUD-71043-CW-RFQ / Capacity building and projec Request for Quota Single Stage - One E 2019-01-1 Aménagement d'un point d'i IDA / 60590 Post Limited 48,860.00 0.00 Canceled 2018-09-22 2019-09-24 2018-11-17 t management tions nvelope 6 nformation du BRT SN-CETUD-133870-CW-RFB / Construction et Réhabilitatio BRT infrastructure, fleet, an Single Stage - One E 2020-06-2 n d'Edifices Scolaires dans le IDA / 60590 Post Request for Bids Open - National 328,000.00 0.00 Canceled 2019-10-15 2019-10-20 2019-11-21 2019-12-06 2019-12-31 d systems nvelope 8 s Départements de Dakar et Guédiawaye (en 2 lots ) SN-CETUD-133908-CW-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E 2020-08-2 IDA / 60590 Post Limited 81,000.00 0.00 Canceled 2020-04-20 2020-05-27 Réhabilitation d'Edifices Spor d systems tions nvelope 5 tifs SN-CETUD-133304-CW-RFQ / Aménagement de pavés et e BRT infrastructure, fleet, an Request for Quota Single Stage - One E 2020-03-1 spaces verts dans les commu IDA / 60590 Post Limited 81,000.00 0.00 Canceled 2019-11-10 2019-12-17 d systems tions nvelope 6 nes de Pattes D'oie, Derklé, Grand-Dakar, Grand-Yoff, Gol f Sud SN-CETUD-165269-CW-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E 2020-12-2 Travaux d'extension du marc IDA / 60590 Post Limited 115,000.00 0.00 Canceled 2020-05-09 2020-06-23 d systems tions nvelope 0 hé de Grand Yoff SN-CETUD-342981-CW-RFB / Request for Bids - Travaux réhabilitation de gar Public transport network rest Single Stage - One E Works (without pr Pending Imp 2024-04-0 IDA / 60590 Post Request for Bids Open - National 1,956,375.00 0.00 2023-06-02 2023-06-07 2023-07-19 2023-09-02 2023-10-07 e des parcelles assainies et d ructuring and road works nvelope equalification) SP lementation 4 ’aménagement d'aires de sta D tionnement Request for Bids - SN-CETUD-342968-CW-RFB / Public transport network rest Single Stage - One E Works (without pr Pending Imp 2024-03-2 Travaux de réalisation de la IDA / 60590 Post Request for Bids Open - National 999,000.00 0.00 2023-06-08 2023-06-13 2023-07-25 2023-08-24 2023-09-28 ructuring and road works nvelope equalification) SP lementation 6 gare routière de Petersen D SN-CETUD-342987-CW-RFB / Request for Bids - Travaux de réalisation des ga Public transport network rest Single Stage - One E Small Works SPD Pending Imp 2024-08-0 IDA / 60590 Post Request for Bids Open - National 1,458,900.00 0.00 2023-06-20 2023-06-25 2023-08-06 2023-09-05 2023-10-10 res routières de Gounass et ructuring and road works nvelope (1 envelope proce lementation 5 Wakhinane dans le départem ss) ent de Guédiawaye National Procure SN-CETUD-364619-CW-RFQ / ment Document - Travaux d'aménagement d'e Public transport network rest Request for Quota Single Stage - One E Pending Imp 2024-03-1 IDA / 73070 Post Limited 1 Envelope proce 24,000.00 0.00 2023-07-22 2023-09-16 spaces de travail pour les ce ructuring and road works tions nvelope lementation 4 ss (Non Bank-SPD ntres de carrières ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual F002/17 / Acquisition de mat Capacity building and projec Single Stage - One E ériels de transport pour l'unit IDA / 60580 Post Request for Bids Open - National 273,000.00 0.00 Canceled 2018-01-14 2018-01-19 2018-02-19 2018-03-05 2018-04-09 2018-05-02 t management nvelope é d'exécution du projet F004/17 / acquisition de mat Capacity building and projec Request for Quota Single Stage - One E ériels informatique et de logi IDA / 60580 Post Limited 36,000.00 0.00 Canceled 2018-02-07 2018-03-13 2018-03-30 t management tions nvelope ciels pour le CETUD et l'AGER OUTE F005/17 / Acquisition d'une s Public transport network rest Single Stage - One E ixième station de mesure de IDA / 60580 Post Request for Bids Open - National 258,000.00 0.00 Canceled 2018-06-04 2018-06-09 2018-07-21 2018-08-06 2018-09-04 2018-12-24 ructuring and road works nvelope la qualité de l'air sur le corrid or du BRT. Page 1 SN-CETUD-55439-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de matériels et m IDA / 60590 Post Limited 81,433.00 69,874.50 Completed 2018-04-16 2018-05-16 2018-05-24 2018-06-18 2018-06-15 2018-09-24 t management tions nvelope obiliers de bureau SN-CETUD-55445-GO-RFB / Capacity building and projec Single Stage - One E IDA / 60590 Post Request for Bids Open - National 251,466.00 167,077.86 Completed 2018-04-05 2018-07-13 2018-04-25 2018-07-13 2018-05-30 2018-08-17 2018-06-14 2018-07-10 2019-10-24 2018-08-01 2019-11-01 Acquisition de véhicules et m t management nvelope otos SN-CETUD-55446-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de fournitures de IDA / 60590 Post Limited 48,860.00 28,607.79 Completed 2018-04-07 2018-05-16 2018-05-15 2018-07-23 2018-05-30 2018-10-23 t management tions nvelope bureau et de consommables informatiques SN-CETUD-61510-GO-RFB / Capacity building and projec Single Stage - One E Acquisition de matériels infor IDA / 60590 Post Request for Bids Open - National 195,440.00 144,199.82 Completed 2018-05-18 2018-06-26 2018-05-23 2018-07-13 2018-06-27 2018-07-27 2018-07-17 2018-08-17 2018-08-11 2018-10-24 2018-08-31 2019-09-30 t management nvelope matiques et logiciels SN-CETUD-71038-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Equipements du point d'infor IDA / 60590 Post Limited 24,430.00 103,002.11 Signed 2018-10-15 2021-09-01 2018-12-10 2021-11-19 2019-01-09 t management tions nvelope mation du BRT SN-CETUD-95259-GO-RFB / Public transport network rest Open - Internationa Single Stage - One E Acquisition de matériel de co IDA / 60590 Post Request for Bids 114,000.00 74,440.44 Completed 2019-01-21 2019-10-23 2019-01-31 2019-04-30 2019-03-17 2019-06-14 2019-04-01 2019-07-18 2019-04-26 2019-08-26 2019-10-13 2020-02-04 ructuring and road works l nvelope mptages de trafic routier SN-CETUD-102659-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de fourniture de b IDA / 60590 Post Limited 33,000.00 26,234.87 Completed 2019-03-05 2019-06-04 2019-04-03 2019-07-19 2019-04-18 2019-09-09 t management tions nvelope ureau pour le CETUD et le BR T SN-CETUD-102134-GO-RFB / Capacity building and projec Single Stage - One E Acquisition de matériels infor IDA / 60590 Post Request for Bids Open - National 133,550.00 159,726.28 Signed 2019-04-15 2019-08-09 2019-04-20 2019-06-09 2019-09-12 2019-06-29 2019-10-03 2019-07-23 2019-11-18 2019-09-06 2020-06-29 t management nvelope matiques et logiciels SN-CETUD-102142-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de consommable IDA / 60590 Post Limited 49,000.00 60,590.10 Signed 2019-04-10 2019-07-12 2019-05-09 2019-11-09 2019-05-24 2020-01-01 t management tions nvelope s informatiques (en 6 lots) SN-CETUD-133306-GO-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E IDA / 60580 Post Limited 65,000.00 60,885.61 Signed 2020-04-18 2020-08-12 2020-05-25 2020-11-11 2020-07-24 Acquisition de matériels méd d systems tions nvelope icaux SN-CETUD-133282-GO-RFB / BRT infrastructure, fleet, an Single Stage - One E Acquisition de matériels infor IDA / 60590 Post Request for Bids Open - National 113,000.00 202,537.19 Completed 2020-04-15 2020-06-03 2020-04-20 2020-06-04 2020-05-22 2020-07-10 2020-06-06 2020-11-04 2020-07-01 2021-02-19 2020-08-30 2021-08-05 d systems nvelope matiques et mobiliers de bur eau SN-CETUD-101488-GO-RFB / BRT infrastructure, fleet, an Open - Internationa Single Stage - One E Acquisition d'une station de IDA / 60590 Post Request for Bids 350,000.00 374,939.38 Signed 2020-01-20 2020-01-20 2020-01-24 2020-01-28 2020-03-10 2020-03-18 2020-03-30 2020-04-30 2020-04-24 2020-12-02 2020-07-23 d systems l nvelope mesure de la pollution de l'ai r SN-CETUD-163751-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisitions de matériels de IDA / 60590 Post Limited 11,500.00 8,797.09 Completed 2020-03-28 2020-03-17 2020-05-12 2020-05-19 2020-05-27 2020-06-30 t management tions nvelope climatisation SN-CETUD-133286-GO-RFB / Acquisition d'équipements et de matériels de transformati BRT infrastructure, fleet, an Single Stage - One E IDA / 60590 Post Request for Bids Open - National 102,000.00 0.00 Canceled 2020-04-06 2020-04-11 2020-05-13 2020-05-28 2020-06-17 2020-08-16 on des produits locaux (mini d systems nvelope patisserie, moulin, materiel d e transformation, materiel de savon et emballage) SN-CETUD-133293-GO-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E Acquisition de matériels de s IDA / 60590 Post Limited 20,000.00 0.00 Canceled 2020-04-18 2020-05-25 2020-06-24 d systems tions nvelope érigraphie SN-CETUD-133296-GO-RFQ / Acquisition de Logistiques év BRT infrastructure, fleet, an Request for Quota Single Stage - One E IDA / 60590 Post Limited 63,000.00 0.00 Canceled 2019-11-23 2019-12-30 2020-01-29 ènementiels (Sonorisation, b d systems tions nvelope aches, chaises) SN-CETUD-133275-GO-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E IDA / 60590 Post Limited 33,000.00 0.00 Canceled 2020-04-06 2020-05-09 2020-06-08 Acquisition de produits d'entr d systems tions nvelope etien SN-CETUD-133278-GO-RFB / Acquisition de matériels de n BRT infrastructure, fleet, an Single Stage - One E IDA / 60590 Post Request for Bids Open - National 140,000.00 171,698.70 Completed 2020-05-04 2020-07-24 2020-05-09 2020-06-10 2020-09-11 2020-06-25 2020-12-07 2020-07-15 2021-04-17 2020-08-14 2021-07-02 ettoiement et de produits d'e d systems nvelope ntretien en deux lots SN-CETUD-165266-GO-RFB / BRT infrastructure, fleet, an Single Stage - One E IDA / 60590 Post Request for Bids Open - National 106,000.00 88,559.95 Signed 2020-04-15 2020-07-10 2020-04-20 2020-04-23 2020-08-13 2020-05-13 2020-09-03 2020-06-22 2020-12-01 2020-07-22 Acquisition de kits scolaire d systems nvelope SN-CETUD-166819-GO-RFQ / Aménagement du rez de cha Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 10,000.00 13,846.11 Completed 2020-04-10 2020-08-31 2020-05-25 2020-10-20 2020-06-24 2020-12-24 ussée de l'annexe CETUD, po t management tions nvelope ur la maison d'information du BRT SN-CETUD-172040-GO-RFQ / Public transport network rest Request for Quota Single Stage - One E Acquisition de matériels de c IDA / 60590 Post Limited 42,000.00 19,739.24 Signed 2020-05-22 2020-06-25 2020-07-02 2020-12-18 2020-08-31 ructuring and road works tions nvelope omptages de données de traf ic SN-CETUD-181966-GO-DIR / Capacity building and projec Acquisition de fourniture de b IDA / 60590 Post Direct Selection Direct 25,290.00 22,663.89 Signed 2020-07-07 2020-07-01 2020-07-12 2020-07-06 2020-07-27 2020-08-03 2020-08-06 t management ureau pour le CETUD et le BR T SN-CETUD-183058-GO-RFB / Capacity building and projec Single Stage - One E Acquisition de matériels infor IDA / 60590 Post Request for Bids Open - National 134,394.00 96,339.32 Signed 2020-08-02 2020-12-28 2020-08-07 2020-09-06 2021-02-02 2020-09-26 2021-02-17 2020-10-31 2021-04-24 2020-12-15 t management nvelope matiques informatiques et lo giciels SN-CETUD-183344-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de consommable IDA / 60590 Post Limited 45,603.00 10,757.13 Signed 2020-08-05 2020-09-17 2020-08-30 2021-03-10 2022-08-30 t management tions nvelope s et accessoires informatique s SN-CETUD-185865-GO-RFQ / Conception, fourniture et inst Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 86,482.00 79,049.08 Signed 2020-08-19 2020-09-08 2020-09-20 2020-10-22 2020-12-19 allation de six (6) kiosques d’ t management tions nvelope information le long du corrid or du BRT SN-CETUD-209767-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition d'un groupe élect IDA / 60590 Post Limited 40,717.00 39,099.60 Signed 2020-12-30 2021-11-12 2021-02-08 2022-01-08 2021-02-23 t management tions nvelope rogène de 150 KVA SN-CETUD-61519-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 90,275.00 0.00 Canceled 2018-06-04 2018-07-16 2019-07-16 Acquisition de carburant pou t management tions nvelope r le projet Page 2 SN-CETUD-212413-GO-RFB / Capacity building and projec Single Stage - One E Acquisition de matériels et m IDA / 60590 Post Request for Bids Open - National 105,863.00 100,342.31 Signed 2021-01-19 2021-03-01 2021-01-24 2021-02-28 2021-03-30 2021-03-30 2021-05-13 2021-04-29 2021-06-03 2021-05-29 t management nvelope obiliers de bureaux SN-CETUD-133287-GO-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E IDA / 60590 Post Limited 57,000.00 0.00 Canceled 2020-05-19 2020-09-16 2020-06-25 2020-07-25 Acquisition d'équipements sp d systems tions nvelope ortifs SN-CETUD-133272-GO-RFQ / BRT infrastructure, fleet, an Request for Quota Single Stage - One E Acquisition de Fournitures et IDA / 60590 Post Limited 87,000.00 0.00 Canceled 2019-09-24 2019-10-31 2019-11-30 d systems tions nvelope de Kits scolaires SN-CETUD-192633-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 146,580.00 154,827.84 Completed 2021-07-20 2021-09-17 2021-09-03 2021-10-23 2021-10-03 2021-12-15 Acquisition de véhicules t management tions nvelope SN-CETUD-241310-GO-RFQ / Acquisition de matériels de c Public transport network rest Request for Quota Single Stage - One E IDA / 60590 Post Limited 21,173.00 10,798.83 Signed 2021-07-20 2021-09-06 2021-09-02 2021-12-21 2021-11-21 omptages de données de traf ructuring and road works tions nvelope ic 03 lots distincts SN-CETUD-271140-GO-RFQ / Acquisition de matériels de g Public transport network rest Request for Quota Single Stage - One E IDA / 60580 Post Limited 84,900.00 36,745.61 Signed 2022-05-10 2022-05-25 2022-07-05 2022-09-22 2023-01-01 estion de la circulation pour l ructuring and road works tions nvelope a Police Nationale et la Gend armerie SN-CETUD-282516-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de consommable IDA / 60590 Post Limited 15,000.00 11,542.06 Signed 2022-04-04 2022-03-16 2022-05-30 2022-05-10 2022-11-26 t management tions nvelope s et accessoires informatique s SN-CETUD-288028-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition et installation d’u IDA / 60590 Post Limited 33,500.00 28,217.84 Signed 2022-05-10 2022-06-10 2022-07-05 2022-09-07 2023-01-01 t management tions nvelope n système de Téléphonie IP SN-CETUD-267705-GO-RFB / Capacity building and projec Single Stage - One E Acquisition de matériels infor IDA / 60580 Post Request for Bids Open - National 192,000.00 0.00 Canceled 2022-04-05 2022-04-10 2022-05-22 2022-06-21 2022-07-26 2023-01-22 t management nvelope matiques et logiciels SN-CETUD-299377-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de matériels infor IDA / 60590 Post Limited 95,000.00 87,735.41 Signed 2022-06-22 2022-06-23 2022-08-17 2022-08-21 2023-02-13 2022-09-16 t management tions nvelope matiques et logiciels SN-CETUD-183350-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Acquisition de matériel et câ IDA / 60590 Post Limited 48,860.00 0.00 Canceled 2020-08-20 2020-09-07 2020-09-28 t management tions nvelope blage du réseau informatique du CETUD. SN-CETUD-233271-GO-RFB / Conception et fourniture de s Capacity building and projec Single Stage - One E Under Imple IDA / 60590 Post Request for Bids Open - National 120,510.00 0.00 2023-01-20 2022-10-24 2023-01-25 2023-03-01 2023-03-31 2023-05-15 2024-05-14 upports et objets de commun t management nvelope mentation ication du projet BRT SN-CETUD-323542-NC-RFQ / Request for Quota Single Stage - One E Acquisition de supports de co IDA / 60590 Road Safety Post Limited 90,169.00 0.00 Signed 2023-01-15 2023-02-24 2023-03-12 2023-09-08 tions nvelope mmunication sur la sécurité r outière SN-CETUD-342989-GO-RFB / Acquisition de quatorze (14) Public transport network rest Single Stage - One E Under Imple IDA / 60590 Post Request for Bids Open - National 235,045.00 0.00 2023-04-24 2023-05-15 2023-04-29 2023-05-23 2023-06-10 2023-07-10 2023-08-14 2024-02-10 conteneurs aménagés à usag ructuring and road works nvelope mentation e de bureaux au niveau des t erminus SN-CETUD-347841-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Pending Impl Acquisition de matériel infor IDA / 60590 Post Limited 31,400.00 0.00 2023-04-15 2023-06-10 2023-12-07 t management tions nvelope ementation matique et logiciels SN-CETUD-356327-GO-RFQ / Capacity building and projec Request for Quota Single Stage - One E Under Imple Acquisition de consommable IDA / 60590 Post Limited 33,100.00 0.00 2023-05-22 2023-05-31 2023-07-17 2024-01-13 t management tions nvelope mentation s et accessoires informatique s SN-CETUD-270703-GO-RFB / Acquisition d’équipement de Single Stage - One E Pending Impl IDA / 60580 Road Safety Post Request for Bids Open - National 245,225.00 0.00 2023-12-05 2023-12-10 2024-01-21 2024-02-20 2024-03-26 2024-09-22 sécurité spécialisé y compris nvelope ementation la formation des agents du c ontrôle routier SN-CETUD-332064-GO-RFQ / Acquisition d'écrans digitaux Capacity building and projec Request for Quota Single Stage - One E Under Imple IDA / 60590 Post Limited 9,000.00 0.00 2023-05-01 2023-04-25 2023-06-26 2023-12-23 verticaux et de système Visio t management tions nvelope mentation conférence pour la maison d e la mobilité SN-CETUD-361022-GO-RFB / Fourniture et pose de signalé Public transport network rest Single Stage - One E Pending Impl tique pour la mise en œuvre IDA / 60590 Post Request for Bids Open - National 999,000.00 0.00 2023-06-20 2023-06-25 2023-08-06 2023-09-05 2023-10-10 2024-04-07 ructuring and road works nvelope ementation du plan de circulation et du s tationnement autour du BRT SN-CETUD-361035-GO-RFB / Fourniture d'équipements en appui aux collectivités territo Public transport network rest Single Stage - One E Pending Impl IDA / 60590 Post Request for Bids Open - National 416,250.00 0.00 2023-09-05 2023-09-10 2023-10-22 2023-11-21 2023-12-26 2024-06-23 riales pour la gestion des déc ructuring and road works nvelope ementation hets pour les populations riv eraines le long du corridor B RT SN-CETUD-361266-GO-RFB / Fourniture et pose d'abris de Single Stage - One E Pending Impl IDA / 60590 Road Safety Post Request for Bids Open - National 249,600.00 0.00 2023-11-09 2023-11-14 2023-12-26 2024-01-25 2024-02-29 2024-08-27 s forces de l'ordre pour la sur nvelope ementation veillance corridor BRT SN-CETUD-364599-GO-RFB / Acquisition de matériel et log iciel en Transport et Mobilité Public transport network rest Single Stage - One E Pending Impl IDA / 73070 Post Request for Bids Open - National 79,100.00 0.00 2023-07-05 2023-07-10 2023-08-21 2023-09-20 2023-10-25 2024-04-22 pour le programme du Maste ructuring and road works nvelope ementation r interuniversitaire en Transp ort et Mobilité Numérique (Mi TMN) SN-CETUD-364616-GO-RFB / Acquisition de matériel Infor Public transport network rest Single Stage - One E Pending Impl matique et télécommunicatio IDA / 73070 Post Request for Bids Open - National 315,000.00 0.00 2023-07-10 2023-07-15 2023-08-26 2023-09-25 2023-10-30 2024-04-27 ructuring and road works nvelope ementation ns pour le programme du Ma ster MiTMN et les centres de carrières SN-CETUD-364617-GO-RFQ / Acquisition de matériel et mo Public transport network rest Request for Quota Single Stage - One E Pending Impl IDA / 73070 Post Limited 24,000.00 0.00 2023-07-09 2023-09-03 2024-03-01 biliers de bureau pour les ce ructuring and road works tions nvelope ementation ntres de carrières Page 3 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S001/17 / Service d'assuran Capacity building and projec Request for Quota Single Stage - One E ce des véhicules acquis dans IDA / 60580 Post Limited 8,000.00 0.00 Canceled 2018-01-27 2018-03-24 2019-03-24 t management tions nvelope le cadre du projet. SN-CETUD-55527-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 9,772.00 10,792.51 Signed 2018-05-10 2018-05-24 2018-06-06 2018-06-14 2019-06-05 Gardiennage des Locaux du t management tions nvelope BRT SN-CETUD-61517-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Service de nettoiement et d' IDA / 60590 Post Limited 8,958.00 8,428.02 Signed 2018-06-02 2018-05-30 2018-07-14 2018-06-26 2019-07-14 t management tions nvelope entretien des espaces verts d u BRT SN-CETUD-61520-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Câblage informatique et inter IDA / 60590 Post Limited 16,287.00 30,153.21 Signed 2018-05-30 2020-01-23 2018-07-06 2020-07-27 2018-09-04 t management tions nvelope connexion des locaux du BRT et du CETUD SN-CETUD-55511-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Souscription de police d'assu IDA / 60590 Post Limited 48,860.00 19,705.89 Signed 2018-06-10 2018-07-11 2018-07-22 2018-09-25 2019-07-22 t management tions nvelope rances maladie SN-CETUD-71009-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Recrutement d'une agence d IDA / 60590 Post Limited 81,430.00 61,587.33 Signed 2018-08-19 2019-06-04 2018-10-14 2019-10-22 2019-10-13 2019-11-14 t management tions nvelope e publicité pour la campagne d'affichage SN-CETUD-71024-NC-RFQ / Recrutement d' une agence Capacity building and projec Request for Quota Single Stage - One E de communication pour la co IDA / 60590 Post Limited 81,430.00 101,433.14 Signed 2018-08-21 2018-11-14 2018-10-16 2019-03-20 2019-04-14 t management tions nvelope nception et la production  de supports de communication et d'objets publicitaires SN-CETUD-71486-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Souscription de polices d'ass IDA / 60590 Post Limited 34,200.00 5,339.54 Completed 2018-09-23 2018-11-15 2018-11-18 2019-01-08 2019-11-18 2019-02-05 t management tions nvelope urances pour les véhicules d u BRT SN-CETUD-70997-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Sélection d'une agence de co IDA / 60590 Post Limited 57,003.00 83,991.78 Signed 2018-08-28 2019-06-07 2018-10-23 2019-08-27 2019-04-21 t management tions nvelope mmunication hors média SN-CETUD-89729-NC-RFQ / RECRUTEMENT D'UNE AGEN CE DE COMMUNICATION POU Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 12,103.00 0.00 Canceled 2018-12-11 2019-01-05 2019-01-20 R L'INSTALLATION D'UN ESP t management tions nvelope ACE D'EXPOSITION DE 50 M2 A LA FOIRE INTERNATIONAL E DE DAKAR FIDAK 2018 SN-CETUD-102621-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Gardiennage des locaux du C IDA / 60590 Post Limited 78,000.00 48,537.16 Signed 2019-04-10 2019-05-28 2019-05-09 2019-08-02 2021-05-08 t management tions nvelope ETUD et du BRT SN-CETUD-102663-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Entretien des locaux du CETU IDA / 60590 Post Limited 52,000.00 19,834.19 Signed 2019-04-15 2019-04-25 2019-05-11 2019-07-19 2021-05-10 t management tions nvelope D et du BRT SN-CETUD-102665-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 69,000.00 0.00 Canceled 2019-04-25 2019-05-21 2022-05-20 Entretien des véhicules du C t management tions nvelope ETUD SN-CETUD-102137-NC-RFQ / Souscription de police d'assu Capacity building and projec Single Stage - One E IDA / 60590 Post Request for Bids Open - National 227,000.00 29,936.03 Signed 2019-04-15 2019-08-20 2019-04-20 2019-05-25 2019-09-24 2019-06-14 2020-01-06 2019-07-09 2020-07-22 2022-07-08 rances équipements, véhicul t management nvelope es et maladie (en 3 lots) SN-CETUD-108595-NC-RFQ / Maintenance des équipement Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 20,000.00 4,076.98 Signed 2019-04-30 2019-07-12 2019-06-03 2019-11-08 2022-06-02 s informatiques et reprograp t management tions nvelope hie du CETUD et du BRT SN-CETUD-176075-NC-RFQ / Recrutement d’une agence d Capacity building and projec Request for Quota Single Stage - One E e communication pour la pro IDA / 60590 Post Limited 55,243.00 59,925.43 Completed 2020-05-29 2020-05-29 2020-06-30 2020-06-18 2020-07-30 2020-07-23 t management tions nvelope duction et diffusion de vidéos de sensibilisation contre le C OVID 19 SN-CETUD-181970-NC-DIR / Capacity building and projec Gardiennage des locaux du B IDA / 60590 Post Direct Selection Direct 51,264.00 46,073.41 Signed 2020-07-07 2020-07-01 2020-07-12 2020-06-09 2020-08-01 2020-08-04 2021-07-27 t management RT et du CETUD SN-CETUD-181976-NC-DIR / Service de nettoiment et d'e Capacity building and projec IDA / 60590 Post Direct Selection Direct 22,493.00 26,015.17 Signed 2020-07-07 2020-07-01 2020-07-12 2020-07-14 2020-07-27 2020-07-30 2021-07-22 ntretien des locaux de l'unité t management de gestion du projet BRT et d u CETUD SN-CETUD-183337-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Maintenance préventive et c IDA / 60590 Post Limited 9,772.00 4,838.90 Signed 2020-08-25 2021-03-30 2020-09-12 2021-07-17 2022-09-12 t management tions nvelope urative des équipements info rmatiques SN-CETUD-183338-NC-RFQ / Maintenance préventive et c Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 9,772.00 4,657.15 Signed 2020-09-04 2021-03-30 2020-09-29 2021-07-17 2022-09-29 urative des équipements et i t management tions nvelope nstallations de téléphonie SN-CETUD-183341-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 32,573.00 0.16 Signed 2020-08-19 2020-12-09 2020-09-13 2021-05-06 2022-09-13 Location d'imprimantes de pr t management tions nvelope oduction SN-CETUD-183348-NC-DIR / Prorogation durée de validité Capacity building and projec IDA / 60590 Post Direct Selection Direct 3,142.00 29,786.72 Signed 2020-07-22 2021-07-16 2020-07-24 2021-07-22 2020-08-08 2021-08-03 2021-03-09 du contrat d'assurance pour t management les véhicules du projet BRT SN-CETUD-198830-NC-DIR / Sélection d’un concessionnai re BRT infrastructure, fleet, an IDA / 60590 Prior Direct Selection Direct 120,000,000.00 149,575,025.60 Signed 2020-10-22 2020-10-18 2020-12-21 2022-02-18 2021-05-09 2022-03-22 2031-05-07 pour l’acquisition de matériel d systems s roulants, l’exploitation et la maintenance du premier rés eau de Bus Rapid Transit (BR T) de Dakar Page 4 SN-CETUD-234077-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Gardiennage des locaux du p IDA / 60590 Post Limited 94,463.00 57,517.70 Signed 2021-06-20 2021-06-25 2021-08-03 2021-07-31 2023-08-03 t management tions nvelope rojet BRT et du CETUD SN-CETUD-234078-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Nettoiement des locaux du p IDA / 60590 Post Limited 71,662.00 3,522.70 Signed 2021-06-20 2021-06-25 2021-08-03 2021-07-31 2023-08-03 t management tions nvelope rojet BRT et du CETUD SN-CETUD-282430-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60580 Post Limited 12,136.00 13,765.75 Signed 2022-04-10 2022-03-23 2022-06-05 2022-05-13 2022-12-02 Abonnement annuel Microsof t management tions nvelope t 365 SN-CETUD-270711-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60580 Post Limited 18,040.00 0.00 Signed 2022-05-10 2022-04-11 2022-07-05 2023-01-01 Services d'abonnement Clou t management tions nvelope d SN-CETUD-233275-CS-CQS / Capacity building and projec Request for Quota Single Stage - One E Sélection d'une agence pour IDA / 60590 Post Limited 25,230.00 24,778.08 Signed 2021-09-20 2022-05-05 2021-11-15 2022-07-19 2022-05-14 t management tions nvelope la communication digitale sur le projet SN-CETUD-233279-NC-DIR / Capacity building and projec Pending Impl Campagne d'affichage Abri-b IDA / 60590 Post Direct Selection 32,573.00 0.00 2022-08-12 2022-08-17 2022-09-11 2024-09-10 t management ementation us avec l'entreprise VDN TE CH SN-CETUD-183336-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 16,286.00 0.00 Canceled 2022-06-17 2022-07-14 2024-07-13 Sauvegarde automatique à di t management tions nvelope stance SN-CETUD-209768-NC-RFQ / Entretien et réparation des é Capacity building and projec Request for Quota Single Stage - One E IDA / 60590 Post Limited 11,401.00 0.00 Canceled 2020-12-30 2021-02-03 2023-02-03 quipements froids du projet t management tions nvelope BRT et du CETUD SN-CETUD-316844-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Maintenance curative et prév IDA / 60590 Post Limited 4,690.00 0.00 Signed 2023-01-15 2022-11-25 2023-03-12 2023-09-08 t management tions nvelope entive des équipements infor matiques SN-CETUD-355567-NC-RFB / Souscription de Polices d’Ass Capacity building and projec Single Stage - One E Under Imple urances (maladie - locaux et IDA / 60590 Post Request for Bids Open - National 81,750.00 0.00 2023-06-20 2023-04-24 2023-06-25 2023-05-25 2023-08-06 2023-06-22 2023-09-05 2023-10-10 2024-04-07 t management nvelope mentation équipements - véhicules) en trois (3) lots distincts SN-CETUD-315451-NC-RFQ / Prestation de services pour l Public transport network rest Request for Quota Single Stage - One E IDA / 60590 Post Limited 22,215.00 0.00 Canceled 2022-12-25 2023-02-19 2023-08-18 a collecte de données de traf ructuring and road works tions nvelope ic avec les matériels de com ptage SN-CETUD-233280-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Pending Impl IDA / 60590 Post Limited 32,158.00 0.00 2023-12-24 2024-02-07 2024-06-06 Campagne d'affichage numér t management tions nvelope ementation ique SN-CETUD-233276-NC-DIR / Capacity building and projec Pending Impl Campagne d'affichage bus A IDA / 60590 Post Direct Selection Direct - National 6,017.00 0.00 2023-08-10 2023-08-15 2023-09-24 2024-01-22 t management ementation FTU avec l'entreprise FIRELY MEDIA SN-CETUD-364551-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Pending Impl IDA / 60590 Post Limited 54,000.00 0.00 2023-07-08 2023-09-02 2024-09-01 Gardiennage des locaux du C t management tions nvelope ementation ETUD SN-CETUD-364557-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Pending Impl IDA / 60590 Post Limited 52,000.00 0.00 2023-07-15 2023-09-09 2024-09-08 Nettoiement des locaux du C t management tions nvelope ementation ETUD SN-CETUD-364559-NC-RFQ / Capacity building and projec Request for Quota Single Stage - One E Pending Impl Entretien des équipements fr IDA / 60590 Post Limited 8,000.00 0.00 2023-07-19 2023-09-13 2024-03-11 t management tions nvelope ementation oid du BRT SN-CETUD-364622-NC-RFQ / Services abonnements Cloud Public transport network rest Request for Quota Single Stage - One E Pending Impl IDA / 73070 Post Limited 5,000.00 0.00 2023-07-30 2023-09-24 2024-03-22 : Internet et Déploiement po ructuring and road works tions nvelope ementation ur la plate-forme Web CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C 008/17 / Supervision et sui Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Prior 853,000.00 0.00 Canceled 2018-01-21 2018-02-11 2018-03-01 2018-03-31 2018-04-30 2018-06-04 2018-07-09 2020-07-08 vi des travaux d'aménageme ructuring and road works Based Selection l nt urbains C001/17 / Mission de supervi BRT infrastructure, fleet, an Quality And Cost- Open - Internationa sion et de suivi des travaux d IDA / 60590 Prior 6,500,000.00 0.00 Canceled 2018-01-15 2018-02-05 2018-03-21 2018-04-18 2018-05-18 2018-06-22 2018-07-27 2020-03-31 d systems Based Selection l 'aménagement de l'infrastruc ture BRT SN-CETUD-55682-CS-QCBS / Sélection d'un cabinet pour l Capacity building and projec Quality And Cost- Open - Internationa IDA / 60590 Post 400,000.00 497,506.02 Signed 2018-04-10 2018-05-24 2018-04-24 2018-06-11 2018-06-03 2018-11-21 2018-07-03 2019-01-10 2018-07-23 2019-01-18 2018-09-01 2019-03-25 2018-10-11 2019-06-18 2019-06-08 e développement d'un modèl t management Based Selection l e de transport multimodal lo gé au CETUD SN-CETUD-55690-CS-QCBS / Recrutement d'un cabinet po Capacity building and projec Quality And Cost- Open - Internationa ur la mise en place d'un sys IDA / 60590 Post 150,000.00 56,793.49 Signed 2018-04-09 2018-04-24 2018-04-23 2018-07-23 2018-06-02 2018-11-21 2018-07-02 2018-12-28 2018-07-22 2019-01-18 2018-08-31 2019-02-06 2018-10-10 2019-04-08 2018-12-09 t management Based Selection l tème informatisé de suivi - é valuation et d'information m anagériale SN-CETUD-55689-CS-QCBS / Recrutement d'un cabinet po Capacity building and projec Quality And Cost- Open - Internationa IDA / 60590 Prior 1,850,000.00 2,796,906.15 Signed 2018-04-02 2018-10-03 2018-04-16 2019-01-25 2018-05-26 2019-09-24 2018-06-25 2019-11-12 2018-07-15 2020-01-09 2018-08-24 2020-11-13 2018-10-03 2020-12-04 2021-09-17 ur l'Assistance à la Maitrise d t management Based Selection l 'Ouvrage (AMO) SN-CETUD-55665-CS-QCBS / Supervision des travaux du p BRT infrastructure, fleet, an Quality And Cost- Open - Internationa IDA / 60590 Prior 8,000,000.00 0.00 Canceled 2018-04-02 2018-04-16 2018-05-15 2018-06-29 2018-07-19 2018-08-28 2018-10-11 2021-09-25 rojet pilote de Bus Rapid Tra d systems Based Selection l nsit (BRT) à Dakar SN-CETUD-55676-CS-QCBS / Public transport network rest Quality And Cost- Open - Internationa Surveillance des travaux d'a IDA / 60590 Prior 1,000,000.00 0.00 Canceled 2019-03-15 2019-03-29 2019-05-08 2019-06-07 2019-06-27 2019-08-06 2019-09-16 2021-09-05 ructuring and road works Based Selection l ménagement connexes au B RT Page 5 SN-CETUD-55659-CS-QCBS / Recrutement d'un bureau agr ée pour le Contrôle techniqu BRT infrastructure, fleet, an Quality And Cost- Open - Internationa IDA / 60590 Post 500,000.00 0.00 Canceled 2018-04-05 2018-04-19 2018-05-24 2018-06-23 2018-07-13 2018-08-22 2018-10-05 2021-09-19 e des infrastructures (ponts, d systems Based Selection l stations, chaussée en béton) et des installations des équip ements du BRT SN-CETUD-71475-CS-QCBS / Sélection d'un maitre d'œuvr Capacity building and projec Consultant Qualifi e en charge du suivi, du con IDA / 60590 Post Open - National 32,570.00 50,594.83 Signed 2019-01-08 2019-01-16 2019-01-23 2019-04-08 2019-02-21 2019-05-22 2019-04-07 2019-07-08 2019-05-12 2019-09-05 2020-08-23 t management cation Selection trôle et de la surveillance des travaux d'extension du siège du CETUD SN-CETUD-90358-CS-QCBS / Etude de restructuration glob ale du réseau de transports e Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Prior 1,200,000.00 2,326,022.24 Signed 2017-09-21 2017-10-01 2018-03-15 2018-05-07 2018-06-04 2018-10-07 2019-02-05 2018-10-12 2019-02-15 2018-10-18 n commun de Dakar y compr ructuring and road works Based Selection l is son système de rabatteme nt et d'intégration tarifaire SN-CETUD-94872-CS-QCBS / Sélection d'un consultant po ur l'élaboration d'un schéma Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Post 83,000.00 149,871.37 Signed 2019-01-17 2019-02-06 2019-02-04 2019-02-20 2019-04-01 2019-03-28 2019-05-02 2019-05-14 2019-05-13 2019-05-28 2019-06-17 2019-06-26 2019-07-22 2019-12-04 2020-03-30 institutionnel et organisation ructuring and road works Based Selection l nel de gestion de la circulatio n et du stationnement dans l a région de Dakar SN-CETUD-95278-CS-QCBS / Recrutement d'un cabinet po Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Post 800,000.00 1,175,634.52 Signed 2019-02-04 2019-02-06 2019-02-18 2019-03-04 2019-03-20 2019-07-26 2019-04-21 2019-09-12 2019-05-06 2019-10-03 2019-06-05 2019-11-07 2019-07-05 2020-05-21 2020-10-29 ur l'étude de circulation et de ructuring and road works Based Selection l stationnement sur la zone d'i nfluence du BRT SN-CETUD-94890-CS-QCBS / Public transport network rest Consultant Qualifi Open - Internationa Sélection d'un consultant po IDA / 60590 Post 122,000.00 297,574.81 Signed 2019-02-04 2019-02-18 2019-02-19 2019-03-15 2019-03-21 2019-04-30 2019-04-20 2019-10-31 2019-05-10 2019-12-23 2020-02-17 ructuring and road works cation Selection l ur une étude sur la logistique urbaine SN-CETUD-102666-CS-CQS / Sélection d'un consultant po Public transport network rest Consultant Qualifi Open - Internationa IDA / 60590 Post 130,000.00 273,611.25 Signed 2019-03-21 2019-03-20 2019-04-11 2019-05-22 2019-05-31 2019-09-30 2019-06-20 2019-12-06 2019-07-20 2020-07-23 2020-01-16 ur la réalisation d'un système ructuring and road works cation Selection l d'information sur les transpor ts urbains SN-CETUD-55680-CS-QCBS / Recrutement d'un cabinet po Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Post 400,000.00 0.00 Canceled 2018-04-02 2018-04-17 2018-04-16 2018-05-26 2018-06-25 2018-07-15 2018-08-24 2018-10-03 2019-05-31 ur l'étude de circulation et de ructuring and road works Based Selection l stationnement sur la zone d'i nfluence du BRT SN-CETUD-166694-CS-QCBS Public transport network rest Quality And Cost- Open - Internationa / Etude sur les Externalités N IDA / 60590 Post 91,000.00 0.00 Canceled 2020-04-30 2020-05-09 2020-05-20 2020-06-20 2020-07-20 2020-08-14 2020-09-18 2020-10-28 2021-09-01 ructuring and road works Based Selection l égatives du Transport SN-CETUD-180279-CS-QCBS Public transport network rest Quality And Cost- Open - Internationa / Etude sur les externalités n IDA / 60590 Post 400,000.00 422,077.02 Signed 2020-06-23 2020-07-29 2020-07-07 2020-06-23 2020-08-20 2020-09-28 2020-09-19 2020-12-17 2020-10-19 2021-01-06 2020-11-28 2021-06-16 2021-01-11 2021-09-07 2021-11-15 ructuring and road works Based Selection l égatives du transport à Daka r SN-CETUD-166705-CS-QCBS Public transport network rest Quality And Cost- Open - Internationa IDA / 60590 Post 114,000.00 0.00 Canceled 2020-05-15 2020-06-04 2020-07-19 2020-08-18 2020-09-12 2020-10-17 2020-11-26 2021-06-21 / Etude de Conception TOD P ructuring and road works Based Selection l etersen SN-CETUD-194734-CS-CQS / Capacity building and projec Consultant Qualifi Sélection d'un cabinet de rec IDA / 60590 Post Open - National 32,573.00 0.00 Canceled 2020-10-02 2020-12-17 2020-10-17 2020-11-08 2020-12-08 2020-12-23 2021-12-23 t management cation Selection rutement pour le CETUD SN-CETUD-282425-CS-QCBS / Recrutement d’un consulta Capacity building and projec Quality And Cost- Under Implement IDA / 60580 Post Open - National 57,400.00 0.00 2022-06-06 2022-05-23 2022-06-27 2022-06-15 2022-08-10 2022-10-23 2022-09-07 2022-12-20 2022-10-07 2023-02-13 2022-11-11 2022-12-16 2023-12-16 nt la mise en place d’un sché t management Based Selection ation ma directeur de système d’in formation SN-CETUD-240318-CS-CQS / Capacity building and projec Consultant Qualifi Formation des administrateu IDA / 60590 Post Open - National 19,218.00 0.00 Canceled 2021-07-08 2021-07-28 2021-07-29 2021-08-23 2021-09-02 2021-09-22 2021-09-24 t management cation Selection rs du CETUD SN-CETUD-166742-CS-CQS / Public transport network rest Consultant Qualifi Numérisation et Cartographi IDA / 60590 Post Open - National 49,000.00 0.00 Canceled 2020-04-30 2020-08-28 2020-05-20 2020-07-03 2020-10-21 2020-08-02 2020-09-11 2020-12-10 ructuring and road works cation Selection e du Réseau de Transport Ur bain SN-CETUD-270705-CS-QCBS Quality And Cost- / Sélection de cabinets pour l IDA / 60580 Road Safety Post Open - National 147,135.00 0.00 Signed 2022-06-01 2022-05-30 2022-07-12 2022-07-29 2022-08-25 2022-09-30 2022-09-22 2022-11-03 2022-10-22 2022-11-28 2022-11-26 2022-12-16 2022-12-31 2023-12-31 Based Selection a réalisation de campagnes d ’IEC SN-CETUD-316839-CS-CQS / Sélection d’un cabinet pour l e développement et la maint Consultant Qualifi IDA / 60590 Road Safety Post Open - National 15,300.00 0.00 Under Review 2022-11-10 2023-03-22 2022-12-01 2023-01-14 2023-02-13 2023-03-20 2023-09-16 enance d’un système de cart cation Selection ographie et d’analyse des do nnées d’accidents et formati on des agents. SN-CETUD-270706-CS-QCBS / Sélection d’un cabinet pour Quality And Cost- Open - Internationa Under Implement IDA / 60580 Road Safety Post 163,483.00 0.00 2023-02-06 2022-12-27 2023-02-27 2023-02-23 2023-04-12 2023-04-12 2023-05-10 2023-05-09 2023-06-09 2023-07-14 2023-08-18 2024-08-17 la réalisation de l’audit de sé Based Selection l ation curité routière avant exploita tion SN-CETUD-316843-CS-CQS / Sélection de cabinets pour la Consultant Qualifi création et l'animation d'une IDA / 60590 Road Safety Post Open - National 22,900.00 0.00 Under Review 2023-01-16 2023-04-07 2023-02-06 2023-03-22 2023-04-21 2023-05-26 2023-09-23 cation Selection plateforme sur la sécurité ro utière pour les établissement s scolaires SN-CETUD-282512-CS-QCBS / Etude portant sur la gestion Quality And Cost- opérationnelle de la circulati IDA / 60580 Road Safety Post Open - National 217,433.00 0.00 Canceled 2022-06-07 2022-05-23 2022-06-28 2022-08-11 2022-09-08 2022-10-08 2022-11-12 2022-12-17 2023-12-17 Based Selection on autour du BRT et les mod alités d’occupation de ses dé pendances SN-CETUD-340374-CS-QCBS / Étude de faisabilité pour ge Public transport network rest Quality And Cost- Open - Internationa Under Implement stion intégrée des aménage IDA / 60590 Post 350,000.00 0.00 2023-02-09 2023-02-08 2023-03-02 2023-02-10 2023-04-15 2023-03-14 2023-05-13 2023-05-02 2023-06-12 2023-05-08 2023-07-17 2023-05-22 2023-08-21 2023-12-19 ructuring and road works Based Selection l ation ments, de l’espace public urb ain et des dépendances de la voirie autour du BRT SN-CETUD-332065-CS-CQS / Recrutement d’un cabinet po ur l’accompagnement du CET Capacity building and projec Consultant Qualifi IDA / 60590 Post Open - National 32,000.00 0.00 Canceled 2023-02-08 2023-02-03 2023-03-01 2023-04-14 2023-05-14 2023-06-18 2023-12-15 UD dans l’organisation d’un c t management cation Selection oncours pour la toponymie et l’identité visuelle des station s du BRT Page 6 SN-CETUD-166818-CS-CQS / Public transport network rest Consultant Qualifi Assistance technique des op IDA / 60590 Post Open - National 49,000.00 0.00 Canceled 2022-12-05 2022-12-25 2023-02-07 2023-03-09 2023-04-18 2023-07-17 ructuring and road works cation Selection érateurs pour l'intégration ta rifaire SN-CETUD-361000-CS-QCBS / Recrutement d’un cabinet p our la structuration institutio Capacity building and projec Quality And Cost- Pending Impleme IDA / 60590 Post Open - National 249,750.00 0.00 2023-06-12 2023-07-03 2023-08-16 2023-09-13 2023-10-13 2023-11-17 2023-12-22 2024-12-21 nnelle, les études architectur t management Based Selection ntation ales et techniques du centre de formation polyvalent aux métiers du transport SN-CETUD-361239-CS-QCBS / Etude de mise à niveau des Public transport network rest Quality And Cost- Pending Impleme réseaux du réseau d'assainis IDA / 60590 Post Open - National 166,400.00 0.00 2023-07-25 2023-08-15 2023-09-28 2023-10-26 2023-11-25 2023-12-30 2024-02-03 2024-06-02 ructuring and road works Based Selection ntation sement des eaux usées sur l es zones sensibles du BRT SN-CETUD-361240-CS-QCBS / Etude pour la mise en place Public transport network rest Quality And Cost- Pending Impleme IDA / 60590 Post Open - National 166,400.00 0.00 2023-09-25 2023-10-16 2023-11-29 2023-12-27 2024-01-26 2024-03-01 2024-04-05 2024-08-03 d'un plan de gestion du GER ructuring and road works Based Selection ntation des aménagements du BRT SN-CETUD-361244-CS-QCBS / Recrutement d'un consultan Capacity building and projec Quality And Cost- Pending Impleme IDA / 60590 Post Open - National 83,200.00 0.00 2023-10-10 2023-10-31 2023-12-14 2024-01-11 2024-02-10 2024-03-16 2024-04-20 2025-04-20 t pour l'élaboration du Plan st t management Based Selection ntation ratégique de développement du CETUD SN-CETUD-361256-CS-CQS / Recrutement d'un Consultant Capacity building and projec Consultant Qualifi Pending Impleme IDA / 60590 Post Open - National 46,100.00 0.00 2023-06-20 2023-07-11 2023-08-24 2023-09-23 2023-10-28 2024-04-25 pour l'évaluation de la mise e t management cation Selection ntation n œuvre du PAR SN-CETUD-282457-CS-QCBS BRT infrastructure, fleet, an Quality And Cost- IDA / 60580 Post Open - National 100,000.00 0.00 Canceled 2022-05-02 2022-07-26 2022-05-23 2022-07-06 2022-08-03 2022-09-02 2022-10-07 2022-11-11 2023-11-11 / Audit technique des travaux d systems Based Selection BRT SN-CETUD-224065-CS-CQS / Assistance et accompagnem Capacity building and projec Consultant Qualifi ent à l'utilisation des logiciels IDA / 60590 Post Open - National 16,287.00 0.00 Canceled 2021-03-24 2023-01-23 2021-04-08 2021-05-08 2021-05-18 2021-06-07 2023-06-07 t management cation Selection (TOMPRO,TOMPAIE,TOMMAR CHE,TOMETASFIN,TOMSTOCK ,TOMCIONSO) SN-CETUD-343466-CS-QCBS / Recrutement d'un consultan Public transport network rest Quality And Cost- t pour la supervision des trav IDA / 60590 Post Open - National 222,694.00 0.00 Under Review 2023-06-20 2023-06-13 2023-07-11 2023-08-24 2023-09-21 2023-10-21 2023-11-25 2023-12-30 2024-12-29 ructuring and road works Based Selection aux des gares et aires de sta tionnement en trois (03) lots distincts INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C12/17 / Recrutement d'un e Capacity building and projec Individual Consult IDA / 60590 Post Limited 30,000.00 0.00 Canceled 2017-10-08 2017-10-13 2017-11-03 2017-12-08 2018-12-08 xpert en suivi évaluation t management ant Selection C013/17 / Recrutement d'un Capacity building and projec Individual Consult IDA / 60580 Post Open 30,000.00 0.00 Canceled 2018-02-12 2018-04-02 2018-04-23 2018-05-28 2019-05-31 ingénieur en amenagement t management ant Selection C 011/17 / Recrutement d'un Capacity building and projec Individual Consult urbaniste spécialisé en planif IDA / 60590 Post Open 30,000.00 0.00 Canceled 2017-07-10 2017-08-28 2017-09-18 2017-10-23 2018-04-21 t management ant Selection ication des transports C 007/17 / Recrutement d'un consultant pour l'évaluation des risques sociaux et plan d' BRT infrastructure, fleet, an Individual Consult IDA / 60590 Post Limited 30,000.00 0.00 Canceled 2017-06-20 2017-06-20 2017-06-20 2017-07-11 2018-01-07 engagement des parties pren d systems ant Selection antes y compris un mécanis me de plaintes et de litiges d ans le cadre du BRT S-20 CETUD / Recrutement d Capacity building and projec Individual Consult 'un assistant en charge des d IDA / 60580 Post Open 15,000.00 0.00 Canceled 2018-01-04 2018-02-03 2018-02-12 2018-02-28 2019-02-28 t management ant Selection ossiers des PAP (CETUD) S-19 CETUD / recrutement d' Capacity building and projec Individual Consult IDA / 60580 Post Open 15,000.00 0.00 Canceled 2018-01-04 2018-02-06 2018-02-08 2018-02-27 2019-02-28 un agent administratif t management ant Selection S-18 CETUD / Recrutement d Capacity building and projec Individual Consult 'un chargé de la base de don IDA / 60580 Post Open 28,000.00 0.00 Canceled 2018-01-04 2018-02-07 2018-02-14 2018-02-28 2019-03-01 t management ant Selection nées ( CETUD) S-17 CETUD / recrutement d' un sociologue en appui au su Capacity building and projec Individual Consult IDA / 60580 Post Open 30,000.00 0.00 Canceled 2018-01-04 2018-02-11 2018-02-20 2018-03-01 2019-03-04 ivi des mesures d'accompag t management ant Selection nement sociales du BRT ( CE TUD) C003/17 / recrutement d'un Capacity building and projec Individual Consult IDA / 60580 Post Limited 30,000.00 0.00 Canceled 2017-06-18 2017-06-23 2017-07-14 2017-07-28 2018-07-28 spécialiste en passation des t management ant Selection marchés C004/17 / Recrutement d'un Capacity building and projec Individual Consult IDA / 60580 Post Open 30,000.00 0.00 Canceled 2018-02-12 2018-03-19 2018-04-09 2018-04-23 2019-04-22 ingénieur circulation et sécur t management ant Selection ité routière C 010/17 / Recrutement d'un Capacity building and projec Individual Consult IDA / 60580 Post Limited 30,000.00 0.00 Canceled 2018-01-08 2018-01-13 2018-02-03 2018-03-10 2019-03-10 expert en communication so t management ant Selection ciale SN-CETUD-61514-CS-INDV / Capacity building and projec Individual Consult Recrutement d'une Assistant IDA / 60590 Post Limited 31,270.00 3,823.57 Signed 2018-05-21 2018-05-21 2018-05-26 2020-06-04 2018-06-10 2020-01-06 2018-06-30 2020-01-07 2020-06-29 t management ant Selection e de Direction SN-CETUD-61516-CS-INDV / Recrutement d'un consultant Capacity building and projec Individual Consult IDA / 60590 Post Limited 39,088.00 26,098.42 Signed 2018-05-25 2018-06-21 2018-05-30 2018-07-23 2018-06-14 2018-09-06 2018-07-04 2018-09-06 2020-07-03 individuel pour l'accompagne t management ant Selection ment de l'auditeur Interne du CETUD SN-CETUD-64277-CS-CDS / E Public transport network rest tude de la situation de référe IDA / 60590 Prior Direct Selection Direct 300,000.00 326,191.04 Signed 2018-06-26 2018-07-10 2018-07-26 2018-07-13 2018-09-30 2018-10-24 2019-04-28 ructuring and road works nce du projet BRT Page 7 SN-CETUD-71059-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un consultant IDA / 60590 Post Limited 24,430.00 17,325.67 Signed 2018-08-27 2018-09-10 2018-09-01 2019-01-14 2018-09-22 2019-03-21 2018-10-27 2019-03-14 2020-10-16 t management ant Selection individuel en marketing digit al SN-CETUD-71434-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un consultant IDA / 60590 Post Limited 11,400.00 25,335.90 Signed 2018-09-19 2018-09-10 2018-09-24 2019-04-02 2018-10-15 2019-09-05 2018-11-19 2019-10-29 2019-11-19 t management ant Selection pour la capitalisation photos et vidéos SN-CETUD-71437-CS-INDV / Recrutement d'un consultant pour la conception de 3 éditi Capacity building and projec Individual Consult IDA / 60590 Post Limited 24,430.00 39,374.26 Signed 2018-09-27 2019-01-21 2018-10-02 2019-05-21 2018-10-23 2019-08-26 2018-11-27 2019-10-03 2019-09-26 ons du magazine trimestriel t management ant Selection d'information du CETUD et la production de publireportage s SN-CETUD-71442-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un consultant IDA / 60590 Post Limited 3,250.00 0.00 Canceled 2018-11-14 2018-11-19 2018-12-10 2019-01-14 2019-01-17 t management ant Selection formateur en Marchés Public s SN-CETUD-71448-CS-INDV / Capacity building and projec Recrutement d'un consultant IDA / 60590 Post Direct Selection Direct 16,300.00 0.00 Canceled 2018-08-20 2018-08-06 2018-08-30 2018-11-03 2018-12-03 t management en hydrocarbure SN-CETUD-71473-CS-INDV / Recrutement d'un prestataire Capacity building and projec Individual Consult IDA / 60590 Post Limited 12,200.00 0.00 Canceled 2018-08-30 2018-09-04 2018-09-25 2018-10-30 2019-04-28 en appui à la conception, à la t management ant Selection préparation de l'extension d u siège du CETUD SN-CETUD-71735-CS-CDS / P Capacity building and projec IDA / 60590 Post Direct Selection Direct 20,040.00 0.00 Canceled 2018-08-30 2018-09-10 2018-09-09 2018-10-24 2018-11-13 2018-11-16 rogramme de formation avec t management UITP SN-CETUD-71922-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un Spécialiste IDA / 60590 Post Limited 89,580.00 0.00 Canceled 2018-10-16 2018-10-21 2018-11-11 2018-12-16 2020-12-05 t management ant Selection en Marketing Communication . SN-CETUD-71503-CS-QCBS / Recrutement d'un consultant Capacity building and projec Individual Consult IDA / 60590 Post Limited 16,287.00 0.00 Canceled 2018-09-28 2018-10-03 2018-10-24 2018-11-28 2019-02-26 individuel pour la mise à jour t management ant Selection du manuel de procédures du CETUD SN-CETUD-102660-CS-CDS / Capacity building and projec Contrat d'assistance juridiqu IDA / 60590 Post Direct Selection Direct 66,000.00 44,187.00 Signed 2019-03-04 2019-05-05 2019-03-29 2019-05-15 2019-05-03 2019-06-11 2021-05-02 t management e avec Maitre Habibatou TOU RE SN-CETUD-89746-CS-CDS / MISSION DE COMMUNICATIO N, FACILITATION ET ACCOMP BRT infrastructure, fleet, an IDA / 60590 Prior Direct Selection Direct 243,402.04 0.00 Canceled 2018-12-27 2019-01-22 2019-01-21 2019-03-27 2020-03-26 AGNEMENT SOCIAL DANS LE d systems CADRE DE LA MISE EN ŒUVR E DU PAR DU PROJET BRT en 2 lots SN-CETUD-102901-CS-CDS / Mission de communication, f acilitation et accompagneme BRT infrastructure, fleet, an IDA / 60590 Post Direct Selection Direct 234,000.00 206,319.30 Signed 2019-03-19 2019-03-21 2019-04-18 2019-03-21 2019-05-23 2019-05-31 2021-05-22 nt social dans le cadre de la d systems mise en œuvre du par du pro jet avec ENDA JEUNESSE ACT ION (EJA) SN-CETUD-133913-CS-INDV / Sélection d'un consultant in Capacity building and projec Individual Consult dividuel pour l'élaboration d' IDA / 60590 Post Limited 29,000.00 30,374.28 Signed 2019-09-26 2019-10-08 2019-10-11 2019-10-04 2019-11-01 2019-11-25 2019-11-21 2019-12-02 2020-01-20 t management ant Selection offres de formation en lien av ec la mobilité numérique SN-CETUD-166816-CS-INDV / Assistance technique pour l' Public transport network rest Individual Consult adaptation du cadre régleme IDA / 60590 Post Limited 49,000.00 49,152.45 Signed 2020-04-30 2021-11-23 2020-05-20 2022-04-15 2020-06-09 2022-07-25 2020-07-04 2022-10-02 2022-07-04 ructuring and road works ant Selection ntaire et revue du système d' attribution des autorisations de Transport SN-CETUD-95257-CS-CDS / S élection d'un consultant pour Public transport network rest IDA / 60590 Post Direct Selection Direct 50,000.00 0.00 Canceled 2019-03-04 2019-02-18 2019-03-24 2019-04-02 2019-04-28 2019-07-27 la digitalisation du réseau de ructuring and road works transport collectif de Dakar SN-CETUD-183339-CS-INDV / Recrutement d'un consultan Capacity building and projec Individual Consult t pour le contrôle et le suivi d IDA / 60590 Post Limited 8,143.00 8,517.35 Signed 2020-08-26 2020-08-25 2020-08-28 2021-01-20 2020-09-07 2021-08-05 2020-09-17 2021-08-06 2021-09-17 t management ant Selection e la réalisation des câblages des résaux informatiques du BRT et du CETUD SN-CETUD-183050-CS-INDV Capacity building and projec Individual Consult IDA / 60580 Post Limited 29,315.00 33,277.50 Signed 2020-08-03 2020-08-14 2020-08-08 2020-10-01 2020-09-02 2020-12-18 2020-09-17 2021-01-16 2020-12-06 / Recrutement d'un garant de t management ant Selection probité SN-CETUD-194745-CS-CDS / Capacity building and projec Contrat d'assistance juridiqu IDA / 60590 Post Direct Selection Direct 42,345.00 44,298.02 Signed 2020-09-30 2021-06-18 2020-10-10 2021-07-28 2020-11-04 2021-08-10 2021-11-04 t management e avec Maitre Habibatou TOU RE SN-CETUD-55674-CS-INDV / Assistance technique pour l’a Public transport network rest Individual Consult nimation de la plateforme co IDA / 60590 Post Limited 55,000.00 31,083.66 Signed 2020-11-12 2020-12-24 2020-11-22 2021-03-02 2020-12-07 2021-11-16 2020-12-27 2021-12-16 2022-12-17 ructuring and road works ant Selection ncertation des opérateurs loc aux de transport pour la restr ucturation SN-CETUD-203257-CS-INDV Capacity building and projec Individual Consult IDA / 60590 Post Limited 48,860.00 53,489.02 Signed 2020-11-12 2020-11-09 2020-11-22 2020-11-13 2020-12-17 2021-01-29 2021-01-06 2021-02-12 2021-07-05 / Recrutement d'un conseiller t management ant Selection financier SN-CETUD-203258-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un conseiller IDA / 60590 Post Limited 16,287.00 53,489.02 Signed 2020-11-12 2020-11-09 2020-11-17 2020-11-13 2020-11-27 2021-02-04 2021-01-01 2021-02-12 2021-06-30 t management ant Selection en fiscalité SN-CETUD-203260-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un conseiller IDA / 60590 Post Limited 48,860.00 47,900.61 Signed 2020-11-12 2020-11-09 2020-11-22 2020-11-26 2020-12-17 2021-01-29 2021-01-06 2021-02-12 2021-07-05 t management ant Selection en stratégie SN-CETUD-61515-CS-CDS / R ecrutement d'un chef de l'uni Capacity building and projec IDA / 60590 Post Direct Selection Direct 69,577.00 0.00 Canceled 2018-06-25 2018-07-25 2018-09-03 2020-09-02 té exploitation et intégration t management des réseaux de transport Page 8 SN-CETUD-102885-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Spécialist IDA / 60590 Post Open 62,150.00 0.00 Canceled 2019-04-23 2019-06-12 2019-06-22 2019-07-22 2022-07-21 t management ant Selection e en Marketing et Communic ation SN-CETUD-212414-CS-INDV / Sélection d'un consultant p Capacity building and projec Individual Consult IDA / 60590 Post Limited 40,717.00 13,630.16 Signed 2021-01-19 2021-01-12 2021-01-24 2021-01-21 2021-02-13 2021-03-12 2021-02-23 2021-03-13 2021-04-09 our l'évaluation à mi parcour t management ant Selection s du Projte Bus Rapid Transit (BRT) SN-CETUD-166749-CS-INDV / Assistance technique pour l Public transport network rest Individual Consult IDA / 60590 Post Limited 49,000.00 0.00 Canceled 2020-04-30 2020-08-28 2020-05-20 2020-06-09 2020-07-04 2022-07-04 e développent d'une platefor ructuring and road works ant Selection me de coordination et de con certation SN-CETUD-230096-CS-INDV / Recrutement d'un Project M Capacity building and projec Individual Consult IDA / 60590 Post Limited 65,147.00 54,303.22 Signed 2021-05-03 2021-05-17 2021-05-13 2021-10-07 2021-06-03 2022-02-08 2021-06-23 2022-03-29 2022-06-23 anagement Officer (PMO) po t management ant Selection ur la cordination et le pilotag e du projet BRT SN-CETUD-241313-CS-CDS / Etude de l’élaboration d’un Pl Capacity building and projec Pending Impleme IDA / 60590 Post Direct Selection Direct 258,944.00 0.00 2021-07-15 2021-08-04 2021-09-23 2022-07-21 an de Mobilité Urbaine Soute t management ntation nable (PMUS) pour l’agglomé ration de Dakar SN-CETUD-209243-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Coordonn IDA / 60590 Post Open 73,294.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 t management ant Selection ateur Adjoint SN-CETUD-203261-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un conseiller IDA / 60590 Post Limited 16,287.00 0.00 Canceled 2020-11-12 2020-11-09 2020-11-17 2020-11-26 2020-12-12 2021-01-01 2021-06-30 t management ant Selection en matériel roulant électriqu e SN-CETUD-55673-CS-INDV / Recrutement d'un consultant individuel pour l'Assistance t Public transport network rest Individual Consult IDA / 60590 Post Limited 55,000.00 0.00 Canceled 2018-05-06 2021-11-09 2018-05-11 2018-06-01 2018-07-06 2018-11-03 echnique pour l'adaptation d ructuring and road works ant Selection u cadre réglementaire et rev ue du système d'attribution d es autorisations de transport SN-CETUD-287506-CS-CQS / Recrutement d’un consultant Public transport network rest Individual Consult Under Implement individuel pour la collecte de IDA / 60590 Post Limited 49,000.00 0.00 2022-04-29 2022-05-31 2022-05-04 2022-06-24 2022-05-25 2022-09-02 2022-06-29 2022-12-26 ructuring and road works ant Selection ation s données pour la numérisati on du réseau de transport col lectif de Dakar SN-CETUD-295404-CS-INDV / Recrutement du chef de pro Public transport network rest Individual Consult Under Implement IDA / 60590 Post Limited 50,912.00 0.00 2022-06-10 2022-06-22 2022-06-15 2022-07-23 2022-07-06 2022-09-30 2022-08-10 2023-02-06 jet pour l'élaboration du sché ructuring and road works ant Selection ation ma directeur du système d'in formation SN-CETUD-209255-CS-INDV / Recrutement d'un expert en Capacity building and projec Individual Consult IDA / 60590 Post Open 62,223.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 communication, développem t management ant Selection ent organisationnel et Market ing SN-CETUD-231375-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un consultan IDA / 60590 Post Limited 58,632.00 0.00 Canceled 2023-01-02 2023-01-12 2023-01-27 2023-02-16 2024-02-16 t management ant Selection t en exploitation de transport de masse SN-CETUD-209231-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un chef de l’ IDA / 60590 Post Open 71,449.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 t management ant Selection unité infrastructures SN-CETUD-252637-CS-INDV / Recrutement d'un un Spéci Capacity building and projec Individual Consult IDA / 60590 Post Open 50,977.20 0.00 Canceled 2021-09-20 2021-09-10 2021-11-08 2021-11-29 2022-01-03 2022-07-02 aliste en Passation des March t management ant Selection és et en Gestion de Contrats (SPMGC) SN-CETUD-209263-CS-INDV / Recrutement d'un chef de l' Capacity building and projec Individual Consult IDA / 60590 Post Open 69,577.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 unité exploitation et intégrati t management ant Selection on des réseaux de transport SN-CETUD-241319-CS-CDS / Etude TOD (Projet « Quartier Capacity building and projec IDA / 60590 Post Direct Selection Direct 74,249.00 0.00 Canceled 2022-07-19 2022-07-24 2022-09-03 2023-06-03 bas carbone pour la gare Pet t management ersen de Dakar ») SN-CETUD-166817-CS-INDV / Assistance pour la mise en Public transport network rest Individual Consult Under Implement place d'un schéma organisati IDA / 60590 Post Limited 25,000.00 0.00 2023-01-24 2023-01-27 2023-02-13 2023-05-22 2023-03-05 2023-03-30 2023-06-28 ructuring and road works ant Selection ation onnel pour l'exploitation des l ignes de rabattement SN-CETUD-332063-CS-INDV / Recrutement d'un consultan t individuel pour la captation Individual Consult Under Implement IDA / 60590 Road Safety Post Limited 35,000.00 0.00 2023-02-08 2023-02-16 2023-02-13 2023-03-06 2023-04-10 2023-10-07 d'images et la conception de ant Selection ation vidéos pour les activités de s ensibilisation sur le projet BR T SN-CETUD-102896-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Ingénieur IDA / 60590 Post Open 94,000.00 0.00 Canceled 2020-01-01 2020-02-20 2020-03-01 2020-03-31 2022-03-31 t management ant Selection Trafic et Circulation SN-CETUD-341747-CS-CDS / Capacity building and projec Under Implement Renouvellement contrat d'as IDA / 60590 Post Direct Selection Direct - National 48,100.00 0.00 2023-03-30 2023-04-07 2023-04-09 2023-04-12 2023-06-13 2024-06-12 t management ation sistance juridique SN-CETUD-190245-CS-QCBS / Sélection d'un consultant p Individual Consult our l’élaboration d’un plan st IDA / 60590 Road Safety Post Limited 25,000.00 0.00 Canceled 2020-09-30 2020-10-16 2020-10-05 2021-01-07 2020-10-26 2020-11-10 2021-01-09 ant Selection ratégique pour la mise en œ uvre de la composante sécuri té routière du BRT SN-CETUD-347668-CS-CDS / Capacity building and projec Pending Impleme Renouvellement du contrat d IDA / 60590 Post Direct Selection Direct - National 47,100.00 0.00 2023-04-05 2023-04-15 2023-06-19 2024-06-18 t management ntation u conseiller financier SN-CETUD-347674-CS-CDS / Capacity building and projec Under Implement Renouvellement du contrat d IDA / 60590 Post Direct Selection Direct - National 31,400.00 0.00 2023-04-04 2023-04-07 2023-04-14 2023-04-12 2023-06-18 2024-06-17 t management ation u conseiller en fiscalité locale Page 9 SN-CETUD-71491-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un Assistant IDA / 60590 Post Limited 35,830.00 0.00 Canceled 2018-09-03 2018-09-08 2018-09-29 2018-11-03 2020-10-23 t management ant Selection Comptable SN-CETUD-209242-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Ingénieur IDA / 60590 Post Open 62,223.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 t management ant Selection en Aménagement Urbain SN-CETUD-102898-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Ingénieur IDA / 60590 Post Open 119,000.00 0.00 Canceled 2019-04-11 2019-04-18 2019-05-31 2019-06-10 2019-07-10 2021-10-27 t management ant Selection en exploitation SN-CETUD-71501-CS-INDV / Capacity building and projec Individual Consult Recrutement d'un ingénieur IDA / 60590 Post Limited 89,580.00 0.00 Canceled 2018-10-04 2019-04-18 2018-10-09 2018-10-30 2018-12-04 2020-11-23 t management ant Selection chargé des études générales et techniques SN-CETUD-102897-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Expert en IDA / 60590 Post Open 127,000.00 0.00 Canceled 2019-04-11 2020-12-17 2019-05-31 2019-06-10 2019-07-10 2022-07-09 t management ant Selection circulation / sécurité routière SN-CETUD-102890-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Ingénieur IDA / 60590 Post Open 62,000.00 0.00 Canceled 2019-04-25 2019-05-21 2019-06-14 2019-06-24 2019-07-14 2022-07-13 t management ant Selection informaticien Assistant SN-CETUD-102900-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Ingénieur IDA / 60590 Post Open 141,000.00 0.00 Canceled 2019-04-18 2019-04-18 2019-06-07 2019-06-17 2019-07-17 2022-07-16 t management ant Selection systèmes SN-CETUD-102891-CS-INDV Capacity building and projec Individual Consult / Recrutement d'un Assistant IDA / 60590 Post Open 62,000.00 0.00 Canceled 2019-04-22 2019-06-11 2019-06-21 2019-07-21 2022-07-20 t management ant Selection Comptable SN-CETUD-209270-CS-INDV / Ingénieur spécialisé en expl Capacity building and projec Individual Consult IDA / 60590 Post Open 62,223.00 0.00 Canceled 2020-12-18 2020-12-22 2021-02-06 2021-02-16 2021-03-08 2023-03-08 oitation et intégration de rés t management ant Selection eau de transports urbains SN-CETUD-102892-CS-INDV Capacity building and projec Individual Consult IDA / 60590 Post Open 46,000.00 0.00 Canceled 2019-04-24 2019-04-18 2019-06-13 2019-10-10 2019-06-23 2020-01-06 2019-08-03 2022-08-02 / Recrutement d'un Archivist t management ant Selection e SN-CETUD-323563-CS-INDV / Recrutement d'un consultan Individual Consult Pending Impleme IDA / 60590 Road Safety Post Limited 35,000.00 0.00 2023-05-15 2023-05-20 2023-06-10 2023-07-15 2024-01-11 t individuel pour la réalisatio ant Selection ntation n du magazine mobilité SN-CETUD-361248-CS-INDV / Recrutement d'un Consulta Capacity building and projec Individual Consult Pending Impleme IDA / 60590 Post Open - National 29,952.00 0.00 2023-08-15 2023-10-03 2023-10-24 2023-11-28 2024-05-26 nt individuel en appui pour la t management ant Selection ntation mise en place du centre de g estion de la mobilité SN-CETUD-364621-CS-INDV / Développement de la plate- Public transport network rest Individual Consult Pending Impleme IDA / 73070 Post Open - National 8,000.00 0.00 2023-07-07 2023-08-25 2023-09-15 2023-10-20 2024-04-17 forme Web de gestion et de s ructuring and road works ant Selection ntation uivi de carrières et alumnis SN-CETUD-367324-CS-INDV / Recrutement d'un constant Public transport network rest Individual Consult IDA / 60590 Post Limited 8,200.00 0.00 Under Review 2023-06-30 2023-06-22 2023-07-05 2023-07-26 2023-08-30 2024-02-26 individuel en marketing digit ructuring and road works ant Selection al pour le projet BRT Page 10 PROCUREMENT PLAN (Textual Part) Project information: Solomon Islands Sustainable Mining Development Technical Assistance Project (P173018) Project Implementation agency: Ministry of Mines, Energy and Rural Electrification Date of the Procurement Plan: ... 2021 Period covered by this Procurement Plan: whole project implementation period. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017, August 2018, and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. The Project will also use the Procurement Implementation Guidance: Making Procurement Work for Fragile and Small States in the Pacific under World Bank Investment Project Financing following the Procurement Regulations for IPF Borrowers [July 2016, revised November 2017, August 2018, and November 2020]. The Guidance is mainly based on the recognition that traditional international or national competitive processes may not be the most appropriate methods to achieve the vision of Bank-financed procurement, viz. “Procurement in IPF operations supports Borrowers to achieve value for money with integrity in delivering sustainable development”, given the prevailing geographic and market conditions in the Pacific. The Guidance includes notes in Parts I and II. Part III includes templates for use in projects, as appropriate, for preparing simple procurement documents and for providing inputs to Project Operational Manuals. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Solomon Islands Government Procurement and Contract Administration Manual, version April 2013 which was developed under the SIG Financial Instructions and as mandated by the Public Finance and Audit Act of Solomon Islands, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables Works: is not applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Solomon Islands : Solomon Islands Sustainable Mining Development Technical Assistance Project PLAN General Information Country: Solomon Islands 2022-03-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173018 GPN Date: Project Name: Solomon Islands Sustainable Mining Development Technical Assistance Project Loan / Credit No: IDA / D9120 Ministry of Mines, Energy and Rural Electrification Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure MMERE-CW-RFQ-1 / Office R Request for Quota Single Stage - One E ment Document - 2022-04-2 IDA / D9120 Project Management Post Limited 50,000.00 19,960.00 Completed 2022-03-26 2022-03-21 2022-04-01 2022-07-06 efurbishment Contractor tions nvelope 1 Envelope proce 2 ss (Non Bank-SPD ) Request for Quota SB-MMERE-305808-CW-RFB Request for Quota Single Stage - One E tions - Small Work 2022-10-3 / Additional office refurbishm IDA / D9120 Project Management Post Limited 15,000.00 14,639.78 Signed 2022-08-14 2022-08-10 2022-09-09 2022-09-05 tions nvelope s (Emergency) SP 1 ent D -Competitive GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MMERE-GO-RFQ-3 / Laptop C Request for Quota Single Stage - One E IDA / D9120 Project Management Post Open - National 20,000.00 19,962.50 Completed 2022-05-04 2022-05-12 2022-06-23 2022-05-28 2022-07-16 omputers, printer and softwa tions nvelope re SB-MMERE-295711-GO-RFQ / Request for Quota Single Stage - One E IDA / D9120 Project Management Post Open - National 70,000.00 58,362.50 Completed 2022-05-25 2022-07-20 2022-07-14 2023-01-16 2022-08-05 Acquisition of Two Project Ve tions nvelope hicles SB-MMERE-299986-GO-RFQ / Request for Quota Single Stage - One E IDA / D9120 Project Management Post Open - National 20,000.00 7,012.50 Completed 2022-06-21 2022-07-07 2022-07-01 2022-08-06 2022-07-30 Office Furniture tions nvelope SB-MMERE-305444-GO-RFQ / Request for Quota Single Stage - One E IDA / D9120 Project Management Post Open - National 6,000.00 5,865.94 Signed 2022-08-08 2022-08-25 2022-09-08 2022-09-24 Video Conference Equipment tions nvelope SB-MMERE-312049-GO-RFQ / Request for Quota Single Stage - One E Under Imple IDA / D9120 Project Management Post Open - National 20,000.00 0.00 2022-09-02 2022-09-12 2022-09-30 Safety and Protective Gears tions nvelope mentation SB-MMERE-315104-GO-RFQ / Strengthening the Capacity Request for Quota Single Stage - One E Pending Impl Laboratory and geodata colle IDA / D9120 Post Limited 150,000.00 0.00 2022-09-17 2022-11-12 2023-05-11 of Regulatory Institutions tions nvelope ementation ction equipment. SB-MMERE-317308-GO-RFQ / Request for Quota Single Stage - One E IDA / D9120 Project Management Post Limited 8,000.00 0.00 Terminated 2022-09-30 2022-09-19 2022-10-14 2022-11-14 Additional Office Furniture tions nvelope SB-MMERE-347930-GO-RFQ / Request for Quota Single Stage - One E IDA / D9120 Project Management Post Limited 5,554.00 0.00 Signed 2023-03-09 2023-03-05 2023-03-10 2023-04-30 Desktop for MMERE Cadastra tions nvelope l System NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MMERE-328210-NC-RFP / Request for Quota Single Stage - One E IT Firm Acquisition and Install IDA / D9120 Project Management Post Limited 50,000.00 0.00 Signed 2023-03-12 2023-02-10 2023-05-07 2023-11-03 tions nvelope ation of Critical Equipment CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MMERE-336613-CS-CQS / Completion of the Regulator Consultant Qualifi Open - Internationa Under Implement Strategic Environmental & So IDA / D9120 Post 50,000.00 0.00 2023-01-31 2023-01-18 2023-02-01 2023-03-03 2023-02-16 2023-04-02 2023-04-27 2023-10-24 y Framework cation Selection l ation cial Assessment (SESA) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MMERE-281847-CS-QCBS Individual Consult IDA / D9120 Project Management Post Open 200,000.00 80,000.00 Signed 2022-03-02 2022-03-07 2022-03-23 2022-04-13 2022-03-30 2022-04-30 2022-04-20 2022-05-08 2024-04-20 / Project Manager ant Selection MMERE-CS-INDV-23 / ESF/Ge Individual Consult nder/Stakeholder Engageme IDA / D9120 Project Management Post Open 150,000.00 60,000.00 Signed 2022-03-25 2021-09-07 2022-04-01 2022-04-21 2022-04-04 2022-05-05 2022-04-20 2022-05-10 2022-10-17 ant Selection nt Specialist MMERE-CS-INDV-24 / M & E Individual Consult IDA / D9120 Project Management Post Open 150,000.00 150,000.00 Signed 2022-03-25 2021-09-07 2022-04-06 2022-04-29 2022-04-13 2022-05-06 2022-04-18 2022-05-19 2024-04-18 Specialist ant Selection MMERE-CS-INDV-22 / Procur Individual Consult IDA / D9120 Project Management Post Open 150,000.00 60,000.00 Signed 2022-03-25 2021-09-09 2022-04-08 2022-04-19 2022-04-10 2022-05-16 2022-04-29 2022-05-27 2024-04-29 ement Specialist ant Selection MMERE-CS-INDV-21 / Financ Individual Consult IDA / D9120 Project Management Post Open 150,000.00 60,000.00 Terminated 2022-03-25 2021-09-07 2022-04-13 2022-04-21 2022-04-20 2022-05-06 2022-05-13 2022-05-19 2024-05-04 e Specialist ant Selection SB-MMERE-298905-CS-INDV Completion of the Regulator Individual Consult / Chief Mining Sector Manage IDA / D9120 Post Open 200,000.00 50,000.00 Signed 2022-06-15 2022-07-25 2022-06-24 2022-07-11 2022-06-29 2022-08-08 2022-07-02 2022-08-17 2023-06-27 y Framework ant Selection ment Advisor(Resident) Page 1 MMERE-CS-IND-3 / Legal Adv Completion of the Regulator Individual Consult IDA / D9120 Post Open 50,000.00 50,000.00 Signed 2022-05-27 2022-12-23 2022-06-05 2022-06-15 2022-06-07 2022-06-27 2022-06-11 2022-07-08 2022-12-08 iser on Mining Regulation y Framework ant Selection SB-MMERE-305439-CS-QBS / Strengthening the Capacity Individual Consult Open - Internationa IDA / D9120 Post 50,000.00 0.00 Canceled 2022-08-12 2022-09-13 2022-09-18 2022-09-28 2023-03-27 Exploration Specialist of Regulatory Institutions ant Selection l SB-MMERE-305436-CS-CDS / Strengthening the Capacity Direct - Internation IDA / D9120 Post Direct Selection 326,670.00 0.00 Signed 2022-07-22 2022-08-09 2022-07-30 2022-07-13 2022-08-08 2023-02-04 Cadastral Software firm of Regulatory Institutions al SB-MMERE-305437-CS-QBS / Individual Consult IDA / D9120 Project Management Post Open - National 50,000.00 0.00 Signed 2022-08-07 2022-08-26 2022-08-31 2022-10-20 2022-09-07 2022-10-25 2022-09-18 2023-03-17 Gender & Social- Inclusion Of ant Selection ficer SB-MMERE-305442-CS-QBS / Strengthening the Capacity Individual Consult Open - Internationa IDA / D9120 Post 50,000.00 0.00 Canceled 2022-08-19 2022-09-09 2022-09-13 2022-09-30 2023-03-29 Production Specialist of Regulatory Institutions ant Selection l SB-MMERE-317307-CS-INDV Strengthening the Capacity Individual Consult Open - Internationa Under Implement IDA / D9120 Post 50,000.00 0.00 2022-09-26 2022-10-06 2022-10-19 2022-10-24 2022-10-31 2023-04-29 / Exploration & Mining Specia of Regulatory Institutions ant Selection l ation list SB-MMERE-317316-CS-INDV Strengthening the Capacity Individual Consult Open - Internationa Under Implement IDA / D9120 Post 50,000.00 0.00 2022-09-26 2022-10-06 2022-10-19 2022-10-26 2022-11-04 2023-05-03 / Community Engagement Sp of Regulatory Institutions ant Selection l ation ecialist SB-MMERE-317317-CS-INDV Strengthening the Capacity Individual Consult Open - Internationa Under Implement / Compliance Planning & Coo IDA / D9120 Post 50,000.00 0.00 2022-09-26 2022-10-06 2022-10-19 2022-10-25 2022-11-04 2023-05-03 of Regulatory Institutions ant Selection l ation rdination Advisor SB-MMERE-305438-CS-QBS / Completion of the Regulator Individual Consult Open - Internationa Conduct a SESA of mineral d IDA / D9120 Post 50,000.00 0.00 Canceled 2022-08-05 2022-08-26 2022-08-07 2022-08-07 2022-08-17 2023-02-13 y Framework ant Selection l evelopment SB-MMERE-350956-CS-INDV Completion of the Regulator Individual Consult Open - Internationa Pending Impleme IDA / D9120 Post 50,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 / Environment Regulation Sp y Framework ant Selection l ntation ecialist SB-MMERE-350957-CS-INDV Individual Consult Open - Internationa Pending Impleme IDA / D9120 Project Management Post 50,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 / Exploration and Mining Spe ant Selection l ntation cialist SB-MMERE-350958-CS-INDV Completion of the Regulator Individual Consult Open - Internationa Pending Impleme IDA / D9120 Post 50,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 / Fiscal and Trade Regulation y Framework ant Selection l ntation s Specialist SB-MMERE-350959-CS-INDV Completion of the Regulator Individual Consult Open - Internationa Pending Impleme IDA / D9120 Post 50,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 / Institution Development Sp y Framework ant Selection l ntation ecialist SB-MMERE-350960-CS-INDV Individual Consult Open - Internationa Pending Impleme / Feasibility, Mine Impact and IDA / D9120 Project Management Post 50,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 ant Selection l ntation Closure Specialist SB-MMERE-347929-CS-INDV Individual Consult IDA / D9120 Project Management Post Open - National 50,000.00 0.00 Signed 2023-03-09 2023-03-21 2023-03-19 2023-04-04 2023-03-28 2023-04-04 2023-04-09 2023-10-06 / Finance Specialist ant Selection SB-MMERE-350955-CS-INDV Individual Consult Open - Internationa Pending Impleme / Compliance Planning and C IDA / D9120 Project Management Post 50,000.00 0.00 2023-04-11 2023-05-30 2023-06-20 2023-07-25 2024-01-21 ant Selection l ntation oordination Advisor Page 2 SUMMARY OF PROCUREMENT PLAN Project information: Institutional Foundations to Improve Services for Health (IFISH) P169641 Project Implementation Agency: Ministry of Health Date of the Procurement Plan: July 1, 2021 to December 31, 2022 Period covered by this Procurement Plan: First Eighteen (18) Months. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 1, 2016, revised November 2017 and August 2018, November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. These textual parts along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: - (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: The table below depicts the thresholds and Procurement Methods to be used under the IFISH for a risk rating of substantial: Table A: Procurement Methods Thresholds (Estimated Cost in US Dollars) – Applicable to All of the Projects Managed by the Project Implementation Unit at the Ministry of Health Thresholds for Procurement Methods Works, Turnkey and S&l of Plant Goods, IT & Non-Consulting Shortlist of National and Equipment Services Consultants Open Open Request Open Open Request Consultin Engineeri Internatio National for Internatio National for g Services ng & nal or ICB of NCB Quotation nal or ICB or NCB Quotation ($000) Constructi ($000) ($000) or ($000) ($000) or on Shopping Shopping Supervisio ($000) ($000) n ($000) ≥ < ≤ ≥ < ≤ < ≤ 5,000 5,000 200 500 500 100 100 200 Notes on Procurement Method Thresholds: Specific Threshold was issued for Liberia since March 2, 2017 with the following; and that approval modification is attached as Annex-1 1. Based on Liberia’s specific needs and circumstances, shopping threshold for the purchase of vehicles and fuel may be increased up to US$500,000. 2. The threshold for the use of Selection of consultant firms based on Consultants' Qualifications (CQS) is determined on a case by case basis taking into account the nature and complexity of the assignment but shall not exceed US$ 300,000 other than in exceptional situations in accordance with paragraph 3.7 of the Guidelines: Selection Employment of Consultants. 3. Special cases beyond the defined thresholds are allowed based on applicable ma r ket conditions and on agreement with the Bank *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Table B: Procurement Methods Thresholds (Estimated Cost in US Dollars) – Applicable to All of the Projects Managed by the Project Implementation Unit at the Ministry of Health Prior Review - Thresholds for Procurement Methods Procurement High Risk Substantial Risk Moderate Risk Low Risk Type ($000) ($000) ($000) ($000) Works 5,000 10,000 15,000 20,000 Goods, IT & 1,500 2,000 4,000 6,000 Non- Consulting Services Consultants 500 1,000 2,000 4,000 (Firms) Individual 200 300 400 500 Consultants Notes on Prior Review Thresholds: 1. All procurement under direct contracting and selection of consultants on a single source basis generally subject to Bank's Prior, except for very small value procurement which would have been pre-approved by the Bank and reflected in the approved Procurement Plan to follow PO Review procedures. 2. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and Financial Management (FM) Specialists. 3. Irrespective of the thresholds and category of risk, the Terms of Reference for selection of all consultants (firms or individuals), whether under prior or post reviews shall be cleared by the Bank. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: The IFISH team will prepare Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: None 1. Hiring of a Construction firm to build the New Redemption Hospital (Phase 2) with an estimated amount US$ 3,400,000.00 2. Procurement and installation of Equipment for both New Redemption Hospital (Phase 1 & 2) with an estimated amount of US$ 1,500,000.00 3. Purchase of Essential Life Saving Commodities for 25 Public Hospitals with an estimated amount of US$ 737,640.00 4. Hiring a Design and Supervision firm for the New Redemption Hospital (Phase 2) with an estimated amount US$ 340,000.00 5. Hiring of International Procurement Specialist with an estimated US$ 136,600.00 6. Hiring of Office Assistance-1 with an estimated amount of US$ 3,500.00 7. Hiring of Office Assistance-2 with an estimated amount of US$ 3,500.00 8. Hiring of Procurement Clerk with an estimated amount of US$ 3,500.00 9. Hiring of Administrative Assistance with an estimated amount of US$ 7,350.00 10.Hiring of Finance Manager with an estimated amount of US$ 22,470.00 11.Hiring of Program Assistant with an estimated amount of US$ 10,500 Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Works 1 2 3 4 5 6 7 8 9 Ref. Description of Estimat Selection Review Expected Expected Expected Commen No. Assignment ed Method/ by date of Contract Completi ts Cost in Market Bank bid Signatur on US$ Approach (Prior / submissi e Date Post) on Date 1. Hiring of a RFB; Construction Opened firm to build the RFB/Open- Post 27 Nov 31 Jan 30 July Competiti New Internation 2021 2022 2022 on Redemption 3,400,0 al Hospital (Phase 00 2) Sub-Total US$ 3,400,000.00 Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Description Estimat Selectio Review Expected Expecte Expected Comments No. of ed n by date of d Completi Assignment Cost in Method/ Bank bid Contrac on US$ Market (Prior / submissio t Date Approac Post) n Signatu h re Date Procurement RFB; and installation Opened of Equipment 1,500,00 RFB Post 22 Jan 22 28 Mar 24 Sept 22 Competition 1 for both New 0 22 Redemption Hospital (Phase 1&2 2 Purchase of RFB; Essential Life Opened Saving 737,640. RFB Post 16 Jan 22 22 Mar 18 Sept 22 Competition Commodities 00 22 for 25 Public Hospitals Sub-Total US$ 2,237,640.00 Consultancy Services 1 2 3 4 5 6 7 8 9 Ref. Description of Estimat Selecti Revi Expecte Expecte Expected Comments No. Assignment ed on ew d date d Completio Cost in Method by of Contrac n US$ / Bank proposa t Date Market (Prio l Signatu Approa r/ submiss re ch Post) ion Date 1. Hiring a Design 340,000. RFP/QC Post 20 Aug 04 Jan 22 04 Jan ToR to be and Supervision 00 BS 21 2023 submit to IDA firm for the New for review and No Objection Redemption Hospital (Phase 2) 2. Hiring of 136,600. RFP Post 12 Sept 12 Nov 11 May 22 ToR is to be International 00 21 21 submitted to Procurement IDA for review Specialist and No Objection 3. Hiring of Finance 22,470.0 INDV,DI Post N/A 29 Nov 28 May 22 TOR, Manager 0 R 21 Justification, minutes of contract negotiation, and draft contract are to be submitted to IDA for Review and No Objection. Sub-Total US$ 499,070.00 Total US$ 6,136,710.00 GENERAL NOTES 1. Operational Costs: These are expenditures incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub- agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Liberia : Institutional Foundations to Improve Services For Health PLAN General Information Country: Liberia 2021-08-31 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169641 GPN Date: Project Name: Institutional Foundations to Improve Services For Health Loan / Credit No: IDA / 66460, IDA / 72070 Ministry of Health and Social Welfare Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOHSW-244310-CW-RFB Request for Bids - / Hiring of a Construction firm Component 1: Improved ser Open - Internationa Single Stage - One E Works (without pr 2022-07-3 IDA / 66460 Post Request for Bids 3,400,000.00 0.00 Canceled 2021-10-11 2021-10-16 2021-11-27 2021-12-27 2022-01-31 to build the New Redemption vice delivery l nvelope equalification) SP 0 Hospital (Phase 2) D GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-244512-GO-RFB Component 1: Improved ser Open - Internationa Single Stage - One E / Purchase of Essential Life S IDA / 66460 Post Request for Bids 737,640.00 0.00 Canceled 2021-11-30 2021-12-05 2022-01-16 2022-02-15 2022-03-22 2022-09-18 vice delivery l nvelope aving Commodities for 25 Pu blic Hospitals LR-MOHSW-268853-GO-RFQ / Purchase of Laptop Comput Component 3: Project Manag Request for Quota Single Stage - One E IDA / 66460 Post Limited 12,500.00 0.00 Signed 2022-01-02 2022-01-11 2022-01-17 2022-01-31 ers for use by Staffs of the Pr ement tions nvelope oject Implementation Unit LR-MOHSW-282066-GO-RFQ Component 3: Project Manag Request for Quota Open - Internationa Single Stage - One E Under Imple / Purchase of Genuine Micros IDA / 66460 Post 6,000.00 0.00 2022-03-23 2022-05-29 2022-05-18 2022-11-14 ement tions l nvelope mentation oft Office Suite and Anti Virus LR-MOHSW-337912-GO-RFQ Component 2: Institutional s / Purchase of HFs and CHAs Request for Quota Single Stage - One E Pending Impl IDA / 72070 trengthening to address key Post Limited 27,110.00 0.00 2023-03-07 2023-05-02 2023-10-29 Drug boxes (Gbarpolu and Gr tions nvelope ementation binding constraints and Cape Mount Counties) LR-MOHSW-339135-GO-RFQ / Purchase of CHAs Assorted Component 2: Institutional s Request for Quota Single Stage - One E Under Imple Materials (Rain gear includin IDA / 72070 trengthening to address key Post Limited 45,005.00 0.00 2023-03-07 2023-05-02 2023-05-02 2023-10-29 tions nvelope mentation g boots, Back pads, life Jacke binding constraints ts, vest, & solar torch lights) LR-MOHSW-339114-GO-RFB Component 2: Institutional s Open - Internationa Single Stage - One E Under Imple / Procurement of RMNCAH Pr IDA / 72070 trengthening to address key Post Request for Bids 267,867.00 0.00 2023-02-06 2023-06-11 2023-02-11 2023-06-11 2023-03-25 2023-04-24 2023-05-29 2023-11-25 l nvelope mentation oducts binding constraints LR-MOHSW-339169-GO-RFB Component 2: Institutional s Open - Internationa Single Stage - One E Under Imple / Procurement of Essential M IDA / 72070 trengthening to address key Post Request for Bids 1,227,866.00 0.00 2023-02-06 2023-06-09 2023-02-11 2023-06-09 2023-03-25 2023-04-24 2023-05-29 2023-11-25 l nvelope mentation edicines and Supplies binding constraints LR-MOHSW-339160-GO-RFB Component 2: Institutional s Open - Internationa Single Stage - One E Pending Impl / Purchase of Nutritional Prod IDA / 72070 trengthening to address key Post Request for Bids 400,000.00 0.00 2023-02-15 2023-02-20 2023-04-03 2023-05-03 2023-06-07 2023-12-04 l nvelope ementation ucts for Malnourished Childre binding constraints n LR-MOHSW-339109-GO-RFB / Purchase of Assorted Vehicl Component 2: Institutional s Open - Internationa Single Stage - One E Under Imple es to Support County Health IDA / 72070 trengthening to address key Post Request for Bids 856,478.00 0.00 2023-02-06 2023-04-24 2023-02-11 2023-06-22 2023-03-25 2023-04-24 2023-05-29 2023-11-25 l nvelope mentation Teams, Hospitals, and Key M binding constraints OH Health Service Delivery F acilities LR-MOHSW-339091-GO-RFQ / Procurement of Assorted Of Component 4: Contigency E fice Equipment and Furniture Request for Quota Single Stage - One E Pending Impl IDA / 72070 mergency Response Compo Post Limited 19,200.00 0.00 2023-02-20 2023-04-17 2023-10-14 (4 Laptops, Camera, Desk an tions nvelope ementation nent d Chairs, Cabinets, Projectors and Television Monitors) for the PIU LR-MOHSW-339089-GO-RFQ Component 4: Contigency E / Procurement of Vehicles for Request for Quota Single Stage - One E Under Imple IDA / 72070 mergency Response Compo Post Limited 400,000.00 0.00 2023-03-04 2023-03-16 2023-04-29 2023-10-26 use by PIU, Aid Management tions nvelope mentation nent Unit, SCMU, M&E, HR Unit an d & CHSU LR-MOHSW-339121-GO-RFQ Component 4: Contigency E / Procurement of Assorted Of Request for Quota Single Stage - One E Pending Impl IDA / 72070 mergency Response Compo Post Limited 41,300.00 0.00 2023-02-21 2023-04-18 2023-10-15 fice Equipment to Support Bir tions nvelope ementation nent th Registration Centers LR-MOHSW-338023-GO-RFQ Component 4: Contigency E Request for Quota Single Stage - One E Pending Impl / Procurement of supplies for IDA / 72070 mergency Response Compo Post Limited 30,900.00 0.00 2023-02-26 2023-04-23 2023-10-20 tions nvelope ementation birth Registration nent LR-MOHSW-341085-GO-DIR / Component 2: Institutional s Direct - Internation Procurement of Vaccines - An IDA / 72070 trengthening to address key Post Direct Selection 856,478.00 0.00 Signed 2023-02-05 2023-02-09 2023-02-10 2023-02-01 2023-03-17 2023-09-13 al tigens & Injection supplies binding constraints LR-MOHSW-339150-GO-RFQ / The Procurement and Distri Component 2: Institutional s Request for Quota Single Stage - One E Under Imple bution of Community Health IDA / 72070 trengthening to address key Post Limited 15,718.00 0.00 2023-03-05 2023-04-30 2023-10-27 tions nvelope mentation Commodities for Gbarpolu an binding constraints d Grand Cape Mount Countie s LR-MOHSW-341250-GO-RFQ Component 2: Institutional s Request for Quota Single Stage - One E Pending Impl / Purchase of Vehicle for ASR IDA / 72070 trengthening to address key Post Limited 50,000.00 0.00 2023-03-11 2023-05-06 2023-11-02 tions nvelope ementation H Coordination and Monitorin binding constraints g LR-MOHSW-339120-GO-RFQ / Purchase of Assorted Office Component 2: Institutional s Request for Quota Single Stage - One E Pending Impl Equipment for use by Adoles IDA / 72070 trengthening to address key Post Open - National 61,629.00 0.00 2023-04-05 2023-05-31 2023-11-27 tions nvelope ementation cent, Community Health, War binding constraints ehouse, Procurement Unit, a nd M & E Units Page 1 LR-MOHSW-341084-GO-RFQ / Procurement of Motorbikes Component 2: Institutional s Single Stage - One E Under Imple for use by Primary Healthcar IDA / 72070 trengthening to address key Post Request for Bids Open - National 715,200.00 0.00 2023-03-24 2023-04-24 2023-03-29 2023-06-22 2023-05-10 2023-06-09 2023-07-14 2024-01-10 nvelope mentation e Delivery Facilities, CHAP, R binding constraints H Supervision, Birth Registrat ion Centers LR-MOHSW-356713-GO-RFQ Component 3: Project Manag Request for Quota Single Stage - One E Under Imple IDA / 72070 Post Limited 6,600.00 0.00 2023-05-05 2023-06-30 2023-12-27 / Purchase of PBF Office Equi ement tions nvelope mentation pment LR-MOHSW-362361-GO-RFQ Component 3: Project Manag Request for Quota Single Stage - One E / Purchae of Laptop Compute IDA / 72070 Post Limited 9,000.00 0.00 Canceled 2023-07-05 2023-08-30 2024-02-26 ement tions nvelope rs for use by PBF Unit LR-MOHSW-367582-GO-RFQ / Purchase of Laptop Comput Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / 72070 Post Limited 20,800.00 0.00 2023-07-24 2023-09-18 2024-03-16 ers and Office Equipment for ement tions nvelope ementation use by PBF Unit, SCM, and H ealth Financing Unit NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-244526-NC-RFB / Procurement and installatio Component 1: Improved ser Open - Internationa Single Stage - One E Pending Impl IDA / 66460 Post Request for Bids 1,500,000.00 0.00 2021-12-06 2021-12-11 2022-01-22 2022-02-21 2022-03-28 2022-09-24 n of Equipment for both New vice delivery l nvelope ementation Redemption Hospital (Phase 1 & 2) LR-MOHSW-339153-NC-RFQ Component 4: Contigency E Request for Quota Single Stage - One E / Procurementof Space in the IDA / 72070 mergency Response Compo Post Limited 23,474.00 0.00 Canceled 2023-02-11 2023-04-08 2023-10-05 tions nvelope Cloud to Host all HIS Sub-Sys nent tems LR-MOHSW-339080-NC-RFQ Component 4: Contigency E Request for Quota Single Stage - One E Pending Impl IDA / 72070 Post Limited 4,000.00 0.00 2023-03-05 2023-04-30 2023-10-27 / Printing of Project Legal Do mergency Response Compo tions nvelope ementation cuments nent LR-MOHSW-341070-NC-RFQ Component 2: Institutional s / Printing of Final Copy of the Request for Quota Single Stage - One E IDA / 72070 trengthening to address key Post Limited 18,000.00 0.00 Canceled 2023-09-16 2023-11-11 2024-05-09 HR Policy and Strategy, and tions nvelope binding constraints Health Financing Strategy LR-MOHSW-348115-NC-RFQ Component 2: Institutional s Request for Quota Single Stage - One E Pending Impl / Printing of Materials as sup IDA / 72070 trengthening to address key Post Limited 47,000.00 0.00 2023-03-19 2023-05-14 2023-11-10 tions nvelope ementation port to the Community Healt binding constraints h Symposium LR-MOHSW-348104-NC-DIR / Component 4: Contigency E Procurement of Space in the Under Imple IDA / 66460 mergency Response Compo Post Direct Selection Direct - National 23,474.00 0.00 2023-02-06 2023-04-10 2023-02-11 2023-05-03 2023-03-18 2023-09-14 Cloud to Host all HIS Sub-Sys mentation nent tems on its Exisiting Server LR-MOHSW-348112-NC-RFQ Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / 72070 Post Limited 4,000.00 0.00 2023-06-12 2023-08-07 2024-02-03 / Print of Health Financing Str ement tions nvelope ementation ategy LR-MOHSW-354386-NC-RFQ Component 4: Contigency E Request for Quota Single Stage - One E Under Imple / Printing of HIS Reporting an IDA / 72070 mergency Response Compo Post Limited 36,000.00 0.00 2023-04-22 2023-06-17 2023-12-14 tions nvelope mentation d Recording Tools nent LR-MOHSW-362834-NC-RFQ Component 2: Institutional s Request for Quota Single Stage - One E Pending Impl / Assorted Pritings for CRVS a IDA / 72070 trengthening to address key Post Limited 24,307.00 0.00 2023-06-24 2023-08-19 2024-02-15 tions nvelope ementation nd CHAP binding constraints CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-253523-CS-QCB Component 3: Project Manag Consultant Qualifi Open - Internationa S / Hiring of Independent Veri IDA / 66460 Post 200,000.00 0.00 Canceled 2021-11-22 2021-05-31 2021-12-13 2022-01-26 2022-02-25 2022-04-01 2022-09-28 ement cation Selection l cation Agency (IVA) to Verify DLIs LR-MOHSW-243502-CS-QBS / Hiring a Design and Supervi Component 1: Improved ser Quality Based Sel Open - Internationa IDA / 66460 Post 340,000.00 0.00 Canceled 2021-06-30 2021-07-21 2021-09-03 2021-10-01 2021-10-31 2021-11-30 2022-01-04 2023-01-04 sion firm for the New Redem vice delivery ection l ption Hospital (Phase 2) LR-MOHSW-339078-CS-CDS Component 1: Improved ser Quality And Cost- Open - Internationa Pending Impleme / Hire a Design firm for the N IDA / 72070 Post 550,000.00 0.00 2023-03-01 2023-03-22 2023-05-05 2023-06-02 2023-07-02 2023-08-06 2023-09-10 2024-09-09 vice delivery Based Selection l ntation ew Redemption Hospital (add itional services) LR-MOHSW-358960-CS-QCB Component 3: Project Manag Quality And Cost- Open - Internationa Under Implement S / Hiring of National Verificat IDA / 72070 Post 627,906.00 0.00 2023-05-19 2023-05-02 2023-06-09 2023-05-11 2023-07-23 2023-08-20 2023-09-19 2023-10-24 2023-11-28 2024-11-27 ement Based Selection l ation ion Agency for PBF Implemen tation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-244298-CS-CDS Component 3: Project Manag IDA / 66460 Post Direct Selection Direct 22,470.00 99,510.00 Signed 2021-09-15 2021-12-14 2021-09-25 2021-12-15 2021-11-29 2021-12-21 2022-05-28 / Hiring of Finance Manager ement LR-MOHSW-244531-CS-INDV Component 3: Project Manag Individual Consult IDA / 66460 Post Direct 7,350.00 0.00 Canceled 2021-09-15 2021-09-25 2021-10-16 2021-11-20 2022-05-19 / Hiring of Administrative Assi ement ant Selection stant LR-MOHSW-243505-CS-CDS Component 3: Project Manag Under Implement IDA / 66460 Post Direct Selection Direct 3,500.00 0.00 2021-09-15 2021-09-14 2021-09-25 2021-11-29 2022-05-28 / Hiring of Procurement Clerk ement ation LR-MOHSW-243507-CS-CDS Component 3: Project Manag Under Implement IDA / 66460 Post Direct Selection Direct 3,500.00 0.00 2021-09-15 2021-09-14 2021-09-25 2021-11-29 2022-05-28 / Hiring of Office Assistant-1 ement ation LR-MOHSW-244530-CS-INDV Component 3: Project Manag Individual Consult Under Implement IDA / 66460 Post Direct 3,500.00 0.00 2021-09-15 2021-09-14 2021-09-25 2021-10-16 2021-11-20 2022-05-19 / Hiring of Office Assistant-2 ement ant Selection ation Page 2 LR-MOHSW-243504-CS-INDV Component 3: Project Manag Individual Consult Pending Impleme IDA / 66460 Post Limited 10,500.00 0.00 2021-09-15 2021-09-20 2021-10-11 2021-11-15 2022-05-14 / Hiring of Program Assistant ement ant Selection ntation LR-MOHSW-244305-CS-INDV Component 3: Project Manag Individual Consult Under Implement / Hiring of International Procu IDA / 66460 Prior Open 136,600.00 0.00 2021-09-30 2022-05-27 2021-11-18 2023-03-28 2021-12-09 2022-01-13 2022-07-12 ement ant Selection ation rement Specialist LR-MOHSW-253743-CS-CDS / Hiring of National Verificatio Component 1: Improved ser IDA / 66460 Post Direct Selection Direct 500,000.00 497,752.53 Completed 2021-09-16 2021-09-16 2021-09-19 2021-09-18 2021-09-27 2021-11-08 2022-03-26 2022-04-14 n Agency(NVA) to Conduct Q vice delivery Q&QA Services at PBF Hospit als LR-MOHSW-264035-CS-CDS Component 3: Project Manag IDA / 66460 Post Direct Selection Direct 7,350.00 22,683.12 Signed 2021-11-21 2021-11-19 2021-12-01 2021-12-02 2022-02-04 2021-12-05 2022-08-03 / Hiring of Procurment Assist ement ant LR-MOHSW-264048-CS-CDS Component 1: Improved ser IDA / 66460 Post Direct Selection Direct 158,758.92 0.00 Signed 2021-11-21 2021-11-19 2021-12-01 2021-12-02 2022-02-04 2022-08-03 / Hiring of PBF Technical Assi vice delivery stant LR-MOHSW-282071-CS-CDS Component 3: Project Manag / Hiring of Procurement Offic IDA / 66460 Post Direct Selection Direct 26,470.62 26,469.00 Signed 2022-03-14 2022-03-09 2022-03-24 2022-03-16 2022-05-28 2022-03-25 2022-11-24 ement er for the PIU LR-MOHSW-282049-CS-CDS Component 3: Project Manag IDA / 66460 Post Direct Selection Direct 46,680.00 49,014.72 Signed 2022-03-02 2022-03-09 2022-03-12 2022-03-14 2022-05-16 2022-03-25 2022-11-12 / Hiring of Infrastructure Spec ement ialist LR-MOHSW-282050-CS-CDS Component 3: Project Manag IDA / 66460 Post Direct Selection Direct 25,000.02 25,000.02 Signed 2022-03-20 2022-03-09 2022-03-30 2022-03-14 2022-06-03 2022-03-25 2022-11-30 / Hiring of Program Officer ement LR-MOHSW-338200-CS-INDV / Hiring of a Local Consultant Component 2: Institutional s Individual Consult Under Implement to Revise, Consolidate, and Fi IDA / 72070 trengthening to address key Post Open - National 5,400.00 0.00 2023-03-06 2023-05-02 2023-04-24 2023-05-15 2023-06-19 2023-12-16 ant Selection ation anlize the Curriculum for Co binding constraints mpetence Training of Nurses and Midwives LR-MOHSW-339092-CS-CDS Component 4: Contigency E / Direct Hiring the Services of Pending Impleme IDA / 72070 mergency Response Compo Post Direct Selection Direct - National 25,000.00 0.00 2023-02-28 2023-03-10 2023-05-14 2023-11-10 the GAC to Conduct Annual Fi ntation nent nancial Audit of the Project LR-MOHSW-339179-CS-CDS Component 4: Contigency E Pending Impleme IDA / 72070 Post Direct Selection Direct - National 18,301.00 0.00 2023-06-05 2023-06-15 2023-08-19 2024-02-15 / Direct Hiring of Deputy PIU mergency Response Compo ntation Manager nent LR-MOHSW-339265-CS-CDS Component 4: Contigency E Pending Impleme IDA / 72070 Post Direct Selection Direct - National 11,111.00 0.00 2023-06-05 2023-06-15 2023-08-19 2024-02-15 / Administrative and Finance mergency Response Compo ntation Officer nent LR-MOHSW-339273-CS-INDV Component 4: Contigency E Individual Consult Under Implement IDA / 72070 Post Open - National 33,333.00 0.00 2023-02-06 2023-05-01 2023-03-27 2023-04-17 2023-05-22 2023-11-18 / Program Officer mergency Response Compo ant Selection ation nent LR-MOHSW-339267-CS-CDS Component 4: Contigency E Pending Impleme IDA / 72070 Post Direct Selection Direct - National 15,600.00 0.00 2023-05-01 2023-05-11 2023-07-15 2024-01-11 / Program Assistant mergency Response Compo ntation nent LR-MOHSW-356715-CS-INDV Component 3: Project Manag Individual Consult Open - Internationa Under Implement / Hire Consulting service for P IDA / 72070 Post 250,095.00 0.00 2023-04-30 2023-04-10 2023-06-18 2023-07-09 2023-08-13 2024-02-09 ement ant Selection l ation BF data base and dashboard LR-MOHSW-358956-CS-INDV Component 4: Contigency E Individual Consult Under Implement IDA / 72070 Post Open - National 15,600.00 0.00 2023-05-19 2023-04-30 2023-07-07 2023-07-28 2023-09-01 2024-02-28 / Hiring of Program Assistant mergency Response Compo ant Selection ation nent LR-MOHSW-339178-CS-INDV Component 3: Project Manag Individual Consult Under Implement IDA / 72070 Post Open - National 18,000.00 0.00 2023-02-15 2023-05-26 2023-04-05 2023-04-26 2023-05-31 2023-11-27 / Hiring of PBF Primary Office ement ant Selection ation r LR-MOHSW-339177-CS-INDV Component 3: Project Manag Individual Consult Under Implement IDA / 72070 Post Open - National 18,000.00 0.00 2023-02-15 2023-05-26 2023-04-05 2023-04-26 2023-05-31 2023-11-27 / Hiring of PBF Secondary Offi ement ant Selection ation cer Page 3 PROCUREMENT PLAN (Textual Part) Project information: Nepal- Strategic Road Connectivity and Trade Improvement Project (P170409) Project Implementation agency: Department of Roads Date of the Procurement Plan: 2020/03/16 Period covered by this Procurement Plan: 2020/03/16 – 2021/09/15 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used with applicable caveats as follows. National Procurement Procedures: These procedures are applicable for the procurement of goods, works and non-consulting services only. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan tables in STEP, the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Nepal’s Public Procurement Act, 2007, as amended by Amendment 2073 (2016) – (1st Amendment) and the Public Procurement Regulation, 2007, as amended by Amendment 2076 (2019) – (9th Amendment), such arrangements shall be subject to paragraph 5.4 of the Bank’s Procurement Regulations and the following conditions: 1) Model bidding documents, including contract conditions agreed with the Bank (as amended from time to time), shall be used. Bidding documents shall be made available, by mail or in person, or through e-GP portal to all who are willing to pay the required fee. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids / request for proposals document shall require that Bidders / Proposers submitting Bids / Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Qualification criteria (in case pre-qualifications were not carried out) shall be stated in the bidding documents for all contracts, irrespective of the value, and if a registration process is required, a foreign firm declared as the lowest evaluated bidder shall be given a reasonable opportunity to register, without let or hindrance. 5) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. 6) Performance security should be an amount of five (5) to ten (10) percent of the contract price and shall not be increased merely based on comparison of the bid price of awarded bidders with the pre-bid cost estimate. 7) If a contract is terminated because of fundamental breach of contract by the contractor, the amount to be recovered from the contractor representing the employer’s additional costs for completing the contract shall be provisioned as agreed with the Bank in model bidding documents. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Nepal : Nepal Strategic Road Connectivity and Trade Improvement Project PLAN General Information Country: Nepal 2020-03-26 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170409 GPN Date: 2020-06-01 Project Name: Nepal Strategic Road Connectivity and Trade Improvement Project Loan / Credit No: IDA / 66730, / Department of Roads Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SRCTIP-DOR-W-NNM-ICB-1 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E 20,000,000.0 10,876,546. 2029-01-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids Signed 2020-03-30 2020-05-18 2020-07-14 2021-07-29 2020-08-11 2021-09-22 2020-04-15 2020-10-21 2020-10-10 2021-11-25 2020-11-09 2022-03-12 2021-01-16 2022-04-13 mprovement l nvelope 0 30 6 Bridges [CH: 0+000 Km to C H: 12+260 Km, Tribhuban Hi ghway] SRCTIP-DOR-W-NNM-ICB-2 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E 84,000,000.0 43,987,346. 2029-01-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids Signed 2020-03-30 2020-05-18 2020-07-14 2021-07-29 2020-08-11 2021-09-22 2020-04-15 2020-10-21 2020-10-10 2021-11-25 2020-11-09 2022-03-12 2021-01-16 2022-04-28 mprovement l nvelope 0 00 6 Bridges [CH: 0+000 Km to C H: 43+540 Km, Prithivi High way] SRCTIP-DOR-W-NNM-ICB-3 / I mprovement of Nagdhunga - Regional Road Connectivity I Open - Internationa Single Stage - One E 72,300,000.0 Under Imple 2029-03-1 Naubise - Mugling Road and IDA / 66730 Prior Request for Bids 0.00 2020-05-31 2021-03-06 2020-09-14 2022-04-12 2020-10-12 2022-05-05 2020-06-16 2021-03-23 2020-12-11 2022-07-04 2021-01-10 2022-09-21 2021-03-19 mprovement l nvelope 0 mentation 9 Bridges [CH: 43+542 Km to CH: 82+403 Km, Prithivi High way] SRCTIP-DOR-WPM-RDBKT-NC B-01 / Periodic Maintenance Single Stage - Two E 1,140,739.7 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,140,000.00 Signed 2021-01-24 2021-03-05 2021-01-25 2021-03-05 2021-02-25 2021-04-08 2021-04-06 2021-05-07 2021-05-05 2021-05-28 of Khawa-Lamidanda Road, N nvelope 5 9 H34-011,Bhaktapur Division, DOR SRCTIP-DOR-WPM-RDBRT-N CB-02 / Periodic Maintenance of Mawa-Harichamod NH01- Single Stage - Two E 2022-08-0 006, Budhi Khola-Itahari NH0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,180,000.00 779,881.01 Signed 2021-01-24 2021-03-16 2021-01-25 2021-03-16 2021-02-25 2021-04-18 2021-04-10 2021-06-20 2021-05-09 2021-07-21 nvelope 2 1-008, Itahari-Sakhawa Gach hi NH01-009, Base Camp - B hedetar NH08-007,Biratnaga r Division, DOR SRCTIP-DOR-WPM-RDCHN-N CB-03 / Periodic Maintenance of Banke-Nawalpur NH01-02 Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,060,000.00 862,667.17 Signed 2021-01-24 2021-04-16 2021-01-25 2021-04-20 2021-02-25 2021-05-17 2021-04-10 2021-06-25 2021-05-09 2021-07-12 4, Nawalpur-Bagmati NH01-0 nvelope 2 25, Bagmati-Chandranigahap ur NH01-026,Chandranigaha pur Division, DOR SRCTIP-DOR-WPM-RDCHR-N CB-04 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 910,000.00 901,985.77 Signed 2021-01-24 2021-03-01 2021-01-25 2021-03-01 2021-02-25 2021-04-04 2021-04-10 2021-04-25 2021-05-09 2021-05-11 of Dolalghat - Chautara NH3 nvelope 2 1-001,Charikot Division, DOR SRCTIP-DOR-WPM-RDDNG-N CB-05 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,020,000.00 654,835.57 Signed 2021-01-24 2021-03-07 2021-01-25 2021-03-07 2021-02-25 2021-04-08 2021-04-10 2021-05-24 2021-05-09 2021-06-18 of Lamahi-Ameliya, NH01-05 nvelope 2 7,Dang Division, DOR SRCTIP-DOR-WPM-RDDSB-N CB-06 / Periodic Maintenance Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,220,000.00 978,900.31 Signed 2021-01-24 2021-03-08 2021-01-25 2021-03-16 2021-02-25 2021-04-09 2021-04-06 2021-05-16 2021-05-05 2021-07-01 of Khurkot - Barkhe Khola, N nvelope 9 H13-005,DhuliKel Bardibas R oad SRCTIP-DOR-WPM-RDKTM-N CB-07 / Periodic Maintenance of Bansbari-Budhanilkantha Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,260,000.00 998,979.53 Signed 2021-01-24 2021-03-03 2021-01-25 2021-03-03 2021-02-25 2021-04-04 2021-04-06 2021-05-20 2021-05-05 2021-06-15 F02503, Tinkune-Koteshwar nvelope 9 NH34-002, Koteshwar-Manoh ara bridge NH34-003,Kathma ndu Division, DoR SRCTIP-DOR-WPM-RDMHN-N CB-08 / Periodic Maintenance of Sukhad Choraha-Atariya N Single Stage - Two E 2022-07-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,370,000.00 810,057.38 Signed 2021-01-24 2021-04-13 2021-01-25 2021-04-20 2021-02-25 2021-05-20 2021-04-06 2021-06-22 2021-05-05 2021-07-05 H01-066, Atariya-Mohana Riv nvelope 9 er NH01-067, Mohana River- Daiji NH01-068,Mahendranag ar Division, DOR SRCTIP-DOR-WPM-RDNPL-NC B-09 / Periodic Maintenance Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 870,000.00 666,130.11 Signed 2021-01-24 2021-03-16 2021-01-25 2021-03-16 2021-02-25 2021-04-16 2021-04-10 2021-05-24 2021-05-09 2021-06-17 of Khairi Khola-Kohalpur NH0 nvelope 2 1-060,Nepalgunj Division, DO R SRCTIP-DOR-WPM-RDSRK-N CB-11 / Periodic Maintenance of Kalakhola Gaun (DB) - Sai Single Stage - Two E 2022-08-0 n NH58-012, Sain - Tilepata IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,120,000.00 934,336.45 Signed 2021-01-24 2021-03-30 2021-01-25 2021-03-30 2021-02-25 2021-04-30 2021-04-10 2021-08-05 2021-05-09 2021-09-09 nvelope 2 NH58-013, Gurase (DB) - Chu pra (NH03) NH60-002, Dailek h - Pallo Kalimati NH60-003, Surkhet Division, DOR SRCTIP-DOR-WPM-RDPKR-NC B-10 / Periodic Maintenance of Bindebasini-Yamdi bridge F04202, Waling-Syangja NH4 Single Stage - Two E 2022-08-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 1,330,000.00 0.00 Canceled 2021-01-24 2021-03-03 2021-01-25 2021-03-03 2021-02-25 2021-04-04 2021-04-10 2021-05-09 7-010, Syangja-Kubinde NH4 nvelope 2 7-011, Syangja-Kubinde NH4 7-011, Pokhara municipality boundary-Prithvichok NH47-0 13, Pokhara Division, DOR SRCTIP-DOR-WPM-RDPKR-NC B-10-RE / Periodic Maintenan National Procure ce of Bindebasini-Yamdi brid ment Document - ge F04202, Waling-Syangja N Single Stage - Two E 1,151,413.2 2023-02-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 1,330,000.00 Signed 2021-08-20 2021-08-24 2021-08-21 2021-08-24 2021-09-21 2021-09-24 2021-11-04 2022-01-04 2021-12-03 2022-02-20 H47-010, Syangja-Kubinde N nvelope 1 6 ss (Non Bank-SPD H47-011, Syangja-Kubinde N ) H47-011, Pokhara municipalit y boundary-Prithvichok NH47 -013, Pokhara Division, DOR Page 1 SRCTIP-DOR-WPM-RDBHT-N CB-12 / Periodic Maintenance National Procure of Lothar-Tikauli (km 457.78 ment Document - 0 to km 461.780) of Mahendr Single Stage - Two E Pending Imp 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 450,000.00 0.00 2021-12-15 2021-12-16 2022-01-16 2022-03-01 2022-03-30 a Highway (NH01_034), Nara nvelope lementation 0 ss (Non Bank-SPD yanghat-Aanptari (km 30.450 ) to km 32.900) of Narayangha t - Mugling Highway (NH044_ 02), Bharatpur Division DOR. SRCTIP-DOR-WPM-RDBRT-N CB-13 / Periodic Maintenance National Procure of Duhabi (KRM)-Inarwa (km ment Document - 0.000 to km 8.000 of F054_0 Single Stage - Two E Under Imple 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 1,160,000.00 0.00 2021-12-15 2021-12-29 2021-12-16 2021-12-29 2022-01-16 2022-01-30 2022-03-01 2022-02-18 2022-03-30 1), Bardanga-Urlabari (MRM) nvelope mentation 0 ss (Non Bank-SPD (km 0.000 to km 19.35 of F0 ) 60-01), Mawa-Harichamod (k m 54.750 to km 63.450 of N H01-006), Biratnagar Divisio n, DoR. SRCTIP-DOR-WPM-RDBTW-N CB-14 / Periodic Maintenance of Sunwal-Parasi-Maheshpur National Procure (km 0.000 to km 8.950 of F0 ment Document - Single Stage - Two E Under Imple 2023-03-3 09_01,_02), Belhaiya-Siddhar IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 2,233,000.00 0.00 2021-12-15 2022-01-01 2021-12-16 2022-01-01 2022-01-16 2022-03-01 2022-03-30 nvelope mentation 0 thanagar, Butwal Municipalit ss (Non Bank-SPD y Boundry - Rajmarga Chaura ) ha (km 0.750 to km 4.800, k m 22.110 to km24.040 of N H47_001,_003), Butwal Divisi on, DOR. SRCTIP-DOR-WPM-RDHRK-N CB-15 / Periodic Maintenance of Hilepani-Harkapur (km 46 National Procure 6.34 to 473.34 of NH03_017) ment Document - Single Stage - Two E 1,130,787.1 2023-03-3 , Hilepani-Okhaldhunga (km IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 1,182,000.00 Signed 2021-12-15 2021-12-20 2021-12-16 2021-12-20 2022-01-16 2022-01-21 2022-03-01 2022-02-13 2022-03-30 2022-02-25 nvelope 6 0 102.13 to 116.33 of NH20_00 ss (Non Bank-SPD 6), Okhaldhunga-Mudhebisan ) a-Salleri (km 137.330 to 195. 04 of of NH20_007 and 008), Harkapur Division DoR. SRCTIP-DOR-WPM-RDLHN-N CB-16 / Periodic Maintenance National Procure of Koshi Barrage- Bhardaha ( ment Document - Single Stage - Two E Under Imple 2023-03-3 km 134.93 to km140.950 of IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 450,000.00 0.00 2021-12-15 2021-12-26 2021-12-16 2021-12-26 2022-01-16 2022-03-01 2022-03-30 nvelope mentation 0 NH01_012), Bhardaha-Rupan ss (Non Bank-SPD i (km 161.74-km171.740 of N ) H01_013), Lahan Division DO R. SRCTIP-DOR-WPM-RDPLP-NC National Procure B-17 / Periodic Maintenance ment Document - Single Stage - Two E 2023-03-3 of Kadambas-Banstari (km 3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 450,000.00 405,483.86 Signed 2021-12-15 2022-02-03 2021-12-16 2022-02-02 2022-01-16 2022-03-06 2022-03-01 2022-04-25 2022-03-30 2022-05-19 nvelope 0 5.200 to km 55.590 of NH47_ ss (Non Bank-SPD 005), Palpa Division, DOR. ) SRCTIP-DOR-WPM-RDSRK-N CB-18 / Periodic Maintenance National Procure of Harre-Chhinchu (km 74.0 ment Document - 00 to 80.600 of NH58_007), Single Stage - Two E 2023-03-3 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 750,000.00 0.00 Canceled 2021-12-15 2022-01-04 2021-12-16 2022-01-04 2022-01-16 2022-02-04 2022-03-01 2022-03-30 Bangesimal-Baddichaur (km1 nvelope 0 ss (Non Bank-SPD 12.990 to km140.100 of NH5 ) 8_010), Kalakholagaun-Sain ( km 165.990-174.990 of NH 5 8_012), Surkhet Division, DO R. SRCTIP-DOR-WPM-RDBHT-N National Procure CB-19 / Periodic Maintenance ment Document - of Lothar-Tikauli (km 438.55 Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 558,125.04 0.00 Signed 2022-07-19 2022-07-22 2022-07-22 2022-07-24 2022-08-22 2022-08-22 2022-09-16 2022-09-14 2022-10-23 0-440.000, km 442.800-444. nvelope 0 ss (Non Bank-SPD 800, km 457.200-458.750)of ) Mahendra Highway Link NH0 1-034), Bharatpur Division D OR SRCTIP-DOR-WPM-RDDSB-N National Procure CB-21 / Periodic Maintenance ment Document - of Barkhe Khola-Dhulikhel(k Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 397,922.48 0.00 Signed 2022-07-19 2022-09-14 2022-07-22 2022-09-28 2022-08-22 2022-10-17 2022-09-16 2022-12-04 2022-10-23 m 149.000-156.000 of BP Hig nvelope 0 ss (Non Bank-SPD hway link NH13-006),Dhulikh ) el Bardibas Road Project, DO R SRCTIP-DOR-WPM-RDDMK-N National Procure CB-22 / Periodic Maintenance ment Document - Single Stage - Two E 2023-06-2 of Gauradaha-Dipu-Gaurigan IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 619,706.72 0.00 Signed 2022-07-19 2022-07-22 2022-07-22 2022-08-02 2022-08-22 2022-08-22 2022-09-16 2022-11-07 2022-10-23 nvelope 0 j (km 10.560-21.960 of link F ss (Non Bank-SPD 002-02),Damak Division, DO ) R SRCTIP-DOR-WPM-RDHTD-N CB-23 / Periodic Maintenance National Procure of Sirsiya Border-Junction of ment Document - Old Alignment(km 0.000 -1.3 Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 477,051.68 0.00 Signed 2022-07-19 2022-07-22 2022-07-22 2022-08-22 2022-08-22 2022-09-16 2022-10-16 2022-10-23 30 of link H02-01 Tribhuvan nvelope 0 ss (Non Bank-SPD Rajpath Old),Ratamate-Hetau ) nda (km391.360-396.700 of link NH01-031 Tribhuvan Raj path) Hetaunda Division, DO R SRCTIP-DOR-WPM-RDKTM-N CB-24 / Periodic Maintenance of Kalanki-Balkhu link NH39- National Procure 011(km 18.95-21.95), Manoh ment Document - Single Stage - Two E 2023-06-2 ara-Koteshwar link NH39-001 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 3,125,164.64 0.00 Signed 2022-07-19 2022-08-26 2022-07-22 2022-08-25 2022-08-22 2022-09-25 2022-09-16 2022-10-13 2022-10-23 nvelope 0 (0.000-1.000),Lainchaur-Ring ss (Non Bank-SPD road-Balaju Bypass link F021- ) 02 (km 4.38-5.34), Lainchaur -Maharajgunj, link F025-01(k m 0.00 to 1.00), Sankhu-Laps iphedi-Bhot SRCTIP-DOR-WPM-RDLTP-NC B-25 / Periodic Maintenance of Balkhu-Ekantakuna (KTM R National Procure ing Road) link NH39-012 (km ment Document - Single Stage - Two E 2023-06-2 21.95-23.95), Ekantakuna-Ku IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 2,518,017.92 0.00 Signed 2022-07-19 2022-08-26 2022-07-22 2022-08-25 2022-08-22 2022-09-25 2022-09-16 2022-10-13 2022-10-23 nvelope 0 santi-Satdobato link NH39-01 ss (Non Bank-SPD 3 ( km 23.95-25.95), Satdoba ) to-Gwarko link NH39-014 ( k m 25.95-27.45), Gwarko-Ma nohara (Balkumari), link NH3 9-015 (km 27.45 SRCTIP-DOR-WPM-RDNPL-NC B-26 / Periodic Maintenance of Man River-Bhuregaun link National Procure NH01-062 ( km 842.91-869.4 ment Document - Single Stage - Two E 2023-06-2 , 875-878.04 ), Bhuregaun-Ka IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 1,773,948.32 0.00 Signed 2022-07-19 2022-07-25 2022-07-22 2022-07-28 2022-08-22 2022-08-24 2022-09-16 2022-09-15 2022-10-23 nvelope 0 rnali NH01-063 (km 878.04-9 ss (Non Bank-SPD 00.75), of Mahendra Highway ) , Kohalpur-Deurali link NH58- 005 (kn 22.24-42.91),Deurali -Harre link NH58-006 ( km 45 .3-68.85) of Page 2 SRCTIP-DOR-WPM-RDSRK-N CB-18-2 / Periodic Maintenan National Procure ce of Harre-Chhinchu(km 74. ment Document - 000 to 80.600 of NH58_007), Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 750,000.00 0.00 Canceled 2022-03-10 2022-04-01 2022-03-11 2022-04-04 2022-04-11 2022-05-25 2022-06-23 Bangesimal-Baddichaur(km1 nvelope 3 ss (Non Bank-SPD 12.990 to km140.100 of NH5 ) 8_010), Kalakholagaun-Sain( km 165.990-174.990 of NH 5 8_012), Surkhet Division, DO R SRCTIP-DOR-WPM-RDSRK-N CB-18-3 / Periodic Maintenan National Procure ce of Harre-Chhinchu(km 74. ment Document - 000 to 80.600 of NH58_007), Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 777,656.00 0.00 Canceled 2022-07-19 2022-07-22 2022-07-22 2022-07-24 2022-08-22 2022-09-16 2022-10-23 Bangesimal-Baddichaur(km1 nvelope 0 ss (Non Bank-SPD 12.990 to km140.100 of NH5 ) 8_010), Kalakholagaun-Sain( km 165.990-174.990 of NH 5 8_012),Surkhet Division, DOR . SRCTIP-DOR-WPM-RDBTW-N CB-20 / Periodic Maintenance National Procure of Bamaha Khola-Kothi River ment Document - ( km 598.21-614.45, link NH0 Single Stage - Two E 2023-06-2 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 2,405,970.08 0.00 Canceled 2022-07-19 2022-07-25 2022-07-22 2022-08-22 2022-09-16 2022-10-23 1-048, of Mahendra Highway) nvelope 0 ss (Non Bank-SPD , Ramgram-Lumbini (km 532. ) 240-538.88, km 539.88-555. 19, of Postal Highway Link N H05-026),Butwal Division DO R SRCTIP-DOR-WPM-RDBTW-N National Procure CB-20-2 / Periodic Maintenan ment Document - ce of Parasi-Bhairahawa road Single Stage - Two E 2023-09-0 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 2,405,970.08 0.00 Signed 2022-09-30 2022-09-30 2022-10-03 2022-10-11 2022-11-03 2022-11-02 2022-11-28 2022-12-01 2023-01-04 (KM 532.240 to KM 555.19) o nvelope 1 ss (Non Bank-SPD f NH05_026, and Bamaha Kh ) ola-Kothi River road (KM 598. 21 to KM 615.45) of NH01-04 8 SRCTIP-DOR-WPM-RDSRK-N CB-18-4 / Periodic Maintenan National Procure ce of Harre-Chhinchu(km 74. ment Document - 000 to 80.600 of NH58_007), Single Stage - Two E 2023-10-1 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 777,656.00 0.00 Canceled 2022-11-13 2022-11-16 2022-12-17 2023-01-11 2023-02-17 Bangesimal-Baddichaur(km1 nvelope 5 ss (Non Bank-SPD 12.990 to km140.100 of NH5 ) 8_010), Kalakholagaun-Sain( km 165.990-174.990 of NH 5 8_012),Surkhet Division, DOR . SRCTIP-DOR-WPM-RDSRK-N CB-18-4-2 / Periodic Mainten National Procure ance of Harre-Chhinchu(km 7 ment Document - 4.000 to 80.600 of NH58_007 Single Stage - Two E 2024-01-1 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 777,656.00 0.00 Canceled 2023-02-12 2023-02-15 2023-03-18 2023-04-12 2023-05-19 ),Bangesimal-Baddichaur(km nvelope 4 ss (Non Bank-SPD 112.990 to km140.100 of NH ) 58_010), Kalakholagaun-Sain (km 165.990-174.990 of NH 58_012),Surkhet Division, DO R. SRCTIP-DOR-WPM-RDSRK-N CB-34 / Periodic Maintenance National Procure Works along Ratna Rajmarg ( ment Document - Harre – Chhinchu Section) (C Single Stage - Two E Pending Imp 2024-06-1 IDA / 66730 Institutional Strengthening Post Request for Bids Open - National 2 Envelope proce 797,053.00 0.00 2023-06-24 2023-06-29 2023-07-30 2023-08-25 2023-09-16 h.74+000 to 80+400) and Su nvelope lementation 2 ss (Non Bank-SPD rkhet Jumla Road (Ch.112+9 ) 90 to 140+100 and Ch.165+ 900 to 174+990 of NH58-012 ), Surkhet and Dailekh. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-NCS-17 / Procur ement of Non- Consulting Ser Single Stage - One E Under Imple IDA / 66730 Trade Facilitation Post Request for Bids Open - National 89,600.00 0.00 2021-10-06 2021-10-31 2021-10-11 2021-11-19 2021-11-25 2021-12-20 2021-12-25 2022-01-29 2025-01-13 vices For GBV Service Provid nvelope mentation er under SRCTIP in NNM Roa d SRCTIP-DOR-NCS-18 / Procur ement of Non- Consulting Ser Single Stage - One E Pending Impl IDA / 66730 Trade Facilitation Post Request for Bids Open - National 100,000.00 0.00 2021-11-01 2021-11-08 2021-12-23 2022-02-06 2022-03-13 2025-02-25 vices For Training Service Pro nvelope ementation vider under SRCTIP in NNM R oad CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-CS-NNM-QCBS- 1 / Procurement of Consultin g Service for Construction Su Regional Road Connectivity I Quality And Cost- Open - Internationa IDA / 66730 Prior 8,000,000.00 4,840,361.52 Signed 2020-04-08 2020-06-29 2020-04-18 2020-10-09 2020-07-01 2021-04-30 2020-08-30 2021-07-15 2020-10-09 2021-10-29 2020-11-24 2022-03-09 2020-12-20 2022-04-17 2028-12-20 pervision of Improvement/Wi mprovement Based Selection l dening of Nagdhunga - Naubi se - Mugling Road and Bridge s SRCTIP-DOR-CS-KDP-QCBS-2 / Detailed engineering Desig Regional Road Connectivity I Quality And Cost- Open - Internationa n of Upgradation of Kamala- IDA / 66730 Prior 2,850,000.00 1,865,504.59 Signed 2020-03-27 2020-04-21 2020-04-06 2020-06-18 2020-06-19 2021-01-26 2020-08-18 2021-03-23 2020-09-22 2021-06-25 2020-11-14 2021-08-12 2021-01-05 2021-09-19 2022-01-05 mprovement Based Selection l Dhalkebar- Pathlaiya Section of Mahendra Highway and as sociated Bridges SRCTIP-DOR-CS-KDP-QCBS-3 / Environmental Social Impac Regional Road Connectivity I Quality And Cost- IDA / 66730 Post Open - National 600,000.00 367,695.91 Signed 2020-03-27 2020-03-19 2020-04-06 2020-06-11 2020-06-20 2021-02-15 2020-07-20 2021-04-01 2020-09-18 2021-09-13 2020-11-02 2021-09-30 2021-01-01 2021-12-09 2022-01-01 t Assessment (ESIA), RAP and mprovement Based Selection VCDP of Kamala-Dhalkebar-P athlaiya SRCTIP-DOR-PMC-CS-QCBS-6 Regional Road Connectivity I Quality And Cost- / Program Management Cons IDA / 66730 Prior Open - National 1,300,000.00 809,493.63 Signed 2020-04-09 2020-08-13 2020-04-30 2020-11-09 2020-07-13 2021-04-26 2020-08-17 2021-07-28 2020-10-01 2021-11-12 2020-11-12 2022-01-03 2020-12-31 2022-02-18 2025-12-31 mprovement Based Selection ultant for Periodic Maintenan ce Page 3 SRCTIP-DOR-CS-CQS-7 / Proc urement of Consulting Servic Consultant Qualifi / Institutional Strengthening Post Open - National 20,000.00 0.00 Canceled 2020-06-05 2020-07-17 2020-06-12 2020-07-26 2020-09-09 2020-10-21 2021-01-19 e for the Detail Design of Trai cation Selection ning Center of Department of Roads at Gajuri SRCTIP-DOR-CS-QCBS-7 / Pr ocurement of Consulting Ser Quality And Cost- vice for Detailed Design and IDA / 66730 Institutional Strengthening Post Open - National 80,000.00 26,434.15 Signed 2020-07-27 2020-07-28 2020-08-03 2020-08-11 2020-09-16 2021-01-29 2020-10-14 2021-02-28 2020-11-13 2021-04-19 2020-12-18 2021-04-29 2021-01-29 2021-06-11 2024-01-29 Based Selection Technical Support Consultant for Research and Training Ce ntre at Gajuri SRCTIP-DOR-CS-QCBS- 11 / Consulting Service to carry o Regional Road Connectivity I Quality And Cost- Under Implement IDA / 66730 Post Open - National 100,000.00 0.00 2020-12-24 2020-12-22 2020-12-29 2020-12-25 2021-02-26 2021-04-16 2021-03-28 2021-07-06 2021-04-27 2021-07-28 2021-06-01 2021-08-18 2021-07-13 2027-04-13 ut Road User Satisfaction Sur mprovement Based Selection ation vey and Preparation of Neces sary Reports SRCTIP-MOPIT-CS-QCBS-19 / Procurement of Consultancy Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement Services of Project Managem IDA / 66730 Prior 1,186,000.00 0.00 2021-08-11 2021-08-24 2021-08-21 2021-08-30 2021-11-04 2022-04-19 2022-01-03 2022-07-08 2022-02-07 2022-10-31 2022-04-01 2023-01-06 2022-05-23 2025-05-07 mprovement Based Selection l ation ent Consultants (PMC) for Ro ad Safety Management (MOP IT) under SRCTIP SRCTIP-DOR-CS-QCBS-28 / T Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement ransaction Advisory Services IDA / 66730 Post 600,000.00 0.00 2022-07-07 2022-07-08 2022-08-06 2022-08-23 2022-09-19 2023-02-16 2022-10-31 2023-04-06 2022-11-30 2023-01-04 2023-02-08 2025-07-27 mprovement Based Selection l ation under SRCTIP SRCTIP-DOR-RAMS-CS-QCBS -29 / Project Management Co Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement IDA / 66730 Prior 1,654,611.91 0.00 2022-07-13 2022-07-21 2022-07-28 2022-07-25 2022-09-11 2023-02-07 2022-10-23 2023-04-04 2022-11-22 2022-12-27 2023-02-09 2028-02-08 nsultant for Road Asset Mana mprovement Based Selection l ation gement System development SRCTIP-DOR-TESP-CS-QCBS- 30 / Procurement of Training Quality And Cost- Under Implement IDA / 66730 Institutional Strengthening Post Open - National 350,000.00 0.00 2022-09-26 2022-12-18 2022-10-17 2023-01-02 2022-11-30 2023-02-24 2022-12-28 2023-04-05 2023-01-27 2023-03-03 2023-04-07 2024-10-06 and Employment Service Pro Based Selection ation vider Under SRCTIP SRCTIP-DOR-KDP-CS-QCBS-3 1 / Procurement of Consultin g Service for Construction Su Regional Road Connectivity I Quality And Cost- Open - Internationa Under Implement IDA / 66730 Prior 5,990,000.00 0.00 2023-01-15 2023-01-31 2023-01-22 2023-03-01 2023-04-07 2023-06-28 2023-05-19 2023-06-18 2023-08-04 2023-09-08 2031-09-07 pervision of Improvement/Up mprovement Based Selection l ation grading of Kamala - Dhalkeb ar- Bagmati Road Section (7 6.702Km) of Mahendra High way INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SRCTIP-DOR-NNM-CS-IND-4 / Regional Road Connectivity I Individual Consult Procurement Evaluation Pane / Prior Open 110,000.00 0.00 Canceled 2020-04-07 2020-04-29 2020-05-04 2020-05-25 2020-05-31 2021-05-31 mprovement ant Selection l Expert - 1 SRCTIP-DOR-NNM-CS-IND-5 / Regional Road Connectivity I Individual Consult / Prior Open 110,000.00 0.00 Canceled 2020-04-07 2020-04-30 2020-05-04 2020-05-25 2020-05-31 2021-05-31 Procurement Panel Expert - 2 mprovement ant Selection SRCTIP-DOR-NNM-CS-IND- 4 / Procurement of Individual C Regional Road Connectivity I Individual Consult IDA / 66730 Prior Open 123,000.00 98,281.75 Signed 2020-07-16 2020-07-21 2020-09-19 2021-01-08 2020-09-28 2021-02-23 2020-10-29 2021-03-11 2021-10-29 onsultant; Procurement Eval mprovement ant Selection uation Panel Expert-1 SRCTIP-DOR-NNM-CS-IND- 5 / Procurement of Individual C Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Prior Open 123,000.00 0.00 2020-07-16 2020-07-21 2020-09-19 2020-09-28 2020-10-29 2021-10-29 onsultant; Procurement Eval mprovement ant Selection ation uation Panel Expert - 2; SRCTIP-DOR-S-IND-8 / Procur ement of Individual Consulta Individual Consult nt (Technical Advisor for Roa IDA / 66730 Institutional Strengthening Post Limited 30,000.00 30,218.02 Signed 2020-08-10 2020-08-10 2020-08-13 2020-09-11 2020-09-03 2020-11-26 2020-09-22 2020-12-11 2021-09-22 ant Selection d Asset and Road Maintenan ce Management Specialist) SRCTIP-DOR-CS-IND-9 / Proc urement of Individual Consult Regional Road Connectivity I Individual Consult IDA / 66730 Post Open 45,000.00 0.00 Canceled 2020-11-05 2020-11-02 2020-12-22 2021-01-12 2021-02-05 2024-07-19 ant; Occupational Health and mprovement ant Selection Safety Specialist [OHSS] SRCTIP-DOR-CS-IND-10 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Post Open 45,000.00 0.00 Canceled 2020-11-05 2020-11-02 2020-12-22 2021-01-12 2021-02-05 2024-07-19 mprovement ant Selection ltant; Gender Specialist [GS] SRCTIP-DOR-CS-IND - 10 / Pr Regional Road Connectivity I Individual Consult Under Implement ocurement of Individual Cons IDA / 66730 Post Open 105,000.00 0.00 2021-01-25 2021-01-29 2021-03-03 2021-03-24 2021-04-28 2026-04-28 mprovement ant Selection ation ultant; Gender Specialist [GS ] SRCTIP-MOPIT-CS-IND-12 / C onsulting Service of Individua Individual Consult Under Implement IDA / 66730 Institutional Strengthening Post Limited 100,000.00 0.00 2021-02-17 2021-03-07 2021-02-22 2021-03-15 2021-03-28 2024-03-27 l Consultant [TECHNICAL ADV ant Selection ation ISOR (ROAD SAFETY)] SRCTIP-DOR-CS-IND-13 / Pro curement of Individual Consu Individual Consult IDA / 66730 Institutional Strengthening Post Open 18,500.00 16,237.14 Signed 2021-04-05 2021-04-08 2021-05-10 2021-09-21 2021-05-20 2021-10-03 2021-06-10 2021-11-04 2024-06-09 ltant ; Financial Management ant Selection Consultant (FMC) SRCTIP-DOTM-CS-IND-14 / T echnical Advisor for Road Tra Individual Consult Under Implement IDA / 66730 Institutional Strengthening Post Open 67,000.00 0.00 2021-04-16 2021-04-21 2021-05-27 2021-05-31 2021-06-18 2023-06-18 nsport Safety Activities under ant Selection ation DOTM and NRSC SRCTIP-DOR-CS-IND-15 / Soc ial Development Advisor (SD Individual Consult A) for Planning and Impleme IDA / 66730 Institutional Strengthening Post Open 37,000.00 31,369.90 Signed 2021-04-25 2021-04-21 2021-06-15 2021-12-23 2021-06-19 2022-01-06 2021-07-07 2022-02-01 2023-07-07 ant Selection ntation of Social Safeguard A ctivities as Capacity Enhance ment of GESU, DoR SRCTIP-DOR-CS-IND-16 / Env ironmental Advisor (EA) for Pl Individual Consult anning and Implementation o IDA / 66730 Institutional Strengthening Post Open 37,000.00 31,392.56 Signed 2021-04-25 2021-04-21 2021-06-15 2021-11-24 2021-06-19 2021-12-14 2021-07-07 2022-02-14 2023-07-07 ant Selection f Environmental Safeguard A ctivities as Capacity Enhance ment of GESU, DoR Page 4 SRCTIP-DOR-CS-IND-20 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Prior Direct 12,500.00 9,754.33 Signed 2021-07-27 2021-07-28 2021-07-31 2021-07-29 2021-08-03 2021-08-06 2021-08-09 2021-08-09 2022-01-06 mprovement ant Selection ltant; Procurement Specialist [PS] SRCTIP-DOR-CS-IND-21 / Ge Individual Consult otechnical Engineering Exper IDA / 66730 Institutional Strengthening Post Open 50,000.00 44,544.16 Signed 2021-07-29 2021-08-02 2021-09-16 2021-11-01 2021-10-07 2021-11-02 2021-11-11 2021-11-30 2022-05-10 ant Selection t (GEE) at DOR-GESU SRCTIP-DOR-CS-IND - 9 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult IDA / 66730 Post Open 105,000.00 0.00 Canceled 2021-01-25 2021-01-29 2021-03-03 2021-03-24 2021-04-28 2026-04-28 ltant; Occupational Health an mprovement ant Selection d Safety Specialist [OHSS] SRCTIP-DOR-CS-IND - 9-2 / P rocurement of Individual Con Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Post Open 105,000.00 0.00 2021-08-11 2021-08-11 2021-10-02 2021-10-23 2021-11-20 2026-11-20 sultant; Occupational Health mprovement ant Selection ation and Safety Specialist [OHSS] SRCTIP-DOR-CS-IND-22 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult IDA / 66730 Prior Open 200,000.00 103,211.78 Signed 2021-10-26 2021-10-31 2021-11-20 2021-12-28 2021-11-22 2022-01-03 2021-12-08 2022-01-25 2027-07-15 ltant : Procurement and Cont mprovement ant Selection ract Management Specialist SRCTIP-DOR-CS-IND-23 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult Under Implement IDA / 66730 Post Open 170,000.00 0.00 2021-10-25 2021-10-31 2021-11-19 2021-11-22 2021-12-12 2027-07-15 ltant ; Social Development Ex mprovement ant Selection ation pert/ Consultant SRCTIP-DOR-CS-IND-24 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Post Open 170,000.00 69,591.15 Signed 2021-10-25 2021-10-31 2021-11-19 2022-01-10 2021-11-24 2022-01-24 2021-12-13 2022-02-08 2027-07-15 mprovement ant Selection ltant ; Environmental Safegu ard Consultant SRCTIP-DOR-S-IND-25 / Proc urement of Individual Consult Individual Consult ant: Technical Advisor for Ro IDA / 66730 Institutional Strengthening Post Limited 70,000.00 57,566.54 Signed 2021-11-19 2021-11-21 2021-11-24 2021-12-09 2021-12-15 2022-01-13 2022-01-19 2022-02-01 2024-01-19 ant Selection ad Asset and Road Maintena nce Management Specialist ( National). SRCTIP-DOR-CS-IND-25 / Pro curement of Individual Engin Regional Road Connectivity I Individual Consult IDA / 66730 Post Limited 15,000.00 58,000.48 Signed 2022-01-04 2022-01-06 2022-01-04 2021-12-09 2022-01-06 2022-01-13 2022-01-17 2022-02-01 2022-06-16 eer for Slope Assessment W mprovement ant Selection orks in Nagdhunaga- Naubise -Mugling Road SRCTIP-DOR-CS-IND-26 / Pro curement of Individual Consu Regional Road Connectivity I Individual Consult Under Implement ltant : Junior Engineer for Slo IDA / 66730 Post Limited 5,000.00 0.00 2022-01-04 2022-01-06 2022-01-05 2022-01-06 2022-01-17 2022-06-16 mprovement ant Selection ation pe Assessment Works in Na gdhunaga- Naubise-Mugling Road SRCTIP-MOPIT-CS-IND-27 / C ONSULTANCY SERVICES OF R Individual Consult IDA / 66730 Institutional Strengthening Post Limited 13,000.00 0.00 Canceled 2022-03-13 2022-03-22 2022-03-18 2022-04-08 2022-05-13 2023-05-13 OAD SAFETY ENGINEER FOR ant Selection THE NATIONAL ROAD SAFETY COUNCIL SRCTIP-MOPIT-CS-IND-27-2 / Individual Consult Under Implement ROAD SAFETY SUPPORT ENGI IDA / 66730 Institutional Strengthening Post Limited 12,300.00 0.00 2022-04-07 2022-04-15 2022-04-12 2022-05-03 2022-06-07 2023-06-07 ant Selection ation NEER FOR NATIONAL ROAD S AFETY COUNCIL SRCTIP-DOR-CS-IND-32 / Pro Regional Road Connectivity I Individual Consult curement of Individual Consu IDA / 66730 Prior Direct - National 12,500.00 0.00 Signed 2023-02-16 2023-02-22 2023-02-18 2023-02-28 2023-02-23 2023-03-16 2023-03-03 2023-06-04 2023-03-18 mprovement ant Selection ltant -Procurement Specialist [PS] SRCTIP-MOPIT-CS-IND-33 / R Individual Consult Under Implement OAD SAFETY SUPPORT ENGIN IDA / 66730 Institutional Strengthening Post Limited 11,230.00 0.00 2023-05-26 2023-05-24 2023-05-31 2023-06-15 2023-06-29 2024-06-28 ant Selection ation EER FOR NATIONAL ROAD SA FETY COUNCIL Page 5 STRENGTHENING DATA INFRASTRUCTURE TO CLOSE THE DIGITAL GAP IN ARGENTINA PROJECT (P178609) Requesting Unit: LCC7C Responsible Unit: IDD07/GGIVP Lending Instrument: Investment Project Financing Net commitment: 200 M PROCUREMENT Argentina : Strengthening data infrastructure to close the digital gap in Argentina Project PLAN General Information Country: Argentina 2023-02-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P178609 GPN Date: Project Name: Strengthening data infrastructure to close the digital gap in Argentina Project Loan / Credit No: IBRD / 94550 Secretaría de Innovación Pública Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-SIP-362941-CS-QCBS / C onsultoría para el estudio de Inclusive broadband connect Quality And Cost- Under Implement la infraestructura de banda a IBRD / 94550 Post Open - National 80,000.00 0.00 2023-05-22 2023-05-29 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-03-30 ivity Based Selection ation ncha, conectividad existente y demanda en localidades no conectadas. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-SIP-341488-CS-INDV / Co Project Management and Ev Individual Consult Under Implement nsultor Individual Especialist IBRD / 94550 Post Open - National 83,000.00 0.00 2023-02-15 2023-06-07 2023-03-15 2023-03-16 2023-04-01 2028-01-31 aluation ant Selection ation a en Adquisiciones AR-SIP-341489-CS-INDV / Co Project Management and Ev Individual Consult Under Implement nsultor Individual Especialist IBRD / 94550 Post Open - National 83,000.00 0.00 2023-02-15 2023-06-07 2023-03-15 2023-03-16 2023-04-01 2028-01-31 aluation ant Selection ation a Ambiental y Social AR-SIP-341732-CS-INDV / Co Project Management and Ev Individual Consult Under Implement IBRD / 94550 Post Open - National 83,000.00 0.00 2023-02-15 2023-06-07 2023-03-15 2023-03-16 2023-04-01 2028-01-31 nsultor Individual Especialist aluation ant Selection ation a Técnico AR-SIP-362936-CS-INDV / Es Individual Consult IBRD / 94550 Resilient data infrastructure Post Open - National 10,227.00 0.00 Under Review 2023-05-22 2023-05-29 2023-06-11 2023-06-13 2023-06-29 2023-10-27 pecialista individual Coordina ant Selection dor AR-SIP-342823-CS-INDV / Co nsultores Individuales para el Individual Consult Under Implement IBRD / 94550 Resilient data infrastructure Post Open - National 61,858.00 0.00 2023-05-22 2023-05-29 2023-06-11 2023-06-13 2023-06-29 2023-10-27 estudio de la demanda de Ce ant Selection ation ntros de Datos (5 puestos) Page 1 PROCUREMENT PLAN (Textual Part) Project information: Sindh Water and Agriculture Transformation Project (SWAT) (P167596) Project Implementation agency(ies): (i) Sindh Agriculture Department; (ii) Sindh Irrigation and Drainage Authority and (ii) Sindh Planning & Development Department - Project Coordination and Management Unit Date of the Procurement Plan: October 2022 Period covered by this Procurement Plan: October 15, 2022 June 30 2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in public procurement rules such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is not allowed Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Sindh Water and Agriculture Transformation Project (SWAT) PLAN General Information Country: Pakistan 2023-05-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167596 GPN Date: 2022-03-31 Project Name: Sindh Water and Agriculture Transformation Project (SWAT) Loan / Credit No: IDA / 72550, IDA / 72540 Agriculture Supplies and Prices Department Government of Sindh Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SAD-361441-GO-RFQ-009 Component 3: Targeted Agri Request for Quota Single Stage - One E Pending Impl / Procurement of Office Suppl IDA / 72550 cultural Incentives and Inve Post Open - National 100,000.00 0.00 2023-05-27 2023-06-16 2023-07-16 tions nvelope ementation ies & IT Equipment. stments PK-SAD-361444-GO-RFQ-010 Component 3: Targeted Agri Request for Quota Single Stage - One E Pending Impl / Procurement of Office Furni IDA / 72550 cultural Incentives and Inve Post Open - National 100,000.00 0.00 2023-05-29 2023-06-24 2023-07-24 tions nvelope ementation ture & Fixture stments PK-SAD-363038-GO-RFQ-FER C-001 / Development of MIS Component 5: Agricultural Fl Request for Quota Single Stage - One E Pending Impl and associated Systems, app IDA / 72540 ood Emergency Rehabilitatio Post Open - National 50,000.00 0.00 2023-05-30 2023-07-02 2023-12-29 tions nvelope ementation lications, and solutions for Fl n ood Emergency Rehabilitatio n Component. PK-SAD-361645-GO-RFQ-012 Component 3: Targeted Agri / Procurement of Motorcycles Request for Quota Single Stage - One E Pending Impl IDA / 72550 cultural Incentives and Inve Post Open - National 145,000.00 0.00 2023-06-11 2023-07-01 2023-07-15 for all the Project Support Uni tions nvelope ementation stments ts (Extension, CRS, Agri Mark eting, ADU, etc.) PK-SAD-361445-GO-RFQ-011 / Procurement of Project Vehi Component 3: Targeted Agri Request for Quota Single Stage - One E Pending Impl cles for all the ADU - Project IDA / 72550 cultural Incentives and Inve Post Open - National 500,000.00 0.00 2023-06-10 2023-07-11 2023-08-10 tions nvelope ementation Support Units (Wings i.e. Ext stments ension, Research, CSA, CSR, Agri Marketing). NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SAD-361436-CS-CQS-008 / Hiring of Services for Third- Component 6: Contingent E Request for Quota Single Stage - One E Pending Impl Party Validation through the I IDA / 72540 Post Open - National 20,000.00 0.00 2023-06-20 2023-08-15 2023-12-31 mergency Response tions nvelope ementation VR System against wheat se ed cash subsidy distribution. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SAD-307037-CS-QCBS-00 Component 3: Targeted Agri Quality And Cost- Open - Internationa Under Implement 1 / Hiring of Project Impleme IDA / 72550 cultural Incentives and Inve Post 1,600,000.00 0.00 2023-06-04 2023-06-02 2023-06-25 2023-06-27 2023-07-10 2023-08-07 2023-08-17 2023-09-04 2023-09-17 2028-01-23 Based Selection l ation ntation Support consultant fo stments r ADU SWAT. PK-SAD-367831-CS-CQS / Hir Component 3: Targeted Agri Consultant Qualifi Pending Impleme ing of Design and Supervisio IDA / 72550 cultural Incentives and Inve Post Open - National 300,000.00 0.00 2023-06-30 2023-07-21 2023-09-03 2023-09-08 2023-09-18 2024-03-16 cation Selection ntation n(Architect) Firm stments INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SAD-361430-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement IDA / 72550 Prior Open - National 100,000.00 0.00 2023-06-07 2023-07-11 2023-08-01 2023-09-05 2028-01-10 3 / Hiring of Finance Manager cultural Incentives and Inve ant Selection ation - ADU stments PK-SAD-361177-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement 1 / Hiring of Program Implem IDA / 72550 cultural Incentives and Inve Post Direct - National 192,000.00 0.00 2023-06-04 2023-06-05 2023-06-14 2023-06-19 2023-06-28 2028-01-10 ant Selection ation entation Advisor - ADU stments PK-SAD-361433-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement 6 / Hiring of FFS & Value Chai IDA / 72550 cultural Incentives and Inve Post Open - National 100,000.00 0.00 2023-06-07 2023-06-05 2023-07-26 2023-08-16 2023-09-20 2028-01-10 ant Selection ation n Specialist stments PK-SAD-361434-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement IDA / 72550 Post Open - National 100,000.00 0.00 2023-06-07 2023-06-05 2023-07-26 2023-08-16 2023-09-20 2028-01-10 7 / Hiring of M&E Specialist cultural Incentives and Inve ant Selection ation stments PK-SAD-361431-CS-INDV-00 Component 3: Targeted Agri Individual Consult IDA / 72550 Prior Open - National 100,000.00 0.00 Under Review 2023-06-07 2023-07-26 2023-08-16 2023-09-20 2028-01-10 4 / Hiring of Procurement Spe cultural Incentives and Inve ant Selection cialist stments PK-SAD-361432-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement 5 / Hiring of Social & Gender IDA / 72550 cultural Incentives and Inve Post Open - National 100,000.00 0.00 2023-06-07 2023-06-05 2023-07-26 2023-08-16 2023-09-20 2028-01-10 ant Selection ation Specialist - ADU stments Page 1 PK-SAD-361179-CS-INDV-00 Component 3: Targeted Agri Individual Consult Under Implement 2 / Hiring of Environment Spe IDA / 72550 cultural Incentives and Inve Post Direct - National 100,000.00 0.00 2023-06-08 2023-06-05 2023-06-18 2023-07-09 2023-08-13 2028-01-10 ant Selection ation cialist - ADU stments Page 2 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : Nom du pays : Côte d’Ivoire Nom du Projet : Projet Emploi Jeune et Développement des Compétences – Phase 3 (PEJEDEC – Phase 3) No d’identification du projet : P172800 Agence d’exécution du Projet : Bureau de Coordination des Programmes Emploi (BCP-Emploi) Date du plan de passation des marchés :  Plan original : 24/12/2021  Révision 1 : …/08/2022 Période couverte par ce plan de passation des marchés : mai 2022 – octobre 2023 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. « Sans objet » Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] PROCUREMENT Cote d'Ivoire : Cote d'Ivoire Youth Employment and Skills Development Project - Phase 3 PLAN General Information Country: Cote d'Ivoire 2022-08-24 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172800 GPN Date: 2022-08-10 Project Name: Cote d'Ivoire Youth Employment and Skills Development Project - Phase 3 Loan / Credit No: IDA / 70340 Coordination Office of Employment Programs Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-BCP-EMPLOI-301152-CW- Request for Quota Project Management and Mo Request for Quota Single Stage - One E Pending Imp 2023-04-2 RFQ / Travaux d’aménageme IDA / 70340 Post Limited tions (Non Bank-S 140,000.00 0.00 2022-12-28 2023-02-22 nitoring and Evaluation tions nvelope lementation 3 nt des locaux du BCP-Emploi PD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-BCP-EMPLOI-300677-GO- Project Management and Mo Request for Quota Single Stage - One E Under Imple RFQ / Acquisition de supports IDA / 70340 Post Limited 30,000.00 0.00 2022-08-21 2022-11-18 2022-10-16 2022-11-15 nitoring and Evaluation tions nvelope mentation de communication au profit d u BCP-Emploi CI-BCP-EMPLOI-300687-GO- RFQ / Acquisition de matériel Project Management and Mo Request for Quota Single Stage - One E de communication et de mult IDA / 70340 Post Limited 50,000.00 0.00 Signed 2022-08-16 2022-12-09 2022-10-11 2022-11-25 nitoring and Evaluation tions nvelope imédia (Caméra, appareil ph oto, micro-cravate, …) au pro fit du BCP-Emploi CI-BCP-EMPLOI-300747-GO- RFQ / Acquisition de fournitur Project Management and Mo Request for Quota Single Stage - One E Pending Impl es de bureau et de consomm IDA / 70340 Post Limited 13,000.00 0.00 2022-09-14 2022-11-09 2022-12-09 nitoring and Evaluation tions nvelope ementation ables informatiques et burea utique au profit du BCP-Empl oi CI-BCP-EMPLOI-300756-GO- RFQ / Acquisition de véhicule Project Management and Mo Request for Quota Single Stage - One E IDA / 70340 Post Limited 480,000.00 0.00 Signed 2022-09-10 2022-10-25 2022-11-05 2023-01-04 s pour le renouvellement de l nitoring and Evaluation tions nvelope a flotte automobile du BCP-E mploi CI-BCP-EMPLOI-300764-GO- Project Management and Mo Request for Quota Single Stage - One E Under Imple RFQ / Acquisition de matériel IDA / 70340 Post Limited 90,000.00 0.00 2022-09-26 2022-12-09 2022-11-21 2023-05-20 nitoring and Evaluation tions nvelope mentation informatique pour le BCP-Em ploi CI-BCP-EMPLOI-300765-GO- RFQ / Acquisition de matériel Project Management and Mo Request for Quota Single Stage - One E Under Imple IDA / 70340 Post Limited 80,000.00 0.00 2022-09-12 2022-12-09 2022-11-07 2023-01-06 de bureau (copieur, scanner, nitoring and Evaluation tions nvelope mentation …) pour le BCP-Emploi CI-BCP-EMPLOI-300766-GO- Project Management and Mo Request for Quota Single Stage - One E Pending Impl RFQ / Acquisition de mobilier IDA / 70340 Post Limited 60,000.00 0.00 2022-11-05 2022-12-31 2023-02-14 nitoring and Evaluation tions nvelope ementation s de bureau pour le BCP-Emp loi CI-BCP-EMPLOI-300769-GO- Project Management and Mo Request for Quota Single Stage - One E Under Imple RFQ / Acquisition d’un group IDA / 70340 Post Limited 96,000.00 0.00 2022-11-28 2022-12-08 2023-01-23 2024-01-23 nitoring and Evaluation tions nvelope mentation e électrogène pour le BCP-E mploi CI-BCP-EMPLOI-300775-GO- RFQ / Acquisition de la nouve Project Management and Mo Pending Impl IDA / 70340 Post Direct Selection Direct 40,000.00 0.00 2022-08-16 2022-08-21 2022-09-25 2022-11-24 lle version du logiciel TOMAT nitoring and Evaluation ementation E (TOMPRO) pour le BCP-Emp loi CI-BCP-EMPLOI-300721-GO- Project Management and Mo Pending Impl RFQ / Acquisition de carbura IDA / 70340 Post Direct Selection Direct - National 10,000.00 0.00 2022-10-31 2022-11-05 2022-12-10 2023-06-08 nitoring and Evaluation ementation nt au profit du BCP-Emploi CI-BCP-EMPLOI-351545-GO- Improving Skills Training an RFQ / Acquisition de matériel d Catalyzing Entrepreneursh Request for Quota Single Stage - One E Pending Impl de communication pour la Di IDA / 70340 ip for Job Creation through E Post Limited 48,890.00 0.00 2023-05-08 2023-07-03 2023-08-17 tions nvelope ementation rection de Communication du mpowered Local Governmen METFPA et des Régions ts CI-BCP-EMPLOI-351551-GO- Improving Skills Training an DIR / Acquisition de carburan d Catalyzing Entrepreneursh Pending Impl t au profit du BCP-Emploi, de IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 314,730.00 0.00 2023-06-14 2023-06-19 2024-07-02 2024-12-29 ementation l'AEJ, des Régions, du METFP mpowered Local Governmen A, du CNBP et du SE-CPP ts CI-BCP-EMPLOI-351554-GO- Improving Skills Training an RFQ / Acquisition de fournitur d Catalyzing Entrepreneursh Request for Quota Single Stage - One E Pending Impl es de bureau au profit du BC IDA / 70340 ip for Job Creation through E Post Limited 94,560.00 0.00 2023-05-27 2023-07-22 2024-07-21 tions nvelope ementation P-Emploi, des Régions, du ME mpowered Local Governmen TFPA, du CNBP, les CBP et du ts SE-CPP CI-BCP-EMPLOI-351604-GO- Strengthening the TVET Syst RFQ / Acquisition de logiciel em’s Capacity to Provide Bet Request for Quota Single Stage - One E Pending Impl pour le développement des a IDA / 70340 ter Employment Opportuniti Post Limited 4,120.00 0.00 2023-07-10 2023-09-04 2023-10-04 tions nvelope ementation pplicatifs de prise en charge es to and Promote Entrepren des usagers de l'AEJ eurship of Ivo rian Youth CI-BCP-EMPLOI-351610-GO- Improving Skills Training an RFB / Acquisition de matériel d Catalyzing Entrepreneursh Single Stage - One E Pending Impl IDA / 70340 Post Request for Bids Open - National 195,000.00 0.00 2023-05-24 2023-05-29 2023-07-10 2023-08-09 2023-09-13 2023-12-12 de bureau au profit des Régi ip for Job Creation through E nvelope ementation ons, du CNBP et du SE-CPP mpowered Local Governmen ts CI-BCP-EMPLOI-351614-GO- Strengthening the TVET Syst RFQ / Acquisition de matériel em’s Capacity to Provide Bet Request for Quota Single Stage - One E Pending Impl de maintenance et d'assistan IDA / 70340 ter Employment Opportuniti Post Limited 60,000.00 0.00 2023-07-10 2023-09-04 2023-11-03 tions nvelope ementation ce technique au profit du ME es to and Promote Entrepren TFPA eurship of Ivo rian Youth Page 1 CI-BCP-EMPLOI-351621-GO- Improving Skills Training an RFB / Acquisition de matériel d Catalyzing Entrepreneursh Single Stage - One E Pending Impl informatique au profit des Ré IDA / 70340 ip for Job Creation through E Post Request for Bids Open - National 824,710.00 0.00 2023-05-30 2023-06-04 2023-07-16 2023-08-15 2023-09-19 2023-12-18 nvelope ementation gions, du METFPA, des Branc mpowered Local Governmen hes professionnelles, du CNB ts P, du SE-CPP et de l'AEJ CI-BCP-EMPLOI-351625-GO- Improving Skills Training an RFB / Acquisition de mobilier d Catalyzing Entrepreneursh Single Stage - One E Pending Impl IDA / 70340 Post Request for Bids Open - National 114,400.00 0.00 2023-06-12 2023-06-17 2023-07-29 2023-08-28 2023-10-02 2023-12-31 de bureau au profit des Régi ip for Job Creation through E nvelope ementation ons et du METFPA mpowered Local Governmen ts Improving Skills Training an CI-BCP-EMPLOI-351629-GO- d Catalyzing Entrepreneursh Request for Quota Single Stage - One E Pending Impl RFQ / Acquisition de petits m IDA / 70340 Post Limited 11,040.00 0.00 2023-05-24 2023-07-19 2023-08-18 ip for Job Creation through E tions nvelope ementation atériel au profit des Régions mpowered Local Governmen ts CI-BCP-EMPLOI-351635-GO- Improving Skills Training an RFQ / Acquisition de vidéopro d Catalyzing Entrepreneursh Request for Quota Single Stage - One E Pending Impl IDA / 70340 Post Limited 32,400.00 0.00 2023-07-05 2023-08-30 2023-09-29 jecteurs au profit des Région ip for Job Creation through E tions nvelope ementation s, du CNBP et du SE-CPP mpowered Local Governmen ts CI-BCP-EMPLOI-351639-GO- Improving Skills Training an RFQ / Acquisition de Consom d Catalyzing Entrepreneursh Request for Quota Single Stage - One E Pending Impl mables informatiques et bure IDA / 70340 ip for Job Creation through E Post Limited 40,580.00 0.00 2023-07-25 2023-09-19 2024-09-18 tions nvelope ementation autiques au profit du BCP-Em mpowered Local Governmen ploi, des Régions, du METFPA ts , du CNBP et du SE-CPP CI-BCP-EMPLOI-351631-GO- Improving Skills Training an RFB / Acquisition de supports d Catalyzing Entrepreneursh Single Stage - One E Pending Impl IDA / 70340 Post Request for Bids Open - National 209,500.00 0.00 2023-07-13 2023-07-18 2023-08-29 2023-09-28 2023-11-02 2024-11-01 de communication au profit d ip for Job Creation through E nvelope ementation es Régions, du METFPA et de mpowered Local Governmen l'AEJ ts CI-BCP-EMPLOI-351541-GO- Improving Skills Training an RFB / Acquisition de véhicule d Catalyzing Entrepreneursh s au profit du Ministère de l'E Open - Internationa Single Stage - One E Under Imple IDA / 70340 ip for Job Creation through E Prior Request for Bids 2,370,000.00 0.00 2023-05-04 2023-05-09 2023-06-20 2023-07-20 2023-08-24 2024-02-20 nseignement Technique, de l l nvelope mentation mpowered Local Governmen a Formation Professionnelle e ts t de l'Apprentissage et des a nciennes Régions NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-BCP-EMPLOI-300776-NC-R FQ / Recrutement d’un prest Project Management and Mo Request for Quota Single Stage - One E Under Imple IDA / 70340 Post Limited 60,000.00 0.00 2022-12-27 2022-11-18 2023-02-21 2023-02-24 ataire pour l’organisation de l nitoring and Evaluation tions nvelope mentation a cérémonie de lancement d u PEJEDEC 3 CI-BCP-EMPLOI-300785-NC-D IR / Services de gardiennage Project Management and Mo Under Imple IDA / 70340 Post Direct Selection Direct 26,000.00 0.00 2022-10-19 2022-10-24 2022-10-24 2022-12-15 2022-11-28 2023-12-31 et de surveillance des locaux nitoring and Evaluation mentation du BCP-Emploi au titre de l’a nnée 2023 CI-BCP-EMPLOI-300790-NC-D IR / Services d’entretien des Project Management and Mo Pending Impl véhicules du BCP-Emploi au t IDA / 70340 Post Direct Selection Direct 20,000.00 0.00 2023-01-11 2023-01-16 2023-02-20 2024-02-20 nitoring and Evaluation ementation itre de la période allant du 1e r novembre 2022 au 31 déce mbre 2023 CI-BCP-EMPLOI-300791-NC-R FQ / Souscription d’une assur ance tout risque pour la flott Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / 70340 Post Limited 40,000.00 0.00 2022-08-23 2022-10-18 2023-10-18 e automobile du BCP-Emploi nitoring and Evaluation tions nvelope ementation au titre de la période du 1er septembre 2022 au 31 déce mbre 2023 CI-BCP-EMPLOI-301115-NC-R FQ / Souscription d’une polic Project Management and Mo Request for Quota Single Stage - One E Under Imple e d’assurance maladie et d’a IDA / 70340 Post Limited 70,000.00 0.00 2022-11-05 2022-11-14 2022-12-31 2023-12-31 nitoring and Evaluation tions nvelope mentation ssurance individuel accident pour le personnel au titre de l’année 2023 CI-BCP-EMPLOI-301123-NC-R FQ / Services d’entretien du matériel informatique et bure Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / 70340 Post Limited 45,000.00 0.00 2022-08-30 2022-10-17 2023-09-07 autique du BCP-Emploi pour l nitoring and Evaluation tions nvelope ementation a période allant du 1er nove mbre 2022 au 31 décembre 2023 CI-BCP-EMPLOI-301139-NC-D IR / Maintenance et entretien Project Management and Mo Pending Impl du Système d’Information et IDA / 70340 Post Direct Selection Direct 24,000.00 0.00 2022-11-23 2022-11-28 2023-01-02 2024-01-02 nitoring and Evaluation ementation de Gestion (SIG) du BCP-Emp loi au titre de l’année 2023 CI-BCP-EMPLOI-301131-NC-D IR / Services d’abonnement d Project Management and Mo Under Imple e géolocalisation et télésurve IDA / 70340 Post Direct Selection Direct - National 20,000.00 0.00 2022-11-10 2022-12-01 2022-11-15 2022-12-15 2022-12-20 2023-12-20 nitoring and Evaluation mentation illance de la flotte automobil e du BCP-Emploi au titre de l’ année 2023 CI-BCP-EMPLOI-301121-NC-R FQ / Souscription d’une polic e d’assurance multirisque pr Project Management and Mo Request for Quota Single Stage - One E Under Imple IDA / 70340 Post Limited 16,000.00 0.00 2022-11-28 2023-01-03 2024-03-23 ofessionnel pour les locaux d nitoring and Evaluation tions nvelope mentation u BCP-Emploi pour la période allant du 1er octobre 2022 a u 31 décembre 2023 CI-BCP-EMPLOI-324760-NC-R FQ / Services d’entretien et n Project Management and Mo Request for Quota Single Stage - One E Under Imple IDA / 70340 Post Limited 51,200.00 0.00 2022-12-06 2022-11-30 2022-12-31 2023-12-31 ettoyage des locaux du BCP- nitoring and Evaluation tions nvelope mentation Emploi au titre de l’année 20 23 CI-BCP-EMPLOI-300777-NC-R FQ / Services d’entretien et r éparation des splits du BCP-E Project Management and Mo Request for Quota Single Stage - One E Pending Impl IDA / 70340 Post Limited 15,000.00 0.00 2022-12-19 2023-01-19 2024-01-19 mploi et compris les petits tr nitoring and Evaluation tions nvelope ementation avaux d’électricité et de plo mberie au titre de l’année 20 23 Page 2 CI-BCP-EMPLOI-351550-NC-R Strengthening the TVET Syst FQ / Souscription d'une polic em’s Capacity to Provide Bet Request for Quota Single Stage - One E Pending Impl e d'assurance individuelle ac IDA / 70340 ter Employment Opportuniti Post Limited 97,000.00 0.00 2023-05-28 2023-07-23 2026-07-22 tions nvelope ementation cident au profit des bénéficia es to and Promote Entrepren ires du stage et des FRR eurship of Ivo rian Youth CI-BCP-EMPLOI-351668-NC-R FQ / Sélection d'un garage po Project Management and Mo Request for Quota Single Stage - One E Under Imple IDA / 70340 Post Limited 30,000.00 0.00 2023-04-01 2022-12-05 2023-05-27 2024-05-26 ur l'entretien et la réparation nitoring and Evaluation tions nvelope mentation des anciens véhicules du BCP -Emploi CI-BCP-EMPLOI-351705-NC-R Strengthening the TVET Syst FQ / Location de véhicules po em’s Capacity to Provide Bet Request for Quota Single Stage - One E Pending Impl ur la campagne de sensibilis IDA / 70340 ter Employment Opportuniti Post Limited 8,000.00 0.00 2023-06-19 2023-08-14 2024-08-13 tions nvelope ementation ation des acteurs sur la réfor es to and Promote Entrepren me de l'ETFPA eurship of Ivo rian Youth CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-BCP-EMPLOI-301161-CS-Q Improving Skills Training an CBS / Recrutement d’un cons d Catalyzing Entrepreneursh ultant firme pour une assista Quality And Cost- Open - Internationa IDA / 70340 ip for Job Creation through E Post 800,000.00 0.00 Under Review 2022-08-23 2023-06-20 2022-09-13 2022-10-27 2022-11-24 2022-12-24 2023-01-28 2023-03-04 2023-06-02 nce technique aux Conseils R Based Selection l mpowered Local Governmen égionaux / District en vue de ts l’élaboration de leurs Plans d e Développement Local CI-BCP-EMPLOI-301188-CS-C QS / Recrutement d’un consu Project Management and Mo Consultant Qualifi Under Implement ltant firme pour l’élaboration IDA / 70340 Post Limited 160,000.00 0.00 2022-08-19 2022-08-30 2022-09-02 2022-10-02 2022-11-06 2022-12-06 nitoring and Evaluation cation Selection ation du Manuel d’Exécution du Pr ojet, y compris les sous-man uels CI-BCP-EMPLOI-301192-CS-Q Project Management and Mo Quality And Cost- Open - Internationa Under Implement CBS / Recrutement d’une Ag IDA / 70340 Post 720,000.00 0.00 2022-08-31 2022-09-19 2022-09-21 2023-01-30 2022-11-04 2022-12-02 2023-01-01 2023-02-05 2023-03-12 2026-02-24 nitoring and Evaluation Based Selection l ation ence de Vérification Indépen dante CI-BCP-EMPLOI-301198-CS-L CS / Recrutement d’un cabin Project Management and Mo Least Cost Selecti Pending Impleme et pour l’audit financier et co IDA / 70340 Post Open - National 60,000.00 0.00 2022-12-20 2023-01-10 2023-02-23 2023-03-23 2023-04-22 2023-05-27 2023-07-01 2026-06-15 nitoring and Evaluation on ntation mptable des exercices 2022, 2023 et 2024 du projet CI-BCP-EMPLOI-324772-CS-C QS / Recrutement d’un cabin Project Management and Mo Consultant Qualifi Pending Impleme IDA / 70340 Post Limited 140,000.00 0.00 2023-03-23 2023-04-06 2023-05-06 2023-06-10 2023-12-07 et pour l’élaboration de la str nitoring and Evaluation cation Selection ntation atégie de communication du Projet CI-BCP-EMPLOI-351771-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet ultant firme pour l'élaboratio Quality And Cost- Pending Impleme IDA / 70340 ter Employment Opportuniti Post Open - National 240,000.00 0.00 2023-05-22 2023-06-12 2023-07-26 2023-08-23 2023-09-22 2023-10-27 2023-12-01 2024-05-29 n du Répertoire National des Based Selection ntation es to and Promote Entrepren Compétences Professionnelle eurship of Ivo rian Youth s, y compris la reconnaissanc e des acquis CI-BCP-EMPLOI-351772-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet ltant firme pour la formation Consultant Qualifi Pending Impleme IDA / 70340 ter Employment Opportuniti Post Open - National 60,000.00 0.00 2023-05-31 2023-06-21 2023-08-04 2023-09-03 2023-10-08 2024-04-05 des inspecteurs du METFPA e cation Selection ntation es to and Promote Entrepren n vue de la mise en œuvre d eurship of Ivo rian Youth u Cadre National de Certificat ion CI-BCP-EMPLOI-351778-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet ltant firme pour la réalisation Consultant Qualifi Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 298,000.00 0.00 2023-04-19 2023-05-03 2023-06-02 2023-07-07 2025-07-06 des études techniques et le s cation Selection ntation es to and Promote Entrepren uivi et contrôle des travaux d eurship of Ivo rian Youth e réhabilitation des Centres d e Formation Professionnelle CI-BCP-EMPLOI-351784-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet ltant firme pour la réalisation Consultant Qualifi Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 60,000.00 0.00 2023-06-19 2023-07-03 2023-08-02 2023-09-06 2023-12-05 d'un Constat d'Impact Enviro cation Selection ntation es to and Promote Entrepren nnemental et Social (CIES) d eurship of Ivo rian Youth ans les Centres de Formation s Professionnelle à réhabiliter CI-BCP-EMPLOI-351788-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet ultant firme pour l'accompag Quality And Cost- Open - Internationa Pending Impleme IDA / 70340 ter Employment Opportuniti Post 350,000.00 0.00 2023-05-18 2023-06-08 2023-07-22 2023-08-19 2023-09-18 2023-10-23 2023-11-27 2024-05-25 nement à la rénovation des c Based Selection l ntation es to and Promote Entrepren urricula des cinq (5) Centres eurship of Ivo rian Youth de Formation Professionnelle CI-BCP-EMPLOI-351877-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet Quality And Cost- Pending Impleme ultant firme en vue d'accomp IDA / 70340 ter Employment Opportuniti Post Open - National 160,000.00 0.00 2023-08-02 2023-08-23 2023-10-06 2023-11-03 2023-12-03 2024-01-07 2024-02-11 2024-08-09 Based Selection ntation agner l'opérationnalisation d es to and Promote Entrepren e la réforme du FDFP eurship of Ivo rian Youth CI-BCP-EMPLOI-351890-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet Quality And Cost- Pending Impleme ultant firme pour la formatio IDA / 70340 ter Employment Opportuniti Post Open - National 200,000.00 0.00 2023-06-07 2023-06-28 2023-08-11 2023-09-08 2023-10-08 2023-11-12 2023-12-17 2024-06-14 Based Selection ntation n des animateurs des CBP à l es to and Promote Entrepren a réalisation du portrait sect eurship of Ivo rian Youth eur de leurs branches CI-BCP-EMPLOI-351891-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet Quality And Cost- Pending Impleme ultant firme pour la concepti IDA / 70340 ter Employment Opportuniti Post Open - National 230,000.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-11 2023-09-10 2023-10-15 2023-11-19 2024-05-17 Based Selection ntation on d'une plateforme intégrée es to and Promote Entrepren de concertation secteur privé eurship of Ivo rian Youth / secteur public CI-BCP-EMPLOI-351894-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet Quality And Cost- Pending Impleme ultant firme pour l'accompag IDA / 70340 ter Employment Opportuniti Post Open - National 100,000.00 0.00 2023-06-15 2023-07-06 2023-08-19 2023-09-16 2023-10-16 2023-11-20 2023-12-25 2024-06-22 Based Selection ntation nement de l'Agence Emploi J es to and Promote Entrepren eune à la démarche qualité e eurship of Ivo rian Youth n vue de sa certification Page 3 CI-BCP-EMPLOI-351895-CS-C Strengthening the TVET Syst QS / Recrutement d'un organ em’s Capacity to Provide Bet Consultant Qualifi Pending Impleme isme agréé en vue de la certi IDA / 70340 ter Employment Opportuniti Post Limited 20,000.00 0.00 2023-09-05 2023-09-19 2023-10-19 2023-11-23 2024-05-21 cation Selection ntation fication de l'Agence Emploi Je es to and Promote Entrepren une eurship of Ivo rian Youth CI-BCP-EMPLOI-351902-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet Consultant Qualifi Pending Impleme ltant firme en vue de la form IDA / 70340 ter Employment Opportuniti Post Open - National 36,000.00 0.00 2023-08-02 2023-08-23 2023-10-06 2023-11-05 2023-12-10 2024-06-07 cation Selection ntation ation des conseillers en inser es to and Promote Entrepren tion professionnelle de l'AEJ eurship of Ivo rian Youth CI-BCP-EMPLOI-351903-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet Consultant Qualifi Pending Impleme ltant firme en vue de la form IDA / 70340 ter Employment Opportuniti Post Open - National 18,000.00 0.00 2023-07-31 2023-08-21 2023-10-04 2023-11-03 2023-12-08 2024-06-05 cation Selection ntation ation des développeurs de l'A es to and Promote Entrepren EJ eurship of Ivo rian Youth CI-BCP-EMPLOI-351904-CS-Q Strengthening the TVET Syst CBS / Recrutement d'un cons em’s Capacity to Provide Bet Quality And Cost- Pending Impleme ultant firme pour la réalisatio IDA / 70340 ter Employment Opportuniti Post Open - National 220,000.00 0.00 2023-08-24 2023-09-14 2023-10-28 2023-11-25 2023-12-25 2024-01-29 2024-03-04 2026-03-04 Based Selection ntation n d'études de suivi de l'insert es to and Promote Entrepren ion des bénéficiaires de certa eurship of Ivo rian Youth ins projets / programmes CI-BCP-EMPLOI-301178-CS-Q Strengthening the TVET Syst CBS / Recrutement d’un cons em’s Capacity to Provide Bet ultant firme en vue de l’évalu Quality And Cost- Open - Internationa IDA / 70340 ter Employment Opportuniti Post 900,000.00 0.00 Canceled 2023-05-23 2023-06-13 2023-07-27 2023-08-24 2023-09-23 2023-10-28 2023-12-02 2024-12-01 ation et la Maîtrise d’Œuvre Based Selection l es to and Promote Entrepren des travaux de réhabilitation eurship of Ivo rian Youth des Centres de Formation Pr ofessionnelle (CFP) CI-BCP-EMPLOI-351918-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 120,000.00 0.00 2023-05-09 2023-05-30 2023-07-13 2023-08-12 2023-09-16 2024-03-14 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 300 jeunes de la région d ts u Folon CI-BCP-EMPLOI-351921-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 150,000.00 0.00 2023-05-16 2023-06-06 2023-07-20 2023-08-19 2023-09-23 2024-03-21 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 375 jeunes de la région d ts u Bafing CI-BCP-EMPLOI-351924-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 160,000.00 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-11 2023-09-15 2024-03-13 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 400 jeunes de la région d ts u Bounkani CI-BCP-EMPLOI-351925-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 200,000.00 0.00 2023-05-05 2023-05-26 2023-07-09 2023-08-08 2023-09-12 2024-03-10 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 500 jeunes de la région d ts u Cavally CI-BCP-EMPLOI-351927-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 210,000.00 0.00 2023-05-05 2023-05-26 2023-07-09 2023-08-08 2023-09-12 2024-03-10 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 525 jeunes de la région d ts u Gôh CI-BCP-EMPLOI-351969-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 190,000.00 0.00 2023-05-09 2023-05-30 2023-07-13 2023-08-12 2023-09-16 2024-03-14 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 475 jeunes de la région d ts u Guémon CI-BCP-EMPLOI-351971-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 180,000.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2024-03-15 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 450 jeunes de la région d ts u Hambol CI-BCP-EMPLOI-351972-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 230,000.00 0.00 2023-05-11 2023-06-01 2023-07-15 2023-08-14 2023-09-18 2024-03-16 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 575 jeunes de la région d ts e la Nawa CI-BCP-EMPLOI-351973-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 240,000.00 0.00 2023-05-12 2023-06-02 2023-07-16 2023-08-15 2023-09-19 2024-03-17 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 600 jeunes de la région d ts u Poro CI-BCP-EMPLOI-351974-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 200,000.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2024-03-20 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 500 jeunes de la région d ts u Sud-Comoé CI-BCP-EMPLOI-351977-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 210,000.00 0.00 2023-05-16 2023-06-06 2023-07-20 2023-08-19 2023-09-23 2024-03-21 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 525 jeunes de la région d ts u Tchologo CI-BCP-EMPLOI-351978-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 180,000.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2024-03-22 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 450 jeunes de la région d ts u Tonkpi CI-BCP-EMPLOI-351979-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 150,000.00 0.00 2023-05-18 2023-06-08 2023-07-22 2023-08-21 2023-09-25 2024-03-23 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 375 jeunes de la région d ts u Worodougou CI-BCP-EMPLOI-351980-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Open - National 170,000.00 0.00 2023-05-19 2023-06-09 2023-07-23 2023-08-22 2023-09-26 2024-03-24 cation Selection ntation e des activités HIMO au profit mpowered Local Governmen de 425 jeunes de le District A ts utonome d'Abidjan Page 4 CI-BCP-EMPLOI-352187-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 205,275.00 0.00 2023-05-02 2023-05-23 2023-07-06 2023-08-05 2023-09-09 2025-09-08 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 45 jeunes dans la Région du Bafing CI-BCP-EMPLOI-352188-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 166,600.00 0.00 2023-05-03 2023-05-24 2023-07-07 2023-08-06 2023-09-10 2025-09-09 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 2 ts 80 jeunes dans le District Aut onome d'Abidjan CI-BCP-EMPLOI-352189-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 229,670.00 0.00 2023-05-05 2023-05-26 2023-07-09 2023-08-08 2023-09-12 2025-09-11 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 86 jeunes dans la Région du Bounkani CI-BCP-EMPLOI-352190-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 295,120.00 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-11 2023-09-15 2025-09-14 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 96 jeunes dans la Région du Cavally CI-BCP-EMPLOI-352192-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 295,715.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2025-09-16 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 97 jeunes dans la Région du Gôh CI-BCP-EMPLOI-352195-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 273,105.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2025-09-16 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 59 jeunes dans la Région du Guemon CI-BCP-EMPLOI-352199-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 254,660.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2025-09-16 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 28 jeunes dans la Région du Hambol CI-BCP-EMPLOI-352200-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,500.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2025-09-16 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 5 ts 50 jeunes dans la Région de l a Nawa CI-BCP-EMPLOI-352207-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,800.00 0.00 2023-05-11 2023-06-01 2023-07-15 2023-08-14 2023-09-18 2025-09-17 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 5 ts 83 jeunes dans la Région du Poro CI-BCP-EMPLOI-352212-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 298,900.00 0.00 2023-05-12 2023-06-02 2023-07-16 2023-08-15 2023-09-19 2025-09-18 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 5 ts 59 jeunes dans la Région du Tchologo CI-BCP-EMPLOI-352224-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,960.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2025-09-21 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 7 ts 22 jeunes dans la Région du Tonkpi CI-BCP-EMPLOI-352231-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 223,125.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2025-09-23 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 75 jeunes dans la Région du Worodougou CI-BCP-EMPLOI-352344-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 182,070.00 0.00 2023-05-24 2023-06-14 2023-07-28 2023-08-27 2023-10-01 2025-09-30 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 07 jeunes dans la Région du du Folon CI-BCP-EMPLOI-352347-CS-C Improving Skills Training an QS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 298,690.00 0.00 2023-05-23 2023-06-13 2023-07-27 2023-08-26 2023-09-30 2025-09-29 uvre du volet appui à la créat cation Selection ntation mpowered Local Governmen ion d’AGR/MPE au profit de 5 ts 03 jeunes dans la Région de l 'Agnéby-Tiassa CI-BCP-EMPLOI-352367-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 230,000.00 0.00 2023-05-02 2023-05-23 2023-07-06 2023-08-05 2023-09-09 2025-09-08 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 57 ts 5 jeunes dans le District Auto nome d'Abidjan CI-BCP-EMPLOI-352368-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 200,000.00 0.00 2023-05-03 2023-05-24 2023-07-07 2023-08-06 2023-09-10 2025-09-09 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 50 ts 0 jeunes dans la Région du B afing CI-BCP-EMPLOI-352369-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 210,000.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2025-09-23 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 52 ts 5 jeunes dans la Région du B ounkani Page 5 CI-BCP-EMPLOI-352370-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 260,000.00 0.00 2023-05-19 2023-06-09 2023-07-23 2023-08-22 2023-09-26 2025-09-25 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 65 ts 0 jeunes dans la Région du C avally CI-BCP-EMPLOI-352371-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 280,000.00 0.00 2023-05-05 2023-05-26 2023-07-09 2023-08-08 2023-09-12 2025-09-11 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 70 ts 0 jeunes dans la Région du G ôh CI-BCP-EMPLOI-352372-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 250,000.00 0.00 2023-05-11 2023-06-01 2023-07-15 2023-08-14 2023-09-18 2025-09-17 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 62 ts 5 jeunes dans la Région du G uemon CI-BCP-EMPLOI-352373-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 240,000.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-13 2023-09-17 2025-09-16 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 60 ts 0 jeunes dans la Région du H ambol CI-BCP-EMPLOI-352374-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,700.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2025-09-23 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 77 ts 5 jeunes dans la Région de la Nawa CI-BCP-EMPLOI-352375-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,960.00 0.00 2023-05-15 2023-06-05 2023-07-19 2023-08-18 2023-09-22 2025-09-21 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 85 ts 0 jeunes dans la Région du P oro CI-BCP-EMPLOI-352376-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 240,000.00 0.00 2023-05-19 2023-06-09 2023-07-23 2023-08-22 2023-09-26 2025-09-25 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 60 ts 0 jeunes dans la Région du S ud-Comoé CI-BCP-EMPLOI-352377-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 290,000.00 0.00 2023-05-12 2023-06-02 2023-07-16 2023-08-15 2023-09-19 2025-09-18 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 72 ts 5 jeunes dans la Région du T chologo CI-BCP-EMPLOI-352378-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 299,790.00 0.00 2023-05-24 2023-06-14 2023-07-28 2023-08-27 2023-10-01 2025-09-30 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 75 ts 0 jeunes dans la Région du T onkpi CI-BCP-EMPLOI-352379-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 210,000.00 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-11 2023-09-15 2025-09-14 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 52 ts 5 jeunes dans la Région du W orodougou CI-BCP-EMPLOI-352387-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 270,000.00 0.00 2023-05-20 2023-06-10 2023-07-24 2023-08-23 2023-09-27 2025-09-26 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 67 ts 5 jeunes dans la Région de l' Agnéby-Tiassa CI-BCP-EMPLOI-352412-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Consultant Qualifi Pending Impleme IDA / 70340 ip for Job Creation through E Post Open - National 180,000.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2025-09-23 ace d’AVEC en vue du financ cation Selection ntation mpowered Local Governmen ement d'AGR au profit de 45 ts 0 jeunes dans la Région du F olon CI-BCP-EMPLOI-352414-CS-Q CBS / Recrutement d'un cons ultant firme pour la concepti Project Management and Mo Quality And Cost- Pending Impleme IDA / 70340 Post Open - National 120,000.00 0.00 2023-10-11 2023-11-01 2023-12-15 2024-01-12 2024-02-11 2024-03-17 2024-04-21 2024-10-18 on d'une interface de progra nitoring and Evaluation Based Selection ntation mmation d'applications (API) pour le système de Suivi Eval uation CI-BCP-EMPLOI-358379-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet Consultant Qualifi Pending Impleme ltant firme pour l'évaluation IDA / 70340 ter Employment Opportuniti Post Open - National 100,000.00 0.00 2023-06-21 2023-07-12 2023-08-25 2023-09-24 2023-10-29 2024-04-26 cation Selection ntation de la phase pilote de la réfor es to and Promote Entrepren me de l'apprentissage eurship of Ivo rian Youth CI-BCP-EMPLOI-358877-CS-C Strengthening the TVET Syst QS / Recrutement d'un consu em’s Capacity to Provide Bet Consultant Qualifi Pending Impleme ltant firme pour la formation IDA / 70340 ter Employment Opportuniti Post Open - National 20,000.00 0.00 2023-07-31 2023-08-21 2023-10-04 2023-11-03 2023-12-08 2024-06-05 cation Selection ntation des agents de l'AEJ à la réalis es to and Promote Entrepren ation de l'audit qualité eurship of Ivo rian Youth CI-BCP-EMPLOI-363026-CS-C Improving Skills Training an QS / Recrutement d'un consu d Catalyzing Entrepreneursh Consultant Qualifi Pending Impleme ltant firme pour une assistan IDA / 70340 ip for Job Creation through E Post Limited 297,000.00 0.00 2023-07-27 2023-08-10 2023-09-09 2023-10-14 2024-10-13 cation Selection ntation ce technique aux Régions/Dis mpowered Local Governmen tricts en vue du suivi des pre ts staires d'exécution INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 CI-BCP-EMPLOI-351722-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet Individual Consult Under Implement ultant individuel pour l'appui IDA / 70340 ter Employment Opportuniti Post Open - National 12,000.00 0.00 2023-05-16 2023-06-23 2023-07-04 2023-07-25 2023-08-29 2023-10-13 ant Selection ation à la rédaction des textes d'a es to and Promote Entrepren pplication de la loi sur l'ETFP eurship of Ivo rian Youth A CI-BCP-EMPLOI-351729-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet Individual Consult Pending Impleme ultant individuel pour un app IDA / 70340 ter Employment Opportuniti Post Open - National 27,000.00 0.00 2023-05-30 2023-07-18 2023-08-08 2023-09-12 2023-12-11 ant Selection ntation ui à la rédaction de la politiq es to and Promote Entrepren ue et de la stratégie 2024-20 eurship of Ivo rian Youth 30 du METFPA CI-BCP-EMPLOI-351881-CS-I NDV / Recrutement d'un cons Strengthening the TVET Syst ultant individuel en vue de la em’s Capacity to Provide Bet Individual Consult Pending Impleme réalisation d'une étude pour l IDA / 70340 ter Employment Opportuniti Post Open - National 60,000.00 0.00 2023-06-20 2023-08-08 2023-08-29 2023-10-03 2024-03-31 ant Selection ntation 'évaluation de la mise en œu es to and Promote Entrepren vre de la convention cadre d eurship of Ivo rian Youth e partenariat Secteur Public / Secteur Privé CI-BCP-EMPLOI-351893-CS-I NDV / Recrutement d'un cons Strengthening the TVET Syst ultant individuel pour un app em’s Capacity to Provide Bet ui à l'analyse des besoins et Individual Consult Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 10,000.00 0.00 2023-05-05 2023-05-10 2023-05-31 2023-07-05 2023-08-04 à la rédaction du cahier de c ant Selection ntation es to and Promote Entrepren harges fonctionnel de la plat eurship of Ivo rian Youth eforme intégrée de concertat ion, y compris les TDR pour l e recrutement du cabinet CI-BCP-EMPLOI-301166-CS-I NDV / Recrutement d’un cons Strengthening the TVET Syst ultant individuel pour l’élabor em’s Capacity to Provide Bet Individual Consult ation des textes règlementair IDA / 70340 ter Employment Opportuniti Post Open 100,000.00 0.00 Canceled 2023-03-15 2023-05-03 2023-05-24 2023-06-28 2023-08-27 ant Selection es en vue de la réforme du F es to and Promote Entrepren onds pour le Développement eurship of Ivo rian Youth de la Formation Professionne lle (FDFP) CI-BCP-EMPLOI-301177-CS-I Strengthening the TVET Syst NDV / Recrutement d’un cons em’s Capacity to Provide Bet Individual Consult ultant individuel pour un app IDA / 70340 ter Employment Opportuniti Post Open - National 70,000.00 0.00 Canceled 2023-04-11 2023-05-30 2023-06-20 2023-07-25 2023-09-23 ant Selection ui à la mise en place d’un Ca es to and Promote Entrepren dre National de Certification ( eurship of Ivo rian Youth CNC) des Compétences CI-BCP-EMPLOI-301174-CS-I NDV / Recrutement d’un cons Strengthening the TVET Syst ultant individuel pour un app em’s Capacity to Provide Bet Individual Consult ui à la finalisation du Plan Str IDA / 70340 ter Employment Opportuniti Post Open - National 70,000.00 0.00 Canceled 2022-12-21 2023-02-08 2023-03-01 2023-04-05 2023-06-04 ant Selection atégique de Développement es to and Promote Entrepren (PSD) de l’Agence Nationale eurship of Ivo rian Youth de Formation Professionnelle (AGEFOP) CI-BCP-EMPLOI-301164-CS-I NDV / Recrutement d’un cons Strengthening the TVET Syst ultant individuel pour un app em’s Capacity to Provide Bet Individual Consult ui en vue de la finalisation de IDA / 70340 ter Employment Opportuniti Post Open - National 70,000.00 0.00 Canceled 2023-03-14 2023-05-02 2023-05-23 2023-06-27 2023-08-26 ant Selection s textes d’application de la L es to and Promote Entrepren oi d’orientation sur l’Enseign eurship of Ivo rian Youth ement Technique et Formatio n Professionnelle (ETFP) CI-BCP-EMPLOI-301169-CS-I Strengthening the TVET Syst NDV / Recrutement d’un cons em’s Capacity to Provide Bet ultant individuel pour l’évalu Individual Consult IDA / 70340 ter Employment Opportuniti Post Open - National 60,000.00 0.00 Canceled 2023-04-05 2023-05-24 2023-06-14 2023-07-19 2023-09-02 ation de la réforme de l’appr ant Selection es to and Promote Entrepren entissage en Côte d’Ivoire et eurship of Ivo rian Youth la révision des textes règlem entaires CI-BCP-EMPLOI-351906-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet ultant individuel pour un app Individual Consult Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 50,000.00 0.00 2023-04-28 2023-05-03 2023-05-24 2023-06-28 2023-09-26 ui à l'élaboration des Plans St ant Selection ntation es to and Promote Entrepren ratégique de Développement eurship of Ivo rian Youth (PSD) de l'AGEFOP et de l'Ag ence CI-PME CI-BCP-EMPLOI-351909-CS-I Strengthening the TVET Syst NDV / Recrutement d’un cons em’s Capacity to Provide Bet Individual Consult Under Implement ultant en génie civil pour un IDA / 70340 ter Employment Opportuniti Post Limited 98,500.00 0.00 2023-04-21 2023-05-16 2023-04-26 2023-05-17 2023-06-21 2025-06-20 ant Selection ation appui au BCP-Emploi dans le es to and Promote Entrepren cadre de la mise en œuvre d eurship of Ivo rian Youth u PEJEDEC – Phase 3 CI-BCP-EMPLOI-351912-CS-I Improving Skills Training an NDV / Recrutement d'un cons d Catalyzing Entrepreneursh Individual Consult Pending Impleme ultant individuel pour un app IDA / 70340 ip for Job Creation through E Post Limited 98,500.00 0.00 2023-05-03 2023-05-08 2023-05-29 2023-07-03 2025-07-02 ant Selection ntation ui au BCP-Emploi dans le cad mpowered Local Governmen re du développement local et ts de la décentralisation CI-BCP-EMPLOI-351983-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-04-17 2023-04-27 2023-07-01 2023-12-28 ntation e des activités HIMO au profit mpowered Local Governmen de 500 jeunes de la région d ts e l'Agnéby-Tiassa CI-BCP-EMPLOI-352042-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 190,000.00 0.00 2023-05-23 2023-06-02 2023-08-06 2024-02-02 ntation e des activités HIMO au profit mpowered Local Governmen de 475 jeunes de la région d ts e la Bagoué CI-BCP-EMPLOI-352146-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 150,000.00 0.00 2023-05-24 2023-06-03 2023-08-07 2024-02-03 ntation e des activités HIMO au profit mpowered Local Governmen de 375 jeunes de la région d ts u Bélier CI-BCP-EMPLOI-352150-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 140,000.00 0.00 2023-05-24 2023-06-03 2023-08-07 2024-02-03 ntation e des activités HIMO au profit mpowered Local Governmen de 350 jeunes de la région d ts u Gbôklè CI-BCP-EMPLOI-352152-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 298,900.00 0.00 2023-05-25 2023-06-04 2023-08-08 2024-02-04 ntation e des activités HIMO au profit mpowered Local Governmen de 750 jeunes de la région d ts u Haut Sassandra Page 7 CI-BCP-EMPLOI-352154-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 149,995.00 0.00 2023-05-26 2023-06-05 2023-08-09 2024-02-05 ntation e des activités HIMO au profit mpowered Local Governmen de 375 jeunes de la région d ts u Kabadougou CI-BCP-EMPLOI-352155-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 190,000.00 0.00 2023-05-29 2023-06-08 2023-08-12 2024-02-08 ntation e des activités HIMO au profit mpowered Local Governmen de 475 jeunes de la région d ts e la Mé CI-BCP-EMPLOI-352159-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 150,000.00 0.00 2023-05-30 2023-06-09 2023-08-13 2024-02-09 ntation e des activités HIMO au profit mpowered Local Governmen de 375 jeunes de la région d ts u Moronou CI-BCP-EMPLOI-352161-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-05-31 2023-06-10 2023-08-14 2024-02-10 ntation e des activités HIMO au profit mpowered Local Governmen de 500 jeunes de la région d ts e San Pedro CI-BCP-EMPLOI-352166-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh Pending Impleme ltant firme pour la mise œuvr IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 140,000.00 0.00 2023-05-10 2023-05-20 2023-07-24 2024-01-20 ntation e des activités HIMO au profit mpowered Local Governmen de 350 jeunes du District Aut ts onome de Yamoussoukro CI-BCP-EMPLOI-352350-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 215,390.00 0.00 2023-05-25 2023-06-04 2023-08-08 2025-08-07 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 63 jeunes dans le District Aut onome de Yamoussoukro CI-BCP-EMPLOI-352353-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 231,455.00 0.00 2023-05-25 2023-06-04 2023-08-08 2025-08-07 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 89 jeunes dans la Région du Bélier CI-BCP-EMPLOI-352354-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 213,010.00 0.00 2023-05-17 2023-05-27 2023-07-31 2025-07-30 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 59 jeunes dans la Région du Gbôklè CI-BCP-EMPLOI-352356-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 437,325.00 0.00 2023-05-30 2023-06-09 2023-08-13 2025-08-12 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 7 ts 35 jeunes dans la Région du Haut Sassandra CI-BCP-EMPLOI-352358-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 229,670.00 0.00 2023-05-30 2023-06-09 2023-08-13 2025-08-12 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 87 jeunes dans la Région du Kabadougou CI-BCP-EMPLOI-352359-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 293,335.00 0.00 2023-05-31 2023-06-10 2023-08-14 2025-08-13 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 93 jeunes dans la Région de l a Mé CI-BCP-EMPLOI-352360-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 220,220.00 0.00 2023-05-26 2023-06-05 2023-08-09 2025-08-08 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 3 ts 70 jeunes dans la Région du Moronou CI-BCP-EMPLOI-352361-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 296,905.00 0.00 2023-05-17 2023-05-27 2023-07-31 2025-07-30 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 98 jeunes dans la Région de San Pedro CI-BCP-EMPLOI-352363-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 259,420.00 0.00 2023-05-18 2023-05-28 2023-08-01 2025-07-31 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 36 jeunes dans la Région du Sud-Comoé CI-BCP-EMPLOI-352365-CS-C Improving Skills Training an DS / Recrutement d’un consu d Catalyzing Entrepreneursh ltant firme pour la mise en œ Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 286,195.00 0.00 2023-05-04 2023-05-14 2023-07-18 2025-07-17 uvre du volet appui à la créat ntation mpowered Local Governmen ion d’AGR/MPE au profit de 4 ts 81 jeunes dans la Région de l a Bagoué CI-BCP-EMPLOI-352383-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 250,000.00 0.00 2023-05-04 2023-05-14 2023-07-18 2025-07-17 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 62 ts 5 jeunes dans la Région de la Bagoué CI-BCP-EMPLOI-352386-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-05-17 2023-05-27 2023-07-31 2025-07-30 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 50 ts 0 jeunes dans la Région du B élier Page 8 CI-BCP-EMPLOI-352388-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 190,000.00 0.00 2023-05-16 2023-05-26 2023-07-30 2025-07-29 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 47 ts 5 jeunes dans la Région du G bôklè CI-BCP-EMPLOI-352400-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 410,000.00 0.00 2023-05-30 2023-06-09 2023-08-13 2025-08-12 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 10 ts 25 jeunes dans la Région du Haut Sassandra CI-BCP-EMPLOI-352402-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-05-25 2023-06-04 2023-08-08 2025-08-07 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 50 ts 0 jeunes dans la Région du K abadougou CI-BCP-EMPLOI-352403-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 260,000.00 0.00 2023-05-17 2023-05-27 2023-07-31 2025-07-30 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 65 ts 0 jeunes dans la Région de la Mé CI-BCP-EMPLOI-352406-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-05-08 2023-05-18 2023-07-22 2025-07-21 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 50 ts 0 jeunes dans la Région du M oronou CI-BCP-EMPLOI-352407-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 280,000.00 0.00 2023-05-18 2023-05-28 2023-08-01 2025-07-31 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 70 ts 0 jeunes dans la Région de S an Pedro CI-BCP-EMPLOI-352411-CS-C Improving Skills Training an DS / Recrutement d'un consu d Catalyzing Entrepreneursh ltant firme pour la mise en pl Pending Impleme IDA / 70340 ip for Job Creation through E Post Direct Selection Direct - National 200,000.00 0.00 2023-05-18 2023-05-28 2023-08-01 2025-07-31 ace d’AVEC en vue du financ ntation mpowered Local Governmen ement d'AGR au profit de 50 ts 0 jeunes dans le District Auto nome de Yamoussoukro CI-BCP-EMPLOI-352415-CS-I Improving Skills Training an NDV / Recrutement de deux ( d Catalyzing Entrepreneursh Individual Consult Pending Impleme IDA / 70340 Post Open - National 144,000.00 0.00 2023-08-02 2023-09-20 2023-10-11 2023-11-15 2026-11-14 2) Consultants juniors en ent ip for Job Creation through E ant Selection ntation reprenariat en appui au BCP- mpowered Local Governmen Emploi ts CI-BCP-EMPLOI-352417-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet ultant individuel pour la réali Individual Consult Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 10,000.00 0.00 2023-06-06 2023-06-11 2023-07-02 2023-08-06 2024-02-02 sation d'une étude de référe ant Selection ntation es to and Promote Entrepren nce sur la satisfaction des us eurship of Ivo rian Youth agers de l'agence régionale p ilote CI-BCP-EMPLOI-352418-CS-I NDV / Recrutement d'un cons Strengthening the TVET Syst ultant individuel pour la réali em’s Capacity to Provide Bet Individual Consult Pending Impleme sation d'une étude de suivi s IDA / 70340 ter Employment Opportuniti Post Limited 10,000.00 0.00 2023-07-05 2023-07-10 2023-07-31 2023-09-04 2024-03-02 ant Selection ntation ur la satisfaction des usagers es to and Promote Entrepren de l'agence régionale pilote a eurship of Ivo rian Youth près l'obtention de la certific ation ISO 9001 CI-BCP-EMPLOI-352419-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet Individual Consult Pending Impleme ultant individuel en vue du d IDA / 70340 ter Employment Opportuniti Post Limited 10,000.00 0.00 2023-07-19 2023-07-24 2023-08-14 2023-09-18 2023-11-17 ant Selection ntation éveloppement de l'intranet d es to and Promote Entrepren e l'AEJ eurship of Ivo rian Youth CI-BCP-EMPLOI-352420-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet ultant individuel en vue du d Individual Consult Pending Impleme IDA / 70340 ter Employment Opportuniti Post Limited 20,000.00 0.00 2023-07-26 2023-07-31 2023-08-21 2023-09-25 2024-03-23 éveloppement d'une applicat ant Selection ntation es to and Promote Entrepren ion de suivi et de prise en ch eurship of Ivo rian Youth arge financière des bénéficiai res de stages et FRR CI-BCP-EMPLOI-353831-CS-I Strengthening the TVET Syst NDV / Recrutement d'un cons em’s Capacity to Provide Bet Individual Consult Pending Impleme ultant individuel pour un app IDA / 70340 ter Employment Opportuniti Post Limited 96,000.00 0.00 2023-06-16 2023-06-21 2023-07-12 2023-08-16 2025-08-15 ant Selection ntation ui au BCP-Emploi en vue du s es to and Promote Entrepren uivi des Conditions Basées su eurship of Ivo rian Youth r les Paiements (CBP) CI-BCP-EMPLOI-301163-CS-I Improving Skills Training an NDV / Recrutement d’un cons d Catalyzing Entrepreneursh ultant individuel pour l’évalu Individual Consult IDA / 70340 ip for Job Creation through E Post Open - National 70,000.00 0.00 Canceled 2022-12-08 2023-01-26 2023-02-16 2023-03-23 2023-09-19 ation des besoins en formati ant Selection mpowered Local Governmen on des acteurs au niveau loc ts al impliqués dans la mise en œuvre du projet Page 9 18-MONTH PROCUREMENT PLAN Project information: Nigeria Rural Access And Agricultural Marketing Project (RAAMP) - P163353 Project Implementation Agencies: Federal Ministry of Agriculture and Rural Development and State Project Implementation Units (SPIUs) Date of the Procurement Plan: September 18, 2019 Period covered by this Procurement Plan: February 2019 to July 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Nigeria Public Procurement Act 2007, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [15% is applicable for those contracts identified in the Procurement Plan tables]; Works: [ 7.5% is applicable for those contracts identified in the Procurement Plan tables] I. Threshold for Prior Review – Goods, Works, Non-Consulting Services and Consulting Services Prior-review Thresholds Thresholds for Procurement Methods High Substanti Moderate Low Risk Goods, IT & Non-Consulting Shortlist of National Procurement Type Risk al Risk Risk Works ($'000) ($'000) ($'000) ($'000) Services Consultants Request Request Engineering Open for for Open Open Open Consultin & Quotatio Quotatio 10,0 15,0 20,0 Internatio National internatio National g Constructio Works n or n or 5,000 00 00 00 nal or ICB or NCB National nal or ICB or NCB National Services n ($'000) ($'000) ($'000) ($'000) ($'000) Supervision Shopping Shopping ($'000) ($'000) ($'000) Goods, IT & Non- 2,0 4,0 6,0 Consulting Services 1,500 00 00 00 ≧ < ≦ ≧ < ≦ < ≦ Consultants 1,0 2,0 4,0 20,0 20,0 5,0 5,0 1 3 5 200 (Firms) 500 00 00 00 00 00 00 00 00 00 00 Post Review: All contracts not subject to prior review shall be subject to post review. Summary of the procurement packages for Goods, Works and Non-Consulting Services (Planned for the first 18 months after project effectiveness): Selecti Market on Evaluation Approa Review Metho Options Expected ch Prequal- Domestic Expected by Estimat d (Most date of Sr. Contract (Open- ification Preferenc date of Bank ed Cost (RFP, Advantageou bid/ No Description Nation (Yes/ e Contract (Prior/ (US$) RFB, s Bid, BAFO, proposal al/ No) (Yes/No) Signature Post) RFQ, Rated Criteria opening Limited DS etc.) etc.) etc.) Procurement of Air Conditioners 2 Limited Lowest March. 1 Post 24,600 RFQ No No Feb. 2020 Horse power Evaluated Cost 2020 (Split Unit) (Goods) Procurement of Steel File cabinets, Lowest March. 2 Spiral Binding Post 12,600 Limited RFQ Evaluated Cost No No Feb. 2020 2020 Machines and Consumables (Goods) Procurement of External hard disk + software packages Lowest March. 3 (licensed MS Post 12,300 Limited RFQ Evaluated Cost No No 2020 April. 2020 Office, Autocads, Antivirus, Converter etc) (Goods) Procurement of Laptops and Lowest March. 4 Post 100,000 Limited RFQ No No May. 2020 Tablets Evaluated Cost 2020 (Goods) Procurement Lowest March. 5 Post 22,400 Limited RFQ No No April. 2020 of Evaluated Cost 2020 Photocopying Machines (Goods) Medium Sized Lowest March. 6 Refrigerators Post 10,800 Limited RFQ Evaluated Cost No No 2020 April. 2020 (Goods) Procurement of Safety Equipment (Boots, Lowest 7 Post 39,000 Limited RFQ No No June. 2020 July, 2020 Helmets, Evaluated Cost Reflective Jackets etc.) (Goods) Construction Measuring Manual Wheel Lowest August. 8 Post 6,500 Limited RFQ No No July 2020 (Surveyor’s Evaluated Cost 2020 Wheel) (Goods) Roads Maintenance Equipment for Community based road maintenance (30 Nos tipping tricycles and other Open- 1,235,0 Lowest 9 equipment Post Nationa RFB No No Sept. 2020 Dec. 2020 00 Evaluated Cost such roads l signs and; cutlasses, wheelbarrows, hand rammer, digger, helmet, watering cans, reflective jacket, long shovel, nose cover, boots etc) (Goods) Procurement of Office Equipment, Printers, Open- Digital Lowest August. 10 Post 420,000 Nationa RFB No No June. 2020 Cameras & Evaluated Cost 2020 l Sundry Communicatio n devices (Goods) Purchase of Open- Project 2,940,0 Lowest March. 11 Prior Nationa RFB No No May. 2020 Vehicles 00 Evaluated Cost 2020 l (Goods) Server, Network System and other Open- Lowest equipment & Post 150,000 Nationa RFB Evaluated Cost No No Feb. 2020 May. 2020 accessories for l NiRTIMS and CosMos (Goods) Design and Construction of 200km of Rural Roads Open- 134,000 Rated Criteria (13 Prior Interna RFP No No Jun. 2020 Dec. 2020 ,000.00 and Cost Contracts of tional US$10.3 Million each) (Works) Construction/E stablishment Open – of Agro- 2,000,0 Lowest March. Post Nationa RFB No No July. 2021 Logistics 00 Evaluated Cost 2021 l centers/hubs at strategic locations (Multiple contracts) (Works) Construction /Rehabilitation of 10 Nos. Rural Bridges Open- 8,000,0 Lowest March. & Large Post Nationa RFB No No July. 2022 00 Evaluated Cost 2021 culverts (US$ l 0.6 M each Package) (Works) Local Community Group (LCG) and micro- enterprises maintenance Open- 14,000, Lowest of pilot roads Post Nationa RFB No No April. 2020 June.2020 000 Evaluated Cost (Multiple l Contracts in 13 States - US$ 0.002/year) (Works) II. Summary of the procurement packages for Consulting Services -Planned for the first 18 months after project effectiveness): Selection Market Method Review Approach Expected Expected Estimate (QCBS, Shortlisti Sr. by Bank (Open - date of bid/ date of Contract Description d Cost FBS, ng No (Prior/ International proposal Contract (US$) LCBS, (Yes/ No) Post) / National/ opening Signature QBS, CQS, etc.) DS etc.) Offshore & Onshore training and Workshops for Open- March. 1 the 13 states (Multiple Post 5,200,000 CQS No May. 2020 National 2020 contracts not to exceed US$ 0.1 M) (Consultancy) Consultancy Services for Detailed assessment, preliminary engineering design, ESIA, Procurement Support for Rural roads and Bridges; Road and 25,390,00 Open- 2 Bridge Supervision Prior QCBS Yes June. 2020 Nov. 2020 0 International Consultancy; Assessment of project security risk and mitigation (Multiple contracts spread in different locations) (Consultancy) Consultancy Services for design, procurement and supervision for Agro- Open- 3 logistics centers (Multiple Post 6,500,000 QCBS Yes Sep. 2020 Dec. 2020 International contracts spread in different locations) (Consultancy) Consultancy Services for the establishment of state Open- March. August. 4 road fund, and Post 5,665,000 QCBS Yes National 2020 2020 establishment of state rural access roads administration (Multiple contracts at 13 states) (Consultancy) Consultancy services on the development and operationalization of the Nigeria Rural Transport Infrastructure Management System (NiRTIMS) for sustainable road asset; Planning and Open- 5 Post 5,860,000 QCBS Yes Feb. 2020 July. 2020 implementation of the National routine maintenance system, spot improvement, periodic maintenance for rural roads. (Multiple contracts at 13 states) (Consultancy) Technical assistance consultancy services for the provision of technical advice (TA) to enhance the performance of agro- logistics centers (to ensure effective utilization of the facilities at the agro- Open- National March. 6 logistics centers); Post 4,975,000 QCBS Yes July. 2020 provision of TA and 2020 implements to farm level post-harvest agro-logistics activities and enhance the engagement of women and unemployed youth. (Multiple contracts at 13 states) (Consultancy) Consultancy services support for coordination of Open- 7 Post 2,442,000 CQS No Feb. 2020 April. 2020 project implementation at National Federal and State Levels (Multiple contracts at 13 states) (Consultancy) Consultancy services on Impact Evaluation, Baseline Data Collection, Comprehensive Technical Audit, Consultancy support for the development and Open- March. 8 operationalization of the Post 5,325,000 QCBS Yes July.2020 National 2020 smartphone-based construction site monitoring system (CoSMoS) (Multiple contracts at 13 states) (Consultancy) Consultancy support for the development and monitoring of Grievance Redress Mechanism and Gender-Based Violence; Development of road safety manual and training Open- 9 Post 1,843,000 CQS No April.2020 June. 2020 at the state level; National establishment/strengtheni ng the state traffic management agencies; road safety audit. (Multiple contracts at 13 states) (Consultancy) Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a 1Guidelineson Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Nigeria : Nigeria Rural Access and Agricultural Marketing Project PLAN General Information Country: Nigeria 2021-04-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163353 GPN Date: Project Name: Nigeria Rural Access and Agricultural Marketing Project Loan / Credit No: IDA / 65190 Plateau RAAMP Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NG-PLATEAU RAAMP-280463 Request for Bids - Component A. Improvement -CW-RFB / physical improvem Single Stage - One E Small Works SPD Pending Imp 2024-02-1 IDA / 65190 of Rural Access and Trading Post Request for Bids Open - National 1,000,000.00 0.00 2022-09-20 2022-09-25 2022-11-06 2022-12-06 2023-01-10 ent of about 2 nos. Agrologist nvelope (1 envelope proce lementation 3 Infrastructure ics Centres (ALCs) ss) NG-PLATEAU RAAMP-230762 Component B. Asset Manage 2021-12-3 -CW-RFB / procurement of Ro IDA / 65190 ment, Agro-logistics Perform Post Request for Bids 1,500,000.00 0.00 Canceled 2021-05-17 2021-05-20 2021-06-17 2021-07-01 2021-07-20 1 utine Maintenance of 700kim ance Enhancement and Sect Rural Roads or Reform Request for Bids - NG-PLATEAU RAAMP-280464 Component A. Improvement Single Stage - One E Small Works SPD Pending Imp 2024-02-2 -CW-RFB / Rural Roads upgra IDA / 65190 of Rural Access and Trading Post Request for Bids Open - National 2,000,000.00 0.00 2022-09-05 2022-09-10 2022-10-22 2022-11-21 2022-12-26 nvelope (1 envelope proce lementation 8 ding of about 40km Infrastructure ss) Request for Bids - NG-PLATEAU RAAMP-230792 Component B. Asset Manage Single Stage - One E Small Works SPD Pending Imp 2024-06-0 -CW-RFB / Backlog maintena IDA / 65190 ment, Agro-logistics Perform Post Request for Bids Open - National 2,500,000.00 0.00 2022-11-30 2022-12-06 2023-01-17 2023-02-16 2023-03-16 nvelope (1 envelope proce lementation 9 nce PLUS Rehabilitation of 10 ance Enhancement and Sect ss) 0km rural roads or Reform Request for Bids - NG-PLATEAU RAAMP-230780 Component B. Asset Manage Single Stage - One E Small Works SPD Pending Imp 2023-03-1 -CW-RFB / Spot improvement IDA / 65190 ment, Agro-logistics Perform Post Request for Bids Open - National 5,000,000.00 0.00 2021-08-23 2021-08-30 2021-10-11 2021-11-10 2021-12-15 nvelope (1 envelope proce lementation 0 of about 225km rural roads ance Enhancement and Sect ss) or Reform NG-PLATEAU RAAMP-230820 Request for Bids - Component A. Improvement -CW-RFB / Construction of 10 Single Stage - One E Small Works SPD Pending Imp 2023-06-1 IDA / 65190 of Rural Access and Trading Post Request for Bids Open - National 900,000.00 0.00 2021-11-25 2021-11-30 2022-01-11 2022-02-10 2022-03-17 0 linear meters Cross-draina nvelope (1 envelope proce lementation 0 Infrastructure ge structures (bridges/culver ss) t) in Plateau State. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-PLATEAU RAAMP-230303 Component C. Institutional D Request for Quota Single Stage - One E Pending Impl -GO-RFQ / Purchase of office IDA / 65190 evelopment, Project Manage Post Limited 50,000.00 0.00 2022-06-13 2022-07-25 2022-10-24 tions nvelope ementation furniture and equipment ment and Risk Mitigation NG-PLATEAU RAAMP-230281 Component C. Institutional D -GO-RFQ / Purchase of operat Request for Quota Single Stage - One E IDA / 65190 evelopment, Project Manage Post Limited 150,000.00 0.00 Canceled 2022-05-16 2022-06-27 2022-09-26 ing project vehicles (2nos. 4 tions nvelope ment and Risk Mitigation wheel drive double cabin pic k-up) NG-PLATEAU RAAMP-230574 Component C. Institutional D -GO-RFQ / Purchase of Data Request for Quota Single Stage - One E IDA / 65190 evelopment, Project Manage Post Limited 10,000.00 0.00 Canceled 2021-05-28 2021-07-09 2021-10-07 Collection Gadgets (6N0.) for tions nvelope ment and Risk Mitigation NIRTIMS and CoSMoS NG-PLATEAU RAAMP-230379 -GO-RFQ / Purchase of. lapto ps, 10nos, Desktops, Printers Component C. Institutional D Request for Quota Single Stage - One E / Fax, UPS and peripherals, H IDA / 65190 evelopment, Project Manage Post Limited 80,000.00 0.00 Canceled 2022-06-06 2022-07-18 2022-10-17 tions nvelope eavy Duty Photocopier, Scan ment and Risk Mitigation ners, Projector, Internet Insta llation, Air Conditioners and Consumables, etc. NG-PLATEAU RAAMP-230580 -GO-RFQ / Purchase of Safeg uard equipment (PPEs, First a Component C. Institutional D id kits, Environmental Monito Request for Quota Single Stage - One E IDA / 65190 evelopment, Project Manage Post Limited 25,000.00 0.00 Canceled 2022-05-30 2022-07-11 2022-10-10 ring and Tracking equipment tions nvelope ment and Risk Mitigation including in-situ air quality ki ts, noise meter, PH meter, ca ution tapes, measuring tapes , camera, GPS etc) NG-PLATEAU RAAMP-230399 Component C. Institutional D Request for Quota Single Stage - One E -GO-RFQ / Purchase of Solar IDA / 65190 evelopment, Project Manage Post Limited 33,000.00 0.00 Canceled 2022-07-11 2022-08-22 2022-11-21 tions nvelope Power ment and Risk Mitigation NG-PLATEAU RAAMP-367908 Component C. Institutional D Request for Quota Single Stage - One E Under Imple -GO-RFQ / Purchase of Solar IDA / 65190 evelopment, Project Manage Post Limited 33,000.00 0.00 2022-08-19 2022-08-19 2022-09-30 2023-03-29 tions nvelope mentation Power ment and Risk Mitigation NG-PLATEAU RAAMP-367969 Component C. Institutional D -GO-RFQ / Purchase of Opera Request for Quota Single Stage - One E Under Imple IDA / 65190 evelopment, Project Manage Post Limited 150,000.00 0.00 2022-07-20 2022-07-20 2022-08-31 2023-02-27 ting Project Vehicles (2nos. 4 tions nvelope mentation ment and Risk Mitigation -wheel drive double cabin pic k-up) NG-PLATEAU RAAMP-367972 Component C. Institutional D -GO-RFQ / Purchase of Data c Request for Quota Single Stage - One E Under Imple IDA / 65190 evelopment, Project Manage Post Limited 10,000.00 0.00 2022-09-28 2022-09-28 2022-11-02 2023-05-01 ollection gadgets (6Nos) for tions nvelope mentation ment and Risk Mitigation NIRTIMS and CoSMoS NG-PLATEAU RAAMP-367996 -GO-RFQ / Purchase of Safeg uard equipment (PPEs, First a Component C. Institutional D id kits, Environmental Monito Request for Quota Single Stage - One E Under Imple IDA / 65190 evelopment, Project Manage Post Limited 25,000.00 0.00 2022-10-24 2022-11-15 2022-12-19 2023-06-17 ring and Tracking equipment tions nvelope mentation ment and Risk Mitigation including in-situ air quality ki ts, noise meter, PH meter, ca ution tapes, measuring tapes , camera, GPS etc) Page 1 NG-PLATEAU RAAMP-367978 -GO-RFQ / Purchase of laptop s, 15nos, Desktops, Printers/ Component C. Institutional D Request for Quota Single Stage - One E Under Imple Fax, UPS and peripherals, He IDA / 65190 evelopment, Project Manage Post Limited 80,000.00 0.00 2022-08-17 2022-08-17 2022-09-28 2023-03-27 tions nvelope mentation avy Duty Photocopier, Scann ment and Risk Mitigation ers, Projector, Internet Install ation, Air Conditioners and C onsumables, etc. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-PLATEAU RAAMP-280376 -CS-QCBS / Consultancy Servi Component A. Improvement Quality And Cost- Open - Internationa Under Implement ces for Design and Supervisi IDA / 65190 of Rural Access and Trading Post 395,000.00 0.00 2022-03-07 2022-08-05 2022-03-28 2022-11-07 2022-05-11 2023-02-10 2022-06-08 2023-03-13 2022-07-09 2022-08-13 2022-09-17 2024-11-28 Based Selection l ation on of physical improvement Infrastructure of 5 to 6 nos. Agro-logistics C enters (ALCs) NG-PLATEAU RAAMP-280467 -CS-QCBS / Consultancy Servi Component A. Improvement Quality And Cost- Open - Internationa Under Implement ces for Design and Supervisi IDA / 65190 of Rural Access and Trading Post 430,000.00 0.00 2022-03-21 2022-08-05 2022-04-11 2022-07-22 2022-05-25 2022-08-24 2022-06-22 2023-02-10 2022-07-22 2022-08-26 2022-09-30 2024-12-11 Based Selection l ation on of 160 km Rural Road Upg Infrastructure rading (Design & Build; Non- Design & Build contracts) NG-PLATEAU RAAMP-230438 Component B. Asset Manage -CS-CQS / Consultancy servic ment, Agro-logistics Perform Consultant Qualifi Under Implement es for Design and Supervisio IDA / 65190 Post Open - National 180,000.00 0.00 2022-03-16 2022-08-05 2022-03-23 2022-06-05 2022-04-29 2022-08-05 2022-05-13 2022-06-10 2023-07-17 ance Enhancement and Sect cation Selection ation n of Backlog Maintenance/Re or Reform habilitation of roads (125km ). NG-PLATEAU RAAMP-282586 -CS-CQS / Consultancy Servic Component B. Asset Manage es for Design and Supervisio ment, Agro-logistics Perform Consultant Qualifi Under Implement IDA / 65190 Post Open - National 200,000.00 0.00 2022-03-16 2022-08-05 2022-04-06 2022-04-22 2022-05-20 2022-09-07 2022-06-20 2022-07-25 2023-01-23 n of Spot Improvement (300k ance Enhancement and Sect cation Selection ation m), and construction of 50 lin or Reform ear meter Cross-drainage Str uctures (bridges/culverts). NG-PLATEAU RAAMP-230421 -CS-CQS / Consultancy Servic Component A. Improvement Consultant Qualifi es for Design and Supervisio IDA / 65190 of Rural Access and Trading Post Open - National 430,000.00 0.00 Canceled 2022-07-06 2022-03-07 2022-07-13 2022-08-19 2022-09-02 2022-09-30 2025-04-17 cation Selection n of Rural Road Upgrading (D Infrastructure esign & Build; non-design an d build contracts) NG-PLATEAU RAAMP-362868 -CS-CQS / Consultancy Servic es for The Engagement of Co Component C. Institutional D nsultant for The Preparation Consultant Qualifi Pending Impleme IDA / 65190 evelopment, Project Manage Post Limited 200,000.00 0.00 2023-06-12 2023-06-26 2023-07-26 2023-08-30 2024-02-26 of Safeguards Instruments (E cation Selection ntation ment and Risk Mitigation SMP) for Road upgrades, Bac klog Maintenance/Rehabilitat ion, Spot Improvement and C ross drainage structures. NG-PLATEAU RAAMP-362872 -CS-CQS / Consultancy Servic es for The Engagement of Co Component C. Institutional D nsultant for The Preparation Consultant Qualifi Pending Impleme IDA / 65190 evelopment, Project Manage Post Limited 150,000.00 0.00 2023-07-03 2023-07-17 2023-08-16 2023-09-20 2024-03-18 Safeguards Instruments (RAP cation Selection ntation ment and Risk Mitigation ) for Road upgrades, Backlog Maintenance/Rehabilitation, Spot Improvement and Cross drainage structures NG-PLATEAU RAAMP-362873 -CS-CQS / Consultancy Servic Component C. Institutional D es for The Engagement of Co Consultant Qualifi Under Implement IDA / 65190 evelopment, Project Manage Post Limited 60,000.00 0.00 2023-09-25 2023-06-07 2023-10-09 2023-11-08 2023-12-13 2024-06-10 nsultant for The Preparation cation Selection ation ment and Risk Mitigation of Safeguards Instruments (E SMP) for Agro-Logistics Cente rs NG-PLATEAU RAAMP-362880 -CS-CQS / Consultancy Servic Component C. Institutional D es for The Engagement of Co Consultant Qualifi Under Implement IDA / 65190 evelopment, Project Manage Post Limited 50,000.00 0.00 2023-11-27 2023-06-07 2023-12-11 2024-01-10 2024-02-14 2024-08-13 nsultant for The Preparation cation Selection ation ment and Risk Mitigation of Safeguards Instruments (R AP) for Agro-Logistics Center s INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-PLATEAU RAAMP-230520 Component C. Institutional D Individual Consult -CS-INDV / Engagement of Te IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 Canceled 2022-06-01 2022-06-06 2022-06-27 2022-07-13 2023-07-03 ant Selection chnical Assistant (TA) on Soci ment and Risk Mitigation al Safeguard NG-PLATEAU RAAMP-230487 Component C. Institutional D Individual Consult -CS-INDV / Engagement of Te IDA / 65190 evelopment, Project Manage Post Limited 40,000.00 0.00 Canceled 2022-06-01 2022-06-06 2022-06-27 2022-07-13 2023-07-03 ant Selection chnical Assistant (TA) on GBV ment and Risk Mitigation NG-PLATEAU RAAMP-230523 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 Canceled 2022-06-08 2022-06-13 2022-07-04 2022-07-20 2023-07-17 chnical Assistant (TA) on Envi ant Selection ment and Risk Mitigation ronmental Safeguard NG-PLATEAU RAAMP-230545 Component C. Institutional D Individual Consult Under Implement -CS-INDV / Engagement of Te IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2022-07-06 2023-05-03 2022-07-11 2022-06-29 2022-08-01 2022-08-17 2023-08-14 ant Selection ation chnical Assistant (TA) on Infr ment and Risk Mitigation astructure NG-PLATEAU RAAMP-230539 Component C. Institutional D Individual Consult -CS-INDV / Engagement of Te IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 Canceled 2022-07-13 2022-07-18 2022-08-08 2022-08-24 2023-08-21 ant Selection chnical Assistant (TA) on Proc ment and Risk Mitigation urement Page 2 NG-PLATEAU RAAMP-230539 Component C. Institutional D Individual Consult Under Implement -CS-INDV-2 / Engagement of IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2023-02-15 2023-05-24 2023-02-20 2023-03-13 2023-03-29 2024-03-25 ant Selection ation Technical Assistant (TA) on P ment and Risk Mitigation rocurement NG-PLATEAU RAAMP-348422 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult Under Implement IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2023-03-13 2023-03-13 2023-03-20 2023-04-10 2023-04-26 2024-04-22 chnical Assistant (TA) on Envi ant Selection ation ment and Risk Mitigation ronmental Safeguard NG-PLATEAU RAAMP-348442 Component C. Institutional D Individual Consult Under Implement -CS-INDV / Engagement of Te IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2023-03-20 2023-03-13 2023-03-27 2023-04-17 2023-05-03 2024-04-22 ant Selection ation chnical Assistant (TA) on Soci ment and Risk Mitigation al Safeguard NG-PLATEAU RAAMP-348444 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult Under Implement IDA / 65190 evelopment, Project Manage Post Limited 40,000.00 0.00 2023-03-20 2023-03-13 2023-03-27 2023-04-17 2023-05-03 2024-04-22 chnical Assistant (TA) on Gen ant Selection ation ment and Risk Mitigation der-Based Violence NG-PLATEAU RAAMP-359506 -CS-INDV / Consultancy Servi ces for the Engagement of C Component C. Institutional D Individual Consult Pending Impleme onsultant for the Preparation IDA / 65190 evelopment, Project Manage Post Limited 80,000.00 0.00 2023-09-04 2023-09-11 2023-10-02 2023-10-18 2024-10-14 ant Selection ntation of Safeguards Instruments (E ment and Risk Mitigation nvironmental and Social Man agement Plan) for Agro-Logis tics Centers NG-PLATEAU RAAMP-280336 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult IDA / 65190 evelopment, Project Manage Post Limited 25,000.00 0.00 Canceled 2022-06-08 2021-05-31 2022-06-13 2022-07-04 2022-08-08 2023-08-08 chnical Assistant (TA) for Dat ant Selection ment and Risk Mitigation a Entry specialist (DES). NG-PLATEAU RAAMP-280390 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 Canceled 2022-03-21 2022-04-04 2022-03-28 2022-04-21 2022-04-18 2022-10-28 2022-05-23 2023-05-23 chnical Assistant (TA) for Stat ant Selection ment and Risk Mitigation e Security Specialist NG-PLATEAU RAAMP-367990 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult Pending Impleme IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2022-03-28 2022-04-21 2022-05-12 2022-06-16 2023-06-16 chnical Assistant (TA) for Stat ant Selection ntation ment and Risk Mitigation e Security Specialist NG-PLATEAU RAAMP-250556 Component C. Institutional D -CS-INDV / Engagement of Te Individual Consult Pending Impleme IDA / 65190 evelopment, Project Manage Post Limited 30,000.00 0.00 2021-06-07 2021-06-24 2021-06-26 2021-07-31 2022-07-31 chnical Assistant (TA) for Dat ant Selection ntation ment and Risk Mitigation a Entry specialist (DES). Page 3 PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2019-04-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / 62120, IDA / 62150, IDA / 62140 COORDINATING UNIT OF THE WACA PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-WACA CI-107603-CW-RFQ / Travaux de connexion inter Component 4: National Coor Request for Quota Single Stage - One E 2019-06-0 IDA / 62120 Post Open - National 92,000.00 0.00 Canceled 2019-04-07 2019-05-06 net sécurisée et d'installation dination tions nvelope 5 d'un système de visioconfére nce CI-WACA CI-107601-CW-RFQ / Travaux d'installation de câ Component 2: Strengthening Request for Quota Single Stage - One E 2020-05-0 blage réseaux et système de IDA / 62120 the Policy and Institutional F Post Open - National 70,000.00 59,612.34 Completed 2020-03-17 2020-04-03 2019-12-31 tions nvelope 3 sécurité électrique des locau ramework x du siège du projet WACA CI-WACA CI-266714-CW-RFB Component 3: Strengthening Request for Bids - / Construction de l'ouvrage d Open - Internationa Single Stage - One E 16,000,000.0 2023-08-0 IDA / 62120 National Physical and Social Prior Request for Bids Works SPD (after 0.00 Canceled 2022-01-10 2022-03-28 2022-03-28 2022-01-15 2022-06-06 2022-07-06 2022-08-10 e protection du cordon sable l nvelope 0 5 Investments prequalification) ux de Grand-Lahou Request for Bids - CI-WACA CI-272865-CW-RFB Works (after preq Component 3: Strengthening / Construction de l'ouvrage d Open - Internationa Single Stage - Two E ualification) SPD - 54,000,000.0 Under Revie 2024-02-1 IDA / 62120 National Physical and Social Prior Request for Bids 0.00 2022-01-31 2022-01-26 2022-03-20 2022-06-20 2022-03-20 2022-12-21 2022-02-05 2022-02-14 2022-05-29 2023-02-28 2022-07-24 2022-08-28 e protection du cordon sable l nvelope Applying contract 0 w 9 Investments ux de Grand-Lahou. or disqualificiatio n GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107607-GO-RFB / Acquisition de 02 Pick up do Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 120,000.00 102,901.32 Completed 2019-04-25 2019-05-25 2019-09-25 2019-07-24 2019-10-03 uble cabine de type 4X4 ave dination tions nvelope c pare-buffles et covercross s ur la part bailleur CI-WACA CI-107608-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Acquisition de carburant po IDA / 62120 Post Open - National 20,000.00 17,326.60 Completed 2019-04-09 2019-05-09 2019-06-28 2019-05-30 2019-07-18 dination tions nvelope ur les véhicules de l'UCP CI-WACA CI-107610-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 50,000.00 54,843.58 Completed 2019-03-30 2019-11-27 2019-04-29 2019-05-28 2019-05-29 2019-10-10 / Acquisition de matériel infor dination tions nvelope matique CI-WACA CI-107612-GO-RFQ / Acquisition des fournitures Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 20,000.00 14,005.10 Completed 2019-04-29 2019-11-27 2019-05-29 2019-05-28 2019-06-13 2019-06-18 et consommables pour le ma dination tions nvelope tériel informatique CI-WACA CI-107614-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Acquisition de petits matéri IDA / 62120 Post Open - National 10,000.00 6,828.04 Completed 2019-04-14 2019-05-14 2019-04-30 2019-05-29 2019-05-18 dination tions nvelope els, fournitures de bureau et documentation CI-WACA CI-107752-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Acquisition du matériel et o IDA / 62120 Post Open - National 16,000.00 8,842.66 Completed 2019-04-13 2019-05-13 2020-09-03 2019-05-28 2020-09-07 dination tions nvelope utillage technique CI-WACA CI-107759-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 84,000.00 71,551.00 Completed 2019-04-07 2019-05-07 2019-04-29 2019-06-06 2019-06-25 / Acquisition de mobilier de b dination tions nvelope ureau CI-WACA CI-107761-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 40,000.00 0.00 Canceled 2019-05-05 2019-06-04 2019-06-25 / Acquisition de matériel de b dination tions nvelope ureau CI-WACA CI-110220-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Acquisition et installation d' IDA / 62120 Post Open - National 50,000.00 0.00 Canceled 2019-05-15 2019-06-17 2019-08-16 dination tions nvelope un groupe électrogène CI-WACA CI-107604-GO-DIR Component 2: Strengthening / Acquisition des données his Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 200,000.00 0.00 2019-05-24 2019-05-29 2019-06-16 2019-07-16 toriques des littoraux de l'Afri ementation ramework que de l'Ouest avec la sociét é CEREMA CI-WACA CI-164263-NC-DIR / CONTRAT AVEC COMAFRIQU E TECHNOLOGIE POUR LA FO Component 2: Strengthening URNITURE DES LOGICIELS AR IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 31,549.00 28,039.66 Completed 2020-03-16 2020-05-26 2020-03-21 2020-06-11 2020-04-05 2020-06-19 2020-06-04 2020-07-23 CGIS POUR LA MISE EN PLAC ramework E DU GÉOPORTAIL DE L’OBSE RVATOIRE NATIONAL DU LITT ORAL CI-WACA CI-164296-GO-RFQ Component 3: Strengthening Request for Quota Single Stage - One E / ACQUISITION FOURS AMELI IDA / 62120 National Physical and Social Post Open - National 10,000.00 0.00 Canceled 2020-06-14 2020-07-21 2020-09-19 tions nvelope ORES Investments CI-WACA CI-164297-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / ACQUISITION DE CARBURA IDA / 62120 Post Open - National 40,000.00 17,326.60 Completed 2020-03-31 2020-05-06 2019-06-28 2020-12-31 2019-08-15 dination tions nvelope NT POUR LES VÉHICULES DU PROJET CI-WACA CI-164300-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / ACQUISITION DE FOURNITU IDA / 62120 Post Open - National 16,000.00 17,180.21 Signed 2020-04-06 2020-05-11 2020-05-27 2020-06-10 2020-06-11 dination tions nvelope RES ET CONSOMMABLES INF ORMATIQUES CI-WACA CI-164301-GO-RFQ / Acquisition de petits matéri Component 4: National Coor Request for Quota Single Stage - One E els, fournitures de bureau et IDA / 62120 Post Open - National 30,000.00 26,845.62 Completed 2020-03-30 2020-04-30 2020-05-27 2020-05-30 2020-05-27 dination tions nvelope documentation (papier, class eur) pour l'UCP et pour les kit s des ateliers Page 1 CI-WACA CI-164302-GO-RFQ / ACQUISITION DE MATERIEL ET OUTILLAGE TECHNIQUE ( Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 14,000.00 13,176.06 Completed 2020-04-28 2020-05-30 2019-11-01 2020-06-29 2019-11-01 GPS,Gilets,Rallonges,Multipri dination tions nvelope ses, Appareils photos,Chauss ures de sécurités, Casques...) CI-WACA CI-164303-GO-RFQ / Acquisition de meubles de r angement, Bureaux, de chais Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 30,000.00 0.00 Canceled 2020-03-29 2020-04-30 2020-05-30 es, chaises visiteurs, au profi dination tions nvelope t de l'équipe du projet, store, rideau, étiquettage des porte s CI-WACA CI-164305-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Fourniture et installation de IDA / 62120 Post Open - National 3,000.00 2,590.53 Completed 2020-03-30 2020-05-05 2020-05-19 2020-06-04 2020-05-19 dination tions nvelope trois (3) splits CI-WACA CI-164298-GO-RFQ / Acquisition de matériel infor Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 30,000.00 25,691.39 Completed 2020-06-08 2020-07-16 2020-07-01 2020-08-15 2020-07-08 matique pour le personnel en dination tions nvelope complément de ceux acquis en 2019 CI-WACA CI-173392-GO-RFQ / Acquisition de kits sanitaire Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 20,500.00 1,843,472.18 Signed 2020-06-13 2020-07-28 2020-07-16 2020-08-27 s pour le personnel de l'UCP dination tions nvelope dans le cadre de la préventio n du COVID-19 CI-WACA CI-193336-GO-DIR / CONTRAT AVEC TOTAL CI P OUR LA FOURNITURE DE CAR Component 3: Strengthening BURANT POUR LES VEHICULE IDA / 62120 National Physical and Social Post Direct Selection Direct 40,000.00 35,772.20 Signed 2020-10-12 2020-10-01 2020-10-22 2020-09-28 2020-11-06 2020-11-10 2020-12-06 S DE L'UCP ET DES STRUCTU Investments RES PATENAIRES POUR L'EXE CUTION DES ACTIVITES TECH NIQUES. CI-WACA CI-107606-GO-RFQ Component 3: Strengthening / Acquisition des fours amélio Request for Quota Single Stage - One E Pending Impl IDA / 62120 National Physical and Social Post Open - National 10,000.00 0.00 2020-11-10 2020-11-29 2020-12-29 rés pour le fumage de poisso tions nvelope ementation Investments n à mettre à disposition des communautés CI-WACA CI-164294-GO-RFB / Fourniture en équipements et logiciels aux structures na Component 2: Strengthening Open - Internationa Single Stage - One E Pending Impl tionales de collecte de donné IDA / 62120 the Policy and Institutional F Post Request for Bids 1,000,000.00 0.00 2020-11-12 2020-11-17 2021-01-01 2021-01-16 2021-02-13 2021-05-14 l nvelope ementation es hydrométéo climatiques ( ramework SODEXAM, ONPC, plateforme nationale RRC, CRO, ANDE, C IAPOL) CI-WACA CI-221912-GO-RFQ -KK-21 / ACQUISITION D'EQUI PEMENT AU PROFIT DES POS Component 3: Strengthening Request for Quota Single Stage - One E Under Imple TES DE COMMANDEMENT ET IDA / 62120 National Physical and Social Post Open - National 40,000.00 0.00 2021-09-26 2021-12-27 2021-11-21 2022-05-20 tions nvelope mentation DE CONTROLE D'ALERTE ( FO Investments RMATION DES ADMINISTRAT EURS A L'UTILISATION DES E QUIPEMENTS) CI-WACA CI-234851-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E -KK-21 / FOURNITURE ET CO IDA / 62120 Post Limited 30,000.00 25,361.01 Completed 2021-06-12 2021-06-04 2021-08-07 2021-07-17 2022-02-03 2021-08-04 dination tions nvelope NSOMMABLE DE MATERIELS I NFORMATIQUES CI-WACA CI-234854-GO-RFQ -KK-21 / ACQUISITION DE PET Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Limited 20,000.00 11,417.63 Completed 2021-06-14 2021-06-04 2021-08-09 2021-07-17 2022-02-05 2021-08-13 ITS MATERIELS, FOURNITURE dination tions nvelope DE BUREAU ET DOCUMENTA TION CI-WACA CI-234912-GO-RFQ KK-21 / Acquérir des kits sani Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Limited 40,000.00 24,928.24 Completed 2021-06-14 2021-06-02 2021-08-09 2021-07-14 2022-02-05 2021-08-05 taires pour le personnel de l' dination tions nvelope UCP dans le cadre de la COVI D-19 CI-WACA CI-256941-GO-RFB- BV-21 / ACQUISITION D'ÉQUI PEMENTS POUR LES STRUCT Component 2: Strengthening Open - Internationa Single Stage - One E URES NATIONALES DE COLLE IDA / 62120 the Policy and Institutional F Post Request for Bids 1,000,000.00 72,314.55 Signed 2021-11-03 2021-11-24 2021-11-08 2021-12-20 2022-02-07 2022-01-19 2022-03-11 2022-02-23 2022-05-16 2022-08-22 l nvelope CTE DE DONNÉES HYDROME ramework TEOCLIMATIQUES (SODEXAM , ONPC, PLATEFORME NATIO NALE RRC, CRO, ANDE, CIAP OL) CI-WACA CI-280727-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Under Imple -BV-22 / ACQUISITION DU MA IDA / 62120 Post Limited 6,000.00 0.00 2022-03-24 2022-11-04 2022-04-19 2022-05-19 dination tions nvelope mentation TERIEL INFORMATIQUE CI-WACA CI-280736-GO-RFQ -BV-22 / ACQUISITION DES PE Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 10,000.00 0.00 2022-04-01 2022-04-25 2022-05-25 TITS MATERIELS, FOURNITUR dination tions nvelope ementation ES DE BUREAU ET DOCUMEN TATION CI-WACA CI-280745-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E -BV-22 / ACQUISITION DES F IDA / 62120 Post Limited 10,000.00 1,615.75 Completed 2022-04-06 2022-05-16 2022-04-27 2022-06-21 2022-05-27 2022-07-20 dination tions nvelope OURNITURES ET MATERIEL T ECHNIQUE CI-WACA CI-280890-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Under Imple -BV-22 / ACQUISITION DU MO IDA / 62120 Post Limited 30,000.00 0.00 2022-04-01 2022-08-17 2022-04-29 2022-05-29 dination tions nvelope mentation BILIER DE BUREAU CI-WACA CI-280919-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E -BV-22 / ACQUISITION DU MA IDA / 62120 Post Limited 20,000.00 14,304.51 Completed 2022-04-06 2022-05-10 2022-05-02 2022-06-10 2022-06-01 2022-06-21 dination tions nvelope TERIEL DE BUREAU CI-WACA CI-280732-GO-RFQ -BV-22 / ACQUISITION DES F Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Limited 40,000.00 30,197.30 Completed 2022-03-29 2022-04-04 2022-04-20 2022-05-13 2022-04-23 2022-06-14 OURNITURES ET CONSOMMA dination tions nvelope BLES POUR LE MATERIEL INF ORMATIQUE CI-WACA CI-280952-GO-RFQ -BV-22 / ACQUISITION DES KI Component 4: National Coor Request for Quota Single Stage - One E TS SANITAIRES POUR LE PER IDA / 62120 Post Limited 24,000.00 14,593.18 Signed 2022-04-06 2022-05-10 2022-05-02 2022-06-14 2022-06-01 dination tions nvelope SONNEL DE L'UCP DANS LE C ADRE DE LA COVID-19 Page 2 CI-WACA CI-293237-GO-RFQ -BV22 / Acquisition de matéri els et outillages dans le cadr Component 3: Strengthening Request for Quota Single Stage - One E Under Imple e de l'appui aux communaut IDA / 62120 National Physical and Social Post Limited 80,000.00 0.00 2022-10-11 2022-09-01 2022-11-03 2022-12-05 tions nvelope mentation és pour la réalisation des tra Investments vaux de plantation et réhabili tation des mangroves et pour la création de parc à bois CI-WACA CI-323206-GO-RFB- BV 22 / Acquisition d’équipe Component 2: Strengthening Single Stage - One E ments océanographiques et IDA / 62120 the Policy and Institutional F Post Request for Bids Open - National 679,480.00 0.00 Canceled 2022-11-16 2022-11-21 2022-12-21 2023-01-05 2023-02-09 2023-08-08 nvelope bathymétriques pour le Cent ramework re de Recherche Océanologiq ue (CRO) CI-WACA CI-341768-GO-RFB- 23 / Acquisition d’équipemen Component 2: Strengthening Single Stage - One E Pending Impl ts et de logiciels de collecte IDA / 62120 the Policy and Institutional F Post Request for Bids Open - National 679,480.00 0.00 2023-02-28 2023-03-06 2023-04-05 2023-04-20 2023-05-25 2023-11-21 nvelope ementation de données hydrométeoclim ramework atiques au Centre de Recher che Océanologique (CRO) CI-WACA CI-343731-GO-RFB- 23 / Acquisition houlographe Component 2: Strengthening Single Stage - One E Pending Impl et marégraphe et logiciels au IDA / 62120 the Policy and Institutional F Post Request for Bids Open - National 700,000.00 0.00 2023-03-22 2023-03-27 2023-04-26 2023-05-11 2023-05-23 2024-05-17 nvelope ementation x structures nationales de col ramework lecte de données océaniques CI-WACA CI-343807-GO-RFQ -23 / Acquisition de matériels et outillages complémentaire Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl s dans le cadre de l'appui au IDA / 62120 National Physical and Social Post Limited 40,000.00 0.00 2023-03-29 2023-04-26 2023-05-26 tions nvelope ementation x communautés pour la créat Investments ion de forêts communautaire s et de la restauration des m angroves CI-WACA CI-343790-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Pending Impl -23 / Acquisition de deux véh IDA / 62120 Post Limited 120,000.00 0.00 2023-03-24 2023-04-21 2023-04-24 dination tions nvelope ementation icules pour le projet WACA CI-WACA CI-354396-GO-RFQ Component 2: Strengthening -23 / Acquisition de matériel i Request for Quota Single Stage - One E Pending Impl IDA / 62120 the Policy and Institutional F Post Limited 70,000.00 0.00 2023-04-26 2023-05-25 2023-06-19 nformatique au profit du rése tions nvelope ementation ramework au des maires de la zone côti ère CI-WACA CI-354397-GO-RFQ Component 2: Strengthening -23 / Acquisition de mobilier Request for Quota Single Stage - One E Pending Impl IDA / 62120 the Policy and Institutional F Post Limited 20,000.00 0.00 2023-04-26 2023-05-25 2023-06-19 de bureau au profit du résea tions nvelope ementation ramework u des maires de la zone côtiè re CI-WACA CI-357672-GO-RFQ -23 / Acquisition de matériel i Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 30,000.00 0.00 2023-05-17 2023-06-14 2023-06-29 nformatique pour l'Unité de c dination tions nvelope ementation oordination du projet WACA CI-WACA CI-357679-GO-RFQ -23 / Acquisition de fournitur Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 34,000.00 0.00 2023-05-16 2023-06-09 2023-06-24 e et consommable pour le m dination tions nvelope ementation atériel informatique CI-WACA CI-357686-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 30,000.00 0.00 2023-05-16 2023-06-09 2023-06-24 -23 / Acquisition de matériel dination tions nvelope ementation de bureau CI-WACA CI-362362-GO-DIR- 23 / Acquisition d’ équipeme Component 2: Strengthening nts et logiciels des structures Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 120,000.00 0.00 2023-05-30 2023-06-01 2023-07-03 2023-12-30 nationales de collecte de don ementation ramework nées hydrométéoclimatiques complémentaires à la directi on de l’hydrologie CI-WACA CI-362341-GO-RFQ Component 2: Strengthening -23 / Acquisition de FLYBOX e Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 21,600.00 0.00 2023-07-04 2023-07-06 2023-07-30 2023-08-29 t abonnement internet avec ementation ramework Orange Côte d'Ivoire au profi t du réseau des maires CI-WACA CI-368884-GO-RFQ -23 / Acquisition de petits ma Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 10,000.00 0.00 2023-07-06 2023-08-04 2023-09-03 tériels, fournitures de bureau dination tions nvelope ementation et documentation CI-WACA CI-368888-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Pending Impl -23 / Acquisition des fournitur IDA / 62120 Post Limited 30,000.00 0.00 2023-07-14 2023-08-11 2023-09-10 dination tions nvelope ementation es et matériel technique CI-WACA CI-368890-GO-RFQ Component 4: National Coor Request for Quota Single Stage - One E Pending Impl -23 / Acquisition de mobilier IDA / 62120 Post Limited 30,000.00 0.00 2023-07-13 2023-08-11 2023-09-10 dination tions nvelope ementation de bureau au profit du projet WACA NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107765-NC-RFQ Component 3: Strengthening Request for Quota Single Stage - One E / Production des outils d'app IDA / 62120 National Physical and Social Post Open - National 10,000.00 0.00 Canceled 2019-07-16 2019-08-15 2019-09-05 tions nvelope ui au Dialogue social Investments CI-WACA CI-107791-NC-RFQ / Production des supports de Component 3: Strengthening Request for Quota Single Stage - One E communication et gadgets (B IDA / 62120 National Physical and Social Post Open - National 30,000.00 15,784.70 Completed 2019-04-30 2019-05-30 2019-10-23 2019-06-29 2019-12-20 tions nvelope ranting de véhicules, flyers, k Investments akemonos, banderoles, tee-s hirt, etc.) CI-WACA CI-107803-NC-RFQ Component 3: Strengthening Request for Quota Single Stage - One E / Confection des panneaux di IDA / 62120 National Physical and Social Post Open - National 6,000.00 3,385.98 Completed 2019-04-28 2019-05-28 2019-10-23 2019-06-27 2020-03-17 tions nvelope rectionnels et d'enseigne du Investments WACA CI-WACA CI-107814-NC-DIR / Contrat avec AGOSOFT pour l e paramétrage et l'assistanc Component 4: National Coor IDA / 62120 Post Direct Selection Direct 40,000.00 45,087.46 Completed 2019-04-09 2019-07-03 2019-04-14 2019-08-23 2019-04-28 2019-08-06 2019-05-28 2019-09-03 e du logiciel de comptabilité dination TOMPRO et la livraison de TO MARCHE (y compris formatio n Page 3 CI-WACA CI-107815-NC-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 6,000.00 4,519.75 Completed 2019-05-12 2019-06-11 2020-05-15 2019-07-11 2020-06-09 / Assurance des véhicules dination tions nvelope CI-WACA CI-107816-NC-DIR / Component 4: National Coor Contrat d'entretien et de rép IDA / 62120 Post Direct Selection Direct 9,000.00 0.00 Canceled 2019-05-02 2019-05-07 2019-05-22 2019-06-21 dination aration des véhicules avec le concessionnaire CI-WACA CI-107817-NC-DIR / Component 4: National Coor Contrat de bail pour la locati IDA / 62120 Post Direct Selection Direct 55,200.00 61,588.71 Completed 2019-04-01 2019-02-06 2019-04-06 2019-01-22 2019-04-18 2019-01-17 2020-04-12 2019-01-24 dination on du siège du projet avec M. FIANKAN CI-WACA CI-108336-NC-RFQ / Service d'entretien, de nett Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 19,200.00 12,926.48 Completed 2019-05-01 2020-01-07 2019-05-24 2019-06-12 2020-05-18 2020-01-01 oyage, de livraison de fournit dination tions nvelope ures et produits d'entretien CI-WACA CI-108337-NC-RFQ Component 4: National Coor Request for Quota Single Stage - One E / Couverture Assurance santé IDA / 62120 Post Open - National 100.00 5,671.87 Signed 2019-04-23 2019-05-27 2019-07-18 2020-05-21 dination tions nvelope du personnel CI-WACA CI-109988-NC-DIR / Convention avec l'OIPR pour l Component 4: National Coor es activités de restauration d IDA / 62120 Post Direct Selection Direct 60,000.00 0.00 Canceled 2019-09-10 2019-09-11 2019-09-26 2020-09-25 dination u Parc National d'Azagny et l e Parc National des Iles Ehotil és CI-WACA CI-110226-NC-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 19,200.00 10,557.10 Completed 2019-04-21 2019-11-27 2019-06-16 2019-05-06 2020-06-15 2020-01-01 / Services de gardiennage dination tions nvelope CI-WACA CI-110211-NC-RFQ / Installation d'un système d' Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 30,000.00 0.00 Canceled 2019-06-01 2019-06-30 2019-07-30 archivage électronique des d dination tions nvelope ocuments du projet CI-WACA CI-130047-NC-RFQ / Fourniture et installation d' Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 92,000.00 228,186.03 Signed 2019-09-28 2019-11-23 2020-02-14 2019-12-23 2020-02-19 un système de visioconféren dination tions nvelope ce pour projet WACA CI-WACA CI-164284-NC-DIR / Contrat avec ATLANTIQUE AS SURANCE POUR LA FOURNIT Component 4: National Coor URE DE SERVICE D’ASSURAN IDA / 62120 Post Direct Selection Direct 23,136.00 11,469.96 Completed 2020-03-17 2020-04-09 2020-03-22 2020-06-09 2020-04-17 2020-07-24 2020-10-14 2020-07-28 dination CE MALADIE ET INDIVIDUELL E ACCIDENT POUR LE PERSO NNEL DU PROJET WACA AU TI TRE DE L’ANNEE 2020 CI-WACA CI-164307-NC-RFQ / Recrutement d'un prestatai Component 3: Strengthening re pour produire les supports Request for Quota Single Stage - One E IDA / 62120 National Physical and Social Post Open - National 28,000.00 0.00 Canceled 2020-05-24 2020-07-08 2020-09-06 de sensibilisation (spot audio tions nvelope Investments visuelle, des contenus audio, PLV, boite à outils, etc.) et Ed ition des documents du MGP CI-WACA CI-130049-NC-RFQ / Services d'entretien des ins Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 10,000.00 7,133.58 Completed 2020-04-13 2020-06-08 2020-04-03 2020-12-31 2020-04-09 tallations électriques du proj dination tions nvelope et (Splits, sanitaire et plombe rie) CI-WACA CI-164401-NC-DIR / Renouvellement du contrat d Component 4: National Coor IDA / 62120 Post Direct Selection Direct 55,200.00 49,270.97 Completed 2020-03-16 2019-01-15 2020-03-21 2020-02-03 2020-03-28 2020-02-13 2020-12-03 2020-03-25 e bail pour la location du sièg dination e du projet avec M. FIANKAN CI-WACA CI-164476-NC-RFQ / ENTRETIEN ET REPARATION Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 6,000.00 799.58 Completed 2020-05-12 2020-06-24 2020-07-21 2020-12-31 2020-07-21 DU MATERIEL INFORMATIQUE dination tions nvelope ET DU MOBILIER DE BUREAU CI-WACA CI-164480-NC-DIR / CONTRAT AVEC CFAO MOTO Component 4: National Coor Pending Impl IDA / 62120 Post Direct Selection Direct 20,000.00 0.00 2020-04-29 2020-05-04 2020-05-28 2020-12-31 RS POUR L'ENTRETIEN ET LA dination ementation REPARATION DES VEHICULES CI-WACA CI-164504-NC-RFQ Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Open - National 6,000.00 3,547.87 Signed 2020-03-19 2020-04-22 2020-05-15 2020-10-19 2020-05-15 / ASSURANCE DES VEHICULE dination tions nvelope S CI-WACA CI-164498-NC-DIR / Convention avec l'OIPR pour l Component 3: Strengthening es activités de restauration d IDA / 62120 National Physical and Social Post Direct Selection Direct 400,000.00 358,910.00 Signed 2020-06-08 2020-09-17 2020-06-13 2020-09-04 2020-07-18 2020-10-15 2023-08-16 u Parc National d’Azagny et l Investments e Parc National des Iles Ehotil és sur la durée du projet CI-WACA CI-164280-NC-DIR / CONTRAT AVEC EBEN COTE Component 4: National Coor IDA / 62120 Post Direct Selection Direct 25,156.00 22,517.48 Completed 2020-03-17 2019-11-13 2020-03-22 2019-12-05 2020-04-06 2020-03-27 2020-04-26 2020-03-27 D'IVOIRE POUR L'ENTRETIEN dination DES LOCAUX DU PROJET WA CA AU TITRE DE 2020 CI-WACA CI-164278-NC-DIR / CONTRAT AVEC EZITO SECU Component 4: National Coor IDA / 62120 Post Direct Selection Direct 19,695.00 17,210.44 Completed 2020-06-04 2019-12-12 2020-06-09 2019-11-13 2020-06-24 2020-03-31 2021-03-21 2020-03-31 RITE POUR LE GARDIENNAGE dination DES LOCAUX DU PROJET WA CA AU TITRE DE 2020 CI-WACA CI-193342-NC-RFQ / RECRUTEMENT D'UN PREST ATAIRE POUR L'EDITION DES Component 3: Strengthening Request for Quota Single Stage - One E DOCUMENTS DU MGP ( MAN IDA / 62120 National Physical and Social Post Open - National 30,000.00 27,135.50 Signed 2020-10-24 2020-11-19 2020-10-15 2020-12-29 tions nvelope UEL SIMPLIFIE, DEPLIANTS D Investments U MGP, SUPPORT DE FONCTI ONNEMENT DES ORGANES D U MGP) CI-WACA CI-193345-NC-RFQ / RECRUTEMENT D'UN PREST ATAIRE POUR L'ORGANISATI Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl ON D'UNE CAMPAGNE DE CO IDA / 62120 National Physical and Social Post Open - National 5,000.00 0.00 2020-11-15 2021-01-10 2021-07-09 tions nvelope ementation MMUNICATION DIGITAL DE S Investments ENSIBILISATION SUR L'IMPOR TANCE DE LA PRESERVATION DU LITTORAL. CI-WACA CI-198606-NC-DIR / Component 3: Strengthening Contrat avec la société AEG IDA / 62120 National Physical and Social Post Direct Selection Direct 17,786.00 19,410.12 Signed 2020-10-22 2020-12-17 2020-10-27 2020-10-09 2020-12-01 2020-12-23 2021-05-30 pour la connexion internet de Investments la fibre optique du système d e visioconférence Page 4 CI-WACA CI-218784-NC-RFQ- KK-21 / Recrutement d'un pr estataire pour la confection d Component 2: Strengthening e stand, kits, supports et gad Request for Quota Single Stage - One E IDA / 62120 the Policy and Institutional F Post Open - National 42,000.00 0.00 Canceled 2021-04-20 2021-06-15 2021-12-12 get dans le cadre des activité tions nvelope ramework s de la Quinzaine Nationale d e l'Environnement et du Dév eloppement Durable (QNEDD ) et du SARA. CI-WACA CI-218794-NC-DIR- Component 3: Strengthening KK-21 / Maintenance de la pl Pending Impl IDA / 62120 National Physical and Social Post Direct Selection Direct 6,000.00 0.00 2021-05-03 2021-05-08 2021-06-12 2021-12-09 ateforme numérique d'enregi ementation Investments strement et de suivi des plai ntes CI-WACA CI-218795-NC-RFQ- Component 3: Strengthening Request for Quota Single Stage - One E KK-21 / Production de suppor IDA / 62120 National Physical and Social Post Open - National 40,000.00 34,073.95 Signed 2021-06-14 2021-08-09 2021-07-20 2022-02-05 tions nvelope ts de sensibilisation et de co Investments mmunication CI-WACA CI-218796-NC-RFQ- KK-21 / Recrutement d'un pr Component 3: Strengthening estataire pour l'organisation Request for Quota Single Stage - One E Pending Impl IDA / 62120 National Physical and Social Post Open - National 20,000.00 0.00 2021-03-28 2021-05-23 2021-11-19 d'une campagne de commun tions nvelope ementation Investments ication digitale de sensibilisat ion sur l'importance de la pré servation du littoral CI-WACA CI-218797-NC-RFQ- Component 3: Strengthening Request for Quota Single Stage - One E KK-21 / Conception et produc IDA / 62120 National Physical and Social Post Open - National 12,000.00 4,332.31 Signed 2021-03-28 2021-05-23 2021-07-20 2021-11-19 tions nvelope tion d'un bulletin d'informatio Investments n sur le WACA CI-WACA CI-221916-NC-RFQ- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl KK-21 / NETTOYAGE DU RESE IDA / 62120 National Physical and Social Post Open - National 30,000.00 0.00 2021-05-26 2021-07-21 2022-01-17 tions nvelope ementation AU PLUVIAL Investments CI-WACA CI-221919-NC-RFQ- Component 3: Strengthening KK-21 / CAMPAGNE DE SENSI Request for Quota Single Stage - One E Pending Impl IDA / 62120 National Physical and Social Post Open - National 50,000.00 0.00 2021-05-25 2021-07-20 2022-01-16 BILISATION AUX RISQUES ET tions nvelope ementation Investments A LA GESTION DES DECHETS CI-WACA CI-221921-NC-RFQ- KK-21 / SURVEILLANCE DU R Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl ESEAU PLUVIAL DE GRAND-L IDA / 62120 National Physical and Social Post Open - National 10,000.00 0.00 2021-06-30 2021-08-25 2022-02-21 tions nvelope ementation AHOU ( CONNEXION AU SYST Investments EME D'ALERTE ET AU SIG ) CI-WACA CI-218792-NC-DIR- Component 2: Strengthening KK-21 / Contrat avec COMAF IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 22,000.00 14,396.52 Signed 2021-03-16 2021-07-19 2021-03-21 2021-07-19 2021-04-25 2021-09-03 2021-10-22 RIQUE TECHNOLOGIE pour l'a ramework cquisition de la licence ARCG IS CI-WACA CI-221922-NC-DIR- Component 4: National Coor Under Imple KK-21 / MAINTENANCE DE L'A IDA / 62120 Post Direct Selection 18,000.00 0.00 2021-05-26 2021-09-08 2021-05-31 2021-09-08 2021-07-05 2022-01-01 dination mentation PPLICATION DE SUIVI-EVALU ATION RUCHE CI-WACA CI-218805-CW-DIR- KK-21 / Contrat avec le Grou pement R&D pour la prise en Component 4: National Coor Pending Impl IDA / 62120 Post Direct Selection Direct 13,400.00 0.00 2021-03-29 2021-04-03 2021-05-08 2021-11-04 charge des frais additifs dus dination ementation à l'incidence de la Covid-19 s ur l'étude quantitative des ris ques naturels. CI-WACA CI-218790-NC-DIR- Component 2: Strengthening KK-21 / Hébergement et mai IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 6,000.00 5,170.58 Signed 2021-03-16 2021-05-04 2021-03-21 2021-05-04 2021-04-25 2021-07-09 2021-10-22 ntenance du site internet de ramework SGIE par Entente Directe ave c le consultant MAP CI-WACA CI-218782-NC-DIR- KK-21 / CONVENTION AVEC L' Component 2: Strengthening URPCI POUR LA DIFFUSION D IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 20,000.00 17,181.00 Signed 2021-04-15 2021-05-19 2021-04-20 2021-07-27 2021-05-25 2021-08-13 2021-11-21 ES MESSAGES DE SENSIBILIS ramework ATION A TRAVERS LES RADIO S DE PROXIMITE CI-WACA CI-234840-NC-DIR- KK-21 / ENTRETIEN ET MAINT ENANCE DES LOGICIELS DE C Component 4: National Coor IDA / 62120 Post Direct Selection Direct 10,000.00 8,323.30 Signed 2021-05-27 2021-07-23 2021-06-01 2021-07-23 2021-07-06 2021-08-18 2022-01-02 OMPTABILITE TOM2PRO ; TO dination M2PAIE ET DE PASSATION DE S MARCHES TOM2MARCHE A VEC LE CABINET AGOSOFT. CI-WACA CI-234861-NC-DIR- KK-21 / RENOUVELLEMENT D Component 4: National Coor Pending Impl IDA / 62120 Post Direct Selection Direct 60,000.00 0.00 2021-05-31 2021-06-05 2021-07-10 2022-01-06 U CONTRAT DE BAIL AU TITR dination ementation E DE L'ANNEE 2021 CI-WACA CI-234865-NC-RFQ- KK-21 / ENTRETIEN DES LOC Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 30,000.00 0.00 2021-06-13 2021-08-08 2022-02-04 AUX Y COMPRIS LE MATERIEL dination tions nvelope ementation ET FOURNITURE D'ENTRETIE N CI-WACA CI-234848-NC-RFQ- Component 4: National Coor Request for Quota Single Stage - One E Pending Impl KK-21 / ASSURANCE DU MAT IDA / 62120 Post Limited 6,000.00 0.00 2021-06-14 2021-08-09 2022-02-05 dination tions nvelope ementation ERIEL ROULANT AU TITRE DE L'ANNEE 2021 CI-WACA CI-234867-NC-RFQ- Component 4: National Coor Request for Quota Single Stage - One E KK-21 / ENTRETIEN ET REPAR IDA / 62120 Post Limited 30,000.00 17,752.63 Completed 2021-06-14 2021-06-03 2021-08-09 2021-08-05 2022-02-05 2021-09-10 dination tions nvelope ATION DU MATERIEL INFORM ATIQUE CI-WACA CI-234837-NC-RFQ- KK-21 / CONTRAT AVEC SAHA Component 4: National Coor Pending Impl IDA / 62120 Post Direct Selection Direct 40,000.00 0.00 2021-06-03 2021-06-08 2021-07-13 2022-07-13 M POUR L'ASSURANCE DU PE dination ementation RSONNEL AU TITRE DE L'AN NEE 2021 CI-WACA CI-234869-NC-RFQ KK 21 / ENTRETIEN ET REPAR Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 20,000.00 0.00 2021-06-15 2021-08-10 2022-02-06 ATION DU MATERIEL ET MOBI dination tions nvelope ementation LER SAUF INFORMATIQUE CI-WACA CI-234874-NC-RFQ Component 4: National Coor Request for Quota Single Stage - One E KK-21 / FOURNITURE DE SER IDA / 62120 Post Limited 30,000.00 21,895.47 Signed 2021-06-14 2021-08-24 2021-08-09 2021-10-27 2022-02-05 dination tions nvelope VICE DE GARDIENNAGE CI-WACA CI-221917-NC-RFQ- Component 3: Strengthening Request for Quota Single Stage - One E KK-21 / IMPRESSION DES GUI IDA / 62120 National Physical and Social Post Limited 26,000.00 0.00 Canceled 2021-11-27 2021-11-19 2022-01-22 2022-07-21 tions nvelope DES D'UTILISATION DES PEST Investments ICIDES Page 5 CI-WACA CI-235346-NC-RFQ- KK-21 / Entretien et mainten Component 4: National Coor Request for Quota Single Stage - One E Pending Impl ance des installations électri IDA / 62120 Post Limited 5,328.00 0.00 2021-11-02 2021-12-28 2022-06-26 dination tions nvelope ementation ques (climatiseurs, groupe él ectrogène, sanitaire et plomb erie) CI-WACA CI-283866-NC-RFQ- Component 4: National Coor Request for Quota Single Stage - One E Under Imple BV 22 / Recrutement d'un pr IDA / 62120 Post Limited 20,000.00 0.00 2022-04-06 2022-06-30 2022-04-27 2022-05-27 dination tions nvelope mentation estataire pour la fourniture d e carburant CI-WACA CI-283869-NC-RFQ- Component 4: National Coor Request for Quota Single Stage - One E Pending Impl BV 22 / Recrutement d'un pr IDA / 62120 Post Limited 48,000.00 0.00 2022-04-06 2022-04-27 2022-05-27 dination tions nvelope ementation estataire pour le service de g ardiennage CI-WACA CI-283871-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Request for Quota Single Stage - One E Pending Impl estataire pour l'entretien de IDA / 62120 Post Limited 24,000.00 0.00 2022-04-12 2022-05-03 2022-06-02 dination tions nvelope ementation s installations électriques, cli matiseurs, sanitaires et plom berie CI-WACA CI-281180-NC-RFQ- BV 22 / Recrutement d’un pr Component 4: National Coor Request for Quota Single Stage - One E estataire pour la prise en cha IDA / 62120 Post Limited 50,000.00 25,344.84 Signed 2022-04-06 2022-04-01 2022-04-27 2022-05-13 2022-05-27 dination tions nvelope rge de l’assurance maladie d u personnel contractuel de l’ UCP CI-WACA CI-293221-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Limited 74,000.00 48,050.94 Signed 2022-06-14 2022-05-16 2022-07-05 2022-06-21 2022-09-03 estataire pour la fourniture e dination tions nvelope t l’installation d’équipements de visioconférence CI-WACA CI-293226-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Request for Quota Single Stage - One E IDA / 62120 Post Limited 36,000.00 13,334.65 Signed 2022-06-22 2022-05-16 2022-07-13 2022-07-25 2022-12-10 estataire pour l'entretien et l dination tions nvelope a réparation du matériel infor matique CI-WACA CI-293228-NC-RFQ- BV 22 / Recrutement d'un pr Component 4: National Coor Request for Quota Single Stage - One E Under Imple estataire pour l'entretien et l IDA / 62120 Post Limited 12,000.00 0.00 2022-06-22 2022-08-16 2022-07-13 2022-12-20 dination tions nvelope mentation a réparation du matériel et m obilier sauf informatique CI-WACA CI-293233-NC-DIR- BV22 / Hébergement et main Component 2: Strengthening Under Imple tenance du site internet de S IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 6,000.00 0.00 2022-06-21 2022-05-27 2022-06-22 2022-05-30 2022-07-03 2023-07-03 mentation GIE par Entente Directe avec ramework le cabinet MAP APPLICATION BUILDING CI-WACA CI-293235-NC-DIR- BV22 / Renouvellement et m Component 2: Strengthening Under Imple aintenance de la licence Arc IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 20,000.00 0.00 2022-06-22 2022-06-01 2022-06-23 2022-06-06 2022-07-04 2023-07-04 mentation Gis par Entente Directe avec ramework COMAFRIQUE TECHNOLOGIE (ESRI) CI-WACA CI-299391-NC-RFQ- BV22 / Recrutement d’un pre Component 2: Strengthening stataire pour l’organisation d' Request for Quota Single Stage - One E IDA / 62120 the Policy and Institutional F Post Limited 32,400.00 22,362.65 Signed 2022-06-23 2022-08-11 2022-07-20 2022-10-03 2022-08-19 une campagne médiatique d tions nvelope ramework e sensibilisation d’un mois su r le projet WACA et la loi de g estion du littoral CI-WACA CI-293241-NC-DIR- Component 3: Strengthening BV22 / Maintenance de la pl Pending Impl IDA / 62120 National Physical and Social Post Direct Selection Direct - National 6,000.00 0.00 2022-08-30 2022-08-31 2022-09-29 2023-09-29 ateforme numérique d'enregi ementation Investments strement et de suivi des plai ntes CI-WACA CI-299392-NC-DIR- Component 2: Strengthening Direct - Internation Under Imple BV22 / Maintenance du géop IDA / 62120 the Policy and Institutional F Post Direct Selection 10,000.00 0.00 2022-08-29 2022-05-27 2022-08-30 2022-05-30 2022-09-28 2023-09-28 al mentation ortail du SGIE par Entente Dir ramework ecte CI-WACA CI-320041-NC-DIR- BV 22 / Maintenance annuell Component 4: National Coor Under Imple e des logiciels TOMATE acqui IDA / 62120 Post Direct Selection Direct - National 10,000.00 0.00 2022-10-24 2022-07-04 2022-10-26 2022-07-08 2022-11-30 2023-11-30 dination mentation s (TOM2PRO- TOM2PAIE- TO M2MARCHE) par le projet WA CA CI-WACA CI-323208-NC-DIR- Component 4: National Coor Direct - Internation Under Imple BV 22 / Maintenance de l'app IDA / 62120 Post Direct Selection 6,000.00 0.00 2022-11-07 2022-10-13 2022-11-09 2022-10-19 2022-12-09 2023-12-09 dination al mentation lication de S&E Ruche CI-WACA CI-334494-NC-RFQ -KT 23 / Recrutement d'un pr Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 50,400.00 0.00 2023-01-11 2023-02-08 2023-12-29 estataire pour assurer le serv dination tions nvelope ementation ice de gardiennage CI-WACA CI-334495-NC-RFQ- KT 23 / Recrutement d'un pre Component 4: National Coor Request for Quota Single Stage - One E Pending Impl stataire pour la fourniture de IDA / 62120 Post Limited 10,000.00 0.00 2023-01-11 2023-02-05 2023-12-29 dination tions nvelope ementation services d’assurance des deu x (02) véhicules de marque T OYOTA du projet WACA CI-WACA CI-343809-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Request for Quota Single Stage - One E Pending Impl taire pour l'entretien des inst IDA / 62120 Post Limited 30,000.00 0.00 2023-03-30 2023-04-27 2024-02-27 dination tions nvelope ementation allations électriques, climatis eurs, sanitaires, plomberies e t groupes électrogènes CI-WACA CI-347582-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Request for Quota Single Stage - One E Pending Impl taire pour la prise en charge IDA / 62120 Post Limited 50,000.00 0.00 2023-03-28 2023-04-26 2024-04-25 dination tions nvelope ementation de l'assurance maladie du pe rsonnel du projet WACA CI-WACA CI-347847-NC-RFQ- Component 4: National Coor Request for Quota Single Stage - One E Pending Impl 23 / Recrutement d'un presta IDA / 62120 Post Limited 20,000.00 0.00 2023-03-28 2023-04-25 2023-05-25 dination tions nvelope ementation taire pour l'acquisition de car burant CI-WACA CI-352520-NC-DIR- 23 / Convention avec la Radi Component 2: Strengthening o Côte d'Ivoire pour la produ Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 19,456.80 0.00 2023-04-24 2023-04-26 2023-05-19 2024-05-18 ction et la diffusion des mess ementation ramework ages d’information et de sen sibilisation sur les activités d u WACA Page 6 CI-WACA CI-352524-NC-DIR- 23 / Convention la Radio des Component 2: Strengthening Grands Ponts pour la product Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 8,000.00 0.00 2023-04-17 2023-04-19 2023-05-12 2024-05-11 ion et la diffusion des messa ementation ramework ges d’information et de sensi bilisation sur les activités du WACA CI-WACA CI-352527-NC-RFQ- 23 / Recrutement d'un presta Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 27,000.00 0.00 2023-04-19 2023-05-17 2024-05-16 taire pour l'entretien et la ré dination tions nvelope ementation paration du matériel informat ique CI-WACA CI-357687-NC-DIR- Component 3: Strengthening 23 / Maintenance de la platef Pending Impl IDA / 62120 National Physical and Social Post Direct Selection Direct - National 6,000.00 0.00 2023-05-15 2023-05-17 2023-06-09 2023-12-31 orme numérique d'enregistre ementation Investments ment et de suivi des plaintes CI-WACA CI-358418-NC-DIR- Component 2: Strengthening Pending Impl 23 / MAINTENANCE DU LOGI IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 20,000.00 0.00 2023-05-11 2023-05-12 2023-06-05 2023-12-31 ementation CIEL ARCGIS POUR LE PROJET ramework WACA CI-WACA CI-359450-NC-DIR- Component 2: Strengthening 23 / Maintenance du site int Pending Impl IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 6,000.00 0.00 2023-05-15 2023-05-16 2023-06-07 2023-12-31 ernet du SGIE de l’observatoi ementation ramework re national du littoral de COT E D’IVOIRE CI-WACA CI-362325-NC-DIR- 23 / Convention avec l' opéra Component 3: Strengthening teur Orange Money Côte d'Iv Pending Impl IDA / 62120 National Physical and Social Post Direct Selection Direct - National 60,000.00 0.00 2023-05-30 2023-06-01 2023-07-08 2024-07-07 oire pour les activités d'AGR ementation Investments et de création de forêts com munautaires et restauration des mangroves CI-WACA CI-362843-NC-RFQ- Component 3: Strengthening 23 / Recrutement d'un presta Request for Quota Single Stage - One E Pending Impl IDA / 62120 National Physical and Social Post Limited 24,000.00 0.00 2023-06-07 2023-07-05 2023-08-19 taire pour l'impression de gui tions nvelope ementation Investments de d'utilisation des pesticides CI-WACA CI-368894-NC-DIR- 23 / Entretien et maintenanc Component 4: National Coor Pending Impl e des logiciels de comptabilit IDA / 62120 Post Direct Selection Direct - National 10,000.00 0.00 2023-06-28 2023-06-30 2023-07-21 2023-12-31 dination ementation é Tom2Pro et de passation d e marchés Tom2Marché et as sister l'UCP CI-WACA CI-368904-NC-RFQ- 23 / RECRUTEMENT D'UN PR ESTATAIRE POUR LA REALISA Component 4: National Coor Request for Quota Single Stage - One E Pending Impl IDA / 62120 Post Limited 24,000.00 0.00 2023-07-12 2023-08-21 2023-09-20 TION DE L'ENTRETIEN ET LA dination tions nvelope ementation REPARATION DU MATERIEL E T MOBILIER SAUF INFORMATI QUE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-107811-CS-CQS Component 3: Strengthening / Recrutement d'un consultan Consultant Qualifi Under Implement IDA / 62120 National Physical and Social Post Open - National 10,000.00 0.00 2019-06-18 2020-04-01 2019-07-03 2019-07-10 2019-07-15 2019-07-27 2019-08-26 t pour la Conception et Héber cation Selection ation Investments gement du site (maintenance ) CI-WACA CI-110148-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening pour évaluer les risques pour Quality And Cost- Open - Internationa IDA / 62150 National Physical and Social Post 200,000.00 0.00 Canceled 2019-04-12 2019-06-14 2019-04-27 2019-05-07 2019-05-12 2019-05-17 2019-05-23 2019-06-02 2020-06-01 la zone pilote (inondation côt Based Selection l Investments ière, érosion, système d'alert e précoce de Grand Lahou) CI-WACA CI-110152-CS-CQS / Recrutement d'un cabinet o Component 3: Strengthening u ONG pour la réhabilitation Consultant Qualifi IDA / 62150 National Physical and Social Post Open - National 14,945.00 0.00 Canceled 2019-08-05 2019-08-26 2019-09-04 2019-09-14 2019-09-29 2019-11-28 et la plantation de mangrove cation Selection Investments s (les zones concernées sero nt ciblées dans le complexe l agunaire de Grand-Lahou) CI-WACA CI-110158-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening Quality And Cost- Open - Internationa pour la réalisation de l'étude IDA / 62120 National Physical and Social Post 350,000.00 564,305.59 Signed 2019-04-16 2019-06-13 2019-04-23 2020-03-02 2019-04-30 2019-09-28 2019-05-07 2019-01-31 2019-05-08 2019-05-08 2019-05-14 2019-05-08 2019-05-24 2019-11-10 2020-05-23 2020-05-15 Based Selection l de préfaisabilité de la protect Investments ion du cordon sableux de Gra nd Lahou CI-WACA CI-110160-CS-CQS / Recrutement d'un cabinet p Component 3: Strengthening our réaliser l'étude d'impact Consultant Qualifi Pending Impleme IDA / 62120 National Physical and Social Post Open - National 25,000.00 0.00 2019-05-08 2019-05-29 2019-06-12 2019-06-19 2019-07-13 2019-09-11 environnemental et social po cation Selection ntation Investments ur la réhabilitation et la resta uration des mangroves dans la zone de Grand Lahou CI-WACA CI-110192-CS-QCB S / Recrutement d'un cabinet Component 2: Strengthening Quality And Cost- pour l'élaboration du Plan d' IDA / 62120 the Policy and Institutional F Post Open - National 200,000.00 556,146.55 Signed 2019-05-13 2020-03-02 2019-05-28 2020-04-02 2019-07-11 2020-06-30 2019-08-10 2020-09-02 2019-08-20 2020-09-23 2019-09-03 2020-10-15 2019-09-27 2020-12-11 2019-11-26 Based Selection Aménagement de Gestion du ramework Littoral Ivoirien (PAGLI) (duré e de 6 à 9 mois) CI-WACA CI-110046-CS-QCB S / Recrutement d'un cabinet Component 4: National Coor Quality And Cost- d'audit externe du PPA 2018 IDA / 62120 Post Open - National 30,000.00 14,114.03 Signed 2019-07-25 2019-09-23 2019-08-09 2019-11-26 2019-09-18 2020-03-17 2019-09-20 2020-04-03 2019-10-05 2020-04-03 2019-10-20 2020-04-22 2019-11-09 2020-06-19 2021-10-29 dination Based Selection et pour l'exercice septembre 2018 à décembre2018 et les exercices 2019 et 2020 CI-WACA CI-125661-CS-QCB S / Evaluer les risques pour la Component 3: Strengthening Quality And Cost- Open - Internationa zone pilote (inondation côtiè IDA / 62120 National Physical and Social Post 240,638.00 316,378.47 Completed 2019-08-23 2018-02-28 2019-08-24 2020-03-17 2019-08-26 2019-11-05 2019-08-27 2019-02-14 2019-08-28 2019-02-13 2019-08-30 2019-03-29 2019-09-01 2019-08-26 2020-06-27 2020-08-31 Based Selection l re, érosion, systeme d'alerte Investments precoce de Grand Lahou) CI-WACA CI-164416-CS-QCB Component 2: Strengthening Quality And Cost- S / Recrutement d'un cabinet IDA / 62120 the Policy and Institutional F Post Open - National 112,000.00 728,482.17 Completed 2020-04-22 2020-06-29 2020-05-13 2020-10-02 2020-05-23 2020-12-18 2020-05-27 2021-03-29 2020-06-26 2021-04-16 2020-07-15 2021-05-11 2020-08-08 2021-10-21 2021-01-31 2021-12-21 Based Selection pour élaborer l'EESS du PAGL ramework I Page 7 CI-WACA CI-218818-CS-CQS- Component 3: Strengthening KK-01 / Recrutement d'un ca Consultant Qualifi IDA / 62120 National Physical and Social Post Open - National 300,000.00 257,925.43 Completed 2021-03-30 2021-03-19 2021-04-20 2021-04-28 2021-06-03 2021-05-28 2021-07-03 2021-07-07 2021-08-07 2021-07-27 2022-02-03 2021-09-17 binet pour la réalisation de l' cation Selection Investments EIES de l'option d'adaptation CI-WACA CI-218827-CS-CQS- KK-21 / Recrutement d'un ca Component 3: Strengthening Consultant Qualifi Pending Impleme binet pour la réalisation de l' IDA / 62120 National Physical and Social Post Open - National 300,000.00 0.00 2021-04-28 2021-05-19 2021-07-02 2021-08-01 2021-09-05 2022-03-04 cation Selection ntation EIES de la faisabilité de la sta Investments bilisation du littoral de Port-B ouët CI-WACA CI-218828-CS-CQS- KK-21 / Recrutement d'un ca Component 3: Strengthening Consultant Qualifi Under Implement binet pour la réalisation de l' IDA / 62120 National Physical and Social Post Open - National 80,000.00 0.00 2021-06-03 2021-06-24 2021-08-07 2021-09-06 2021-10-11 2022-04-09 cation Selection ation évaluation environnementale Investments et sociale liée à la mise en œ uvre des AGR CI-WACA CI-221926-CS-QCB S-KK-21 / MISE EN PLACE D'U Component 2: Strengthening Quality And Cost- Pending Impleme N SYSTEME DE GESTION DUR IDA / 62120 the Policy and Institutional F Post Open - National 180,000.00 0.00 2021-09-16 2021-10-07 2021-11-20 2021-12-18 2022-01-17 2022-02-21 2022-03-28 2023-03-28 Based Selection ntation ABLE DES TERRITOIRES: AGE ramework NDA 21, GOUVERNANACE, SI G TERRITORIAL CI-WACA CI-164496-CS-QCB S / Recrutement d'un consult ant pour réaliser un (e) const Component 3: Strengthening at ou étude d’impact environ Quality And Cost- IDA / 62120 National Physical and Social Post Open - National 40,000.00 0.00 Canceled 2020-05-20 2021-03-01 2020-06-10 2020-07-01 2020-07-05 2020-07-15 2020-08-03 2020-08-27 2020-09-08 nemental et social pour la ré Based Selection Investments habilitation et la plantation d es mangroves dans la zone d e Grand Lahou et à Assinie (îl es éhotilés). CI-WACA CI-223165-CS-CQS / RECRUTEMENT D’UN CONS ULTANT POUR LA REALISATIO Component 3: Strengthening N D’UN CONSTAT D'IMPACT E Consultant Qualifi IDA / 62120 National Physical and Social Post Open - National 40,000.00 62,714.07 Completed 2021-03-22 2021-03-22 2021-04-12 2021-04-02 2021-04-22 2021-05-06 2021-04-29 2021-07-07 2021-05-16 2021-07-27 2021-06-20 2021-10-06 NVIRONNEMENTAL ET SOCIA cation Selection Investments L (CIES) DU SOUS-PROJET DE REHABILITATION ET DE PLAN TATION DE MANGROVE DU C OMPLEXE LAGUNAIRE DE GR AND-LAHOU CI-WACA CI-256688-CS-CQS- Component 3: Strengthening BV-21 / RECRUTEMENT D'UN Consultant Qualifi IDA / 62120 National Physical and Social Post Open - National 100,000.00 72,853.44 Signed 2021-10-21 2021-10-22 2021-11-11 2021-12-25 2022-02-03 2022-01-24 2022-02-24 2022-02-28 2022-04-15 2022-08-27 E STRUCTURE ( ONG ou AUT cation Selection Investments RES) POUR L’EXÉCUTION DES AGR CI-WACA CI-218819-CS-CQS- KK-21 / Recrutement d'une O NG pour la réhabilitation, le r Component 3: Strengthening Consultant Qualifi Pending Impleme eboisement des champs de IDA / 62120 National Physical and Social Post Open - National 60,000.00 0.00 2021-08-18 2021-09-08 2021-10-22 2021-11-21 2021-12-26 2022-06-24 cation Selection ntation mangrove et la formation de Investments s communautés dans les zon es ciblées du complexe lagun aire de Grand-Lahou CI-WACA CI-221936-CS-QBS- KK-21 / PLANTATION DE PAR CS A BOIS, FORMATION A LA GESTION DURABLE DES RESS Component 3: Strengthening Consultant Qualifi Pending Impleme OURCES, IDENTIFICATION ET IDA / 62120 National Physical and Social Post Open - National 96,000.00 0.00 2021-10-14 2021-11-04 2021-12-18 2022-01-17 2022-02-21 2022-08-20 cation Selection ntation SECURISATION DES SITES, EL Investments ABORATIONS DES TEXTES RE GLMENETAIRES ET REBOISEM ENTS DES SITES EN ESPECE SELECTIONNE CI-WACA CI-164497-CS-CQS / RECRUTEMENT D'UNE ONG POUR LA RÉHABILITATION ET Component 3: Strengthening LE REBOISEMENT DES CHAM Consultant Qualifi Pending Impleme IDA / 62120 National Physical and Social Post Open - National 72,000.00 0.00 2021-11-04 2021-11-25 2021-12-05 2021-12-10 2022-01-03 2022-04-03 PS DE MANGROVES ET LA FO cation Selection ntation Investments RMATION DES COMMUNAUTÉ S DANS LES ZONES CIBLES DU COMPLEXE LAGUNAIRE D E GRAND-LAHOU CI-WACA CI-218815-CS-CQS- KK-21 / RECRUTEMENT D'UN CONSULTANT POUR L'EVALU ATION ENVIRONNEMENTALE Component 3: Strengthening ET SOCIALE (CIES/EIES) DES Consultant Qualifi IDA / 62120 National Physical and Social Post Open - National 70,000.00 0.00 Canceled 2021-12-20 2022-01-10 2022-02-23 2022-03-25 2022-04-29 2022-10-26 TRAVAUX DE DEBOUCHAGE cation Selection Investments ET ENTRETIEN DU RESEAU PL UVIAL ET DES TRAVAUX DE C ONSTRUCTION DE L'ENTENN E RELAI AU PROFIT DES COM MUNAUTES DE LA ZONE PILO TE DU PROJET WACA CI-WACA CI-218803-CS-CQS- KK-21 / Recrutement d'un co Component 2: Strengthening Quality And Cost- Open - Internationa nsultant pour la conception e IDA / 62120 the Policy and Institutional F Post 200,000.00 0.00 Canceled 2021-12-10 2021-12-31 2022-02-13 2022-03-13 2022-04-12 2022-05-17 2022-06-21 2023-06-21 Based Selection l t la mise en œuvre d'un syst ramework ème d'alerte précoce sur les risques côtiers. CI-WACA CI-264247-CS-CQS Component 2: Strengthening / Recrutement d'un cabinet p Consultant Qualifi Under Implement IDA / 62120 the Policy and Institutional F Post Limited 90,000.00 0.00 2021-12-06 2021-12-17 2021-12-20 2022-01-19 2022-02-23 2022-03-16 our le renforcement des capa cation Selection ation ramework cités des membres du CNP et du CoTech CI-WACA CI-256685-CS-QBS- BV-21 / RECRUTEMENT D'UN Component 2: Strengthening CABINET POUR l’INTEGRATIO Consultant Qualifi IDA / 62120 the Policy and Institutional F Post Open - National 17,000.00 0.00 Canceled 2021-11-25 2021-12-16 2022-01-29 2022-02-28 2022-04-04 2022-10-01 N DU RÉSEAU DANS LE SYST cation Selection ramework ÈME GEODESIQUE NATIONAL (SECTEUR ABIDJAN - ASSINIE) CI-WACA CI-221929-CS-QCB S-KK-21 / ÉTUDE DE FAISABIL ITÉ DU COMBLEMENT ET MIS Component 3: Strengthening E EN SECURITE DES ZONES D Consultant Qualifi IDA / 62120 National Physical and Social Post Open - National 60,000.00 0.00 Canceled 2021-11-17 2021-12-08 2022-01-21 2022-02-20 2022-03-27 2022-09-23 E GLISSEMENTS MAJEURS SU cation Selection Investments R GRAND-LAHOU ET DU DÉB OUCHAGE ET ENTRETIEN DU RÉSEAU PLUVIAL DE GRAND- LAHOU/GESTION DES DÉCHE TS CI-WACA CI-266723-CS-QCB S / Recrutement d'un cabinet Component 3: Strengthening Quality And Cost- Open - Internationa Under Implement pour l'assistance à la constru IDA / 62120 National Physical and Social Prior 3,500,000.00 0.00 2022-01-11 2022-01-04 2022-02-01 2022-02-09 2022-02-15 2022-07-14 2022-04-01 2022-12-01 2022-04-16 2023-02-13 2022-05-21 2022-06-25 2023-06-25 Based Selection l ation ction de l'option d'daptation Investments du cordon sableux de Grand- Lahou. Page 8 CI-WACA CI-293239-CS-LCS- BV22 / Recrutement d'un cab Component 4: National Coor Least Cost Selecti Under Implement IDA / 62120 Post Open - National 40,000.00 0.00 2022-06-30 2022-06-27 2022-07-21 2022-09-03 2022-10-01 2022-10-31 2022-12-05 2023-01-09 2024-01-09 inet pour la réalisation de l'a dination on ation udit 2022 et 2023 du projet WACA CI-WACA CI-312257-CS-CQS- BV22 / Recrutement d'un con sultant pour la réalisation de Component 3: Strengthening l'étude de faisabilité du comb Consultant Qualifi Under Implement IDA / 62120 National Physical and Social Post Open - National 120,000.00 0.00 2022-09-21 2022-09-14 2022-10-05 2022-10-24 2022-10-28 2022-11-07 2023-02-05 lement et mise en sécurité d cation Selection ation Investments es trois zones du glissement majeur sur grand lahou et du débouchage et entretien du r éseau pluvial de Grand-Laho u CI-WACA CI-323228-CS-CQS- BV 22 / Recrutement d’un co nsultant pour la réalisation d’ un diagnostic complet pour l Component 2: Strengthening Consultant Qualifi Under Implement a mise en place d’un systèm IDA / 62120 the Policy and Institutional F Post Limited 200,000.00 0.00 2022-11-22 2022-11-11 2022-12-06 2022-12-27 2023-01-06 2023-04-06 cation Selection ation e d’alerte précoce sur le litto ramework ral ivoirien dans le cadre du Programme d’Investissement Régional de Résilience des Z ones Côtières en Afrique de l’ Oues CI-WACA CI-359459-CS-CQS- 23 / Recrutement d’un consul Component 2: Strengthening tant pour l’élaboration du pro Consultant Qualifi Under Implement IDA / 62120 the Policy and Institutional F Post Open - National 100,000.00 0.00 2023-05-18 2023-05-23 2023-06-01 2023-06-07 2023-06-21 2023-06-29 2023-09-27 jet de décret fixant la liste de cation Selection ation ramework s espaces et milieux à préser ver de la zone côtière et les r ègles qui leur sont applicable s INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-WACA CI-110036-CS-INDV Component 4: National Coor Individual Consult / Recrutement d'un Spécialist IDA / 62120 Post Open 22,000.00 31,208.40 Completed 2019-04-17 2019-06-05 2019-05-08 2019-07-17 2019-05-13 2019-07-23 2019-06-02 2019-08-20 2019-11-29 2019-08-20 dination ant Selection e en Développement instituti onnel CI-WACA CI-110037-CS-INDV Component 4: National Coor Individual Consult / Recrutement d'un Spécialist IDA / 62120 Post Open 48,000.00 3,120,840.00 Signed 2019-04-22 2019-03-08 2019-05-18 2019-05-02 2019-05-25 2019-05-15 2019-06-09 2019-06-18 2019-12-06 dination ant Selection e en Gestion du littoral CI-WACA CI-110040-CS-INDV Component 4: National Coor Individual Consult / Recrutement d'un Spécialist IDA / 62120 Post Open 48,000.00 58,408.94 Signed 2019-04-23 2019-11-13 2019-05-22 2020-02-21 2019-06-01 2020-03-12 2019-06-16 2020-03-21 2019-12-13 2020-03-21 dination ant Selection e en sauvegarde social CI-WACA CI-110042-CS-INDV Component 4: National Coor Individual Consult IDA / 62120 Post Open 6,000.00 14,563.92 Completed 2019-04-16 2019-01-14 2019-04-25 2019-03-20 2019-04-30 2019-05-15 2019-05-07 2019-05-29 2019-11-03 2019-06-13 / Recrutement de deux (02) c dination ant Selection hauffeurs CI-WACA CI-110045-CS-INDV Component 4: National Coor Individual Consult / Recrutement d'une assistan IDA / 62120 Post Open 12,000.00 19,752.32 Completed 2019-04-15 2019-01-18 2019-05-01 2019-02-26 2019-05-08 2019-04-06 2019-05-23 2019-05-15 2019-11-19 2019-06-06 dination ant Selection te de direction CI-WACA CI-110050-CS-INDV / Recrutement d'un consultan Component 4: National Coor Individual Consult IDA / 62120 Post Open 35,000.00 56,877.74 Signed 2019-04-29 2020-10-05 2019-05-25 2020-10-27 2019-06-04 2020-12-17 2019-07-02 2021-01-28 2019-12-29 t individuel pour l'évaluation, dination ant Selection la détermination et le ciblage des AGR CI-WACA CI-110052-CS-INDV / Recrutement d'un cabinet p Component 3: Strengthening Individual Consult our l'étude pour fournir les d IDA / 62120 National Physical and Social Post Open 52,000.00 46,583.92 Completed 2019-04-16 2019-06-13 2019-05-01 2018-07-10 2019-05-02 2018-07-16 2019-05-10 2019-01-10 2019-11-06 2019-01-10 ant Selection onnées socio-économiques d Investments e base de la zone pilote CI-WACA CI-110156-CS-CQS / Recrutement d'un consultan Component 3: Strengthening Individual Consult t individuel pour la réalisatio IDA / 62120 National Physical and Social Post Open 40,000.00 30,131.71 Completed 2019-06-25 2019-09-02 2019-07-21 2019-12-05 2019-07-26 2019-11-25 2019-08-30 2020-02-05 2020-02-26 2020-02-06 ant Selection n de l'étude de faisabilité po Investments ur la réhabilitation et la plant ation de mangroves CI-WACA CI-110172-CS-CDS / Contrat avec le consultant i nternational Jean POMMIER p Component 2: Strengthening our le transfert de compéten IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 7,000.00 6,297.12 Signed 2019-05-14 2020-02-13 2019-05-24 2020-04-06 2019-06-23 2020-04-24 2019-07-23 ces pour la gestion du géo po ramework rtail du système de gestion d e l'information environnemen tale (SGIE) CI-WACA CI-110178-CS-INDV Component 2: Strengthening / Recrutement d'un consultan Individual Consult IDA / 62120 the Policy and Institutional F Post Open 7,500.00 0.00 Canceled 2019-05-14 2019-06-09 2019-06-19 2019-07-06 2019-08-05 t national pour l'intégration d ant Selection ramework es données du SGIE CI-WACA CI-110179-CS-INDV / Recrutement d'un consultan Component 2: Strengthening Individual Consult t national pour la collecte de IDA / 62120 the Policy and Institutional F Post Open 7,500.00 13,459.13 Signed 2019-05-24 2020-08-03 2019-06-22 2020-09-02 2019-07-02 2020-09-25 2019-07-22 2020-12-09 2019-08-21 ant Selection s données en vue de l'actuali ramework sation y compris la formation de l'administrateur CI-WACA CI-110184-CS-INDV / Recrutement d'un consultan t individuel pour faire l'état d es lieux des capacités des str Component 2: Strengthening Individual Consult uctures nationales pouvant f IDA / 62120 the Policy and Institutional F Post Open 20,000.00 17,514.30 Completed 2019-04-23 2019-09-02 2019-05-17 2019-12-17 2019-05-27 2020-01-16 2019-06-13 2020-02-12 2019-07-13 2020-06-16 ant Selection ournir des informations hydr ramework oclimatiques en vue du renfo rcement de leurs plateaux te chniques (SODEXAM, ONPC, plateforme nationale RRC, C RO, CI-WACA CI-110202-CS-INDV / Recrutement d'un consultan t pour l'élaboration du projet Component 2: Strengthening Individual Consult de décret et du costing porta IDA / 62120 the Policy and Institutional F Post Open 20,000.00 16,949.14 Completed 2019-04-15 2019-06-13 2019-04-30 2018-12-10 2019-05-05 2018-11-29 2019-05-17 2019-01-16 2019-06-16 2019-01-16 ant Selection nt création, attribution, orga ramework nisation et fonctionnement d e l'Agence Nationale de Gesti on Intégrée du Littoral (ANGI L) Page 9 CI-WACA CI-130034-CS-INDV / Recrutement d'un consultan Component 4: National Coor Individual Consult t individuel pour le paramétr IDA / 62120 Post Open 20,000.00 26,064.27 Completed 2019-09-18 2019-09-24 2019-10-14 2019-12-04 2019-10-24 2019-12-10 2019-11-17 2020-01-18 2019-12-17 2020-02-03 dination ant Selection age et l'installation d'un syst ème d'archivage électroniqu e des documents du projet CI-WACA CI-110164-CS-CDS / Contrat avec GLOBAL DATA BASE pour la mise en place d Component 2: Strengthening ’une plateforme de partage d IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 49,095.00 57,938.20 Completed 2020-03-20 2020-03-26 2020-04-01 2020-04-03 2020-05-05 2020-06-21 2020-11-01 2020-08-20 es données de l’observatoire ramework nationale du littoral de Côte d’Ivoire dans le cadre du Proj et WACA-ResIP CI-WACA CI-164287-CS-CDS / CONTRAT AVEC MADAME M Component 4: National Coor adame KOFFI Adjoua Olga Ep IDA / 62120 Post Direct Selection Direct 21,600.00 1,629.16 Completed 2020-03-16 2017-10-10 2020-03-26 2020-03-10 2020-04-15 2020-03-21 2020-12-31 2020-03-21 dination ouse KOUAKOU en qualité d' Assistante en Passation des Marchés du projet WACA CI-WACA CI-164291-CS-CDS / CONTRAT AVEC MADEMOIS Component 4: National Coor IDA / 62120 Post Direct Selection Direct 18,600.00 1,402.89 Completed 2020-03-16 2018-08-02 2020-03-26 2020-03-10 2020-04-15 2020-03-21 2020-12-31 2020-03-21 ELLE Djekankou DIOUBATE e dination n qualité d'Assistante Compt able du projet WACA CI-WACA CI-164502-CS-INDV / Recrutement d'un consultan t pour la mise en place du sy stème (permettant aux orga Component 3: Strengthening Individual Consult nes d'enregistrer, de commu IDA / 62120 National Physical and Social Post Open 10,000.00 14,427.80 Signed 2020-05-28 2020-06-24 2020-06-23 2020-07-15 2020-06-28 2020-09-03 2020-07-13 2020-11-07 2020-08-12 ant Selection niquer les plaintes automatiq Investments uement à l'UCP et d'avoir l'ét at de traitement de chaque p lainte) et la fourniture des éq uipements associés (tablette s CI-WACA CI-164506-CS-CDS / Contrat avec le consultant Component 2: Strengthening MAP APPLICATION BUILDING IDA / 62120 the Policy and Institutional F Post Direct Selection Direct 6,000.00 5,418.61 Completed 2020-03-23 2020-03-26 2020-04-02 2020-04-09 2020-04-24 2020-06-18 2021-04-24 2020-07-22 (MAB) pour l'hébergement d ramework e relooking et la maintenanc e du site internet de SGIE CI-WACA CI-164515-CS-CDS / Renouvellement du contrat Component 1: Strengthening avec OUATTARA Hafsa en qu IDA / 62120 Post Direct Selection Direct 40,800.00 3,048.02 Completed 2020-09-22 2020-06-15 2020-10-02 2020-07-30 2020-12-06 2020-08-13 2021-09-30 2020-08-13 Regional Integration alité de Spécialiste en dévelo ppement institutionnel du pr ojet WACA CI-WACA CI-164516-CS-CDS / Contrat avec BONI Aya Mari Component 4: National Coor Under Implement IDA / 62120 Post Direct Selection Direct 55,200.00 0.00 2020-09-20 2019-11-04 2020-09-30 2020-12-04 2021-06-02 e Epouse Mme EBROTTIE en dination ation qualité de Spécialiste en com munication CI-WACA CI-164518-CS-CDS / Renouvellement du contrat Component 4: National Coor IDA / 62120 Post Direct Selection Direct 22,200.00 1,664.47 Completed 2020-04-23 2020-04-27 2020-05-03 2020-04-24 2020-06-17 2020-06-16 2020-07-13 2020-06-16 avec AMBEU Assi Anin Rachel dination Epouse OMOKPRA CI-WACA CI-164519-CS-CDS / Renouvellement des contrat Component 4: National Coor s avec OUATTARA Salifou et IDA / 62120 Post Direct Selection Direct 16,800.00 634.92 Completed 2020-04-22 2020-06-06 2020-05-02 2020-06-15 2020-06-30 2020-06-16 2021-06-30 2020-06-16 dination GBEGBE Michel en qualité de chauffeurs du projet WACA CI-WACA CI-164520-CS-CDS Component 4: National Coor Under Implement / Contrat avec KOFFI N'Gbin IDA / 62120 Post Direct Selection Direct 20,400.00 0.00 2020-03-16 2020-01-06 2020-03-18 2020-03-25 2021-03-25 dination ation Denis en qualité de Comptabl e CI-WACA CI-164523-CS-CDS / Contrat avec KOUAKOU He Component 4: National Coor Under Implement mman Ulrich Thibault en qual IDA / 62120 Post Direct Selection Direct 32,700.00 0.00 2020-03-16 2019-10-01 2020-03-19 2019-09-23 2020-03-27 2021-03-27 dination ation ité de Spécialiste Multimédia et Chargé de l'informatique CI-WACA CI-164530-CS-CDS / Contrat avec GONGBEÏ Gon Component 4: National Coor Under Implement IDA / 62120 Post Direct Selection Direct 32,700.00 0.00 2020-03-16 2020-11-02 2020-03-26 2020-05-30 2021-05-30 san Mathieu en qualité de Sp dination ation écialiste en Evaluation Enviro nnementale CI-WACA CI-164494-CS-INDV / Recrutement d'un consultan Component 2: Strengthening t national pour la collecte de Individual Consult Under Implement IDA / 62120 the Policy and Institutional F Post Open 15,000.00 0.00 2020-06-08 2020-07-09 2020-07-12 2020-08-01 2020-09-15 s données en vue de l'actuali ant Selection ation ramework sation et l’intégration des do nnées dans le nouveau géop ortail CI-WACA CI-177341-CS-CDS / CONTRAT AVEC COSIT POU Component 4: National Coor R L’EXTENSION ET LA MISE A IDA / 62120 Post Direct Selection Direct 12,850.00 11,659.95 Signed 2020-06-04 2020-06-29 2020-06-14 2020-07-01 2020-07-13 2020-07-24 2020-08-07 dination JOUR DE L'APPLICATION DE S UIVI-EVALUATION RUCHE CI-WACA CI-125428-CS-INDV / Recrutement d'un consultan Component 3: Strengthening Individual Consult Under Implement t individuel pour la formation IDA / 62120 National Physical and Social Post Open 12,000.00 0.00 2020-10-22 2020-10-26 2020-11-25 2020-12-10 2021-01-08 2021-02-07 ant Selection ation des membres des Comités d Investments e gestion des plaintes sur leu rs rôles CI-WACA CI-213248-CS-CDS / ETUDE DE FAISABILITE DE L Component 3: Strengthening 'OPTION D'ADAPTATION CHOI IDA / 62120 National Physical and Social Post Direct Selection Direct 1,500,000.00 1,281,161.52 Completed 2021-01-28 2021-02-16 2021-02-07 2021-02-15 2021-03-29 2021-04-29 2022-01-23 2021-11-24 SIE POUR LA STABILITE DU C Investments ORDON SABLEUX FDE GRAN D-LAHOU CI-WACA CI-218809-CS-INDV -KK-21 / Recrutement d'un co Component 3: Strengthening Individual Consult nsultant pour l'étude de faisa IDA / 62120 National Physical and Social Post Open 30,000.00 36,706.67 Signed 2021-07-28 2021-07-09 2021-09-15 2021-09-01 2021-10-06 2021-09-15 2021-11-10 2021-10-06 2022-05-09 ant Selection bilité pour la mise en place d' Investments une antenne relai téléphoniq ue au profit de 04 villages CI-WACA CI-218823-CS-CQS- KK-21 / Recrutement d'un pr estataire pour la planification Component 3: Strengthening Individual Consult des parcs à bois et la formati IDA / 62120 National Physical and Social Post Open 30,000.00 34,286.40 Completed 2021-04-12 2021-08-25 2021-05-31 2021-09-02 2021-06-21 2021-09-14 2021-07-26 2021-11-11 2022-01-22 2021-12-21 ant Selection on des communautés à la ge Investments stion durable des ressources en bois dans les villages coti ers Page 10 CI-WACA CI-222298-CS-INDV -KK-21 / REALISATION DE L'E Component 3: Strengthening Individual Consult Pending Impleme VALUATION ENVIRONNEMEN IDA / 62120 National Physical and Social Post Open 34,000.00 0.00 2021-07-07 2021-08-25 2021-09-15 2021-10-20 2022-04-18 ant Selection ntation TAL ET SOCIAL POUR LA CRE Investments ATION DES PARCS A BOIS CI-WACA CI-218832-CS-CDS- KK-21 / Renouvellement du c Component 4: National Coor Pending Impleme IDA / 62120 Post Direct Selection Direct 42,000.00 0.00 2021-03-10 2021-03-20 2021-05-24 2021-11-20 ontrat de la spécialiste en dé dination ntation veloppement institutionnelle de l'UCP WACA CI-WACA CI-222306-CS-INDV Component 4: National Coor Individual Consult -KK-21 / BILAN A MI-PARCOU IDA / 62120 Post Open 50,000.00 70,013.64 Signed 2021-05-17 2021-05-10 2021-07-05 2021-07-28 2021-07-26 2021-08-12 2021-08-30 2021-09-08 2022-02-26 dination ant Selection RS DU PROJET CI-WACA CI-221931-CS-CDS- Component 3: Strengthening KK-21 / ASSISTANCE A MAITR Pending Impleme IDA / 62120 National Physical and Social Post Direct Selection Direct 20,000.00 0.00 2021-03-25 2021-04-04 2021-06-08 2021-12-05 ISE D'OUVRAGE A LA PLANTA ntation Investments TION DES MANGROVE CI-WACA CI-222308-CS-CDS- KK-21 / CONVENTION AVEC L' UIAP POUR LA PRISE EN CHA Component 4: National Coor Pending Impleme IDA / 62120 Post Direct Selection Direct 709,426.00 0.00 2021-05-18 2021-05-28 2021-08-01 2022-01-28 RGE DU PERSONNEL ET DE C dination ntation ERTAINES ACTIVITES DE FON CTIONNEMENT DU PROJET W ACA CI-WACA CI-234828-CS-INDV -KK-21 / Renouvellement du Component 4: National Coor Individual Consult Pending Impleme IDA / 62120 Post Open 40,800.00 0.00 2021-05-27 2021-07-15 2021-08-05 2021-09-09 2022-03-08 Chargé de Communication M dination ant Selection ntation ultiMedia et Responsable Info rmatique CI-WACA CI-234799-CS-INDV -KK-21 / RENOUVELLEMENT Component 4: National Coor Pending Impleme IDA / 62120 Post Direct Selection Direct 22,200.00 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE L'ASSISTAN dination ntation CE DE DIRECTION DU PROJET WACA CI-WACA CI-234803-CS-INDV -KK-21 / RENOUVELLEMENT Component 4: National Coor Under Implement IDA / 62120 Post Direct Selection Direct 21,600.00 0.00 2021-06-07 2021-04-16 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE L'ASSISTAN dination ation TE SPECIALISTE EN PASSATIO N DES MARCHES CI-WACA CI-234805-CS-INDV Component 4: National Coor Pending Impleme -KK-21 / RENOUVELLEMNT D IDA / 62120 Post Direct Selection Direct 19,200.00 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 dination ntation U CONTRAT DE L'ASSISTANT E COMPTABLE CI-WACA CI-234820-CS-INDV Component 4: National Coor Pending Impleme -KK-21 / RENOUVELLEMENT IDA / 62120 Post Direct Selection Direct 16,800.00 0.00 2021-06-07 2021-06-17 2021-08-21 2022-02-17 dination ntation DU CONTRAT DES CHAUFFEU RS CI-WACA CI-234832-CS-CDS- Component 4: National Coor Pending Impleme KK-21 / CONTRAT AVEC M.KO IDA / 62120 Post Direct Selection Direct 52,800.00 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 dination ntation UAKOU Kouassi Lanzaré CI-WACA CI-234831-CS-CDS- KK-21 / CONTRAT AVEC N'GB Component 4: National Coor Pending Impleme IDA / 62120 Post Direct Selection Direct 60,000.00 0.00 2021-06-08 2021-06-18 2021-08-22 2022-02-18 EKE AMON SOSTHENE FELIX, dination ntation RESPONSABLE ADMINISTRATI F ET FINANCIER CI-WACA CI-234796-CS-INDV -KK-21 / RENOUVELLEMENT Component 4: National Coor Under Implement IDA / 62140 Post Direct Selection Direct 40,800.00 0.00 2021-06-07 2021-02-03 2021-06-17 2021-08-21 2022-02-17 DU CONTRAT DE LA SPECIALI dination ation STE EN DEVELOPPEMENT INS TITUTIONNEL CI-WACA CI-234826-CS-CDS- KK-21 / Contrat avec M. IRO Component 4: National Coor Pending Impleme IDA / 62120 Post Direct Selection Direct 54,000.00 0.00 2021-06-04 2021-06-14 2021-08-18 2022-02-14 Koulai Marius Vidal, Spécialis dination ntation te en Suivi Evaluation CI-WACA CI-239850-CS-QCB S-KK-21 / Recrutement d’un Consultant individuel pour l’é Component 3: Strengthening laboration d’un Plan d’Action Individual Consult IDA / 62120 National Physical and Social Post Open 80,000.00 64,969.82 Completed 2021-06-28 2021-07-22 2021-08-02 2021-09-02 2021-08-17 2021-09-22 2021-09-15 2021-10-09 2021-11-14 2021-11-24 de Réinstallation involontaire ant Selection Investments (PAR) relatif aux travaux de s tabilisation du cordon sableu x et de l’aménagement de l’e mbouchure de Grand-Lahou CI-WACA CI-218798-CS-INDV -KK-21 / Recrutement d'un co nsultant pour l'élaboration du projet de décret fixant les mo Component 2: Strengthening Individual Consult Under Implement dalités de mise en œuvres d IDA / 62120 the Policy and Institutional F Post Limited 20,000.00 0.00 2021-11-11 2021-10-22 2021-11-16 2021-12-07 2022-01-11 2022-07-10 ant Selection ation es instruments de protection ramework du littoral (article 7) y compr is le décret fixant la liste des espaces et milieux à préserv er (article 46) CI-WACA CI-260616-CS-INDV Component 4: National Coor Individual Consult Pending Impleme -BV-21 / RECRUTEMENT DU R IDA / 62120 Post Open 15,000.00 0.00 2021-12-01 2022-01-19 2022-02-09 2022-03-16 2022-07-14 dination ant Selection ntation ESPONSABLE DES SERVICES COMMUNS CI-WACA CI-260623-CS-INDV -BV-21 / RECRUTEMENT D'UN CONSULTANT POUR L’ÉVALU ATION ET SOCIALE (CIES/EIES Component 3: Strengthening Individual Consult Pending Impleme ) DES TRAVAUX DE DÉBOUC IDA / 62120 National Physical and Social Post Open 70,000.00 0.00 2021-12-20 2022-02-07 2022-02-28 2022-04-04 2022-10-01 ant Selection ntation HAGE ET ENTRETIEN DU RÉS Investments EAU PLUVIAL ET DE CONSTR UCTION D'UNE ANTENNE REL AI AU PROFIT DES COMMUNA UTÉS DE LA ZONE PILOTE DU PROJET WACA CI-WACA CI-266708-CS-INDV / Recrutement d'un consultan Component 2: Strengthening Individual Consult t individuel pour l'intégration IDA / 62120 the Policy and Institutional F Post Limited 17,000.00 11,905.04 Signed 2022-01-05 2021-12-17 2022-01-10 2022-01-14 2022-01-31 2022-06-10 2022-03-07 2022-07-25 2022-09-03 ant Selection du réseau dans le système g ramework éodésique national (secteur Abidjan-Assinie) CI-WACA CI-309044-CS-INDV Component 3: Strengthening / Recrutement de trois (03) C Individual Consult Under Implement IDA / 62120 National Physical and Social Post Limited 18,000.00 0.00 2022-08-30 2022-08-25 2022-08-31 2022-09-21 2022-09-29 2022-10-20 onsultants pour la formation ant Selection ation Investments des acteurs locaux de la filièr e pesticide Page 11 CI-WACA CI-266710-CS-INDV / Recrutement d'un consultan t individuel pour l'étude de fa Component 3: Strengthening isabilité du comblement et m Individual Consult IDA / 62120 National Physical and Social Post Limited 60,000.00 0.00 Canceled 2021-12-13 2021-12-17 2021-12-18 2022-01-08 2022-02-12 2022-08-11 ise en sécurité des trois zone ant Selection Investments s de glissement majeure sur Grand-Lahou et du débaucha ge et entretien du réseau flu vial /gestion des déchets CI-WACA CI-309058-CS-INDV / Recrutement d'un prestatai Component 3: Strengthening re pour la plantation des parc Individual Consult Under Implement IDA / 62120 National Physical and Social Post Open - National 100,000.00 0.00 2022-09-14 2022-09-14 2022-10-07 2022-10-28 2022-11-07 2023-07-05 s à bois et la formation des c ant Selection ation Investments ommunautés à la gestion dur able des ressources au profit de 4 villages côtiers CI-WACA CI-319789-CS-CDS- BV 22 / Recrutement d'un ex Component 3: Strengthening Under Implement pert mangroves pour l'appui IDA / 62120 National Physical and Social Post Direct Selection Direct - National 30,000.00 0.00 2022-10-17 2023-01-31 2022-10-21 2022-11-25 2023-11-25 ation à la réhabilitation et le rebois Investments ement des champs de mangr oves CI-WACA CI-260626-CS-INDV -BV-21 / Recrutement d’un(e) consultant(e) pour la réalisati on d’un diagnostic complet p Component 2: Strengthening Individual Consult our la mise en place d’un sys IDA / 62120 the Policy and Institutional F Post Open 100,000.00 0.00 Canceled 2022-01-04 2021-12-17 2022-01-31 2022-02-21 2022-03-28 2022-09-24 ant Selection tème d’alerte précoce sur le l ramework ittoral ivoirien dans le cadre du Programme d’Investissem ent Régional de Résilience de s Zones Côtières en Afrique d e CI-WACA CI-325382-CS-CDS- BV 22 / Recrutement d’un co nsultant à l’appui à l’élaborat ion d’un projet de décret port Component 2: Strengthening Under Implement ant approbation du Plan d’A IDA / 62120 the Policy and Institutional F Post Direct Selection Direct - National 12,000.00 0.00 2022-11-17 2023-02-03 2022-11-21 2023-02-06 2022-12-12 2023-01-11 ation ménagement et de gestion In ramework tégrée du Littoral (PAGIL) da ns le cadre du Projet d’Invest issement pour la Résilience d es Zones Côtières Ouest-afric aine CI-WACA CI-357703-CS-INDV -23 / Recrutement d’un cons Component 2: Strengthening Individual Consult Under Implement ultant individuel pour l’intégr IDA / 62120 the Policy and Institutional F Post Open - National 50,000.00 0.00 2023-05-15 2023-05-23 2023-06-09 2023-06-23 2023-07-02 2023-09-30 ant Selection ation ation du réseau dans le systè ramework me géodésique national du s ecteur Tabou à Abidjan Page 12 Procurement 1. Procurement for the proposed project will be carried out in accordance with: World Bank’s "Guidelines: Procurement of Goods, Works and Non- Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" of January 2011, revised July 2014 (Procurement Guidelines); "Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" of January 2011, revised July 2014 (Consultant Guidelines); and the provisions stipulated in the Financing Agreement. “Guidelines on Preventing and Combating Fraud and Corruption in projects Financed by IBRD Loans and IDA Credits and Grants” dates October 15, 2006 and updated January 2011, shall also apply to the Project. Unless otherwise agreed with the Bank, the Bank’s Standard Bidding Documents, Requests for Proposals, and Forms of Consultant Contract will be used. 2. In case of conflict between the Bank’s procurement procedures and any national rules and regulations, the Bank’s procurement procedures will take precedence. The general descriptions of various items under different expenditure categories are described below. For each contract to be financed by the Credit, the different procurement methods or consultant selection methods, the need for prequalification, estimated costs, prior review requirements, and time frames are agreed between the Borrower and the Bank project team and included in the initial Procurement Plan. 3. Retroactive Financing. If requested by the Borrower, the IDA may provide retroactive financing under the IDA Credit. Retroactive financing may only be provided when: (a) the activities financed by retroactive financing are related to the Development Objectives and are included in the project description; (b) the payments are for items procured in accordance with the applicable Bank procurement procedures; (c) the total amount of retroactive financing is SDR 815,000 (US$1.125 million equivalent) or less; and (d) the payments are made by the Borrower prior to the date of the Financing Agreement but on or after January 1, 2016 for eligible expenditures. 4. Procurement of Works. Works procured under this project shall be procured following International Competitive Bidding and National Competitive Bidding and may involve shopping in some cases. Bank standard documents will be used for International Competitive Bidding contracts. Standard Bidding Documents of the Borrower as agreed with the Bank will be used for National Competitive Bidding contracts. Procurement of such works shall be guided by the provisions applicable to those as laid down in the corresponding paragraphs of Procurement Guidelines as well as the processes detailed out in the POM of the project. 5. Procurement of Goods. Goods procured under this project shall be done using Bank’s SBDs for all International Competitive Bidding and National Standard Bidding Documents agreed with (or satisfactory to) the Bank for all National Competitive Bidding and Shopping. Small value procurements (up to US$500 or equivalent) may be carried out following Direct Contracting. 6. The following methods will be applicable for procurement of Goods and Works and Non-Consulting Services, consistent with the relevant sections of the Bank’s Procurement Guidelines:  International Competitive Bidding;  National Competitive Bidding;  Shopping (Quotations);  Direct Contracting;  Force Account; and  Community Participation. 7. Requirements under National Competitive Bidding. In order to ensure economy, efficiency, transparency and broad consistency with the provisions of the Procurement Guidelines, goods, works, and non-consultant services procured under the National Competitive Bidding method shall be subject to the following requirements: (i) Only the model bidding documents for National Competitive Bidding agreed with the Bank shall be used for bidding; (ii) Invitations for bids will be advertised in at least one widely circulated national daily newspaper, and bidding documents will be made available at least twenty one (21) days before, and issued up to, the deadline for submission of bids; (iii) Qualification criteria will be stated in the bidding documents, and if a registration process is required, a foreign firm declared as the lowest evaluated responsive bidder shall be given a reasonable time for registering, without let or hindrance; (iv) Bids will be opened in public in one location, immediately after the deadline for the submission of bids, as stipulated in the bidding document (the bidding document will indicate the date, time and place of bid opening); (v) Except in cases of force majeure or exceptional situations beyond the control of the implementing agency, the extension of bid validity will not be allowed; (vi) Bids will not be rejected merely on the basis of a comparison with an official estimate; (vii) Except with the prior concurrence of the Bank, there will be no negotiation of price with bidders, even with the lowest evaluated bidder; (viii) A bidder's bid security will apply only to the specific bid, and a contractor’s performance security will apply only to the specific contract under which they are furnished; and (ix) Bids will not be invited on the basis of percentage premium or discount over the estimated cost, unless agreed with the Bank. 8. Selection of Consultants. Major consultancy services to be procured shall follow the World Bank guidelines for selection of consultants and standard documents of the Bank shall be used. Short lists of consultants for services estimated to cost less than US$300,000 or equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The Bank’s Standard Request for Proposal (April 2015) will be used as a base for all procurement of consultancy services under the project. The following methods will be applicable for selection of consultants, consistent with the relevant sections of the Bank’s Consultant Guidelines:  Quality- and Cost- Based Selection;  Quality-Based Selection;  Least Cost Selection;  Fixed Budget Selection;  Selection based on Consultants’ Qualifications: for services estimated to cost less than US$300,000 equivalent per contract, in accordance with the provisions of paragraph 3.7 of the Consultant Guidelines;  Single-Source Selection;  Selection of Individual Consultants as set forth in paragraphs 5.2 and 5.3 of the “Consultant Guidelines” ; and  Sole Source Procedures for the Selection of Individual Consultants. 9. Thresholds for Procurement Methods and Prior Review. Review thresholds and requirements for different methods of procurement of works, goods, non-consulting services and selection of Consultants based on the current procurement risk rating are listed in the table below. 10. These thresholds and review requirements may be modified on the basis of reassessed risk ratings during project implementation in agreement with the Bank. Table 3.3 Thresholds for procurement methods and prior review Expendit Contract Value Procurement Contracts/Processes ure (Threshold) Method Subject to Prior Category Review Works ≥US$7,500,000 International All contracts Competitive Bidding